232179 | 2/21/2020 |
Order Approving Termination Order No: 20-0220-3 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
231487 | 1/14/2020 |
PALMDALE ENERGY PROJECT - Request to Terminate
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
230965 | 12/2/2019 |
Palmdale Energy Project Termination Request
Compliance 1 page(s)
| | CEC/Jonathan Fong | Palmdale Energy, LLC |
225626 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
220968 | 8/30/2017 |
NOD for Palmdale Energy Project Final Commission Decision Notice of Decision (NOD) in compliance with Public Resources Code 21080.5, and Title 20, CRC section 1768 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
220858 | 8/23/2017 |
Final Commission Decision
504 page(s)
| | CEC/Dockets | Energy Commission Hearing Unit |
220619 | 8/9/2017 |
Commission Adoption Order Commission Adoption Order No. 17-0809-4 5 page(s)
| | CEC/Dockets | California Energy Commission |
220607 | 8/8/2017 |
Transcript of the 07/24/2017 PMPD Committee Conference
20 page(s)
| | CEC/Dockets | California Energy Commission |
220544 | 8/3/2017 |
Errata to the Presiding Member's Proposed Decision Errata found in the Presiding Member's Proposed Decision and proposed corrections. 7 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
220505 | 8/2/2017 |
[Proposed] Commission Adoption Order Proposed Energy Commission findings and Order on the Petition to Amend the Palmdale Hybrid Power Plant and change its name to Palmdale Energy Project. 5 page(s)
| | CEC/Dockets | Energy Commission Hearing Unit |
220286 | 7/20/2017 |
Palmdale Energy Project Amendment - Staff Comments on the Presiding Member’s Proposed Decision Staff Comments on the Presiding Member’s Proposed Decision 19 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
220143 | 7/13/2017 |
Palmdale Energy LLC's Comments on the Presiding Member's Proposed Decision
6 page(s)
| | CEC/Docket Unit | DayZen LLC |
220010 | 7/3/2017 |
Notice of Availability of Presiding Member's Proposed Decision (PMPD) and Committee Conference and Energy Commission Hearing Committee Conference (PMPD Comments) on July 24, 2017, at 10:00 a.m.; Full Energy Commission Hearing on PMPD on August 9, 2017, at 10:00 a.m. 7 page(s)
| | Parties and Public | Energy Commission Hearing Office |
220009 | 7/3/2017 |
Presiding Member's Proposed Decision (PMPD)
487 page(s)
| | Parties and Public | Energy Commission Hearing Office |
219149 | 6/16/2017 |
Email chain between Hearing Officer Celli, the parties and Public Adviser Emailed request from Hearing Officer to parties and public adviser about their preferences for the location of the PMPD Committee Conference. 2 page(s)
| | All Parties and Public Adviser | Energy Commission Hearing Office |
217578 | 5/12/2017 |
Order Approving 2nd Extension of the Deadline to Commence Construction
2 page(s)
| | CEC/Dockets | California Energy Commission |
217544 | 5/11/2017 |
Palmdale Energy LLC's Stipulation Regarding CEC Staff's Revised Compendium of Conditions of Certification
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 2 page(s)
| | CEC/Dockets | DayZen LLC |
217537 | 5/10/2017 |
Palmldale Energy Project Compendium of Conditions, May 10, 2017 Palmdale Energy Project (PEP) Final Compendium of Conditions of Certification, dated May 10, 2017 Compliance 211 page(s)
| 508 | CEC/Dockets | California Energy Commission |
217377 | 5/1/2017 |
Palmdale Energy Project, Cover Letter and Staff Analysis of 2nd Petition to Extend Construction Deadline Palmdale Energy Project (PEP), Staff Analysis of 2nd Petition to Extend Construction Deadline December 31, 2017. Compliance 7 page(s)
| | Interested Parties | California Energy Commission |
217353 | 4/28/2017 |
2nd PETITION TO EXTEND THE DEADLINE FOR COMMENCEMENT OF CONSTRUCTION FOR THE PALMDALE ENERGY PROJECT Notice of Receipt 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
217298 | 4/26/2017 |
Palmdale Energy LLC's Request for Additional Extension of Construction Start Date
2 page(s)
| | | DayZen LLC |
217209 | 4/20/2017 |
Hearing Officer Memo regarding incomplete, extraneous and erroneous material in the Compendium of Conditions (TN 216834) The Committee directs Staff and Petitioner to confer regarding the changes needed to correct the Compendium of Conditions and to docket a complete and corrected Compendium of Conditions. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
216846 | 4/6/2017 |
Palmdale Energy LLC's Stipulation Regarding CEC Staff's Compendium of Conditions of Certification
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 2 page(s)
| | | DayZen LLC |
216834 | 4/6/2017 |
Conditions of Certification Compendium Revised Compendium from Pre-Hearing Conference reflecting changes to BIO-10 and TSE-5 Compliance 205 page(s)
| | | California Energy Commission |
216723 | 3/28/2017 |
Transcript of 03/22/2017 Evidentiary Hearing
60 page(s)
| | Parties | California Energy Commission |
216659 | 3/22/2017 |
Email Regarding Correction to Transcript of 03102017 Prehearing Conference Mr. Cameron's first name is Thomas, not Tomas. It should read Thomas Cameron. 1 page(s)
| | Parties | California Energy Commission |
216646 | 3/22/2017 |
Eric Knight Declaration and Resume for Bio Resources Resume and declaration Biological Resources 5 page(s)
| 509 | CEC/Docket Unit | California Energy Commission |
216640 | 3/21/2017 |
Palmdale Compendium of Conditions, March 21, 2017 Compliance 204 page(s)
| | CEC/Docket Unit | California Energy Commission |
216639 | 3/21/2017 |
Palmdale Compendium of Conditions, March 21, 2017 Palmdale Energy Project (PEP) Final Clean Compendium of Conditions, dated March 21, 2017 Compliance 204 page(s)
| | CEC/Docket Unit | California Energy Commission |
216635 | 3/21/2017 |
Transcript of 03/10/2017 Prehearing Conference
25 page(s)
| | | California Energy Commission |
216592 | 3/16/2017 |
Palmdale Amendment Status Update No. 16 Palmdale Energy Project (PEP) Committee Status Update 16, March 2017 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
216587 | 3/16/2017 |
Biological Resources Supplemental Testimony, Palmdale Energy Project ***THIS DOCUMENT SUPERSEDES TN 216576*** Compliance 8 page(s)
| 507 | | California Energy Commission |
216576 | 3/15/2017 |
Biological Resources Supplemental Testimony ***THIS DOCUMENT IS SUPERSEDED BY TN
216587*** Compliance 4 page(s)
| | | California Energy Commission |
216492 | 3/9/2017 |
Palmdale Energy LLC's Proposed Changes to Staff’s Condition of Certification BIO-24
Biological Resources 2 page(s)
| | | DayZen LLC |
216453 | 3/9/2017 |
Staff’s Proposed Condition of Certification BIO-26 for Discussion at the Palmdale Energy Project Prehearing Conference
1 page(s)
| | | California Energy Commission |
216419 | 3/7/2017 |
Declaration of Christopher Dennis, P.G., C. Hg.
1 page(s)
| 506 | | California Energy Commission |
216386 | 3/3/2017 |
Energy Commission Staff's Prehearing Conference Statement
7 page(s)
| | CEC/Docket Unit | California Energy Commission |
216372 | 3/3/2017 |
Palmdale Energy LLC's Prehearing Conference Statement
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 23 page(s)
| 58 | | DayZen LLC |
216354 | 3/3/2017 |
Additional Staff Declarations Declaration of Alvin Greenberg, James Adams, Edward James Brady and Nancy Fletcher 4 page(s)
| 505 | | California Energy Commission |
216278 | 2/28/2017 |
Palmdale Energy LLC's Air Quality Rebuttal Testimony
Air Quality 2 page(s)
| | | DayZen LLC |
216277 | 2/28/2017 |
Email from J. Cagle Regarding Air Force Plant 42
Traffic and Transportation 2 page(s)
| 57 | | DayZen LLC |
216180 | 2/22/2017 |
Energy Commission Staff's Response to Palmdale Energy, LLC's Opening Testimony
8 page(s)
| 502 | CEC/Docket Unit | California Energy Commission |
216092 | 2/17/2017 |
Air Force Plant 42 Air Installation Compatible Use Zone Study This study is an update to the 2002 US Air Force Plant 42 (Plant
42), California Air Installation Compatible Use Zone (AICUZ)
study. Plant 42 is a government owned, contractor operated facility
for the development, manufacturing, and testing of high
performance aircraft; the installation lies in northern Los Angeles
County in the city of Palmdale (Figure 1-1). This update presents
and documents the changes in aircraft operations occurring at Plant
42 and the land use setting in the vicinity since the issuance of the
previous AICUZ study. Traffic and Transportation 172 page(s)
| | CEC/Docket Unit | California Energy Commission |
216087 | 2/17/2017 |
Aviso Sobre La Conferencia Previa A La Audiencia Y Audiencia Probatoria, Programacio Y Otras Ordenes Spanish version of Notice - Viernes 10 De Marzo De 2017 and Miercoles 22 De Marzo De 2017 10 page(s)
| | All Parties | Energy Commission Hearing Office |
216085 | 2/17/2017 |
Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, etc. Notice 9 page(s)
| | All Parties | Energy Commission Hearing Office |
216038 | 2/15/2017 |
Palmdale Amendment Status Update No. 15 Palmdale Energy Project (PEP) (08-AFC-9C) Status Update 15, dated February 15, 2017 Compliance 1 page(s)
| | | California Energy Commission |
215397 | 1/13/2017 |
Palmdale Energy Project Status Update No. 14 Palmdale Energy Project (PEP) Committee Status Update No. 14, dated January 13, 2017 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott, and Ken Celli | California Energy Commission |
215189 | 1/6/2017 |
Palmdale Energy LLC's Opening Testimony
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 86 page(s)
| 56 | CEC/Docket Unit | DayZen LLC |
215118 | 12/29/2016 |
Palmdale Energy Project Traffic and Transportation Supplemental Testimony Palmdale Energy Project (PEP), supplemental testimony, plus appendices and figure, dated December, 2016 Compliance 18 page(s)
| 501 | CEC/Docket Unit | California Energy Commission |
214825 | 12/15/2016 |
Palmdale Amendment Status Update No. 13 Palmdale Energy Project (PEP) Amendment Committee Status Update number 13 for December, 2016 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
214721 | 12/9/2016 |
Palmdale Energy LLC's Status Report 13 and Request to Reinstate Schedule
2 page(s)
| | | DayZen LLC |
214567 | 11/28/2016 |
Palmdale Energy, LLC's Plume Vertical Velocity Assessment for the Air Cooled Condensers
Air Quality 8 page(s)
| 55 | CEC/Docket Unit | DayZen LLC |
214509 | 11/16/2016 |
Palmdale Energy LLC's Status Report 12
1 page(s)
| | | DayZen LLC |
214484 | 11/14/2016 |
Palmdale Amendment Status Update No. 12 Palmdale Energy Project (PEP) Committee Status Update No. 12 for November, 2016 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott, and Kenneth Celli | California Energy Commission |
214087 | 10/17/2016 |
Memo re: Applicant’s request for a schedule delay for the Palmdale Energy Project Petition to Amend (08-AFC-09C) Memo from Hearing Officer accepting Applicant's request to defer scheduling events in the Palmdale Energy Project until the Applicant requests a resumption of the schedule. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
214082 | 10/17/2016 |
Palmdale Committee Status Report No. 11 Palmdale Energy Project (PEP) Status Report No. 11 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
214002 | 10/14/2016 |
Palmdale Energy LLC's Status Report 11
2 page(s)
| | | DayZen LLC |
213940 | 10/10/2016 |
Palmdale Energy Project Email Chain Regarding Schedule Delay
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 2 page(s)
| | Scott Galati | DayZen LLC |
213697 | 9/16/2016 |
Notice of Availability: Of Final Staff Assessment for Palmdale Energy Project Amendment to Members of the Public Final Staff Assessment for the Palmdale Energy Project Amendment 5 page(s)
| | Members of the Public | California Energy Commission |
213696 | 9/16/2016 |
Palmdale Committee Status Report No. 10
Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
213689 | 9/16/2016 |
Request for Public Access to Final Staff Assessment for Palmdale Energy Project Amendment Notice of Availability 1 page(s)
| | Librarian | California Energy Commission |
213653 | 9/15/2016 |
Palmdale Energy LLC's Status Report 10
1 page(s)
| | CEC/Docket Unit | DayZen LLC |
213645 | 9/14/2016 |
Request for Comments on the Final Staff Assessment for the Palmdale Energy Project Amendment (08-AFC-9C) Letter to Agency 4 page(s)
| | Agency Distribution List | California Energy Commission |
213623 | 9/12/2016 |
Final Staff Assessment
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 958 page(s)
| 500 | CEC/Docket Unit | California Energy Commission |
213215 | 8/31/2016 |
Proposed Offsets for PEP, July 6, 2016 Proposed emission reduction credits (offsets) for Palmdale Energy Project (PEP) Compliance 3 page(s)
| 54 | Antelope Valley Air Quality Management District/Chris Anderson | Atmospheric Dynamics, Inc. |
213085 | 8/30/2016 |
Record of Conversation for Palmdale Energy Project, LA County Public Works, Waterworks Division Record of Conservation with LA County Public Works, Waterworks Division, documenting state of potable water supply assessment Compliance 1 page(s)
| | | California Energy Commission |
212928 | 8/24/2016 |
Palmdale Energy Project Amendment Special Status Update, Final Staff Assessment Publication Date Staff document updating two week delay in FSA publication date Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
212922 | 8/24/2016 |
Antelope Valley Air Quality Management District’s Revised Final Determination of Compliance
Air Quality 76 page(s)
| 53 | CEC/Eric Veerkamp | DayZen LLC |
212800 | 8/15/2016 |
Palmdale Energy Project Amendment STATUS UPDATE No. 9
1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
212793 | 8/15/2016 |
Palmdale Energy LLC's Status Report 9
Air Quality 1 page(s)
| | CEC/Docket Unit | DayZen LLC |
212643 | 8/5/2016 |
Revised General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters General Orders 6 page(s)
| | All Parties | Energy Commission Hearing Office |
212458 | 7/25/2016 |
Antelope Valley Air Quality Management District’s Final Determination of Compliance
Air Quality 74 page(s)
| 52 | Palmdale Energy, LLC/Thomas Johns | DayZen LLC |
212332 | 7/18/2016 |
Order Approving Extension of the Deadline to Commence Construction
2 page(s)
| | Parties | California Energy Commission |
212323 | 7/15/2016 |
Palmdale Energy Project Amendment Status Report (Update) No. 8 Palmdale Energy Project (PEP) Committee status update number 8 for July15, 2016 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea Scott | California Energy Commission |
212308 | 7/15/2016 |
Palmdale Energy LLC's Status Report 8
Air Quality, Cultural Resources, Land Use 2 page(s)
| | CEC/Docket Unit | DayZen LLC |
212304 | 7/13/2016 |
Palmdale Cultural Significance Eval & CRHR Eligibility for Four Sites
Cultural Resources 126 page(s)
| | | DayZen LLC |
212277 | 7/13/2016 |
Palmdale Energy, LLC's Application for Confidential Designation
Cultural Resources 2 page(s)
| | | DayZen LLC |
211845 | 6/16/2016 |
EPA Comments on Palmdale Revised PDOC, dated June 10, 2016 EPA, Region 9 Comments on the revised Preliminary Determination of Compliance (PDOC) for the Palmdale Energy Project (PEP) issued by the AVAQMD on June 6, 2016 Compliance 3 page(s)
| | | US EPA |
211844 | 6/16/2016 |
Staff Analysis of Petition to extend Construction Deadline Cover letter and staff analysis of the request to extend the construction deadline for the Palmdale Energy Project (PEP), 08-AFC-9C Compliance 5 page(s)
| | | California Energy Commission |
211832 | 6/15/2016 |
Palmdale Energy Project Amendment Status Update No. 7
1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
211818 | 6/15/2016 |
Palmdale Energy LLC's Status Report 7
Air Quality, Cultural Resources, Transmission Line Safety and Nuisance 2 page(s)
| | CEC/Docket Unit | DayZen LLC |
211713 | 6/3/2016 |
Notice of Receipt Petition to Extend the Deadline for Commencement of Construction for the Palmdale Energy Project (08-AFC-9C) 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
211662 | 5/27/2016 |
Palmdale Energy LLC Air Cooled Condensers Plume Analysis
Air Quality 9 page(s)
| 51 | CEC/Docket Unit | DayZen LLC |
211625 | 2/12/2016 |
Appendix D Power Flow Plots - Queue Cluster 8 Phase I Report
356 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211546 | 5/18/2016 |
Palmdale Energy LLC's Request for Extension of Construction Start Date
4 page(s)
| | | DayZen LLC |
211543 | 3/2/2016 |
Palmdale Energy Project CAISO Cluster 8 Phase I Interconnection Study - Addendum #1 Appendix A
Transmission System Engineering 24 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211542 | 3/2/2016 |
Palmdale Energy Project CAISO Cluster 8 Phase I Interconnection Study - Addendum #1
Transmission System Engineering 70 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211540 | 3/2/2016 |
CAISO Cluster 8 Phase I Study Results Meeting Minutes
Transmission System Engineering 10 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211515 | 2/12/2016 |
Appendix K Environmental - Queue Cluster 8 Phase I Report
9 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211514 | 2/12/2016 |
Appendix H Short Circuit Calculation - Queue Cluster 8 Phase I Report
5 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211513 | 2/12/2016 |
Appendix F Transient Stability Report - Queue Cluster 8 Phase I Report
78 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211512 | 2/12/2016 |
Appendix E Cost Summary - Queue Cluster 8 Phase I Report
1 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211510 | 2/12/2016 |
Appendix C Bulk Contingency List - Queue Cluster 8 Phase I Report
17 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211509 | 2/12/2016 |
Appendix B System Assumptions - Queue Cluster 8 Phase I Report
9 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211508 | 2/12/2016 |
Appendix A Palmdale - Q1216 Queue Cluster 8 Phase I Report
23 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211507 | 2/12/2016 |
Northern Area Report - Queue Cluster 8 Phase I Interconnection Study Report
69 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
211506 | 2/12/2016 |
California ISO Cover Letter for attached Cluster 8 Phase I Interconnection Study Report
1 page(s)
| | Palmdale Energy, LLC/Thomas Johns | DayZen LLC |
211505 | 5/17/2016 |
Response to Application for Confidentiality - CAISO Cluster 8 Phase I Interconnection Study
3 page(s)
| | Scott A. Galati | California Energy Commission |
211503 | 5/16/2016 |
Palmdale Energy LLC's Status Report 6
Air Quality, Transmission Line Safety and Nuisance 1 page(s)
| | CEC/Docket Unit | DayZen LLC |
211502 | 5/16/2016 |
Status Update No. 6 Palmdale Energy Project (PEP) Committee Status Update, May 16, 2016 Compliance 1 page(s)
| | CEC/Karen Douglas, Janea A. Scott and Kenneth Celli | California Energy Commission |
211494 | 5/16/2016 |
Transcript of the 05/10/16 Committee Status Conference
33 page(s)
| | Parties | California Energy Commission |
211488 | 5/16/2016 |
Antelope Valley Air Quality Management District Road Paving Protocol Approval for Palmdale Energy Project
Air Quality 1 page(s)
| 50 | Atmospheric Dynamics Inc./Gregory S. Darvin | DayZen LLC |
211479-1 | 5/13/2016 |
Preliminary ERC RACT Review for the Palmdale Energy Project
Air Quality 54 page(s)
| 48 | Antelope Valley Air Quality Management District/Chris Anderson | DayZen LLC |
211479-2 | 5/13/2016 |
Preliminary ERC RACT Review for the Palmdale Energy Project - AVAQMD RACT Matrix Excel spreadsheet Air Quality
| 49 | Antelope Valley Air Quality Management District/Chris Anderson | DayZen LLC |
211451 | 5/12/2016 |
Antelope Valley Air Quality Management District's Preliminary Determination of Compliance - Rev A for Palmdale Energy Project
Air Quality 70 page(s)
| 47 | Palmdale Energy, LLC/Thomas Johns | DayZen LLC |
211353 | 5/4/2016 |
California Water Boards - Lahontan Region Comments on Preliminary Staff Assessment
4 page(s)
| | CEC/Christine Root | California Water Boards Lahontan Region |
211352 | 5/4/2016 |
James Brockway Comments On Palmdale Energy Project Preliminary Staff Assessment
1 page(s)
| | CEC/Docket Unit | James Brockway |
211264 | 4/27/2016 |
Palmdale Energy LLC’s Final Comments on the Preliminary Staff Assessment
Air Quality, Biological Resources, Cultural Resources, Facility Design, Land Use, Project Description, Traffic and Transportation, Worker Safety and Fire Protection, Waste Management, Soil and Water 14 page(s)
| 46 | | DayZen LLC |
211239 | 4/25/2016 |
AVISO SOBRE LA CONFERENCIA DE ANÁLISIS DE SITUACIÓN DEL COMITÉ May 10, 2016 10:00 a.m. Status Conference in Hearing Room B at the Energy Commission 7 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
211234 | 4/25/2016 |
Audio Recording of Palmdale Energy Project (PEP) Preliminary Staff Assessment (PSA) Workshop Notice of availability of audio recording of PEP PSA workshop held at Energy Commission on 4/20/2016 Compliance 1 page(s)
| | | California Energy Commission |
211217 | 4/25/2016 |
Center for Biological Diversity Comments: on Preliminary Staff Assessment
5 page(s)
| | CEC/Docket Unit | April Rose Sommer for Center for Biological Diversity |
211187 | 4/22/2016 |
Los Angeles County Department of Public Works re use of road right of way
Land Use
| | | Los Angeles County Department of Public Works |
211174 | 4/21/2016 |
Palmdale Energy LLC's Revised Emissions Offset Package
Air Quality 11 page(s)
| 45 | Antelope Valley Air Quality Management District/Chris Anderson | DayZen LLC |
211168 | 4/21/2016 |
Palmdale Energy Project Subpart TTTT Compliance Calculations
Air Quality 1 page(s)
| 44 | CEC/Docket Unit | DayZen LLC |
211150 | 4/20/2016 |
County Sanitation Districts of Los Angeles County Will Serve Letter for Palmdale Energy Project
Waste Management, Soil and Water 2 page(s)
| | PlamdaleEnergy, LLC | County of Sanitation Districts |
211133 | 4/18/2016 |
Notice of Committee Status Conference May 10, 2016 10:00 am Status Conference @ California Energy Commission 6 page(s)
| | CEC/Docket Unit | Energy Commission Hearing Office |
211070 | 4/14/2016 |
Confidential Emissions Offset Package Additional Information
Air Quality 9 page(s)
| | | DayZen LLC |
211067 | 4/14/2016 |
Palmdale Energy, LLC's Application for Confidential Designation
Air Quality 2 page(s)
| | | DayZen LLC |
211045 | 4/14/2016 |
Palmdale Energy LLC’s Initial Comments on the Preliminary Staff Assessment
Air Quality, Biological Resources, Cultural Resources, Facility Design, Land Use, Project Description, Traffic and Transportation, Worker Safety and Fire Protection, Waste Management, Soil and Water 12 page(s)
| 43 | | DayZen LLC |
211029 | 4/13/2016 |
Palmdale Energy LLC's Status Report 5
1 page(s)
| | | DayZen LLC |
211027 | 4/13/2016 |
Palmdale Energy Project Amendment Status Update No. 5
1 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
211012 | 4/12/2016 |
Martin Family Comments: On 08-AFC-9C
2 page(s)
| | CEC/Docket Unit | Martin Family |
210985 | 4/8/2016 |
Notice of Public Workshop for the Preliminary Staff Assessment This document supersedes TN 210978 7 page(s)
| | | California Energy Commission |
210978 | 4/7/2016 |
Notice of Public Workshop for the Preliminary Staff Assessment Workshop notice for Palmdale Energy Project (PEP) discussion of Preliminary Staff Assessment (PSA) Compliance 7 page(s)
| | | California Energy Commission |
210849 | 3/24/2016 |
Public Participation in the Review of the Preliminary Staff Assessment Notice of Availability for public review of the Preliminary Staff Assessment (PSA) for the Palmdale Energy Project (PEP), dated March, 24, 2016 Compliance 5 page(s)
| | Members of the Public | California Energy Commission |
210848 | 3/24/2016 |
Request for Public Access to Preliminary Staff Assessment (PSA) Notice of Availability requesting librarians grant public access to Preliminary Staff Assessment (PSA) for the Palmdale Energy Project (PEP), dated 3/24/2016 Compliance 1 page(s)
| | Librarian | California Energy Commission |
210844 | 3/23/2016 |
Request for Comments on the Preliminary Staff Assessment for the Palmdale Energy Project Amendment Palmdale (PEP) PSA Notice of Availability (NOA) Agency Distribution List Compliance 5 page(s)
| | Agency Distribution List | California Energy Commission |
210835 | 3/23/2016 |
Palmdale Final Preliminary Staff Assessment, 3/23/2016 Palmdale Energy Project (PEP) Preliminary Staff Assessment (PSA), dated March 23, 2016 Compliance 580 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210797 | 3/21/2016 |
Palmdale Energy LLC's Revised Supplemental Response to California Energy Commission Staff Data Request 55
Transmission System Engineering 2 page(s)
| 42 | CEC/Dockets Unit | DayZen LLC |
210783 | 3/18/2016 |
Palmdale Energy LLC's Revised One-Line Drawing No. A01 Revision E
Transmission System Engineering 1 page(s)
| 41 | | DayZen LLC |
210751 | 3/15/2016 |
Palmdale Committee Status Report No. 4 Palmdale Energy Project (PEP) Status Report No. 4, dated March 15, 2016 Compliance 2 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
210720 | 3/15/2016 |
Palmdale Energy LLC's Status Report 4
Air Quality, Transmission System Engineering 2 page(s)
| | CEC/Docket Unit | DayZen LLC |
210693 | 3/11/2016 |
Project Owner Responses to miscellaneous inquiries from air quality staff Palmdale Energy, LLC responses to Air Quality staff inquiries on March 10, 2016 Compliance 6 page(s)
| 40 | California Energy Commission | Palmdale Energy, LLC |
210662 | 3/9/2016 |
Palmdale Energy response to Transmission system equipment rating questions Response from Thomas Johns with Summit Power to transmission staff question about Palmdale system hardware ratings Compliance 4 page(s)
| 39 | | California Energy Commission |
210639 | 3/8/2016 |
EPA Region 9 Comments on the Preliminary Determination of Compliance EPA Region 9 Comments on Palmdale Energy Project (PEP) Preliminary Determination of Compliance (PDOC) issued by AVAQMD Compliance 5 page(s)
| | | California Energy Commission |
210610 | 3/4/2016 |
Palmdale Energy LLC's Revised Transmission System Engineering Drawings
Transmission System Engineering 4 page(s)
| 38 | CEC/Dockets Unit | DayZen LLC |
210599 | 3/3/2016 |
Order Canceling the March 23, 2016 Committee Status Conference Order 1 page(s)
| | All Parties | Energy Commission Hearing Office |
210594 | 3/2/2016 |
Palmdale Energy LLC's Revised Supplemental Response to California Energy Commission Staff Data Request 55 and 58
Transmission System Engineering 3 page(s)
| 37 | CEC/Dockets Unit | DayZen LLC |
210593 | 2/11/2016 |
Palmdale Energy Project Confidential Document
1 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
210592 | 3/2/2016 |
Response to Application for Confidentiality
3 page(s)
| | | California Energy Commission |
210591 | 3/2/2016 |
Palmdale Energy LLC's Application for Confidential Designation CAISO Cluster 8 Phase I Interconnection Study – Addendum #1 Confidential information: Palmdale Energy Project Caiso Cluster 8; Phase I Interconnection Study – Addendum #1
Transmission System Engineering 2 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
210587 | 3/2/2016 |
Palmdale Energy LLC's Revised Paved ERC Data Collection Protocol
Air Quality 13 page(s)
| 36 | Antelope Valley Air Quality Management District/Chris Anderson | DayZen LLC |
210501 | 2/22/2016 |
Memorandum Regarding Extension to Publish Preliminary Staff Assessment Memorandum 1 page(s)
| | All Parties | Energy Commission Hearing Office |
210499 | 2/22/2016 |
Notice of Committee Status Conference March 23, 2016 at 2:00 p.m. Status Conference at the Energy Commission 6 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
210478 | 2/19/2016 |
City of Lancaster Withdrawal of Intervention
1 page(s)
| | CEC/Dockets Unit | Law Offices of Gloria D. Smith |
210476 | 2/19/2016 |
Palmdale Energy Project Committee Status Report No. 3 Committee Status Report No. 3 for the Palmdale Energy Project (PEP) Compliance 2 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
210470 | 2/19/2016 |
Palmdale Energy LLC's Status Report 3
2 page(s)
| | CEC/Dockets Unit | DayZen LLC |
210455 | 2/18/2016 |
Palmdale Data Response Workshop audio recording Cover letter notification of availability of Palmdale Energy Project (PEP) Data Response Workshop No. 2 audio recording Compliance 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210452 | 2/18/2016 |
Record of Conversation for Palmdale Energy Project, Water Supply Assesment Record of Conservation about pending Water Supply Assessment from the LA County Dept. of Public Works for the Palmdale Energy Project Compliance 1 page(s)
| | | California Energy Commission |
210410 | 2/18/2016 |
Palmdale Energy LLC's Response to WSQ-2 Typical Filter House Evaporative Cooler Assembly Diagram
Public Health 1 page(s)
| 35 | CEC/Dockets Unit | DayZen LLC |
210363 | 2/17/2016 |
Letter from SoCal Gas Regarding Gas Sulfur Content
2 page(s)
| 34 | Summit Power Group, LLC/Thomas Johns | DayZen LLC |
210359 | 2/12/2016 |
Palmdale Energy, LLC's Application for Confidentiality Palmdale Energy Project CaISO Cluster 8 Phase I Interconnection Study 3 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
210328 | 2/16/2016 |
Presentation - Palmdale Energy Project Workshop Data Response Workshop No. 2 Agenda Agenda for discussion at Palmdale Data Response Workshop No. 2 Compliance 8 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210321 | 2/16/2016 |
Rule 1406 PERC Data Collection Protocol for the Palmdale Energy Project Paving Emissions Reduction Credits Protocol Air Quality 12 page(s)
| 33 | Antelope Valley Air Quality Management District/Chris Anderson | DayZen LLC |
210281 | 2/11/2016 |
Palmdale Energy, LLC's Application for Confidential Designation Confidential Emissions Offset Package 3 page(s)
| | CEC/Robert Oglesby | DayZen LLC |
210277-1 | 2/11/2016 |
Memo re: February Status Reports due 2/19/16 Hearing Officer Memorandum extending the due date for the February status reports to February 19, 2016 based upon unanimous consent of the parties. 1 page(s)
| | All Parties | Energy Commission Hearing Office |
210277-2 | 2/11/2016 |
Email from Scott Galati re February Status Report Email thread among the parties and Hearing Officer regarding Applicant's request to extend the deadline to file the February status report from 2/15/16 to 2/19/16. 2 page(s)
| | All Parties and Hearing Officer | Energy Commission Hearing Office |
210198 | 2/5/2016 |
Palmdale Class I Update Appendix G Built Environ Maps
| | | California Energy Commission |
210197 | 2/5/2016 |
Palmdale Class I Update Appendix F Built Environ Records Search
| | | California Energy Commission |
210196 | 2/5/2016 |
Palmdale Confidential Appendix E Archy Maps
| | | California Energy Commission |
210195 | 2/5/2016 |
Palmdale Class I Update Appendix A Resumes
| | | California Energy Commission |
210194 | 2/5/2016 |
Palmdale Class I Update
| | | California Energy Commission |
210185 | 2/5/2016 |
Palmdale Energy LLC's Supplemental Response to CEC Staff Data Request 46
Socioeconomics 4 page(s)
| 32 | CEC/Dockets Unit | DayZen LLC |
210183 | 2/5/2016 |
Palmdale Energy LLC's Response to CEC Staff Data Request Set No.3 (65-68)
Air Quality 13 page(s)
| 31 | CEC/Dockets Unit | DayZen LLC |
210171 | 2/5/2016 |
Palmdale Energy LLC's Supplemental Response to California Energy Commission Staff Data Request 55 and 58
Transmission System Engineering 4 page(s)
| 30 | CEC/Dockets Unit | DayZen LLC |
210170 | 2/5/2016 |
Repeated Application for Confidentiality - Cultural Resources Appendix B, Appendix C, and Appendix D are too large to upload. See dockets staff for a CD. 2 page(s)
| | | Palmdale Energy LLC |
210167 | 2/5/2016 |
Antelope Valley Air Quality Management District's Preliminary Determination of Compliance for Palmdale Energy Project
Air Quality 65 page(s)
| 29 | Palmdale Energy, LLC/Thomas Johns | DayZen LLC |
210166 | 2/5/2016 |
Palmdale Energy LLC's Responses to Workshop Queries (1-8) In support of the Petition to Amend Air Quality, Public Health, Transmission System Engineering, Worker Safety and Fire Protection, Soil and Water 33 page(s)
| 28 | CEC/Dockets Unit | DayZen LLC |
210130 | 2/2/2016 |
Palmdale Energy LLC's Preliminary Fire Protection Plan in Response to CEC Staff Data Request 61
Worker Safety and Fire Protection 15 page(s)
| 27 | CEC/Dockets Unit | DayZen LLC |
210121 | 2/1/2016 |
Notice of Staff Workshop for the Palmdale Energy Project – Petition to Amend the Commission Final Decision Data Response and Issue Resolution Workshop No. 2 - February 17, 2016 Compliance 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208550 | 1/22/2016 |
Palmdale Energy LLC's Supplemental Response to CEC Staff Data Request 62
Worker Safety and Fire Protection 3 page(s)
| 26 | CEC/Dockets Unit | DayZen LLC |
207443 | 1/15/2016 |
Palmdale Energy Project Committee Status Update No. 2 Palmdale Energy Project (PEP) Committee Update No. 2, January 15, 2016 Compliance 3 page(s)
| | CEc/Docket | California Energy Commission |
207442 | 1/15/2016 |
Palmdale Data Requests Set 3 Palmdale Energy Project (PEP) Data Requests Set 3 (65-68) Compliance 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207325 | 1/15/2016 |
Palmdale Energy LLC's Status Report 2
2 page(s)
| | | DayZen LLC |
207318 | 1/14/2016 |
Palmdale Energy LLC's Supplemental Response to Data Request 32, Off-site Ammonia Consequence Analysis
Air Quality 9 page(s)
| 25 | CEC/Dockets Unit | DayZen LLC |
207176 | 1/4/2016 |
Cover Memo, Palmdale Data Response Workshop Audio Recording Memo providing location of audio recording of Palmdale Data Response Workshop on December 17, 2015 Compliance 1 page(s)
| | | California Energy Commission |
207054 | 12/16/2015 |
Presentation - Palmdale (PEP) Data Response Workshop Agenda Agenda and supporting materials for the Palmdale Energy Project Data Response Workshop - Participation Information, Purpose, and Agenda Topics on December 17, 2015 Compliance 8 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207015 | 12/15/2015 |
Palmdale Energy LLC's Status Report 1
2 page(s)
| | | DayZen LLC |
206939 | 12/11/2015 |
City of Lancaster's Status Report #1 status report Compliance 3 page(s)
| | CEC/Dockets Unit | City of Lancaster |
206928 | 12/11/2015 |
Palmdale Energy LLC's Response to CEC Staff Data Request Set One (1-63) Air Quality Modeling Files CD's containing Air Modeling Files are located in the Docket Unit 1 page(s)
| 24 | | DayZen, LLC |
206915 | 12/10/2015 |
Transcript of 11/16/15 Public Site Visit, Environmental Scoping Meeting and Informational Hearing, and Committee Order
67 page(s)
| | Parties | California Energy Commission |
206914 | 12/10/2015 |
Palmdale Energy LLC's Response to CEC Staff Data Request Set No.2 (64)
Waste Management 152 page(s)
| 23 | CEC/Eric Veerkamp | DayZen LLC |
206869 | 12/7/2015 |
Notice of Staff Workshop for the Palmdale Energy Project, Petition to Amend the Commission Final Decision Notice of Data Request Workshop Compliance 6 page(s)
| | Interested Parties | California Energy Commission |
206819 | 12/2/2015 |
Committee Scheduling Order
7 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
206812 | 12/1/2015 |
Palmdale Energy Project Status Report No. 1, Nov. 1, 2015 Status Report No. 1 for the Palmdale Energy Project, November 1, 2015 Compliance 3 page(s)
| | CEC/Karen Douglas, Janea Scott and Kenneth Celli | California Energy Commission |
206797 | 11/30/2015 |
Palmdale Energy LLC's Response to CEC Staff Data Request Set No.1 (1-63)
Air Quality, Cultural Resources, Hazardous Materials, Public Health, Socioeconomics, Transmission System Engineering, Worker Safety and Fire Protection, Soil and Water 161 page(s)
| 22 | CEC/Eric Veerkamp | DayZen LLC |
206777 | 11/25/2015 |
Data Request Set 2, No. 64 Data Request Set 2, No. 64 for Palmdale Energy Project (PEP) Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
206712 | 11/20/2015 |
GE’s Comments to Palmdale Energy Center LLC’s Revised Petition for Amendment
3 page(s)
| | | Peter Paul Alexander Stroganow II |
206676 | 11/18/2015 |
Letter of Support This Project Will Bring Construction and Jobs to the Immediate Area
2 page(s)
| | City of Palmdale/Mayor James C. Ledford, Jr. | Antelope Valley African American Chamber of Commerce/Richard Paston |
206675 | 11/18/2015 |
Comments on the Plant Impact to Health and Well-Being
1 page(s)
| | CEC/Dockets Unit | Stephen L. Brown and Connie L. Brown |
206674 | 11/18/2015 |
Comments on Support for the Palmdale Energy Project
1 page(s)
| | CEC/Dockets Unit | Tom Lackey/Assemblyman, 36th District |
206668 | 11/18/2015 |
Power Point Presentation for11/16/15 Site Visit, Etc.
50 page(s)
| | All Parties | Energy Commission Hearing Office |
206651 | 11/17/2015 |
Palmdale Energy LLC's Presentation for 11/16/15 Site Visit, Scoping Meeting & Informational Hearing
10 page(s)
| 21 | | DayZen LLC |
206601 | 11/12/2015 |
Memorandum re Palmdale Energy Project Schedule Schedule for Discussion During the Upcoming Palmdale Energy Project Site Visit, Scoping Meeting & Informational Hearing November 16, 2015 2 page(s)
| | All Parties | Energy Commission Hearing Office |
206593 | 11/12/2015 |
Notice of Informational Hearing and Site Visit (Spanish Version) AVISO DE VISITA PÚBLICA AL EMPLAZAMIENTO, REUNIÓN PARA TRATAR EL ALCANCE AMBIENTAL Y
AUDIENCIA INFORMATIVA, Y DECISIÓN DEL COMITÉ 9 page(s)
| | All Parties | Energy Commission Hearing Office |
206570 | 11/10/2015 |
Lancaster Issue Identification Report Issue identification and scoping report Compliance 9 page(s)
| | | City of Lancaster |
206542 | 11/9/2015 |
Request for Water Supply Assessment from City of Palmdale for Palmdale Energy Project A request for a Water Supply Assessment from City of Palmdale Public Works for the Palmdale Energy Project (PEP) from Energy Commission Water staff Compliance 1 page(s)
| | Gordon L. Phair, P.E./City of Palmdale | California Energy Commission |
206523-1 | 11/6/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) *** THIS DOCUMENT SUPPLEMENTS TN 206521-1 *** - THIS DOCUMENT IS PART OF APPENDICES FILED UNDER TN 206521-2 through TN 206521-7 26 page(s)
| 19 | CEC/Dockets Unit | DayZen LLC |
206523-2 | 11/6/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 6) THIS DOCUMENT IS PART OF APPENDICES FILED UNDER TN 206521-2 through TN 206521-7 34 page(s)
| 20 | CEC/Dockets Unit | DayZen LLC |
206521-1 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) *** THIS DOCUMENT IS REPLACED BY TN 206523-1 *** 113 page(s)
| 12 | CEC/Dockets Unit | DayZen LLC |
206521-2 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 1)
113 page(s)
| 13 | CEC/Dockets Unit | DayZen LLC |
206521-3 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 2)
72 page(s)
| 14 | CEC/Dockets Unit | DayZen LLC |
206521-4 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 3)
39 page(s)
| 15 | CEC/Dockets Unit | DayZen LLC |
206521-5 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 4)
38 page(s)
| 16 | CEC/Dockets Unit | DayZen LLC |
206521-6 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 5)
17 page(s)
| 17 | CEC/Dockets Unit | DayZen LLC |
206521-7 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No.1 (1-13) DR-5 (Part 7)
29 page(s)
| 18 | CEC/Dockets Unit | DayZen LLC |
206519 | 11/5/2015 |
Response Letter to the Energy Commission's Request for a Water Supply Assessment for Palmdale Hybrid Power Project
Compliance 1 page(s)
| | CEC/Christopher Dennis | Palmdale Water District/Matthew Knudson |
206512 | 11/5/2015 |
Palmdale Energy LLC's Response to City of Lancaster Data Request Set No. 1 (1-13) - Appendices DR-2 & DR-3 The two CD's are in the Docket Unit containing air quality modeling files 1 page(s)
| 11 | CEC/Dockets Unit | DayZen LLC |
206506 | 11/3/2015 |
Issues Identification and Scoping Report Palmdale Energy Project (PEP) Petition to Amend (PTA) Major Issues Identification and Scoping Report Compliance 15 page(s)
| | | California Energy Commission |
206472 | 10/30/2015 |
Palmdale Energy Project - Petition to Amend Data Requests - Set 1 (Nos. 1-63) Data Request 1 through 63 for Palmdale Energy Project (PEP) PTA Compliance 24 page(s)
| | Galati Blek, LLP/Scott Galati | California Energy Commission |
206412 | 10/22/2015 |
Email from Caitlin Gulley Regarding Tribal Consultation re Palmdale Hybrid Power Project
2 page(s)
| | CEC/Kenneth Celli | Energy Commission Hearing Office |
206407 | 10/20/2015 |
City of Lancaster's First Set of Data Requests Data Requests Compliance 11 page(s)
| | Applicant | City of Lancaster |
206386 | 10/16/2015 |
Palmdale Energy LLC's Supplemental Cumulative AQ Impact Analysis Report - AQ Modeling Files
Air Quality 1 page(s)
| 10 | CEC/Dockets Unit | DayZen LLC |
206385 | 10/16/2015 |
Notice of Public Site Visit, Environmental Scoping Meeting, etc. Notice 7 page(s)
| | All parties | Energy Commission Hearing Office |
206378 | 10/16/2015 |
Applicant's Responses to Socioeconomic and Alternatives Inquiry responses to informal questions from Energy Commission staff about Palmdale Energy Project for Socioeconomics and Alternatives Compliance 2 page(s)
| 9 | | DAYZEN LLC/ Scott Galati |
206335 | 10/13/2015 |
Palmdale Energy LLC's Supplemental Cumulative Air Quality Impact Analysis Report
Air Quality 4 page(s)
| 8 | | DayZen LLC |
206288 | 10/6/2015 |
Notice of Receipt by Antelope Valley Air District Antelope Valley Air Quality Management District notice of receipt of Palmdale Energy Project permit application Compliance 2 page(s)
| | | Antelope Valley Air Quality Management District |
206232 | 9/29/2015 |
Water Supply Assessment Request Letter to Los Angeles County Waterworks District California Energy Commission letter to LA Waterworks requesting a water supply assessment for the Palmdale PTA Compliance 1 page(s)
| | Los Angeles County Waterworks Districts/Adam Ariki | California Energy Commission |
206219 | 9/28/2015 |
Letter from Energy Commission to Palmdale Water District requesting a water supply assessment for the Palmdale PTA
Compliance 1 page(s)
| | Palmdale Water District | California Energy Commission |
206193 | 9/24/2015 |
Antelope Valley Air District Source data listing for Palmdale Cumulative air modeling Antelope Valley Air District source data list for cumulative air analysis for PHPP PTA Compliance 40 page(s)
| | | California Energy Commission |
206102 | 9/14/2015 |
Committee Order Granting Petition to Intervene Order 3 page(s)
| | All parties | California Energy Commission |
206098 | 9/14/2015 |
Memo re Upcoming Site Visit, Scoping Meeting & Informational Hearing Dates
1 page(s)
| | All parties | California Energy Commission |
206090 | 9/14/2015 |
Report of Conversation Parks Socioeconomic staff record of Palmdale park acreage Socioeconomics 1 page(s)
| | | California Energy Commission |
206089 | 9/14/2015 |
Report of Conversation (Antelope Valley) project school fees for socioeconomics Socioeconomic staff ROC for Antelope valley school impact fees Socioeconomics 1 page(s)
| | | California Energy Commission |
206088 | 9/14/2015 |
Report of Conversation (Lancaster) School Impact Fees Socioeconomic staff ROC for Lancaster school impact fees Socioeconomics 1 page(s)
| | | California Energy Commission |
206057 | 9/10/2015 |
Amended General Orders Regarding Electronic Document Formats Orders 18 page(s)
| | Parties | Energy Commission Hearing Office |
206025 | 9/9/2015 |
Palmdale Energy LLC's Preliminary Drainage, Erosion, and Sediment Control Plan
327 page(s)
| 7 | | DayZen LLC |
206021 | 9/8/2015 |
General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters Order 16 page(s)
| | Parties | Energy Commission Hearing Office |
205987 | 9/2/2015 |
PTA Appendix 4.1.G Final Revised Appendix 4.1.G, Offsets/Mitigation, of the RPTA Appendices, 277 pages docketed on 7/27/15. Compliance 14 page(s)
| | | California Energy Commission |
205842 | 8/26/2015 |
Palmdale- Report of Conversation-LA Assessor-Property number, ownership, and tax rate area ROC with LA County Assessor confirming project parcel number, ownership, and tax rate area (property tax rate) Socioeconomics 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
205803 | 8/24/2015 |
Letter from NAHC to CEC Letter from NAHC to CEC regarding Sacred Lands File Search and list of tribes Cultural Resources 2 page(s)
| | Native American Heritage Commission | California Energy Commission |
205802 | 8/24/2015 |
Letters to Native American Tribes Letters from CEC to Native American tribes inviting them to consult on the Palmdale Project Cultural Resources 2 page(s)
| | | California Energy Commission |
205759 | 8/17/2015 |
City of Lancaster Petition to Intervene
Compliance 4 page(s)
| | CEC/Docket Unit | City of Lancaster |
205746 | 8/14/2015 |
PETICIÓN DE ENMIENDA, Proyecto de Energia Hibrida Palmdale Acuse de Recibo, 08-AFC-9C) Compliance 3 page(s)
| | | California Energy Commission |
205734 | 8/13/2015 |
Hearing Adviser Assignment Memo
1 page(s)
| | | Energy Commission Hearing Office |
205640 | 8/5/2015 |
Notice of Recipt for Palmdale Petition for Technology Change Notice of Receipt (NOR) for Palmdale Hybrid Power Project (PHPP) PTA for Technology Change and Name Change Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
205520 | 7/27/2015 |
RPTA Appendices *** Appendices received on 07/20/15 *** 277 page(s)
| 6 | CEC/ Docket Unit | Galati Blek, LLP |
205450 | 7/21/2015 |
RPTA Figure 2-7b Revised Replacement figure for PEP RPTA Figure 2-7b. 1 page(s)
| 5 | CEC/Docket Unit | Galati | Blek LLP |
205394-1 | 7/20/2015 |
Palmdale Energy Project Revised Petition to Amend
225 page(s)
| 2 | CEC/Eric Veerkamp | Galati | Blek LLP |
205394-2 | 7/20/2015 |
Palmdale Energy Project RPTA Section 2 & 3 Figures
17 page(s)
| 3 | CEC/Eric Veerkamp | Galati | Blek LLP |
205394-3 | 7/20/2015 |
Palmdale Energy Project RPTA Section 4 & 6 Figures Maps and photographs 14 page(s)
| 4 | CEC/Eric Veerkamp | Galati | Blek LLP |
205022 | 6/12/2015 |
Order Approving Transfer of Ownership from the City of Palmdale to Palmdale Energy, LLC Order No. 15-0610-1a 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
204725 | 5/26/2015 |
Notice of Receipt (NOR), Palmdale Hybrid Ownership Transfer Notice of Receipt (NOR) for Palmdale Hybrid Power Project Petition to Amend to transfer ownership to Palmdale Energy, LLC Compliance 2 page(s)
| | | California Energy Commission |
204509 | 5/6/2015 |
Staff Comments on Palmdale Air Quality and Public Health Modeling Protocol For the Palmdale Hybrid Power Project [New Palmdale Energy Project] Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
204459 | 4/30/2015 |
Palmdale Energy, LLC's Petition for Amendment
144 page(s)
| 1 | | Galati | Blek LLP |
204458 | 4/30/2015 |
Palmdale Energy, LLC's Petition for Ownership Transfer
4 page(s)
| | | Galati | Blek LLP |
201504 | 1/2/2014 |
Letter from City of Lancaster re Emission Reduction Credits Transfer Approval
2 page(s)
| | CEC/Karen Douglas | City of Lancaster |
201500 | 12/31/2013 |
Letter re Review of Requested Inter-District Transfer of ERCs from Mojave Desert Air
33 page(s)
| | Gloria D. Smith, Esq. | Pless Environmental, Inc. |
201499 | 12/31/2013 |
7/17/87 Letter to Dr. Leon Hebertson re proposed issuance of ERC Banking Certificate to Texaco
3 page(s)
| | Dr. Leon Hebertson | California Energy Commission |
57033 | 6/7/2010 |
MOU Between CEC & West Coast Code Consultants
6 page(s)
| | CEC/Docket Unit | CEC/M. Errecart |