222235 | 1/18/2018 |
Anthony Furr - Sara Stratton Comments Further Response as Commenter-Protestant (3 of 3) Proof of Service 2 page(s)
| | CEC/Docket Unit | Anthony Furr - Sara Stratton |
222234 | 1/18/2018 |
Anthony Furr - Sara Stratton Comments Further Response as Commenter-Protestant (2 of 3) Unsigned Declaration of Service by Eric Sayre 2 page(s)
| | CEC/Docket Unit | Anthony Furr - Sara Stratton |
222233 | 1/18/2018 |
Anthony Furr - Sara Stratton Comments Further Response as Commenter-Protestant (1 of 3) Letter 7 page(s)
| | CEC/Docket Unit | Anthony Furr - Sara Stratton |
210282 | 2/11/2016 |
Order Denying Extension of Construction Deadline and Granting Ownership Transfer Commission Order Denying Palen SEGS I, LLC Petition for an Extension of the Construction Deadline and Granting the Ownership Transfer from Palen SEGS I, LLC to Maverick Solar, LLC. 4 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
210263 | 2/10/2016 |
Order Denying Petition for Extension of Construction Deadline Unsigned version of the ENERGY COMMISSION ORDER DENYING THE PETITION FOR EXTENSION OF DEADLINE FOR COMMENCEMENT OF CONSTRUCTION . 4 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
210258 | 2/9/2016 |
Comments on Petition for Transfer of Ownership and Petition for Extension of Deadline
2 page(s)
| | CEC/Commissioners | San Bernardino County/Gregory C. Devereaux |
210154 | 2/4/2016 |
Letter to CEC Re: 2/10/16 Palen Hearing N/A
| | | County of Kings |
210144 | 2/3/2016 |
Supplemental Opposition to Extension
18 page(s)
| | | Center for Biological Diversity |
210137 | 2/3/2016 |
Letter to CEC RE: 2/10/16 Palen Hearing
5 page(s)
| | | County of Riverside |
210136 | 2/3/2016 |
Intervenor CRIT Comments on Petitioner's Answers to Questions
| | | Shute, Mihaly & Weinberger LLP |
210135 | 2/3/2016 |
Staff Response to Palen SEGS I, LLC's Petition for Ownership Transfer and Petition for Extension of Deadline For Commencement of Construction 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
208653 | 1/22/2016 |
Petitioner's Response to Questions Posed in Notice of Energy Commission's Hearing on Petition for Ownership Palen SEGS I response to 11 Jan 2016 Notice of Hearing Compliance 24 page(s)
| | Commission | Marten Law |
208185 | 1/20/2016 |
County of Riverside letter re ownership tranfer
1 page(s)
| | CEC/Dockets Unit | County of Riverside |
207270 | 1/11/2016 |
Notice of Energy Commission Hearing on Petition for Ownership Transfer from Palen SEGS I, LLC to Maverick Solar, LLC & Petitions
5 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
207216 | 1/7/2016 |
OPPPOSITION TO SECOND PETITION FOR EXTENSION
3 page(s)
| | CEC/Dockets Unit | Basin and Range Watch |
207197 | 1/6/2016 |
Notice of Receipt - Request to Transfer Ownership for the Palen Solar Power Project
2 page(s)
| | Public | California Energy Commission |
207196 | 1/6/2016 |
Colorado River Indian Tribes Response to Second Petition for Extension of Deadline For Commencement of Construction 4 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
207189 | 1/5/2016 |
Center OPPPOSITION TO DECEMBER 22, 2015 PETITION FOR EXTENSION OF DEADLINE FOR COMMENCEMENT OF CONSTRUCTION
11 page(s)
| | Commission | Center for Biological Diversity |
207099 | 12/22/2015 |
Petition for Extension of Deadline for Commencement of Construction
Compliance 6 page(s)
| | CEC | Marten Law |
207035 | 12/15/2015 |
Graham Declaration Declaration in support Compliance 2 page(s)
| | CEC | Marten Law |
207034 | 12/15/2015 |
Petition re: Transfer of Ownership
Compliance 2 page(s)
| | CEC/Docket Unit | Marten Law |
206118 | 9/16/2015 |
Order Granting Extension of Time to Construct
2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206018 | 9/8/2015 |
Colorado River Indians Tribes' Supplemental Response to Petition to Extend - Commencement of Construction Cultural Resources 3 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
206011 | 9/4/2015 |
Letter Regarding Extension
2 page(s)
| | CEC/Docket Unit | County of Riverside |
206003 | 9/3/2015 |
Alfredo A. Figueroa Comments: Opposition to Extension for Palen Project
Cultural Resources 9 page(s)
| | | Alfredo A. Figueroa |
205999 | 9/3/2015 |
Linda Stanley Comments: I say No to this solar project... you should too.
Biological Resources 1 page(s)
| | CEC/ Docket Unit | Linda Stanley |
205994 | 9/2/2015 |
Response and Continued Opposition to the Petition for Extension of Deadline for Commencement of Construction
3 page(s)
| | | Basin and Range Watch |
205989 | 9/2/2015 |
Basin and Range Watch Comments: Response and Continued Opposition to the Petition for Extension of Deadline - For Commencement of Construction 4 page(s)
| | CEC/Docket Unit | Basin and Range Watch /Kevin Emmerich |
205977 | 9/1/2015 |
Comments: Oppose Extension On Palen Construction Permit
Compliance 3 page(s)
| | CEC/Docket Unit | California Desert Organizations |
205970 | 9/1/2015 |
Supplemental Opposition to Extension
3 page(s)
| | | Center for Biological Diversity |
205962 | 9/1/2015 |
Energy Commission Staff’s Statement Regarding the Petition for Extension of the Construction Deadline
4 page(s)
| | CEC/Docket Unit | California Energy Commission |
205925 | 8/31/2015 |
Patrick Donnelly Comment - Response to Applicant's Response Response to Applicant's Response to Public Comments on Petition to Extend Deadline for Commencement of Construction 3 page(s)
| | CEC/Docket Unit | Patrick Donnelly |
205882 | 8/27/2015 |
Tom O'Key Comments: Compliance Calif. Desert Organizations Oppose Extending the Deadline for Construction for Palen Solar Power
Land Use 1 page(s)
| | CEC/Karen Douglas | Tom O'Key |
205856 | 8/27/2015 |
Marian Fricano Comments:
Biological Resources 1 page(s)
| | CEC/ Docket Unit | Marian Fricano |
205854 | 8/27/2015 |
Response Letter to Comments on Petition
2 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris LLP |
205826 | 8/25/2015 |
Comments in Opposition to Petition for Extension of Deadline for Commencement of Construction
5 page(s)
| | CEC/ Docket Unit | Quechan Tribe of the Fort Yuma Indian Reservation |
205822 | 8/25/2015 |
Defenders of Wildlife Comments: Urge Denial of Petition to Extend Deadline for Palen Solar Power Project
Compliance 4 page(s)
| | CEC/Docket Unit | Defenders of Wildlife/Kim Delfino |
205813 | 8/25/2015 |
Sierra Club Opposition to Petition to Extend Commencement of Construction
3 page(s)
| | CEC/Docket Unit | Sierra Club |
205797 | 8/24/2015 |
Dennis Morrison Comments: Lost Opportunity
Biological Resources, Project Description, Visual Resources 1 page(s)
| | CEC/Docket Unit | Dennis Morrison |
205796 | 8/24/2015 |
Debbie Bulger Comments: Oppose Palen Solar Permit extension
1 page(s)
| | CEC/Docket Unit | Debbie Bulger |
205778 | 8/19/2015 |
CRIT Response to Petition to Extend Deadlines
| | | Shute, Mihaly & Weinberger LLP |
205776 | 8/19/2015 |
Opposition to Petition for Commencement of Construction
4 page(s)
| | | Basin and Range Watch |
205773 | 8/18/2015 |
Center Opposition to Pet. for Extension of Deadline
7 page(s)
| | | Center for Biological Diversity |
205771 | 8/18/2015 |
Marian Fricano Comments: Petition to Extend the Deadline for Commencement of Construction for the Palen Solar Power Project
Biological Resources 2 page(s)
| | CEC/Docket Unit | Marian Fricano |
205748 | 8/17/2015 |
Public comment from Patrick Donnelly on Opposing Commencement of Construction Comment opposing Petition to Extend Deadline for Palen Solar Power Project 1 page(s)
| | CEC/Docket Unit | Patrick Donnelly |
205702 | 8/12/2015 |
Notice of Receipt Petition to Extend Deadline for Commencement of Construction 2 page(s)
| | CEC/ Docket Unit | California Energy Commission |
205632 | 8/4/2015 |
Petition to Extend Commencement of Construction
7 page(s)
| | | Ellison, Schneider & Harris LLP |
203214 | 10/20/2014 |
Memo re: Removal of the Proof of Service List from the PSEGS website Memorandum regarding removal of the Proof of Service list from the PSEGS website, and explanation of how to continue to receive notices regarding PSEGS. 1 page(s)
| | All Parties on the POS list | Energy Commission Hearing Office |
203124 | 9/29/2014 |
Order Terminating Proceeding Order 1 page(s)
| | Parties | CEC/Karen Douglas |
203116 | 9/26/2014 |
Palen Solar Holdings, LLC's Notice of Withdrawal
1 page(s)
| | CEC/K. Douglas | Galati | Blek LLP |
203114 | 9/26/2014 |
Brian Kessler Comments: I urge you not to approve this large solar complex
Facility Design 1 page(s)
| | CEC/ Docket Unit | Public/ Brian Kessler |
203113 | 9/26/2014 |
Response to Colorado River Indian Tribes' Email re Clarification of PSEGS' Comments Deadline and Preceding Email Chain
3 page(s)
| | Parties | Energy Commission Hearing Office |
203112 | 9/26/2014 |
Response to Center for Biological Diversity's Email re Clarification of PSEGS' Comments Deadline and Preceding Email Chain
4 page(s)
| | Parties | Energy Commission Hearing Office |
203109 | 9/26/2014 |
Pat Flanagen Comments: Project description invalid: CEC approval would be illegal
Biological Resources, Cultural Resources, Project Description, Traffic and Transportation, Visual Resources 6 page(s)
| | CEC/ Karen Douglas/ David Hochschld | Morongo Basin Conservation Association/ Pat Flanagen |
203102 | 9/25/2014 |
Kathryn Hackett-Fields Comments: Letter and Newspaper Article Attachment
3 page(s)
| | CEC/Dockets Unit | Kathryn Hackett-Fields |
203097 | 9/23/2014 |
Letter in Opposition to Palen Project Cocket 09-AFC-07C Cultural Resources 10 page(s)
| | California Energy Commission | La Cuna de Aztlan Sacred Sites Protection Circle |
203096 | 9/23/2014 |
Tamoanchan Power Point Presentation in PDF form Cultural Resources 54 page(s)
| | California Energy Commission | La Cuna de Aztlan Sacred Sites Protection Circle |
203090 | 9/23/2014 |
David Elser Comments: Not in my country
3 page(s)
| | CEC/Dockets Unit | David Elser |
203089 | 9/23/2014 |
Public Comment - Opposition to Final Approval
Alternatives, Biological Resources, Compliance 1 page(s)
| | CEC/Christine Stora | Daniel Nichols |
203086 | 9/21/2014 |
Brian Matthew Swope, M.D. Comments: Save Our Desert
| | | Brian Matthew Swope, M.D. |
203081 | 9/18/2014 |
Parke Ewing Comments: Palen Solar Energy Project
Compliance, Geology/Paleontology, Land Use 1 page(s)
| | CEC/Dockets Unit | Parke Ewing |
203079 | 9/18/2014 |
David Elser Comments: We need green energy
1 page(s)
| | CEC/ Docket Unit | Public/ David Elser |
203076 | 9/17/2014 |
Jane Humphries Comments: Palen Solar Project a Disaster in the Making
Alternatives, Compliance 1 page(s)
| | CEC / Docket Unit | Jane Humphries |
203075 | 9/17/2014 |
Karen McQuade Comments: Palen Project Another Bird Killer
Facility Design 1 page(s)
| | CEC / Docket Unit | Karen McQuade |
203069 | 9/15/2014 |
Memorandum extending the deadline to comment on the Revised Presiding Member's Proposed Decision to October 15, 2014
1 page(s)
| | All parties and the public | Energy Commission Hearing Office |
203062 | 9/15/2014 |
Scott Connelly Comments: Adverse impacts of Palen Project
Biological Resources, Compliance, Geology/Paleontology, Land Use, Visual Resources 3 page(s)
| | CEC/Docket Unit | Scott Connelly |
203061 | 9/15/2014 |
Revised Presiding Member's Proposed Decision (PMPD) Supersedes TN 203059 Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 1181 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
203060 | 9/12/2014 |
Notice of Availability of Revised Presiding Member’s Proposed Decision, Notice of Committee Conference and Commission Hearing Committee Conference on October 6, 2014; Commission Hearing on October 29, 2014. 9 page(s)
| | CEC/Docket | Energy Commission Hearing Office |
203059 | 9/12/2014 |
Revised Presiding Member's Proposed Decision (PMPD) Air Quality, Alternatives, Biological Resources, Socioeconomics, Traffic and Transportation, Cultural Resources, Efficiency, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 1121 page(s)
| | CEC/Docket | Energy Commission Hearing Office |
203018 | 8/29/2014 |
Energy Commission Staff Reply Brief (Reopened Evidentiary Record)
Compliance 13 page(s)
| | CEC/Dockets Unit | California Energy Commission |
203017 | 8/29/2014 |
Reply Brief of Intervenor Center for Biological Diversity
Alternatives, Biological Resources, Compliance, Project Description, Traffic and Transportation 19 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
203015 | 8/29/2014 |
Palen Solar Holdings, LLC's Reply Brief
Biological Resources, Cultural Resources, Project Description, Traffic and Transportation, Alternatives 29 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
203014 | 8/29/2014 |
Colorado River Indian Tribes Rebuttal Brief
Cultural Resources, Project Description, Traffic and Transportation, Visual Resources 13 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
203011 | 8/29/2014 |
Methodology to Assess Potential Glint and Glare Hazards from Concentrating Solar Power Plants (2011) Clifford, et al Article Compliance 9 page(s)
| | CEC/Dockets Unit | California Energy Commission |
203008 | 8/29/2014 |
Ivanpah Solar Electric Generating System Spring 2014 Avian Quarterly Report
Biological Resources 96 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
203007 | 8/29/2014 |
Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee Meeting July 2014
Biological Resources 4 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
202988 | 8/27/2014 |
Alfredo Acosta Figueroa Comments: Oppostion to Palen Solar Power Project
Cultural Resources 18 page(s)
| | CEC / Docket Unit | Alfredo Acosta Figueroa |
202987 | 8/26/2014 |
Comments on Proposed Modification to BIO-16b
Biological Resources 96 page(s)
| | CEC/ Christine Stora | USFWS |
202985 | 8/26/2014 |
Committee Order Granting Intervenor Liuna's Request to Withdraw from Proceeding Order 1 page(s)
| | Parties | California Energy Commission |
202975 | 8/25/2014 |
Regional Bird Migration Numbers for Desert Center, August, 2014
Biological Resources 4 page(s)
| | | Basin and Range Watch |
202970 | 8/21/2014 |
Fox News Article - San Francisco to Tally Bird-into-Window Death Toll
Biological Resources 1 page(s)
| | | Galati | Blek LLP |
202966 | 8/20/2014 |
Susan Kraemer Comments: Refuting the claim that batteries are a cheaper substitute for CSP storage
Alternatives 2 page(s)
| | CEC/Dockets Unit | Susan Kraemer |
202965 | 8/20/2014 |
Susan Kraemer Comments: A Solyndra-like media circus over avian mortality endangers California's future
Biological Resources 1 page(s)
| | CEC/Dockets Unit | Susan Kraemer |
202939 | 8/18/2014 |
Opening Brief From Basin and Range Watch
Traffic and Transportation, Alternatives, Biological Resources, Cultural Resources 5 page(s)
| | | Basin and Range Watch |
202935 | 8/15/2014 |
Center for Biological Diversity Opening Brief for Reopened Hearings Opening Brief Compliance, Project Description, Alternatives, Biological Resources 32 page(s)
| | | Center for Biological Diversity |
202934 | 8/15/2014 |
CEC Staff's Palen Opening Brief - Reopener - FINAL
Compliance 9 page(s)
| | CEC/Dockets | California Energy Commission |
202933 | 8/15/2014 |
Intervenor CRIT Opening Brief (Reopened Evidentiary Proceedings)
Biological Resources, Cultural Resources, Project Description, Traffic and Transportation
| | | Shute, Mihaly & Weinberger LLP |
202932 | 8/15/2014 |
Palen Solar Holdings, LLC's Opening Brief
Alternatives, Biological Resources, Cultural Resources, Project Description, Traffic and Transportation 30 page(s)
| | | Galati | Blek LLP |
202929 | 8/15/2014 |
Palen Solar Holdings, LLC’s Proposed Modifications to BIO-16b - Outcome Performance Standards
Biological Resources 6 page(s)
| | | Galati | Blek LLP |
202928 | 8/15/2014 |
Palen Solar Holdings, LLC's Proposed Modifications to Staff TRANS-7
Traffic and Transportation 3 page(s)
| | | Galati | Blek LLP |
202926 | 8/14/2014 |
Transcript of the August 4, 2014 Closed Session
8 page(s)
| | Parties | Energy Commission Hearing Office |
202918 | 8/13/2014 |
Palen Solar Holdings, LLC's Corrections to 7.29.14 Evidentiary Hearing Transcript
Cultural Resources, Traffic and Transportation 1 page(s)
| | CEC / Docket Unit | Galati | Blek LLP |
202916 | 8/13/2014 |
Palen Solar Holdings, LLC's Corrections to 7.30.14 Evidentiary Hearing Transcript
Alternatives, Biological Resources, Project Description 7 page(s)
| | CEC / Docket Unit | Galati | Blek LLP |
202911 | 8/13/2014 |
Corrections to Christine Stora Testimony
Project Description 1 page(s)
| | CEC / Docket Unit | California Energy Commission |
202905 | 8/12/2014 |
CRIT Corrections To Evidentiary Hearing Transcripts
3 page(s)
| | CEC / Docket Unit | Shute, Mihaly & Weinberger LLP |
202896 | 8/8/2014 |
USFWS Comments with Enclosure Comments on the California Energy Commission's Supplemental Staff
Assessment and Testimony for the Proposed Palen Solar Electric Generation Biological Resources 8 page(s)
| | Ms. Christine Stora | USFWS |
202895 | 8/8/2014 |
Palen Solar Holdings, LLC's Corrections to 7.30.14 Evidentiary Hearing Transcript, Testimony of Arne Olson
Alternatives 3 page(s)
| | | Galati | Blek LLP |
202893 | 8/8/2014 |
Kim Marsden Comments: Incomplete Document Docketed
Biological Resources 1 page(s)
| | CEC / Docket Unit | Kim Marsden |
202892 | 8/8/2014 |
Kim Marsden Comments: Incomplete document docketed
Biological Resources 1 page(s)
| | CEC/ Docket Unit | Kim Marsden |
202891 | 8/8/2014 |
FWS Enclosure Avian Mortality Monitoring Objectives Enclosure for USFWS Comments on the California Energy Commission's Supplemental Staff Assessment and Testimony for the Proposed Palen Solar Electric Generation
Biological Resources Biological Resources 1 page(s)
| | Ms. Christine Stora | USFWS |
202890 | 8/7/2014 |
USFWS Comments Biological Resources 4 page(s)
| | CEC / Ms. Christine Stora | USFWS / Kennon A Corey |
202883 | 8/4/2014 |
Scott Connelly Comments: Palen Solar Project
1 page(s)
| | CEC/Dockets Unit | Scott Connelly |
202877 | 8/4/2014 |
Modifications to TRANS-7 Heliostat Positioning and Monitoring Plan Modifications made to the version of TRANS-7 in the December 2013 PMPD. Traffic and Transportation 3 page(s)
| | | California Energy Commission |
202876 | 8/4/2014 |
Request to Withdraw from Proceeding by Hildeberto Sanchez, Eddie Simmons, and LIUNA Local Union 1184
2 page(s)
| | CEC/Dockets Unit | Lozeau Drury LLP |
202875 | 8/1/2014 |
Memo Re: Briefing Deadlines
1 page(s)
| | Parties | Energy Commission Hearing Office |
202873 | 8/1/2014 |
Transcript of the July 29, 2014 Evidentiary Hearing Supersedes TN's 202861 and 202859. 303 page(s)
| | | Energy Commission Hearing Office |
202871 | 8/1/2014 |
Transcript of the July 30, 2014 Evidentiary Hearing
459 page(s)
| | Parties | California Energy Commission |
202865 | 7/31/2014 |
Audubon California Garry George Comments: Audubon California comments
Biological Resources 3 page(s)
| | CEC/ Docket Unit | Audubon California/Garry George |
202861 | 7/31/2014 |
Transcript of the July 29, 2014 Evidentiary Hearing 304 page(s)
| | Parties | California Energy Commission |
202859 | 7/31/2014 |
Transcript of the July 29, 2014 Evidentiary Hearing 334 page(s)
| | Parties | California Energy Commission |
202854 | 7/30/2014 |
Teresa Regina Weiner Comments: Palen Solar Energy Generating System
Biological Resources, Land Use, Visual Resources 9 page(s)
| | CEC / Docket | Teresa Regina Weiner |
202853 | 7/30/2014 |
Shaun Gonzales Comments: Shaun Gonzales comments on 9-AFC-07C
Air Quality, Biological Resources, Cultural Resources, Project Description, Greenhouse Gases 3 page(s)
| | CEC/ Docket Unit | Shaun Gonzales |
202849 | 7/30/2014 |
Sierra Club Comments: Sierra Club Additional Comments
4 page(s)
| | CEC/Dockets Unit | Sierra Club |
202848 | 7/30/2014 |
Transcript of the July 23, 2014 Prehearing Conference
104 page(s)
| | Parties | California Energy Commission |
202847 | 7/29/2014 |
Kim Delfino, California Program Director, Defenders of Wildlife Comments: Comments on Petition to Amend Palen SEGS
3 page(s)
| | CEC / Docket Unit | Kim Delfino, California Program Director, Defenders of Wildlife |
202835 | 7/29/2014 |
Pat Flanagan Comments: Palen Solar Power Project
Biological Resources 4 page(s)
| | CEC / Docket Unit | Pat Flanagan |
202830 | 7/28/2014 |
Biological Resources - Figure 7 Ivanpah Solar Electric Generating System - Aerial View Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
202829 | 7/28/2014 |
Biological Resources - Figure 9 Ivanpah Solar Electric Generating System - Ivanpah non-Singed Mortality Count for Circular Ring Areas Bins = 5 Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
202828 | 7/28/2014 |
Biological Resources - Figure 10 Ivanpah Solar Electric Generating System - Uniform Ring Mortality Count vs Uniform Area Mortality Count for a Circular Area Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
202827 | 7/28/2014 |
Biological Resources - Figure 11 Ivanpah Solar Electric Generating System - Mortality Distribution of Non-Singed Bird at ISEGS (March 2013-June 2014) Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
202826 | 7/28/2014 |
Shannon Eddy, Large-scale Solar Association Comments: Avian Mortality Thresholds for Solar Thermal Projects
2 page(s)
| | CEC/Dockets Unit | Shannon Eddy, Large-scale Solar Association |
202825 | 7/28/2014 |
Biological Resources - Figures 7-11 Figures Biological Resources 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
202824 | 7/28/2014 |
Revised Biological Resources - Figure 8
Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
202823 | 7/28/2014 |
Staff's Comments Regarding a Possible Energy Commission Finding of Overriding Considerations
1 page(s)
| 1206 | CEC/Dockets Unit | California Energy Commission |
202821 | 7/28/2014 |
TRANS-7 Heliostat Positioning and Monitoring Plan
Traffic and Transportation 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
202818 | 7/25/2014 |
David Lamfrom Comments: NPCA Comments on Palen PMPD to supplement existing submitted comments
Biological Resources, Land Use, Socioeconomics, Visual Resources 5 page(s)
| | CEC / Docket Unit | David Lamfrom |
202817 | 7/25/2014 |
ISEGS and PSEGS Flux-Related Mortality Estimates Comparison Table Exhibit No. 1205 Biological Resources 1 page(s)
| 1205 | CEC Docket Unit | Galati | Blek LLP |
202816 | 7/25/2014 |
Revised BIO-29 Table 3
Biological Resources 1 page(s)
| 2034 | CEC/Dockets Unit | California Energy Commission |
202815 | 7/25/2014 |
Intervenor CRIT Request to Clarify
Cultural Resources 3 page(s)
| | CEC / Docket Unit | Shute, Mihaly & Weinberger LLP |
202814 | 7/25/2014 |
Glare Evaluation of Ivanpah Solar Electric Generating System email Traffic and Transportation, Visual Resources 2 page(s)
| 2033 | Jim Adams | CEC / Ho Clifford |
202811 | 7/25/2014 |
Ex.1204 - Bird Nesting Map from ISEGS May 2014 Monthly Compliance Report
Biological Resources 1 page(s)
| 1204 | | Galati | Blek LLP |
202810 | 7/25/2014 |
Ex.1201 - Electromagnetic Radiation Spectrum
Biological Resources 1 page(s)
| 1201 | CEC / Docket Unit | Galati | Blek LLP |
202809 | 7/25/2014 |
Ex.1202 - Solar Irradiance Chart
Biological Resources 1 page(s)
| 1202 | CEC / Docket Unit | Galati | Blek LLP |
202808 | 7/25/2014 |
Ex.1203 - Summary of ISEGS Bird and Bat Mortality - January through June 2014
Biological Resources 1 page(s)
| 1203 | CEC / Docket Unit | Galati | Blek LLP |
202805 | 7/24/2014 |
ISEGS - Proportion of Area Occupied by Heliostats Exhibit No. 1196 Biological Resources 1 page(s)
| 1196 | CEC / Docket Unit | Galati | Blek LLP |
202804 | 7/24/2014 |
ISEGS - Cumulative Proportion of Fatalities by Distance - All Exhibit No. 1197 Biological Resources 1 page(s)
| 1197 | CEC / Docket Unit | Galati | Blek LLP |
202803 | 7/24/2014 |
ISEGS - Cumulative Proportion of Fatalities by Distance - Collision Exhibit No. 1198 Biological Resources 1 page(s)
| 1198 | CEC / Docket Unit | Galati | Blek LLP |
202802 | 7/24/2014 |
ISEGS - Cumulative Proportion of Fatalities by Distance - Singed Exhibit No. 1199 Biological Resources 1 page(s)
| 1199 | CEC /Docket Unit | Galati | Blek LLP |
202801 | 7/24/2014 |
ISEGS - Cumulative Proportion of Fatalities by Distance - Unknown Exhibit No. 1200 Biological Resources 1 page(s)
| 1200 | | Galati | Blek LLP |
202800 | 7/24/2014 |
Example of Typical Uniform Distribution - 2 Exhibit No. 1195 Biological Resources 1 page(s)
| 1195 | CEC/ Docket Unit | Galati | Blek LLP |
202799 | 7/24/2014 |
Example of Typical Uniform Distribution - 1 Exhibit No. 1194 Biological Resources 1 page(s)
| 1194 | CEC / Docket Unit | Galati | Blek LLP |
202795 | 7/24/2014 |
Brett Fooks Resume
1 page(s)
| 2031 | CEC/Docket Unit | California Energy Commission / Brett Fooks |
202794 | 7/24/2014 |
Dave Vidaver Resume
2 page(s)
| 2030 | CEC/Docket Unit | California Energy Commission / Dave Vidaver |
202793 | 7/24/2014 |
Mark Hesters Resume
1 page(s)
| 2029 | CEC/Docket Unit | California Energy Commission / Mark Hesters |
202792 | 7/24/2014 |
Email RE: Palen Project Hearing July 29 Palo Verde College, Blythe, Dated July 24, 2014
1 page(s)
| | Christine Stora/CEC/Docket Unit | California Energy Commission / Alicia Campos |
202790 | 7/24/2014 |
Comments: Opposed to Palen Solar Project
1 page(s)
| | CEC / Docket Unit | Bonnie Dierking |
202789 | 7/24/2014 |
Memorandum re: Topic Order at the Evidentiary Hearing This memo memorializes the order in which the Committee will take evidence at the PSEGS evidentiary hearing in Blythe, California; and reminds the parties of the room number change per discussions at the prehearing conference. Alternatives, Biological Resources, Cultural Resources, Project Description, Traffic and Transportation 1 page(s)
| | All parties | California Energy Commission |
202786 | 7/24/2014 |
Response to Request for Clarification Regarding Solar Flux-Related Avian Mortalities From United States Department of the Interior, Fish and Wildlife Service 3 page(s)
| 3151 | CEC/Docket Unit | CEC / U. S. Dept of Interior, Fish & Wildlife Service |
202785 | 7/23/2014 |
PSEGS Evidentiary Hearings California Energy Commission Cultural Resources Opening Statement
Cultural Resources 11 page(s)
| | CEC/Docket Unit | California Energy Commission / T. Gates / M. McGuirt / L. Cachora |
202782 | 7/23/2014 |
Comments Re:Palen Project, Dated July 22, 2014 From: Larry McLaughlin, Regional Director and Deputy Sector Navigator, Advanced Transportation & Renewable Energy 1 page(s)
| | Christine Stora/CEC | California Energy Commission |
202781 | 7/21/2014 |
Intervenor CRIT Pre-hearing Conference Statement
Biological Resources, Cultural Resources, Traffic and Transportation 5 page(s)
| | CEC / Docket Unit | Shute, Mihaly & Weinberger LLP |
202780 | 7/21/2014 |
Center Prehearing Conf. Statement and updated exhibit list
Air Quality, Alternatives, Biological Resources, Cultural Resources, Project Description, Visual Resources 20 page(s)
| 3150 | CEC / Docket Unit | Center for Biological Diversity |
202779 | 7/21/2014 |
Prehearing Conference Statement
4 page(s)
| | CEC / Docket Unit | Adams Broadwell Joseph & Cardozo |
202778 | 7/22/2014 |
Prehearing Conference Statement
Alternatives, Cultural Resources, Visual Resources 4 page(s)
| | CEC / Docket Unit | Basin and Range Watch |
202777 | 7/21/2014 |
Palen Solar Holdings, LLC's Prehearing Conference Statement
Alternatives, Biological Resources, Cultural Resources, Project Description, Traffic and Transportation 28 page(s)
| | CEC/ Docket Unit | Galati | Blek LLP |
202776 | 7/21/2014 |
Kimball Garrett Comments: Palen Solar Power Project Comment
| | | Kimball Garrett |
202775 | 7/21/2014 |
CEC Staff Prehearing Conference Statement Prehearing Conference Statement and Exhibit List Compliance 10 page(s)
| | CEC Dockets | California Energy Commission |
202773 | 7/18/2014 |
Staff's Rebuttal Testimony (Supersedes by TN 202757)
Biological Resources, Cultural Resources, Introduction, Traffic and Transportation 80 page(s)
| 2018 | CEC/Dockets Unit | California Energy Commission |
202772 | 7/18/2014 |
Staff's Rebuttal Testimony Biological Resources, Cultural Resources, Introduction, Traffic and Transportation 80 page(s)
| | CEC / Docket Unit | California Energy Commission |
202771 | 7/18/2014 |
Solar Two Final Report
294 page(s)
| | CEC / Docket Unit | California Energy Commission |
202770 | 7/18/2014 |
Exh 3148 GreenTech Media; California Closes in on Smart Solar Inverter Rules
Alternatives, Project Description 6 page(s)
| 3148 | CEC / Docket Unit | Center for Biological Diversity |
202769 | 7/18/2014 |
Exh 3147 PV Magazine Tenaska Switches
Alternatives, Project Description 1 page(s)
| 3147 | CEC / Docket Unit | Center for Biological Diversity |
202768 | 7/18/2014 |
Exh 3146 Powers Rebuttal Testimony
Alternatives, Project Description 4 page(s)
| 3146 | CEC / Docket Unit | Center for Biological Diversity |
202767 | 7/18/2014 |
Exh 3149 GreenTech Media: Western Utilities Call for Smart Solar Inverters
Alternatives, Project Description 4 page(s)
| 3149 | CEC / Docket Unit | Center for Biological Diversity |
202766 | 7/18/2014 |
CUL-1 including Cover letter Clean version of CUL-1
| 2020 | CEC/ Docket Unit | California Energy Commission |
202765 | 7/18/2014 |
Exh 3141 Center Rebuttal Intro
Alternatives, Biological Resources 3 page(s)
| 3141 | CEC / Docket Unit | Center for Biological Diversity |
202764 | 7/18/2014 |
Exh 3144 Smallwood Rebuttal Testimony
Biological Resources 9 page(s)
| 3144 | CEC / Docket Unit | Center for Biological Diversity |
202763 | 7/18/2014 |
Exh 3145 Van Vuren and Smallwood 1996
Biological Resources 13 page(s)
| 3145 | CEC / Docket Unit | Center for Biological Diversity |
202762 | 7/18/2014 |
Ex. 3142 Rebuttal Testimony of Gordon Pratt PhD
Biological Resources 3 page(s)
| 3142 | | Center for Biological Diversity |
202761 | 7/18/2014 |
Ex. 3143 Photo
Biological Resources 1 page(s)
| 3143 | | Center for Biological Diversity |
202760 | 7/18/2014 |
Ex 4007, May 2014 TAC report for Ivanpah
2 page(s)
| 4007 | CEC / Docket Unit | Basin and Range Watch |
202759 | 7/18/2014 |
Ex. 4008, 4 Reasons Why it's a Bad Argument to Say Cats Kill More Birds Than Wind Turbines
8 page(s)
| 4008 | CEC / Docket Unit | Basin and Range Watch |
202758 | 7/18/2014 |
Rebuttal Testimony, Biological Resources
| | CEC / Docket Unit | Basin and Range Watch |
202757 | 7/18/2014 |
Staff’s Rebuttal Testimony Superseded by 202773 Biological Resources, Cultural Resources, Introduction, Traffic and Transportation 79 page(s)
| | CEC / Docket Unit | California Energy Commission |
202755 | 7/18/2014 |
CRIT Intervnor Ex. 8036-Rebuttal Testimony of Councilwoman Amanda Barrera
Cultural Resources
| 8036 | CEC / Docket Unit | Shute, Mihaly & Weinberger LLP |
202754 | 7/18/2014 |
Ex.1182 - Letter from American Bird Conservancy Grant Sizemore to CEC dated July 10, 2014, Avian Mitigation Plan Clarification
Biological Resources 2 page(s)
| 1182 | CEC / Docket Unit | Galati | Blek LLP |
202753 | 7/18/2014 |
Ex.1174 - ISEGS Winter Quarterly Avian Report
Biological Resources 90 page(s)
| 1174 | CEC / Docket Unit | Galati | Blek LLP |
202752 | 7/18/2014 |
Ex.1183 - Article April 23, 2104 DOE’s Moniz Calls For “Urgency” In Climate Change Action
2 page(s)
| 1183 | CEC / Docket Unit | Galati | Blek LLP |
202751 | 7/18/2014 |
Revised Ex.1133 - Updated Avian Comparison Table
Biological Resources 8 page(s)
| 1133 | CEC / Docket Unit | Galati | Blek LLP |
202750 | 7/18/2014 |
Ex.1179 - Alternative Supplemental Rebuttal Testimony
Alternatives 26 page(s)
| 1179 | CEC / Docket Unit | Galati | Blek LLP |
202749 | 7/18/2014 |
Ex.1184 - PBS News Hour Article – World Bank President: Climate Change is Urgent Today Problem
2 page(s)
| 1184 | CEC / Docket Unit | Galati | Blek LLP |
202748 | 7/18/2014 |
Ex.1185 - UN Climate Chief: IPCC Press Release
3 page(s)
| 1185 | CEC / Docket Unit | Galati | Blek LLP |
202747 | 7/18/2014 |
Ex.1186 - Biological Resources Supplemental Rebuttal Testimony - DeTect
Biological Resources 3 page(s)
| 1186 | CEC / Docket Unit | Galati | Blek LLP |
202746 | 7/18/2014 |
Ex.1187 - Traffic and Transportation Rebuttal Testimony – Glint and Glare – Pilot Opinion
Traffic and Transportation 5 page(s)
| 1187 | CEC / Docket Unit | Galati | Blek LLP |
202745 | 7/18/2014 |
Ex.1188 - HyperSound Technical White Paper
Biological Resources 11 page(s)
| 1188 | CEC / Docket Unit | Galati | Blek LLP |
202744 | 7/18/2014 |
Ex.1181 - Overriding Considerations Supplemental Rebuttal Testimony – Thermal Energy Storage
4 page(s)
| 1181 | CEC/ Docket Unit | Galati | Blek LLP |
202743 | 7/18/2014 |
Ex.1178 - Biological Resources Supplemental Rebuttal Testimony – Curtailment Infeasibility, Performance Standards and Polarized
Biological Resources 9 page(s)
| 1178 | CEC/ Docket Unit | Galati | Blek LLP |
202742 | 7/18/2014 |
Ex.1189 - NREL Report 40 percent RPS
43 page(s)
| 1189 | CEC/ Docket Unit | Galati | Blek LLP |
202741 | 7/18/2014 |
Ex.1176 - Biological Resources Supplemental Rebuttal Testimony - Insects
Biological Resources 7 page(s)
| 1176 | CED / Docket Unit | Galati | Blek LLP |
202740 | 7/18/2014 |
Ex.1190 - NREL Report 33 Percent RPS
35 page(s)
| 1190 | CEC/ Docket Unit | Galati | Blek LLP |
202739 | 7/18/2014 |
Ex.1180 - Traffic and Transportation Supplemental Rebuttal Testimony – Glint and Glare – Effectiveness of Conditions
Traffic and Transportation 3 page(s)
| 1180 | | Galati | Blek LLP |
202738 | 7/18/2014 |
Ex.1193 - White House Climate Change Fact Sheet
4 page(s)
| 1193 | CEC / Docket Unit | Galati | Blek LLP |
202737 | 7/18/2014 |
Ex.1192 - Governor Brown Climate Change Article
2 page(s)
| 1192 | CEC/ Docket Unit | Galati | Blek LLP |
202736 | 7/18/2014 |
Ex.1173 - Biological Resources Supplemental Rebuttal Testimony – Avian Impacts and Mitigation
Biological Resources 22 page(s)
| 1173 | CEC / Docket Unit | Galati | Blek LLP |
202735 | 7/18/2014 |
Ex.1177 - Summary and Analysis of CBD Exhibit 3108
Biological Resources 28 page(s)
| 1177 | CEC/ Docket Unit | Galati | Blek LLP |
202734 | 7/18/2014 |
Ex.1191 - Ivanpah SEGS Heliostat Positioning Plan Report
Traffic and Transportation 34 page(s)
| 1191 | | Galati | Blek LLP |
202733 | 7/18/2014 |
Ex.1172 - Proposed Modifications to CUL-1
Cultural Resources 9 page(s)
| 1172 | | Galati | Blek LLP |
202732 | 7/18/2014 |
Ex.1171 - Cultural Resources Supplemental Rebuttal Testimony
Cultural Resources 8 page(s)
| 1171 | CEC/ Docket Unit | Galati | Blek LLP |
202731 | 7/18/2014 |
Ex.1170 - Proposed Modifications to BIO-29
Biological Resources 3 page(s)
| 1170 | CEC / Docket Unit | Galati | Blek LLP |
202730 | 7/18/2014 |
Ex. 1169 - Proposed Modifications to Soil&Water-3
Project Description 2 page(s)
| 1169 | CEC / Dcoket Unit | Galati | Blek LLP |
202729 | 7/18/2014 |
Ex. 1168 - Estimated Construction Personnel By Month Phase I
Project Description 1 page(s)
| 1168 | CEC / Docket Unit | Galati | Blek LLP |
202728 | 7/18/2014 |
Ex.1175 - ISEGS May TAC Meeting Minutes
Biological Resources 5 page(s)
| 1175 | | Galati | Blek LLP |
202727 | 7/18/2014 |
Ex. 1166 - Project Description Supplemental Rebuttal Testimony
Project Description 10 page(s)
| 1166 | | Galati | Blek LLP |
202726 | 7/18/2014 |
Ex. 1167 - Revised Phasing Plan
Project Description 1 page(s)
| 1167 | | Galati | Blek LLP |
202724 | 7/17/2014 |
Heliostat Positioning Plan Report
33 page(s)
| | CEC/Dockets Unit | California Energy Commission |
202709 | 7/15/2014 |
Determination of No Hazard to Air Navigation, dated 07/18/2013 Solar Tower Unit 2 8 page(s)
| 2028 | Charles Turlinski, Palen Solar Holdings, LLC | California Energy Commission |
202708 | 7/15/2014 |
Determination of No Hazard to Air Navagation, dated 07/18/2013 Solar Tower Unit 1 8 page(s)
| 2027 | Charles Turlinski, Palen Solar Holdings, LLC | California Energy Commission |
202700 | 7/14/2014 |
Palen Solar Generating System Glare Video 1 page(s)
| 2023 | CEC / Docket Unit | California Energy Commission / Alica Campos |
202698 | 7/14/2014 |
Exh 3140 Corrections to Opening Testimony Smallwood Opening Testimony; Corrections Biological Resources 21 page(s)
| 3140 | | Center for Biological Diversity |
202694 | 7/14/2014 |
Letter Re: Pilot Complaints of Visual Impacts from Ivanpah Solar Electric Generating System, dated March 10, 2014 Las Vegas McCarran International Airport, Raymond C. Lee and Michael W. Ahrens 7 page(s)
| | CEC/Joseph Douglas and BrightSource Energy, Inc./Jennifer Wallens | California Energy Commission |
202675 | 7/10/2014 |
Grant Sizemore Comments: Avian Mitigation Plan Clarification
3 page(s)
| | Energy Resources Conservation and Development Commission | Grant Sizemore |
202664 | 7/2/2014 |
PSEGS glint and glare impacts to aviation will also be considered under the topic of Traffic and Transportation Memorandum from Hearing Officer advising parties that aviation impacts from glint and glare will be considered under the topic of Traffic and Transporation as well as Visual Resources. Traffic and Transportation, Visual Resources 1 page(s)
| | All parties | Energy Commission Hearing Office |
202585 | 6/24/2014 |
Email Re: Request for Ivanpah Report, dated June 10, 2014
18 page(s)
| 2026 | CEC/Jim Adams | Federal Aviation Administration/Dan Rollins |
202584 | 6/24/2014 |
Email with attached Palen Aeronutical Study, dated June 9, 2014
19 page(s)
| 2025 | CEC/Jim Adams | Federal Aviation Administration/Dan Rollins |
202583 | 6/24/2014 |
Email Re: Ivanpah Solar Power Plant Site Recon, dated May 9, 2014
2 page(s)
| 2024 | CEC/Jim Adams | California Department of Transportation/Gary Cathey |
202582 | 6/24/2014 |
Letter re Solar Power Plant Glare, dated April 22, 2014
1 page(s)
| | CEC/Docket Unit | Department of Transportation Federal Aviation Administration |
202581 | 6/24/2014 |
Email Re: Recent ASRS Report, dated April 9, 2014
4 page(s)
| | Jim Adams/CEC/Docket Unit | California Energy Commission |
202580 | 6/24/2014 |
Email Re: ASRS Solar Panel Glare Pilot Reports, dated March 14, 2014 with Attachment: Environmental Visual Flight Hazard DBOL Reports 6 page(s)
| | Jim Adams/CEC/Docket Unit | California Energy Commission |
202579 | 6/24/2014 |
Basin and Range Watch Exhibit 4001
2 page(s)
| 4001 | CEC / docket Unit | Basin and Range Watch |
202578 | 6/24/2014 |
Basin and Range Watch Opening Testimony
7 page(s)
| | CEC / Docket Unit | Basin and Range Watch |
202577 | 6/24/2014 |
Basin and Range Watch Exhibit 4004
4 page(s)
| 4004 | Cec / Docket Unit | Basin and Range Watch |
202576 | 6/24/2014 |
Basin and Range Watch Exhibit 4003
3 page(s)
| 4003 | CEC / Docket Unit | Basin and Range Watch |
202575 | 6/24/2014 |
Basin and Range Watch Exhibit 4002
3 page(s)
| 4002 | Cec / Docket Unit | Basin and Range Watch |
202574 | 6/24/2014 |
Basin and Range Watch 4006
3 page(s)
| 4006 | CEC / DocketUnuit | Basin and Range Watch |
202573 | 6/24/2014 |
Basin and Range Watch Exhibit 4005
3 page(s)
| 4005 | CEC / Docket Unit | Basin and Range Watch |
202572 | 6/24/2014 |
Redacted Resolution E-4269. Pacific Gas and Electric Company (PG&E)
25 page(s)
| | CEC/Docket Unit | California Energy Commission / PUC |
202571 | 6/23/2014 |
Exh 6000 Testimony of William J. Perez on Behalf of CURE on Overriding Considerations
6 page(s)
| 6000 | CEC/Dockets Unit | Adams Broadwell Joseph & Cardozo |
202570 | 6/23/2014 |
Exhibit 8035 Testimony of David Harper
Biological Resources, Cultural Resources 4 page(s)
| 8035 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202569 | 6/23/2014 |
Exhibit 8034 Glare Factor Solar Installations and Airports
Visual Resources 3 page(s)
| 8034 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202568 | 6/23/2014 |
Exhibit 8033 The Ivanpah ASRS Report
Visual Resources 3 page(s)
| 8033 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202567 | 6/23/2014 |
Exhibit 8032 FAA World Aeronautical Chart Section CG-18
Visual Resources 1 page(s)
| 8032 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202566 | 6/23/2014 |
Exhibit 8031 Testimony of Ted Swendra
Visual Resources 5 page(s)
| 8031 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202565 | 6/23/2014 |
Exhibit 8030 Testimony of Councilwoman Amanda Barrera
Cultural Resources 5 page(s)
| 8030 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202564 | 6/23/2014 |
Exhibit 8029 Summary Transcript of 4-8-14 Workshop
Cultural Resources 4 page(s)
| 8029 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202563 | 6/23/2014 |
Exhibit 8028 Testimony of Chairman Dennis Patch
Cultural Resources 4 page(s)
| 8028 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
202562 | 6/23/2014 |
Exh. 3139 Smallwood et al 2010 Novel Scavenger Removal Trials Increase Wind urbine - Caused Avian Fatality Estimates Biological Resources 9 page(s)
| 3139 | CEC/Dockets Unit | Center for Biological Diversity |
202561 | 6/23/2014 |
Exh. 3138 Smallwood 2008 ARTICLE - WIND POWER COMPANY COMPLIANCE WITH
MITIGATION PLANS IN THE ALTAMONT PASS
WIND RESOURCE AREA Biological Resources 57 page(s)
| 3138 | CEC/Dockets Unit | Center for Biological Diversity |
202560 | 6/23/2014 |
Exh. 3137 Smallwood & Karas 2009 Avian and Bat Fatality Rates at Old-Generation and
Repowered Wind Turbines in California Biological Resources 10 page(s)
| 3137 | CEC/Dockets Unit | Center for Biological Diversity |
202559 | 6/23/2014 |
Exh. 3136 Smallwood 2009
Biological Resources 65 page(s)
| 3136 | CEC/Dockets Unit | Center for Biological Diversity |
202558 | 6/23/2014 |
Exh. 3127. Flanagan 2014 Flanagan, P. 2014. Impact on Migratory birds Biological Resources 3 page(s)
| 3127 | CEC/Dockets Unit | Center for Biological Diversity |
202557 | 6/23/2014 |
Exh. 3126. Anderson testimony Ileene Anderson testimony on PSEGS reopening of evidentiary record Biological Resources 3 page(s)
| 3126 | CEC/Dockets Unit | Center for Biological Diversity |
202556 | 6/23/2014 |
Exh. 3125. NGEJ . Feds bet on wrong solar NGEJ. Federal gov't bets on wrong solar horse Alternatives, Efficiency, Facility Design, Transmission System Engineering 8 page(s)
| 3125 | CEC/Dockets Unit | Center for Biological Diversity |
202555 | 6/23/2014 |
Exh. 3124. GTM - Ivanpah gets approval GTM - Ivanpah gets approval $5.50 watt Alternatives, Efficiency, Facility Design, Transmission System Engineering 2 page(s)
| 3124 | CEC/Dockets Unit | Center for Biological Diversity |
202554 | 6/23/2014 |
Exh. 3123 EPW - Large scale solar prices plummet EPW - Large scale solar prices plummet in West Alternatives, Efficiency, Facility Design, Transmission System Engineering 3 page(s)
| 3123 | CEC/Dockets Unit | Center for Biological Diversity |
202553 | 6/23/2014 |
Exh. 3122 EPW PNM to build 4 solar projects next year EPW - PNM to build 4 solar projects next year Alternatives, Efficiency, Facility Design, Transmission System Engineering 1 page(s)
| 3122 | CEC/Dockets Unit | Center for Biological Diversity |
202552 | 6/23/2014 |
Exh. 3121 ICF Jones & Stokes ICF Jones & Stokes OTC reliability study Alternatives, Efficiency, Facility Design, Transmission System Engineering 8 page(s)
| 3121 | CEC/Dockets Unit | Center for Biological Diversity |
202551 | 6/23/2014 |
Exh. 3120 CPUC PR Track 4 LTPP CPUC PR Track 4 LTPP final decision Alternatives, Efficiency, Facility Design, Transmission System Engineering 3 page(s)
| 3120 | CEC/Dockets Unit | Center for Biological Diversity |
202550 | 6/23/2014 |
Exh. 3119. CPUC Energy Storage Decision CPUC Energy Storage Decision D1310040 - 17Oct13 Alternatives, Efficiency, Facility Design, Transmission System Engineering 97 page(s)
| 3119 | CEC/Dockets Unit | Center for Biological Diversity |
202549 | 6/23/2014 |
Exh. 3118. CA Energy Storage Mandate CA Energy Storage Mandate Alternatives, Efficiency, Facility Design, Transmission System Engineering 15 page(s)
| 3118 | CEC/Dockets Unit | Center for Biological Diversity |
202548 | 6/23/2014 |
Exh. 3117 CAISO Peak Load History CAISO Peak Load History 1998-2013 Alternatives, Efficiency, Facility Design, Transmission System Engineering 1 page(s)
| 3117 | CEC/Dockets Unit | Center for Biological Diversity |
202547 | 6/23/2014 |
Exh. 3116 CPUC Decision 11-01-025 CPUC Decision 11-01-025. Rulemaking on RPS Alternatives, Efficiency, Facility Design, Transmission System Engineering 80 page(s)
| 3116 | CEC/Dockets Unit | Center for Biological Diversity |
202546 | 6/23/2014 |
Exh. 3115 AB 327 AB 327 - CA RPS program expanding net metering Alternatives, Efficiency, Facility Design, Transmission System Engineering 21 page(s)
| 3115 | CEC/Dockets Unit | Center for Biological Diversity |
202545 | 6/23/2014 |
Exh. 3114. CA solar initiative CA's solar initiative (CPUC) Alternatives, Efficiency, Facility Design, Transmission System Engineering 3 page(s)
| 3114 | CEC/Dockets Unit | Center for Biological Diversity |
202544 | 6/23/2014 |
Exh. 3113. Powers Testimony, Decl. & CV Bill Powers Testimony, Declaration & CB Alternatives, Efficiency, Facility Design, Transmission System Engineering 29 page(s)
| 3113 | CEC/Dockets Unit | Center for Biological Diversity |
202543 | 6/23/2014 |
Exh. 3112. Philotiella speciosa Photo of Philotiella speciosa Biological Resources 1 page(s)
| 3112 | CEC/Dockets Unit | Center for Biological Diversity |
202542 | 6/23/2014 |
Exh. 3111 Strohecker et al. 1968 Grasshopper key Biological Resources 186 page(s)
| 3111 | CEC/Dockets Unit | Center for Biological Diversity |
202541 | 6/23/2014 |
Exh. 3110 Spaniacris & Xeracris Photo of Spaniacris deserticola and Xeracris snowii Biological Resources 1 page(s)
| 3110 | CEC/Dockets Unit | Center for Biological Diversity |
202540 | 6/23/2014 |
Exh. 3109. Tinkham 1975 Neararctic desert sand dune Orthoptera Biological Resources 120 page(s)
| 3109 | CEC/Dockets Unit | Center for Biological Diversity |
202539 | 6/23/2014 |
Exh. 3108 - Andrews et al. 1979 Coleopterus fauna CA desert sand dunes Biological Resources 147 page(s)
| 3108 | CEC/Dockets Unit | Center for Biological Diversity |
202538 | 6/23/2014 |
Exh. 3107 Kagan et al 2014 Avian mortality Report Biological Resources 28 page(s)
| 3107 | CEC/Dockets Unit | Center for Biological Diversity |
202537 | 6/23/2014 |
Ex.1164 - January 28, 2014 Letter from American Bird Conservancy Regarding Feral Cats
Biological Resources 7 page(s)
| 1164 | CEC/Dockets Unit | Galati | Blek LLP |
202536 | 6/23/2014 |
Ex.1163 - April 12, 2011 Letter from ABC, National Audubon Society and Others Regarding Feral Cats
Biological Resources 12 page(s)
| 1163 | CEC/Dockets Unit | Galati | Blek LLP |
202534 | 6/23/2014 |
Ex.1162 - ISEGS Flux Carcass Density Plots
Biological Resources 1 page(s)
| 1162 | CEC/Dockets Unit | Galati | Blek LLP |
202533 | 6/23/2014 |
Ex. 1161 - Carcass Distribution Plot
Biological Resources 1 page(s)
| 1161 | CEC/Dockets Unit | Galati | Blek LLP |
202532 | 6/23/2014 |
Exh. 3105 Pratt 1998 EAFB surveys 1996 Biological Resources 43 page(s)
| 3105 | CEC/Dockets Unit | Center for Biological Diversity |
202531 | 6/23/2014 |
Exh. 3106 Pratt 2000 EAFB study 1996-1998 Biological Resources 100 page(s)
| 3106 | CEC/Dockets Unit | Center for Biological Diversity |
202530 | 6/23/2014 |
Ex.1160 - Flux Projections at PSEGS
Biological Resources 1 page(s)
| 1160 | CEC/Dockets Unit | Galati | Blek LLP |
202529 | 6/23/2014 |
Ex.1159 - Fall Diurnal Raptor Plot
Biological Resources 1 page(s)
| 1159 | CEC/Dockets Unit | Galati | Blek LLP |
202528 | 6/23/2014 |
Exh. 3133 Horvitz and Thompson 1952
Biological Resources 24 page(s)
| 3133 | CEC/Dockets Unit | Center for Biological Diversity |
202527 | 6/23/2014 |
Ex.1158 - Pre-construction Field Survey Efforts Conducted at the PSEGS Project
Biological Resources 3 page(s)
| 1158 | CEC/Dockets Unit | Galati | Blek LLP |
202526 | 6/23/2014 |
Exh. 3134 Smallwood Article - Response to Huso and Erickson’s Comments on Novel Scavenger Removal Trials
Biological Resources 10 page(s)
| 3134 | CEC/Dockets Unit | Center for Biological Diversity |
202525 | 6/23/2014 |
Ex.1156 - Bird Mortality at Wind Energy Facilities in Southwestern U.S.
Biological Resources 5 page(s)
| 1156 | CEC/Dockets Unit | Galati | Blek LLP |
202524 | 6/23/2014 |
Ex.1155 - Table Comparing Solar Project Capacity and Acreage
Biological Resources 1 page(s)
| 1155 | CEC/Dockets Unit | Galati | Blek LLP |
202523 | 6/23/2014 |
Exh. 3135 Smallwood Article - Influence of Behavior on Bird Mortality in Wind Energy Developments
Biological Resources 17 page(s)
| 3135 | CEC/Dockets Unit | Center for Biological Diversity |
202522 | 6/23/2014 |
Ex.1154 - USFWS February 14, 2014 Memo
Biological Resources 1 page(s)
| 1154 | CEC/Dockets Unit | Galati | Blek LLP |
202521 | 6/23/2014 |
Exh. 3130 Smallwood - Suggested Standards for Science Applied to Conservation Issues
Biological Resources 10 page(s)
| 3130 | CEC/Dockets Unit | Center for Biological Diversity |
202520 | 6/23/2014 |
Ex.1153 - USFWS Letter to Solar Industry on May 12, 2014
Biological Resources 4 page(s)
| 1153 | CEC/Dockets Unit | Galati | Blek LLP |
202519 | 6/23/2014 |
Ex.1152 - Project Description Supplemental Opening Testimony - Natural Gas Use
Project Description 2 page(s)
| 1152 | CEC/Dockets Unit | Galati | Blek LLP |
202518 | 6/23/2014 |
Exh. 3131 Smallwood Article - Estimating Wind Turbine–Caused Bird Mortality
Biological Resources 11 page(s)
| 3131 | CEC/Dockets Unit | Center for Biological Diversity |
202517 | 6/23/2014 |
Exh. 3132 Smallwood Article Comparing Bird and Bat Fatality-Rate Estimates Among North American Wind-Energy Projects
Biological Resources 15 page(s)
| 3132 | CEC/Dockets Unit | Center for Biological Diversity |
202516 | 6/23/2014 |
Ex.1151 - Alternatives Supplemental Opening Testimony of David Schlosberg – PPA Deadlines
Alternatives 33 page(s)
| 1151 | CEC/Dockets Unit | Galati | Blek LLP |
202515 | 6/23/2014 |
Ex.1150 - Infeasibility of Trough and PV Alternatives
Alternatives 1 page(s)
| 1150 | CEC/Dockets Unit | Galati | Blek LLP |
202514 | 6/23/2014 |
Exh. 3102 - Painted lady butterfly photo of painted lady butterfly Biological Resources 1 page(s)
| 3102 | CEC/Dockets Unit | Center for Biological Diversity |
202513 | 6/23/2014 |
Exh. 3103 checkered white butterfly Photo of checkered white butterfly Biological Resources 1 page(s)
| 3103 | CEC/Dockets Unit | Center for Biological Diversity |
202512 | 6/23/2014 |
Ex.1149 - CAISO “Duck Curve” Illustrates Potential for PSEGS with Thermal Storage Subject - Override Considerations 1 page(s)
| 1149 | CEC/Dockets Unit | Galati | Blek LLP |
202511 | 6/23/2014 |
Exh. 3104 - Funeral duskywing butterfly Photo of funeral duskywing butterfly Biological Resources 1 page(s)
| 3104 | CEC/Dockets Unit | Center for Biological Diversity |
202510 | 6/23/2014 |
Exh. 3098 - Palmer's metalmark butterfly photo of Palmer's metalmark butterfly Biological Resources 1 page(s)
| 3098 | CEC/Dockets Unit | Center for Biological Diversity |
202509 | 6/23/2014 |
Ex.1148 - Demand for PSEGS with TES Likely to Increase Over Time Subject - Override Considerations 1 page(s)
| 1148 | CEC/Dockets Unit | Galati | Blek LLP |
202508 | 6/23/2014 |
Exh. 3099 - Monarch butterfly Photo of Monarch butterfly Biological Resources 1 page(s)
| 3099 | CEC/Dockets Unit | Center for Biological Diversity |
202507 | 6/23/2014 |
Exh. 3100 - Queen Butterfly Photo of Queen butterfly Biological Resources 1 page(s)
| 3100 | CEC/Dockets Unit | Center for Biological Diversity |
202506 | 6/23/2014 |
Ex.1157 - Anthropogenic Sources of Avian Mortality
Biological Resources 1 page(s)
| 1157 | CEC/Dockets Unit | Galati | Blek LLP |
202505 | 6/23/2014 |
Exh. 3101 - Buckeye butterfly Photo of buckeye butterfly Biological Resources 1 page(s)
| 3101 | CEC/Dockets Unit | Center for Biological Diversity |
202504 | 6/23/2014 |
Ex.1165 - Estimated Bird Cat Predation Rates
Biological Resources 1 page(s)
| 1165 | CEC/Dockets Unit | Galati | Blek LLP |
202503 | 6/23/2014 |
Ex.1147 - Why Not Build TES Now? Subject - Override Considerations 1 page(s)
| 1147 | CEC/Dockets Unit | Galati | Blek LLP |
202502 | 6/23/2014 |
Ex.1146 - Tower Technology Has Greater Potential in the Intermediate-Term Than Trough Subject - Override Considerations 1 page(s)
| 1146 | CEC/Dockets Unit | Galati | Blek LLP |
202501 | 6/23/2014 |
Exh. 3129 Article Map Based Repowering and Reorganization of a Wind Resource Area to Minimize Burrowing Owl and Other Bird Fatal Smallwood et al 2009b Biological Resources 29 page(s)
| 3129 | CEC/Dockets Unit | Center for Biological Diversity |
202500 | 6/23/2014 |
Exh. 3092 Opening Testimony for Reopened Hearings and Updated Exhibit List
Alternatives, Biological Resources 13 page(s)
| 3092 | CEC/Dockets Unit | Center for Biological Diversity |
202499 | 6/23/2014 |
Exh. 3128 Testimony of Smallwood and CV
Biological Resources 68 page(s)
| 3128 | CEC/Dockets Unit | Center for Biological Diversity |
202498 | 6/23/2014 |
Exh. 3095. Table 1. Plants & butterful larval food plants on Palen
Biological Resources 4 page(s)
| 3095 | CEC/Dockets Unit | Center for Biological Diversity |
202497 | 6/23/2014 |
Exh. 3096 - Pygmy Blue butterfly Photo of Pygmy Blue Butterfly Biological Resources 1 page(s)
| 3096 | CEC/Dockets Unit | Center for Biological Diversity |
202496 | 6/23/2014 |
Exh. 3097 Gray hairstreak butterfly Photo of gray hairstreak butterfly Biological Resources 1 page(s)
| 3097 | CEC/Dockets Unit | Center for Biological Diversity |
202495 | 6/23/2014 |
Ex.1145 - CEC 2012 IEPR Update - Important Attributes for California’s Energy Future Subject - Override Considerations 1 page(s)
| 1145 | CEC/Dockets Unit | Galati | Blek LLP |
202494 | 6/23/2014 |
Ex.1144 - Comparison of Operational Benefits - PSEGS (Tower) versus PSPP (Trough) Subject - Override Considerations 1 page(s)
| 1144 | CEC/Dockets Unit | Galati | Blek LLP |
202493 | 6/23/2014 |
Exh. 3094. Ballmer 1995 Ballmer 1995 Biological Resources 10 page(s)
| 3094 | | Center for Biological Diversity |
202492 | 6/23/2014 |
Exh. 3093. Pratt Testimony, Declaration & CV
Biological Resources 19 page(s)
| 3093 | CEC/Dockets Unit | Center for Biological Diversity |
202491 | 6/23/2014 |
Ex.1143 - Comparison of Operational Benefits - PSEGS (Tower) versus PV Alternative Subject - Override Considerations 1 page(s)
| 1143 | CEC/Dockets Unit | Galati | Blek LLP |
202490 | 6/23/2014 |
Ex.1142 - ISEGS Filed Documents on Pilot Complaints
Visual Resources 15 page(s)
| 1142 | CEC/Dockets Unit | Galati | Blek LLP |
202489 | 6/23/2014 |
Ex.1141 - Biological Resources Supplemental Opening Testimony of Elwood G. Norris – Description of HyperSound Technology
Biological Resources 18 page(s)
| 1141 | | Galati | Blek LLP |
202488 | 6/23/2014 |
Ex.1140 - DeTect Testimony on Deterrent Method
Biological Resources 57 page(s)
| 1140 | CEC/Dockets Unit | Galati | Blek LLP |
202487 | 6/23/2014 |
Ex.1139 - Draft Bird and Bat Conservation Strategy
Biological Resources 114 page(s)
| 1139 | CEC/Dockets Unit | Galati | Blek LLP |
202486 | 6/23/2014 |
Ex.1138 - Table and Graph – GSEP Labor Hours versus Reported Avian Mortality
Biological Resources 2 page(s)
| 1138 | CEC/Dockets Unit | Galati | Blek LLP |
202485 | 6/23/2014 |
Ex.1137 - Biological Resources Supplemental Opening Testimony of Gustavo Buhacoff – Heliostat Operations at ISEGS and PSEGS
Biological Resources 6 page(s)
| 1137 | CEC/Dockets Unit | Galati | Blek LLP |
202484 | 6/23/2014 |
Ex. 1136 – Bio Supplemental Opening Testimony of Matt Stucky, Chris Morris and Charlie Turlinski – Infeasibility of Curtailment
Biological Resources 13 page(s)
| 1136 | CEC/Dockets Unit | Galati | Blek LLP |
202483 | 6/23/2014 |
Ex.1135 - Biological Resources Supplemental Opening Testimony of Andrea Grenier – Avian Mortality Data
Biological Resources 3 page(s)
| 1135 | CEC/Dockets Unit | Galati | Blek LLP |
202482 | 6/23/2014 |
Ex.1134 - Biological Resources Supplemental Opening Testimony Wally P. Erickson and Dr. Ken Levenstein – Avian Impacts
Biological Resources 29 page(s)
| 1134 | CEC/Dockets Unit | Galati | Blek LLP |
202481 | 6/23/2014 |
Exhibit 1133 - Updated Avian Comparison Table
Biological Resources 8 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
202480 | 6/23/2014 |
Energy Commission Staff Supplemental Staff Assessment and Testimony
Biological Resources, Cultural Resources, Efficiency, Facility Design, Introduction, Project Description, Traffic and Transportation, Visual Resources 151 page(s)
| 2017 | CEC/Docket Unit | California Energy Commission |
202469 | 6/18/2014 |
Jamey Stillings Comments: Palen - on the question of glare
Facility Design 3 page(s)
| | CEC / Christina Stora | Jamey Stillings |
202454 | 6/13/2014 |
Committee Order Denying Petition to Intervene Order 2 page(s)
| | Parties | California Energy Commission |
202438 | 6/9/2014 |
Basin and Range Watch Support of Sierra Club Petition to Intervene
3 page(s)
| | CEC/Dockets Unit | Basin and Range Watch |
202422 | 6/5/2014 |
Petition to Intervene By The Sierra Club Petition 7 page(s)
| | Public / CEC Docket Unit | California Environmental Law Project |
202421 | 6/5/2014 |
Kurtis Engle Comments: I can think of much better ways to do this...
2 page(s)
| | CEC/Dockets Unit | Kurtis Engle |
202419 | 6/5/2014 |
Palen Solar Holdings, LLC's Opposition to Sierra Club’s Untimely Petition to Intervene
2 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
202407 | 6/2/2014 |
Revised Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders
12 page(s)
| | Parties | California Energy Commission |
202404 | 5/30/2014 |
Order Granting Motion to Continue Hearing Dates and Revised Committee Scheduling Order
3 page(s)
| | Parties | California Energy Commission |
202388 | 5/28/2014 |
Opposition to Intervenor Center for Biological Diversity's Motion for Continuance Palen Solar Holdings, LLC's 4 page(s)
| | | Galati | Blek LLP |
202387 | 5/28/2014 |
Transcript of the Continuance of the April 16, 2014 Committee Conference Closed Session on May 7, 2014
36 page(s)
| | Parties | California Energy Commission |
202384 | 5/28/2014 |
Motions Motions to Continue Hearing Date, Schedule, etc. Biological Resources 5 page(s)
| | Committee | Center for Biological Diversity |
202383 | 5/27/2014 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders Notice Alternatives, Cultural Resources, Visual Resources 12 page(s)
| | Parties | California Energy Commission |
202382 | 5/27/2014 |
Memo re Basin Range Watch Request to Change Schedule Memorandum in Response to Request from Basin and Range Watch to Change the Schedule. 1 page(s)
| | Basin and Range Watch | California Energy Commission |
202366 | 5/23/2014 |
Request: Evidentiary Hearing be moved up from July 8th and 9th, 2014 Palen Solar Energy Hearing Schedule and Location 1 page(s)
| | | Basin and Range Watch |
202362 | 5/21/2014 |
Committee Order Granting Petitioner's Motion to Reopen the Evidentiary Record and Setting Revised Schedule Order 7 page(s)
| | Parties | California Energy Commission |
202335 | 5/14/2014 |
Marian Fricano Comments: Issue with Solar Farms Concerned about the Fish & Wildlife report about solar farms in California killing hundreds of birds,
including many hummingbirds. Air Quality 1 page(s)
| | | Marian Fricano |
202333 | 5/14/2014 |
Marian Fricano Comments: Recommendations to help save birds
1 page(s)
| | | Marian Fricano |
202314 | 5/7/2014 |
Sandy Choudhari Comments: Study Done by FWS for Bird Mortality
2 page(s)
| | CEC | Sandy Choudhari |
202313 | 5/7/2014 |
David Lamfrom Comments: NPCA Strongly Supports Presiding Member’s Proposed Decision (PMPD) to Deny the Petition to Amend Also ask the Commission to deny the petitioners motion to
reopen the evidentiary record Biological Resources, Facility Design, Land Use, Visual Resources 3 page(s)
| | CEC / Docket Unit | David Lamfrom |
202308 | 5/6/2014 |
Sierra Club Comments: Sierra Club has Gone on Record Strongly Supporting the PMPD. Sierra
Club urges the Commission to vote to confirm denial of the Petition to Amend at this time. 4 page(s)
| | CEC | Sierra Club |
202307 | 5/6/2014 |
Supplemental Response to Motion to Reopen Evidentiary Record and Scheduling Order
Alternatives, Biological Resources, Cultural Resources 8 page(s)
| | | Galati | Blek LLP |
202298 | 5/5/2014 |
Jeff Aardahl Comments: Defenders of Wildlife (“Defenders”) recommends that the Evidentiary Record for the Palen Solar.
3 page(s)
| | CEC | Jeff Aardahl |
202296 | 5/6/2014 |
Sandi Choudhari Comments: Concerned Resident and Father
2 page(s)
| | CEC | Sandi Choudhari |
202289 | 5/5/2014 |
Audubon California / Garry George Comments: Petition to Amend
14 page(s)
| | | Audubon California / Garry George |
202225 | 4/23/2014 |
Supplemental Response to Motion to Reopen Evidentriary Record Amendment for the Palen Solar Electric Generating System Biological Resources, Cultural Resources 3 page(s)
| | | Shute, Mihaly & Weinberger LLP |
202214 | 4/23/2014 |
Kenneth B Waxlax Comments
2 page(s)
| | CEC/Docket Unit | Kenneth B Waxlax |
202210 | 4/23/2014 |
CEC Staff's Response to Petitioner's Motion to Reopen Evidentiary Record
42 page(s)
| 2019 | CEC/Dockets Unit | CEC/ Jennifer Martin-Gallardo |
202013 | 4/11/2014 |
Forensic Lab Report Evaluation Report Evaluation 5 page(s)
| | | California Energy Commission |
202005 | 4/11/2014 |
Notice of Continuance of the April 16, 2014 Committee Conference - Closed Session Notice of Continuance 5 page(s)
| | Parties | California Energy Commission |
202002 | 4/10/2014 |
Fall 2013 Avian Field Surveys for Palen Solar Electric Generating System
Biological Resources 90 page(s)
| 1131 | | Galati | Blek LLP |
202000 | 4/10/2014 |
Fall 2013 Nocturnal Migration Surveys for Palen Solar Electric Generating System Final Report Biological Resources 43 page(s)
| 1132 | CEC | Galati | Blek LLP |
201995 | 4/10/2014 |
Extension of Due Dates for Briefs in Response to Petitioner's Motion to Reopen Evidentiary Hearings Memorandum to the parties extending due-dates to April 23, 2014 for briefs in response to Petitioner's Motion to Reopen Evidentiary Hearings Alternatives, Biological Resources, Cultural Resources 1 page(s)
| | All Parties | California Energy Commission/ Kenneth Celli |
201983 | 4/7/2014 |
Opposition to Motion to Reopen Evidentiary Record
5 page(s)
| | | Basin and Range Watch |
201982 | 4/9/2014 |
Palen Status Report Number 6
2 page(s)
| | CEC/Karen Douglas/ David Hochschild/ Kenneth Celli | California Energy Commission |
201980 | 4/7/2014 |
V. John White/Anne Baker Comments: Approval of Palen Project
3 page(s)
| | CEC/Dockets Unit | V. John White/Anne Baker |
201978 | 4/7/2014 |
National Park Service Cultural and Visual Resource Comments
3 page(s)
| | CEC/Dockets Unit | National Park Service |
201977 | 4/7/2014 |
Supplemental Opposition to Motion to Reopen Evidentiary Record and Scheduling Order
32 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
201976-1 | 4/7/2014 |
CURE's Support for Motion to Reopen PSEGS Record
3 page(s)
| | CEC/Dockets Unit | Adams Broadwell Joseph & Cardozo |
201976-2 | 4/7/2014 |
Declaration of Service - CURE's Support for Motion to Reopen PSEGS Record
5 page(s)
| | CEC/Dockets Unit | Adams Broadwell Joseph & Cardozo |
201975 | 4/7/2014 |
United States Fish and Wildlife Service Comments on Motion to Reopen Palen Record
1 page(s)
| | CEC/Christine Stora | United States Fish and Wildlife Service |
201973 | 4/7/2014 |
Response of Intervenor Colorado River Indian Tribes to Petitioners’ Motion to Reopen Evidentiary Record
3 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201972 | 4/7/2014 |
Opposition to Motion to Reopen Evidentiary Record and Proposed Schedule
10 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
201965 | 4/4/2014 |
Condition of Certification CUL-1: Staff Response to Committee Direction from the Jan. 7, 2014 Committee Conference on the PMPD
Cultural Resources 23 page(s)
| | CEC/Christine Stora | CEC/Jon Hilliard |
201963 | 4/4/2014 |
Corrected Notice of Committee Meeting - Closed Session
5 page(s)
| | Parties | California Energy Commission |
201960 | 4/4/2014 |
Notice of Committee Meeting - Closed Session Notice 4 page(s)
| | Parties | California Energy Commission |
201959 | 4/4/2014 |
Notice of Committee Meeting - Closed Session 4 page(s)
| | Parties | California Energy Commission |
201958 | 4/3/2014 |
Basin and Range Watch Comments: April 16th, Palen Workshop Request
3 page(s)
| | CEC/Dockets Unit | Basin and Range Watch |
201948 | 4/1/2014 |
Comments re: Possible Alternatives for Thermal Energy Storage, dated March 28, 2014
2 page(s)
| | CEC/Christine Stora | California Center for Sustainable Energy |
201947 | 4/1/2014 |
Letter to Roger Johnson re Presiding Members Proposed Decision for the Palen Solar Electric Generating System
7 page(s)
| | CEC/Roger Johnson | Soboba Band of Luiseño Indians |
201942 | 4/1/2014 |
Notice of Workshop
Alternatives, Biological Resources, Facility Design 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201909 | 3/24/2014 |
Notice of Public Workshop on Tuesday, April 8, 2014
Cultural Resources 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
201907 | 3/24/2014 |
Memo re Responses to Petitioner's Motion to Reopen
1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201901 | 3/21/2014 |
Palen Solar Holdings, LLC's Updated Compilation of Avian Data as of 3-21-14
Biological Resources 7 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201900 | 3/21/2014 |
Palen Solar Holdings, LLC's Motion to Reopen Evidentiary Record
7 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201871 | 3/13/2014 |
Letter to Honorable Dennis Patch re: PSEGS - CEC Tribal Consultation, dated March 7, 2014
1 page(s)
| | Honorable Dennis Patch, Chairman/Colorado River Indian Tribes | California Energy Commission |
201838 | 3/7/2014 |
Palen Solar Holdings, LLC's Review of Potential Bird Deterrent Strategies for Large Scale Solar Facilities
13 page(s)
| 1130 | CEC/Dockets Unit | Galati | Blek LLP |
201817 | 3/3/2014 |
Palen Solar Holdings, LLC's Drawing Showing Potential Future Thermal Storage Equipment
1 page(s)
| 1129 | | Galati | Blek LLP |
201811 | 2/28/2014 |
Palen Solar Holdings, LLC's Updated Compilation of Avian Data at Various Solar Projects as of 02-26-14
Biological Resources 7 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201809 | 2/28/2014 |
Palen Solar Holdings, LLC's Proposed Revisions to Condition of Certification BIO-16b
Biological Resources 6 page(s)
| 1128 | CEC/Dockets Unit | Galati | Blek LLP |
201808 | 2/28/2014 |
Palen Solar Holdings, LLC's Status Report 5
5 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201807 | 2/28/2014 |
Colorado River Indian Tribes Comments: Palen Solar Electric Generating System-California Energy Commission/Tribal Consultation
2 page(s)
| | CEC/Roger Johnson | Colorado River Indian Tribes |
201757 | 2/18/2014 |
Palen Status Report No 5
Biological Resources, Cultural Resources, Compliance 3 page(s)
| | Commissioner Karen Douglas | California Energy Commission |
201735 | 2/13/2014 |
Palen Solar Holdings, LLC’s Response to Center for Biological Diversity’s Data Request (2:7:14)
2 page(s)
| 1127 | | Galati | Blek LLP |
201720 | 2/13/2014 |
Email requesting meeting to review concerns
1 page(s)
| | CEC/Thomas Gates | Agua Caliente Band of Cahuilla Indians |
201719 | 2/13/2014 |
Response letter from Soboba Band of Luiseno Indians re Invitation to Participate in CEC/Tribal Consultation Concerning CUL-1
1 page(s)
| | CEC/Thomas Gates | Soboba Band of Luiseno Indians |
201713 | 2/10/2014 |
Palen Solar Holdings, LLC's Alternatives Supplemental Testimony
Alternatives 8 page(s)
| 1124 | CEC / Dockets | Galati | Blek LLP |
201710 | 2/10/2014 |
Palen Solar Holdings, LLC's Compilation of Avian Data at Various Solar Projects
Biological Resources 7 page(s)
| | | Galati | Blek LLP |
201704 | 2/10/2014 |
Palen Solar Holdings, LLC's Overriding Considerations Supplemental Testimony
20 page(s)
| 1125 | | Galati | Blek LLP |
201700 | 2/10/2014 |
Palen Solar Holdings, LLC's Proposed Revisions of Staff's Condition of Certification CUL-1
Cultural Resources 5 page(s)
| 1126 | CEC/ Dockets | Galati | Blek LLP |
201677 | 2/7/2014 |
Data Request -Avian Data Data Request on Avian Data Biological Resources 3 page(s)
| | CEC | Center for Biological Diversity |
201640 | 2/5/2014 |
Corrected Transcript of Palen Evidentiary Hearing 10-28-13 Corrects Transcript docketed 11/18/13 tn 201234 316 page(s)
| | Parties | California Energy Commission |
201623 | 2/3/2014 |
Palen Solar Holdings, LLC's Status Report 4
3 page(s)
| | | Galati | Blek LLP |
201619 | 2/3/2014 |
Invitations to Tribes and Tribal Leaders to Participate in California Energy Commission/Tribal Consultation
Cultural Resources 63 page(s)
| | See Cover Sheet-Page 1 of document | California Energy Commission |
201608 | 1/28/2014 |
Corrected Transcipt of the Committee Conference held January 7, 2014
81 page(s)
| | All Parties | California Energy Commission |
201586 | 1/23/2014 |
Committee Order re: Status Reports
Alternatives, Biological Resources, Cultural Resources 3 page(s)
| | Parties | Energy Commission Hearing Office |
201546 | 1/10/2014 |
Palen Transcript of the Committee Conference held January 7, 2013 Corrected Transcript Docketed as TN 201608 81 page(s)
| | CEC/Docket Unit | California Energy Commission |
201542 | 1/10/2014 |
Rough Copy Reporter's Transcript of the Committee Conference on the Presiding Member's Proposed Decision on 1/7/14 Alternatives, Biological Resources, Cultural Resources 81 page(s)
| | All Parties | California Energy Commission |
201518 | 1/8/2014 |
Sarah Friedman Comments: Docket No. 09-AFC-07C: Palen Solar Power Project – Compliance, Comments of Sierra Club on Presiding Member’s Proposed Decision
Biological Resources 2 page(s)
| | CEC/Dockets Unit | Sarah Friedman |
201516 | 1/7/2014 |
Letter of Support for Presiding Member's Proposed Decision
Alternatives 2 page(s)
| | CEC/Dockets Unit | National Park Service |
201513 | 1/6/2014 |
Comments of CRIT re Schedule Extension and Supplemental Record
6 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201507 | 1/2/2014 |
Seth Shteir Comments: National Parks Conservation Association Strongly Supports PMPD
4 page(s)
| | CEC/Dockets Unit | National Parks Conservation Association/Seth Shteir |
201466 | 12/23/2013 |
Memo Approving Time Delay and Extending Comment Period
1 page(s)
| | Parties and Public | California Energy Commission |
201464 | 12/23/2013 |
Request for Delay in the Schedule
2 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201460 | 12/20/2013 |
California Defenders of Wildlife Comments supporting PMPD Decision
Compliance 2 page(s)
| | CEC/Dockets Unit | Defenders of Wildlife/Kim Delfino |
201458 | 12/20/2013 |
Memorandum re: PSEGS Parties' Comments on PMPD While parties' comments on the PMPD are not required, the Committee asks that the parties file their comments before noon on 1/6/14 so they may addressed at the 1/7/14 Committee Conference on the PMPD. 1 page(s)
| | All Parties | California Energy Commission |
201435 | 12/13/2013 |
Notice of Availability
| | | California Energy Commission |
201434 | 12/13/2013 |
Presiding Member's Proposed Decision
1021 page(s)
| | Parties | California Energy Commission |
201422 | 12/12/2013 |
Letter Regarding Update on Morongo Basin Conservation Association Response to CEC Letter (12/6/2013)
3 page(s)
| | Commissioner Karen Douglas and David Hochschild, and BLM Project Manager Frank McMenimen | Morongo Basin Conservation Association |
201421 | 12/12/2013 |
Letter Regarding Palen Solar Energy Generating System Power Tower Dimensions
2 page(s)
| | Jennifer Martin-Gallardo/CEC | Morongo Basin Conservation Association |
201381 | 12/6/2013 |
CEC Staff Response to Morongo Basin Conservation Association December 3, 2013 Letter
2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201373 | 12/5/2013 |
Final Determination of Compliance
Air Quality 250 page(s)
| 2016 | CEC/Christine Stora | South Coast Air Quality Management District |
201367 | 12/4/2013 |
Letter re Conflicting Power Tower Dimensions Between the CEC-FSA
Project Description, Visual Resources 2 page(s)
| | Commissioners Douglas and Hochschild, BLM's Frank McMeniman | Morongo Basin Conservation Association |
201366 | 12/4/2013 |
Transcript of the 11/25/13 Evidentiary Hearing Transcript of 11/25/13 Hearing and Closed Session Air Quality 19 page(s)
| | Alll Parties | California Energy Commission |
201358 | 12/2/2013 |
Rebuttal Brief of Colorado River Indian Tribes
Cultural Resources 10 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201357 | 12/2/2013 |
County of Riverside Letter Regarding Palen Solar Holdings Opening Brief
Worker Safety and Fire Protection 5 page(s)
| | CEC/Dockets Unit | County of Riverside |
201355 | 12/2/2013 |
Energy Commission Staff Reply Brief
5 page(s)
| | CEC/ Dockets Unit | California Energy Commission |
201353 | 12/2/2013 |
Palen Solar Holdings, LLC's Reply Brief
25 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201345 | 11/27/2013 |
Reporter's Transcript of the 11/22/13 Evidentiary Hearing 11/22/13 Evidentiary Hearing Reporter's Transcript Air Quality, Greenhouse Gases 71 page(s)
| | All Parties | California Energy Commission |
201338 | 11/26/2013 |
ENERGY COMMISSION STAFF OPENING BRIEF
Compliance 44 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201336 | 11/26/2013 |
Center for Biological Diversity - Opening Brief Opening Brief and Appendix with COC changes 60 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
201332 | 11/26/2013 |
Opening Brief of Colorado River Indian Tribes
Alternatives, Cultural Resources, Visual Resources 30 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201331 | 11/26/2013 |
Palen Solar Holdings, LLC's Opening Brief
41 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201329 | 11/26/2013 |
Basin and Range Watch Opening Brief Opening Brief 6 page(s)
| | CEC/Dockets Unit | Basin and Range Watch |
201324 | 11/25/2013 |
Tourism Economics Commission Comments: Draft Supplemental Environmental Impact Statement July 2013
5 page(s)
| | CEC/Dockets Unit | Tourism Economics Commission |
201323 | 11/25/2013 |
Exhibit 55 in the RSEP Proceeding
21 page(s)
| 1123 | CEC/Dockets Unit | Galati | Blek LLP |
201322 | 11/22/2013 |
SCAQMD's Comments to the Final Staff Assessment for Palen Solar Generation FSA comments from SCAQMD Air Quality 2 page(s)
| 2015 | Christine Stora | South Coast Air Quality Management District |
201321 | 11/22/2013 |
CRIT's Corrections to the October 28, 2013 Transcript
11 page(s)
| | | Shute, Mihaly & Weinberger LLP |
201320 | 11/24/2013 |
Memorandum re: PSEGS AQ Briefs Memo in response to CBC request for briefing dates on Air Quality. Greenhouse Gases, Air Quality 1 page(s)
| | All Parties | California Energy Commission |
201313 | 11/22/2013 |
Notice of Continuance of Evidentiary Hearing Notice of Continuance of the Evidentiary Hearing for the Committee to conduct a closed session. Contains WebEx information for public comment. 5 page(s)
| | All Parties | California Energy Commission |
201312 | 11/22/2013 |
Center for Biological Diversity's Corrections to 10 29 Transcript
1 page(s)
| | | Center for Biological Diversity |
201311 | 11/22/2013 |
Center Corrections to 10 28 Transcript document 9 page(s)
| | | Center for Biological Diversity |
201310 | 11/22/2013 |
Staff's Corrections to 10/28/13 Evidentiary Hearing Reporter's Transcript
16 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201309 | 11/22/2013 |
Palen Solar Holding’s Corrections to 10/28/13 Evidentiary Hearing Transcript
1 page(s)
| | | Galati | Blek LLP |
201307 | 11/22/2013 |
Palen Solar Project Site and Private Parcels Map
Project Description 1 page(s)
| 3091 | | Galati | Blek LLP |
201302 | 11/21/2013 |
Exh. 3089 Ivanpah Solar Electric Generating System Oct 2013 Monthly Compliance Report monitoring compliance report Biological Resources 611 page(s)
| 3089 | CEC/Dockets Unit | Center for Biological Diversity |
201301 | 11/21/2013 |
Exh. 3090 Ivanpah Solar Plants May be Attracting Birds article Biological Resources 4 page(s)
| 3090 | CEC/Dockets Unit | Center for Biological Diversity |
201300 | 11/21/2013 |
Exh. 3086 Desert Sunlight Air Quality Monitoring Report Sept. 2013 AQ monitoring report Air Quality 23 page(s)
| 3086 | CEC/Dockets Unit | Center for Biological Diversity |
201299 | 11/21/2013 |
Exh. 3087 Solar threatens biofuels Article Biological Resources 3 page(s)
| 3087 | CEC/Dockets Unit | Center for Biological Diversity |
201298 | 11/21/2013 |
Exh. 3088 Funnel Effect Discussion Article Biological Resources 3 page(s)
| 3088 | CEC/Dockets Unit | Center for Biological Diversity |
201297 | 11/21/2013 |
Exh. 3085 Desert Sunlight Air Quality Monitoring Report August 2013 AQ monitoring report Air Quality 24 page(s)
| 3085 | CEC/Dockets Unit | Center for Biological Diversity |
201296 | 11/21/2013 |
Exh. 3082 Desert Sunlight Air Quality Monitoring Report May 2013 AQ monitoring report Air Quality 24 page(s)
| 3082 | CEC/Dockets Unit | Center for Biological Diversity |
201295 | 11/21/2013 |
Exh. 3083 Desert Sunlight Air Quality Monitoring Report June 2013 AQ monitoring report Air Quality 23 page(s)
| 3083 | CEC/Dockets Unit | Center for Biological Diversity |
201294 | 11/21/2013 |
Exh. 3084 Desert Sunlight Air Quality Monitoring Report July 2013 AQ monitoring report Air Quality 25 page(s)
| 3084 | CEC/Dockets Unit | Center for Biological Diversity |
201293 | 11/21/2013 |
Exh. 3081 Desert Sunlight Air Quality Monitoring Report April 2013 AQ monitoring report Air Quality 23 page(s)
| 3081 | CEC/Dockets Unit | Center for Biological Diversity |
201292 | 11/21/2013 |
Exh. 3079 Desert Sunlight Air Quality Monitoring Report Feb 2013 AQ monitoring report Air Quality 22 page(s)
| 3079 | CEC/Dockets Unit | Center for Biological Diversity |
201291 | 11/21/2013 |
Exh. 3080 Desert Sunlight Air Quality Monitoring Report March 2013 AQ monitoring report Air Quality 24 page(s)
| 3080 | CEC/Dockets Unit | Center for Biological Diversity |
201290 | 11/21/2013 |
Exh. 3078 Desert Sunlight Air Quality Monitoring Report Jan 2013 AQ Monitoring report Air Quality 24 page(s)
| 3078 | CEC/Dockets Unit | Center for Biological Diversity |
201289 | 11/21/2013 |
Exh. 3075 Desert Sunlight Air Quality Monitoring Report Oct. 2012 AQ Monitoring report Air Quality 24 page(s)
| 3075 | CEC/Dockets Unit | Center for Biological Diversity |
201288 | 11/21/2013 |
Exh 3076 Desert Sunlight Air Quality Monitoring Report Nov. 2012 AQ Monitoring report Air Quality 23 page(s)
| 3076 | CEC/Dockets Unit | Center for Biological Diversity |
201287 | 11/21/2013 |
Exh. 3077 Desert Sunlight Air Quality Monitoring Report Dec. 2012 AQ monitoring report Air Quality 24 page(s)
| 3077 | CEC/Dockets Unit | Center for Biological Diversity |
201286 | 11/21/2013 |
Exh. 3073 Desert Sunlight Air Quality Monitoring Report August 2012 AQ Monitoring Report Air Quality 24 page(s)
| 3073 | CEC/Dockets Unit | Center for Biological Diversity |
201285 | 11/21/2013 |
Exh. 3074 Desert Sunlight Air Quality Monitoring Report Sept. 2012 AQ Monitoring Report Air Quality 23 page(s)
| 3074 | CEC/Dockets Unit | Center for Biological Diversity |
201284 | 11/21/2013 |
Exh. 3067 Air Quality Testimony I. Anderson PSEGS Air Quality testimony and additional Biology Air Quality, Biological Resources 3 page(s)
| 3067 | CEC/Dockets Unit | Center for Biological Diversity |
201283 | 11/21/2013 |
Exh. 3069 Desert Sunlight Air Quality Monitoring Report April 2012 AQ MONITORING REPORT Air Quality 24 page(s)
| 3069 | CEC/Dockets Unit | Center for Biological Diversity |
201282 | 11/21/2013 |
Exh. 3070 Desert Sunlight Air Quality Monitoring Report May 2012 AQ MONITORING REPORT Air Quality 24 page(s)
| 3070 | CEC/Dockets Unit | Center for Biological Diversity |
201281 | 11/21/2013 |
Exh. 3071 Desert Sunlight Air Quality Monitoring Report June 2012 AQ MONITORING REPORT Air Quality 23 page(s)
| 3071 | CEC/Dockets Unit | Center for Biological Diversity |
201280 | 11/21/2013 |
Exh.3072 Desert Sunlight Air Quality Monitoring Report July 2012 AQ MONITORING REPORT Air Quality 24 page(s)
| 3072 | CEC/Dockets Unit | Center for Biological Diversity |
201279 | 11/21/2013 |
Exh. 3068. Desert Sunlight Air Quality Monitoring Report March 2012 AQ MONITORING REPORT Air Quality 22 page(s)
| 3068 | CEC/Dockets Unit | Center for Biological Diversity |
201261 | 11/19/2013 |
Exhibit 3066. NPS comments on PSEGS SDEIS NPS comment on PSEGS SDEIS Air Quality, Alternatives, Biological Resources, Cultural Resources, Visual Resources 7 page(s)
| 3066 | BLM | Center for Biological Diversity |
201252 | 11/18/2013 |
Revised Memo re: Correcting Transcript Memo from Hearing Advisor asking parties to submit their corrections to the 10/28/13 reporter's transcripts at the 11/22/13 evidentiary hearing. 1 page(s)
| | All Parties | California Energy Commission |
201243 | 11/18/2013 |
Memo re Correcting the Transcript Memo from the Hearing Advisor regarding submission of the parties' corrections to the 10/28/13 reporters transcript. 1 page(s)
| | All Parties | California Energy Commission |
201240 | 11/18/2013 |
Letter to Mr. Mohsen Nazemi Regarding Comments on SCAQMD Preliminary Determination of Compliance
Air Quality, Compliance 2 page(s)
| | Mr. Mohsen Nazemi, Deputy Executive Officer/South Coast Air Quality Management District | California Energy Commission |
201239 | 11/18/2013 |
Memo re SECOND PSEGS Briefing Extension Memo changing the due dates for Opening and Rebuattal Briefs 1 page(s)
| | All Parties | California Energy Commission |
201234 | 11/18/2013 |
Transcript of the 10/28/13 Evidentiary Hearing Corrected Transcript docketed 2/5/14 TN 201640 304 page(s)
| | | California Energy Commission |
201233 | 11/15/2013 |
Palen and CEC Staff Stipulation Regarding Certain Conditions of Certification Part 2
176 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201212 | 11/14/2013 |
Comments on the Draft Supplemental Environmental Impact Statement
Air Quality, Alternatives, Biological Resources, Land Use, Soil and Water, Greenhouse Gases 47 page(s)
| | Bureau of Land Management/Frank McMenimen | Center for Biological Diversity |
201208 | 11/14/2013 |
Request to Continue Briefing Deadlines
Compliance 2 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
201201 | 11/14/2013 |
Sandy Choudhari Comments: Comments on Proposed Palen Solar Draft Supplement EIS
1 page(s)
| | CEC/Dockets Unit | Sandy Choudhari |
201199 | 11/14/2013 |
U.S. Fish and Wildlife Service Comments on CEC FSA for Proposed PSEGS
Biological Resources 13 page(s)
| | CEC/Dockets Unit | U.S. Department of the Interior Fish and Wildlife Service |
201197 | 11/14/2013 |
Comments on the Draft Supplemental Environmental Impact Statement Memorandum 14 page(s)
| | California Desert District Manager, Bureau of Land Management/Greg Miller | U.S. Department of the Interior, Fish and Wildlife Services |
201181 | 11/13/2013 |
Palen Solar Holdings/California Energy Commission Stipulation Regarding Certain Conditions of Certification – Part 1
110 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201170 | 11/13/2013 |
Brendan Hughes Comments: Comments on Proposed Palen Solar Draft Supplement EIS
1 page(s)
| | CEC/Dockets Unit | Brendan Hughes |
201146 | 11/8/2013 |
Memorandum re: PSEGS Briefing Due Dates Memorandum re: new PSEGS Due Dates for Opening and Rebuttal Briefs 1 page(s)
| | All Parties | California Energy Commission |
201143 | 11/7/2013 |
Veena Comments: Committee to confirm land use as per current zoning will not be impacted for neighboring parcels
Hazardous Materials, Land Use, Public Health, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Soil and Water 1 page(s)
| | CEC/Dockets Unit | Veena |
201137 | 11/7/2013 |
Notice of Availability of the Final Staff Assessment-Part C Public Letter Air Quality, Compliance 6 page(s)
| | | California Energy Commission |
201136 | 11/7/2013 |
Document Handling for the Final Staff Assessment-Part C and Posting of Public Notice Library Letter Air Quality, Compliance 2 page(s)
| | | California Energy Commission |
201135 | 11/7/2013 |
Request For Comments on the Final Staff Assessment-Part C Agency Letter Air Quality, Compliance 4 page(s)
| | | California Energy Commission |
201134 | 11/6/2013 |
Email re: briefing dates from Basin and Range Watch
1 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201133 | 11/6/2013 |
CBD request to extend brief dates Email and motion to extend dates to file briefs 2 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201132 | 11/6/2013 |
Email re: brief from Staff Email from Staff re: brief from CBD requesting extension of time to file briefs 1 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201131 | 11/6/2013 |
Email re: briefing dates from PSH Email from PSH re: CBD's request to extend briefing dates 1 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201130 | 11/6/2013 |
Email re: briefing dates from CURE
1 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201129 | 11/6/2013 |
Email re: briefing dates from CRIT
1 page(s)
| | PSEGS Committee and parties | California Energy Commission |
201124 | 11/6/2013 |
Center for Biological Diversity's Request to Continue Briefing Deadlines
2 page(s)
| | CEC/Ken Celli | Center for Biological Diversity |
201123 | 11/6/2013 |
Notice of Evidentiary Hearing Notice of Hearing on 11-22-13 6 page(s)
| | Parties | Energy Commission Hearing Office |
201121 | 11/6/2013 |
Email to Parties re: CBD motion Email to Parties re: CBD motion to extend the briefing deadlines 1 page(s)
| | | California Energy Commission |
201119 | 11/5/2013 |
Metropolian Water District of Southern California Comments on the Final Staff Assessment- Part A
17 page(s)
| | | Metropolitan Water District of Southern California |
201117 | 11/5/2013 |
10/24/13 Preahearing Conference Transcript Transcript of Preahearing Conference 10/24/13 136 page(s)
| | | California Energy Commission |
201110 | 11/4/2013 |
10/29/13 Transcript of the Palen Evidentiary Hearing Transcript of the 10/29/13 Palen Evidentiary Hearing - Day 2 Biological Resources, Worker Safety and Fire Protection, Alternatives 271 page(s)
| | | California Energy Commission |
201102 | 11/4/2013 |
Exhibit 3065 Record Identification Record Identification for oral testimony on fence line Biological Resources 2 page(s)
| 3065 | CEC/Dockets Unit | Center for Biological Diversity |
201099 | 11/1/2013 |
Memorandum from the Committee suggesting issues to be briefed by the parties.
Biological Resources, Land Use, Visual Resources 1 page(s)
| | | California Energy Commission |
201097 | 11/1/2013 |
Palen - Final Staff Assessment Part C Final Staff Assessment - Part C Air Quality 117 page(s)
| 2013 | CEC/Dockets Unit | California Energy Commission |
201089 | 10/31/2013 |
Exhibit 2012 – Condition of Certification Worker Safety-5
1 page(s)
| 2012 | CEC/Dockets Unit | California Energy Commission |
201088 | 10/31/2013 |
Exhibit 2011 – Conditions of Certification PAL-5 and PAL-9
4 page(s)
| 2011 | CEC/Dockets Unit | California Energy Commission |
201086 | 10/31/2013 |
Ex. 5002 - Clipping of a photograph of sculpture of Native American idol
Cultural Resources 1 page(s)
| 5002 | CEC/Dockets Unit | Californians for Renewable Energy |
201085 | 10/31/2013 |
Exhibit 5001 (back) Photo of Corn Springs Offramp
Cultural Resources 2 page(s)
| 5001 | CEC/Dockets Unit | Californians for Renewable Energy |
201084 | 10/31/2013 |
Exhibit 5001 (front and back) - Photo of Corn Springs offramp of the I-10
Cultural Resources 2 page(s)
| | CEC/Dockets Unit | Californians For Renewable Energy |
201078 | 10/29/2013 |
County of Riverside letter regarding Final Staff Assessment - Parts A and B County of Riverside comment letter regarding FSA Parts A and B. 59 page(s)
| | | County of Riverside |
201076 | 10/30/2013 |
County of Riverside letter regarding Final Staff Assessment - Parts A and B 59 page(s)
| | CEC/Dockets Unit | County of Riverside |
201075 | 10/30/2013 |
Exh 3064 Chain Link Sand Fence photo photo Biological Resources 1 page(s)
| 3064 | CEC/Dockets Unit | Center for Biological Diversity |
201072 | 10/29/2013 |
Cumulative Projects Lists with Edits from PSA to FSA
45 page(s)
| | | California Energy Commission |
201060 | 10/23/2013 |
Email to Parties re Link to Exhibit List - Revised email with working link.
1 page(s)
| | | California Energy Commission |
201057 | 10/25/2013 |
Staff's Motion for Reconsideration of Decision to Exclude Lorey Cachora from Participating on Staff's Cultural Resources Panel
3 page(s)
| | | California Energy Commission |
201054 | 10/25/2013 |
Palen Solar Holding's Proposed Modifications to BIO Conditions contained in Staff's Rebuttal Testimony
Biological Resources 6 page(s)
| 1122 | CEC/Dockets Unit | Galati | Blek LLP |
201053 | 10/24/2013 |
Tanya Trujillo Comments: Comments of the Colorado River Board of California
Soil and Water 4 page(s)
| | CEC/Dockets Unit | Tanya Trujillo |
201051 | 10/24/2013 |
PSEGS Witness Worksheet Hearing Officer's worksheet identifying witnesses and estimating time for testimony. 5 page(s)
| | N/A | California Energy Commission |
201047 | 10/24/2013 |
Testimony of Wilene Fisher-Holt and email from CRIT Counsel re Confidentiality Process
6 page(s)
| 8026 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201045 | 10/17/2013 |
Palen Testimony 10-12-13
4 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
201044 | 10/17/2013 |
8017 Anonymous Testimony
1 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
201043 | 10/17/2013 |
8016 Stacia Bailey Testimony
2 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
201042 | 10/17/2013 |
8015 P Smith Testimony
2 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
201041 | 10/17/2013 |
Testimony of W. Fisher-Holt re Impacts
4 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
201030 | 10/23/2013 |
Lorey Cachora Declaration, Bio and CV
3 page(s)
| 2010 | | California Energy Commission |
201029 | 10/23/2013 |
Staff's Revised Prehearing Conference Statement - Identity of Staff Witnesses
7 page(s)
| | | California Energy Commission |
201023 | 10/23/2013 |
South Coast Air Quality Management District's Preliminary Determination of Compliance
Air Quality 136 page(s)
| | CEC/Dockets Unit | South Coast Air Quality Management District |
201010 | 10/23/2013 |
Staff’s REVISED Exhibit List – Adding Exhibits 2007 and 2008
2 page(s)
| | | California Energy Commission |
201009 | 10/23/2013 |
Notice of Intent to Issue Permit
2 page(s)
| | CEC/Dockets Unit | South Coast Air Quality Management District |
201008 | 10/23/2013 |
Palen Solar Holdings Objection to Petition to Intervene
3 page(s)
| | CEC/Ken Celli | Galati Blek, LLP |
201006 | 10/22/2013 |
Final Staff Assessment - Supplement A
41 page(s)
| 2008 | | California Energy Commission |
201002 | 10/22/2013 |
Revised Intervenor CRIT Exh. 8020
Cultural Resources 6 page(s)
| | | Shute, Mihaly & Weinberger LLP |
201001 | 10/22/2013 |
PSH's Prehearing Conference Statement
45 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
200998 | 10/22/2013 |
Intervenor CRIT Exh. 8020
Cultural Resources 6 page(s)
| 8020 | | Shute, Mihaly & Weinberger LLP |
200997 | 10/22/2013 |
Pre-Hearing Conference Statement
11 page(s)
| | | Shute, Mihaly & Weinberger LLP |
200996 | 10/22/2013 |
Staff's Prehearing Conference Statement with Exhibit List - Final
8 page(s)
| | | California Energy Commission |
200995 | 10/22/2013 |
Exhibit 2005 - CDFW Outline for Proposed Desert Kit Fox Health Monitoring and Mitigation Program to CEC
3 page(s)
| 2005 | | California Energy Commission |
200991 | 10/22/2013 |
Exhibit 4000-Impacts to Visual Resoures from the Palen Solar Energy Power Project
Visual Resources 9 page(s)
| 4000 | CEC/Dockets Unit | Basin and Range Watch |
200990 | 10/22/2013 |
Basin and Range Watch Prehearing Conference Statement
5 page(s)
| | CEC/Dockets Unit | Basin and Range Watch |
200989 | 10/22/2013 |
Center Prehearing Conference Statement Prehearing Conf. Statement with exhibit list 14 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
200988 | 10/22/2013 |
Center for Biological Diversity's Response re Petition to Intervene
2 page(s)
| | CEC/Ken Celli | California Energy Commission |
200987 | 10/22/2013 |
Basin and Range Watch's Response re Petition to Intervene
2 page(s)
| | CEC/Ken Celli | California Energy Commission |
200986 | 10/22/2013 |
Email to Parties re Petition to Intervene
2 page(s)
| | | California Energy Commission |
200985 | 10/22/2013 |
Colorado River Indian Tribes Response re Petition to Intervene
2 page(s)
| | CEC/Ken Celli | California Energy Commission |
200981 | 10/21/2013 |
10-21-13 General Orders Updated for e-filing and Attachments
18 page(s)
| | | California Energy Commission |
200980 | 10/21/2013 |
Energy Commission Staff's Rebuttal Testimony with Attachments
45 page(s)
| 2003 | | California Energy Commission |
200979 | 10/21/2013 |
Rebuttal Testimony of R. Loudbear, W. King, S. Clark re Cultural Resources
Cultural Resources 7 page(s)
| 8027 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200977 | 10/21/2013 |
Petition to Intervene-National Parks Conservation Association
7 page(s)
| | CEC/Dockets Unit | National Parks Conservation Association |
200969 | 10/21/2013 |
PSH's Rebuttal Testimony to Intervenor CRIT's Opening Testimony
Cultural Resources 11 page(s)
| 1081 | CEC/Dockets Unit | Galati | Blek LLP |
200968 | 10/21/2013 |
PSH's Rebuttal Testimony to Intervenor CBD's Opening Testimony
Biological Resources 62 page(s)
| 1080 | CEC/Dockets Unit | Galati | Blek LLP |
200967 | 10/21/2013 |
10.21.13 PALEN Siting case general orders updated for e-filing and attachment.pdf 18 page(s)
| | | California Energy Commission |
200966 | 10/21/2013 |
Exh. 3058a. HHSEGS FSA Part 1 CEC's HHSEGS FSA Biological Resources, Soil and Water 1136 page(s)
| 3058 | | Center for Biological Diversity |
200965 | 10/21/2013 |
Exh. 3058b. HHSEGS FSA Part 2 CEC's HHSEGS FSA Biological Resources, Soil and Water 1045 page(s)
| 3063 | | Center for Biological Diversity |
200964 | 10/21/2013 |
Exh 3061 Muth Rebuttal Testimony rebuttal testimony Biological Resources 3 page(s)
| 3061 | CEC/Dockets Unit | Center for Biological Diversity |
200963 | 10/18/2013 |
Exh. 3060 . ISEGS September 2013 Monthly Compliance Report Monthly compliance report Sept. 2013 ISEGS Biological Resources 736 page(s)
| 3060 | | Center for Biological Diversity |
200962 | 10/18/2013 |
Exh. 3057 Avian Mortality Report 9-1-2013 (ISEGS) spreadsheet of avian mortalities from ISEGS Biological Resources
| 3057 | | Center for Biological Diversity |
200961 | 10/18/2013 |
Exh. 3059. Monthly Compliance Report August 2013 (Genesis) monthly compliance report on Genesis from August 2013 Biological Resources 497 page(s)
| 3059 | | Center for Biological Diversity |
200952 | 10/18/2013 |
Email from Roy Oliveras to CEC/Christine Stora PDOC/Title V/Public Notice/Letters Signed by Mohsen for PSEGS Title V Review 44 page(s)
| | CEC/Christine Stora | South Coast Air Quality Management District |
200951 | 10/18/2013 |
Preliminary Determination of Compliance / Title V / Notice of Intent to Issue Permit PDOC/Title V/Public Notice Air Quality 5 page(s)
| 2006 | Mr. Gerardo Rios | South Coast Air Quality Management District |
200944 | 10/18/2013 |
Email re: I-10 Fencing Email between Scott Galati and CEC/Christine Stora 1 page(s)
| | Scott Galati | CEC/Christine Stora |
200932 | 10/17/2013 |
Colorado River Indian Tribes Application for Confidential Designation
3 page(s)
| | CEC/Dockets Unit | Colorado River Indian Tribes |
200931 | 10/17/2013 |
Exh. 3027. Manning 2009. BUOW Pop Size in Imp Valley CA Report to IID Biological Resources 193 page(s)
| 3027 | CEC/Dockets Unit | Center for Biological Diversity |
200930 | 10/17/2013 |
Exh. 3036. Impact Minimization Alternative (MFTL&RP) Map of alternative Biological Resources 1 page(s)
| 3036 | CEC/Dockets Unit | Center for Biological Diversity |
200929 | 10/17/2013 |
Exh. 3011. Esque etal. 2010 Effects of subsidized predators & translocation journal article Biological Resources 11 page(s)
| 3011 | CEC/Dockets Unit | Center for Biological Diversity |
200928 | 10/17/2013 |
E-Filing Unavailable 10/19/13 Memo 1 page(s)
| | All Parties | California Energy Commission |
200927 | 10/16/2013 |
Opening Testimony, Exhibit List, and Exhibits
8 page(s)
| 8021 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200926 | 10/16/2013 |
Intervenor CRIT Ex. 8019
Cultural Resources 3 page(s)
| 8019 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200925 | 10/16/2013 |
Intervenor CRIT Ex. 8013
Cultural Resources 22 page(s)
| 8013 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200924 | 10/16/2013 |
Intervenor CRIT Ex. 8014
Cultural Resources 2 page(s)
| 8014 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200923 | 10/16/2013 |
Intervenor CRIT Ex. 8011
Cultural Resources 3 page(s)
| 8011 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200922 | 10/16/2013 |
Intervenor CRIT Ex. 8012
Cultural Resources 26 page(s)
| 8012 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200921 | 10/16/2013 |
Intervenor CRIT Ex. 8008
Cultural Resources 3 page(s)
| 8008 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200920 | 10/16/2013 |
Intervenor CRIT Ex. 8009
Cultural Resources 4 page(s)
| 8009 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200919 | 10/16/2013 |
Intervenor CRIT Ex. 8010
Cultural Resources 7 page(s)
| 8010 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200918 | 10/16/2013 |
Intervenor CRIT Ex. 8006
Cultural Resources 68 page(s)
| 8006 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200917 | 10/16/2013 |
Intervenor CRIT Ex. 8007
Cultural Resources 3 page(s)
| 8007 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200916 | 10/16/2013 |
Intervenor CRIT Ex. 8005
Cultural Resources 26 page(s)
| 8005 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200915 | 10/16/2013 |
Intervenor CRIT Ex. 8002
Cultural Resources 5 page(s)
| 8002 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200914 | 10/16/2013 |
Intervenor CRIT Ex. 8003
Cultural Resources 6 page(s)
| 8003 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200913 | 10/16/2013 |
Intervenor CRIT Ex. 8004
Cultural Resources 4 page(s)
| 8004 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200912 | 10/16/2013 |
Intervenor CRIT Ex. 8000
Cultural Resources 2 page(s)
| 8000 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200911 | 10/16/2013 |
Intervenor CRIT Ex. 8001
Cultural Resources 12 page(s)
| 8001 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200910 | 10/16/2013 |
Exhibit 3051: California's Famous "duck chart" is outdated, experts say news article Alternatives 2 page(s)
| 3051 | CEC/Dockets Unit | Center for Biological Diversity |
200909 | 10/16/2013 |
Opening Testimony of R. Loudbear, et al re Lessons Learned from the Unanticapted Discovery at Genesis CRIT Cultural Resources 19 page(s)
| 8024 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200908 | 10/16/2013 |
Testimony of W. Patch re Impacts of Renewable Energy Projects on CRIT
Cultural Resources 4 page(s)
| 8022 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200907 | 10/16/2013 |
Testimony of D. Bonamici re Consultation and Ethnographic Study for Palen Project
Cultural Resources 7 page(s)
| 8025 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200906 | 10/16/2013 |
Opening Testimony of R. Loudbear, et al re Comments on Cultural Resources, Visual Resources, Enviro Justice, Bio Resource, Alts
Visual Resources, Alternatives, Biological Resources, Cultural Resources, Socioeconomics 25 page(s)
| 8023 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
200905 | 10/16/2013 |
Exhibit 3000: Center Opening Testimony and Exhibit List Intervenor's Opening Testimony Alternatives, Biological Resources 10 page(s)
| 3000 | | Center for Biological Diversity |
200904 | 10/16/2013 |
Exh 3050 Testimony of Allan Muth Expert testimony Biological Resources 13 page(s)
| 3050 | | Center for Biological Diversity |
200902 | 10/16/2013 |
Energy Commission Staff's Testimony and Errata to the Final Staff Assessment Part B Errata Part B Cultural Resources 3 page(s)
| 2007 | Commissioners Karen Douglas and David Hochschild, Hearing Officer Ken Celli | California Energy Commission |
200900 | 10/16/2013 |
Exh. 3040-A Linkage Network For The California Deserts BLM cocument Biological Resources 361 page(s)
| 3040 | CEC/Dockets Unit | Center for Biological Diversity |
200899 | 10/16/2013 |
Exh. 3048-Desert Tortoise LCU map Biological Resources 1 page(s)
| 3048 | | Center for Biological Diversity |
200898 | 10/16/2013 |
Exh. 3049-Land Facets Ca Deserts Map map Biological Resources 1 page(s)
| 3049 | CEC/Dockets Unit | Center for Biological Diversity |
200897 | 10/16/2013 |
Exh. 3043-Mojave National Preserve-Stepladder Turtle Mountains Land Facets map Biological Resources 1 page(s)
| 3043 | CEC/Dockets Unit | Center for Biological Diversity |
200896 | 10/16/2013 |
Exh. 3044-Stepladder Turtle Mountains-Palen McCoy Land Facets map Biological Resources 1 page(s)
| 3044 | CEC/Dockets Unit | Center for Biological Diversity |
200895 | 10/16/2013 |
Exh. 3045-Palen-McCoy-Whipple Mountain Land Facets map Biological Resources 1 page(s)
| 3045 | CEC/Dockets Unit | Center for Biological Diversity |
200894 | 10/16/2013 |
Exh. 3046-Joshua Tree National Park - Palen McCoy Mountains Land Facets map Biological Resources 1 page(s)
| 3046 | CEC/Dockets Unit | Center for Biological Diversity |
200893 | 10/16/2013 |
Exh. 3047-Palen-McCoy-Chocolate Mtns LF map Biological Resources 1 page(s)
| 3047 | | Center for Biological Diversity |
200892 | 10/16/2013 |
Exh. 3037-Pat Flanagan testimony, declaration & resume.
Biological Resources 11 page(s)
| 3037 | CEC/Dockets Unit | Center for Biological Diversity |
200891 | 10/16/2013 |
Exh. 3038-Birds Banded at the Salton Sea map of birds Biological Resources 1 page(s)
| 3038 | CEC/Dockets Unit | Center for Biological Diversity |
200890 | 10/16/2013 |
Exh 3039-Priority Areas for Breeding Birds within the Planning Area of DRECP
Biological Resources 42 page(s)
| 3039 | CEC/Dockets Unit | Center for Biological Diversity |
200889 | 10/16/2013 |
Exh. 3041-Journal Article-Use of Land Facets to Plan for Climate Change:Conserving the Arenas, Not the Actors SUPERSEDES TN 200863 Biological Resources 10 page(s)
| 3041 | CEC/Dockets Unit | Center for Biological Diversity |
200888 | 10/16/2013 |
Exh. 3042-Journal Article-Use of land facets to design linkages for climate change
Biological Resources 23 page(s)
| 3042 | CEC/Dockets Unit | Center for Biological Diversity |
200887 | 10/16/2013 |
Exh. 3035-Disturbance and Recovery of Biological Soil Crusts journal article Biological Resources 21 page(s)
| 3035 | CEC/Dockets Unit | Center for Biological Diversity |
200886 | 10/16/2013 |
Exh. 3034-Biological Soil Crusts and Wind Erosion journal article Biological Resources 9 page(s)
| 3034 | CEC/Dockets Unit | Center for Biological Diversity |
200885 | 10/16/2013 |
Exh. 3032-Wildlife Interactions at Solar 1 Facility. Report to SCE Biological Resources 33 page(s)
| 3032 | CEC/Dockets Unit | Center for Biological Diversity |
200884 | 10/16/2013 |
Exh 3033-Potential Roles of Biological Soil Crusts journal article Biological Resources 20 page(s)
| 3033 | CEC/Dockets Unit | Center for Biological Diversity |
200883 | 10/16/2013 |
Exh. 3030-Modern Insect Extinctions journal article Biological Resources 7 page(s)
| 3030 | CEC/Dockets Unit | Center for Biological Diversity |
200882 | 10/16/2013 |
Exh. 3031- Endangered and Threatened Wildlife and Plants; Determination of Endangered Status for Casey’s June Beetle and Des
Biological Resources 45 page(s)
| 3031 | CEC/Dockets Unit | Center for Biological Diversity |
200881 | 10/16/2013 |
Burrowing Owl Population Size in the Imperial Valley California: Survey and Sampling Methodologies for Estimation Biological Resources 193 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
200880 | 10/16/2013 |
Exh. 3028-Staff Report on Burrowing Owl Mitigation CDFG staff report Biological Resources 36 page(s)
| 3028 | CEC/Dockets Unit | Center for Biological Diversity |
200879 | 10/16/2013 |
Exh. 3029-USFWS 2003 Burrowing Owl FWS Status-Assessment USFWS report Biological Resources 120 page(s)
| 3029 | CEC/Dockets Unit | Center for Biological Diversity |
200878 | 10/16/2013 |
Exh. 3025-Bald Eagle and Golden Eagle Mortalities at Wind Energy Facilities in the Contiguous United States
Biological Resources 6 page(s)
| 3025 | CEC/Dockets Unit | Center for Biological Diversity |
200877 | 10/16/2013 |
Exh. 3026-Avian Mortality at Solar Energy Plant. journal article Biological Resources 7 page(s)
| 3026 | CEC/Dockets Unit | Center for Biological Diversity |
200876 | 10/16/2013 |
Exh. 3023-Appendix C.7 Desert Harvest DEIS Golden Eagle Winter Survey Report BLM DEIS appendix Biological Resources 20 page(s)
| 3023 | CEC/Dockets Unit | Center for Biological Diversity |
200875 | 10/16/2013 |
Exh. 3024-Southern California Edison Notice to Proceed Request for the Red Bluff Substation Project Distribution Line SCE request for notice to proceed Biological Resources 46 page(s)
| 3024 | CEC/Dockets Unit | Center for Biological Diversity |
200874 | 10/16/2013 |
Exh. 3020-Journal Article-Golden Eagle Population Trends in the Western United States: 1968–2010
Biological Resources 13 page(s)
| 3020 | CEC/Dockets Unit | Center for Biological Diversity |
200873 | 10/16/2013 |
Exh. 3021-Golden Eagles in US-Canada - status trends journal article Biological Resources 9 page(s)
| 3021 | CEC/Dockets Unit | Center for Biological Diversity |
200872 | 10/16/2013 |
Exh. 3022-FINAL Report_Joshua Tree National Park_GE Survey 2011 NPS report Biological Resources 51 page(s)
| 3022 | CEC/Dockets Unit | Center for Biological Diversity |
200871 | 10/16/2013 |
Exh. 3018-Yuma clapper rail recovery plan USFWS document Biological Resources 60 page(s)
| 3018 | CEC/Dockets Unit | Center for Biological Diversity |
200870 | 10/16/2013 |
Exh. 3019-EBird Lake Tamarisk hotspot checklist 10-15-13 checklist Biological Resources 12 page(s)
| 3019 | CEC/Dockets Unit | Center for Biological Diversity |
200869 | 10/16/2013 |
Exh. 3017-5-Year Review Yuma clapper rail USFWS report Biological Resources 29 page(s)
| 3017 | CEC/Dockets Unit | Center for Biological Diversity |
200868 | 10/16/2013 |
Exh. 3016-Desert Kit Fox Distemper outbreak Los Angeles times article Biological Resources 2 page(s)
| 3016 | CEC/Dockets Unit | Center for Biological Diversity |
200867 | 10/16/2013 |
Exh. 3013-BLM Wind Apps & Auths July 2012 BLM list Biological Resources 9 page(s)
| 3013 | CEC/Dockets Unit | Center for Biological Diversity |
200866 | 10/16/2013 |
Exh. 3014-Kern County wind projects Kern County list Biological Resources 3 page(s)
| 3014 | CEC/Dockets Unit | Center for Biological Diversity |
200865 | 10/16/2013 |
Exh. 3015-McCoy Solar Energy Project PA-FEIS Vol. 1 BLM FEIS Biological Resources 338 page(s)
| 3015 | CEC/Dockets Unit | Center for Biological Diversity |
200864 | 10/16/2013 |
Exh. 3010-ISEGS DT near or on Stateline project site. Map Biological Resources 1 page(s)
| 3010 | | Center for Biological Diversity |
200863 | 10/16/2013 |
Journal Article-Effect of Subsidized Predators, Resource Variability, and Human Population Density on Desert Tortoise Population Biological Resources 11 page(s)
| | CEC/Dockets Unit | Center for Biological Diversity |
200862 | 10/16/2013 |
Exh. 3012-BLM 2012 Solar Apps and Auths BLM list Biological Resources 4 page(s)
| 3012 | CEC/Dockets Unit | Center for Biological Diversity |
200861 | 10/16/2013 |
Exh. 3007-2012 DRAFT Rangewide Mojave Desert Tortoise Monitoring USFWS report Biological Resources 54 page(s)
| 3007 | CEC/Dockets Unit | Center for Biological Diversity |
200860 | 10/16/2013 |
Exh. 3008-The Health Status of Translocated Desert Tortoises 2009 Report USGS report Biological Resources 27 page(s)
| 3008 | CEC/Dockets Unit | Center for Biological Diversity |
200859 | 10/16/2013 |
Exh. 3009-Recommendations of Independent Science Advisors for the California DRECP Technical report Biological Resources 192 page(s)
| 3009 | CEC/Dockets Unit | Center for Biological Diversity |
200858 | 10/16/2013 |
Exh. 3003-Journal Article-How much compensation is enough
Biological Resources 9 page(s)
| 3003 | CEC/Dockets Unit | Center for Biological Diversity |
200857 | 10/16/2013 |
Exh. 3004-Journal Article-Biodiversity offsets
Biological Resources 9 page(s)
| 3004 | CEC/Dockets Unit | Center for Biological Diversity |
200856 | 10/16/2013 |
Exh. 3005-Preparing for any Action that may occur within the Range of the Mojave Desert Tortoise USFWS guidance on tortoise surveys Biological Resources 16 page(s)
| 3005 | CEC/Dockets Unit | Center for Biological Diversity |
200855 | 10/16/2013 |
Exh. 3006-2007 Annual Report re Range-Wide Monitoring of the Mojave Population of the Desert Tortoise USFWS report Biological Resources 77 page(s)
| 3006 | CEC/Dockets Unit | Center for Biological Diversity |
200854 | 10/16/2013 |
Exh. 3002-Journal Article re Wildlife Conservation
Biological Resources 11 page(s)
| 3002 | CEC/Dockets Unit | Center for Biological Diversity |
200853 | 10/16/2013 |
Exh. 3001-Anderson Testimony, Declaration & CV Anderson Testimony, Declaration & CV Alternatives, Biological Resources, Soil and Water 22 page(s)
| 3001 | CEC/Dockets Unit | Center for Biological Diversity |
200848 | 10/15/2013 |
PSEGS 1-10 Desert Tortoise Exclusion Fence Project Description
Biological Resources, Project Description 20 page(s)
| 1078 | CEC/Dockets Unit | Galati | Blek LLP |
200847 | 10/15/2013 |
Ethnographic Report Informing the Final Staff Assessment
Cultural Resources 151 page(s)
| 2004 | | California Energy Commission |
200807 | 10/9/2013 |
Energy Commission Staff's Testimony and Errata to the Final Staff Assessment Part A Errata to the FSA Part A Alternatives, Executive Summary, Public Health, Traffic and Transportation, Transmission Line Safety and Nuisance, Visual Resources, Soil and Water 6 page(s)
| 2002 | Commissioner Karen Douglas, Commissioner David Hochschild, and Hearing Officer Ken Celli | California Energy Commission |
200806 | 10/9/2013 |
Palen Solar Holding's Opening Testimony - Batch 2
Alternatives, Biological Resources, Cultural Resources, Geology/Paleontology, Project Description, Public Health, Traffic and Transportation, Worker Safety and Fire Protection 126 page(s)
| 1077 | CEC/Dockets Unit | Galati | Blek LLP |
200769 | 10/8/2013 |
Emails between Petitioner and Centers for Biological Diversity Email from Lisa Belenky re: witness availability and response from Scott Galati Biological Resources 1 page(s)
| | All Parties | California Energy Commission |
200758 | 10/7/2013 |
Notice of Prehearing Conference and Evidentiary Hearing and Hearing Orders Notice 15 page(s)
| | | California Energy Commission |
200731 | 10/3/2013 |
Memo re PSEGS Hearing Dates Memorandum to alert all parties to impending hearing dates for their convenience. 1 page(s)
| | All Parties | California Energy Commission |
200715 | 10/2/2013 |
Committee Order Granting CRIT Petition to Intervene 2 page(s)
| | | California Energy Commission |
200689 | 10/1/2013 |
Notice of Availability of the Final Staff Assessment-Part B Public Notice Cultural Resources, Executive Summary, Compliance, Introduction 5 page(s)
| | | California Energy Commission |
200688 | 10/1/2013 |
Document Handling for the Final Staff Assessment-Part B Library Notice of Availability Executive Summary, Compliance, Introduction, Cultural Resources 2 page(s)
| | | California Energy Commission |
200686 | 10/1/2013 |
Request for Comments on the Final Staff Assessment for the Proposed Palen Solar Electric Generating System Ageny Notice of Availability Executive Summary, Compliance, Introduction, Cultural Resources 4 page(s)
| | | California Energy Commission |
200683 | 9/30/2013 |
Email from Ken Celli to parties re CRIT Petition to Intervene
2 page(s)
| | | California Energy Commission |
200682 | 9/30/2013 |
Basin and Range Watch non-opposition of CRIT petition to intervene
3 page(s)
| | CEC/Ken Celli | Basin and Range Watch |
200681 | 9/30/2013 |
Center for Biological Diversity's non-opposition to CRIT petition to intervene
2 page(s)
| | CEC/Ken Celli | Center for Biological Diversity |
200680 | 9/30/2013 |
CURE non-opposition to CRIT petition to intervene
2 page(s)
| | CEC/Ken Celli | Adams Broadwell Joseph & Cardozo |
200679 | 9/30/2013 |
Emal from Applicant re non-objection to CRIT petition to intervene
2 page(s)
| | CEC/Ken Celli | Galati Blek, LLP |
200667 | 9/30/2013 |
PSH's Opening Testimony- Batch 1
Soil and Water, Efficiency, Facility Design, Compliance, Hazardous Materials, Land Use, Noise and Vibration, Reliability, Socioeconomics, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Waste Management 60 page(s)
| 1076 | | Galati | Blek LLP |
200644 | 9/30/2013 |
Committee Order Granting Petition to Intervene
2 page(s)
| | | California Energy Commission |
200564 | 9/23/2013 |
Palen Solar Electric Generating System Final Staff Assessment - Part B Final Staff Assessment - Part B Cultural Resources, Executive Summary, Compliance, Introduction 304 page(s)
| 2001 | | California Energy Commission |
200548 | 9/20/2013 |
PETITION TO INTERVENE BY THE COLORADO RIVER INDIAN TRIBES
8 page(s)
| | | Shute, Mihaly & Weinberger LLP |
200531 | 9/19/2013 |
Due Diligence Request for Information to Palen Solar Holdings from US Department of the Interior, Bureau of Land Management
2 page(s)
| 3054 | Charles Turlinski, Palen Solar Holdings, LLC | U.S. Department of the Interior, Bureau of Land Management |
200500 | 9/16/2013 |
Acknowledgment of Request to Reinitiate Formal Consultation for the Palen Solar Energy Project
3 page(s)
| | California Desert District Manager, Bureau of Land Management | U.S. Department of the Interior, Fish and Wildlife Services |
200494 | 9/16/2013 |
fred rinne Comments: Palen Solar Project
Land Use 1 page(s)
| | CEC/Dockets Unit | fred rinne |
200467 | 9/13/2013 |
Email from Jaime Rudd re Palen Updated Map
1 page(s)
| 3052 | CEC/Ann Crisp | California Department of Fish and Wildlife |
200466 | 9/13/2013 |
Kit Fox Den Activity Map - September 2013
1 page(s)
| 3053 | CEC/Ann Crisp | California Department of Fish and Wildlife |
200463 | 9/12/2013 |
Revised - Table I. Estimated area of indirect impact resulting from construction of PSEGS facility
1 page(s)
| 1075 | CEC/Dockets Unit | Galati Blek, LLP |
200457 | 9/12/2013 |
Document Handling for the Final Staff Assessment - Part A Library Letter Noise and Vibration, Project Description, Public Health, Reliability, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Alternatives, Biological Resources, Efficiency, Executive Summary, Facility Design 1 page(s)
| | | California Energy Commission |
200450 | 9/11/2013 |
Request for Comments on the Final Staff Assessment - Part A Agency Letter Biological Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 4 page(s)
| | | California Energy Commission |
200449 | 9/11/2013 |
Notice of Availability of the Final Staff Assessment - Part A Public Letter Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Biological Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description 6 page(s)
| | | California Energy Commission |
200442 | 9/10/2013 |
Palen Solar Electric Generating System FSA - Part A Final Staff Assessment - Part A Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Introduction, Land Use, Noise and Vibration, Project Description, Alternatives, Biological Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials 1639 page(s)
| 2000 | | California Energy Commission |
200440 | 9/10/2013 |
Palen Solar Electric Generating System FSA - Part A Alternatives, Biological Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 1639 page(s)
| | | California Energy Commission |
200381 | 8/30/2013 |
Correspondence between Rafael Cobian and Andrea Koch re regarding Palen operations traffic
4 page(s)
| 1074 | CEC/Andrea Koch | Fehr and Peers |
200371 | 8/29/2013 |
FAA Determinations of No Hazard to Air Navigation
17 page(s)
| 1073 | CEC/Dockets Unit | Galati | Blek LLP |
200361 | 8/28/2013 |
Quechan Indian Tribe Comments: re the Preliminary Staff Assessment for the Palen Solar Electric Generating System
3 page(s)
| | CEC/Dockets Unit | Quechan Indian Tribe |
200345 | 8/26/2013 |
RCWMD Comments re Sufficient Landfill Capacity
1 page(s)
| | CEC/Christopher Dennis | Riverside County Waste Management Department |
200268 | 8/20/2013 |
Email re CEC request for GIS data 08132013 CEC request for GIS data in re Mojave fringe toed lizard Biological Resources 3 page(s)
| 1072 | CEC/Jacque Gilbreath | Neil Storey |
200226 | 8/20/2013 |
Alfred Figueroa email providing Factual Info by La Cuna Aztlan Sacred Sites Protection Circle ISO Opposition to Project
25 page(s)
| 5000 | CEC/Christine Stora | Californians for Renewable Energy |
200213 | 8/19/2013 |
Palen Solar Holding's Final Sand Transport Study Supplement No.1
Biological Resources 2 page(s)
| 1071 | CEC/Dockets Unit | Galati | Blek LLP |
200211 | 8/16/2013 |
County of Riverside Comments on Applicant's Fire Risk Assessment
Worker Safety and Fire Protection 5 page(s)
| | CEC/Karen Douglas | County of Riverside |
200209 | 8/16/2013 |
Transcript of August 5, 2013 Status Conference
69 page(s)
| | | California Energy Commission |
200204 | 8/15/2013 |
PSH's Lake or Streambed Alteration Agreement Amendment Notification
Biological Resources 129 page(s)
| 1070 | CEC/Dockets Unit | Galati | Blek LLP |
200198 | 8/14/2013 |
Department of Transportation's Comments re Preliminary Staff Assessment
3 page(s)
| | CEC/Christine Stora | California Department of Transportation |
200196 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 6
13 page(s)
| 1121 | CEC/Andrea Koch | Fehr and Peers |
200195 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 5
13 page(s)
| 1120 | CEC/Andrea Koch | Fehr and Peers |
200194 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 4
13 page(s)
| 1119 | CEC/Andrea Koch | Fehr and Peers |
200193 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 3
13 page(s)
| 1118 | CEC/Andrea Koch | Fehr and Peers |
200192 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 2
13 page(s)
| 1117 | CEC/Andrea Koch | Fehr and Peers |
200191 | 8/14/2013 |
Email Responding to Traffic Questions-Attachment 1
13 page(s)
| 1116 | CEC/Andrea Koch | Fehr and Peers |
200190 | 8/14/2013 |
Applicant's Traffic Consultant's Response re Traffic Questions from CEC and CalTrans
1 page(s)
| 1069 | CEC/Andrea Koch | Fehr and Peers |
200188 | 8/13/2013 |
PSH’s RESPONSE TO STAFF’S 8/2/13 EMAIL REQUEST
Biological Resources 68 page(s)
| 1068 | CEC/Dockets Unit | Galati | Blek LLP |
200186 | 8/13/2013 |
PSH's Revised Supplemental Response to DR 54 & 55
Cultural Resources 31 page(s)
| 1067 | CEC/Dockets Unit | Galati | Blek LLP |
200184 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Proof of Service
3 page(s)
| 1115 | CEC/Dockets Unit | Galati Blek, LLP |
200183 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 7.4
6 page(s)
| 1114 | CEC/Dockets Unit | Galati Blek, LLP |
200182 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 7.3
3 page(s)
| 1113 | CEC/Dockets Unit | Galati Blek, LLP |
200181 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 7.2
6 page(s)
| 1112 | CEC/Dockets Unit | Galati Blek, LLP |
200180 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 7.1
14 page(s)
| 1111 | CEC/Dockets Unit | Galati Blek, LLP |
200179 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 6
50 page(s)
| 1110 | CEC/Dockets Unit | Galati Blek, LLP |
200178 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 5.4
18 page(s)
| 1109 | CEC/Dockets Unit | Galati Blek, LLP |
200177 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 5.3
5 page(s)
| 1108 | CEC/Dockets Unit | Galati Blek, LLP |
200176 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 5.2
5 page(s)
| 1107 | CEC/Dockets Unit | Galati Blek, LLP |
200175 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 5.1
22 page(s)
| 1106 | CEC/Dockets Unit | Galati Blek, LLP |
200174 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 4.2
6 page(s)
| 1105 | CEC/Dockets Unit | Galati Blek, LLP |
200173 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 4.1
44 page(s)
| 1104 | CEC/Dockets Unit | Galati Blek, LLP |
200172 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 3
50 page(s)
| 1103 | CEC/Dockets Unit | Galati Blek, LLP |
200171 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 2
50 page(s)
| 1102 | CEC/Dockets Unit | Galati Blek, LLP |
200170 | 8/13/2013 |
Applicant Response to CEC Data Request 57- Part 1
51 page(s)
| 1066 | CEC/Dockets Unit | Galati Blek, LLP |
200167 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 5d
| | | Galati | Blek LLP |
200166 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 5c
| | | Galati | Blek LLP |
200165 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 5b
| | | Galati | Blek LLP |
200164 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 5a
| | | Galati | Blek LLP |
200163 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - 4b -2
| | | Galati | Blek LLP |
200162 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 4b-1
| | | Galati | Blek LLP |
200161 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 4
| | | Galati | Blek LLP |
200160 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 3
| | | Galati | Blek LLP |
200159 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 2
| | | Galati | Blek LLP |
200158 | 8/9/2013 |
Supplemental Response to DR 24 & 25 - Part 1
| | | Galati | Blek LLP |
200152 | 8/9/2013 |
Repeated Application for Confidential Designation Supplemental Responses to Data Requests 29, 30 & 31 Confidential Data Provided on 5 CD's hand delivered to CEC. 3 page(s)
| | CEC/Robert Oglesby | Galati Blek, LLP |
200148 | 8/9/2013 |
Palen Solar Holding's Response to Data Request 56 Per Counsel cover letter should reflect 8/9/13, not 8/6/13. Cultural Resources 18 page(s)
| 1065 | CEC/Dockets Unit | Galati | Blek LLP |
200147 | 8/9/2013 |
Confidential Application - Supplemental Response to DR 24 & 25
Cultural Resources 3 page(s)
| | CEC/Robert Oglesby | Galati | Blek LLP |
200123 | 8/7/2013 |
Palen Schedule Clarifications
2 page(s)
| | Lisa Belenky/Center for Biological Diversity | California Energy Commission |
200122 | 8/7/2013 |
Email re Palen Schedule Clarifications 2 page(s)
| | Lisa Belenky/Center for Biological Diversity | California Energy Commission |
200118 | 8/6/2013 |
Palen Solar Holding's Supplemental Response to CEC Staff Data Requests 54 & 55
Cultural Resources 16 page(s)
| 1064 | California Energy Commission | Galati | Blek LLP |
200116 | 8/6/2013 |
Supplemental Traffic Data Information Requested by Staff in 7/31/13 Email
Traffic and Transportation 3 page(s)
| 1063 | CEC/Dockets Unit | Galati | Blek LLP |
200115 | 8/6/2013 |
Palen Solar Holding's Response to Center for Biological Diversity's Data Requests (1-2)
Biological Resources 2 page(s)
| 1062 | CEC/Dockets Unit | Galati | Blek LLP |
200112 | 8/2/2013 |
Airport Land Use Commission's Comments re PSA Petition to Amend
2 page(s)
| | CEC/Christine Stora | Riverside County Airport Land Use Commission |
200106 | 8/1/2013 |
USFWS email to Pete Bloom in re: Palen Helo GOEA Nest Survey Flights email Biological Resources 3 page(s)
| 3055 | CEC/Ann Crisp | Palm Springs Fish and Wildlife |
200104 | 8/1/2013 |
Email from FWS opting to defer comments to FSA until docketed data fully integrated and thorough analysis can be made.
Biological Resources 2 page(s)
| | Ann Crisp | Palm Springs Fish and Wildlife Office |
200103 | 8/1/2013 |
Palen Solar Electric Generating System, Status Report No. 4 Status Report No. 4 Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 4 page(s)
| | Commissioner Karen Douglas, Commissioner David Hochschild, and Hearing Officer Kenneth Celli | California Energy Commission |
200100 | 7/31/2013 |
PSH's Supplemental Response to Data Request 40d & 44
Biological Resources 55 page(s)
| 1061 | | Galati | Blek LLP |
200098 | 7/31/2013 |
PSH's Response to Data Request Set 4 (73-89)
Biological Resources, Geology/Paleontology, Public Health, Socioeconomics, Worker Safety and Fire Protection 44 page(s)
| 1060 | | Galati | Blek LLP |
200095 | 7/31/2013 |
Status Report by Intervenors Hildeberto Sanchez, Eddie Simmons, and LIUNA Local 1184
4 page(s)
| | CEC/Dockets Unit | Lozeau Drury LLP |
200094 | 7/30/2013 |
County of Riverside Comments on PSA for PSEGS Amendment
20 page(s)
| | CEC/Karen Douglas | County of Riverside |
200093 | 7/31/2013 |
Intervener's Status Report for the Palen Solar Energy Project
3 page(s)
| | California Energy Commission | Basin and Range Watch |
200090 | 7/30/2013 |
Palen Solar Holdings, LLC's Status Report 3
Air Quality, Biological Resources, Cultural Resources, Traffic and Transportation, Worker Safety and Fire Protection 7 page(s)
| 1059 | CEC/Docket Unit | Galati | Blek LLP |
200089 | 7/30/2013 |
Intervenor CBD's Third Status Report Center for Biological Diversity's 3rd Status report Biological Resources 4 page(s)
| | POS list & Public | Center for Biological Diversity |
200088 | 7/30/2013 |
Vol.2 -U.S Department of the Interior Bureau of Land Management –Draft Supplemental Environmental Impact Statement (Part 2)
1077 page(s)
| | Recipients | United States Department of Interior Bureau of Land Management/ESA Energy/J.Scott |
200087 | 7/30/2013 |
Vol.2 - U.S Department of the Interior Bureau of Land Management –Draft Supplemental Environmental Impact Statement (Part 1)
879 page(s)
| | Recipients | United States Department of Interior Bureau of Land Management/ESA Energy/J.Scott |
200086 | 7/30/2013 |
Record of Converation Regarding Construction Workforce and Lodging Preferences Lisa Worrall and San Bernardino and Riverside Counties Building & Constructruction Trade Council 2 page(s)
| | CEC / Docket Unit | California Energy Commission |
200085 | 7/30/2013 |
PSH's Supplemental Comments on the 7/26/13 Version of Condition of Certification BIO-17
Biological Resources 12 page(s)
| 1058 | | Galati | Blek LLP |
200081 | 7/30/2013 |
Transmittal Letter - Palen Solar Plan Amendment/Draft Supplemental Environmental Impact Statement
1 page(s)
| | Recipients | United States Department of Interior Bureau of Land Management/ESA Energy/J.Scott |
200079 | 7/30/2013 |
Vol.1-United States Department of the Interior Bureau of Land Management –Draft Supplemental Environmental Impact Statement United States Department of the Interior Bureau of Land Management – Palen Solar Electric Generating System Draft Supplemental Environmental Impact Statement 422 page(s)
| | Recipients | United States Department of Interior Bureau of Land Management/ESA Energy/J.Scott |
200078 | 7/29/2013 |
Basin and Range Watch comments on Palen PSA Comments on Preliminary Staff Assessment for the Palen Project Alternatives, Biological Resources, Cultural Resources, Efficiency, Compliance, Geology/Paleontology, Visual Resources 8 page(s)
| | CEC/Docket Unit | Basin and Range Watch/K.Emmerich /L.Cunningham |
200077 | 7/29/2013 |
Palen Solar Holdings, LLC's Final Comments on the Preliminary Staff Assessment
Air Quality, Biological Resources, Cultural Resources, Compliance, Hazardous Materials, Traffic and Transportation, Worker Safety and Fire Protection, Soil and Water 30 page(s)
| 1057 | CEC/Docket Unit | Galati | Blek LLP/M.Fleming |
200076 | 7/29/2013 |
Exhibit 1 to CRIT Comment Letter on Palen PSA
3 page(s)
| | CEC/Docket Unit | Colorado River Indian Tribes |
200075 | 7/29/2013 |
Colorado River Indian Tribes re the PSA for the Palen Solar
11 page(s)
| | CEC/Docket Unit | Colorado River Indian Tribes/W.Patch |
200074 | 7/29/2013 |
Tourism Economics Commission and Morongo Basin Conservation Association’s Joint Comments on the PSA for Palen Solar
4 page(s)
| | CEC/C.Stora | Tourism Economics Commission/P.Smith /Morongo Basin Conservation Association/P.Flanagan |
200073 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 17 Wohlfahrt et. al. 2008 Large annual ecosystem CO2 uptake in Mojave 1475 page(s)
| | CEC | Center for Biological Diversity |
200072 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 16 Walker et al. 2005. Resident GE ranging behaviour b4 & after windfarm 24 page(s)
| | CEC | Center for Biological Diversity |
200071 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 15 Richardson and Miller 1997. Rec. for protecting Raptors 6 page(s)
| | CEC | Center for Biological Diversity |
200070 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 14 Norton 2008 Envt Mgt 9 page(s)
| | CEC | Center for Biological Diversity |
200069 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 13 Moilanen et al. 2009. How much compensation is enough 9 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200068 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 12 McCrary et al. 1986. Avian Mortality at solar energy plant 7 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200067 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 11 Manning 2009. BUOW pop size in IV, CA 193 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200066 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 10 Lovich & Ennen 2011. Wildlife Conservation &Solar Energy Development in the Desert SW 11 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200065 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 9 Helix 2013. DPV2 MFTL Monitoring Summary 071113 4 page(s)
| 3062 | CEC/Docket Unit | Center for Biological Diversity |
200064 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 8 Frid and Dill 2002. Human caused disturbance stimuli as form of predation risk 16 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200063 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 7 Fiedler,P.G. 1991. Mitigation-related transplantation et al. projects involving T&E rare plants 144 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200062 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 6 Epps et al. 2005. Highways block gene flow and decline in DBS 16 page(s)
| | CEC/ Docket Unit | Center for Biological Diversity |
200061 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 5 Epps et al. 2004. Effects of CC on pop persistence of desert dwelling mtn. sheep in CA 12 page(s)
| | CEC/ Docket Unit | Center for Biological Diversity |
200060 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 4 Camp et al. 1997. Viewsheds - complimentary mangt. approach 5 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200059 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 3 Belnap&Eldridge 2001. Disturbance and Recovery 21 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200058 | 7/29/2013 |
Colorado River Board’s Comment Letter on the PSA for the Palen Solar Electric Generating System
2 page(s)
| | CEC/C.Marxen | Colorado River Board of California/T.Trujillo |
200057 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 2 Belnap 2006. Potential roles of biological soil crusts 21 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200056 | 7/29/2013 |
CBD's Comments on PSA Final - Attachment 1 Belnap 2001. wind erosion 9 page(s)
| | CEC/ Docket Unit | Center for Biological Diversity |
200055 | 7/29/2013 |
CBD's Comments on Palen PSA Final
29 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
200048 | 7/26/2013 |
Record of Conversation between G. Darvin & A. Chu Regarding Palen HRA with Mirror Washing - Reduced Risk Values in Table
Air Quality, Public Health 5 page(s)
| 1056 | | Galati | Blek LLP |
200047 | 7/26/2013 |
Kenneth B Waxlax Comments: re Palen Project
| | | Kenneth B Waxlax |
200046 | 7/26/2013 |
Palen Solar Holdings, LLC's Response to Data Requests 78-81
Public Health 5 page(s)
| 1055 | | Galati | Blek LLP |
200044 | 7/26/2013 |
Kenneth B Waxlax Comments: re Palen Project 2 page(s)
| | CEC/Dockets Unit | Kenneth B Waxlax |
200043 | 7/26/2013 |
SCAQMD letter deeming application package complete
2 page(s)
| 1054 | Charles Turlinski/Palen Solar | South Coast Air Quality Management District |
200041 | 7/25/2013 |
Shaun Gonzales Comments:re the proceedings of BrightSource Energy’s Palen Solar Electric Generating System (PSEGS) at the California Energy Commission (CEC).
2 page(s)
| | CEC/Dockets Unit | Shaun Gonzales |
200040 | 7/25/2013 |
PSH LLC's Wastewater Discharge Requirements
Soil and Water 43 page(s)
| 1053 | | Galati | Blek LLP |
200038 | 7/25/2013 |
DRI Geomorphic Assessment of Sand Transport for the Modified Project Draft final report prepared for Aspen Environmental Group 26 page(s)
| | CEC/Dockets Unit | California Energy Commission |
200037 | 7/24/2013 |
PSH, LLC's Advance Response to Data Request 82_.xlsx spreadsheet
Socioeconomics 4 page(s)
| 1101 | | Galati | Blek LLP |
200036 | 7/24/2013 |
PSH LLC's Advance Response to Data Request 82
Socioeconomics 6 page(s)
| 1052 | | Galati | Blek LLP |
200031 | 7/23/2013 |
PSH LLC's Fire & Emergency Services Risk Assessment
61 page(s)
| 1051 | CEC/Dockets Unit | Galati Blek, LLP |
200030 | 7/23/2013 |
Figure 18-PSH LLC's Final Sand Transport Study
| 1100 | CEC/Dockets Unit | Galati Blek, LLP |
200029 | 7/23/2013 |
Figure 17-PSH LLC's Final Sand Transport Study
| 1099 | CEC/Dockets Unit | Galati Blek, LLP |
200028 | 7/23/2013 |
Figure 16-PSH LLC's Final Sand Transport Study
| 1098 | CEC/Dockets Unit | Galati Blek, LLP |
200027 | 7/23/2013 |
Figure 15-PSH LLC's Final Sand Transport Study
| 1097 | CEC/Dockets Unit | Galati Blek, LLP |
200026 | 7/23/2013 |
Figure 14-PSH LLC's Final Sand Transport Study
| 1096 | CEC/Dockets Unit | Galati Blek, LLP |
200025 | 7/23/2013 |
Figure 13-PSH LLC's Final Sand Transport Study
| 1095 | CEC/Dockets Unit | Galati Blek, LLP |
200024 | 7/23/2013 |
Figure 12-PSH LLC's Final Sand Transport Study
| 1094 | CEC/Dockets Unit | Galati Blek, LLP |
200023 | 7/23/2013 |
Figure 11-PSH LLC's Final Sand Transport Study
| 1093 | CEC/Dockets Unit | Galati Blek, LLP |
200022 | 7/23/2013 |
Figure 10-PSH LLC's Final Sand Transport Study
| 1091 | CEC/Dockets Unit | Galati Blek, LLP |
200021 | 7/23/2013 |
Figure 9-PSH LLC's Final Sand Transport Study
| 1090 | CEC/Dockets Unit | Galati Blek, LLP |
200020 | 7/23/2013 |
Figure 8-PSH LLC's Final Sand Transport Study
| 1089 | CEC/Dockets Unit | Galati Blek, LLP |
200019 | 7/23/2013 |
Figure 7-PSH LLC's Final Sand Transport Study
| 1088 | CEC/Dockets Unit | Galati Blek, LLP |
200018 | 7/23/2013 |
Figure 6-PSH LLC's Final Sand Transport Study
| 1087 | CEC/Dockets Unit | Galati Blek, LLP |
200017 | 7/23/2013 |
Figure 5-PSH LLC's Final Sand Transport Study
| 1086 | CEC/Dockets Unit | Galati Blek, LLP |
200016 | 7/23/2013 |
Figure 4-PSH LLC's Final Sand Transport Study
| 1085 | CEC/Dockets Unit | Galati Blek, LLP |
200015 | 7/23/2013 |
Figure 3-PSH LLC's Final Sand Transport Study
| 1084 | CEC/Dockets Unit | Galati Blek, LLP |
200014 | 7/23/2013 |
Figure 2-PSH LLC's Final Sand Transport Study
| 1083 | CEC/Dockets Unit | Galati Blek, LLP |
200013 | 7/23/2013 |
Figure 1-PSH LLC's Final Sand Transport Study
| 1082 | CEC/Dockets Unit | Galati Blek, LLP |
200012 | 7/23/2013 |
PSH LLC's Final Sand Transport Study
| 1050 | CEC/Dockets Unit | Galati Blek, LLP |
200011 | 7/23/2013 |
PSH LLC's Supplemental Spring 2013 Biological Surveys
118 page(s)
| 1049 | CEC/Docket Unit | Galati Blek, LLP |
200010 | 7/23/2013 |
PSH LLC's Spring 2013 Avian Survey Results
105 page(s)
| 1048 | CEC/Docket Unit | Galati Blek, LLP |
200009 | 7/23/2013 |
Palen Solar Holding's Bat Habitat Assessment
29 page(s)
| 1047 | CEC/Dockets Unit | Galati Blek, LLP |
71695 | 7/22/2013 |
Supplemental Socioeconomic Information Requested By Staff in PSA
10 page(s)
| 1046 | CEC/Docket Unit | Galati Blek/ Palen Solar Holdings |
71694 | 7/19/2013 |
Repeated Application for Confidential Designation - Supplemantal Response to Data Requests 29 and 32 Cultural Resources 15 Mile Class 1 Report
3 page(s)
| | CEC/R. Oglesby | Galati Blek/ Palen Solar Holdings |
71692 | 7/18/2013 |
Air Quality Health Risk Assessment Modeling Files (the files can be obtained from Dockets on request) Air Quality Health Risk Assessment Modeling Files 2 page(s)
| 1043 | CEC/Docket Unit | Galati Blek/ Palen Solar Holdings |
71690 | 7/19/2013 |
Revised Supplement Number Two - Complete Air Quality and Public Health Sections
77 page(s)
| 1045 | CEC/ Docket Unit | Galati Blek/ Palen Solar Holdings |
71688 | 7/19/2013 |
Palen Solar Holding LLC's Supplemental Response to Data Request 14 - Traffic Study Update
11 page(s)
| 1044 | CEC/Docket Unit | Palen Solar Holdings LLC/Galati Blek LLP/M.Fleming |
71673 | 7/18/2013 |
Riverside County Sheriff's Response - Law Enforcement Needs Assessment Form
2 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
71602 | 7/15/2013 |
Notice of Status Conference held August 5, 2013
9 page(s)
| | CEC/ Docket Unit | CEC/ Hearing Office |
71593 | 7/12/2013 |
Record of Conversation - REAT Number 10
2 page(s)
| 3056 | CEC/Docket Unit | CEC/ Carol Watson |
71565 | 7/12/2013 |
Report of Conversation with CEC's Ann Crisp and CDFW's Magdalena Rodriquez re Lake or Streambed Alternation Notification Amendment Form
2 page(s)
| | CEC/Docket Unit | CEC/A.Crisp |
71554 | 7/11/2013 |
Emails between CEC's Christine Stora and Andrea Grenier re CEC's Andrea Koch's Traffic Question
2 page(s)
| 1042 | Centerline/Andrea Grenier | CEC/C.Stora |
71551 | 7/11/2013 |
Palen Solar Holdings, LLC's Initial Comments on the Preliminary Staff Assessment
22 page(s)
| 1041 | CEC/Docket Unit | Palen Solar Holdings, LLC/Galati Blek LLP/M.Fleming |
71548 | 7/10/2013 |
Repeated Application for Confidential Designation - Class 1 15 Mile Records Search Results Maps in Partial Fulfillment of Data Requests 29 and 32
3 page(s)
| | CEC/R. Oglsby | Galati Blek LLP |
71547 | 7/10/2013 |
Repeated Application for Confidential Designation - Class 1 15 Mile Records Search Results Tables, Site Forms, and Reports on Partial Fulfillment of Data Requests 29 and 32
3 page(s)
| | CEC/R. Oglesby | Galati Blek LLP |
71543 | 7/10/2013 |
Staff's Data Request Set Four
14 page(s)
| | Applicant/Galati Blek LLP/S.Galati | CEC/C.Stora |
71530 | 7/8/2013 |
Intervenor Center for Biological Diversity's Data Request
6 page(s)
| | CEC/Docket Unit | Intervenor/Center for Biological Diversity/L.Belenky |
71516 | 7/3/2013 |
Notices of Public Workshop Four and Five
13 page(s)
| | CEC/Docket Unit | CEC/R.Johnson |
71514 | 7/3/2013 |
REVISED Notice of Availability for the Public, Libraries, and Agencies
13 page(s)
| | Members of the Public | CEC/C.Marxen |
71496 | 7/2/2013 |
CEC Letter to Riverside County Sheriff Department re Potential Law Enforcement Needs
8 page(s)
| | Riverside County Sheriff Departmemt/R.Wood | CEC/L.Worrall |
71486 | 7/1/2013 |
Parke Ewing - Public Comment
1 page(s)
| | CEC/Docket Unit | Public/P.Ewing |
71452 | 6/28/2013 |
Preliminary Staff Assessment Notice of Availability for Public, Libraries, and Agencies
12 page(s)
| | CEC/Docket Unit | CEC/ |
71434 | 6/28/2013 |
Preliminary Staff Assessment
1367 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
71403 | 6/27/2013 |
Repeated Application for Confidential Response to DR 29, 32 & Partial Response to DR 54
347 page(s)
| | CEC/ R. Oglesby | Galati Blek/ M. Fleming |
71349 | 6/21/2013 |
Report of Conversation with CEC's Casey Weaver and BLM's Philip Gensler and Tiffany Thomas re Palen Paleontology Subsurface Characterization
2 page(s)
| | CEC/Docket Unit | CEC/C.Weaver |
71348 | 6/21/2013 |
CEC's Lisa Worrall's Email to CEC's Christine Stora re Riverside County Sheriff Department Law Enforcement Needs
Assessment
3 page(s)
| | CEC/C.Stora | CEC/L.Worrall |
71285 | 6/17/2013 |
Staff's Emergency Response Matrix - Estimated Values for Riverside County
1 page(s)
| | CEC/Docket Unit | CEC/ A. Campos |
71280 | 6/14/2013 |
Palen Solar Holdings, LLC’s Response to CEC Staff Data Request Set Three, Numbers 40-72
257 page(s)
| 1040 | CEC/Docket Unit | Applicant/ Galati Blek/ Palen Solar |
71244 | 6/13/2013 |
Revised Table 2.4-1 Average Daily Water Requirements (Both Solar Plants) for Palen Solar Holdings LLC's Petition to Amend
5 page(s)
| 1039 | CEC/Docket Unit | Palen Solar Holdings LLC/Galati Blek LLP/M.Fleming |
71208 | 6/10/2013 |
Staff's Status Report Number Four
8 page(s)
| | CEC/K.Douglas /D.Hochschild | CEC/C.Stora |
71204 | 6/10/2013 |
Revised Committee Scheduling Order
6 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /D.Hochschild |
71174 | 6/7/2013 |
N. Lancaster Sand Transport Progress Report
3 page(s)
| | CEC/Docket Unit | Division of Earth and Ecosystem Sciences Desert Research Institute/N. Lancaster |
71168 | 6/5/2013 |
Coversheet of CEQAnet Database
1 page(s)
| | CEC/Docket Unit | CEC/A.Campos |
71167 | 6/5/2013 |
Riverside County Planning Department Webpage - Quick Links
1 page(s)
| | CEC/Docket Unit | CEC/A.Campos |
71154 | 6/6/2013 |
Palen Solar's Scope of Work for PSEGS Summer 2013 Pre-Construction & Avian Field Surveys
11 page(s)
| | CEC/Docket Unit | Palen Solar/Galati Blek/M.Fleming |
71153 | 6/5/2013 |
Palen Solar's Preliminary Spring 2013 Pre-Construction & Avian Field Survey Results
9 page(s)
| | CEC/Docket Unit | Palen Solar/Galati Blek/M.Fleming |
71131 | 6/5/2013 |
Palen Solar's Summary of Survey for Jurisdictional State Waters
54 page(s)
| | CEC/Docket Unit | Palen Solar/Galati Blek LLP/M.Fleming |
71123 | 6/5/2013 |
Palen Solar's Spring 2013 Golden Eagle Nest Survey Results Interim Report
6 page(s)
| | CEC/Docket Unit | Palen Solar/Galati Blek/M.Flemming |
71098 | 5/31/2013 |
Palen Solar's Visual Resources Analysis Report
125 page(s)
| 1034 | CEC/Docket Unit | Applicant/ Galati Blek/ M. Fleming |
71087 | 5/31/2013 |
Palen Solar Generating Station's Submittal of the Joshua Tree National Park Visual Resources Analysis Report
54 page(s)
| 1033 | CEC/Docket Unit | Palen Solar Gen Station Galati Blek/ M. Fleming |
70991 | 5/28/2013 |
Applicant's Draft Weed Management Plan
57 page(s)
| 1032 | CEC/Docket Unit | Applicant/ Galati Blek |
70990 | 5/24/2013 |
Repeated Application for Confidentiality - Supplemental Cultural Resources Report
3 page(s)
| | CEC/ R. Oglesby | Applicant/ Galati Blek |
70980 | 5/28/2013 |
Applicant's Additional Transmission System Engineering Information Related to SCE's Red Bluff Substation
8 page(s)
| 1031 | CEC/Docket Unit | Applicant/ Galati Blek |
70976 | 5/28/2013 |
Applicant's Submittal Wesley A. Alston's Resume
7 page(s)
| 1030 | CEC/Docket Unit | Applicant/ Consultant/ Galati Blek/M. Fleming |
70970 | 5/28/2013 |
Andrea Grenier Email to Christine Stora regarding Section 4.3 Hazardous Material
1 page(s)
| 1029 | CEC/C.Stora | Andrea Grenier |
70945 | 5/23/2013 |
Email from Kevin Emmerich of Basin and Range Watch
3 page(s)
| | CEC/ C.Stora | Basin and Range Watch |
70912 | 5/21/2013 |
Andrea Grenier's Email to CEC's Christine Stora re Project Description Questions
2 page(s)
| 1028 | CEC/C.Stora | Andrea Grenier |
70897 | 5/21/2013 |
Palen Solar Holdings, LLC's Summary of Spring Wildlife & Plant Surveys
15 page(s)
| 1027 | CEC/Docket Unit | Palen Solar Holdings, LLC |
70896 | 5/21/2013 |
Palen Solar Holdings, LLC's Response to CEC Staff Data Request Set Two 19-39
91 page(s)
| 1026 | CEC/Docket Unit | Palen Solar Holdings, LLC |
70893 | 5/20/2013 |
Notice of Status Conference
9 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /D.Hochshild |
70861 | 5/16/2013 |
Palen Solar LLC's Tower Viewshed Delineation—Minus Condensers
5 page(s)
| 1025 | CEC/ Docket Unit | Galati Blek/ Palen Solar |
70849 | 5/15/2013 |
Email resending Project Description Questions
1 page(s)
| | CEC/Christine Stora | Andrea Grenier |
70827 | 5/15/2013 |
Staff's Status Report No.Two
7 page(s)
| | CEC/K.Douglas /D.Hochschild /K.Celli | CEC/C.Stora |
70824 | 5/15/2013 |
CEC Staff's Data Request Set Three (Nos. 40-72)
21 page(s)
| | Palen Solar Holding LLC/Galati Blek LLP/S.Galati | CEC/C.Stora |
70819 | 5/14/2013 |
Palen Solar Holdings, LLC's Request for Status Conference
6 page(s)
| 1024 | CEC/Docekt Unit | Palen Solar Electric Generating Systems/Palen Solar Holdings, LLC/Galati Blek LLP/M.Fleming |
70816 | 5/13/2013 |
E-mail Correspondence from S. Sharma Regarding Information About Jurisdictional Delineation of State Water
4 page(s)
| | CEC/ A. Crisp | Shankar Sharma |
70815 | 5/14/2013 |
E-mail Correspondence from M. Rodriguez Regarding PSEGS BUOW Edits
2 page(s)
| | CEC/ A. Crisp | Magdalena Rodriguez |
70813 | 5/13/2013 |
E-mail Correspondence Regarding Waters Guidance
4 page(s)
| 1022 | CEC/ A. Crisp | Alice Karl |
70799 | 5/14/2013 |
Andrea Grenier Email to C. Stora
7 page(s)
| 1023 | CEC/C. Stora | Andrea Grenier |
70786 | 5/7/2013 |
Palen Solar Electric Air Quality Modeling Files
1 page(s)
| 1018 | CEC/ J. Leyva | Galati & Blek |
70785 | 5/13/2013 |
Palen Solar Holdings LLC's Response to Workshop Queries
46 page(s)
| 1021 | CEC/C.Stora | Palen Solar Holdings LLC/Galati Blek LLP/S.Galati |
70781 | 5/10/2013 |
Email Regarding Environmental Justice Questions
3 page(s)
| | CEC/ I. Anderson | CEC/ J. Martin |
70763 | 5/10/2013 |
Palen Solar Holdings, LLC's Oblique View of Palen Solar Electric Generating System
5 page(s)
| 1020 | CEC/Docket Unit | Palen Solar Holdings, LLC/Galati Blek LLP/M.Fleming |
70697 | 5/8/2013 |
Intervenor Basin and Ranch Watch's Status Report Number Two
8 page(s)
| | CEC/Docket Unit | Intervenor/Basin and Range Watch/K.Emmerich |
70675 | 5/8/2013 |
Intervenor H. Sanchez, E. Simmons, and Laborers' International Union of North America's Status Report
6 page(s)
| | CEC/Docket Unit | Intervenor/ Hildeberto Sanchez/ Eddie Simmons/ Laborers' International Union of North America, Local |
70670 | 5/8/2013 |
Palen Solar Holdings' Status Report Two
8 page(s)
| 1019 | CEC/Docket Unit | Palen Solar Holdings LLC/Galati Blek LLP/M.Flemming |
70666 | 5/8/2013 |
Intervenor Center for Biological Diversity's Second Status Report
13 page(s)
| | CEC/Docket Unit | Intervenor/ Center for Biological Diversity |
70665 | 5/7/2013 |
Email from Magdalena Rodriguez
2 page(s)
| | CEC/C. Stora | Public/ Magdalena Rodriguez |
70661 | 5/7/2013 |
Report of Conversation with Interagency Meeting Participants
1 page(s)
| | CEC/Docket Unit | CEC/ C. Watson |
70656 | 5/6/2013 |
Repeated Application for Confidential Designation - Response to DR-26
3 page(s)
| | CEC/R. Oglesby | Applicant/ Galati Blek |
70632 | 5/6/2013 |
Soboba Band of Luiseno Indians Cultural Resources Department Letter of Request
4 page(s)
| | CEC/ C. Stora | Soboba Band of Luiseno Indians |
70553 | 5/2/2013 |
Notice of Workshop Three Continuance
3 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
70552 | 4/26/2013 |
Hearing Adviser Paul Kramer Email - Possible Change in Committee for Palen Solar Power Project Amendment
1 page(s)
| | CEC/Docket Unit | CEC/P.Kramer |
70537 | 4/30/2013 |
Agenda for Workshop 3 to be held on May 1, 2013
2 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
70536 | 4/30/2013 |
South Coast Air Quality Management District's Completeness Letter for the Palen Solar Electric Generation Project
4 page(s)
| | Palen Solar Electic Generating Station/C.Turlinski | South Coast Air Quality Management District/M.Nazemi |
70528 | 4/29/2013 |
Agenda for Workshop 2 to be held on April 30, 2013
2 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
70451 | 4/24/2013 |
Hearing Officer Assignment Memo
4 page(s)
| | CEC/Commissioners | CEC/R.Weisenmiller |
70449 | 4/24/2013 |
Veena Doijdo - Public Comment
1 page(s)
| | CEC/Media Office | Public/V.Doijode |
70448 | 4/24/2013 |
Palen Solar Holdings, LLC's Supplement No.Three
6 page(s)
| 1017 | CEC/C.Stora | Palen Solar Holdings, LLC/Galati Blek LLP/S.Galati |
70405 | 4/22/2013 |
Corrected Notice for Public Workshop to be Held on May 1, 2013
8 page(s)
| | CEC/Docket Unit | CEC/R.Johnson |
70404 | 4/19/2013 |
CEC Staff's Data Request Set Two
20 page(s)
| | Applicant/Galati/Blek/S.Galati | CEC/C.Stora |
70402 | 4/19/2013 |
U.S.Fish and Wildlife Service Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance
8 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
70401 | 4/19/2013 |
U.S Fish and Wildlife Service - San Joaquin Kit Fox Survey Protocol for the Northern Range
12 page(s)
| | CEC/Docket Unit | CEC/C.Stora |
70400 | 4/19/2013 |
A Review of Stream Processes and Forms in Dryland Watersheds
36 page(s)
| | CEC/Docket Unit | California Departmen of Fish and Game/K.Vyverberg |
70397 | 4/19/2013 |
Notice for Public Workshop to be Held on May 1, 2013
8 page(s)
| | CEC/Docket Unit | CEC/R.Johnson |
70343 | 4/16/2013 |
Palen Solar's Revised Tower Delineation - Potential Sensitive Receptors
5 page(s)
| 1016 | CEC/Docket Unit | Palen Solar Electric Generating Station/ Galati Blek LLP |
70297 | 4/15/2013 |
Notice of Public Workshop to be held on April 30, 2013
8 page(s)
| | CEC/Docket Unit | CEC/R.Johnson |
70287 | 4/12/2013 |
CEC Staff's GIS Data Request Email to Scott Galati
1 page(s)
| | Galati Blek LLP/ S. Galati | CEC/ J. Gilbreath |
70278 | 4/11/2013 |
CEC Letters to BLM Tribal Leaders
35 page(s)
| | CEC/Docket Unit | CEC/ L. Mata |
70277 | 4/11/2013 |
South Coast Air Quality Management District Letter
2 page(s)
| | CEC/R. Johnson | SCAQMD/ M. Nazemi |
70274 | 4/11/2013 |
Agua Caliente Band Cahuilla Indians Letter re Invitation to Participate in CEC Tribal Consultation
6 page(s)
| | CEC/T.Gates | Agua Caliente Band Cahuilla Indians/P.Garcia-Tuck |
70251 | 4/8/2013 |
Palen Solar Generating Station's Tower Viewshed Delineation - Potential Sensitive Receptors
5 page(s)
| 1015 | CEC/Docket Unit | Plaen Solar/ Galati Blek LLP |
70243 | 4/8/2013 |
Report of Conversation Interagency Conference Call re Palen Solar Power Project
2 page(s)
| | CEC/Docket Unit | CEC/A.Crisp /C.Watson |
70242 | 4/8/2013 |
Palen Solar Electric Generating System Winter 2013 Golden Eagle Survey Results
25 page(s)
| 1014 | CEC/Docket Unit | Palen Solar Holdings/Galati Blek LLP/M.Fleming |
70219 | 4/4/2013 |
CEC Notice of Public Workshop on April 17, 2013
8 page(s)
| | CEC/Docket Unit | CEC/ C.Stora |
70214 | 4/4/2013 |
Staff's Corrected Status Report No. One
6 page(s)
| | CEC/K.Douglas /D.Hochschild /R.Renaud | CEC/C.Stora |
70209 | 4/4/2013 |
Staff's Status Report No. One
6 page(s)
| | CEC/K.Douglas /R.Weisenmiller /R.Renaud | CEC/C.Stora |
70205 | 4/3/2013 |
REAT Agencies Phone Call - Record of Conversation
1 page(s)
| | CEC/ Docket Unit | CEC/ C. Stora |
70200 | 3/29/2013 |
Palen Solar Holdings LLC's Supplemental Response to CEC Staff Data Request Five
23 page(s)
| 1013 | CEC/C.Stora | Palen Solar Holdings LLC |
70180 | 3/29/2013 |
Center for Biological Diversity's Status Report
7 page(s)
| | CEC/Docket Unit | Center for Biological Diversity |
70179 | 3/29/2013 |
Palen Solar Holdings, LLC's Status Report One
9 page(s)
| 1012 | CEC/ Docket Unit | Palen Solar Holdings, LLC's |
70178 | 3/29/2013 |
Basin and Range Watch's Status Report One
11 page(s)
| | CEC/Docket Unit | Basin and Range Watch |
70161 | 3/26/2013 |
Order Granting Petition to Intervene to Hildeberto Sanchez, Eddie Simmons, and Laborers’ International Union of North America, Local Union No. 1184
5 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /D.Hochschild |
70152 | 3/27/2013 |
Palen Solar's Preliminary Draft Drainage Erosion and Sedimentation Control Plan/ Stormwater Pollution Prevention Plan Supplement - Appendix A
8 page(s)
| 1011 | CEC/Docket Unit | Galati Blek/ M.Fleming |
70096 | 3/25/2013 |
Palen Solar Holdings, LLC's Response to CEC Data Request Set 1 (1-18)
142 page(s)
| 1010 | CEC/ Docket Unit | Palen Solar Holdings, LLC |
70051 | 3/25/2013 |
CEC Hearing Advisor Paul Kramer's Email re Change in the Process for Obtaining the Current Proof of Service List
1 page(s)
| | Proof of Service | CEC/P.Kramer |
70046 | 3/25/2013 |
Report of Conversation - Turkey Vulture Migration over the Palen Project Site
2 page(s)
| | CEC/Docket Unit | CEC/ C. Stora |
70026 | 3/22/2013 |
General Orders re Electronic Document Formats, Filing and Service of Documents and Other Matters
6 page(s)
| | CEC/Docket Unit | CEC/K.Douglas |
70015 | 3/21/2013 |
Preliminary Draft Construction Drainage, Erosion and Sedimentation Control Plan - Stormwater Pollution Prevention Plan (the files can be obtained from Dockets on request) 2000 page(s)
| 1009 | CEC/Docket Unit | Palen Solar Holdings/Galati Blek LLP/M.Fleming |
69964 | 3/20/2013 |
La Cuna de Aztlan Sacred Sites Protection Circle's Opposition to the Petition to Amend for Palen Solar
8 page(s)
| | CEC/R.Renaud /C.Stora | La Cuna de Aztlan Sacred Sites Protection Circle/A.Figueroa |
69931 | 3/15/2013 |
Palen Solar's Relocated Natural Gas Pipeline Drawing
5 page(s)
| 1008 | CEC/Docket Unit | Palen Solar/Galati Blek LLP/M.Fleming |
69909 | 3/13/2013 |
Palen Solar Holdings, LLC's Supplement Number Two - Complete Air Quality and Public Health Sections
263 page(s)
| 1007 | CEC/C. Stora | Palen Solar Holdings, LLC/ Galati Blek LLP/ S. Galati |
69897 | 3/12/2013 |
U.S. Fish and Wildlife Service Clarifications on Golden Eagle Surveys
6 page(s)
| | CEC/Docket Unit | U.S. Fish and Wildlife Service |
69896 | 3/12/2013 |
U.S. Fish and Wildlife Services Interim Golden Eagle Technical Guidance - Inventory and Monitoring Protocols and Other Recommendations in Support of Golden Eagle Management and Permit Issuance
30 page(s)
| | CEC/Docket Unit | US Fish and Wildlife Service |
69884 | 3/8/2013 |
CEC Letter to Native American Heritage Commission Tribes
51 page(s)
| | Native American Heritage Commission/ Various Tribes | CEC/ R. Johnson |
69839 | 3/6/2013 |
Committee Scheduling Order
7 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /D.Hochschild |
69802 | 3/4/2013 |
Petition to Intervene by Hildeberto Sanchez, Eddie Simmons, and Laborer International Union of North America, Local Union NO. 1184
12 page(s)
| | CEC/Docket Unit | Petitioner/Lozeau Drury LLP/R.Drury /C.Caro |
69756 | 3/1/2013 |
CEC Staff's Data Request No. 1-18
15 page(s)
| | Applicant/Galati Blek LLP/S.Galati | CEC/C.Stora |
69747 | 3/1/2013 |
CEC Committee, Staff and Public Adviser's Power Point Presentations for the Palen Solar Site Visit, Environmental Scoping Meeting and Informational Hearing
32 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /R.Weisenmiller /R.Renaud /C.Stora /B.Roberts |
69693 | 2/27/2013 |
GIS Data Request - Biological Resources
1 page(s)
| 1006 | CEC/C.Stora | Galati Blek LLP/M.Fleming |
69601 | 2/19/2013 |
Palen Solar's Response to Staff's Issue Identification Report
9 page(s)
| 1005 | CEC/Docket Unit | Palen Solar Holdings LLC/M.Fleming |
69560 | 2/15/2013 |
All Parties Letter with Newly Revised Proof of Service
5 page(s)
| | All Parties | CEC/R.Avalos |
69542 | 2/15/2013 |
CEC Staff's Issues Identification Report
20 page(s)
| | CEC/ Karen Douglas/ Robert Weisenmiller/ Raoul Renaud | CEC/Christine Stora |
69517 | 2/13/2013 |
All Parties Letter with Newly Revised Proof of Service
5 page(s)
| | All Parties | CEC/R.Avalos |
69471 | 2/8/2013 |
Palen Solar Holding's Supplement Number One to Support Petition to Amendment (the files can be obtained from Dockets on request) 339 page(s)
| 1004 | CEC/Christine Stora | Palen Solar Holdings, LLC/ Glati Blek/ Scott Galati |
69412 | 2/6/2013 |
County of Riverside's Comment Letter
4 page(s)
| | CEC/R.Renaud /C.Stora | County of Riverside/T.North |
69344 | 1/31/2013 |
Galati Blek LLP/M Flemming Confidential Geoarchaeology of Palen Project
45 page(s)
| | CEC/Docket Unit | Galati Blek LLP/M Flemming |
69324 | 1/30/2013 |
Notice of Informational Hearing, Environmental Scoping Meeting and Public Site Visit
9 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /R.Weisenmiller |
69254 | 1/24/2013 |
Alfredo Acosta Figueroa Oppsoition Comment Letter
31 page(s)
| | CEC/ Raoul Renaud | La Cuna De Aztlan/ Alfredo Acosta Figueroa |
69089 | 1/10/2013 |
MEMO - Hearing Officer Assignment
1 page(s)
| | CEC/Commissioners | CEC/ Weisenmiller |
68961 | 12/21/2012 |
Notice of Receipt - Petition to Amend the CEC Decision
6 page(s)
| | CEC/ Docket Unit | CEC/ C. Marxen |
68910 | 12/17/2012 |
Palen Solar Holdings LLC's Petition for Amendment
285 page(s)
| 1003 | CEC/C.Stora | Palen Solar Holdings, LLC/ Galati Blek/ S.Galati |
68533 | 11/15/2012 |
CEQA - NEPA Notice Request
3 page(s)
| | Bureau of Land Management/A.Shaffer /L.Elser /CEC/C.Stora | Lozeau Drury LLP/T.Steams |
66254 | 7/17/2012 |
Notice of Decision to Transfer Ownership
1 page(s)
| | California Resources Agency | CEC/C.Stora |
66219 | 7/13/2012 |
Order Approving Transfer of Ownership to Palen SEGS I, LLC
2 page(s)
| | CEC/Docket Unit | CEC/H.Kalleymam |
66186 | 7/10/2012 |
County of Riverside Letter to CEC Joining Center for Biological Diversity Response to Item 3 of July 11 Business Meeting
7 page(s)
| | CEC/ C. Stora | Intervenor County of Riverside/ T. Wells |
66018 | 6/28/2012 |
Revision to June 25, 2012 Petition for Ownership Transfer
6 page(s)
| 1002 | CEC/Docket Unit | Applicant/Galati Blek LLP/M.Fleming |
66016 | 6/28/2012 |
Intervenor Center for Biological Diversity Response to Petition for Ownership Transfer and Request to Clarify Petition
6 page(s)
| | CEC/Docket Unit | Intervenor/Center for Biological Diversity |
65980 | 6/27/2012 |
Notice of Receipt - Petition to Change Ownership
4 page(s)
| | CEC/Docket Unit | CEC/C.Marxen |
65936 | 6/25/2012 |
Petition for Ownership from Palen Solar I to NALEP Solar Project I LLC
8 page(s)
| 1001 | CEC/Docket Unit | Galati Blek LLP/M.Fleming |
56719 | 5/18/2010 |
MOU Between tne CEC, Bureau of Land Management, and WCCC, Inc.
8 page(s)
| | CEC/ Docket Unit | CEC/ T.O. Brien |
2950-0 | 6/7/2013 |
Transcript of the Status Conference for Palen Solar
62 page(s)
| | | CEC |
2922-0 | 2/28/2013 |
Transcript of the Informational Hearing and Environmental Scoping Meeting
76 page(s)
| | | CEC |