53334 | 9/23/2009 |
Final Staff Assessment
100 page(s)
| | CEC/ Docket Unit | CEC |
53333 | 9/23/2009 |
Supplement I in Response to Data Requests
40 page(s)
| | CEC/ Docket Unit | Walnut Creek Energy |
45691 | 3/14/2008 |
Energy Commission Order No. 08-0312-6 RE: Siting Committees
4 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45610 | 3/11/2008 |
Facility Permit to Operate Walnut Creek Energy Park
53 page(s)
| | CEC / Docket Unit | SCAMD |
45518 | 2/29/2008 |
Final Commission Decision
75 page(s)
| | CEC/ Docket Unit | CEC/ G. Shean |
45469 | 2/27/2008 |
Notice of Decision by CEC
5 page(s)
| | OPR / CRA | CEC / J. Caswell |
45468 | 2/27/2008 |
Adoption Order
3 page(s)
| | CEC/ Docket Unit | CEC/Commissioner Pfannenstiel/ Boyd/ Byron/ Rosenfeld/ Douglas |
45464 | 2/26/2008 |
Third Errata to Presiding Member's Proposed Decision
2 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45461 | 2/26/2008 |
FDOC for EME's Proposed WCE Project to located at 911 Bixby Dr., City of Industry, CA 91744
6 page(s)
| | CEC / J. Caswell | SCAQMD / M. Nazemi |
45438 | 2/22/2008 |
Second Errata to PMPD
6 page(s)
| | POS List | CEC/ J. Pfannenstiel |
45397 | 2/15/2008 |
Errata to Staff's Comments on the Errata to Presiding Member's Proposed Decision, and the Amended Final Determination of Compliance
6 page(s)
| | CEC / J. Pfannenstiel | CEC / J. Caswell |
45360 | 2/15/2008 |
Comments on the Fist Eratta to the Revised Presiding Member's Proposed Decision and Comments on Staff's Supplemental Testimony
7 page(s)
| | CEC / Docket Unit | GB / D. Wiseman |
45309 | 2/11/2008 |
Staff's Comments on the Revised PMPD, the Amended Fianl Determination of Compliance, and on Walnut Creek Energy Park's Comments on the Revised PMPD for Noise and Vibration
16 page(s)
| | CEC / J. Pfannenstiel | CEC / J. Caswell |
45308 | 2/11/2008 |
Notice of Commission Hearing on Proposed Decision
4 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45303 | 2/11/2008 |
Staff's Comments on the Revised PMPD, the Amended Final Determination of Compliance, and on WCEP's Comments on the Revised PMPD for Noise and Vibration
17 page(s)
| | CEC / J. Pfannenstiel | CEC / J. Caswell |
45269 | 2/6/2008 |
First Errata to PMPD
4 page(s)
| | POS List | CEC/ J. Pfannenstiel/ J. Geesman |
45268 | 2/6/2008 |
Notice of Hearing on Status of the Proceeding and Evidentiary Hearing & First Errata to Presiding Member's Proposed Decision
8 page(s)
| | CEC/Docket Unit | CEC/ J. Pfannenstiel/ J. Geesman |
44851 | 1/24/2008 |
Notice of Intent to Issue Permit Pursuant to AQMD Rules 212 and 3006
3 page(s)
| | CEC / Docket Unit | SCAQMD |
44695 | 1/23/2008 |
Addendum to the DOC for EME's Proposed WCE To Be Located at 911 Bixby Dr., City of Industry
106 page(s)
| | CEC / J. Caswell | AQMD / M. Nazemi |
42685 | 10/5/2007 |
Letter addressed to J. Pfannenstiel regarding Walnut Creek Project
7 page(s)
| | CEC/J. Pfannenstiel | SCAQMD/M. Nazemi |
42672 | 10/4/2007 |
Walnut Creek Energy Park's Comments on the Revised Presiding Members Proposed Decision
7 page(s)
| | CEC / R. Rodriguez | GalatiBlek / M. Cosens |
42641 | 10/3/2007 |
Letter from SCAQMD - Informing the Completion of Analysis of Proposed WCEP
9 page(s)
| | CEC / J. Caswell | SCAQMD / M. Nazemi |
42571 | 9/28/2007 |
Documentation Demonstrating Compliance with Priority Reserve Rule 1309.1 (c)(5)(B)
8 page(s)
| | SCAQMD / K. Coats | EME /V. Yamada |
42498 | 9/25/2007 |
Notice of Commission Hearing on Proposed Decision
5 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel / J. Geesman |
42417 | 9/24/2007 |
Revisions to presiding member's proposed Decision
32 page(s)
| | CEC/ Doccket Unit | CEC/ J. Pfannenstiel/ J. Geesman |
42339 | 9/18/2007 |
Letter from AQMD - M. Nazemi
1 page(s)
| | Walnut Creek, LLC / V. Yamada | AQMD / M. Nazemi |
42331 | 9/17/2007 |
Email in response confirming information received.
1 page(s)
| | CEC/ G. Shean | D. Simmons |
42330 | 9/17/2007 |
Email re: request for information concerning the Commissioners public outreach on the Walnut Creek Project
5 page(s)
| | Los Angeles County/ D. Simmons | CEC/ G. Shean |
42311 | 9/14/2007 |
CEC Staff's Comments on Two Issues Raised at the Sept. 12, 2007 PMPD Hearing
6 page(s)
| | CEC / Docket Unit | CEC / L. Decarlo |
42243 | 9/11/2007 |
LLC's Comments on Presiding Member's Proposed Decicion
8 page(s)
| | CEC / Docket Unit | Galati Blek LLP / M. Cosens |
42234 | 9/10/2007 |
Supplemental Testimony
22 page(s)
| | CEC/ Docket Unit | Galati/ Blek/ M. Cosens |
42233 | 9/10/2007 |
Commission Staff Responses to the Committee PMPD Hearing Order and Comments on the Presiding Member's Proposed Decision For the Walnut
25 page(s)
| | CEC/Commissioners/J. Pfannenstiel/J. Geesman | CEC/J. Caswell |
42039 | 8/24/2007 |
Executive Summary
1 page(s)
| | CEC / Docket Unit | Walnut Creek AFC Committe / J. Pfannenstiel |
41944 | 8/17/2007 |
Notice of Availability of Proposed Decision
4 page(s)
| | CEC/ Interested Parties | CEC/ J. Pfannestiel/ J. Geesman |
41942 | 8/17/2007 |
Notice of Hearing on Proposed Decision and Evidentiary Hearing
5 page(s)
| | CEC/ Presiding Members | CEC/ J. Pfannestiel/ J. Geesman |
41910 | 8/15/2007 |
August 2007 Walnut Creek Presiding Member's Proposed Decision
315 page(s)
| | CEC/ Interested Parties | CEC/ G. Shean |
41585 | 7/19/2007 |
E-mail regarding LMS100 Graphics.
1 page(s)
| | CEC/ Dockets Unit | CEC/ G. Shean |
41482 | 7/12/2007 |
WCEP Supplemental Testimony, POS attached.
9 page(s)
| | CEC/ R. Rogriguez | GalatiBlek/ M. Cosens |
41407 | 7/5/2007 |
Letter in response to the proposed WCEP project
1 page(s)
| | CEC | County of LA Public Health/ C. Medina for T. Powell |
41237 | 6/28/2007 |
Committee's Order Holding Evidentiary Record Open Pending Committee Review of Applicant's Further Submission
2 page(s)
| | CEC/ Interested Parties | CEC/ J. Pfannestiel/ J. Geesman |
41177 | 6/27/2007 |
Letter in response to the proposed Walnut Creek Energy Park in the City of Industry
4 page(s)
| | CEC/PAO | County of LA/T. Powell |
41101 | 6/22/2007 |
Memo-- Walnut Creek evidentiary hearing; Questions Re: Walnut Creek condition of Certification
6 page(s)
| | CEC/ Dockets Unit | CEC/ G. Shean |
41080 | 6/21/2007 |
Edison Mission Energy's Testimony for Walnut Creek Energy Park
114 page(s)
| | CEC/Docket Unit | M. Cosens/GalatiBlek |
41028 | 6/18/2007 |
Walnut Creek Energy Park CEC Staff Errata to the Final Staff Assessment
11 page(s)
| | CEC/ J. Pfannenstiel/J. Geesman | CEC/J. Caswell |
40865 | 6/7/2007 |
Updated POS list and labels.
3 page(s)
| | CEC/ Dockets Unit | CEC/ C. Hillhouse |
40855 | 6/7/2007 |
ROC, electronic mail, RE Volatile Organic Compounds calculations and offset requirements.
1 page(s)
| | Joe Loyer | AQMD/ K. Coats |
40625 | 5/29/2007 |
Dept of Public Works Comments on FSA and Notice of Pre-Hearing Conference for Walnut Creek Energy park
1 page(s)
| | CEC/J. Caswell | Co of LA/D. Hunter |
40438 | 5/16/2007 |
Notice of Evidentiary Hearing, WCE
4 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel/J. Geesman |
40413 | 5/14/2007 |
Response to Walnut Creek FSA
1 page(s)
| | CEC/J. Caswell | SCAG/S. Del Rosario |
40408 | 5/14/2007 |
Notice of Prehearing Conference
3 page(s)
| | CEC/J. Caswell | County of Los Angeles/D. Hunter |
40371 | 5/11/2007 |
Walnut Creek Energy LLC's Prehearing Conference Statement
1 page(s)
| | CEC/R. Rodriquez | GalatiBlek/M. Cosens |
40370 | 5/11/2007 |
CEC Staff's Pre-Hearing Conference Statement
4 page(s)
| | CEC/Docket Unit | CEC/L. DeCarlo |
40174 | 4/26/2007 |
Current POS list as of April, 26, 2007.
1 page(s)
| | All Parties | CEC Hearing Adviser's Office/ C. Hillhouse |
40105 | 4/23/2007 |
Committee's Notice of Prehearing Conference for May 15th
6 page(s)
| | Interested Partied | CEC/G. Shean |
40025 | 4/11/2007 |
Request for Agency Comments on the FSA.
2 page(s)
| | Agency Distribution List | CEC/ R. Johnson |
40024 | 4/11/2007 |
Document Handling for FSA
3 page(s)
| | Librarian | CEC/ R. Johnson |
40023 | 4/11/2007 |
Notice of Availability - FSA
2 page(s)
| | Interested Parties | CEC/ R. Johnson |
39663 | 3/19/2007 |
SCAQMD Response to CC request for info on Rule 1309-Priority Reserve
14 page(s)
| | CEC/T. O'Brien/Dockets Unit | SCAQMD/M. Nazemi |
39383 | 2/26/2007 |
Final determination of compliance for Walnut Creek Energy, LLC
64 page(s)
| | CEC/ L. Prescott | SCAQMD |
39347 | 2/21/2007 |
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT'S COMPLETE ANALYSIS OF PROPOSED WALNUT CREEK ENERGY PROJECT
83 page(s)
| | CEC/L. PRESCOTT | SCAQMD/M. NAZEMI |
39346 | 2/21/2007 |
RECORD OF CONVERSATION WITH DOUG DAVY OF CH2M HILL
1 page(s)
| | CEC/DOCKETS UNIT | CEC/L. PRESCOTT |
39286 | 2/14/2007 |
Data Request Response #84 in support of the AFC.
5 page(s)
| | CEC/ L. Prescott | CH2M Hill/ D. Davy |
39189 | 2/5/2007 |
E-mail regarding Walnut Creek Noise
1 page(s)
| | Majestic Realty Co./ E. Konjoyan | CEC/ S. Khoshmashrab |
39188 | 2/5/2007 |
ROC with County Counsel's Office for LA County regarding Applicable Noise Standards.
1 page(s)
| | Docket Unit | CEC/ S. Khoshmashrab |
39129 | 1/30/2007 |
DTSC has received and provides comments, as requested, on PSA.
2 page(s)
| | CEC/ L. Prescott | DTSC/ J. Oborne |
39090 | 1/26/2007 |
Letter RE Proof of Service List , current as of January 26, 2007 (POS attached).
3 page(s)
| | All Parties | CEC/ C. Hillhouse |
39086 | 1/25/2007 |
Letter notifying that the Engineering department has reviewd the development projects approved by the city prior to the AFC filing of WCEP.
1 page(s)
| | CEC-Environmental Protection Office/ M. Hamblin | City of Industry/ T. Helling |
39037 | 1/23/2007 |
Committee's Order on Applicant's Motion re FSA
2 page(s)
| | CEC/Dockets Unit | CEC/G. Shean |
38995 | 1/22/2007 |
1-13-07 Letter of Receipt of PSA from Sheriff's Department
1 page(s)
| | CEC/L. Prescott | C of LA Sheriffs Dept/M. Smith |
38966 | 1/18/2007 |
Staff's Response to Walnut Creek Energy, LLC's Motion for Scheduling Order
5 page(s)
| | Docket Unit | CEC/ L. De Carlo |
38941 | 1/16/2007 |
Supplemental Cultural Resources Survey
6 page(s)
| | CEC/ L. Prescott | CH2M Hill/ D.M. Davy |
38920 | 1/16/2007 |
Walnut Creek LLC's notice of motion and motion for scheduling order.
5 page(s)
| | CEC/ Dockets Unit | WCE/ M. Cosens |
38913 | 1/12/2007 |
Preliminary Comments on the Preliminary Staff Assessment.
23 page(s)
| | CEC/ R. Rodriguez | Galati & Blek/ M. Cosens |
38882 | 1/8/2007 |
Walnut Creek Energy Park - Senate Bill 1368
2 page(s)
| | M. Shean/ K. Shean/ G. Shean/ J. Geesman/ J. Pfannenstiel/ Docket Unit | D.E. Lutz |
38852 | 1/8/2007 |
Notice of PSA Workshop for the Walnut Creek Project
6 page(s)
| | CEC/Docket Unit | CEC/ T. O'Brien |
38826 | 1/4/2007 |
Agency letters
1 page(s)
| | Agencies | CEC/R. Johnson |
38825 | 1/4/2007 |
Library letter
3 page(s)
| | Libraries | CEC/R. Johnson |
38794 | 12/29/2006 |
Notice of Availability for PSA for Walnut Creek Energy.
2 page(s)
| | Docket Unit | L. Prescott / J. Reede /CEC |
38792 | 12/29/2006 |
Preliminary Staff Assessment and POS for Walnut Creek Energy.
511 page(s)
| | Docket Unit | L. Prescott/ CEC |
38691 | 12/18/2006 |
Repeated request for confidentiality and air quality status report #4
4 page(s)
| | CEC/ Dockets Unit | WCE/ S. Galati |
38603 | 12/11/2006 |
Report of conversation staff with DR. Davy regarding additional t-lines
1 page(s)
| | CEC/ Docket Unit | CEC/ D. Torres |
38457 | 11/21/2006 |
Notice of Intent to Issue Permit Pursuant to AQMD Rules 212 and 3006.
3 page(s)
| | CEC/ L. Presott | South Coast AQMD |
38443 | 11/20/2006 |
Edison Mission Energy Proposed 500 MW Power Plant Facility ID No. 146536 Location Walnut Creek energy LLC (WCE) 911 Bixby Drive, City of Industry, CA.
123 page(s)
| | L. Prescott /CEC | M. D. Mills / SCAQMD |
38377 | 11/13/2006 |
Supplement IV in response to data requests
38 page(s)
| | CEC/L.Prescott | CH2MHill/D.Davy |
38331 | 11/3/2006 |
South Coast Air Quality Managment District's PDOC and engineering analysis.
67 page(s)
| | CEC/ L. Prescott | SCAQMD/ M. Mills |
37879 | 9/14/2006 |
Report of Telephone Conversation between D. Torres and M. Kissell regarding Warehouse Demolition.
1 page(s)
| | Docket Unit | CEC/ D. Torres |
37875 | 9/7/2006 |
Supplement III in Response to Data Requests 1-104
1 page(s)
| | CEC/ Dockets Unit | CH2MHill/ Walnut Creek Energy Park |
37786 | 9/1/2006 |
Supplement III in response to data requests 1 through 104 and April 25 Workshop queries in support of the AFC for the Walnut Creek Energy Park.
86 page(s)
| | CEC/L. Prescott | CH2MHill/ D. Davy |
37770 | 8/29/2006 |
Repeated Request for Confidential Designation Confidential Air Q Status Report No. 2 & Confidential Offset Strategy
3 page(s)
| | B.B. Blevins/ CEC | Galati & Blek LLP |
37762 | 8/31/2006 |
City of Industry Municipal Code - Title 17 - Zoning
69 page(s)
| | CEC/ L. Prescott | City of Industry/ M. Kissell |
37655 | 8/14/2006 |
Report of Telephone Conversation with L. Prescott, E. Knight, L. DeCarlo, M. Kissell, and M. Vadon RE City of Industry, Details RE Zone Exemption.
1 page(s)
| | Docket Unit | CEC/ L. Prescott |
37648 | 8/11/2006 |
Technical Report Application for Certification - Walnut Creek Energy Park (Industry) FFER 200600049
4 page(s)
| | E. Knight/ Loren Prescott | D. R. Leininger / P. Michael Freeman / County of Los Angeles |
37630 | 8/9/2006 |
Walnut Creek Energy Park Status Report #3
4 page(s)
| | CEC/Commissioners/J. Pfannenstiel/J. Geesman | CEC/L. Prescott |
37602 | 8/8/2006 |
ROC between L. Prescott and J. Morris, Re: Responses to Staff Questions LTI Lease and Laydown Site for WCEP.
2 page(s)
| | J. Morris / D. Davey | CEC / L. C. Prescott |
37475 | 7/24/2006 |
Attached Email from California Air Resources Board and Letter from CH2M Hill regarding the Health Risk Assessment completed for Walnut Creek and for Sun Valley
5 page(s)
| | Dockets Unit | L. Prescott/CEC |
37361 | 7/11/2006 |
Request for Entry into the NOx and SOx RECLAIM Program
3 page(s)
| | Edison Mission Energy/T. McCabe | South Coast Air Quality Management District/M. Nazemi |
37317 | 7/7/2006 |
Supplement II in Response to Data Request 1 through 104 and April 25 Workshop Queries in Support of the Application for Certification for The Walnut Creek Energy Park
46 page(s)
| | CEC/ E. Knight | CH2MHILL / D. M. Davy, Ph. D. |
37254 | 7/7/2006 |
Letter informing E. KNight that LTI entered into a lease option agreement with Walnut Creek Energy, LLC
1 page(s)
| | E. Knight/ CEC | T. F. Newcomer/ Logistics Terminals, Inc. |
37207 | 6/28/2006 |
Letter to Eric Knight, Project Manager.
1 page(s)
| | E. Knight/ CEC | K. Radecki/ Industry Urban-Development Agency |
37151 | 6/21/2006 |
Walnut Creek Energy Park Status Report #2
4 page(s)
| | CEC/Commissioners/J. Pfannenstiel/J. Geesman | CEC/E. Knight |
37150 | 6/21/2006 |
Second Round Data Requests (100-104)
5 page(s)
| | Edison Mission Energy/T. McCabe | CEC/E. Knight |
37135 | 6/20/2006 |
ROP Beverly Batian and Dorthy Torres with Thomas Taylor of the Natural Gas and Cultural Resources Group in the Corporate Environmental health and Safety Organization for Southern California Edison.
2 page(s)
| | CEC/ Docket Unit | B. Bastian/ D. Torres |
37071 | 6/7/2006 |
Walnut Creek Energy Park Report of Conversation June 1 2006 with Doug Davey and CH2MHILL 12:00 p.m.
1 page(s)
| | Docket Unit | E. Knight |
37069 | 6/1/2006 |
Report of Conversation with Mike Kissel re: Local LORS and Warehouse Demolition @ 2:15 No. 626-33-2211
1 page(s)
| | Docket Unit | E. Knight |
37046 | 5/31/2006 |
Supplemental Data Responses (set 1-97), Responses to Workshop Questions, and Data Responses 98-99.
47 page(s)
| | CEC/E. Knight/Docket Unit | CH2MHill/Davy |
37031 | 5/26/2006 |
Electronic POS list and Electronic Distribution list
1 page(s)
| | Docket Unit | G. Shean / CEC |
37021 | 5/25/2006 |
This is the POS Only --- for this document look in TN No. 37020
(Order Denying Petition to Intervene and Creating a Electronic Distributions list.)
1 page(s)
| | Docket Unit | J. Pfannestiel / J. Geesman/ CEC |
37020 | 5/25/2006 |
Order Denying Petition to Intervene and Creating Electronic Distribution List and POS.
6 page(s)
| | Docket Unit | J. Pfannestiel / J.Geesman / CEC |
36963 | 5/18/2006 |
Fax from J. Ballas, City of Industry Engineer, to D. Smith, CEC Staff Re: roadway LOS thresholds and copy of City's LOS Standards.
4 page(s)
| | CEC/D. Smith | City of Industry Engineer/J. Ballas |
36962 | 5/18/2006 |
Report of Conversation between Dmitri Smith and Leon Franks. Re: Dimensions of Trailer for Generator Assembly
1 page(s)
| | CEC/Docket Unit | CEC/D. Smith |
36949 | 5/16/2006 |
City Industry Urban Development Agency Warehouse Demolition Responsibility, ROC between Ellie Townsend and Mike Kissell.
1 page(s)
| | Eric Knight/ Dockets | Ellie Townsend- Hough/ CEC |
36945 | 5/16/2006 |
ARB's comments on the Health Risk Assessment (HRA)
3 page(s)
| | CEC/E. Knight | Stephanie Kato |
36920 | 5/10/2006 |
Walnut Creek Energy Park Status Report #1, POS
6 page(s)
| | CEC/J. Pfannenstiel/J. Geesman | CEC/E. Knight |
36915 | 5/9/2006 |
Cultural Resources Confidentiality Application Walnut Creek Energy Park Project, docket No. 05-AFC-1
2 page(s)
| | Docket Unit | CEC/B.B. Blevins |
36886 | 5/4/2006 |
Air Quality Modeling Readme Text File. This file describes the input/output air quality modeling files for the Walnut Creek Energy Park AFC. Applicant's Response to Data Request #28.
2 page(s)
| | CEC/Staff | Edison Mission |
36882 | 5/3/2006 |
Edison Mission Energy's Repeated Request for Confidential Designation Confidential Air Quality Status Report No. 1 Confidential Offset Strategy
6 page(s)
| | CEC/Blevins/Docket Unit | Galati & Blek/Mills |
36851 | 4/27/2006 |
Petition to Intervene" regarding the Walnut Creek Energy Center. POS
5 page(s)
| | CEC/Docket Unit | Allan J. Thompson/Panoche Energy Center, LLC |
36844 | 4/26/2006 |
Letter re: City Noise Standards Applicable to WCEP.
1 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | City of Industry/M. Kissell |
36803 | 4/20/2006 |
Supplemental Data Requests (98-99)
3 page(s)
| | Edison Mission Energy/T. McCabe | CEC/E. Knight |
36801 | 4/20/2006 |
City of Industry's review of Walnut Creek Energy Park Project's consistency with City laws, ordinances, and standards.
13 page(s)
| | CEC/E. Knight | City of Industry/M. Kissell |
36784 | 4/19/2006 |
City of Industry Demolition Project
1 page(s)
| | CEC/J. Pfannenstiel and J. Geesman | City of Industry/M. Kissell |
36727 | 4/13/2006 |
Comments on Priority Reserve Amended Rule 1309.1
1 page(s)
| | Docket Unit | CEC/P. Richins |
36715 | 4/12/2006 |
Notice of Data Response & Issue Resolution Staff Workshop. POS
6 page(s)
| | CEC/Docket Unit | CEC/T. O'Brien |
36678 | 4/10/2006 |
Applicant's Responses to CEC Staff Data Requests 1 - 97. POS
292 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | CH2MHILL/J. Carrier |
36671 | 4/7/2006 |
CONFIDENTIALS on Cultural; a review of all recorded archaelogical sites within a 1/2-mile radius of the project, as well as, review of cultural resource reports on file.
202 page(s)
| | Mr. Clint J. Helton/CEC/Docket | South Central Coastal Information Center |
36670 | 4/6/2006 |
Request for Confidential Designation of the Response to Data Request Number 52. POS (this letter accompanied the CONFIDENTIAL FILING from South Central Coastal Information Center).
6 page(s)
| | Mr. B. B. Blevins/CEC/Docket Unit | Galati & Blek, LLP |
36669 | 4/6/2006 |
Notice of Determination of approval of Demolition of Warehouse at 911 Bixby Drive.
2 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | City of Industry |
36668 | 4/6/2006 |
Report of Conversation between Joe Diamond, CEC, and Michael Kissell, Planning Director of City of Industry; re: Warehouse Demolition and Socioeconomics.
1 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | CEC/J. Diamond |
36667 | 4/6/2006 |
Negative Declaration for Demolition of Warehouse at 911 Bixby Drive.
1 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | City of Industry |
36666 | 4/6/2006 |
INITIAL STUDY for: 911 Bixby Drive Building Demolition.
48 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | City of Industry |
36635 | 11/22/2005 |
Air Modeling and Health Risk Assessment files. (on cd)
1 page(s)
| | Mr. Eric Knight/CEC/Docket Unit | Walnut Energy Park |
36541 | 3/16/2006 |
Letters to Native American Communities.
13 page(s)
| | Various Native American Communities/CEC/Docket Unit | CEC/P. Richins |
36512 | 12/9/2005 |
Report of Conversation between Joe Diamond, CEC, and Robbie Maxville, Hacienda La Puente Unified School Dist., re: Educational Impacts.
1 page(s)
| | CEC/Docket Unit | CEC/J. Diamond |
36505 | 3/10/2006 |
CEC Staff's Data Requests (1-97). POS
30 page(s)
| | CEC/Docket Unit | CEC/E. Knight |
36500 | 3/9/2006 |
Review of Walnut Creek Energy Park Application for Certification and Appendixes; Supplement to Application for Certification.
2 page(s)
| | CEC/E. Townsend-Hough | Dept of Toxic Substances Control/C. Plotkin |
36398 | 2/24/2006 |
Order Granting California Unions for Reliance Energy's Petition to Intervene
4 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel and J. Geesman |
36396 | 2/24/2006 |
Letter to Mike Kissell, City of Industry Planning Director, requesting the city's input on the project's compliance with city plans, policies, and regulations
2 page(s)
| | City of Industry Planning Dept/M. Kissell | CEC/E. Knight |
36383 | 2/21/2006 |
Issue Identification Report - POS
13 page(s)
| | CEC/Pfannenstiel/Geesman/Docket Unit | CEC/E. Knight |
36362 | 2/16/2006 |
Notice of Receipt Supplemental Information for the Walnut Creek Energy Park Application for Certification
2 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
36357 | 2/10/2006 |
Petition to Intervene by California Unions For Reliable Energy
5 page(s)
| | CEC | Attorneys for the California Unions For Reliable Energy |
36348 | 2/8/2006 |
Request for Agency Participation in the Review of the Walnut Creek Energy Park Application for Certification
2 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
36347 | 2/8/2006 |
Library distribution letter for Supplemental Information for the Walnut Creek Energy Park Application for Certification
3 page(s)
| | CEC/Docket Unit | CEC/Johnson |
36346 | 2/8/2006 |
Notice of Public Informational Hearing & Site Visit. POS
8 page(s)
| | CEC/Docket Unit | CEC/Commissioners Pfannenstiel & Geesman |
36317 | 2/2/2006 |
Letter granting temporary confidentiality to the Walnut Creek Energy Park project's potential offset sources,
(Docket No. 05-AFC-2).
3 page(s)
| | Docket Unit/Galati | CEC/B.B. Blevins |
36316 | 2/2/2006 |
Hearing Officer Assignment for Walnut Park Energy Park Project CEC Docket No. 05-AFC-2
1 page(s)
| | Docket Unit / All COMMISSIONERS | CHAIRMAN DESMOND |
36310 | 2/1/2006 |
PM10 Significance Modeling for the Walnut Creek Energy Park and the Sun Valley Energy Project
2 page(s)
| | South Coast Air Quality Management District/Coats | Edison Mission Energy/McCabe |
36287 | 1/30/2006 |
Executive Director's Revised Data Adequacy Recommendation on the Walnut Creek Energy Park AFC.
31 page(s)
| | CEC/Commissioners/Docket Unit | CEC/B.B. Blevins |
36250 | 1/25/2006 |
Supplemental Request for Confidential Designation Confidential Offset Strategy
7 page(s)
| | CEC/Blevins/Docket Unit | Galati & Blek/Galati |
36241 | 1/12/2006 |
Amended Request for Confidential Designation -- Confidential Offset Strategy
17 page(s)
| | B. B. Blevins/CEC/Docket Unit | Galati & Blek LLP |
36213 | 1/19/2006 |
Comments of the US Fish and Wildlife Service on the Walnut Creek Energy Park, City of Industry, Los Angeles County, California
2 page(s)
| | CEC/Knight | United States Department of the Interior/Goebel |
36212 | 1/19/2006 |
Comments of the Southern California Assoc. of Governments on Walnut Creek Energy Park
1 page(s)
| | CEC/Knight | Southern California Association of Governments/Wallace |
36210 | 1/13/2006 |
Supplement in Response to CEC Staff's Data Adequacy Comments on the AFC for the Walnut Creek Energy Park
139 page(s)
| | CEC/Blevins/Docket Unit | Edison Mission Energy/Scilacci |
36190 | 1/13/2006 |
Follow-up email re: PM10 and CO offsets. Also included comments from Latham and Watkins, LLP, re: Proposed Amended Rule 1309.1 - Priority Reserve.
4 page(s)
| | CEC/R. Worl/E. Knight/Docket Unit | NJ Resources, LLC/J. Morris |
36179 | 1/11/2006 |
Request for Confidential Designation-Confidential Offset Strategy
16 page(s)
| | B.B Blevins/CEC/Docket Unit | Galati & Blek LLP/S. Galati |
36155 | 1/6/2006 |
Comments of the CA Dept. of Transportation on the Walnut Creek Energy Park AFC
1 page(s)
| | CEC/Knight | CA Dept Transportation/IGR/CEQA/Powell |
36111 | 12/21/2005 |
Walnut Creek Energy Park, Executive Director's Data Adequacy Recommendation
72 page(s)
| | CEC/Commissioners/Docket Unit | CEC/Blevins |
36108 | 12/19/2005 |
Letter of completeness re: Permit to Construct Application for Walnut Creek Energy Park
1 page(s)
| | Edison Mission Energy/T. McCabe | South Coast Air Quality Mgnt. District/K. Coats |
36096 | 12/16/2005 |
Report of Conversation between Joe Diamond, CEC, and Fred Diamond, Rowland Unified School Dist., re: Impacts on Education.
1 page(s)
| | CEC/Docket Unit | CEC/J. Diamond |
36077 | 12/14/2005 |
Report of Conversation between Joe Diamond, CEC, and Nancy Hogg, of Walnut Valley USD, regarding Impacts on Education.
1 page(s)
| | CEC/Docket Unit | CEC/J. Diamond |
36065 | 12/13/2005 |
Application for a Permit to Construct from the South Coast Air Quality Management District
408 page(s)
| | CEC/Docket Unit | Edison Mission Energy |
36052 | 12/13/2005 |
Letter waiving requirement for 45 day Data Adequacy determination.
1 page(s)
| | CEC/Blevins/Docket Unit | Galati & Blek/Galati |
36045 | 12/12/2005 |
Report of Conversation between Joe Diamond, CEC, and Jim Ballard/Bassett Unified School, re: Comments on Impacts on Education.
1 page(s)
| | CEC/Docket Unit | CEC/J. Diamond |
36044 | 12/12/2005 |
Report of Conversation between Joe Diamond, CEC, and Lee Cavanaugh/Rowland Unified School, re: Comments on Impacts on Education.
1 page(s)
| | CEC/Docket Unit | CEC/J. Diamond |
36006 | 12/6/2005 |
Letter to Honorable Ronald S. Calderon re: the proposed Walnut Creek Energy Park and offer of briefing on CEC's licensing process and project specifics.
1 page(s)
| | Honorable Ronald S. Calderon CA State Assembly | Joseph F. Desmond/CEC |
36005 | 12/6/2005 |
Letter to Honorable Gloria Romero re: the proposed Walnut Creek Energy Park and offer of briefing on CEC's licensing process and project specifics.
1 page(s)
| | Honorable Gloria Romero Ca State Senate | Joseph F. Desmond/CEC |
36004 | 12/6/2005 |
Letter to Mayor David Perez City of Industry providing notification of the proposed Walnut Creek Energy Park and the CEC's licensing process.
2 page(s)
| | Mayor David Perez/City of Industry | B.B. Blevins/CEC |
35989 | 12/2/2005 |
Librarian Distribution letter for the Walnut Creek Energy Park AFC.
4 page(s)
| | Librarian Dist./CEC/Docket Unit | CEC/R. Johnson |
35983 | 12/1/2005 |
Request for agency participation in the review of the Walnut Creek Energy Park AFC.
3 page(s)
| | Agency Dist/CEC/Docket Unit | CEC/R. Johnson |
35962 | 11/28/2005 |
Notice of Receipt of an Application For Certification For the Walnut Creek Energy Park
3 page(s)
| | Docket Unit/CEC | CEC/R. Johnson |
35950 | 11/22/2005 |
Walnut Creek Energy Park AFC Too big to file in the docket. 991 page(s)
| | B.B. Blevins/CEC/Docket Unit | Edison Mission Energy/GPL:bpm |
2264-0 | 2/25/2008 |
Application for Certification of the Walnut Creek Energy Park by Walnut Cre
1 page(s)
| | | CEC |
2202-0 | 10/2/2007 |
Evidentiary Hearing
78 page(s)
| | | CEC |
2162-0 | 7/3/2007 |
Evidentiary Hearing In the Matter of: Application for Certification of the
668 page(s)
| | | CEC |
2139-0 | 5/22/2007 |
Prehearing Conference Transcript
19 page(s)
| | | CEC |
2069-0 | 3/10/2006 |
Informational Hearing & Site visit
78 page(s)
| | | CEC |