Docket Log

Docket: 06-AFC-09
Project Title: Colusa Generating Station
Generated On: 4/19/2024 2:44:51 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
467156/16/2008 CARE's comments on PSD Permit

21 page(s)
 USEPA/ S. KellyLaw Offices of Martin Homec/ M. Homec
460534/29/2008 Filing of Notice of Decision and copy of Check/Receipt from DFG

5 page(s)
 CEC / DocketsCEC / J. Caswell
460454/28/2008 Notice of Availability of the Commission Decision on the Colusa Generating Station

1 page(s)
 CEC/Docket UnitCEC/Docket Unit
460334/25/2008 Colusa Final Commission Decision

347 page(s)
 CEC/ POS List/ Docket UnitCEC/ Commissioners
459324/18/2008 Errata to the PMPD

7 page(s)
 POS ListCEC/ J. Boyd
458914/14/2008 Letter from Colusa County DOA - Air Pollution Control District

4 page(s)
 Sierra Researcher / S. HillColusa County / DOA / H. Krug
458724/10/2008 PG&E's Comments on the Final Determination of Compliance

6 page(s)
 CEC/ A. HockadayGalati Blek/ M. Cosens
458654/9/2008 PG&E's Comments on the Presiding Members Proposed Decision Colusa Generating Stations Docket No. (06-AFC-9)

6 page(s)
 CEC/A. HockadayG&B/M. Cosens
458364/3/2008 PMPD Comments for Colusa Generating Station Project (06-AFC-9)

8 page(s)
 CEC / J. Boyd / R. RenaudCEC / J. Caswell
457443/24/2008 Review of the Proposed Colusa Project

16 page(s)
 USACE / T. CavanaughFWS / P Cross
456993/14/2008 Energy Commission Order No. 08-0312-6 RE: Siting Committees

4 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
456523/14/2008 Presiding Member's Proposed Decision

340 page(s)
 CEC/ Docket UnitCEC/ J. Boyd
456513/14/2008 Notice of Availability of the Presiding Member's Proposed Decision Notice of Committee Conference and Notice of Committee Hearing

4 page(s)
 CEC/DOcket UnitCEC/ J. Boyd
454742/28/2008 Preliminary Interconnection Approval Letter from CAISO

4 page(s)
 PG&E / D. OreCAISO / G. DeShazo
454482/25/2008 Applicant's Post-FSA Changes to the Colusa Generating Station Biological Resources Analysis

4 page(s)
 CEC/J. Boyd/R. RenaudCEC/R. Ratliff
452111/31/2008 Record of Conversation RE Need for Air Quality Determination of Compliance Clarification

4 page(s)
 CEC / Docket UnitCEC / J. Caswell
451831/30/2008 Record of Conversation RE Need for Air Quality Staff Testimony Clarification

2 page(s)
 CEC / Docket UnitCEC / J. Caswell
451421/28/2008 Record of Conversation on Need for Air Quality Staff Testimony Clarification

5 page(s)
 CEC / Docket UnitCEC / J. Caswell
446901/22/2008 Declaration of Alvin J. Greenberg, Ph.D.

3 page(s)
 CEC / Docket UnitCEC / J. Mumme
446761/22/2008 Revised Fire Safety Conditions and Hazardous Materials Conditions; Supplementary Testimony for Traffic and Transportation

14 page(s)
 Colusa Generating Station Siting Committee / All PartiesCEC / R. Ratliff
446731/22/2008 Revised Fire Safety Conditions and Hazardous Materials Conditions; Supplementary Testimony for traffic and Transportation

14 page(s)
 CEC / Docket UnitCEC / R. Ratliff
446691/22/2008 Traffic and Transportation - Colusa Temporary Bridge Design

2 page(s)
 CEC / Docket UnitB. Payne, P.E.
446661/22/2008 Temporary Jumper Bridge, Colusa Generating Station

9 page(s)
 CEC / Docket UnitLW / P. Kihm
446621/22/2008 Letter from D. Barrett / Jack and Donna Barrett

3 page(s)
 CEC / J. CaswellJack and Donna Barrett / D. Barrett
446421/18/2008 (Draft) Temporary Jumper Bridge

9 page(s)
 CEC / Docket UnitLatham & Watkins / P. Kihm
446311/18/2008 Letter from URS to U.S. Army Corps of Engineers Regarding the 404(b)(1) Alternative Analysis

37 page(s)
 CEC / Docket UnitLatham & Watkins / P. Kihm
446291/17/2008 Evidentiary Hearing Instructions and Agenda, POS attached

7 page(s)
 POS ListCEC/ R. Renaud
442631/11/2008 Letter from Mark Hale, URS Corporation, to Brian Vierria, U.S. Army Corps of Engineers, dated October 22, 2007

155 page(s)
 CEC/ Docket UnitLatham & Watkins/ P. Kihm
441081/10/2008 CPW Road Mitigation

8 page(s)
 CEC/ J. CaswellColusa County Public Works/ Loren Clifton
440801/10/2008 Letter from D. Barrett

2 page(s)
 CEC / J. CaswellD. Barrett
440271/9/2008 Letter from Dirks & Barrett

2 page(s)
 US Army Corps / B. VerriaDirks & Barrett
439841/7/2008 Supplemental Information for the 1600 Lake and Streambed Alteration Agreement Application for CGS

31 page(s)
 CEC / Docket UnitURS / D. Shileikis
439811/4/2008 Glenn Colusa Irrigation District's Resolution No. 07-11

11 page(s)
 CEC / Docket UnitLatham & Watkins/ P. Kihm
439801/4/2008 County of Colusa Land Use Approvals

168 page(s)
 CEC / Docket UnitLatham & Watkins / P. Kihm
439721/7/2008 Agreement for the Transfer, Conveyance and Delivery of Water

26 page(s)
 CEC / Docket UnitLatham & Watkins / P. Kihm
439551/3/2008 Applicant's Prehearing Conference Statement regarding the Colusa Project, POS attached

119 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kihm
439401/3/2008 Staff Pre-Hearing Conference Statement

3 page(s)
 CEC / Docket UnitCEC / R. Ratliff
439341/3/2008 Comment Letter from COC - DOPW

2 page(s)
 CEC / J. CaswellCOC DOPW / L. Clifton / J. Wrysinski
439151/2/2008 Letter from County of Colusa - Board of Supervisors

1 page(s)
 CEC / J. CaswellColusa County Board of Supervisors / G. Evans
4389412/27/2007 Notice of Revised Pre-Hearing Conference Date

3 page(s)
 CEC / Docket UnitCEC / J. Geesman / J. Boyd
4383612/20/2007 Supplemental Information for the 1600 Lake and Streambed Alteration Agreement

30 page(s)
 CEC / Docket UnitURS / D. Shileikis
4382712/20/2007 Disagreement Letter from DPW on the Colusa FSA

2 page(s)
 CEC / J. CaswellCounty of Colusa DPW / L. Clifton
4374612/14/2007 Applicant's comments on the Final Staff Assessment

18 page(s)
 CEC / Docket UnitLW / P. Kihm
4369712/11/2007 Notice of Prehearing Conference and Evidentiary Hearing Dates

7 page(s)
 CEC / Docket UnitCEC / J. Geesman / J. Boyd
4367912/11/2007 Statement of support

3 page(s)
 CEC/ Docket UnitEmerald Farms/ A. Etchepare
4366212/10/2007 Water Quality Certification Application

25 page(s)
 CVRWQCB / P. GillumURS / S. Leach
4354812/3/2007 Agency Letter on Colusa FSA

1 page(s)
 CEC / Docket UnitCEC / R. Johnson
4354612/3/2007 Notice of Availability for Colusa FSA

2 page(s)
 CEC / Docket UnitCEC / R. Johnson
4354512/3/2007 Library Letter on Colusa FSA

3 page(s)
 CEC / Docket UnitCEC / R. Johnson
4353411/30/2007 Colusa Generating Station Final Staff Assessment (06-AFC-9)

676 page(s)
 CEC / Docket UnitCEC / J. Caswell
4350611/28/2007 Letter from Department of Energy re: FSA

2 page(s)
 CEC / Docket UnitDOE / T. Boyko
4349311/27/2007 Revised Biological Assessment

121 page(s)
 CEC / Docket UnitURS / S. Leach
4349211/26/2007 Notice of an Application for a Certificate of Public Convenience and Necessity

1 page(s)
 CEC / Docket UnitPG&E / D. Kraska
4346711/21/2007 Request Letter from L&W, LLP

1 page(s)
 CEC / J. CaswellL&W, LLP / M. Carroll
4338011/15/2007 Application of PG&E for a Certificate of Public Convenience and Necessity Authorizing Construction of the Colusa Power Project

364 page(s)
 CEC / Docket UnitPG&E / J. Levenberg
4337011/15/2007 Letter to J. Caswell from Latham & Watkins Regarding Preliminary Staff Assessment Request

5 page(s)
 CEC / J. CaswellLatham & Watkins LLP / M. J. Carroll
4324511/6/2007 Record of Conversation - Re: Construction Water Supply Agreement

2 page(s)
 CEC/J. Caswell/Docket UnitCEC/R. Latteri
4322911/6/2007 Record of Conversation - Soil and Water Related Issues

1 page(s)
 Glenn-Colusa Irrigation District/B. Menke/CEC/Docket UnitCEC/R. Latteri
4302610/25/2007 Letter from US Army ED to A. Welch

2 page(s)
 E&L Westcoast, LLC / A. WelchU.S. Army ED / T. Cavanaugh
4281210/15/2007 Streambed Alteration Agreement Application for Colusa Generating Station

29 page(s)
 CEC / Dockets UnitURS / D. Shileikis
4281110/15/2007 Responses to Data Request 130-136

23 page(s)
 CEC / Dockets UnitURS / D. Shileikis
4280610/15/2007 Colusa Generating Station Status Report #3

5 page(s)
 CEC/J. Geesman/J. BoydCEC J. Caswell
4280510/12/2007 Responses to Data Requests 130 Through 136

28 page(s)
 CEC / Docket UnitLatham & Watkins LLP / P. Kihm
4278710/12/2007 Applicant Status Report #4

8 page(s)
 CEC / Docket UnitLatham & Watkins, LLP. / P. Kihm
425519/28/2007 Committee Order to Provide Status Report

5 page(s)
 CECCEC/ J. Geesman/ J. Byron
425339/27/2007 Applicant's Supplemental Information to the Water Agreement and MFPD

23 page(s)
 CEC / Docket UnitE&L Westcoast, LLC
424059/24/2007 Letter from Barretts and Dirks for Colusa Project

3 page(s)
 CEC / Docket UnitJ. Barrett, D. Barrett, W. Dirks and D. Dirks
423589/20/2007 Glenn-Colusa Canal Bridge Revision Data Requests 130-136 for Colusa

5 page(s)
 CPV / A. WelchCEC / J. Caswell
423569/19/2007 Applicant's Supplemental Information on Water Agreement and MFPD

28 page(s)
 CEC / Docket UnitLATHAM & WATKINS LLP / P. Kihm
423089/14/2007 Responses to Data Requests 126 through 129 - AFC for Colusa

18 page(s)
 CEC / Docket UnitLATHAM & WATKINS LLP
422919/13/2007 Report Of Conversation - Power Plant Impacts on Organic Certification

1 page(s)
 CEC / Docket UnitCEC / EFS & EPD
422049/6/2007 Preliminary Staff Assessment Workshop Summary and Data Requests 126 through 129 for the Colusa

6 page(s)
 Competitive Power Ventures / A. WelchCEC / R. Johnson
422039/6/2007 Notice of Receipt for the Colusa Generating Station, AFC (06-AFC-9) Supplemental Filing

3 page(s)
 CEC / Docket UnitCEC / R. Johnson
422019/6/2007 Letter to Libraries for Colusa, AFC Supplemental Filing (06-AFC-9)

4 page(s)
 LibrariesCEC / R. Johnson
422009/6/2007 Request for Agency Participation in the Review of the Colusa Generating Station, AFC Supplemental Filing (06-AFC-9)

2 page(s)
 Agency Distribution ListCEC / R. Johnson
421728/30/2007 Supplement to the Biological Assesment

39 page(s)
 Fish and Wildlife Biologist/ M. ToverURS/ S. Leach
421708/30/2007 SPK-200600897 Update to 404 Permit Application

6 page(s)
 U.S. Army Corps/ B. VierriaURS/ S. Leach
421488/17/2007 Proposed Modifications to Glenn-Colusa Canal Bridge Design

31 page(s)
 CEC/Docket UnitURS / E&L Westcoast
421338/29/2007 Record of Conversation RE Colusa Revised Bridge Design

2 page(s)
 CEC / J. CaswellURS Corporation / K. Rushmore
421048/1/2007 PSA for Colusa Generating Station

528 page(s)
 CEC / Docket UnitCEC
420648/27/2007 Letter from MFPD - D. Wells

2 page(s)
 CEC / R. TylerMFPD / D. Wells
420318/24/2007 Application for Certification for the Colusa Generating Station Udated POS

2 page(s)
 CECCEC / M. Reed
420188/23/2007 Record of Conversation - Colusa County Roads

1 page(s)
 CEC / D. FloresDirector of Public Works / J. Wrysinski
420018/23/2007 PSA Workshop Sign-In Sheets for Colusa

4 page(s)
 CEC / Docket UnitCEC / J. Caswell
420008/23/2007 Record of Conversation - Preliminary Staff Assessment Workshop

2 page(s)
 CEC / Docket UnitCEC / J. Caswell
419858/21/2007 Comments from Jack and D. Barrett and William and D. Dirks on Colusa Generating Station (06-AFC-9)

2 page(s)
 CEC / Docket UnitCEC / D. Barrett / W. Dirks / J. Barrett / D. Dirks
419828/21/2007 Emerald Farms PSA Comments.

77 page(s)
 CEC/ J. KramerEmerald Farms/ J. Etchepare
419798/21/2007 Record of Conversation

2 page(s)
 CEC / J. CaswellMary Azevedo
419758/20/2007 Staff Reports provided by the County of Colusa.

56 page(s)
 CEC/ J. CaswellCounty of Colusa/ S. Hackney
419748/21/2007 E-mail - Public Comment concerning the proposed Colusa Generating Station

2 page(s)
 CEC/ Commissioner J. GeesmanJ. Barrett/ D. Barrett/ W. Dirks/ D. Dirks
419738/21/2007 E-mail in opposition to the proposed Colusa Generating Station

3 page(s)
 CEC/ J. Caswell/ Dockets UnitA. Azevedo/ M. A. Azevedo
419698/21/2007 Colusa Generating Station / Comments on Preliminary Staff ASsessment

43 page(s)
 CEC / Dockets UnitURS Corporation / C. Short
419598/20/2007 Comments on the Preliminary Staff Assessment & Proposed Modifications to Glenn-Colusa Canal Bridge Design

58 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kimh
419558/17/2007 Response to PG&E's Data Request- Set 1

2 page(s)
 CEC/ J. GeesmanEmerald Farms/ A. Etchepare
419548/17/2007 Data Request Set 1

1 page(s)
 PG&E/ S. GallatiEmerald Farms/A. Etchepare
419078/13/2007 Recommendation of a Statutory Exemption be Adopted

2 page(s)
 CEC / Docket UnitPlannina & Building / Stephen Hackney
418918/13/2007 Recommendation Letter of Adoption of Statutory Exemption

2 page(s)
 CEC / Dockets UnitPlanning & Building / S. Hackney
418668/10/2007 Notice of a Preliminary Staff Assessment Workshop for the Colusa Generating Station

3 page(s)
 CECCEC / T. O'Brien
417858/2/2007 Notice of Availability - PSA

2 page(s)
 Mail Lists # 7180 and 7181CEC/ E. Allen for R. Johnson
417848/2/2007 Request for Agency Comments on the PSA.

2 page(s)
 Agency Distribution List, # 7182CEC/ E. Allen for R. Johnson
417838/2/2007 Document Handling for the Colusa PSA

4 page(s)
 Librarian/ Mail List # 7183CEC/ E. Allen for R. Johnson
416797/26/2007 Petition for Hearing of FDOC

1 page(s)
 Emerald Farms/A. EtchepareColusa County APCDHB/H Krug
416267/23/2007 Data Request Set 1; POS attached

7 page(s)
 CEC/ Dockets UnitGalati Blek/ M. Cosens
415997/20/2007 Application for Confidentiality, Colusa Generating Station

2 page(s)
 URS Corp/ D. ShileikisCEC/ B. Blevins
415827/19/2007 Another revised page 43 of the FDOC; POS attached.

5 page(s)
 CEC/ J. CaswellColusa County APCD/ Les
415717/19/2007 Applicant's Status Report #3

5 page(s)
 CEC/Docket UnitLatham & Watkins/E. Taylor
415377/16/2007 Comments on Notice of AB32 Review Requirements for Transmission Line Losses

3 page(s)
 CEC/Docket UnitEmerald Farms/J. Etchepare
414517/10/2007 Letter of Completeness for the General Plan Amendment & Zoning Amendment, Tentative Parcel Map, and Use Permit Application

2 page(s)
 CEC/J. Caswell/Docket UnitCounty of Colusa/T. Loudon
414507/9/2007 Record of Conversation email

5 page(s)
 CEC/J. Caswell/Docket UnitAlfa Omega Associates/D. Smith
414067/5/2007 (Revised) Committee Scheduling Order, with POS by C. Hillhouse

6 page(s)
 CEC/ Dockets UnitCEC/ J. Geesman/ J. Boyd
414017/5/2007 Record of Conversation email from Alfa Omega Associates to CEC

6 page(s)
 CEC/J. Caswell/Docket UnitAlfa Omega Associates/D. Smith
413817/3/2007 Record of Conversation regarding Interpollutant Trade Ratio Issue

2 page(s)
 CARB/C. GallensCEC/K. Golden
413757/3/2007 Memo - Schedule for Colusa (POS attached, by J. Preis).

4 page(s)
 CEC/ J. Geesman/ J. Boyd/ P. KramerCEC/ R. Ratliff
413267/2/2007 Opposition to Applicant's "Motion" re Scheduling Request for Revised Scheduling Order

4 page(s)
 CEC/ J. GeesmanEmerald Farms/ A. Etchepare
413227/2/2007 Revised FDOC page 43

2 page(s)
 CEC/Docket UnitCEC/J. Caswell
413107/2/2007 Colusa Generating Station Project's Pacific Gas and Electric Company's Response to Applicant's Motion for Revised Scheduling Order

6 page(s)
 CEC/ R. RodriguezGalati Blek LLP/ M.Cosens
412366/28/2007 Letter to L&W regarding the Application for Confidentiality

3 page(s)
 Latham & Watkins LLP/ M. CarrollCEC/ B. Blevins
411876/26/2007 Memorandum RE June 21, 2007 Applicant's Request for Revised Scheduling Order, with POS by M. Read.

6 page(s)
 All PartiesCEC/ P. Kramer
411816/26/2007 Revised Final Determination of Compliance page 43 with table.

1 page(s)
 CEC/ Dockets UnitCEC/ J. Caswell
411806/26/2007 Copy of a letter from Andrew Welch to the Lake County Board of Supervisors, with POS by P. Kihm.

7 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kihm
411796/26/2007 Copy of a letter from Andrew Welch to the Butte County Board of Supervisors, with POS by P. Kihm.

7 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kihm
411536/25/2007 Letter of Response to M. Homec regarding USEPA Process

2 page(s)
 M. HomecCEC/ Dockets Unit
411386/25/2007 Letter to M. Homec regarding participation in CEC's review process of the Colusa Generating Station

2 page(s)
 CEC/ CPV/ URS Corp/ Docket Optical SystemCEC/ J. Caswell
411226/25/2007 Opposition Email re: USEPA Investigation of Colusa Generating Station

1 page(s)
 CEC/Docket UnitPublic/M. Homec
410866/21/2007 Colusa Generating Station AFC - Request for Revised Scheduling Order

2 page(s)
 CEC/J. GeesmanLatham & Watkins LLP/M. Carroll
410786/15/2007 E&L CGS Confidential - Response to Data Requests 117-125 regarding Figures

22 page(s)
 CEC/ Dockets UnitURS/ D. Shileikis
410446/19/2007 Letter of Completeness for General Plan Amendment & Zoning Amendment, Tentative Parcel Map, and Use Permit applications.

1 page(s)
 URS Corp./ D. Shileikis/ K. RushmoreCounty of Colusa/ S. Hackney
410386/19/2007 Initiation of Consultation - Sec 7 Endangered Species Act - Colusa Generating Station

2 page(s)
 US Fish and Wildlife Service/H. HerodArmy Corp of Engineers/T. Cavanaugh
410376/18/2007 Applicant's Response to Data Requests, with POS attached (by C. Short).

107 page(s)
 CEC/ Dockets UnitURS/ C. Short
410146/15/2007 Responses to CEC Data Requests 117-125 RE the Shasta-Flanagan-Keswick Reconductoring Project

105 page(s)
 CEC/ Dockets UnitURS/ E&L/ D. Shileikis
409496/12/2007 Final Determination of Compliance for Colusa Generating Station

49 page(s)
 CEC/J. CaswellColusa Co APCD/H. Krug
409296/12/2007 Comments on Preliminary Determination of Compliance for Colusa Generating Station.

6 page(s)
 CEC/J. CaswellAir Resources Board/K. Howard
408966/8/2007 Application for Confidentiality Designation - Option Agreeement for Purchase & Sale Emission Reduction Credits

13 page(s)
 CEC/J. CaswellLatham & Watkins/M. Carroll
408116/5/2007 M. Carroll Letter from Andy Welch to Allen Etchepare

8 page(s)
 CEC/Dockets UnitL&W/P. Kihm
408016/5/2007 CGS Project's Status Report 1 (POS attached, by M. Cosens).

4 page(s)
 CEC/ Dockets UnitGalatiBlek/ D. Wiseman/ M. Cosens
407966/4/2007 Letter RE Colusa's Application for Confidentiality; Response to EF's Correspondence dated May 17, 2007, and May 23, 2007 (POS attached, by M. Read).

6 page(s)
 Emerald Farms/ A. EtchepareCEC/ P. Kramer
406855/31/2007 Letter re: Emerald Farms letter to Commissioner Geesman on timelines & actions taken by Colusa Co. APCD.

5 page(s)
 CEC/J. CaswellColusa County/H. Krug
406835/31/2007 Letter from URS to U.S. ACofE re: Colusa (CGS) Project Jurisdictional Delineation Report Revised Table and Figures

12 page(s)
 CEC/ Dockets UnitL&W/ P. Kihm
406825/31/2007 Clarification to Colusa Status Report #2

6 page(s)
 CEC/ Dockets UnitL&W/ P. Kihm
406775/31/2007 Colusa Generating Station Use Permit Application w-Diagrams

5 page(s)
 CEC/M. HamblinCo. of Colusa/S. Hackney
406745/30/2007 Applicant's Status Report #2 (E-POS attached).

8 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kihm/ M. Carroll
406735/30/2007 Resolution 2007-10, Butte County Air Quality Management District (E-POS attached).

7 page(s)
 CEC/ Dockets UnitLatham & Watkins/ P. Kihm/ Butte County AQMD/ W. J. Wagoner
406715/30/2007 Colusa Generating Station Fire Service Impact Study

18 page(s)
 CEC/ Dockets UnitL&W/ M. Carroll
406665/30/2007 Complaint of intervenor Emerald Farms Re lack of notice for Air District Prelim Determination of Compliance.

5 page(s)
 CEC/J.Geesman/J. Byron/P. KramerCEC/R. Ratliff
406335/29/2007 Colusa Status Report 2

4 page(s)
 CEC/ CommissionersCEC/J. Caswell
406265/29/2007 Letter dated May 23, 2007 regarding Emerald Farms' Petition for CCR Title 20 Section 2028 changes because of lack of Notice of PDOC.

5 page(s)
 CEC/ Commissioner Geesman/ Dockets UnitEmerald Farms/ J. Etchepare/ A. Etchepare
406235/29/2007 Dept of Public Works Comments on FSA and Notice of Pre-Hearing Conference for Walnut Creek Energy park

1 page(s)
 CEC/J. CaswellCounty of Los Angeles/D. Wolfe
405925/25/2007 Petition for Extension of Time to Comment because of lack of Notice of PDOC.

5 page(s)
 Colusa County APCD/ H. KrugEmerald Farms/ A. Etchepare
405675/24/2007 Comments on Preliminary Determination of Compliance (PDOC).

4 page(s)
 Colusa Co. APCD/H. KingCEC/P. Richins
404805/18/2007 Petition for Public Notice of WAPA Participation in Siting Proceeding - Halt Proceedings

3 page(s)
 CEC/J. GeesmanEmerald Farms/A. Etchepare
404395/16/2007 Project Description Data Requests 117 through 125

29 page(s)
 Competitive Power Ventures/A. WelchCEC/J. Caswell
404345/16/2007 Committee Order Granting PG&E Petition to Intervene

5 page(s)
 CEC/Docket UnitCEC/J. Geesman/J. Boyd
403495/9/2007 PG&E's 2004 Long Term RFP Projects Letter

6 page(s)
 CEC/R. RodriguezGalatiBlek/M. Cosens
402105/1/2007 Petition to Intervene by PG&E Co., dated April 30, 2007 (POS attached).

5 page(s)
 CEC/ Dockets Unit/ R. RodriguezGalati & Blek/ M. Cosens
401714/26/2007 Preliminary Determination of Compliance

43 page(s)
 CEC/Docket UnitE&L Westcoast
401704/25/2007 Colusa Generating Station Transmission System Upgrades

4 page(s)
 CEC/Docket UnitCEC/J. Caswell
401644/26/2007 Updated POS List

3 page(s)
 All Parties/Docket UnitCEC/M. Read
401524/24/2007 MFPD's response to CEC Request RE the MFPD's Requirements for the Colusa Generating Station

4 page(s)
 CEC/J. CaswellMFPD/D. Wells
401074/23/2007 March 30, 2007 Email from Intervenor Emerald Farms Regarding Meetings

5 page(s)
 Parties in Colusa Generatin gStation AFC ProceedingCEC/P. Kramer
401014/23/2007 Applicatn't Status Report #1

9 page(s)
 CEC/Docket UnitLatham & Watkins/P. Kihm
400674/19/2007 URS Revised TAbles to Data Response #36 Dated 2/12/07

5 page(s)
 Docket UnitURS Corp
399984/13/2007 Colusa County Response to CEC Request for additional PDOC

1 page(s)
 CEC/J. CaswellColusa County/H. Krug
399224/6/2007 Draft Jurisdictional Delineation and Draft US Army Corps of Engineers Permit Application

192 page(s)
 CEC/Docket UnitURS/D. Shileikis
399144/6/2007 Amended Status Report #1

2 page(s)
 CEC/J. Geesman/J. Boyd/Docket UnitCEC/J. Caswell
399034/5/2007 Colusa Generating Station Amended Status Report 1

2 page(s)
 CEC/J. Geesman/J. BoydCEC/J. Caswell
399004/5/2007 CEC Response to Colusa March 19, 2007 Letter re: questions in Complying with CEQA

4 page(s)
 County of Colusa/S. HackneyCEC/R. Ratliff
398774/4/2007 Status Report #1

4 page(s)
 CEC/J. Geesman/J. Boyd/Docket UnitCEC/J. Caswell
398734/4/2007 Colusa County Air Pollution Control District PDOC

1 page(s)
 CEC/J. Caswell/Docket UnitColusa Co. Air Pollution Control District/H. Krug
398654/3/2007 County of Colusa Request for CEQA Processing Requirements, Responsibility, Authority for the Porposed Colusa Generating Station

5 page(s)
 CEC/J. CaswellColusa County/S. Hackney
398203/30/2007 E-mail / Letter to Commission RE Meetings Notice and Status Report.

3 page(s)
 CEC/ J. GeesmanEmerald Farms/ J. Etchepare
397653/23/2007 Responses to Questions 2/21/07 Wkshp & Responses to Emerald Farms - Petition to Intervene

1 page(s)
 CEC/Docket UnitURS/E&L Westcoast/D. Shileikis
396843/20/2007 ROC with URS VP D. Shileikis

7 page(s)
 Docket UnitCEC/J. Caswell
396833/20/2007 US EPA Response to E&L Westcoast PSD App.

4 page(s)
 E&L Westcoast/CEC/Docket UnitUS EPA/G. Rios
395353/7/2007 Committee Order Granting Petition to Intervene.

4 page(s)
 Docket UnitCEC/ J. Geesman/ J. Boyd
394363/1/2007 Tentative Parcel Map Application Packet.

500 page(s)
 CEC/ Docket UnitURS/ D. Shileikis/ E&L
394353/1/2007 Major Use Permit Application Packet.

500 page(s)
 CEC/ Docket UnitURS/ D. Shileikis/ E&L
394343/1/2007 General Plan Amendment and Zoning Amendment Application Packet.

500 page(s)
 CEC/ Docket UnitURS/ D. Shileikis/ E&L
393682/22/2007 EMERALD FARMS PETITION TO INTERVENE

6 page(s)
 CEC/DOCKETS UNITEF/A. ETCHEPARE
392472/13/2007 Data Responses to data requests, 1-116

1 page(s)
 CEC/ Dockets UnitURS/D. Shileikis
392272/8/2007 Notice of Data Response & Issue Resolution Staff Workshop for the Colusa Generating Station

5 page(s)
 CEC/Docket UnitCEC/T. O'Brien
392042/6/2007 Response to letter dated 1/23/07 regarding incomplete application for the proposed Colusa Generating Station, on APN 11-040-024

4 page(s)
 CEC/J. Caswell/Docket UnitCounty of Colusa/S. Hackney
392032/2/2007 AFC and constituent participation information regarding the Colusa project

2 page(s)
 County of Colusa/G. Evans/CEC/Docket UnitCEC/T. O'Brien
392022/2/2007 AFC and constituent participation information regarding the Colusa project

2 page(s)
 County of Colusa/M. Marshall/CEC/Docket UnitCEC/T. O'Brien
391862/2/2007 Transcript- Informational hearing and site visit.

52 page(s)
 CEC/ Docket UnitPSRC/ R. Friant
391712/2/2007 Draft jurisdictional delineation TOO large to scan, transmittal/cover page docketed

102 page(s)
 CEC/ Docket UnitURS/ D. Shileikis
391472/1/2007 Letter re: Proposed New Power Plant Near Delevan

2 page(s)
 CEC/P. Richins/Docket UnitEnterprise Rancheria/R. Reynolds
391422/1/2007 Committee Scheduling Order (POS list attached)

5 page(s)
 Docket UnitCEC/ J. Geesman/ J. Boyd
391111/29/2007 ISSUES AND CONCERNS FROM DEPT OF AGRICULTURE REGARDING 1-25-07 SITE VISIT

4 page(s)
 CEC/ J. CASWELLDOA/H. KRUG
390621/24/2007 CEC Letter in response to Paleo Resources Application for Confidentiality.

2 page(s)
 E&L Westcoast LLC/ A. WelchCEC/ B. B. Blevins
390611/24/2007 CEC Letter in response to Application for Confidential Air Quality.

3 page(s)
 E&L Westcoast LLC/ A. WelchCEC/ B. B. Blevins
390361/23/2007 Applicants Response to Issues Identification Report

13 page(s)
 CEC/ Dockets UnitL&W/ P. Kihm
390111/22/2007 Applicant's Inbility to provide responses.

7 page(s)
 CEC/ Docket UnitLatham & Watkins/ P. Kihm
389741/19/2007 Interpretation of Colusa County Air District Office Requirement

1 page(s)
 E&L Westcoast LLC/A. Welch/CEC/Docket UnitColusa County Air Pollution Control District/H. Krug/URS
389721/19/2007 Memorandum regarding the Issues Identification Report

11 page(s)
 Commissioner J. Geesman/ Commissioner J. BoydCEC/ J. Caswell
389431/12/2007 Data Requests 1 through 116

38 page(s)
 Competitive Power Ventures/ A. Welch - V.P.CEC/ E. Allen
388511/8/2007 Notice of Public Site Visit and Infomational Hearing w/ POS list

7 page(s)
 CEC/ Docket UnitM. Read
388081/3/2007 County of Colusa Stephen Hackney Incompleteness letter for application for general plan amendement, zoning amendment for colusa generating station on APN 11-040-024 to URS vice president Dale Shileikis.

3 page(s)
 URS/ D. ShileikisCofC/ S. Hackney
3877912/27/2006 Proposed New Power Plant near Delevan in Colusa County. (M. Reiff, K. Flores, M. McKay, G. Nelson, F. Watson, B. Combs, T. Fullerton, S. Morganson, Wintun Prtection Agency, E. Patterson, W. Michem, E. Freeman)

24 page(s)
 Interested Parties (Native American Tribes)P. Richins / CEC
3877712/26/2006 Letter to Dave Singleton of the native american heritage commission requesting list of interested parties

1 page(s)
 NAHC/D.SingletonCEC/G.Reinoehl
3876312/22/2006 Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment - Prevention of Significant Deterioration

126 page(s)
 U.S. EPA/G. Rios/CEC/Docket UnitE&L Westcoast/A. Welch
3876112/22/2006 Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment - Biological Assessment

68 page(s)
 U.S. EPA/G. Rios/CEC/Docket UnitE&L Westcoast/A. Welch
3876012/22/2006 Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment - Prevention of Significant Deterioration

126 page(s)
 U.S. EPA/G. Rios/CEC/Docket UnitE&L Westcoast/A. Welch
3874212/20/2006 Application for confidential designation for Appendix R for Colusa AFC

4 page(s)
 CEC/ Dockets UnitE&L/A. Welch
3873712/20/2006 Memorandum - Hearing Office Assigment. - Paul Kramer for Coulsa 06-AFC-9

1 page(s)
 All Commissioners / Docket UnitJ. Pfanenstiel / CEC
3873312/20/2006 Application for Confidential Designation and Files -Emmissions Offset Strategy Options Agreements.

260 page(s)
 B.B. BlevinsAndrew Welch E&L Westcoast, LLC
3864812/14/2006 Order No. 06-1213-11, Commission Appointment of Committee

1 page(s)
 Docket UnitCEC/ J. Pfannenstiel
3862312/12/2006 Revised Data Adequacy recommendation

17 page(s)
 CEC/ Dockets UnitCEC/ J. Caswell
3861712/12/2006 Supplement in Response to the CEC Data Adequacy Review.

109 page(s)
 CEC/ J. CaswellURS/ A. Walsh
3856612/7/2006 Record of Conversation - MFPD's comments

1 page(s)
 CEC/J. Caswell/Docket UnitMaxwell Fire Protection District/D. Wells
3853712/5/2006 DA Recommendation

202 page(s)
 CEC/ Dockets UnitCEC/ J. Caswell
3851111/6/2006 Submittal of AFC for the Colusa Generating Station Project Cover Letter
AFC is too large to file. Please contact the siting unit.
4 page(s)
 CEC/B.B. BlevinsE & L Westcoast LLC/A. Welch
3847911/28/2006 Agency letter

3 page(s)
 CEC/ Docket UnitCEC/ R. Johnson
3847811/28/2006 Property Owners Letter

3 page(s)
 CEC/ Docket UnitCEC/ R. Johnson
3847711/28/2006 Library Letter

4 page(s)
 CEC/Dockets UnitCEC/R. Johnson
3837211/13/2006 Colusa cover letter to air quality and public health modeling files.

1 page(s)
 CEC/Dockets UnitE&L,LLC/A. Welch
2279-04/22/2008 Application for Certification Colusa Generating Station PMPD

21 page(s)
  CEC
2258-02/7/2008 AFC Colusa Generating Station

104 page(s)
  CEC
2251-01/15/2008 Prehearing Conference

88 page(s)
  CEC