Docket Log

Docket: 11-RPS-01
Project Title: Renewables Portfolio Standard
Generated On: 12/26/2024 5:38:07 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
26084811/25/2024 CONFIDENTIAL - PacifiCorp RPS Certification Application Information
Confidential information submitted in support of RPS certification application
3 page(s)
 CEC/Docket Unit/Mr. Drew BohanDowney Brand LLP
26076812/20/2024 CEC Response to PacifiCorp's re-submitted Application for Confidentiality

2 page(s)
 Jedediah GibsonCalifornia Energy Commission
26028511/25/2024 PacifiCorp Application for Confidential Designation of Information in RPS Certification Application
Application for confidential designation
4 page(s)
 CEC/Docket Unit/Mr. Drew BohanDowney Brand LLP
2484371/18/2023 COS Commercial Energy Motion

27 page(s)
 CEC/Docket UnitCustomized Energy Solutions
2484361/18/2023 Commercial Energy Motion to File Under Seal

8 page(s)
 CEC/Docket UnitCustomized Energy Solutions
2339987/23/2020 Los Angeles Department of Water and Power - Final Verification Results Report for Compliance Period 1
Compliance Period 1 Verification Results for Los Angeles Department of Water and Power- Commission Final Report
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2339947/23/2020 Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Staff Draft Report
Staff Draft Report of the Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification
160 page(s)
 CEC/DocketsCalifornia Energy Commission
2339937/23/2020 Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Lead Commissioner Report
Lead Commissioner Report of the Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification
158 page(s)
 CEC/DocketsCalifornia Energy Commission
2339927/23/2020 Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Commission Final Report
Commission Final Report of the Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification
159 page(s)
 CEC/DocketsCalifornia Energy Commission
2327924/20/2020 Resolution Number 20-0408-6
RESOLUTION ADOPTING RENEWABLES PORTFOLIO STANDARD VERIFICATION RESULTS REPORT FOR THE LOS ANGELES DEPARTMENT OF WATER AND POWER FOR COMPLIANCE PERIOD 1
6 page(s)
 CEC/DocketsCalifornia Energy Commission
2325693/27/2020 Second Notice of Availability and Request for Comments on the Renewables Portfolio Standard
2011-2013 Verification Results Staff Draft Report for Los Angeles Department of Water and Power
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2325683/27/2020 Los Angeles Department of Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 1
*** This document supersedes TN 232443***
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2324443/17/2020 Notice of Availability and Request for Comments on the Renewables Portfolio Standard
2011-2013 Verification Results Staff Draft Report for Los Angeles Department of Water and Power
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2324433/17/2020 Los Angeles Department of Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 1
***SUPERSEDED BY TN 232568***
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2210038/17/2017 Confidential - LADWP CP2 RPS Reports and Contracts
Confidential documents uploaded on the RPS Online System
1 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power
2208248/17/2017 LADWP 2016 Repeated Application for Confidential Designation
Confidential request for Electric power plant specific hourly generation; price & energy sales data; residential home addresses of solar photovoltaic owners, et al.; energy transmission pathway & generate data, et al.
10 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power
2166383/21/2017 Extended RPS Reporting Deadline for Facilities Submitting the Common Carrier Pipeline Report for 2016 data to July 3, 2017.

1 page(s)
 POU Representatives California Energy Commission
2156621/30/2017 Notice of Availability of the Final RPS Verification Results Reports for POUs for Compliance Period 1
This document is the Notice of Availability of the Final Renewables Portfolio Standard Verification Results Reports for Local Publicly Owned Electric Utilities for Compliance Period 1
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156611/30/2017 City of Vernon Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156601/30/2017 Victorville Municipal Utility Services Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156591/30/2017 Port of Stockton Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156581/30/2017 Silicon Valley Power Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156571/30/2017 Truckee Donner Public Utility District Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156561/30/2017 Turlock Irrigation District Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156551/30/2017 City of Ukiah Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156541/30/2017 City of Rancho Cucamonga Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156531/30/2017 Redding Electric Utility Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156521/30/2017 City of Riverside Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156511/30/2017 Sacramento Municipal Utility District Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156501/30/2017 Power and Water Resources Pooling Authority Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156491/30/2017 Port of Oakland Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156481/30/2017 City of Pittsburg Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156471/30/2017 Pasadena Water and Power Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156461/30/2017 City of Moreno Valley Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156451/30/2017 City of Needles Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156441/30/2017 Lodi Electric Utility Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156431/30/2017 City of Lompoc Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156421/30/2017 Merced Irrigation District Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156411/30/2017 Modesto Irrigation District Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156401/30/2017 Lassen Municipal Utility District Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156391/30/2017 Glendale Water and Power Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156381/30/2017 City of Healdsburg Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156371/30/2017 Imperial Irrigation District Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156361/30/2017 City of Industry Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156351/30/2017 Kirkwood Meadows Public Utility Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156341/30/2017 City of Palo Alto Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156331/30/2017 Roseville Electric Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156321/30/2017 City of Shasta Lake Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156311/30/2017 Eastside Power Authority Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156301/30/2017 Gridley Electric Utility Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156291/30/2017 City of Cerritos Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156281/30/2017 Colton Public Utilities Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156271/30/2017 Burbank Water and Power Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156261/30/2017 City of County of San Francisco Final RPS Verification Results Report for Compliance Period 1

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156251/30/2017 City of Corona Final RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156241/30/2017 Alameda Municipal Power Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156231/30/2017 City of Anaheim Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156221/30/2017 City of Banning Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156211/30/2017 Biggs Municipal Services RPS Final Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2156201/30/2017 Azuza Light and Water Final RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2155341/24/2017 Staff Report - Renewables Portfolio Standard Verification Methodology Report
This document supersedes TN215142. The report was updated to reflect that it is a "Staff Report."
41 page(s)
  California Energy Commission
2154041/17/2017 Burbank Water and Power RPS Verification Results Report for Compliance Period 1
*** This document supersedes TN 215384 ***
6 page(s)
 CEC/DocketCalifornia Energy Commission
2153941/13/2017 Notice to Consider Adoption of the Renewables Portfolio Standard Verification Results Lead Commissioner Reports
Wednesday, January 25, 2017
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153921/13/2017 Modesto Irrigation District RPS Verification Results Report, Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153911/13/2017 Kirkwood Meadows Public Utility RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153901/13/2017 Imperial Irrigation District RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153891/13/2017 Glendale Water and Power RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153871/13/2017 Eastside Power Authority RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153851/13/2017 City of Corona RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153841/13/2017 Burbank Water and Power RPS Verification Results Report for Compliance Period 1
*** This document is replaced by TN 215404 ***
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153821/13/2017 City and County of San Francisco RPS Verification Results Report for Compliance Years 2011-2013

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153801/13/2017 City of Riverside RPS Verification Results Report for Compliance Period 1

6 page(s)
  California Energy Commission
2153791/13/2017 Sacramento Municipal Utility District RPS Verification Results Report for Compliance Period 1

6 page(s)
  California Energy Commission
2153771/13/2017 Truckee Donner Public Utility District RPS Verification Results Report for Compliance Period 1

6 page(s)
  California Energy Commission
2153761/13/2017 City of Needles RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153711/13/2017 Victorville Municipal Utility Services RPS Verification Results Report for Compliance Period 1

6 page(s)
  California Energy Commission
2153701/13/2017 City of Vernon RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153691/13/2017 Ukiah Electric Utility RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153681/13/2017 Turlock Irrigation District RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153651/13/2017 Silicon Valley Power RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153641/13/2017 Port of Stockton RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153631/13/2017 Redding Electric Utility RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153621/13/2017 Rancho Cucamonga Municipal Utility RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153611/13/2017 Power and Water Resources Pooling Authority RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153601/13/2017 Pasadena Water and Power RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153581/13/2017 City of Pittsburg RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153571/13/2017 Port of Oakland RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153561/13/2017 City of Moreno Valley RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153551/13/2017 Merced Irrigation District RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153541/13/2017 City of Lompoc RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153531/13/2017 Lodi Electric Utility RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153511/13/2017 Lassen Municipal Utility District RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153501/13/2017 City of Industry RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153491/13/2017 City of Healdsburg RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153481/13/2017 Gridley Electric Utility RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153471/13/2017 City of Shasta Lake RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153461/13/2017 Roseville Electric RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153451/13/2017 City of Palo Alto RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153441/13/2017 Colton Public Utilities RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153431/13/2017 City of Cerritos RPS Verification Results Report for Compliance Period 1

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153421/13/2017 Biggs Municipal Services RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153411/13/2017 City of Banning RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153401/13/2017 City of Anaheim RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153391/13/2017 Alameda Municipal Power RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2153381/13/2017 Azusa Light and Water RPS Verification Results Report for Compliance Period 1

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2151421/3/2017 Staff Draft Report - Renewables Portfolio Standard Verification Methodology Report

41 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2151411/3/2017 Notice of Availability of the RPS Verification Methodology Report
Notice of Availability of the Renewables Portfolio Standard Verification Methodology Report
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2125328/1/2016 Notice of Availability of the RPS 2011-2013 Retail Sellers Procurement Verificaton Commission Final Report
Notice of Availability of the Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Commission Final Report adopted at the July 13, 2016 Business Meeting.
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2125237/20/2016 Transaction Confirmation
Confidential material is too large to upload. Please see Docket staff for a copy.
  California Energy Commission
2124826/23/2016 Confidential Heat Rate Range for LADWP Generating Facilities

2 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2123677/20/2016 Application for Confidential Designation 2015 RPS Publically Owned Electric Utilities Annual Report

4 page(s)
  LADWP
2123377/18/2016 Response to Application for Confidentiality - LADWP

3 page(s)
  California Energy Commission
2123037/5/2016 Confidential Letter Regarding LADWP Reasonable Progress Report for 2015

6 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2123027/5/2016 LADWP Confidential RPS Compliance Period Report: Accounting

1 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2123017/5/2016 LADWP Confidential Lista of Narratives to be Attached to Compliance Report

3 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2123007/5/2016 LADWP Confidential Annual RPS Report - Accounting

1 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2122997/5/2016 LADWP Confidential Compliance Report

17 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2122987/5/2016 LADWP Confidential WREGIS State/Provincial/Voluntary Compliance Report

18 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2122977/5/2016 LADWP Confidential CA RPS e-Tag Summary Report

17 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2121247/5/2016 Los Angeles Department of Water & Power Application for Confidential Designation
Confidential designation for electric power plant specific hourly generation; price & energy sales data; residential home addresses of solar photovoltaic owners, Energy Transmission Pathway and generation data
3 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2119836/27/2016 Notice to Consider Adoption of the RPS 2011-2013 Retail Sellers Procurement Report
This is a notice to consider adoption of the Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Lead Commissioner Report
4 page(s)
  California Energy Commission
2119556/23/2016 Los Angeles Department of Water & Power Application for Confidential Designation
Confidential Heat Rate Range for LADWP Generating Facilities
9 page(s)
 CEC/Docket UnitLos Angeles Department of Water & Power
2118096/14/2016 Letter RE LADWP Renewable Energy Resources

3 page(s)
 California Energy Commission/ Robert B. WeisenmillerCalifornia Legislature
2116986/2/2016 Pacific Gas and Electric Company Comments: on the Staff Draft 2011-2013 RPS Retail Sellers Verification Report

3 page(s)
 CEC/Docket UnitPacific Gas and Electric Company
2116575/26/2016 SCE's Comemnts on Renewables Portfolio Standard 2011-2013 Retail Sellers Procurement Verification Draft Staff Report
  Catherine Hackney
2115224/29/2016 Accounting Documentation
  California Energy Commission
2114225/10/2016 Notice of Availability and Request for Comments on the RPS 2011-2013 Retail Sellers Procurement Verification Staff Draft Report
Notice of availability and request for comments on the Renewables Portfolio Standard 2011-2013 retail sellers procurement verification staff draft report.
4 page(s)
  California Energy Commission
2114085/9/2016 Memo Regarding DTE Stockton, LLC's Audit Report for the Creation of Retroactive Renewable Energy Credits
Memo to Executive Director Oglesby from Deputy Director Korosec regarding the audit report and request from DTE Stockton LLC for the creation of REC's in WREGIS for RPS certification
2 page(s)
 CEC/Robert OglesbyCalifornia Energy Commission
2114075/9/2016 DTE Stockton LLC Audit Report
Audit report submitted by DTE Stockton LLC for the creation of REC's in WREGIS.
  DTE Stockton, LLC
2114065/9/2016 Response Letter to DTE Stockton LLC Regarding Audit Report
Response letter to DTE Stockton LLC regarding submitted audit report for the creation of REC's in WREGIS.
  California Energy Commission
2113735/5/2016 Response to Application for Confidentiality - DTE Stockton, LLC

2 page(s)
  California Energy Commission
2112914/29/2016 Application for Confidentiality

2 page(s)
  California Energy Commission
2111234/18/2016 Letter from USDA - San Dimas Technology & Development Center request for time extension

31 page(s)
  USDA
2111224/18/2016 USDA Lettter with Additional Information requested from CEC
Additional information requested from USDA-San Dimas Technology and Development Center
31 page(s)
  California Energy Commission
2111214/18/2016 Memo to Executive Director Oglesby from Deputy Director Korosec
regarding the time extension request from USDA - San Dimas Technology and Development Center
4 page(s)
  California Energy Commission
2111204/18/2016 Waiver Letter to USDA-San Dimas Technology and Development Center Granting Requested Extension.

1 page(s)
  California Energy Commission/ R. Oglesby
2107373/15/2016 Response to Southern California Edison's Request for Extension of RPS Certification Deadline
Executive Director Robert P. Oglesby response to Southern California Edison request for extension and waiver of RPS certification application deadlines for three Salton Sea geothermal facilities: Salton Sea Power Generation Co. #3, Salton Sea Power Generation Co. #1 and Salton Sea Power Generation Co. #4.
1 page(s)
 Southern California Edison/Eric LopezCalifornia Energy Commission
2107363/15/2016 Letter and documents from Southern California Edison Regarding Salton Sea Request for Extension and Waiver
Letter and documents from Southern California Edison requesting an extension and waiver of RPS certification application deadlines to reinstate the original RPS eligibility date of April 5, 2005 for three Salton Sea geothermal facilities: Salton Sea Power Generation Co. #3, Salton Sea Power Generation Co. #1 and Salton Sea Power Generation Co. #4.
26 page(s)
 CEC/Robert OglesbySouthern California Edison
2107353/15/2016 Memo Regarding Southern California Edison's Request for Extension of RPS Certification Application Deadline
Memo from Deputy Director Suzanne Korosec to Executive Director Robert P. Oglesby regarding request from Southern California Edison for extension and waiver of RPS certification application deadlines to reinstate the original RPS eligibility for three Salton Sea geothermal facilities: Salton Sea Power Generation Co. #3, Salton Sea Power Generation Co. #1 and Salton Sea Power Generation Co. #4.
4 page(s)
 CEC/Robert OglesbyCalifornia Energy Commission
2106523/8/2016 SG2 - Imperial Valley LLC Audit Report
Audit report received November 18, 2015 for the creation of retroactive RECs for Sonora Solar Facility, Alhambra Solar Facility and Arkansas Solar Facility.
  California Energy Commission
2106513/8/2016 Response Letter to Southern Power Co./SG2, Imperial Valley LLC
Response letter from Executive Robert Oglesby approving the request for retroactive RECs after review of audit material by staff.
  California Energy Commission
2106503/8/2016 Memo from Deputy Director Korosec to Executive Director Oglesby regarding extension request for SG2- Imperial Valley
Memorandum from Deputy Director Suzanne Korosec to Executive Director Robert Oglesby regarding retroactive REC request for Southern Power Co., SG2 - Imperial Valley , after submitted audit report was received and reviewed, recommending Executive Director Oglesby accept the audit report and forward the report to WREGIS.
  California Energy Commission
2106493/8/2016 SG-2 Imperial Valley Supplemental to Audit Report

162 page(s)
  California Energy Commission
2105132/23/2016 Response to SolarCity Corporation's Request for Extension of RPS Certification Deadline
Letter from Executive Director Oglesby to SolarCity requesting more documentation in order to approve the extension request.
1 page(s)
 SolarCity Corporation/Ana StewartCalifornia Energy Commission
2105122/23/2016 Memorandum Regarding SolarCity Request for Extension of RPS Certification Application Deadline
Memo from Deputy Director Korosec to Executive Director Oglesby regarding Extension of RPS certification application deadline.
4 page(s)
 CEC/Robert OglesbyCalifornia Energy Commission
2105112/23/2016 Letter Requesting Extensions for the RPS Certification
Letter from SolarCity requesting extension for the Renewable Portfolio Standard (RPS) certifications for nine systems.
6 page(s)
 CEC/Robert OglesbySolarCity Corporation
2103462/16/2016 Los Angeles Department of Water and Power Comments: Draft Preliminary Verification Results for RPS Eligibility of Claims for 2011-2013 Compliance Period

7 page(s)
 CEC/Dockets UnitLos Angeles Department of Water and Power
2103432/16/2016 Southern California Edison Comments: On Draft 2011-2013 Renewables Portfolio Standard Verification Results
  Southern California Edison
2103422/16/2016 Pacific Gas and Electric Company Comments: On Draft RPS Verification Results Dated February 4, 2016

1 page(s)
 CEC/Dockets UnitPacific Gas and Electric Company
20712812/22/2015 Response to Los Angeles Dept. of Water & Power Regarding Petition for Reconsideration of Amended Applications
Los Angeles Department Water & Power's Petition for Reconsideration of Amended Applications for Renewables Portfolio Standard (RPS) Certification
121 page(s)
 Los Angeles Department of Water & Power/John DennisCalifornia Energy Commission
20711512/22/2015 Response Letter to Pristine Sun LLC Regarding Extension Request for RPS Certification Application Deadline

1 page(s)
 Pristine Sun LLC/Alexander LiCalifornia Energy Commission
20711412/22/2015 Memo Regarding Pristine Sun LLC's Request for Extension of RPS Certification Application Deadline

3 page(s)
 CEC/Robert OglesbyCalifornia Energy Commission
20711312/22/2015 Pristine Sun Request for Extension of Time on Final Certification

13 page(s)
 CEC/Robert OglesbyPristine Sun, LLC
7643912/7/2015 Notice of Correction - Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition - RPS Forms Instructions

16 page(s)
 CEC/Docket UnitCEC/L. Green
7640311/19/2015 Response to SGE Imperial Valley LLC's Request for Deadline Extension

1 page(s)
 E. Spencer/Southern Power Company & SG2 Imperial Valley, LLCCEC/R. Oglesby
7640211/19/2015 Memo re SG2 Imperial Valley LLC's Request for Deadline Extension

2 page(s)
 CEC/S. KorosecCEC/R. Oglesby
7640111/19/2015 SG2 Imperial Valley, LLC's Background Information for CEC Extension Request

1 page(s)
 CEC/R. OglesbySouthern Power/E. Spencer
7639811/19/2015 SG2 Imperial Valley, LLC's Request for Extension of Due Date for Submission of Audit Report

2 page(s)
 CEC/R. OglesbySouthern Power/E. Spencer
7631811/6/2015 Response to DTE Stockton LLC's Request for Creation of Retroactive Renewable Energy Credits in Western Renewable Energy Generation Information System for RPS Certification

1 page(s)
 DTE Stockton, LLC/M. RigbyCEC/R. Oglesby
7631711/6/2015 DTE Stockton LLC's Request for Creation of Retroactive Renewable Energy Credits in Western Renewable Energy Generation Information System for RPS Certification

3 page(s)
 CEC/R. OglesbyCEC/S. Korosec
7631611/6/2015 Requesting Creation of Retroactive Renweable Energy Credits

37 page(s)
 CEC/R. OglesbyDTE Stockton, LLC/M. Rigby
7630110/30/2015 Response to Request for Extension of RPS Certification Deadline

1 page(s)
 City of Ukiah/M. GrandiCEC/R. Oglesby
7630010/30/2015 Memo Regarding City of Ukiah Request for Extension of Time of RPS Certification Application Deadline

4 page(s)
 CEC/R. OglesbyCEC/S. Korosec
7629910/30/2015 Request for Extension of Time to Submit an Application for RPS Certification

2 page(s)
 CEC/Dockets UnitCity of Ukiah/M. Grandi
7629810/30/2015 Request for Extension of Time to Submit an Application for RPS Certification

1 page(s)
 CEC/Dockets UnitCity of Ukiah/M. Grandi
7629710/30/2015 Request for Extension of Time to Submit an Application for RPS Certification

1 page(s)
 CEC/Dockets UnitCity of Ukiah/M. Grandi
7626210/23/2015 Response to Modesto Irrigation District's Request for Extension of RPS Certification Deadline for New Hogan Power Plant Project

1 page(s)
 G. Salyer/Modesto Irrigation DistrictCEC/R. Oglesby
7626110/23/2015 Memo Regarding Modesto Irrigation District's Request for Extension of RPS Certification Application Deadline

3 page(s)
 CEC/R. OglesbyCEC/S. Korosec
7626010/23/2015 Request for Extensions of Certification Application Deadlines for New Hogan Power Plant

37 page(s)
 CEC/R. OglesbyModesto Irrigation District
761659/16/2015 Transcript of 08-18-15 Proceedings

29 page(s)
 CEC/Dockets UnitCEC/C. Goldthrite
761539/1/2015 Comments on Historic Carryover Verification

9 page(s)
 CEC/Docket UnitSacramento Municiple Utility District
761318/19/2015 Memo re: Imperial Valley LLC's Request for Creation of Retroactive Renewable Energy Credits in WREGIS for RPS Certification

4 page(s)
 CEC/R. OglesbyCEC/S. Korosec
761308/19/2015 Response Letter for Request for Authorization of Creation of Retroactive Renewable Energy Credits for Sonora, Alhambra and Arkansas Solar Facilities

1 page(s)
 Southern Power Company/J. StyslingerCEC/R. Oglesby
761298/19/2015 Request for Authorization of the Creation of Retroactive Renewable Energy Credits for the Sonora Solar Facility

15 page(s)
 CEC/R. OglesbySouthern Power/J. Styslinger
761288/19/2015 Request for Authorization of the Creation of Retroactive Renewable Energy Credits for the Arkansas Solar Facility

15 page(s)
 CEC/R. OglesbySouthern Power/J. Styslinger
761278/19/2015 Request for Authorization of the Creation of Retroactive Renewable Energy Credits for Alhambra Solar Facility

15 page(s)
 CEC/R. OglesbySouthern Power/J. Styslinger
761068/3/2015 Response to LADWP Application for Designation of Confidential Records

2 page(s)
 Los Angeles Department of Water and Power/P. ChuaCEC/R. Oglesby
761058/3/2015 Application for Designation of Confidential Records

10 page(s)
 CEC/R. OglesbyLos Angeles Department of Water Power/P. Chua
760066/29/2015 Notice of Availability of 8th Edition Guidebook De Minimis Form

1 page(s)
 CEC/Docket UnitCEC
760046/26/2015 Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

113 page(s)
 CEC/Docket UnitCEC/L. Green
760036/26/2015 Notice of Availability - Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

1 page(s)
 CEC/Docket UnitCEC/L. Green
759866/17/2015 Renewables Portfolio Standard Eligibility Guidebook Resolution #15-0610-6

2 page(s)
 CEC/Docket UnitCEC/L. Green
759446/11/2015 Notice of Exemption for Adoption of Revisions to Renewables Portfolio Guidebook

1 page(s)
 CEC/Docket UnitCEC/D. Burgess
759006/8/2015 Comments on Clarification in RPS-Eligibility Guidebook

2 page(s)
 CEC/E. Chisholm, A. Gould and L. GreenJames Hendry
758816/5/2015 PacificCorp Comments on Staff Final Renewables Portfolio Standard Eligibility Guidebook

4 page(s)
 CEC/Docket UnitEllison, Schneider & Harris, L.L.P.
758806/5/2015 Comments on Staff Final Renewables Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitPacific Gas and Electric Company/E. Lee
758796/5/2015 Memorandum - CEQA Assessment RPS Guidebook 8th Edition

4 page(s)
 CEC/ David HochschildCEC/ Gabe Herrera
758626/1/2015 Response to Request for Certification Extension

1 page(s)
 Portland General Electric Company/B. SimsCEC/R. Oglesby
758616/1/2015 Request for Certification Extension

17 page(s)
 CEC/R. OglesbyPortland General Electric Company/B. Sims
758606/1/2015 WREGIS State/Provincial/Voluntary Compliance Report

3 page(s)
 CEC/Docket UnitCEC/L. Green
758596/1/2015 Staff Final Guidebook - Renewables Portfolio Standard Eligibility (Underline, strikeout version)

234 page(s)
 CEC/Docket UnitCEC/L. Green
758586/1/2015 Staff Final Guidebook - Renewables Portfolio Standard Eligibility (clean version)

112 page(s)
 CEC/Docket UnitCEC/L. Green
758576/1/2015 RPS Procurement Claims from RPS-Certified Facilities CEC-RPS-TRACK

6 page(s)
 CEC/Docket UnitCEC/L. Green
758566/1/2015 Annual Hourly Comparison Scheduled PCC 1 POU Claims CEC-RPS-HOURLY

1050 page(s)
 CEC/Docket UnitCEC/L. Green
758556/1/2015 Report of Generation and Fuel Use for RPS-Certified Facilities CEC-RPS-GEN

7 page(s)
 CEC/Docket UnitCEC/L. Green
758546/1/2015 Functionally Dedicated Pipeline Biomethane Use by Facilities - CEC-RPS-FDP

15 page(s)
 CEC/Docket UnitCEC/L. Green
758536/1/2015 CA RPS e-Tag Summary Report CEC-RPS-eTag

8 page(s)
 CEC/Docket UnitCEC/L. Green
758526/1/2015 Certification of Individual Facilities CEC-RPS-De Minimis - Certification Supplement - De Minimis

1 page(s)
 CEC/Docket UnitCEC/L. Green
758516/1/2015 Common Carrier Pipeline Biomethane Use by Facilities CEC-RPS-CCP

15 page(s)
 CEC/Docket UnitCEC/L. Green
758506/1/2015 Section 399.30(j) Eligibility Report for Publicly Owned Utilities - CEC-RPS-399

8 page(s)
 CEC/Docket UnitCEC/L. Green
758496/1/2015 Certification of Aggregated Units - CEC-RPS-3

28 page(s)
 CEC/Docket UnitCEC/L. Green
758486/1/2015 Certification of Precertification of Individual Facilities (CEC-RPS-1)

5 page(s)
 CEC/Docket UnitCEC/L. Green
758476/1/2015 Certification of Precertification of Individual Facilities (CEC-RPS-1.S4) - Certification Supplement 4 - Incremental

1 page(s)
 CEC/Docket UnitCEC/L. Green
758446/1/2015 Certification of Precertification of Individual Facilities (CEC-RPS-1.S3) - Certification Supplement 3 - Facilities with First Point of Interconnection to Non-CBA Outside California

2 page(s)
 CEC/Docket UnitCEC/L. Green
758426/1/2015 Certification of Precertification of Individual Facilities (CEC-RPS-1.S2) - Certification Supplement 2 - Hydroelectric

3 page(s)
 CEC/Docket UnitCEC/L. Green
758396/1/2015 Certification of Precertification of Individual Facilities (CEC-RPS-1.S1) - Certification Supplement 1 - Biomethane

2 page(s)
 CEC/Docket UnitCEC/L. Green
758386/1/2015 Notice of Business Meeting re: Guideline Revisions for RPS Implementation - Notice to Consider Adoption of Staff Final Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

4 page(s)
 CEC/Docket UnitCEC/L. Green
755734/3/2015 Response to Request for Extension of Time and Rescinding That Request

1 page(s)
 Walnut Valley Water District/S. ShawCEC/R. Oglesby
755724/3/2015 Rescind Request for Extension of Time

2 page(s)
 CEC/R. OglesbyWalnut Valley Water District/S. Shaw
755714/3/2015 Request for Extension of Time to Submit a Complete Application for RPS Certification

1 page(s)
 CEC/R. OglesbyWalnut Valley Water District/S. Shaw
745502/18/2015 Comments on Draft RPS Eligibility Guidebook

14 page(s)
 CEC/Docket UnitSMUD
745492/18/2015 Comments Of Pacificorp On The Draft Eighth Edition Of The Renewables Portfolio Standard Eligibility Guidebook

11 page(s)
 CEC/Docket UnitPacificorp
745482/17/2015 Comments on Staff Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

16 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power (LADWP)/J. Dennis
745472/17/2015 Comments on the Proposed Revisions to the Renewables Portfolio Standard Eligibility Guidebook

10 page(s)
 CEC/Docket UnitCalifornia Municipal Utilities Association/T. Andreoni and J. Wynne
745462/17/2015 Comments on the Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

7 page(s)
 CEC/Docket UnitTurlock Irrigation District/J. Wynne
745392/17/2015 Comments on the Staff Draft of the Renewables Portfolio Standard Eligibility Guidebook, 8th Edition (RPS Guidebook)

6 page(s)
 CEC/Docket UnitSan Francisco Water Power Sewer/M. Hyams and J. Hendry
745382/17/2015 Comments on Staff Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

5 page(s)
 CEC/Docket UnitNorthern California Power Agency/C. Berlin
745372/17/2015 Comments on California Energy Commission Staff Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

8 page(s)
 CEC/Docket UnitSouthern California Edison/M. Alvarez
745362/17/2015 Comments on Staff Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

6 page(s)
 CEC/Docket UnitPacific Gas and Electric Company/M. Silva
745352/17/2015 Comments Regarding California Energy Commission, Draft RPS Guidebook Eigth Edition

2 page(s)
 CEC/R. OglesbyCalifornia Association of Sanitation Agencies/A. Link
745342/17/2015 Southern California Public Power Authority Comments on the January 16, 2015 Notice Requesting Public Comments on the Staff Draft Renewables Portfolio Standard Eligibility Guidebook, Eighth Edition

8 page(s)
 CEC/Docket UnitSouthern California Public Power Authority/T. DeRivi
745332/17/2015 Comments Regarding Draft Renewables Portfolio Standard Eligibility Guidebook (Draft RPS Guidebook)

3 page(s)
 CEC/Docket UnitOrmat Technologies, Inc./R. Orenstein
745312/17/2015 Walker Ranch Energy, LLC's comment to the draft 8th edition of the RPS Guidebook

2 page(s)
 CEC/Docket UnitWalker Ranch Energy, LLC
743361/21/2015 Letter With Corrected Elegibility Date for Request for Extension of RPS Certification Deadline for the Capital Dynamics' Vinam 9011 Facility

1 page(s)
 Capital Dynamics, Inc.CEC/R. Oglesby
743301/16/2015 Section 399.30(j) Eligibility Report for Publicly Owned Utilities - CEC-RPS-399

8 page(s)
 CEC Docket UnitCEC/L. Green
743291/16/2015 RPS Procurement Claims from RPS-Certified Facilities - CEC-RPS-TRACK

7 page(s)
 CEC Docket UnitCEC/L. Green
743281/16/2015 Report of Generation and Fuel Use for RPS-Certified Facilities - CEC-RPS-Gen

7 page(s)
 CEC Docket UnitCEC/L. Green
743271/16/2015 Compliance Report Form for Local Publicly Owned Electric Utilities - CEC-RPS-POU

35 page(s)
 CEC Docket UnitCEC/L. Green
743261/16/2015 Common Carrier Pipeline Biomethane Use by Facilities - CEC-RPS-CCP

14 page(s)
 CEC Docket UnitCEC/L. Green
743251/16/2015 Certification or Precertification of Individual Facilities - CEC-RPS-1

5 page(s)
 CEC Docket UnitCEC/L. Green
743241/16/2015 Certification or Precertification of Individual Facilities - CEC-RPS-1.S3 - Certification Supplement 3 - Facilities With First Point of Interconnection to Non-CBA Outside California

2 page(s)
 CEC Docket UnitCEC/L. Green
743231/16/2015 Certification or Precertification of Individual Facilities - CEC-RPS-1.S4 - Certification Supplement 4 - Incremental

1 page(s)
 CEC Docket UnitCEC/L. Green
743221/16/2015 Certification or Precertification of Individual Facilities - CEC-RPS-1-S.2 - Certification Supplement 2 - Hydroelectric

3 page(s)
 CEC Docket UnitCEC/L. Green
743211/16/2015 Certification or Precertification of Individual Facilities - CEC-RPS-1.S1 - Certification Supplement 1 - Biomethane

2 page(s)
 CEC Docket UnitCEC/L. Green
743201/16/2015 WREGIS State/Provincial/Voluntary Compliance Report and WREGIS e-Tag Summary Report Attestation

3 page(s)
 CEC Docket UnitCEC/L. Green
743191/16/2015 Certification of Aggregated Units - CEC-RPS-3

28 page(s)
 CEC Docket UnitCEC/L. Green
743181/16/2015 CA RPS e-Tag Summary Report - CEC-RPS-e-Tag

8 page(s)
 CEC/Docket UnitCEC/L. Green
743171/16/2015 Annual Hourly Comparison Scheduled PCC 1 POU Claims - CEC-RPS Hourly

8 page(s)
 CEC/Docket UnitCEC/L. Green
743161/16/2015 Renewables Portfolio Standard Eligibility, Eighth Edition, Staff Draft Guidebook

106 page(s)
 CEC/Docket UnitCEC/ L. Green
743151/16/2015 Request for Comments Regarding Guideline Revisions for RPS Implementation

2 page(s)
 CEC/Docket UnitCEC/L. Green
742751/12/2015 Response letter re: RPS Certification extension

1 page(s)
 Windstream 6040/A. DaviesCEC/R. Oglesby
742741/12/2015 Response letter re: RPS Certification extension

1 page(s)
 Capital Dynamics, Inc./R. McClenachan & K. OlsoniCEC/ R. Oglesby
742541/5/2015 Response to Turlock Irrigation District's request for extensino of RPS Certification deadline

2 page(s)
 Turlock Irrigation Disttrict/K. NoldCEC/R. Oglesby
742531/5/2015 Request for extension for Facility Certification Request

2 page(s)
 CEC/Docket UnitTID Water & Power/K. Nold
742521/5/2015 Response letter to MIC Renewable Energy Holding's request for extension of RPS Certification deadline

2 page(s)
 MIC Renewable Energy Hlding/B. GreenCEC/R. Oglesby
742501/5/2015 Response letter to Silicon Valley Power's request for extension of RPS Certification deadline

2 page(s)
 Silicon Valley Power/S. HanceCEC/R. Oglesby
742491/5/2015 Response to LightBeam Power Company Girdley Main and LightBeam Power Company Gridley Main Two's request for extension of RPS Certification deadline

2 page(s)
 LighBeam Power Company Gridley Main/M. NelsonCEC/R. Oglesby
742481/5/2015 Response letter to Mogul Energy Partners' request for extension of RPS Certification deadline

2 page(s)
 Mogul Enegy Partners I, LLC/C. LongCEC/R. Oglesby
742471/5/2015 Response to NRG Solar LLC's request for extension of RPS Certification deadline

1 page(s)
 NRG Solar LLC/P. ZavesoffCEC/R. Oglesby
742461/5/2015 Request for RPS Certification Application deadline extension

9 page(s)
 CEC/Docket UnitMIC Renewable Energy Holdigns/B. Green
742451/5/2015 Request for waiver extension

6 page(s)
 CEC/Docket UnitSilicon Valley Power/S. Hance
742441/5/2015 Request to extend and waive deadlines for RPS Certification

1 page(s)
 CEC/Docket UnitNRG/D. Fellman
742431/5/2015 Request for extension for certification

3 page(s)
 CEC/Docket UnitLightBeam Power Company Gridley Main/S. Tuszynski
742421/5/2015 Response to ConEdison Solutions' request for extension of RPS Certification deadline

2 page(s)
 ConEdison Solutions/S. OndishinCEC/R. Oglesby
742411/5/2015 Response letter regarding Request for extension of RPS Certification deadline

1 page(s)
 Nevada Irrigation District/P. HarmanCEC/R. Oglesby
742401/5/2015 Response to SPI's request for extension of RPS Certification deadline

1 page(s)
 SPI/S. KircherCEC/R. Oglesby
742391/5/2015 Requesting extension and waive deadlines for RPS Certification

6 page(s)
 CEC/Docket UnitNRG/D. Fellman
742381/5/2015 Letter Requesting extension and waive of application deadlines

1 page(s)
 CEC/Docket UnitMogul Energy Partners/C. Long
742371/5/2015 Request for waiver regarding missed application deadline

2 page(s)
 CEC/R. OglesbySPI/S. Kircher
742361/5/2015 Request for extension of RPS Certification deadlines

4 page(s)
 CEC/R. OglesbyNevada Irrigation District/P. Harman
7422012/31/2014 Request for a Time Extension for Submission of a Properly Executed RPS Certification for the Vinam 9011 Solar Project (CEC-RPS-ID: 61795A)

4 page(s)
 CEC/Docket UnitCapital Dynamics
7417412/17/2014 Request for Extension of Time RE RPS CERT Renewal

1 page(s)
 CEC/Docket UnitWinstead 6040
7407712/3/2014 Resolution No. 14-1117-14

6 page(s)
 CECCEC
7407612/2/2014 Response to Coronal Porterville

1 page(s)
 Coronal Management LLCCEC
7407512/2/2014 Repsonse to Coronal - Farmersville

1 page(s)
 Coronal Management LLCCEC
7402111/18/2014 Applicant Amendment Letter Final - FPA

7 page(s)
 FPACEC
7402011/18/2014 Applicant Amendment Letter Final - IID

7 page(s)
 IIDCEC
7401911/18/2014 Applicant Amendment Letter Final - CCSF

7 page(s)
 CCSFCEC
7401811/18/2014 Applicant Amendment Letter - final

7 page(s)
 LADWPCEC
7401711/14/2014 Coronal - Farmersville 6

1 page(s)
 CECCoronal
7401611/14/2014 Coronal - Farmersville7

1 page(s)
 CECCoronal
7401511/14/2014 Coronal - Farmersville 3

1 page(s)
 CECCoronal
7401411/24/2014 Coronal - Farmersville 2

1 page(s)
 CECCoronal
7401311/17/2014 Coronal - Farmersville 1

1 page(s)
 CECCoronal
7398711/14/2014 CEC Response to CA. Leg. Letter RE Friant Power

5 page(s)
 CA Leg.cec
7398611/14/2014 CA. Leg. Letter RE Friant Power

2 page(s)
 CECCA. Leg
7398211/13/2014 SFWPS Comments on Proposed Resolution

3 page(s)
 CECSan Francisco Water Power Sewer
7397411/13/2014 Comments of the Friant Power Authority

3 page(s)
 CECBraun Blaising McLaughlin & Smith P.C.
7396011/10/2014 Notice of Proposed Implementation of Assembly Bill 1478 for the Renewables Portfolio Standard

8 page(s)
 CECCEC
7382510/10/2014 Resolution 14-1007-10

6 page(s)
 CEC/Docket UnitCEC
7381510/9/2014 CRS Proposed Process for Retroactive Renewable Energy Certificate

2 page(s)
 CEC/Docket UnitCRS
7381010/3/2014 California Municipal Utilities Association

2 page(s)
 CEC/Dockets UnitCalifornia Municipal Utilities Association
7380910/3/2014 Comments on the City and County of San Francisco on the Proposal to Allow the Creation of Retroactive Renewable Energy Certificates and Extend the Deadline for Use of the Interim Tracking System for the Renewables Portfolio Standard (RPS)

1 page(s)
 CEC/Dockets UnitSan Francisco Water Power Sewer
7380810/3/2014 Comments from the Los Angeles Department of Water and Power (LADWP) to Proposed Process to Allow Creation of Retroactive Renewable Energy Certificates (RECs) and Extend the Deadline for the Interim Tracking System (ITS) for the RPS

8 page(s)
 CEC/Dockets UnitLos Angeles Department of Water and Power
7380710/3/2014 Comments on California Energy Commission Revised Notice of Proposed Process to Allow Creation of Retroactive Renewable Energy Certificates and Extend the Deadline for the Interim Tracking System for the Renewables Portfolio Standard

5 page(s)
 CEC/Dockets UnitSouthern California Edison
7380610/3/2014 Sacramento Municipal Utility District's Comments on the Proposed Process to Allow Creation of Retroactive Renewable Energy Certificates and Extend the Deadline for the Interim Tracking System for the Renewables Portfolio Standard

3 page(s)
 CEC/Dockets UnitSacramento Municipal Utility District
7380510/3/2014 Northern California Power Agency Comments on the Proposed Process to Allow Creation of Retroactive Recs and Extend the Deadline for Publicly Owned Utilities to Use the Interim Tracking System

4 page(s)
 CEC/Dockets UnitNorthern California Power Agency
7380410/3/2014 M-S-R Comments on Proposed Process to Allow Creation of Retroactive Recs and Extend the Deadline for Pous to Use the ITS

2 page(s)
 CEC/Dockets UnitM-S-R Public Power Agency
7380210/3/2014 PG&E Stakeholder Comments Proposed Process to Allow Creation of Retroactive Renewable Energy Certificates and Extend the Deadline for the Interim Tracking System for the Renewables Portfolio Standard

3 page(s)
 CEC/Dockets UnitPacific Gas and Electric Company
7379610/3/2014 SCPPA Comments on October 7th Business Meeting

1 page(s)
 CEC/ Docket UnitSCPPA
734337/16/2014 Response to Reconsideration of Order by the CEC on LAOWP's Application for Renewables Portfolio Standard (RPS) Certification for the Castaic Power

2 page(s)
 CEC / Docket UnitCEC / M S Levy
734317/11/2014 Reconsideration of Order by CEC on the Los Angeles Department of Water and Power's (LADWP's) Applications for Renewables Portfolio Standard (RPS) Certification for the Castaic Power Plant, Units 3 and 5, RPS ID No. 62561A

3 page(s)
 CEC / Docket UnitLADWP
733667/11/2014 Petition for Reconsideration of Applications for RPS Cerlification for Castaic Power Plant Units 3 and 5 RPS ID 62561A

36 page(s)
 CEC / Docket UnitLADWP / R S Howard
733647/11/2014 Applications for Renewables Portfolio Standard (RPS) Certification for the Castaic Power Plant, RPS ID 62561A

4 page(s)
 CEC / Docket UnitCEC / Suzanne Korosec
733627/11/2014 Form CEC-108 SERVICE ON THE CHIEF COUNSEL

1 page(s)
 CEC / Docket UnitCEC
731966/13/2014 Petition for Reconsideration of Application for Renewables Portfolio Standard Certification for the Castaic Power Plant

24 page(s)
 CEC / Docket UnitCEC
731956/12/2014 Order Dismissing Letter of Appeal

3 page(s)
 CEC / Docket UnitEnergy Resources Conservation & Development
730465/23/2014 Request to extension to Submit a Complete Application for RPS Certification of Dessert Hot Springs Solar Farm

19 page(s)
 CEC / Docket UnitConEdison Solutions / S Ondishin
730455/23/2014 Request to extend and waive the Application Deadline for th Final Certification

13 page(s)
 CEC / Docket UnitG2Energy / R. C. Jones
730165/12/2014 Petition for Reconsideration of Application for Renewables Portfolio Standard Certification for the Castaic Power Plant, Units 3 and 5, RPS 10 62561A

23 page(s)
 CEC / Docket UnitCEC / R. S. Howard
730155/12/2014 Petition for Reconsideration of Application for Reemploys Portfolio Standard Certification for There Castric POWER PLANT

35 page(s)
 CEC / Docket UnitLos Angels Dept of Water & Power LADWP
730135/12/2014 Letter: Energy Commission Staff has Determined that the Castaic Power Plant is not Eligible for RPS Certification

4 page(s)
 CEC / Docket UnitCEC / O. Alverez LADWP
730125/12/2014 Form CEC 108 Service on the Chief Counsel

1 page(s)
 CEC / Docket UnitLA Department of Water and Power
730115/12/2014 Letter of Appeal for Denying LADWP's Petition for Reconsideration of Application for Renewables Portfolio Standard

6 page(s)
 CEC / Docket Unit / R Weisenmiller & M. LeveyLos Angles Department of Water & Power LADWP
729835/1/2014 Nevada Irrigation District's's Request for Extension of RPS Cert Deadlines for Dutch Flat #2 Powerhouse CEC-RPS-ID No 60264A & Rollins Powerhouse CEC-RPS-ID No 60265A

3 page(s)
 CEC / Docket Unit / R. OglesbyMINASIAN, MEITH, SOARES, SEXTON & Cooper, LLP
729524/23/2014 Resolution: California Energy Commission is Charged with Certifying Renewable Energy Resources, Time Extension Process Signed Resolution (4-22-14

3 page(s)
 CEC / Docket Unit G. HerreraCEC / Wiesnmiller, Douglas, Hochschild, Scott
729294/17/2014 Re: Comments on the Process to Extend or Waive Deadlines for Renewable Portfolio Standard Certification

2 page(s)
 CEC / Docket UnitCMUA California Municipal Utilities Association
729284/18/2014 NORTHERN CALIFORNIA POWER AGENCY Comments on process to extend and waive deadlines for renewable Portfolio standard certification

4 page(s)
 CEC / Docket UnitNCPA Northern California Power Agency C. S. Berlin, Esq
729254/17/2014 Docket No. 11-RPS-01, Comments on CEC Notice to Consider Process to Extend and Waive Deadlines for RPS Certification

3 page(s)
 CEC / Docket UnitEdison Southern California / M Alvarez
729194/17/2014 Comments of NRG Solar LLC in Support of Process to Extend and Waive Deadlines for Renewables Portfolio Standard Certification

2 page(s)
 CEC / Docket UnitNRG D. Fellman
729184/17/2014 RPS Certification 11-RPS-01: Nevada Irrigation District's Comments on the Proposed Amendment to the RPS Guidebook Certification Provisions.

2 page(s)
 CEC / Docket UnitMinasian, Meith, Soares, Sexton, & Cooper, LLP Attorneys at Law
729174/17/2014 G2 Energy Hay Road Power Plant Letter to Re: CEC-RPS-ID No. 61205A, REQUEST FOR RECONSIDERATION, REQUEST FOR EXEMPTION OR WAIVER

4 page(s)
 CEC / Docket UnitG2 energy R. Jones
728804/8/2014 04-22-14 Deadline Notice Final Notice to Consider Process to Extend and Waive Deadlines to Renewables Portfolio Standard Certification

8 page(s)
 CEC / Docket UnitCEC K. Zocchetti
728764/4/2014 Petition for Reconsideration of Applications for Renewables Portfolio Standard Certification for Scattergood, Harbor, Valley and Haynes Generating Stations Using Biomethane from 2009 Shell and Atmos Contracts RPS ID 61596A, 61597A, 61598A and 61599A

68 page(s)
 CEC / Docket Unit R P OglesbyB. Moschos / S. Snyder LADWP
727102/13/2014 NID Petition for Reconsideration of CEC Denial

87 page(s)
 CEC/Docket UnitNID
726972/18/2014 SCE RPS Guidebook Scoping Workshop Comments

5 page(s)
 CEC / Docket UnitC. Karlstad / Southern CA Edison
726962/18/2014 Iberdrola Comments to CEC RPS Guidebook Scoping Workshop

3 page(s)
 CEC / Docket UnitR. J. Smutny
726952/14/2014 Final CEC RPS Guiedbook Letter

3 page(s)
 CEC / Docket UnitA. Link / CASA
726942/14/2014 RPS Comments to workshop

3 page(s)
 CEC / Docket UnitJ. Luckhardt / Downey Brand
726932/14/2014 CEC SDGE Comments RPS Guidebook Scoping 2014

3 page(s)
 CEC / Docket UnitT. Rasberry / SDGE
726892/18/2014 Los Angeles Department of Water and Power's Comments To The California Energy Commission's Notice of Lead Commissioner Workshop To Scope A Future Edition Of The Renewables Portfolio Standard Eligibility Guidebook

9 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power
726882/18/2014 SMUD's Comments about the RPS Eligibility Guidebook

29 page(s)
 CEC/ Docket UnitSMUD
726862/18/2014 Nevada Irrigation District's Comments

5 page(s)
 CEC/Docket UnitNevada Irrigation District
726852/18/2014 San Francisco Public Utilities Commission (SFPUC) Comments on proposed topics for consideration in revising the CEC's RPS Eligibility Guidebook

3 page(s)
 CEC/Docket UnitSan Francisco Public Utilities Commission (SFPUC)
726842/18/2014 Pacific Gas and Electric Company's Comments on the Lead Commissioner Workshop

12 page(s)
 CEC/Docket UnitPacific Gas and Electric Company
726832/18/2014 California Solar Energy Industries Association Comments

3 page(s)
 CEC/Docket UnitCalifornia Solar Energy Industries Association
726822/18/2014 NCPA Comments Re: Scope RPS Guidebook Revisions

7 page(s)
 CEC/Docket UnitNCPA
726812/18/2014 Large-Scale Solar Association Comments on the RPS Guidebook Scoping Workshop

4 page(s)
 CEC/Docket UNitLarge-scale Solar Association
726802/14/2014 2014 Scoping Workshop Presentation

54 page(s)
 CEC / Docket UnitCEC / M. Kootstra
726792/18/2014 CMUA's Comments on RPS Eligibility Guidebook Scoping Workshop

7 page(s)
 CEC/Docket UnitCMUA
726782/14/2014 2014 RPS Scoping Workshop Notice

8 page(s)
 CEC / Docket UnitCEC / M. Kooststra
726762/18/2014 Southern California Public Power Authority Comments on the RPS Guidebook Scoping Workshop

5 page(s)
 CEC/Docket UnitSouthern California Public Power Authority
726752/14/2014 Scoping Workshop Agenda

1 page(s)
 CEC / Docket UnitCEC / M. Kootstra
726742/18/2014 Waste Management Comments - Proposed Changes to Renewable Portfolio Standard (RPS) Eligibility Guidebook

3 page(s)
 CEC/Docket UnitWaste Management by Chuck White
726732/19/2014 Bioenergy Association of California's comments on proposed changes to the RPS Eligibility Guidebook

4 page(s)
 CEC/Docket UnitBioenergy Association of California
726722/13/2014 Petition for Reconsideration

35 page(s)
 CEC / Docket UnitLADWP
726652/18/2014 CA Pacific Corp Comments

7 page(s)
 CEC / Docket UnitC. Meyer / Pacific Meyer
726622/18/2014 Redding Comments re Scope RPS Guidebook Revisions

5 page(s)
 CEC / Docket UnitS. Berlin Law Office of Susie Berlin
725592/13/2014 RPS Eligibility Guidebook Hand Delivered it's Petition for Reconsideration

87 page(s)
 CEC / Docket UnitK. Mitchell on behalf of Jeffery Harris
724881/16/2014 The California Hydropower Reform Coalition and other organizations Comments on the Lead Commissioner Report

3 page(s)
 CEC/ Docket UnitCalifornia Hydropower Reform Coalition and other organizations
724721/13/2014 BC Hydro Power Point Presentation

5 page(s)
 CEC/ Docket UnitCEC/ B McCollough
724711/10/2014 BC Hydro Draft Report

2 page(s)
 CEC / Docket UnitCEC / B. McCollough
724681/9/2014 BC Draft Report on Draft Report California Energy Commission's Run of the River Study

3 page(s)
 CEC / Docket UnitB. McCollough Clean Energy BC
7236711/15/2013 Joint Comment Letter re BC Hydro Draft Report

13 page(s)
 CEC/Docket UnitCalifornia Hydropower Reform Coalition/K.Nakatani
7235011/18/2013 Natalie Anderson of Colorado State University's Comments on BC Hydro Draft Report

2 page(s)
 CEC/Docket UnitColorado State University/N.Anderson
7234811/15/2013 Ben Hawthorne's Comments BC Hydro Draft Report

1 page(s)
 CEC/Docket UnitPublic/B.Hawthorne
7234011/14/2013 Resolution Number 13-1114-7

3 page(s)
 CEC/ Docket UnitCEC/ Harriet Kallemeyn
719989/20/2013 Sacramento Municipal Utility District's Comments on Staff Workshop on Station Service

3 page(s)
 CEC/Docket UnitSacramento Municipal Utility District/W.Westerfield /T.Tutt
719979/20/2013 Independent Energy Producers Association's Comments on the Staff Workshop on Station Service in the RPS

4 page(s)
 CEC/Docket UnitIndependent Energy Producers Association/S.Kelly
719949/20/2013 Union of Concerned Scientists and the Sierra Club's Joint Comments on Station Service in the RPS

2 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/L.Wisland /Sierra Club California/M.Vespa
719939/20/2013 NextEra Energy Resource Comments on the Station Service Workshop

3 page(s)
 CEC/Docket UnitNextEra Energy Resources/K.Hattevik /M.Toomey
719929/20/2013 Los Angeles Department of Water and Power's Comments on Station Service

7 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
719909/20/2013 Geysers Power Company, LLC's Comments to Staff Workshop on Station Service

1 page(s)
 CEC/Docket UnitGeysers Power Company, LLC/D.Cooley
719899/19/2013 The Utility Reform Network's Comments

4 page(s)
 CEC/Docket UnitThe Utility Reform Network/M.Freedman
719889/19/2013 University of California, Davis' Comments on Staff Workshop on Station Service

2 page(s)
 CEC/Docket UnitUniversity of California, Davis/W.Glassley /P.Schiffman /E.Brown
719879/20/2013 Southern California Public Power Authority Comment Letter RE Station Service

2 page(s)
 CEC/Docket UnitSouthern California Public Power Authority
719869/20/2013 Ormat Technologies Comment Letter

8 page(s)
 CEC/Docket UnitOrmat Technologies
719829/18/2013 Cyrq Energy's Comments on the Definition of Station Service Load at Eligible Renewable Facilities

3 page(s)
 CEC/Docket UnitCyrq Energy/N.Goodman
719719/12/2013 Ormat's POWER POINT Presentation at the Station Service Workshop

3 page(s)
 CEC/Docket UnitCEC/M.Kootstra
719709/12/2013 CEC's Mark Kootstra's POWER POINT Presentation - Station Service and California’s RPS Program

36 page(s)
 CEC/Docket UnitCEC/M.Kootstra
719699/12/2013 Attachment A - Station Service

11 page(s)
 CEC/Docket UnitCEC/M.Kootstra
719689/12/2013 Notice of Staff Workshop on Station Service in the Renewables Portfolio Standard Program

4 page(s)
 CEC/Docket UnitCEC/M.Kootstra
719669/9/2013 Geothermal Energy Association's Comments on the Renewables Portfolio Standard

1 page(s)
 CEC/Docket UnitGeothermal Energy Association/K.Gawell
708675/16/2013 Commission Guidebook - Renewable Portfolio Standard Eligibility (Seventh Edition)

227 page(s)
 CEC/Docket UnitCEC/M.Kootstra
708635/16/2013 Renewable Energy Program - Overall Program Guidebook Sixth Edition

28 page(s)
 CEC/Docket UnitCEC/M.Kootstra
708555/16/2013 Notice of Availability and Errata for the RPS Eligibility and the Overall Guidebook (Final)

5 page(s)
 CEC/Docket UnitCEC/M.Kootstra
707535/9/2013 Resolution Number 12-0328-3- Resolution -Correction Resolution

2 page(s)
 CEC/Docket UnitCEC
707515/9/2013 Resolution Number 13-0430-6 - Resolution - Lifting Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/Docket UnitCEC/ H. Kallemeyn
707495/9/2013 Resolution Number 13-0430-5

2 page(s)
 CEC/Docket UnitCEC/ H. Kallemeyn
707475/9/2013 Resolution Number 13-0430-4

2 page(s)
 CEC/ Docket UnitCEC/ H. Kallemeyn
706135/3/2013 Errata to the Proposed Revisions to Staff's Final Renewables Portfolio Standard Eligibility Guidebook

8 page(s)
 CEC/Docket UnitCEC/M.Kootstra
706115/3/2013 Staff Final Guidebook - Renewable Energy Program Overall Program Guidebook

33 page(s)
 CEC/Docket UnitCEC/M.Kootstra
706095/3/2013 Staff Final Guidebook - Renewables Portfolio Standard Eligibility

298 page(s)
 CEC/Docket UnitCEC/M.Kootstra
706075/3/2013 Revised Notice of Business Meeting re Guideline Revisions for RPS Implementation and Renewable Energy Program

9 page(s)
 CEC/Docket UnitCEC/M.Kootstra
706055/3/2013 WREGIS State/Provincial/Voluntary Compliance Report Attestation Form - Draft

1 page(s)
 CEC/Docket UnitCEC/M.Kootstra
706005/3/2013 POU-RPS Compliance Spreadsheet - Draft

44 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705965/3/2013 Procurement of Renewable Energy Generation from RPS Certified Facilities - Draft

6 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705935/3/2013 Report of Fuel Use for California RPS Certified Facilities - Draft

3 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705895/3/2013 Report of Scheduled into a CBA - PCC 1 Claims Annual Hourly Comparison Spreadsheet for POU RPS Claims - Draft

248 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705875/3/2013 Report of Historic Carry-Over for California RPS - Draft

5 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705785/3/2013 Report of Generation for California RPS Certified Facilities - Draft

6 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705755/3/2013 CA RPS e-Tag Summary Report - Draft

7 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705705/3/2013 Report of Biomethane Use - Draft

7 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705685/3/2013 Appendix D – Summary of Reporting Requirements and Deadlines

3 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705665/3/2013 Appendix A – WREGIS Reporting Instructions

11 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705645/3/2013 CEC POWER POINT Presentation - Proposed Revisions to RPS Eligibility Guidebook

64 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705625/3/2013 Staff Draft Guidebook - RPS Standard Eligibility

179 page(s)
 CEC/Docket UnitCEC/M.Kootstra
705605/3/2013 Notice of Workshop re Guideline Revisions for RPS Implementation

4 page(s)
 CEC/Docket UnitCEC/M.Kootstra
704744/25/2013 Los Angeles Department of Water and Power's Comments CEC's RPS Eligibility Guidebook

13 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
704684/25/2013 Southern California Public Power Authority's Comments on the CECs Draft RPS Eligibility Guidebook

15 page(s)
 CEC/Docket UnitSouthern California Public Power Authority/O.Herrera
704664/25/2013 CalEnergy's Comments to the Final Draft RPS Eligibility Guidebook

2 page(s)
 CEC/Docket UnitCalEnergy Operating Corporation/R.Keller
704634/25/2013 Independent Energy Producers Association's Comments on Developing Regulations and Guidelines for the 33 Percent Renewable Portfolio Standard

3 page(s)
 CEC/Docket UnitIndependent Energy Producers Association/S.Kelly
704614/25/2013 Ormat's Comments on Developing Regulations and Guidelines for the 33 Percent Renewables Portfolio Standard

4 page(s)
 CEC/Docket UnitOrmat/P.Thomson
704594/25/2013 Waste Management's Comments on Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitWaste Management/C.White
704574/25/2013 Cyrq Energy’s Comments on Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitCyrq Energy/N.Goodman
704544/25/2013 Geothermal Energy Association's Comments on Developing Regulations and Guidelines for the 33 Percent Renewables Portfolio Standard

1 page(s)
 CEC/Docket UnitGeothermal Energy Association/K.Gawell
704524/25/2013 Global Geothermal & Recurrent Engineering's Comments on Developing Regulations and Guidelines for the 33 percent Renewables Portfolio Standard

1 page(s)
 CEC/Docket UnitGlobal Geothermal & Recurrent Engineering/B.Levy
704374/23/2013 Assembly California Legislature Nancy Skinner Letter of Support

3 page(s)
 CEC/Docket UnitAssembly California Legislature/ Nancy Skinner
703364/15/2013 Shell Energy North America Comments

8 page(s)
 CEC/ Docket UnitShell Energy North America
703004/15/2013 Powerex Corp's Comments on Proposed Changes to RPS Eligibility Guidebook

2 page(s)
 CEC/Docket UnitPowerex Corp/Goodin, Macbride, Squeri, Day & Lamprey LLP/S.Hong
702934/15/2013 Element Markets LLC Comments to Appendices and Forms

3 page(s)
 CEC/ Docket UnitElement Markets LLC
702904/15/2013 Coalition for Renewable Natural Gas Comments to Biomethane Appendices and Forms for the RPS Eligibility Guidebook

2 page(s)
 CEC/R.WeisenmillerCoalition for Renewable Natural Gas/J.Escudero /D.Cox
702264/5/2013 Clean Energy BC Comments re the Renewables Portfolio Standard

12 page(s)
 CEC/Docket UnitClean Energy BC/P.Kariya
702214/5/2013 California Hydropower Reform Coalition Comment Letter

9 page(s)
 CEC/ Docket UnitCalifornia Hydropower Reform Coalition
701904/2/2013 San Diego Gas & Electric Company's Comments re Commission Staff Workshop on Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitSempra Energy Utilities/T.Rasberry
701884/2/2013 Ken Holowanky's Comments re BC "Run of River"

3 page(s)
 CEC/Docket UnitPublic/K.Holowanky
701653/27/2013 Iberdrola's comments on CEC Draft RPS Guidebook-Seventh Edition

7 page(s)
 CEC/Docket UnitIberdrola
701563/26/2013 Large-Scale Solar Association's Comments on Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

6 page(s)
 CEC/Docket UnitLarge -Scale Solar Association/R.Gold
701543/26/2013 Waste Management's Comments on Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

5 page(s)
 CEC/Docket UnitWaste Management/C.White
701503/25/2013 The Utility Reform Network's Comments on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

16 page(s)
 CEC/Docket UnitThe Utility Reform Network/M.Freedman /M.Hawiger
701483/25/2013 Powerex Corporation's Comments on the Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

7 page(s)
 CEC/Docket UnitPowerex Corporation/S.Hong
701463/25/2013 Southern California Edison's Comments Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

7 page(s)
 CEC/Docket UnitSouthern California Edison/M.Alvarez
701443/25/2013 Independent Energy Producers Association's Comments on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

7 page(s)
 CEC/Docket UnitIndependent Energy Producers Association/S.Kelly
701423/25/2013 The Coalition for Renewable Natural Gas's Comments on the Staff's Draft RPS Eligibility Guidebook, Seventh Edition

5 page(s)
 CEC/Docket UnitThe Coalition for Renewable Natural Gas/J.Escudero /D.Cox
701403/25/2013 Ormat Technologies Inc's Comments on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

4 page(s)
 CEC/Docket UnitOrmat Technologies Inc/P.Thomsen
701383/25/2013 Southern California Public Power Authority's Comments on Staff's Workshop on Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook, Seventh Edition

14 page(s)
 CEC/Docket UnitSouthern California Public Power Authority/O.Herrera
701363/25/2013 M-S-R Public Power Agency's Comments on the Draft Renewables Portfolio Standard Eligibility Guidebook, Seventh Edition

3 page(s)
 CEC/Docket UnitM-S-R Public Power Agency/M.Hopper
701343/25/2013 Sacramento Municipal Utility District's Comments on the Draft Seventh Edition of the Renewables Portfolio Standard Guidebook

18 page(s)
 CEC/Docket UnitSacramento Municipal Utility District/W.Westerfield /T.Tutt
701323/25/2013 Alliance for Retail Energy Markets Comments on the RPS Guidebook

3 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P./Alliance for Retail Energy Markets/A.Brown
701303/25/2013 Redding Electric Utility's Comments on Draft RPS Guidebook

4 page(s)
 CEC/Docket UnitRedding Electric Utility/E.Hadley
701273/25/2013 Calpine Corporation's Comments on the Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

9 page(s)
 CEC/Docket UnitCalpine Corporation/S.Kochavi
701263/25/2013 CalEnergy Operating Corporation's Comments on Proposed Revisions to the Renewable Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitCalEnergy Operating Corporation/S.Larsen
701223/26/2013 NCPA Comments on Draft RPS Guidebook

11 page(s)
 CEC/Docket UnitNCPA
701203/26/2013 PacifiCorp Comments on Draft Guidebook

16 page(s)
 CEC/Docket UnitPacifiCorp
701173/26/2013 Clean Energy's Comments on Proposed Changes to RPS Eligibility Guidebook

4 page(s)
 CEC/ Docket UnitClean Energy
701043/25/2013 Imperial Irrigation District's Comments on RPS Eligibility Guidebook

3 page(s)
 CEC/Docket UnitImperial Irrigation District/C.Stills
701013/25/2013 Noble Americas Energy Solutions' Comments in Response to RPS Eligibility Guidebook Workshop

11 page(s)
 CEC/Docket UnitNoble Americas Energy Solutions LLC/T.Corr /G.Bass /J.Pannu
700973/25/2013 Cyrq Energy's Comments on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

4 page(s)
 CEC/Docket UnitCyrq Energy/W.Brown
700943/25/2013 California Energy Storage Alliance's Comments on Proposed Changes to the Renewables Portfolio Standard Eligibility Guidebook

5 page(s)
 CEC/Docket UnitCalifornia Energy Storage Alliance/J.Lin
700923/25/2013 Bear Valley Electric Service, a Division of Golden State Water Company's Comments on the Draft Seventh Edition RPS Eligibility Guidebook

7 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P./J.Gibson
700883/26/2013 CalWEA Comments on Staff Draft Guidebook

1 page(s)
 CEC/Docket UnitCalWEA
700873/25/2013 PG&E's Comments on the Staff Draft Renewables Portfolio Standard Eligibility Guidebook, 7th Edition

12 page(s)
 CEC/Docket UnitPacific Gas and Electric Company/G.Mathai-Jackson
700853/26/2013 Pasadena Water and Power Comments regarding CEC RPS Eligibility Guidebook 7th Edition

4 page(s)
 CEC/Docket UnitPasadena Water and Power
700833/25/2013 Shell Energy Comments on Proposed Changes to the RPS Eligibility Guidebook

14 page(s)
 CEC/Docket UnitShell Energy North America (US), L.P./J.Leslie
700803/25/2013 LADWP's Comments on the CEC's RPS Eligibility Guidebook, 7th Edition

18 page(s)
 CEC/ Docket UnitLADWP
700793/25/2013 LotusWorks' Comments on the Changes to Station Service Definition

1 page(s)
 CEC/Docket UnitLotusWorks/S.Ostrowski
700763/25/2013 CBEA Comments on Proposed Changes to RPS Eligibility Guidebook

2 page(s)
 CEC/Docket UnitCBEA
700743/25/2013 EDF Renewable Energy Comments on the Staff Draft Guidebook RPS Eligibility 7th Edition

5 page(s)
 CEC/Docket UnitEDF Renewable Energy/V.Singh
700733/25/2013 Solar City and Tesla Motors Final Comments on Proposed Revisions RPS Guidebook

6 page(s)
 CEC/ Docket UnitSolarCity/ Tesla Motors
700693/25/2013 CMUA Comments on CEC's 7th Edition RPS Eligibility Guidebook

16 page(s)
 CEC/Docket UnitCMUA
700683/25/2013 BioFuels PT. Loma, LLC Comments on the RPS Eligibility Guidebook, Seventh Edition

8 page(s)
 CEC/Docket UnitBioFuel PT.Loma LLC/M.Boccadoro /E.Macaux
700643/25/2013 Element Markets LLC's Comments on the Workshop on Proposed Revisions to the RPS Guidebook, 7th Ed

4 page(s)
 CEC/Docket UnitElement Markets LLC/R.Lack
700603/25/2013 Brookfield Renewable Energy Group's Comments to the RPS Eligibility Guidebook 7th Edition

9 page(s)
 CEC/Docket UnitBrookfield Renewable Energy Group/M.Miller
700333/22/2013 U.S. Geothermal Inc's Comments on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

1 page(s)
 CEC/Docket UnitU.S. Geothermal Inc/S.Nichols
700303/22/2013 Bodington & Company 's Comments on the Definition of Station Service

177 page(s)
 CEC/Docket UnitBodington & Company/J.Bodington
700283/22/2013 Geothermal Energy Association on the Proposed Changes to the Renewable Portfolio Standard Eligibility Guidebook

1 page(s)
 CEC/Docket UnitGeothermal Energy Association/K.Gawell
699913/20/2013 TAS Energy's Comments re Changes to Station Service

1 page(s)
 CEC/Media and Public Communications OfficeTAS Energy, INC/H.Dickey
699893/20/2013 Ken Holowanky's Public Comments on the Staff Workshop on British Columbia Study

2 page(s)
 CEC/Docket UnitPublic/K.Holowanky
699883/20/2013 Ken Holowanky's Public Comments to B.C. Environmental Assessment Office

12 page(s)
 CEC/Docket UnitPublic/K.Holowanky
699873/20/2013 Joan and Soren Bech's Submission to the B.C. Environmental Assessment Office re the Proposed Narrows Inlet Private Power Project

9 page(s)
 CEC/Docket UnitPublic/K.Holowanky
699863/20/2013 Ken Holowanky's Letter to Kathy Eichenberger of the Environmental Assessment Office re Stlixwim Hydro Corporation Narrows Inlet / Tzoonie River Proposal

5 page(s)
 Enviormental Assessment Office/K.EichenbergerPublic/K.Holowanky
699853/20/2013 Ken Holowanky's EAO Submission re Narrows Inlet Hydro

16 page(s)
 EAO/G.AlexanderPublic/K.Holowanky
699843/20/2013 Ken Holowanky's Letter to California Senator Simitian

1 page(s)
 California Senator/J.SimitianPublic/K.Holowanky
699533/19/2013 GEM Comment Letter

3 page(s)
 CEC/Docket UnitGEM
699343/15/2013 CEC's Angela Gould's POWER POINT Presentation for the Staff Workshop-Hearing

60 page(s)
 CEC/Docket UnitCEC/A.Gould
695032/12/2013 Los Angeles Department of Water and Power's Interpretation on 40MW Hydro Units Effective Date

13 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard /J.Bertet
695012/11/2013 Union of Concerned Scientists on the CEC's AB 2196 Concept Paper

4 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/L.Wisland
694932/11/2013 Pacific Gas and Electric Company's Comments on the Staff Concept Paper for Implementation of Assembly Bill 2196

6 page(s)
 CEC/Docket UnitPG&E
694802/11/2013 Sacramento Municipal Utility District's Comments on AB 2196

25 page(s)
 CEC/Docket UnitSacramento Municipal Utility District/W.Westerfield /T.Tutt
694782/8/2013 Waste Management's Comment Letter

6 page(s)
 CEC/Docket UnitWaste Management/C.White
694762/8/2013 Southern California Public Power Authority's Comments on AB 2196

8 page(s)
 CEC/Docket UnitSouthern California Public Power Authority/J.Lau
694732/8/2013 California Municipal Utilities Association's Comments on AB 2196

3 page(s)
 CEC/Docket UnitCalifornia Municipal Utilities Association/T.Andreoni
694702/8/2013 Center for Resource Solutions' Comments on AB 2196

4 page(s)
 CEC/K.ZocchettiCenter for Resource Solutions/J.Martin
694672/8/2013 Clean Energy's Comments on the Concept Paper for Implementation of Assembly Bill 2196 Pertaining to the Renewables Portfolio Standard Program

3 page(s)
 CEC/ Docket UnitClean Energy
694662/8/2013 Shell Energy North America (US), L.P. Comments on Staff Concept Paper on AB 2196 Implementation

9 page(s)
 CEC/ Docket UnitShell Energy North America (US), L.P.
694642/8/2013 Coalition For Renewable Natural Gas Comment Letter on AB 2196

3 page(s)
 CEC/R.WeisenmillerCoalition For Renewable Natural Gas/J.Escudero /D.Cox
694622/8/2013 Element Markets Renewable Energy's Comments to the AB2196 Concept Paper

3 page(s)
 CEC/Docket UnitElement Markets Renewable Energy
694602/8/2013 Los Angeles Department of Water and Power's Comments on the CEC's AB2196 Concept Paper

18 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
694592/8/2013 BioFuels Pt. Loma, LLC Comment Letter

8 page(s)
 CEC/Docket UnitBioFuels Pt. Loma, LLC
694562/8/2013 Republic Services Inc. Comment Letter

3 page(s)
 CEC/K. ZochettiRSI
694532/8/2013 Joint Comment Letter from TURN, LSA and CalWEA on the AB 2196 Concept Paper

9 page(s)
 CEC/Docket UnitLarge-Scale Solar Association /California Wind Energy Association /The Utility Reform Network
694312/8/2013 EDF Renewable Energy Comment Letter

6 page(s)
 CEC/Docket UnitEDF Renewable Energy
6861511/16/2012 CEC Staff K Chou CEC Staff 7-30-12 Workshop Presentation Regarding 33 Percent RPS

31 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6860811/16/2012 CEC Staff K Chou CEC Staff Clean Version of the 33 Percent RPS Draft Regulations

37 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6860711/16/2012 CEC Staff K Chou CEC Staff 33 Percent RPS Draft Regulations 7-12

43 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6860611/21/2012 CEC Staff K Chou CEC Staff Workshop on 7-30-12 Regarding 33 Percent PRS

4 page(s)
 CEC/Docket StaffCEC Staff/K Chou
6859911/16/2012 CEC Staff K Chou - Attachment B to RPS 3-1-12 Workshop

2 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6859611/16/2012 CEC Staff K Chou - Attachment A to RPS 3-1-12 Workshop

4 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6859411/16/2012 CEC Staff K Chou - 3-1-12 CEC Staff Presentation

28 page(s)
 CEC/Docket UnitCEC Staff/K Chou
6859211/16/2012 CEC Staff - K Chou - 33 Percent RPS Draft Regulations Feb 2012

32 page(s)
 CEC/Docket UnitCEC Staff/K. Chou
6859011/16/2012 CEC Staff - K Chou - 3-01-12 Transcript

108 page(s)
 CEC/Docket UnitCEC Staff/ K. Chou
6858911/16/2012 CEC Staff - K. Chou - Notice of Workshop on 33 Percent RPS

4 page(s)
 CEC/Docket UnitCEC Staff/K. Chou
6765610/8/2012 Comments of Shell Enegy on 2008-2010 RPS Procurement Verification and SBX1 2 RPS Procurement Verification from John Leslie, McKenna Long & Aldridge LLP

7 page(s)
 CEC/ Docket UnitMcKenna Long & Aldridge LLP/ J. Leslie
6764610/8/2012 Comments - Renewable Portfolio Standard Reporting and Verification Under SBX1 2 from Modesto Irrigation Dist., Redding Electric Utility, Turlock Irrigation Dist.

5 page(s)
 CEC/ Docket UnitRedding Electricity Utility/ E. Hadley
6763710/8/2012 Noble Americas Energy Solutions LLC Comments Regarding RPS under SB X 1-2

5 page(s)
 CEC/Docket UnitNoble Americas Energy Solutions LLC/T. Corr
6762610/10/2012 Los Angeles Department of Water and Power's Comments on the September 21, 2012 Staff Workshop

13 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
6762510/8/2012 SMUD Comments Regarding RPS under SB X1-2

7 page(s)
 CEC/Docket UnitSacramento Municipal Utility District/D. Mollart
6761810/8/2012 Alliance for Retail Energy Markets' Comments on SB X 1-2 Procurement Verification

3 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP/A, Brown Attorneys for the Alliance for Retail Energy Markets
6761510/8/2012 California Association of Small and Multi-Jurisdictional Utilities' Comments on SB X 1-2 Procurement Verification

10 page(s)
 CEC/Docket UnitCalifornia Association of Small and Multi-Jurisdictional Utilities/J.Gibson
6760810/8/2012 Iberdrola's Comments Regarding the September 21, 2012 Staff Workshop

41 page(s)
 CEC/Docket UnitIberdrola Renewables
6760710/8/2012 NCPA Comments re Verification Workshop

6 page(s)
 CEC/Docket UnitNCPA
6760410/8/2012 CMUA's Comment Letter on CEC's RPS Procurement Verification

7 page(s)
 CEC/Docket UnitCMUA
6759710/8/2012 San Diego Gas and Electric Company's Comment Letter for the September 21, 2012 Staff Workshop

2 page(s)
 CEC/Dockets UnitSempra Energy UtilitiesT.Rasberry
6757810/5/2012 Comments - Sept. 21, 12 Workshop re. RPS Procurement and SB X 1-2 from Nancy Norris, Powerex Corp.

3 page(s)
 CEC/ Docket UnitPowerex Corp./ N. Norris
6752210/4/2012 Pacific Gas and Electric Company's Comments on the September 21, 2012 Staff Workshop

3 page(s)
 CEC/Docket UnitPacific Gas and Electric Company/G.Mathai-Jackson
6742010/1/2012 AGL Resources' Comments on the RPS Procurement Verification

2 page(s)
 CEC/Docket UnitAGL Resources/C.Russo
673499/27/2012 Resolution Number 12-0509-6

2 page(s)
 CEC/Docket UnitCEC/H.Kellemeyn
673489/27/2012 RESOLUTION NO 12-0509-7

2 page(s)
 CEC/Docket UnitCEC/H.Kallemeyn
673399/27/2012 Resolution Number 12-0809-9

2 page(s)
 CEC/Docket UnitCEC/H. Kallemeyn
673329/27/2012 Resolution Number 12-0809-10

2 page(s)
 CEC/Docket UnitCEC/Hariet Kallemeyn
673009/26/2012 Public Comment - Carlos J. Echevarria

1 page(s)
 CEC/Docket UnitPublic/C.Echevarria
672579/24/2012 Comments on the 33% RPS

2 page(s)
 CEC/ Docket UnitUnion of Concerned Scientist
671679/17/2012 Union of Concerned Scientists/J. Hargleroad-Comment on 33% RPS

2 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/J. Hargleroad
671589/17/2012 Public Comment - Elizabeth Anthony

1 page(s)
 CEC/Docket UnitPublic/E.Anthony
671579/17/2012 Public Comment - Robert Keenan

1 page(s)
 CEC/Docket UnitPublic/R.Keenan
671199/14/2012 Public Comment - Ernest Thayer

1 page(s)
 CEC/Docket UnitPublic/E.Thayer
670649/11/2012 Gebhardo Christensen Public Comments Regarding 33 Percent RPS

1 page(s)
 CEC/ Docket UnitPublic/ G. Christensen
670529/10/2012 Andrea Foerster Public Comments on the 33 Percent RPS

1 page(s)
 CEC/ Docket UnitPublic/ A. Foerster
670289/5/2012 Public Comment by Angela Alvarez of Union of Concerned Scientists

1 page(s)
 CEC/Docket UnitPublic/A. Alvarez/Union of Concerned Scientists
670009/5/2012 Public Comments of Richard Robinson on Comment on the 33 Percent

1 page(s)
 CEC/ Docket UnitPublic/ R. Robinson
669598/13/2012 California Municipal Utilities Association's Comments on 33 Percent Renewables Portfolio

8 page(s)
 CEC/Docket UnitCalifornia Municipal Utilities Association/T.Andreoni
669588/14/2012 Comments of the Northern California Power Agency on the Draft Staff Report - 33 Percent Renewables Portfolio

13 page(s)
 CEC/Docket UnitAttorneys for Nothern California Power Agency/McCarthy & Berlin LLP/S.Berlin
669558/27/2012 Unions of Concerned Scientists on Behalf of Concerned Citizens

1 page(s)
 CEC/ Docket UnitUnions of Concerned Scientists/ L. Cervantes
669508/27/2012 Public Comments from Union of Concerned Scientists on behalf of Concerned Citizens

1 page(s)
 CEC/ Docket UnitUnions of Concerned Scientists/ V. Meyer
669488/24/2012 Public Comments from Unions Scientists on Behalf of Concerned Citizens

1 page(s)
 CEC/ Docket UnitUnion of Concerned Scientists/ K. Gobby
669358/13/2012 Los Angeles Department of Water and Power's Response to the CEC's RPS Draft Regulations for POUs

51 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
669304/16/2012 Calpine Corporation on Behalf of Paastoria Energy- Appplication for Confidential Designation of Portions of Responses to FORM CEC - RPS- BIO, Certification Supplement - Biomethane

4 page(s)
 CEC/R.OglesbyCalpine Corp
669284/16/2012 Calpine Corporation on Behalf of Pastoria Energy, Los Medanos and Metcalf - Request for Confidential Designation of Portions of Responses to FORM CEC - RPS- BIO, Certification Supplement - Biomethane

3 page(s)
 CEC/R.OglesbyCalpine Corp
669258/23/2012 Public Comments - Concerned Citizens

2 page(s)
 CEC/Docket UnitConcerned Citizens
669248/22/2012 Public Comments - Concerned Citizens

8 page(s)
 CEC/Docket UnitConcerned Citizens
669238/20/2012 Public Comments - Concerned Citizens

11 page(s)
 CEC/Docket UnitConcerned Citizens
669228/16/2012 Public Comments - Concerned Citizens

11 page(s)
 CEC/Docket UnitConcerned Citizens
669218/17/2012 Public Comments - Concerned Citizens

7 page(s)
 CEC/Docket UnitConcerned Citizens
669208/20/2012 Public Comments - Concerned Citizens

7 page(s)
 CEC/Docket UnitConcerned Citizens
669198/21/2012 Public Comments - Concerned Citizens

5 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/ Concerned Citizens
669188/20/2012 Public Comments - Concerned Citizens

9 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Concerned Citizens
669178/15/2012 Public Comments - Concerned Citizens

12 page(s)
 CEC/Docket UnitUnion of Concerned Scientist/ Concerned Citizens
669168/16/2012 Public Comments - Concerned Citizens

9 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/ Concerned Citizens
669158/14/2012 Public Comments - Concerned Citizens

42 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/ Concerned Citizens
669148/15/2012 Public Comments - Concerned Citizens

18 page(s)
 CEC/Docket UnitUnions of Concerned Scientists/Concerned CitIzens
668488/20/2012 STAFF NOE RPS Eligibility Guidebook

1 page(s)
 CEC/DOCKET UNITCEC STAFF/G. HERRERA
668418/20/2012 STAFF NOE Overall Program Guidebook for REP

1 page(s)
 CEC/DOCKET UNITCEC STAFF/G. HERRERA
667456/5/2012 Calpine Energy Confidential Designation to Verify Procurement of Pilot Power Group, Inc.

3 page(s)
 CEC/R.OglesbyCalpine Corp
667446/5/2012 Calpine Energy Services Request for Confidential Designation to Verify Procurement of Noble Americans Energy Solutions

3 page(s)
 CEC/R.OglesbyCalpine Energy
666738/14/2012 City and County of San Francisco Comments on the Renewables Portfolio Standard

10 page(s)
 CEC/Docket UnitSan Francisco Public Utilities Commission/M.Meal /J.Hendry
666718/14/2012 Comments from the Center for Energy Efficiency and Renewable Technologies on the 33% Renewables Portfolio Standard Pre-Rulemaking Draft Regulations

3 page(s)
 CEC/Docket UnitCenter for Energy Efficiency and Renewable Technologies/D.Mills
666638/13/2012 Comments by Defenders of Wildlife, Audubon CA and National Resources Defense Council re Golden Eagle Permits under DRECP

15 page(s)
 CEC/ Dockets UnitDefenders of Wildlife, Audubon CA and National Resources Defense Council
666528/13/2012 Comments from SMUD re 33 Percent Renewables Portfolio

15 page(s)
 CEC/ Dockets UnitSMUD
666518/13/2012 Comment from PG&E re 33 Percent Renewables Portfolio

4 page(s)
 CEC/ Dockets UnitPG&E
666448/14/2012 Comments of San Francisco Public Utilities Commission on the 33 Percent Renewables Portfolio Standard Pre-Rulemaking

10 page(s)
 CEC/ Docket UnitSan Francisco PUC/ M. Meal
666378/14/2012 Public Comments - Concerned Citizens

22 page(s)
 CEC/Docket UnitUnion of Concerned Scinetists/Concerned Citizens
666368/13/2012 Public Comments - Concerned Citizens

66 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Concerned Citizens
666168/13/2012 Joint Comments of The Utility Reform Network(TURN) and The Coalition of California Utility Employees on the 33 Percent Renewables Portfolio Standard Pre-Rulemaking

7 page(s)
 CEC/ Docket UnitTURN/ M. Freedman
666148/13/2012 Public Power Agency Comments on the 33 Percent Renewables Portfolio Standard Pre-Rulemaking Draft Regulations

7 page(s)
 CEC/ Docket UnitPublic/ M. Hooper
666068/13/2012 Public Comments - Concerned Citizens

111 page(s)
 CEC/Docket UnitUnion of Concerned Scientists
666048/13/2012 Public Comments - Concerned Citizens

108 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Concerned Citizens
666018/9/2012 Public Comments - Concerned Citizens

1472 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Concerned Citizens
665998/13/2012 Public Comments - Concerned Citizens

173 page(s)
 CEC/Docket UnitUnion of Concerned Scinetists/ Concerned Citizens
665978/13/2012 Joint Comments from the Modesto Irrigation District, Redding Electric Utility, and the Turlock Irrigation District Regarding RPS Regulations

6 page(s)
 CEC/Docket UnitModesto Irrigation District/Redding Electric Utility/ Turlock Irrigation District
665968/13/2012 Comments of the Cities of Cerritos, Corona, Moreno Valley, Rancho Cucamonga and Victorville on the 33 Percent Renewables Portfolio Standard Pre-Rulemaking Revised Draft Regulations

2 page(s)
 CEC/Docket UnitCities of Cerritos/Corona/Moreno Valley/Rancho Cucamonga/Victorville
665958/13/2012 Comments of Powerex Corp on the 33 Percent Renewables Standards

2 page(s)
 CEC/Docket UnitPowerex Corp
665948/13/2012 Comments of Pathfinder Renewable Wind and Zephyr Transmission, LLC on the Draft 33 Percent RPS Rules

4 page(s)
 CEC/Docket UnitPathfinder Renewable Wind and Zephyr Transmission, LLC
665938/8/2012 CRS Comments on Renewables Portfolio Standard

2 page(s)
 CEC/ Dockets UnitCenter for Resource Solutions
665928/13/2012 Comments from the UCS and the LSA Regarding the Second Version of Pre Rulemaking Draft Regulations

7 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Large-Scale Solar Association
665918/13/2012 The City of Riverside Comments regarding Pre Rulemaking Draft Regualtions

5 page(s)
 CEC/Docket UnitCity of Riverside
665638/10/2012 Public Comments - Union of Concerned Scientists - Concerned Citizens

343 page(s)
 CEC/Docket UnitUnion of Concerned Scientists/Public/ Concerned Citizens
665348/9/2012 SMUD's Comments on Guideline Revisions for RPS Implementation and Renewable Energy Program

6 page(s)
 CEC/Docket UnitSacramento Municipal Utility District/W.Westerfield /T.Tutt
665308/8/2012 Unions of Concerned Scientists Comments

1 page(s)
 CEC/Docket UnitUnions of Concerned Scientists
664328/3/2012 Genergy's Public Comments on the RPS Guidebook Proposed Changes

5 page(s)
 CEC/R.Weisenmiller /A.McAllister /C.Peterman /K.DouglasGenergy/K.Gorssman
661497/6/2012 Comments of Pacific Gas and Electric Company on the Renewables Portfolio Standard Eligibility Guidebook

2 page(s)
 CEC/Docket UnitPacific Gas & Electric Company/M.Mathai-Jackson
660837/5/2012 Los Angeles Department of Water and Power's Comments on the California Energy Commission's Guidebook Revisions

8 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/R.Howard
657416/12/2012 Application for Confidential Designation for Agreements for the Purchase and Sale of Renewable Energy Credits for November and December 2010

5 page(s)
 CEC/R.OglesbyCalpine Power America - CA, L.LC. / Ellison Schneider & Harris/ Chase Kappel
655265/31/2012 Notice of Exemption - Adoption of Revisions to the Overall Program Guidebook for the Renewable Energy Program

1 page(s)
 Office of Planning and ResearchCEC/G.Herrera
655235/31/2012 Notice of Exemption - Adoption of Revisions to the Renewables Portfolio Standards Eligibility Guidebook

1 page(s)
 Office of Planning and ResearchCEC/G.Herrera
653895/9/2012 Kurt Groassman Letter regarding Non Marine Water

19 page(s)
 CEC/CommissionersKurt Grossman
651225/9/2012 Center for Energy Efficiency and Renewable Technologies' Comments RPS Eligibility Guidebook

2 page(s)
 CEC/Docket UnitCenter for Energy Efficiency and Renewable Technologies/D.Mills
650515/2/2012 CMUA Comments on the Proposed Revisions to the Renewables Portfolio Standard Eligibility Guidebook

6 page(s)
 CEC/ Docket UnitCMUA/ T. Andreoni
650445/2/2012 Los Angeles Department of Water and Power’s Comments on the Notice to Consider Adoption of Revisions to the Renewables Portfolio Standard Eligibility Guidebook and Overall Guidebook for the Renewables Energy Program

23 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power/O.Herrera
650425/2/2012 Pacific Gas and Electric Company on the Lead Commissioner Draft Renewables Portfolio Standard Eligibility Guidebook

14 page(s)
 CEC/Dockets UnitPacific Gas and Electric Company/M.Mathai-Jackson
650415/2/2012 Southern California Edison's Comments on the Proposed Revisions to the RPS Eligibility Guidebook

3 page(s)
 CEC/Docket UnitSouthern California Edison/M.Alvarez
650395/2/2012 COMMENTS OF THE CITY AND COUNTY OF SAN FRANCISCO ON THE LEAD COMMISSIONER DRAFT RENEWABLES PROTFOLIO STANDARD ELIGIBILITY GUIDEBOOK

5 page(s)
 CEC/ DOCKET UNITOffice of City Attorney Dennis J. Herrera/T. MUELLER
647244/13/2012 Imperial Irrigation Comments and Responses to the Attachment B Survey Questions

8 page(s)
 CEC/Docket UnitImperial Irrigation
646204/5/2012 Correction to Resolution on Suspension of the RPS Eligibility Guidelines Related to Biomethane

4 page(s)
 CEC/Dockets UnitCEC/K.Zocchetti
646184/5/2012 Notice of Correction to Resolution on Suspension of the RPS Eligibility Guidelines Related to Biomethane

5 page(s)
 CEC/Dockets UnitCEC.K.Zocchetti
645544/2/2012 CCSF Comments on Draft Regulations

11 page(s)
 CEC/Docket UnitCCSF
645273/30/2012 Comments of the Large-Scale Solar Association on the 33 Percent Renewable Portfolio Standard Pre-Rulemaking Draft Regulations

29 page(s)
 CEC/Dockets UnitLarge-Scale Solar Association/K.Burford
645263/30/2012 Los Angeles Department of Water and Power's Response to the CEC's RPS Draft Regulations

49 page(s)
 CEC/Dockets UnitLos Angeles Department of Water and Power/O.Herrera
645253/30/2012 Joint Comments from the Union of Concerned Scientists and The Utility Reform Network Regarding the Commission’s 33 Percentage RPS Pre-Rulemaking Draft Regulations.

10 page(s)
 CEC/Dockets UnitUnion of Concerned Scientists/L.Wisland
645223/30/2012 Sacramento Municipal Utility District's Comments on 33% RPS Pre-Rulemaking Draft Regulations

38 page(s)
 CEC/Dockets UnitSacramento Municipal Utility District/A.Arroyo
645193/30/2012 Comment Letter from Glendale Water & Power Regarding 33% RPS Requirements

3 page(s)
 CEC/Dockets UnitGlendale Water & Power/V.Puffer
645163/30/2012 Comments of the Center for Energy Efficiency and Renewable Technologies to the California Energy Commission on the 33% Renewables Portfolio Standard

6 page(s)
 CEC/Dockets UnitCenter for Energy Efficiency and Renewable Technologies/D.Mills
645153/30/2012 City of Anaheim Comments to the 33% RPS Pre-Rulemaking Draft Regulations

5 page(s)
 CEC/ Docket UnitCity of Anaheim/ G. Bowen
645143/30/2012 Comment Letter from Burbank Water and Power on Renewable Portfolio Standard

4 page(s)
 CEC/Dockets UnitBurbank Water and Power/B.Jeider
645123/30/2012 Sacramento Municipal Utility District and Turlock Irrigation District's Joint Comments on Renewables Portfolio Standard

8 page(s)
 CEC/Dockets UnitSacramento Municipal Utility District/A.Arroyo
645103/30/2012 Merced Irrigation District's Comment Letter on the 33 Percent Renewables Portfolio Standard

1 page(s)
 CEC/R.OglesbyMerced Irrigation District/M.Jensen
645083/30/2012 Pacific Gas and Electric Company's Comments on the 33 Percent Renewables Portfolio Standard

9 page(s)
 CEC/Dockets UnitPacific Gas & Electric Company/M.Grady Mathai-Jackson
645043/30/2012 Comments of Modesto Irrigation District , Redding Electric Utility, Turlock Irrigation District on the 33 Percent Renewable Portfolio Standards

7 page(s)
 CEC/Dockets UnitTurlock Irrigation District/M.Lucas
645033/30/2012 California Municipal Utilities Associations's Comments on CEC's 33 Percent Renewables Portfolio Standard

13 page(s)
 CEC/Dockets UnitCalifornia Municipal Utilities Association/A.Andreoni
645003/30/2012 Comments of the NCPA on the Draft Staff Report 33 Percent

24 page(s)
 CEC/ Docket UnitNCPA/ C. Susie Berlin
644993/30/2012 CMUA Comments on the CEC's 33 Percent Renewables Portfolio Standard Pre-Rulemaking Draft Regulations

13 page(s)
 CEC/ Docket UnitCMUA/ T. Andreoni
644983/30/2012 Southern California Edison (SCE) Questions to Stakeholders Concerning the 33 Percent Renewables Portfolio

5 page(s)
 CEC/ Docket UnitSCE/ M. Alvarez
644973/30/2012 Small POU Cities Comments on 33 Percent Renewables Portfolio Standard Pre-Rulemaking Draft Regulations

9 page(s)
 CEC/ Docket UnitBraun Blaising McLaughlin & Smith/ L. Johnson
644933/30/2012 Comments of Turlock Irrigation District on the 33 Percent Renewable Portfolio Standards

8 page(s)
 CEC/Dockets UnitEllison, Schneider & Harris L.L.P./K.Mitchell
644923/30/2012 California Energy Storage Alliance's Comments on the 33 Percent Renewables Portfolio Standard

2 page(s)
 CEC/R.WeisenmillerDouglass & Liddell/M.Dangott
644893/29/2012 Comments of the County Sanitation Districts of Los Angeles County on the 33 Percent Renewables Portfolio Standard Pre-Rulemaking Draft Regulations

5 page(s)
 CEC/Dockets UnitLos Angeles County Sanitation Districts/A.Schmidt
644883/29/2012 Island Energy Comments on the 33 Percent Renewables Portfolio Standard Draft Regulations for Publicly Owned Electric Utilities Regulations Concept Paper

3 page(s)
 CEC/Dockets UnitEllison Schneider & Harris LLP/E.Janssen
644793/29/2012 Suspension of RPS Eligiblility Guidelines Related to Biomethane

4 page(s)
 CEC/Docket UnitCEC/H.Kallemeyn
644333/28/2012 Coalition for Clean Air's Comments on the Notice to Suspension of RPS Eligibility Guideline Related to Bioethane

2 page(s)
 CEC/Dockets UnitCoalition for Clean Air/N.Bautista
644313/28/2012 Solid Waste Association's Comments on the Notice to Suspension of RPS Eligibility Guideline Related to Bioethane

2 page(s)
 CEC/R.WeisenmillerSolid Waste Association/J.Skinner
644293/27/2012 The Hunter Group's Comments on the Notice to Suspension of RPS Eligibility Guideline Related to Bioethane

2 page(s)
 CEC/R.WeisenmillerThe Hunter Group, LLC/D.Mauney
644153/26/2012 Morrow Renewables Notice to Consider Suspension of RPS Eligibility Guidelines

2 page(s)
 CEC/ R. WeisenmillerMorrow Renewables/ L. Morrow
644143/26/2012 Comments of the City of Vernon on Proposed Suspension of RPS Eligibility Guidelines Relating to Biomethane

8 page(s)
 CEC/ Docket UnitHanna and Morton/ N. Pedersen
644103/27/2012 Straus Family Creamery's Comment Letter on Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/R.WeisenmillerStraus Family Creamery/A.Straus
644093/27/2012 The Energy Coalition Opposition Letter Regarding Suspension of RPS Eligibility Guidelines

2 page(s)
 CEC/ R. WeisenmillerEnergy Coalition/ C. Perkins
644073/26/2012 BioEnergy Comments on Notice to Consider Suspension of RPS Eligibility Guidelines

6 page(s)
 CEC/ R. WeisenmillerBioEnergy/ D. Albers
644053/26/2012 California Against Waste's Comments on the Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/R.WeisenmillerCalifornia Against Waste/N.Lapis
644003/26/2012 Fortistar's Comments on Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/R.WeisenmillerFortistar/S.Dahlquist
643973/26/2012 FireSouthwest's Comments on the Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/R.WeisenmillerFire Southwest/R.Finken
643943/23/2012 JSH international's Comments on the Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

3 page(s)
 CEC/R.WeisenmillerJSH international/K.Sanford
643903/23/2012 Comments of Shell Energy North America on Notice to Consider Suspension of the RPS Eligibility Guidelines Related to Biomethane

13 page(s)
 CEC/Dockets UnitShell Energy North America/J.Leslie
643853/23/2012 Comments of the Coalition for Renewable Natural Gas on Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

7 page(s)
 CEC/Dockets UnitCoalition for Renewable Natural Gas/J.Costantino
643773/23/2012 Joint Comments on Notice to Consider Suspension of the RPS Eligibility Guidelines Related to Biomethane

3 page(s)
 CEC/Dockets UnitCenter for Energy Efficiency and Renewable/O.Mills
643723/23/2012 Republic Services Inc.'s Comments on the Notice to Consider Suspension of the RPS Eligibility Guidelines Related to Biomethane

4 page(s)
 CEC/R.WeisenmillerRepublic Services Inc./W.Held
643663/23/2012 Latham & Watkins LLP's Comments on the Proposed Suspension of RPS Eligibility Guidelines Related to Biomethane

119 page(s)
 CEC/R.WeisenmillerLatham & Watkins LLP/P.Kihm
643623/23/2012 Western United Dairymen's Comments on the Notice to Consider Suspension of RPS Eligibility Guidelines

1 page(s)
 CEC/Dockets UnitWestern United Dairymen/K.Reuter
643603/23/2012 Pacific Gas & Electric Company's Comments on the Notice to Consider Suspension of RPS Eligibility Guidelines for Biomethane

4 page(s)
 CEC/Dockets UnitPacific Gas and Electric Company/V.Winn
643583/23/2012 CMUA Comments on CEC’s Notice to Consider Suspension of the RPS Eligibility Guidelines for Biomethane

3 page(s)
 CEC/Docket UnitCMUA
643563/23/2012 Jeremy Weinstein Comments regarding Staff Workshop on the Use of Biomethane

10 page(s)
 CEC/Docket UnitJ.Weinstein
643523/23/2012 Comments of The Utility Reform Network on the Notice of Suspension of the RPS Eligibility Guidelines Related to Biomethane

11 page(s)
 CEC/Docket UnitTURN
643503/23/2012 The Climate Trust Comment Letter

2 page(s)
 CEC/Docket UnitThe Climate Trust
643473/23/2012 Comments of Bloom Energy Corporation on Notice to Consider Suspension RPS Eligibility Guidelines Related to Biomethane

8 page(s)
 CEC/Docket UnitBLOOM ENERGY CORPORATION
643453/23/2012 SUMA America’s Comments RE Biomethane

3 page(s)
 CEC/Docket UnitSUMA
643433/23/2012 Energy Power Partners Letter in Opposition to a Moratorium on Biogas in California

2 page(s)
 CEC/Docket UnitEnergy Power Partners
643413/23/2012 SoCalGas Comments RE RPS Eligibility GuidelinesRelated to Biomethane

2 page(s)
 CEC/Docket UnitSoCalGas
643393/23/2012 Ameresco Opposition to CA Moratorium on Biomethane

2 page(s)
 CEC/Docket UnitAmeresco
643373/23/2012 Waste Management Comment Letter

5 page(s)
 CEC/Docket UnitWaste Management
643353/23/2012 Land Fill Energy Systems Opposing CA Moratorium on Biomethane

2 page(s)
 CEC/Docket UnitLand Fill Energy Systems
643323/23/2012 BP Comment Letter RE Biomethane

5 page(s)
 CEC/Docket UnitBP
643293/23/2012 CWCCG Comments to Notice to Consider Suspension of the RPS Eligibility Guidelines Related to Biomethane

4 page(s)
 CEC/Docket UnitClimate Waste Water Climate Change Group
643273/23/2012 LADWP's Comments to the CEC's Notice to Consider Suspension

11 page(s)
 CEC/Docket UnitLADWP
643243/23/2012 Calpine Corp Comments re Notice ot Consider Suspension

7 page(s)
 CEC/Docket UnitCalpine Corp
643223/23/2012 Coalition of California Utility Employees and the California State Association of Electrical Workers Comments

2 page(s)
 CEC/Docket UnitCUE/CSAEW
643203/23/2012 County Sanitation Districts of Los Angeles County Comment Letter on the Notice to Consider Suspension of the RPS Eligibility Guidelines Related to Biomethane

3 page(s)
 CEC/Docket UnitCounty Sanitation Districts of Los Angeles County
643183/23/2012 Cascade Energy's Letter Response to the CEC-Proposed Moratorium on Biomethane Projects

1 page(s)
 CEC/Docket UnitCascade Energy
643163/23/2012 Agricultural Energy Consumers Association Comment Letter re Biomethane

5 page(s)
 CEC/Docket UnitAgricultural Energy Consumers Association
643143/23/2012 Imperial Irrigation District's Comment Letter

8 page(s)
 CEC/Docket UnitImperial Irrigation District
643123/23/2012 Anahau Energy, LLC Comment Letter re Biomethane

1 page(s)
 CEC/Docket UnitAnahau Energy, LLC
643103/23/2012 SCPPA Comment Letter regarding Biomethane

2 page(s)
 CEC/Docket UnitSCPPA
643083/23/2012 Sustainable Energy Solutions LLC Comments regarding Biomethane

2 page(s)
 CEC/Docket UnitSustainable Energy Solutions LLC
643063/23/2012 JDMT Inc. Comments Letter re Biomethane

3 page(s)
 CEC/Docket UnitJDMT Inc
643043/22/2012 Gierlich Mitchell Comments re Notice to Consider Suspension of RPS Eligibility Guidelines Related to Biomethane

2 page(s)
 CEC/Docket UnitGierlich Mitchell
643013/23/2012 Biogas Comments on Notice to Consider Suspension

4 page(s)
 CEC / R. WeisenmillerBiogas / P. Serfass
642973/23/2012 Cambrian Energy Management Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

3 page(s)
 CEC/Docket UnitCambrian Energy Management
642963/22/2012 Des Moines WRA Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

4 page(s)
 CEC/Docket UnitDes Moines WRA
642943/23/2012 Camco Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

2 page(s)
 CEC/Docket UnitCamco
642923/23/2012 Home Land Bio Gas Energy Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

2 page(s)
 CEC/Docket UnitHome Land Bio Gas Energy
642913/22/2012 UTS Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

3 page(s)
 CEC/Docket UnitUTS
642903/23/2012 AGL Resources Comments on Notice to Consider Suspension

2 page(s)
 CEC / Docket UnitAGL Resources / B. Batson
642843/23/2012 BIOFerm Energy Systems Comments on the Proposed Action to Suspend Guidelines related to the RPS Eligibility of Biomethane

4 page(s)
 CEC/Docket UnitBIOFerm Energy Systems
642823/22/2012 Teracastus Comments Regarding Suspension of Eligibility Guidelines for RPS related to Biomethane

2 page(s)
 CEC/Docket UnitTeracastus
642813/23/2012 Biogas Energy Solutions Comments Regarding Suspension of Eligibility Guidelines for RPS related to Biomethane

2 page(s)
 CEC/Docket UnitBES
642793/23/2012 CWP Comments on Notice to Consider Suspension

2 page(s)
 CEC / R. WeisenmillerCWP / M. Wong
642783/22/2012 SJVACPD Comments Regarding Suspension of Eligibility Guidelines for RPS related to Biomethane

3 page(s)
 CEC/Docket UnitSJVACPD
642763/23/2012 Landia Inc Comments on Notice to Consider Suspension

2 page(s)
 CEC / R. WeisenmillerLandia Inc / S. Rasmussen
642703/23/2012 SMUD Comments on Notice of Consider Suspension

5 page(s)
 CEC / Docket UnitSMUD / W. Westerfield / T. Tutt
642693/22/2012 Westhoff, Cone & Holmstedt's Comment Letter to the CEC's Commissioner Weisenmiller Regarding the RPS Proceeding

2 page(s)
 CEC/Dockets UnitWesthott, Cone & Holmstedt/M.Holmstedt
642653/22/2012 Comments of the City of Vernon on Proposed Suspension of RPS Eligibility Guidelines Relating to Biomethane

8 page(s)
 CEC/Dockets UnitHanna and Morton LLP/S.Cantos
642603/22/2012 G4 Insights Inc.'s Comment Letter to the CEC's Commissioner Weisenmiller Regarding RPS Proceeding

2 page(s)
 CEC/R.WeisenmillerG4 Insights Inc./E.NG
642583/22/2012 Montauk Energy's Comment Letter to the CEC's Commissioner Weisenmiller Regarding RPS Proceeding

2 page(s)
 CEC/R.WeisenmillerMontauk Energy/M.Ryan
642563/22/2012 City of Burbank Mayor Jess Talamantes' Letter to the CEC's Commissioner Weisenmiller Regarding RPS Proceeding

3 page(s)
 CEC/R.WeisenmillerCity of Burbank Mayor/J.Talamantes
642503/21/2012 Organic Energy Corporation Comment Letter

1 page(s)
 CEC/Docket EnergyOrganic Energy Corporation
642283/20/2012 CERF Comment Letter

7 page(s)
 CEC/R.WeisenmillerCERF
641753/16/2012 Ministry of Energy and Mines' Comment Letter to Brian McCollough of the California Energy Commission

8 page(s)
 CEC/B.McColloughMinistry of Energy and Mines/K.McNeil
640243/7/2012 Trinity Public Utilities District's Comment Letter to the CEC

1 page(s)
 CEC/Docket UnitTrinity Public Utilities District/P.Hauser
640233/6/2012 Watershed Watch Salmon Society's Comment Letter to CEC

105 page(s)
 CEC/Dockets UnitWatershed Watch Salmon Society/A.Hill
640193/6/2012 Clean Energy's Response to Staff Workshop on BC Run-of-River Hydroelectric Projects Study

17 page(s)
 CEC/Dockets UnitClean Energy/P.Kariya
639763/5/2012 Wilderness Committee's Comment Letter

28 page(s)
 CEC/Docket UnitWilderness Committee/G.Barlee
639593/2/2012 Comments from Friends of Bute Inlet Intended to Inform Review of California’s Renewable Portfolio Standards

5 page(s)
 CEC/ Docket UnitFriends of Bute Inlet/ L. Keller
639103/2/2012 Comment Letter of the California Hydropower Reform Coalition for the British Columbia Hydroelectric Study

5 page(s)
 CEC/Dockets UnitCalifornia Hydropower Reform Coalition/K.Nakatani
634101/19/2012 Comments of Kurt Grossman, Genergy on Definition of Hydroelectric

4 page(s)
 CEC/J.JenningsGEnergy/K.Grossman
633551/12/2012 Supplemental Comments on Proposed Revisions to the CEC's Guidebook on RPS Eligibility

5 page(s)
 CEC/R.WeisenmillerPaul Hastings/J.Yung
6287411/10/2011 SMUD Comments on Proposed Changes to the RPS Guidebook

6 page(s)
 CEC/ Docket UnitSMUD
6281611/7/2011 Letter from Assembly Member Cameron Smith Re RPS Rules

1 page(s)
 CEC/C.PetermanAssembly California Legislature/C.Smith
6280311/3/2011 The Solar Alliance Comments on Staff Guidebook

6 page(s)
 CEC/ Docket UnitThe Solar Alliance
6279911/3/2011 Lindsay Strathmore Irrigation District Comments

3 page(s)
 CEC/ Docket UnitLindsey Strathmore Irrigation District
6279611/3/2011 Chowchilla Water District's Comments for the October 21, 2011 Staff Workshop

3 page(s)
 CEC/ Docket unitChowchilla Water District
6279311/3/2011 Madera Irrigation District's Comments on Staff Workshop held October 21, 2011

3 page(s)
 CEC/ Docket unitMadera Irrigation District
6279111/3/2011 Solar Reserve Comments to CEC Workshop on Proposed Changes to the RPS Eligibility

1 page(s)
 CEC/ Docket UnitSolar Reserve
6278911/3/2011 Orange Cove Irrigation District's Comments regarding October 13, 2011 Staff Workshop

5 page(s)
 CEC/ Docket UnitOrange Cove Irrigation District
6278511/3/2011 Letter to CEC from Senator T. Lieu

2 page(s)
 CEC/ R. WeisenmillerCalifornia State Senate/ T. Lieu
6278411/3/2011 Letter to CEC from Senator J. Fuller

1 page(s)
 CEC/ C. PetermanCalifornia State Senate/ J. Fuller
6277711/3/2011 SDG&E's Comments Re RPS Guidebook

4 page(s)
 CEC/Dockets UnitSempra Energy Utilities/D.Reed
6277211/3/2011 SCE's Comments on Proposed Changes to RPS Guidebook

6 page(s)
 CEC/Dockets UnitSouthern California Edison/R.Meiers-De Pastino
6277011/3/2011 Sempra Generation’s Comments on the RPS Guidebook

4 page(s)
 CEC/Dockets UnitSempra Generation/S.Bailey
6276611/3/2011 Comments of SFPUC Re RPS Guidebook

5 page(s)
 CEC/Dockets UnitSF Water/J.Hendry
6276411/2/2011 CMUA Comments on the CEC Workshop Proposed Changes to the RPS Guidebook

5 page(s)
 CEC/Dockets UnitCalifornia Municipal Utilities Association/A.Andreoni
6276211/2/2011 SCPPA's Comments on Proposed Changes to RPS Guidebook

16 page(s)
 CEC/Dockets UnitHanna and Morton LLP/S.Cantos
6275911/2/2011 UCS comments on Proposed Changes to RPS Guidebook

4 page(s)
 CEC/Dockets UnitUnion of Concerned Scientists/L.Wisland
6275711/2/2011 Comments of Pacificorp on the Draft Fifth Edition of the Renewables Portfolio Standard Eligibility Guidebook

9 page(s)
 CEC/ Docket UnitEllison, Schneider & Harris/ K. Mitchell
6275511/2/2011 SREC Trade Comments Regarding RPS Eligibility Guidebook

1 page(s)
 CEC/ Docket UnitSREC Trade/ S. Eisenberg
6275411/2/2011 Leaf Exchange Comments on Staff Workshop on the Proposed Changes

3 page(s)
 CEC/ Docket UnitLeaf Exchange/ A. Gerza
6275211/2/2011 Comments of Abengoa Solar, Inc and BrightSource Energy on Proposed Revisions

10 page(s)
 CEC/ Docket UnitPaul Hastings/ P. Weiner
6274911/3/2011 Comments of the Alliance for Retail Energy Markets

3 page(s)
 CEC/ Docket UnitEllison, Schneider, & Harris/ A. Brown
6274711/2/2011 Comments of the Northern California Power Agency on the Proposed Changes

7 page(s)
 CEC/ Docket UnitNCPA/ C. Susie Berlin
6274411/2/2011 Independent Energy Producers Association Comments Regarding Proposed Changes

6 page(s)
 CEC/ Docket UnitIndependent Energy Producers Assoc/ S. Kelly
6274211/2/2011 Los Angeles Department of Water and Power’s (LADWP) Comments to the Staff Workshop on the Proposed Changes

16 page(s)
 CEC/ Docket UnitLADWP/ R. Howard
6273811/2/2011 Post-Workshop Comments of AGLR Resources Inc on the Staff Workshop on the Proposed Changes

5 page(s)
 CEC/ Docket UnitAGLR Resources/ B. Batson
6273611/2/2011 Comments of Mustang Renewable Power Ventures on Proposed Revisions

4 page(s)
 CEC/ Docket UnitPaul Hastings/ P. Weiner
6272911/2/2011 PG&E's Comments on the Proposed Changes to the RPS Guidebook

10 page(s)
 CEC/Dockets UnitPG&E/V.Winn
6272811/1/2011 SPI's Comments on Renewable Guidebook

2 page(s)
 CEC/Dockets UnitSierra Pacific Industries/D.Branchcomb
6272311/1/2011 Comments from DEID Re RPS Guidebook

5 page(s)
 CEC/Dockets UnitDelano-Earlimart Irrigation District/D.Brogan
6271910/31/2011 Rockland Capital's Comments to Proposed Revisions to RPS Guidebook

3 page(s)
 CEC/Dockets UnitRockland Capital/J.Harlen
6270910/31/2011 S. Geivet for Terra Bella Irrigation District Comments Regarding Overall Guidebook

2 page(s)
 CEC/ Docket UnitTerra Bella Irrigation District/ S. Geivet
6270610/31/2011 S. Geivet for Terra Bella Irrigation District Comments Regarding Renewables Guidebook

2 page(s)
 CEC/ Docket UnitTerra Bella Irrigation District/ S. Geivet
6268910/31/2011 Friant Power Autority Comments Regarding CEC Staff Workshop

3 page(s)
 CEC/ Docket UnitFriant Power Authority/ B. Carlisle
6268610/31/2011 Southern San Joaquin Municipal Utility District (SSJMUD) Comments Regarding Staff Workshop

2 page(s)
 CEC/ Docket UnitSSJMUD/ B. Carlisle
6266110/28/2011 LSID's Comments Re RPS Guidebook and Overall Guidebook

3 page(s)
 CEC/Dockets UnitLindsay-Strathmore Irrigation District/S.Edwards
6265810/28/2011 URS Corp.'s Comments Re Proposed Changes to RPS Guidebooks

2 page(s)
 CEC/Dockets UnitURS Corporation/G.Reichert
6265410/27/2011 CAREBS Comments regarding Changes to Guidebook

6 page(s)
 CEC/ Docket unitCAREBS
6254510/7/2011 Comments by the CPUC on the Use of Pipeline Biomethane to Meet RPS Requirements

2 page(s)
 CEC/Dockets UnitCalifornia Public Utilities Commission/N.Reardon
624929/30/2011 CRNG's Comments on RPS Proceeding

20 page(s)
 CEC/R.WeisenmillerThe Coalition for Renewable Natural Gas
6247510/4/2011 SMUD Comments on Use of Biomethane Delivered via the Natural GasPipeline System

13 page(s)
 CEC/ Docket UnitSMUD
624739/30/2011 SCPPA Comments on Workshop on the Use of Biomethane

21 page(s)
 CEC/ Docket unitSCPPA
624519/30/2011 CEERT's Comments regarding the Use of Biomethane Delivered via the Natural Gas Pipeline System

3 page(s)
 CEC/ Docket UnitCEERT
624499/30/2011 PG&E's Comments on Developing Regulations and Guidelines for the 33 Percent Renewables Portfolio

15 page(s)
 CEC/ Docket UnitPG&E
624479/30/2011 Waste Management Comments

10 page(s)
 CEC/ Docket unitWaste Management/ C. White
624429/30/2011 CMUA's Comments on the CEC Workshop RE Usage of Biomethane

2 page(s)
 CEC/Dockets UnitCMUA/D.Modisette
624409/30/2011 AECA's Comments on RPS Proceeding

4 page(s)
 CEC/Dockets UnitAECA/M.Boccadoro
624389/30/2011 Comments from Los Angeles Department of Water and Power from the Staff Workshop

15 page(s)
 CEC/ Docket UnitDept of Water & Power LA/ R. Howard
624339/30/2011 American Biogas Council Comments in Response to Biomethane Delivered Workshop

5 page(s)
 CEC/ Docket UnitAmerican Biogas Council/ P. Serfass
624279/30/2011 BloomEnergy Comments Regarding the Use of Pipeline Biomethane in Renewable Portfolio Standard

2 page(s)
 CEC/ C. PetermanBloomEnergy/ E. Grizard
624219/30/2011 Republic Services, Inc. Comments on Staff Workshop and Renewable Portfolio Standard

6 page(s)
 CEC/ C. PetermanRepublic Services Inc/ W. Held
624179/30/2011 Law offices of Jeremy D. Weinstein Comments regarding Staff Workshop on the Use of Biomethane

9 page(s)
 CEC/ Docket unitLaw offices of Jeremy D. Weinstein
624149/30/2011 TURN's Comments of the Utility Reform Network

9 page(s)
 CECC/ Docket UnitTURN
624129/30/2011 Post-Workshop Comments in Response to Notice of Staff Workshop on the Use of Biomethane Delivered

14 page(s)
 CEC/ Docket UnitAGL Resources/ C. Russo
624079/30/2011 Comments of Shell Energy on the Use of Biomethane Delivered Via Pipeline

16 page(s)
 CEC/ Docket UnitShell Energy/ J. Leslie
623949/30/2011 Gas Technology Institute (GTI) Comments on Biomethane Delivered Via the Natal Gas Pipeline Workshop

3 page(s)
 CEC/ Docket UnitGas Tech Institute/ S. Patterson
623799/29/2011 Clean Energy's Comments in Response Staff Workshop on the Use of Biomethane

6 page(s)
 CEC/Dockets UnitClean Energy/ H. Clay
623389/23/2011 Order Instituting Rulemaking

4 page(s)
 CEC/Dockets UnitCEC/G.Herrera
622959/20/2011 Comment of ENXCO Developing Regulations and Guidelines for the 33 Percent Renewables Porofolio Standard and Implementation of Renewables Investment Plan Legislation

4 page(s)
 CECENXCO
622889/19/2011 Comments of BP Energy Co. on Staff Workshop on the Use of Biomethane Delivered Via the Natural Gas Pipeline System

7 page(s)
 CEC/DOCKET UNITBP Energy Co.
622329/15/2011 SMUD Comemnts on 33 Percent RPS Regulations

20 page(s)
 CEC/ Docket UnitSMUD
622189/13/2011 Duke Energy Corporation's Comments on the 33 Percent RPS Regulations

34 page(s)
 CEC/ Docket UnitStoel Rives
622149/14/2011 CEERT Comments and Reply Comments regarding 33 Percent Renewable Portfolio

31 page(s)
 CEC/ Docket UnitCEERT
622009/12/2011 Comments of Powerex Corp. on the 33 Percent Renewables Portfolio Standard

4 page(s)
 CEC/Dockets UnitGoodin, MacBride, Squeri, Day & Lamprey LLP/J.Squeri
621989/13/2011 Imperial Irrigation District Comments regarding 33 Percent Renewable Portfolio

3 page(s)
 CEC/ Docket UnitImperial Irrigation District
621899/12/2011 MSR Public Power Agency Comments on the 33 Percent Renewables Portfolio

21 page(s)
 CEC/ Docket UnitMSR Public Power Agency
621889/12/2011 Comments from Cities of Cerritos, Corona, Moreno Valley, Rancho Cucamonga and Victorville regarding 33 Percent Renwable Report

8 page(s)
 CEC/ Docket UnitBraun Blaising McLaughlin P.C
621859/12/2011 CMUA’s Comments on the CEC’s 33 Percent Renewables Portfolio Standard Publicly Owned Electric Utilities Regulations Concept Paper

39 page(s)
 CEC/ Docket UnitCMUA
621849/12/2011 Comments from the Modesto Irrigation District (MID), Redding Electric Utility (REU), and the Turlock Irrigation District (TID)

25 page(s)
 CEC/ Docket UnitMID/ TID/ REU
621839/12/2011 Northern California Power Agency Comments

20 page(s)
 CEC/ Docket UnitNorthern California Power Agency
621769/12/2011 LADWP's Comments to the CEC's Staff Meeting on 33 Percent Renewables Portfolio Standard Publicly Owned Electric Utilities Regulations Concept Paper, Dated September 1, 2011

20 page(s)
 CEC/ Docket UnitLADWP
621719/12/2011 Island Energy Comments on the 33 Percent RPS Publicly Owned Electric Utility Regulations Concept Paper

6 page(s)
 CEC/Dockets UnitEllison,Schneider & Harris LLP/K.Mitchell
621709/12/2011 SCE Comments on 33 Percent RPS Publicly Owned Electric Utility Regulations Concept Paper

53 page(s)
 CEC/Dockets UnitSCE/C.Karlstad
621699/12/2011 PG&E Comments on CEC POU 33% Concept Paper

36 page(s)
 CEC/Dockets UnitPG&E/G.Mathai-Jackson
621629/12/2011 UCS Comments on 33% RPS Implementation for the Publicly-Owned Utilities

10 page(s)
 CEC/Dockets UnitUnion of Concerned Scientists/L.Wisland
621269/9/2011 IEP's Comments on the RPS Regulations for Publicly Owned Utilities

56 page(s)
 CEC/Dockets UnitIndependent Energy Producers Association/A.Riesenhuber
620759/2/2011 Los Angeles Dept of Water and Power’s Request for Extension Responding on the CEC's Request for Comments Related to the Sept 1, 2011 Staff Meeting

1 page(s)
 CEC/ Docket UnitLADWP
619218/16/2011 July 19th Sign In Sheet for CEC Focus Group

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
619208/16/2011 July 20th Sign in Sheet

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
619198/16/2011 July 20th POU Focus Group Agenda

1 page(s)
 CEC/Dockets UnitCEC/A.Gould
619188/16/2011 POU Focus Group Agenda

1 page(s)
 CEC/Dockets UnitCEC/A.Gould
619178/16/2011 POU Focus Group Meeting Discussion of Issues

3 page(s)
 CEC/Dockets UnitCEC/A.Gould
619168/16/2011 Order Instituting Rulemaking Proceeding

4 page(s)
 CEC/Dockets UnitCEC/A.Gould
619158/16/2011 Agenda for June 17th Staff Workshop

1 page(s)
 CEC/Dockets UnitCEC/A.Gould
619148/16/2011 Angela Gould of CEC's Presentation at June 17th Workshop

32 page(s)
 CEC/Dockets UnitCEC/A.Gould
619138/16/2011 Notice of Intent to Implement 33 Percent RPS

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
619128/16/2011 Notice for June 17th 33 Percent RPS Regs Workshop

4 page(s)
 CEC/Dockets UnitCEC/A.Gould
619118/16/2011 UCS Comments Re June 17th Staff Workshop

5 page(s)
 CEC/Dockets UnitCEC/A.Gould
619108/16/2011 Comments of Pitsburg Power Company

1 page(s)
 CEC/Dockets UnitCEC/A.Gould
619098/16/2011 M-S-R Power Agency's Comments on the June 17th Staff Workshop on 33 percent Renewables Portfolio

6 page(s)
 CEC/Dockets UnitCEC/A.Gould
619078/16/2011 Comments of the Utility Reform Network on SBX2 Implementation for Publicly Owned Utilities

4 page(s)
 CEC/Dockets UnitCEC/A.Gould
619058/16/2011 Notice of Staff Workshop re Pipeline Biomethane

7 page(s)
 Interested PartiesCEC
619048/16/2011 MID, REU, and TID's Comments on Renewable Portfolio Standard

8 page(s)
 CEC/Dockets UnitCEC/A.Gould
619028/16/2011 SCE's Comments Re 33 Percent Portfolio Standard Regulations

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
619018/16/2011 Clean Line's Comment to CEC on 33 Percent Renewables Portfolio Standard

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
619008/16/2011 City of Rancho Cucamonga Comments regarding 33 percent Renewable Portfolio Standard

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
618888/16/2011 Northern California Power Agency's Comments on the June 17th Staff Workshop

7 page(s)
 CEC/Dockets UnitCEC/A.Gould
618868/16/2011 LADWP Comments Re June 17 Staff Workshop

10 page(s)
 CEC/Dockets UnitCEC/A.Gould
618858/16/2011 Scoping Comments of PG&E Company

5 page(s)
 CEC/Dockets UnitCEC/A.Gould
618848/16/2011 Independant Energy Producers Association Comments on Staff Workshop

3 page(s)
 CEC/Dockets UnitCEC/A.Gould
618838/16/2011 CMUA's Comments Re CEC June 17th Workshop

6 page(s)
 CEC/Dockets UnitCEC/A.Gould
618828/16/2011 Leaf Exchange's Comments on June 17th Staff Workshop

2 page(s)
 CEC/Dockets UnitCEC/A.Gould
618818/16/2011 Opening Comments of the City of Cerritos, Corona, Moreno Valley and Victorvile

4 page(s)
 CEC/Dockets UnitCEC/A.Gould
617617/29/2011 Memo for Opening New Docket Number

1 page(s)
 CEC/ Docket UnitCEC/ C. Peterman
3024-05/7/2014 Developing Regulations & Guidelines for the 33 Percent Renwables Portfolio

197 page(s)
   
3009-03/12/2014 Transcrip of Staff Workshop

197 page(s)
   
2987-010/4/2013 Transcript of Staff Workshop on Station Service in the RPS Program

83 page(s)
   
2942-04/22/2013 Transcript of Staff Workshop on British Columbia Run-Of-River Hydroelectric

50 page(s)
   
2939-04/12/2013 Transcript of Staff Workshop on Proposed Revisions to the RPS Eligibility G

262 page(s)
   
2889-010/8/2012 Workshop - Procurement Verification

53 page(s)
   
2839-04/24/2012 Transcript of March 1, 2012 Staff Workshop on 33% RPS Pre-Rulemaking Worksh

108 page(s)
   
2801-012/6/2011 RPS Workshop

141 page(s)