Docket Log

Docket: 19-SPPE-03
Project Title: Sequoia Data Center
Generated On: 4/24/2024 9:43:10 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2436936/23/2022 Memo re Close Docket

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2387067/6/2021 Commission Final Decision

502 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2386467/2/2021 CDFW fee receipt
Receipt confirming fee paid to California Department of Fish and Wildlife
2 page(s)
 CEC/docket unitCalifornia Energy Commission
2386457/2/2021 Notice of Determination Summary
CEQANET webpage confirming Notice of Determination
3 page(s)
 CEC/docket unitCalifornia Energy Commission
2384886/25/2021 Commission Adoption Order

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2384726/24/2021 Robert Sarvey Comments on revised proposed decision
Comments on revised proposed decision Sarvey
Air Quality
17 page(s)
 CEC/Docket UnitRobert Sarvey
2381896/14/2021 PROPOSED COMMISSION ORDER ON REVISED COMMITTEE PROPOSED DECISION

3 page(s)
 CEC/ Docket UnitCalifornia Energy Commission
2381726/10/2021 Corrected - Proof of Publication

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381236/7/2021 Proof of Service

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381196/4/2021 Notice of Intent et al
NOTICE OF: INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION, AVAILABILITY OF THE REVISED COMMITTEE PROPOSED DECISION, PUBLIC COMMENT PERIOD, AND CALIFORNIA ENERGY COMMISSION HEARING
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2381186/4/2021 Revised Committee Proposed Decision

583 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381176/4/2021 Sequoia Ruling on Evidence

12 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2381156/4/2021 Proof of Publication

1 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2378295/17/2021 Sarvey response to CEC motion 5-3-21
Sarvey response to CEC motion 5-3-21
Air Quality
10 page(s)
 CEC/docket unitRobert Sarvey
2378275/17/2021 Transcript with Certification of Prehearing Conference, Evidentiary Hearing, Scheduling Order, and Further Orders

42 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
2378145/14/2021 Transcript 5-11-21 of Prehearing Conference, Evidentiary Hearing, Scheduling Order, and Further Orders

40 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2377595/10/2021 CEC Staff Exhibit List for Sequoia

2 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2377425/7/2021 SARVEY REVISED SUPPLEMENTAL EXHIBIT LIST
SARVEY REVISED SUPPLEMENTAL EXHIBIT LIST
Air Quality
1 page(s)
 CEC/Docket UnitRobert Sarvey
2377395/7/2021 Robert Sarvey's Sequoia EXHIBIT - Part 2 - Data Centers in Census
Sequoia EXHIBIT 313 Part 2 Data Centers in Census
Air Quality
17 page(s)
314CEC/Docket UnitRobert Sarvey
2377385/7/2021 Robert Sarvey's Exhibit - Part 1 - Santa Clara Data Centers in Census Tract 6085505202
Exhbit 313 Part 1 Santa Clara Data Centers in Census Tract 6085505202.pdf
Air Quality
9 page(s)
313CEC/Docket UnitRobert Sarvey
2377375/7/2021 Staff Cross Examination Responses including Declarations and Resumes

Air Quality, Biological Resources, Hazardous Materials, Noise and Vibration
27 page(s)
213CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2376745/5/2021 Memo re Staff Motion to Direct Intervenor Sarvey to Comply with Committee Order 5-3-21

2 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2376735/5/2021 C1 Revised Supplemental Exhibit List - SBGF

Air Quality, Noise and Vibration, Project Description
2 page(s)
 CEC/Docket OfficeDayZenLLC
2376725/5/2021 C1 Supplemental Reply Testimony to Intervenor Sarvey Cross-Examination Questions

Air Quality, Noise and Vibration, Project Description
8 page(s)
48CEC/Docket OfficeDayZenLLC
2376445/4/2021 Intervenor Sarvey's Sequoia Data Center Evidentiary Hearing Questions
Sequoia Data Center Evidentiary hearing questions. revised
Air Quality
4 page(s)
 CEC/Docket UnitRobert Sarvey
2376345/3/2021 Staff Motion to Direct Intervenor Sarvey to Comply with Committee Order 5-3-21

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2376125/3/2021 Memo Re Intervenor Sarvey's Evidentiary Hearing Questions and Schedule Update

1 page(s)
 CEC/Docket OfficeEnergy Commission Hearing Office
2376115/3/2021 Email Exchange between Hearing Officer and CEC Staff Counsel

1 page(s)
 CEC/Lisa DeCarloEnergy Commission Hearing Office
2376074/30/2021 Robert Sarvey's Evidentiary hearing questions
Evidentiary hearing questions
Air Quality
4 page(s)
 CEC/Docket UnitRobert Sarvey
2375924/29/2021 Robert Sarvey's Exhibit - April 21, 2008 Letter CEC Executive Director Melissa Jones to W
Exhibit 318 April 21, 2008 Letter CEC Executive Director Melissa Jones to W. Tate Cantrell
Air Quality
4 page(s)
319CEC/Docket UnitRobert Sarvey
2375864/28/2021 Robert Sarvey's Exhibit - Locations of CEC Data Centers Census Tract 6085505202
Exhibit 320 Locations of CEC Data Centers Census Tract 6085505202
Air Quality
7 page(s)
321CEC/Docket UnitRobert Sarvey
2375844/28/2021 Robert Sarvey's Exhibit CARB comments on Staff Air Quality Assesment
Exhibit 319 CARB comments on Staff Air Quality Assessment.
Air Quality
120 page(s)
 CEC/Docket UnitRobert Sarvey
2375834/28/2021 Robert Sarvey's Exhibit - SV1 Revised Noise Analysis - GOSBGF
Exhibit 17 SV1 Revised Noise Analysis - GOSBGF
Noise and Vibration
7 page(s)
318CEC/Docket UnitRobert Sarvey
2375824/28/2021 Robert Sarvey's Exhibit Sequoia Data Center Exhibit 316 Santa Clara Data center EE
Sequoia Data Center Exhibit 316 Santa Clara Data Center engineering evaluation
Air Quality
110 page(s)
317CEC/Docket UnitRobert Sarvey
2375814/28/2021 Robert Sarvey's Exhibit Sequoia Data Center Exhibit 315 Bay Area Air Quality Management District Comments on NOP San jose
Sequoia Data Center Exhibit 315 BAAQMD Comments on San Jose Data Center NOP
17 page(s)
316CEC/Docket UnitRobert Sarvey
2375804/28/2021 Robert Sarvey Exhibit - Bay Area Air Quality Management District Comments -NOP Great Oaks South
Exhibit 314 Bay Area Air Quality Management District Comments -NOP Great Oaks South
Air Quality
18 page(s)
315CEC/Docket UnitRobert Sarvey
2375794/28/2021 Intervenor Sarvey’s Reply Testimony April 28, 2021
Exhibit 312 Intervenor Sarvey’s Reply Testimony April 28, 2021.
Air Quality
13 page(s)
312CEC/Docket UnitRobert Sarvey
2375644/28/2021 C1 SBGF Supplemental Rebuttal Testimony - Third Round

4 page(s)
47CEC/Docket OfficeDayZenLLC
2375284/23/2021 Sequoia Compiled Revised Initial Study and Proposed Mitigated Negative Declaration
Staff's Compiled Revised Initial Study responding to the Committee's Notice of Prehearing Conference, Evidentiary Hearing, Scheduling Order, and Further Orders dated April 12, 2021.
Air Quality
401 page(s)
212CEC/Docket UnitCalifornia Energy Commission
2375074/20/2021 CAISO Ordered SVP Curtailment August 14 2020

Air Quality
1 page(s)
46CEC/Docket UnitDayZenLLC
2375064/20/2021 BAAQMD Generator Run Hours Table - Highlighted during Governor's Emergency Proclamations

Air Quality
12 page(s)
45CEC/Docket UnitDayZenLLC
2375054/20/2021 Governor's Emergency Proclamations

Air Quality
7 page(s)
44CEC/Docket UnitDayZenLLC
2374844/16/2021 C1 SBGF Supplemental Testimony Responding to Committee Questions on Air Quality

Air Quality
9 page(s)
43CEC/Docket UnitDayZenLLC
2374284/12/2021 Notice of Prehearing Conference, Evidentiary Hearing, Scheduling Order, and Further Orders

15 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2372133/18/2021 Sarvey Sequoia Data Center Status Report
Sarvey Status Report
Air Quality
5 page(s)
 CEC/Docket UnitRobert Sarvey
2372103/18/2021 Transcript of March 12, 2021 Committee Conference

10 page(s)
 CEC/DocketsCalifornia Energy Commission
2371443/12/2021 C1's Supplemental Exhibit List - SBGF

1 page(s)
 CEC/docket unitDayZenLLC
2369793/4/2021 C1 SBGF Suplemental Opening Testimony Package

Air Quality, Hazardous Materials, Land Use, Project Description, Public Health, Traffic and Transportation
6 page(s)
42CEC/DocketsDayZenLLC
2369763/4/2021 CEC Staff Opening Testimony

1 page(s)
 CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2369563/2/2021 CEC Staff Resume of Joseph Hughes
CEC staff resume of Joseph Hughes, P.E. This filing supplements TN 236919, which contains Mr. Hughes' declaration for additional testimony filed in staff's Revised Initial Study and Proposed Mitigated Negative Declaration.
3 page(s)
211CEC/Docket UnitCalifornia Energy Commission
2369192/26/2021 Revised Initial Study and Proposed Mitigated Negative Declaration
CEC staff's identification of all replacements, additions, substitutions, and corrections from the previously filed Initial Study/Proposed Mitigated Negative Declaration.
133 page(s)
 CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2368712/22/2021 Notice of Committee Conference for the Primary Purpose of Conducting a Closed Session

5 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
2368392/18/2021 Sarvey Sequoia Stauts Report 2-18-21
Status Report 2-18-91
Air Quality
1 page(s)
 CEC/Docket UnitRobert Sarvey
2368372/18/2021 C1 Post Proposed Decision Status Report 2 - SBGF

Executive Summary
2 page(s)
 CEC/DocketsDayZenLLC
2368332/18/2021 February 2021 Status Report

5 page(s)
210CEC/DocketsCalifornia Energy Commission
2368322/18/2021 SBGF - Revised Emmissions Table with BAAQMD Offset Screening Calculation

Air Quality
1 page(s)
41CEC/DocketsDayZenLLC
2368062/16/2021 Revised Emission Table

Air Quality
1 page(s)
40CEC/DocketsDayZenLLC
2366562/5/2021 ALUC Final Consistency Determination Letter

34 page(s)
39CEC/Ashley GutierrezALUC
2366512/5/2021 Second Revised Scheduling Order and Related Orders

6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2364511/26/2021 C1 Revised AQ Emission Tables and Ammonia Calculations

Air Quality
6 page(s)
38CEC/DocketsDayZenLLC
2364431/25/2021 C1 Supplemental Information - Urea Solution - SBGF

Hazardous Materials
12 page(s)
37CEC/Docket UnitDayZenLLC
2364291/25/2021 SBGF Revised Project Description and AQ Emissions - Tier 4

Air Quality, Hazardous Materials, Project Description
31 page(s)
36CEC/DocketsDayZenLLC
2363801/20/2021 Memo re filing date for revised project description

1 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2363441/19/2021 Sarvey Sequoia Status Report January 18, 2021
Sequoia Status Report January 18, 2021.
Air Quality
6 page(s)
 CEC/DocketsRobert Sarvey
2363401/15/2021 C1 Post Proposed Decision Status Report 1 - SBGF

Introduction
9 page(s)
 CEC/DocketsDayZenLLC
2363371/15/2021 Memo re Committee Report on January 25, 2021 Business Meeting

1 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
2363301/14/2021 CEC Staff's January Status Report

11 page(s)
209CEC/Docket UnitCalifornia Energy Commission
2362691/12/2021 Agenda for Workshop to Discuss Research into Clean Energy Alternatives to Diesel Backup Generator Systems

2 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
2362261/5/2021 Notice of Workshop to Discuss Research into Clean Energy Alternatives to Diesel Backup Generator Systems
January 21, 2021
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23617512/29/2020 Transcript 12-16-20 on Committee Conference and Closed Session

66 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23616112/24/2020 Sequoia Power Point 12-16-2020 Committee Conference

18 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23612812/23/2020 Order After Committee Conference

5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
23608812/22/2020 BAAQMD letter Re BACT Determination for Diesel Back-up Engines Greater Than or Equal to 1,000 Brake Horsepower
From Jack P. Broadbent, Executive Officer,APCO, Bay Area Quality Management District
2 page(s)
208CEC/Drew Bohan, Executive DriectorBay Area Quality Management District
23593912/14/2020 California Air Resources Board Comments - CARB-BAAQMD Joint Recommendation

1 page(s)
207CEC/Docket UnitCalifornia Air Resources Board
23593712/14/2020 C! Individual Statement and Proposed Schedule

Air Quality
3 page(s)
 CEC/Docket UnitDayZenLLC
23593612/14/2020 Staff's Response To Committee Questions

4 page(s)
206CEC/Docket UnitCalifornia Energy Commission
23593412/14/2020 Intervenor Sarvey Position on Disputed Issues

Air Quality
3 page(s)
 CEC/Docket UnitRobert Sarvey
23592712/14/2020 Sequoia Data Center Attachment 1 Decmber 14, 2020 comments on air analysis Microsoft Santa Clarap
Microsoft Data Center HRA
Air Quality
10 page(s)
 CEC/DocketsRobert Sarvey
23588012/8/2020 Email from Hearing Officer

1 page(s)
 CEC/DocketsEnergy Commission Hearing Office
23585712/4/2020 Notice of Committee Conference
WEDNESDAY, DECEMBER 16, 2020 2:00 p.m.
9 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
23578211/23/2020 Memo re hold the date Committee conference on December 16, 2020 2 PM - 4 PM

1 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
23575811/20/2020 Order Affirming and Modifying Order to Remand

5 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23560011/13/2020 Earthjustice Comments - on Sequoia Backup Generating Facility SPPE

Air Quality
2 page(s)
 CEC/Docket UnitEarthjustice
23558511/13/2020 Preliminary Root Cause Analysis

121 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23551211/4/2020 Claire Ann Warshaw Comments - 2020_11_04 for recent diesel backup generation plant designs_Clean Energy Group's, Understanding Solar + Storage

Facility Design
71 page(s)
 CEC/Docket OfficeClaire Ann Warshaw
23548611/2/2020 Understanding natural gas fuel reliability for backup power
Understanding natural gas fuel reliability for backup power
Air Quality
4 page(s)
 CEC/DocketsRobert Sarvey
23548511/2/2020 With cleaner options available, data centers double down on diesel
With cleaner options available, data centers double down on diesel
Air Quality
5 page(s)
 CEC/DocketsRobert Sarvey
23548411/2/2020 NATURAL GAS IS A SMART CHOICE FOR DATA CENTER BACKUP POWER — EVEN IN EARTHQUAKE-PRONE AREAS
Natural Gas the smart choice for data center backup even in earthquake prone areas
Air Quality
3 page(s)
 CEC/DocketsRobert Sarvey
23548311/2/2020 A Comparison of Fuel Choice for Backup Generators
A Comparison of Fuel Choice for Backup Generators
Air Quality
59 page(s)
 CEC/DocketsRobert Sarvey
23548211/2/2020 Powering Data Centers with Natural Gas
Powering Data Centers with Natural Gas
Air Quality
8 page(s)
 CEC/DocketsRobert Sarvey
23548111/2/2020 Jenbacher white paper A reliable greenr way to montize your assets
Natural Gas is a viable and smarter solution to data center backup than diesle
Air Quality
16 page(s)
 CEC/DocketsRobert Sarvey
23547610/30/2020 C1 Response to Order to Remand to Committee

Air Quality
42 page(s)
 CEC/Docket UnitDayZenLLC
23547510/30/2020 Corrected Sequoia Data Center Comments on Motion to remandSarvey
Comments on motion to remand
Air Quality
11 page(s)
 CEC/Docket UnitRobert Sarvey
23547210/30/2020 Energy Commission Staff's Comments on Motion to Remand

34 page(s)
205CEC/Docket UnitCalifornia Energy Commission
23545710/29/2020 Third Revised Notice of California Energy Commission Hearing to Reconsider Motion to Remand

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23527110/15/2020 California Air Resources Board Comments - CARB Comments on Air Quality Analysis

118 page(s)
320CEC/Docket UnitCalifornia Air Resources Board
23502010/5/2020 Second Revised Notice of California Energy Commission Hearing To Reconsider Motion To Remand
Tuesday, November 10, 2020 at 10 a.m.
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2348989/24/2020 Revised Notice of Hearing - to Reconsider Motion to Remand
*** THIS DOCUMENT SUPERSEDES TN 234821 *** - Wednesday, October 14, 2020 at 10:00 a.m.
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2348409/18/2020 Item 13 - Transcript of September 9, 2020 Business Meeting
Transcript of Item 13 from the September 9, 2020 Business Meeting
29 page(s)
 CEC/DocketsCalifornia Energy Commission
2348309/18/2020 Memo re approval of motion to remand proceedings back to the Committee

1 page(s)
 CEC and Docket UnitCalifornia Energy Commission
2348219/18/2020 Notice of Hearing - Motion to Remand
*** THIS DOCUMENT IS REPLACED BY TN 9/24/2020 ***
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2346849/14/2020 Email Communications between Hearing Officer and Air Resources Board Staff
***SUPERSEDES TN 234674***
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2346749/11/2020 Email between Hearing Officer and CARB re timing
***SUPERSEDED BY TN 234684***
1 page(s)
 ARB/Craig SegallCalifornia Energy Commission
2346559/10/2020 CEC Form 108 for Petition for Reconsideration of a Decision or Order in a Power Plant Licensing Case
C1-Santa Clara LLC
Compliance
1 page(s)
 CEC/Docket UnitDayZenLLC
2346499/10/2020 C1-Santa Clara LLC Petition For Reconsideration-Appeal of Order

Air Quality, Alternatives, Compliance
13 page(s)
 CEC/Docket UnitDayZenLLC
2345959/8/2020 Notice of Communication

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2345438/31/2020 Intervenor Sarvey's Comments on the Proposed Decision
PD Comments Sarvey
Air Quality
8 page(s)
 CEC/Docket UnitRobert Sarvey
2344828/25/2020 Sequoia Proposed Commission Adoption Order

2 page(s)
 CEC/DocketsCalifornia Energy Commission
2344178/24/2020 NOTICE OF AVAILABILITY OF THE COMMITTEE PROPOSED DECISION, NOTICE OF PUBLIC COMMENT PERIOD, AND NOTICE OF HEARING

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2344168/21/2020 Sequoia Committee Proposed Decision

401 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2342528/7/2020 Transcript of the July 31, 2020 Closed Session

9 page(s)
 CEC/DocketsCalifornia Energy Commission
2340247/28/2020 Transcript 5-29-20 re Prehearing Conference
Transcript with certificates - *** THIS DOCUMENT SUPERSEDES TN 234018 ***
44 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2340187/27/2020 Draft Transcript 5-29-20 re Prehearing Conference
*** THIS DOCUMENT IS REPLACED BY TN 234024 ***
42 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2339917/22/2020 Memo re Hearing Officer Assignment

1 page(s)
 CEC/Karen Doublas, Patty Monahan, and All PartiesCalifornia Energy Commission
2338987/16/2020 NOTICE OF COMMITTEE CONFERENCE CLOSED SESSION ON FRIDAY, JULY 31, 2020 at 130 pm

5 page(s)
 CEC and docket unitCalifornia Energy Commission
2334916/16/2020 NOTICE OF OPPORTUNITY TO FILE STATEMENTS OF CONCERN

5 page(s)
 CEC and docket unitCalifornia Energy Commission
2334216/10/2020 Transcript of June 5, 2020 Evidentiary Hearing

79 page(s)
 CEC/DocketsCalifornia Energy Commission
2333356/5/2020 Raging Wires 2020 Proy Statement
Raging Wires 2020 Proxy statement
Air Quality
66 page(s)
 CEC/Docket UnitRobert Sarvey
2333346/4/2020 Staff's Exhibits List for Evidentiary Hearing

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2333336/4/2020 C1 List of Evidentiary Hearing Documents

Executive Summary
1 page(s)
 CEC/Dockert UnitDayZenLLC
2333326/4/2020 C1 Revised Exhibit List

Executive Summary
5 page(s)
 CEC/Docket UnitDayZenLLC
2333316/4/2020 Exhibit 204 Excerpt from McLaren Data Center Project Initial Study and Proposed Mitigated Negative Declaration

2 page(s)
204CEC/Docket UnitCalifornia Energy Commission
2333246/4/2020 Sarvey Updated exhbit List
Sarvey Updated exhibit list
1 page(s)
 CEC/Docket UnitRobert Sarvey
2333226/4/2020 Attachment A to CARB Resolution 18-26

40 page(s)
34CEC/Docket UnitDayZenLLC
2333216/4/2020 SVO Power IREP 2018 - Revised
This document was previously docketed in another docket.
110 page(s)
35CEC/Docket UnitDayZenLLC
2333176/4/2020 NCPA Comments on PSPS impacts as an Exhibit
Exhibit 311 NCPA comments on PSPS impacts
Air Quality
15 page(s)
311CEC/Docket UnitRobert Sarvey
2333166/4/2020 SJVAPCD emergency operations as an Exhibit
Exhibit 310 SJVAPCD on Emergency Operations - This is a previously docketed document.
Air Quality
3 page(s)
310CEC/Docket UnitRobert Sarvey
2333156/4/2020 Friendster Outage as an Exhibit
Exhibit 309 Friendster Outage
Air Quality
2 page(s)
309CEC/Docket UnitRobert Sarvey
2333146/4/2020 Santa Clara Genral Plan EIR as an Exhibit
Exhibit 308 Santa Clara General Plan EIR
Air Quality, Greenhouse Gases
593 page(s)
308CEC/Docket UnitRobert Sarvey
2333136/4/2020 SVP Outlet December 2018 as Exhibit
Exhibit 307 SVP Outlet December 2018
Air Quality
2 page(s)
307CEC/Docket UnitRobert Sarvey
2333116/4/2020 Presentation - CARB thresholds of signifcance as an Exhibit
Exhibit 306 CARB Thresholds of Signifcance
Greenhouse Gases
15 page(s)
306CEC/Docket UnitRobert Sarvey
2333086/4/2020 Order Regarding Filing of Rebuttal Testimony and Updated Information for Remote Participation in Evidentiary Hearing Via Zoom
Updated Information for Participating in Evidentiary Hearing and Order on June 5, 2020 at 11 am. ***SUPERSEDES TN 233288***
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2333076/4/2020 CARB Resolution 18-26

Greenhouse Gases
28 page(s)
33CEC/DocketsDayZenLLC
2333066/3/2020 Intervenor Sarvey's Response to Staff and Applicant on Committee Questions
Exhibit 305 Sarvey Rebuttal to Staff and applicant committee questions
Air Quality
8 page(s)
305CEC/Docket UnitRobert Sarvey
2332886/3/2020 Updated Information for Participating in Evidentiary Hearing and Order on June 5, 2020 at 11 am
***SUPERSEDED BY TN 233308***
3 page(s)
 CEC and docket unitCalifornia Energy Commission
2332846/3/2020 Transcript of March 17, 2020 Continuance of Closed Session on Hearing and Motion to Compel by Intervenor Robert Sarvey

7 page(s)
 CEC/DocketsCalifornia Energy Commission
2332836/3/2020 Transcript of March 11, 2020 Hearing and Related Orders on Motion to Compel by Intervenor Robert Sarvey

39 page(s)
 CEC/DocketsCalifornia Energy Commission
2332826/3/2020 Transcript of February 26, 2020 Committee Conference

52 page(s)
 CEC/DocketsCalifornia Energy Commission
2332475/29/2020 Memo - Submittal of Rebuttal Testimony to Committee Questions

1 page(s)
 All Parties and Persons InterestedCalifornia Energy Commission
2331385/26/2020 Prehearing conference statement Sarvey
Sarvey Prehearing Conference Statement
Air Quality
3 page(s)
 CEC/Docket UnitRobert Sarvey
2331155/26/2020 Staff's Prehearing Conference Statement

Compliance
5 page(s)
 DocketsCalifornia Energy Commission
2331045/26/2020 C1-Santa Clara LLC's Revised PreHearing Conference Statement and Exhibit List

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
8 page(s)
 CEC/DocketsDayZenLLC
2331025/22/2020 C1-Santa Clara LLC's Supplemental Testimony Package

Air Quality, Public Health, Greenhouse Gases
18 page(s)
32CEC/Docket UnitDayZenLLC
2331005/22/2020 National Fuel Cell Research Center Comments on Sequoia Data Center Initial Study and Proposed Mitigated Negative Declaration

12 page(s)
 CEC/Docket UnitNational Fuel Cell Research Center
2330955/22/2020 CEC Staff Responses to Committee Questions
CEC Staff Supplemental Testimony responsive to the Committee Questions on potential air quality, greenhouse gas emissions, and public health impacts. Additional staff declarations and resumes are included.
Air Quality, Public Health, Greenhouse Gases
38 page(s)
203CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2330885/22/2020 SVP Email to City of Santa Clara on Carbon Intensity Factor

Greenhouse Gases
1 page(s)
31CEC/Docket UnitDayZenLLC
2330865/22/2020 Excerpts From Laurelwood Final Decision

Air Quality, Efficiency, Public Health
5 page(s)
30CEC/Docket UnitDayZenLLC
2330845/22/2020 CEC Staff ROC with SVP regarding reliability of system

Air Quality, Efficiency, Public Health, Reliability
18 page(s)
29CEC/DocketsDayZenLLC
2330565/21/2020 BAAQMD Methodology Risk and Hazards Screening Tool

Air Quality, Public Health
5 page(s)
28CEC/Docket UnitDayZenLLC
2330555/21/2020 SVP's 2018 IRP

Efficiency
27 DayZenLLC
2330535/21/2020 Annual Data Center Survey Results - Uptime Institute

Efficiency, Project Description
6 page(s)
26CEC/DocketsDayZenLLC
2330525/21/2020 2017 CEQA Guidelines - BAAQMD

Air Quality, Public Health, Greenhouse Gases
224 page(s)
25CEC/DocketsDayZenLLC
2329575/8/2020 NOTICE OF PREHEARING CONFERENCE AND EVIDENTIARY HEARING, REVISED SCHEDULING ORDER, AND FURTHER ORDERS
The PREHEARING CONFERENCE will be held on: FRIDAY, MAY 29, 2020 ***SUPERSEDES TN 232956*** 2:00 p.m. The EVIDENTIARY HEARING will be held on: FRIDAY, JUNE 5, 2020 11:00 a.m.
15 page(s)
 CEC/DocketsCalifornia Energy Commission
2329565/8/2020 NOTICE OF PREHEARING CONFERENCE AND EVIDENTIARY HEARING, REVISED SCHEDULING ORDER, AND FURTHER ORDERS
***SUPERSEDED BY TN 232957***
15 page(s)
 CEC/DocketsCalifornia Energy Commission
2329155/6/2020 Job Specification Sheet with Emission Summary-DLR Santa Clara
The docketed item is a certificate from the manufacturer that demonstrates that the diesel particulate filter typical for those to be used at this facility would remove 85% of the diesel particulate matter produced by the diesel engines.
Air Quality
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2326104/1/2020 CEC Executive Director's Jurisdictional Determination VDC

Project Description
2 page(s)
24CEC/DocketsDayZenLLC
2326013/30/2020 BAAQMD Diesel Free Document

Air Quality, Public Health, Greenhouse Gases
5 page(s)
23CEC/DocketsDayZenLLC
2326003/30/2020 C1's PreHearing Conference Statement and Exhibit List

Air Quality, Alternatives, Biological Resources, Cultural Resources, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Visual Resources, Waste Management, Soil and Water, Greenhouse Gases
6 page(s)
 CEC/DocketsDayZenLLC
2325263/25/2020 SCHEDULE FOR COMMITTEE EVENTS

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2325063/23/2020 Sarvey Rebuttal Exhi9bit 1
Washington State Department of Ecology Health Risk Assessment Cyrus one Quincy
Air Quality
36 page(s)
304CEC/DocketsRobert Sarvey
2325053/23/2020 Reply testiomny of Robert Sarvey
Sarvey Reply Testimony
Air Quality
18 page(s)
303CEC/DocketsRobert Sarvey
2324963/23/2020 C1 Reply Testimony Package

Air Quality, Facility Design, Project Description, Public Health, Socioeconomics, Greenhouse Gases
3 page(s)
22CEC/DocketsDayZenLLC
2324933/23/2020 C1 Reply to Sarvey Motion to Suspend Proceedings

Air Quality
2 page(s)
 CEC/DocketsDayZenLLC
2324863/20/2020 ORDER DENYING INTERVENOR SARVEY’S MOTION TO COMPEL

3 page(s)
 CEC and Docket unitCalifornia Energy Commission
2324743/20/2020 NOTICE OF COMMITTEE CONFERENCE (CLOSED SESSION) Wednesday, April 1, 2020 at 10 am

4 page(s)
 CEC/DocketsCalifornia Energy Commission
2324213/16/2020 Robert Sarvey's Motion to Suspend the Procedural Schedule and Provide an Immediate Response

Air Quality
1 page(s)
 CEC/Docket UnitRobert Sarvey
2324203/16/2020 C1-Santa Clara, LLC SBGF Opening Testimony and Declarations

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
17 page(s)
21CEC/Docket UnitDayZenLLC
2324113/16/2020 The Mercury News ad for Santa Clara & San Jose area
Mercury News ad for the Walsh/Sequoia Data Centers Joint-Committee Conference, Feb. 26, 2020
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2324093/13/2020 Staff's Opening Testimony with Declarations and Resumes

36 page(s)
202CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2324013/13/2020 Committee Order Granting Petition to Intervene Filed California Unions for Reliable Energy

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2323983/13/2020 San Jose Mercury News Proof of Publication
San Jose Mercury News Proof of Publication for the city of Santa Clara and San Jose
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2323973/13/2020 San Jose Mercury News Proof of Publication
San Jose Mercury News Proof of Publication for the city of Santa Clara and San Jose - Spanish version
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2323953/13/2020 San Jose Mercury News Prueba de publicación
San Jose Mercury News Prueba de publicación para la ciudad de Santa Clara y San José
1 page(s)
 CEC/DocketsCalifornia Energy Commission
23239210/25/2019 Confidential SBGF Cultural Resources Technical Report

48 page(s)
 CEC/Mr Drew BohanDayZenLLC
23239110/30/2019 Confidential Appedix C to Cultral Resources Technical Report

6 page(s)
 CEC/Drew BohanDayZenLLC
23239010/30/2019 Confidential Appendix B to Cultral Resources Technical Report

30 page(s)
 CEC/Drew BohanDayZenLLC
23238910/30/2019 Confidential Appendix A to Cultral Resources Technical Report

9 page(s)
 CEC/Drew BohanDayZenLLC
2323853/12/2020 Notice of Continuance of the Closed Session of the Motion to Compel by Intervenor Robert Sarvey
Closed session continued to March 17, 2020, at 3:30 p.m.
2 page(s)
 CEC/DocketsEnergy Commission Hearing Office
2323733/10/2020 Public Advisor's PowerPoint Presentation for Walsh and Sequoia Joint Committee Conference
Presented on February 26, 2020, in Santa Clara, CA
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2323413/9/2020 Sarvey Response
Intervenor Sarvey's response to Staff and applicant comments on cumulative i9mpact assessment motion
Air Quality
14 page(s)
302CEC/DocketsRobert Sarvey
2323383/9/2020 CEC Staff Responses to Comments on the Initial Study and Proposed Mitigated Negative Declaration
CEC Staff Responses to Comments on the Initial Study and Proposed Mitigated Negative Declaration
17 page(s)
201CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2323323/6/2020 Staff Response to Intervenor Robert Sarvey's Motion to Compel

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2323223/5/2020 State Clearinghouse Review Summary

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2323153/5/2020 C1 Clairificaiton and Response to BAAQMD ISMND Cumulative HRA Comment

Air Quality, Public Health
3 page(s)
20CEC/DocketsDayZenLLC
2322732/28/2020 Sarvey IS comments as an exhibit
exhibit 3 - Santa Clara 2018 GHG progress Report
Greenhouse Gases
29 page(s)
 CEC/Docket UnitRobert Sarvey
2322722/28/2020 Sarvey IS comments as an Exhibit
Exhibit 2 - CEC Staff evaluation of SVP procurement plan - Document previously docketed in 18-IRP-01.
Efficiency
53 page(s)
 CEC/Docket UnitRobert Sarvey
2322712/28/2020 NOTICE OF HEARING AND RELATED ORDERS ON MOTION TO COMPEL BY INTERVENOR ROBERT SARVEY
Wednesday, March 11, 2020 at 2:00 p.m.
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2322702/28/2020 Testimony of Robert Sarvey on the Initial Study MND for the Sequoia Data Center

Air Quality
31 page(s)
300CEC/Docket UnitRobert Sarvey
2322592/28/2020 Department of Toxic Substances Control Comments - on Initial Study and Proposed Mitigated Negative Declaration

2 page(s)
 CEC/Leonidas PayneDepartment of Toxic Substances Control
2322542/27/2020 Joint Committee Conference Hearing Officers' PowerPoint Presentation

18 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2322422/27/2020 Bay Area Air Quality Management District Comments - Comment Letter for Sequoia Data Center MND

Air Quality, Greenhouse Gases
4 page(s)
301CEC/Leonidas PayneBay Area Air Quality Management District
2322202/25/2020 SBGF Reply to Sarvey Motion To Compel

Air Quality
3 page(s)
 CEC/DocketsDayZenLLC
2322122/24/2020 SBGF Status Report

Executive Summary
2 page(s)
 CEC/DocketsDayZenLLC
2321872/21/2020 Motion to Compel the Applicant to Perform a Cumulative Impact Analysis
Motion to compel applicant to provide a cumulative air quality analysys
Air Quality
4 page(s)
 CEC/DocketsRobert Sarvey
2321722/21/2020 CEC Staff's Status Report

1 page(s)
 CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
2320482/18/2020 Sarvey Comments on the Sequoia Data Center intial Study negative declaration Attachment 1
Potential Emissions Impact of Public Safety Power Shutoff (PSPS) Draft California Air Resources Board 1 Emission Impact: Additional Generator Usage Associated with Power Outage January 30, 2020
Air Quality
4 page(s)
 CEC/DocketsRobert Sarvey
2320452/14/2020 Petition to Intervene by California Unions for Reliable Energy

Air Quality, Hazardous Materials, Noise and Vibration, Public Health, Greenhouse Gases
6 page(s)
 CEC/Docket UnitAdams Broadwell Joseph & Cardozo
2320422/14/2020 Notice of Joint Committee Conference
Notice of Committee Conference to be held jointly with the Walsh SPPE Application in Santa Clara on February 26, 2020
9 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2320202/12/2020 Sequoia Data Center FAA No Hazard Determination

4 page(s)
19CEC/Docket UnitDayZenLLC
2320182/12/2020 City of San Jose Airport Department Comments - Aviation-Related Information and Analysis in the Initial Study

1 page(s)
 CEC/Docket UnitCity of San Jose Airport Department
2320072/11/2020 Transcript of 12-17-2019 Committee Conference

55 page(s)
 CEC/DocketsCalifornia Energy Commission
2317911/29/2020 Committee Scheduling Order

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2316521/23/2020 Notice of Intent to Adopt a Proposed Mitigated Negative Declaration

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2316511/23/2020 Sequoia Data Center Initial Study and Proposed Mitigated Negative Declaration
Initial Study
321 page(s)
200CEC/Docket UnitCalifornia Energy Commission
2315461/16/2020 Committee Order Granting Petition to Intervene Filed by Robert Sarvey

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2314911/14/2020 Email - Applicant Acceptance of Mitigation Measure Language
Applicant's email response confirming agreement to staff's proposed mitigation measures as presented in TN 231455.
2 page(s)
 California Energy CommissionCalifornia Energy Commission
2314561/10/2020 Report of Conversation - Coordination Regarding Tree Removal within City of Santa Cl

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2314551/10/2020 Email - Sequoia Data Center Mitigation Measure language
CEC staff request for agreement by the applicant of mitigation measure language
44 page(s)
 C1-Santa Clara, LLC - c/o Scott GalatiCalifornia Energy Commission
2314541/10/2020 Report of Conversation - Mitigation Measure Coordination for Western Burrowing Owl
Conversation between Ann Crisp of the CEC and Kristin Garrison of the CDFW
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2314431/10/2020 SAVE THE DATE Status Conference on Wednesday, February 26, 2020, in Santa Clara, California

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2314421/10/2020 Committee Scheduling Order

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2314401/10/2020 Report of Conversation - Information Requests Re Norman Y Mineta San Jose Int Airport Resident Western Burrowing Owl Population
Conversation between Ann Crisp of the CEC and Erik Chow of the USDA APHIS Wildlife Services
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2314391/10/2020 Report of Conversation - Information Requests Re Norman Y Mineta San Jose Int Airport Resident Western Burrowing Owl Population
Conversation between Ann Crisp of the CEC and Kristin Garrison of the CDFW
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2314201/8/2020 Email - AQIA Practices for Emergency Operations
This information is being docketed to respond to the Committee request at the project status conference on December 17, 2019, for staff to ask air districts, especially the South Coast AQMD, about their practice of evaluating emergency operations of projects they review.
2 page(s)
 CEC/Gerry BemisSan Joaquin Valley Air Pollution Control District/Lelan Villalvazo
2314191/8/2020 Additional Clarification Re Application of Appendix W Modeling Guidiance for the 1-hour NO2 National Ambient AQ Standard
This information is being docketed to respond to the Committee request at the project status conference on December 17, 2019, for staff to ask air districts, especially the South Coast AQMD, about their practice of evaluating emergency operations for projects they review.
27 page(s)
 Regional Air Division DirectorsUnited States Environmental Protection Agency/Tyler Fox/Air Quality Modeling Group
23135512/31/2019 ALUC Final Consistency Determination - SDC

Traffic and Transportation
2 page(s)
18CEC/DocketsDayZenLLC
23133612/30/2019 Response to Comments on Air Quality & Public Health Issues
This document was docketed for McLaren Backup Generation Facility and is needed for the Sequoia Data Center Project.
Air Quality
30 page(s)
 CEC/DocketsEnergy Commission
23133512/30/2019 Record of Conversation
This document was docketed for Laurelwood Data Center and is needed for the Sequoia Data Center Project
Air Quality
17 page(s)
 CEC/DocketsEnergy Commission
23133112/27/2019 Record of Conversation from Silicon Valley Power – response to questions on 7-2-19 ( TN 229077)
SVP responses to CEC staff questions and historical outages
17 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23133012/27/2019 Data Clarification Questions And Responses For The McLaren Back
Responses to CEC staff concerning vantage data center historical outages.
30 page(s)
 CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
23132612/27/2019 Record of Conversation about FAA Airspace Analysis
CEC Staff Report of Conversation with Cary Greene, Airport Planner, City of San Jose Airport Department. Communication about Applicant's Submitted FAA Airspace Analysis.
Land Use, Traffic and Transportation
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23128212/18/2019 Email from Staff on Sequoia Schedule
Email from Lon Payne to Galen Lemei regarding the Sequoia schedule.
2 page(s)
 CEC/DocketsCalifornia Energy Commission
23125712/17/2019 C1 Responses to CEC Staff DR Set 3

Air Quality, Project Description, Public Health, Traffic and Transportation
95 page(s)
17CEC/DocketsDayZenLLC
23124512/16/2019 Sarvey Petition to intervene
Petition to intervene
Air Quality
2 page(s)
 CEC/DocketsRobert Sarvey
23119512/13/2019 C1 Status Conference Presentation

Project Description
4 page(s)
 CEC/DocketsDayZenLLC
23115912/11/2019 C1 Santa Clara LLC's Response to CEC Staff IIR and Proposed Schedule

Air Quality, Biological Resources, Cultural Resources, Efficiency, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
2 page(s)
 CEC/Docket UnitDayZenLLC
23101412/6/2019 Data Requests Set 3

4 page(s)
 CEC/DocketsCalifornia Energy Commission
23101112/6/2019 Numbered Project Design Measures - SBGF SPPE Application, Section 2-7

Project Description
6 page(s)
16CEC/DocketsDayZenLLC
23099412/4/2019 Issues Identification, Status Report, and Proposed Schedule for the Sequoia Small Power Plant Exemption

2 page(s)
 CEC/Karen Douglas and Patty MonahanCalifornia Energy Commission
23089312/2/2019 Generator Tank Detail Revision to Respond to ALUC - Supplemental Response to DR 89

Hazardous Materials, Land Use, Traffic and Transportation
1 page(s)
15CEC/DocketsDayZenLLC
23085911/26/2019 Notice of Committee Conference and Orders on Hearings
Committee Conference scheduled for December 17, 2019, at 10 a.m. in Sacramento
7 page(s)
 CEC/DocketsEnergy Commission Hearing Office
23079211/19/2019 General Orders Regarding Motions, Electronic Filing, etc
General Orders
4 page(s)
 All parties and interested personsCalifornia Energy Commission
23050711/5/2019 Appendix BIO DR-62 to Data Request Set 1

Biological Resources
10 page(s)
14CEC/Docket UnitDayZenLLC
23047511/1/2019 Response Application Confidential Designation Cultural Resources Data
***Supersedes TN230473**
10 page(s)
 DayZen, LLC/Scott A. GalatiCalifornia Energy Commission
23047311/1/2019 Response Application for Confidential Designation Cultural Resources Data
***SUPERSEDED BY TN 230475***
2 page(s)
 CEC/DocketsCalifornia Energy Commission
23044110/30/2019 Confidential SBGF Cultural Resources Technical Report With Appendices
This document includes the Appendices to the CRTR that were inadvertently left off of TN 230367
3 page(s)
 CEC/Drew BohanDayZenLLC
23043710/29/2019 Communication About FAA Notification and City of San Jose Avigation Easement
Conversation between Andrea Koch of the CEC and Cary Greene of the City of San Jose Airport Department
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23036710/25/2019 Request For Confidential Designation - Data Request 71-73 Cultural Resources Technical Report

3 page(s)
 CEC/Drew BohanDayZenLLC
23036210/25/2019 Proof of Publication in the City of San Jose in the State of California County of Santa Clara
Publication in the San Jose Mercury News
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23035710/25/2019 C1 Appendix TRANS DR-103 - Part IV of IV Response to DR Set 2

Traffic and Transportation
14 page(s)
13CEC/DocketsDayZenLLC
23035610/25/2019 C1 Appendix TRANS DR-103 Part III of IV Response to DR Set 2

Traffic and Transportation
16 page(s)
12CEC/DocketsDayZenLLC
23035410/25/2019 C1 Appendix TRANS DR-103 Part II of IV Response to DR Set 2

Traffic and Transportation
18 page(s)
11CEC/DocketsDayZenLLC
23035310/25/2019 C1 Appendix TRANS DR-103 Part I of IV Response to DR Set 2

Traffic and Transportation
63 page(s)
10CEC/DocketsDayZenLLC
23034810/25/2019 C1 Response to CEC Data Request Set 2 -without Appendices

Biological Resources, Cultural Resources, Hazardous Materials, Land Use, Project Description, Traffic and Transportation
12 page(s)
8CEC/DocketsDayZenLLC
23034710/25/2019 C1 Appendix BIO DR-93 Response to CEC DR Set 2
Landscape and Tree Removal Plans
Biological Resources
15 page(s)
9CEC/DocketsDayZenLLC
23014510/11/2019 Data Requests for Sequoia Data Center - Set 2

14 page(s)
 C1-Santa Clara, LLC - c/o Scott GalatiCalifornia Energy Commission
22997310/7/2019 Appendix BIO DR-64 Tree Removal Plan - C1 Response to CEC Data Request Set 1

Biological Resources
2 page(s)
7CEC/DocketsDayZenLLC
22995510/3/2019 C1-Santa Clara, LLC's Application for Confidential Designation

11 page(s)
 CEC/Drew BohanC!-Santa Clara, LLC
229938-110/2/2019 C1 Santa Clara, LLC's Response to CEC Staff Data Request - Set 1 (1-92)

60 page(s)
5CEC/Docket UnitDayZenLLC
229938-210/2/2019 C1 Santa Clara, LLC's Response to CEC Staff Data Request - Set 1 - SBGF Appendices

187 page(s)
6CEC/Docket UnitDayZenLLC
2297549/17/2019 Memorandum re Hearing Officer Assignment
Memo
1 page(s)
 All parties and interested personsCalifornia Energy Commission
2297379/13/2019 Data Requests, Set 1

26 page(s)
 C1-Santa Clara, LLC/c/o Scott GalatiCalifornia Energy Commission
2297219/12/2019 Order Establishing Committee
Order Number 19-0911-3
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2296819/6/2019 Sequoia Agency Distribution List

2 page(s)
  California Energy Commission
2296789/6/2019 Tribal Consultation Letters

24 page(s)
 CEC/DocketsCalifornia Energy Commission
2296288/30/2019 Request for Agency Participation in the Review of the Sequoia Data Center

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2296278/30/2019 Notice of Receipt of An Application for a Small Power Plant Exemption

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
229419-18/14/2019 Application for Small Power Plant Exemption

221 page(s)
1CEC/Docket UnitC1-Santa Clara, LLC
229419-28/14/2019 Appendices A-N - part 1

304 page(s)
2CEC/Docket UnitC1-Santa Clara, LLC
229419-38/14/2019 Appendices A-N - part 2

207 page(s)
3CEC/Docket UnitC1-Santa Clara, LLC
229419-48/14/2019 Appendices A-N - part 3

1175 page(s)
4CEC/Docket UnitC1-Santa Clara, LLC
2292788/8/2019 Memo to Open New Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission