Docket Log

Docket: 00-AFC-01C
Project Title: Contra Costa Power Plant Project Compliance
Generated On: 4/19/2024 8:30:38 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2552923/27/2024 Annual Compliance Report RY 2023 for the PG&E Gateway Generating Station

Compliance
548 page(s)
 John Heiser, Compliance Project ManagerPG&E Gateway Generating Station
2493753/20/2023 Annual Compliance Report RY 2022 for the PG&E Gateway Generating Station

569 page(s)
 CEC/John HeiserPG&E Gateway Generating Station
2424833/28/2022 Annual Compliance Report RY 2021 for PG&E Gateway Generating Station
Annual Compliance Report RY 2021 as per General Condition of Certification (pp 179-180) for PG&E Gateway Generating Station
Compliance
518 page(s)
 CEC/John HeiserPG&E Gateway Generating Station
2373413/29/2021 Annual Compliance Report RY 2020 for GGS_5of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
301 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373403/29/2021 Annual Compliance Report RY 2020 for GGS_6of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
51 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373393/29/2021 Annual Compliance Report RY 2020 for GGS_7of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
69 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373383/29/2021 Annual Compliance Report RY 2020 for GGS_8of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
11 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373373/29/2021 Annual Compliance Report RY 2020 for GGS_1of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
21 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373363/29/2021 Annual Compliance Report RY 2020 for GGS_2of8 parts
Annual Compliance Report No. 12 for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
6 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373353/29/2021 Annual Compliance Report RY 2020 fro GGS_3of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
2 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
2373343/29/2021 Annual Compliance Report RY 2020 for GGS_4of8 parts
Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020
14 page(s)
 CEC/Docket OfficePG&E Gateway Generating Station
23560511/16/2020 Paul Smith Comments - Notable Reference

Alternatives
1 page(s)
 CEC/DocketsPaul Smith
2342758/10/2020 McGill AirClean Comments - Pollution Control

Air Quality
5 page(s)
 CEC/DocketsMcGill AirClean
2325203/24/2020 ACR RY 2019 for GGS_1of4 parts

250 page(s)
 CEC/DocketsPG&E Gateway Generating Station
2325193/24/2020 ACR RY 2019 for GGS_2of4 parts

200 page(s)
 CEC/DocketsPG&E Gateway Generating Station
2325183/24/2020 ACR RY 2019 for GGS_3of4 parts

255 page(s)
 CEC/DocketsPG&E Gateway Generating Station
2325173/24/2020 ACR RY 2019 for GGS_4of4 parts

305 page(s)
 CEC/DocketsPG&E Gateway Generating Station
23127912/18/2019 2018 CEC Annual Compliance Report 1 of 2
2018 ACR
Compliance
600 page(s)
 CEC/DocketsPG&E Gateway Generating Station
23127812/18/2019 2018 CEC Annual Compliance Report 2 of 2
2018 ACR
Compliance
459 page(s)
 CEC/DocketsPG&E Gateway Generating Station
2273443/15/2019 Letter Regarding Removal and Replacement of Underground Natural Gas Pipelines
Letter
2 page(s)
 Gateway Generating Station/PG&ECalifornia Energy Commission
22558410/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2244618/10/2018 Settlement Agreement Between California Energy Commission and Pacific Gas and Electric Company

7 page(s)
 CEC/ Docket unitCalifornia Energy Commission
2243698/2/2018 Order Approving Settlement
Order No: 18-0801-5
4 page(s)
 CEC/DocketsCalifornia Energy Commission
21510112/22/2016 RESPONSE TO COMMENTS ON THE NOTICE OF DETERMINATION FOR THE STORM WATER SYSTEM INSTALLATION
Energy Commissions's Response to Comments on the Traffic and Transportation section of the Notice of Determination
Traffic and Transportation
3 page(s)
 Interested PartiesCalifornia Energy Commission
21508912/22/2016 Report of Conversation on November 17, 2016, Regarding Comments on Notice of Determination
Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination
Traffic and Transportation
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21508812/21/2016 Revised Report of Conversation (ROC) Regarding Comments on Notice of Determination
*** This Document Supersedes Docketed ROC (TN 214483) *** - Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination Compliance
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21448311/14/2016 Report of Conversation Regarding Comments on Notice of Determination
*** This Document is Replaced by TN 215088 *** - Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination
Compliance
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21448111/14/2016 Status of Investigations of Complaints at Gateway Generating Station
Status of Investigations of Complaints for Damages to Properties including Boats, Motor Homes and Cars, caused by alleged emissions from the Gateway Generating Station
Compliance
2 page(s)
  California Energy Commission
21424510/28/2016 Notice of Determination for Petition to Amend Gateway Generating Station to install a New Storm Water Treatment System
PG&E Petition to Amend requested approval to install a New Storm Water Treatment System in order to comply with the most recent National Pollutant Discharge Elimination System Industrial General Permit.
Soil and Water
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2129748/26/2016 Pacific Gas & Electric Company's Petition for Amendment for Gateway Generating Station

23 page(s)
 CEC/Bruce BoyerDayZen LLC
2057378/14/2015 Notice of Determination
for Petition for Insignificant Change
7 page(s)
  California Energy Commission
2053707/16/2015 Notice of Receipt
for the Petition to Amend dated MAY 20, 2015
2 page(s)
  California Energy Commission
2046755/21/2015 Petition for Insignificant Project Change to Plant Facility
Additional Decking on the East Side of the Steam Turbine Deck
26 page(s)
 CEC/Joseph DouglasPacific Gas & Electric Company
2039183/19/2015 Notice of Determination - Petition to Modify the Project Description for the PG&E Gateway Generating Station

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
20347212/19/2014 Notice of Receipt for PG&E Gateway Generating System

2 page(s)
  California Energy Commission
20340512/5/2014 Email re Petition for Staff Approval on Equipment Modification-Installation of Fixed Hydrogen Tube Bank
Additional Information
Compliance
2 page(s)
 CEC/Joseph DouglasPG&E Gateway Generating Station
20340412/5/2014 Petition for Staff Approval on Equipment Modification

Compliance
5 page(s)
 CEC/Joseph DouglasPG&E Gateway Generating Station
2030168/29/2014 Notice of Determination and Staff Analysis for the Petition to Modify the Project Description for the Gateway Generating Station

Air Quality, Biological Resources, Cultural Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Waste Management, Soil and Water
3 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2029048/12/2014 GGS Response to CEC Data Request of Jul 23, 2014
GGS Response to CEC Data Request of Jul 23, 2014 in support of Petition for Insignificant Project Change to Plant Facility - Additional Grating-type Decking at Steam Turbine Structure
1 page(s)
 CEC/ Christopher J. MarxenPG&E Gateway Generating Station
2029038/12/2014 CEC Letter of July 23, 2014 requesting additional information
This is an attachment to GGS Response to CEC Data Request of July 23, 2014
2 page(s)
 PG&E Gateway Generating StationCEC/ Chris Marxen
2028858/5/2014 Data Requests Number 1 & 2 including cover letter

Cultural Resources
2 page(s)
 Angel B. EspirituCalifornia Energy Commission
2024126/2/2014 Notice of Receipt

2 page(s)
 CEC / Docket UnitCalifornia Energy Commission
2023725/23/2014 Petition for Insignificant Proj Change_Additional Steam Turbine Decking

29 page(s)
 CEC / Docket Unit / Christine Stora (CPM)PG&E Gateway Generating Station
648504/19/2012 Approval of Project Changes

1 page(s)
 PG&E/R.GawerCEC/C.Hoffman
645874/4/2012 Notice of Determination

2 page(s)
 CEC/Docket unitCEC/C.Hoffman
640783/9/2012 Petition for Insignificant Project Change to Plant Facility

7 page(s)
 CEC/C.HoffmanPG&E/R.Gawer
621179/9/2011 Gateway Order Approving the Petition

6 page(s)
 CEC/Dockets UnitCEC/C.Hoffman
621169/9/2011 Notice of Decision

2 page(s)
 CEC/Dockets UnitCEC/C.Hoffman
611146/14/2011 Staff Analysis of Proposed Modification to Reduce Emissions Limits

11 page(s)
 CEC/Dockets UnitCEC/C.Stora
602774/15/2011 Notice of Receipt to Amend the Decision

3 page(s)
 CEC/Dockets UnitCEC/C.Marxen
601994/4/2011 Gateway Generating Station Nimor Amendment

4 page(s)
 CEC/ Docket UnitPG&E
5891910/29/2010 Approval of Project Change

1 page(s)
 Pacific Gas & Electric COmpany/R. GawerCEC/C. Snow
5880610/18/2010 Notice of Approval to Modify Project

2 page(s)
 CEC/Docket UnitCEC/C. Snow
585529/20/2010 Petition for Insignificant Project Change to Plant Facility

20 page(s)
 CEC/J. CaswellPacific Gas & Electric/R. Gawer
582108/26/2010 Revised BAAQMD Fine Amount

5 page(s)
 Bay Area Air Quality Mgmt. District/B. BungerPG & E/R. Gawer
580738/18/2010 PG&E Fire by BAAQMD- Written Report After Removal of Emergency Fire- pump Engine

4 page(s)
 CEC/ Docket UnitPG&E/ R. Gawer
556302/23/2010 Email from Michael Boyd to Request to Incorporate Attached Information to Case

2 page(s)
 CEC/Docket UnitCalifornians for Renewable Energy/M. Boyd
555252/22/2010 Commission Adoption Order

2 page(s)
 CEC/Docket UnitCEC/M. Read
553942/16/2010 Review of the Proposed Order of the Siting Committee

13 page(s)
 CEC/Docket unitM. Boyd
553312/11/2010 Newly Revised Proof of Service List

4 page(s)
 All PartiesCEC/ M. Read
552602/8/2010 Petition of R. Sarvey for Full Commission Review of the Proposed Order of the Siting Committee

13 page(s)
 CEC/Docket UnitIntervener/R. Sarvey
549991/25/2010 Commission Order Proposed Decision of the Siting Committee

11 page(s)
 CEC/Docket UnitCEC/ M. Read
5453312/22/2009 Order Denying Respondent's Motion for Summary Judgment

8 page(s)
 Intervenor/ M. BoydUS Environmental Protection Agency/ A. Torkington
5450712/18/2009 Motion for Rehearing by Californians for Renewable Energy, Inc (CARE)

30 page(s)
 CEC/ Docket UnitCARE/ M. Boyd
5431112/2/2009 Air Quality Modeling Files Health Risk Assessment input/output Files Associated with the Phase II Amendment

1 page(s)
 CEC/ Docket UnitGalati Blek/ David Wiseman
5403111/6/2009 Motion to Answer & Answer of Californians for Renewable Energy to Respondents PG&E

35 page(s)
 CEC/ Docket UnitCARE/ M. Boyd
5384410/28/2009 Correction of Staff Brief RE Applicable Conditions of Certifications in Gateway Complaint Proceeding

4 page(s)
 CEC/ Docket UnitCEC/ K. Bell
5368610/13/2009 Federal Energy Regulatory Commission(FERC) Answer of Califonians for Renewable Energy to Motions to Dismiss of PG&E and CEC

4 page(s)
 CEC/ Docket UnitPublic/ M. Boyd
5363510/13/2009 Concerns Regarding Public Participation Violation

8 page(s)
 CEC/ E. MillerGolden Gate Univ/ D. Behles
5352810/1/2009 Staff Brief on Complaint Proceedings Based on Filings by Acorn

12 page(s)
 CEC/ Docket UnitCEC/ K. Bell
5352110/1/2009 JOINT REPLY BRIEF OF COMPLAINANTS

15 page(s)
 CEC/ Docket UnitENVIRONMENTAL LAW AND JUSTICE CLINIC/ D. Behles
534149/24/2009 Request for Reconsideration of the Commissions August 26th Approval of the Gateway Amendment

14 page(s)
 CEC/ Docket UnitIntervenor/ R. Starvey
533819/24/2009 PG&E Rebuttal Brief

29 page(s)
 CEC/ Docket UnitGalati Blek/ M. Mills
532629/21/2009 PG&E's Opposition to CARE's Request for Reconsideration

5 page(s)
 CEC/ Docket UnitGalati & Blek LLP/ M. Mills
532169/15/2009 Notice of Violation

1 page(s)
 CEC/ Docket UnitCEC/ R. Yasny
531949/10/2009 Complainants' Joint Opening Brief

33 page(s)
 CEC/ Docket UnitGolden Gate University/ D. Behles
531899/9/2009 Rebuttal Exhibits Proposed by PG&E

537 page(s)
 CEC/ Docket UnitGalati & Blek LLP/ M. Mills
531839/9/2009 Complaint of Californians Renewable Energy

38 page(s)
 CEC/ Docket UnitCARE/ M. Boyd
531709/8/2009 E-mail from M. Homec & Response from E. Allen

1 page(s)
 CEC/ M. HomecCEC/ E. Allen
531159/2/2009 Complainant's Joint Supplemental Exhibit List

27 page(s)
 CEC/ D. Ratliff & K. CelliGolden Gate University/ D. Behles
530278/27/2009 Notice of Decision in Compliance

1 page(s)
 California Resources AgencyCEC/ R. Yasny
530258/27/2009 Order Amending the CEC Decision to Modify Equipment & Change Air Quality Conditions of Certification

16 page(s)
 CEC/ Docket UnitCEC/ K. Douglas
528898/17/2009 Golden Gate University Comments Submitted in Response to the July 30, 2009 Staff Report

5 page(s)
 CEC/ R. YasnyGolden Gate University
528748/13/2009 Complainants' Joint Supplemental Exhibit List

4 page(s)
 CEC/ K. CelliGolden Gate University Law / D. Behles
528698/13/2009 Robert Sarvey's Testimony

17 page(s)
 CEC/ Docket UnitPublic/ R. Sarvey
527798/6/2009 Health Risk Assessment for Diesel Engine Fire Pump

13 page(s)
 Brian LusherInteroffice Memorandum/ I. Salinas
527478/6/2009 Request to CEC for Administrative Notice of this Federal Energy Regulatory Commission Civil Penalties Policy on Fraud & False Statement

22 page(s)
 CEC/ Docket UnitCEC/ K. Celli
526758/3/2009 Email regarding Testimony of ACORN Witnesses

8 page(s)
 CEC/ K.CelliDeborah Behles
526578/3/2009 Amended Joint Prehearing Statement

16 page(s)
 CEC/ Docket UnitEnvironmental Law and Justice Clinic
526507/31/2009 E-mail RE Exhibits 20 & 21 for the Gateway Generating Station Project

5 page(s)
 CEC/ Docket UnitCEC/ K. Celli
526477/31/2009 PG&E's Response to Compliant Filed by Acorn, Care, & Local Clean Energy Alliance

23 page(s)
 CEC/ Docket UnitGalati & Blek LLP/ A. Garner for Marie Mills
526467/31/2009 Declaration of Gary Rubenstein & Declaration of Steve Royall

29 page(s)
 CEC/ Docket UnitGalati Blek LLP/ M. Mills
526447/31/2009 PG&E's Prehearing Statement

8 page(s)
 CEC/ Docket UnitGalati Blek LLP/ A. Garner for Marie Mills
526427/31/2009 Staff Prehearing Conference Statement

4 page(s)
 CEC/ Docket UnitCEC/ R. Ratliff
526397/31/2009 Joint Prehearing Statement

10 page(s)
 CEC/ Docket UnitEnviornmental Law & Justices Clinic/ D. Behles
526237/30/2009 Staff Analysis of Proposed Air Quality Amendment

23 page(s)
 Interested PartiesCEC/ R. Yasny
526097/29/2009 Staff Response & Recommendation to Complaint by Rob Simpson

9 page(s)
 CEC/ Docket UnitCEC/ K. Bell
525827/27/2009 Notice of Hearing, Decision & Order

6 page(s)
 CEC/ Docket UnitCEC/ K. Douglas & J. Byron
525177/17/2009 R. Redwood Complaint Request for Official Notice Comments on Staff Report Comments

49 page(s)
 CEC/ Docket UnitPublic/ R. Redwood
524527/20/2009 Reply of Complainant Contra Costa Branch of Acorn to Staff Response and Recommendations

7 page(s)
 CEC/ Docket UnitEnvironmental Law and Justice Clinic/ L. Williams
524167/14/2009 Staff Response & Recommendations to Complaint by Rory Cox

1 page(s)
 CEC/ Docket UnitCEC/ K. Bell
522907/3/2009 Staff Response & Recommendations to Complaint by Assocaiation of Community Organizations of Community Organizations for Reform Now(Acorn)

20 page(s)
 CEC/ Docket UnitCEC/ K. Bell
521896/29/2009 Local Clean Energy Alliance Complaint for PG&E’s Non-Compliance with CEC Certification Requirements

3 page(s)
 CEC/ R. YasnyPacific Enviornment/ R. Cox
521596/25/2009 Notice of Relevant Document

9 page(s)
 CEC/ R. YasnyGolden Gate University/ D. Behles
518896/9/2009 J. Adams Declaration Regarding Complaint of Non-Compliance

1 page(s)
 CEC/ Docket UnitPublic/ J. Adams
518586/5/2009 Complaint of Non-Compliance with Certification

25 page(s)
 CEC/ R. YasnyGGU Law School's ELJC/ D. Behles
517936/2/2009 Petition to Amend the Energy Commision Decision

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
514985/8/2009 Applicant's Petition to Amend Various Air Quality Conditions of Certification

48 page(s)
 CEC/ R. YasnySierra Research/ N. Mattaws
504063/5/2009 Withdrawal of Petiton to Amend Air Quality Conditions of Certification

3 page(s)
 CEC/ R. YasnyPG&E/ Thomas Allen
470427/14/2008 Letter to Bay Area Air Quality Management District RE Application 17182

3 page(s)
 BAAQMD / J. BroadbentCEC / D. Edwards
455993/7/2008 Gateway Generating Station's Responses to Data Requests (1-10)

33 page(s)
 CEC/ A. HockadayGalati Blek/ D. Wiseman
454042/19/2008 Notice of Insignificant Project Change to Reroute the Sewer Line for the Gateway Generating Station

2 page(s)
 CEC/ Docket UnitCEC/ Eileen Allen
452702/6/2008 PG&E's request for an insignificant project change related to a proposed modification

10 page(s)
 CEC/ R. YasnyPG&E/ A. Grenier
451321/28/2008 Notice of Receipt Petition to Amend The Energy Commission Decision for the Gateway Generating Station

3 page(s)
 CEC / Docket UnitCEC / E. Allen
444851/16/2008 Petition to Amend the Final Decision to Modify Air Quality Conditions of Certification.

209 page(s)
 CEC/ Ron YasnyPG&E/ A. Grenier
442721/14/2008 Filing of Notice of Decision RE: Addition of Two Above Ground Water Tanks

1 page(s)
 CEC / Docket UnitCEC / R. Yansy
440651/9/2008 Order to Amend the Energy Commission Decision to Allow Use of Two Additional Water Tanks

3 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
4369412/11/2007 Filing of Notice of Decision RE: Use of Ammonia as a Refrigerant at the Gateway Generating Station

1 page(s)
 CEC / Docket UnitCEC / R. Yasny
4367712/11/2007 Order No. 07-1205-9, Order to Amend the CEC Decision to Allow Use of Anhydrous Ammonia as the Refrigerant in the inlet Air Chiller.

3 page(s)
 CEC/ Docket UnitCEC/ J. Pfannenstiel
4365912/7/2007 Gateway Generating Station Staff Analysis of the Proposed Addistion of Two Water Tanks

6 page(s)
 Interested PartiesCEC / R. Yasny
4355612/3/2007 Petition to Allow Use of Anhydrous Ammonia in Inlet Chiller

2 page(s)
 CEC / Docket UnitCEC / S. Baker
4353911/30/2007 Request to Amend Hazardous Materials Management Conditions HAZ-1, 4 and 6 Supplement to Revised Hazardous Materials Management Staff Analysis

1 page(s)
 CEC / Docket UnitCEC / R. Tyler
4350011/27/2007 Notice of Receipt PG&E Petition to Add Water Tanks for the Gateway Generating Station

3 page(s)
 CEC / Docket UnitCEC / R. Johnson
4346211/20/2007 Gateway Generating Station Revised Staff Analysis of the Proposed change to anhydrous ammonia as the refrigerant in the inlet air chiller

6 page(s)
 Interested PartiesCEC / R. Yasny
4342111/19/2007 Staff Analysis of the Proposed Change to Anhydrous Ammonia as the Refrigerant in the Inlet Air Chiller

5 page(s)
 Interested PartiesCEC / R. Yasny
4337511/15/2007 Petition to Modify the Gateway Generating Station Project Final Decision to Add Two New Tanks

17 page(s)
 CEC / R. YasnyPG&E / A. Grenier
4329311/9/2007 Notice of Receipt PG&E Petition to Allow Use of Anhydrous Ammonia as a Refrigerant at the Gateway Generating Station

3 page(s)
 CEC / Docket UnitCEC / R. Johnson
4321011/5/2007 Petition for a change to gateway generating station project inlet chiller system

27 page(s)
 CEC/ R.YasnyPG&E/ A. Grenier
424279/25/2007 GGS Project Conditional Approval to Drive Pilings for Air-Cooled Condenser

1 page(s)
 PG&E/T. AllenCEC/R. Johnson
418598/9/2007 Commission Approval of 12/19/06 Petition to Eliminate Use of San Joaquin River Water for Cooling

1 page(s)
 CEC / T. AllenCEC / C. Meyer
418098/6/2007 Order Amending The Energy Commission Decision to Eliminate the Use of San Joaquin River Water as The Colling Water Source and Complete Ten Associated Project Design Changes

27 page(s)
 CEC / Docket UnitState of California Energy Resources Conservation and Development Commission/J. Boyd
417828/2/2007 Notice of Decision.

1 page(s)
 CRACEC/ C. Meyer
417768/2/2007 Gateway Generating Station Response and Comments on the Staff Analysis for the Dry Cooling Petition

1 page(s)
 CEC / CommissionersCEC/ T. O'Brien
417207/30/2007 Gateway Generating Plant--Water

3 page(s)
 CEC/ C. MeyerWorrell's Automotive/ C. Worl
417197/30/2007 Visual Key Observation Points--Scenic Route 160 from the Antioch Bridge traveling south

2 page(s)
 CEC/ C. MeyerWorrell's Automotive/ C. Worrell
417187/30/2007 Gateway Generating Station Project--Soil and Water

2 page(s)
 CEC/ C. MeyerWorrell's Automotive/ C. Worrell
416587/25/2007 Errata to the staff analysis for the dry cooling petition

7 page(s)
 CEC/ J. Geesman and J. BoydCEC/ C. Meyer
416537/25/2007 Comment letter requesting extension to hearing scheduled for Aug. 1, 2007

3 page(s)
 CEC/C. MeyerC. Worrell
416487/24/2007 Several questions, comments, and concerns about the proposed changes dated July 3, 2007.

2 page(s)
 CEC/ C. MeyerSportsmen Yacht Club/ T. Chapman
413967/5/2007 Staff Analysis of the PG&E Petition to Eliminate the Use of San Joaquin River Water as the Cooling Water Source and Complete Ten Associated Project Design Changes.

71 page(s)
 Interested PartiesCEC/C. Meyer
406305/29/2007 Order No. 07-0523-5: Order to Change Construction Work Hours and Noise-8 for the Gateway Generating Station.

2 page(s)
 Dockets UnitCEC/ J. Pfannenstiel
405715/24/2007 Conversation after BM on Status of Dry Cooling Petition.

1 page(s)
 PG&E/A. Grenier/S. GalatiCEC/C. Meyer
403035/8/2007 Staff Analysis of Proposed Change in Construction Work Hours Cover Letter

2 page(s)
 CEC/Docket Unit/Interested PartiesCEC/C. Meyer
403025/8/2007 Petition to Amend Noise-8 Noise and Vibration Analysis

3 page(s)
 CEC/Docket UnitGateway Generating Station/S. Baker
401694/26/2007 CEC Notice of Receipt - PG&E Petition to Change Construction Work Hours at the Gateway Generating Station

3 page(s)
 CEC/Docket UnitCEC/R. Johnson
400584/18/2007 Revised Water Balances to PG&E's License Petition Amendment Dated Dec. 2006

3 page(s)
 CEC/C. MeyerPG&E/A. Grenier
399674/11/2007 PG&E Petition to Amend Condition of Certification Noise-8

17 page(s)
 CEC/C. MeyerPG&E/A. Grenier
394323/1/2007 CRWQCB letter regarding PG&E's GGS licencse petition amendment.

2 page(s)
 CEC/ C. MeyerCRWQCB/ B. Wolfe
393482/21/2007 Response to Data Requests #8

184 page(s)
 CEC/ Dockets UnitPG&E/ A. Grenier
392532/13/2007 Responses to Staff Data Requests 1-8.

9 page(s)
 CEC/ C. MeyerPG&E/ A. Grenier
390551/23/2007 order clarifying that pg&e is now the sole owner of contra costa power plant unit 8, removing mirant delta, llc as a co-owner, and changing the name of the project to the gateway generating station.

2 page(s)
 CEC/ Docket UnitCEC/ J. Pfannenstiel
389681/18/2007 Approval to Restart Construction on Permitted Project.

1 page(s)
 PG&E/ T. AllenCEC/ C. Meyer
3878812/28/2006 Notice of recipt PG&E petition to eliminate the use of sanjoaquin river water as the cooling water source and complete ten associated project design changes at the gateway generating station.

3 page(s)
 CEC/ Dockets UnitCEC/R. Johnson
3872012/19/2006 PG&E's Gateway Generating Station License Petition amendment with cover letter.

125 page(s)
 CEC/ Dockets UnbitCH2MHill/ M. Cosens
3864712/14/2006 Notice of Receipt - PG&E Petition to Clarify it is the Sole Owner of Contra Costa P.P. and change of Project Name to Gateway G.S.

2 page(s)
 Interested PartiesCEC/ R. Johnson
3852912/4/2006 PG&E's Petition for minor amendment to clarify it is the sole owner of the Contra Costa Power Plant Unit 8 and for Name Change

67 page(s)
 CEC/Dockets UnitG&B/ M. Cosens
3828511/10/2006 Closure of asset transfer agreement and start of milestones.

3 page(s)
 PG&E/ T. AllenCEC/ R. Johnson
374867/27/2006 Order Approving Addition of PG&E Company as Co-Owner and Operator with Mirant Delta, LLC on the Contra Costa PP Unit 8 Project

3 page(s)
 Docket UnitCEC/ J. Boyd, A. Rosenfeld, and J. Byron
374787/24/2006 Filing of Notice of Decision in compliance with Public Resources Code Section 21080.5 and Title 20 Ca Code of Regulations Section 1768

1 page(s)
 Ca Resources AgencyCEC/C. Meyer
374197/14/2006 Contra Costa Plant Unit 8 Revised Staff Analysis of Proposed Addition of PG&E

13 page(s)
 Interested PartiesCEC/ C. Meyer
374137/13/2006 Contra Costa Unit 8 Power Project Docket No. 00-AFC-1C Second Revised Verified Statement Attesting to Compliance With Conditions of Certification.

3 page(s)
 J. L. Geesman / CECPG&E / F. Wan
372367/3/2006 Contra Costa P. P. Unit 8 Amendment Petition to Add PG&E as an Owner, Extend the Construction Milestones, and Add Four Facility Enhancements

2 page(s)
 Docket UnitC. Meyer and P. Kramer/ CEC
372337/5/2006 Proposed Modification of the Contra Costa Power Plant Unit 8 Project Decision

7 page(s)
 J. Pfannenstiel / C. Meyer / CECS. Choksi / Baykeeper
372166/30/2006 Revised Verified Statement Attesting to Compliance with Conditions of Certification

3 page(s)
 CEC/ Docket UnitS. A. Galati / Counsel to PG&E
371576/21/2006 Re: Contra Costa Unit 8 - submitted a petition seeking certain approvals from CEC

2 page(s)
 CEC/P. KramerWhite & Case/L. Cottle
371186/16/2006 Contra Costa Power Plant Unit 8 (00-AFC-1C) Staff Analysis of the proposed addition of PG&E as an owner, extension of the construction milestones, and four facility enhancements

9 page(s)
 Interested PartiesCEC Christopher Meyer, Compliance Project Manager
363202/3/2006 Notice of Receipt - Petition to Add an Owner and Amend Contra Costa Power Plant Unit 8 Project.

3 page(s)
 CEC/Docket UnitCEC/R. Johnson
363072/1/2006 Update Regarding Recent Developments that Effect Planned Construction of Unit 8 Power Project

172 page(s)
 CEC/Marc PryorMirant Delta, LLC
351748/4/2005 Notice of Hearing Re: Mirant's Motion to: 1) Approve stipulation Tolling Statute of limitations & Authorize the Debtors to Enter into other Tolling Agreements with Third Parties;2) Extend Statute of Limitations relating to Third Parties, and 3) Preserve the Debtors Right to Utilize Sections 502(b) and (d) after Expiration of APPLICABLE STATUTE OF LIMITATIONS PERIODS.

3 page(s)
 CEC/Docket UnitWhite & Case LLP/M. Campbell
351428/2/2005 Status of the Contra Cost Project and Planned Schedule for Amending the AFC

2 page(s)
 CEC/Najarian/DocketsMirant CA/Russell
322278/30/2004 Order Approving Request to Extend Construction Milestones

1 page(s)
 DocketsCEC/Keese
319657/28/2004 Letter from Mirant requesting time to grant an extension for the CO8 project.

2 page(s)
 CEC/Dockets/ila LewisMirant California, Llc/Mark Osterholt
242201/16/2002 Approval of Change for TDS for Cooling Towers

1 page(s)
 Office Of Planning & Research/DocketsCEC/I. Lewis
240281/11/2002 Approval to Amend the Air Quality Condition for Contra Costa Power Plant

2 page(s)
 Mirant Corp/Frandsen/docketsCEC/Therkelsen
238971/8/2002 Notice of Exemption-Approval to Change Route of Hazardous Material

1 page(s)
 Office Of Planning And Research/DocketsCEC/Lewis
222219/5/2001 Approval of Change of Muffler System for the Contra Costa Power Plant

1 page(s)
 Office Of Planning & Research/DocketsCEC/I. Lewis
222209/5/2001 Approval of Change of Muffler System for the Contra Costa Power Plant

2 page(s)
 Mirant Corp/Frandsen/docketsCECTCectherkelsen
219788/10/2001 Notice of Exemption - Visual Screening Installation to Occur Concurrent with Site Mobilization

1 page(s)
 Office Of Planning And ResearchCEC/I. Lewis
219338/16/2001 Notice of Exemption-Addition of Condition of Certificate to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid

1 page(s)
 Office Of Planning And Research/DocketsCEC/Bruins
217978/10/2001 Approval of Change in Language for Visual Screening Installation

2 page(s)
 Mirant Corporation/Frandsen/docketsCEC/Therkselsen
213636/20/2001 E-mail comments concerning CPUC Application

3 page(s)
 Public Advisor's Office/DocketsHawkins
2473-08/19/2009 August 5th Transcript

1 page(s)
  CEC