255292 | 3/27/2024 |
Annual Compliance Report RY 2023 for the PG&E Gateway Generating Station
Compliance 548 page(s)
| | John Heiser, Compliance Project Manager | PG&E Gateway Generating Station |
249375 | 3/20/2023 |
Annual Compliance Report RY 2022 for the PG&E Gateway Generating Station
569 page(s)
| | CEC/John Heiser | PG&E Gateway Generating Station |
242483 | 3/28/2022 |
Annual Compliance Report RY 2021 for PG&E Gateway Generating Station Annual Compliance Report RY 2021 as per General Condition of Certification (pp 179-180) for PG&E Gateway Generating Station Compliance 518 page(s)
| | CEC/John Heiser | PG&E Gateway Generating Station |
237341 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_5of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 301 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237340 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_6of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 51 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237339 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_7of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 69 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237338 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_8of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 11 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237337 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_1of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 21 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237336 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_2of8 parts Annual Compliance Report No. 12 for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 6 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237335 | 3/29/2021 |
Annual Compliance Report RY 2020 fro GGS_3of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 2 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
237334 | 3/29/2021 |
Annual Compliance Report RY 2020 for GGS_4of8 parts Annual Compliance Report for PG&E Gateway Generating Station (00-AFC-01C) for RY 2020 14 page(s)
| | CEC/Docket Office | PG&E Gateway Generating Station |
235605 | 11/16/2020 |
Paul Smith Comments - Notable Reference
Alternatives 1 page(s)
| | CEC/Dockets | Paul Smith |
234275 | 8/10/2020 |
McGill AirClean Comments - Pollution Control
Air Quality 5 page(s)
| | CEC/Dockets | McGill AirClean |
232520 | 3/24/2020 |
ACR RY 2019 for GGS_1of4 parts
250 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
232519 | 3/24/2020 |
ACR RY 2019 for GGS_2of4 parts
200 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
232518 | 3/24/2020 |
ACR RY 2019 for GGS_3of4 parts
255 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
232517 | 3/24/2020 |
ACR RY 2019 for GGS_4of4 parts
305 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
231279 | 12/18/2019 |
2018 CEC Annual Compliance Report 1 of 2 2018 ACR Compliance 600 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
231278 | 12/18/2019 |
2018 CEC Annual Compliance Report 2 of 2 2018 ACR Compliance 459 page(s)
| | CEC/Dockets | PG&E Gateway Generating Station |
227344 | 3/15/2019 |
Letter Regarding Removal and Replacement of Underground Natural Gas Pipelines Letter 2 page(s)
| | Gateway Generating Station/PG&E | California Energy Commission |
225584 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
224461 | 8/10/2018 |
Settlement Agreement Between California Energy Commission and Pacific Gas and Electric Company
7 page(s)
| | CEC/ Docket unit | California Energy Commission |
224369 | 8/2/2018 |
Order Approving Settlement Order No: 18-0801-5 4 page(s)
| | CEC/Dockets | California Energy Commission |
215101 | 12/22/2016 |
RESPONSE TO COMMENTS ON THE NOTICE OF DETERMINATION FOR THE STORM WATER SYSTEM INSTALLATION Energy Commissions's Response to Comments on the Traffic and Transportation section of the Notice of Determination Traffic and Transportation 3 page(s)
| | Interested Parties | California Energy Commission |
215089 | 12/22/2016 |
Report of Conversation on November 17, 2016, Regarding Comments on Notice of Determination Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination
Traffic and Transportation 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
215088 | 12/21/2016 |
Revised Report of Conversation (ROC) Regarding Comments on Notice of Determination *** This Document Supersedes Docketed ROC (TN 214483) *** - Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination
Compliance 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214483 | 11/14/2016 |
Report of Conversation Regarding Comments on Notice of Determination *** This Document is Replaced by TN 215088 *** - Comments on Traffic and Transportation section for the Storm Water System Installation Notice of Determination Compliance 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214481 | 11/14/2016 |
Status of Investigations of Complaints at Gateway Generating Station Status of Investigations of Complaints for Damages to Properties including Boats, Motor Homes and Cars, caused by alleged emissions from the Gateway Generating Station Compliance 2 page(s)
| | | California Energy Commission |
214245 | 10/28/2016 |
Notice of Determination for Petition to Amend Gateway Generating Station to install a New Storm Water Treatment System PG&E Petition to Amend requested approval to install a New Storm Water Treatment System in order to comply with the most recent National Pollutant Discharge Elimination System Industrial General Permit. Soil and Water 7 page(s)
| | CEC/Docket Unit | California Energy Commission |
212974 | 8/26/2016 |
Pacific Gas & Electric Company's Petition for Amendment for Gateway Generating Station
23 page(s)
| | CEC/Bruce Boyer | DayZen LLC |
205737 | 8/14/2015 |
Notice of Determination for Petition for Insignificant Change 7 page(s)
| | | California Energy Commission |
205370 | 7/16/2015 |
Notice of Receipt for the Petition to Amend dated MAY 20, 2015 2 page(s)
| | | California Energy Commission |
204675 | 5/21/2015 |
Petition for Insignificant Project Change to Plant Facility Additional Decking on the East Side of the Steam Turbine Deck 26 page(s)
| | CEC/Joseph Douglas | Pacific Gas & Electric Company |
203918 | 3/19/2015 |
Notice of Determination - Petition to Modify the Project Description for the PG&E Gateway Generating Station
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
203472 | 12/19/2014 |
Notice of Receipt for PG&E Gateway Generating System
2 page(s)
| | | California Energy Commission |
203405 | 12/5/2014 |
Email re Petition for Staff Approval on Equipment Modification-Installation of Fixed Hydrogen Tube Bank Additional Information Compliance 2 page(s)
| | CEC/Joseph Douglas | PG&E Gateway Generating Station |
203404 | 12/5/2014 |
Petition for Staff Approval on Equipment Modification
Compliance 5 page(s)
| | CEC/Joseph Douglas | PG&E Gateway Generating Station |
203016 | 8/29/2014 |
Notice of Determination and Staff Analysis for the Petition to Modify the Project Description for the Gateway Generating Station
Transmission System Engineering, Visual Resources, Waste Management, Soil and Water, Air Quality, Biological Resources, Cultural Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance 3 page(s)
| | CEC/Dockets Unit | California Energy Commission |
202904 | 8/12/2014 |
GGS Response to CEC Data Request of Jul 23, 2014 GGS Response to CEC Data Request of Jul 23, 2014 in support of Petition for Insignificant Project Change to Plant Facility - Additional Grating-type Decking at Steam Turbine Structure 1 page(s)
| | CEC/ Christopher J. Marxen | PG&E Gateway Generating Station |
202903 | 8/12/2014 |
CEC Letter of July 23, 2014 requesting additional information This is an attachment to GGS Response to CEC Data Request of July 23, 2014 2 page(s)
| | PG&E Gateway Generating Station | CEC/ Chris Marxen |
202885 | 8/5/2014 |
Data Requests Number 1 & 2 including cover letter
Cultural Resources 2 page(s)
| | Angel B. Espiritu | California Energy Commission |
202412 | 6/2/2014 |
Notice of Receipt
2 page(s)
| | CEC / Docket Unit | California Energy Commission |
202372 | 5/23/2014 |
Petition for Insignificant Proj Change_Additional Steam Turbine Decking
29 page(s)
| | CEC / Docket Unit / Christine Stora (CPM) | PG&E Gateway Generating Station |
64850 | 4/19/2012 |
Approval of Project Changes
1 page(s)
| | PG&E/R.Gawer | CEC/C.Hoffman |
64587 | 4/4/2012 |
Notice of Determination
2 page(s)
| | CEC/Docket unit | CEC/C.Hoffman |
64078 | 3/9/2012 |
Petition for Insignificant Project Change to Plant Facility
7 page(s)
| | CEC/C.Hoffman | PG&E/R.Gawer |
62117 | 9/9/2011 |
Gateway Order Approving the Petition
6 page(s)
| | CEC/Dockets Unit | CEC/C.Hoffman |
62116 | 9/9/2011 |
Notice of Decision
2 page(s)
| | CEC/Dockets Unit | CEC/C.Hoffman |
61114 | 6/14/2011 |
Staff Analysis of Proposed Modification to Reduce Emissions Limits
11 page(s)
| | CEC/Dockets Unit | CEC/C.Stora |
60277 | 4/15/2011 |
Notice of Receipt to Amend the Decision
3 page(s)
| | CEC/Dockets Unit | CEC/C.Marxen |
60199 | 4/4/2011 |
Gateway Generating Station Nimor Amendment
4 page(s)
| | CEC/ Docket Unit | PG&E |
58919 | 10/29/2010 |
Approval of Project Change
1 page(s)
| | Pacific Gas & Electric COmpany/R. Gawer | CEC/C. Snow |
58806 | 10/18/2010 |
Notice of Approval to Modify Project
2 page(s)
| | CEC/Docket Unit | CEC/C. Snow |
58552 | 9/20/2010 |
Petition for Insignificant Project Change to Plant Facility
20 page(s)
| | CEC/J. Caswell | Pacific Gas & Electric/R. Gawer |
58210 | 8/26/2010 |
Revised BAAQMD Fine Amount
5 page(s)
| | Bay Area Air Quality Mgmt. District/B. Bunger | PG & E/R. Gawer |
58073 | 8/18/2010 |
PG&E Fire by BAAQMD- Written Report After Removal of Emergency Fire- pump Engine
4 page(s)
| | CEC/ Docket Unit | PG&E/ R. Gawer |
55630 | 2/23/2010 |
Email from Michael Boyd to Request to Incorporate Attached Information to Case
2 page(s)
| | CEC/Docket Unit | Californians for Renewable Energy/M. Boyd |
55525 | 2/22/2010 |
Commission Adoption Order
2 page(s)
| | CEC/Docket Unit | CEC/M. Read |
55394 | 2/16/2010 |
Review of the Proposed Order of the Siting Committee
13 page(s)
| | CEC/Docket unit | M. Boyd |
55331 | 2/11/2010 |
Newly Revised Proof of Service List
4 page(s)
| | All Parties | CEC/ M. Read |
55260 | 2/8/2010 |
Petition of R. Sarvey for Full Commission Review of the Proposed Order of the Siting Committee
13 page(s)
| | CEC/Docket Unit | Intervener/R. Sarvey |
54999 | 1/25/2010 |
Commission Order Proposed Decision of the Siting Committee
11 page(s)
| | CEC/Docket Unit | CEC/ M. Read |
54533 | 12/22/2009 |
Order Denying Respondent's Motion for Summary Judgment
8 page(s)
| | Intervenor/ M. Boyd | US Environmental Protection Agency/ A. Torkington |
54507 | 12/18/2009 |
Motion for Rehearing by Californians for Renewable Energy, Inc (CARE)
30 page(s)
| | CEC/ Docket Unit | CARE/ M. Boyd |
54311 | 12/2/2009 |
Air Quality Modeling Files Health Risk Assessment input/output Files Associated with the Phase II Amendment
1 page(s)
| | CEC/ Docket Unit | Galati Blek/ David Wiseman |
54031 | 11/6/2009 |
Motion to Answer & Answer of Californians for Renewable Energy to Respondents PG&E
35 page(s)
| | CEC/ Docket Unit | CARE/ M. Boyd |
53844 | 10/28/2009 |
Correction of Staff Brief RE Applicable Conditions of Certifications in Gateway Complaint Proceeding
4 page(s)
| | CEC/ Docket Unit | CEC/ K. Bell |
53686 | 10/13/2009 |
Federal Energy Regulatory Commission(FERC) Answer of Califonians for Renewable Energy to Motions to Dismiss of PG&E and CEC
4 page(s)
| | CEC/ Docket Unit | Public/ M. Boyd |
53635 | 10/13/2009 |
Concerns Regarding Public Participation Violation
8 page(s)
| | CEC/ E. Miller | Golden Gate Univ/ D. Behles |
53528 | 10/1/2009 |
Staff Brief on Complaint Proceedings Based on Filings by Acorn
12 page(s)
| | CEC/ Docket Unit | CEC/ K. Bell |
53521 | 10/1/2009 |
JOINT REPLY BRIEF OF COMPLAINANTS
15 page(s)
| | CEC/ Docket Unit | ENVIRONMENTAL LAW AND JUSTICE CLINIC/ D. Behles |
53414 | 9/24/2009 |
Request for Reconsideration of the Commissions August 26th Approval of the Gateway Amendment
14 page(s)
| | CEC/ Docket Unit | Intervenor/ R. Starvey |
53381 | 9/24/2009 |
PG&E Rebuttal Brief
29 page(s)
| | CEC/ Docket Unit | Galati Blek/ M. Mills |
53262 | 9/21/2009 |
PG&E's Opposition to CARE's Request for Reconsideration
5 page(s)
| | CEC/ Docket Unit | Galati & Blek LLP/ M. Mills |
53216 | 9/15/2009 |
Notice of Violation
1 page(s)
| | CEC/ Docket Unit | CEC/ R. Yasny |
53194 | 9/10/2009 |
Complainants' Joint Opening Brief
33 page(s)
| | CEC/ Docket Unit | Golden Gate University/ D. Behles |
53189 | 9/9/2009 |
Rebuttal Exhibits Proposed by PG&E
537 page(s)
| | CEC/ Docket Unit | Galati & Blek LLP/ M. Mills |
53183 | 9/9/2009 |
Complaint of Californians Renewable Energy
38 page(s)
| | CEC/ Docket Unit | CARE/ M. Boyd |
53170 | 9/8/2009 |
E-mail from M. Homec & Response from E. Allen
1 page(s)
| | CEC/ M. Homec | CEC/ E. Allen |
53115 | 9/2/2009 |
Complainant's Joint Supplemental Exhibit List
27 page(s)
| | CEC/ D. Ratliff & K. Celli | Golden Gate University/ D. Behles |
53027 | 8/27/2009 |
Notice of Decision in Compliance
1 page(s)
| | California Resources Agency | CEC/ R. Yasny |
53025 | 8/27/2009 |
Order Amending the CEC Decision to Modify Equipment & Change Air Quality Conditions of Certification
16 page(s)
| | CEC/ Docket Unit | CEC/ K. Douglas |
52889 | 8/17/2009 |
Golden Gate University Comments Submitted in Response to the July 30, 2009 Staff Report
5 page(s)
| | CEC/ R. Yasny | Golden Gate University |
52874 | 8/13/2009 |
Complainants' Joint Supplemental Exhibit List
4 page(s)
| | CEC/ K. Celli | Golden Gate University Law / D. Behles |
52869 | 8/13/2009 |
Robert Sarvey's Testimony
17 page(s)
| | CEC/ Docket Unit | Public/ R. Sarvey |
52779 | 8/6/2009 |
Health Risk Assessment for Diesel Engine Fire Pump
13 page(s)
| | Brian Lusher | Interoffice Memorandum/ I. Salinas |
52747 | 8/6/2009 |
Request to CEC for Administrative Notice of this Federal Energy Regulatory Commission Civil Penalties Policy on Fraud & False Statement
22 page(s)
| | CEC/ Docket Unit | CEC/ K. Celli |
52675 | 8/3/2009 |
Email regarding Testimony of ACORN Witnesses
8 page(s)
| | CEC/ K.Celli | Deborah Behles |
52657 | 8/3/2009 |
Amended Joint Prehearing Statement
16 page(s)
| | CEC/ Docket Unit | Environmental Law and Justice Clinic |
52650 | 7/31/2009 |
E-mail RE Exhibits 20 & 21 for the Gateway Generating Station Project
5 page(s)
| | CEC/ Docket Unit | CEC/ K. Celli |
52647 | 7/31/2009 |
PG&E's Response to Compliant Filed by Acorn, Care, & Local Clean Energy Alliance
23 page(s)
| | CEC/ Docket Unit | Galati & Blek LLP/ A. Garner for Marie Mills |
52646 | 7/31/2009 |
Declaration of Gary Rubenstein & Declaration of Steve Royall
29 page(s)
| | CEC/ Docket Unit | Galati Blek LLP/ M. Mills |
52644 | 7/31/2009 |
PG&E's Prehearing Statement
8 page(s)
| | CEC/ Docket Unit | Galati Blek LLP/ A. Garner for Marie Mills |
52642 | 7/31/2009 |
Staff Prehearing Conference Statement
4 page(s)
| | CEC/ Docket Unit | CEC/ R. Ratliff |
52639 | 7/31/2009 |
Joint Prehearing Statement
10 page(s)
| | CEC/ Docket Unit | Enviornmental Law & Justices Clinic/ D. Behles |
52623 | 7/30/2009 |
Staff Analysis of Proposed Air Quality Amendment
23 page(s)
| | Interested Parties | CEC/ R. Yasny |
52609 | 7/29/2009 |
Staff Response & Recommendation to Complaint by Rob Simpson
9 page(s)
| | CEC/ Docket Unit | CEC/ K. Bell |
52582 | 7/27/2009 |
Notice of Hearing, Decision & Order
6 page(s)
| | CEC/ Docket Unit | CEC/ K. Douglas & J. Byron |
52517 | 7/17/2009 |
R. Redwood Complaint Request for Official Notice Comments on Staff Report Comments
49 page(s)
| | CEC/ Docket Unit | Public/ R. Redwood |
52452 | 7/20/2009 |
Reply of Complainant Contra Costa Branch of Acorn to Staff Response and Recommendations
7 page(s)
| | CEC/ Docket Unit | Environmental Law and Justice Clinic/ L. Williams |
52416 | 7/14/2009 |
Staff Response & Recommendations to Complaint by Rory Cox
1 page(s)
| | CEC/ Docket Unit | CEC/ K. Bell |
52290 | 7/3/2009 |
Staff Response & Recommendations to Complaint by Assocaiation of Community Organizations of Community Organizations for Reform Now(Acorn)
20 page(s)
| | CEC/ Docket Unit | CEC/ K. Bell |
52189 | 6/29/2009 |
Local Clean Energy Alliance Complaint for PG&E’s Non-Compliance with CEC Certification Requirements
3 page(s)
| | CEC/ R. Yasny | Pacific Enviornment/ R. Cox |
52159 | 6/25/2009 |
Notice of Relevant Document
9 page(s)
| | CEC/ R. Yasny | Golden Gate University/ D. Behles |
51889 | 6/9/2009 |
J. Adams Declaration Regarding Complaint of Non-Compliance
1 page(s)
| | CEC/ Docket Unit | Public/ J. Adams |
51858 | 6/5/2009 |
Complaint of Non-Compliance with Certification
25 page(s)
| | CEC/ R. Yasny | GGU Law School's ELJC/ D. Behles |
51793 | 6/2/2009 |
Petition to Amend the Energy Commision Decision
3 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
51498 | 5/8/2009 |
Applicant's Petition to Amend Various Air Quality Conditions of Certification
48 page(s)
| | CEC/ R. Yasny | Sierra Research/ N. Mattaws |
50406 | 3/5/2009 |
Withdrawal of Petiton to Amend Air Quality Conditions of Certification
3 page(s)
| | CEC/ R. Yasny | PG&E/ Thomas Allen |
47042 | 7/14/2008 |
Letter to Bay Area Air Quality Management District RE Application 17182
3 page(s)
| | BAAQMD / J. Broadbent | CEC / D. Edwards |
45599 | 3/7/2008 |
Gateway Generating Station's Responses to Data Requests (1-10)
33 page(s)
| | CEC/ A. Hockaday | Galati Blek/ D. Wiseman |
45404 | 2/19/2008 |
Notice of Insignificant Project Change to Reroute the Sewer Line for the Gateway Generating Station
2 page(s)
| | CEC/ Docket Unit | CEC/ Eileen Allen |
45270 | 2/6/2008 |
PG&E's request for an insignificant project change related to a proposed modification
10 page(s)
| | CEC/ R. Yasny | PG&E/ A. Grenier |
45132 | 1/28/2008 |
Notice of Receipt Petition to Amend The Energy Commission Decision for the Gateway Generating Station
3 page(s)
| | CEC / Docket Unit | CEC / E. Allen |
44485 | 1/16/2008 |
Petition to Amend the Final Decision to Modify Air Quality Conditions of Certification.
209 page(s)
| | CEC/ Ron Yasny | PG&E/ A. Grenier |
44272 | 1/14/2008 |
Filing of Notice of Decision RE: Addition of Two Above Ground Water Tanks
1 page(s)
| | CEC / Docket Unit | CEC / R. Yansy |
44065 | 1/9/2008 |
Order to Amend the Energy Commission Decision to Allow Use of Two Additional Water Tanks
3 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
43694 | 12/11/2007 |
Filing of Notice of Decision RE: Use of Ammonia as a Refrigerant at the Gateway Generating Station
1 page(s)
| | CEC / Docket Unit | CEC / R. Yasny |
43677 | 12/11/2007 |
Order No. 07-1205-9, Order to Amend the CEC Decision to Allow Use of Anhydrous Ammonia as the Refrigerant in the inlet Air Chiller.
3 page(s)
| | CEC/ Docket Unit | CEC/ J. Pfannenstiel |
43659 | 12/7/2007 |
Gateway Generating Station Staff Analysis of the Proposed Addistion of Two Water Tanks
6 page(s)
| | Interested Parties | CEC / R. Yasny |
43556 | 12/3/2007 |
Petition to Allow Use of Anhydrous Ammonia in Inlet Chiller
2 page(s)
| | CEC / Docket Unit | CEC / S. Baker |
43539 | 11/30/2007 |
Request to Amend Hazardous Materials Management Conditions HAZ-1, 4 and 6 Supplement to Revised Hazardous Materials Management Staff Analysis
1 page(s)
| | CEC / Docket Unit | CEC / R. Tyler |
43500 | 11/27/2007 |
Notice of Receipt PG&E Petition to Add Water Tanks for the Gateway Generating Station
3 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43462 | 11/20/2007 |
Gateway Generating Station Revised Staff Analysis of the Proposed change to anhydrous ammonia as the refrigerant in the inlet air chiller
6 page(s)
| | Interested Parties | CEC / R. Yasny |
43421 | 11/19/2007 |
Staff Analysis of the Proposed Change to Anhydrous Ammonia as the Refrigerant in the Inlet Air Chiller
5 page(s)
| | Interested Parties | CEC / R. Yasny |
43375 | 11/15/2007 |
Petition to Modify the Gateway Generating Station Project Final Decision to Add Two New Tanks
17 page(s)
| | CEC / R. Yasny | PG&E / A. Grenier |
43293 | 11/9/2007 |
Notice of Receipt PG&E Petition to Allow Use of Anhydrous Ammonia as a Refrigerant at the Gateway Generating Station
3 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43210 | 11/5/2007 |
Petition for a change to gateway generating station project inlet chiller system
27 page(s)
| | CEC/ R.Yasny | PG&E/ A. Grenier |
42427 | 9/25/2007 |
GGS Project Conditional Approval to Drive Pilings for Air-Cooled Condenser
1 page(s)
| | PG&E/T. Allen | CEC/R. Johnson |
41859 | 8/9/2007 |
Commission Approval of 12/19/06 Petition to Eliminate Use of San Joaquin River Water for Cooling
1 page(s)
| | CEC / T. Allen | CEC / C. Meyer |
41809 | 8/6/2007 |
Order Amending The Energy Commission Decision to Eliminate the Use of San Joaquin River Water as The Colling Water Source and Complete Ten Associated Project Design Changes
27 page(s)
| | CEC / Docket Unit | State of California Energy Resources Conservation and Development Commission/J. Boyd |
41782 | 8/2/2007 |
Notice of Decision.
1 page(s)
| | CRA | CEC/ C. Meyer |
41776 | 8/2/2007 |
Gateway Generating Station Response and Comments on the Staff Analysis for the Dry Cooling Petition
1 page(s)
| | CEC / Commissioners | CEC/ T. O'Brien |
41720 | 7/30/2007 |
Gateway Generating Plant--Water
3 page(s)
| | CEC/ C. Meyer | Worrell's Automotive/ C. Worl |
41719 | 7/30/2007 |
Visual Key Observation Points--Scenic Route 160 from the Antioch Bridge traveling south
2 page(s)
| | CEC/ C. Meyer | Worrell's Automotive/ C. Worrell |
41718 | 7/30/2007 |
Gateway Generating Station Project--Soil and Water
2 page(s)
| | CEC/ C. Meyer | Worrell's Automotive/ C. Worrell |
41658 | 7/25/2007 |
Errata to the staff analysis for the dry cooling petition
7 page(s)
| | CEC/ J. Geesman and J. Boyd | CEC/ C. Meyer |
41653 | 7/25/2007 |
Comment letter requesting extension to hearing scheduled for Aug. 1, 2007
3 page(s)
| | CEC/C. Meyer | C. Worrell |
41648 | 7/24/2007 |
Several questions, comments, and concerns about the proposed changes dated July 3, 2007.
2 page(s)
| | CEC/ C. Meyer | Sportsmen Yacht Club/ T. Chapman |
41396 | 7/5/2007 |
Staff Analysis of the PG&E Petition to Eliminate the Use of San Joaquin River Water as the Cooling Water Source and Complete Ten Associated Project Design Changes.
71 page(s)
| | Interested Parties | CEC/C. Meyer |
40630 | 5/29/2007 |
Order No. 07-0523-5: Order to Change Construction Work Hours and Noise-8 for the Gateway Generating Station.
2 page(s)
| | Dockets Unit | CEC/ J. Pfannenstiel |
40571 | 5/24/2007 |
Conversation after BM on Status of Dry Cooling Petition.
1 page(s)
| | PG&E/A. Grenier/S. Galati | CEC/C. Meyer |
40303 | 5/8/2007 |
Staff Analysis of Proposed Change in Construction Work Hours Cover Letter
2 page(s)
| | CEC/Docket Unit/Interested Parties | CEC/C. Meyer |
40302 | 5/8/2007 |
Petition to Amend Noise-8 Noise and Vibration Analysis
3 page(s)
| | CEC/Docket Unit | Gateway Generating Station/S. Baker |
40169 | 4/26/2007 |
CEC Notice of Receipt - PG&E Petition to Change Construction Work Hours at the Gateway Generating Station
3 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
40058 | 4/18/2007 |
Revised Water Balances to PG&E's License Petition Amendment Dated Dec. 2006
3 page(s)
| | CEC/C. Meyer | PG&E/A. Grenier |
39967 | 4/11/2007 |
PG&E Petition to Amend Condition of Certification Noise-8
17 page(s)
| | CEC/C. Meyer | PG&E/A. Grenier |
39432 | 3/1/2007 |
CRWQCB letter regarding PG&E's GGS licencse petition amendment.
2 page(s)
| | CEC/ C. Meyer | CRWQCB/ B. Wolfe |
39348 | 2/21/2007 |
Response to Data Requests #8
184 page(s)
| | CEC/ Dockets Unit | PG&E/ A. Grenier |
39253 | 2/13/2007 |
Responses to Staff Data Requests 1-8.
9 page(s)
| | CEC/ C. Meyer | PG&E/ A. Grenier |
39055 | 1/23/2007 |
order clarifying that pg&e is now the sole owner of contra costa power plant unit 8, removing mirant delta, llc as a co-owner, and changing the name of the project to the gateway generating station.
2 page(s)
| | CEC/ Docket Unit | CEC/ J. Pfannenstiel |
38968 | 1/18/2007 |
Approval to Restart Construction on Permitted Project.
1 page(s)
| | PG&E/ T. Allen | CEC/ C. Meyer |
38788 | 12/28/2006 |
Notice of recipt PG&E petition to eliminate the use of sanjoaquin river water as the cooling water source and complete ten associated project design changes at the gateway generating station.
3 page(s)
| | CEC/ Dockets Unit | CEC/R. Johnson |
38720 | 12/19/2006 |
PG&E's Gateway Generating Station License Petition amendment with cover letter.
125 page(s)
| | CEC/ Dockets Unbit | CH2MHill/ M. Cosens |
38647 | 12/14/2006 |
Notice of Receipt - PG&E Petition to Clarify it is the Sole Owner of Contra Costa P.P. and change of Project Name to Gateway G.S.
2 page(s)
| | Interested Parties | CEC/ R. Johnson |
38529 | 12/4/2006 |
PG&E's Petition for minor amendment to clarify it is the sole owner of the Contra Costa Power Plant Unit 8 and for Name Change
67 page(s)
| | CEC/Dockets Unit | G&B/ M. Cosens |
38285 | 11/10/2006 |
Closure of asset transfer agreement and start of milestones.
3 page(s)
| | PG&E/ T. Allen | CEC/ R. Johnson |
37486 | 7/27/2006 |
Order Approving Addition of PG&E Company as Co-Owner and Operator with Mirant Delta, LLC on the Contra Costa PP Unit 8 Project
3 page(s)
| | Docket Unit | CEC/ J. Boyd, A. Rosenfeld, and J. Byron |
37478 | 7/24/2006 |
Filing of Notice of Decision in compliance with Public Resources Code Section 21080.5 and Title 20 Ca Code of Regulations Section 1768
1 page(s)
| | Ca Resources Agency | CEC/C. Meyer |
37419 | 7/14/2006 |
Contra Costa Plant Unit 8 Revised Staff Analysis of Proposed Addition of PG&E
13 page(s)
| | Interested Parties | CEC/ C. Meyer |
37413 | 7/13/2006 |
Contra Costa Unit 8 Power Project Docket No. 00-AFC-1C Second Revised Verified Statement Attesting to Compliance With Conditions of Certification.
3 page(s)
| | J. L. Geesman / CEC | PG&E / F. Wan |
37236 | 7/3/2006 |
Contra Costa P. P. Unit 8 Amendment Petition to Add PG&E as an Owner, Extend the Construction Milestones, and Add Four Facility Enhancements
2 page(s)
| | Docket Unit | C. Meyer and P. Kramer/ CEC |
37233 | 7/5/2006 |
Proposed Modification of the Contra Costa Power Plant Unit 8 Project Decision
7 page(s)
| | J. Pfannenstiel / C. Meyer / CEC | S. Choksi / Baykeeper |
37216 | 6/30/2006 |
Revised Verified Statement Attesting to Compliance with Conditions of Certification
3 page(s)
| | CEC/ Docket Unit | S. A. Galati / Counsel to PG&E |
37157 | 6/21/2006 |
Re: Contra Costa Unit 8 - submitted a petition seeking certain approvals from CEC
2 page(s)
| | CEC/P. Kramer | White & Case/L. Cottle |
37118 | 6/16/2006 |
Contra Costa Power Plant Unit 8 (00-AFC-1C)
Staff Analysis of the proposed addition of PG&E as an owner, extension of the construction milestones, and four facility enhancements
9 page(s)
| | Interested Parties | CEC Christopher Meyer, Compliance Project Manager |
36320 | 2/3/2006 |
Notice of Receipt - Petition to Add an Owner and Amend Contra Costa Power Plant Unit 8 Project.
3 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
36307 | 2/1/2006 |
Update Regarding Recent Developments that Effect Planned Construction of Unit 8 Power Project
172 page(s)
| | CEC/Marc Pryor | Mirant Delta, LLC |
35174 | 8/4/2005 |
Notice of Hearing Re: Mirant's Motion to: 1) Approve stipulation Tolling Statute of limitations & Authorize the Debtors to Enter into other Tolling Agreements with Third Parties;2) Extend Statute of Limitations relating to Third Parties, and 3) Preserve the Debtors Right to Utilize Sections 502(b) and (d) after Expiration of APPLICABLE STATUTE OF LIMITATIONS PERIODS.
3 page(s)
| | CEC/Docket Unit | White & Case LLP/M. Campbell |
35142 | 8/2/2005 |
Status of the Contra Cost Project and Planned Schedule for Amending the AFC
2 page(s)
| | CEC/Najarian/Dockets | Mirant CA/Russell |
32227 | 8/30/2004 |
Order Approving Request to Extend Construction Milestones
1 page(s)
| | Dockets | CEC/Keese |
31965 | 7/28/2004 |
Letter from Mirant requesting time to grant an extension for the CO8 project.
2 page(s)
| | CEC/Dockets/ila Lewis | Mirant California, Llc/Mark Osterholt |
24220 | 1/16/2002 |
Approval of Change for TDS for Cooling Towers
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/I. Lewis |
24028 | 1/11/2002 |
Approval to Amend the Air Quality Condition for Contra Costa Power Plant
2 page(s)
| | Mirant Corp/Frandsen/dockets | CEC/Therkelsen |
23897 | 1/8/2002 |
Notice of Exemption-Approval to Change Route of Hazardous Material
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Lewis |
22221 | 9/5/2001 |
Approval of Change of Muffler System for the Contra Costa Power Plant
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/I. Lewis |
22220 | 9/5/2001 |
Approval of Change of Muffler System for the Contra Costa Power Plant
2 page(s)
| | Mirant Corp/Frandsen/dockets | CECTCectherkelsen |
21978 | 8/10/2001 |
Notice of Exemption - Visual Screening Installation to Occur Concurrent with Site Mobilization
1 page(s)
| | Office Of Planning And Research | CEC/I. Lewis |
21933 | 8/16/2001 |
Notice of Exemption-Addition of Condition of Certificate to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Bruins |
21797 | 8/10/2001 |
Approval of Change in Language for Visual Screening Installation
2 page(s)
| | Mirant Corporation/Frandsen/dockets | CEC/Therkselsen |
21363 | 6/20/2001 |
E-mail comments concerning CPUC Application
3 page(s)
| | Public Advisor's Office/Dockets | Hawkins |
2473-0 | 8/19/2009 |
August 5th Transcript
1 page(s)
| | | CEC |