Docket Log

Docket: 16-AFC-01
Project Title: Stanton Energy Reliability Center
Generated On: 3/28/2024 10:02:45 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2263901/28/2019 Memo Regarding Closing the Docket for Stanton Energy Reliability Center

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2262731/7/2019 Memo re POS List Closed
Memorandum regarding the closing and deletion of the Proof of Service List.
3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22587011/9/2018 Final Commission Decision

575 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22586911/9/2018 Notice of Decision

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22586611/8/2018 Commission Adoption Order
Order No: 18-1107-3
5 page(s)
 CEC/DocketsCalifornia Energy Commission
22582711/6/2018 Errata to the PMPD
Errata to the Presiding Member's Proposed Decision
10 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22581111/5/2018 PROPOSED Commission Adoption Order
Committee's proposed Findings and Order for the Commission's consideration at the November 7, 2018 Business Meeting
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22581011/5/2018 Transcript of 10292018 Presiding Member's Proposed Decision Committee Conference

12 page(s)
 CEC/DocketsCalifornia Energy Commission
22506410/22/2018 Energy Commission Staff Comments on the Stanton Energy Reliability Center Presiding Member's Proposed Decision
Memo
12 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
22505810/22/2018 Stanton Energy Reliability Center, LLC's Comments on the Presiding Member's Proposed Decision

Visual Resources, Facility Design, Project Description
2 page(s)
 CEC/Docket UnitDayZenLLC
22490710/5/2018 Notice of Availability of PMPD, Committee Conference and Energy Commission Hearing
NOTICE OF AVAILABILITY OF THE PRESIDING MEMBER’S PROPOSED DECISION, NOTICE OF 10/29/18 COMMITTEE CONFERENCE ON THE PRESIDING MEMBER’S PROPOSED DECISION, AND NOTICE OF 11/7/18 ENERGY COMMISSION HEARING
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22490610/5/2018 KOREAN VERSION OF NOTICE OF AVAILABILITY OF PMPD, COMMITTEE CONFERENCE AND ENERGY COMMISSION BUSINESS MEETING
KOREAN VERSION OF NOTICE OF AVAILABILITY OF PMPD, 10/29//18 COMMITTEE CONFERENCE AND 11/7/18 ENERGY COMMISSION BUSINESS MEETING
Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Cultural Resources, Efficiency, Executive Summary, Air Quality, Alternatives, Biological Resources
8 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22490510/5/2018 VIETNAMESE VERSION OF NOTICE OF AVAILABILITY OF PMPD, COMMITTEE CONFERENCE AND ENERGY COMMISSION BUSINESS MEETING
VIETNAMESE VERSION OF NOTICE OF AVAILABILITY OF PMPD, OCTOBER 29, 2018 COMMITTEE CONFERENCE AND NOVEMBER 7, 2018 ENERGY COMMISSION BUSINESS MEETING
8 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22490410/5/2018 NOTIFICACIÓN DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, NOTIFICACIÓN DE CONFERENCIA DEL COMITÉ, Y MAS
NOTIFICACIÓN DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, NOTIFICACIÓN DE CONFERENCIA DEL COMITÉ SOBRE LA PROPUESTA DE DECISIÓN DEL MIEMBRO PRESIDENTE, Y NOTIFICACIÓN DE AUDIENCIA DE LA COMISIÓN DE ENERGÍA - Lunes, 29 De Octubre De 2018, 10:00 a.m.
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Waste Management, Soil and Water, Greenhouse Gases, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection
8 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22490310/5/2018 Presiding Member's Proposed Decision

Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency
574 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22489410/5/2018 COMMITTEE ORDER CLOSING THE EVIDENTIARY RECORD
Committee ORDER receiving corrected maps marked as Exhibits 105 and 308 into the hearing record and closing the record.
1 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2247779/24/2018 SERC Revised Natural Gas Figures and Declaration of Doug Davy

Noise and Vibration, Project Description
5 page(s)
105CEC/DocketsDayZenLLC
2247469/18/2018 Energy Commission Staff's Response to the Committee Order for Resubmission of Maps to Conform to Evidence

8 page(s)
308CEC/Docket UnitCalifornia Energy Commission
2247459/18/2018 Declaration of Doug Davy in Support of Revised Figures

Noise and Vibration, Project Description
  DayZenLLC
2247239/14/2018 SERC Resubmission of Maps Applicant
Project Description
Project Description
4 page(s)
 CEC/Ken CelliCH2M
2246529/6/2018 COMMITTEE ORDER FOR RESUBMISSION OF MAPS TO CONFORM TO EVIDENCE
Order reopening the record to allow the parties to substitute nine corrected maps with the southern gas line alternative removed, and omitted street names inserted. Corrected maps are due on or before September 18, 2018.
2 page(s)
 All partiesEnergy Commission Hearing Office
2244498/8/2018 Transcript of 822018 Evidentiary Hearing

65 page(s)
 CEC/DocketsCalifornia Energy Commission
2244488/8/2018 Transcript of 07252018 Prehearing Conference

64 page(s)
 CEC/DocketsCalifornia Energy Commission
2244438/8/2018 Emails between Applicant's counsel and Hearing Officer
Email from Hearing Officer Celli to Attorney Galati regarding Exhibit 104, and reply email.
Land Use
1 page(s)
 CEC/DocketsEnergy Commission Hearing Office
2243918/3/2018 Orange County Recorder Office Pages 36 and 37 of Book 278
Official Plat Map recorded in Book 278, pages 36 and 37 showing Parcel 2 as an official legal parcel, Exhibit 104
Land Use, Project Description
2 page(s)
104CEC/Docket UnitDayZenLLC
2243267/31/2018 SERC, LLC's Response to Clean Coalition Withdrawal of Testimony and Intervention
SERC, LLC's Response to Clean Coalition Withdrawal of Testimony and Intervention
Alternatives
1 page(s)
 CEC/DocketsDayZenLLC
2243247/31/2018 Clean Coalition Withdrawal as Intervenor
Letter requesting to withdraw as intervenor and recommending an Energy Commission practice of developing adequate DER alternatives early in the process
Alternatives
3 page(s)
 Hearing Officer CelliClean Coalition
2243157/27/2018 Energy Commission Staff's Response to the Committee's Request for Clarification

13 page(s)
307CEC/ docket unitCalifornia Energy Commission
2243017/25/2018 Email from Miles Maurino regarding exhibit numbers
Email from Attorney Maurino to Hearing Officer Celli designating the Declaration and resume of Doug Karpa as Exhibits 918 and 919, respectively.
1 page(s)
 CEC/Kenneth CelliEnergy Commission Hearing Office
2243007/25/2018 Conditions of Certification Compendium Stanton Energy Reliability Center

162 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2242987/25/2018 Clean Coalition Opening Testimony Citation Number 27 Source Document
NREL report titled, "The Impact of Wind and Solar on the Value of Energy Storage"
40 page(s)
 CEC/Docket UnitClean Coalition
2242977/25/2018 Clean Coalition Opening Testimony Citation Number 6 Source Document

3 page(s)
 CEC/Docket UnitClean Coalition
2242897/24/2018 Energy Commission Staff's Air Quality Greenhouse Gas Emissions Errata

3 page(s)
306CEC/Docket UnitCalifornia Energy Commission
2242827/24/2018 Memo Regarding Updates to the Exhibit List

1 page(s)
 All PartiesEnergy Commission Hearing Office
2242657/23/2018 Email from Applicant's attorney with corrections to the Exhibit List
Email from Attorney Galati to Hearing Officer Celli requesting corrections to the Exhibit List.
1 page(s)
 Hearing Officer/Applicant's counselEnergy Commission Hearing Office
224262-17/23/2018 Response Motion to Strikefor Leave for Late Filing of Witness Information

6 page(s)
 CEC/Docket UnitClean Coalition
224262-27/23/2018 Response Motion to Strike - Attachment A

2 page(s)
 CEC/Docket UnitClean Coalition
224262-37/23/2018 Response Motion to Strike - Attachment B

15 page(s)
 CEC/Docket UnitClean Coalition
224262-47/23/2018 Response Motion to Strike - Attachment C

2 page(s)
 CEC/Docket UnitClean Coalition
2242527/23/2018 NOTICE OF DATE AND TIME CHANGE OF EVIDENTIARY HEARING to August 2, 2018 at 130 p.m.
This Notice changes the Evidentiary Hearing date and time (which had previously been set for August 3, 2018 at 10:00 a.m.) to August 2, 2018 at 1:30 p.m. The location and all other notifications and Orders contained in the previous Notice (TN 223890) remain in effect.
2 page(s)
 All parties and interested publicEnergy Commission Hearing Office
2242517/23/2018 THÔNG BÁO V? VI?C Ð?I NGÀY GI? C?A PHIÊN ÐI?U TR?N
Vietnamese Notice of Date and Time Change of Evidentiary Hearing. THURSDAY, AUGUST 2, 2018 Beginning at 1:30 p.m. Public comment begins at 5:30 p.m. Stanton Community Center/City Hall 7800 Katella Avenue Stanton, California 90680 (Wheelchair Accessible)
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2242507/23/2018 Korean Notice of Date and Time Change of Evidentiary Hearing
Korean Notice of Date and Time Change of Evidentiary Hearing. THURSDAY, AUGUST 2, 2018 Beginning at 1:30 p.m. Public comment begins at 5:30 p.m. Stanton Community Center/City Hall 7800 Katella Avenue Stanton, California 90680 (Wheelchair Accessible)
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2242497/23/2018 NOTIFICACIÓN DE CAMBIO DE FECHA Y HORA DE AUDIENCIA PROBATORIA
Spanish version of Notice of Date and Time Change of Evidentiary Hearing. THURSDAY, AUGUST 2, 2018 Beginning at 1:30 p.m. Public comment begins at 5:30 p.m. Stanton Community Center/City Hall 7800 Katella Avenue Stanton, California 90680 (Wheelchair Accessible)
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2242327/20/2018 Clean Coalition SERC Exhibit List

2 page(s)
 CEC/Docket UnitClean Coalition
2242277/20/2018 Memo re Date Change for Evidentiary Hearing
Memorandum from Hearing Officer advising the parties that the Evidentiary Hearing will be changed to the afternoon of August 2, 2018.
1 page(s)
 All parties and interested publicEnergy Commission Hearing Office
2242137/19/2018 Memo re Exhibit List for Stanton Energy Reliability Center
Memo to the parties with a link to the exhibit list that requests the parties review the exhibit list for accuracy and provide changes or corrections to the hearing officer.
1 page(s)
 All PartiesEnergy Commission Hearing Office
2241857/16/2018 NREL's article - The Impact of Wind and Solar on the Value of Energy Storage
This document was referenced in Notes 21, 22, 23 and 27 of the Clean Coalition's Opening Testimony (TN#: 224025).
40 page(s)
 CEC/Docket UnitClean Coalition
224182-17/16/2018 Memo and Revised July 25 2018 Prehearing Conference Agenda Korean translation

2 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
224182-27/16/2018 Memo and Revised July 25 2018 Prehearing Conference Agenda Spanish translation
Notificación acerca de que el Comité considerará la Petición de Anulación de la declaración testimonial de Clean Coalition durante la Conferencia Previa a la Audiencia del 25 de julio de 2018; Orden del día de la Conferencia Previa a la Audiencia modificado
2 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
224182-37/16/2018 Memo and Revised July 25 2018 Prehearing Conference Agenda Vietnamese translation
Luu ý rang Uy ban se xem xét Thinh cau cua Nguyên don de xóa bo loi khai cua to chuc Clean Coalition trong phiên dieu tran ngày 25 tháng 7 nam 2018; Chuong trình nghi su cho phiên dieu tran so bo duoc sua doi
2 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
2241807/13/2018 Miles Maurino Statement of Qualifications

1 page(s)
 CEC/Docket UnitClean Coalition
2241797/13/2018 Miles Maurino Declaration

1 page(s)
 CEC/Docket UnitClean Coalition
2241787/13/2018 Clean Coalition Prehearing Conference Statement

5 page(s)
 CEC/Docket UnitClean Coalition/Doug Karpa
2241777/13/2018 Stanton Energy Reliability Center PreHearing Conference Statement and Proposed Exhibit List

Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases, Air Quality
15 page(s)
 CEC/Docket UnitDayZenLLC
2241757/13/2018 Doug Karpa Declaration
Clean Coalition Opening and Response Testimony Co-Author, Doug Karpa, Declarations Page
1 page(s)
918CEC/Docket UnitClean Coalition
2241747/13/2018 Doug Karpa Statement of Qualifications
Clean Coalition Opening and Rebuttal Testimony Co-Author, Doug Karpa, Statement of Qualifications
1 page(s)
919CEC/Docket UnitClean Coalition
2241737/13/2018 Memo and Revised July 25 2018 Prehearing Conference Agenda adding Applicant's Motion to Strike Clean Coalition's Testimony
Applicant's Motion to Strike will be considered during the Prehearing Conference
2 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
2241717/13/2018 Clean Coalition - Wall Street Journal Article Summary and Link
This document was cited in Note 35 of the Clean Coalition's Opening Testimony (TN#: 224025).
1 page(s)
916CEC/Docket UnitClean Coalition
2241697/13/2018 LBNL Article - Demand Response Potential
This document was cited in Note 3 of the Clean Coalition's Opening Testimony (TN#: 224025).
67 page(s)
902CEC/DocketsClean Coalition
2241687/13/2018 Integrating Increased DR and Dynamic Price Response into NYISO Markets
This document was cited in Note 4 of the Clean Coalition's Opening Testimony (TN#: 224025)
26 page(s)
903CEC/DocketsClean Coalition
2241677/13/2018 FERC 2015 Assessment of DR and AMI.
Note 5 of the Clean Coalition's Opening Testimony (TN#: 224025) references this document.
36 page(s)
904CEC/DocketsClean Coalition
2241667/13/2018 Energy Commission Staff's Prehearing Conference Statement

4 page(s)
 CEC/ Docket unitCalifornia Energy Commission
2241657/13/2018 SCE Demand Response Programs
This website was cited in citations 7, 8 and 9 in the Clean Coalition's Opening Testimony (TN#: 224025).
6 page(s)
905CEC/DocketsClean Coalition
2241647/13/2018 Status Report #15

1 page(s)
  California Energy Commission
2241637/13/2018 GreenBiz Article - Here comes the sun Solar plus storage energy solutions get competitive
This article was cited in Note 11 of the Clean Coalition's Opening Testimony (TN#: 224025)
13 page(s)
906CEC/DocketsClean Coalition
2241627/13/2018 Carbon Budget Article
This document was cited in Note 12 of the Clean Coalition's Opening Testimony (TN# 224025).
27 page(s)
907CEC/DocketsClean Coalition
2241617/13/2018 NREL Advanced Inverter Article
This document was cited in Note 13 of the Clean Coalition's Opening Testimony (TN# 224025)
8 page(s)
908CEC/DocketsClean Coalition
2241607/13/2018 KIUC SolarCity Selects Battery System for Kaua'i Co-op Solar Storage Project
This document was cited in Note 14 of the Clean Coalition's Opening Testimony (TN#: 224025)
2 page(s)
909CEC/DocketsClean Coalition
2241597/13/2018 Renewables Now, Hawaii Regulators approve solar-plus-storage project on Kaua'i
This article was cited in Note 15 of the Clean Coalition's Opening Testimony (TN#: 224025)
5 page(s)
910CEC/DocketsClean Coalition
2241587/13/2018 Clean Coalition Solar Siting Surveys
This webpage was cited in Note 16 of the Clean Coalition's Opening Testimony (TN#: 224025).
4 page(s)
911CEC/DocketsClean Coalition
2241577/13/2018 US EIA 2018 Annual Energy Outlook
This document was cited in Notes 24, 25, and 26 in the Clean Coalition's Opening Testimony (TN#: 224025).
74 page(s)
912CEC/DocketsClean Coalition
2241567/13/2018 CPUC Decision 15-11-041
This Decision was cited in Notes 29, 31, 32 and 33 of the Clean Coalition's Opening Testimony (TN#: 224025).
41 page(s)
913CEC/DocketsClean Coalition
2241557/13/2018 CPUC Decision 16-09-004
This Decision was cited in Note 30 of the Clean Coalition's Opening Testimony (TN#: 224025).
33 page(s)
914CEC/DocketsClean Coalition
2241547/13/2018 CPUC Decision 16-05-050
This Decision was cited in Note 34 of the Clean Coalition's Opening Testimony (TN#: 224025).
41 page(s)
915CEC/DocketsClean Coalition
2241437/12/2018 Deep Decarbonization in a High Renewables Future

141 page(s)
305CEC/Docket unitCalifornia Energy Commission
2240947/9/2018 Stanton Energy Reliability Center, LLC's Motion To Strike Intervenor Clean Coalition's Testimony

Alternatives
5 page(s)
 CEC/Docket UnitDayZenLLC
2240867/6/2018 Miles Maurino Comments Clean Coalition Rebuttal Testimony

3 page(s)
901CEC Docket UnitMiles Maurino
2240847/6/2018 Rebuttal to Clean Colation Alternatives Testimony - Corrected Cost Analysis

Alternatives
102CEC/Docket UnitDayZenLLC
2240837/6/2018 SERC, LLC Final Rebuttal Testimony Package - Alternatives - Declarations

Alternatives
21 page(s)
101CEC/Docket UnitDayZenLLC
2240817/6/2018 CPUC Hearing Transcript Excerpts
CPUC Evidentiary Hearing Transcript, Application 14-11-012, May 5, 2015, Volume 1 Page 30, lines 17-23, Testimony of Jesse Bryson
Alternatives
2 page(s)
99CEC/Docket UnitDayZenLLC
2240777/6/2018 NREL Land Use Requirements for Solar Power Plants in the United States

47 page(s)
97CEC/Docket UnitDayZenLLC
2240767/6/2018 CAISO 2019 Local Capacity Technical Report
Final Report and Study Results, May 15, 2018
131 page(s)
98CEC/Docket UnitDayZenLLC
2240717/6/2018 Energy Commission Staff's Rebuttal Testimony

13 page(s)
304CEC/ Docket unitCalifornia Energy Commission
2240437/3/2018 Resume of Jim McLucas
Resume of Jim McLucas as Attachement to Opening Testimony for SERC, LLC
5 page(s)
103CEC/DocketsDayZenLLC
2240266/29/2018 Opening Testimony Supplement

4 page(s)
917CEC/Docket UnitClean Coalition
2240256/29/2018 Opening Testimony of Clean Coalition

14 page(s)
900CEC/Docket UnitClean Coalition
2240186/29/2018 Stanton Energy Relibility Center LLC's Opening Testimony

68 page(s)
100CEC/Docket UnitDayZen LLC
2239856/28/2018 COMMITTEE ORDER GRANTING PETITION TO INTERVENE
Committee ORDER granting Clean Coalition's Petition to Intervene
Alternatives
3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2239396/25/2018 Email between parties and hearing officer regarding Clean Coalition's Petition to Intervene
Document Description: Email from Scott Galati to Hearing Officer Celli and all parties regarding the Petition to Intervene filed by Clean Coalition, and email from Hearing Officer Celli asking the parties to reply with an indication whether they intend to oppose the Petition to Intervene.
Alternatives
2 page(s)
 All Parties and Hearing OfficerEnergy Commission Hearing Office
2239126/22/2018 Clean Coalition Comments - Petition to Intervene

Alternatives, Project Description
5 page(s)
 CEC/Docket UnitClean Coalition/Miles Maurino
2238976/21/2018 Declaration of Brett Fooks

Compliance
1 page(s)
303CEC/Docket UnitCalifornia Energy Commission
2238906/20/2018 Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders with links to Spanish, Korean and Vietnamese translations.
10 page(s)
 CEC/DocketsCalifornia Energy Commission
2238896/20/2018 Korean Version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders.

12 page(s)
 CEC/DocketsCalifornia Energy Commission
2238886/20/2018 Notificación De Conferencia Previa A La Audiencia Y Audiencia Probatoria, Orden De Programación Y Órdenes Adicionales
Spanish version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders.
11 page(s)
 CEC/DocketsCalifornia Energy Commission
2238876/20/2018 Thông Báo V Hi Ngh Truc Phiên Ðiu Trn Và Phiên Ðiu Trn Da Trên Bng Chng, Lnh Lên K Hoch, Và Các Lnh Tip Theo
Vietnamese version of the Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders.
11 page(s)
 CEC/DocketsCalifornia Energy Commission
2238826/20/2018 Energy Commission Staff's Opening Testimony

Compliance
2 page(s)
302CEC/Docket UnitCalifornia Energy Commission
2238436/18/2018 Status Report #14

1 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2238406/18/2018 Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders
***SUPERCEDED BY TN 223890*** The PREHEARING CONFERENCE will be conducted on: WEDNESDAY, JULY 25, 2018 Beginning at 10:00 a.m. California Energy Commission Art Rosenfeld Room – Hearing Room A 1516 Ninth Street Sacramento, CA 95814 The EVIDENTIARY HEARING will take place on: FRIDAY, AUGUST 3, 2018 Beginning at 10:00 a.m. Stanton Community Center/City Hall 7800 Katella Avenue Stanton, California 90680
10 page(s)
 CEC/DocketsCalifornia Energy Commission
2238396/18/2018 Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders
***SUPERCEDED BY TN 223890*** The PREHEARING CONFERENCE will be conducted on: WEDNESDAY, JULY 25, 2018 Beginning at 10:00 a.m. California Energy Commission Art Rosenfeld Room – Hearing Room A 1516 Ninth Street Sacramento, CA 95814 The EVIDENTIARY HEARING will take place on: FRIDAY, AUGUST 3, 2018 Beginning at 10:00 a.m. Stanton Community Center/City Hall 7800 Katella Avenue Stanton, California 90680
10 page(s)
 CEC/DocketsCalifornia Energy Commission
2238376/15/2018 Stanton Energy Reliability Center LLC's Status Report No.14

2 page(s)
 CEC/Docket UnitDayZen LLC
2237406/7/2018 Notice of Availability - Final Staff Assessment (Vietnamese Version)
Final Staff Assessment for the Proposed Stanton Energy Reliability Center
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237396/7/2018 Notice of Availability - Final Staff Assessment (Korean Version)
Final Staff Assessment for the Proposed Stanton Energy Reliability Center
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237386/7/2018 Notificacion de Disponibilidad Evaluacion Final Del Personal (Spanish Version)
Notificacion De Disponibilidad Evaluacion Final Del Personal Para El Stanton Energy Reliability Center Propuesto
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237376/7/2018 Notice of Availability - Final Staff Assessment (English Version)
Final Staff Assessment for the Proposed Stanton Energy Reliability Center
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237366/7/2018 Document Handling For The Final Staff Assessment For The Proposed Stanton Energy Reliability Center (16-AFC-01)
Library Letter
1 page(s)
 LibrarianCalifornia Energy Commission
2237346/7/2018 Executive Summary (Vietnamese Version)
Summary
25 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237336/7/2018 Executive Summary (Spanish Version)
Summary
29 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237326/7/2018 Executive Summary (Korean Version)

33 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237316/7/2018 Executive Summary
Summary
26 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237266/7/2018 Final Staff Assessment

947 page(s)
300CEC/Docket UnitCalifornia Energy Commission
2234545/16/2018 Report of Conversation - Re. Traffic and Transportation - Alternate Route for Hazardous Materials Delivery
Conversation between Andrea Koch of the CEC and Allan Rigg, Public Works Director/City Engineer for the City of Stanton
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2234505/15/2018 Memo - Status Report #13

1 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2234475/15/2018 Stanton Energy Reliability Center LLC's Status Report No. 13

2 page(s)
 CEC/Docket UnitDayZen LLC
2234465/15/2018 Report of Conversation re Inquiry Regarding Construction Duration, Stanton Energy Reliability Center
Conversation between CEC staff, John Heiser and Scott Galati, Applicant's representative.
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2234255/11/2018 Stanton Energy Reliability Center's Responses to Data Requests A73 through A85

Soil and Water, Traffic and Transportation
15 page(s)
96CEC/John HeiserCH2M
2234145/10/2018 Stanton Energy Reliability Center LLC's Supplemental NOISE-7 Comment on Preliminary Staff Assessment

Noise and Vibration
2 page(s)
95CEC/Docket UnitDayZen LLC
2234095/9/2018 Stanton Energy Reliability Center LLC's Supplemental Responses to PSA Workshop Query Relating to Stormwater Discharge

30 page(s)
94CEC/Docket UnitDayZen LLC
2234025/8/2018 Southern California Edison Company Generator Interconnection Agreement for Stanton Energy Reliability Center

216 page(s)
93CEC/Docket UnitDayZen LLC
2233895/8/2018 Memo re Hold the Date for 2018 Prehearing Conference and Evidentiary Hearing
Memorandum from the SERC Committee establishing the due date for the Final Staff Assessment as June 8, 2018 and tentatively setting the dates for the Prehearing Conference and Evidentiary Hearing as July 25, 2018 and August 3, 2018 respectively.
1 page(s)
 All PartiesEnergy Commission Hearing Office
2233155/3/2018 Staff Data Requests
Data Requests Regarding Recent Project Changes and Discussions at the April 18, 2018 Preliminary Staff Assessment Workshop
5 page(s)
 SERC, LLC/Kara MilesCalifornia Energy Commission
223313-15/2/2018 Stanton Energy Reliability Center (SERC) Cover Letter
Letter regarding the SCAQMD issued the Preliminary Determination of Compliance and proposed initial Title V permit for the SERC project for review.
1 page(s)
 Honorable Janea A. Scott and Karen DouglasSCAQMD
223313-25/2/2018 Stanton Energy Reliability Center (SERC) Final Determination of Compliance (FDOC) Package

197 page(s)
301Honorable Janea A. Scott and Karen DouglasSCAQMD
223313-35/2/2018 Stanton Energy Reliability Center (SERC) Draft Facility Permit for Final Determination of Compliance (FDOC) Package

80 page(s)
 Honorable Janea A. Scott and Karen DouglasSCAQMD
2233004/30/2018 Committee Comments on the Preliminary Staff Assessment
Memorandum from the Hearing Officer on behalf of the Committee with comments on the Preliminary Staff Assessment.
1 page(s)
 All PartiesEnergy Commission Hearing Office
2232934/30/2018 Stanton Energy Reliability Center LLC's Final Comments on the Preliminary Staff Assessment

Air Quality, Biological Resources, Cultural Resources, Hazardous Materials, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Soil and Water, Noise and Vibration, Project Description, Traffic and Transportation
17 page(s)
92CEC/DocketsDayZen LLC
2232894/30/2018 Stanton Energy Reliability Center - Updated Comments

Hazardous Materials, Socioeconomics
3 page(s)
 CEC/DocketsOrange County Fire Authority/Tamera Rivers
2232814/26/2018 Stanton Energy Reliability Center LLC's Response to PSA Workshop Queries

51 page(s)
91CEC/Docket UnitDayZen LLC
2232734/24/2018 Orange County Fire Authority's Comments on the Preliminary Staff Assessment

Hazardous Materials, Socioeconomics
3 page(s)
 CEC/Docket UnitOrange County Fire Authority/Tamera Rivers
2232544/20/2018 Status Report #12
Report
1 page(s)
 1516 9th Street, Sacramento CA 95814California Energy Commission
2232534/20/2018 Stanton Energy Reliability Center LLC's Status Report No.12

2 page(s)
 CEC/DocketsDayZen LLC
2232474/20/2018 South Coast Air Quality Management District Response to Applicant's Preliminary Determination of Compliance Comments
Letter dated April 19, 2018
Air Quality
6 page(s)
 Kara Miles/Stanton Energy Reliability CenterSCAQMD
2232034/16/2018 Stanton Energy Reliability Center Preliminary Staff Assessment Workshop Revised Agenda

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2231894/12/2018 Stanton Energy Reliability Center LLC's Initial Comments on the Preliminary Staff Assessment -Attachment A, App.5.1E Replacement

Air Quality
8 page(s)
90CEC/Docket UnitDayZen LLC
2231844/12/2018 Stanton Energy Reliability Center LLC's Water Quality Management Plan

Soil and Water
312 page(s)
89CEC/Docket UnitDayZen LLC
2231794/11/2018 Stanton Energy Reliability Center LLC's Initial Comments on the Preliminary Staff Assessment

105 page(s)
88CEC/Docket UnitDayZen LLC
2231784/11/2018 Email re Stanton Status Report
Hearing Officer's reply email to request from Applicant's counsel extending the due date for status reports 5 days to April 20, 2018.
1 page(s)
 All PartiesEnergy Commission Hearing Office
223146-14/6/2018 Executive Summary
Summary
27 page(s)
 1516 9th Street, Sacramento CA 95814California Energy Commission
223146-24/6/2018 Exective Summary (Spanish Version)
Summary
33 page(s)
 1516California Energy Commission
223146-34/6/2018 Executive Summary (koren Version)
Summary
36 page(s)
 1516 9th Street, Sacramento CA 95814California Energy Commission
223146-44/6/2018 Executive Summary (Vietnamese Version)
Executive Summary
28 page(s)
 1516 9th Street, Sacramento CA 95814California Energy Commission
223133-14/4/2018 Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (English Version)
Workshop Notice, Wednesday, April 18, 2018
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223133-24/4/2018 Aviso de Taller de Evaluacion Preliminar del Personal para el Evaluacion De preliminar Del Personal (Spanish Version)
Workshop Notice, Miercoles, 18 de abril de 2018
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223133-34/4/2018 Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (Korean Version)
Workshop Notice, April 18, 2018
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223133-44/4/2018 Notice of Preliminary Staff Assessment Workshop for the Preliminary Staff Assessment (Vietmamese Version)
Workshop Notice, April 18, 2018
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2230983/30/2018 Stanton Energy Reliability Center Traffic and Transportation Figure 3
Reference to TN # 223086
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2230883/29/2018 Document Handling for the Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center

1 page(s)
 LibrarianCalifornia Energy Commission
2230873/29/2018 Request for Comments on the Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center
Agency Notice
2 page(s)
 Agency Distribution ListCalifornia Energy Commission
2230863/29/2018 Stanton Energy Reliability Center Preliminary Staff Assessment
This Document Supersedes TN 223078
Air Quality, Alternatives, Biological Resources, Greenhouse Gases, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Waste Management, Soil and Water, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction
855 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223081-13/29/2018 Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center
English Language Version
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223081-23/29/2018 Notificacion De Disponibilidad Evaluacion Preliminar Del Personal Para El Stanton Energy Reliability Center Propuesto
Spanish Language Version
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223081-33/29/2018 Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center (Vietnamese Language)
Vietamese Language Version
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
223081-43/29/2018 Notice of Availability Preliminary Staff Assessment for the Proposed Stanton Energy Reliability Center (Korean Version)
Korean Language Version
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2230783/29/2018 Stanton Energy Reliability Center Preliminary Staff Assessment
*** THIS DOCUMENT IS REPLACED BY TN 223086 ***
Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction
845 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2229823/15/2018 Status Report #11

1 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2229813/15/2018 Stanton Energy Reliability Center, LLC's Status Report No. 11

2 page(s)
 CEC/Docket UnitDayZen LLC
2229633/14/2018 Report of Conversation - Inquiry Regarding Water of U.S and Potential Need for USACE Permits for the SERC (Stanton)
Conversation between Ann Crisp and Cori Farrar, Chief, Orange & Riverside Counties Section, Regulatory Division, South Coast Branch Los Angeles District, U.S. Army Corps of Engineers (USACE)
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2226512/21/2018 Record of Conversation between G. Darvin and W. Qian Re Cumulative Modeling Assessment

Air Quality
9 page(s)
87CEC/Docket UnitDayZen LLC
2226112/20/2018 Stanton Energy Reliability Center LLC's Comments on the Preliminary Determination of Compliance

Air Quality
7 page(s)
86SCAQMD/Bhaskar Chandan, P.E.DayZen LLC
2225652/15/2018 Stanton Energy Reliability Center LLC's Status Report No.10

1 page(s)
 CEC/Docket UnitDayZen LLC
2225642/15/2018 Status Report #10

1 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2225452/14/2018 Stanton Energy Reliability Center LLC's Cumulative Air Quality Impact Analysis

Air Quality
8 page(s)
85CEC/Docket UnitDayZen LLC
2225222/12/2018 Public Notice of Intent to Issue Permits
Stanton - SCAQMD PDOC Draft Permit to Operate
82 page(s)
 CEC/DocketsSouth Coast Air Quality Management District
2225212/12/2018 Notice of Intent to Issue Permits
Stanton - Public Notice from SCAQMD - Notice of Intent to Issue Permitts
3 page(s)
 CEC/DocketsSouth Coast Air Quality Management District
2225202/12/2018 SCAQMD Memorandum - Modeling Review
Stanton - Public Notice from SCAQMD - Memorandum Review of Dispersion Modeling Analysis and Health Risk Assessment
9 page(s)
 CEC/DocketsSouth Coast Air Quality Management District
2225192/12/2018 Preliminary Determination Of Compliance (PDOC)
Stanton - Notice of SCAQMD PDOC - for Permits to Construct
179 page(s)
84CEC/DocketsSouth Coast Air Quality Management District
2221431/15/2018 Stanton Energy Reliability Center LLC's Status Report No. 9

2 page(s)
 CEC/DocketsDayZen LLC
2221411/12/2018 Status Report #9

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2221381/12/2018 Report of Conversation Inquiry Re Biological Resources in the City of Stanton
Conversation between Ann Crisp of the CEC and Kelly Hart, Community Development Director for the city of Stanton
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2221371/12/2018 Report of Conversation Inquiry Re Nesting Bird Mitigation for the Stanton Energy Reliability Center
Conversation between Ann Crisp of the CEC and Tom Dietsch and Christine Medak of the U.S. Fish and Wildlife Service
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2221241/10/2018 Stanton Energy Reliability Center LLC's Supplemental Response to Data Request A10

Air Quality
16 page(s)
83CEC/Docket UnitDayZen LLC
22206812/27/2017 CDFW Response Letter - No Lake or Streambed Alteration Agreement Needed - Notification No. 1600-2017-0278-R5
Response Letter dated December 15, 2017
1 page(s)
 CEC/Ann CrispCalifornia Department of Fish and Wildlife (CDFW)
22206712/27/2017 Department of Fish and Wildlife Comments on the Draft Preliminary Staff Assessment
Letter dated December 14, 2017 regarding comments of the Stanton Energy Reliability Center Draft Preliminary Staff Assessment of Impact to Biological Resources in Stanton and Carbon Creek Channels
3 page(s)
 CEC/Ann CrispCalifornia Department of Fish and Wildlife (CDFW)
22198612/15/2017 Stanton Energy Reliability LLC's Status Report No. 8

2 page(s)
 CEC/DocketsDayZen LLC
22198412/15/2017 Status Report #8

1 page(s)
 CEC/DocketsCalifornia Energy Commission
22178911/15/2017 Stanton Energy Reliability Center LLC's Status Report No. 7

Air Quality, Cultural Resources
2 page(s)
 CEC/Docket UnitDayZen LLC
22178611/15/2017 Status Report #7

2 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
22176911/14/2017 Barre Substation Form DPR523 dated 11.14.2017 for Cultrual Resources

Cultural Resources
13 page(s)
82CEC/Docket UnitCH2M
22172211/13/2017 Stanton Energy Reliability Center, LLC Response to SCAQMD October 16, 2017

Air Quality, Public Health
17 page(s)
80CEC/DocketsDayZen LLC
22172111/13/2017 Stanton Energy Reliability Center, LLC Supplemental Response to SCAQMD October 16, 2017 Letter RE Emission Gaurantees

Air Quality, Public Health
3 page(s)
81CEC/DocketsDayZen LLC
22163610/27/2017 Report of Conversation ReClarification on Biological Resources Data Response A64 and A72
Conversation between Ann Crisp of the CEC and Doug Davy, CH2M
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22150910/16/2017 Stanton Reliability Energy Center (16-AFC-01) Status Report #6

2 page(s)
 CEC/DocketsCalifornia Energy Commission
22150810/16/2017 Stanton Energy Reliability Center LLC's Status Report No. 6

2 page(s)
 CEC/DocketsDayZen LLC
22145810/10/2017 Permit Applications for the Stanton Electric Reliability Center (16-AFC-01)

7 page(s)
 CEC/DocketsCalifornia Energy Commission
2213609/14/2017 SERC LLC's Response to CEC Staff Data Request No. A26

14 page(s)
 CEC/Robert OglesbyDayZen LLC
2213009/22/2017 SERC_Data_Request_Response-Set_3-09.21.2017.pdf
SERC_Data_Request_Response-Set_3-09.21.2017.pdf
Biological Resources
37 page(s)
79John HeiserCH2M
2211869/14/2017 SERC LLC's Repeated Application for Confidential Designation
Confidential Response to CEC Staff Data Request No. A26
2 page(s)
 CEC/Robert OglesbyDayZen LLC
2211839/15/2017 Stanton Reliability Energy Center (16-AFC-01) Status Report #5
*** THIS DOCUMENT SUPERSEDES TN 221181 ***
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2211819/15/2017 Memo Regarding Stanton Reliability Energy Center (16-AFC-01) Status Report #5
*** THIS DOCUMENT IS REPLACED BY TN 221183 ***
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2211809/15/2017 Letter of Support for Stanton Energy Reliability Center from Chairwoman Steel

1 page(s)
78CEC/DocketsDayZen LLC
2211799/15/2017 Stanton Energy Reliability Center LLC's Status Report No. 5

2 page(s)
 CEC/DocketsDayZen LLC
2211519/13/2017 Assemblywoman, Sharon Quirk-Silva Comments on Stanton Energy Reliability Center

1 page(s)
 CEC/Janea Scott and Karen DouglasAssemblywoman, Sharon Quirk-Silva
2210719/7/2017 Committee Order Granting Petition to Intervene
Petition from Rob Simpson/Helping Hand Tools
3 page(s)
 All partiesEnergy Commission Hearing Unit
2209808/31/2017 Report of Conversation Re Anaheim Union High School District School Impact Fee for Proposed Stanton Energy Reliability Center
Conversation between Ellen LeFevre of the CEC and Leticia Hauck, Anaheim Union High School District
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2209798/31/2017 Report of Conversation Re Law Enforcement Needs Assessment for Proposed Stanton Energy Reliability Center
Conversation between Ellen LeFevre of the CEC and Lieutenant Sean Howell, Chief of Stanton Police Services.
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2209428/29/2017 Stanton Energy Reliability Center Supplemental Response to Data Request A17

Biological Resources
30 page(s)
77CEC/John HeiserCH2M
2209388/29/2017 Staff's Data Requests, Set 3, A71 through A72

3 page(s)
 SERC, LLC/Kara MilesCalifornia Energy Commission
2208778/24/2017 Memo Regarding Laws, Ordinances, Regulations, and Standards (LORS) tables in all sections of Staff Analyses.
Memorandum with example of LORS Table to be included in all sections of staff analyses that have applicable LORS.
3 page(s)
 Energy Commission StaffEnergy Commission Hearing Office
2208468/22/2017 robert james simpson Comments: petition to intervene

Air Quality
  robert james simpson
2208218/17/2017 Stanton Energy Reliability Center Data Request Response Set 2, for Data Requests A64 through A70

Soil and Water, Biological Resources, Cultural Resources
17 page(s)
76CEC/Docket UnitCH2M
2207818/15/2017 Stanton Energy Reliability Center LLC's Status Report No. 4

2 page(s)
 CEC/Docket UnitDayZen LLC
2207738/15/2017 Stanton Reliability Energy Center Status Report #4

2 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2207678/15/2017 Email from Hearing Officer Ken Celli to Petitioner Rob Simpson
Email asking Petitioner to include a telephone number for Helping Hand Tools and referring the Petitioner to the Public Adviser to access the current regulations.
1 page(s)
 Rob Simpson, Scott Galati, Lisa De Carlo, Bob Sarvey, Paul Kramer, Alana MathewsEnergy Commission Hearing Office
2207408/14/2017 robert james simpson - Petition to intervene Helping Hand Tools

Air Quality
3 page(s)
 CEC/Docket Unitrobert james simpson
2206208/9/2017 Stanton Energy Reliability Center, LLC’s Proposed Modifications to Condition of Certification HAZ-8

Hazardous Materials
2 page(s)
75CEC/DocketsDayZen LLC
2204958/1/2017 North Orange County Chamber of Commece Comments Support for Stanton Energy Reliability Center

2 page(s)
 CEC/Janea Scott and Karen DouglasNorth Orange County Chamber of Commece
2203657/25/2017 Staff's Data Requests, Set 2, A64 through A70

7 page(s)
 SERC, LLC/Kara MilesCalifornia Energy Commission
2202937/21/2017 Order Granting Petition to Intervene
***Supersedes TN 220292***
3 page(s)
 PartiesCalifornia Energy Commission
2202927/21/2017 Committee Order Granting Petition to Intervene
***Superseded by TN 220293***
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2202697/19/2017 U.S. Dept. Transportation, Federal Aviation Admin. LTR to James Adams of the CEC
Letter with DVD containing Flight track data in response to FOIA request 2017-007715, dated June 21. (The Docket Unit has a copy of the DVD)
1 page(s)
 CEC/James AdamsU.S. Department of Transportation - Federal Aviation Administration
2202457/18/2017 General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents, and Other Matters

6 page(s)
 All parties and the publicEnergy Commission Hearing Unit
2202377/17/2017 Stanton Energy Reliability Center LLC's Status Report No. 3

2 page(s)
 CEC/DocketsDayZen LLC
2201667/14/2017 Status Report #3

2 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2201017/10/2017 Bicycle Facilities Clarification
Letter
1 page(s)
 CEC/DocketsCity of Stanton
2199896/30/2017 Record of Conversation re LAAA Operations
***supersedes TN 219964***
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2199656/28/2017 Robert Sarvey's Petition to Intervene

Air Quality, Alternatives
2 page(s)
 CommitteeRobert Sarvey
2199646/28/2017 Record of Conversation re LAAA Operations

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2188616/15/2017 Stanton Reliability Energy Center Status Report #2

2 page(s)
 CEC/Janea Scott, Karen Douglas and Ken CelliCalifornia Energy Commission
2188496/15/2017 Stanton Energy Reliability Center LLC's Status Report No. 2

2 page(s)
 CEC/DocketsDayZen LLC
2188126/15/2017 6.15.17 Stanton Energy Reliability Center Comment Letter

Traffic and Transportation
2 page(s)
 CEC/John HeiserOrange County Transportation Authority
2187946/15/2017 Stanton Energy Reliability Center AFC Noise Section, Table 5.7-7, Revised

Noise and Vibration
2 page(s)
74CEC/John HeiserCH2M
2183356/14/2017 RE Potential Law Enforcement Needs for the Stanton Energy Reliability Center (16-AFC-01)
letter
Socioeconomics
11 page(s)
 Lieutenant Sean Howell, Orange County SheriffEnergy Commission
2178776/6/2017 Letter Regarding Proposed Energy Reliability Center Project
Response to request for search of the NAHC Sacred Lands file and a consultation list
Cultural Resources
4 page(s)
 CEC/Matthew BraunNative American Heritage Commission
2178766/6/2017 Letter Regarding Invitation to Participate in CEC Consultation
Letters sent to Native American tribes regarding the Stanton Reliability Energy Center
Cultural Resources
190 page(s)
 Multiple ChairpersonsCalifornia Energy Commission
2177875/31/2017 Stanton Energy Reliability Center, LLC’s Response Response Staff Data Requests A1-A5 and Responses to South Coast Air Quality
Stanton Energy Reliability Center, LLC’s Response Response Staff Data Requests A1-A5 and Responses to South Coast Air Quality Management District Comments
Air Quality
2 page(s)
73CEC/John HeiserCH2M
2177175/25/2017 Air Quality Letter
Air Quality Letter
Air Quality
2 page(s)
72CEC/John HeiserCH2M
2176995/23/2017 Stanton Energy Reliability Center's Responses to Staff Data Requests A34-A35 and Revised Human Health Risk Assessment
SERC Public Health DRR A34-A35 - CD is for human health risk assessment modeling files
Public Health
36 page(s)
71CEC/John HeiserCH2M
2176985/23/2017 Union Pacific Railroad Company Comments On Response to the Notice on the Stanton Energy Reliability Center

4 page(s)
 CEC/Alana MatthewsUnion Pacific Railroad Company
2176815/22/2017 Response to Staff Data Requests A1-A5
Responses to South Coast Air Quality Management District Comments on AFC Section 5.1, Air Quality
Air Quality
198 page(s)
70 CH2M
2176005/15/2017 Status Report No.1

2 page(s)
  California Energy Commission
2175955/15/2017 Stanton Energy Reliability Center LLC's Status Report 1

2 page(s)
 CEC/DocketsDayZen LLC
2174745/8/2017 Craig Clausen Comments: Road Closure Suggestion

Efficiency, Facility Design, Noise and Vibration
  Craig Clausen
2174615/5/2017 Stanton Energy Reliability Center's Data Request Response, Set 1 (A1-A63)

771 page(s)
69CEC/John HeiserCH2M
2173935/2/2017 Document Handling for the Application for Certification

2 page(s)
 CEC/DocketsCalifornia Energy Commission
2173915/2/2017 Request for Agency Participation in the Review fo the Application for Certification

5 page(s)
  California Energy Commission
2173755/1/2017 Committee Scheduling Order
Presiding Member's established schedule for the prehearing phase of the proceeding.
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2173074/26/2017 Transcript of 04/17/2017 Public Site Visit, Environmental Scoping Meeting, and Informational Hearing

84 page(s)
 PartiesCalifornia Energy Commission
2171794/19/2017 Stanton Energy Reliability Center LLC's Presentation for Public Site Visit, Environmental Scoping Mtg. and Informational Hearing

21 page(s)
68 DayZen LLC
2171644/19/2017 Site Visit, Environmental Scoping Meeting and Informational Hearing
Power Point Presentation
12 page(s)
  California Energy Commission
2170414/14/2017 Letter to Honorable Alan Lowenthal, U.S. Representative
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Alan Lowenthal, United States RepresentativeCalifornia Energy Commission
2170394/14/2017 Letter to Honorable Dianne Feinstein, U.S. Senator
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Dianne Feinstein, United States SenatorCalifornia Energy Commission
2170384/14/2017 Letter to Honorable Michelle Steel, Chairperson
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Michelle Steel, Chairperson, Orange County SupervisorCalifornia Energy Commission
2170374/14/2017 Letter to Hon. Josh Newman, California Assembly Member
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Josh Newman, California Assembly MemberCalifornia Energy Commission
2170364/14/2017 Letter to Honorable Carol Warren, Mayor
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Carol Warren, Mayor, City of StantonCalifornia Energy Commission
2170354/14/2017 Letter to Honorable Kamala Harris, United States Senator
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable Kamala Harris, United States SenatorCalifornia Energy Commission
2170344/14/2017 Letter to Honorable David Shawver, Mayor Pro Tem
California Energy Commission’s Executive Director Letter
2 page(s)
 Honorable David Shawver, Mayor Pro Tem, City of StantonCalifornia Energy Commission
2170334/14/2017 Letter to the Hon. Sharon Quirk-Silva, California Assembly Member
California Energy Commission’s Executive Director Letter
2 page(s)
 Honroable Sharon Quirk-Silva, California Assembly MemberCalifornia Energy Commission
2169174/10/2017 Magnolia School District's Letter of Support for Stanton Energy Reliability Center

Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Air Quality, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
2 page(s)
67 DayZen LLC
2168894/7/2017 Issues Identification Report

8 page(s)
  California Energy Commission
2168154/5/2017 Staff's Data Requests, Set 1, A1 through A63
Data Requests
23 page(s)
 SERC, LLC/Kara MilesCalifornia Energy Commission
2168134/5/2017 Cong Dong Tham Gia Danh Gia Ho So Xin Cap Giay Chung Nhan Cho Trung Tam Dam Bao Nguon Cung Nang Luong Stanton
Stanton Public Participation Notice (Vietnamese)
6 page(s)
 California Energy Commission 1516 9th Street. Sacramento, CA 95814California Energy Commission
2168124/5/2017 Stanton Public Participation Notice (Korean Version)
Public Notice (Korean Version)
5 page(s)
 California Energy Commission 1516 9th Street. Sacramento, CA 95814California Energy Commission
2168114/5/2017 Stanton Public Participation Notice (Spanish Version)
PARTICIPACIÓN PÚBLICA EN LA REVISIÓN DE LA SOLICITUD DE CERTIFICACIÓN PARA EL CENTRO DE CONFIABILIDAD DE ENERGÍA STANTON (16-AFC-01)
5 page(s)
 California Energy Commission 1516 9th Street. Sacramento, CA 95814California Energy Commission
2168104/5/2017 Stanton Public Participation Notice
Public Notice
5 page(s)
  California Energy Commission
2167743/30/2017 Spanish Translation of Notice of Public Site Visit, Environmental Scoping Meeting
Lunes 17 De Abril De 2017, Spanish Translation of Notice of Public Site Visit, Environmental Scoping Meeting, and Informational
9 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2167683/30/2017 Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing
Notice of Public Site Visit, Environmental Scoping Meeting and Informational Hearing, April 17, 2017 (contains links to Vietnamese and Korean translations).
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2167583/30/2017 Vietnamese Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing
THONG BAO THAM QUAN THUC DIA, HOI THAO DANH GIA TAC DONG MOI TRUONG VA PHIEN DIEU TRAN DE TIM HIEU THONG TIN DANH CHO CAC THANH VIEN CONG DONG, THU HAI, NGAY 17 THANG 4 NAM 2017
7 page(s)
 All parties and interested publicEnergy Commission Hearing Office
2167573/30/2017 Korean Notice of Public Site Visit, Environmental Scoping Meeting, and Informational Hearing
Korean Translation of Notice of Public Site Visit, Environmental Scoping Meeting and Informational Hearing, April 17, 2017
7 page(s)
 All parties and interested publicEnergy Commission Hearing Office
2167393/29/2017 Memo re Hold the Date of April 17, 2017
Memorandum from Hearing Officer Celli regarding the Site Visit, Environmental Scoping Meeting and Informational Hearing, to be held on April 17, 2017.
1 page(s)
 All parties and interested publicEnergy Commission Hearing Office
2167063/24/2017 Invitation to Consult with Native American Groups
Letters to Native American groups identified by the Native American Heritage Commission
Cultural Resources
110 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2164973/9/2017 Order No: 17-0308-4
Order Accepting the Executive Director's Recommendation to Find the Stanton Energy Reliability Center Application for Certification (AFC) Complete and Establishing Committee
2 page(s)
 PartiesCalifornia Energy Commission
2162792/28/2017 Staff's Data Adequacy Recommendation

99 page(s)
 CEC/Robert Weisenmiller, Karen Douglas, David Hochschild, Andrew McAllister and Janea ScottCalifornia Energy Commission
2162492/27/2017 March 8, 2017 Business Meeting Agenda
4. STANTON ENERGY RELIABILITY CENTER (16-AFC-01). Contact: John Heiser. (Staff presentation: 10 minutes) a. Possible approval of an order adopting the Executive Director’s recommendation to find the Stanton Energy Reliability Center application for certification complete. The proposed project is a new 98-megawatt hybrid electrical generating and storage facility consisting of two General Electric LM6000 PC natural gas-fired combustion turbine generators and related facilities, with integrated batteries for hybrid operation and clutch gear for synchronous condenser operation. The project would be located on a vacant 3.978 acre portion of an industrial- zoned site in the city of Stanton, west of the Southern California Edison Barre Substation in Orange County. b. Possible appointment of a siting committee for Stanton Energy Reliability Center.
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2162232/24/2017 Permit Applications for the Stanton Electric Reliability Center

4 page(s)
 Stanton Energy Reliability Center, LLC/Kara MilesSouth Coast Air Quality Management District
2157942/7/2017 Permit Applications for the Stanton Electric Reliability Center
Letter
5 page(s)
 Stanton Energy Reliability Center, LLC/Kara MilesSouth Coast Air Quality Management District
2151651/5/2017 Attachment DA3.0-1 One-Line Diagram, searchable .pdf
Attachment DA3.0-1 One-Line Diagram, searchable .pdf
Transmission System Engineering
1 page(s)
66John Heiser, CECCH2M
21511712/29/2016 Supplemental info on operations payroll for Socioeconomics Data Adequacy
Report of Conversation (ROC) with supplemental data adequacy info for Socioeconomics- operations payroll
Socioeconomics
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21509712/22/2016 Stanton Energy Reliability Center Application for Certification Data Adequacy Supplement 12.20.2016
Data Adequacy Supplement
Introduction, Project Description, Socioeconomics, Traffic and Transportation, Transmission System Engineering, Soil and Water, Air Quality, Cultural Resources, Geology/Paleontology
445 page(s)
65CEC/John HeiserCH2M
21509012/21/2016 Jeanene Louwsma Comments: On Concerns Regarding Installation of Combustion Turbine Generators

1 page(s)
 CEC/Docket UnitJeanene Louwsma
21508012/21/2016 Stanton Energy Reliability Center LLC's Response to CEC Staff Data Adequacy Question DAS 3-1

Cultural Resources
1 page(s)
  DayZen LLC
21497312/21/2016 Stanton Energy Reliability Center LLC's Repeated Application for Confidential Designation

Cultural Resources
2 page(s)
  DayZen LLC
21490212/19/2016 Order Accepting the Executive Director's Recommendation to Find the AFC Incomplete - Order No: 16-1214-3
Order Accepting the Executive Director's Recommendation to find the Stanton Energy Reliability Center Application for Certification (AFC) Incomplete
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21463012/5/2016 Permit Applications for the Stanton Electric Reliability Center

6 page(s)
 Stanton Energy Reliability Center, LLC/Kara MilesSouth Coast Air Quality Management District
21457811/29/2016 Staff's Data Adequacy Recommendation

99 page(s)
 CEC/Robert Weisenmiller, Karen Douglas, David Hochschild, Andrew McAllister, and Janea ScottCalifornia Energy Commission
21457111/28/2016 Letter Regarding Stanton Energy Reliability Center (SERC) - Electric Power Plant

1 page(s)
 CEC/John HeiserOrange County Fire Authority
21439211/1/2016 Stanton Energy Reliability Center LLC's Appendix 5.3B Cultural Resources Survey Report
Confidential request to prevent looting of cultural resources.
Cultural Resources
190 page(s)
 CEC/Robert OglesbyDayZen LLC
21439011/1/2016 Stanton Energy Reliability Center LLC's Appendix 5.3C CHRIS Literature Search Results Part 1 of 2
Confidential request to prevent looting of cultural resources. *** Part 2 of 2 is too big to approve and is on a CD in the Docket Unit ***
Cultural Resources
186 page(s)
 CEC/Robert OglesbyDayZen LLC
21437711/4/2016 Stanton Energy Reliability Center Geotechnical Report 10-27-16
Geotechnical Report
Facility Design, Geology/Paleontology
34 page(s)
64Mike MonasmithCH2M
21437011/4/2016 Notice of Receipt of an Application for Certification for the Stanton Energy Reliability Center (16-AFC-01)

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21435911/3/2016 Response to Application for Confidentiality - Cultural Resources

2 page(s)
  California Energy Commission
21432111/1/2016 Stanton Energy Reliability Center LLC's AFC Air Quality Modeling Files
The CD containing the Air Quality Modeling Files is located in the Docket Unit
1 page(s)
63CEC/John HeiserDayZen LLC
21431711/1/2016 Stanton Energy Reliability Center LLC's Application for Confidential Designation
Confidential documents are Appendix 5.3B Cultural Resources Survey Report and Appendix 5.3C CHRIS Literature Search Results
Cultural Resources
3 page(s)
 CEC/Robert OglesbyDayZen LLC
21426910/31/2016 Stanton Energy Reliability Center City of Stanton Review
Letter
2 page(s)
 CEC/John HeiserCity of Stanton
214207-110/26/2016 Application for Certification Volume 2 -Table of Contents
Application for Certification Vol. 2
1 page(s)
28 Stanton Energy Reliability Center, LLC
214207-210/26/2016 Appendix 1A - ALTA Survey
Application for Certification Vol. 2
5 page(s)
29 Stanton Energy Reliability Center, LLC
214207-310/26/2016 Appendix 1B - List of Owners of Nearby Properties
Application for Certification Vol. 2
29 page(s)
30 Stanton Energy Reliability Center, LLC
214207-410/26/2016 Appendix 1C - Persons Who Prepared this AFC
Application for Certification Vol. 2
3 page(s)
31 Stanton Energy Reliability Center, LLC
214207-510/26/2016 Appendix 2A - Engineering Design Criteria
Application for Certification Vol. 2
20 page(s)
32 Stanton Energy Reliability Center, LLC
214207-610/26/2016 Appendix 2B - Golden State Water Will-Serve Letter
Application for Certification Vol. 2
2 page(s)
33 Stanton Energy Reliability Center, LLC
214207-710/26/2016 Appendix 2C - City of Stanton Can-Serve Letter
Application for Certification Vol. 2
2 page(s)
34 Stanton Energy Reliability Center, LLC
214207-810/26/2016 Appendix 2D - Correspondence with Orange County Sanitation District Personnel
Application for Certification Vol. 2
3 page(s)
35 Stanton Energy Reliability Center, LLC
214207-910/26/2016 Appendix 3A - Interconnection Request Studies
Application for Certification Vol. 2
252 page(s)
36 Stanton Energy Reliability Center, LLC
214207-1010/26/2016 Appendix 3A-1a - Addendum 1 to the Interconnection Study Report
Application for Certification Vol. 2
53 page(s)
37 Stanton Energy Reliability Center, LLC
214207-1110/26/2016 Appendix 3A-1b - Addendum 1 to the Interconnection Study Report
Application for Certification Vol. 2
53 page(s)
38 Stanton Energy Reliability Center, LLC
214207-1210/26/2016 Appendix 5.1A - Support Data for Emissions Calculations
Application for Certification Vol. 2
18 page(s)
39 Stanton Energy Reliability Center, LLC
214207-1310/26/2016 Appendix 5.1B - Air Quality Impact Analysis Support Data
Application for Certification Vol. 2
19 page(s)
40 Stanton Energy Reliability Center, LLC
214207-1410/26/2016 Appendix 5.1C - Dispersion Modeling Protocol
Application for Certification Vol. 2
2 page(s)
41 Stanton Energy Reliability Center, LLC
214207-1510/26/2016 Appendix 5.1D - Risk Assessment Support Data
Application for Certification Vol. 2
29 page(s)
42 Stanton Energy Reliability Center, LLC
214207-1610/26/2016 Appendix 5.1E - Estimated Construction Period Emissions and Impacts
Application for Certification Vol. 2
36 page(s)
43 Stanton Energy Reliability Center, LLC
214207-1710/26/2016 Appendix 5.1F - Evaluation of Best Available Control Technology
Application for Certification Vol. 2
3 page(s)
44 Stanton Energy Reliability Center, LLC
214207-1810/26/2016 Appendix 5.1G - Regional Emissions Inventory Data
Application for Certification Vol. 2
4 page(s)
45 Stanton Energy Reliability Center, LLC
214207-1910/26/2016 Appendix 5.1H -Mitigation Strategy Support Data
Application for Certification Vol. 2
2 page(s)
46 Stanton Energy Reliability Center, LLC
214207-2010/26/2016 Appendix 5.1I - Permitting Forms
Application for Certification Vol. 2
2 page(s)
47 Stanton Energy Reliability Center, LLC
214207-2110/26/2016 Appendix 5.2A - Special-Status Species
Application for Certification Vol. 2
12 page(s)
48 Stanton Energy Reliability Center, LLC
214207-2210/26/2016 Appendix 5.2B - Rare Plant Survey Report

18 page(s)
49 Stanton Energy Reliability Center, LLC
214207-2310/26/2016 Appendix 5.2C - Biological Resources Resumes
Application for Certification Vol. 2
9 page(s)
50 Stanton Energy Reliability Center, LLC
214207-2410/26/2016 Appendix 5.3A - Consultation Record
Application for Certification Vol. 2
36 page(s)
51 Stanton Energy Reliability Center, LLC
214207-2510/26/2016 Appendix 5.3B - Cultural Resources Report (Confiential)
Application for Certification Vol. 2
2 page(s)
  Stanton Energy Reliability Center, LLC
214207-2610/26/2016 Appendix 5.3C - CHRIS Literature Search (Confidential)
Application for Certification Vol. 2
2 page(s)
  Stanton Energy Reliability Center, LLC
214207-2710/26/2016 Appendix 5.3D - Cultural Resources Resumes
Application for Certification Vol. 2
8 page(s)
52 Stanton Energy Reliability Center, LLC
214207-2810/26/2016 Appendix 5.4A - Preliminary Geotechnical Report
Application for Certification Vol. 2
178 page(s)
53 Stanton Energy Reliability Center, LLC
214207-2910/26/2016 Appendix 5.5A - Offsite Consequences Analysis
Application for Certification Vol. 2
14 page(s)
54 Stanton Energy Reliability Center, LLC
214207-3010/26/2016 Appendix 5.6A - Cumulative Projects
Application for Certification Vol. 2
4 page(s)
55 Stanton Energy Reliability Center, LLC
214207-3110/26/2016 Appendix 510A - Environmental Justice Analysis
Application for Certification Vol. 2
33 page(s)
56 Stanton Energy Reliability Center, LLC
214207-3210/26/2016 Appendix 510B - Records of Conversation with OCFA and OCSD
Application for Certification Vol. 2
3 page(s)
57 Stanton Energy Reliability Center, LLC
214207-3310/26/2016 Appendix 5.11A - Soil Loss Calculation
Application for Certification Vol. 2
7 page(s)
58 Stanton Energy Reliability Center, LLC
214207-3410/26/2016 Appendix 5.13A - Design Concept
Application for Certification Vol. 2
2 page(s)
59 Stanton Energy Reliability Center, LLC
214207-3510/26/2016 Appendix 5.13B - Landscape Plan
Application for Certification Vol. 2
3 page(s)
60 Stanton Energy Reliability Center, LLC
214207-3610/26/2016 Appendix 5.14A -Phase I ESA
Application for Certification Vol. 2
477 page(s)
61 Stanton Energy Reliability Center, LLC
214207-3710/26/2016 Appendix 5.14B - Phase II ESA
Application for Certification Vol. 2
82 page(s)
62 Stanton Energy Reliability Center, LLC
214206-110/26/2016 Transmittal Letter for the Application for Certification
Application for Certification Vol. 1
1 page(s)
1 Stanton Energy Reliability Center, LLC
214206-210/26/2016 Title Page
Application for Certification Vol. 1
1 page(s)
2 Stanton Energy Reliability Center, LLC
214206-310/26/2016 Acronyms
Application for Certification Vol. 1
7 page(s)
3 Stanton Energy Reliability Center, LLC
214206-410/26/2016 Contents
Application for Certification Vol. 1
11 page(s)
4 Stanton Energy Reliability Center, LLC
214206-510/26/2016 Executive Summary
Application for Certification Vol. 1
Executive Summary
5 page(s)
5 Stanton Energy Reliability Center, LLC
214206-610/26/2016 1.0 Introduction
Application for Certification Vol. 1
Introduction
12 page(s)
6 Stanton Energy Reliability Center, LLC
214206-710/26/2016 2.0 Project Description
Application for Certification Vol. 1
Project Description
36 page(s)
7 Stanton Energy Reliability Center, LLC
214206-810/26/2016 3.0 Electric Transmission
Application for Certification Vol. 1
11 page(s)
8 Stanton Energy Reliability Center, LLC
214206-910/26/2016 4.0 Natural Gas Supply
Application for Certification Vol. 1
3 page(s)
9 Stanton Energy Reliability Center, LLC
214206-1010/26/2016 5.0 Environmental Analysis
Application for Certification Vol. 1
1 page(s)
10 Stanton Energy Reliability Center, LLC
214206-1110/26/2016 5.1 Air Quality
Application for Certification Vol. 1
51 page(s)
11 Stanton Energy Reliability Center, LLC
214206-1210/26/2016 5.2 Biological Resources
Application for Certification Vol. 1
Biological Resources
60 page(s)
12 Stanton Energy Reliability Center, LLC
214206-1310/26/2016 5.3 Cultural Resources
Application for Certification Vol. 1
Cultural Resources
29 page(s)
13 Stanton Energy Reliability Center, LLC
214206-1410/26/2016 5.4 Geological Hazards and Resources
Application for Certification Vol. 1
12 page(s)
14 Stanton Energy Reliability Center, LLC
214206-1510/26/2016 5.5 Hazardous Materials Handling
Application for Certification Vol. 1
Hazardous Materials
24 page(s)
15 Stanton Energy Reliability Center, LLC
214206-1610/26/2016 5.6 Land Use
Application for Certification Vol. 1
Land Use
40 page(s)
16 Stanton Energy Reliability Center, LLC
214206-1710/26/2016 5.7 Noise
Application for Certification Vol. 1
Noise and Vibration
19 page(s)
17 Stanton Energy Reliability Center, LLC
214206-1810/26/2016 5.8 Paleontological Resources
Application for Certification Vol. 1
10 page(s)
18 Stanton Energy Reliability Center, LLC
214206-1910/26/2016 5.9 Public Health
Application for Certification Vol. 1
Public Health
16 page(s)
19 Stanton Energy Reliability Center, LLC
214206-2010/26/2016 5.10 Socioeconomics
Application for Certification Vol. 1
Socioeconomics
22 page(s)
20 Stanton Energy Reliability Center, LLC
214206-2110/26/2016 5.11 Soils
Application for Certification Vol. 1
18 page(s)
21 Stanton Energy Reliability Center, LLC
214206-2210/26/2016 5.12 Traffic and Transportation

25 page(s)
22 Stanton Energy Reliability Center, LLC
214206-2310/26/2016 5.13 Visual Resources
Application for Certification Vol. 1
54 page(s)
23 Stanton Energy Reliability Center, LLC
214206-2410/26/2016 5.14 Waste Management
Application for Certification Vol. 1
Waste Management
15 page(s)
24 Stanton Energy Reliability Center, LLC
214206-2510/26/2016 5.15 Water Resources
Application for Certification Vol. 1
17 page(s)
25 Stanton Energy Reliability Center, LLC
214206-2610/26/2016 5.16 Worker Health and Safety
Application for Certification Vol. 1
Worker Safety and Fire Protection
21 page(s)
26 Stanton Energy Reliability Center, LLC
214206-2710/26/2016 6.0 Alternatives
Application for Certification Vol. 1
Alternatives
11 page(s)
27 Stanton Energy Reliability Center, LLC