46715 | 6/16/2008 |
CARE's comments on PSD Permit
21 page(s)
| | USEPA/ S. Kelly | Law Offices of Martin Homec/ M. Homec |
46053 | 4/29/2008 |
Filing of Notice of Decision and copy of Check/Receipt from DFG
5 page(s)
| | CEC / Dockets | CEC / J. Caswell |
46045 | 4/28/2008 |
Notice of Availability of the Commission Decision on the Colusa Generating Station
1 page(s)
| | CEC/Docket Unit | CEC/Docket Unit |
46033 | 4/25/2008 |
Colusa Final Commission Decision
347 page(s)
| | CEC/ POS List/ Docket Unit | CEC/ Commissioners |
45932 | 4/18/2008 |
Errata to the PMPD
7 page(s)
| | POS List | CEC/ J. Boyd |
45891 | 4/14/2008 |
Letter from Colusa County DOA - Air Pollution Control District
4 page(s)
| | Sierra Researcher / S. Hill | Colusa County / DOA / H. Krug |
45872 | 4/10/2008 |
PG&E's Comments on the Final Determination of Compliance
6 page(s)
| | CEC/ A. Hockaday | Galati Blek/ M. Cosens |
45865 | 4/9/2008 |
PG&E's Comments on the Presiding Members Proposed Decision Colusa Generating Stations Docket No. (06-AFC-9)
6 page(s)
| | CEC/A. Hockaday | G&B/M. Cosens |
45836 | 4/3/2008 |
PMPD Comments for Colusa Generating Station Project (06-AFC-9)
8 page(s)
| | CEC / J. Boyd / R. Renaud | CEC / J. Caswell |
45744 | 3/24/2008 |
Review of the Proposed Colusa Project
16 page(s)
| | USACE / T. Cavanaugh | FWS / P Cross |
45699 | 3/14/2008 |
Energy Commission Order No. 08-0312-6 RE: Siting Committees
4 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45652 | 3/14/2008 |
Presiding Member's Proposed Decision
340 page(s)
| | CEC/ Docket Unit | CEC/ J. Boyd |
45651 | 3/14/2008 |
Notice of Availability of the Presiding Member's Proposed Decision Notice of Committee Conference and Notice of Committee Hearing
4 page(s)
| | CEC/DOcket Unit | CEC/ J. Boyd |
45474 | 2/28/2008 |
Preliminary Interconnection Approval Letter from CAISO
4 page(s)
| | PG&E / D. Ore | CAISO / G. DeShazo |
45448 | 2/25/2008 |
Applicant's Post-FSA Changes to the Colusa Generating Station Biological Resources Analysis
4 page(s)
| | CEC/J. Boyd/R. Renaud | CEC/R. Ratliff |
45211 | 1/31/2008 |
Record of Conversation RE Need for Air Quality Determination of Compliance Clarification
4 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
45183 | 1/30/2008 |
Record of Conversation RE Need for Air Quality Staff Testimony Clarification
2 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
45142 | 1/28/2008 |
Record of Conversation on Need for Air Quality Staff Testimony Clarification
5 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
44690 | 1/22/2008 |
Declaration of Alvin J. Greenberg, Ph.D.
3 page(s)
| | CEC / Docket Unit | CEC / J. Mumme |
44676 | 1/22/2008 |
Revised Fire Safety Conditions and Hazardous Materials Conditions; Supplementary Testimony for Traffic and Transportation
14 page(s)
| | Colusa Generating Station Siting Committee / All Parties | CEC / R. Ratliff |
44673 | 1/22/2008 |
Revised Fire Safety Conditions and Hazardous Materials Conditions; Supplementary Testimony for traffic and Transportation
14 page(s)
| | CEC / Docket Unit | CEC / R. Ratliff |
44669 | 1/22/2008 |
Traffic and Transportation - Colusa Temporary Bridge Design
2 page(s)
| | CEC / Docket Unit | B. Payne, P.E. |
44666 | 1/22/2008 |
Temporary Jumper Bridge, Colusa Generating Station
9 page(s)
| | CEC / Docket Unit | LW / P. Kihm |
44662 | 1/22/2008 |
Letter from D. Barrett / Jack and Donna Barrett
3 page(s)
| | CEC / J. Caswell | Jack and Donna Barrett / D. Barrett |
44642 | 1/18/2008 |
(Draft) Temporary Jumper Bridge
9 page(s)
| | CEC / Docket Unit | Latham & Watkins / P. Kihm |
44631 | 1/18/2008 |
Letter from URS to U.S. Army Corps of Engineers Regarding the 404(b)(1) Alternative Analysis
37 page(s)
| | CEC / Docket Unit | Latham & Watkins / P. Kihm |
44629 | 1/17/2008 |
Evidentiary Hearing Instructions and Agenda, POS attached
7 page(s)
| | POS List | CEC/ R. Renaud |
44263 | 1/11/2008 |
Letter from Mark Hale, URS Corporation, to Brian Vierria, U.S. Army Corps of Engineers, dated October 22, 2007
155 page(s)
| | CEC/ Docket Unit | Latham & Watkins/ P. Kihm |
44108 | 1/10/2008 |
CPW Road Mitigation
8 page(s)
| | CEC/ J. Caswell | Colusa County Public Works/ Loren Clifton |
44080 | 1/10/2008 |
Letter from D. Barrett
2 page(s)
| | CEC / J. Caswell | D. Barrett |
44027 | 1/9/2008 |
Letter from Dirks & Barrett
2 page(s)
| | US Army Corps / B. Verria | Dirks & Barrett |
43984 | 1/7/2008 |
Supplemental Information for the 1600 Lake and Streambed Alteration Agreement Application for CGS
31 page(s)
| | CEC / Docket Unit | URS / D. Shileikis |
43981 | 1/4/2008 |
Glenn Colusa Irrigation District's Resolution No. 07-11
11 page(s)
| | CEC / Docket Unit | Latham & Watkins/ P. Kihm |
43980 | 1/4/2008 |
County of Colusa Land Use Approvals
168 page(s)
| | CEC / Docket Unit | Latham & Watkins / P. Kihm |
43972 | 1/7/2008 |
Agreement for the Transfer, Conveyance and Delivery of Water
26 page(s)
| | CEC / Docket Unit | Latham & Watkins / P. Kihm |
43955 | 1/3/2008 |
Applicant's Prehearing Conference Statement regarding the Colusa Project, POS attached
119 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kihm |
43940 | 1/3/2008 |
Staff Pre-Hearing Conference Statement
3 page(s)
| | CEC / Docket Unit | CEC / R. Ratliff |
43934 | 1/3/2008 |
Comment Letter from COC - DOPW
2 page(s)
| | CEC / J. Caswell | COC DOPW / L. Clifton / J. Wrysinski |
43915 | 1/2/2008 |
Letter from County of Colusa - Board of Supervisors
1 page(s)
| | CEC / J. Caswell | Colusa County Board of Supervisors / G. Evans |
43894 | 12/27/2007 |
Notice of Revised Pre-Hearing Conference Date
3 page(s)
| | CEC / Docket Unit | CEC / J. Geesman / J. Boyd |
43836 | 12/20/2007 |
Supplemental Information for the 1600 Lake and Streambed Alteration Agreement
30 page(s)
| | CEC / Docket Unit | URS / D. Shileikis |
43827 | 12/20/2007 |
Disagreement Letter from DPW on the Colusa FSA
2 page(s)
| | CEC / J. Caswell | County of Colusa DPW / L. Clifton |
43746 | 12/14/2007 |
Applicant's comments on the Final Staff Assessment
18 page(s)
| | CEC / Docket Unit | LW / P. Kihm |
43697 | 12/11/2007 |
Notice of Prehearing Conference and Evidentiary Hearing Dates
7 page(s)
| | CEC / Docket Unit | CEC / J. Geesman / J. Boyd |
43679 | 12/11/2007 |
Statement of support
3 page(s)
| | CEC/ Docket Unit | Emerald Farms/ A. Etchepare |
43662 | 12/10/2007 |
Water Quality Certification Application
25 page(s)
| | CVRWQCB / P. Gillum | URS / S. Leach |
43548 | 12/3/2007 |
Agency Letter on Colusa FSA
1 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43546 | 12/3/2007 |
Notice of Availability for Colusa FSA
2 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43545 | 12/3/2007 |
Library Letter on Colusa FSA
3 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43534 | 11/30/2007 |
Colusa Generating Station Final Staff Assessment (06-AFC-9)
676 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
43506 | 11/28/2007 |
Letter from Department of Energy re: FSA
2 page(s)
| | CEC / Docket Unit | DOE / T. Boyko |
43493 | 11/27/2007 |
Revised Biological Assessment
121 page(s)
| | CEC / Docket Unit | URS / S. Leach |
43492 | 11/26/2007 |
Notice of an Application for a Certificate of Public Convenience and Necessity
1 page(s)
| | CEC / Docket Unit | PG&E / D. Kraska |
43467 | 11/21/2007 |
Request Letter from L&W, LLP
1 page(s)
| | CEC / J. Caswell | L&W, LLP / M. Carroll |
43380 | 11/15/2007 |
Application of PG&E for a Certificate of Public Convenience and Necessity Authorizing Construction of the Colusa Power Project
364 page(s)
| | CEC / Docket Unit | PG&E / J. Levenberg |
43370 | 11/15/2007 |
Letter to J. Caswell from Latham & Watkins Regarding Preliminary Staff Assessment Request
5 page(s)
| | CEC / J. Caswell | Latham & Watkins LLP / M. J. Carroll |
43245 | 11/6/2007 |
Record of Conversation - Re: Construction Water Supply Agreement
2 page(s)
| | CEC/J. Caswell/Docket Unit | CEC/R. Latteri |
43229 | 11/6/2007 |
Record of Conversation - Soil and Water Related Issues
1 page(s)
| | Glenn-Colusa Irrigation District/B. Menke/CEC/Docket Unit | CEC/R. Latteri |
43026 | 10/25/2007 |
Letter from US Army ED to A. Welch
2 page(s)
| | E&L Westcoast, LLC / A. Welch | U.S. Army ED / T. Cavanaugh |
42812 | 10/15/2007 |
Streambed Alteration Agreement Application for Colusa Generating Station
29 page(s)
| | CEC / Dockets Unit | URS / D. Shileikis |
42811 | 10/15/2007 |
Responses to Data Request 130-136
23 page(s)
| | CEC / Dockets Unit | URS / D. Shileikis |
42806 | 10/15/2007 |
Colusa Generating Station Status Report #3
5 page(s)
| | CEC/J. Geesman/J. Boyd | CEC J. Caswell |
42805 | 10/12/2007 |
Responses to Data Requests 130 Through 136
28 page(s)
| | CEC / Docket Unit | Latham & Watkins LLP / P. Kihm |
42787 | 10/12/2007 |
Applicant Status Report #4
8 page(s)
| | CEC / Docket Unit | Latham & Watkins, LLP. / P. Kihm |
42551 | 9/28/2007 |
Committee Order to Provide Status Report
5 page(s)
| | CEC | CEC/ J. Geesman/ J. Byron |
42533 | 9/27/2007 |
Applicant's Supplemental Information to the Water Agreement and MFPD
23 page(s)
| | CEC / Docket Unit | E&L Westcoast, LLC |
42405 | 9/24/2007 |
Letter from Barretts and Dirks for Colusa Project
3 page(s)
| | CEC / Docket Unit | J. Barrett, D. Barrett, W. Dirks and D. Dirks |
42358 | 9/20/2007 |
Glenn-Colusa Canal Bridge Revision Data Requests 130-136 for Colusa
5 page(s)
| | CPV / A. Welch | CEC / J. Caswell |
42356 | 9/19/2007 |
Applicant's Supplemental Information on Water Agreement and MFPD
28 page(s)
| | CEC / Docket Unit | LATHAM & WATKINS LLP / P. Kihm |
42308 | 9/14/2007 |
Responses to Data Requests 126 through 129 - AFC for Colusa
18 page(s)
| | CEC / Docket Unit | LATHAM & WATKINS LLP |
42291 | 9/13/2007 |
Report Of Conversation - Power Plant Impacts on Organic Certification
1 page(s)
| | CEC / Docket Unit | CEC / EFS & EPD |
42204 | 9/6/2007 |
Preliminary Staff Assessment Workshop Summary and Data Requests 126 through 129 for the Colusa
6 page(s)
| | Competitive Power Ventures / A. Welch | CEC / R. Johnson |
42203 | 9/6/2007 |
Notice of Receipt for the Colusa Generating Station, AFC (06-AFC-9) Supplemental Filing
3 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
42201 | 9/6/2007 |
Letter to Libraries for Colusa, AFC Supplemental Filing (06-AFC-9)
4 page(s)
| | Libraries | CEC / R. Johnson |
42200 | 9/6/2007 |
Request for Agency Participation in the Review of the Colusa Generating Station, AFC Supplemental Filing (06-AFC-9)
2 page(s)
| | Agency Distribution List | CEC / R. Johnson |
42172 | 8/30/2007 |
Supplement to the Biological Assesment
39 page(s)
| | Fish and Wildlife Biologist/ M. Tover | URS/ S. Leach |
42170 | 8/30/2007 |
SPK-200600897 Update to 404 Permit Application
6 page(s)
| | U.S. Army Corps/ B. Vierria | URS/ S. Leach |
42148 | 8/17/2007 |
Proposed Modifications to Glenn-Colusa Canal Bridge Design
31 page(s)
| | CEC/Docket Unit | URS / E&L Westcoast |
42133 | 8/29/2007 |
Record of Conversation RE Colusa Revised Bridge Design
2 page(s)
| | CEC / J. Caswell | URS Corporation / K. Rushmore |
42104 | 8/1/2007 |
PSA for Colusa Generating Station
528 page(s)
| | CEC / Docket Unit | CEC |
42064 | 8/27/2007 |
Letter from MFPD - D. Wells
2 page(s)
| | CEC / R. Tyler | MFPD / D. Wells |
42031 | 8/24/2007 |
Application for Certification for the Colusa Generating Station Udated POS
2 page(s)
| | CEC | CEC / M. Reed |
42018 | 8/23/2007 |
Record of Conversation - Colusa County Roads
1 page(s)
| | CEC / D. Flores | Director of Public Works / J. Wrysinski |
42001 | 8/23/2007 |
PSA Workshop Sign-In Sheets for Colusa
4 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
42000 | 8/23/2007 |
Record of Conversation - Preliminary Staff Assessment Workshop
2 page(s)
| | CEC / Docket Unit | CEC / J. Caswell |
41985 | 8/21/2007 |
Comments from Jack and D. Barrett and William and D. Dirks on Colusa Generating Station (06-AFC-9)
2 page(s)
| | CEC / Docket Unit | CEC / D. Barrett / W. Dirks / J. Barrett / D. Dirks |
41982 | 8/21/2007 |
Emerald Farms PSA Comments.
77 page(s)
| | CEC/ J. Kramer | Emerald Farms/ J. Etchepare |
41979 | 8/21/2007 |
Record of Conversation
2 page(s)
| | CEC / J. Caswell | Mary Azevedo |
41975 | 8/20/2007 |
Staff Reports provided by the County of Colusa.
56 page(s)
| | CEC/ J. Caswell | County of Colusa/ S. Hackney |
41974 | 8/21/2007 |
E-mail - Public Comment concerning the proposed Colusa Generating Station
2 page(s)
| | CEC/ Commissioner J. Geesman | J. Barrett/ D. Barrett/ W. Dirks/ D. Dirks |
41973 | 8/21/2007 |
E-mail in opposition to the proposed Colusa Generating Station
3 page(s)
| | CEC/ J. Caswell/ Dockets Unit | A. Azevedo/ M. A. Azevedo |
41969 | 8/21/2007 |
Colusa Generating Station / Comments on Preliminary Staff ASsessment
43 page(s)
| | CEC / Dockets Unit | URS Corporation / C. Short |
41959 | 8/20/2007 |
Comments on the Preliminary Staff Assessment & Proposed Modifications to Glenn-Colusa Canal Bridge Design
58 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kimh |
41955 | 8/17/2007 |
Response to PG&E's Data Request- Set 1
2 page(s)
| | CEC/ J. Geesman | Emerald Farms/ A. Etchepare |
41954 | 8/17/2007 |
Data Request Set 1
1 page(s)
| | PG&E/ S. Gallati | Emerald Farms/A. Etchepare |
41907 | 8/13/2007 |
Recommendation of a Statutory Exemption be Adopted
2 page(s)
| | CEC / Docket Unit | Plannina & Building / Stephen Hackney |
41891 | 8/13/2007 |
Recommendation Letter of Adoption of Statutory Exemption
2 page(s)
| | CEC / Dockets Unit | Planning & Building / S. Hackney |
41866 | 8/10/2007 |
Notice of a Preliminary Staff Assessment Workshop for the Colusa Generating Station
3 page(s)
| | CEC | CEC / T. O'Brien |
41785 | 8/2/2007 |
Notice of Availability - PSA
2 page(s)
| | Mail Lists # 7180 and 7181 | CEC/ E. Allen for R. Johnson |
41784 | 8/2/2007 |
Request for Agency Comments on the PSA.
2 page(s)
| | Agency Distribution List, # 7182 | CEC/ E. Allen for R. Johnson |
41783 | 8/2/2007 |
Document Handling for the Colusa PSA
4 page(s)
| | Librarian/ Mail List # 7183 | CEC/ E. Allen for R. Johnson |
41679 | 7/26/2007 |
Petition for Hearing of FDOC
1 page(s)
| | Emerald Farms/A. Etchepare | Colusa County APCDHB/H Krug |
41626 | 7/23/2007 |
Data Request Set 1; POS attached
7 page(s)
| | CEC/ Dockets Unit | Galati Blek/ M. Cosens |
41599 | 7/20/2007 |
Application for Confidentiality, Colusa Generating Station
2 page(s)
| | URS Corp/ D. Shileikis | CEC/ B. Blevins |
41582 | 7/19/2007 |
Another revised page 43 of the FDOC; POS attached.
5 page(s)
| | CEC/ J. Caswell | Colusa County APCD/ Les |
41571 | 7/19/2007 |
Applicant's Status Report #3
5 page(s)
| | CEC/Docket Unit | Latham & Watkins/E. Taylor |
41537 | 7/16/2007 |
Comments on Notice of AB32 Review Requirements for Transmission Line Losses
3 page(s)
| | CEC/Docket Unit | Emerald Farms/J. Etchepare |
41451 | 7/10/2007 |
Letter of Completeness for the General Plan Amendment & Zoning Amendment, Tentative Parcel Map, and Use Permit Application
2 page(s)
| | CEC/J. Caswell/Docket Unit | County of Colusa/T. Loudon |
41450 | 7/9/2007 |
Record of Conversation email
5 page(s)
| | CEC/J. Caswell/Docket Unit | Alfa Omega Associates/D. Smith |
41406 | 7/5/2007 |
(Revised) Committee Scheduling Order, with POS by C. Hillhouse
6 page(s)
| | CEC/ Dockets Unit | CEC/ J. Geesman/ J. Boyd |
41401 | 7/5/2007 |
Record of Conversation email from Alfa Omega Associates to CEC
6 page(s)
| | CEC/J. Caswell/Docket Unit | Alfa Omega Associates/D. Smith |
41381 | 7/3/2007 |
Record of Conversation regarding Interpollutant Trade Ratio Issue
2 page(s)
| | CARB/C. Gallens | CEC/K. Golden |
41375 | 7/3/2007 |
Memo - Schedule for Colusa (POS attached, by J. Preis).
4 page(s)
| | CEC/ J. Geesman/ J. Boyd/ P. Kramer | CEC/ R. Ratliff |
41326 | 7/2/2007 |
Opposition to Applicant's "Motion" re Scheduling Request for Revised Scheduling Order
4 page(s)
| | CEC/ J. Geesman | Emerald Farms/ A. Etchepare |
41322 | 7/2/2007 |
Revised FDOC page 43
2 page(s)
| | CEC/Docket Unit | CEC/J. Caswell |
41310 | 7/2/2007 |
Colusa Generating Station Project's Pacific Gas and Electric Company's Response to Applicant's Motion for Revised Scheduling Order
6 page(s)
| | CEC/ R. Rodriguez | Galati Blek LLP/ M.Cosens |
41236 | 6/28/2007 |
Letter to L&W regarding the Application for Confidentiality
3 page(s)
| | Latham & Watkins LLP/ M. Carroll | CEC/ B. Blevins |
41187 | 6/26/2007 |
Memorandum RE June 21, 2007 Applicant's Request for Revised Scheduling Order, with POS by M. Read.
6 page(s)
| | All Parties | CEC/ P. Kramer |
41181 | 6/26/2007 |
Revised Final Determination of Compliance page 43 with table.
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Caswell |
41180 | 6/26/2007 |
Copy of a letter from Andrew Welch to the Lake County Board of Supervisors, with POS by P. Kihm.
7 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kihm |
41179 | 6/26/2007 |
Copy of a letter from Andrew Welch to the Butte County Board of Supervisors, with POS by P. Kihm.
7 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kihm |
41153 | 6/25/2007 |
Letter of Response to M. Homec regarding USEPA Process
2 page(s)
| | M. Homec | CEC/ Dockets Unit |
41138 | 6/25/2007 |
Letter to M. Homec regarding participation in CEC's review process of the Colusa Generating Station
2 page(s)
| | CEC/ CPV/ URS Corp/ Docket Optical System | CEC/ J. Caswell |
41122 | 6/25/2007 |
Opposition Email re: USEPA Investigation of Colusa Generating Station
1 page(s)
| | CEC/Docket Unit | Public/M. Homec |
41086 | 6/21/2007 |
Colusa Generating Station AFC - Request for Revised Scheduling Order
2 page(s)
| | CEC/J. Geesman | Latham & Watkins LLP/M. Carroll |
41078 | 6/15/2007 |
E&L CGS Confidential - Response to Data Requests 117-125 regarding Figures
22 page(s)
| | CEC/ Dockets Unit | URS/ D. Shileikis |
41044 | 6/19/2007 |
Letter of Completeness for General Plan Amendment & Zoning Amendment, Tentative Parcel Map, and Use Permit applications.
1 page(s)
| | URS Corp./ D. Shileikis/ K. Rushmore | County of Colusa/ S. Hackney |
41038 | 6/19/2007 |
Initiation of Consultation - Sec 7 Endangered Species Act - Colusa Generating Station
2 page(s)
| | US Fish and Wildlife Service/H. Herod | Army Corp of Engineers/T. Cavanaugh |
41037 | 6/18/2007 |
Applicant's Response to Data Requests, with POS attached (by C. Short).
107 page(s)
| | CEC/ Dockets Unit | URS/ C. Short |
41014 | 6/15/2007 |
Responses to CEC Data Requests 117-125 RE the Shasta-Flanagan-Keswick Reconductoring Project
105 page(s)
| | CEC/ Dockets Unit | URS/ E&L/ D. Shileikis |
40949 | 6/12/2007 |
Final Determination of Compliance for Colusa Generating Station
49 page(s)
| | CEC/J. Caswell | Colusa Co APCD/H. Krug |
40929 | 6/12/2007 |
Comments on Preliminary Determination of Compliance for Colusa Generating Station.
6 page(s)
| | CEC/J. Caswell | Air Resources Board/K. Howard |
40896 | 6/8/2007 |
Application for Confidentiality Designation - Option Agreeement for Purchase & Sale Emission Reduction Credits
13 page(s)
| | CEC/J. Caswell | Latham & Watkins/M. Carroll |
40811 | 6/5/2007 |
M. Carroll Letter from Andy Welch to Allen Etchepare
8 page(s)
| | CEC/Dockets Unit | L&W/P. Kihm |
40801 | 6/5/2007 |
CGS Project's Status Report 1 (POS attached, by M. Cosens).
4 page(s)
| | CEC/ Dockets Unit | GalatiBlek/ D. Wiseman/ M. Cosens |
40796 | 6/4/2007 |
Letter RE Colusa's Application for Confidentiality; Response to EF's Correspondence dated May 17, 2007, and May 23, 2007 (POS attached, by M. Read).
6 page(s)
| | Emerald Farms/ A. Etchepare | CEC/ P. Kramer |
40685 | 5/31/2007 |
Letter re: Emerald Farms letter to Commissioner Geesman on timelines & actions taken by Colusa Co. APCD.
5 page(s)
| | CEC/J. Caswell | Colusa County/H. Krug |
40683 | 5/31/2007 |
Letter from URS to U.S. ACofE re: Colusa (CGS) Project Jurisdictional Delineation Report Revised Table and Figures
12 page(s)
| | CEC/ Dockets Unit | L&W/ P. Kihm |
40682 | 5/31/2007 |
Clarification to Colusa Status Report #2
6 page(s)
| | CEC/ Dockets Unit | L&W/ P. Kihm |
40677 | 5/31/2007 |
Colusa Generating Station Use Permit Application w-Diagrams
5 page(s)
| | CEC/M. Hamblin | Co. of Colusa/S. Hackney |
40674 | 5/30/2007 |
Applicant's Status Report #2 (E-POS attached).
8 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kihm/ M. Carroll |
40673 | 5/30/2007 |
Resolution 2007-10, Butte County Air Quality Management District (E-POS attached).
7 page(s)
| | CEC/ Dockets Unit | Latham & Watkins/ P. Kihm/ Butte County AQMD/ W. J. Wagoner |
40671 | 5/30/2007 |
Colusa Generating Station Fire Service Impact Study
18 page(s)
| | CEC/ Dockets Unit | L&W/ M. Carroll |
40666 | 5/30/2007 |
Complaint of intervenor Emerald Farms Re lack of notice for Air District Prelim Determination of Compliance.
5 page(s)
| | CEC/J.Geesman/J. Byron/P. Kramer | CEC/R. Ratliff |
40633 | 5/29/2007 |
Colusa Status Report 2
4 page(s)
| | CEC/ Commissioners | CEC/J. Caswell |
40626 | 5/29/2007 |
Letter dated May 23, 2007 regarding Emerald Farms' Petition for CCR Title 20 Section 2028 changes because of lack of Notice of PDOC.
5 page(s)
| | CEC/ Commissioner Geesman/ Dockets Unit | Emerald Farms/ J. Etchepare/ A. Etchepare |
40623 | 5/29/2007 |
Dept of Public Works Comments on FSA and Notice of Pre-Hearing Conference for Walnut Creek Energy park
1 page(s)
| | CEC/J. Caswell | County of Los Angeles/D. Wolfe |
40592 | 5/25/2007 |
Petition for Extension of Time to Comment because of lack of Notice of PDOC.
5 page(s)
| | Colusa County APCD/ H. Krug | Emerald Farms/ A. Etchepare |
40567 | 5/24/2007 |
Comments on Preliminary Determination of Compliance (PDOC).
4 page(s)
| | Colusa Co. APCD/H. King | CEC/P. Richins |
40480 | 5/18/2007 |
Petition for Public Notice of WAPA Participation in Siting Proceeding - Halt Proceedings
3 page(s)
| | CEC/J. Geesman | Emerald Farms/A. Etchepare |
40439 | 5/16/2007 |
Project Description Data Requests 117 through 125
29 page(s)
| | Competitive Power Ventures/A. Welch | CEC/J. Caswell |
40434 | 5/16/2007 |
Committee Order Granting PG&E Petition to Intervene
5 page(s)
| | CEC/Docket Unit | CEC/J. Geesman/J. Boyd |
40349 | 5/9/2007 |
PG&E's 2004 Long Term RFP Projects Letter
6 page(s)
| | CEC/R. Rodriguez | GalatiBlek/M. Cosens |
40210 | 5/1/2007 |
Petition to Intervene by PG&E Co., dated April 30, 2007 (POS attached).
5 page(s)
| | CEC/ Dockets Unit/ R. Rodriguez | Galati & Blek/ M. Cosens |
40171 | 4/26/2007 |
Preliminary Determination of Compliance
43 page(s)
| | CEC/Docket Unit | E&L Westcoast |
40170 | 4/25/2007 |
Colusa Generating Station Transmission System Upgrades
4 page(s)
| | CEC/Docket Unit | CEC/J. Caswell |
40164 | 4/26/2007 |
Updated POS List
3 page(s)
| | All Parties/Docket Unit | CEC/M. Read |
40152 | 4/24/2007 |
MFPD's response to CEC Request RE the MFPD's Requirements for the Colusa Generating Station
4 page(s)
| | CEC/J. Caswell | MFPD/D. Wells |
40107 | 4/23/2007 |
March 30, 2007 Email from Intervenor Emerald Farms Regarding Meetings
5 page(s)
| | Parties in Colusa Generatin gStation AFC Proceeding | CEC/P. Kramer |
40101 | 4/23/2007 |
Applicatn't Status Report #1
9 page(s)
| | CEC/Docket Unit | Latham & Watkins/P. Kihm |
40067 | 4/19/2007 |
URS Revised TAbles to Data Response #36 Dated 2/12/07
5 page(s)
| | Docket Unit | URS Corp |
39998 | 4/13/2007 |
Colusa County Response to CEC Request for additional PDOC
1 page(s)
| | CEC/J. Caswell | Colusa County/H. Krug |
39922 | 4/6/2007 |
Draft Jurisdictional Delineation and Draft US Army Corps of Engineers Permit Application
192 page(s)
| | CEC/Docket Unit | URS/D. Shileikis |
39914 | 4/6/2007 |
Amended Status Report #1
2 page(s)
| | CEC/J. Geesman/J. Boyd/Docket Unit | CEC/J. Caswell |
39903 | 4/5/2007 |
Colusa Generating Station Amended Status Report 1
2 page(s)
| | CEC/J. Geesman/J. Boyd | CEC/J. Caswell |
39900 | 4/5/2007 |
CEC Response to Colusa March 19, 2007 Letter re: questions in Complying with CEQA
4 page(s)
| | County of Colusa/S. Hackney | CEC/R. Ratliff |
39877 | 4/4/2007 |
Status Report #1
4 page(s)
| | CEC/J. Geesman/J. Boyd/Docket Unit | CEC/J. Caswell |
39873 | 4/4/2007 |
Colusa County Air Pollution Control District PDOC
1 page(s)
| | CEC/J. Caswell/Docket Unit | Colusa Co. Air Pollution Control District/H. Krug |
39865 | 4/3/2007 |
County of Colusa Request for CEQA Processing Requirements, Responsibility, Authority for the Porposed Colusa Generating Station
5 page(s)
| | CEC/J. Caswell | Colusa County/S. Hackney |
39820 | 3/30/2007 |
E-mail / Letter to Commission RE Meetings Notice and Status Report.
3 page(s)
| | CEC/ J. Geesman | Emerald Farms/ J. Etchepare |
39765 | 3/23/2007 |
Responses to Questions 2/21/07 Wkshp & Responses to Emerald Farms - Petition to Intervene
1 page(s)
| | CEC/Docket Unit | URS/E&L Westcoast/D. Shileikis |
39684 | 3/20/2007 |
ROC with URS VP D. Shileikis
7 page(s)
| | Docket Unit | CEC/J. Caswell |
39683 | 3/20/2007 |
US EPA Response to E&L Westcoast PSD App.
4 page(s)
| | E&L Westcoast/CEC/Docket Unit | US EPA/G. Rios |
39535 | 3/7/2007 |
Committee Order Granting Petition to Intervene.
4 page(s)
| | Docket Unit | CEC/ J. Geesman/ J. Boyd |
39436 | 3/1/2007 |
Tentative Parcel Map Application Packet.
500 page(s)
| | CEC/ Docket Unit | URS/ D. Shileikis/ E&L |
39435 | 3/1/2007 |
Major Use Permit Application Packet.
500 page(s)
| | CEC/ Docket Unit | URS/ D. Shileikis/ E&L |
39434 | 3/1/2007 |
General Plan Amendment and Zoning Amendment Application Packet.
500 page(s)
| | CEC/ Docket Unit | URS/ D. Shileikis/ E&L |
39368 | 2/22/2007 |
EMERALD FARMS PETITION TO INTERVENE
6 page(s)
| | CEC/DOCKETS UNIT | EF/A. ETCHEPARE |
39247 | 2/13/2007 |
Data Responses to data requests, 1-116
1 page(s)
| | CEC/ Dockets Unit | URS/D. Shileikis |
39227 | 2/8/2007 |
Notice of Data Response & Issue Resolution Staff Workshop for the Colusa Generating Station
5 page(s)
| | CEC/Docket Unit | CEC/T. O'Brien |
39204 | 2/6/2007 |
Response to letter dated 1/23/07 regarding incomplete application for the proposed Colusa Generating Station, on APN 11-040-024
4 page(s)
| | CEC/J. Caswell/Docket Unit | County of Colusa/S. Hackney |
39203 | 2/2/2007 |
AFC and constituent participation information regarding the Colusa project
2 page(s)
| | County of Colusa/G. Evans/CEC/Docket Unit | CEC/T. O'Brien |
39202 | 2/2/2007 |
AFC and constituent participation information regarding the Colusa project
2 page(s)
| | County of Colusa/M. Marshall/CEC/Docket Unit | CEC/T. O'Brien |
39186 | 2/2/2007 |
Transcript- Informational hearing and site visit.
52 page(s)
| | CEC/ Docket Unit | PSRC/ R. Friant |
39171 | 2/2/2007 |
Draft jurisdictional delineation TOO large to scan, transmittal/cover page docketed
102 page(s)
| | CEC/ Docket Unit | URS/ D. Shileikis |
39147 | 2/1/2007 |
Letter re: Proposed New Power Plant Near Delevan
2 page(s)
| | CEC/P. Richins/Docket Unit | Enterprise Rancheria/R. Reynolds |
39142 | 2/1/2007 |
Committee Scheduling Order (POS list attached)
5 page(s)
| | Docket Unit | CEC/ J. Geesman/ J. Boyd |
39111 | 1/29/2007 |
ISSUES AND CONCERNS FROM DEPT OF AGRICULTURE REGARDING 1-25-07 SITE VISIT
4 page(s)
| | CEC/ J. CASWELL | DOA/H. KRUG |
39062 | 1/24/2007 |
CEC Letter in response to Paleo Resources Application for Confidentiality.
2 page(s)
| | E&L Westcoast LLC/ A. Welch | CEC/ B. B. Blevins |
39061 | 1/24/2007 |
CEC Letter in response to Application for Confidential Air Quality.
3 page(s)
| | E&L Westcoast LLC/ A. Welch | CEC/ B. B. Blevins |
39036 | 1/23/2007 |
Applicants Response to Issues Identification Report
13 page(s)
| | CEC/ Dockets Unit | L&W/ P. Kihm |
39011 | 1/22/2007 |
Applicant's Inbility to provide responses.
7 page(s)
| | CEC/ Docket Unit | Latham & Watkins/ P. Kihm |
38974 | 1/19/2007 |
Interpretation of Colusa County Air District Office Requirement
1 page(s)
| | E&L Westcoast LLC/A. Welch/CEC/Docket Unit | Colusa County Air Pollution Control District/H. Krug/URS |
38972 | 1/19/2007 |
Memorandum regarding the Issues Identification Report
11 page(s)
| | Commissioner J. Geesman/ Commissioner J. Boyd | CEC/ J. Caswell |
38943 | 1/12/2007 |
Data Requests 1 through 116
38 page(s)
| | Competitive Power Ventures/ A. Welch - V.P. | CEC/ E. Allen |
38851 | 1/8/2007 |
Notice of Public Site Visit and Infomational Hearing w/ POS list
7 page(s)
| | CEC/ Docket Unit | M. Read |
38808 | 1/3/2007 |
County of Colusa Stephen Hackney Incompleteness letter for application for general plan amendement, zoning amendment for colusa generating station on APN 11-040-024 to URS vice president Dale Shileikis.
3 page(s)
| | URS/ D. Shileikis | CofC/ S. Hackney |
38779 | 12/27/2006 |
Proposed New Power Plant near Delevan in Colusa County. (M. Reiff, K. Flores, M. McKay, G. Nelson, F. Watson, B. Combs, T. Fullerton, S. Morganson, Wintun Prtection Agency, E. Patterson, W. Michem, E. Freeman)
24 page(s)
| | Interested Parties (Native American Tribes) | P. Richins / CEC |
38777 | 12/26/2006 |
Letter to Dave Singleton of the native american heritage commission requesting list of interested parties
1 page(s)
| | NAHC/D.Singleton | CEC/G.Reinoehl |
38763 | 12/22/2006 |
Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment
- Prevention of Significant Deterioration
126 page(s)
| | U.S. EPA/G. Rios/CEC/Docket Unit | E&L Westcoast/A. Welch |
38761 | 12/22/2006 |
Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment
- Biological Assessment
68 page(s)
| | U.S. EPA/G. Rios/CEC/Docket Unit | E&L Westcoast/A. Welch |
38760 | 12/22/2006 |
Submittal of Application for Prevention of Significant Deterioration (PSD) Review and Biological Assessment
- Prevention of Significant Deterioration
126 page(s)
| | U.S. EPA/G. Rios/CEC/Docket Unit | E&L Westcoast/A. Welch |
38742 | 12/20/2006 |
Application for confidential designation for Appendix R for Colusa AFC
4 page(s)
| | CEC/ Dockets Unit | E&L/A. Welch |
38737 | 12/20/2006 |
Memorandum - Hearing Office Assigment. - Paul Kramer for Coulsa 06-AFC-9
1 page(s)
| | All Commissioners / Docket Unit | J. Pfanenstiel / CEC |
38733 | 12/20/2006 |
Application for Confidential Designation and Files -Emmissions Offset Strategy Options Agreements.
260 page(s)
| | B.B. Blevins | Andrew Welch E&L Westcoast, LLC |
38648 | 12/14/2006 |
Order No. 06-1213-11, Commission Appointment of Committee
1 page(s)
| | Docket Unit | CEC/ J. Pfannenstiel |
38623 | 12/12/2006 |
Revised Data Adequacy recommendation
17 page(s)
| | CEC/ Dockets Unit | CEC/ J. Caswell |
38617 | 12/12/2006 |
Supplement in Response to the CEC Data Adequacy Review.
109 page(s)
| | CEC/ J. Caswell | URS/ A. Walsh |
38566 | 12/7/2006 |
Record of Conversation - MFPD's comments
1 page(s)
| | CEC/J. Caswell/Docket Unit | Maxwell Fire Protection District/D. Wells |
38537 | 12/5/2006 |
DA Recommendation
202 page(s)
| | CEC/ Dockets Unit | CEC/ J. Caswell |
38511 | 11/6/2006 |
Submittal of AFC for the Colusa Generating Station Project Cover Letter AFC is too large to file. Please contact the siting unit. 4 page(s)
| | CEC/B.B. Blevins | E & L Westcoast LLC/A. Welch |
38479 | 11/28/2006 |
Agency letter
3 page(s)
| | CEC/ Docket Unit | CEC/ R. Johnson |
38478 | 11/28/2006 |
Property Owners Letter
3 page(s)
| | CEC/ Docket Unit | CEC/ R. Johnson |
38477 | 11/28/2006 |
Library Letter
4 page(s)
| | CEC/Dockets Unit | CEC/R. Johnson |
38372 | 11/13/2006 |
Colusa cover letter to air quality and public health modeling files.
1 page(s)
| | CEC/Dockets Unit | E&L,LLC/A. Welch |
2279-0 | 4/22/2008 |
Application for Certification Colusa Generating Station PMPD
21 page(s)
| | | CEC |
2258-0 | 2/7/2008 |
AFC Colusa Generating Station
104 page(s)
| | | CEC |
2251-0 | 1/15/2008 |
Prehearing Conference
88 page(s)
| | | CEC |