2106413/8/2016 Removal of the Proof of Service List from the SVEP website (05-AFC-03)

1 page(s)
  Energy Commission Hearing Office
20639410/19/2015 Commission Adoption Order

2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20634610/14/2015 Carol Weed, M.D.'s Comments on TerminatingThree Power Plants

1 page(s)
 CEC/CommissionersCarol Weed, M.D.
20626410/2/2015 Commission Hearing on Committee Order Granting Staff's Motions to Terminate
Notice of 10/14/2015 10:00 a.m. Energy Commission Hearing on Committee Orders DENYING Applicant’s Request for Additional Suspension and GRANTING Energy Commission Staff’s Motions to Terminate Proceedings
2 page(s)
  Energy Commission Hearing Office
2062309/29/2015 Committee Order DENYING Applicant's Request for Additional Suspension and GRANTING Energy Commission Staff's Motion to Terminate
At the October 14, 2015 Business Meeting, the full Energy Commission will consider whether to approve the Order terminating this proceeding.
4 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
2061319/16/2015 Transcript of the August 26, 2015 Committee Hearing
Committee hearing on Applicant's motions to continue suspension and Energy Commission's motions to terminate proceedings.
61 page(s)
 PartiesCalifornia Energy Commission
2058338/26/2015 Sierra Club Comments: On Applicants Request for Additional Suspension

5 page(s)
 CEC/Docket UnitSierra Club
2058328/26/2015 Claire Broome Comments: Terminate this case for the local community and the state

Air Quality, Public Health, Greenhouse Gases
1 page(s)
 CEC/Docket UnitClaire Broome
2058168/25/2015 Background Information in Support of Energy Commission Staff's Motion to Terminate and Opposition to Extending the Suspensions

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2056978/12/2015 Notice of Committee Hearing on Applicant's Motions to Continue Suspension/Energy Commission Staff's Motions to Terminate
August 26, 2015 Hearing at the California Energy Commission
7 page(s)
  Energy Commission Hearing Office
2056938/12/2015 Hearing Adviser Assignment Memo

1 page(s)
  Energy Commission Hearing Office
2055507/29/2015 All Parties and Persons Interested in the Sun Valley Energy Project and San Gabriel Generating Station
Memorandum re Appointment of Single Committee
1 page(s)
 PartiesCalifornia Energy Commission
2053587/15/2015 Valle Del Sol Energy, LLC Response to Energy Commission Staff's Motion to Terminate Proceeding
Applicant's response to staff motion
3 page(s)
 CEC/Docket UnitWinston & Strawn LLP
2053077/9/2015 Notice that Committee Appointments will be reviewed at July 30, 2015 Energy Commission Meeting

1 page(s)
 PartiesEnergy Commission Hearing Office
2051996/30/2015 Valle Del Sol Energy, LLC Request for Additional Suspension
Request for additional twelve month suspension of proceeding
4 page(s)
 CEC/Docket UnitWinston & Strawn LLP
2051956/30/2015 Motion to Terminate Proceeding

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2048126/1/2015 Valle Del Sol Energy, LLC Quarterly Status Report

2 page(s)
 CEC/Docket UnitWinston & Strawn LLP
2038683/12/2015 Memo re: Merger of Hearing and Chief Counsel's Offices

1 page(s)
 All Parties and Persons Interested in this ProceedingEnergy Commission Hearing Office
2037553/2/2015 Valle Del Sol Energy, LLC Quarterly Status Report
Applicant's status report
2 page(s)
 CEC/Docket UnitWinston & Strawn LLP
20338912/1/2014 Valle Del Sol Energy, LLC Quarterly Status Report

2 page(s)
 CEC/Dockets UnitWinston & Strawn LLP
2030048/29/2014 Valle Del Sol Energy, LLC Quarterly Status Report

2 page(s)
 CEC/Dockets UnitWinston & Strawn LLP
2026306/30/2014 Order Extending Suspension of Proceedings

1 page(s)
 PartiesCalifornia Energy Commission
2024476/10/2014 Applicant's Request for Additional Suspension
Request for additional suspension of the proceeding
6 page(s)
  Winston & Strawn LLP
2024276/6/2014 Sun Valley Energy Project's Status Report #31

1 page(s)
 CEC/Keith WinsteadNRG Energy
2023095/7/2014 Status Report #30 for the Sun Valley Energy Project (05-AFC-03)

1 page(s)
 CEC / Keith WinsteadNRG Energy
2019714/7/2014 Status Report #29

1 page(s)
 CEC/Keith WinsteadValle Del Sol Energy, LLC
2018303/4/2014 Status Report #28 for the Sun Valley Energy Project (05-AFC-03)
NA
1 page(s)
  Edison Mission Energy
2016572/6/2014 Status Report #27 for the Sun Valley Energy Project (05-AFC-03)

Introduction
1 page(s)
 CEC/Keith WinsteadDowney Brand LLP
2015121/6/2014 Sun Valley Energy Status Report #26

1 page(s)
 Keith Winstead, Siting Project ManagerDowney Brand LLP
20106710/28/2013 Revised General Orders Regarding Electronic Filing, etc
Committee Orders re Use of Electronic Filing System (mandatory after 11-01-13), format of documents, exhibits, motions, and transcripts
18 page(s)
 PartiesEnergy Commission Hearing Office
2001208/7/2013 CEQA and Land Use Notice Request
Laborers lnternational Union of North America, Local Union1184 and LiUNA
  Lozeau Drury LLP
712316/11/2013 Order Extending Suspension of Proceeding

3 page(s)
 CEC/Docket UnitCEC/K.Douglas /R.Weisenmiller
710936/3/2013 Sun Valley's Project Status Report Number 25

3 page(s)
 CEC/K.WinsteadApplicant/Sun Valley Energy Project/Valle Del Sol Energy, LLC/H.MacLeod
708075/14/2013 Sun Valley Energy Project's Extension Request for Suspension

4 page(s)
 CEC/K.Douglas /R.WeisenmillerApplicant/Sun Valley Energy Project/Valle Del Sol Energy, LLC/J.Lee
708045/14/2013 Sun Valley Energy Project's Status Report Number 24

3 page(s)
 CEC/K.WinsteadApplicant/Sun Valley Energy/Valle Del Sol Energy, LLC/H.MacLeod
705775/3/2013 Sun Valley Energy Project's Status Report Number 24

3 page(s)
 CEC/K. WinsteadValle Del Sol Energy, LLC
701854/2/2013 Applicant's Status Report No.23

3 page(s)
 CEC/K.WinsteadApplicant/Valle Del Sol Energy, LLC/H.MacLeod
700453/25/2013 CEC Hearing Advisor Paul Kramer's Email re Change in the Process for Obtaining the Current Proof of Service List

1 page(s)
 Proof of ServiceCEC/P.Kramer
697513/1/2013 Applicant's Status Report 22

3 page(s)
 CEC/ K. WinsteadApplicant/ Valley Del Sol Energy LLC
693922/5/2013 All Parties Letter and Newly Revised Proof of Service

4 page(s)
 All PartiesCEC/R.Avalos
693862/5/2013 Sun Valley Energy's Status Report Number 21

3 page(s)
 CEC/K.WinsteadValle Del Sol Energy, LLC/H.MacLeod
6896612/21/2012 Sun Valley Energy's Status Report Number 20

3 page(s)
 CEC/R.WorlApplicant/Valle Del Sol Energy LLC/H.MacLeod
6874012/3/2012 Status Report No. 19

3 page(s)
 CEC/R.WorlApplicant/Valle Del Sol Energy LLC/H.MacLeod
6827711/1/2012 Sun Valley Energy's Status Report Number 18

3 page(s)
 CEC/R. WorlValle De Sol Energ, LLC
6741810/2/2012 Applicant's Status Report Number 17

3 page(s)
 CEC/R.WorlValle Del Sol Energy, LLC/H.MacLeod
669909/4/2012 Applicant's Status Report Number 16

3 page(s)
 CEC/R.WorlValle Del Sol Energy, LLC/ H.MacLeod
667078/16/2012 All Parties Letter

4 page(s)
 All PartiesCEC/J.Clay
667068/16/2012 General Orders

5 page(s)
 CEC/Docket UnitCEC/K.Douglas
664098/1/2012 Status Report no.15

3 page(s)
 CEC/R.WorlValle Del Sol Energy/H.MacLeod
663805/2/2012 Status Report no.13

3 page(s)
 CEC/R.WorlValle Del Sol Energy LLC/H.Macleod
661267/5/2012 Hearing Officer Assignment

1 page(s)
 CEC/All CommissionersCEC/R.Weisenmiller
660717/2/2012 Status Report no.14

3 page(s)
 CEC/R.WorlValle Del Sol/H.Macleod
658676/20/2012 All Parties Letter

4 page(s)
 All PartiesCEC/J.Clay
658666/20/2012 Order Reinstating Suspension

3 page(s)
 CEC/Docket UnitCEC/K.Douglas
654545/25/2012 Request for an Additional 12 Month Suspension

5 page(s)
 CEC/K.Douglas/R.WeisenmillerApplicant/Downey Brand/J.Luckhardt
649474/26/2012 All Parties Letter Regarding Newly Revised Proof of Service

4 page(s)
 CEC/ Docket UnitCEC/ R. Avalos
645823/28/2012 Record of Conversation with Robert Worl and EME's Jennifer Morris-Lee and Heather MacLeod Regarding Forward Plans for SVEP into 2012

1 page(s)
 CEC/Dockets UnitCEC/C.Jackson
645674/3/2012 All Parties Letter

4 page(s)
 All PartiesCEC. Hearing Office
645113/30/2012 Applicant's Status Report #12

3 page(s)
 CEC/ R. WorlValley De Sol/ H. Mecleod
638822/29/2012 Status Report #11

3 page(s)
 CEC/R.WorlDowney Brand/L.Navarrot
634651/26/2012 Status Report #10

3 page(s)
 CEC / R. WorlVDSE, LLC / H. MacLeod
6309512/9/2011 Request for Name Change for Intervenor Anthony Rosilez

1 page(s)
 CEC/ Docket UnitRomoland School District
6301812/1/2011 Letter Regarding Newly Revised Proof of Service

4 page(s)
 All PartiesCEC/ R. Avalos
6298011/23/2011 Applicant's Status Report #9

3 page(s)
 CEC/ R. WorlValle De Sol Energy/ H. MacLeod
608585/31/2011 Order Suspending Proceeding

4 page(s)
 CEC/ Dokcet UnitCEC/ R. Weisenmiller
606055/10/2011 Edison Mission Energy's Request for Suspension

5 page(s)
 CEC/ Docket UnitGalati Blek
563234/20/2010 Notice of Opportunity to File Statements of Concern re Eileen Allen

7 page(s)
 CEC/Docket UnitCEC/M. Read
555122/22/2010 Newly Revised POS List

4 page(s)
 All PartiesCEC/R. Avalos
550551/27/2010 Letter Regarding Newly Revised POS List

4 page(s)
 All PartiesCEC/R. Avalos
532299/16/2009 All Parties Letter Regarding Newly Revised Proof of Service

4 page(s)
 All PartiesCEC/ R. Avalos
519266/10/2009 Valle Del Sol Energy, LLC's Letter in Response to the Energy Commission's Letter Regarding Emission Reduction Credits

5 page(s)
 CEC/M. JonesValle Del Sol Energy/L. Kostrzewa
514915/8/2009 Status of Your AFC & Schedule for Air Quality Offsets

4 page(s)
 Valle Del Sol Energy/ L. KostrzewaCEC/ M. Jones
505303/16/2009 Applicant's Response to South Coast Air Quality Management District's ERC Plan

4 page(s)
 SCAQMD/B. WallersteinValle Del Sol Energy/L. Kostrzewa
502922/26/2009 All Parties Letter and New Proof of Service List

4 page(s)
 CEC/Docket UnitCEC/R. Avalos
502642/25/2009 Letter from Riverside County Transpotation Commission Regarding Application for Private, Temporary, Railroad Crossing

3 page(s)
 Edison Mission Energy/V. YamadaRCTC/G. Gallagher
502602/25/2009 EME Application for a Private, Temporary, Railroad Crossing

9 page(s)
 CEC/ A. SolomonEdision Mission Energy/ Victor Yamada
502132/23/2009 All Parties Letter and New Proof of Service List

4 page(s)
 CEC/Docket UnitCEC/R. Avalos
499642/2/2009 Memo Re Revised Proof of Service List

3 page(s)
 CEC/ Docket UnitCEC/ R. Avalos
499612/2/2009 All Parties Letter

3 page(s)
 CEC/ Docket UnitCEC/ R. Avalos
479659/10/2008 NSR PM 2.5 Requirements

2 page(s)
 SCAQMA/ K. CoatsEdison Mission Energy
474798/6/2008 SCAQMD Request - PM2.5 info per NSR update

1 page(s)
 Valle Del Sol, LLC/ V. YamadaSCAQMD/ M. Nazemi
469277/7/2008 ROC with Riverside County Transportation Commission, CPUC regarding rail line crossing for project construction

1 page(s)
 CEC/ Docket UnitCEC/ J. Adams
467606/18/2008 SVEP Remaining Purchase of VOC ERCs

1 page(s)
 CEC/J. LoyerEHS/V. Yamada
465045/30/2008 E-mail regarding the district's boundaries

1 page(s)
 CEC/ J. AdamsRomoland School District/ B. Plough
462815/12/2008 Report of Conversation: Email from V. Yamada of Edison Mission Group to R. Worl Providing a Revised Project Commercial Operation Date to 6/2011

1 page(s)
 CEC/Docket UnitCEC/R. Worl
461685/2/2008 Final Determination of Compliance (FDOC) for Edison Mission Energy's (EME's) Proposed Valle Del Sol Energy, LLC (VSE) Project (Facility ID No. 146534), To Be Located at 29500 Rouse Road, Romoland, CA 92585; (05-AFC-3)

120 page(s)
 CEC/R. WorlSCAQMD/M. Nazemi
457323/21/2008 Updated POS List as of March. 21, 2008

3 page(s)
 CEC/ All PartiesCEC/ M. Read
456923/14/2008 Energy Commission Order No. 08-0312-6 RE: Siting Committees

4 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
456593/17/2008 Status Report #8

5 page(s)
 CEC/ Docket UnitCEC. M. Dyas
454632/26/2008 Third Errata to Presiding Member's Proposed Decision

2 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
454622/26/2008 SVEP - PR Letter to Update Public

2 page(s)
 PublicSVEP / L. Kostrzewa
453452/14/2008 Revised Preliminary Determination of Compliance for Ediston Mission Energy's Balle Del Sol Energy Project

170 page(s)
 CEC / B. WorlSCAQMD / M. Nazemi
452762/6/2008 Status Report Number 5

7 page(s)
 CEC/A. HockadayGalati & Blek/M. Cosens
443361/15/2008 January 7, 2008 Letter from Department of the Army, Los Angeles District, Corps of Engineers Containing an Approved Jurisdictional Determination

14 page(s)
 CEC/ R. WorlCH2MHILL/ J. Harris for D. Davy
441411/11/2008 Letter from Dept of Army Regarding Jurisdictional Determination Request

2 page(s)
 CH2MHILL / D. DavyDept of Army / D. Swenson
4384812/21/2007 Status Report #7 for the Sun Valley Energy Project

5 page(s)
 CEC / Docket UnitCEC / B. Worl
4350311/27/2007 Changes to Figures for Drainage for Edison Mission Energy Sun Valley Energy Project

9 page(s)
 U.S. Army Corps of Engineers / M. StalderCHM2HILL / D. Davy
4337311/15/2007 Report of Conversation Regarding Sun Valley PSA Comments

5 page(s)
 CEC / Docket UnitCEC / R/ Worl
4298510/24/2007 Email re Sun Valley Project Site Visit with Corps Engineers

1 page(s)
 CEC / R. WorlCH2M HILL / D. Davy
4297410/23/2007 Mailed out POS VSE to SCAQMD: Priority Reserve Rule Compliance Statemen

12 page(s)
 CEC / R. WorlEME / V. Yamada
4264210/4/2007 Report of Conversation Cumulative Analysis For SVEP-Homeland /Romoland Area Drainage Plan

1 page(s)
 CEC / Docket UnitCEC / J. Diamond
423429/18/2007 SCAQMD Comments to Valle Del Sol, LLC Renewable/Alternative Energy Criteria

1 page(s)
 Valle Del Sol, LLC / V. YamadaSCAQMD / M. Nazemi
421118/29/2007 Status Report #6 for the Sun Valley Energy Project

5 page(s)
 CEC/J. Geesman/J.PfannenstielCEC/R. Worl
420818/27/2007 Environmental Protection Agency Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes

4 page(s)
 CECFederal Register
419768/21/2007 Letter regarding Amended Rule 1309.1, and additional criteria.

3 page(s)
 Valle del Sol, LLC/ V. YamadaSCAQMD/ M. Nazemi
419618/20/2007 Letter to Pechanga Indian Reservation in response to their Comments

4 page(s)
 Pechanga Indian Reservation/L. MirandaCEC/B. Worl
416147/23/2007 Cultural Resources Treatment and Disposition Agreement

8 page(s)
 CEC/ B. Worl/ B. BastianSoboba Band of Luiseno Indians/ R. Salgado
416137/23/2007 Report of Conversation- Beverly Bastian with D. Singleton re: Native American groups which could be named most likely Descendents for the SVEP project, if human remains should be found.

1 page(s)
 CEC/ Dockets UnitCEC/ B. Worl
415555/16/2007 Sun Valley Preliminary Staff Assessment

561 page(s)
 CEC/Docket UnitCEC/B. Worl
414317/6/2007 Preliminary Staff Assesment Workshop- Part I Workshop Notes Part II Comments on an Suggested Wording for Conditions of Certification

16 page(s)
 CEC/ Dockets UnitCEC/ B. Worl
413307/3/2007 Comments on the PSA

8 page(s)
 CEC/B. WorlPechanga Indian Reservation/L. Miranda
412746/29/2007 Request for Energy Comments on the PSA for the Sun Valley Energy Project

5 page(s)
 CEC/ R. WorlSCCOB/ Cypress Office/ G. Holmes
410546/19/2007 Phase II Environmental Site Assessment--Soil Investigation Results, dated Jan. 15, 2007, and Additional Soil Investigation Results, dated May 7, 2007 (POS attached, by J. Harris).

94 page(s)
 CEC/ R. WorlCH2MHILL/ J. Harris for D. Davy
409546/12/2007 Community Outreach Report: For communications from October 2005 to the present.

106 page(s)
 CEC/ R. WorlEdison/ TMG Communications/ A. Eventov
408546/7/2007 ROC, electronic mail, RE Volatile Organic Compounds calculations and offset requirements.

1 page(s)
 Joe LoyerAQMD/ K. Coats
408136/5/2007 Native American Consultation Calls 06-05-07

5 page(s)
 CEC/Dockets UnitCEC/ R. Worl
406375/29/2007 Valle del Sol Energy, LLC's Comments on the Preliminary Staff Assessment (POS, by M. Cosens, attached).

21 page(s)
 CEC/ R. Rodriguez/ Dockets UnitGalati & Blek/ M. Cosens/ S. Galati
404865/18/2007 SUN VALLEY PSA WORKSHOP NOTICE

5 page(s)
 PUBLICCEC/T. OBRIEN
404735/16/2007 NOTICE OF AVAILABILITY FOR SUN VALLEY PSA

2 page(s)
 PUBLICCEC/R. JOHNSON
404725/16/2007 AGENCY LETTER FOR SUN VALLEY PSA

10 page(s)
 AGENCIESCEC/R. JOHNSON
404715/16/2007 LIBRARY LETTER FOR SUN VALLEY PSA

30 page(s)
 LIBRARIESCEC/R. JOHNSON
402175/1/2007 Riverside County Researh for Area Projects

6 page(s)
 CEC/J. AdamsRiverside County Planning Dept/R. Brady
398944/5/2007 Riverside County Advisory Conditional Use Permit for SUEP

45 page(s)
 CEC/R. WorlCounty of Riverside/J. Tavaglione
398714/4/2007 ROC R. Brady County of Riverside Re: Zoning for SUEP

1 page(s)
 Docket UnitCEC/A. Stennick
397473/23/2007 POS List

1 page(s)
 Docket UnitCEC/C. Hillhouse
397233/22/2007 ROC USFWS on Nitrogen

1 page(s)
 CEC/Docket UnitCEC/J. Mathis
397223/22/2007 ROC USFWS on Nitrogen

1 page(s)
 CEC/Docket UnitCEC/J. Mathis
396863/20/2007 AQMD Rule 1309-Priority Reserve Additional info

13 page(s)
 CEC/T. O'Brien/Docket UnitSCAQMD/M. Nazemi
396643/19/2007 POS List

3 page(s)
 Docket UnitCEC/C. Hillhouse
396407/7/2006 Supplement II on Response to The Data Request 1 through 93 and The April 25 Workshop Queries in Support of The AFC for The Sun Valley Project.

48 page(s)
 CEC/R. Worl/Docket UnitCH2MHill/D. Davy
395527/7/2006 Supplement II in response to data requests (#1-93)

44 page(s)
 CEC/ B. WorlCH2MHill
394483/1/2007 CH2M Hill Tech Memo RE Drainage Features and Letters seeking Comment from USACE, SARWQCB, and CDFG

9 page(s)
 CEC/ R. WorlCH2M Hill/ D. Davy
394473/1/2007 Calif. Dept. of Fish and Game Statement that SVEP will not need a Streambed Alteration Agreement.

2 page(s)
 CEC/ R. WorlCH2M Hill/ D. Davy
394463/1/2007 Santa Ana Reg. & Water Quality Control Board, SVEP subject to SWRCB General Construction Permit.

2 page(s)
 CEC/ R. WorlCH2M Hill/ D. Davy
394373/1/2007 US FOREST SERVICE TO SCAQMD POTENTIAL IMPACTS OF SVEP

5 page(s)
 SCAQMD/M. MILLSUSDA/J. EVANS
394162/28/2007 AIR DISTRICT UPDATE AND SCHEDULE CORRECTION FOR STATUS REPORT #5

3 page(s)
 CEC/J. GEESMAN, J. PFANNENSTIELCEC/R. WORL
393902/26/2007 STATUS REPORT #5

5 page(s)
 CEC/R. WORLCEC/J. GEESMAN, J. PFANNENSTIEL
393542/22/2007 ROC between J. Adams and R. Skumawitz regarding the School children saftey crossing SR-74.

1 page(s)
 Docket UnitCEC/ J. Adams
391542/2/2007 SCAQMD PDOC AND POS

6 page(s)
 CEC/R. WORLSCAQMD/M. MILLS
391021/29/2007 PDOC FROM SCAQMD PLUS POS

69 page(s)
 CEC/R. WORLSCAQMD/M. MILLS
389561/18/2007 ROC with Nevada Hydro RE LEAPS Project

1 page(s)
 Docket UnitCEC/ J. Diamond
389541/18/2007 L. Prescott's ROC with GE Reps

1 page(s)
 Docket UnitCEC/ R. Worl/ L. Prescott
389401/16/2007 Supplemental Cultural Resources Survey

6 page(s)
 CEC/ R. WorlCH2M Hill/ D.M. Davy
3878012/27/2006 Traffice information request by Valle Del Sol Energy LLC August 3, 2006 - Response to June 6, 2006 Letter and POS.

4 page(s)
 R. Worl / CECH. Swain/ Romoland School District.
3869212/18/2006 Repeated request for confidential designation and data for air quality status report # 4

4 page(s)
 CEC/ Dockets UnitSVEP/ S. Galati
3865212/14/2006 Landscape plan for Sun Valley

1 page(s)
 CEC/ DocketsCEC
3863112/13/2006 Adam Fischer of the Santa Ana Regional Water Quality Control Board regarding potential effects of nonreclaimable water pipeline.

1 page(s)
 CEC/ B. WorlCH2MHill/ D. Davy
3858912/8/2006 Landscape Plan in support of the AFC.

12 page(s)
 CEC/ B. WorlCH2MHill/ D. Davy
3858012/8/2006 Traffic Information Request by Valle del Sol Energy, LLC, August 3, 2006, Responding to the Romoland School District's June 6, 2006 letter

11 page(s)
 Romoland School District/R. Skumawitz/CEC/Docket UnitCEC/R. Worl
3837911/13/2006 Supplement IV in Response to Data Requests and Workshop Queries

31 page(s)
 CEC/ B.WorlCH2MHill/D.Davy
3837811/13/2006 ROC mwith Nevada Hydro regarding LEAPS Project Included for Cumulative Socioeconomic Analysis of SVEP.

1 page(s)
 Docket UnitCEC/ J. Diamond
378519/12/2006 ROC - Beverly Bastian of CEC and Jim Fagelson, Cultural Resources Specialist for Riverside County Plannign Dept.

1 page(s)
 Docket UnitB. Worl / B. bastian / CEC
378489/12/2006 ROC - with Robert Worl of CEC and Doug Davy of CH2MHILL Project Manager for SVEP - 2 90 Foot High Monopoles

1 page(s)
 Docket UnitB. Worl / CEC
377859/1/2006 Supplement III in Response to DAta Requests 1 through 93 and April 25 Workshop Queries in Support of the AFC for the Sun Valley Energy Project.

86 page(s)
 CEC/R. WorlCH2MHill/D. Davy
377718/29/2006 Repeated Request for Confidential Designation Air Quality Status Report No. 2 and Offset Strategy.

4 page(s)
 B.B. Blevins /CECGalati & Blek LLP
376298/9/2006 CEC Status Report #3

7 page(s)
 CEC/Geesman/Pfannenstiel/Docket UnitCEC/R. Worl
375978/7/2006 Romoland School District Letter Re: Sun Valley Energy Project

8 page(s)
 Romoland School District/ C. Bohn, I. Harris, G. Reller, B. Yost, and R. SkumawitzValle del Sol Energy LLC/L. Kostrzewa
375568/3/2006 Supplemental Request for Confidential Designation and Confidential Cultural Resources Report

10 page(s)
 CEC/B.B. BlevinsGalati & Blek/S. Galati
374917/25/2006 RE Sun Valley Energy Project - Riverside County's Input as to wether the proposed facility complies with relevant local land use laws, ordinances, regulations and standards.

48 page(s)
 R. Worl/ CECR. Brady - Planning Department/ County of Riverside Transportation and Land Management Agency
374767/24/2006 Attached Email from CA Air Resources Board and Letter from CH2M Hill regarding the Health Risk Assessment completed for Walnut Creek and for Sun Valley

5 page(s)
 Dockets UnitL. Prescott/CEC
373127/10/2006 Request for Entry into the NOx and SOx RECLAIM Program

2 page(s)
 T. J. McCabe/ Edison Mission EnergySouth Coast AQMD/ M. Nazemi
371996/27/2006 Report of Conversation with Doug Davy, CH2M Hill Project Manager

1 page(s)
 Docket UnitR. Worl
371686/23/2006 Sun Valley Energy Project Data Requests

6 page(s)
 Edison Mission Energy/T. McCabeCEC/R. Worl
371556/22/2006 Letter of support for the development to Edison Mission Group's Sun Valley Energy Project in the Romoland area of Western Riverside County.

1 page(s)
 CEC/R. WorlHarvest Valley Community Council/G. O'Brien
371056/14/2006 Sun Valley Energy Project / Western Riverside County MSHCP

4 page(s)
 CEC/J. Mathias/Docket UnitU S Fish and Wildlife / S. Brown
370746/8/2006 Comments from Romoland School District Issues and Concerns about the Proposed Sun Valley Energy Project Application for Certification and POS

8 page(s)
 R. Worl / Docket UnitP. Whales for R. Skumawitz / Romoland School District
370656/1/2006 Supplement 1 in Response to Data Requests 1 -- 80 and April 25 Workshop Queries.

39 page(s)
 R. WorlCH2MILL
370635/24/2006 Information Regarding Romoland School District Facilities and Potential Impacts from the Proposed Sun Valley Energy Project

5 page(s)
 Romoland School District/R. Skumawitz/CEC/Docket UnitCEC/Worl
370516/1/2006 Valle Del Sol LLC's Supplement in Response to Data Request 1 -- 80, and the April 25 Workshop Queries, in Support of the Application for Certification for the Sun Valley Energy Project.

41 page(s)
 R. Worl / Docket UnitCH2MHILL/ D. M. Davy
370325/26/2006 Status Report # 2 for the Sun Valley Energy Project.

3 page(s)
 J. L. Geesman / J. Pfannenstiel / Docket UnitR. Worl / CEC
370235/26/2006 Request for NOx and SOx RECLAIM Program Applicability for Sun Valley Project

1 page(s)
 CEC/B. WorlEdison/TMC
370115/22/2006 Order Granting Petition to Intervene and POS

3 page(s)
 Docket UnitJ. L. Geesman / J. Pfannenstiel / CEC
369735/19/2006 Menifee Valley Chamber of Commerce's approval of the resolution supporting development of the Sun Valley Energy Project

5 page(s)
 CEC/Docket UnitMenifee Valley Chamber of Commerce
369505/16/2006 ARB's comments on the health risk assessment (HRA) for the Sun Valley Energy Project.

2 page(s)
 Robert WorlStephanie Kato
368905/5/2006 David Milner CAISO review of the EME Sun Valley Generation Facility

4 page(s)
 CEC/Worl/Docket UnitCEC/Arachchige
368895/4/2006 Data Response and Issues Resolution Workshop Sign in sheet.

3 page(s)
 Docket UnitCEC/ B. Worl
368885/4/2006 Letter Perris Valley Chamber of Commerce Resolution in Support of Sun Valley Energy Project-- Meeting on April 18, 2006 Board of Directors of Perris Valley Chamber of Commerce approved the Attached Resolution Supporting Development of Peak load Power Plant in Romoland, California.

2 page(s)
 Docket Unit/ A. WiensPerris Valley Chamber of Commerce/ D. G. Stuart
368835/3/2006 Edison Mission Energy's Repeated Request for Confidential Designation Confidential Air Quality Status Report No. 1 Confidential Offset Strategy

5 page(s)
 CEC/Blevins/Docket UnitGalati & Blek/Mills
368815/3/2006 Cultural Resources Application for Confidentiality

2 page(s)
 Galati & Blek/Galati/CEC/Docket UnitCEC/Blevins
368735/1/2006 Applicant's Responses to CEC Staff Data Requests 81-90.

202 page(s)
 CEC/R. WorlCH2MHILL/D. Davy
367864/19/2006 Status Report No. 1. POS

4 page(s)
 B. B. Blevins/CEC/Docket UnitGalati & Blek LLP/Sun Valley Energy Project
367854/19/2006 Request for Confidential Designation; Confidential Cultural Report. POS

60 page(s)
 B. B. Blevins/CEC/Docket UnitGalati & Blek/Sun Valley Energy Park
367614/17/2006 Applicants Responses to CEC Staff Data Requests 1-80 Sun Valley

191 page(s)
 Docket UnitCH2MHILL
367434/14/2006 Petition for Intervention

4 page(s)
 CEC/GeesmanRomoland School District/Skumawitz
367394/14/2006 Status Report

5 page(s)
 CEC/Geesman/Pfannenstiel/Docket UnitCEC/Worl
367384/13/2006 Informational letter and briefing availability

1 page(s)
 California State Senate/Battin/CEC/Docket UnitCEC/Desmond
367374/13/2006 Informational letter and briefing availability

1 page(s)
 California State Assembly/Bogh/CEC/Docket UnitCEC/Desmond
367294/13/2006 Comments on Priority Reserve Amended Rule 1309.1

1 page(s)
 Docket UnitCEC
367234/12/2006 Notice of Data Response and Issues Resolution Staff Workshop

3 page(s)
 CEC/Interested Parties/Docket UnitCEC/O'Brien
366614/4/2006 Comments from the public regarding the Sun Valley Energy Project.

9 page(s)
 CEC/Docket UnitCEC/R. Worl
366423/30/2006 Data Requests

8 page(s)
 Edison Mission Energy/McCabe/CEC/Docket UnitCEC/Worl
366403/28/2006 Comment Letter

5 page(s)
 CEC/Docket UnitSoboba Band of Luiseno Indians/Arres
366313/23/2006 Potential impacts to the properties of traditional religious and cultural significance to the Augustine Band

4 page(s)
 CEC/Richins/Docket UnitAugustine Band of Cahuilla Indians/Green
366243/22/2006 Comments regarding the AFC, Informational Meeting, and Site Visit. POS

4 page(s)
 Nicholas Barsch/CEC/Docket UnitRamona Band of Cahuilla/J. Hamilton
366143/20/2006 Letter in response to your request for Native American consultation on the above referenced project.

1 page(s)
 Docket UnitCupa Culture Center / S. C. Gaughen
366133/20/2006 Sun Valley Letters From the Public.

20 page(s)
 Docket UnitCEC
366113/20/2006 REVISED Comments from the Romoland School District on the AFC for Sun Valley.

8 page(s)
 Mr. Robert Worl/Mr. Roger Johnson/CEC/Docket UnitRomoland School District
365473/16/2006 Comments for the Romoland School District. POS

7 page(s)
 Robert Worl/Roger Johnson/CEC/Docket UnitRomoland School Dist/R. Skumawitz, Superintendent
365363/15/2006 Data Requests. POS

27 page(s)
 Mr. Tom McCabe/CEC/Docket UnitCEC/R. Worl
365023/9/2006 Letter From Augustine Band of Cahuilla Indians Regarding Potential Impact of Properties With Traditional Religious and Cultural Significance

1 page(s)
 CEC/N. BartschAugustine Band of Cahuilla Indians/Mary Ann Green
364783/6/2006 Committee Scheduling Order. POS

6 page(s)
 CEC/Docket UnitCEC/Commissioners Geesman & Pfannenstiel
364673/3/2006 Re: Edison Mission Group's Proposed Power Plant

1 page(s)
 Docket UnitR. Worl / CEC
364663/3/2006 Global Economic & Workforce Development Coallition

1 page(s)
 Docket UnitCEC/ B. Worl
364653/3/2006 Sun Valley Energy Project Application for Certification and Supplement in Response to Data Adequacy Review.

5 page(s)
 Docket UnitCEC/ B. Worl
364233/1/2006 Proposed New Power Plant Near Romoland, County of Riverside

39 page(s)
 Representatives of Native American CommunitiesCEC/P. Richins
364223/1/2006 Newspaper Clipping Regarding Informational Hearing and Site Visit

1 page(s)
 CEC/ Docket UnitThe Press - Enterprise
364213/1/2006 Proposed Sun Valley Energy Project Application for Certification

3 page(s)
 CEC/R. Johnson and R. WorlThe Planning Center/R. Skumawitz
364203/1/2006 Endorsement Letters for Sun Valley Power Plant

24 page(s)
 CEC/B. WorlResidents
363912/23/2006 Letter Sun Valley re: December 2005 letter re: application for certification to construct 500 MW.

3 page(s)
 Docket UnitCEC/ B. Worl
363872/22/2006 Tribe will not be able to participate in the workshop. However, wants to be allowed to participate in the environmental approval process

2 page(s)
 CEC/Docket UnitMorongo Band of Mission Indians/Wilson
363852/21/2006 VSE's Proposed Schedule

5 page(s)
 CEC/Docket UnitGalati & Blek/Galati
363822/21/2006 Issue Identification Report - POS

13 page(s)
 CEC/Geesman/Pfannenstiel/Docket UnitCEC/Worl
363702/16/2006 Oder Granting Petition To Intervene Sun Valley

4 page(s)
 Docket UnitCEC
363592/9/2006 Notice of Receipt - Supplemental Information for the Sun Valley Energy Project

2 page(s)
 General DistributionCEC/R. Johnson
363582/10/2006 Petition to Intervene by California Unions For Reliable Energy

5 page(s)
 CECAttorneys for the California Unions For Reliable Energy
363452/7/2006 Request for Agency Participation in the Review of the AFC

2 page(s)
 Agency Distribution List/CEC/Docket UnitCEC/Johnson
363442/7/2006 Supplemental AFC Information

2 page(s)
 Librarian/CEC/Docket UnitCEC/Johnson
363432/7/2006 Notice of Public Informational Presentation and Site Visit - POS

8 page(s)
 CEC/Docket UnitCEC/Geesman/Pfannenstiel
363192/2/2006 Hearing Officer Assignment Sun Valley Power Project Docket No. 05-AFC-3

1 page(s)
 Docket Unit/ ALL COMMISSIONERSCHAIRMAN DESMOND
363182/2/2006 Confidential Offset Strategy, Confidentially Application, Sun Valley Energy Project, Docket No. 05-AFC-3

3 page(s)
 Docket UnitCEC
363052/1/2006 PM10 Significance Modeling

2 page(s)
 CEC/R. WorlEdison Mission Energy
362881/30/2006 Revised Sun Valley Energy Project Data Adequacy Recommendation

28 page(s)
 Docket UnitCEC
362491/25/2006 Supplemental Request for Confidential Designation Confidential Offset Strategy

7 page(s)
 CEC/Blevins/Docket UnitGalati & Blek/Galati
362081/13/2006 Supplement in Response to Data Adequacy Comments on the AFC for Sun Valley

35 page(s)
 CEC/Blevins/Docket UnitEdison Mission Energy/Scilacci
362061/17/2006 Paleontological Resources Application for Confidentiality

2 page(s)
 Counsel for Edison Mission Energy/Galati/CEC/Docket UnitCEC/Blevins
361911/13/2006 Follow-up email re: PMIO and CO offsets. Also included comments from Latham and Watkins.

4 page(s)
 CEC/R. Worl/E. Knight/Docket UnitNJ Resources, LLC/J. Morris
361781/11/2006 Request for Confidential Designation/Confidential offset Strategy

16 page(s)
 B.B. Blevins/CEC/Docket UnitGalati & Blek Lip/S. Galati
361651/10/2006 Participation in the CEC review of the projects

2 page(s)
 Board of Supervisors/Ashley/CEC/Docket UnitCEC/O'Brien
361481/6/2006 Report of Conversation between Joe Diamond, CEC, and Clint Marsalek, Sun City Fire Station 7-Sun City; re: Response time for Emergency Medical Service (EMS).

1 page(s)
 CEC/Docket UnitCEC/B. Worl
361461/5/2006 Record of Conversation between Joe Diamond, CEC, and James McElvain, Riverside Sheriff, re: Response time for emergency vehicles.

1 page(s)
 CEC/Docket UnitCEC/B. Worl/J. Diamond
3613312/28/2005 Sun Valley Energy Project Data Adequacy Recommendation

66 page(s)
 CEC/CommissionersCEC
3611912/22/2005 Report of Conversation between Joe Diamond, CEC, and Emmanuelle Reynolds, Facility & Planning Administrator for the Perris Union High School Dist, Riverside County; re: Impacts on Education.

1 page(s)
 CEC/Docket UnitCEC/J. Diamond
3611512/22/2005 permit to construct applications-Valle del Sol energy

1 page(s)
 McCabe/Edison Mission EnergySouth Coast Air Quality Management District/Coats
3606912/13/2005 Request for Confidential Designation - Confidential Paleontological Resources Technical Report

6 page(s)
 CEC/Blevins/Docket UnitGalati & Blek/Galati
3606812/13/2005 Document Handling for the Sun Valley Energy Project

4 page(s)
 Librarians/CEC/Docket UnitCEC/Johnson
3606712/13/2005 Request for Agency Participation in the Review of the Sun Valley Energy Project

3 page(s)
 Agency Distribution List/CEC/Docket UnitCEC/Johnson
3606612/13/2005 Notice of Receipt of an AFC for Sun Valley

3 page(s)
 CEC/Docket UnitCEC/Johnson
3605112/13/2005 Data Adequacy Recommendation

1 page(s)
 CEC/Blevins/Docket UnitGalati & Blek/Galati
3601512/8/2005 Application for a Permit to Construct for the Sun Valley Energy Project

359 page(s)
 CEC/DocketValle Del Sol Energy
3598612/1/2005 Application for Certification seeking authority to construct & operate the Sun Valley Project, a 500 megawatt, natural gas-fired power plant. (2 binders: 1 application=511: 1 appendices=534).

1045 page(s)
 B. B. Blevins/CEC/Docket UnitSun Valley Energy Project/Valle del Sol Energy/
3598512/1/2005 Air Modeling/HRA Files.

1 page(s)
 Robert Worl/CEC/Docket UnitSun Valley Energy Project
2070-03/10/2006 Informational Hearing & Site Visit

87 page(s)
  CEC