Docket Log

Docket: 99-AFC-08C
Project Title: Blythe Energy Project Compliance & Blythe Transmission Line Modification
Generated On: 4/19/2014 5:38:15 PM

TN #Docketed DateDocument TitleExhibit #ToFrom
2001258/8/2013Order Approving Change Operational Control of the Blythe Energy Project

Compliance
2 page(s)
  California Energy Commission
2001278/8/2013Approval letter for Request to Transfer Operational Control from Nextera Energy to Atlasgas Blythe Operations

Compliance
1 page(s)
 Kim HellwigCEC/Mary Dyas
2000517/26/2013Name Change Notification

1 page(s)
 CEC/Dockets UnitBlythe Energy, Inc.
716787/18/2013Notice of Decision - Transfer the Operational Control
Notice of Decision - Transfer the Operational Control
1 page(s)
 California Resoruces AgencyCEC/M.Dyas
716357/15/2013Concerned Citizen of Blythe Comment Letter
Concerned Citizen of Blythe Comment Letter
12 page(s)
 CEC/ Docket UnitConcerned Citizen of Blythe
711756/7/2013Blythe Energy Inc.'s Petition to Change Operational Control
Blythe Energy Inc.'s Petition to Change Operational Control
11 page(s)
 CEC/ Docket UnitBlythe Energy Inc.
6278811/4/2011Approval of Request to Transfer Operational Control
Approval of Request to Transfer Operational Control
1 page(s)
 Winston & Strawn/ L. CottleCEC/ M. Dyas
6274511/3/2011Order Approving Transfer of Operationl Control to NextEra Energy Operating Services
Order Approving Transfer of Operationl Control to NextEra Energy Operating Services
2 page(s)
 CEC/ Docket UnitCEC/ H. Kallemeyn
6278111/3/2011Filing Notice of Decision
Filing Notice of Decision
1 page(s)
 California Resources AgencyCEC/ M. Dyas
6261110/19/2011Notice of Receipt-Petition to Transfer Ownership
Notice of Receipt-Petition to Transfer Ownership
2 page(s)
 CEC/Dockets UnitCEC/C.Marxen
620839/2/2011Petition of Blythe Energy, LLC to Transfer Operational Control of the Blythe Energy Project
Petition of Blythe Energy, LLC to Transfer Operational Control of the Blythe Energy Project
12 page(s)
 CEC/ Docket UnitWinston Strawn LLP
602514/13/2011Next Era Energy Address Change Letter
Next Era Energy Address Change Letter
1 page(s)
 CEC/ M. DyasNext Era Energy
596602/11/2011SAPM #6 Data Requests 1-7 December 20,2010
SAPM #6 Data Requests 1-7 December 20,2010
1 page(s)
 CEC/Docket UnitCEC/Mary Dyas
596612/11/2011Blythe Energy LLC G.Hickey SAPM #6 Data Response 1-7 January 7,2011
Blythe Energy LLC G.Hickey SAPM #6 Data Response 1-7 January 7,2011
40 page(s)
 CEC/Mary DyasBlythe Energy LLC/G.Hickey
596632/11/2011SAPM #6 Data Response 1-7 Revised February 8, 2011
SAPM #6 Data Response 1-7 Revised February 8, 2011
41 page(s)
 CEC/Docket UnitCEC/Mary Dyas
596542/10/2011CEC Letter to Jenna Farrell Tetra Tech regarding Application for Confidentiality Cultural Resources
CEC Letter to Jenna Farrell Tetra Tech regarding Application for Confidentiality Cultural Resources
2 page(s)
 Tetra Tech/ J. FarrellCEC/ M. Jones
595201/12/2011Application for Confidentiality Final Cultural Resources Monitoring Report
Application for Confidentiality Final Cultural Resources Monitoring Report
278 page(s)
 CEC/ M. JonesTETRATECH EC, INC/ J. Farrell
5925512/15/2010Notice of Receipt Petition to Amned The Blythe Energy Project Transmission Line
Notice of Receipt Petition to Amned The Blythe Energy Project Transmission Line
2 page(s)
 CEC/ Docket UnitCEC/ C. Marxen
5900111/15/2010Request for Staff Approved Project Modification
Request for Staff Approved Project Modification
45 page(s)
 CEC/M. DyasTetra Tech/ P. Eckert
5877610/13/2010Approval Letter for Spare Transformer Installation
Approval Letter for Spare Transformer Installation
1 page(s)
 NextEra Energy Resources LLC/R. PiperCEC/M. Dyas
581678/25/2010Letter Regarding Release of Funds from Escrow Account, BIO-16 & BIO-17
Letter Regarding Release of Funds from Escrow Account, BIO-16 & BIO-17
2 page(s)
 First American Title Co./T. Springstead, Deser Tortoise PReserve Comm./J. Lee, Blythe/G. HickeyCEC/M. Dyas
572206/18/2010CA ISO Notification of Commercial Operation.
CA ISO Notification of Commercial Operation.
1 page(s)
 CEC/ Docket UnitBlythe Energy/ J. Goodwin
562254/13/2010Letter re Transfer of Indirect Ownership of La Paloma Generating Company, LLC
Letter re Transfer of Indirect Ownership of La Paloma Generating Company, LLC
4 page(s)
 CEC/M. DyasLa Paloma Generatin Company/L. Cuervo
562264/13/2010Ltrs Exchanged Between J. Caswell & R. Piper re Installation of Co Catalyst
Ltrs Exchanged Between J. Caswell & R. Piper re Installation of Co Catalyst
3 page(s)
 CEC/J. CaswellNextra Energy/R. Piper
556472/18/2010Approval Letter to Blythe Energy LLC for SAPM No. 5
Approval Letter to Blythe Energy LLC for SAPM No. 5
3 page(s)
 Blythe Energy/ G. HickeyCEC/T. O'Brien
551332/2/2010Notice of Receipt of Petition to Amend
Notice of Receipt of Petition to Amend
2 page(s)
 CEC/Docket UnitCEC/E. Allen
547021/6/2010Transmission Line Project Request for Staff Approved Project Modification
Transmission Line Project Request for Staff Approved Project Modification
337 page(s)
 CEC/ M. DyasTetra Tech/ P. Jennings
5361810/13/2009Letter from WAPA to M. Dyas Regarding Blythe Energy Proposal to Connect Blythe-Julian Hinds
Letter from WAPA to M. Dyas Regarding Blythe Energy Proposal to Connect Blythe-Julian Hinds
1 page(s)
 CEC/ M. DyasDept of Energy/ G. Bates
525577/27/2009Approval Letter to G. Hickey for Staff Approved Project Modification to T-Line Amendment
Approval Letter to G. Hickey for Staff Approved Project Modification to T-Line Amendment
3 page(s)
 Blythe Energy/ G. HickeyCEC/ M. Dyas
522597/1/2009Notice of Receipt: Petition to Amend to Modify
Notice of Receipt: Petition to Amend to Modify
2 page(s)
 CEC/ Docket UnitCEC/ E. Allen
521566/25/2009USFWS Amendment to the Biological Opinion for the Blythe Energy Project
USFWS Amendment to the Biological Opinion for the Blythe Energy Project
3 page(s)
 CEC/ M. DyasCarlsbad Fish&Wildlife/ K. Goebel
520426/17/2009Request for Staff Approved Project Modifications
Request for Staff Approved Project Modifications
49 page(s)
 CEC/ Docket UnitBlythe Energy
502172/19/2009Blythe Transmission Line Modifications - Approval Letter to Begin Construction
Blythe Transmission Line Modifications - Approval Letter to Begin Construction
1 page(s)
 Blythe Energy/ Gary HickeyCEC/ M. Dyas
501792/18/2009CBO Itr- FPL Energy has met COCs; OK to begin Construction
CBO Itr- FPL Energy has met COCs; OK to begin Construction
1 page(s)
 CEC/ M. DyasBureau Veritas/ K. Wedman
500272/9/2009Blythe Energy Project Transmission Line Modification-Approval of Request of 3rd Insignificant Project Change
Blythe Energy Project Transmission Line Modification-Approval of Request of 3rd Insignificant Project Change
2 page(s)
 Blythe Energy LLC/ G. HickeyCEC/ T. O'Brien
499752/4/2009Approval for Partial Notice of Proceed - Waiting for MWD
Approval for Partial Notice of Proceed - Waiting for MWD
1 page(s)
 Blythe Energy LLC/ Gary HickeyCEC/ M. Dyas
499772/4/2009Approval of Verification Change to WORKER SAFETY - 2
Approval of Verification Change to WORKER SAFETY - 2
1 page(s)
 Blythe Energy LLC/ Gary HickeyCEC/ M. Dyas
499782/4/2009Approval for Changes to IPC#3 with MWD Comments
Approval for Changes to IPC#3 with MWD Comments
15 page(s)
 Blythe Energy LLC/ Gary HickeyCEC/ M. Dyas
499121/28/2009Blythe Energy Response to MWD Comments
Blythe Energy Response to MWD Comments
72 page(s)
 CEC/ Mary DyasBlythe Energy/ Gary Hickey
499131/28/2009Agency Comments- MWD Comments to SCE regarding IPC3
Agency Comments- MWD Comments to SCE regarding IPC3
3 page(s)
 SCEC/ John TuckerMWD/ Jon Lambeck
499141/28/2009Agency Comments- SCE Comments to MWD regarding IPC3
Agency Comments- SCE Comments to MWD regarding IPC3
2 page(s)
 MWD/ Jon LambeckSCE/ Robert Lugo
499151/28/2009Agency Comments- MWD Withdrawls Opposition to IPC3
Agency Comments- MWD Withdrawls Opposition to IPC3
1 page(s)
 CEC/ Mary DyasMWD/ Karen Tachiki
496361/7/2009CEC Response to Application for Confidentiality for Cultural Report
CEC Response to Application for Confidentiality for Cultural Report
2 page(s)
 Tetra Tech/ J. FarrellCEC/ M. Jones
496371/7/2009CEC Response to Application for Confidentiality for Revised Cultural Resources
CEC Response to Application for Confidentiality for Revised Cultural Resources
2 page(s)
 Terta Tech/ J. FarrellCEC/ M. Jones
495801/5/2009Agency Comments - Metro Water District of Southern CA
Agency Comments - Metro Water District of Southern CA
2 page(s)
 CEC/ M. DyasMWD/ D. Mahmud
4947212/19/2008Application for Confidential Designation - Cultural Resource/ Historic Properties Plan
Application for Confidential Designation - Cultural Resource/ Historic Properties Plan
3 page(s)
 CEC/ M. JonesTetra Tech/ J. Farrell
4943812/15/2008Application for Confidential Designation - Revised Draft Amendment to Cultural Resources Inventory
Application for Confidential Designation - Revised Draft Amendment to Cultural Resources Inventory
192 page(s)
 CEC/M. JonesTetra Tech/J. Farrell
4938212/11/2008Notice of Insignificant Project Change Request for Approval for Blythe Transmission Line Modifications
Notice of Insignificant Project Change Request for Approval for Blythe Transmission Line Modifications
2 page(s)
 CEC/ Docket UnitCEC/ E. Allen
4922912/3/2008CEC Response Re Aviation Safety Issue at the Blythe Municipal Airport
CEC Response Re Aviation Safety Issue at the Blythe Municipal Airport
11 page(s)
 Robert A. StrugellCEC/ T. O' Brien
4917412/1/2008Third Request for Approval of Insignificant Project Change
Third Request for Approval of Insignificant Project Change
50 page(s)
 CEC/ Docket UnitCEC/ M. Dyas
4849910/9/2008Approval of Request of Second Insignificant Change
Approval of Request of Second Insignificant Change
2 page(s)
 FPL Energy/ M. ArgentineCEC/ T. O'Brien and J. Kalish
477668/27/2008CEC Staff Request for Additional Info for Review of BEPTL Request for Insignificant Change
CEC Staff Request for Additional Info for Review of BEPTL Request for Insignificant Change
1 page(s)
 CEC/ Docket UnitCEC/ M. Dyas
477678/27/2008Blythe Energy, LLC Response to Staff Data Requests for Insignificant Change Request
Blythe Energy, LLC Response to Staff Data Requests for Insignificant Change Request
9 page(s)
 CEC/ Docket UnitCEC/ M. Dyas
477078/25/2008Letter from Blythe Energy RE Transmission Lines.
Letter from Blythe Energy RE Transmission Lines.
10 page(s)
 CEC / M. DyasBE / M. Argentine
477088/25/2008M. Dyas Response to Public Comments from Mr. Mike Bolton
M. Dyas Response to Public Comments from Mr. Mike Bolton
8 page(s)
 M. BoltonCEC / M. Dyas
476558/21/2008Letter re: Western No Longer Participating in Blyth Energy Project Transmission Line Modification Project
Letter re: Western No Longer Participating in Blyth Energy Project Transmission Line Modification Project
2 page(s)
 CEC/ M. Dyas/ Docket UnitDOE/ J. Holt
476158/19/2008Public Comments - Response to Blythe T-Line REquest for Approval of Insignigicant Project Change
Public Comments - Response to Blythe T-Line REquest for Approval of Insignigicant Project Change
1 page(s)
 CEC/ Docket UnitCEC/ M. Dyas
474618/5/2008Notice of Insignificant Project Change - Request for Approval of Insignificant Change for the Blythe Energy Project Transmission Line Modifications
Notice of Insignificant Project Change - Request for Approval of Insignificant Change for the Blythe Energy Project Transmission Line Modifications
2 page(s)
 CEC / Docket UnitCEC / M. Dyas
473247/30/2008Blythe Energy Project Transmission Line Construction Access Road Plan
Blythe Energy Project Transmission Line Construction Access Road Plan
40 page(s)
 CEC/M. DyasSGS/P. Eckert
471617/22/2008Request for Approval of Insignificant Project Change
Request for Approval of Insignificant Project Change
59 page(s)
 CEC/ M. DyasBlythe Energy LLC/ M. Argentine
4333611/5/2007Letter to FCC re: Blythe Municipal Airport Unicom
Letter to FCC re: Blythe Municipal Airport Unicom
8 page(s)
 Federal Communications CommissionRichards I Watson I Gershon / W. Zears
416107/20/2007Notice of Exemption- Blythe Energy Project T-Line
Notice of Exemption- Blythe Energy Project T-Line
1 page(s)
 CRACEC
415797/19/2007Letter regarding CEC Staff's review of Blythe Energy's petition dated April 13, 2007 requesting approval of an IPC.
Letter regarding CEC Staff's review of Blythe Energy's petition dated April 13, 2007 requesting approval of an IPC.
1 page(s)
 Blythe Energy, LLC/ G. PaloCEC/ S. Munro
412886/29/2007Notice of Insignificant Project Change- Petition to Modify the Blythe Energy Project's Transmission Line
Notice of Insignificant Project Change- Petition to Modify the Blythe Energy Project's Transmission Line
2 page(s)
 Mail list # 747CEC/ R. Johnson
400174/16/2007Blythe Energy Transmission Project Request for Approval of Insignificant Change
Blythe Energy Transmission Project Request for Approval of Insignificant Change
45 page(s)
 CEC/S. MunroBlythe Energy LLC/G. Palo
3818910/17/2006Notice of Decision on Amendment Petition.
Notice of Decision on Amendment Petition.
10 page(s)
 Office of Planning and Research/ California Resources AgencyCEC/ J. Caswell
3815910/13/2006Commission Decision on Amendment Petition
Commission Decision on Amendment Petition
9 page(s)
 CEC/ Dockets UnitCEC/ Commissioners
379619/27/2006Blythe Evidentiary Hearing- Petition to modify
Blythe Evidentiary Hearing- Petition to modify
17 page(s)
 CEC/ Dockets UnitPSRC/ P. Petty
379629/27/2006PMPD on amendment petition
PMPD on amendment petition
12 page(s)
 CEC/ Dockets UnitCEC/ J. Pfannenstiel, J. Geesman, M. Read
378959/19/2006Blythe energy LLC's Testimony for The Blythe Energy Transmission Line Amendment.
Blythe energy LLC's Testimony for The Blythe Energy Transmission Line Amendment.
70 page(s)
 Docket UnitM. Cosens / Galati & Blek LLP
379019/19/2006Blythe energy project T. L.- CEC staff's evidentiary hearing statement.
Blythe energy project T. L.- CEC staff's evidentiary hearing statement.
7 page(s)
 CEC/ Dockets UnitCEC/ J. Pfannenstiel
378449/11/2006Notice of Evidentiary Hearing and Hearing Order
Notice of Evidentiary Hearing and Hearing Order
5 page(s)
 Docket UnitHearing Office
378469/7/2006N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
3 page(s)
 CEC/ Dockets UnitCEC/ R. Johnson
378479/7/2006N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
2 page(s)
 CEC/ Agency distribution listCEC/ R. Johnson
378659/7/2006Document Handling For The Revised Staff Assessment / Draft Environmental Assessment for The Blythe Energy Project Transmissions Line Modification Amendment Petition.
Document Handling For The Revised Staff Assessment / Draft Environmental Assessment for The Blythe Energy Project Transmissions Line Modification Amendment Petition.
3 page(s)
 Docket UnitR. E. Johnson /CEC
388279/7/2006Revised Staff Assessment/Draft Environmental Assessment
Revised Staff Assessment/Draft Environmental Assessment
624 page(s)
 CEC/Docket UnitCEC/J. Caswell
376868/22/2006E-mail Re: -- Correspondence with SCE Regarding Transmissions System Impact Study
E-mail Re: -- Correspondence with SCE Regarding Transmissions System Impact Study
1 page(s)
 J. G Hocheimer@fpl.comJ. Tucker@SCE.com
377068/21/2006Blythe Energy, LLC For Post Certification Amendment.
Blythe Energy, LLC For Post Certification Amendment.
6 page(s)
 J. Caswell / Docket UnitC. lang / D. Mahmud / MWD / Metropolitan Water District of Southern California
376428/10/2006MWD REsponse to BEPTL filing
MWD REsponse to BEPTL filing
1 page(s)
 CEC/J. Caswell/P. Kramer/et alMetropolital Water District of So. Cal/D. Mahmud
376318/9/2006Prehearing Conference Held July 31, 2006, Re: Post Certification Amendment
Prehearing Conference Held July 31, 2006, Re: Post Certification Amendment
36 page(s)
 CEC/Docket UnitCEC/Commission Siting Committee
375918/8/2006Record of Conversation with Blythe Energy Project's Gary E. Palo, Project Director
Record of Conversation with Blythe Energy Project's Gary E. Palo, Project Director
2 page(s)
 CEC/J. Caswell/Docket UnitFPL Energy/G. Palo
375988/8/2006Supplemental Information in the Petition for Post Certification Amendment, Response to Prehearing Conference Statements
Supplemental Information in the Petition for Post Certification Amendment, Response to Prehearing Conference Statements
28 page(s)
 CEC/ J. CaswellFPL Energy, LLC/ G. Palo
375458/3/2006Notice of Staff Workshop for the Blythe Energy Project T-Line Project
Notice of Staff Workshop for the Blythe Energy Project T-Line Project
7 page(s)
 CEC/Docket UnitCEC/R. Johnson
375208/1/2006Thank You Letter and No Comments RE: Prehearing Conference Statement Regarding Petition to Modify the Blythe Energy Power Plant Project (T-Line Modification)
Thank You Letter and No Comments RE: Prehearing Conference Statement Regarding Petition to Modify the Blythe Energy Power Plant Project (T-Line Modification)
1 page(s)
 CEC/Docket UnitG. Zimmerman/Colorado River Board of California
375218/1/2006Thank You Letter and No Comments RE: Blythe Energy Project T-Line Modification Amendment Petition Preliminary Staff Assessment.
Thank You Letter and No Comments RE: Blythe Energy Project T-Line Modification Amendment Petition Preliminary Staff Assessment.
1 page(s)
 R. Johnson/CECG. Zimmerman-Executive Director/Colorado River Board of California
375228/1/2006Thank You Letter and No Comments RE: Blythe Energy, LLC, Petition to Amend the Blythe Energy Power Plant Project Petition.
Thank You Letter and No Comments RE: Blythe Energy, LLC, Petition to Amend the Blythe Energy Power Plant Project Petition.
1 page(s)
 J. Caswell/CECG. Zimmerman-Executive Director/Colorado River Board of California
375117/31/2006Blythe Energy LLC's Determination Of No Hazard To Air Navigation.
Blythe Energy LLC's Determination Of No Hazard To Air Navigation.
5 page(s)
 R. Rodriguez/CECM. Cosens/Galati & Blek LLP
375137/31/2006Determination Of No Hazard To Air Navigation
Determination Of No Hazard To Air Navigation
3 page(s)
 G. Palo/Blythe Energy, LLCK. McDonald/Federal Aviation Administration
374957/28/2006Metropolitan's Petition For Intervention and POS.
Metropolitan's Petition For Intervention and POS.
6 page(s)
 CEC / Docket UnitMWD/ Metropolitan Water District of Southern California/ D. Mahmud
374967/28/2006Prehearing Conference Statement of the Metropolitan Water District of Southern CAlifornia and POS.
Prehearing Conference Statement of the Metropolitan Water District of Southern CAlifornia and POS.
14 page(s)
 CEC/ Docket UnitMD/Metropolitan Water District of Southern California/ D. Mahmud
374807/26/2006Commission Staff's Prehearing Confrence Statement (July 31, 2006)
Commission Staff's Prehearing Confrence Statement (July 31, 2006)
8 page(s)
 CEC/ DocketsCEC/ P. Kramer
374817/26/2006Blythe Energy LLC's Prehearing Conference Statement
Blythe Energy LLC's Prehearing Conference Statement
17 page(s)
 CECS. A. Gallati / Galati & Blek, LLP
374847/26/2006Prehearing Conference Statement of Caithness Blythe II, LLC
Prehearing Conference Statement of Caithness Blythe II, LLC
7 page(s)
 CEC/ Docket UnitC. Ellison/ Ellison, Schneider & Harris LLP
374857/26/2006Blythe Energy LLC's Prehearing Conference Statement
Blythe Energy LLC's Prehearing Conference Statement
19 page(s)
 R. Rodriguez/ Docket UnitM. Cosens/ Galati & Blek LLP
374727/21/2006MWD Concern re: interconnections with the Julian Hinds Substation
MWD Concern re: interconnections with the Julian Hinds Substation
1 page(s)
 CEC/E. Bouillon/Docket UnitMWD/D. Mahmud
374647/20/2006Report of Conversation between the Bythe Energy Project Staff, CEC Staff, and Western Area Power Administration Staff on 7-20-06.
Report of Conversation between the Bythe Energy Project Staff, CEC Staff, and Western Area Power Administration Staff on 7-20-06.
4 page(s)
 CEC/ Docket UnitCEC/ Caswell
374557/18/2006Notice of Prehearing Conference
Notice of Prehearing Conference
9 page(s)
 Docket UnitJ. Geesman and J. Boyd/ CEC
377047/10/2006Comments Related to The Recently Distributed Staff Assessment / Draft Environmental Assessment For The Blythe Energy T. Line Modifications and POS.
Comments Related to The Recently Distributed Staff Assessment / Draft Environmental Assessment For The Blythe Energy T. Line Modifications and POS.
8 page(s)
 J. KallishU.S. Department of Interior / C. Sauer
371066/14/2006Programmatic Agreement Contact Letters dated June 8, 2006
Programmatic Agreement Contact Letters dated June 8, 2006
29 page(s)
 Various/CEC/Docket UnitDept of Energy/Western Area Power Administration
371076/14/2006Programmatic Agreement Contact Letter
Programmatic Agreement Contact Letter
2 page(s)
 Ofc of Historic Preservation/M. Donaldson/Dept Parks & Rec/M. McGuirt/CEC/Docket UnitDept of Energy Western Area Power Admin/M. Barger
370255/26/2006Notice of Availability for the SA/DEA
Notice of Availability for the SA/DEA
2 page(s)
 Native American Tribal Distriubution List/CEC/Docket UnitCEC/R. Johnson
370265/26/2006Notice of Availability
Notice of Availability
3 page(s)
 CEC/Docket UnitCEC/R. Johnson
370275/26/2006Document Handling SA/DEA
Document Handling SA/DEA
4 page(s)
 Librarian/CEC/Docket UnitCEC/R. Johnson
370285/26/2006Filing of SA/DEA to State Clearinghouse
Filing of SA/DEA to State Clearinghouse
1 page(s)
 OPR/CRA/CEC/Docket UnitCEC/J. Caswell
370295/26/2006Notice of Availibility of the SA/DEA
Notice of Availibility of the SA/DEA
2 page(s)
 Agency Distribution List/CEC/Docket UnitCEC/R. Johnson
204125/25/2006Staff Assessment / Draft Environmental Assessment - Staff Report
Staff Assessment / Draft Environmental Assessment - Staff Report
569 page(s)
 CEC/ Docket UnitJ. Caswell/ Siting Office
370175/25/2006Blythe Energy Project Transmission Line Modifications Amendment Petition 99-AFC-8C Riverside County
Blythe Energy Project Transmission Line Modifications Amendment Petition 99-AFC-8C Riverside County
576 page(s)
 CEC/ Docket UNitCEC
364163/1/2006Buck Boulevard Julian Hinds 230kV Transmission Line To Tariff Technical Assessment Section of The Facilities Study Final
Buck Boulevard Julian Hinds 230kV Transmission Line To Tariff Technical Assessment Section of The Facilities Study Final
82 page(s)
 Docket Unit/ CEC/ J. CaswellSCEC/ J. Caswell
364102/28/2006Southern California Edison Down Stream Up-grade Pole Interset Construction
Southern California Edison Down Stream Up-grade Pole Interset Construction
4 page(s)
 Docket UnitSCE / J. Caswell
364132/28/2006Petition for Post Certification Amendment Interconnection Mitigation Measures.
Petition for Post Certification Amendment Interconnection Mitigation Measures.
9 page(s)
 Docket UnitBlythe Energy, LLC
364142/28/2006Blythe Energy - Buck Blvd Substation To Palo Verde Devers 500 kV line Interconnection Project / Systems Planning Study of the Facilities Study.
Blythe Energy - Buck Blvd Substation To Palo Verde Devers 500 kV line Interconnection Project / Systems Planning Study of the Facilities Study.
108 page(s)
 Docket UnitBlythe Energy / SCE
377032/27/2006Letter Re: Western Area Power Administration a Power Marketing Agency of The U.S. Department of Energy Received Interconnection Request from Blythe Energy (Same Letter to 8 Different Persons, Mr. D. Eddy Jr, Mr. D. Mike, Ms. N McDowell, MS. M. Martine, Mr. J. James, Mr. R. Milanovich, Mr. R. Torres, and Mr. M. Jackson, Sr.)
Letter Re: Western Area Power Administration a Power Marketing Agency of The U.S. Department of Energy Received Interconnection Request from Blythe Energy (Same Letter to 8 Different Persons, Mr. D. Eddy Jr, Mr. D. Mike, Ms. N McDowell, MS. M. Martine, Mr. J. James, Mr. R. Milanovich, Mr. R. Torres, and Mr. M. Jackson, Sr.)
1 page(s)
 Docket UnitDepartment of Energy / M. E. Barger
363232/2/2006Blythe Energy Project Transmission Line Status Report #7
Blythe Energy Project Transmission Line Status Report #7
6 page(s)
 CEC/L. GeesmanCEC/J. Caswell
361591/9/2006CA ISO Comments on SCE's Addendum to the System Impact Study
CA ISO Comments on SCE's Addendum to the System Impact Study
9 page(s)
 SCE/AronsCA ISO/Cashdollar
361451/5/2006Biological Table dated November 30, 2005
Biological Table dated November 30, 2005
1 page(s)
 CEC/MathiasTetra Tech/Eckert
3604312/12/2005Final Environmental Impact Statement/Environmental Impact Report for the Desert Southwest Transmission Line Project.
Final Environmental Impact Statement/Environmental Impact Report for the Desert Southwest Transmission Line Project.
1 page(s)
 CEC/Docket UnitUnited States Department of the Interior/Acheson
3590411/17/2005SCE's Response to CA ISO Comments on the System Impact Study. POS
SCE's Response to CA ISO Comments on the System Impact Study. POS
112 page(s)
 CAISO/Cashdoller/CEC/Docket UnitSouthern California Edison/Arons
3588211/15/2005Re: Instrumental Landing System-Blythe Airport
Re: Instrumental Landing System-Blythe Airport
4 page(s)
 City of Blythe/Les NelsonWolfe Enterprises/Wolfe
3581210/27/2005Blythe Energy Project Transmission Line 99-AFC-8C Status Report #6.
Blythe Energy Project Transmission Line 99-AFC-8C Status Report #6.
6 page(s)
 Docket UnitCEC/J. Caswell
3581410/26/2005Notification of and Inter-tribal meeting regarding the Blythe Amendment taking place on November 16, 2005
Notification of and Inter-tribal meeting regarding the Blythe Amendment taking place on November 16, 2005
2 page(s)
 CEC/CaswellMorongo Band of Mission Indians
3577110/21/2005Response to the "Second Notification of Intent to File Complaint" from the CEC/T. O'Brien. POS
Response to the "Second Notification of Intent to File Complaint" from the CEC/T. O'Brien. POS
2 page(s)
 T. O'Brien/CEC/Docket UnitFPL/G. Keith Hardy
3564810/11/2005BLM's letter dated September 30, 2005 regarding CEC's Staff Assessment/Environmental Assessment
BLM's letter dated September 30, 2005 regarding CEC's Staff Assessment/Environmental Assessment
6 page(s)
 CEC/CaswellBLM/Kallish
3560210/6/2005Final Desert Tortoise Protocol Survey Report
Final Desert Tortoise Protocol Survey Report
139 page(s)
 CEC/MathiasTetra Tech/Eckert
3560310/6/2005Final Desert Tortoise Protocol Surveyor Report
Final Desert Tortoise Protocol Surveyor Report
139 page(s)
 CEC/MathiasTetra Tech/Eckert
3560510/6/2005Biological Evaluation
Biological Evaluation
38 page(s)
 Department of Fish & Game/NicolTetra Tech/Eckert
3560910/6/2005Biological Assessment
Biological Assessment
72 page(s)
 CEC/DocketWESTERN
3558510/4/2005WESTERNS's Tribal Notification Letters dated September 23, 2005
WESTERNS's Tribal Notification Letters dated September 23, 2005
24 page(s)
 Native American Tribal ListWESTERN/Carlson
355309/22/2005Revised Proof of Service list.
Revised Proof of Service list.
6 page(s)
 CEC/Docket UnitCEC/Hearing Office
355319/22/2005Request for revision to Proof of Service List.
Request for revision to Proof of Service List.
1 page(s)
 CEC/Docket UnitAdams Broadwell Joseph & Cardozo/CURE
355209/20/2005Response to testimony provided on transmission system engineering Conditions of Certification at the CEC Evidentiary Hearing held on August 1, 2005.
Response to testimony provided on transmission system engineering Conditions of Certification at the CEC Evidentiary Hearing held on August 1, 2005.
2 page(s)
 Commissioner Geesman/CEC/Docket UnitWestern Area Power Admin/DOE/Anthony H. Montoya
355009/16/2005CAISO Review of the System Impact Study of Blythe Energy Project II's Proposed Transmission Connection of the Buck Blvd. Substation to the Palo Verde -- Devers 500-kv Line
CAISO Review of the System Impact Study of Blythe Energy Project II's Proposed Transmission Connection of the Buck Blvd. Substation to the Palo Verde -- Devers 500-kv Line
9 page(s)
 J. Tucker/CEC/Docket UnitCA ISO/Richard M Cashdollar
354979/15/2005Response to testimony provided on transmission system engineering Conditions of Certification at the evidentiary hearing, held August 1, 2005.
Response to testimony provided on transmission system engineering Conditions of Certification at the evidentiary hearing, held August 1, 2005.
2 page(s)
 Commissioner Geesman/CEC/Docket UnitWestern Area Power Admin/A. Montoya
354739/14/2005Status Report #5. POS
Status Report #5. POS
5 page(s)
 Commissioner Geesman/CEC/Docket UnitCEC/J. Caswell
354749/14/2005Phoenix Sectional.
Phoenix Sectional.
2 page(s)
 Ms. Billie Stull/CEC/Docket UnitCity of Blythe/Charles Hull
354769/14/2005Concerns regarding potential aviation safety issues.
Concerns regarding potential aviation safety issues.
2 page(s)
 T O'Brien/CEC/Docket UnitDpt. of Trans/R. Austin Wiswell, Chief
354779/14/2005Concerns regarding flight safety with respect to overflying powerplant exhaust plumes. (date not clear on letter)
Concerns regarding flight safety with respect to overflying powerplant exhaust plumes. (date not clear on letter)
4 page(s)
 Honorable Dodd/CEC/Docket UnitU.S. Dept of Trans/Fed Aviation Admin/ John M. Allen
354789/14/2005Blythe Airport meeting summary (July 19, 2005).
Blythe Airport meeting summary (July 19, 2005).
2 page(s)
 CEC/Docket UnitCEC/M. Pryor
354819/14/2005Regarding complaints,------ from pilots about the thermal plumes created from the Blythe 1 power plant.
Regarding complaints,------ from pilots about the thermal plumes created from the Blythe 1 power plant.
1 page(s)
 T. OBrien/CEC/ Docket UnitDept of Trans/ R.A. Wiswell
354829/14/2005Response to the inquiries and concerns expressed in the correspondence of January 25 to the Administrator of the Federal Aviation Administration (FAA).
Response to the inquiries and concerns expressed in the correspondence of January 25 to the Administrator of the Federal Aviation Administration (FAA).
2 page(s)
 T.O'Brien/CEC/Docket UnitUS Dept O Trans/ Fed Aviation Admin/ J. McGraw
354839/14/2005The credentials of Joe Sheble and comments about the Blythe power plant and runway.
The credentials of Joe Sheble and comments about the Blythe power plant and runway.
3 page(s)
 T. O'Brien/CEC/ Docket UnitSheble Aviation/ J. Sheble III
354849/14/2005Discuss the remedies of correcting the danger to the public caused by the Blythe Plant One.
Discuss the remedies of correcting the danger to the public caused by the Blythe Plant One.
2 page(s)
 T. OBrien/ CEC/ Dockets UnitWolfe Enterprises/P.Wolfe
354859/14/2005Blythe Airport Instrument Landing System Relocation.
Blythe Airport Instrument Landing System Relocation.
4 page(s)
 D. Edwards/ CEC/ Docket UnitFPL Energy/ R. Piper
354869/14/2005Blythe Airport/ Blythe Energy Runway Hazard Mitigation Workshop- Follow Up
Blythe Airport/ Blythe Energy Runway Hazard Mitigation Workshop- Follow Up
13 page(s)
 S. Munro/CEC/ Docket UnitCity Of Blythe/ C. Hull
354879/14/2005Override of Riverside County Airport Land Use Commission findings.
Override of Riverside County Airport Land Use Commission findings.
4 page(s)
 CEC/ Docket UnitCity Of Blythe
354889/14/2005Report on the Blythe Power Plant Turbulence issue.
Report on the Blythe Power Plant Turbulence issue.
13 page(s)
 H. Rosen/ CEC/ Docket UnitEngineering Systems Inc./ R. Winn
354899/14/2005Comments on the Public Workshop.
Comments on the Public Workshop.
5 page(s)
 S. Munro/CEC/Docket UnitRiverside County/Airport Land Use Commission/K. Downs
354909/14/2005Comments regarding completion of Blythe Power Plant also indicating that the document needs to address the following issues and supply additional information re: the concerns outlined in the CLUP (BL-00-102).
Comments regarding completion of Blythe Power Plant also indicating that the document needs to address the following issues and supply additional information re: the concerns outlined in the CLUP (BL-00-102).
11 page(s)
 J. Harvey/GREYSTONE/CEC/Docket UnitRiverside County/Airport Land Use Commission/K. Downs
354919/14/2005Cooling Tower vs. Blythe Airport runway. (ESI File #17667C).
Cooling Tower vs. Blythe Airport runway. (ESI File #17667C).
11 page(s)
 H. Rosen, Esq./CEC/Docket UnitEngineering Systems Inc/R. Winn
354929/14/2005Evaluation of Plume Interaction & Flight landings.
Evaluation of Plume Interaction & Flight landings.
18 page(s)
 FLP/CEC/Docket UnitGolder Associates, Inc/K. Kosky
354939/14/2005Status Report on Flight Evaluation.
Status Report on Flight Evaluation.
11 page(s)
 J. Adams, CEC/CEC/Docket UnitArnold & Arnold, Inc/C. Arnold
354949/14/2005Cooling Tower vs. Blythe Airport runway.
Cooling Tower vs. Blythe Airport runway.
4 page(s)
 S. Munro/CEC/Docket UnitFPL Energy/C. Allen
354569/9/2005Letter advising the County of Riverside of their concerns and to ask for assistance re: Blythe Airport. Aircraft pilots have reported unusual turbulence over a power plant on the he the approach to Runway 26.
Letter advising the County of Riverside of their concerns and to ask for assistance re: Blythe Airport. Aircraft pilots have reported unusual turbulence over a power plant on the he the approach to Runway 26.
2 page(s)
 Mr. Rob Fields, County of Riverside/CEC/Docket UnitUS Dept of Trans, Federal Aviation Admin/W. C. Withycombe
354579/9/2005Letter re: Instrument Landing System at Blythe Airport.
Letter re: Instrument Landing System at Blythe Airport.
2 page(s)
 Mr. Rob Fields/County of Riverside/CEC/Docket UnitUS Dept of Trans/Federal Aviation Admin/W. C. Withycombe
354589/9/2005Letter re: Instrument Landing System at Blythe Airport.
Letter re: Instrument Landing System at Blythe Airport.
2 page(s)
 Mr. Rob Fields/County of RiversideUS Dept of Trans/Federal Aviation Admin/W. C. Withycombe
354329/1/2005Second Notification of Intention to File Complaint.
Second Notification of Intention to File Complaint.
3 page(s)
 Keith Hardy/CEC/Docket UnitCEC/T. O'Brien
354238/31/2005Record of Conversation (ROC), Response to CEC E-mail Questions (#1 through 10) August 17, 2005
Record of Conversation (ROC), Response to CEC E-mail Questions (#1 through 10) August 17, 2005
2 page(s)
 CEC/DocketCEC/Caswell
354278/31/2005Report of Conversation between Jack Caswell, CEC, and SCE & BEP Staff, re: SCE process for Down Stream Upgrades Pole Interset BEPTL.
Report of Conversation between Jack Caswell, CEC, and SCE & BEP Staff, re: SCE process for Down Stream Upgrades Pole Interset BEPTL.
2 page(s)
 CEC/Docket UnitCEC/J. Caswell
353448/23/2005Notification of Intention to File Complaint.
Notification of Intention to File Complaint.
3 page(s)
 Chris Allen, General Plant Manager/FPL/CEC/Docket UnitCEC/T. O'Brien
353458/23/2005Request to Change Landing Pattern and Move ILS.
Request to Change Landing Pattern and Move ILS.
2 page(s)
 Charles Hull, Assist City Manager/CEC/Docket UnitCEC/T. O'Brien
352958/18/2005Aerial Map
Aerial Map
1 page(s)
 CEC/DocketBLM/Kalish
352968/18/2005Aerial Photograph of Proposed Tower Location
Aerial Photograph of Proposed Tower Location
1 page(s)
 CEC/DocketTetra Tech/Mudry
352978/18/2005Metropolitan Water District Land Use Parcel Maps
Metropolitan Water District Land Use Parcel Maps
4 page(s)
 CEC/DocketMetropolitan Water District
352838/15/2005Revised Proof of Service. POS
Revised Proof of Service. POS
4 page(s)
 CEC/Docket UnitCEC
352238/11/2005Sign-in sheet for Presentation by Florida Power & Light & Discussion.
Sign-in sheet for Presentation by Florida Power & Light & Discussion.
3 page(s)
 CEC/Docket UnitM. Pryor/CEC
351908/9/2005System Planning Study for the FPLE Blythe Energy Buck-DPV1 Transmission Project. POS
System Planning Study for the FPLE Blythe Energy Buck-DPV1 Transmission Project. POS
1 page(s)
 CEC/Docket UnitFPL Energy/Gary Palo/Kenneth Stein
351918/9/20051 color map - Julian Hinds Substation MWD
1 color map - Julian Hinds Substation MWD
1 page(s)
 CEC/DocketCEC/Caswell
351928/9/2005Visual figure of Hinds Pumping Plant and MWD-owned property under 1932 Act.
Visual figure of Hinds Pumping Plant and MWD-owned property under 1932 Act.
1 page(s)
 CEC/Docket UnitCEC/J. Caswell
351408/2/2005Alternative Transmission Line Interconnection to Midpoint Substation 8-02-05
Alternative Transmission Line Interconnection to Midpoint Substation 8-02-05
2 page(s)
 CEC/CaswellTetra Tech/Mudry
351418/2/2005Midpoint T-Line Map
Midpoint T-Line Map
2 page(s)
 CEC/Caswell/DocketsTetra Tech EC/Mudry
350917/28/2005Submission of Materials Related to Tribal Consultation
Submission of Materials Related to Tribal Consultation
112 page(s)
 CEC/Allen/Docket UnitDepartment of Energy/Carlson
350927/28/2005Notification and Request for Comments
Notification and Request for Comments
20 page(s)
 Fort McDowell Yavapai Nation/Bear/CEC/Docket UnitU S Department of the Interior/Acheson
355177/21/2005Cultural Resources Division Volume 1, 2, & 3.
Cultural Resources Division Volume 1, 2, & 3.
425 page(s)
 Jack Caswell/CEC/Docket UnitMooney/Jones & Stokes/Blythe Energy, LLC
348887/13/2005Status Report #4
Status Report #4
6 page(s)
 CEC/GeesmanCEC/Caswell
348697/11/2005Supplemental Analysis: Proposed Route Realignments for Poles #289-305 & New Midpoint Substation Location. POS
Supplemental Analysis: Proposed Route Realignments for Poles #289-305 & New Midpoint Substation Location. POS
11 page(s)
 CEC/Docket UnitBlythe Energy, LLC
348207/5/2005Supplemental Studies Report
Supplemental Studies Report
53 page(s)
 CEC/DocketWestern Area Power Administration/Saber
347716/27/2005Systems Planning Study For Blythe Energy Project
Systems Planning Study For Blythe Energy Project
143 page(s)
 Docket UnitGalati & Bleck
347326/23/2005Response to Californians for Renewable Energy (CARE) Letter on Blythe Energy Project Received March 16, 2001
Response to Californians for Renewable Energy (CARE) Letter on Blythe Energy Project Received March 16, 2001
3 page(s)
 CEC/Keese/Laurie/DocketsAspen Environmental Group/Nelson
346006/21/2005California ISO's Comments to the System Impact Study for the proposed connection of the Buck Blvd. - Julian Hinds 230kV transmission line to the ISO controlled grid.
California ISO's Comments to the System Impact Study for the proposed connection of the Buck Blvd. - Julian Hinds 230kV transmission line to the ISO controlled grid.
13 page(s)
 SCE/TuckerCA ISO/Miller
346296/16/2005Application for Confidential Designation and Confidential Draft Cultural Resources inventory Volume II for The Blythe Energy Project.
Application for Confidential Designation and Confidential Draft Cultural Resources inventory Volume II for The Blythe Energy Project.
4 page(s)
 Docket UnitGalati & Blek LLP
345906/14/2005Draft Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project
Draft Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project
315 page(s)
 CEC/DocketMooney, Jones & Stokes
355466/14/2005DRAFT Final Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project.
DRAFT Final Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project.
205 page(s)
 Jack Caswell/CECMooney/Jones/Stokes
345586/9/2005Department of Transportation's Comments on the Phase 2 PSA
Department of Transportation's Comments on the Phase 2 PSA
3 page(s)
 CEC/CaswellDepartment of Transportation/Kopulsky
345596/9/2005Assessors Parcel Map for the area near the power plant where the transmission line is in the City.
Assessors Parcel Map for the area near the power plant where the transmission line is in the City.
3 page(s)
 CEC/StennickTetra Tech/Mudry
345666/9/2005Draft - Cultural Resource Inventory of the Proposed Alternate Midpoint Substation - POS
Draft - Cultural Resource Inventory of the Proposed Alternate Midpoint Substation - POS
37 page(s)
 CEC/DocketsMooney Jones & Stokes/Carrico/Eckhardt
345616/8/2005Application for Confidential Designation and Confidential Draft Cultural Resources Inventory of the Proposed Alternate Midpoint Substation for Blythe Modification
Application for Confidential Designation and Confidential Draft Cultural Resources Inventory of the Proposed Alternate Midpoint Substation for Blythe Modification
4 page(s)
 CEC/DocketsGalati & Blek/Galati
343775/19/2005Supplemental Responses to Data Requests re: Soil and Water #65.
Supplemental Responses to Data Requests re: Soil and Water #65.
16 page(s)
 CEC/Docket UnitBlythe Energy, LLC
343465/16/2005Report of Conversation between William Eckhardt, Mooney Jones & Stokes, and Joe Nixon, THPO Agua Caliente Band of Cahuilla Indians dated May 16, 2005.
Report of Conversation between William Eckhardt, Mooney Jones & Stokes, and Joe Nixon, THPO Agua Caliente Band of Cahuilla Indians dated May 16, 2005.
1 page(s)
 CEC/DocketMooney, Jones & Stokes/Eckhardt
343125/12/2005Current Proof of Service List for Blythe Energy Project Modification
Current Proof of Service List for Blythe Energy Project Modification
5 page(s)
 All Parties/CEC/DocketsCEC/Read
325644/27/2005Letter to CEC from BLM dated April 22, 2005 regarding NO Issues in the Initial Review of Blythe Energy's Right-of-Way Application
Letter to CEC from BLM dated April 22, 2005 regarding NO Issues in the Initial Review of Blythe Energy's Right-of-Way Application
1 page(s)
 CEC/CaswellBlm/Acheson
339604/20/2005Native American Heritage Commission's Comments on Blythe T-Line Adjustment
Native American Heritage Commission's Comments on Blythe T-Line Adjustment
3 page(s)
 CEC/Reinoehl/docket UnitNative American Heritage Commission/Gaubatz
339564/18/2005Request for participation in WESTERN, BLM, and CEC's Cultural Resources field trip on April 26, 2005
Request for participation in WESTERN, BLM, and CEC's Cultural Resources field trip on April 26, 2005
5 page(s)
 Hualapai Indian Tribe/JacksonWestern Area Power Administration
339574/18/2005Consultation Record from Western
Consultation Record from Western
5 page(s)
 CEC/Docket UnitWestern Area Power Administration
339284/14/2005Supplemental Responses to Data Requests (Visual Resources data Request # 88)
Supplemental Responses to Data Requests (Visual Resources data Request # 88)
5 page(s)
 CEC/DocketsBlythe Energy
339214/13/2005Committee Order Granting Petition to Intervene
Committee Order Granting Petition to Intervene
4 page(s)
 CEC/Docket UnitCEC/Geesman
339134/12/2005Notice of Decision by the CEC
Notice of Decision by the CEC
1 page(s)
 Office Of Planning And Research/DocketsCEC/Munro
338594/8/2005Request for case review - BEP II 520 MW Interconnection to Western's Buck Blvd Extended Substation
Request for case review - BEP II 520 MW Interconnection to Western's Buck Blvd Extended Substation
1 page(s)
 Aps/Smith/cec/docket UnitSaber
337763/30/2005DRAFT - Programmatic Agreement Among Western Area Power Administration: Bureau of Land Management, Palm Springs and South Coast Field Offices, Advisory Council on Historic Preservation; and CA State Hiostoric Preservation Office re: the Construction of the Blythe Energy Transmission Project
DRAFT - Programmatic Agreement Among Western Area Power Administration: Bureau of Land Management, Palm Springs and South Coast Field Offices, Advisory Council on Historic Preservation; and CA State Hiostoric Preservation Office re: the Construction of the Blythe Energy Transmission Project
57 page(s)
 CEC/DocketsBlythe Energy
337803/30/2005Preliminary Staff Assessment for the Blythe Energy Transmission Line Modification (PSA)
Preliminary Staff Assessment for the Blythe Energy Transmission Line Modification (PSA)
2 page(s)
 CEC/Caswell/docketsSo. Coast Air Quaility Mtg. Dist/Smith
337563/28/2005Western Final System Impact Study - Buck to Palo Verde Devers Component
Western Final System Impact Study - Buck to Palo Verde Devers Component
317 page(s)
 CEC/Caswell/docket UnitFpl Energy
337593/28/2005Proposed Protocols for 2005 Spring Surveys
Proposed Protocols for 2005 Spring Surveys
4 page(s)
 CEC/Docket UnitCEC/Caswell
337203/24/2005Comments to correspondence submitted by DSWTP, Bob Mooney, re: route of the Proposed Blythe Transmission Project.
Comments to correspondence submitted by DSWTP, Bob Mooney, re: route of the Proposed Blythe Transmission Project.
9 page(s)
 Jack Caswell/Cec/docket UnitFpl Energy, Palo
336953/22/2005Further information re: Staff's evaluation of the proposed route of the "Buck to Julian Hinds component" of the transmission line.
Further information re: Staff's evaluation of the proposed route of the "Buck to Julian Hinds component" of the transmission line.
6 page(s)
 Jack Caswell/Cec/docket UnitDesert Sourthwest Transmission Project/B. Mooney
337123/22/2005Clarification re: Status Report #3. POS
Clarification re: Status Report #3. POS
6 page(s)
 Commissioner Geesman/Cec/docket UnitCEC/J. Caswell
338963/22/2005Information regarding the proposed route of the "Buck to Julian Hinds component" of the transmission line - POS
Information regarding the proposed route of the "Buck to Julian Hinds component" of the transmission line - POS
6 page(s)
 CEC/Caswell/docket UnitDesert Southwest Transmission Project/Mooney
336703/14/2005Report of Conversation with Butch Hull, Blythe Airport regarding Update
Report of Conversation with Butch Hull, Blythe Airport regarding Update
1 page(s)
 DocketsCEC/Adams
336713/14/2005Possible Migratory Bird Losses Due to Blythe Energy Project Evaporation Ponds - BIO 6, 7 and 8
Possible Migratory Bird Losses Due to Blythe Energy Project Evaporation Ponds - BIO 6, 7 and 8
3 page(s)
 Allen/Blythe Airport/cec/docketsCEC/O'brien
336463/9/2005Supplemental Comments on the Preliminary Staff Assessment - POS
Supplemental Comments on the Preliminary Staff Assessment - POS
18 page(s)
 CEC/DocketsGalati & Blek/Galati
336473/9/2005Supplemental Information Addressing BLM's Concerns
Supplemental Information Addressing BLM's Concerns
6 page(s)
 DocketsFpl Energy/Davidson
336373/7/2005Blythe Energy Project Transmission Line Amendment Response to Data Request No. 63
Blythe Energy Project Transmission Line Amendment Response to Data Request No. 63
1 page(s)
 CEC/Docket UnitCEC/Caswell List
335723/2/2005Staff's Status Report No. 3 - POS
Staff's Status Report No. 3 - POS
6 page(s)
 CEC/Geesman/keeseCEC/Caswell
335733/2/2005FPL's Comments California Bureau of Land Management
FPL's Comments California Bureau of Land Management
5 page(s)
 Ca Blm/KalishFpl Energy/Palo
335002/23/2005Sign-In Sheets from the PSA Workshop held on February 17 & 18, 2005
Sign-In Sheets from the PSA Workshop held on February 17 & 18, 2005
3 page(s)
 CEC/DocketCEC/Caswell
334652/18/2005Staff Analysis of Proposed Modification to Air Quality Conditions of Certification Regarding Startups and Shutdowns
Staff Analysis of Proposed Modification to Air Quality Conditions of Certification Regarding Startups and Shutdowns
12 page(s)
 Interested Parties/DocketsCEC/Munro
334402/16/2005Colorado River Board of California's comments on CEC's PSA
Colorado River Board of California's comments on CEC's PSA
6 page(s)
 CEC/Johnson/docket UnitColorado River Board Of California/Zimmerman
334422/16/2005Supplemental Analysis Proposed Route Realizements for Milepost 0.5-3.0 and Milepost 64.5-67.4 - POS
Supplemental Analysis Proposed Route Realizements for Milepost 0.5-3.0 and Milepost 64.5-67.4 - POS
16 page(s)
 CEC/Docket UnitBlythe Energy/Tetra Tech Fw
333672/15/2005Blythe Power Plants' Impact on Aviation Safety.
Blythe Power Plants' Impact on Aviation Safety.
2 page(s)
 CEC/Docket UnitCEC/T. O'brien
334262/15/2005Request for a two-month continuance of the Committee Conference and public comment period
Request for a two-month continuance of the Committee Conference and public comment period
14 page(s)
 CEC/Shaw/docket UnitCalifornians For Renewable Energy (care)/Smallwood
333352/11/2005Applicants Preliminary Comments on the Preliminary Staff Assessment - POS
Applicants Preliminary Comments on the Preliminary Staff Assessment - POS
16 page(s)
 CEC/Rodriguez/docket UnitGalati & Blek/Galati
332422/1/2005Letter Re: Proposal by Blythe Energy to Construct or install Electric Power Transmission System Modifications in Riverside County.
Letter Re: Proposal by Blythe Energy to Construct or install Electric Power Transmission System Modifications in Riverside County.
6 page(s)
 DocketsBureau of Land Management/G. Acheson
339462/1/2005Letter Re: Proposal by Blythe Energy, LLC, (Blythe Energy) to Construct or install Electric Power Transmission System Modifications in Riverside County.
Letter Re: Proposal by Blythe Energy, LLC, (Blythe Energy) to Construct or install Electric Power Transmission System Modifications in Riverside County.
6 page(s)
 DocketsU.s. Department Of Interior/G. Acheson
332201/28/2005City of Blythe would Grant a Variance to Blythe Energy for the Installation of Transmission Poles Under Conditions
City of Blythe would Grant a Variance to Blythe Energy for the Installation of Transmission Poles Under Conditions
4 page(s)
 CEC/Richins/docketsCity Of Blythe/Wellman
331931/25/2005Request for Agency Participation in the Review of the Blythe Energy Project Transmission Line Modification Amendment Petition Preliminary Staff Assessment
Request for Agency Participation in the Review of the Blythe Energy Project Transmission Line Modification Amendment Petition Preliminary Staff Assessment
2 page(s)
 Agency Distribution List/DocketsCEC/Johnson
331941/25/2005Document Handling for Preliminary Staff Assessment
Document Handling for Preliminary Staff Assessment
3 page(s)
 Librarian/DocketsCEC/Johnson
331951/25/2005Notice of Availability Preliminary Staff Assessment
Notice of Availability Preliminary Staff Assessment
3 page(s)
 DocketsCEC/Johnson
331971/25/2005Workshop Notice - Preliminary Staff Assessment - Amendment Petition - February 17, 2005 Palm Springs - POS
Workshop Notice - Preliminary Staff Assessment - Amendment Petition - February 17, 2005 Palm Springs - POS
6 page(s)
 CEC/DocketsCEC/O'brian
331981/24/2005Preliminary Staff Assessment - Staff Report - POS
Preliminary Staff Assessment - Staff Report - POS
450 page(s)
 DocketsCEC Cec
331641/20/2005Soil and Water Resources Technical Area Additional Data Needs.
Soil and Water Resources Technical Area Additional Data Needs.
4 page(s)
 Gary Palo, Fpl Energy/Docket UnitCEC/J. Caswell
331651/20/2005Request for 1602 Streambed Alteration Agreement.
Request for 1602 Streambed Alteration Agreement.
52 page(s)
 Kim Nicol, Ca Dept Of Fish & GameG. Palo, Fpl Energy
331211/18/2005Round 2 Responses to Data Requests. Pos
Round 2 Responses to Data Requests. Pos
22 page(s)
 CEC/Docket UnitBlythe Energy/Tetra Tech Fw, Inc
331151/12/2005Comments re: Meeting December 8, 2004, on the right-of-way for the proposed transmission line which traverses BLM-administered public lands.
Comments re: Meeting December 8, 2004, on the right-of-way for the proposed transmission line which traverses BLM-administered public lands.
3 page(s)
 Blythe Energy Llc/Docket UnitUs Dept Interior, Bureau Of Land Management/G. Ach
330621/5/2005Blythe Energy Transmission Line Status Report #2.
Blythe Energy Transmission Line Status Report #2.
6 page(s)
 Chairman Keese, Commissioner Geesman/Docket UnitCEC/J. Caswell
330591/4/2005Blythe Energy's Status Report # 2 - POS
Blythe Energy's Status Report # 2 - POS
6 page(s)
 CEC/DocketsGalati & Blek/Galati
3301912/28/2004Updated Proof of Service list
Updated Proof of Service list
5 page(s)
 All Parties/Docket UnitCEC/Fontanilla
3302012/28/2004Petition to Intervene. Pos
Petition to Intervene. Pos
5 page(s)
 CEC/Docket UnitEllison, Schneider & Harris Llp/Caithness Blythe I
3299612/24/2004Notice of Inability to Respond and Objections to CEC Staff Data Request Set 2 - POS
Notice of Inability to Respond and Objections to CEC Staff Data Request Set 2 - POS
5 page(s)
 CEC/DocketsGalati & Blek/Galati
3300412/24/2004Petition for Post-Certification Amendment - Responses to Data Request & Comments from Western Area Power Administration
Petition for Post-Certification Amendment - Responses to Data Request & Comments from Western Area Power Administration
45 page(s)
 CEC/DocketsBlythe Energy
3298412/21/2004Application for Cultural Resources Survey of the Proposed Blythe Energy Transmission Line Project
Application for Cultural Resources Survey of the Proposed Blythe Energy Transmission Line Project
4 page(s)
 CEC/DocketsBalati & Blek/Galati
3293812/16/2004Blythe Energy Project Transmission Line Modifications Petition Second Set of Data Requests - POS
Blythe Energy Project Transmission Line Modifications Petition Second Set of Data Requests - POS
15 page(s)
 Fpl Energy/Palo/cec/dockets UnitCEC/Caswell
3292812/14/2004Petition for Post-Certification Amendment, Supplemental Response to Data Requests #41, 51, 59, 65, 67, 71, 73n, 74m - POS
Petition for Post-Certification Amendment, Supplemental Response to Data Requests #41, 51, 59, 65, 67, 71, 73n, 74m - POS
162 page(s)
 CEC/Docket UnitBlythe Energy/Tetra Tech
3291912/13/2004Blythe Energy Transmission Line Status Report #1 - POS
Blythe Energy Transmission Line Status Report #1 - POS
8 page(s)
 CEC/Geesman/keese/docket UnitCEC/Caswell
3292312/13/2004Applicant's Status Report No. 1 - POS
Applicant's Status Report No. 1 - POS
6 page(s)
 CEC/Rodriguez/docket UnitGalati & Blek/Galati
3291212/9/2004Comments on Blythe Energy Transmission Line Amendment Data Responses, Filed 11/30/2004. POS
Comments on Blythe Energy Transmission Line Amendment Data Responses, Filed 11/30/2004. POS
8 page(s)
 CEC/Docket UnitWestern
3290712/8/2004Notice of Receipt; Petition to Amend.
Notice of Receipt; Petition to Amend.
3 page(s)
 CEC/Docket UnitCEC/T. O'brien
3289612/7/2004Letter to inform of the proposed project, a brief description, and an invitation to initiate government to government consultation.
Letter to inform of the proposed project, a brief description, and an invitation to initiate government to government consultation.
8 page(s)
 Torres-martinez Desert Chuilla Indians/Torres/cec/Bureau Of Land Management/Acheson
3289012/6/2004Committee Scheduling Order. POS
Committee Scheduling Order. POS
6 page(s)
 CEC/Docket UnitCEC Cec
3286812/2/2004Letter to the Torres-Martinez Desert Cahuilla Indians informing them of the proposed project, provide a brief description, and invitation to initiate government-to-government consultation pursuant to the Executive Memorandum of April 29, 1994, and other applicable laws and regulations.
Letter to the Torres-Martinez Desert Cahuilla Indians informing them of the proposed project, provide a brief description, and invitation to initiate government-to-government consultation pursuant to the Executive Memorandum of April 29, 1994, and other applicable laws and regulations.
8 page(s)
 Torres-martinez Desert Cahuilla IndiansBureau Of Land Management, Gail Acheson
3286912/2/2004Preliminary Responses to Questions on Transmission System Engineering Received from the CEC 10/18/04.
Preliminary Responses to Questions on Transmission System Engineering Received from the CEC 10/18/04.
90 page(s)
 CEC/Docket UnitBlythe Energy
3287012/2/2004CRBC's Comments to the Petition to Amend the Blythe Energy Power Plant Project Petition.
CRBC's Comments to the Petition to Amend the Blythe Energy Power Plant Project Petition.
40 page(s)
 CEC/Docket UnitColorado River Board Of Ca, G. Zimmerman
3285712/1/2004Petition for Post-Certification Amendment--Data Responses 1 - 99.
Petition for Post-Certification Amendment--Data Responses 1 - 99.
1226 page(s)
 CEC/Docket UnitBlythe Energy, Llc/Tetra Tech Fw, Inc.
3305512/1/2004System Impact Study-SCE Interconnection Request for Termination of the Julian Hinds
System Impact Study-SCE Interconnection Request for Termination of the Julian Hinds
280 page(s)
 CEC/DocketWestern Area Power Administration
3305612/1/2004Attachment DR #32-1 - A Class II Cultural Resources Assessment for the Desert-Southwest Transmission Line, Colorado Desert, Riverside and Imperial Counties, California
Attachment DR #32-1 - A Class II Cultural Resources Assessment for the Desert-Southwest Transmission Line, Colorado Desert, Riverside and Imperial Counties, California
256 page(s)
 DocketsAsm Affilates, Inc., /Schaefer
3305712/1/2004Petition for Post-Certification Amendment - Data Responses 1-99 - POS
Petition for Post-Certification Amendment - Data Responses 1-99 - POS
143 page(s)
 DocketsBlythe Energy
3305812/1/2004System Impact Study - Blythe Energy, LLC Interconnection Request for Interconnecting Western's Buck Blvd. 161-kV Substation to SCE Palo Verde-Devers # 1 500-k T.L. (Draft) Vol 1 & 2
System Impact Study - Blythe Energy, LLC Interconnection Request for Interconnecting Western's Buck Blvd. 161-kV Substation to SCE Palo Verde-Devers # 1 500-k T.L. (Draft) Vol 1 & 2
599 page(s)
 DocketsWestern/Saber
3276911/17/2004Issue Resolution & Data Request Workshop - Blythe Energy Transmission Line "Meeting Continuation"
Issue Resolution & Data Request Workshop - Blythe Energy Transmission Line "Meeting Continuation"
5 page(s)
 CEC/Docket UnitCEC/Caswell
3274411/16/2004Blythe Transmission Line Project - Height Variance - POS
Blythe Transmission Line Project - Height Variance - POS
8 page(s)
 City Of Blythe/Wellman/cec/docket UnitTetra Tech Fw Inc./Mudry
3274511/16/2004Outline for Blythe Energy project T/L Modifications - POS
Outline for Blythe Energy project T/L Modifications - POS
6 page(s)
 CEC/Docket UnitCEC Cec
3272111/10/2004Notice Relating to Data Responses. POS
Notice Relating to Data Responses. POS
5 page(s)
 CEC/DocketsBlythe Energy/Galati & Blek Llp
3273211/10/2004Petition For Air Quality Conditions Modification (cd enclosed).
Petition For Air Quality Conditions Modification (cd enclosed).
40 page(s)
 CEC/S. Munro/docketBlythe Energy, Llc
3272611/9/2004Status Report
Status Report
11 page(s)
 CEC/Adams/docketsArnold & Arnold//arnold
3270211/8/2004Modification to the Proof of Service.
Modification to the Proof of Service.
5 page(s)
 CEC/Dockets/all PartiesCEC/Hao/fontanilla
3264511/3/2004Blythe Energy Transmission Line Issues Identification Report - POS
Blythe Energy Transmission Line Issues Identification Report - POS
13 page(s)
 Geesman/Keese/docketsCEC/Caswell
3262311/1/2004Revised Proof of Service List for Blythe Energy Project Modification - POS
Revised Proof of Service List for Blythe Energy Project Modification - POS
5 page(s)
 All Parties/Cec/docket UnitCEC/Fontanilla
3263311/1/2004Staff's Data Requests Nos. 1 - 99
Staff's Data Requests Nos. 1 - 99
42 page(s)
 Fpl Energy/PaloCEC/Caswell
3261910/29/2004Workshop Notice - Issue Resolution & Data Request Workshop Blythe Energy Transmission Line Amendment - November 15, 2004 - CEC
Workshop Notice - Issue Resolution & Data Request Workshop Blythe Energy Transmission Line Amendment - November 15, 2004 - CEC
4 page(s)
 CEC/DocketsCEC/O'brian
3262010/29/2004Current Proof of Service List for Blythe Transmission Line
Current Proof of Service List for Blythe Transmission Line
5 page(s)
 All Parties/Cec/docketsCEC Cec Fontanilla
3261410/27/2004Western Area Power Administration Data Requests for Blythe Energy Project Transmission Line Modifications Petition for Post-certification Amendment, October 2004 Version.
Western Area Power Administration Data Requests for Blythe Energy Project Transmission Line Modifications Petition for Post-certification Amendment, October 2004 Version.
12 page(s)
 CEC/DocketsMark Wieringa
3261510/27/2004Blythe Energy Project Modification Proof of Service List
Blythe Energy Project Modification Proof of Service List
5 page(s)
 CEC/Dockets/all PartiesCEC/Fontanilla
3260410/26/2004Resolution - Blythe Energy Project Transmission Line Modifications Amendment Petition for Post - Certification, Blythe Energy, LLC (99-AFC-8C)
Resolution - Blythe Energy Project Transmission Line Modifications Amendment Petition for Post - Certification, Blythe Energy, LLC (99-AFC-8C)
1 page(s)
 CEC/DocketsCEC/Rosenfeld
3260810/26/2004Notice of Informational Hearing and Site Visit and Bureau of Land Management and Western Area Power Administration Scoping Hearing.
Notice of Informational Hearing and Site Visit and Bureau of Land Management and Western Area Power Administration Scoping Hearing.
14 page(s)
 CEC/DocketsCEC/Geesman/keese
3258910/25/2004Report of Conversation - Helicopter Emergency Service (EMS)
Report of Conversation - Helicopter Emergency Service (EMS)
1 page(s)
 CEC/Dockets/diamondBlythe Ambulance Service/Leslie Watkins
3257010/20/2004Hearing Officer Assignment
Hearing Officer Assignment
1 page(s)
 CEC/Commissioners/docket UnitCEC/Keese
3256310/18/2004Letter with description of proposed modifications
Letter with description of proposed modifications
2 page(s)
 City Of Blythe/Crain/cec/docket UnitCEC/Therkelsen
3255110/15/2004Document Handling for Blythe Energy Amendment Petition Request
Document Handling for Blythe Energy Amendment Petition Request
3 page(s)
 Librarian/DocketsCEC/Richins
3255210/15/2004Request for Agency Participation in the Review of the Blythe Energy Petition to Amend the Project Petition
Request for Agency Participation in the Review of the Blythe Energy Petition to Amend the Project Petition
2 page(s)
 Agency Distribution ListCEC/Richins
3255310/15/2004Notice of Receipt - Petition to Amend Blythe Energy Power Plant License and Modify the Project to Construction and Operate Two New Transmission Lines and A Substation
Notice of Receipt - Petition to Amend Blythe Energy Power Plant License and Modify the Project to Construction and Operate Two New Transmission Lines and A Substation
2 page(s)
 DocketsCEC/Richins
3255410/15/2004Additional Information - Petition for Modification
Additional Information - Petition for Modification
91 page(s)
 CEC/Caswell/docketsTetra Tech/Mudry
3245110/12/2004Application for Confidentiality - Request for Confidentiality - Volume II, Preliminary Cultural Resources Survey and Appendix D-2, Archaeological Site Records - Petition for Transmission Amendment
Application for Confidentiality - Request for Confidentiality - Volume II, Preliminary Cultural Resources Survey and Appendix D-2, Archaeological Site Records - Petition for Transmission Amendment
4 page(s)
 CEC/DocketsGalati & Blek/Galati
3245910/12/2004Blythe Energy Project Transmission Line Modification - Petition for Post-Certification Amendment
Blythe Energy Project Transmission Line Modification - Petition for Post-Certification Amendment
1230 page(s)
 CEC/TherkelsenBlythe Energy, Llc/Grant
322399/2/2004Petition for Air Quality Conditions Modifications
Petition for Air Quality Conditions Modifications
51 page(s)
 CEC/Munro/docket UnitBlythe Energy Llc/Allen
322318/31/2004Public Workshop - Concerning Aviation Safety Issues Related to Turbulence Created by Power Plant Cooling Towers
Public Workshop - Concerning Aviation Safety Issues Related to Turbulence Created by Power Plant Cooling Towers
3 page(s)
 CEC/DocketsCEC/O'brien
320948/12/2004Report of Unsafe Landing Conditions at Blythe Airport Resulting From Cooling Tower Turbulence
Report of Unsafe Landing Conditions at Blythe Airport Resulting From Cooling Tower Turbulence
10 page(s)
 Blythe Energy Operations/Allen/docketsCEC/Munro
315205/17/2004Response to letter to CEC regarding the Blythe airport, dated April 5, 2004.
Response to letter to CEC regarding the Blythe airport, dated April 5, 2004.
5 page(s)
 CEC/MunroWolfe Enterprises/Wolfe
314215/10/2004Blythe I Power Plant Impact on Blythe Airport Aviation Safety. POS
Blythe I Power Plant Impact on Blythe Airport Aviation Safety. POS
5 page(s)
 CEC/T. O'brienCity Of Blythe/Charles Hull, Assistant City Manage
310513/4/2004ROC re: Blythe HRSG plumes; James Adams, CEC, Rory Walkins, Blythe resident and pilot.
ROC re: Blythe HRSG plumes; James Adams, CEC, Rory Walkins, Blythe resident and pilot.
1 page(s)
 CEC/DocketsCEC/J. Adams
310583/4/2004Record of Conversation between Ken Peterson, CEC, and Charles "Butch" Hull, Assist. City Manager; re: Blythe I/II Aviation Safety.
Record of Conversation between Ken Peterson, CEC, and Charles "Butch" Hull, Assist. City Manager; re: Blythe I/II Aviation Safety.
1 page(s)
 CEC/DocketsCEC/K. Peterson
309682/23/2004Report of Conversation between James Adams, CEC, Ken Peterson, CEC, and Joe Sheble, Sheble's Flight Service, regarding Blythe turbulence.
Report of Conversation between James Adams, CEC, Ken Peterson, CEC, and Joe Sheble, Sheble's Flight Service, regarding Blythe turbulence.
1 page(s)
 CEC/DocketsCEC/J. Adams/k. Peterson
2717110/29/2002Order Approving Modification of Requirements Related to PM 10 Emissions
Order Approving Modification of Requirements Related to PM 10 Emissions
3 page(s)
 CEC/DocketsCEC/Keese
2699610/9/2002Cultural Resources Reports for additional 66 acres to Blythe Project Site
Cultural Resources Reports for additional 66 acres to Blythe Project Site
17 page(s)
 CEC/Munro/docketsCEC/Reinoehl
2685610/1/2002Notice of Receipt - Request for Post-Certification Change Emission Reduction Credits for Blythe
Notice of Receipt - Request for Post-Certification Change Emission Reduction Credits for Blythe
2 page(s)
 CEC/DocketsCEC/O'brien
265628/29/2002Notice of Decision by CEC
Notice of Decision by CEC
1 page(s)
 Office Of Planning/Research/docketsCEC/Munro
265058/20/2002Order Approving Amendment to Add 66-Acre for Deposit of Excess Sediments
Order Approving Amendment to Add 66-Acre for Deposit of Excess Sediments
9 page(s)
 CEC/DocketsCEC/Keese
263197/29/2002Comments on Staff Analysis-Amendment to Place Fill Material
Comments on Staff Analysis-Amendment to Place Fill Material
8 page(s)
 CEC/DocketsGrattan And Galati/Galati
260647/1/2002Notice of Public Review Period for the Draft Staff Analysis - Petition to Amend the Commission Decision
Notice of Public Review Period for the Draft Staff Analysis - Petition to Amend the Commission Decision
15 page(s)
 CEC/DocketsCEC/O'brien
258416/6/2002Blythe Energy LLC's Modified Petition for Approval of Addition of 66 acres to Project Description-Revised Petition I-B
Blythe Energy LLC's Modified Petition for Approval of Addition of 66 acres to Project Description-Revised Petition I-B
4 page(s)
 CEC/DocketsGrattan And Galati/Galati
251634/3/2002Airport Land Use Commission Development Review
Airport Land Use Commission Development Review
2 page(s)
 CEC/Pfanner/docketsRiverside County/Downs
249243/12/2002Notice of Exemption - Approval of Request to Add 10 Acres to the Site
Notice of Exemption - Approval of Request to Add 10 Acres to the Site
1 page(s)
 Ofice Of Planning & Research/DocketsCEC/Munro
250213/12/2002Approval of Request to Add 10 Acres to the Site of the Blythe Energy Project
Approval of Request to Add 10 Acres to the Site of the Blythe Energy Project
1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
244892/6/2002Notice of Receipt - request for post-certification change
Notice of Receipt - request for post-certification change
2 page(s)
 CEC/DocketsCEC/Therkelsen
244912/6/2002Establishment of Post-Certification Mailing List
Establishment of Post-Certification Mailing List
2 page(s)
 CEC/DocketsCEC/Munro
242821/30/2002Petition for Approval of Addition of 66 acres to Project Description-Petition I-B
Petition for Approval of Addition of 66 acres to Project Description-Petition I-B
4 page(s)
 CEC/DocketsGrattan And Galati/Galati
242111/22/2002Change in Parent Company of Blythe Energy LLC
Change in Parent Company of Blythe Energy LLC
1 page(s)
 Grattan & Galati/GalatiCEC/Munro
238071/4/2002Petition for Transfer of Ownership; Declaration of Christopher T. McCallion and Declaration of Derrel A. Grant
Petition for Transfer of Ownership; Declaration of Christopher T. McCallion and Declaration of Derrel A. Grant
6 page(s)
 CEC/Munro/docketsGrattan And Galati/Galati
2368712/27/2001Approval of Request to Add 10 Acres to Site
Approval of Request to Add 10 Acres to Site
2 page(s)
 Blythe Energy/Lippman/docketsCEC/Therkelsen
2319211/26/2001Blythe Energy LLC's Petition for Approval of Addition of 66 Acres to Project Description - Petition I-B
Blythe Energy LLC's Petition for Approval of Addition of 66 Acres to Project Description - Petition I-B
120 page(s)
 DocketsGrattan And Galati/Galati
2296411/5/2001Petition for Approval of Addition of 10 Acres to Project Description-Petition 1-A
Petition for Approval of Addition of 10 Acres to Project Description-Petition 1-A
18 page(s)
 CEC/DocketsGrattan And Galati/Grattan
223489/10/2001Response to Letter Concerning Construction Milestones Requirements in Executive Order D-25-01
Response to Letter Concerning Construction Milestones Requirements in Executive Order D-25-01
7 page(s)
 Blythe Energy Project/Lippman/cec/docketsCEC/Herkelsen
219198/16/2001Notice of Exemption-Addition of Condition of Certification to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid
Notice of Exemption-Addition of Condition of Certification to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid
1 page(s)
 Office Of Planning And Research/DocketsCEC/Bruins