Docket Log

Docket: 08-AFC-09C
Project Title: Palmdale Energy Project (Formerly Palmdale Hybrid Power Plant) - Compliance
Generated On: 12/26/2024 4:41:41 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2321792/21/2020 Order Approving Termination
Order No: 20-0220-3
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2314871/14/2020 PALMDALE ENERGY PROJECT - Request to Terminate

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23096512/2/2019 Palmdale Energy Project Termination Request

Compliance
1 page(s)
 CEC/Jonathan FongPalmdale Energy, LLC
22562610/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2209688/30/2017 NOD for Palmdale Energy Project Final Commission Decision
Notice of Decision (NOD) in compliance with Public Resources Code 21080.5, and Title 20, CRC section 1768
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2208588/23/2017 Final Commission Decision

504 page(s)
 CEC/DocketsEnergy Commission Hearing Unit
2206198/9/2017 Commission Adoption Order
Commission Adoption Order No. 17-0809-4
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2206078/8/2017 Transcript of the 07/24/2017 PMPD Committee Conference

20 page(s)
 CEC/DocketsCalifornia Energy Commission
2205448/3/2017 Errata to the Presiding Member's Proposed Decision
Errata found in the Presiding Member's Proposed Decision and proposed corrections.
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2205058/2/2017 [Proposed] Commission Adoption Order
Proposed Energy Commission findings and Order on the Petition to Amend the Palmdale Hybrid Power Plant and change its name to Palmdale Energy Project.
5 page(s)
 CEC/DocketsEnergy Commission Hearing Unit
2202867/20/2017 Palmdale Energy Project Amendment - Staff Comments on the Presiding Member’s Proposed Decision
Staff Comments on the Presiding Member’s Proposed Decision
19 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2201437/13/2017 Palmdale Energy LLC's Comments on the Presiding Member's Proposed Decision

6 page(s)
 CEC/Docket UnitDayZen LLC
2200107/3/2017 Notice of Availability of Presiding Member's Proposed Decision (PMPD) and Committee Conference and Energy Commission Hearing
Committee Conference (PMPD Comments) on July 24, 2017, at 10:00 a.m.; Full Energy Commission Hearing on PMPD on August 9, 2017, at 10:00 a.m.
7 page(s)
 Parties and PublicEnergy Commission Hearing Office
2200097/3/2017 Presiding Member's Proposed Decision (PMPD)

487 page(s)
 Parties and PublicEnergy Commission Hearing Office
2191496/16/2017 Email chain between Hearing Officer Celli, the parties and Public Adviser
Emailed request from Hearing Officer to parties and public adviser about their preferences for the location of the PMPD Committee Conference.
2 page(s)
 All Parties and Public AdviserEnergy Commission Hearing Office
2175785/12/2017 Order Approving 2nd Extension of the Deadline to Commence Construction

2 page(s)
 CEC/DocketsCalifornia Energy Commission
2175445/11/2017 Palmdale Energy LLC's Stipulation Regarding CEC Staff's Revised Compendium of Conditions of Certification

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
2 page(s)
 CEC/DocketsDayZen LLC
2175375/10/2017 Palmldale Energy Project Compendium of Conditions, May 10, 2017
Palmdale Energy Project (PEP) Final Compendium of Conditions of Certification, dated May 10, 2017
Compliance
211 page(s)
508CEC/DocketsCalifornia Energy Commission
2173775/1/2017 Palmdale Energy Project, Cover Letter and Staff Analysis of 2nd Petition to Extend Construction Deadline
Palmdale Energy Project (PEP), Staff Analysis of 2nd Petition to Extend Construction Deadline December 31, 2017.
Compliance
7 page(s)
 Interested PartiesCalifornia Energy Commission
2173534/28/2017 2nd PETITION TO EXTEND THE DEADLINE FOR COMMENCEMENT OF CONSTRUCTION FOR THE PALMDALE ENERGY PROJECT
Notice of Receipt
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2172984/26/2017 Palmdale Energy LLC's Request for Additional Extension of Construction Start Date

2 page(s)
  DayZen LLC
2172094/20/2017 Hearing Officer Memo regarding incomplete, extraneous and erroneous material in the Compendium of Conditions (TN 216834)
The Committee directs Staff and Petitioner to confer regarding the changes needed to correct the Compendium of Conditions and to docket a complete and corrected Compendium of Conditions.
1 page(s)
 All PartiesEnergy Commission Hearing Office
2168464/6/2017 Palmdale Energy LLC's Stipulation Regarding CEC Staff's Compendium of Conditions of Certification

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
2 page(s)
  DayZen LLC
2168344/6/2017 Conditions of Certification Compendium
Revised Compendium from Pre-Hearing Conference reflecting changes to BIO-10 and TSE-5
Compliance
205 page(s)
  California Energy Commission
2167233/28/2017 Transcript of 03/22/2017 Evidentiary Hearing

60 page(s)
 PartiesCalifornia Energy Commission
2166593/22/2017 Email Regarding Correction to Transcript of 03102017 Prehearing Conference
Mr. Cameron's first name is Thomas, not Tomas. It should read Thomas Cameron.
1 page(s)
 PartiesCalifornia Energy Commission
2166463/22/2017 Eric Knight Declaration and Resume for Bio Resources
Resume and declaration
Biological Resources
5 page(s)
509CEC/Docket UnitCalifornia Energy Commission
2166403/21/2017 Palmdale Compendium of Conditions, March 21, 2017
Compliance
204 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2166393/21/2017 Palmdale Compendium of Conditions, March 21, 2017
Palmdale Energy Project (PEP) Final Clean Compendium of Conditions, dated March 21, 2017
Compliance
204 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2166353/21/2017 Transcript of 03/10/2017 Prehearing Conference

25 page(s)
  California Energy Commission
2165923/16/2017 Palmdale Amendment Status Update No. 16
Palmdale Energy Project (PEP) Committee Status Update 16, March 2017
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2165873/16/2017 Biological Resources Supplemental Testimony, Palmdale Energy Project
***THIS DOCUMENT SUPERSEDES TN 216576***
Compliance
8 page(s)
507 California Energy Commission
2165763/15/2017 Biological Resources Supplemental Testimony
***THIS DOCUMENT IS SUPERSEDED BY TN 216587***
Compliance
4 page(s)
  California Energy Commission
2164923/9/2017 Palmdale Energy LLC's Proposed Changes to Staff’s Condition of Certification BIO-24

Biological Resources
2 page(s)
  DayZen LLC
2164533/9/2017 Staff’s Proposed Condition of Certification BIO-26 for Discussion at the Palmdale Energy Project Prehearing Conference

1 page(s)
  California Energy Commission
2164193/7/2017 Declaration of Christopher Dennis, P.G., C. Hg.

1 page(s)
506 California Energy Commission
2163863/3/2017 Energy Commission Staff's Prehearing Conference Statement

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2163723/3/2017 Palmdale Energy LLC's Prehearing Conference Statement

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
23 page(s)
58 DayZen LLC
2163543/3/2017 Additional Staff Declarations
Declaration of Alvin Greenberg, James Adams, Edward James Brady and Nancy Fletcher
4 page(s)
505 California Energy Commission
2162782/28/2017 Palmdale Energy LLC's Air Quality Rebuttal Testimony

Air Quality
2 page(s)
  DayZen LLC
2162772/28/2017 Email from J. Cagle Regarding Air Force Plant 42

Traffic and Transportation
2 page(s)
57 DayZen LLC
2161802/22/2017 Energy Commission Staff's Response to Palmdale Energy, LLC's Opening Testimony

8 page(s)
502CEC/Docket UnitCalifornia Energy Commission
2160922/17/2017 Air Force Plant 42 Air Installation Compatible Use Zone Study
This study is an update to the 2002 US Air Force Plant 42 (Plant 42), California Air Installation Compatible Use Zone (AICUZ) study. Plant 42 is a government owned, contractor operated facility for the development, manufacturing, and testing of high performance aircraft; the installation lies in northern Los Angeles County in the city of Palmdale (Figure 1-1). This update presents and documents the changes in aircraft operations occurring at Plant 42 and the land use setting in the vicinity since the issuance of the previous AICUZ study.
Traffic and Transportation
172 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2160872/17/2017 Aviso Sobre La Conferencia Previa A La Audiencia Y Audiencia Probatoria, Programacio Y Otras Ordenes
Spanish version of Notice - Viernes 10 De Marzo De 2017 and Miercoles 22 De Marzo De 2017
10 page(s)
 All PartiesEnergy Commission Hearing Office
2160852/17/2017 Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, etc.
Notice
9 page(s)
 All PartiesEnergy Commission Hearing Office
2160382/15/2017 Palmdale Amendment Status Update No. 15
Palmdale Energy Project (PEP) (08-AFC-9C) Status Update 15, dated February 15, 2017
Compliance
1 page(s)
  California Energy Commission
2153971/13/2017 Palmdale Energy Project Status Update No. 14
Palmdale Energy Project (PEP) Committee Status Update No. 14, dated January 13, 2017
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott, and Ken CelliCalifornia Energy Commission
2151891/6/2017 Palmdale Energy LLC's Opening Testimony

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
86 page(s)
56CEC/Docket UnitDayZen LLC
21511812/29/2016 Palmdale Energy Project Traffic and Transportation Supplemental Testimony
Palmdale Energy Project (PEP), supplemental testimony, plus appendices and figure, dated December, 2016
Compliance
18 page(s)
501CEC/Docket UnitCalifornia Energy Commission
21482512/15/2016 Palmdale Amendment Status Update No. 13
Palmdale Energy Project (PEP) Amendment Committee Status Update number 13 for December, 2016
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
21472112/9/2016 Palmdale Energy LLC's Status Report 13 and Request to Reinstate Schedule

2 page(s)
  DayZen LLC
21456711/28/2016 Palmdale Energy, LLC's Plume Vertical Velocity Assessment for the Air Cooled Condensers

Air Quality
8 page(s)
55CEC/Docket UnitDayZen LLC
21450911/16/2016 Palmdale Energy LLC's Status Report 12

1 page(s)
  DayZen LLC
21448411/14/2016 Palmdale Amendment Status Update No. 12
Palmdale Energy Project (PEP) Committee Status Update No. 12 for November, 2016
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott, and Kenneth CelliCalifornia Energy Commission
21408710/17/2016 Memo re: Applicant’s request for a schedule delay for the Palmdale Energy Project Petition to Amend (08-AFC-09C)
Memo from Hearing Officer accepting Applicant's request to defer scheduling events in the Palmdale Energy Project until the Applicant requests a resumption of the schedule.
1 page(s)
 All PartiesEnergy Commission Hearing Office
21408210/17/2016 Palmdale Committee Status Report No. 11
Palmdale Energy Project (PEP) Status Report No. 11
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
21400210/14/2016 Palmdale Energy LLC's Status Report 11

2 page(s)
  DayZen LLC
21394010/10/2016 Palmdale Energy Project Email Chain Regarding Schedule Delay

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
2 page(s)
 Scott GalatiDayZen LLC
2136979/16/2016 Notice of Availability: Of Final Staff Assessment for Palmdale Energy Project Amendment to Members of the Public
Final Staff Assessment for the Palmdale Energy Project Amendment
5 page(s)
 Members of the PublicCalifornia Energy Commission
2136969/16/2016 Palmdale Committee Status Report No. 10

Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2136899/16/2016 Request for Public Access to Final Staff Assessment for Palmdale Energy Project Amendment
Notice of Availability
1 page(s)
 LibrarianCalifornia Energy Commission
2136539/15/2016 Palmdale Energy LLC's Status Report 10

1 page(s)
 CEC/Docket UnitDayZen LLC
2136459/14/2016 Request for Comments on the Final Staff Assessment for the Palmdale Energy Project Amendment (08-AFC-9C)
Letter to Agency
4 page(s)
 Agency Distribution ListCalifornia Energy Commission
2136239/12/2016 Final Staff Assessment

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
958 page(s)
500CEC/Docket UnitCalifornia Energy Commission
2132158/31/2016 Proposed Offsets for PEP, July 6, 2016
Proposed emission reduction credits (offsets) for Palmdale Energy Project (PEP)
Compliance
3 page(s)
54Antelope Valley Air Quality Management District/Chris AndersonAtmospheric Dynamics, Inc.
2130858/30/2016 Record of Conversation for Palmdale Energy Project, LA County Public Works, Waterworks Division
Record of Conservation with LA County Public Works, Waterworks Division, documenting state of potable water supply assessment
Compliance
1 page(s)
  California Energy Commission
2129288/24/2016 Palmdale Energy Project Amendment Special Status Update, Final Staff Assessment Publication Date
Staff document updating two week delay in FSA publication date
Compliance
1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2129228/24/2016 Antelope Valley Air Quality Management District’s Revised Final Determination of Compliance

Air Quality
76 page(s)
53CEC/Eric VeerkampDayZen LLC
2128008/15/2016 Palmdale Energy Project Amendment STATUS UPDATE No. 9

1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2127938/15/2016 Palmdale Energy LLC's Status Report 9

Air Quality
1 page(s)
 CEC/Docket UnitDayZen LLC
2126438/5/2016 Revised General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters
General Orders
6 page(s)
 All PartiesEnergy Commission Hearing Office
2124587/25/2016 Antelope Valley Air Quality Management District’s Final Determination of Compliance

Air Quality
74 page(s)
52Palmdale Energy, LLC/Thomas JohnsDayZen LLC
2123327/18/2016 Order Approving Extension of the Deadline to Commence Construction

2 page(s)
 PartiesCalifornia Energy Commission
2123237/15/2016 Palmdale Energy Project Amendment Status Report (Update) No. 8
Palmdale Energy Project (PEP) Committee status update number 8 for July15, 2016
Compliance
1 page(s)
 CEC/Karen Douglas, Janea ScottCalifornia Energy Commission
2123087/15/2016 Palmdale Energy LLC's Status Report 8

Air Quality, Cultural Resources, Land Use
2 page(s)
 CEC/Docket UnitDayZen LLC
2123047/13/2016 Palmdale Cultural Significance Eval & CRHR Eligibility for Four Sites

Cultural Resources
126 page(s)
  DayZen LLC
2122777/13/2016 Palmdale Energy, LLC's Application for Confidential Designation

Cultural Resources
2 page(s)
  DayZen LLC
2118456/16/2016 EPA Comments on Palmdale Revised PDOC, dated June 10, 2016
EPA, Region 9 Comments on the revised Preliminary Determination of Compliance (PDOC) for the Palmdale Energy Project (PEP) issued by the AVAQMD on June 6, 2016
Compliance
3 page(s)
  US EPA
2118446/16/2016 Staff Analysis of Petition to extend Construction Deadline
Cover letter and staff analysis of the request to extend the construction deadline for the Palmdale Energy Project (PEP), 08-AFC-9C
Compliance
5 page(s)
  California Energy Commission
2118326/15/2016 Palmdale Energy Project Amendment Status Update No. 7

1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2118186/15/2016 Palmdale Energy LLC's Status Report 7

Air Quality, Cultural Resources, Transmission Line Safety and Nuisance
2 page(s)
 CEC/Docket UnitDayZen LLC
2117136/3/2016 Notice of Receipt
Petition to Extend the Deadline for Commencement of Construction for the Palmdale Energy Project (08-AFC-9C)
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2116625/27/2016 Palmdale Energy LLC Air Cooled Condensers Plume Analysis

Air Quality
9 page(s)
51CEC/Docket UnitDayZen LLC
2116252/12/2016 Appendix D Power Flow Plots - Queue Cluster 8 Phase I Report

356 page(s)
 CEC/Robert OglesbyDayZen LLC
2115465/18/2016 Palmdale Energy LLC's Request for Extension of Construction Start Date

4 page(s)
  DayZen LLC
2115433/2/2016 Palmdale Energy Project CAISO Cluster 8 Phase I Interconnection Study - Addendum #1 Appendix A

Transmission System Engineering
24 page(s)
 CEC/Robert OglesbyDayZen LLC
2115423/2/2016 Palmdale Energy Project CAISO Cluster 8 Phase I Interconnection Study - Addendum #1

Transmission System Engineering
70 page(s)
 CEC/Robert OglesbyDayZen LLC
2115403/2/2016 CAISO Cluster 8 Phase I Study Results Meeting Minutes

Transmission System Engineering
10 page(s)
 CEC/Robert OglesbyDayZen LLC
2115152/12/2016 Appendix K Environmental - Queue Cluster 8 Phase I Report

9 page(s)
 CEC/Robert OglesbyDayZen LLC
2115142/12/2016 Appendix H Short Circuit Calculation - Queue Cluster 8 Phase I Report

5 page(s)
 CEC/Robert OglesbyDayZen LLC
2115132/12/2016 Appendix F Transient Stability Report - Queue Cluster 8 Phase I Report

78 page(s)
 CEC/Robert OglesbyDayZen LLC
2115122/12/2016 Appendix E Cost Summary - Queue Cluster 8 Phase I Report

1 page(s)
 CEC/Robert OglesbyDayZen LLC
2115102/12/2016 Appendix C Bulk Contingency List - Queue Cluster 8 Phase I Report

17 page(s)
 CEC/Robert OglesbyDayZen LLC
2115092/12/2016 Appendix B System Assumptions - Queue Cluster 8 Phase I Report

9 page(s)
 CEC/Robert OglesbyDayZen LLC
2115082/12/2016 Appendix A Palmdale - Q1216 Queue Cluster 8 Phase I Report

23 page(s)
 CEC/Robert OglesbyDayZen LLC
2115072/12/2016 Northern Area Report - Queue Cluster 8 Phase I Interconnection Study Report

69 page(s)
 CEC/Robert OglesbyDayZen LLC
2115062/12/2016 California ISO Cover Letter for attached Cluster 8 Phase I Interconnection Study Report

1 page(s)
 Palmdale Energy, LLC/Thomas JohnsDayZen LLC
2115055/17/2016 Response to Application for Confidentiality - CAISO Cluster 8 Phase I Interconnection Study

3 page(s)
 Scott A. GalatiCalifornia Energy Commission
2115035/16/2016 Palmdale Energy LLC's Status Report 6

Air Quality, Transmission Line Safety and Nuisance
1 page(s)
 CEC/Docket UnitDayZen LLC
2115025/16/2016 Status Update No. 6
Palmdale Energy Project (PEP) Committee Status Update, May 16, 2016
Compliance
1 page(s)
 CEC/Karen Douglas, Janea A. Scott and Kenneth CelliCalifornia Energy Commission
2114945/16/2016 Transcript of the 05/10/16 Committee Status Conference

33 page(s)
 PartiesCalifornia Energy Commission
2114885/16/2016 Antelope Valley Air Quality Management District Road Paving Protocol Approval for Palmdale Energy Project

Air Quality
1 page(s)
50Atmospheric Dynamics Inc./Gregory S. DarvinDayZen LLC
211479-15/13/2016 Preliminary ERC RACT Review for the Palmdale Energy Project

Air Quality
54 page(s)
48Antelope Valley Air Quality Management District/Chris AndersonDayZen LLC
211479-25/13/2016 Preliminary ERC RACT Review for the Palmdale Energy Project - AVAQMD RACT Matrix
Excel spreadsheet
Air Quality
49Antelope Valley Air Quality Management District/Chris AndersonDayZen LLC
2114515/12/2016 Antelope Valley Air Quality Management District's Preliminary Determination of Compliance - Rev A for Palmdale Energy Project

Air Quality
70 page(s)
47Palmdale Energy, LLC/Thomas JohnsDayZen LLC
2113535/4/2016 California Water Boards - Lahontan Region Comments on Preliminary Staff Assessment

4 page(s)
 CEC/Christine RootCalifornia Water Boards Lahontan Region
2113525/4/2016 James Brockway Comments On Palmdale Energy Project Preliminary Staff Assessment

1 page(s)
 CEC/Docket UnitJames Brockway
2112644/27/2016 Palmdale Energy LLC’s Final Comments on the Preliminary Staff Assessment

Air Quality, Biological Resources, Cultural Resources, Facility Design, Land Use, Project Description, Traffic and Transportation, Worker Safety and Fire Protection, Waste Management, Soil and Water
14 page(s)
46 DayZen LLC
2112394/25/2016 AVISO SOBRE LA CONFERENCIA DE ANÁLISIS DE SITUACIÓN DEL COMITÉ
May 10, 2016 10:00 a.m. Status Conference in Hearing Room B at the Energy Commission
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2112344/25/2016 Audio Recording of Palmdale Energy Project (PEP) Preliminary Staff Assessment (PSA) Workshop
Notice of availability of audio recording of PEP PSA workshop held at Energy Commission on 4/20/2016
Compliance
1 page(s)
  California Energy Commission
2112174/25/2016 Center for Biological Diversity Comments: on Preliminary Staff Assessment

5 page(s)
 CEC/Docket UnitApril Rose Sommer for Center for Biological Diversity
2111874/22/2016 Los Angeles County Department of Public Works re use of road right of way

Land Use
  Los Angeles County Department of Public Works
2111744/21/2016 Palmdale Energy LLC's Revised Emissions Offset Package

Air Quality
11 page(s)
45Antelope Valley Air Quality Management District/Chris AndersonDayZen LLC
2111684/21/2016 Palmdale Energy Project Subpart TTTT Compliance Calculations

Air Quality
1 page(s)
44CEC/Docket UnitDayZen LLC
2111504/20/2016 County Sanitation Districts of Los Angeles County Will Serve Letter for Palmdale Energy Project

Waste Management, Soil and Water
2 page(s)
 PlamdaleEnergy, LLC County of Sanitation Districts
2111334/18/2016 Notice of Committee Status Conference
May 10, 2016 10:00 am Status Conference @ California Energy Commission
6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2110704/14/2016 Confidential Emissions Offset Package Additional Information

Air Quality
9 page(s)
  DayZen LLC
2110674/14/2016 Palmdale Energy, LLC's Application for Confidential Designation

Air Quality
2 page(s)
  DayZen LLC
2110454/14/2016 Palmdale Energy LLC’s Initial Comments on the Preliminary Staff Assessment

Air Quality, Biological Resources, Cultural Resources, Facility Design, Land Use, Project Description, Traffic and Transportation, Worker Safety and Fire Protection, Waste Management, Soil and Water
12 page(s)
43 DayZen LLC
2110294/13/2016 Palmdale Energy LLC's Status Report 5

1 page(s)
  DayZen LLC
2110274/13/2016 Palmdale Energy Project Amendment Status Update No. 5

1 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2110124/12/2016 Martin Family Comments: On 08-AFC-9C

2 page(s)
 CEC/Docket UnitMartin Family
2109854/8/2016 Notice of Public Workshop for the Preliminary Staff Assessment
This document supersedes TN 210978
7 page(s)
  California Energy Commission
2109784/7/2016 Notice of Public Workshop for the Preliminary Staff Assessment
Workshop notice for Palmdale Energy Project (PEP) discussion of Preliminary Staff Assessment (PSA)
Compliance
7 page(s)
  California Energy Commission
2108493/24/2016 Public Participation in the Review of the Preliminary Staff Assessment
Notice of Availability for public review of the Preliminary Staff Assessment (PSA) for the Palmdale Energy Project (PEP), dated March, 24, 2016
Compliance
5 page(s)
 Members of the PublicCalifornia Energy Commission
2108483/24/2016 Request for Public Access to Preliminary Staff Assessment (PSA)
Notice of Availability requesting librarians grant public access to Preliminary Staff Assessment (PSA) for the Palmdale Energy Project (PEP), dated 3/24/2016
Compliance
1 page(s)
 LibrarianCalifornia Energy Commission
2108443/23/2016 Request for Comments on the Preliminary Staff Assessment for the Palmdale Energy Project Amendment
Palmdale (PEP) PSA Notice of Availability (NOA) Agency Distribution List
Compliance
5 page(s)
 Agency Distribution ListCalifornia Energy Commission
2108353/23/2016 Palmdale Final Preliminary Staff Assessment, 3/23/2016
Palmdale Energy Project (PEP) Preliminary Staff Assessment (PSA), dated March 23, 2016
Compliance
580 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2107973/21/2016 Palmdale Energy LLC's Revised Supplemental Response to California Energy Commission Staff Data Request 55

Transmission System Engineering
2 page(s)
42CEC/Dockets UnitDayZen LLC
2107833/18/2016 Palmdale Energy LLC's Revised One-Line Drawing No. A01 Revision E

Transmission System Engineering
1 page(s)
41 DayZen LLC
2107513/15/2016 Palmdale Committee Status Report No. 4
Palmdale Energy Project (PEP) Status Report No. 4, dated March 15, 2016
Compliance
2 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2107203/15/2016 Palmdale Energy LLC's Status Report 4

Air Quality, Transmission System Engineering
2 page(s)
 CEC/Docket UnitDayZen LLC
2106933/11/2016 Project Owner Responses to miscellaneous inquiries from air quality staff
Palmdale Energy, LLC responses to Air Quality staff inquiries on March 10, 2016
Compliance
6 page(s)
40California Energy CommissionPalmdale Energy, LLC
2106623/9/2016 Palmdale Energy response to Transmission system equipment rating questions
Response from Thomas Johns with Summit Power to transmission staff question about Palmdale system hardware ratings
Compliance
4 page(s)
39 California Energy Commission
2106393/8/2016 EPA Region 9 Comments on the Preliminary Determination of Compliance
EPA Region 9 Comments on Palmdale Energy Project (PEP) Preliminary Determination of Compliance (PDOC) issued by AVAQMD
Compliance
5 page(s)
  California Energy Commission
2106103/4/2016 Palmdale Energy LLC's Revised Transmission System Engineering Drawings

Transmission System Engineering
4 page(s)
38CEC/Dockets UnitDayZen LLC
2105993/3/2016 Order Canceling the March 23, 2016 Committee Status Conference
Order
1 page(s)
 All PartiesEnergy Commission Hearing Office
2105943/2/2016 Palmdale Energy LLC's Revised Supplemental Response to California Energy Commission Staff Data Request 55 and 58

Transmission System Engineering
3 page(s)
37CEC/Dockets UnitDayZen LLC
2105932/11/2016 Palmdale Energy Project Confidential Document

1 page(s)
 CEC/Robert OglesbyDayZen LLC
2105923/2/2016 Response to Application for Confidentiality

3 page(s)
  California Energy Commission
2105913/2/2016 Palmdale Energy LLC's Application for Confidential Designation CAISO Cluster 8 Phase I Interconnection Study – Addendum #1
Confidential information: Palmdale Energy Project Caiso Cluster 8; Phase I Interconnection Study – Addendum #1
Transmission System Engineering
2 page(s)
 CEC/Robert OglesbyDayZen LLC
2105873/2/2016 Palmdale Energy LLC's Revised Paved ERC Data Collection Protocol

Air Quality
13 page(s)
36Antelope Valley Air Quality Management District/Chris AndersonDayZen LLC
2105012/22/2016 Memorandum Regarding Extension to Publish Preliminary Staff Assessment
Memorandum
1 page(s)
 All PartiesEnergy Commission Hearing Office
2104992/22/2016 Notice of Committee Status Conference
March 23, 2016 at 2:00 p.m. Status Conference at the Energy Commission
6 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
2104782/19/2016 City of Lancaster Withdrawal of Intervention

1 page(s)
 CEC/Dockets UnitLaw Offices of Gloria D. Smith
2104762/19/2016 Palmdale Energy Project Committee Status Report No. 3
Committee Status Report No. 3 for the Palmdale Energy Project (PEP)
Compliance
2 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
2104702/19/2016 Palmdale Energy LLC's Status Report 3

2 page(s)
 CEC/Dockets UnitDayZen LLC
2104552/18/2016 Palmdale Data Response Workshop audio recording
Cover letter notification of availability of Palmdale Energy Project (PEP) Data Response Workshop No. 2 audio recording
Compliance
1 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2104522/18/2016 Record of Conversation for Palmdale Energy Project, Water Supply Assesment
Record of Conservation about pending Water Supply Assessment from the LA County Dept. of Public Works for the Palmdale Energy Project
Compliance
1 page(s)
  California Energy Commission
2104102/18/2016 Palmdale Energy LLC's Response to WSQ-2 Typical Filter House Evaporative Cooler Assembly Diagram

Public Health
1 page(s)
35CEC/Dockets UnitDayZen LLC
2103632/17/2016 Letter from SoCal Gas Regarding Gas Sulfur Content

2 page(s)
34Summit Power Group, LLC/Thomas JohnsDayZen LLC
2103592/12/2016 Palmdale Energy, LLC's Application for Confidentiality
Palmdale Energy Project CaISO Cluster 8 Phase I Interconnection Study
3 page(s)
 CEC/Robert OglesbyDayZen LLC
2103282/16/2016 Presentation - Palmdale Energy Project Workshop Data Response Workshop No. 2 Agenda
Agenda for discussion at Palmdale Data Response Workshop No. 2
Compliance
8 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2103212/16/2016 Rule 1406 PERC Data Collection Protocol for the Palmdale Energy Project
Paving Emissions Reduction Credits Protocol
Air Quality
12 page(s)
33Antelope Valley Air Quality Management District/Chris AndersonDayZen LLC
2102812/11/2016 Palmdale Energy, LLC's Application for Confidential Designation
Confidential Emissions Offset Package
3 page(s)
 CEC/Robert OglesbyDayZen LLC
210277-12/11/2016 Memo re: February Status Reports due 2/19/16
Hearing Officer Memorandum extending the due date for the February status reports to February 19, 2016 based upon unanimous consent of the parties.
1 page(s)
 All PartiesEnergy Commission Hearing Office
210277-22/11/2016 Email from Scott Galati re February Status Report
Email thread among the parties and Hearing Officer regarding Applicant's request to extend the deadline to file the February status report from 2/15/16 to 2/19/16.
2 page(s)
 All Parties and Hearing OfficerEnergy Commission Hearing Office
2101982/5/2016 Palmdale Class I Update Appendix G Built Environ Maps
  California Energy Commission
2101972/5/2016 Palmdale Class I Update Appendix F Built Environ Records Search
  California Energy Commission
2101962/5/2016 Palmdale Confidential Appendix E Archy Maps
  California Energy Commission
2101952/5/2016 Palmdale Class I Update Appendix A Resumes
  California Energy Commission
2101942/5/2016 Palmdale Class I Update
  California Energy Commission
2101852/5/2016 Palmdale Energy LLC's Supplemental Response to CEC Staff Data Request 46

Socioeconomics
4 page(s)
32CEC/Dockets UnitDayZen LLC
2101832/5/2016 Palmdale Energy LLC's Response to CEC Staff Data Request Set No.3 (65-68)

Air Quality
13 page(s)
31CEC/Dockets UnitDayZen LLC
2101712/5/2016 Palmdale Energy LLC's Supplemental Response to California Energy Commission Staff Data Request 55 and 58

Transmission System Engineering
4 page(s)
30CEC/Dockets UnitDayZen LLC
2101702/5/2016 Repeated Application for Confidentiality - Cultural Resources
Appendix B, Appendix C, and Appendix D are too large to upload. See dockets staff for a CD.
2 page(s)
  Palmdale Energy LLC
2101672/5/2016 Antelope Valley Air Quality Management District's Preliminary Determination of Compliance for Palmdale Energy Project

Air Quality
65 page(s)
29Palmdale Energy, LLC/Thomas JohnsDayZen LLC
2101662/5/2016 Palmdale Energy LLC's Responses to Workshop Queries (1-8)
In support of the Petition to Amend
Air Quality, Public Health, Transmission System Engineering, Worker Safety and Fire Protection, Soil and Water
33 page(s)
28CEC/Dockets UnitDayZen LLC
2101302/2/2016 Palmdale Energy LLC's Preliminary Fire Protection Plan in Response to CEC Staff Data Request 61

Worker Safety and Fire Protection
15 page(s)
27CEC/Dockets UnitDayZen LLC
2101212/1/2016 Notice of Staff Workshop for the Palmdale Energy Project – Petition to Amend the Commission Final Decision
Data Response and Issue Resolution Workshop No. 2 - February 17, 2016
Compliance
5 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2085501/22/2016 Palmdale Energy LLC's Supplemental Response to CEC Staff Data Request 62

Worker Safety and Fire Protection
3 page(s)
26CEC/Dockets UnitDayZen LLC
2074431/15/2016 Palmdale Energy Project Committee Status Update No. 2
Palmdale Energy Project (PEP) Committee Update No. 2, January 15, 2016
Compliance
3 page(s)
 CEc/DocketCalifornia Energy Commission
2074421/15/2016 Palmdale Data Requests Set 3
Palmdale Energy Project (PEP) Data Requests Set 3 (65-68)
Compliance
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2073251/15/2016 Palmdale Energy LLC's Status Report 2

2 page(s)
  DayZen LLC
2073181/14/2016 Palmdale Energy LLC's Supplemental Response to Data Request 32, Off-site Ammonia Consequence Analysis

Air Quality
9 page(s)
25CEC/Dockets UnitDayZen LLC
2071761/4/2016 Cover Memo, Palmdale Data Response Workshop Audio Recording
Memo providing location of audio recording of Palmdale Data Response Workshop on December 17, 2015
Compliance
1 page(s)
  California Energy Commission
20705412/16/2015 Presentation - Palmdale (PEP) Data Response Workshop Agenda
Agenda and supporting materials for the Palmdale Energy Project Data Response Workshop - Participation Information, Purpose, and Agenda Topics on December 17, 2015
Compliance
8 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20701512/15/2015 Palmdale Energy LLC's Status Report 1

2 page(s)
  DayZen LLC
20693912/11/2015 City of Lancaster's Status Report #1
status report
Compliance
3 page(s)
 CEC/Dockets UnitCity of Lancaster
20692812/11/2015 Palmdale Energy LLC's Response to CEC Staff Data Request Set One (1-63) Air Quality Modeling Files
CD's containing Air Modeling Files are located in the Docket Unit
1 page(s)
24 DayZen, LLC
20691512/10/2015 Transcript of 11/16/15 Public Site Visit, Environmental Scoping Meeting and Informational Hearing, and Committee Order

67 page(s)
 PartiesCalifornia Energy Commission
20691412/10/2015 Palmdale Energy LLC's Response to CEC Staff Data Request Set No.2 (64)

Waste Management
152 page(s)
23CEC/Eric VeerkampDayZen LLC
20686912/7/2015 Notice of Staff Workshop for the Palmdale Energy Project, Petition to Amend the Commission Final Decision
Notice of Data Request Workshop
Compliance
6 page(s)
 Interested PartiesCalifornia Energy Commission
20681912/2/2015 Committee Scheduling Order

7 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20681212/1/2015 Palmdale Energy Project Status Report No. 1, Nov. 1, 2015
Status Report No. 1 for the Palmdale Energy Project, November 1, 2015
Compliance
3 page(s)
 CEC/Karen Douglas, Janea Scott and Kenneth CelliCalifornia Energy Commission
20679711/30/2015 Palmdale Energy LLC's Response to CEC Staff Data Request Set No.1 (1-63)

Air Quality, Cultural Resources, Hazardous Materials, Public Health, Socioeconomics, Transmission System Engineering, Worker Safety and Fire Protection, Soil and Water
161 page(s)
22CEC/Eric VeerkampDayZen LLC
20677711/25/2015 Data Request Set 2, No. 64
Data Request Set 2, No. 64 for Palmdale Energy Project (PEP)
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
20671211/20/2015 GE’s Comments to Palmdale Energy Center LLC’s Revised Petition for Amendment

3 page(s)
  Peter Paul Alexander Stroganow II
20667611/18/2015 Letter of Support This Project Will Bring Construction and Jobs to the Immediate Area

2 page(s)
 City of Palmdale/Mayor James C. Ledford, Jr.Antelope Valley African American Chamber of Commerce/Richard Paston
20667511/18/2015 Comments on the Plant Impact to Health and Well-Being

1 page(s)
 CEC/Dockets UnitStephen L. Brown and Connie L. Brown
20667411/18/2015 Comments on Support for the Palmdale Energy Project

1 page(s)
 CEC/Dockets UnitTom Lackey/Assemblyman, 36th District
20666811/18/2015 Power Point Presentation for11/16/15 Site Visit, Etc.

50 page(s)
 All PartiesEnergy Commission Hearing Office
20665111/17/2015 Palmdale Energy LLC's Presentation for 11/16/15 Site Visit, Scoping Meeting & Informational Hearing

10 page(s)
21 DayZen LLC
20660111/12/2015 Memorandum re Palmdale Energy Project Schedule
Schedule for Discussion During the Upcoming Palmdale Energy Project Site Visit, Scoping Meeting & Informational Hearing November 16, 2015
2 page(s)
 All PartiesEnergy Commission Hearing Office
20659311/12/2015 Notice of Informational Hearing and Site Visit (Spanish Version)
AVISO DE VISITA PÚBLICA AL EMPLAZAMIENTO, REUNIÓN PARA TRATAR EL ALCANCE AMBIENTAL Y AUDIENCIA INFORMATIVA, Y DECISIÓN DEL COMITÉ
9 page(s)
 All PartiesEnergy Commission Hearing Office
20657011/10/2015 Lancaster Issue Identification Report
Issue identification and scoping report
Compliance
9 page(s)
  City of Lancaster
20654211/9/2015 Request for Water Supply Assessment from City of Palmdale for Palmdale Energy Project
A request for a Water Supply Assessment from City of Palmdale Public Works for the Palmdale Energy Project (PEP) from Energy Commission Water staff
Compliance
1 page(s)
 Gordon L. Phair, P.E./City of PalmdaleCalifornia Energy Commission
206523-111/6/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13)
*** THIS DOCUMENT SUPPLEMENTS TN 206521-1 *** - THIS DOCUMENT IS PART OF APPENDICES FILED UNDER TN 206521-2 through TN 206521-7
26 page(s)
19CEC/Dockets UnitDayZen LLC
206523-211/6/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 6)
THIS DOCUMENT IS PART OF APPENDICES FILED UNDER TN 206521-2 through TN 206521-7
34 page(s)
20CEC/Dockets UnitDayZen LLC
206521-111/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13)
*** THIS DOCUMENT IS REPLACED BY TN 206523-1 ***
113 page(s)
12CEC/Dockets UnitDayZen LLC
206521-211/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 1)

113 page(s)
13CEC/Dockets UnitDayZen LLC
206521-311/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 2)

72 page(s)
14CEC/Dockets UnitDayZen LLC
206521-411/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 3)

39 page(s)
15CEC/Dockets UnitDayZen LLC
206521-511/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 4)

38 page(s)
16CEC/Dockets UnitDayZen LLC
206521-611/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 5)

17 page(s)
17CEC/Dockets UnitDayZen LLC
206521-711/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 7)

29 page(s)
18CEC/Dockets UnitDayZen LLC
20651911/5/2015 Response Letter to the Energy Commission's Request for a Water Supply Assessment for Palmdale Hybrid Power Project

Compliance
1 page(s)
 CEC/Christopher DennisPalmdale Water District/Matthew Knudson
20651211/5/2015 Palmdale Energy LLC's Response to City of Lancaster Data Request Set No. 1 (1-13) - Appendices DR-2 & DR-3
The two CD's are in the Docket Unit containing air quality modeling files
1 page(s)
11CEC/Dockets UnitDayZen LLC
20650611/3/2015 Issues Identification and Scoping Report
Palmdale Energy Project (PEP) Petition to Amend (PTA) Major Issues Identification and Scoping Report
Compliance
15 page(s)
  California Energy Commission
20647210/30/2015 Palmdale Energy Project - Petition to Amend Data Requests - Set 1 (Nos. 1-63)
Data Request 1 through 63 for Palmdale Energy Project (PEP) PTA
Compliance
24 page(s)
 Galati Blek, LLP/Scott GalatiCalifornia Energy Commission
20641210/22/2015 Email from Caitlin Gulley Regarding Tribal Consultation re Palmdale Hybrid Power Project

2 page(s)
 CEC/Kenneth CelliEnergy Commission Hearing Office
20640710/20/2015 City of Lancaster's First Set of Data Requests
Data Requests
Compliance
11 page(s)
 ApplicantCity of Lancaster
20638610/16/2015 Palmdale Energy LLC's Supplemental Cumulative AQ Impact Analysis Report - AQ Modeling Files

Air Quality
1 page(s)
10CEC/Dockets UnitDayZen LLC
20638510/16/2015 Notice of Public Site Visit, Environmental Scoping Meeting, etc.
Notice
7 page(s)
 All partiesEnergy Commission Hearing Office
20637810/16/2015 Applicant's Responses to Socioeconomic and Alternatives Inquiry
responses to informal questions from Energy Commission staff about Palmdale Energy Project for Socioeconomics and Alternatives
Compliance
2 page(s)
9 DAYZEN LLC/ Scott Galati
20633510/13/2015 Palmdale Energy LLC's Supplemental Cumulative Air Quality Impact Analysis Report

Air Quality
4 page(s)
8 DayZen LLC
20628810/6/2015 Notice of Receipt by Antelope Valley Air District
Antelope Valley Air Quality Management District notice of receipt of Palmdale Energy Project permit application
Compliance
2 page(s)
  Antelope Valley Air Quality Management District
2062329/29/2015 Water Supply Assessment Request Letter to Los Angeles County Waterworks District
California Energy Commission letter to LA Waterworks requesting a water supply assessment for the Palmdale PTA
Compliance
1 page(s)
 Los Angeles County Waterworks Districts/Adam ArikiCalifornia Energy Commission
2062199/28/2015 Letter from Energy Commission to Palmdale Water District requesting a water supply assessment for the Palmdale PTA

Compliance
1 page(s)
 Palmdale Water DistrictCalifornia Energy Commission
2061939/24/2015 Antelope Valley Air District Source data listing for Palmdale Cumulative air modeling
Antelope Valley Air District source data list for cumulative air analysis for PHPP PTA
Compliance
40 page(s)
  California Energy Commission
2061029/14/2015 Committee Order Granting Petition to Intervene
Order
3 page(s)
 All partiesCalifornia Energy Commission
2060989/14/2015 Memo re Upcoming Site Visit, Scoping Meeting & Informational Hearing Dates

1 page(s)
 All partiesCalifornia Energy Commission
2060909/14/2015 Report of Conversation Parks
Socioeconomic staff record of Palmdale park acreage
Socioeconomics
1 page(s)
  California Energy Commission
2060899/14/2015 Report of Conversation (Antelope Valley) project school fees for socioeconomics
Socioeconomic staff ROC for Antelope valley school impact fees
Socioeconomics
1 page(s)
  California Energy Commission
2060889/14/2015 Report of Conversation (Lancaster) School Impact Fees
Socioeconomic staff ROC for Lancaster school impact fees
Socioeconomics
1 page(s)
  California Energy Commission
2060579/10/2015 Amended General Orders Regarding Electronic Document Formats
Orders
18 page(s)
 PartiesEnergy Commission Hearing Office
2060259/9/2015 Palmdale Energy LLC's Preliminary Drainage, Erosion, and Sediment Control Plan

327 page(s)
7 DayZen LLC
2060219/8/2015 General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters
Order
16 page(s)
 PartiesEnergy Commission Hearing Office
2059879/2/2015 PTA Appendix 4.1.G Final
Revised Appendix 4.1.G, Offsets/Mitigation, of the RPTA Appendices, 277 pages docketed on 7/27/15.
Compliance
14 page(s)
  California Energy Commission
2058428/26/2015 Palmdale- Report of Conversation-LA Assessor-Property number, ownership, and tax rate area
ROC with LA County Assessor confirming project parcel number, ownership, and tax rate area (property tax rate)
Socioeconomics
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2058038/24/2015 Letter from NAHC to CEC
Letter from NAHC to CEC regarding Sacred Lands File Search and list of tribes
Cultural Resources
2 page(s)
 Native American Heritage CommissionCalifornia Energy Commission
2058028/24/2015 Letters to Native American Tribes
Letters from CEC to Native American tribes inviting them to consult on the Palmdale Project
Cultural Resources
2 page(s)
  California Energy Commission
2057598/17/2015 City of Lancaster Petition to Intervene

Compliance
4 page(s)
 CEC/Docket UnitCity of Lancaster
2057468/14/2015 PETICIÓN DE ENMIENDA, Proyecto de Energia Hibrida Palmdale
Acuse de Recibo, 08-AFC-9C)
Compliance
3 page(s)
  California Energy Commission
2057348/13/2015 Hearing Adviser Assignment Memo

1 page(s)
  Energy Commission Hearing Office
2056408/5/2015 Notice of Recipt for Palmdale Petition for Technology Change
Notice of Receipt (NOR) for Palmdale Hybrid Power Project (PHPP) PTA for Technology Change and Name Change
Compliance
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2055207/27/2015 RPTA Appendices
*** Appendices received on 07/20/15 ***
277 page(s)
6CEC/ Docket UnitGalati Blek, LLP
2054507/21/2015 RPTA Figure 2-7b Revised
Replacement figure for PEP RPTA Figure 2-7b.
1 page(s)
5CEC/Docket UnitGalati | Blek LLP
205394-17/20/2015 Palmdale Energy Project Revised Petition to Amend

225 page(s)
2CEC/Eric VeerkampGalati | Blek LLP
205394-27/20/2015 Palmdale Energy Project RPTA Section 2 & 3 Figures

17 page(s)
3CEC/Eric VeerkampGalati | Blek LLP
205394-37/20/2015 Palmdale Energy Project RPTA Section 4 & 6 Figures
Maps and photographs
14 page(s)
4CEC/Eric VeerkampGalati | Blek LLP
2050226/12/2015 Order Approving Transfer of Ownership from the City of Palmdale to Palmdale Energy, LLC
Order No. 15-0610-1a
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2047255/26/2015 Notice of Receipt (NOR), Palmdale Hybrid Ownership Transfer
Notice of Receipt (NOR) for Palmdale Hybrid Power Project Petition to Amend to transfer ownership to Palmdale Energy, LLC
Compliance
2 page(s)
  California Energy Commission
2045095/6/2015 Staff Comments on Palmdale Air Quality and Public Health Modeling Protocol
For the Palmdale Hybrid Power Project [New Palmdale Energy Project]
Compliance
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2044594/30/2015 Palmdale Energy, LLC's Petition for Amendment

144 page(s)
1 Galati | Blek LLP
2044584/30/2015 Palmdale Energy, LLC's Petition for Ownership Transfer

4 page(s)
  Galati | Blek LLP
2015041/2/2014 Letter from City of Lancaster re Emission Reduction Credits Transfer Approval

2 page(s)
 CEC/Karen DouglasCity of Lancaster
20150012/31/2013 Letter re Review of Requested Inter-District Transfer of ERCs from Mojave Desert Air

33 page(s)
 Gloria D. Smith, Esq.Pless Environmental, Inc.
20149912/31/2013 7/17/87 Letter to Dr. Leon Hebertson re proposed issuance of ERC Banking Certificate to Texaco

3 page(s)
 Dr. Leon HebertsonCalifornia Energy Commission
570336/7/2010 MOU Between CEC & West Coast Code Consultants

6 page(s)
 CEC/Docket UnitCEC/M. Errecart