258566 | 8/19/2024 |
Blythe Energy Project - ACR, Part 2 Blythe Energy Project, 2023-2024 Annual Compliance Report, Part 2 Air Quality, Compliance, Hazardous Materials, Visual Resources, Soil and Water 121 page(s)
| | CEC/Docket Unit | California Energy Commission |
258565 | 8/19/2024 |
Blythe Energy Project - ACR, Part 1 Blythe Solar Project- 2023-2024 Annual Compliance Report, Part 1 Air Quality, Biological Resources, Compliance, Hazardous Materials, Visual Resources, Waste Management, Soil and Water 472 page(s)
| | CEC/Docket Unit | California Energy Commission |
231040 | 12/10/2019 |
Blythe Energy Project - 2018 Annual Compliance Report - Part 1 Part 1 of Blythe Energy Project's 2018 Annual Compliance Report Compliance 386 page(s)
| | CEC/Dockets | California Energy Commission |
231039 | 12/10/2019 |
Blythe Energy Project - 2018 Annual Compliance Report - Part 2 Part 2 of Blythe Energy Project's 2018 Annual Compliance Report Compliance 187 page(s)
| | CEC/Dockets | California Energy Commission |
230799 | 11/20/2019 |
Statement of Staff Approval of Proposed Change - Petition to Amend AQ-T15 Staff Approval of Petition to Amend COC AQ-T15 Air Quality 11 page(s)
| | CEC/Docket Unit | California Energy Commission |
229017 | 7/18/2019 |
Blythe Energy Project Notice of Receipt for Petition to Amend AQ15 Notice of Receipt for Petition to Amend AQ-15 for Blythe Energy Project Air Quality 2 page(s)
| | CEC/Dockets | California Energy Commission |
228979 | 7/15/2019 |
Blythe Energy Project Petition to Amend AQ-15
Air Quality 16 page(s)
| | CEC/Mary Dyas | Blythe Energy, Inc. |
225558 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
224518 | 8/20/2018 |
Post-Construction Monitoring at the Blythe Solar Power Project Riverside, California Final 2016 Fall Quarterly Interim Report ***SUPERSEDED BY TN 224519***
The document is filed in 09-AFC-06C Biological Resources 55 page(s)
| | CEC/Dockets | Energy Commission |
224517 | 8/20/2018 |
Post-Construction Monitoring at the Blythe Solar Power Project Riverside, California Final 2016 Summer Quarterly Interim Report ***SUPERSEDED BY TN 224517***
The document is filed in 09-AFC-06C Biological Resources 53 page(s)
| | CEC/Dockets | Energy Commission |
222105 | 1/8/2018 |
Order Approving Petition to Amend the Facility License
2 page(s)
| | CEC/Dockets | California Energy Commission |
221950 | 12/13/2017 |
Notice of Decision - Petition to Amend The amendment proposed by this petition would modify existing Air Quality Condition of Certification AQ-T7 and delete AQ-T7a to make them consistent with the proposed changes to the District permit. 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
221887 | 12/1/2017 |
December 13, 2017 Business Meeting Agenda
6 page(s)
| | CEC/Dockets | California Energy Commission |
221691 | 11/7/2017 |
Staff Analysis on Petition to Amend
33 page(s)
| | CEC/Dockets | California Energy Commission |
221382 | 10/4/2017 |
Notice of Receipt - Petition to Amend Decision for Blythe Energy Center
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
221072 | 9/7/2017 |
Blythe Energy Project - Petition to Amend AQ - 20170907 Blythe Energy Project Petition to Amend AQ Compliance, Air Quality 38 page(s)
| | CEC/Dockets | California Energy Commission |
211879 | 6/20/2016 |
Notice of Decision Notice of Decision 20160620 Compliance 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
211858 | 6/17/2016 |
Order Approving Petition to Reduce PM10 and SOx Emissions
5 page(s)
| | | California Energy Commission |
211396 | 5/6/2016 |
Staff Analysis Petition to Amend – Reduce PM10 and SOx Limits
Air Quality 16 page(s)
| | Interested Parties | California Energy Commission |
211011 | 4/12/2016 |
Notice to Reinstate Operation of Super AWOS This document was previously filed in Docket No. 99-AFC-3C due to a docket number error on the document. 2 page(s)
| | City of Blythe/Charles Hull | California Energy Commission |
210796 | 3/21/2016 |
BEP Final Determination and Federal Operating Permit Transmittal of final determination and Title V permit for Blythe Energy Project Air Quality 1 page(s)
| | EPA Region 9, CEC staff, Sierra Research, BEP | Sierra Research |
210795 | 3/21/2016 |
Federal Operating Permit for Blythe Energy, Inc. Revised Title V permit for BEP Air Quality 53 page(s)
| | EPA Region 9, CEC staff, Sierra Research, BEP | Sierra Research |
210794 | 3/21/2016 |
Final Determination, Title V Federal Operating Permit Significant Modification Statement of Basis, Modification of BEP Title V Permit Air Quality 14 page(s)
| | EPA Region 9, CEC staff, Sierra Research, BEP | Sierra Research |
210765 | 3/17/2016 |
Blythe Energy Project - Commission Order 05-0330-03 Approving Modifications to AQ-5 thru AQ-8
5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207079 | 12/18/2015 |
BEP Draft Title V Permit Significant Revision - Redline
Air Quality 53 page(s)
| | | CH2M HILL |
207076 | 12/18/2015 |
BEP Preliminary Determination Title V Federal Operating Permit Significant Modification
Air Quality 14 page(s)
| | | CH2M HILL |
207075 | 12/18/2015 |
BEP Draft Title V Permit Significant Revision
Air Quality 53 page(s)
| | | CH2M HILL |
206172 | 9/22/2015 |
Blythe Energy Project Completion Letter from Mojave Desert Air Quality Management District
Air Quality 3 page(s)
| | Christopher Doyle/AltaGas Sonoran Energy Inc. | Sierra Research |
205850 | 8/27/2015 |
Notice of Receipt - Petition to Amend The California Energy Commission Decision for the Blythe Energy Project Blythe Energy Project - Notice of Receipt - 08-26-2015 Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
205770 | 8/18/2015 |
Petition to Amend - Reduce PM10 and SO2 Emissions 08-18-2015 Blythe Energy Project - Petition to Amend - Reduce PM10 and SO2 Emissions 08-18-2015 Compliance 477 page(s)
| | | Blythe Energy, Inc. |
205378 | 7/17/2015 |
Blythe Energy Project - Notice of Decision
Compliance 1 page(s)
| | California Resources Agency | California Energy Commission |
205374 | 7/16/2015 |
Order Approving a Petition to Reduce Allowable Annual Nox, CO, and PM10 Emissions
26 page(s)
| | CEC/Docket Unit | California Energy Commission |
205234 | 7/3/2015 |
Blythe Energy Project - Response to June 30, 2015 Comments on Staff's Analysis - 07-03-2015
Compliance 3 page(s)
| | Christopher Doyle | California Energy Commission |
205198 | 6/30/2015 |
Blythe Energy Inc., Project Owner Comments on Staff Analysis
Air Quality 4 page(s)
| | CEC/Mary Dyas | Sierra Research |
204864 | 6/3/2015 |
Blythe Energy Project - Staff Analysis of (2/12/2015) Petition to Amend
Compliance 49 page(s)
| | Interested Parties | California Energy Commission |
204521-1 | 5/7/2015 |
Blythe Energy Project - Final Determination for New Source Review Action & Title V Federal Operating Permit
Compliance 17 page(s)
| | CEC/Docket Unit | California Energy Commission |
204521-2 | 5/7/2015 |
Blythe Energy Project - Federal Operating Permit - Permit Revisions - Clean Copy
Compliance 54 page(s)
| | CEC/Docket Unit | California Energy Commission |
204521-3 | 5/7/2015 |
Blythe Energy Project - Federal Operating Permit - Permit Revisions - Redline Copy
Compliance 55 page(s)
| | CEC/Docket Unit | California Energy Commission |
204518 | 5/6/2015 |
Supplement to Petition to Amend
Air Quality 77 page(s)
| | CEC/Mary Dyas | Blythe Energy Inc./Sierra Research |
204089 | 4/8/2015 |
Staff Analysis of Amendment Proposal 04-08-2015 Blythe Energy - Staff Analysis of Amendment Proposal 04-08-2015 Air Quality, Compliance 12 page(s)
| | Interested Parties | California Energy Commission |
203722 | 2/23/2015 |
Blythe I - AQ Notice of Receipt 02-23-2015 Petition to Amend The California Energy Commission Decision for the Blythe Energy Project Compliance 3 page(s)
| | | California Energy Commission |
203657 | 2/12/2015 |
Blythe I - Petition to Amend Emission Reductions
Compliance 38 page(s)
| | CEC/ Mary Dyas | Blythe Energy Inc./ Christopher J. Doyle |
203650 | 2/11/2015 |
Withdrawal of Petition to Amend 99-AFC-08C BEP Withdrawal of PTA Air Quality 1 page(s)
| | CEC/ Mary Dyas | Blythe Energy Inc./ Christopher J. Doyle |
203564 | 1/26/2015 |
Petition to Amend for the Blythe Energy Project
Air Quality 53 page(s)
| | CEC/Mary Dyas | Blythe Energy Inc. |
203503 | 1/7/2015 |
Staff Approved Project Modification - Approval Letter
Compliance 1 page(s)
| | Blythe Energy/Christopher J. Doyle | CEC/Mary Dyas |
203466 | 12/18/2014 |
Notice of Determination
Compliance 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
203427 | 12/10/2014 |
Notice of Receipt - Turndown Upgrades
Compliance 3 page(s)
| | CEC/Dockets Unit | California Energy Commission |
203414 | 12/8/2014 |
MDAQMD Response Letter for Turndown Request
Air Quality 1 page(s)
| | Blythe Energy/Christopher Doyle | Sierra Research |
203390 | 12/1/2014 |
Property Owner List
Project Description 3 page(s)
| | CEC/Mary Dyas | Sierra Research |
203374 | 11/25/2014 |
Project Modification for the Blythe Energy Project
Air Quality, Public Health, Traffic and Transportation 27 page(s)
| | CEC/Dockets Unit | Sierra Research |
200127 | 8/8/2013 |
Approval letter for Request to Transfer Operational Control from Nextera Energy to Atlasgas Blythe Operations
Compliance 1 page(s)
| | Kim Hellwig | CEC/Mary Dyas |
200125 | 8/8/2013 |
Order Approving Change Operational Control of the Blythe Energy Project
Compliance 2 page(s)
| | | California Energy Commission |
200051 | 7/26/2013 |
Name Change Notification
1 page(s)
| | CEC/Dockets Unit | Blythe Energy, Inc. |
71678 | 7/18/2013 |
Notice of Decision - Transfer the Operational Control
1 page(s)
| | California Resoruces Agency | CEC/M.Dyas |
71635 | 7/15/2013 |
Concerned Citizen of Blythe Comment Letter
12 page(s)
| | CEC/ Docket Unit | Concerned Citizen of Blythe |
71175 | 6/7/2013 |
Blythe Energy Inc.'s Petition to Change Operational Control
11 page(s)
| | CEC/ Docket Unit | Blythe Energy Inc. |
62788 | 11/4/2011 |
Approval of Request to Transfer Operational Control
1 page(s)
| | Winston & Strawn/ L. Cottle | CEC/ M. Dyas |
62781 | 11/3/2011 |
Filing Notice of Decision
1 page(s)
| | California Resources Agency | CEC/ M. Dyas |
62745 | 11/3/2011 |
Order Approving Transfer of Operationl Control to NextEra Energy Operating Services
2 page(s)
| | CEC/ Docket Unit | CEC/ H. Kallemeyn |
62611 | 10/19/2011 |
Notice of Receipt-Petition to Transfer Ownership
2 page(s)
| | CEC/Dockets Unit | CEC/C.Marxen |
62083 | 9/2/2011 |
Petition of Blythe Energy, LLC to Transfer Operational Control of the Blythe Energy Project
12 page(s)
| | CEC/ Docket Unit | Winston Strawn LLP |
60251 | 4/13/2011 |
Next Era Energy Address Change Letter
1 page(s)
| | CEC/ M. Dyas | Next Era Energy |
59663 | 2/11/2011 |
SAPM #6 Data Response 1-7 Revised February 8, 2011
41 page(s)
| | CEC/Docket Unit | CEC/Mary Dyas |
59661 | 2/11/2011 |
Blythe Energy LLC G.Hickey SAPM #6 Data Response 1-7 January 7,2011
40 page(s)
| | CEC/Mary Dyas | Blythe Energy LLC/G.Hickey |
59660 | 2/11/2011 |
SAPM #6 Data Requests 1-7 December 20,2010
1 page(s)
| | CEC/Docket Unit | CEC/Mary Dyas |
59654 | 2/10/2011 |
CEC Letter to Jenna Farrell Tetra Tech regarding Application for Confidentiality Cultural Resources
2 page(s)
| | Tetra Tech/ J. Farrell | CEC/ M. Jones |
59520 | 1/12/2011 |
Application for Confidentiality Final Cultural Resources Monitoring Report
278 page(s)
| | CEC/ M. Jones | TETRATECH EC, INC/ J. Farrell |
59255 | 12/15/2010 |
Notice of Receipt Petition to Amned The Blythe Energy Project Transmission Line
2 page(s)
| | CEC/ Docket Unit | CEC/ C. Marxen |
59001 | 11/15/2010 |
Request for Staff Approved Project Modification
45 page(s)
| | CEC/M. Dyas | Tetra Tech/ P. Eckert |
58776 | 10/13/2010 |
Approval Letter for Spare Transformer Installation
1 page(s)
| | NextEra Energy Resources LLC/R. Piper | CEC/M. Dyas |
58167 | 8/25/2010 |
Letter Regarding Release of Funds from Escrow Account, BIO-16 & BIO-17
2 page(s)
| | First American Title Co./T. Springstead, Deser Tortoise PReserve Comm./J. Lee, Blythe/G. Hickey | CEC/M. Dyas |
57220 | 6/18/2010 |
CA ISO Notification of Commercial Operation.
1 page(s)
| | CEC/ Docket Unit | Blythe Energy/ J. Goodwin |
56226 | 4/13/2010 |
Ltrs Exchanged Between J. Caswell & R. Piper re Installation of Co Catalyst
3 page(s)
| | CEC/J. Caswell | Nextra Energy/R. Piper |
56225 | 4/13/2010 |
Letter re Transfer of Indirect Ownership of La Paloma Generating Company, LLC Docketed to incorrect docket. 4 page(s)
| | CEC/M. Dyas | La Paloma Generatin Company/L. Cuervo |
55647 | 2/18/2010 |
Approval Letter to Blythe Energy LLC for SAPM No. 5
3 page(s)
| | Blythe Energy/ G. Hickey | CEC/T. O'Brien |
55133 | 2/2/2010 |
Notice of Receipt of Petition to Amend
2 page(s)
| | CEC/Docket Unit | CEC/E. Allen |
54702 | 1/6/2010 |
Transmission Line Project Request for Staff Approved Project Modification
337 page(s)
| | CEC/ M. Dyas | Tetra Tech/ P. Jennings |
53618 | 10/13/2009 |
Letter from WAPA to M. Dyas Regarding Blythe Energy Proposal to Connect Blythe-Julian Hinds
1 page(s)
| | CEC/ M. Dyas | Dept of Energy/ G. Bates |
52557 | 7/27/2009 |
Approval Letter to G. Hickey for Staff Approved Project Modification to T-Line Amendment
3 page(s)
| | Blythe Energy/ G. Hickey | CEC/ M. Dyas |
52259 | 7/1/2009 |
Notice of Receipt: Petition to Amend to Modify
2 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
52156 | 6/25/2009 |
USFWS Amendment to the Biological Opinion for the Blythe Energy Project
3 page(s)
| | CEC/ M. Dyas | Carlsbad Fish&Wildlife/ K. Goebel |
52042 | 6/17/2009 |
Request for Staff Approved Project Modifications
49 page(s)
| | CEC/ Docket Unit | Blythe Energy |
50217 | 2/19/2009 |
Blythe Transmission Line Modifications - Approval Letter to Begin Construction
1 page(s)
| | Blythe Energy/ Gary Hickey | CEC/ M. Dyas |
50179 | 2/18/2009 |
CBO Itr- FPL Energy has met COCs; OK to begin Construction
1 page(s)
| | CEC/ M. Dyas | Bureau Veritas/ K. Wedman |
50027 | 2/9/2009 |
Blythe Energy Project Transmission Line Modification-Approval of Request of 3rd Insignificant Project Change
2 page(s)
| | Blythe Energy LLC/ G. Hickey | CEC/ T. O'Brien |
49978 | 2/4/2009 |
Approval for Changes to IPC#3 with MWD Comments
15 page(s)
| | Blythe Energy LLC/ Gary Hickey | CEC/ M. Dyas |
49977 | 2/4/2009 |
Approval of Verification Change to WORKER SAFETY - 2
1 page(s)
| | Blythe Energy LLC/ Gary Hickey | CEC/ M. Dyas |
49975 | 2/4/2009 |
Approval for Partial Notice of Proceed - Waiting for MWD
1 page(s)
| | Blythe Energy LLC/ Gary Hickey | CEC/ M. Dyas |
49915 | 1/28/2009 |
Agency Comments- MWD Withdrawls Opposition to IPC3
1 page(s)
| | CEC/ Mary Dyas | MWD/ Karen Tachiki |
49914 | 1/28/2009 |
Agency Comments- SCE Comments to MWD regarding IPC3
2 page(s)
| | MWD/ Jon Lambeck | SCE/ Robert Lugo |
49913 | 1/28/2009 |
Agency Comments- MWD Comments to SCE regarding IPC3
3 page(s)
| | SCEC/ John Tucker | MWD/ Jon Lambeck |
49912 | 1/28/2009 |
Blythe Energy Response to MWD Comments
72 page(s)
| | CEC/ Mary Dyas | Blythe Energy/ Gary Hickey |
49637 | 1/7/2009 |
CEC Response to Application for Confidentiality for Revised Cultural Resources
2 page(s)
| | Terta Tech/ J. Farrell | CEC/ M. Jones |
49636 | 1/7/2009 |
CEC Response to Application for Confidentiality for Cultural Report
2 page(s)
| | Tetra Tech/ J. Farrell | CEC/ M. Jones |
49580 | 1/5/2009 |
Agency Comments - Metro Water District of Southern CA
2 page(s)
| | CEC/ M. Dyas | MWD/ D. Mahmud |
49472 | 12/19/2008 |
Application for Confidential Designation - Cultural Resource/ Historic Properties Plan
3 page(s)
| | CEC/ M. Jones | Tetra Tech/ J. Farrell |
49438 | 12/15/2008 |
Application for Confidential Designation - Revised Draft Amendment to Cultural Resources Inventory
192 page(s)
| | CEC/M. Jones | Tetra Tech/J. Farrell |
49382 | 12/11/2008 |
Notice of Insignificant Project Change Request for Approval for Blythe Transmission Line Modifications
2 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
49229 | 12/3/2008 |
CEC Response Re Aviation Safety Issue at the Blythe Municipal Airport
11 page(s)
| | Robert A. Strugell | CEC/ T. O' Brien |
49174 | 12/1/2008 |
Third Request for Approval of Insignificant Project Change
50 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
48499 | 10/9/2008 |
Approval of Request of Second Insignificant Change
2 page(s)
| | FPL Energy/ M. Argentine | CEC/ T. O'Brien and J. Kalish |
47767 | 8/27/2008 |
Blythe Energy, LLC Response to Staff Data Requests for Insignificant Change Request
9 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
47766 | 8/27/2008 |
CEC Staff Request for Additional Info for Review of BEPTL Request for Insignificant Change
1 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
47708 | 8/25/2008 |
M. Dyas Response to Public Comments from Mr. Mike Bolton
8 page(s)
| | M. Bolton | CEC / M. Dyas |
47707 | 8/25/2008 |
Letter from Blythe Energy RE Transmission Lines.
10 page(s)
| | CEC / M. Dyas | BE / M. Argentine |
47655 | 8/21/2008 |
Letter re: Western No Longer Participating in Blyth Energy Project Transmission Line Modification Project
2 page(s)
| | CEC/ M. Dyas/ Docket Unit | DOE/ J. Holt |
47615 | 8/19/2008 |
Public Comments - Response to Blythe T-Line REquest for Approval of Insignigicant Project Change
1 page(s)
| | CEC/ Docket Unit | CEC/ M. Dyas |
47461 | 8/5/2008 |
Notice of Insignificant Project Change - Request for Approval of Insignificant Change for the Blythe Energy Project Transmission Line Modifications
2 page(s)
| | CEC / Docket Unit | CEC / M. Dyas |
47324 | 7/30/2008 |
Blythe Energy Project Transmission Line Construction Access Road Plan
40 page(s)
| | CEC/M. Dyas | SGS/P. Eckert |
47161 | 7/22/2008 |
Request for Approval of Insignificant Project Change
59 page(s)
| | CEC/ M. Dyas | Blythe Energy LLC/ M. Argentine |
43336 | 11/5/2007 |
Letter to FCC re: Blythe Municipal Airport Unicom
8 page(s)
| | Federal Communications Commission | Richards I Watson I Gershon / W. Zears |
41610 | 7/20/2007 |
Notice of Exemption- Blythe Energy Project T-Line
1 page(s)
| | CRA | CEC |
41579 | 7/19/2007 |
Letter regarding CEC Staff's review of Blythe Energy's petition dated April 13, 2007 requesting approval of an IPC.
1 page(s)
| | Blythe Energy, LLC/ G. Palo | CEC/ S. Munro |
41288 | 6/29/2007 |
Notice of Insignificant Project Change- Petition to Modify the Blythe Energy Project's Transmission Line
2 page(s)
| | Mail list # 747 | CEC/ R. Johnson |
40017 | 4/16/2007 |
Blythe Energy Transmission Project Request for Approval of Insignificant Change
45 page(s)
| | CEC/S. Munro | Blythe Energy LLC/G. Palo |
38827 | 9/7/2006 |
Revised Staff Assessment/Draft Environmental Assessment
624 page(s)
| | CEC/Docket Unit | CEC/J. Caswell |
38189 | 10/17/2006 |
Notice of Decision on Amendment Petition.
10 page(s)
| | Office of Planning and Research/ California Resources Agency | CEC/ J. Caswell |
38159 | 10/13/2006 |
Commission Decision on Amendment Petition
9 page(s)
| | CEC/ Dockets Unit | CEC/ Commissioners |
37962 | 9/27/2006 |
PMPD on amendment petition
12 page(s)
| | CEC/ Dockets Unit | CEC/ J. Pfannenstiel, J. Geesman, M. Read |
37961 | 9/27/2006 |
Blythe Evidentiary Hearing- Petition to modify
17 page(s)
| | CEC/ Dockets Unit | PSRC/ P. Petty |
37901 | 9/19/2006 |
Blythe energy project T. L.- CEC staff's evidentiary hearing statement.
7 page(s)
| | CEC/ Dockets Unit | CEC/ J. Pfannenstiel |
37895 | 9/19/2006 |
Blythe energy LLC's Testimony for The Blythe Energy Transmission Line Amendment.
70 page(s)
| | Docket Unit | M. Cosens / Galati & Blek LLP |
37865 | 9/7/2006 |
Document Handling For The Revised Staff Assessment / Draft Environmental Assessment for The Blythe Energy Project Transmissions Line Modification Amendment Petition.
3 page(s)
| | Docket Unit | R. E. Johnson /CEC |
37847 | 9/7/2006 |
N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
2 page(s)
| | CEC/ Agency distribution list | CEC/ R. Johnson |
37846 | 9/7/2006 |
N. O. A. revised staff assess./draft environmental assess. for the Blythe E.P. Trans. Line mod. amend. petition.
3 page(s)
| | CEC/ Dockets Unit | CEC/ R. Johnson |
37844 | 9/11/2006 |
Notice of Evidentiary Hearing and Hearing Order
5 page(s)
| | Docket Unit | Hearing Office |
37706 | 8/21/2006 |
Blythe Energy, LLC For Post Certification Amendment.
6 page(s)
| | J. Caswell / Docket Unit | C. lang / D. Mahmud / MWD / Metropolitan Water District of Southern California |
37704 | 7/10/2006 |
Comments Related to The Recently Distributed Staff Assessment / Draft Environmental Assessment For The Blythe Energy T. Line Modifications and POS.
8 page(s)
| | J. Kallish | U.S. Department of Interior / C. Sauer |
37703 | 2/27/2006 |
Letter Re: Western Area Power Administration a Power Marketing Agency of The U.S. Department of Energy Received Interconnection Request from Blythe Energy (Same Letter to 8 Different Persons, Mr. D. Eddy Jr, Mr. D. Mike, Ms. N McDowell, MS. M. Martine, Mr. J. James, Mr. R. Milanovich, Mr. R. Torres, and Mr. M. Jackson, Sr.)
1 page(s)
| | Docket Unit | Department of Energy / M. E. Barger |
37686 | 8/22/2006 |
E-mail Re: -- Correspondence with SCE Regarding Transmissions System Impact Study
1 page(s)
| | J. G Hocheimer@fpl.com | J. Tucker@SCE.com |
37642 | 8/10/2006 |
MWD REsponse to BEPTL filing
1 page(s)
| | CEC/J. Caswell/P. Kramer/et al | Metropolital Water District of So. Cal/D. Mahmud |
37631 | 8/9/2006 |
Prehearing Conference Held July 31, 2006, Re: Post Certification Amendment
36 page(s)
| | CEC/Docket Unit | CEC/Commission Siting Committee |
37598 | 8/8/2006 |
Supplemental Information in the Petition for Post Certification Amendment, Response to Prehearing Conference Statements
28 page(s)
| | CEC/ J. Caswell | FPL Energy, LLC/ G. Palo |
37591 | 8/8/2006 |
Record of Conversation with Blythe Energy Project's Gary E. Palo, Project Director
2 page(s)
| | CEC/J. Caswell/Docket Unit | FPL Energy/G. Palo |
37545 | 8/3/2006 |
Notice of Staff Workshop for the Blythe Energy Project T-Line Project
7 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
37522 | 8/1/2006 |
Thank You Letter and No Comments RE: Blythe Energy, LLC, Petition to Amend the Blythe Energy Power Plant Project Petition.
1 page(s)
| | J. Caswell/CEC | G. Zimmerman-Executive Director/Colorado River Board of California |
37521 | 8/1/2006 |
Thank You Letter and No Comments RE: Blythe Energy Project T-Line Modification Amendment Petition Preliminary Staff Assessment.
1 page(s)
| | R. Johnson/CEC | G. Zimmerman-Executive Director/Colorado River Board of California |
37520 | 8/1/2006 |
Thank You Letter and No Comments RE: Prehearing Conference Statement Regarding Petition to Modify the Blythe Energy Power Plant Project (T-Line Modification)
1 page(s)
| | CEC/Docket Unit | G. Zimmerman/Colorado River Board of California |
37513 | 7/31/2006 |
Determination Of No Hazard To Air Navigation
3 page(s)
| | G. Palo/Blythe Energy, LLC | K. McDonald/Federal Aviation Administration |
37511 | 7/31/2006 |
Blythe Energy LLC's Determination Of No Hazard To Air Navigation.
5 page(s)
| | R. Rodriguez/CEC | M. Cosens/Galati & Blek LLP |
37496 | 7/28/2006 |
Prehearing Conference Statement of the Metropolitan Water District of Southern CAlifornia and POS.
14 page(s)
| | CEC/ Docket Unit | MD/Metropolitan Water District of Southern California/ D. Mahmud |
37495 | 7/28/2006 |
Metropolitan's Petition For Intervention and POS.
6 page(s)
| | CEC / Docket Unit | MWD/ Metropolitan Water District of Southern California/ D. Mahmud |
37485 | 7/26/2006 |
Blythe Energy LLC's Prehearing Conference Statement
19 page(s)
| | R. Rodriguez/ Docket Unit | M. Cosens/ Galati & Blek LLP |
37484 | 7/26/2006 |
Prehearing Conference Statement of Caithness Blythe II, LLC
7 page(s)
| | CEC/ Docket Unit | C. Ellison/ Ellison, Schneider & Harris LLP |
37481 | 7/26/2006 |
Blythe Energy LLC's Prehearing Conference Statement
17 page(s)
| | CEC | S. A. Gallati / Galati & Blek, LLP |
37480 | 7/26/2006 |
Commission Staff's Prehearing Confrence Statement (July 31, 2006)
8 page(s)
| | CEC/ Dockets | CEC/ P. Kramer |
37472 | 7/21/2006 |
MWD Concern re: interconnections with the Julian Hinds Substation
1 page(s)
| | CEC/E. Bouillon/Docket Unit | MWD/D. Mahmud |
37464 | 7/20/2006 |
Report of Conversation between the Bythe Energy Project Staff, CEC Staff, and Western Area Power Administration Staff on 7-20-06.
4 page(s)
| | CEC/ Docket Unit | CEC/ Caswell |
37455 | 7/18/2006 |
Notice of Prehearing Conference
9 page(s)
| | Docket Unit | J. Geesman and J. Boyd/ CEC |
37107 | 6/14/2006 |
Programmatic Agreement Contact Letter
2 page(s)
| | Ofc of Historic Preservation/M. Donaldson/Dept Parks & Rec/M. McGuirt/CEC/Docket Unit | Dept of Energy Western Area Power Admin/M. Barger |
37106 | 6/14/2006 |
Programmatic Agreement Contact Letters dated June 8, 2006
29 page(s)
| | Various/CEC/Docket Unit | Dept of Energy/Western Area Power Administration |
37029 | 5/26/2006 |
Notice of Availibility of the SA/DEA
2 page(s)
| | Agency Distribution List/CEC/Docket Unit | CEC/R. Johnson |
37028 | 5/26/2006 |
Filing of SA/DEA to State Clearinghouse
1 page(s)
| | OPR/CRA/CEC/Docket Unit | CEC/J. Caswell |
37027 | 5/26/2006 |
Document Handling SA/DEA
4 page(s)
| | Librarian/CEC/Docket Unit | CEC/R. Johnson |
37026 | 5/26/2006 |
Notice of Availability
3 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
37025 | 5/26/2006 |
Notice of Availability for the SA/DEA
2 page(s)
| | Native American Tribal Distriubution List/CEC/Docket Unit | CEC/R. Johnson |
37017 | 5/25/2006 |
Blythe Energy Project Transmission Line Modifications Amendment Petition 99-AFC-8C Riverside County
576 page(s)
| | CEC/ Docket UNit | CEC |
36416 | 3/1/2006 |
Buck Boulevard Julian Hinds 230kV Transmission Line To Tariff Technical Assessment Section of The Facilities Study Final
82 page(s)
| | Docket Unit/ CEC/ J. Caswell | SCEC/ J. Caswell |
36414 | 2/28/2006 |
Blythe Energy - Buck Blvd Substation To Palo Verde Devers 500 kV line Interconnection Project / Systems Planning Study of the Facilities Study.
108 page(s)
| | Docket Unit | Blythe Energy / SCE |
36413 | 2/28/2006 |
Petition for Post Certification Amendment Interconnection Mitigation Measures.
9 page(s)
| | Docket Unit | Blythe Energy, LLC |
36410 | 2/28/2006 |
Southern California Edison Down Stream Up-grade Pole Interset Construction
4 page(s)
| | Docket Unit | SCE / J. Caswell |
36323 | 2/2/2006 |
Blythe Energy Project Transmission Line Status Report #7
6 page(s)
| | CEC/L. Geesman | CEC/J. Caswell |
36159 | 1/9/2006 |
CA ISO Comments on SCE's Addendum to the System Impact Study
9 page(s)
| | SCE/Arons | CA ISO/Cashdollar |
36145 | 1/5/2006 |
Biological Table dated November 30, 2005
1 page(s)
| | CEC/Mathias | Tetra Tech/Eckert |
36043 | 12/12/2005 |
Final Environmental Impact Statement/Environmental Impact Report for the Desert Southwest Transmission Line Project.
1 page(s)
| | CEC/Docket Unit | United States Department of the Interior/Acheson |
35904 | 11/17/2005 |
SCE's Response to CA ISO Comments on the System Impact Study. POS
112 page(s)
| | CAISO/Cashdoller/CEC/Docket Unit | Southern California Edison/Arons |
35882 | 11/15/2005 |
Re: Instrumental Landing System-Blythe Airport
4 page(s)
| | City of Blythe/Les Nelson | Wolfe Enterprises/Wolfe |
35814 | 10/26/2005 |
Notification of and Inter-tribal meeting regarding the Blythe Amendment taking place on November 16, 2005
2 page(s)
| | CEC/Caswell | Morongo Band of Mission Indians |
35812 | 10/27/2005 |
Blythe Energy Project Transmission Line 99-AFC-8C Status Report #6.
6 page(s)
| | Docket Unit | CEC/J. Caswell |
35771 | 10/21/2005 |
Response to the "Second Notification of Intent to File Complaint" from the CEC/T. O'Brien. POS
2 page(s)
| | T. O'Brien/CEC/Docket Unit | FPL/G. Keith Hardy |
35648 | 10/11/2005 |
BLM's letter dated September 30, 2005 regarding CEC's Staff Assessment/Environmental Assessment
6 page(s)
| | CEC/Caswell | BLM/Kallish |
35609 | 10/6/2005 |
Biological Assessment
72 page(s)
| | CEC/Docket | WESTERN |
35605 | 10/6/2005 |
Biological Evaluation
38 page(s)
| | Department of Fish & Game/Nicol | Tetra Tech/Eckert |
35603 | 10/6/2005 |
Final Desert Tortoise Protocol Surveyor Report
139 page(s)
| | CEC/Mathias | Tetra Tech/Eckert |
35602 | 10/6/2005 |
Final Desert Tortoise Protocol Survey Report
139 page(s)
| | CEC/Mathias | Tetra Tech/Eckert |
35585 | 10/4/2005 |
WESTERNS's Tribal Notification Letters dated September 23, 2005
24 page(s)
| | Native American Tribal List | WESTERN/Carlson |
35546 | 6/14/2005 |
DRAFT Final Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project.
205 page(s)
| | Jack Caswell/CEC | Mooney/Jones/Stokes |
35531 | 9/22/2005 |
Request for revision to Proof of Service List.
1 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/CURE |
35530 | 9/22/2005 |
Revised Proof of Service list.
6 page(s)
| | CEC/Docket Unit | CEC/Hearing Office |
35520 | 9/20/2005 |
Response to testimony provided on transmission system engineering Conditions of Certification at the CEC Evidentiary Hearing held on August 1, 2005.
2 page(s)
| | Commissioner Geesman/CEC/Docket Unit | Western Area Power Admin/DOE/Anthony H. Montoya |
35517 | 7/21/2005 |
Cultural Resources Division Volume 1, 2, & 3.
425 page(s)
| | Jack Caswell/CEC/Docket Unit | Mooney/Jones & Stokes/Blythe Energy, LLC |
35500 | 9/16/2005 |
CAISO Review of the System Impact Study of Blythe Energy Project II's Proposed Transmission Connection of the Buck Blvd. Substation to the Palo Verde -- Devers 500-kv Line
9 page(s)
| | J. Tucker/CEC/Docket Unit | CA ISO/Richard M Cashdollar |
35497 | 9/15/2005 |
Response to testimony provided on transmission system engineering Conditions of Certification at the evidentiary hearing, held August 1, 2005.
2 page(s)
| | Commissioner Geesman/CEC/Docket Unit | Western Area Power Admin/A. Montoya |
35494 | 9/14/2005 |
Cooling Tower vs. Blythe Airport runway.
4 page(s)
| | S. Munro/CEC/Docket Unit | FPL Energy/C. Allen |
35493 | 9/14/2005 |
Status Report on Flight Evaluation.
11 page(s)
| | J. Adams, CEC/CEC/Docket Unit | Arnold & Arnold, Inc/C. Arnold |
35492 | 9/14/2005 |
Evaluation of Plume Interaction & Flight landings.
18 page(s)
| | FLP/CEC/Docket Unit | Golder Associates, Inc/K. Kosky |
35491 | 9/14/2005 |
Cooling Tower vs. Blythe Airport runway. (ESI File #17667C).
11 page(s)
| | H. Rosen, Esq./CEC/Docket Unit | Engineering Systems Inc/R. Winn |
35490 | 9/14/2005 |
Comments regarding completion of Blythe Power Plant also indicating that the document needs to address the following issues and supply additional information re: the concerns outlined in the CLUP (BL-00-102).
11 page(s)
| | J. Harvey/GREYSTONE/CEC/Docket Unit | Riverside County/Airport Land Use Commission/K. Downs |
35489 | 9/14/2005 |
Comments on the Public Workshop.
5 page(s)
| | S. Munro/CEC/Docket Unit | Riverside County/Airport Land Use Commission/K. Downs |
35488 | 9/14/2005 |
Report on the Blythe Power Plant Turbulence issue.
13 page(s)
| | H. Rosen/ CEC/ Docket Unit | Engineering Systems Inc./ R. Winn |
35487 | 9/14/2005 |
Override of Riverside County Airport Land Use Commission findings.
4 page(s)
| | CEC/ Docket Unit | City Of Blythe |
35486 | 9/14/2005 |
Blythe Airport/ Blythe Energy Runway Hazard Mitigation Workshop- Follow Up
13 page(s)
| | S. Munro/CEC/ Docket Unit | City Of Blythe/ C. Hull |
35485 | 9/14/2005 |
Blythe Airport Instrument Landing System Relocation.
4 page(s)
| | D. Edwards/ CEC/ Docket Unit | FPL Energy/ R. Piper |
35484 | 9/14/2005 |
Discuss the remedies of correcting the danger to the public caused by the Blythe Plant One.
2 page(s)
| | T. OBrien/ CEC/ Dockets Unit | Wolfe Enterprises/P.Wolfe |
35483 | 9/14/2005 |
The credentials of Joe Sheble and comments about the Blythe power plant and runway.
3 page(s)
| | T. O'Brien/CEC/ Docket Unit | Sheble Aviation/ J. Sheble III |
35482 | 9/14/2005 |
Response to the inquiries and concerns expressed in the correspondence of January 25 to the Administrator of the Federal Aviation Administration (FAA).
2 page(s)
| | T.O'Brien/CEC/Docket Unit | US Dept O Trans/ Fed Aviation Admin/ J. McGraw |
35481 | 9/14/2005 |
Regarding complaints,------ from pilots about the thermal plumes created from the Blythe 1 power plant.
1 page(s)
| | T. OBrien/CEC/ Docket Unit | Dept of Trans/ R.A. Wiswell |
35478 | 9/14/2005 |
Blythe Airport meeting summary (July 19, 2005).
2 page(s)
| | CEC/Docket Unit | CEC/M. Pryor |
35477 | 9/14/2005 |
Concerns regarding flight safety with respect to overflying powerplant exhaust plumes. (date not clear on letter)
4 page(s)
| | Honorable Dodd/CEC/Docket Unit | U.S. Dept of Trans/Fed Aviation Admin/ John M. Allen |
35476 | 9/14/2005 |
Concerns regarding potential aviation safety issues.
2 page(s)
| | T O'Brien/CEC/Docket Unit | Dpt. of Trans/R. Austin Wiswell, Chief |
35474 | 9/14/2005 |
Phoenix Sectional.
2 page(s)
| | Ms. Billie Stull/CEC/Docket Unit | City of Blythe/Charles Hull |
35473 | 9/14/2005 |
Status Report #5. POS
5 page(s)
| | Commissioner Geesman/CEC/Docket Unit | CEC/J. Caswell |
35458 | 9/9/2005 |
Letter re: Instrument Landing System at Blythe Airport.
2 page(s)
| | Mr. Rob Fields/County of Riverside | US Dept of Trans/Federal Aviation Admin/W. C. Withycombe |
35457 | 9/9/2005 |
Letter re: Instrument Landing System at Blythe Airport.
2 page(s)
| | Mr. Rob Fields/County of Riverside/CEC/Docket Unit | US Dept of Trans/Federal Aviation Admin/W. C. Withycombe |
35456 | 9/9/2005 |
Letter advising the County of Riverside of their concerns and to ask for assistance re: Blythe Airport. Aircraft pilots have reported unusual turbulence over a power plant on the he the approach to Runway 26.
2 page(s)
| | Mr. Rob Fields, County of Riverside/CEC/Docket Unit | US Dept of Trans, Federal Aviation Admin/W. C. Withycombe |
35432 | 9/1/2005 |
Second Notification of Intention to File Complaint.
3 page(s)
| | Keith Hardy/CEC/Docket Unit | CEC/T. O'Brien |
35427 | 8/31/2005 |
Report of Conversation between Jack Caswell, CEC, and SCE & BEP Staff, re: SCE process for Down Stream Upgrades Pole Interset BEPTL.
2 page(s)
| | CEC/Docket Unit | CEC/J. Caswell |
35423 | 8/31/2005 |
Record of Conversation (ROC), Response to CEC E-mail Questions (#1 through 10) August 17, 2005
2 page(s)
| | CEC/Docket | CEC/Caswell |
35345 | 8/23/2005 |
Request to Change Landing Pattern and Move ILS.
2 page(s)
| | Charles Hull, Assist City Manager/CEC/Docket Unit | CEC/T. O'Brien |
35344 | 8/23/2005 |
Notification of Intention to File Complaint.
3 page(s)
| | Chris Allen, General Plant Manager/FPL/CEC/Docket Unit | CEC/T. O'Brien |
35297 | 8/18/2005 |
Metropolitan Water District Land Use Parcel Maps
4 page(s)
| | CEC/Docket | Metropolitan Water District |
35296 | 8/18/2005 |
Aerial Photograph of Proposed Tower Location
1 page(s)
| | CEC/Docket | Tetra Tech/Mudry |
35295 | 8/18/2005 |
Aerial Map
1 page(s)
| | CEC/Docket | BLM/Kalish |
35283 | 8/15/2005 |
Revised Proof of Service. POS
4 page(s)
| | CEC/Docket Unit | CEC |
35223 | 8/11/2005 |
Sign-in sheet for Presentation by Florida Power & Light & Discussion.
3 page(s)
| | CEC/Docket Unit | M. Pryor/CEC |
35192 | 8/9/2005 |
Visual figure of Hinds Pumping Plant and MWD-owned property under 1932 Act.
1 page(s)
| | CEC/Docket Unit | CEC/J. Caswell |
35191 | 8/9/2005 |
1 color map - Julian Hinds Substation MWD
1 page(s)
| | CEC/Docket | CEC/Caswell |
35190 | 8/9/2005 |
System Planning Study for the FPLE Blythe Energy Buck-DPV1 Transmission Project. POS
1 page(s)
| | CEC/Docket Unit | FPL Energy/Gary Palo/Kenneth Stein |
35141 | 8/2/2005 |
Midpoint T-Line Map
2 page(s)
| | CEC/Caswell/Dockets | Tetra Tech EC/Mudry |
35140 | 8/2/2005 |
Alternative Transmission Line Interconnection to Midpoint Substation 8-02-05
2 page(s)
| | CEC/Caswell | Tetra Tech/Mudry |
35092 | 7/28/2005 |
Notification and Request for Comments
20 page(s)
| | Fort McDowell Yavapai Nation/Bear/CEC/Docket Unit | U S Department of the Interior/Acheson |
35091 | 7/28/2005 |
Submission of Materials Related to Tribal Consultation
112 page(s)
| | CEC/Allen/Docket Unit | Department of Energy/Carlson |
34888 | 7/13/2005 |
Status Report #4
6 page(s)
| | CEC/Geesman | CEC/Caswell |
34869 | 7/11/2005 |
Supplemental Analysis: Proposed Route Realignments for Poles #289-305 & New Midpoint Substation Location. POS
11 page(s)
| | CEC/Docket Unit | Blythe Energy, LLC |
34820 | 7/5/2005 |
Supplemental Studies Report
53 page(s)
| | CEC/Docket | Western Area Power Administration/Saber |
34771 | 6/27/2005 |
Systems Planning Study For Blythe Energy Project
143 page(s)
| | Docket Unit | Galati & Bleck |
34732 | 6/23/2005 |
Response to Californians for Renewable Energy (CARE) Letter on Blythe Energy Project Received March 16, 2001
3 page(s)
| | CEC/Keese/Laurie/Dockets | Aspen Environmental Group/Nelson |
34629 | 6/16/2005 |
Application for Confidential Designation and Confidential Draft Cultural Resources inventory Volume II for The Blythe Energy Project.
4 page(s)
| | Docket Unit | Galati & Blek LLP |
34600 | 6/21/2005 |
California ISO's Comments to the System Impact Study for the proposed connection of the Buck Blvd. - Julian Hinds 230kV transmission line to the ISO controlled grid.
13 page(s)
| | SCE/Tucker | CA ISO/Miller |
34590 | 6/14/2005 |
Draft Cultural Resources Inventory of the Proposed Blythe Energy Transmission Project
315 page(s)
| | CEC/Docket | Mooney, Jones & Stokes |
34566 | 6/9/2005 |
Draft - Cultural Resource Inventory of the Proposed Alternate Midpoint Substation - POS
37 page(s)
| | CEC/Dockets | Mooney Jones & Stokes/Carrico/Eckhardt |
34561 | 6/8/2005 |
Application for Confidential Designation and Confidential Draft Cultural Resources Inventory of the Proposed Alternate Midpoint Substation for Blythe Modification
4 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
34559 | 6/9/2005 |
Assessors Parcel Map for the area near the power plant where the transmission line is in the City.
3 page(s)
| | CEC/Stennick | Tetra Tech/Mudry |
34558 | 6/9/2005 |
Department of Transportation's Comments on the Phase 2 PSA
3 page(s)
| | CEC/Caswell | Department of Transportation/Kopulsky |
34377 | 5/19/2005 |
Supplemental Responses to Data Requests re: Soil and Water #65.
16 page(s)
| | CEC/Docket Unit | Blythe Energy, LLC |
34346 | 5/16/2005 |
Report of Conversation between William Eckhardt, Mooney Jones & Stokes, and Joe Nixon, THPO Agua Caliente Band of Cahuilla Indians dated May 16, 2005.
1 page(s)
| | CEC/Docket | Mooney, Jones & Stokes/Eckhardt |
34312 | 5/12/2005 |
Current Proof of Service List for Blythe Energy Project Modification
5 page(s)
| | All Parties/CEC/Dockets | CEC/Read |
33960 | 4/20/2005 |
Native American Heritage Commission's Comments on Blythe T-Line Adjustment
3 page(s)
| | CEC/Reinoehl/docket Unit | Native American Heritage Commission/Gaubatz |
33957 | 4/18/2005 |
Consultation Record from Western
5 page(s)
| | CEC/Docket Unit | Western Area Power Administration |
33956 | 4/18/2005 |
Request for participation in WESTERN, BLM, and CEC's Cultural Resources field trip on April 26, 2005
5 page(s)
| | Hualapai Indian Tribe/Jackson | Western Area Power Administration |
33946 | 2/1/2005 |
Letter Re: Proposal by Blythe Energy, LLC, (Blythe Energy) to Construct or install Electric Power Transmission System Modifications in Riverside County.
6 page(s)
| | Dockets | U.s. Department Of Interior/G. Acheson |
33928 | 4/14/2005 |
Supplemental Responses to Data Requests (Visual Resources data Request # 88)
5 page(s)
| | CEC/Dockets | Blythe Energy |
33921 | 4/13/2005 |
Committee Order Granting Petition to Intervene
4 page(s)
| | CEC/Docket Unit | CEC/Geesman |
33913 | 4/12/2005 |
Notice of Decision by the CEC
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Munro |
33896 | 3/22/2005 |
Information regarding the proposed route of the "Buck to Julian Hinds component" of the transmission line - POS
6 page(s)
| | CEC/Caswell/docket Unit | Desert Southwest Transmission Project/Mooney |
33859 | 4/8/2005 |
Request for case review - BEP II 520 MW Interconnection to Western's Buck Blvd Extended Substation
1 page(s)
| | Aps/Smith/cec/docket Unit | Saber |
33780 | 3/30/2005 |
Preliminary Staff Assessment for the Blythe Energy Transmission Line Modification (PSA)
2 page(s)
| | CEC/Caswell/dockets | So. Coast Air Quaility Mtg. Dist/Smith |
33776 | 3/30/2005 |
DRAFT - Programmatic Agreement Among Western Area Power Administration: Bureau of Land Management, Palm Springs and South Coast Field Offices, Advisory Council on Historic Preservation; and CA State Hiostoric Preservation Office re: the Construction of the Blythe Energy Transmission Project
57 page(s)
| | CEC/Dockets | Blythe Energy |
33759 | 3/28/2005 |
Proposed Protocols for 2005 Spring Surveys
4 page(s)
| | CEC/Docket Unit | CEC/Caswell |
33756 | 3/28/2005 |
Western Final System Impact Study - Buck to Palo Verde Devers Component
317 page(s)
| | CEC/Caswell/docket Unit | Fpl Energy |
33720 | 3/24/2005 |
Comments to correspondence submitted by DSWTP, Bob Mooney, re: route of the Proposed Blythe Transmission Project.
9 page(s)
| | Jack Caswell/Cec/docket Unit | Fpl Energy, Palo |
33712 | 3/22/2005 |
Clarification re: Status Report #3. POS
6 page(s)
| | Commissioner Geesman/Cec/docket Unit | CEC/J. Caswell |
33695 | 3/22/2005 |
Further information re: Staff's evaluation of the proposed route of the "Buck to Julian Hinds component" of the transmission line.
6 page(s)
| | Jack Caswell/Cec/docket Unit | Desert Sourthwest Transmission Project/B. Mooney |
33671 | 3/14/2005 |
Possible Migratory Bird Losses Due to Blythe Energy Project Evaporation Ponds - BIO 6, 7 and 8
3 page(s)
| | Allen/Blythe Airport/cec/dockets | CEC/O'brien |
33670 | 3/14/2005 |
Report of Conversation with Butch Hull, Blythe Airport regarding Update
1 page(s)
| | Dockets | CEC/Adams |
33647 | 3/9/2005 |
Supplemental Information Addressing BLM's Concerns
6 page(s)
| | Dockets | Fpl Energy/Davidson |
33646 | 3/9/2005 |
Supplemental Comments on the Preliminary Staff Assessment - POS
18 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
33637 | 3/7/2005 |
Blythe Energy Project Transmission Line Amendment Response to Data Request No. 63
1 page(s)
| | CEC/Docket Unit | CEC/Caswell List |
33573 | 3/2/2005 |
FPL's Comments California Bureau of Land Management
5 page(s)
| | Ca Blm/Kalish | Fpl Energy/Palo |
33572 | 3/2/2005 |
Staff's Status Report No. 3 - POS
6 page(s)
| | CEC/Geesman/keese | CEC/Caswell |
33500 | 2/23/2005 |
Sign-In Sheets from the PSA Workshop held on February 17 & 18, 2005
3 page(s)
| | CEC/Docket | CEC/Caswell |
33465 | 2/18/2005 |
Staff Analysis of Proposed Modification to Air Quality Conditions of Certification Regarding Startups and Shutdowns
12 page(s)
| | Interested Parties/Dockets | CEC/Munro |
33442 | 2/16/2005 |
Supplemental Analysis Proposed Route Realizements for Milepost 0.5-3.0 and Milepost 64.5-67.4 - POS
16 page(s)
| | CEC/Docket Unit | Blythe Energy/Tetra Tech Fw |
33440 | 2/16/2005 |
Colorado River Board of California's comments on CEC's PSA
6 page(s)
| | CEC/Johnson/docket Unit | Colorado River Board Of California/Zimmerman |
33426 | 2/15/2005 |
Request for a two-month continuance of the Committee Conference and public comment period
14 page(s)
| | CEC/Shaw/docket Unit | Californians For Renewable Energy (care)/Smallwood |
33367 | 2/15/2005 |
Blythe Power Plants' Impact on Aviation Safety.
2 page(s)
| | CEC/Docket Unit | CEC/T. O'brien |
33335 | 2/11/2005 |
Applicants Preliminary Comments on the Preliminary Staff Assessment - POS
16 page(s)
| | CEC/Rodriguez/docket Unit | Galati & Blek/Galati |
33242 | 2/1/2005 |
Letter Re: Proposal by Blythe Energy to Construct or install Electric Power Transmission System Modifications in Riverside County.
6 page(s)
| | Dockets | Bureau of Land Management/G. Acheson |
33220 | 1/28/2005 |
City of Blythe would Grant a Variance to Blythe Energy for the Installation of Transmission Poles Under Conditions
4 page(s)
| | CEC/Richins/dockets | City Of Blythe/Wellman |
33198 | 1/24/2005 |
Preliminary Staff Assessment - Staff Report - POS
450 page(s)
| | Dockets | CEC Cec |
33197 | 1/25/2005 |
Workshop Notice - Preliminary Staff Assessment - Amendment Petition - February 17, 2005 Palm Springs - POS
6 page(s)
| | CEC/Dockets | CEC/O'brian |
33195 | 1/25/2005 |
Notice of Availability Preliminary Staff Assessment
3 page(s)
| | Dockets | CEC/Johnson |
33194 | 1/25/2005 |
Document Handling for Preliminary Staff Assessment
3 page(s)
| | Librarian/Dockets | CEC/Johnson |
33193 | 1/25/2005 |
Request for Agency Participation in the Review of the Blythe Energy Project Transmission Line Modification Amendment Petition Preliminary Staff Assessment
2 page(s)
| | Agency Distribution List/Dockets | CEC/Johnson |
33165 | 1/20/2005 |
Request for 1602 Streambed Alteration Agreement.
52 page(s)
| | Kim Nicol, Ca Dept Of Fish & Game | G. Palo, Fpl Energy |
33164 | 1/20/2005 |
Soil and Water Resources Technical Area Additional Data Needs.
4 page(s)
| | Gary Palo, Fpl Energy/Docket Unit | CEC/J. Caswell |
33121 | 1/18/2005 |
Round 2 Responses to Data Requests. Pos
22 page(s)
| | CEC/Docket Unit | Blythe Energy/Tetra Tech Fw, Inc |
33115 | 1/12/2005 |
Comments re: Meeting December 8, 2004, on the right-of-way for the proposed transmission line which traverses BLM-administered public lands.
3 page(s)
| | Blythe Energy Llc/Docket Unit | Us Dept Interior, Bureau Of Land Management/G. Ach |
33062 | 1/5/2005 |
Blythe Energy Transmission Line Status Report #2.
6 page(s)
| | Chairman Keese, Commissioner Geesman/Docket Unit | CEC/J. Caswell |
33059 | 1/4/2005 |
Blythe Energy's Status Report # 2 - POS
6 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
33058 | 12/1/2004 |
System Impact Study - Blythe Energy, LLC Interconnection Request for Interconnecting Western's Buck Blvd. 161-kV Substation to SCE Palo Verde-Devers # 1 500-k T.L. (Draft) Vol 1 & 2
599 page(s)
| | Dockets | Western/Saber |
33057 | 12/1/2004 |
Petition for Post-Certification Amendment - Data Responses 1-99 - POS
143 page(s)
| | Dockets | Blythe Energy |
33056 | 12/1/2004 |
Attachment DR #32-1 - A Class II Cultural Resources Assessment for the Desert-Southwest Transmission Line, Colorado Desert, Riverside and Imperial Counties, California
256 page(s)
| | Dockets | Asm Affilates, Inc., /Schaefer |
33055 | 12/1/2004 |
System Impact Study-SCE Interconnection Request for Termination of the Julian Hinds
280 page(s)
| | CEC/Docket | Western Area Power Administration |
33020 | 12/28/2004 |
Petition to Intervene. Pos
5 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris Llp/Caithness Blythe I |
33019 | 12/28/2004 |
Updated Proof of Service list
5 page(s)
| | All Parties/Docket Unit | CEC/Fontanilla |
33004 | 12/24/2004 |
Petition for Post-Certification Amendment - Responses to Data Request & Comments from Western Area Power Administration
45 page(s)
| | CEC/Dockets | Blythe Energy |
32996 | 12/24/2004 |
Notice of Inability to Respond and Objections to CEC Staff Data Request Set 2 - POS
5 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
32984 | 12/21/2004 |
Application for Cultural Resources Survey of the Proposed Blythe Energy Transmission Line Project
4 page(s)
| | CEC/Dockets | Balati & Blek/Galati |
32938 | 12/16/2004 |
Blythe Energy Project Transmission Line Modifications Petition Second Set of Data Requests - POS
15 page(s)
| | Fpl Energy/Palo/cec/dockets Unit | CEC/Caswell |
32928 | 12/14/2004 |
Petition for Post-Certification Amendment, Supplemental Response to Data Requests #41, 51, 59, 65, 67, 71, 73n, 74m - POS
162 page(s)
| | CEC/Docket Unit | Blythe Energy/Tetra Tech |
32923 | 12/13/2004 |
Applicant's Status Report No. 1 - POS
6 page(s)
| | CEC/Rodriguez/docket Unit | Galati & Blek/Galati |
32919 | 12/13/2004 |
Blythe Energy Transmission Line Status Report #1 - POS
8 page(s)
| | CEC/Geesman/keese/docket Unit | CEC/Caswell |
32912 | 12/9/2004 |
Comments on Blythe Energy Transmission Line Amendment Data Responses, Filed 11/30/2004. POS
8 page(s)
| | CEC/Docket Unit | Western |
32907 | 12/8/2004 |
Notice of Receipt; Petition to Amend.
3 page(s)
| | CEC/Docket Unit | CEC/T. O'brien |
32896 | 12/7/2004 |
Letter to inform of the proposed project, a brief description, and an invitation to initiate government to government consultation.
8 page(s)
| | Torres-martinez Desert Chuilla Indians/Torres/cec/ | Bureau Of Land Management/Acheson |
32890 | 12/6/2004 |
Committee Scheduling Order. POS
6 page(s)
| | CEC/Docket Unit | CEC Cec |
32870 | 12/2/2004 |
CRBC's Comments to the Petition to Amend the Blythe Energy Power Plant Project Petition.
40 page(s)
| | CEC/Docket Unit | Colorado River Board Of Ca, G. Zimmerman |
32869 | 12/2/2004 |
Preliminary Responses to Questions on Transmission System Engineering Received from the CEC 10/18/04.
90 page(s)
| | CEC/Docket Unit | Blythe Energy |
32868 | 12/2/2004 |
Letter to the Torres-Martinez Desert Cahuilla Indians informing them of the proposed project, provide a brief description, and invitation to initiate government-to-government consultation pursuant to the Executive Memorandum of April 29, 1994, and other applicable laws and regulations.
8 page(s)
| | Torres-martinez Desert Cahuilla Indians | Bureau Of Land Management, Gail Acheson |
32857 | 12/1/2004 |
Petition for Post-Certification Amendment--Data Responses 1 - 99.
1226 page(s)
| | CEC/Docket Unit | Blythe Energy, Llc/Tetra Tech Fw, Inc. |
32769 | 11/17/2004 |
Issue Resolution & Data Request Workshop - Blythe Energy Transmission Line "Meeting Continuation"
5 page(s)
| | CEC/Docket Unit | CEC/Caswell |
32745 | 11/16/2004 |
Outline for Blythe Energy project T/L Modifications - POS
6 page(s)
| | CEC/Docket Unit | CEC Cec |
32744 | 11/16/2004 |
Blythe Transmission Line Project - Height Variance - POS
8 page(s)
| | City Of Blythe/Wellman/cec/docket Unit | Tetra Tech Fw Inc./Mudry |
32732 | 11/10/2004 |
Petition For Air Quality Conditions Modification (cd enclosed).
40 page(s)
| | CEC/S. Munro/docket | Blythe Energy, Llc |
32726 | 11/9/2004 |
Status Report
11 page(s)
| | CEC/Adams/dockets | Arnold & Arnold//arnold |
32721 | 11/10/2004 |
Notice Relating to Data Responses. POS
5 page(s)
| | CEC/Dockets | Blythe Energy/Galati & Blek Llp |
32702 | 11/8/2004 |
Modification to the Proof of Service.
5 page(s)
| | CEC/Dockets/all Parties | CEC/Hao/fontanilla |
32645 | 11/3/2004 |
Blythe Energy Transmission Line Issues Identification Report - POS
13 page(s)
| | Geesman/Keese/dockets | CEC/Caswell |
32633 | 11/1/2004 |
Staff's Data Requests Nos. 1 - 99
42 page(s)
| | Fpl Energy/Palo | CEC/Caswell |
32623 | 11/1/2004 |
Revised Proof of Service List for Blythe Energy Project Modification - POS
5 page(s)
| | All Parties/Cec/docket Unit | CEC/Fontanilla |
32620 | 10/29/2004 |
Current Proof of Service List for Blythe Transmission Line
5 page(s)
| | All Parties/Cec/dockets | CEC Cec Fontanilla |
32619 | 10/29/2004 |
Workshop Notice - Issue Resolution & Data Request Workshop Blythe Energy Transmission Line Amendment - November 15, 2004 - CEC
4 page(s)
| | CEC/Dockets | CEC/O'brian |
32615 | 10/27/2004 |
Blythe Energy Project Modification Proof of Service List
5 page(s)
| | CEC/Dockets/all Parties | CEC/Fontanilla |
32614 | 10/27/2004 |
Western Area Power Administration Data Requests for Blythe Energy Project Transmission Line Modifications Petition for Post-certification Amendment, October 2004 Version.
12 page(s)
| | CEC/Dockets | Mark Wieringa |
32608 | 10/26/2004 |
Notice of Informational Hearing and Site Visit and Bureau of Land Management and Western Area Power Administration Scoping Hearing.
14 page(s)
| | CEC/Dockets | CEC/Geesman/keese |
32604 | 10/26/2004 |
Resolution - Blythe Energy Project Transmission Line Modifications Amendment Petition for Post - Certification, Blythe Energy, LLC (99-AFC-8C)
1 page(s)
| | CEC/Dockets | CEC/Rosenfeld |
32589 | 10/25/2004 |
Report of Conversation - Helicopter Emergency Service (EMS)
1 page(s)
| | CEC/Dockets/diamond | Blythe Ambulance Service/Leslie Watkins |
32570 | 10/20/2004 |
Hearing Officer Assignment
1 page(s)
| | CEC/Commissioners/docket Unit | CEC/Keese |
32564 | 4/27/2005 |
Letter to CEC from BLM dated April 22, 2005 regarding NO Issues in the Initial Review of Blythe Energy's Right-of-Way Application
1 page(s)
| | CEC/Caswell | Blm/Acheson |
32563 | 10/18/2004 |
Letter with description of proposed modifications
2 page(s)
| | City Of Blythe/Crain/cec/docket Unit | CEC/Therkelsen |
32554 | 10/15/2004 |
Additional Information - Petition for Modification
91 page(s)
| | CEC/Caswell/dockets | Tetra Tech/Mudry |
32553 | 10/15/2004 |
Notice of Receipt - Petition to Amend Blythe Energy Power Plant License and Modify the Project to Construction and Operate Two New Transmission Lines and A Substation
2 page(s)
| | Dockets | CEC/Richins |
32552 | 10/15/2004 |
Request for Agency Participation in the Review of the Blythe Energy Petition to Amend the Project Petition
2 page(s)
| | Agency Distribution List | CEC/Richins |
32551 | 10/15/2004 |
Document Handling for Blythe Energy Amendment Petition Request
3 page(s)
| | Librarian/Dockets | CEC/Richins |
32459 | 10/12/2004 |
Blythe Energy Project Transmission Line Modification - Petition for Post-Certification Amendment
1230 page(s)
| | CEC/Therkelsen | Blythe Energy, Llc/Grant |
32451 | 10/12/2004 |
Application for Confidentiality - Request for Confidentiality - Volume II, Preliminary Cultural Resources Survey and Appendix D-2, Archaeological Site Records - Petition for Transmission Amendment
4 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
32239 | 9/2/2004 |
Petition for Air Quality Conditions Modifications
51 page(s)
| | CEC/Munro/docket Unit | Blythe Energy Llc/Allen |
32231 | 8/31/2004 |
Public Workshop - Concerning Aviation Safety Issues Related to Turbulence Created by Power Plant Cooling Towers
3 page(s)
| | CEC/Dockets | CEC/O'brien |
32094 | 8/12/2004 |
Report of Unsafe Landing Conditions at Blythe Airport Resulting From Cooling Tower Turbulence
10 page(s)
| | Blythe Energy Operations/Allen/dockets | CEC/Munro |
31520 | 5/17/2004 |
Response to letter to CEC regarding the Blythe airport, dated April 5, 2004.
5 page(s)
| | CEC/Munro | Wolfe Enterprises/Wolfe |
31421 | 5/10/2004 |
Blythe I Power Plant Impact on Blythe Airport Aviation Safety. POS
5 page(s)
| | CEC/T. O'brien | City Of Blythe/Charles Hull, Assistant City Manage |
31058 | 3/4/2004 |
Record of Conversation between Ken Peterson, CEC, and Charles "Butch" Hull, Assist. City Manager; re: Blythe I/II Aviation Safety.
1 page(s)
| | CEC/Dockets | CEC/K. Peterson |
31051 | 3/4/2004 |
ROC re: Blythe HRSG plumes; James Adams, CEC, Rory Walkins, Blythe resident and pilot.
1 page(s)
| | CEC/Dockets | CEC/J. Adams |
30968 | 2/23/2004 |
Report of Conversation between James Adams, CEC, Ken Peterson, CEC, and Joe Sheble, Sheble's Flight Service, regarding Blythe turbulence.
1 page(s)
| | CEC/Dockets | CEC/J. Adams/k. Peterson |
27171 | 10/29/2002 |
Order Approving Modification of Requirements Related to PM 10 Emissions
3 page(s)
| | CEC/Dockets | CEC/Keese |
26996 | 10/9/2002 |
Cultural Resources Reports for additional 66 acres to Blythe Project Site
17 page(s)
| | CEC/Munro/dockets | CEC/Reinoehl |
26856 | 10/1/2002 |
Notice of Receipt - Request for Post-Certification Change Emission Reduction Credits for Blythe
2 page(s)
| | CEC/Dockets | CEC/O'brien |
26562 | 8/29/2002 |
Notice of Decision by CEC
1 page(s)
| | Office Of Planning/Research/dockets | CEC/Munro |
26505 | 8/20/2002 |
Order Approving Amendment to Add 66-Acre for Deposit of Excess Sediments
9 page(s)
| | CEC/Dockets | CEC/Keese |
26319 | 7/29/2002 |
Comments on Staff Analysis-Amendment to Place Fill Material
8 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
26064 | 7/1/2002 |
Notice of Public Review Period for the Draft Staff Analysis - Petition to Amend the Commission Decision
15 page(s)
| | CEC/Dockets | CEC/O'brien |
25841 | 6/6/2002 |
Blythe Energy LLC's Modified Petition for Approval of Addition of 66 acres to Project Description-Revised Petition I-B
4 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
25163 | 4/3/2002 |
Airport Land Use Commission Development Review
2 page(s)
| | CEC/Pfanner/dockets | Riverside County/Downs |
25021 | 3/12/2002 |
Approval of Request to Add 10 Acres to the Site of the Blythe Energy Project
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/Munro |
24924 | 3/12/2002 |
Notice of Exemption - Approval of Request to Add 10 Acres to the Site
1 page(s)
| | Ofice Of Planning & Research/Dockets | CEC/Munro |
24491 | 2/6/2002 |
Establishment of Post-Certification Mailing List
2 page(s)
| | CEC/Dockets | CEC/Munro |
24489 | 2/6/2002 |
Notice of Receipt - request for post-certification change
2 page(s)
| | CEC/Dockets | CEC/Therkelsen |
24282 | 1/30/2002 |
Petition for Approval of Addition of 66 acres to Project Description-Petition I-B
4 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
24211 | 1/22/2002 |
Change in Parent Company of Blythe Energy LLC
1 page(s)
| | Grattan & Galati/Galati | CEC/Munro |
23807 | 1/4/2002 |
Petition for Transfer of Ownership; Declaration of Christopher T. McCallion and Declaration of Derrel A. Grant
6 page(s)
| | CEC/Munro/dockets | Grattan And Galati/Galati |
23687 | 12/27/2001 |
Approval of Request to Add 10 Acres to Site
2 page(s)
| | Blythe Energy/Lippman/dockets | CEC/Therkelsen |
23192 | 11/26/2001 |
Blythe Energy LLC's Petition for Approval of Addition of 66 Acres to Project Description - Petition I-B
120 page(s)
| | Dockets | Grattan And Galati/Galati |
22964 | 11/5/2001 |
Petition for Approval of Addition of 10 Acres to Project Description-Petition 1-A
18 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
22348 | 9/10/2001 |
Response to Letter Concerning Construction Milestones Requirements in Executive Order D-25-01
7 page(s)
| | Blythe Energy Project/Lippman/cec/dockets | CEC/Herkelsen |
21919 | 8/16/2001 |
Notice of Exemption-Addition of Condition of Certification to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Bruins |
20412 | 5/25/2006 |
Staff Assessment / Draft Environmental Assessment - Staff Report
569 page(s)
| | CEC/ Docket Unit | J. Caswell/ Siting Office |