226390 | 1/28/2019 |
Memo Regarding Closing the Docket for Stanton Energy Reliability Center
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
226273 | 1/7/2019 |
Memo re POS List Closed Memorandum regarding the closing and deletion of the Proof of Service List. 3 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
225870 | 11/9/2018 |
Final Commission Decision
575 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
225869 | 11/9/2018 |
Notice of Decision
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
225866 | 11/8/2018 |
Commission Adoption Order Order No: 18-1107-3 5 page(s)
| | CEC/Dockets | California Energy Commission |
225827 | 11/6/2018 |
Errata to the PMPD Errata to the Presiding Member's Proposed Decision 10 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
225811 | 11/5/2018 |
PROPOSED Commission Adoption Order Committee's proposed Findings and Order for the Commission's consideration at the November 7, 2018 Business Meeting 5 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
225810 | 11/5/2018 |
Transcript of 10292018 Presiding Member's Proposed Decision Committee Conference
12 page(s)
| | CEC/Dockets | California Energy Commission |
225064 | 10/22/2018 |
Energy Commission Staff Comments on the Stanton Energy Reliability Center Presiding Member's Proposed Decision Memo 12 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
225058 | 10/22/2018 |
Stanton Energy Reliability Center, LLC's Comments on the Presiding Member's Proposed Decision
Facility Design, Project Description, Visual Resources 2 page(s)
| | CEC/Docket Unit | DayZenLLC |
224907 | 10/5/2018 |
Notice of Availability of PMPD, Committee Conference and Energy Commission Hearing NOTICE OF AVAILABILITY OF THE PRESIDING MEMBER’S PROPOSED DECISION, NOTICE OF 10/29/18 COMMITTEE CONFERENCE ON THE PRESIDING MEMBER’S PROPOSED DECISION, AND NOTICE OF 11/7/18 ENERGY COMMISSION HEARING Greenhouse Gases, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 7 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224906 | 10/5/2018 |
KOREAN VERSION OF NOTICE OF AVAILABILITY OF PMPD, COMMITTEE CONFERENCE AND ENERGY COMMISSION BUSINESS MEETING KOREAN VERSION OF NOTICE OF AVAILABILITY OF PMPD, 10/29//18 COMMITTEE CONFERENCE AND 11/7/18 ENERGY COMMISSION BUSINESS MEETING Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 8 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224905 | 10/5/2018 |
VIETNAMESE VERSION OF NOTICE OF AVAILABILITY OF PMPD, COMMITTEE CONFERENCE AND ENERGY COMMISSION BUSINESS MEETING VIETNAMESE VERSION OF NOTICE OF AVAILABILITY OF PMPD, OCTOBER 29, 2018 COMMITTEE CONFERENCE AND NOVEMBER 7, 2018 ENERGY COMMISSION BUSINESS MEETING 8 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224904 | 10/5/2018 |
NOTIFICACIÓN DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, NOTIFICACIÓN DE CONFERENCIA DEL COMITÉ, Y MAS NOTIFICACIÓN DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, NOTIFICACIÓN DE CONFERENCIA DEL COMITÉ SOBRE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, Y NOTIFICACIÓN DE AUDIENCIA DE LA COMISIÓN DE ENERGÍA - Lunes, 29 De Octubre De 2018, 10:00 a.m. Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 8 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224903 | 10/5/2018 |
Presiding Member's Proposed Decision
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 574 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224894 | 10/5/2018 |
COMMITTEE ORDER CLOSING THE EVIDENTIARY RECORD Committee ORDER receiving corrected maps marked as Exhibits 105 and 308 into the hearing record and closing the record. 1 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
224777 | 9/24/2018 |
SERC Revised Natural Gas Figures and Declaration of Doug Davy
Noise and Vibration, Project Description 5 page(s)
| 105 | CEC/Dockets | DayZenLLC |
224746 | 9/18/2018 |
Energy Commission Staff's Response to the Committee Order for Resubmission of Maps to Conform to Evidence
8 page(s)
| 308 | CEC/Docket Unit | California Energy Commission |
224745 | 9/18/2018 |
Declaration of Doug Davy in Support of Revised Figures
Noise and Vibration, Project Description
| | | DayZenLLC |
224723 | 9/14/2018 |
SERC Resubmission of Maps Applicant Project Description Project Description 4 page(s)
| | CEC/Ken Celli | CH2M |
224652 | 9/6/2018 |
COMMITTEE ORDER FOR RESUBMISSION OF MAPS TO CONFORM TO EVIDENCE Order reopening the record to allow the parties to substitute nine corrected maps with the southern gas line alternative removed, and omitted street names inserted. Corrected maps are due on or before September 18, 2018. 2 page(s)
| | All parties | Energy Commission Hearing Office |
224449 | 8/8/2018 |
Transcript of 822018 Evidentiary Hearing
65 page(s)
| | CEC/Dockets | California Energy Commission |
224448 | 8/8/2018 |
Transcript of 07252018 Prehearing Conference
64 page(s)
| | CEC/Dockets | California Energy Commission |
224443 | 8/8/2018 |
Emails between Applicant's counsel and Hearing Officer Email from Hearing Officer Celli to Attorney Galati regarding Exhibit 104, and reply email. Land Use 1 page(s)
| | CEC/Dockets | Energy Commission Hearing Office |
224391 | 8/3/2018 |
Orange County Recorder Office Pages 36 and 37 of Book 278 Official Plat Map recorded in Book 278, pages 36 and 37 showing Parcel 2 as an official legal parcel, Exhibit 104 Land Use, Project Description 2 page(s)
| 104 | CEC/Docket Unit | DayZenLLC |
224326 | 7/31/2018 |
SERC, LLC's Response to Clean Coalition Withdrawal of Testimony and Intervention SERC, LLC's Response to Clean Coalition Withdrawal of Testimony and Intervention Alternatives 1 page(s)
| | CEC/Dockets | DayZenLLC |
224324 | 7/31/2018 |
Clean Coalition Withdrawal as Intervenor Letter requesting to withdraw as intervenor and recommending an Energy Commission practice of developing adequate DER alternatives early in the process Alternatives 3 page(s)
| | Hearing Officer Celli | Clean Coalition |
224315 | 7/27/2018 |
Energy Commission Staff's Response to the Committee's Request for Clarification
13 page(s)
| 307 | CEC/ docket unit | California Energy Commission |
224301 | 7/25/2018 |
Email from Miles Maurino regarding exhibit numbers Email from Attorney Maurino to Hearing Officer Celli designating the Declaration and resume of Doug Karpa as Exhibits 918 and 919, respectively. 1 page(s)
| | CEC/Kenneth Celli | Energy Commission Hearing Office |
224300 | 7/25/2018 |
Conditions of Certification Compendium Stanton Energy Reliability Center
162 page(s)
| | CEC/Docket Unit | California Energy Commission |
224298 | 7/25/2018 |
Clean Coalition Opening Testimony Citation Number 27 Source Document NREL report titled, "The Impact of Wind and Solar on the Value of Energy Storage" 40 page(s)
| | CEC/Docket Unit | Clean Coalition |
224297 | 7/25/2018 |
Clean Coalition Opening Testimony Citation Number 6 Source Document
3 page(s)
| | CEC/Docket Unit | Clean Coalition |
224289 | 7/24/2018 |
Energy Commission Staff's Air Quality Greenhouse Gas Emissions Errata
3 page(s)
| 306 | CEC/Docket Unit | California Energy Commission |
224282 | 7/24/2018 |
Memo Regarding Updates to the Exhibit List
1 page(s)
| | All Parties | Energy Commission Hearing Office |
224265 | 7/23/2018 |
Email from Applicant's attorney with corrections to the Exhibit List Email from Attorney Galati to Hearing Officer Celli requesting corrections to the Exhibit List. 1 page(s)
| | Hearing Officer/Applicant's counsel | Energy Commission Hearing Office |
224262-1 | 7/23/2018 |
Response Motion to Strikefor Leave for Late Filing of Witness Information
6 page(s)
| | CEC/Docket Unit | Clean Coalition |
224262-2 | 7/23/2018 |
Response Motion to Strike - Attachment A
2 page(s)
| | CEC/Docket Unit | Clean Coalition |
224262-3 | 7/23/2018 |
Response Motion to Strike - Attachment B
15 page(s)
| | CEC/Docket Unit | Clean Coalition |
224262-4 | 7/23/2018 |
Response Motion to Strike - Attachment C
2 page(s)
| | CEC/Docket Unit | Clean Coalition |
224252 | 7/23/2018 |
NOTICE OF DATE AND TIME CHANGE OF EVIDENTIARY HEARING to August 2, 2018 at 130 p.m. This Notice changes the Evidentiary Hearing date and time (which had previously been set for August 3, 2018 at 10:00 a.m.) to August 2, 2018 at 1:30 p.m. The location and all other notifications and Orders contained in the previous Notice (TN 223890) remain in effect. 2 page(s)
| | All parties and interested public | Energy Commission Hearing Office |
224251 | 7/23/2018 |
THÔNG BÁO V? VI?C Ð?I NGÀY GI? C?A PHIÊN ÐI?U TR?N Vietnamese Notice of Date and Time Change of Evidentiary Hearing.
THURSDAY, AUGUST 2, 2018
Beginning at 1:30 p.m.
Public comment begins at 5:30 p.m.
Stanton Community Center/City Hall
7800 Katella Avenue
Stanton, California 90680
(Wheelchair Accessible)
2 page(s)
| | CEC/Dockets | California Energy Commission |
224250 | 7/23/2018 |
Korean Notice of Date and Time Change of Evidentiary Hearing Korean Notice of Date and Time Change of Evidentiary Hearing.
THURSDAY, AUGUST 2, 2018
Beginning at 1:30 p.m.
Public comment begins at 5:30 p.m.
Stanton Community Center/City Hall
7800 Katella Avenue
Stanton, California 90680
(Wheelchair Accessible)
2 page(s)
| | CEC/Dockets | California Energy Commission |
224249 | 7/23/2018 |
NOTIFICACIÓN DE CAMBIO DE FECHA Y HORA DE AUDIENCIA PROBATORIA Spanish version of Notice of Date and Time Change of Evidentiary Hearing.
THURSDAY, AUGUST 2, 2018
Beginning at 1:30 p.m.
Public comment begins at 5:30 p.m.
Stanton Community Center/City Hall
7800 Katella Avenue
Stanton, California 90680
(Wheelchair Accessible)
2 page(s)
| | CEC/Dockets | California Energy Commission |
224232 | 7/20/2018 |
Clean Coalition SERC Exhibit List
2 page(s)
| | CEC/Docket Unit | Clean Coalition |
224227 | 7/20/2018 |
Memo re Date Change for Evidentiary Hearing Memorandum from Hearing Officer advising the parties that the Evidentiary Hearing will be changed to the afternoon of August 2, 2018. 1 page(s)
| | All parties and interested public | Energy Commission Hearing Office |
224213 | 7/19/2018 |
Memo re Exhibit List for Stanton Energy Reliability Center Memo to the parties with a link to the exhibit list that requests the parties review the exhibit list for accuracy and provide changes or corrections to the hearing officer. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
224185 | 7/16/2018 |
NREL's article - The Impact of Wind and Solar on the Value of Energy Storage This document was referenced in Notes 21, 22, 23 and 27 of the Clean Coalition's Opening Testimony (TN#: 224025). 40 page(s)
| | CEC/Docket Unit | Clean Coalition |
224182-1 | 7/16/2018 |
Memo and Revised July 25 2018 Prehearing Conference Agenda Korean translation
2 page(s)
| | Parties and Interested Persons | Energy Commission Hearing Office |
224182-2 | 7/16/2018 |
Memo and Revised July 25 2018 Prehearing Conference Agenda Spanish translation Notificación acerca de que el Comité considerará la Petición de Anulación de la declaración testimonial de Clean Coalition durante la Conferencia Previa a la Audiencia del 25 de julio de 2018; Orden del día de la Conferencia Previa a la Audiencia modificado 2 page(s)
| | Parties and Interested Persons | Energy Commission Hearing Office |
224182-3 | 7/16/2018 |
Memo and Revised July 25 2018 Prehearing Conference Agenda Vietnamese translation Luu ý rang Uy ban se xem xét Thinh cau cua Nguyên don de xóa bo loi khai cua to chuc Clean Coalition trong phiên dieu tran ngày 25 tháng 7 nam 2018; Chuong trình nghi su cho phiên dieu tran so bo duoc sua doi 2 page(s)
| | Parties and Interested Persons | Energy Commission Hearing Office |
224180 | 7/13/2018 |
Miles Maurino Statement of Qualifications
1 page(s)
| | CEC/Docket Unit | Clean Coalition |
224179 | 7/13/2018 |
Miles Maurino Declaration
1 page(s)
| | CEC/Docket Unit | Clean Coalition |
224178 | 7/13/2018 |
Clean Coalition Prehearing Conference Statement
5 page(s)
| | CEC/Docket Unit | Clean Coalition/Doug Karpa |
224177 | 7/13/2018 |
Stanton Energy Reliability Center PreHearing Conference Statement and Proposed Exhibit List
Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Waste Management, Soil and Water, Greenhouse Gases 15 page(s)
| | CEC/Docket Unit | DayZenLLC |
224175 | 7/13/2018 |
Doug Karpa Declaration Clean Coalition Opening and Response Testimony Co-Author, Doug Karpa, Declarations Page 1 page(s)
| 918 | CEC/Docket Unit | Clean Coalition |
224174 | 7/13/2018 |
Doug Karpa Statement of Qualifications Clean Coalition Opening and Rebuttal Testimony Co-Author, Doug Karpa, Statement of Qualifications 1 page(s)
| 919 | CEC/Docket Unit | Clean Coalition |
224173 | 7/13/2018 |
Memo and Revised July 25 2018 Prehearing Conference Agenda adding Applicant's Motion to Strike Clean Coalition's Testimony Applicant's Motion to Strike will be considered during the Prehearing Conference 2 page(s)
| | Parties and Interested Persons | Energy Commission Hearing Office |
224171 | 7/13/2018 |
Clean Coalition - Wall Street Journal Article Summary and Link This document was cited in Note 35 of the Clean Coalition's Opening Testimony (TN#: 224025). 1 page(s)
| 916 | CEC/Docket Unit | Clean Coalition |
224169 | 7/13/2018 |
LBNL Article - Demand Response Potential This document was cited in Note 3 of the Clean Coalition's Opening Testimony (TN#: 224025). 67 page(s)
| 902 | CEC/Dockets | Clean Coalition |
224168 | 7/13/2018 |
Integrating Increased DR and Dynamic Price Response into NYISO Markets This document was cited in Note 4 of the Clean Coalition's Opening Testimony (TN#: 224025) 26 page(s)
| 903 | CEC/Dockets | Clean Coalition |
224167 | 7/13/2018 |
FERC 2015 Assessment of DR and AMI. Note 5 of the Clean Coalition's Opening Testimony (TN#: 224025) references this document. 36 page(s)
| 904 | CEC/Dockets | Clean Coalition |
224166 | 7/13/2018 |
Energy Commission Staff's Prehearing Conference Statement
4 page(s)
| | CEC/ Docket unit | California Energy Commission |
224165 | 7/13/2018 |
SCE Demand Response Programs This website was cited in citations 7, 8 and 9 in the Clean Coalition's Opening Testimony (TN#: 224025). 6 page(s)
| 905 | CEC/Dockets | Clean Coalition |
224164 | 7/13/2018 |
Status Report #15
1 page(s)
| | | California Energy Commission |
224163 | 7/13/2018 |
GreenBiz Article - Here comes the sun Solar plus storage energy solutions get competitive This article was cited in Note 11 of the Clean Coalition's Opening Testimony (TN#: 224025) 13 page(s)
| 906 | CEC/Dockets | Clean Coalition |
224162 | 7/13/2018 |
Carbon Budget Article This document was cited in Note 12 of the Clean Coalition's Opening Testimony (TN# 224025). 27 page(s)
| 907 | CEC/Dockets | Clean Coalition |
224161 | 7/13/2018 |
NREL Advanced Inverter Article This document was cited in Note 13 of the Clean Coalition's Opening Testimony (TN# 224025) 8 page(s)
| 908 | CEC/Dockets | Clean Coalition |
224160 | 7/13/2018 |
KIUC SolarCity Selects Battery System for Kaua'i Co-op Solar Storage Project This document was cited in Note 14 of the Clean Coalition's Opening Testimony (TN#: 224025) 2 page(s)
| 909 | CEC/Dockets | Clean Coalition |
224159 | 7/13/2018 |
Renewables Now, Hawaii Regulators approve solar-plus-storage project on Kaua'i This article was cited in Note 15 of the Clean Coalition's Opening Testimony (TN#: 224025) 5 page(s)
| 910 | CEC/Dockets | Clean Coalition |
224158 | 7/13/2018 |
Clean Coalition Solar Siting Surveys This webpage was cited in Note 16 of the Clean Coalition's Opening Testimony (TN#: 224025). 4 page(s)
| 911 | CEC/Dockets | Clean Coalition |
224157 | 7/13/2018 |
US EIA 2018 Annual Energy Outlook This document was cited in Notes 24, 25, and 26 in the Clean Coalition's Opening Testimony (TN#: 224025). 74 page(s)
| 912 | CEC/Dockets | Clean Coalition |
224156 | 7/13/2018 |
CPUC Decision 15-11-041 This Decision was cited in Notes 29, 31, 32 and 33 of the Clean Coalition's Opening Testimony (TN#: 224025). 41 page(s)
| 913 | CEC/Dockets | Clean Coalition |
224155 | 7/13/2018 |
CPUC Decision 16-09-004 This Decision was cited in Note 30 of the Clean Coalition's Opening Testimony (TN#: 224025). 33 page(s)
| 914 | CEC/Dockets | Clean Coalition |
224154 | 7/13/2018 |
CPUC Decision 16-05-050 This Decision was cited in Note 34 of the Clean Coalition's Opening Testimony (TN#: 224025). 41 page(s)
| 915 | CEC/Dockets | Clean Coalition |
224143 | 7/12/2018 |
Deep Decarbonization in a High Renewables Future
141 page(s)
| 305 | CEC/Docket unit | California Energy Commission |
224094 | 7/9/2018 |
Stanton Energy Reliability Center, LLC's Motion To Strike Intervenor Clean Coalition's Testimony
Alternatives 5 page(s)
| | CEC/Docket Unit | DayZenLLC |
224086 | 7/6/2018 |
Miles Maurino Comments Clean Coalition Rebuttal Testimony
3 page(s)
| 901 | CEC Docket Unit | Miles Maurino |
224084 | 7/6/2018 |
Rebuttal to Clean Colation Alternatives Testimony - Corrected Cost Analysis
Alternatives
| 102 | CEC/Docket Unit | DayZenLLC |
224083 | 7/6/2018 |
SERC, LLC Final Rebuttal Testimony Package - Alternatives - Declarations
Alternatives 21 page(s)
| 101 | CEC/Docket Unit | DayZenLLC |
224081 | 7/6/2018 |
CPUC Hearing Transcript Excerpts CPUC Evidentiary Hearing Transcript, Application 14-11-012, May 5, 2015, Volume 1 Page 30, lines 17-23, Testimony of Jesse Bryson Alternatives 2 page(s)
| 99 | CEC/Docket Unit | DayZenLLC |
224077 | 7/6/2018 |
NREL Land Use Requirements for Solar Power Plants in the United States
47 page(s)
| 97 | CEC/Docket Unit | DayZenLLC |
224076 | 7/6/2018 |
CAISO 2019 Local Capacity Technical Report Final Report and Study Results, May 15, 2018 131 page(s)
| 98 | CEC/Docket Unit | DayZenLLC |
224071 | 7/6/2018 |
Energy Commission Staff's Rebuttal Testimony
13 page(s)
| 304 | CEC/ Docket unit | California Energy Commission |
224043 | 7/3/2018 |
Resume of Jim McLucas Resume of Jim McLucas as Attachement to Opening Testimony for SERC, LLC 5 page(s)
| 103 | CEC/Dockets | DayZenLLC |
224026 | 6/29/2018 |
Opening Testimony Supplement
4 page(s)
| 917 | CEC/Docket Unit | Clean Coalition |
224025 | 6/29/2018 |
Opening Testimony of Clean Coalition
14 page(s)
| 900 | CEC/Docket Unit | Clean Coalition |
224018 | 6/29/2018 |
Stanton Energy Relibility Center LLC's Opening Testimony
68 page(s)
| 100 | CEC/Docket Unit | DayZen LLC |
223985 | 6/28/2018 |
COMMITTEE ORDER GRANTING PETITION TO INTERVENE Committee ORDER granting Clean Coalition's Petition to Intervene Alternatives 3 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
223939 | 6/25/2018 |
Email between parties and hearing officer regarding Clean Coalition's Petition to Intervene Document Description: Email from Scott Galati to Hearing Officer Celli and all parties regarding the Petition to Intervene filed by Clean Coalition, and email from Hearing Officer Celli asking the parties to reply with an indication whether they intend to oppose the Petition to Intervene. Alternatives 2 page(s)
| | All Parties and Hearing Officer | Energy Commission Hearing Office |
223912 | 6/22/2018 |
Clean Coalition Comments - Petition to Intervene
Alternatives, Project Description 5 page(s)
| | CEC/Docket Unit | Clean Coalition/Miles Maurino |
223897 | 6/21/2018 |
Declaration of Brett Fooks
Compliance 1 page(s)
| 303 | CEC/Docket Unit | California Energy Commission |
223890 | 6/20/2018 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders with links to Spanish, Korean and Vietnamese translations. 10 page(s)
| | CEC/Dockets | California Energy Commission |
223889 | 6/20/2018 |
Korean Version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders.
12 page(s)
| | CEC/Dockets | California Energy Commission |
223888 | 6/20/2018 |
Notificación De Conferencia Previa A La Audiencia Y Audiencia Probatoria, Orden De Programación Y Órdenes Adicionales Spanish version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders. 11 page(s)
| | CEC/Dockets | California Energy Commission |
223887 | 6/20/2018 |
Thông Báo V Hi Ngh Truc Phiên Ðiu Trn Và Phiên Ðiu Trn Da Trên Bng Chng, Lnh Lên K Hoch, Và Các Lnh Tip Theo Vietnamese version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders. 11 page(s)
| | CEC/Dockets | California Energy Commission |
223882 | 6/20/2018 |
Energy Commission Staff's Opening Testimony
Compliance 2 page(s)
| 302 | CEC/Docket Unit | California Energy Commission |
223843 | 6/18/2018 |
Status Report #14
1 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
223840 | 6/18/2018 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders ***SUPERCEDED BY TN 223890*** The PREHEARING CONFERENCE will be conducted on:
WEDNESDAY, JULY 25, 2018
Beginning at 10:00 a.m.
California Energy Commission
Art Rosenfeld Room – Hearing Room A
1516 Ninth Street
Sacramento, CA 95814
The EVIDENTIARY HEARING will take place on:
FRIDAY, AUGUST 3, 2018
Beginning at 10:00 a.m.
Stanton Community Center/City Hall
7800 Katella Avenue
Stanton, California 90680 10 page(s)
| | CEC/Dockets | California Energy Commission |
223839 | 6/18/2018 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders ***SUPERCEDED BY TN 223890***
The PREHEARING CONFERENCE will be conducted on:
WEDNESDAY, JULY 25, 2018
Beginning at 10:00 a.m.
California Energy Commission
Art Rosenfeld Room – Hearing Room A
1516 Ninth Street
Sacramento, CA 95814
The EVIDENTIARY HEARING will take place on:
FRIDAY, AUGUST 3, 2018
Beginning at 10:00 a.m.
Stanton Community Center/City Hall
7800 Katella Avenue
Stanton, California 90680 10 page(s)
| | CEC/Dockets | California Energy Commission |
223837 | 6/15/2018 |
Stanton Energy Reliability Center LLC's Status Report No.14
2 page(s)
| | CEC/Docket Unit | DayZen LLC |
223740 | 6/7/2018 |
Notice of Availability - Final Staff Assessment (Vietnamese Version) Final Staff Assessment for the Proposed Stanton Energy Reliability Center 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223739 | 6/7/2018 |
Notice of Availability - Final Staff Assessment (Korean Version) Final Staff Assessment for the Proposed Stanton Energy Reliability Center 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
223738 | 6/7/2018 |
Notificacion de Disponibilidad Evaluacion Final Del Personal (Spanish Version) Notificacion De Disponibilidad Evaluacion Final Del Personal Para El Stanton Energy Reliability Center Propuesto 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223737 | 6/7/2018 |
Notice of Availability - Final Staff Assessment (English Version) Final Staff Assessment for the Proposed Stanton Energy Reliability Center 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223736 | 6/7/2018 |
Document Handling For The Final Staff Assessment For The Proposed Stanton Energy Reliability Center (16-AFC-01) Library Letter 1 page(s)
| | Librarian | California Energy Commission |
223734 | 6/7/2018 |
Executive Summary (Vietnamese Version) Summary 25 page(s)
| | CEC/Docket Unit | California Energy Commission |
223733 | 6/7/2018 |
Executive Summary (Spanish Version) Summary 29 page(s)
| | CEC/Docket Unit | California Energy Commission |
223732 | 6/7/2018 |
Executive Summary (Korean Version)
33 page(s)
| | CEC/Docket Unit | California Energy Commission |
223731 | 6/7/2018 |
Executive Summary Summary 26 page(s)
| | CEC/Docket Unit | California Energy Commission |
223726 | 6/7/2018 |
Final Staff Assessment
947 page(s)
| 300 | CEC/Docket Unit | California Energy Commission |
223454 | 5/16/2018 |
Report of Conversation - Re. Traffic and Transportation - Alternate Route for Hazardous Materials Delivery Conversation between Andrea Koch of the CEC and Allan Rigg, Public Works Director/City Engineer for the City of Stanton 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
223450 | 5/15/2018 |
Memo - Status Report #13
1 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
223447 | 5/15/2018 |
Stanton Energy Reliability Center LLC's Status Report No. 13
2 page(s)
| | CEC/Docket Unit | DayZen LLC |
223446 | 5/15/2018 |
Report of Conversation re Inquiry Regarding Construction Duration, Stanton Energy Reliability Center Conversation between CEC staff, John Heiser and Scott Galati, Applicant's representative. 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
223425 | 5/11/2018 |
Stanton Energy Reliability Center's Responses to Data Requests A73 through A85
Traffic and Transportation, Soil and Water 15 page(s)
| 96 | CEC/John Heiser | CH2M |
223414 | 5/10/2018 |
Stanton Energy Reliability Center LLC's Supplemental NOISE-7 Comment on Preliminary Staff Assessment
Noise and Vibration 2 page(s)
| 95 | CEC/Docket Unit | DayZen LLC |
223409 | 5/9/2018 |
Stanton Energy Reliability Center LLC's Supplemental Responses to PSA Workshop Query Relating to Stormwater Discharge
30 page(s)
| 94 | CEC/Docket Unit | DayZen LLC |
223402 | 5/8/2018 |
Southern California Edison Company Generator Interconnection Agreement for Stanton Energy Reliability Center
216 page(s)
| 93 | CEC/Docket Unit | DayZen LLC |
223389 | 5/8/2018 |
Memo re Hold the Date for 2018 Prehearing Conference and Evidentiary Hearing Memorandum from the SERC Committee establishing the due date for the Final Staff Assessment as June 8, 2018 and tentatively setting the dates for the Prehearing Conference and Evidentiary Hearing as July 25, 2018 and August 3, 2018 respectively. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
223315 | 5/3/2018 |
Staff Data Requests Data Requests Regarding Recent Project Changes and Discussions at the April 18, 2018 Preliminary Staff Assessment Workshop 5 page(s)
| | SERC, LLC/Kara Miles | California Energy Commission |
223313-1 | 5/2/2018 |
Stanton Energy Reliability Center (SERC) Cover Letter Letter regarding the SCAQMD issued the Preliminary Determination of Compliance and proposed initial Title V permit for the SERC project for review. 1 page(s)
| | Honorable Janea A. Scott and Karen Douglas | SCAQMD |
223313-2 | 5/2/2018 |
Stanton Energy Reliability Center (SERC) Final Determination of Compliance (FDOC) Package
197 page(s)
| 301 | Honorable Janea A. Scott and Karen Douglas | SCAQMD |
223313-3 | 5/2/2018 |
Stanton Energy Reliability Center (SERC) Draft Facility Permit for Final Determination of Compliance (FDOC) Package
80 page(s)
| | Honorable Janea A. Scott and Karen Douglas | SCAQMD |
223300 | 4/30/2018 |
Committee Comments on the Preliminary Staff Assessment Memorandum from the Hearing Officer on behalf of the Committee with comments on the Preliminary Staff Assessment. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
223293 | 4/30/2018 |
Stanton Energy Reliability Center LLC's Final Comments on the Preliminary Staff Assessment
Hazardous Materials, Noise and Vibration, Project Description, Traffic and Transportation, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Soil and Water, Air Quality, Biological Resources, Cultural Resources 17 page(s)
| 92 | CEC/Dockets | DayZen LLC |
223289 | 4/30/2018 |
Stanton Energy Reliability Center - Updated Comments
Hazardous Materials, Socioeconomics 3 page(s)
| | CEC/Dockets | Orange County Fire Authority/Tamera Rivers |
223281 | 4/26/2018 |
Stanton Energy Reliability Center LLC's Response to PSA Workshop Queries
51 page(s)
| 91 | CEC/Docket Unit | DayZen LLC |
223273 | 4/24/2018 |
Orange County Fire Authority's Comments on the Preliminary Staff Assessment
Socioeconomics, Hazardous Materials 3 page(s)
| | CEC/Docket Unit | Orange County Fire Authority/Tamera Rivers |
223254 | 4/20/2018 |
Status Report #12 Report 1 page(s)
| | 1516 9th Street, Sacramento CA 95814 | California Energy Commission |
223253 | 4/20/2018 |
Stanton Energy Reliability Center LLC's Status Report No.12
2 page(s)
| | CEC/Dockets | DayZen LLC |
223247 | 4/20/2018 |
South Coast Air Quality Management District Response to Applicant's Preliminary Determination of Compliance Comments Letter dated April 19, 2018 Air Quality 6 page(s)
| | Kara Miles/Stanton Energy Reliability Center | SCAQMD |
223203 | 4/16/2018 |
Stanton Energy Reliability Center Preliminary Staff Assessment Workshop Revised Agenda
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
223189 | 4/12/2018 |
Stanton Energy Reliability Center LLC's Initial Comments on the Preliminary Staff Assessment -Attachment A, App.5.1E Replacement
Air Quality 8 page(s)
| 90 | CEC/Docket Unit | DayZen LLC |
223184 | 4/12/2018 |
Stanton Energy Reliability Center LLC's Water Quality Management Plan
Soil and Water 312 page(s)
| 89 | CEC/Docket Unit | DayZen LLC |
223179 | 4/11/2018 |
Stanton Energy Reliability Center LLC's Initial Comments on the Preliminary Staff Assessment
105 page(s)
| 88 | CEC/Docket Unit | DayZen LLC |
223178 | 4/11/2018 |
Email re Stanton Status Report Hearing Officer's reply email to request from Applicant's counsel extending the due date for status reports 5 days to April 20, 2018. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
223146-1 | 4/6/2018 |
Executive Summary Summary 27 page(s)
| | 1516 9th Street, Sacramento CA 95814 | California Energy Commission |
223146-2 | 4/6/2018 |
Exective Summary (Spanish Version) Summary 33 page(s)
| | 1516 | California Energy Commission |
223146-3 | 4/6/2018 |
Executive Summary (koren Version) Summary 36 page(s)
| | 1516 9th Street, Sacramento CA 95814 | California Energy Commission |
223146-4 | 4/6/2018 |
Executive Summary (Vietnamese Version) Executive Summary 28 page(s)
| | 1516 9th Street, Sacramento CA 95814 | California Energy Commission |
223133-1 | 4/4/2018 |
Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (English Version) Workshop Notice, Wednesday, April 18, 2018 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
223133-2 | 4/4/2018 |
Aviso de Taller de Evaluacion Preliminar del Personal para el Evaluacion De preliminar Del Personal (Spanish Version) Workshop Notice, Miercoles, 18 de abril de 2018 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
223133-3 | 4/4/2018 |
Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (Korean Version) Workshop Notice, April 18, 2018 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
223133-4 | 4/4/2018 |
Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (Vietmamese Version) Workshop Notice, April 18, 2018 8 page(s)
| | CEC/Docket Unit | California Energy Commission |
223098 | 3/30/2018 |
Stanton Energy Reliability Center Traffic and Transportation Figure 3 Reference to TN # 223086 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
223088 | 3/29/2018 |
Document Handling for the Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center
1 page(s)
| | Librarian | California Energy Commission |
223087 | 3/29/2018 |
Request for Comments on the Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center Agency Notice 2 page(s)
| | Agency Distribution List | California Energy Commission |
223086 | 3/29/2018 |
Stanton Energy Reliability Center Preliminary Staff Assessment This Document Supersedes TN 223078 Greenhouse Gases, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Waste Management, Soil and Water, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design 855 page(s)
| | CEC/Docket Unit | California Energy Commission |
223081-1 | 3/29/2018 |
Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center English Language Version 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223081-2 | 3/29/2018 |
Notificacion De Disponibilidad Evaluacion Preliminar Del Personal Para El Stanton Energy Reliability Center Propuesto Spanish Language Version 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223081-3 | 3/29/2018 |
Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center (Vietnamese Language) Vietamese Language Version 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
223081-4 | 3/29/2018 |
Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center (Korean Version) Korean Language Version 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
223078 | 3/29/2018 |
Stanton Energy Reliability Center Preliminary Staff Assessment *** THIS DOCUMENT IS REPLACED BY TN 223086 *** Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 845 page(s)
| | CEC/Docket Unit | California Energy Commission |
222982 | 3/15/2018 |
Status Report #11
1 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
222981 | 3/15/2018 |
Stanton Energy Reliability Center, LLC's Status Report No. 11
2 page(s)
| | CEC/Docket Unit | DayZen LLC |
222963 | 3/14/2018 |
Report of Conversation - Inquiry Regarding Water of U.S and Potential Need for USACE Permits for the SERC (Stanton) Conversation between Ann Crisp and Cori Farrar, Chief, Orange & Riverside Counties Section, Regulatory Division, South Coast Branch Los Angeles District, U.S. Army Corps of Engineers (USACE) 2 page(s)
| | CEC/Dockets | California Energy Commission |
222651 | 2/21/2018 |
Record of Conversation between G. Darvin and W. Qian Re Cumulative Modeling Assessment
Air Quality 9 page(s)
| 87 | CEC/Docket Unit | DayZen LLC |
222611 | 2/20/2018 |
Stanton Energy Reliability Center LLC's Comments on the Preliminary Determination of Compliance
Air Quality 7 page(s)
| 86 | SCAQMD/Bhaskar Chandan, P.E. | DayZen LLC |
222565 | 2/15/2018 |
Stanton Energy Reliability Center LLC's Status Report No.10
1 page(s)
| | CEC/Docket Unit | DayZen LLC |
222564 | 2/15/2018 |
Status Report #10
1 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
222545 | 2/14/2018 |
Stanton Energy Reliability Center LLC's Cumulative Air Quality Impact Analysis
Air Quality 8 page(s)
| 85 | CEC/Docket Unit | DayZen LLC |
222522 | 2/12/2018 |
Public Notice of Intent to Issue Permits Stanton - SCAQMD PDOC Draft Permit to Operate 82 page(s)
| | CEC/Dockets | South Coast Air Quality Management District |
222521 | 2/12/2018 |
Notice of Intent to Issue Permits Stanton - Public Notice from SCAQMD - Notice of Intent to Issue Permitts 3 page(s)
| | CEC/Dockets | South Coast Air Quality Management District |
222520 | 2/12/2018 |
SCAQMD Memorandum - Modeling Review Stanton - Public Notice from SCAQMD - Memorandum Review of Dispersion Modeling Analysis and Health Risk Assessment 9 page(s)
| | CEC/Dockets | South Coast Air Quality Management District |
222519 | 2/12/2018 |
Preliminary Determination Of Compliance (PDOC) Stanton - Notice of SCAQMD PDOC - for Permits to Construct 179 page(s)
| 84 | CEC/Dockets | South Coast Air Quality Management District |
222143 | 1/15/2018 |
Stanton Energy Reliability Center LLC's Status Report No. 9
2 page(s)
| | CEC/Dockets | DayZen LLC |
222141 | 1/12/2018 |
Status Report #9
1 page(s)
| | CEC/Dockets | California Energy Commission |
222138 | 1/12/2018 |
Report of Conversation Inquiry Re Biological Resources in the City of Stanton Conversation between Ann Crisp of the CEC and Kelly Hart, Community Development Director for the city of Stanton 1 page(s)
| | CEC/Dockets | California Energy Commission |
222137 | 1/12/2018 |
Report of Conversation Inquiry Re Nesting Bird Mitigation for the Stanton Energy Reliability Center Conversation between Ann Crisp of the CEC and Tom Dietsch and Christine Medak of the U.S. Fish and Wildlife Service 1 page(s)
| | CEC/Dockets | California Energy Commission |
222124 | 1/10/2018 |
Stanton Energy Reliability Center LLC's Supplemental Response to Data Request A10
Air Quality 16 page(s)
| 83 | CEC/Docket Unit | DayZen LLC |
222068 | 12/27/2017 |
CDFW Response Letter - No Lake or Streambed Alteration Agreement Needed - Notification No. 1600-2017-0278-R5 Response Letter dated December 15, 2017 1 page(s)
| | CEC/Ann Crisp | California Department of Fish and Wildlife (CDFW) |
222067 | 12/27/2017 |
Department of Fish and Wildlife Comments on the Draft Preliminary Staff Assessment Letter dated December 14, 2017 regarding comments of the Stanton Energy Reliability Center Draft Preliminary Staff Assessment of Impact to Biological Resources in Stanton and Carbon Creek Channels 3 page(s)
| | CEC/Ann Crisp | California Department of Fish and Wildlife (CDFW) |
221986 | 12/15/2017 |
Stanton Energy Reliability LLC's Status Report No. 8
2 page(s)
| | CEC/Dockets | DayZen LLC |
221984 | 12/15/2017 |
Status Report #8
1 page(s)
| | CEC/Dockets | California Energy Commission |
221789 | 11/15/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 7
Air Quality, Cultural Resources 2 page(s)
| | CEC/Docket Unit | DayZen LLC |
221786 | 11/15/2017 |
Status Report #7
2 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
221769 | 11/14/2017 |
Barre Substation Form DPR523 dated 11.14.2017 for Cultrual Resources
Cultural Resources 13 page(s)
| 82 | CEC/Docket Unit | CH2M |
221722 | 11/13/2017 |
Stanton Energy Reliability Center, LLC Response to SCAQMD October 16, 2017
Air Quality, Public Health 17 page(s)
| 80 | CEC/Dockets | DayZen LLC |
221721 | 11/13/2017 |
Stanton Energy Reliability Center, LLC Supplemental Response to SCAQMD October 16, 2017 Letter RE Emission Gaurantees
Air Quality, Public Health 3 page(s)
| 81 | CEC/Dockets | DayZen LLC |
221636 | 10/27/2017 |
Report of Conversation ReClarification on Biological Resources Data Response A64 and A72 Conversation between Ann Crisp of the CEC and Doug Davy, CH2M 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
221509 | 10/16/2017 |
Stanton Reliability Energy Center (16-AFC-01) Status Report #6
2 page(s)
| | CEC/Dockets | California Energy Commission |
221508 | 10/16/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 6
2 page(s)
| | CEC/Dockets | DayZen LLC |
221458 | 10/10/2017 |
Permit Applications for the Stanton Electric Reliability Center (16-AFC-01)
7 page(s)
| | CEC/Dockets | California Energy Commission |
221360 | 9/14/2017 |
SERC LLC's Response to CEC Staff Data Request No. A26
14 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
221300 | 9/22/2017 |
SERC_Data_Request_Response-Set_3-09.21.2017.pdf SERC_Data_Request_Response-Set_3-09.21.2017.pdf Biological Resources 37 page(s)
| 79 | John Heiser | CH2M |
221186 | 9/14/2017 |
SERC LLC's Repeated Application for Confidential Designation Confidential Response to CEC Staff Data Request No. A26 2 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
221183 | 9/15/2017 |
Stanton Reliability Energy Center (16-AFC-01) Status Report #5 *** THIS DOCUMENT SUPERSEDES TN 221181 *** 2 page(s)
| | CEC/Dockets | California Energy Commission |
221181 | 9/15/2017 |
Memo Regarding Stanton Reliability Energy Center (16-AFC-01) Status Report #5 *** THIS DOCUMENT IS REPLACED BY TN 221183 *** 2 page(s)
| | CEC/Dockets | California Energy Commission |
221180 | 9/15/2017 |
Letter of Support for Stanton Energy Reliability Center from Chairwoman Steel
1 page(s)
| 78 | CEC/Dockets | DayZen LLC |
221179 | 9/15/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 5
2 page(s)
| | CEC/Dockets | DayZen LLC |
221151 | 9/13/2017 |
Assemblywoman, Sharon Quirk-Silva Comments on Stanton Energy Reliability Center
1 page(s)
| | CEC/Janea Scott and Karen Douglas | Assemblywoman, Sharon Quirk-Silva |
221071 | 9/7/2017 |
Committee Order Granting Petition to Intervene Petition from Rob Simpson/Helping Hand Tools 3 page(s)
| | All parties | Energy Commission Hearing Unit |
220980 | 8/31/2017 |
Report of Conversation Re Anaheim Union High School District School Impact Fee for Proposed Stanton Energy Reliability Center Conversation between Ellen LeFevre of the CEC and Leticia Hauck, Anaheim Union High School District 1 page(s)
| | CEC/Dockets | California Energy Commission |
220979 | 8/31/2017 |
Report of Conversation Re Law Enforcement Needs Assessment for Proposed Stanton Energy Reliability Center Conversation between Ellen LeFevre of the CEC and Lieutenant Sean Howell, Chief of Stanton Police Services. 4 page(s)
| | CEC/Dockets | California Energy Commission |
220942 | 8/29/2017 |
Stanton Energy Reliability Center Supplemental Response to Data Request A17
Biological Resources 30 page(s)
| 77 | CEC/John Heiser | CH2M |
220938 | 8/29/2017 |
Staff's Data Requests, Set 3, A71 through A72
3 page(s)
| | SERC, LLC/Kara Miles | California Energy Commission |
220877 | 8/24/2017 |
Memo Regarding Laws, Ordinances, Regulations, and Standards (LORS) tables in all sections of Staff Analyses. Memorandum with example of LORS Table to be included in all sections of staff analyses that have applicable LORS. 3 page(s)
| | Energy Commission Staff | Energy Commission Hearing Office |
220846 | 8/22/2017 |
robert james simpson Comments: petition to intervene
Air Quality
| | | robert james simpson |
220821 | 8/17/2017 |
Stanton Energy Reliability Center Data Request Response Set 2, for Data Requests A64 through A70
Biological Resources, Cultural Resources, Soil and Water 17 page(s)
| 76 | CEC/Docket Unit | CH2M |
220781 | 8/15/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 4
2 page(s)
| | CEC/Docket Unit | DayZen LLC |
220773 | 8/15/2017 |
Stanton Reliability Energy Center Status Report #4
2 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
220767 | 8/15/2017 |
Email from Hearing Officer Ken Celli to Petitioner Rob Simpson Email asking Petitioner to include a telephone number for Helping Hand Tools and referring the Petitioner to the Public Adviser to access the current regulations. 1 page(s)
| | Rob Simpson, Scott Galati, Lisa De Carlo, Bob Sarvey, Paul Kramer, Alana Mathews | Energy Commission Hearing Office |
220740 | 8/14/2017 |
robert james simpson - Petition to intervene Helping Hand Tools
Air Quality 3 page(s)
| | CEC/Docket Unit | robert james simpson |
220620 | 8/9/2017 |
Stanton Energy Reliability Center, LLC’s Proposed Modifications to Condition of Certification HAZ-8
Hazardous Materials 2 page(s)
| 75 | CEC/Dockets | DayZen LLC |
220495 | 8/1/2017 |
North Orange County Chamber of Commece Comments Support for Stanton Energy Reliability Center
2 page(s)
| | CEC/Janea Scott and Karen Douglas | North Orange County Chamber of Commece |
220365 | 7/25/2017 |
Staff's Data Requests, Set 2, A64 through A70
7 page(s)
| | SERC, LLC/Kara Miles | California Energy Commission |
220293 | 7/21/2017 |
Order Granting Petition to Intervene ***Supersedes TN 220292*** 3 page(s)
| | Parties | California Energy Commission |
220292 | 7/21/2017 |
Committee Order Granting Petition to Intervene ***Superseded by TN 220293*** 3 page(s)
| | CEC/Dockets | California Energy Commission |
220269 | 7/19/2017 |
U.S. Dept. Transportation, Federal Aviation Admin. LTR to James Adams of the CEC Letter with DVD containing Flight track data in response to FOIA request 2017-007715, dated June 21. (The Docket Unit has a copy of the DVD) 1 page(s)
| | CEC/James Adams | U.S. Department of Transportation - Federal Aviation Administration |
220245 | 7/18/2017 |
General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents, and Other Matters
6 page(s)
| | All parties and the public | Energy Commission Hearing Unit |
220237 | 7/17/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 3
2 page(s)
| | CEC/Dockets | DayZen LLC |
220166 | 7/14/2017 |
Status Report #3
2 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
220101 | 7/10/2017 |
Bicycle Facilities Clarification Letter 1 page(s)
| | CEC/Dockets | City of Stanton |
219989 | 6/30/2017 |
Record of Conversation re LAAA Operations ***supersedes TN 219964*** 4 page(s)
| | CEC/Dockets | California Energy Commission |
219965 | 6/28/2017 |
Robert Sarvey's Petition to Intervene
Air Quality, Alternatives 2 page(s)
| | Committee | Robert Sarvey |
219964 | 6/28/2017 |
Record of Conversation re LAAA Operations
3 page(s)
| | CEC/Dockets | California Energy Commission |
218861 | 6/15/2017 |
Stanton Reliability Energy Center Status Report #2
2 page(s)
| | CEC/Janea Scott, Karen Douglas and Ken Celli | California Energy Commission |
218849 | 6/15/2017 |
Stanton Energy Reliability Center LLC's Status Report No. 2
2 page(s)
| | CEC/Dockets | DayZen LLC |
218812 | 6/15/2017 |
6.15.17 Stanton Energy Reliability Center Comment Letter
Traffic and Transportation 2 page(s)
| | CEC/John Heiser | Orange County Transportation Authority |
218794 | 6/15/2017 |
Stanton Energy Reliability Center AFC Noise Section, Table 5.7-7, Revised
Noise and Vibration 2 page(s)
| 74 | CEC/John Heiser | CH2M |
218335 | 6/14/2017 |
RE Potential Law Enforcement Needs for the Stanton Energy Reliability Center (16-AFC-01) letter Socioeconomics 11 page(s)
| | Lieutenant Sean Howell, Orange County Sheriff | Energy Commission |
217877 | 6/6/2017 |
Letter Regarding Proposed Energy Reliability Center Project Response to request for search of the NAHC Sacred Lands file and a consultation list Cultural Resources 4 page(s)
| | CEC/Matthew Braun | Native American Heritage Commission |
217876 | 6/6/2017 |
Letter Regarding Invitation to Participate in CEC Consultation Letters sent to Native American tribes regarding the Stanton Reliability Energy Center Cultural Resources 190 page(s)
| | Multiple Chairpersons | California Energy Commission |
217787 | 5/31/2017 |
Stanton Energy Reliability Center, LLC’s Response Response Staff Data Requests A1-A5 and Responses to South Coast Air Quality Stanton Energy Reliability Center, LLC’s Response Response Staff Data Requests A1-A5 and Responses to South Coast Air Quality Management District Comments Air Quality 2 page(s)
| 73 | CEC/John Heiser | CH2M |
217717 | 5/25/2017 |
Air Quality Letter Air Quality Letter Air Quality 2 page(s)
| 72 | CEC/John Heiser | CH2M |
217699 | 5/23/2017 |
Stanton Energy Reliability Center's Responses to Staff Data Requests A34-A35 and Revised Human Health Risk Assessment SERC Public Health DRR A34-A35 - CD is for human health risk assessment modeling files Public Health 36 page(s)
| 71 | CEC/John Heiser | CH2M |
217698 | 5/23/2017 |
Union Pacific Railroad Company Comments On Response to the Notice on the Stanton Energy Reliability Center
4 page(s)
| | CEC/Alana Matthews | Union Pacific Railroad Company |
217681 | 5/22/2017 |
Response to Staff Data Requests A1-A5 Responses to South Coast Air Quality Management District Comments on AFC Section 5.1, Air Quality Air Quality 198 page(s)
| 70 | | CH2M |
217600 | 5/15/2017 |
Status Report No.1
2 page(s)
| | | California Energy Commission |
217595 | 5/15/2017 |
Stanton Energy Reliability Center LLC's Status Report 1
2 page(s)
| | CEC/Dockets | DayZen LLC |
217474 | 5/8/2017 |
Craig Clausen Comments: Road Closure Suggestion
Facility Design, Noise and Vibration, Efficiency
| | | Craig Clausen |
217461 | 5/5/2017 |
Stanton Energy Reliability Center's Data Request Response, Set 1 (A1-A63)
771 page(s)
| 69 | CEC/John Heiser | CH2M |
217393 | 5/2/2017 |
Document Handling for the Application for Certification
2 page(s)
| | CEC/Dockets | California Energy Commission |
217391 | 5/2/2017 |
Request for Agency Participation in the Review fo the Application for Certification
5 page(s)
| | | California Energy Commission |
217375 | 5/1/2017 |
Committee Scheduling Order Presiding Member's established schedule for the prehearing phase of the proceeding. 5 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
217307 | 4/26/2017 |
Transcript of 04/17/2017 Public Site Visit, Environmental Scoping Meeting, and Informational Hearing
84 page(s)
| | Parties | California Energy Commission |
217179 | 4/19/2017 |
Stanton Energy Reliability Center LLC's Presentation for Public Site Visit, Environmental Scoping Mtg. and Informational Hearing
21 page(s)
| 68 | | DayZen LLC |
217164 | 4/19/2017 |
Site Visit, Environmental Scoping Meeting and Informational Hearing Power Point Presentation 12 page(s)
| | | California Energy Commission |
217041 | 4/14/2017 |
Letter to Honorable Alan Lowenthal, U.S. Representative California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Alan Lowenthal, United States Representative | California Energy Commission |
217039 | 4/14/2017 |
Letter to Honorable Dianne Feinstein, U.S. Senator California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Dianne Feinstein, United States Senator | California Energy Commission |
217038 | 4/14/2017 |
Letter to Honorable Michelle Steel, Chairperson California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Michelle Steel, Chairperson, Orange County Supervisor | California Energy Commission |
217037 | 4/14/2017 |
Letter to Hon. Josh Newman, California Assembly Member California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Josh Newman, California Assembly Member | California Energy Commission |
217036 | 4/14/2017 |
Letter to Honorable Carol Warren, Mayor California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Carol Warren, Mayor, City of Stanton | California Energy Commission |
217035 | 4/14/2017 |
Letter to Honorable Kamala Harris, United States Senator California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable Kamala Harris, United States Senator | California Energy Commission |
217034 | 4/14/2017 |
Letter to Honorable David Shawver, Mayor Pro Tem California Energy Commission’s Executive Director Letter 2 page(s)
| | Honorable David Shawver, Mayor Pro Tem, City of Stanton | California Energy Commission |
217033 | 4/14/2017 |
Letter to the Hon. Sharon Quirk-Silva, California Assembly Member California Energy Commission’s Executive Director Letter 2 page(s)
| | Honroable Sharon Quirk-Silva, California Assembly Member | California Energy Commission |
216917 | 4/10/2017 |
Magnolia School District's Letter of Support for Stanton Energy Reliability Center
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 2 page(s)
| 67 | | DayZen LLC |
216889 | 4/7/2017 |
Issues Identification Report
8 page(s)
| | | California Energy Commission |
216815 | 4/5/2017 |
Staff's Data Requests, Set 1, A1 through A63 Data Requests 23 page(s)
| | SERC, LLC/Kara Miles | California Energy Commission |
216813 | 4/5/2017 |
Cong Dong Tham Gia Danh Gia Ho So Xin Cap Giay Chung Nhan Cho Trung Tam Dam Bao Nguon Cung Nang Luong Stanton Stanton Public Participation Notice (Vietnamese) 6 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
216812 | 4/5/2017 |
Stanton Public Participation Notice (Korean Version) Public Notice (Korean Version) 5 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
216811 | 4/5/2017 |
Stanton Public Participation Notice (Spanish Version) PARTICIPACIÓN PÚBLICA EN LA REVISIÓN DE LA SOLICITUD DE CERTIFICACIÓN PARA EL
CENTRO DE CONFIABILIDAD DE ENERGÍA STANTON (16-AFC-01) 5 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
216810 | 4/5/2017 |
Stanton Public Participation Notice Public Notice 5 page(s)
| | | California Energy Commission |
216774 | 3/30/2017 |
Spanish Translation of Notice of Public Site Visit, Environmental Scoping Meeting Lunes 17 De Abril De 2017, Spanish Translation of Notice of Public Site Visit, Environmental Scoping Meeting, and Informational 9 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
216768 | 3/30/2017 |
Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing Notice of Public Site Visit, Environmental Scoping Meeting and Informational Hearing, April 17, 2017 (contains links to Vietnamese and Korean translations). 7 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
216758 | 3/30/2017 |
Vietnamese Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing THONG BAO THAM QUAN THUC DIA, HOI THAO DANH GIA TAC DONG MOI TRUONG VA PHIEN DIEU TRAN DE TIM HIEU THONG TIN DANH CHO CAC THANH VIEN CONG DONG, THU HAI, NGAY 17 THANG 4 NAM 2017 7 page(s)
| | All parties and interested public | Energy Commission Hearing Office |
216757 | 3/30/2017 |
Korean Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing Korean Translation of Notice of Public Site Visit, Environmental Scoping Meeting and Informational Hearing, April 17, 2017 7 page(s)
| | All parties and interested public | Energy Commission Hearing Office |
216739 | 3/29/2017 |
Memo re Hold the Date of April 17, 2017 Memorandum from Hearing Officer Celli regarding the Site Visit, Environmental Scoping Meeting and Informational Hearing, to be held on April 17, 2017. 1 page(s)
| | All parties and interested public | Energy Commission Hearing Office |
216706 | 3/24/2017 |
Invitation to Consult with Native American Groups Letters to Native American groups identified by the Native American Heritage Commission Cultural Resources 110 page(s)
| | CEC/Docket Unit | California Energy Commission |
216497 | 3/9/2017 |
Order No: 17-0308-4 Order Accepting the Executive Director's Recommendation to Find the Stanton Energy Reliability Center Application for Certification (AFC) Complete and Establishing Committee 2 page(s)
| | Parties | California Energy Commission |
216279 | 2/28/2017 |
Staff's Data Adequacy Recommendation
99 page(s)
| | CEC/Robert Weisenmiller, Karen Douglas, David Hochschild, Andrew McAllister and Janea Scott | California Energy Commission |
216249 | 2/27/2017 |
March 8, 2017 Business Meeting Agenda 4. STANTON ENERGY RELIABILITY CENTER (16-AFC-01). Contact: John Heiser. (Staff presentation: 10 minutes)
a. Possible approval of an order adopting the Executive Director’s recommendation to find the Stanton Energy Reliability Center application for certification complete. The proposed project is a new 98-megawatt hybrid electrical generating and storage facility consisting of two General Electric LM6000 PC natural gas-fired combustion turbine generators and related facilities, with integrated batteries for hybrid operation and clutch gear for synchronous condenser operation. The project would be located on a vacant 3.978 acre portion of an industrial- zoned site in the city of Stanton, west of the Southern California Edison Barre Substation in Orange County.
b. Possible appointment of a siting committee for Stanton Energy Reliability Center.
8 page(s)
| | CEC/Docket Unit | California Energy Commission |
216223 | 2/24/2017 |
Permit Applications for the Stanton Electric Reliability Center
4 page(s)
| | Stanton Energy Reliability Center, LLC/Kara Miles | South Coast Air Quality Management District |
215794 | 2/7/2017 |
Permit Applications for the Stanton Electric Reliability Center Letter 5 page(s)
| | Stanton Energy Reliability Center, LLC/Kara Miles | South Coast Air Quality Management District |
215165 | 1/5/2017 |
Attachment DA3.0-1 One-Line Diagram, searchable .pdf Attachment DA3.0-1 One-Line Diagram, searchable .pdf Transmission System Engineering 1 page(s)
| 66 | John Heiser, CEC | CH2M |
215117 | 12/29/2016 |
Supplemental info on operations payroll for Socioeconomics Data Adequacy Report of Conversation (ROC) with supplemental data adequacy info for Socioeconomics- operations payroll Socioeconomics 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
215097 | 12/22/2016 |
Stanton Energy Reliability Center Application for Certification Data Adequacy Supplement 12.20.2016 Data Adequacy Supplement Air Quality, Cultural Resources, Geology/Paleontology, Introduction, Project Description, Socioeconomics, Traffic and Transportation, Transmission System Engineering, Soil and Water 445 page(s)
| 65 | CEC/John Heiser | CH2M |
215090 | 12/21/2016 |
Jeanene Louwsma Comments: On Concerns Regarding Installation of Combustion Turbine Generators
1 page(s)
| | CEC/Docket Unit | Jeanene Louwsma |
215080 | 12/21/2016 |
Stanton Energy Reliability Center LLC's Response to CEC Staff Data Adequacy Question DAS 3-1
Cultural Resources 1 page(s)
| | | DayZen LLC |
214973 | 12/21/2016 |
Stanton Energy Reliability Center LLC's Repeated Application for Confidential Designation
Cultural Resources 2 page(s)
| | | DayZen LLC |
214902 | 12/19/2016 |
Order Accepting the Executive Director's Recommendation to Find the AFC Incomplete - Order No: 16-1214-3 Order Accepting the Executive Director's Recommendation to find the Stanton Energy Reliability Center Application for Certification (AFC) Incomplete 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
214630 | 12/5/2016 |
Permit Applications for the Stanton Electric Reliability Center
6 page(s)
| | Stanton Energy Reliability Center, LLC/Kara Miles | South Coast Air Quality Management District |
214578 | 11/29/2016 |
Staff's Data Adequacy Recommendation
99 page(s)
| | CEC/Robert Weisenmiller, Karen Douglas, David Hochschild, Andrew McAllister, and Janea Scott | California Energy Commission |
214571 | 11/28/2016 |
Letter Regarding Stanton Energy Reliability Center (SERC) - Electric Power Plant
1 page(s)
| | CEC/John Heiser | Orange County Fire Authority |
214392 | 11/1/2016 |
Stanton Energy Reliability Center LLC's Appendix 5.3B Cultural Resources Survey Report Confidential request to prevent looting of cultural resources. Cultural Resources 190 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
214390 | 11/1/2016 |
Stanton Energy Reliability Center LLC's Appendix 5.3C CHRIS Literature Search Results Part 1 of 2 Confidential request to prevent looting of cultural resources. *** Part 2 of 2 is too big to approve and is on a CD in the Docket Unit *** Cultural Resources 186 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
214377 | 11/4/2016 |
Stanton Energy Reliability Center Geotechnical Report 10-27-16 Geotechnical Report Facility Design, Geology/Paleontology 34 page(s)
| 64 | Mike Monasmith | CH2M |
214370 | 11/4/2016 |
Notice of Receipt of an Application for Certification for the Stanton Energy Reliability Center (16-AFC-01)
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
214359 | 11/3/2016 |
Response to Application for Confidentiality - Cultural Resources
2 page(s)
| | | California Energy Commission |
214321 | 11/1/2016 |
Stanton Energy Reliability Center LLC's AFC Air Quality Modeling Files The CD containing the Air Quality Modeling Files is located in the Docket Unit 1 page(s)
| 63 | CEC/John Heiser | DayZen LLC |
214317 | 11/1/2016 |
Stanton Energy Reliability Center LLC's Application for Confidential Designation Confidential documents are Appendix 5.3B Cultural Resources Survey Report and Appendix 5.3C CHRIS Literature Search Results Cultural Resources 3 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
214269 | 10/31/2016 |
Stanton Energy Reliability Center City of Stanton Review Letter 2 page(s)
| | CEC/John Heiser | City of Stanton |
214207-1 | 10/26/2016 |
Application for Certification Volume 2 -Table of Contents Application for Certification Vol. 2 1 page(s)
| 28 | | Stanton Energy Reliability Center, LLC |
214207-2 | 10/26/2016 |
Appendix 1A - ALTA Survey Application for Certification Vol. 2 5 page(s)
| 29 | | Stanton Energy Reliability Center, LLC |
214207-3 | 10/26/2016 |
Appendix 1B - List of Owners of Nearby Properties Application for Certification Vol. 2 29 page(s)
| 30 | | Stanton Energy Reliability Center, LLC |
214207-4 | 10/26/2016 |
Appendix 1C - Persons Who Prepared this AFC Application for Certification Vol. 2 3 page(s)
| 31 | | Stanton Energy Reliability Center, LLC |
214207-5 | 10/26/2016 |
Appendix 2A - Engineering Design Criteria Application for Certification Vol. 2 20 page(s)
| 32 | | Stanton Energy Reliability Center, LLC |
214207-6 | 10/26/2016 |
Appendix 2B - Golden State Water Will-Serve Letter Application for Certification Vol. 2 2 page(s)
| 33 | | Stanton Energy Reliability Center, LLC |
214207-7 | 10/26/2016 |
Appendix 2C - City of Stanton Can-Serve Letter Application for Certification Vol. 2 2 page(s)
| 34 | | Stanton Energy Reliability Center, LLC |
214207-8 | 10/26/2016 |
Appendix 2D - Correspondence with Orange County Sanitation District Personnel Application for Certification Vol. 2 3 page(s)
| 35 | | Stanton Energy Reliability Center, LLC |
214207-9 | 10/26/2016 |
Appendix 3A - Interconnection Request Studies Application for Certification Vol. 2 252 page(s)
| 36 | | Stanton Energy Reliability Center, LLC |
214207-10 | 10/26/2016 |
Appendix 3A-1a - Addendum 1 to the Interconnection Study Report Application for Certification Vol. 2 53 page(s)
| 37 | | Stanton Energy Reliability Center, LLC |
214207-11 | 10/26/2016 |
Appendix 3A-1b - Addendum 1 to the Interconnection Study Report Application for Certification Vol. 2 53 page(s)
| 38 | | Stanton Energy Reliability Center, LLC |
214207-12 | 10/26/2016 |
Appendix 5.1A - Support Data for Emissions Calculations Application for Certification Vol. 2 18 page(s)
| 39 | | Stanton Energy Reliability Center, LLC |
214207-13 | 10/26/2016 |
Appendix 5.1B - Air Quality Impact Analysis Support Data Application for Certification Vol. 2 19 page(s)
| 40 | | Stanton Energy Reliability Center, LLC |
214207-14 | 10/26/2016 |
Appendix 5.1C - Dispersion Modeling Protocol Application for Certification Vol. 2 2 page(s)
| 41 | | Stanton Energy Reliability Center, LLC |
214207-15 | 10/26/2016 |
Appendix 5.1D - Risk Assessment Support Data Application for Certification Vol. 2 29 page(s)
| 42 | | Stanton Energy Reliability Center, LLC |
214207-16 | 10/26/2016 |
Appendix 5.1E - Estimated Construction Period Emissions and Impacts Application for Certification Vol. 2 36 page(s)
| 43 | | Stanton Energy Reliability Center, LLC |
214207-17 | 10/26/2016 |
Appendix 5.1F - Evaluation of Best Available Control Technology Application for Certification Vol. 2 3 page(s)
| 44 | | Stanton Energy Reliability Center, LLC |
214207-18 | 10/26/2016 |
Appendix 5.1G - Regional Emissions Inventory Data Application for Certification Vol. 2 4 page(s)
| 45 | | Stanton Energy Reliability Center, LLC |
214207-19 | 10/26/2016 |
Appendix 5.1H -Mitigation Strategy Support Data Application for Certification Vol. 2 2 page(s)
| 46 | | Stanton Energy Reliability Center, LLC |
214207-20 | 10/26/2016 |
Appendix 5.1I - Permitting Forms Application for Certification Vol. 2 2 page(s)
| 47 | | Stanton Energy Reliability Center, LLC |
214207-21 | 10/26/2016 |
Appendix 5.2A - Special-Status Species Application for Certification Vol. 2 12 page(s)
| 48 | | Stanton Energy Reliability Center, LLC |
214207-22 | 10/26/2016 |
Appendix 5.2B - Rare Plant Survey Report
18 page(s)
| 49 | | Stanton Energy Reliability Center, LLC |
214207-23 | 10/26/2016 |
Appendix 5.2C - Biological Resources Resumes Application for Certification Vol. 2 9 page(s)
| 50 | | Stanton Energy Reliability Center, LLC |
214207-24 | 10/26/2016 |
Appendix 5.3A - Consultation Record Application for Certification Vol. 2 36 page(s)
| 51 | | Stanton Energy Reliability Center, LLC |
214207-25 | 10/26/2016 |
Appendix 5.3B - Cultural Resources Report (Confiential) Application for Certification Vol. 2 2 page(s)
| | | Stanton Energy Reliability Center, LLC |
214207-26 | 10/26/2016 |
Appendix 5.3C - CHRIS Literature Search (Confidential) Application for Certification Vol. 2 2 page(s)
| | | Stanton Energy Reliability Center, LLC |
214207-27 | 10/26/2016 |
Appendix 5.3D - Cultural Resources Resumes Application for Certification Vol. 2 8 page(s)
| 52 | | Stanton Energy Reliability Center, LLC |
214207-28 | 10/26/2016 |
Appendix 5.4A - Preliminary Geotechnical Report Application for Certification Vol. 2 178 page(s)
| 53 | | Stanton Energy Reliability Center, LLC |
214207-29 | 10/26/2016 |
Appendix 5.5A - Offsite Consequences Analysis Application for Certification Vol. 2 14 page(s)
| 54 | | Stanton Energy Reliability Center, LLC |
214207-30 | 10/26/2016 |
Appendix 5.6A - Cumulative Projects Application for Certification Vol. 2 4 page(s)
| 55 | | Stanton Energy Reliability Center, LLC |
214207-31 | 10/26/2016 |
Appendix 510A - Environmental Justice Analysis Application for Certification Vol. 2 33 page(s)
| 56 | | Stanton Energy Reliability Center, LLC |
214207-32 | 10/26/2016 |
Appendix 510B - Records of Conversation with OCFA and OCSD Application for Certification Vol. 2 3 page(s)
| 57 | | Stanton Energy Reliability Center, LLC |
214207-33 | 10/26/2016 |
Appendix 5.11A - Soil Loss Calculation Application for Certification Vol. 2 7 page(s)
| 58 | | Stanton Energy Reliability Center, LLC |
214207-34 | 10/26/2016 |
Appendix 5.13A - Design Concept Application for Certification Vol. 2 2 page(s)
| 59 | | Stanton Energy Reliability Center, LLC |
214207-35 | 10/26/2016 |
Appendix 5.13B - Landscape Plan Application for Certification Vol. 2 3 page(s)
| 60 | | Stanton Energy Reliability Center, LLC |
214207-36 | 10/26/2016 |
Appendix 5.14A -Phase I ESA Application for Certification Vol. 2 477 page(s)
| 61 | | Stanton Energy Reliability Center, LLC |
214207-37 | 10/26/2016 |
Appendix 5.14B - Phase II ESA Application for Certification Vol. 2 82 page(s)
| 62 | | Stanton Energy Reliability Center, LLC |
214206-1 | 10/26/2016 |
Transmittal Letter for the Application for Certification Application for Certification Vol. 1 1 page(s)
| 1 | | Stanton Energy Reliability Center, LLC |
214206-2 | 10/26/2016 |
Title Page Application for Certification Vol. 1 1 page(s)
| 2 | | Stanton Energy Reliability Center, LLC |
214206-3 | 10/26/2016 |
Acronyms Application for Certification Vol. 1 7 page(s)
| 3 | | Stanton Energy Reliability Center, LLC |
214206-4 | 10/26/2016 |
Contents Application for Certification Vol. 1 11 page(s)
| 4 | | Stanton Energy Reliability Center, LLC |
214206-5 | 10/26/2016 |
Executive Summary Application for Certification Vol. 1 Executive Summary 5 page(s)
| 5 | | Stanton Energy Reliability Center, LLC |
214206-6 | 10/26/2016 |
1.0 Introduction Application for Certification Vol. 1 Introduction 12 page(s)
| 6 | | Stanton Energy Reliability Center, LLC |
214206-7 | 10/26/2016 |
2.0 Project Description Application for Certification Vol. 1 Project Description 36 page(s)
| 7 | | Stanton Energy Reliability Center, LLC |
214206-8 | 10/26/2016 |
3.0 Electric Transmission Application for Certification Vol. 1 11 page(s)
| 8 | | Stanton Energy Reliability Center, LLC |
214206-9 | 10/26/2016 |
4.0 Natural Gas Supply Application for Certification Vol. 1 3 page(s)
| 9 | | Stanton Energy Reliability Center, LLC |
214206-10 | 10/26/2016 |
5.0 Environmental Analysis Application for Certification Vol. 1 1 page(s)
| 10 | | Stanton Energy Reliability Center, LLC |
214206-11 | 10/26/2016 |
5.1 Air Quality Application for Certification Vol. 1 51 page(s)
| 11 | | Stanton Energy Reliability Center, LLC |
214206-12 | 10/26/2016 |
5.2 Biological Resources Application for Certification Vol. 1 Biological Resources 60 page(s)
| 12 | | Stanton Energy Reliability Center, LLC |
214206-13 | 10/26/2016 |
5.3 Cultural Resources Application for Certification Vol. 1 Cultural Resources 29 page(s)
| 13 | | Stanton Energy Reliability Center, LLC |
214206-14 | 10/26/2016 |
5.4 Geological Hazards and Resources Application for Certification Vol. 1 12 page(s)
| 14 | | Stanton Energy Reliability Center, LLC |
214206-15 | 10/26/2016 |
5.5 Hazardous Materials Handling Application for Certification Vol. 1 Hazardous Materials 24 page(s)
| 15 | | Stanton Energy Reliability Center, LLC |
214206-16 | 10/26/2016 |
5.6 Land Use Application for Certification Vol. 1 Land Use 40 page(s)
| 16 | | Stanton Energy Reliability Center, LLC |
214206-17 | 10/26/2016 |
5.7 Noise Application for Certification Vol. 1 Noise and Vibration 19 page(s)
| 17 | | Stanton Energy Reliability Center, LLC |
214206-18 | 10/26/2016 |
5.8 Paleontological Resources Application for Certification Vol. 1 10 page(s)
| 18 | | Stanton Energy Reliability Center, LLC |
214206-19 | 10/26/2016 |
5.9 Public Health Application for Certification Vol. 1 Public Health 16 page(s)
| 19 | | Stanton Energy Reliability Center, LLC |
214206-20 | 10/26/2016 |
5.10 Socioeconomics Application for Certification Vol. 1 Socioeconomics 22 page(s)
| 20 | | Stanton Energy Reliability Center, LLC |
214206-21 | 10/26/2016 |
5.11 Soils Application for Certification Vol. 1 18 page(s)
| 21 | | Stanton Energy Reliability Center, LLC |
214206-22 | 10/26/2016 |
5.12 Traffic and Transportation
25 page(s)
| 22 | | Stanton Energy Reliability Center, LLC |
214206-23 | 10/26/2016 |
5.13 Visual Resources Application for Certification Vol. 1 54 page(s)
| 23 | | Stanton Energy Reliability Center, LLC |
214206-24 | 10/26/2016 |
5.14 Waste Management Application for Certification Vol. 1 Waste Management 15 page(s)
| 24 | | Stanton Energy Reliability Center, LLC |
214206-25 | 10/26/2016 |
5.15 Water Resources Application for Certification Vol. 1 17 page(s)
| 25 | | Stanton Energy Reliability Center, LLC |
214206-26 | 10/26/2016 |
5.16 Worker Health and Safety Application for Certification Vol. 1 Worker Safety and Fire Protection 21 page(s)
| 26 | | Stanton Energy Reliability Center, LLC |
214206-27 | 10/26/2016 |
6.0 Alternatives Application for Certification Vol. 1 Alternatives 11 page(s)
| 27 | | Stanton Energy Reliability Center, LLC |