260890 | 1/3/2025 |
BSPP 2024 Second Semiannual Groundwater Monitoring Report BSPP 2024 Second Semiannual Groundwater Monitoring Report Compliance 80 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
257995 | 7/25/2024 |
BSPP 2024 First Semiannual Groundwater Monitoring Report
Compliance 84 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
255343 | 3/29/2024 |
BSEP RY 2023 ANNUAL COMPLIANCE REPORT
Compliance 96 page(s)
| | Docket Unit | NexteraEnergy Resources |
254706 | 2/27/2024 |
BSPP_BIO_2023_FINAL
Compliance 18 page(s)
| | CEC/DOCKET UNIT | NexteraEnergy Resources |
254099 | 1/24/2024 |
BSPP 2023 Q4 Groundwater Monitoring Report
Compliance 95 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
252748 | 10/25/2023 |
BSPP 2023 Q3 Groundwater Monitoring Report
Compliance 77 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
251036 | 7/12/2023 |
BSPP 2023 Q1 Groundwater Monitoring Reportpdf
Compliance 77 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
251025 | 7/12/2023 |
BSPP 2023 Q2 Groundwater Monitoring Reportpdf BSPP 2023 Q2 Groundwater Monitoring Report.pdf Compliance 77 page(s)
| | CEC/Docket Unit | NexteraEnergy Resources |
249508 | 3/30/2023 |
BSPP 2022 Q4 Groundwater Monitoring Report
Compliance 77 page(s)
| | CEC/Docket Unit | NextEra Energy |
249506 | 3/30/2023 |
RY 2022 ANNUAL COMPLIANCE REPORT
Compliance 117 page(s)
| | CEC/Docket Unit | NextEra Energy |
244273 | 8/1/2022 |
Blythe Solar Power Project (BSPP) 2022 Q2 Groundwater Level Monitoring Report BSPP 2022 Q2 Groundwater Monitoring Report Compliance 75 page(s)
| | CEC/Docket Unit | NextEra Energy |
242840 | 4/27/2022 |
Wildlife Heritage Foundation 2021 Annual Report Eastern Colorado Desert Preserve 2021 Annual Monitoring Report Biological Resources, Compliance 39 page(s)
| | CEC/Docket Unit | California Energy Commission |
242497 | 3/30/2022 |
RY 2021 Annual Compliance Report Blythe Solar
127 page(s)
| | CEC/Eric Veerkamp | NextEra Energy |
241194 | 1/18/2022 |
BSPP 2021 Q4 Groundwater monitoring
Compliance 88 page(s)
| | CEC/Docket Unit | NextEra Energy |
238891 | 7/15/2021 |
BSPP 2021 Q2 Groundwater Monitoring Report
72 page(s)
| | CEC/Docket Unit | NextEra Energy |
238523 | 6/28/2021 |
Blythe Solar 2020 Annual Compliance Report (Revised)
44 page(s)
| | CEC/Docket Unit | NextEra Energy |
237303 | 3/25/2021 |
Blythe Solar 2020 Annual Compliance Report
31 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-1 | 11/10/2020 |
Blythe Solar PPE Procedure
24 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-2 | 11/10/2020 |
Blythe Solar Arc Flash PPE Procedure
23 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-3 | 11/10/2020 |
Blythe and McCoy Solar Emergency Action Plan
41 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-4 | 11/10/2020 |
Blythe Solar Flood Safety Plan
22 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-5 | 11/10/2020 |
Blythe Solar Heat Illness Preventation Plan
10 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-6 | 11/10/2020 |
Blythe Solar Injury & Illness Prevention Plan
21 page(s)
| | CEC/Docket Unit | NextEra Energy |
235558-7 | 11/10/2020 |
Blythe Solar Fire Safety Plan
26 page(s)
| | CEC/Docket Unit | NextEra Energy |
234320 | 8/13/2020 |
BSPP 3&4 June 2020
80 page(s)
| | CEC/Dockets | Dudek |
234319 | 8/13/2020 |
BSPP 3&4 May 2020
129 page(s)
| | CEC/Dockets | Dudek |
234318 | 8/13/2020 |
BSPP 3&4 July 2020
81 page(s)
| | CEC/Dockets | Dudek |
233730 | 7/2/2020 |
Statement of Staff Approval of Post Certification Change Statement of Staff Approval of Post Certification Change Blythe Solar Power Project Compliance 9 page(s)
| | CEC/Docket Unit | California Energy Commission |
233119 | 5/26/2020 |
Order Approving Petition for a Jointly Initiated Amendment to Remove Condition of Certification TRANS-8
2 page(s)
| | CEC/Dockets | California Energy Commission |
233004 | 5/18/2020 |
BSPP Petition To Amend - Site Boundary Modification
Compliance 11 page(s)
| | CEC/Dockets | DayZenLLC |
232970 | 5/13/2020 |
BSPP 3&4 April 2020 - Monthly Compliance Report Monthly Compliance Report 132 page(s)
| | CEC/Docket Unit | Dudek |
232875 | 4/30/2020 |
Statement of Staff Approval Petition for Change of Ownership Statement of Staff Approval Petition for Change of Ownership Compliance 2 page(s)
| | CEC/Dockets | Energy Commission |
232844 | 4/27/2020 |
Revised Petition For Ownership Transfer BSPP Units 3 and 4
Compliance 5 page(s)
| | CEC/Dockets | DayZenLLC |
232801 | 4/21/2020 |
NOTICE OF RECEIPT AGREEMENT STAFF PROJECT OWNER JOINTLY INITIATED AMENDMENT TO COMMISSION DECISION NOTICE OF RECEIPT AGREEMENT STAFF PROJECT OWNER JOINTLY INITIATED AMENDMENT TO COMMISSION DECISION FOR THE BLYTHE SOLAR ENERGY PROJECT Compliance 5 page(s)
| | CEC/Dockets | Energy Commission |
232800 | 4/21/2020 |
BSPP 3&4 March 2020 MCR for March 2020 128 page(s)
| | CEC/Dockets | Dudek |
232743 | 4/15/2020 |
Petition For Ownership Transfer BSPP Units 3 and 4
Compliance 5 page(s)
| | CEC/Dockets | DayZenLLC |
232709 | 4/10/2020 |
Request For Joint Petition To Amend to Delete TRANS-8
Compliance 78 page(s)
| | CEC/Docket Unit | DayZenLLC |
232708-1 | 4/10/2020 |
RY 2019 ANNUAL COMPLIANCE REPORT BLYTHE SOLAR POWER PROJECT UNITS 1 & 2 10 page(s)
| | CEC/Docket Unit | Genesis Solar, LLC |
232708-2 | 4/10/2020 |
RY 2019 ANNUAL COMPLIANCE REPORT - APPENDIX A BSPP Units 1 & 2 Compliance Matrix 23 page(s)
| | CEC/Docket Unit | Genesis Solar, LLC |
232708-3 | 4/10/2020 |
RY 2019 ANNUAL COMPLIANCE REPORT - APPENDIX E Biological Resources Annual Compliance Report 85 page(s)
| | CEC/Docket Unit | Genesis Solar, LLC |
232419 | 3/16/2020 |
February 2020 Monthly Compliance Report #25 Blythe Solar Power Project (BSPP) - Units 3 and 4 131 page(s)
| | CEc/Docket Unit | Dudek |
232416-1 | 3/16/2020 |
January 2020 - Monthly Complaince Report #24 Blythe Solar Power Project (BSPP) - Units 3 and 4 115 page(s)
| | CEC/Docket Unit | Dudek |
232416-2 | 3/16/2020 |
January 2020 Monthly Compliance Report #24 - Appendix B Blythe Solar Power Project (BSPP) - Units 3 and 4 201 page(s)
| | CEC/Docket Unit | Dudek |
231642 | 1/23/2020 |
BSPP 3&4 December 2019 Part 2 - Monthly Compliance Report #23
103 page(s)
| | CEC/Docket Unit | Dudek |
231641 | 1/23/2020 |
BSPP 3&4 December 2019 Part 1 - Monthly Compliance Report #23
115 page(s)
| | CEC/Docket Unit | Dudek |
231391-1 | 1/6/2020 |
2018 ACR - part 1 0f 4
3 page(s)
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231391-2 | 1/6/2020 |
2018 ACR - Part 2 0f 4
3 page(s)
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231391-3 | 1/6/2020 |
2018 ACR - Part 3 of 4
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231391-4 | 1/6/2020 |
Presentation - 2018 ACR - Part 4 of 4
1 page(s)
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231390 | 1/6/2020 |
Part 1 of 1
Compliance 1 page(s)
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231388 | 1/6/2020 |
Blythe Solar Facility RY 2018 Annual Compliance Report
Compliance 18 page(s)
| | CEC/Eric Veerkamp | Genesis Solar, LLC |
231203 | 12/13/2019 |
BSPP 3&4 November 2019 MCR Part 2
113 page(s)
| | CEC/Dockets | Dudek |
231202 | 12/13/2019 |
BSPP 3&4 November 2019 MCR Part 1
114 page(s)
| | CEC/Dockets | Dudek |
230819 | 11/21/2019 |
BSPP 3&4 October 2019 Part 1 *** THIS DOCUMENT SUPERSEDES TN 230551-2 *** Compliance 114 page(s)
| | CEC/Docket Unit | Dudek |
230551-1 | 11/8/2019 |
BSPP 3&4 October 2019 Part 2
151 page(s)
| | CEC/Dockets | Dudek |
230551-2 | 11/8/2019 |
BSPP 3&4 October 2019 *** THIS DOCUMENT IS REPLACED BY TN 230819 *** - MCR for the BSPP Project Units 3&4 114 page(s)
| | CEC/Dockets | Dudek |
230132 | 10/11/2019 |
Blythe Solar Power Project September 2019 Monthly Compliance Report #20 Monthly Compliance Report for Blythe Solar Power Project Compliance 247 page(s)
| | CEC/Eric Veerkamp | Dudek |
229883 | 9/30/2019 |
Blyth Solar Power Project 3&4 Monthly Compliance Report (COC COM-6) Report 186 page(s)
| | CEC/Docket Unit | California Energy Commission |
229743 | 9/16/2019 |
Monthly Compliance Report.BSPP
186 page(s)
| | CEC/Dockets | California Energy Commission |
229489 | 8/19/2019 |
CEC Letter to NextEra Blythe Solar Regarding Staff Has Determined Construction Activities May Commence as of 08-20-19 Response to NextEra Blythe Solar Energy Center, LLC Units 3 & 4, Final Notice to Proceed with Construction Activities 1 page(s)
| | NextEra Blythe Solar Energy Center, LLC/Matthew Handel | California Energy Commission |
225560 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
224520 | 8/20/2018 |
Post-Construction Monitoring at the Blythe Solar Power Project Riverside, California Final Report-2016 Summer Quarterly Interim Report
***SUPERSEDES TN 224517*** Biological Resources 53 page(s)
| | CEC/Dockets | Energy Commission |
224519 | 8/20/2018 |
Post-Construction Monitoring at the Blythe Solar Power Plant Riverside, California 2016 Fall Quarterly Interim Report
***SUPERSEDES TN 224518*** Biological Resources 55 page(s)
| | CEC/Dockets | Energy Commission |
222588 | 2/16/2018 |
Letter Regarding Limited Notice to Proceed for Pre-Construction activities for Phase 2, Units 3 and 4 The Energy Commission staff is currently in the process of completing its review of the pre-construction requirements for the BSPP. 2 page(s)
| | NextEra Blythe Solar Energy Center, LLC/Matthew Handel | California Energy Commission |
212745 | 8/11/2016 |
Notice of Decision by the California Energy Commission Filing of Notice of Decision in compliance with Public Resources Code Section 21080.5 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212731 | 8/10/2016 |
Order Approving Petition to Transfer Ownership of Units 1 & 2
2 page(s)
| | | California Energy Commission |
212265 | 7/13/2016 |
Notice of Receipt Request to Transfer Ownership for the Bythe Solar Power Project Unit 1 & 2 (09-AFC-6C) 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
212054 | 7/1/2016 |
NextEra Blythe Solar Energy Center LLC's Petition for Ownership Transfer
Compliance 7 page(s)
| | CEC/Docket Unit | DayZen LLC |
211602 | 5/23/2016 |
Bird and Bat Conservation Strategy Report prepared by Western Ecosystems Technology, Inc. 68 page(s)
| | CEC/Docket Unit | California Energy Commission |
211339 | 5/3/2016 |
Blythe Solar Power Project - January 2016 Monthly Compliance Report
Compliance 193 page(s)
| | CEC/Docket Unit | California Energy Commission |
211338 | 5/3/2016 |
Blythe Solar Power Project - December 2015 Monthly Compliance Report
Compliance 205 page(s)
| | CEC/Docket Unit | California Energy Commission |
211332 | 5/2/2016 |
Blythe Solar Power Project - November 2015 Monthly Compliance Report
Compliance 246 page(s)
| | CEC/Docket Unit | California Energy Commission |
210934 | 4/4/2016 |
Blythe Solar Power Project - Formal Acquisition Proposal for Compensation Lands 20160330
Biological Resources 2 page(s)
| | NextEra Blythe Solar Energy Center, LLC/Kenneth Stein | California Energy Commission |
210683 | 3/8/2016 |
Confidential - February 2016 Cultural Resources MCR for Unit 1 of the BSPP (09-AFC-06C)
| | | AECOM |
210658 | 3/8/2016 |
Repeated Application for Confidential Filing - BSPP Cultural Resources Unit 1 MCR (09-AFC-06C)_February 2016
| | | AECOM |
210493 | 2/8/2016 |
Confidential - January 2016 Cultural Resources MCR for Unit 1 of the BSPP (09-AFC-06C)
27 page(s)
| | CEC/Robert Oglesby | AECOM |
210225 | 2/8/2016 |
Repeated Application for Confidential Filing - BSPP Cultural Resources Unit 1 MCR (09-AFC-06C)_January 2016 Cultural Resources Recurring Monthly Compliance Report Submittals is confidential and provided to the Dockets Unit 2 page(s)
| | CEC/Robert Oglesby | AECOM |
208298 | 1/11/2016 |
Confidential - December_2015 Cultural Resources MCR for Unit 1 of the BSPP (09-AFC-06C)
29 page(s)
| | CEC/Docket Unit | AECOM |
207274 | 1/11/2016 |
Blythe Solar, LLC/NextEra Energy Resourced LLC Repeated Application for Confidential Filing
2 page(s)
| | CEC/Robert Oglesby | AECOM |
207212 | 12/10/2015 |
Confidential - November 2015 Cultural Resources MCR for Unit 1 of the BSPP (09-AFC-06C)
128 page(s)
| | CEC/Robert Oglesby | AECOM |
206925 | 12/10/2015 |
Blythe Solar Repeated Application for Confidential Filing - BSPP Cultural Resources Unit 1 MCR (November 2015)
2 page(s)
| | CEC/Robert Oglesby | AECOM |
206781 | 11/30/2015 |
Blythe Solar Power Project - Monthly Compliance Report - October 2015
Compliance 319 page(s)
| | California Energy Commission and U.S. Dept. of the Interior Bureau of Land Management | Blythe Solar |
206780 | 11/30/2015 |
Blythe Solar Power Project - Monthly Compliance Report - September 2015
Compliance 332 page(s)
| | California Energy Commission and U.S. Dept. of the Interior Bureau of Land Management | Blythe Solar |
206779 | 11/30/2015 |
Blythe Solar Power Project - Monthly Compliance Report - August 2015
Compliance 208 page(s)
| | California Energy Commission and U.S. Dept. of the Interior Bureau of Land Management | Blythe Solar |
206592 | 11/10/2015 |
Confidential - October 2015 Cultural Resources MCR for Unit 1 of the BSPP (09-AFC-06C)
Cultural Resources, Compliance 186 page(s)
| | CEC/Robert Oglesby | AECOM |
206577 | 11/10/2015 |
Repeated Application for Confidential Filing - BSPP Cultural Resources Unit 1 MCR (09-AFC-06C)_October 2015
Cultural Resources, Compliance 2 page(s)
| | CEC/Robert Oglesby | AECOM |
206405 | 10/8/2015 |
Confidential - September 2015 Cultural Resources MCR for Unit 1 of the BSPP
256 page(s)
| | | AECOM |
206308 | 10/8/2015 |
Repeated Application for Confidential Filing - BSPP Cultural Resources Unit 1 Monthly Compliance Report September 2015
2 page(s)
| | CEC/ Robert Oglesby | AECOM |
206284 | 10/5/2015 |
Colorado River Indian Tribes (CRIT) Response to Finalization of Revised Blythe Solar CRMMP CRIT response to staff comment on CRIT letters of November 24, 2014 and April 2, 2015 with regard to draft versions of the Revised Cultural Resources Monitoring and Mitigation Plan (CRMMP) for Blythe Solar. Cultural Resources 2 page(s)
| | CEC/Roger E. Johnson | Colorado River Indian Tribes |
206139 | 9/17/2015 |
Correct Final Version of Revised Cultural Resources Monitoring and Mitigation Plan Final version of the Revised Cultural Resources Monitoring and Mitigation Plan (Revised CRMMP) for the Blythe Solar Power Project. **** Supercedes the incorrect version of the Revised CRMMP posted on August 26, 2015 (TN 205844) **** Cultural Resources 239 page(s)
| | California Energy Commission | California Energy Commission |
206091 | 9/10/2015 |
Confidential - August 2015 Cultural Resources MCR for Unit 1 of the BSPP
2 page(s)
| | | AECOM |
206061 | 9/10/2015 |
Repeated Application for Confidentiality - BSPP Cultural Resources Unit 1 Monthly Compliance Report August 2015 2 page(s)
| | | AECOM |
205851 | 8/27/2015 |
Letter to CRIT regarding Comments on Draft Revisions of Cultural Resources Monitoring and Mitigation Plan
Cultural Resources 10 page(s)
| | Chairman Dennis Patch, Colorado River Indian Tribe | Energy Commission |
205844 | 8/26/2015 |
Revised Cultural Resources Monitoring and Mitigation Plan **** THIS DOCUMENT HAS BEEN REPLACED BY TN 206139 **** FINAL REVISED CULTURAL RESOURCES MONITORING AND MITIGATION PLAN Cultural Resources 236 page(s)
| | California Energy Commission | AECOM |
205843 | 8/26/2015 |
FINAL REVISED CULTURAL RESOURCES MONITORING AND MITIGATION PLAN Cultural Resources 236 page(s)
| | California Energy Commission | AECOM |
205821 | 8/11/2015 |
Confidential - July 2015 Cultural Resources Monthly Compliance Report for the Blythe Solar Power Project
Cultural Resources, Compliance 205 page(s)
| | CEC/Robert Oglesby | AECOM |
205713 | 8/13/2015 |
Monthly Compliance Report - July 2015 Blythe Solar Power Project - Monthly Compliance Report - July 2015 Compliance 268 page(s)
| | | Blythe Solar |
205712 | 8/13/2015 |
Monthly Compliance Report - June 2015 Blythe Solar Power Project - Monthly Compliance Report - June 2015 Compliance 204 page(s)
| | | Blythe Solar |
205711 | 8/13/2015 |
Monthly Compliance Report - May 2015 Blythe Solar Power Project - Monthly Compliance Report - May 2015 Compliance 201 page(s)
| | | Blythe Solar |
205710 | 8/13/2015 |
Monthly Compliance Report - April 2015 Blythe Solar Power Project - Monthly Compliance Report - April 2015 Compliance 278 page(s)
| | | Blythe Solar |
205709 | 8/13/2015 |
Monthly Compliance Report - March 2015 Blythe Solar Power Project - Monthly Compliance Report - March 2015 Compliance 290 page(s)
| | | Blythe Solar |
205708 | 8/13/2015 |
Monthly Compliance Report - February 2015 Blythe Solar Power Project - Monthly Compliance Report - February 2015 Compliance 170 page(s)
| | | Blythe Solar |
205707 | 8/13/2015 |
Monthly Compliance Report - January 2015 Blythe Solar Power Project - Monthly Compliance Report - January 2015 Compliance 202 page(s)
| | | Blythe Solar |
205680 | 8/11/2015 |
Blythe Solar, LLC Repeated Application for Confidential Filing - Cultural Resources Monthly Compliance Report (July)
2 page(s)
| | CEC/Robert Oglesby | AECOM |
205350 | 5/7/2015 |
BSPP Confidential MCR for Cultural Resources (09-AFC-06C)_March 2015 Confidential MCR for cultural resources monitoring at the Blythe Solar Power Project (09-AFC-06C) Cultural Resources, Compliance
| | | AECOM |
205349 | 6/9/2015 |
BSPP Confidential MCR for Cultural Resources (09-AFC-06C)_May 2015
Cultural Resources
| | | AECOM |
205348 | 7/6/2015 |
Confidential - June 2015 Blythe Solar Power Project Cultural Resources Recurring Monthly Compliance Report Submittals
Compliance, Cultural Resources 2 page(s)
| | CEC/Robert Oglesby | AECOM |
205251 | 7/6/2015 |
Repeated Application for Confidential Filing - Blythe Solar Power Project Cultural Resources Recurring Monthly Compliance Report Submittals 2 page(s)
| | CEC/Robert Oglesby | AECOM |
204950 | 6/9/2015 |
Repeated Application for Confidential Filing - BSPP Cultural Resources Monthly Compliance Report May 2015
Cultural Resources 2 page(s)
| | CEC/ Docket Unit | AECOM |
204533 | 5/7/2015 |
Repeated Application for Confidential Filing - BSPP Cultural Resources MCR (09-AFC-06C)_April 2015
Cultural Resources, Compliance
| | | AECOM |
204195 | 4/8/2015 |
Confidential - March 2015 Cultural Resources MCR for the BSPP (09-AFC-06C)
102 page(s)
| | CEC/Robert Oglesby | AECOM |
204194 | 3/24/2015 |
Monthly Complaince Report for Cultural Resources_February 2015
10 page(s)
| | CEC/ Robert Oglesby | AECOM |
204093 | 4/8/2015 |
Confidential Filing for Blythe Solar Power Project Cultural Resources MCR - March 2015
2 page(s)
| | CEC/Robert Oglesby | AECOM |
204082 | 4/7/2015 |
Chemehuevi Comment on Second Review Draft of CRMMP Chemehuevi Indian Tribe's comment on the second review draft of the Cultural Resources Monitoring and Mitigation Plan for the construction of the Blythe Solar Power Project Cultural Resources 1 page(s)
| | CEC/ Michael McGuirt | Georgia Lodge |
204077 | 4/7/2015 |
Agua Caliente Band of Cahuilla Indians Comment on Second Review Draft of CRMMP Agua Caliente Band of Cahuilla Indians comment on the second review draft of the Cultural Resources Monitoring and Mitigation Plan for the construction of the Blythe Solar Power Project Cultural Resources 2 page(s)
| | CEC/Michael McGuirt | Agua Caliente Band of Cahuilla Indians |
204076 | 4/7/2015 |
Comment on Second Review Draft of CRMMP Colorado River Indian Tribes comment on the second review draft of the Cultural Resources Monitoring and Mitigation Plan for the construction of the Blythe Solar Power Project Cultural Resources 6 page(s)
| | CEC/Michael McGuirt | Colorado River Indian Tribes |
203950 | 3/24/2015 |
Repeated Application - Monthly Comliance Report February 2015 2 page(s)
| | CEC/ Robert Oglesby | AECOM |
203948 | 11/19/2014 |
Report of Cultural Resources Monitoring for LImited Notice to Proceed Activities for the Blythe Solar Power Project (09-AFC-06) Letter report describing cultural resources monitoring activities at the BSPP 6 page(s)
| | Mary Dyas | AECOM |
203928 | 3/20/2015 |
Confidential Cultural Resources Monthly Compliance Report for Cultural Resources Cultural Resources 2 page(s)
| | CEC/M. Dyas | AECOM |
203927 | 3/20/2015 |
Confidential Cultural Resources Monthly Compliance Report for Cultural Resources Cultural Resources 10 page(s)
| | CEC/M. Dyas | AECOM |
203919 | 3/19/2015 |
Notice to Proceed Blythe Solar Power Project - Notice to Proceed 03-19-2015 Compliance 2 page(s)
| | NextEra Blythe Solar Energy Center LLC | CEC/ Mary Dyas |
203861 | 3/12/2015 |
Memo In Existing Proceedings re: Merger of Hearing and Chief Counsel's Offices
1 page(s)
| | All Parties and Persons Interested in this Proceeding | Energy Commission Hearing Office |
203767 | 3/4/2015 |
Closure of the Proof of Service List for the BSPP Amendment Proceeding
1 page(s)
| | Parties | Energy Commission Hearing Office |
203528 | 1/16/2015 |
Blythe Solar - Limited Notice to Proceed #3 (01-16-2015)
Compliance 2 page(s)
| | NextEra Blythe Solar Energy Center, LLC | California Energy Commission |
203504 | 1/7/2015 |
Response Letter for Confidential Designation: Report of Cultural Resources Monitoring for Limited Notice to Proceed Activities
2 page(s)
| | AECOM/M. Tennyson | California Energy Commission |
203478 | 12/23/2014 |
Colorado River Indian Tribes (CRIT) Comment on Blythe Solar CRMMP CRIT comment on the June 2014 draft revised Cultural Resources Monitoring and Mitigation Plan for Blythe Solar Cultural Resources 9 page(s)
| | CEC/Michael McGuirt | Colorado River Indian Tribes |
203359 | 11/19/2014 |
BSPP LNTP Confidential Filing Application Application Letter for Confidential Filing Cultural Resources 2 page(s)
| | Dockets Unit | AECOM |
203154 | 10/3/2014 |
Letter from Colorado River Indian Tribes to Express Concerns re Proposed Process and Timeline for Construction
Cultural Resources, Compliance 4 page(s)
| | CEC/Mary Dyas | Shute Mihaly & Weinberger |
203137 | 9/30/2014 |
Blythe Solar - Limited Notice to Proceed #2 09-30-2014
Biological Resources, Compliance 1 page(s)
| | NextEra Blythe Solar/M. Handel | California Energy Commission |
202822 | 7/28/2014 |
Authorization to Start Limited Construction Activities
Compliance 36 page(s)
| | NextEra Blythe Solar Energy Center, LLC | California Energy Commission |
202590 | 6/25/2014 |
Email from Jared Babula to Mr. Lin Porter re Blythe Solar Concerns 06-25-2014
Compliance 1 page(s)
| | Mr. Lin Porter | CEC/Jared Babula |
202476 | 6/19/2014 |
Revised Cultural Resources Montioring and Mitigation Plan for the Modified Blythe Solar Power Project
Cultural Resources 209 page(s)
| | CEC/ Rob Oglesby | AECOM |
202472 | 6/19/2014 |
Blythe Solar Confidential filing application
Cultural Resources 2 page(s)
| | CEC / Rob Oglesby | AECOM |
202467 | 6/17/2014 |
LIN PORTER Comments: BLYTHE SOLAR POWER PROJECT
Facility Design, Compliance, Land Use, Noise and Vibration, Transmission Line Safety and Nuisance 1 page(s)
| | CEC/Dockets Unit | LIN PORTER |
202400 | 5/30/2014 |
Memo with link to US Bureau of Land Management Final Environmental Impact Statement
1 page(s)
| | CEC/Dockets Unit | CEC/Raoul Renaud |
201794 | 2/21/2014 |
Opposition to California Energy Commission's approval of NextEra Blythe Solar Project
1 page(s)
| | Commissioner Karen Douglas | Committee on Chicano Rights |
201765 | 2/20/2014 |
Alfredo A. Figueroa Comments: Opposition of CEC decision in Approving NextEra Blythe Solar Project
Cultural Resources, Soil and Water
| | | Alfredo A. Figueroa |
201696 | 2/10/2014 |
Bureau of Land Management Notice of Availability of Draft Environmental Impact Statement and Public Comment Meeting
1 page(s)
| | CEC/Dockets Unit | Bureau of Land Management |
201593 | 1/24/2014 |
Notice of Decision
1 page(s)
| | California Resources Agency | California Energy Commission |
201581 | 1/21/2014 |
Notice of Adoption and Docketing of the Commission Decision on the Blythe Solar Power Project Amendment
1 page(s)
| | Parties | CEC/ Hearing Office |
201580 | 1/21/2014 |
Blythe Solar Power Project Amendment Commission Decision
363 page(s)
| | Parties | CEC/ Hearing Office |
201558 | 1/15/2014 |
Errata to the Presiding Member's Proposed Decision Inserted new item 22 7 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201556 | 1/14/2014 |
Errata to the Blythe Amendment PMPD
7 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
201554 | 1/14/2014 |
Airport Land Use Commission Comments on PMPD Letter from Riverside County Airport Land Use Commission commenting on Presiding Member's Proposed Decision, Blythe Solar Power Project (revised) Compliance, Traffic and Transportation 5 page(s)
| | Ms. Mary Dyas, Compliance Project Manager | Riverside County Airport Land Use Commission |
201551 | 1/13/2014 |
CRIT's Comment Letter on the Blythe PMPD
6 page(s)
| | | Shute, Mihaly & Weinberger LLP |
201548 | 1/13/2014 |
CEC Staff Comments on the PMPD with Appendix B and D 1.13.14
44 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201545 | 1/13/2014 |
NextEra Blythe Solar Energy Center, LLC's Comments on the Presiding Member's Proposed Decision
Biological Resources, Project Description 8 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201544 | 1/10/2014 |
Intervenor LIUNA's Comments on Presiding Member's Proposed Decision
7 page(s)
| | CEC Dockets Unit | Lozeau Drury LLP |
201433 | 12/13/2013 |
Notice of Availability
4 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201432 | 12/13/2013 |
Presiding Member's Proposed Decision
335 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201430 | 12/13/2013 |
USFWS Comments to CEC for Proposed Blythe Solar Electric Generating Facility USFWS Comments to CEC for the Proposed Blythe Solar Electric Generating Facility Biological Resources 5 page(s)
| | Mary Dyas | USFWS |
201393 | 12/10/2013 |
Proposed Language CUL-5, CUL-16 and CUL-17 Proposed Text by Staff, CRIT and NEXTERA Cultural Resources 9 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201391 | 12/9/2013 |
CRIT’s Requested Additions to the Stipulated Conditions of Certification for Cultural Resources
Cultural Resources 13 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201374 | 12/5/2013 |
Energy Commission Staff Recommended Conditions of Certification
302 page(s)
| | CEC/ Dockets Unit | California Energy Commission |
201372 | 12/5/2013 |
Email exchange between parties re CRIT-NextEra Stipulation on Conditions of Certification
Cultural Resources 5 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201365 | 12/3/2013 |
County of Riverside Comments on Socioeconomics
Socioeconomics 11 page(s)
| | CEC/Dockets Unit | County of Riverside |
201362 | 12/3/2013 |
Staff Response to County of Riverside's 11/12/13 Comment Letter Regarding Staff Assissment TN# 201158
5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201361 | 12/3/2013 |
NextEra Blythe Solar, LLC's Reply Brief to Colorado River Indian Tribes Opening Brief
10 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201359 | 12/3/2013 |
Energy Commission Staff's Reply Brief
10 page(s)
| | CEC/ Dockets Unit | California Energy Commission |
201348 | 11/27/2013 |
Transcript of 11-19-2013 Evidentiary Hearing
179 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201342 | 11/27/2013 |
Opening Brief of Colorado River Indian Tribes
Cultural Resources, Land Use, Visual Resources 16 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201337 | 11/26/2013 |
NextEra Blythe Solar, LLC and Colorado River Indian Tribes Stipulation Re: Conditions of Certification CUL-5, CUL-16, and CUL-17
8 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201263 | 11/15/2013 |
CRIT Exhibit 4013 Statement of Stacia Bailey 2 page(s)
| 4013 | CEC/Docket Unit | Colorado River Indian Tribes |
201262 | 11/15/2013 |
CRIT Exhibit 4012 Statement of Weldon B. Johnson, SR. 2 page(s)
| 4012 | | Colorado River Indian Tribes |
201251 | 11/19/2013 |
NextEra Blythe Solar Energy Center LLC's Revised Exhibit List
4 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201250 | 11/18/2013 |
Blythe Solar Power Project Guide to Conditions of Certification Table
8 page(s)
| 1014 | CEC/Dockets Unit | Galati | Blek LLP |
201249 | 11/19/2013 |
Blythe Solar Final Decision 2010
629 page(s)
| 2004 | CEC/Dockets Unit | California Energy Commission |
201248 | 11/18/2013 |
Staff's Revised Exhibit List
1 page(s)
| | CEC/ Dockets Unit | California Energy Commission |
201247 | 11/18/2013 |
Staff's Testimony of Andrea Martine and Carol Wason re Bio Resources
Biological Resources 7 page(s)
| 2006 | CEC/ Dockets Unit | California Energy Commission |
201242 | 11/18/2013 |
Supplemental Testimony Relating To Certificate of Certification BIO-15
Biological Resources 7 page(s)
| 1013 | CEC/Dockets Unit | Galati Blek, LLP |
201235 | 11/18/2013 |
Intervenor Colorado River Indian Tribes Notice of Unavailability of Expert Witness Notice of Unavailability of Expert Witness Ms. Wilene Fisher-Holt 5 page(s)
| | | Shute, Mihaly & Weinberger LLP |
201230 | 11/15/2013 |
Staff’s Supplemental Testimony – Air Quality Background Update and Worker’s Safety Update
3 page(s)
| 2005 | CEC/Dockets Unit | California Energy Commission |
201219 | 11/15/2013 |
CRIT Application for Confidential Designation
3 page(s)
| | CEC/Docket Unit | Colorado River Indian Tribes |
201194 | 11/13/2013 |
Energy Commission Staff Prehearing Statement.pdf
10 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201193 | 11/13/2013 |
NextEra Blythe Solar Energy Center LLC's Pre-Hearing Statement and Testimony
57 page(s)
| 1012 | CEC/Dockets Unit | Galati | Blek LLP |
201192 | 11/13/2013 |
CRIT Prehearing Statement
Cultural Resources 7 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201191 | 11/13/2013 |
CRIT Ex. 4008
Cultural Resources 4 page(s)
| 4008 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201190 | 11/13/2013 |
Staff Response to Comments on the Staff Assessments Parts A and B
14 page(s)
| 2002 | CEC/Dockets Unit | California Energy Commission |
201189 | 11/13/2013 |
Staff's Supplemental Testimony Modifying Conditions of Certification
194 page(s)
| 2003 | CEC/Dockets Unit | California Energy Commission |
201188 | 11/13/2013 |
Intervenor CRIT Exhibit 4007 CRIT's Proposed Modifications to Conditions of Certification Cultural Resources 8 page(s)
| 4007 | | Shute, Mihaly & Weinberger LLP |
201187 | 11/13/2013 |
Intervenor CRIT Exhibit 4010 Opening Testimony of Winter King regarding Lessons Learned from the Unanticipated
Discovery of Buried Cultural Material at the Genesis Solar Energy Project Cultural Resources 9 page(s)
| 4010 | CEC/Docket Unit | Shute, Mihaly & Weinberger LLP |
201183 | 11/13/2013 |
Intervenor CRIT Exhibit 4009 Testimony of Wilene Fisher-Holt regarding Impacts of Blythe Project on Cultural Resources Cultural Resources 5 page(s)
| 4009 | CEC/Docket Unit | Shute, Mihaly & Weinberger LLP |
201182 | 11/13/2013 |
LIUNA Prehearing Statement and Exhibit List INTERVENOR LABORERS’ INTERNATIONAL UNION
OF NORTH AMERICA, LOCAL UNION NO. 1184’s
PREHEARING STATEMENT AND EXHIBIT LIST 9 page(s)
| | | Lozeau Drury LLP |
201180 | 11/13/2013 |
Intervenor CRIT Exhibit 4001 Sustainable Preservation: California’s Statewide Historic Preservation Plan, 2013-2017 Cultural Resources 68 page(s)
| 4001 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201179 | 11/13/2013 |
Intervenor CRIT Exhibit 4000 Presidential Memorandum on Tribal Consultation | The White House Cultural Resources 2 page(s)
| 4000 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201178 | 11/13/2013 |
Intervenor CRIT Exhibit 4004 Declaration of David Harper Cultural Resources 4 page(s)
| 4004 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201177 | 11/13/2013 |
Intervenor CRIT Exhibit 4003 Declaration of Mamie Harper Cultural Resources 3 page(s)
| 4003 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201176 | 11/13/2013 |
Intervenor CRIT Exhibit 4002 Declaration of Priscilla Eswonia Cultural Resources 3 page(s)
| 4002 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201175 | 11/13/2013 |
Intervenor CRIT Exhibit 4006 Amicus Brief In Support of Appellant Quechan Tribe of the Fort Yuma Indian Reservation by CRIT Cultural Resources 22 page(s)
| 4006 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201174 | 11/13/2013 |
Intervenor CRIT Exhibit 4005 SUPPLEMENTAL
DECLARATION OF LYLE
BALENQUAH IN SUPPORT OF
PLAINTIFF’S APPLICATION
FOR TEMPORARY
RESTRAINING ORDER AND
ORDER TO SHOW CAUSE Cultural Resources 7 page(s)
| 4005 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201171 | 11/13/2013 |
Priority Desert Tortoise Connectivity Habitat Identified by USFWS that Overlaps with Variance Lands in the Final Solar PEIS
Biological Resources 1 page(s)
| 1011 | CEC/Dockets Unit | Galati | Blek LLP |
201158 | 11/12/2013 |
County of Riverside Letter Regarding Staff Assessment
8 page(s)
| | CEC/Dockets Unit | County of Riverside |
201152 | 11/8/2013 |
Testimony of K. Shawn Smallwood, Ph.D. written testimony Biological Resources 62 page(s)
| 5005 | CEC/Dockets Unit | Lozeau Drury LLP |
201151 | 11/8/2013 |
Email from Jared Babula to Mr. Lin Porter 10-16-2013 Email from Jared Babula to Mr. Lin Porter regarding Questions about Blythe Solar Power Project Compliance 2 page(s)
| | Public/ Lin Porter | CEC/ Jared Babula |
201150 | 11/8/2013 |
Lin Porter Comments: Lin Porter's Public Concerns and Questions re the Blythe Solar Project and Impacts on my Property
3 page(s)
| | CEC/Docket Unit | Public/Lin Porter |
201149 | 11/8/2013 |
Comments of CRIT on the Blythe Solar Power Project Amendment
18 page(s)
| 4011 | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201147 | 11/8/2013 |
Committee Order Granting The Colorado River Indian Tribes Petition to Intervene
3 page(s)
| | Parties | Energy Commission Hearing Office |
201145 | 11/7/2013 |
BSPP Comments on Part B of the Energy Commission's Staff Assessment RCALUC Comments on the Energy Commission's Staff Assessment - Part B Land Use 6 page(s)
| | Mary Dyas/CEC | Riverside County Airport Land Use Commission |
201144 | 11/8/2013 |
Blythe Solar Workshop Agenda for 11-12-2013 Workshop Agenda for the 11-12-2013 Blythe Solar Staff Assessment Workshop Compliance 1 page(s)
| | | California Energy Commission |
201138 | 11/7/2013 |
Nextera Blythe Solar Energy Center LLC’s Initial Comments on the Staff Assessment, Parts A and B
Air Quality, Biological Resources, Cultural Resources, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 38 page(s)
| | CEC/Dockets Unit | Galati | Blek LLP |
201120 | 11/5/2013 |
Blythe Order Granting LIUNA PTI
| | | California Energy Commission |
201101 | 11/1/2013 |
PETITION TO INTERVENE BY THE COLORADO RIVER INDIAN TRIBES.pdf
8 page(s)
| | CEC/Dockets Unit | Shute, Mihaly & Weinberger LLP |
201093 | 11/1/2013 |
Notice of Evidentiary Hearing
10 page(s)
| | | Energy Commission Hearing Office |
201091 | 10/31/2013 |
NOTICE OF PUBLIC WORKSHOP WORKSHOP NOTICE 5 page(s)
| | | California Energy Commission |
201058 | 10/28/2013 |
Comments on Part A of the California Energy Commission's Staff Assessment Comments on BSPP SA Part A Compliance 2 page(s)
| | CEC/Mary Dyas | Riverside County Airport Land Use Commission |
201056 | 10/25/2013 |
Mojave Desert Air Quality Management District Comments: re Staff Assessment - Part A
1 page(s)
| | CEC/Dockets Unit | Mojave Desert Air Quality Management District |
201036 | 10/23/2013 |
Colorado River Board of California Comments: Request for Comments on CEC's Staff Assessment - Part A
8 page(s)
| | CEC/Dockets Unit | Colorado River Board of California |
201034 | 10/24/2013 |
MWD Comments: MWD comment leter on FEIS 19 Sep 2010
Soil and Water 9 page(s)
| | CEC/Alan Soloman | Metropolitan Water District of Southern California |
201033 | 10/24/2013 |
MWD Comments: MWD comment leter on Blythe Solar Project DEIS 15 June 2010
Soil and Water 7 page(s)
| | CEC/Alan Soloman | Metropolitan Water District of Southern California |
201032 | 10/24/2013 |
MWD Comments: MWD comment letter on Notice of Intent to prepare an EIS on the amended Blythe Solar Project 30 Sep 2013
Soil and Water 19 page(s)
| | Bureau of Land Management -Palm Springs | Metropolitan Water District of Southern California |
201031 | 10/24/2013 |
Metropolitan Water District of Southern CA Comments: MWD COmment Letter on Blythe Solar FInal Staff Assessment 23 October 2013
Soil and Water 6 page(s)
| | CEC/Mary Dyas | Metropolitan Water District of Southern California |
201027 | 10/23/2013 |
Michael R. Lozeau Comments: LIUNA Comments on Staff Assessment - Part A for the Proposed Blythe Solar Power Project (09-AFC-6C)
Air Quality 72 page(s)
| 5000 | CEC/Dockets Unit | Michael R. Lozeau |
201022 | 10/23/2013 |
LIUNA Petition to Intervene Petition to intervene 7 page(s)
| | California Energy Commission | Lozeau Drury LLP |
201019 | 10/23/2013 |
Revised General Orders Regarding Electronic Filing, etc Committee Orders re Use of Electronic Filing System (mandatory after 11-01-13), format of documents, exhibits, motions, and transcripts 18 page(s)
| | Parties | Energy Commission Hearing Office |
200943 | 10/18/2013 |
Notice of Availability of the Staff Assessment - Part B Public Letter Traffic and Transportation, Visual Resources, Alternatives, Biological Resources, Cultural Resources, Compliance, Land Use 6 page(s)
| | | California Energy Commission |
200942 | 10/18/2013 |
Document Handling for the Final Staff Assessment Part B and Posting of Public Notice Library Letter Alternatives, Biological Resources, Cultural Resources, Compliance, Land Use, Traffic and Transportation, Visual Resources 1 page(s)
| | | California Energy Commission |
200941 | 10/18/2013 |
Request for Comments on the Staff Assessment - Part B Agency Letter Alternatives, Biological Resources, Cultural Resources, Compliance, Land Use, Traffic and Transportation, Visual Resources 4 page(s)
| | | California Energy Commission |
200840 | 10/11/2013 |
Blythe Solar Power Project Staff Assessment - Part B Staff Assessment - Part B Alternatives, Biological Resources, Cultural Resources, Executive Summary, Compliance, Land Use, Traffic and Transportation, Visual Resources 601 page(s)
| 2001 | | California Energy Commission |
200765 | 10/7/2013 |
ALUC Riverside County Comments to BLM 10-02-2013 Comment letter to BLM from ALUC Riverside County 10-02-2013 Land Use 12 page(s)
| | Bureau of Land Management | Riverside County Airport Land Use Commission |
200747 | 10/7/2013 |
Response to Invitation to Participate Response from Agua Caliente Band of Cahuilla Indians Cultural Resources 1 page(s)
| | | Agua Caliente Band of Cahuilla Indians |
200692 | 10/1/2013 |
Request for Comments on Staff Assessment Part A - Agencies
Compliance 4 page(s)
| | | California Energy Commission |
200691 | 10/1/2013 |
Document Handling for the Final Staff Assessment Part A -Notice of Availability - Libraries
Compliance 1 page(s)
| | | California Energy Commission |
200690 | 10/1/2013 |
Request for Comments on Staff Assessment Part A.
Compliance 6 page(s)
| | | California Energy Commission |
200629 | 9/27/2013 |
Blythe Solar Power Project Staff Assessment - Part A (Corrected) *** THIS DOCUMENT SUPERSEDES TN 200566 *** - Corrected Staff Assessment - Part A Executive Summary, Compliance, Introduction, Project Description 725 page(s)
| 2000 | CEC/Dockets Unit | California Energy Commission |
200569 | 9/26/2013 |
Blythe Staff Assessment-Part A Introduction, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Transmission Line Safety and Nuisance, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Air Quality, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology 725 page(s)
| | | California Energy Commission |
200566 | 9/23/2013 |
Blythe Solar Power Project Staff Assessment Part A *** THIS DOCUMENT HAS BEEN REPLACED BY TN 200629 *** Air Quality, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Transmission Line Safety and Nuisance, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Soil and Water 724 page(s)
| | | California Energy Commission |
200565 | 9/23/2013 |
Blythe Solar Power Project Staff Assessment Part A Air Quality, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Transmission Line Safety and Nuisance, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Soil and Water 724 page(s)
| | | California Energy Commission |
200378 | 8/27/2013 |
Lin Porter Comments: DOCKET 09-AFC-06C BLYTHE SOLAR PROJECT
| | | Lin Porter |
200350 | 8/27/2013 |
NEPA-CEQA and Land Use Notice Request NEPA-CEQA and Land Use Notice Request on behalf of Laborers International Union of North America, Local Union 1184 and its members living in Riverside County Compliance 3 page(s)
| | CEC/Mary Dyas | Lozeau Drury, LLP |
200341 | 8/26/2013 |
Attachment DR 21 Construction Workforce Schedule by Trade, Revision A Construction Workforce Schedule by Trade Socioeconomics 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
200270 | 8/20/2013 |
Riverside County - Law Enforcement Needs Assessment Response - Riverside County Law Enforcement Needs Assessment 08-20-2013 Socioeconomics 2 page(s)
| | CEC/Dockets Unit | Riverside County Law Enforcement |
200225 | 8/20/2013 |
Response from Chemehuevi Indian Tribe 08-05-2013 Response to CEC Request for Tribal Consultation Cultural Resources 1 page(s)
| | CEC/Thomas Gates | Chemehuevi Indian Tribe |
200203 | 8/15/2013 |
ROC Regarding Construction Workforce and Lodging
Socioeconomics 3 page(s)
| | CEC/Mary Dyas | CEC/Steven Kerr |
200202 | 8/15/2013 |
Email re Law Enforcement Needs Assessment Riverside County Sherrif's Department Needs Assessment Socioeconomics 3 page(s)
| | CEC/Mary Dyas | CEC/ Steven Kerr |
200130 | 8/8/2013 |
Response to Invitation to Participate in CEC Tribal Consultation
Cultural Resources 1 page(s)
| | CEC/Roger E. Johnson | Soboba Band of Luiseno Indians |
200126 | 8/8/2013 |
Report of Interagency Meeting re Avian Data Collection Telephone Report of Conversation 3 page(s)
| | | California Energy Commission |
200108 | 8/1/2013 |
NextEra Blythe Solar's Response to Data Requests Set 2 (20-25)
Biological Resources, Socioeconomics 15 page(s)
| 1010 | CEC/Mary Dyas | Galati | Blek LLP |
200052 | 7/29/2013 |
Blythe Amendment CEC Tribal Consultation Request and Response Letters and BLM Tribal Tribal Leader Contact List and NAHC - North American Riverside County Contacts List and BSPP Project Features Fig. 2 and BSPP Vicinity Map Fig. 1 Cultural Resources 176 page(s)
| | NAHC/D. Singleton | CEC/T. Gates |
71693 | 7/22/2013 |
CEC's Steven Kerr's Letter to Riverside County Sheriff's Department's Ray Wood re Potential Law Enforcement Needs
8 page(s)
| | Riverside County Sheriff's Department/R.Wood | CEC/S.Kerr |
71634 | 7/15/2013 |
Repeated Application - Addendum 1 Cultural Resources Class 3 Report Attachments 4-6
3 page(s)
| | CEC/ R. Oglesby | Galati Blek/ M. Fleming |
71557 | 7/12/2013 |
Staff's Status Update Number One
2 page(s)
| | CEC/K.Douglas /D.Hochschild /R.Renaud | CEC/M.Dyas |
71556 | 7/12/2013 |
Staff's Data Request Set No.Two (Nos. 20-25)
6 page(s)
| | NextEra Energy Resources/D.Neville | CEC/M.Dyas |
71536 | 7/9/2013 |
Staff Emergency Response Matrix
1 page(s)
| | CEC/ Docket Unit | CEC/ D. Rundquist |
71501 | 7/1/2013 |
Repeated Application for Confidentially Designation Transmission Line Reroute Report
133 page(s)
| | CEC/R Oglesby | Galati Blek/M Fleming |
71500 | 7/1/2013 |
Repeated Application for Confidential Designation Addendum I Cultural Resource Class III Report
253 page(s)
| | CEC/R Oglesby | Galati Blek LLP/M Fleming |
71305 | 6/17/2013 |
NextEra Blythe Solar's Response to DR Set 1 (1-19)
100 page(s)
| 1009 | CEC/M. Dyas | Galati Blek/ NextEra |
71235 | 6/11/2013 |
General Orders Regarding Electronic Document Formats, Filing and Service of Documents and Other Matters
7 page(s)
| | CEC/Docket Unit | CEC/K.Douglas |
71017 | 5/29/2013 |
CEC Staff Issues Identification Report
15 page(s)
| | CEC/K.Douglas /D.Hochschild /R.Renaud | CEC/M.Dyas |
71016 | 5/29/2013 |
CEC Staff's Data Request Set One (Nos. 1-19)
16 page(s)
| | NextEra Energy Resources/D.Neville | CEC/M.Dyas |
70826 | 5/15/2013 |
Committee Scheduling Order
7 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /D.Hochschild |
70505 | 4/26/2013 |
Hearing Adviser Paul Kramer Email - Possible Change in Committee for Blythe Solar Power Project Amendment
1 page(s)
| | CEC/Docket Unit | CEC/ P. Kramer |
70476 | 4/25/2013 |
NextEra Blythe Solar Energy Center, LLC's Comparison of Impacts to State Jurisdictional Waters Figure
5 page(s)
| 1008 | CEC/Docket Unit | Galati Blek LLP/M.Fleming |
70465 | 4/25/2013 |
Nextera Blythe Solar Energy Center's Errata to Air Quality for the Revised Petition to Amend
6 page(s)
| 1007 | CEC/Docket Unit | NextEra Blythe Solar Energy/Galati Blek LLP/M.Fleming |
70318 | 4/12/2013 |
Blythe Solar Power Project's Revised Petition to Amend
812 page(s)
| 1006 | CEC/ M.Dyas | NextEra Blythe Solar Energy Center, LLC |
70303 | 4/15/2013 |
Repeated Application for Confidential Designation - Treatment Status of Sites Listed in the Conditions of Certification Cultural Resources Map
3 page(s)
| | CEC/R. Oglesby | Galati Blek LLP/ M. Fleming/Next Era Blythe Solar |
69088 | 1/10/2013 |
Memo - Hearing Officer Assignment
1 page(s)
| | CEC/Commissioners | CEC/Weisenmiller |
68082 | 10/25/2012 |
Patrick Jordan's Response to Lin Porter Comments
3 page(s)
| | Public/L.Porter | Patrick Stewart Properties/P.Jordan |
68081 | 10/25/2012 |
Lin Porter - Public Comment
4 page(s)
| | CEC/Docket Unit | Public/L.Porter |
67722 | 10/15/2012 |
Palo Verde Solar I, LLC Numerical Ground Water Flow Model
233 page(s)
| 1005 | CEC/Docket Unit | Palo Verde Solar I, LLC |
67278 | 9/25/2012 |
Comments from Daniel Rivest on Recycling CD TE Solar Modules
1 page(s)
| | CEC/M.Dyas | Beyond Oil Solar/D.Rivest |
67267 | 9/24/2012 |
Recycling of CdTe Thin Film Photovoltaic Panels
3 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
66964 | 8/28/2012 |
Status Report
5 page(s)
| 1004 | CEC/Docket Unit | Galati Blek LLP/M.Fleming |
66562 | 8/13/2012 |
Petition for Inspection of Confidential Records
2 page(s)
| | CEC/M.Levy | SWAPE/ M.Hagemann |
66502 | 8/7/2012 |
Public Comments of Daniel Rivest
1 page(s)
| | CEC/ M. Dyas | Public/ D. Rivest |
66419 | 7/31/2012 |
Errata to the Notice of Decision
1 page(s)
| | California Resource Agency | CEC/M.Dyas |
66253 | 7/17/2012 |
Notice of Decision to Change Ownership
1 page(s)
| | California Resources Agency | CEC/M.Dyas |
66220 | 7/13/2012 |
Order Approving Transfer of Ownership to NextEra Blythe Solar Energy Center LLC
2 page(s)
| | CEC/Docket Unit | CEC/H.Kellymeyn |
66190 | 7/11/2012 |
County of Riverside's Notice of Receipt of Petition to Amend CEC Decision for Blythe Solar Power Project
3 page(s)
| | CEC/ M. Dyas | County of Riverside/ T. North |
66033 | 6/29/2012 |
Notice of Receipt for the Petition to Amend Dated June 28, 2012
4 page(s)
| | CEC/Docket Unit | CEC/C.Marxen |
66027 | 6/28/2012 |
Palo Verde Solar I, LLC's Petition for Amendment Air Quality Modeling Files
1 page(s)
| 1003 | CEC/M.Dyas | Galati Blek/S. Galati |
66026 | 6/28/2012 |
Palo Verde Solar I, LLC's Petition for Amendment Conversion to PV
245 page(s)
| 1002 | CEC/M.Dyas | Galati Blek/ S.Galati |
65981 | 6/27/2012 |
Notice of Receipt - Petition to Change Ownership
4 page(s)
| | CEC/Docket Unit | CEC/D.Parrow |
65933 | 6/25/2012 |
Petition for Ownership Transfer from Palo Verde Solar I LLC to Nextera
8 page(s)
| 1001 | CEC/Docket Unit | Galati Blek LLP/M.Fleming |
63112 | 12/13/2011 |
Revised final Mitigation Proposal Letter for Phase 1A Only
3 page(s)
| | Palo Verde Solar LLC | State of California Natural Resources Agency |
62653 | 10/24/2011 |
Repeated Application for Confidential - Condition of Certification COM-06 and Cultural Exhibit
14 page(s)
| | CEC/ R. Oglesby | Galati Blek/ M. Fleming |
62310 | 9/22/2011 |
Repeated Application for Confidential - August Monthly Condition of Certification COM-06
35 page(s)
| | CEC/ R. Oglesby | Galati Blek/ M. Fleming |
62051 | 8/31/2011 |
Notice of Decision
1 page(s)
| | California Resources Agency | CEC/ M. Dyas |
62035 | 8/30/2011 |
Response to BLM and Compliance Maintenance Strategy
19 page(s)
| | CEC/ M. Dyas | Solar Trust/ N. Tenenbaum |
62031 | 8/30/2011 |
Order Approving Petition to Modify Facility Design and Location of its Transmission Line
6 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
61983 | 8/23/2011 |
Repeated Application for Confidential - Monthly Condition of Certification COM-06
46 page(s)
| | CEC/ R. Oglesby | Galati Blek/ S. Galati |
61841 | 8/12/2011 |
Addendum 01 LEC Natural Gas Line- Cultural Resources Survey
13 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
61492 | 7/22/2011 |
Commission Staff Analysis for Petition to Amend
17 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
61488 | 7/21/2011 |
Repeated Application for Confidential Condition of Certification COM 06
35 page(s)
| | CEC/ R. Oglesby | Galati Blek/ M. Fleming |
61305 | 7/6/2011 |
Repeated Application for Confidential - Addendum II Cultural Resources Class III Report
62 page(s)
| | CEC/ R. Oglesby | CEC/ S. Galati |
61304 | 7/6/2011 |
Repeated Application for Confidential Condition of Certification CUL-06
37 page(s)
| | CEC/ R. Oglesby | Galati Blek/ S. Galati |
61245 | 6/30/2011 |
Phase 1B Early Works Pre-Construction Approval Letter
1 page(s)
| | Solar Milennium/N.Tenenbaum | CEC/M.Dyas |
61214 | 6/28/2011 |
Notice of Receipt to Amend CEC Decision
3 page(s)
| | CEC/Dockets Unit | CEC/C.Marxen |
61148 | 6/14/2011 |
Palo Verde Solar I, LLC's Petition for Amendment
45 page(s)
| 1000 | CEC/ M. Dyas | Galati Blek LLP/ S. Galati |
60263 | 4/14/2011 |
Confidential Compliance Submittal for Condition of Certification CUL-06 Magnetometry Ground Truthing Study
3 page(s)
| | CEC/M.Jones | Galati Blek LLP/M.Fleming |
60262 | 4/14/2011 |
Confidential Compliance Submittal for Condition of Certification CUL-06 Site CA-RIV-3419 Revised Letter Report on Data Recovery in Project Limits of Disturbances
3 page(s)
| | CEC/Melissa Jones | Galati Blek LLP/M.Fleming |
58870 | 10/18/2010 |
Application for Confidential Designation - Confidential Proprietary Reclamation Cost Estimate
4 page(s)
| | CEC/M. Jones | Galati Blek LLP/M. Mills |
58745 | 9/22/2010 |
Repeated Application for Confidential Designation - Condition of Certification CUL-05, CUL-06, Draft Cultural Resources Monitoring & Mitigation Plan
4 page(s)
| | CEC/M. Jones | Galati Blek/M. Mills |
56796 | 5/20/2010 |
MOU Between CEC & WC3
9 page(s)
| | CEC/M. Dyas | WC3/G. Senaratne |