251224 | 7/27/2023 |
Order Increasing the Annual Operating Hours of the Two Combined-Cycle Gas Turbins and Corresponding Emissions Order No.: 23-0726-04 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
250998 | 7/10/2023 |
Huntington Beach Energy Project - Errata to Staff Analysis Huntington Beach Energy Project - Errata to Staff Analysis (TN 250605) 2 page(s)
| | CEC/Joseph Douglas | California Energy Commission |
250605 | 6/12/2023 |
CEC Staff Analysis of Petition to Amend the Final Commission Decision ***This document supersedes document Transaction Number 250342 *** Alternatives 55 page(s)
| | CEC/Docket Unit | California Energy Commission |
250342 | 5/25/2023 |
Huntington Beach Energy Project ***THIS DOCUMENT IS REPLACED BY TN 250605***
CEC Staff Analysis of Petition to Amend the Final Commission Decision Compliance 55 page(s)
| | CEC/Docket Unit | California Energy Commission |
249545 | 4/5/2023 |
Draft Permit to Operate (PTO) - AES Huntington Beach Energy, LLC Proposed Significant Permit Revision Draft Permit to Operate (PTO) for HBEP's proposed operational hours changes. 59 page(s)
| | CEC/Docket Unit | California Energy Commission |
249543 | 4/4/2023 |
Preliminary Statement of Basis - AES Huntington Beach Energy, LLC Proposed Significant Permit Revision South Coast AQMD's air quality compliance analysis of the HBEP's proposed operational hours changes. Air Quality 125 page(s)
| | CEC/Docket Unit | California Energy Commission |
247079 | 10/28/2022 |
STATEMENT OF STAFF APPROVAL OF POST CERTIFICATION CHANGE Huntington Beach Energy Project-Front Entrance 12-AFC-02C Compliance 15 page(s)
| | CEC/Docket Office | California Energy Commission |
245671 | 8/24/2022 |
Notice of Receipt for Post Certification Change Huntington Beach Energy Project- NOR for Post Certification Change Compliance 3 page(s)
| | CEC/Docket Office | California Energy Commission |
244295-1 | 8/2/2022 |
PTA for Entrance Remodel
146 page(s)
| | CEC/Joseph Douglas | AES |
244295-2 | 8/2/2022 |
Cover Letter - Petition to Amend for Entrance Remodel
1 page(s)
| | CEC/Joseph Douglas | AES |
243484 | 6/8/2022 |
Notice of Receipt - Petition for Post Certification Change Notice of Receipt-Petition for Post Certification Change-Huntington Beach Energy Project Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
243008 | 5/11/2022 |
Petition to Amend for Increase to CCGT Operating Hours
172 page(s)
| | CEC/Joseph Douglas | AES |
243007 | 5/11/2022 |
Cover Letter - PTA for Increase to CCGT Operating Hours
1 page(s)
| | CEC/Joseph Douglas | AES |
239354 | 8/18/2021 |
Order Approving a Petition to Amend Air Quality Conditions Order No: 21-0811-1b 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
238710 | 7/7/2021 |
Staff Analysis of Amendment Proposal to Modify Air Quality Conditions
15 page(s)
| | CEC/Docket Unit | California Energy Commission |
237482 | 4/16/2021 |
Item 4_Order Approving a Petition to Modify Visual Screening System ORDER NO: 21-0414-04 7 page(s)
| | CEC/Docket Unit | California Energy Commission |
237379 | 4/5/2021 |
Huntington Beach Energy Project Comments on Staff Analysis for Amendment Proposal to Modify Visual Screening
2 page(s)
| | CEC/Joseph Douglas | Ellison Schneider Harris & Donlan LLP |
237249 | 3/22/2021 |
Greg Gardiner Comments - Letter of Support for Kim West Mural Architectural Treatment
Visual Resources 2 page(s)
| | CEC/Docket Office | Greg Gardiner |
237197 | 3/17/2021 |
Visit Huntington Beach Comments - Letter of Support for the Petition to Approve the Kim West Mural Architectural Treatment
Compliance 1 page(s)
| | CEC/Joseph Douglas | Visit Huntington Beach |
237026 | 3/8/2021 |
Staff Analysis of Amendment Proposal to Modify Visual Screening
19 page(s)
| | CEC/Dockets | California Energy Commission |
236482 | 9/23/2019 |
HBEP Confidential Large Generator Intercnnection Agreement LGIA Agreement 96 page(s)
| | CEC/Joseph Douglas | AES |
236403 | 1/22/2021 |
Notice of Receipt - Petition for Post Certification Project Change
2 page(s)
| | CEC/Dockets | California Energy Commission |
236374 | 1/20/2021 |
Response letter to Application for Confidential Designation for Large Generator Interconnection Agreement
3 page(s)
| | AES Hungtington Beach Energy/Jeff Miller | California Energy Commission |
235533 | 11/6/2020 |
Applicant Petition For Modification of VIS-1 and Approval of a Mural-Based Architectural Treatment Huntington Beach Energy Project (12-AFC-02C) Petition for Modification of VIS-1 and Approval of a Mural-Based Architectural Treatment Visual Resources 41 page(s)
| | CEC/Joseph Douglas | Ellison Schneider Harris & Donlan LLP |
233824 | 7/9/2020 |
NOTICE OF RECEIPT PETITION FOR POST CERTIFICATION PROJECT CHANGE
2 page(s)
| | CEC/Dockets | CEC |
233519 | 6/17/2020 |
Petition to Amend - TV Permit Revisions
Air Quality 73 page(s)
| | CEC/Joseph Douglas | AES |
232896 | 5/1/2020 |
Response Letter for Confidential Designation re Cultual Resources Data
2 page(s)
| | Jeff Miller, AES | California Energy Commission |
232862 | 3/26/2020 |
HBEP Cultural Resources Report
64 page(s)
| | Joseph Douglas | AES |
232559 | 3/26/2020 |
Application for Confidential Designation CRR
3 page(s)
| | Joseph Douglas | AES |
231305 | 12/23/2019 |
alan cohen Comments - project questions AES Huntington Beach
Noise and Vibration, Public Health 1 page(s)
| | CEC/Dockets | alan cohen |
229932 | 5/24/2019 |
Operation Security Plan HAZ8
18 page(s)
| | Joseph Douglas | AES |
229818 | 9/23/2019 |
TSE-3 LGIA Cover Letter and Application for Confidential Designation Cover Letter and Application for Confidential Designation 4 page(s)
| | Joseph Douglas | AES |
229082 | 7/25/2019 |
Staff Approval of Proposed Change
12 page(s)
| | CEC/Docket Unit | California Energy Commission |
228922 | 7/9/2019 |
Notice of Receipt - Post Certification Project Change - Huntington Beach Energy Project *** THIS DOCUMENT SUPERSEDES TN# 228920 *** 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
228920 | 7/9/2019 |
Notice of Receipt - Post Certification Project Change - Huntington Beach Energy Project *** THIS DOCUMENT IS REPLACED BY TN# 228922 *** 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
228888 | 7/2/2019 |
HBEP Petition to Amend Auxiliary Boiler Commissioning Conditions Auxiliary Boiler Commissioning Changes - Petition for Post-Certification Amendment Air Quality 16 page(s)
| | CEC/Docket Unit | Jacobs |
228381 | 5/24/2019 |
HAZ8 Operation Security Plan Submittal Cover Letter and Confidential Application Form
2 page(s)
| | Joseph Douglas | AES |
225591 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
220951 | 8/30/2017 |
Ella Moline Comments Noise from AES PLANT in Huntington Beach
Noise and Vibration 1 page(s)
| | CEC/Docket Unit | Ella Moline |
219937 | 6/27/2017 |
COM-6, Huntington Beach Energy Project Final LNTP MCR, May 2017 Final Monthly Compliance Report (MCR) for HBEP LNTP Demolition activities, May 2017 Compliance 287 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
219935 | 6/27/2017 |
COM-6, Huntington Beach Energy Project Final LNTP MCR, May 2017 Final Monthly Compliance Report (MCR) for HBEP LNTP Demolition activities, May 2017 Compliance 287 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
219910 | 6/26/2017 |
Compliance Advice Letter for Biological Resources Monitoring
4 page(s)
| | CEC/Dockets | California Energy Commission |
218009 | 6/9/2017 |
COM-6, HBEP Monthly Compliance Report (MCR) for April, 2017 COM-6, Monthly Compliance Report (MCR) for the Huntington Beach Energy Project LNTP for Demolition Compliance 270 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
217788 | 5/31/2017 |
Revised Final Decision SUPERSEDES TN 217462
This Revised Final Decision has been prepared to correct certain errors in the previous compilation of the Final Decision and supersedes that document. 415 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
217543 | 5/11/2017 |
Project Owner's Request to Correct Errors in the May 5, 2017 Final Decision
23 page(s)
| | Hearing Adviser Susan Cochran | Stoel Rives LLP |
217462 | 5/5/2017 |
Huntington Beach Energy Project Amendment Commission Decision Energy Commission Final Decision 414 page(s)
| | All Parties | Energy Commission Hearing Office |
217319 | 4/27/2017 |
Transcript of 04/06/2017 Committee Conference
8 page(s)
| | CEC/Dockets | California Energy Commission |
217289 | 4/25/2017 |
COM-6, HBEP Monthly Compliance Report (MCR) for March 2017 Huntington Beach Energy Project Monthly Compliance Report, dated April 14, 2017 (for March 2017) Compliance 320 page(s)
| | | California Energy Commission |
217030 | 4/14/2017 |
Notice of Decision in compliance with Public Resources Code Section 21080.5 Notice of Decision 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
216990 | 4/12/2017 |
Commission Adoption Order Order No. 17-0412-2 4 page(s)
| | Parties | California Energy Commission |
216968 | 4/11/2017 |
Letter from AES Re Proposed Orders Effective Dates
2 page(s)
| | CEC/Commissioners | Stoel Rives LLP |
216947 | 4/11/2017 |
Project Owner's Comments on Proposed Com. Adoption Order Project Owner's Comments on Proposed Commission Adoption Order and Errata 5 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
216932 | 4/11/2017 |
Proposed Commission Adoption Order For consideration at the April 12, 2017, Business Meeting 4 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
216931 | 4/11/2017 |
Errata to the Presiding Member's Proposed Decision Includes responses to comments received on the Presiding Member's Proposed Decision during the public comment period 14 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
216836 | 4/6/2017 |
COM-6, Monthly Compliance Report (MCR) for February, 2017 Huntington Beach Energy Project Monthly Compliance Report (MCR), dated March 14, 2017 (for February 2017). Compliance 225 page(s)
| | CEC/Dockets | California Energy Commission |
216835 | 4/6/2017 |
COM-6, Monthly Compliance Report (MCR) for February, 2017 Huntington Beach Energy Project Monthly Compliance Report (MCR), dated March 14, 2017 (for February 2017). Compliance 225 page(s)
| | | California Energy Commission |
216818 | 4/6/2017 |
Staff Response to Owner's Request for Necessary Revision to Condition of Certification SOIL&WATER-4 (TN: 216802) 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
216802 | 4/5/2017 |
Project Owner's Request for Necessary Revision to Condition of Certification Soil&Water 4
Soil and Water 2 page(s)
| | The Honorable Andrew McAllister; The Honorable Karen Douglas; and Hearing Officer Cochran | Stoel Rives LLP |
216728 | 3/28/2017 |
Transcript of 08/19/2016 Status Conference
54 page(s)
| | Parties | California Energy Commission |
216722 | 3/28/2017 |
Transcript of 01/25/2017 Continued Committee Closed Session
10 page(s)
| | Parties | California Energy Commission |
216721 | 3/28/2017 |
Transcript of 01/09/2017 Continuance of December 21, 2016 Committee Closed Session Following Evidentiary Hearing
10 page(s)
| | Parties | California Energy Commission |
216685 | 3/23/2017 |
Notice of Committee Conference (Closed Session) Notice 5 page(s)
| | All Parties | Energy Commission Hearing Office |
216661 | 3/22/2017 |
Cabrillo Wetlands Conservancy Comments Habitat Mitigation and monitoring Plan Request for use of Temporary Parking Lot
| | | Cabrillo Wetlands Conservancy |
216614 | 3/20/2017 |
Project Owner's Additional Comments on the Presiding Member's Proposed Decision Project Owner's Additional Comments on the Presiding Member's Proposed Decision 5 page(s)
| | CEC/Docket Unit | Stoel Rives LLP |
216560 | 3/15/2017 |
John Comments: John_QUESTIONS REGARDING THE PROPOSED AES POWER PLANT IN HUNTINGTON BEACH
2 page(s)
| | CEC/Docket Unit | John |
216544 | 3/14/2017 |
Joint Comments: HBEC Oppose Comment Letter
8 page(s)
| | | Sierra Club/ L.A. Waterkeeper/ CERF/ Ca. Coastal Protection Network/ Earth Law Center/ 350.Org/ Surfrider Foundation |
216462 | 3/9/2017 |
robert james simpson Comments: Inititial comments on PMPD
Air Quality 245 page(s)
| | CEC/Docket Unit | robert james simpson |
216400 | 3/6/2017 |
Staff Comments on the Huntington Beach Energy Project Petition to Amend Presiding Member's Proposed Decision
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
216394 | 3/6/2017 |
Project Owner's Initial Comments on the Presiding Member's Proposed Decision
8 page(s)
| | Honorable Andrew McAllister; Honorable Karen Douglas; Hearing Adviser Susan Cochran | Stoel Rives LLP |
216313 | 3/1/2017 |
Notice of Availability of the Presiding Member's Proposed Decision, etc. *** THIS DOCUUMENT SUPERSEDES TN 216270 *** - Corrected notice as to the first link only 7 page(s)
| | All Parties | Energy Commission Hearing Office |
216282 | 2/28/2017 |
Status Report for February 2017 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
216274 | 2/28/2017 |
Warren Finley Comments: Loss of energy contained in the Brine of a Desalinatioon Plant
Efficiency, Project Description, Socioeconomics, Soil and Water, Greenhouse Gases 1 page(s)
| | CEC/Docket Unit | Warren Finley |
216270 | 2/27/2017 |
Notice of Availability of the Presiding Member's Proposed Decision, etc. This document supersedes TN 216260. Notice of PMPD filing and March 9th and April 12th Hearings regarding same 7 page(s)
| | All Parties | Energy Commission Hearing Office |
216260 | 2/27/2017 |
Notice of Availability of the Presiding Member's Proposed Decision, etc. This document is superseded by TN 216270. Notice of PMPD filing and March 9th and April 12th Hearings re same 7 page(s)
| | All Parties | Energy Commission Hearing Office |
216255 | 2/27/2017 |
PMPD Signature Page Signature page to be attached to PMPD filed on 2-24-17 1 page(s)
| | All Parties | Energy Commission Hearing Office |
216248 | 2/24/2017 |
Redlined Conditions of Certification for the Presiding Member's Proposed Decision PMPD filed February 24, 2017 197 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
216247 | 2/24/2017 |
Presiding Member's Proposed Decision
410 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
215793 | 2/7/2017 |
robert james simpson Comments: Objection to Applicant motion (framed as a letter) Sur reply to Staff and applicant reply briefs. Public comments and or letter to Commission
22 page(s)
| | CEC/Docket Unit | robert james simpson |
215783 | 2/6/2017 |
Letter to Siting Committee and Hearing Officer re PMPD Schedule
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
215681 | 1/31/2017 |
Status Report for January 2017 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
215663 | 1/30/2017 |
COM-6, HBEP Monthly Compliance Report (MCR) for December 2016 Monthly Compliance Report (MCR) for Huntington Beach (HBEP) Demolition for December 2016 Compliance 197 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
215518 | 1/23/2017 |
Letter to Siting Committee and Hearing Officer re Revisions to the December 21, 2016 Evidentiary Hearing Transcript Letter to Siting Committee and Hearing Officer re Revisions to the December 21, 2016 Evidentiary Hearing Transcript 2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
215430 | 1/18/2017 |
Memorandum of Agreement Between California Energy Commission and California Coastal Commission For the convenience of the Committee and the parties, Staff is docketing the 2005 Memorandum of Agreement referenced in the Opening Brief by Helping Hands/Robert Simpsons and Staff’s Reply Brief 7 page(s)
| | | California Energy Commission |
215429 | 1/18/2017 |
Staff’s Reply Brief
9 page(s)
| | | California Energy Commission |
215425 | 1/18/2017 |
Robert James Simpson and Helping Hand Tools Reply Brief
5 page(s)
| | CEC/Docket Unit | Robert James Simpson |
215424 | 1/18/2017 |
Project Owner's Reply to Opening Brief of Helping Hand Tools and Robert Simpson
11 page(s)
| | CEC/Docket Unit | Stoel Rives LLP |
215408 | 1/17/2017 |
SCAQMD Response Comments for Huntington Beach Energy Project Response to Comments -HBEP Air Quality 6 page(s)
| | Public Solar Power Coalition/Harvey Eder | South Coast Air Quality Management District |
215259 | 1/11/2017 |
Opening Brief by Helping Hand tools and Robert Simpson
244 page(s)
| | | Helping Hand Tools/ Robert Simpson |
215249 | 1/11/2017 |
Project Owner's Post Evidentiary Hearing Opening Brief
14 page(s)
| | CEC/Docket Unit | Stoel Rives LLP |
215233 | 1/11/2017 |
Staff's Opening Brief
5 page(s)
| | | California Energy Commission |
215211 | 1/10/2017 |
Notice of Continuance of January 9, 2017 Committee Closed Session Following Evidentiary Hearing Notice of Committee Closed Session continued to January 25, 2017 at 3:00 p.m. in the 2nd Floor Fishbowl Conference Room 5 page(s)
| | All Parties | Energy Commission Hearing Office |
215187 | 1/6/2017 |
Status Report for December 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
215180 | 1/6/2017 |
Huntington Beach Energy Project Monthly Compliance Report, November, 2016 Huntington Beach (HBEP) COM-6 Monthly Compliance Report (MCR) for November, 2016 Compliance 189 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
215168 | 1/5/2017 |
Committee Order re Briefing Schedule Order 4 page(s)
| | All Parties | Energy Commission Hearing Office |
215154 | 1/4/2017 |
Transcript of 12/21/16 Prehearing Conference and Evidentiary Hearing
140 page(s)
| | CEC/Docket Unit | California Energy Commission |
215086 | 12/21/2016 |
Notice of Continuance of December 21, 2016 Committee Closed Session, etc. Notice 4 page(s)
| | All Parties | Energy Commission Hearing Office |
214972 | 12/21/2016 |
Michael E Boyd Comments: PETITION TO CONDUCT ANY HEARINGS IN THE AFFECTED COMMUNITY
Air Quality, Alternatives, Efficiency, Hazardous Materials, Public Health, Socioeconomics, Worker Safety and Fire Protection, Greenhouse Gases 1 page(s)
| | CEC/Docket Unit | Michael E Boyd |
214965 | 12/21/2016 |
Ed Murphy Comments: Need for Local Hearings
1 page(s)
| 7001 | CEC/Docket Unit | Ed Murphy |
214964 | 12/21/2016 |
robert james simpson Comments: PETITION TO CONDUCT POWER PLANT HEARINGS IN HUNTINGTON BEACH 2
9 page(s)
| 7002 | CEC/Docket Unit | robert james simpson |
214963 | 12/21/2016 |
robert james simpson Comments: PETITION TO CONDUCT POWER PLANT HEARINGS IN HUNTINGTON BEACH
5 page(s)
| 7003 | CEC/Docket Unit | robert james simpson |
214950 | 12/20/2016 |
Committee Order Granting Petition to Intervene Order granting Robert Simpson/Helping Hand Tools Petition to Intervene 3 page(s)
| 5063 | All Parties | Energy Commission Hearing Office |
214929 | 12/19/2016 |
Memo from Hearing Officer re: Potential Revised Agenda for December 21, 2016, Prehearing Conference Memorandum and Potential Revised Agenda for December 21, 2016, Prehearing Conference and Evidentiary Hearing 3 page(s)
| 5057 | All Parties | Energy Commission Hearing Office |
214928 | 12/19/2016 |
Staff Opposition To Petition To Intervene Filed By Rob Simpson
Compliance 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
214887 | 12/19/2016 |
Project Owner's Opposition to Simpson's and Helping Hand Tools' Motion to Continue Hearing Dates and Motion for Change of Venue
8 page(s)
| 5123 | CEC/Docket Unit | Stoel Rives LLP |
214881 | 12/19/2016 |
Project Owner's Opposition to Robert Simpson and Helping Hand Tools' Petition to Intervene
8 page(s)
| 5122 | CEC/Docket Unit | Stoel Rives LLP |
214880 | 12/19/2016 |
Diane Nygaard Comments: Petition to Conduct Hearings in the Affected City
1 page(s)
| | CEC/Docket Unit | Diane Nygaard |
214878 | 12/19/2016 |
Dale Stocking Comments: PETITION TO CONDUCT ANY HEARINGS IN THE AFFECTED COMMUNITY
1 page(s)
| | CEC/Docket Unit | Dale Stocking |
214876 | 12/17/2016 |
Colby Allerton Comments: PETITION TO CONDUCT ANY HEARINGS IN THE AFFECTED COMMUNITY (Huntington Beach Energy Project (HBEP))
Alternatives 6 page(s)
| | CEC/Commissioners | Colby Allerton |
214875 | 12/19/2016 |
June Brashares Comments: PETITION TO CONDUCT ANY HEARINGS IN THE AFFECTED COMMUNITY
Air Quality, Alternatives, Biological Resources, Public Health, Greenhouse Gases 1 page(s)
| | CEC/Docket Unit | June Brashares |
214871 | 12/16/2016 |
Rick Comments: Public Hearing in the Affected community
1 page(s)
| | CEC/Docket Unit | Rick |
214870 | 12/16/2016 |
Motion to Continue Hearing Dates and Change of Venue by Robert Simpson
5 page(s)
| | CEC/Docket Unit | Robert James Simpson |
214869 | 12/16/2016 |
Helping Hand Tools and Robert Simpson's Pre-hearing Conference Statement
9 page(s)
| | CEC/Docket Unit | Robert James Simpson |
214868 | 12/16/2016 |
Petition to Intervene by Helping Hand Tools and Robert Simpson
4 page(s)
| | CEC/Docket Unit | Robert James Simpson |
214867 | 12/16/2016 |
Edward Mainland Comments: Hold Gas Plant Hearings in Affected Community
1 page(s)
| | CEC/Docket Unit | Edward Mainland |
214866 | 12/16/2016 |
Energy Commission Staff's Pre-Hearing Conference Statement
Compliance 10 page(s)
| | CEC/Docket Unit | California Energy Commission |
214839 | 12/16/2016 |
Project Owner's Comprehensive Prehearing Conference Statement, Exhibit List and Prehearing Brief
56 page(s)
| 5121 | CEC/Docket Unit | Stoel Rives LLP |
214836 | 12/16/2016 |
Additional Final Determination of Compliance Comments
Air Quality 1 page(s)
| 5120 | | CH2M HILL |
214829 | 12/15/2016 |
Memo from Hearing Officer re: Witness Availability for December 21, 2016, Evidentiary Hearing Witness(es) needed to discuss issues regarding construction of intersection improvements and parking lot/laydown yard on Plains All American tank farm 1 page(s)
| | All Parties and Persons Interested | Energy Commission Hearing Office |
214796 | 12/14/2016 |
Project Owner's Rebuttal Testimony (Part 2) Project Owner's Rebuttal Testimony (Part 2) 7 page(s)
| 5119 | | Stoel Rives LLP |
214790 | 12/14/2016 |
December 14, 2016 Declaration of Stephen O'Kane December 14, 2016 Declaration of Stephen O'Kane 1 page(s)
| 5118 | CEC/Docket Unit | Stoel Rives LLP |
214789 | 12/14/2016 |
December 14, 2016 Declaration of Jerry Salamy
1 page(s)
| 5116 | CEC/Docket Unit | Stoel Rives LLP |
214788 | 12/14/2016 |
Supplemental Declaration of Mark Bastasch
Noise and Vibration 1 page(s)
| 5117 | CEC/Docket Unit | Stoel Rives LLP |
214756 | 12/12/2016 |
Project Owner's Opening Testimony (Part 2) Comments on the Final Staff Assessment Part 2, and Revised Preliminary Exhibit List 30 page(s)
| 5113 | CEC/Docket Unit | Stoel Rives LLP |
214744 | 12/12/2016 |
Request for Public Access to the FSA Part 2 for the Proposed HBEP Petition to Amend Library Notice 1 page(s)
| | | California Energy Commission |
214743 | 12/12/2016 |
Supplemental Declaration of Stephen O'Kane
2 page(s)
| 5111 | CEC/Docket Unit | Stoel Rives LLP |
214742 | 12/12/2016 |
Supplemental Declaration of Jerry Salamy
2 page(s)
| 5110 | CEC/Docket Unit | Stoel Rives LLP |
214741 | 12/12/2016 |
Declaration of Elyse Engel Declaration of Elyse Engel Air Quality, Public Health 8 page(s)
| 5112 | | Stoel Rives LLP |
214737 | 12/9/2016 |
Notice of Availability for the Final Staff Assessment, Part 2, Petition to Amend, to Agencies Agency Notice 3 page(s)
| | Agency Distribution List | California Energy Commission |
214736 | 12/9/2016 |
Notice of Availability for the Final Staff Assessment, Part 2, Petition to Amend, to Members of the Public Public Notice 3 page(s)
| | Members of the Public | California Energy Commission |
214732 | 12/9/2016 |
Final Staff Assessment, Part 2 and Supplemental Testimony In Response to Questions for the Petition to Amend the Huntington Beach Energy Project Decision Air Quality, Executive Summary, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Traffic and Transportation, Visual Resources, Worker Safety and Fire Protection, Soil and Water 301 page(s)
| 6003 | CEC/Docket Unit | California Energy Commission |
214709 | 12/8/2016 |
AES's Comments on SCAQMD's Final Determination of Compliance
| 5108 | | CH2M |
214701 | 12/7/2016 |
Notice of Prehearing Conference and Evidentiary Hearing, etc. Notice and Further Orders 8 page(s)
| | All Parties | Energy Commission Hearing Office |
214660 | 12/7/2016 |
COM-6, HBEP Monthly Compliance Report for October 2016 COM-6 Monthly Compliance Report (MCR) for October 2016, Huntington Beach Energy Project (Demolition) Compliance 186 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
214627 | 12/2/2016 |
Order Shortening Time; Order Granting Motion to Advance Date for Evidentiary Hearing, etc. Orders regarding advancing date for Evidentiary Hearing; Scheduling Order 5 page(s)
| | All Parties | Energy Commission Hearing Office |
214625 | 12/2/2016 |
HBEP COM-6, Monthly Compliance Report (MCR) for September 2016 Monthly Compliance Report for the Huntington Beach Energy Project (HBEP) for September, 2016 201 page(s)
| | CEC/Eric Veerkamp | AES Huntington Beach Energy, LLC |
214618 | 12/2/2016 |
City of Huntington Beach Comments Regarding Final Staff Assessment Part 1
6 page(s)
| | CEC/John Heiser | City of Huntington Beach |
214615 | 12/1/2016 |
Petition to Amend, Status Report #10
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
214614 | 12/1/2016 |
Energy Commission Staff's Concurrence Regarding Schedule
Compliance 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214604 | 12/1/2016 |
Project Owner's Motion to Advance the Evidentiary Hearing Project Owner's Motion to Advance Schedule 4 page(s)
| 5107 | CEC/Docket Unit | Stoel Rives LLP |
214601 | 12/1/2016 |
Transcript of 11/14/16 Prehearing Conference
53 page(s)
| | CEC/Docket Unit | California Energy Commission |
214595 | 11/30/2016 |
Status Report for November 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
214581 | 11/30/2016 |
Notice of Cancellation of November 30, 2016, Evidentiary Hearing, and Orders after Prehearing Conference
6 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
214577 | 11/29/2016 |
HBGS Units 3 and 4 Demolition Schedule
Air Quality 1 page(s)
| 5106 | Wenjun Ojan | CH2M HILL |
214565 | 11/23/2016 |
Scheduling Concern
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214555 | 11/23/2016 |
Project Owner's Revised Proposed Schedule, dated November 23, 2016 Project Owner's Revised Proposed Schedule, dated November 23, 2016 5 page(s)
| 5105 | | Stoel Rives LLP |
214552 | 11/22/2016 |
Energy Commission Staff's Comment Regarding Schedule
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214550 | 11/22/2016 |
Project Owner's Proposed Schedule for the Remainder of the PTA Proceeding Project Owner's Proposed Schedule for the Remainder of the PTA Proceeding 4 page(s)
| 5104 | | Stoel Rives LLP |
214549 | 11/22/2016 |
Hearing Officer Memo re: Cancellation of November 30, 2016, Evidentiary Hearing
1 page(s)
| | Parties and Interested Persons | Energy Commission Hearing Office |
214533 | 11/18/2016 |
Huntington Beach Energy Project (HBEP) Final Determination of Compliance (FDOC) Package HBEP - Final Determination of Compliance (FDOC) Package Air Quality 286 page(s)
| 6002 | John Heiser and Matthew Layton | South Coast Air Quality Management District |
214532 | 11/18/2016 |
Huntington Beach Energy Project (HBEP) Draft Facility Permit for Final Determination of Compliance (FDOC) Package HBEP - Draft Facility Permit for FDOC Air Quality 60 page(s)
| 5102 | John Heiser and Matthew Layton | South Coast Air Quality Management District |
214520 | 11/18/2016 |
AES HBEP Re-Issued PDOC Public Notice Distribution Verification
28 page(s)
| 5115 | South Coast Air Quality Management District/Chris Perri | CH2M |
214464 | 11/10/2016 |
Huntington Beach Energy Project - Re-notice of Public Notice of Intent to Issue Permits HBEP-Re-noticing of SCAQMD PDOC Public Notice Air Quality 5 page(s)
| 5101 | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
214455 | 11/10/2016 |
Project Owner's Motion to Submit Supplemental Testimony and Supplemental Testimony of Stephen O'Kane
6 page(s)
| | CEC/Docket Unit | Stoel Rives LLP |
214452 | 11/10/2016 |
Energy Commission Staff’s Pre-hearing Conference Statement (Revised) *** This document supersedes TN 214451 *** 12 page(s)
| | CEC/Dockets Unit | California Energy Commission |
214451 | 11/9/2016 |
Energy Commission Staff's Pre-hearing Conference Statement *** This document is replaced by TN 214452 ***
11 page(s)
| | CEC/Docket Unit | California Energy Commission |
214446 | 11/9/2016 |
Project Owner's Prehearing Conference Statement and Exhibit List
28 page(s)
| | CEC/Docket Unit | Stoel Rives LLP |
214374 | 11/4/2016 |
Determination of Compliance Revisions Proposed revisions based on voluntary reduction of CO emission rate for combined-cycle gas turbines 10 page(s)
| 5109 | South Coast Air Quality Management District/Chris Perri | CH2M |
214361 | 11/3/2016 |
Project Owner's Rebuttal Testimony and Revised Preliminary Exhibit List Project Owner's Rebuttal Testimony and Revised Preliminary Exhibit List 10 page(s)
| 5056 | | Stoel Rives LLP |
214358 | 11/3/2016 |
Energy Commission Staff's Rebuttal Testimony
Compliance 12 page(s)
| 6001 | CEC/Docket Unit | California Energy Commission |
214256 | 10/28/2016 |
Status Report for October 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
214211 | 10/27/2016 |
Project Owner's Opening Testimony Project Owner's Opening Testimony, Preliminary Identification of Issues, and Witness and Exhibit Lists, and Comments on the Final Staff Assessment Part 1 50 page(s)
| 5055 | CEC/Docket Unit | Stoel Rives LLP |
214210 | 10/27/2016 |
Declaration of Lisa Valdez in Support of Project Owner's Opening Testimony This document supersedes TN 214179. 5 page(s)
| 5044 | | Stoel Rives LLP |
214194 | 10/26/2016 |
Declaration of Seth Richardson
1 page(s)
| 5054 | CEC/Docket Unit | Stoel Rives LLP |
214193 | 10/26/2016 |
Declaration of Stephen O'Kane
7 page(s)
| 5053 | CEC/Docket Unit | Stoel Rives LLP |
214192 | 10/26/2016 |
Declaration of Jerry Salamy
Alternatives, Facility Design, Hazardous Materials, Land Use, Project Description, Worker Safety and Fire Protection, Waste Management 5 page(s)
| 5052 | CEC/Docket Unit | Stoel Rives LLP |
214187 | 10/26/2016 |
Declaration of Robert Sims in Support of Project Owner's Opening Testimony Declaration of Robert Sims in Support of Project Owner's Opening Testimony (Transmission System
Engineering, Transmission Line Safety & Nuisance) Transmission Line Safety and Nuisance, Transmission System Engineering 3 page(s)
| 5051 | | Stoel Rives LLP |
214186 | 10/26/2016 |
Declaration of Thomas Priestley in Support of Project Owner's Opening Testimony Declaration of Thomas Priestley in Support of Project Owner's Opening Testimony (Visual Resources) Visual Resources 5 page(s)
| 5043 | | Stoel Rives LLP |
214185 | 10/26/2016 |
Declaration of Thomas Lae in Support of Project Owner's Opening Testimony Declaration of Thomas Lae in Support of Project Owner's Opening Testimony (Geology) Geology/Paleontology 4 page(s)
| 5045 | | Stoel Rives LLP |
214184 | 10/26/2016 |
Declaration of Natalie Lawson in Support of Project Owner's Opening Testimony Declaration of Natalie Lawson in Support of Project Owner's Opening Testimony (Cultural Resources) Cultural Resources 13 page(s)
| 5049 | | Stoel Rives LLP |
214183 | 10/26/2016 |
Declaration of Melissa Fowler in Support of Project Owner's Opening Testimony Declaration of Melissa Fowler in Support of Project Owner's Opening Testimony (Biological Resources) Biological Resources 5 page(s)
| 5042 | CEC/Docket Unit | Stoel Rives LLP |
214182 | 10/26/2016 |
Declaration of Matt Franck in Support of Project Owner's Opening Testimony Declaration of Matt Franck in Support of Project Owner's Opening Testimony (Water Resources) Soil and Water 4 page(s)
| 5046 | CEC/Docket Unit | Stoel Rives LLP |
214181 | 10/26/2016 |
Declaration of Mark Bastasch in Support of Project Owner's Opening Testimony Declaration of Mark Bastasch in Support of Project Owner's Opening Testimony (Noise and Vibration) Noise and Vibration 4 page(s)
| 5041 | CEC/Docket Unit | Stoel Rives LLP |
214180 | 10/26/2016 |
Declaration of Jennifer Krenz-Ruark in Support of Project Owner's Testimony Declaration of Jennifer Krenz-Ruark in Support of Project Owner's Testimony (Soils) Soil and Water 4 page(s)
| 5047 | | Stoel Rives LLP |
214179 | 10/26/2016 |
Declaration of Lisa Valdez in Support of Project Owner's Opening Testimony This document is superseded by TN 214210. Traffic and Transportation 5 page(s)
| | | Stoel Rives LLP |
214178 | 10/26/2016 |
Declaration of James Verhoff in Support of Project Owner's Opening Testimony Declaration of James Verhoff in Support of Project Owner's Opening Testimony (Paleontological Resources) Geology/Paleontology 5 page(s)
| 5050 | | Stoel Rives LLP |
214177 | 10/26/2016 |
Declaration of Fatuma Yusuf Ph.D. in Support of Project Owner's Opening Testimony Declaration of Fatuma Yusuf Ph.D. in Support of Project Owner's Opening Testimony (Socioeconomics) Socioeconomics 4 page(s)
| 5048 | | Stoel Rives LLP |
214127 | 10/21/2016 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders Prehearing Conference, November 14, 2016 - Evidentiary Hearing, November 30, 2016 11 page(s)
| | All Parties | Energy Commission Hearing Office |
214116 | 10/20/2016 |
Final Decision in Original Proceeding
652 page(s)
| 5114 | | Energy Commission Hearing Office |
214075 | 10/17/2016 |
Notice of Availability for the FSA, Part 1, Petition to Amend, to Agencies Agency Notice Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 3 page(s)
| | Agency Distribution List | California Energy Commission |
214074 | 10/17/2016 |
Notice of Availability for the FSA, Part 1, Petition to Amend, to Members of the Public. Public Notice Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 3 page(s)
| | Members of the Public | California Energy Commission |
214073 | 10/17/2016 |
Request for Public Access to the Enclosed FSA Part 1 for the Proposed HBEP Petition to Amend Library Notice Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 1 page(s)
| | Librarian | California Energy Commission |
214025 | 10/17/2016 |
Final Staff Assessment - Part 1 Petition to Amend Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 519 page(s)
| 6000 | | California Energy Commission |
213999 | 10/13/2016 |
Project Owner's Request for Evidentiary Hearing Date and Related Deadlines Project Owner's Request for Evidentiary Hearing Date and Related Deadlines 2 page(s)
| 5040 | Andrew McAllister, Karen Douglas, John Heiser and Susan Cochran | Stoel Rives LLP |
213967 | 10/11/2016 |
Committee Order Directing Staff to Publish Portions of the Final Staff Assessment by October 17, 2016 Order 4 page(s)
| | All Parties | Energy Commission Hearing Office |
213872 | 9/30/2016 |
Revised-Status Report for September 2016 Revised Minor Correction of Status Report for September 2016 Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
213869 | 9/30/2016 |
Staff's Huntington Beach Status Report #9
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susah Cochran | California Energy Commission |
213868 | 9/30/2016 |
Status Report for September 2016 Letter of Status Report Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
213867 | 9/30/2016 |
Email from Huntington Beach Fire, Visual Screening Conceptual Plans E-mail comments from the City of Huntington Beach Fire Department on the architectural
enhancements proposed at the Huntington Beach Energy Project site as shown in TN # 210763. Please note that I have
inserted bracketed text in the e-mail to clarify Mr. Eros’s reference to the fire access roads on the project site. I am
submitting this e-mail for posting on the docket log for the amended HBEP. Visual Resources 2 page(s)
| 5017 | CEC/John Heiser | California Energy Commission |
213865 | 9/30/2016 |
Project Owner's Status Report #9
2 page(s)
| 5039 | Hon. Andrew McAllister, Hon. Karen Douglas, and Hearing Advisor Susan Cochran | Stoel Rives LLP |
213862 | 9/30/2016 |
Order Shortening Time to Consider Request for Publication of the Final Staff Assessment by October 10, 2016 Order 4 page(s)
| | All Parties | Energy Commission Hearing Office |
213812 | 9/27/2016 |
Project Owner's Motion for Order to Publish Final Staff Assessment
3 page(s)
| 5038 | CEC/Docket Unit | Stoel Rives LLP |
213744 | 9/21/2016 |
COM-6, Monthly Compliance Report for August 2016 Huntington Beach Energy Project (HBEP) Monthly Compliance Report (MCR) for August 2016 Compliance 170 page(s)
| | California Energy Commission | AES Huntington Beach Energy, LLC |
213492 | 9/6/2016 |
Response to August 29, 2016 Amended Committee Scheduling Order [Clutches]
2 page(s)
| 5037 | CEC/Andrew McAllister, Karen Douglas, Susan Cochran and John Heiser | Stoel Rives LLP |
213478 | 9/2/2016 |
Project Owner's Additional Response to Coastal Commission Comments This document supersedes TN 213477. 77 page(s)
| 5036 | | Stoel Rives LLP |
213477 | 9/2/2016 |
Project Owner's Additional Response to Coastal Commission Comments This document is superseded by TN 213478. 77 page(s)
| | | Stoel Rives LLP |
213472 | 9/1/2016 |
Data Responses, Set 1-R3
95 page(s)
| 5100 | | CH2M HILL |
213457 | 9/1/2016 |
AES Status Report #8
Air Quality 2 page(s)
| 5035 | The Honorable Andrew McAllister; Hearing Adviser Susan Cochran | Stoel Rives LLP |
213456 | 9/1/2016 |
Memorandum - Petition to Amend, Status Report #8
1 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
213317 | 8/31/2016 |
Status Report for August 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
213017 | 8/29/2016 |
Amended Committee Scheduling Order Order 6 page(s)
| | All Parties | Energy Commission Hearing Office |
212980 | 8/26/2016 |
Amendment PSA Workshop Audio File for July 12, 2016
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212948 | 8/25/2016 |
Project Owner's Follow-Up to Status Conference - Additional PSA Comments (Alternatives - Clutches) Project Owner's Follow-Up to Status Conference - Additional PSA Comments (Alternatives - Clutches) 3 page(s)
| 5034 | CEC/Andrew McAllister, Karen Douglas, Susan Cochran and John Heiser | Stoel Rives LLP |
212942 | 8/25/2016 |
HBEP Data Responses Set 1-R2, Data Responses to A4-A6 (Air Quality)
34 page(s)
| 5099 | CEC/Docket Unit | CH2M |
212912 | 8/23/2016 |
HBEP Monthly Compliance Report for July 2016 Monthly Compliance Report (MCR) for Huntington Beach (HBEP) Construction (Demo), July 2016 Compliance 256 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
212880 | 8/19/2016 |
Correspondence with SCAQMD Compilation of data obtained through SCAQMD's Public Records Request process since May 2016.
| 5098 | | CH2M |
212829 | 8/18/2016 |
COM-6, HBEP Monthly Compliance Report for June 2016 Monthly Compliance Report (MCR) for the Huntington Beach Energy Project (HBEP), June 2016 Compliance 97 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
212797-1 | 8/15/2016 |
California Coastal Commission's Report for Petition to Amend Application for Certification - Section 30413(d) As approved by Coastal Commission, August 10, 2016 263 page(s)
| | CEC/Andrew McAllister | California Coastal Commission |
212797-2 | 8/15/2016 |
California Coastal Commission's Report for Petition to Amend Application for Certification Exhibits to Section 30413(d)
80 page(s)
| | CEC/Andrew McAllister | California Coastal Commission |
212753 | 8/11/2016 |
AES Huntington Beach Energy LLC Response to CCC Draft Report *** THIS DOCUMENT SUPERSEDES TN 212751 *** 10 page(s)
| 5033 | California Coastal Commission/Tom Luster and Alison Dettmer | Stoel Rives LLP |
212752 | 8/11/2016 |
Response to City of Huntington Beach Comments on the PSA
5 page(s)
| 5032 | CEC/John Heiser, Project Manager | Stoel Rives LLP |
212751 | 8/11/2016 |
AES Huntington Beach Energy LLC Response to CCC Draft Report *** THIS DOCUMENT IS REPLACED BY TN 212753 due to a pdf system error *** 10 page(s)
| | California Coastal Commission/Tom Luster and Allison Dettmer | Stoel Rives LLP |
212733 | 8/10/2016 |
Limited Notice to Proceed for Demolition Activities
2 page(s)
| | | California Energy Commission |
212725 | 8/10/2016 |
Comments of California ISO regarding Petition to Amend
2 page(s)
| | | California ISO |
212691 | 8/9/2016 |
Notice of Committee Status Conference on August 19, 2016 Notice 7 page(s)
| | All Parties | Energy Commission Hearing Office |
212678 | 8/8/2016 |
Huntington Beach California ISO Repowering Study Report
14 page(s)
| 5031 | CEC/Docket Unit | Stoel Rives LLP |
212639 | 8/5/2016 |
Revised General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters General Orders 6 page(s)
| | All Parties | Energy Commission Hearing Office |
212528 | 8/1/2016 |
Memorandum - Petition to Amend, Status Report #7
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
212525 | 8/1/2016 |
Status Report #7; Request for Status Conference
3 page(s)
| 5030 | Commissioners McAllister and Douglas; Hearing Adviser Cochran | Stoel Rives LLP |
212508 | 7/29/2016 |
South Coast Air Quality Management District's Status Report for July 2016
Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
212471 | 7/26/2016 |
Department of Parks and Recreation Comments: Notice of Review
2 page(s)
| | CEC/Docket Unit | Department of Parks and Recreation |
212439 | 7/25/2016 |
Huntington Beach Public Works Department, Project Implementation Code Requirements
4 page(s)
| | CEC/Docket Unit | Huntington Beach Public Works Department |
212438 | 7/25/2016 |
Huntington Beach Fire Department. AES Huntingon Beach Energy Project (HBEP) Response to "Preliminary Staff Assessment"
3 page(s)
| | CEC/Docket Unit | Huntington Beach Fire Department |
212437 | 7/25/2016 |
Department of Planning and Building. City of Huntington Beach Comments Regarding Preliminary Staff Assesment
5 page(s)
| | CEC/John Heiser | City of Huntington Beach, Department of Planning and Building |
212393 | 7/22/2016 |
Transcript of the 06/22/2016 Committee Status Conference
23 page(s)
| | Parties | California Energy Commission |
212392 | 7/22/2016 |
Transcript of the 04/19/2016 Committee Status Conference
31 page(s)
| | Parties | California Energy Commission |
212382 | 7/21/2016 |
Letter from Presiding Member to California Independent System Operator President welcoming CAISO comments Letter dated July 20, 2016 2 page(s)
| | All Parties | California Energy Commission |
212380 | 7/21/2016 |
City of Huntington Beach RESOLUTION NO 2016-27 City of Huntington Beach RESOLUTION NO 2016-27 Land Use, Visual Resources 4 page(s)
| 5029 | | Stoel Rives LLP |
212379 | 7/21/2016 |
Project Owner's Comments on the Preliminary Staff Assessment Project Owner's Comments on the Preliminary Staff Assessment 20 page(s)
| 5028 | John Heiser | Stoel Rives LLP |
212365 | 7/20/2016 |
Memorandum - Energy Commission Staff's Response to the Amended Committee Scheduling Order - Petition to Amend
1 page(s)
| | | California Energy Commission |
212311 | 7/15/2016 |
Project Owner's Response to the Committee's Amended Scheduling Order
Air Quality 2 page(s)
| 5027 | CEC/Andrew McAllister, Karen Douglas, and Susan Cochran | Stoel Rives LLP |
212278 | 7/13/2016 |
AES Comments on the SCAQMD HBEP Preliminary Determination of Compliance
Air Quality 8 page(s)
| 5097 | South Coast Air Quality Management District/Andrew Lee | CH2M HILL |
212267 | 7/13/2016 |
Petition to Amend Preliminary Staff Assessment Workshop Presentation
14 page(s)
| | | California Energy Commission |
212213 | 7/8/2016 |
Preliminary Staff Assessment Workshop Meeting Agenda 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212210 | 7/8/2016 |
Amended Committee Scheduling Order Issued in July, 2016. Supersedes previously issued schedules. 5 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
212197 | 7/7/2016 |
HBEP Monthly Compliance Report for May 2016 Amended Monthly Compliance Report (MCR) for May, 2016 for the Huntington Beach Energy Project Compliance 82 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
212145 | 7/5/2016 |
Mike M Trelles Comments: Health and Nuisance cost
Air Quality, Alternatives, Hazardous Materials, Noise and Vibration 1 page(s)
| | CEC/Docket Unit | Mike M Trelles |
212044 | 6/30/2016 |
Project Owner's Status Report #6
2 page(s)
| 5026 | Commissioners McAllister and Douglas and Hearing Advisor Susan Cochran | Stoel Rives LLP |
212043 | 6/30/2016 |
Notice of Preliminary Staff Assessment Workshop for the Huntington Beach Energy Project, Petition to Amend
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
212040 | 6/30/2016 |
Memorandum - Petition to Amend, Status Report #6
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
211991 | 6/27/2016 |
Corrected Visual Resources Appendix VR-1 Visible Plume Modeling Analysis - The attached corrected Visual Resource Appendix VR-1: Visible Plume Modeling Analysis will replace the Appendix VR-1: Plume Velocity Analysis in the Preliminary Staff Assessment docketed on June 24, 2016; TN 211973 7 page(s)
| | CEC/Docket Unit | California Energy Commission |
211975 | 6/24/2016 |
Notice of Availability - Preliminary Staff Assessment for the Huntington Beach Energy Project Petition to Amend Also, Request for Public Access to the Enclosed Preliminary Staff Assessment and Request for Comments on the Preliminary Staff Assessment for Agency, Library, and Public Letters 8 page(s)
| | CEC/Docket Unit | California Energy Commission |
211973 | 6/24/2016 |
Preliminary Staff Assessment Petition to Amend - The corrected Visual Resources Appendix VR-1 is in TN 211991. Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 577 page(s)
| | CEC/Docket Unit | California Energy Commission |
211930 | 6/21/2016 |
AES HBEP PDOC Public Notice Verification
Air Quality 31 page(s)
| 5096 | Chris Perri/South Coast Air Quality Management District | CH2M HILL |
211856 | 6/17/2016 |
Order Approving Transfer of Ownership ORDER APPROVING Transfer of Ownership to AES Huntington Beach Energy, LLC 2 page(s)
| 5025 | | California Energy Commission |
211788 | 6/10/2016 |
Memorandum - Staff Response to Applicant's Supplement to Status Report #5
1 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
211756 | 6/8/2016 |
Applicant's Supplement to Status Report No. 5 Applicant's Supplement to Status Report #5 Air Quality 3 page(s)
| 5024 | The Honorable Andrew McAllister; The Honorable Karen Douglas; Hearing Officer Susan Cochran | Stoel Rives LLP |
211748 | 6/8/2016 |
South Coast Air Quality Management District - Facility Permit to Operate Notice 61 page(s)
| 5092 | CEC/Docket Unit | South Coast Air Quality Management District |
211747 | 6/8/2016 |
South Coast Air Quality Management District - Preliminary Determination of Compliance (PDOC)
212 page(s)
| 5093 | CEC/Docket Unit | South Coast Air Quality Management District |
211746 | 6/8/2016 |
South Coast Air Quality Management District - Notice of Intent to Issue Permits Notice 4 page(s)
| 5094 | CEC/Docket Unit | South Coast Air Quality Management District |
211745 | 6/8/2016 |
South Coast Air Quality Management District - Preliminary Determination of Compliance
2 page(s)
| 5095 | CEC/Eric Veerkamp | South Coast Air Quality Management District |
211694 | 6/1/2016 |
Status Report on Petition to Amend for May 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
211690 | 6/1/2016 |
Project Owner's Status Report #5 Status Report Air Quality 2 page(s)
| 5023 | CEC/Andrew McAllister, Karen Douglas, and Susan Cochran | Stoel Rives LLP |
211689 | 6/1/2016 |
Memo Regarding Petition to Amend Status Report No.5
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
211658 | 5/26/2016 |
Notice of Receipt Petition to Transfer Ownership of the Huntington Beach Energy Project (12-AFC-02C) 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
211610 | 5/23/2016 |
HARP Files for AQ Modeling from CH2M Hill Report of Conversation 2 page(s)
| 5090 | CEC/Docket Unit | California Energy Commission |
211437 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 9
631 page(s)
| 5089 | CEC/Docket Unit | CH2M HILL |
211434 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 8
175 page(s)
| 5088 | CEC/Docket Unit | CH2M HILL |
211433 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 7
174 page(s)
| 5087 | CEC/Docket Unit | CH2M HILL |
211432 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 6
1000 page(s)
| 5086 | CEC/Docket Unit | CH2M HILL |
211429 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 5
130 page(s)
| 5085 | CEC/Docket Unit | CH2M HILL |
211428 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 4
130 page(s)
| 5084 | CEC/Docket Unit | CH2M HILL |
211427 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 3
120 page(s)
| 5083 | CEC/Docket Unit | CH2M HILL |
211426 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 2
120 page(s)
| 5082 | CEC/Docket Unit | CH2M HILL |
211425 | 5/10/2016 |
South Coast Air Quality Management District Correspondance 05-06-16 Part 1
678 page(s)
| 5081 | CEC/Docket Unit | CH2M Hill |
211411 | 5/9/2016 |
Letter Regarding Response to Conservancy Project Owner's Response to Comment Letter of Huntington Beach Wetlands Conservancy Air Quality 6 page(s)
| 5022 | CEC/John Heiser | Stoel Rives LLP |
211310 | 4/29/2016 |
South Coast Air Quality Management District Status Report for April 2016 Status Report for Huntington Beach Energy Project Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
211300 | 4/29/2016 |
Petition to Amend Status Report No. 4
2 page(s)
| | | California Energy Commission |
211292 | 4/29/2016 |
Status Report #4 Project Owner's Status Report #4 Air Quality 2 page(s)
| 5021 | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
211171 | 4/21/2016 |
Email Regarding Alamitos and Huntington Beach Email: Requesting scheduling, and courtesy copies of the PDOCs for Huntington Beach and Alamitos. 2 page(s)
| 5080 | CEC/Matthew Layton and Mohsen Nazemi | South Coast Air Quality Management District/Andrew Lee |
211140 | 4/19/2016 |
Report of Conversation – HBEP – PTA Demolition Waste Clarification Request
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
211139 | 4/19/2016 |
CAISO Section 25 Affidavit
Transmission System Engineering 32 page(s)
| 5020 | California ISO/Raeann Quadro | CH2M HILL |
211134 | 4/18/2016 |
Huntington Beach Wetlands Conservancy Comments
Air Quality, Biological Resources, Compliance, Noise and Vibration 10 page(s)
| | CEC/Docket Unit | Huntington Beach Wetlands Conservancy/Gordon W. Smith |
210984 | 4/8/2016 |
AES Huntington Beach Energy, LLC's Petition to Change Ownership
9 page(s)
| 5019 | California Energy Commission | Stoel Rives LLP |
210969 | 4/6/2016 |
Petition to Amend Revised Air Quality and Public Health Assessment Sections
521 page(s)
| 5079 | CEC/John Heiser | CH2M HILL |
210926 | 4/1/2016 |
Staff’s Status Report #3 for the Huntington Beach Energy Project Petition to Amend Status Report #3 2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
210923 | 4/1/2016 |
Project Owner's Status Report #3
2 page(s)
| 5018 | Commissioners Andrew McAllister and Karen Douglas and Hearing Advisor Susan Cochran | Stoel Rives LLP |
210917 | 4/1/2016 |
Status Report for March 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
210807 | 3/22/2016 |
Huntington Beach Energy Project's Revised Air Permit Application Documentation
124 page(s)
| 5078 | South Coast Air Quality Management District/Chris Perri | CH2M HILL |
210763 | 3/16/2016 |
Conceptual Design Plan - Status Update
Visual Resources 13 page(s)
| | CEC/John Heiser | Stoel Rives LLP |
210732 | 3/15/2016 |
Supplemental Information to TN 206858 regarding fin fan cooler data
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
210731 | 3/15/2016 |
Coastal Commission recent email synopsis regarding sea level rise, flooding and tsunami inundation information Report of Conversation 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
210714 | 3/15/2016 |
Report of Conversation with CEC Staff and Tom Luster California Coastal Commission Report of Conversation with CEC Staff regarding Hunting Beach Project corrected Link from previous email. *** This document supercedes TN 210690 *** 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210690 | 3/11/2016 |
Report of Conversation with CEC Staff and Tom Luster California Coastal Commission *** This document is replaced by TN 210714 *** Report of Conversation with CEC Staff regarding Huntington Beach Project corrected Link from previous e-mail
| | | California Energy Commission |
210681 | 3/11/2016 |
Map from Tom Luster w/ California Coastal TWL Contributions Near Huntington Beach 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210680 | 3/11/2016 |
Huntington Beach Energy Project Drawings From Tetra Tech Sea Water Desalination Project 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210679 | 3/11/2016 |
Memo To: Joise McKinley From: Steve Tedesco P.E. Tetra Tech Updated Sea Level Rise inundation and Tsunami Flood Hazards Technical Memorandum 17 page(s)
| | Poseidon Water/Josie McKinley | California Energy Commission |
210678 | 3/11/2016 |
Report of Conversation with CEC Staff and Tom Luster, California Coastal Commission RE: New Information for AES Huntington Beach Report of Conversation with CEC Staff regarding Huntington Beach 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210666 | 3/9/2016 |
Amended Committee Scheduling Order Order 6 page(s)
| | All Parties | Energy Commission Hearing Office |
210660 | 3/9/2016 |
HBEP Cumulative Air Quality Analysis Correspondace
| 5077 | | CH2M HILL |
210620-1 | 3/7/2016 |
Resubmission of Data Responses Set 1, Updated Response to Data Requests 4-6, Part 1 [Air Quality] 850 page(s)
| 5074 | CEC/Dockets Unit | CH2M HILL |
210620-2 | 3/7/2016 |
Resubmission of Data Responses Set 1, Updated Response to Data Requests 4-6, Part 2
250 page(s)
| 5075 | CEC/Dockets Unit | CH2M HILL |
210620-3 | 3/7/2016 |
Resubmission of Data Responses Set 1, Updated Response to Data Requests 4-6, Part 3
382 page(s)
| 5076 | CEC/Dockets Unit | CH2M HILL |
210602 | 3/3/2016 |
Transcript of 02/16/16 Committee Status Conference
26 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210567 | 3/1/2016 |
Project Owner's Status Report #2
3 page(s)
| 5016 | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
210564 | 3/1/2016 |
Petition to Amend Status Report #2 2 page(s)
| | | California Energy Commission |
210545 | 2/26/2016 |
Status Report for February 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
210361 | 2/16/2016 |
Huntington Beach Energy Project Data Request A14, A16-A18 Air Quality Modeling files transmittal letter A Copy of the CD can be obtained through the Dockets Unit. 1 page(s)
| 5073 | CEC/John Heiser | CH2M HILL |
210360 | 2/16/2016 |
Huntington Beach Energy Project Petition to Amend Data Requests A75-A77 HARP Modeling Files Petition to Amend Data Requests A75-A77 HARP Modeling Files. A Copy of the CD can be obtained through the Dockets Unit. 1 page(s)
| 5072 | CEC/John Heiser | CH2M HILL |
210300 | 2/12/2016 |
Huntington Beach Energy Project Data Requests A75-A77
8 page(s)
| 5071 | CEC/Dockets Unit | CH2M HILL |
210271 | 2/11/2016 |
HBEP SCAQMD Cumulative Air Quality Inventory Correspondence
Air Quality 39 page(s)
| 5070 | SDO/Andrew Dunavent | CH2M HILL |
210262 | 2/10/2016 |
Project Owner's Response to City of Huntington Beach Comments on PTA
9 page(s)
| 5015 | CEC/John Heiser, Project Manager | Stoel Rives LLP |
210250 | 2/9/2016 |
Data Responses to Workshop Data Request
29 page(s)
| 5069 | CEC/Dockets Unit | CH2M HILL |
210123 | 2/1/2016 |
Huntington Beach Energy Project, Petition to Amended Status Report #1
2 page(s)
| | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | California Energy Commission |
210116 | 2/1/2016 |
Huntington Beach Energy Project-Petition to Amend Huntington Beach Energy Project-Data Requests A 75 through A 77 3 page(s)
| | AES Southland, LLC/Steven O'Kane | California Energy Commission |
210109 | 2/1/2016 |
Project Owner's Status Report #1; Response to Committee Scheduling Order
2 page(s)
| 5014 | CEC/Commissioners McAllister and Douglas and Hearing Advisor Susan Cochran | Stoel Rives LLP |
210089 | 1/29/2016 |
Status Report for January 2016 SCAQMD Status Report for HBEP Air Quality 2 page(s)
| | Honorable Commissioner Andrew McAllister and Karen Douglas | South Coast Air Quality Management District |
209986 | 1/27/2016 |
Notice of Committee Status Conferences Notice 8 page(s)
| | All Parties | Energy Commission Hearing Office |
208218 | 1/21/2016 |
SCAQMD HBEP Air Permit Application Transmittal Letters to EPA and the FLMs
Air Quality 5 page(s)
| 5068 | U.S. EPA, Region IX/Gerardo Rios | CH2M HILL |
207324 | 1/14/2016 |
Committee Scheduling Order Order 7 page(s)
| | All Parties | Energy Commission Hearing Office |
207314 | 1/14/2016 |
Transcript of 12/08/15 Conference Informational Hearing, Environmental Scoping, Issues Identification and Scheduling Conference. 91 page(s)
| | Parties | California Energy Commission |
207239 | 1/8/2016 |
SCAQMD HBEP Air Permit Application Completeness Determination *** This document is a duplicate of TN 207088 *** Air Quality 1 page(s)
| 5067 | AES Huntington Beach, LLC/Stephen O'Kane | CH2M HILL |
207211 | 12/7/2015 |
Confidential Response to Staff's Data Requests, Set One Confidential Cultural Resources Information 1 page(s)
| 5007 | CEC/Robert Oglesby | Stoel Rives |
207209 | 12/11/2015 |
AES Southland Development, LLC's Confidential Cultural Resources Records
449 page(s)
| 5011 | CEC/Robert Oglesby | Stoel Rives |
207088 | 12/18/2015 |
Amended HBEP Air Permit Completeness Determination *** This document is a duplicate of TN 207239 *** Air Quality 1 page(s)
| | AES Huntington Beach, LLC/Stephen O'Kane | South Coast Air Quality Management District |
207070 | 12/17/2015 |
Presentation - Site Visit, Environmental Scoping Meeting and Informational Hearing PowerPoint Presentation of Committee, Commission Staff and Public Adviser from the Site Visit and Information Hearing on December 8, 2015, in Huntington Beach 43 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
207021 | 12/15/2015 |
DR Set 1 Figures A9-1 through A9-3
5 page(s)
| 5066 | | CH2M HILL |
207018 | 12/15/2015 |
Response to Application for Confidentiality, Cultural Resources Location Records Huntington Beach Energy Project
2 page(s)
| | CEC Docket Unit | California Energy Commission |
207017 | 12/15/2015 |
Response Letter to the 10/26/15 Request for Water Supply Assessment
1 page(s)
| 5013 | California Energy Commission/ Mike Conway | City of Huntington Beach |
207011 | 12/14/2015 |
Project Owner's Follow-Up to Data Request Workshop 12.14.15
3 page(s)
| 5012 | John Heiser, Project Manager | Stoel Rives LLP |
206938 | 12/11/2015 |
SCAQMD Emissions Response
4 page(s)
| 5065 | South Coast Air Quality Management District/Chris Perri | CH2M HILL |
206936 | 12/11/2015 |
AES Huntington Beach, LLC's Response to South Coast Air Quality Management District's Completeness Determination Letter
95 page(s)
| 5064 | South Coast Air Quality Management District/Andrew Lee | CH2M HILL |
206935 | 12/11/2015 |
AES Southland Development, LLC's Application for Designation of Confidential Cultural Resources Records
3 page(s)
| 5010 | CEC/Robert Oglesby | Stoel Rives |
206932 | 12/11/2015 |
Report of Conversation - Clarification Request - HB Confusion Huntington Beach Energy Project - Amendment Data Response Workshop 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206922 | 12/10/2015 |
Huntington Beach Energy Project Amendment - Data Response Workshop Purpose, Agenda and Project Description 15 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206921 | 12/10/2015 |
Presentation - Petition to Amend Huntington Beach Energy Project Visual Resources Visual Resources Presentation - HBEP Amendment Data Request Workshop 13 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206917 | 12/10/2015 |
Presentation - Environmental Scoping Meeting and Informational Hearing by AES Southland Development, LLC Project Owner's PowerPoint Presented at the HBEP Informational Hearing on 12/08/2015 26 page(s)
| 5009 | CEC/Dockets Unit | Stoel Rives LLP |
206916 | 12/10/2015 |
Project Owner's Handout for Huntington Beach Energy Project Site Visit 12-08-2015
2 page(s)
| 5008 | CEC/Dockets Unit | Stoel Rives LLP |
206859 | 12/7/2015 |
AES Southland Development LLC's Repeated Application for Confidential Desigation and for Response to Data Request Confidential Cultural Information contained in Response to Staff's Data Requests, Set One 5 page(s)
| 5006 | CEC/Robert Oglesby | Stoel Rives |
206858 | 12/7/2015 |
Data Responses, Set 1 (Responses to Data Requests 1-74)
180 page(s)
| 5005 | | CH2M HILL |
206824 | 12/3/2015 |
CAISO Letter to CPUC re synchronous condensers Letter regarding inclusion of synchronous condensers in combustion turbine projects for potential discussion at the December 8, 2015, Site Visit and Informational Hearing 1 page(s)
| | | Energy Commission Hearing Office |
206807 | 12/1/2015 |
Objections to Certain Data Responses Contained in CEC Staff's Data Requests Set One (#A1-A74)
4 page(s)
| 5004 | CEC/John Heiser, Andrew McAllister and Karen Douglas | Stoel Rives LLP |
206806 | 12/1/2015 |
Project Owner's Response to Staff's Issues Identification Report, Proposed Schedule, and Request for Committee Scheduling Order
4 page(s)
| 5003 | CEC/Andrew McAllister, Karen Douglas, John Heiser and Susan Cochran | Stoel Rives LLP |
206778 | 11/25/2015 |
Petition to Amend Issues Identification and Scoping Report Issues Identification Report and Proposed Schedule 16 page(s)
| | CEC/Docket Unit | California Energy Commission |
206776 | 11/25/2015 |
Notice of Amendment Data Response Workshop 6 page(s)
| | | California Energy Commission |
206757 | 11/24/2015 |
SCAQMD Completeness Response
16 page(s)
| | South Coast Air Quality Management District | CH2M HILL |
206751 | 11/24/2015 |
Comment Letters from City Huntington Beach on AES Petition to Amend HBEP Supersedes TN 206738
"Comment Letters From Huntington Beach Dept. of Public Works, Fire Department, and Dept. of Planning & Building on The AES Huntington Beach Energy Project Petition to Amend." 21 page(s)
| | | California Energy Commission |
206738 | 11/23/2015 |
Comment Letters from City of Huntington Beach on AES Petition to Amend Superseded by TN 206751 21 page(s)
| | | City of Huntington Beach |
206730 | 11/23/2015 |
Notice of Public Site Visit, Environmental Scoping Meeting, etc. Notice and Order 8 page(s)
| | All Parties | Energy Commission Hearing Office |
206629 | 11/16/2015 |
Hearing Officer Assignment Memorandum Memorandum assigning Susan Cochran as Hearing Officer 1 page(s)
| | All Parties | Energy Commission Hearing Office |
206622 | 11/13/2015 |
General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters Order and attachments 18 page(s)
| | All Parties | Energy Commission Hearing Office |
206618 | 11/13/2015 |
Huntington Beach Energy Project - Petition to Amend Staff's Data Requests, A1 through A74 (12-AFC-02C) 12-AFC-02C 27 page(s)
| | Steven O'Kane/AES Southland, LLC | California Energy Commission |
206560 | 11/10/2015 |
California Energy Commission Executive Director's Letter to the Honorable Jill Hardy, Mayor, City of Huntington Beach Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | The Honorable Jill Hardy, Mayor, City of Huntington Beach | California Energy Commission |
206559 | 11/10/2015 |
California Energy Commission Executive Director's Letter to the Honorable Todd Spitzer, Chairman, Orange County Supervisor Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | The Honorable Todd Spitzer, Chairman, Orange County Supervisor | California Energy Commission |
206554 | 11/10/2015 |
California Energy Commission Executive Director's Letter to the Honorable Mathew Harper, California Assembly Member Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | The Honorable Mathew Harper, California Assembly Member | California Energy Commission |
206553 | 11/10/2015 |
California Energy Commission Executive Director's Letter to the Honorable John Moorlach, California State Senator Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | The Honorable John Moorlach, California State Senator | California Energy Commission |
206552 | 11/10/2015 |
California Energy Commission Letter to The Honorable Dana Rohrabacher, United States Representative Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | The Honorable Dana Rohrabacher, United States Representative | California Energy Commission |
206551 | 11/10/2015 |
Legislator Letter to Senator Diane Feinstein Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | | California Energy Commission |
206550 | 11/10/2015 |
Legislator Letter to Senator Barbara Boxer Huntington Beach Energy Project Petition to Amend 12-AFC-02C 2 page(s)
| | | California Energy Commission |
206513 | 11/5/2015 |
Document Handling for the AES Petition to Amend the Huntington Beach Energy Project
2 page(s)
| | CEC/Librarian | California Energy Commission |
206464 | 10/30/2015 |
Public Participation in the Review of the Petition to Amend
5 page(s)
| | Members of the Public | California Energy Commission |
206442 | 10/27/2015 |
Project Owner's Proposed Schedule and Request for Scheduling Order
3 page(s)
| 5002 | CEC/Andrew McAllister, Karen Douglas and Susan Cochran | Stoel Rives LLP |
206379 | 10/16/2015 |
Request for Agency Participation in the Review of the Petition to Amend
4 page(s)
| | Agencies | CEC/ Chris Davis |
206358 | 10/14/2015 |
AES Huntington Beach, LLC's Response to South Coast Air Management District's Request for Additional Information Response of AES to SCAQMD's request for additional information 137 page(s)
| | Andrew Lee, P.E./South Coast Air Quality Management District | Stoel Rives, LLP |
206352 | 10/14/2015 |
Letter from South Coast Air Quality Management District re: Amended Huntington Beach Energy Project Letter from SCAQMD to AES re incomplete application Air Quality 2 page(s)
| | Stephen O'Kane/AES Huntington Beach, LLC | Stoel Rives LLP |
206153 | 9/18/2015 |
Notice of Receipt Petition to Amend Amend the Final Decision for Huntington Beach Energy Project 3 page(s)
| | California Energy Commission | California Energy Commission |
206137 | 9/17/2015 |
Petition to Amend Appendix 5.1A - Demolition and Construction Emission Estimates
217 page(s)
| | CEC/Dockets Unit | CH2M Hill |
206092 | 9/9/2015 |
Petition to Amend Air Quality and Health Dispersion Modeling Files
1 page(s)
| | CEC/John Heiser | CH2M Hill |
206087 | 9/9/2015 |
Petition to Amend With Appendices
650 page(s)
| 5001 | CEC/Dockets Unit | CH2M Hill |