257547 | 7/1/2024 |
Michael Carwana Comments - Against Lithium Battery Storage Facility
1 page(s)
| | CEC/Docket Unit | Michael Carwana |
256773 | 6/10/2024 |
Determination of Incomplete Application and Request for Follow-up Information for the Darden Clean Energy Project (23-OPT-02)
62 page(s)
| | CEC/Docket Unit | California Energy Commission |
256559 | 5/10/2024 |
Appendix J_Energy Storage Charging Reliability Power Flow Results CAISO Cluster 14 Phase II Study Appendix J -Energy Storage Charging Reliability Power Flow Results 18 page(s)
| | CEC/Docket Unit | Intersect Power |
256558 | 5/10/2024 |
PG&E South 500 kV Interconnection Area Report CAISO Cluster 14 Phase II Study PG&E South 500 kV Interconnection Area Report 61 page(s)
| | CEC/Docket Unit | Intersect Power |
256557 | 5/10/2024 |
Attachment 10_Substation and Transmission Line Work Scope_Q1949 CAISO Cluster 14 Phase II Study Attachment 10 - Substation and Transmission Line Work Scope 15 page(s)
| | CEC/Docket Unit | Intersect Power |
256556 | 5/10/2024 |
Attachment 9_Transient Stability Contingency List & Results_Q1949 CAISO Cluster 14 Phase II Study Attachment 9 - Transient Stability Contingency List & Results 8 page(s)
| | CEC/Docket Unit | Intersect Power |
256555 | 5/10/2024 |
Attachment 8_Preliminary Protection Requirements_Q1949 CAISO Cluster 14 Phase II Study Attachment 8 - Preliminary Protection Requirements 7 page(s)
| | CEC/Docket Unit | Intersect Power |
256554 | 5/10/2024 |
Attachment 6_Generator Dynamic Data_Q1949 CAISO Cluster 14 Phase II Study Attachment 6 - Generator Dynamic Data 36 page(s)
| | CEC/Docket Unit | Intersect Power |
256553 | 5/10/2024 |
Appendix K_Interconnection Area Map CAISO Cluster 14 Phase II Study Appendix K 0 Interconnection Area Map 3 page(s)
| | CEC/Docket Unit | Intersect Power |
256552 | 5/10/2024 |
Appendix I_Deliverability Assessment Results CAISO Cluster 14 Phase II Study Appendix I - Deliverability Assessment Results 10 page(s)
| | CEC/Docket Unit | Intersect Power |
256551 | 5/10/2024 |
Appendix H_Short Circuit Study Results CAISO Cluster 14 Phase II Study Appendix H - Short Circuit Study Results 66 page(s)
| | CEC/Docket Unit | Intersect Power |
256550 | 5/10/2024 |
Appendix G_Reliability Assessment Results CAISO Cluster 14 Phase II Study Appendix G - Reliability Assessment Results 8 page(s)
| | | Intersect Power |
256549 | 5/10/2024 |
Appendix E_Reliability Power Flow Results CAISO Cluster 14 Phase II Study Appendix E - Reliability Power Flow Results 97 page(s)
| | CEC/Docket Unit | Intersect Power |
256548 | 5/10/2024 |
Appendix C_Contingency Lists CAISO Cluster 14 Phase II Study Appendix C - Contingency Lists 601 page(s)
| | CEC/Docket Unit | Intersect Power |
256547 | 5/10/2024 |
Appendix B_System Assumptions CAISO Cluster 14 Phase II Study Appendix B - system assumptions 68 page(s)
| | CEC/Docket Unit | Intersect Power |
256546 | 5/10/2024 |
Appendix A_Cluster 14 Phase II Study CAISO Cluster 14 Phase II Study - Appendix A 26 page(s)
| | CEC/Docket Unit | Intersect Power |
256531 | 5/24/2024 |
Darden Clean Energy Project Docket No
3 page(s)
| | Darden - S. Ross and B. Moores | California Energy Commission |
256457 | 5/17/2024 |
Confidentiality Request - Community Benefits Agreements ***The applicant withdraws the application for confidentiality on 6/25/24***
Confidentiality request letter for the signed contract agreements associated with the Community Benefits Plan for the Darden Clean Energy Project 3 page(s)
| | CEC/Drew Bohan | Intersect Power |
256455 | 5/17/2024 |
Darden Clean Energy Project Community Benefits Plan Community Benefits Plan for the Darden project Compliance 8 page(s)
| | CEC/Docklet Unit | Intersect Power |
256336 | 5/13/2024 |
Darden Clean Energy Project Officer Attestation Letter Officer attestation letter for Darden Clean Energy Project application materials Compliance 1 page(s)
| | CEC/Docket Unit | Intersect Power |
256296 | 5/10/2024 |
CEC Data Request Response Set 4 Provides the Applicant's fourth and final response set to data requests received from the CEC. Responses address data requests related to Air Quality, Biological Resources, Socioeconomics, Transmission System Design, and Water Resources. The document includes the following appendices to support responses: Appendix A DR AQ-2 SJVAPCD Completeness Determination Letter, Appendix B DR BIO-7 Burrowing Owl Management Plan, Appendix C DR BIO-7 PV and Gen-tie Biological Resources Management Plan, Appendix D DR BIO-7 Utility Switchyard and Alternate Green Hydrogen Site Biological Resources Management Plan, Appendix E DR BIO-18 Land Cover Maps, Appendix F DR BIO-20 Model Parameters and Assumptions, Appendix G DR BIO-23 CNDDB Form Data Tables, Appendix H DR BIO-24 CDFW Correspondence, Appendix I DR BIO-45 Agency Correspondence, Appendix J DR BIO-47 Updated Section 5.12.5 LORS, Appendix K DR WATER-3 Water Quality Lab Results, Appendix L DR WATER-14 Westlands Water District Option Agreement (Redacted) 299 page(s)
| | CEC/Docket Unit | Rincon Consultants |
256295 | 5/10/2024 |
CAISO Phase II Study Confidentiality Request Letter requesting confidentiality for the Phase II study documents 4 page(s)
| | CEC/Docket Unit | Intersect Power |
256197 | 5/6/2024 |
CEC Response letter to Darden's confidentiality application dated 03-26-2024
3 page(s)
| | IP Darden I, LLC, c/o Intersect Power, LLC/Simon Ross | California Energy Commission |
256013 | 2/21/2024 |
Appendix M_Socioeconomics Study Feb 2024_Confidential_Darden Clean Energy Assesses the Darden Clean Energy Project’s effects on socioeconomic resources. Contains values in Table 39 that are submitted under confidential cover for CEC review. A separate redacted version has been docketed publicly. 111 page(s)
| | CEC/Docket Unit | Intersect Power |
256012 | 11/7/2023 |
Confidential Appendix B of Appendix M Socioeconomics Study_Darden Clean Energy Appendix B Project Economic and Employment Assumptions of Appendix M Socioeconomics Study. 5 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
255914 | 4/24/2024 |
Data Response Set 3 Appendix A - SJVACPD Preliminary Draft Permit Application Vol 2 Volume 2 of the San Joaquin Valley Air Pollution Control District preliminary draft permit application, provided in response to DR AQ-2 as Appendix A of Response Set 3 Air Quality 458 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255913 | 4/24/2024 |
Data Response Set 3 Appendix B and Appendix C Includes emissions calculations, provided in response to DR AQ-5 as Appendix B of Response Set 3 and supplementary technical approach information, provided in response to DR AQ-11 as Appendix C of Response Set 3 Air Quality 18 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255912 | 4/24/2024 |
Data Response Set 3 Appendix D and Appendix E - Construction and Operations AAQA Data Files Vol 1 Includes the construction and operations emissions data files, provided in response to DR AQ-11 as Appendix D of Response Set 3 and Volume 1 of the construction and operations ambient air quality analysis data files, provided in response to DR AQ-11 as Appendix E of Response Set 3 Air Quality 2169 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255911 | 4/24/2024 |
Data Response Set 3 Appendix E - Construction and Operations AAQA Data Files Vol 2 Volume 2 of the construction and operations ambient air quality analysis data files, provided in response to DR AQ-11 as Appendix E of Response Set 3 Air Quality 825 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255910 | 4/24/2024 |
Data Response Set 3 Appendix E - Construction and Operations AAQA Data Files Vol 3 Volume 3 of the construction and operations ambient air quality analysis data files, provided in response to DR AQ-11 as Appendix E of Response Set 3 Air Quality 648 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255909 | 4/24/2024 |
Data Response Set 3 Appendix E - Construction and Operations AAQA Data Files Vol 4 Volume 4 of the construction and operations ambient air quality analysis data files, provided in response to DR AQ-11 as Appendix E of Response Set 3 Air Quality 705 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255908 | 4/24/2024 |
Data Response Set 3 Appendix F and Appendix G Includes Phase I and Phase II Environmental Site Assessments conducted for the project, provided in response to DR HAZ-1 as Appendix F of Response Set 3 and an updated Section 5.8 References, provided in response to DR PH-1 as Appendix G of Response Set 3 Hazardous Materials, Public Health 2061 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255907 | 4/24/2024 |
Data Response Set 3 Appendix A - SJVACPD Preliminary Draft Permit Application Vol 1 Volume 1 of the San Joaquin Valley Air Pollution Control District preliminary draft permit application, provided in response to DR AQ-2 as part of Appendix A of Response Set 3 Air Quality 109 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255906 | 4/24/2024 |
CEC Data Request Response Set 3 Provides the Applicant's third response set to data requests received from the CEC. Responses address data requests related to Air Quality, Efficiency, Energy and Energy Resources, Greenhouse Gas Emissions (Climate Change), Hazardous Materials Handling, and Public Health. It also includes a resubmittal of one response for Socioeconomics. The document includes the following appendices to support responses: Appendix A DR AQ-2 SJVAPCD Preliminary Draft Permit Application, Appendix B DR AQ-5 Emissions Calculations, Appendix C DR AQ-11 Supplementary Technical Approach Information, Appendix D DR AQ-11 Construction and Operations Emissions Data Files, Appendix E DR AQ-11 Construction and Operations AAQA Data Files, Appendix F DR HAZ-1 Phase I and Phase II Environmental Site Assessments, Appendix G DR PH-1 Updated Section 5.8 Reference List Air Quality, Efficiency, Hazardous Materials, Public Health, Socioeconomics, Greenhouse Gases 25 page(s)
| | CEC/Docket Unit | Rincon Consultants |
255850 | 4/22/2024 |
CEC’s Response Letter to Application for Confidential Designation, dated 2-20-24 ***This document supersedes the TN 254357*** 2 page(s)
| | IP Darden I, LLC c/o Intersect Power, LLC/Simon Ross and Becky Moores | California Energy Commission |
255801 | 2/29/2024 |
Revised Confidential Appendix I Cultural Resources Technical Report_DR Set 1 CUL-TRI Confidential Cultural Resources Technical Report updated in response to data requests addressed in DR Response Set 1. 114 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
255800 | 2/29/2024 |
Updated Appendix I-4_DR Set 1 CUL-TRI Appendix I-4 California Department of Parks and Recreation 523 Series Forms updated in response to data requests addressed in DR Response Set 1. 229 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
255799 | 2/29/2024 |
Updated Appendix I-3_DR Set 1 CUL-TRI Appendix I-3 Research Design updated in response to data requests addressed in DR Response Set 1. 32 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
255750 | 4/17/2024 |
CEC Response Letter re Application for Confidential Designation dated 02-29-2024
2 page(s)
| | IP Darden I, LLC c/o Intersect Power, LLC/Breana Campbell-King | California Energy Commission |
255519 | 2/9/2024 |
CAISO Phase I_Appendix G_South 500 kV_Reliability Assessment Results CAISO Phase I_Appendix G_South 500 kV_Reliability Assessment Results 9 page(s)
| | CEC/Drew Bohan | Intersect Power |
255518 | 2/9/2024 |
CAISO Phase I_Appendix E_South 500 kV_Reliability Power Flow Results CAISO Phase I_Appendix E_South 500 kV_Reliability Power Flow Results 233 page(s)
| | CEC/Drew Bohan | Intersect Power |
255517 | 2/9/2024 |
CAISO Phase I_Appendix C_South 500 kV_Contingency Lists CAISO Phase I_Appendix C_South 500 kV_Contingency Lists 632 page(s)
| | CEC/Drew Bohan | Intersect Power |
255516 | 2/9/2024 |
CAISO Phase I_Appendix B_System Assumptions CAISO Phase I_Appendix B_System Assumptions 70 page(s)
| | CEC/Drew Bohan | Intersect Power |
255515 | 2/9/2024 |
CAISO Phase I_Q1949-Darden-Appendix_A-C14Ph1 CAISO Phase I_Q1949-Darden-Appendix_A-C14Ph1 20 page(s)
| | CEC/Drew Bohan | Intersect Power |
255514 | 2/9/2024 |
CAISO Phase I_Attachment 10_Substation and Transmission Line Work Scope_Q1949 CAISO Phase I_Attachment 10_Substation and Transmission Line Work Scope_Q1949 9 page(s)
| | CEC/Drew Bohan | Intersect Power |
255513 | 2/9/2024 |
CAISO Phase I_Attachment 8_Preliminary Protection Requirements_Q1949 CAISO Phase I_Attachment 8_Preliminary Protection Requirements_Q1949 7 page(s)
| | CEC/Drew Bohan | Intersect Power |
255512 | 2/9/2024 |
CAISO Phase I_South 500 kV Interconnection Area Report CAISO Phase I_South 500 kV Interconnection Area Report 54 page(s)
| | CEC/Drew Bohan | Intersect Power |
255511 | 2/9/2024 |
CAISO Phase I_Appendix K_Interconnection Area Map CAISO Phase I_Appendix K_Interconnection Area Map 3 page(s)
| | CEC/Drew Bohan | Intersect Power |
255510 | 2/9/2024 |
CAISO Phase I_Appendix I_South 500 Interconnection Area CAISO Phase I_Appendix I_South 500 Interconnection Area 25 page(s)
| | CEC/Drew Bohan | Intersect Power |
255509 | 2/9/2024 |
CAISO Phase I_Appendix H_Short Circuit Study Results CAISO Phase I_Appendix H_Short Circuit Study Results 169 page(s)
| | CEC/Drew Bohan | Intersect Power |
255414 | 4/2/2024 |
CEC's Response Letter re February 9, 2024 Application for Confidential Designation
2 page(s)
| | IP Darden I, LLC, c/o Intersect Power, LLC/Simon Ross | California Energy Commission |
255283 | 3/26/2024 |
23-OPT-02_Darden_DR-SOCIO-7_Confidentiality Request Request for confidentiality of response to data request DR SOCIO-7 5 page(s)
| | CEC/Drew Bohan | Intersect Power |
255082 | 3/15/2024 |
CEC Data Request Response Set 2 Provides the Applicant's second response set to data requests received from the CEC. Responses address data requests related to Hazards and Hazardous Materials, Project Description, Socioeconomics, Traffic and Transportation, Transmission System and Design, and Waste. The document includes the following appendices to support responses:
- Appendix A DR HAZ-7 Industrial Lithium-Ion Battery Emergency Response Guide
- Appendix B DR TRANS-5 Preliminary Helicopter Use Plan
- Appendix C DR TRANS-7 Transportation Analysis Supplement
- Appendix D DR TSD-2 Substation and Switchyard Diagram
- Appendix E DR TSD-4 Grounding Detail Facility Design, Hazardous Materials, Project Description, Socioeconomics, Traffic and Transportation, Waste Management 128 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254734 | 2/29/2024 |
Application for Confidential Request_Revised Appendix I_Darden Clean Energy_DR Set 1 CUL-TRI Confidential Application for the revised Appendix I, which has been updated in response to CEC data requests addressed in Response Set 1. Updated Appendix I documents include the Cultural Resources Technical Report, Appendix I-3 Research Design, and Appendix I-4 DPR Forms 2 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
254677 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Utility Switchyard Geotechnical report for the utility switchyard, provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 58 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254676 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 2 Volume 2 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 119 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254675 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 1 Part 2 Volume 1 Part 2 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 362 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254674 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 1 Part 1 Volume 1 Part 1 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 167 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254673 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 3 Volume 3 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 118 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254672 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 5 Volume 5 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 136 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254671 | 2/26/2024 |
Data Response Set 1 Appendix A - Geotechnical Report Vol 4 Volume 4 of the geotechnical report provided in response to DR GEO-1 as part of Appendix A of Response Set 1. Geology/Paleontology 136 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254670 | 2/23/2024 |
CEC Data Request Response Set 1_Darden Clean Energy This section provides the first set of data responses to the CEC's data request on 23-OPT-02. Responses are provided for data requests for cultural and tribal cultural resources, geologic hazards, land use, noise, soils, visual resources, and worker safety. Cultural Resources, Geology/Paleontology, Land Use, Noise and Vibration, Visual Resources, Worker Safety and Fire Protection, Soil and Water 35 page(s)
| | CEC/Docket Unit | Rincon Consultants |
254593 | 2/21/2024 |
Appendix M_Socioeconomics Study Feb 2024_Application for Confidential Designation Letter requesting confidential designation of values in Table 39 in the Socioeconomics Study for the Darden Clean Energy Project. 4 page(s)
| | CEC/Docket Unit | Intersect Power |
254588 | 2/20/2024 |
Appendix M_Socioeconomics Study Feb 2024_Darden Clean Energy Assesses the Darden Clean Energy Project’s effects on socioeconomic resources. Updated document with redacted version of sub-Appendix B included. Socioeconomics 111 page(s)
| | CEC/Docket Unit | Intersect Power |
254398 | 2/9/2024 |
DR-TSD-1_Application for Confidential Designation DR-TSD-1 Application for Confidential Designation 3 page(s)
| | CEC/Drew Bohan | Intersect Power |
254357 | 2/6/2024 |
CEC response to IP Darden I, LLC Application for Confidentiality dated November 7 2023 ***This document is replaced by TN 255850*** 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
254086 | 1/23/2024 |
Summary of Meeting Between CEC and Intersect Power Notes from December 6, 2023 meeting 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
253727 | 12/22/2023 |
Proof of Publication of Notice of Receipt in The Fresno Bee They were published in English and Spanish on December 21, 2023 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
253712 | 12/21/2023 |
Courtesy Tribal Notification of Receipt for Darden Clean Energy Project Opt-in Application Notification emailed on December 21, 2023 Cultural Resources 8 page(s)
| | CEC/Docket Unit | California Energy Commission |
253578 | 12/11/2023 |
Determination of Incomplete Application and Request for Information for the Darden Clean Energy Project
162 page(s)
| | IP Darden I, LLC and Affiliates/Becky Moores | California Energy Commission |
253570 | 12/8/2023 |
Hydrogen Wastewater Disposal Update 12082023 Update to proposed methods for discharge of wastewater from the hydrogen electrolyzer. Waste Management, Soil and Water 1 page(s)
| | CEC/Docket Unit | Intersect Power |
253557 | 11/7/2023 |
Confidential Appendix I-1_Volume 1_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 109 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253556 | 11/7/2023 |
Confidential Appendix I-1_Volume 6_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 190 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253555 | 11/7/2023 |
Confidential Appendix I-1_Volume 7_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 341 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253554 | 11/7/2023 |
Confidential Appendix I-1_Volume 8_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 249 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253553 | 11/7/2023 |
Confidential Appendix I-1_Volume 9_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 190 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253552 | 11/7/2023 |
Confidential Appendix I-1_Volume 10_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 133 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253551 | 11/7/2023 |
Confidential Appendix I-1_Volume 11_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 357 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253550 | 11/7/2023 |
Confidential Appendix I-1_Volume 2_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 283 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253549 | 11/7/2023 |
Confidential Appendix I-1_Volume 3_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 135 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253548 | 11/7/2023 |
Confidential Appendix I-1_Volume 4_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 179 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253547 | 11/7/2023 |
Confidential Appendix I-1_Volume 5_Cultural Resources Technical Report_Darden Clean Energy California Historical Resources Information System Records Search Results and Fresno
Historical Society Outreach 242 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253546 | 12/7/2023 |
CEC's Response Letter to IP Darden I, LLC re Application for Confidential Designation, dated November 7, 2023
2 page(s)
| | IP Darden I, LLC, c/o Intersect Power, LC/Breana Campbell-King | California Energy Commission |
253534 | 12/6/2023 |
Appendix R Species Observed and with Potential to Occur and 10-mile CNDDB_Darden Clean Energy Species Observed and with Potential to Occur and 10-mile CNDDB Biological Resources 44 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253477 | 12/4/2023 |
CEC's response letter re confidentiality application, dated November 7, 2023
2 page(s)
| | IP Darden I, LLC, c/o Intersect Power, LLC/Breana Campbell-King | California Energy Commission |
253371 | 11/29/2023 |
Comments from Fresno County Fire Protection District on Darden Clean Energy Project
1 page(s)
| | CEC/Docket Unit | Fresno County Fire Protection District |
253186 | 11/17/2023 |
Notice of Receipt of Opt-in Application for Federal, State, Local and Other Agencies Notice emailed on November 17, 2023 to Federal, State, Local and other agencies 12 page(s)
| | CEC/Docket Unit | California Energy Commission |
253139 | 11/15/2023 |
Notice of Receipt of an Opt-in Application for MOU Agencies Notice emailed on November 13, 2023 to CDFW, DTSC, and Water Boards per MOU 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
253060-1 | 11/9/2023 |
Appendix U Incidental Take Permit Form_Volume 1_Darden Clean Energy California Endangered Species Act Incidental Take Permit Application 271 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253060-2 | 11/9/2023 |
Appendix U Incidental Take Permit Form_Volume 2_Darden Clean Energy California Endangered Species Act Incidental Take Permit Application 88 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253060-3 | 11/9/2023 |
Appendix U Incidental Take Permit Form_Volume 3_Darden Clean Energy California Endangered Species Act Incidental Take Permit Application 204 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253047 | 11/7/2023 |
Appendix I Application for Confidential Request_Darden Clean Energy Confidential Cultural Resources Technical Report.
Appendix I-1 California Historical Resources Information System Records Search Results and Fresno Historical Society Outreach
Appendix I-2 Native American Heritage Commission Sacred Lands Search Results and Native American Outreach
Appendix I-3 Research Design
Appendix I-4 California Department of Parks and Recreation 523 Series Forms
Appendix I-5 State Historic Preservation Officer (SHPO) Concurrence Letter for Determinations of Eligibility for the California Aqueduct (P-10-006207) 2 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253046 | 11/7/2023 |
Confidential Appendix M Socioeconomics Study_Appendix B_Darden Clean Energy Application for confidential request for Appendix B Project Economic Employment and Assumptions of Appendix M Socioeconomics Study. 2 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253038-1 | 11/7/2023 |
Appendix Q Biological Resources Assessment_Volume 1_Darden Clean Energy Includes a Biological Resources Assessment which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to biological resources.
Appendix Q-1 Regulatory Framework
Appendix Q-2 Special-Status Species Evaluation Tables
Appendix Q-3 Field Forms
Appendix Q-4 Site Photographs
Appendix Q-5 Species Compendia
Appendix Q-6 San Joaquin Kit Fox Habitat Assessment
Appendix Q-7 Swainson’s Hawk Nesting Survey Report
Appendix Q-8 Analysis of Project Impacts to Swainson’s Hawk Foraging Habitat
Appendix Q-9 Aquatic Resources Delineation
Appendix Q-10 Aquatic Resources Representative Photographs
Appendix Q-11 Delineation Data Sheets 233 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253038-2 | 11/7/2023 |
Appendix Q Biological Resources Assessment_Volume 2_Darden Clean Energy Includes a Biological Resources Assessment which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to biological resources.
Appendix Q-1 Regulatory Framework
Appendix Q-2 Special-Status Species Evaluation Tables
Appendix Q-3 Field Forms
Appendix Q-4 Site Photographs
Appendix Q-5 Species Compendia
Appendix Q-6 San Joaquin Kit Fox Habitat Assessment
Appendix Q-7 Swainson’s Hawk Nesting Survey Report
Appendix Q-8 Analysis of Project Impacts to Swainson’s Hawk Foraging Habitat
Appendix Q-9 Aquatic Resources Delineation
Appendix Q-10 Aquatic Resources Representative Photographs
Appendix Q-11 Delineation Data Sheets 87 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253038-3 | 11/7/2023 |
Appendix Q Biological Resources Assessment_Volume 3_Darden Clean Energy Includes a Biological Resources Assessment which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to biological resources.
Appendix Q-1 Regulatory Framework
Appendix Q-2 Special-Status Species Evaluation Tables
Appendix Q-3 Field Forms
Appendix Q-4 Site Photographs
Appendix Q-5 Species Compendia
Appendix Q-6 San Joaquin Kit Fox Habitat Assessment
Appendix Q-7 Swainson’s Hawk Nesting Survey Report
Appendix Q-8 Analysis of Project Impacts to Swainson’s Hawk Foraging Habitat
Appendix Q-9 Aquatic Resources Delineation
Appendix Q-10 Aquatic Resources Representative Photographs
Appendix Q-11 Delineation Data Sheets 65 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253037 | 11/7/2023 |
Appendix M Socioeconomics Study_Darden Clean Energy Assesses the Darden Clean Energy Project’s effects on socioeconomic resources. Provides a description of the Project and existing regional conditions including population and social characteristics, housing supply and market conditions, economic characteristics including income and employment, county fiscal resources, public services, and utilities. Provides a discussion of socioeconomic impacts (and the methodology used to identify and assess them), characterizing impacts qualitatively and quantifying them where data allow. The analysis addresses direct and indirect impacts, then discusses cumulative impacts of the Project in combination with the potential effects of other foreseeable projects. 107 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253036 | 11/7/2023 |
CEC App_Chapter 6_Alternatives_Darden Clean Energy This section discusses alternatives to the proposed Darden Clean Energy Project. These include the “no project” alternative, a technology alternative, as well as a discussion of the site selection criteria employed. This discussion focuses on alternatives that could feasibly accomplish the basic objectives of the Project and could avoid or substantially lessen one or more of the potential impacts. Alternatives 24 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253035 | 11/7/2023 |
CEC App_Section 5-13_Water Resources_Darden Clean Energy This section discusses the existing water resources near the Darden Clean Energy Project, and potential impacts that the Project may have on these resources. Soil and Water 82 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253034 | 11/7/2023 |
CEC App_Section 5-2_Land Use_Darden Clean Energy This section describes the land uses present in the vicinity of the Darden Clean Energy Project site, as well as the potential impacts that may result from construction and operation of the Project related to land use. Land Use 76 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253033-1 | 11/7/2023 |
Appendix L Visual Simulations Methodology and Data Sheets_Volume 1_Darden Clean Energy Volume 1 provides Federal Highway Administration (FHWA) Visual Impact Assessment Worksheets and visual simulations methodology. 30 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253033-2 | 11/7/2023 |
Appendix L Visual Simulations Methodology and Data Sheets_Volume 2_Darden Clean Energy Volume 2 provides photo simulations of the Darden Clean Energy Project. 13 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253033-3 | 11/7/2023 |
Appendix L Visual Simulations Methodology and Data Sheets_Volume 3_Darden Clean Energy Volume 3 provides photo simulations of the Darden Clean Energy Project. 10 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253033-4 | 11/7/2023 |
Appendix L Visual Simulations Methodology and Data Sheets_Volume 4_Darden Clean Energy Volume 4 provides photo simulations of the Darden Clean Energy Project. 11 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253031-1 | 11/7/2023 |
Appendix N Air Quality and Greenhouse Gas Emissions Study_Volume 1_Darden Clean Energy Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to sensitive receptors.
Appendix N-1 Assumptions
Appendix N-2 Calculations
Appendix N-3 CalEEMod Outputs
Appendix N-4 HRA Summary
Appendix N-5 HARP Output
Appendix N-6 AAQA Summary
Appendix N-7 AERMOD Output Part 1
Appendix N-8 AERMOD Output Part 2 2858 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253031-2 | 11/7/2023 |
Appendix N Air Quality and Greenhouse Gas Emissions Study_Volume 2_Darden Clean Energy Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to sensitive receptors.
Appendix N-1 Assumptions
Appendix N-2 Calculations
Appendix N-3 CalEEMod Outputs
Appendix N-4 HRA Summary
Appendix N-5 HARP Output
Appendix N-6 AAQA Summary
Appendix N-7 AERMOD Output Part 1
Appendix N-8 AERMOD Output Part 2 1313 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253031-3 | 11/7/2023 |
Appendix N Air Quality and Greenhouse Gas Emissions Study_Volume 3_Darden Clean Energy Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to sensitive receptors.
Appendix N-1 Assumptions
Appendix N-2 Calculations
Appendix N-3 CalEEMod Outputs
Appendix N-4 HRA Summary
Appendix N-5 HARP Output
Appendix N-6 AAQA Summary
Appendix N-7 AERMOD Output Part 1
Appendix N-8 AERMOD Output Part 2 7810 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253031-4 | 11/7/2023 |
Appendix N Air Quality and Greenhouse Gas Emissions Study_Volume 4_Darden Clean Energy Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the proposed Darden Green Energy Project and evaluates short and long term impacts of the Project to sensitive receptors.
Appendix N-1 Assumptions
Appendix N-2 Calculations
Appendix N-3 CalEEMod Outputs
Appendix N-4 HRA Summary
Appendix N-5 HARP Output
Appendix N-6 AAQA Summary
Appendix N-7 AERMOD Output Part 1
Appendix N-8 AERMOD Output Part 2 7812 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253030-1 | 11/7/2023 |
Cover Letter and CEC Opt-In Application Crosswalk Matrix_Darden Clean Energy Cover letter to the CEC regarding the Opt-In Application for the Certification of the Darden Clean Energy Project
Crosswalk matrix identifying location of CEC Appendix B requirements within the Opt-In Application (Chapters 1 through 6). 25 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
253030-2 | 11/7/2023 |
CEC App_Cover Title Pages and TOC_Darden Clean Energy Title pages and Table of Contents for CEC Opt-In Application. 20 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
253027 | 11/7/2023 |
Appendix R Application for Confidential Request_Darden Clean Energy Application for confidential request for Appendix R Species Observed and with Potential to Occur and 10-mile CNDDB. 2 page(s)
| | CEC/Drew Bohan | Rincon Consultants |
253025 | 11/7/2023 |
CEC App_Section 5-6_Socioeconomics_Darden Clean Energy This section describes the effects of the Darden Clean Energy Project on socioeconomic resources. Socioeconomics 54 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253022 | 11/7/2023 |
Appendix E Community Benefits Plan_Darden Clean Energy Provides the Applicant’s plan and timeline to obtain agreements with Fresno county community-based organizations to make significant investments over the next ten years with community-based initiatives and programs in the Western Fresno County area, prior to project certification, consistent with Public Resources Code section 25545.10. Socioeconomics 3 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253021 | 11/7/2023 |
Appendix V Swainsons Hawk Conservation Strategy_Darden Clean Energy Outlines the current status of Swainson's hawk at the Darden Clean Energy Project site, assesses potential impacts, and proposes strategies for avoiding and mitigation potential impacts from construction, operation, and eventual repowering or decommissioning of the Project. Biological Resources 138 page(s)
| | CEC/Docket Unit | Rincon Consultants |
253020 | 11/7/2023 |
Appendix S Water Supply Assessment_Darden Clean Energy Informs the Project applicant, local and regional agencies, and the public about the availability of water supply to support the Darden Clean Energy Project in the decades after implementation. Soil and Water 36 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252985 | 11/6/2023 |
CEC App_Chapter 2_Project Description_Darden Clean Energy This chapter provides a project description and details of the Darden Clean Energy Project. Project Description 34 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252984 | 11/6/2023 |
CEC App_Chapter 1_Executive Summary_Darden Clean Energy This chapter provides an executive summary of the Darden Clean Energy Project and presents Project objectives, location, components, schedule, and ownership details as well as a list of Application preparers. Executive Summary 18 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252983 | 11/6/2023 |
CEC App_Section 5-7_Air Quality_Darden Clean Energy The section presents the air quality impact assessment related to the Darden Clean Energy Project. Air Quality 32 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252982 | 11/6/2023 |
CEC App_Section 5-11_Waste Management_Darden Clean Energy This section discusses the potential effect on human health and the environment from existing site conditions as well as nonhazardous and hazardous waste generated during construction and operation at the Darden Clean Energy Project. Waste Management 26 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252981 | 11/6/2023 |
CEC App_Chapter 4_Engineering_Darden Clean Energy In accordance with CEC requirements, this chapter presents information related to the design, engineering, reliability and efficiency of the Darden Clean Energy Project. Facility Design 12 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252979 | 11/6/2023 |
Appendix K Traffic and Transportation Analysis_Darden Clean Energy Analyzes traffic conditions related to the Darden Clean Energy Project and surrounding transportation facilities Traffic and Transportation 47 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252977 | 11/6/2023 |
CEC App_Section 5-4_Traffic and Transportation_Darden Clean Energy This section discusses the potential effect on traffic and transportation from the Darden Clean Energy Project. Traffic and Transportation 44 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252976 | 11/6/2023 |
CEC App_Section 5-5_Visual Resources_Darden Clean Energy This section describes the visual resources present in the vicinity of the Darden Clean Energy Project as well as the potential impacts to visual resources that may result from construction and operation of the Project. Visual Resources 72 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252975 | 11/6/2023 |
CEC App_Section 5-8_Public Health_Darden Clean Energy This section discusses activities that could potentially affect public health as they relate to the construction and operation of the Darden Clean Energy Project. Public Health 24 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252974 | 11/6/2023 |
CEC App_Section 5-12_Biological Resources_Darden Clean Energy This section describes biological resources in and near the Darden Clean Energy Project, and the potential impacts that the Project may have on these resources. Biological Resources 70 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252973 | 11/6/2023 |
CEC App_Section 5-15_Paleontological Resources_Darden Clean Energy This section describes the paleontological resources and geologic units present in the vicinity of the Darden Clean Energy Project site, as well as the potential impacts that may result from construction and operation of the Project related to the destruction of a unique paleontological resource or site, or unique geologic feature. Geology/Paleontology 18 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252972 | 11/6/2023 |
CEC App_Section 5-3_Noise_Darden Clean Energy This section presents the noise impact assessment related to the Darden Clean Energy Project. Noise and Vibration 40 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252971 | 11/6/2023 |
CEC App_Section 5-1_Cultural Resources and Tribal Cultural Resources_Darden Clean Energy This section describes cultural resources, inclusive of archaeological, built environment, and tribal cultural resources, in and near the Darden Clean Energy Project, and the potential effects the Project may have on these resources. Cultural Resources 52 page(s)
| | CEC/Docket Unit | Rincon Consultants |
252967 | 11/6/2023 |
Appendix T Paleontological Resources Assessment_Darden Clean Energy Provides a literature review, museum records search, paleontological sensitivity assessment, and reporting consistent with the standards of the California Energy Commission (CEC) (Title 20, California Code of Regulations, Section 1704, Appendix B) and Society of Vertebrate Paleontology to determine whether the Darden Clean Energy Project would result in significant impacts to paleontological resources under federal,
state, and local environmental regulations. Geology/Paleontology 28 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252966 | 11/6/2023 |
Appendix J Noise Study_Darden Clean Energy Includes a Noise Study which analyzes the potential noise impacts of the proposed Darden Clean Energy Project and evaluates the short and long term impacts of the Project to noise-sensitive receptors.
Appendix J-1 On-Site Noise Measurement Data
Appendix J-2 Roadway Construction Noise Model (RCNM) Results
Appendix J-3 Traffic Noise Model (FHWA RD 77-108) Results
Appendix J-4 SoundPLAN Calculations
Appendix J-5 Vibration Calculations Noise and Vibration 203 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252965 | 11/6/2023 |
Appendix D Public Resources Code Section 21183 and 211836_Darden Clean Energy Provides a crosswalk and attachment which demonstrate the ways in which the Darden Clean Energy Project meets the requirements of California Public Resources Code (PCR) Sections 21183 and 21183.6. Compliance 9 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252964 | 11/6/2023 |
Appendix B Facility Definitions_Darden Clean Energy In accordance with California Code of Regulations Title 20 § 1877 (b), Appendix B provides an explanation of how the Darden Clean Energy Project facilities meet one or more of the definitions of “facility” in California Public Resources Code § 25545(b). Compliance 3 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252939 | 11/3/2023 |
CEC App_Section 5-9_Hazardous Materials_Darden Clean Energy This section discusses the use and storage of hazardous materials associated with the construction and operation of the Darden Clean Energy Project and the potential effects on human health and the environment. Hazardous Materials 36 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252935 | 11/3/2023 |
CEC App_Section 5-14_Soils_Darden Clean Energy This section describes the soil resources present in the vicinity of the Darden Clean Energy Project site, as well as the potential impacts that may result from construction and operation of the Project related to soils. Soil and Water 32 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252934 | 11/3/2023 |
CEC App_Section 5-16_Geological Hazards and Resources_Darden Clean Energy This section describes the geological hazards and resources present in the vicinity of the Darden Clean Energy Project site, as well as the potential impacts that may result from construction and operation of the Project related to geological hazards and geological resources of commercial, recreational, or scientific value. Geology/Paleontology 54 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252933 | 11/3/2023 |
CEC App_Section 5-17_Wildfire_Darden Clean Energy This section discusses issues related to wildfire associated with the construction and operation of the Darden Clean Energy Project. Worker Safety and Fire Protection 18 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252932 | 11/3/2023 |
CEC App_Section 5-10_Worker Safety_Darden Clean Energy This section summarizes the worker health and safety issues that may be encountered during construction and operation of the Darden Clean Energy Project. Worker Safety and Fire Protection 30 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252931 | 11/3/2023 |
CEC App_Chapter 5_Environmental Analysis_Darden Clean Energy This section provides an introduction to the seventeen (17) individual environmental impact assessments required for the certification of the Darden Clean Energy Project as well as Cumulative Project details. Introduction 8 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252930 | 11/3/2023 |
CEC App_Chapter 3_Facility Closure_Darden Clean Energy This chapter discusses facility closure. Section 3.1 discusses temporary facility closure, and Section 3.2 discusses permanent facility closure. Section 3.2, Permanent Closure, is based in part on the Project’s Reclamation Plan (Appendix H, TN 252922), which describes the framework for decommissioning and reclamation for the Project. Facility Design 2 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252929 | 11/3/2023 |
Appendix U Incidental Take Permit Form_Darden Clean Energy California Endangered Species Act Incidental Take Permit Application. Biological Resources 3 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252928 | 11/3/2023 |
Appendix P Fire Protection Philosophy_Darden Clean Energy Describes the fire protection and fire and gas detection philosophy and guidelines to be implemented to ensure life, health, and safety, and to protect the environment and assets during operations. Complies with the California Fire Code and provides guidelines for fire prevention, active fire protection and fire and gas detection and alarm systems and personnel safety measures. Worker Safety and Fire Protection 31 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252927 | 11/3/2023 |
Appendix O Soil Management Plan_Darden Clean Energy The Soil Management Plan provides protocols for the proper management of unknown impacts to soil or undocumented subsurface features potentially encountered at the site during grading and construction activities. Soil and Water 34 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252922 | 11/3/2023 |
Appendix G Public Resources Code Section Certifications_Darden Clean Energy Compliance letter for prevailing wage and workforce requirements set forth in Assembly Bill 205 (“AB 205”), and Public Resources Code Section 25545.3.3 and 25545.3.5. 4 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252921 | 11/3/2023 |
Appendix H Reclamation Plan_Darden Clean Energy Outlines the framework for decommissioning and reclamation of the Darden Clean Energy Project. Facility Design 12 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252920 | 11/3/2023 |
Appendix F Project Design Layout and Elevations_Darden Clean Energy Includes Project design, layout, site plans, elevations, and notes. Facility Design 37 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252918 | 11/3/2023 |
Appendix A Property Owner Information_Darden Clean Energy Contains property owner names and mailing addresses for all assessor parcel
numbers (APNs) within 1,000 feet of the Darden Clean Energy Project facilities and 500 feet of the Project’s generation intertie line. Land Use 17 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252917 | 11/3/2023 |
Appendix C List of Preparers_Darden Clean Energy Provides the names and titles of all application preparers for the Darden Clean Energy Project organized by subject area. Compliance 5 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
252568 | 10/10/2023 |
Memo to Open New Docket
1 page(s)
| | CEC/Docket Unit | California Energy Commission |