Docket Log

Docket: 97-AFC-01C
Project Title: High Desert Power Plant
Generated On: 4/25/2024 9:20:35 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2493953/22/2023 High Desert Power Project Statement of Staff Approval
Statement of Staff Approval of Post Certification Change Title V
Compliance
38 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2488402/17/2023 Statement of Staff Approval of Post Certification Change
Statement of Staff Approval of Post Certification Change
Compliance
15 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24802212/12/2022 High Desert Power Project
Petition for Post Certification Change-Install a small concrete storage pad.
Compliance
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24725411/2/2022 Email from Intervenor Representative California Department of Fish and Wildlife for Attorney Name Change

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24669810/20/2022 NOTICE OF RECEIPT PETITION FOR POST-CERTIFICATION PROJECT CHANGE
High Desert Power Project Title V Modifications
Air Quality
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24637410/6/2022 Petition to Amend HDPP_Pad Project
Concrete Storage and Oil Containment Pad Petition to Amend
Compliance
18 page(s)
 CEC/Docket UnitMiddle River Power
2461609/20/2022 Petition to Amend HDPP
Administrative Changes to Air Quality Conditions
Air Quality
5 page(s)
 CEC/Docket OfficeMiddle River Power
2450838/16/2022 Travis Boyer Comments - Bitcoin mining to stop wasting unused energy

Air Quality, Efficiency, Reliability, Socioeconomics, Greenhouse Gases
1 page(s)
 CEC/Docket UnitTravis Boyer
23103112/10/2019 High Desert Power Plant 2018 Report

39 page(s)
 CEC/DocketsCalifornia Energy Commission
22558910/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2233165/3/2018 Final Commission Decision Granting Petition to Drought-Proof the Facility

36 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2232104/17/2018 Commission Adoption Order
Order No. 18-0411-2
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2231684/10/2018 [Proposed] Commission Adoption Order
For consideration at the April 11, 2018, Business Meeting
4 page(s)
 CEC/DocketEnergy Commission Hearing Office
2231674/9/2018 Errata to the Committee Recommended Decision
For consideration at the April 11, 2018, Business Meeting
4 page(s)
 CEC/DocketEnergy Commission Hearing Office
2231374/4/2018 Lahontan Regional Water Quality Control Board Comments on High Desert Power Project

4 page(s)
 CEC/Susan CochranLahontan Regional Water Quality Control Board
2231364/4/2018 Comments of High Desert Power Project, LLC on Committee Recommended Decision Granting Petition to Drought-Proof the Facility

13 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2231224/3/2018 Staff's Comments on Recommended Decision

12 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2230723/27/2018 Notice of Committee Conference
April 6, 2018, beginning at 10:00 a.m., to discuss the Committee Recommended Decision
5 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
2230693/27/2018 Word Processing Version of Conditions of Certification from the Committee Recommended Decision
Memo from the Hearing Officer advising of the availability of a word processing version of the Conditions of Certification for the Committee Recommended Decision (TN 233006)
1 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2230083/20/2018 Notice of Availability of Committee Recommended Decision; Notice of Energy Commission Hearing
Comment period closes on April 4, 2018. The Committee Recommended Decision will be considered by the Energy Commission at its regular Business Meeting on April 11, 2018.
4 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2230063/20/2018 Committee Recommended Decision Granting Petition to Drought-Proof the Facility
Committee Recommended Decision granting petition to drought-proof the High Desert Power Plant; includes conditions of certification
29 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22189712/5/2017 Transcript of the 09112017 Prehearing Conference

44 page(s)
 CEC/DocketsCalifornia Energy Commission
2213169/26/2017 Memo Regarding Supporting Documents for Stipulation

205 page(s)
 CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
2211469/13/2017 Notice of Cancellation of September 20, 2017 Evidentiary Hearing
Notice
2 page(s)
 All parties and the publicEnergy Commission Hearing Office
2211139/11/2017 Email from Valerie Wiegenstein to Peter Kiel Regarding Watermaster Revisions to Comprehensive Stipulation and Agreement

10 page(s)
 Peter KielEllison Schneider Harris & Donlan LLP
2211029/8/2017 High Desert Power Project, LLC's Prehearing Conference Statement

3 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2211019/8/2017 Reply Brief of High Desert Power Project, LLC in Response to Orders After July 10, 2017 Committee Conference

9 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2211009/8/2017 Information Regarding Timing of the Public Portion of the PrehearingConference Scheduled for Monday, September 11, 2017
Memorandum
1 page(s)
 All parties and interested personsEnergy Commission Hearing Office
2210949/8/2017 Staff's Prehearing Conference Statement

3 page(s)
 Docket unitCalifornia Energy Commission
2210089/1/2017 Comprehensive Stipulation and Agreement Between Parties
Comprehensive Stipulation and Agreement Between Applicant High Desert Power Project, LLC, California Energy Commission Staff and California Department of Fish and Wildlife on Proposed Amendments to Soil&Water Conditions of Certification for the High Desert Power Project
23 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2209378/29/2017 High Desert Power Project, LLC's Motion to Withdraw Prior Testimony and Exhibits

2 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2209158/25/2017 Notice of Prehearing Conference and Evidentiary Hearing, Scheduling Order, and Further Orders
Notice of Prehearing Conference Monday, September 11, 2017 and Evidentiary Hearing Wednesday, September 20, 2017
10 page(s)
 All partiesEnergy Commission Hearing Office
2209148/25/2017 Staff’s Opening Brief On Condition of Certification SOIL&WATER-6.d

6 page(s)
 Docket unitCalifornia Energy Commission
2209138/25/2017 California Department of Fish and Wildlife Opening Brief on Condition of Certification Soil & Water-6d

3 page(s)
 CEC/Docket UnitCalifornia Department of Fish and Wildlife
2209128/25/2017 Legal Brief of High Desert Power Project, LLC in Response to Orders After July 10, 2017, Committee Conference

339 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2208678/23/2017 High Desert Power Project LLC's Request for Schedule Clarification

13 page(s)
 CEC/Karen Douglas and Janea ScottEllison Schneider Harris & Donlan LLP
2208398/21/2017 Report of Conversation Minimum Delivery Rate of Chlorinated Recycled Water to HOPP
Steve Ashton, City of Victorville
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2207828/15/2017 High Desert Power Project LLC's Status Report

2 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2207668/15/2017 High Desert Power Project - Status Update

8 page(s)
 CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
2207658/15/2017 California Department of Fish and Wildlife Status Conference Statement

2 page(s)
 CEC/Docket UnitCalifornia Department of Fish and Wildlife
2207058/11/2017 Energy Commission Staff's Proposed Stipulation Language For The High Desert Power Project (HDPP, 97-AFC-01C) Recycled Water Use

11 page(s)
 High Desert Power Project PartiesCalifornia Energy Commission
2205438/3/2017 Orders After July 10, 2017, Committee Conference
Orders
4 page(s)
 All parties and interested personsEnergy Commission Hearing Office
2202467/18/2017 Transcript of the 07/10/2017 Continued Committee Status Conference

33 page(s)
 CEC/DocketsCalifornia Energy Commission
2201087/10/2017 CEC Staff and CDFW Joint Proposal - Conditions of Certification
Proposed Conditions of Certification SOIL&WATER-1, -4, -5, -6, -13, -22, -23
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2200687/6/2017 Applicant Status Report and Proposed Schedule for the Remaining Proceedings

13 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2200647/6/2017 Memorandum Regarding High Desert Power Project Status Update

3 page(s)
 CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
2200067/3/2017 Status Report
Status Report
Biological Resources
2 page(s)
 CEC/DocketsCalifornia Department of Fish and Wildlife
2199876/30/2017 Notice of Committee Conference and Related Orders
Notice
6 page(s)
 All partiesEnergy Commission Hearing Unit
2188026/15/2017 Transcript of 06052017 Committee Status Conference

37 page(s)
 PartiesCalifornia Energy Commission
2180156/9/2017 Memorandum re Scheduling Prehearing Conference
Memorandum from the Hearing Officer regarding the scheduling of a Prehearing Conference on July 10, 2017
1 page(s)
 All Parties and Persons Interested in High Desert Power Plant ProceedingsEnergy Commission Hearing Office
2179966/8/2017 Storage Agreement Between Mojave Basic Area Watermaster and Victorville Water District

8 page(s)
 CEC/Karen Douglas and Janea ScottEllison Schneider Harris & Donlan LLP
2177565/26/2017 High Desert Power Project, LLC's Status Report and Proposed Schedule for the Remaining Proceedings

12 page(s)
 CEC/DocketsEllison Schneider Harris & Donlan LLP
2177455/26/2017 High Desert Status Update

1 page(s)
 CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
2176255/17/2017 NOTICE OF COMMITTEE CONFERENCE AND RELATED ORDERS
June 5, 2017 Committee Conference at the Energy Commission - *** THIS DOCUMENT SUPERSEDES TN 217624 ***
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2176245/17/2017 NOTICE OF COMMITTEE CONFERENCE AND RELATED ORDERS
*** THIS DOCUMENT HAS BEEN REPLACED BY TN 217625 *** - June 5, 2017 Committee Conference at the Energy Commission
5 page(s)
  Energy Commission Hearing Office
2175745/12/2017 Committee Conference Scheduling

1 page(s)
 CEC/Commissioner Douglas and Commissioner ScottCalifornia Energy Commission
2175725/12/2017 High Desert Power Project, LLC Response to Committee Questions

1 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2175545/11/2017 Scheduling Committee Conference
DEADLINE: By noon on May 12, 2017, parties need to indicate their availability on two dates for a committee conference.
2 page(s)
  Energy Commission Hearing Office
2173204/27/2017 HDPP Retail Water Supply Contracts Diagram with Wholesale Contracts Shown

1 page(s)
 CEC/DocketsEllison Schneider Harris & Donlan LLP
2172544/21/2017 Notice of Staff Workshop on Petition for Modification to Drought-Proof

6 page(s)
 CEC/DocketsCalifornia Energy Commission
2169934/12/2017 CORRECTED Energy Commission Staff review of CDFW Water Balance Study to correct plot legends.
This document supersedes TN 216956.
Soil and Water
14 page(s)
  California Energy Commission
2169604/11/2017 Two Figures Requested by Committee
Figure 1 showing the High Desert Power Plant (HDPP) and associated water resource features; and Figure 2 showing boundaries of the Mojave Water Agency (MWA) service area along with water delivery facilities within the service area.
Soil and Water
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2169564/11/2017 Energy Commission Staff Review of the Deparment of Fish and Wildlife Alto Transition Zone Water Balance Study

Soil and Water
14 page(s)
 CEC/DocketsCalifornia Energy Commission
2165063/10/2017 Order Regarding Use of Prior Advisors and Notice of March 21, 2017 Committee Conference
Notice
7 page(s)
 All PartiesEnergy Commission Hearing Office
2161752/22/2017 Response to Mojave River Transition Zone Water Balance Study
CDFW response to GSI
Biological Resources
2 page(s)
 Commissioners Douglas and ScottCalifornia Department of Fish and Wildlife
2157842/6/2017 High Desert Power Project, LLC's Proposed Soil&Water Conditions of Certification
High Desert Power Project, LLC's Proposed Soil&Water Conditions of Certification in Support of the Petition for Modification to Drought-Proof the High Desert Power Plant
9 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P.
2157652/6/2017 GSI Water Solutions, Inc. Technical Review of CDFW Water Balance Study

10 page(s)
 CEC/Karen Douglas and Janea ScottEllison, Schneider & Harris L.L.P.
2153321/13/2017 Disclosure of Communications and Notice: Participation of Prior Advocates - Comments of the Project Owner on the Path Forward

2 page(s)
 CEC/Karen Douglas and Janea ScottEllison, Schneider & Harris LLP
21483712/16/2016 Water Balance Study for the Transition Zone of the Mojave River

116 page(s)
  California Department of Fish and Wildlife
21459812/1/2016 Staff's Response to Committee Disclosure of Communications

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21459411/30/2016 High Desert Power Project, LLC Response to Request for Waiver Participation of Past Advisors

2 page(s)
 CEC/Karen Douglas, and Janea ScottEllison, Schneider & Harris LLP
21453411/21/2016 Committee Disclosure of Communications

10 page(s)
  California Energy Commission
21423010/28/2016 Transcript of 05/04/16 Continued Committee Status Conference

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2137409/20/2016 Mojave Water Agency Water Supply Reliability and Groundwater Replenishment Program Final Project Environmental Impact Report

511 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137399/20/2016 Mojave Water Agency 2004 Regional Water Management Plan

333 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137389/20/2016 Finding of No Significant Impact Upper Mojave River Groundwater Regional Recharge and Recovery Project

8 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137379/20/2016 Environmental Assessment Upper Mojave River Groundwater Regional Recharge and Recovery Project (R3)

108 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137319/19/2016 2015 Urban Water Management Plan Appendix H

7 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137309/19/2016 2015 Urban Water Management Plan Appendix G

100 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137299/19/2016 2015 Urban Water Management Plan Appendix F

20 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137289/19/2016 2015 Urban Water Management Plan Appendix E

10 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137279/19/2016 2015 Urban Water Management Plan Appendix D Part 4 of 4

157 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137269/19/2016 2015 Urban Water Management Plan Appendix D Part 3 of 4

160 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137259/19/2016 2015 Urban Water Management Plan Appendix D Part 2 of 4

159 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137249/19/2016 2015 Urban Water Management Plan Appendix D Part 1 of 4

159 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137209/19/2016 2015 Urban Water Management Plan Appendix C

22 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137199/19/2016 2015 Urban Water Management Plan Appendix B

158 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137189/19/2016 2015 Urban Water Management Plan Appendix A

299 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137179/19/2016 2014 Mojave Region Integrated Regional Water Managment Plan

400 page(s)
  Ellison, Schneider & Harris LLP
2137169/19/2016 2015 Urban Water Management Plan for Mojave Water Agency

148 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137069/16/2016 Rules and Regulations of the Mojave Basin Area Watermaster

65 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137059/16/2016 Judgement After Trial, January 10, 1996 (Part 2 of 2)

71 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137049/16/2016 Judgement After Trial, January 10, 1996 (Part 1 of 2)

70 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137039/16/2016 Appendix L to Twenty-Second Annual Report of the Majave Basin Area Water Year 2014-15

339 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2137029/16/2016 Twenty-Second Annual Report of the Mojave Basin Area Watermaster Water Year 2014-15

198 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2136719/15/2016 HDPP Workshop Postponement

Biological Resources
2 page(s)
 Jeffery Harris and CEC/Susan CochranCalifornia Department of Fish and Wildlife
2136609/15/2016 Memo from Hearing Officer Regarding September 20 Committee Conference
Memo notifying the parties and the public that the September 20 Committee Conference will now largely be devoted to Closed Session; Technical Expert Discussion will be rescheduled to later this year
1 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2136209/12/2016 Email from Jeff Harris, HDPP Counsel, to Hearing Officer Cochrane regarding Schedule
  Ellison, Schneider & Harris L.L.P.
2136019/9/2016 Notice of September 20, 2016 Committee Status Conference/Technical Expert Discussion
Notice
8 page(s)
 All PartiesEnergy Commission Hearing Office
2135859/9/2016 HD Update of Groundwater Model Mesh - March 2003
*** This document supersedes TN 212826 *** Revision to the model mesh update done in 2002.
Soil and Water
14 page(s)
 CEC/Docket UnitLDBond & Associates
2135849/9/2016 HD Update of Groundwater Model Mesh - March 2003
Soil and Water
14 page(s)
 CEC/Docket UnitLDBond & Associates
2135839/9/2016 Final Water Bank Model Update - April 2004
*** This document supersedes TN 212825 ***
Soil and Water
27 page(s)
 CEC/Docket UnitLDBond & Associates
2135829/9/2016 High Desert Update of Groundwater Model Mesh - Dec. 2002
*** This document supersedes TN 212824 ***
Soil and Water
41 page(s)
 CEC/Docket UnitLDBond & Associates
2135609/9/2016 Transcript of 08/11/16 Committee Status Conference

66 page(s)
 PartiesCalifornia Energy Commission
2129848/26/2016 High Desert Power Project, LLC Comments on Committee Memorandum
Memorandum on Technical Expert Discussion and Date Availability and Comments on Participation of Past Advocates
16 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2129798/26/2016 Petition to Amend Energy Commission Staff Schedules for the September 2016 Committee Conference

3 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2129258/24/2016 Statement and Dates Regarding Expert Availability

Introduction
1 page(s)
 CEC/Docket UnitCalifornia Department of Fish and Wildlife
2129058/22/2016 High Desert Power Project, LLC's Questions and Answers to Help Focus the Remaining Proceedings

6 page(s)
  Ellison, Schneider & Harris LLP
2128818/19/2016 Letter from the Watermaster of the Mojave River Basin
Letter from Mojave Water Agency to Energy Commission staff in response to Energy Commission's letter of August 11, 2016.
Soil and Water
2 page(s)
 Robert OglesbyMojave Water Agency/K. Brill
2128608/18/2016 Memo to All Parties re: Committee Conference: Technical Expert Discussion and Date Availability
Memorandum from Hearing Officer Cochran Seeking Dates for a Technical Expert Discussion and related issues
2 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2128268/17/2016 HD Update of Groundwater Model Mesh - March 2003
*** This document is replaced by TN 213585 *** Revision to the model mesh update done in 2002.
Soil and Water
14 page(s)
 Energy CommissionLDBond & Associates
2128258/17/2016 Final Water Bank Model Update - April 2004
*** This document is replaced by TN 213583 ***
Soil and Water
27 page(s)
 Energy CommissionLDBond & Associates
2128248/17/2016 High Desert Update of Groundwater Model Mesh - Dec. 2002
*** This document is replaced by TN 213582 ***
Soil and Water
41 page(s)
 CEC/Docket UnitLDBond & Associates
2126828/8/2016 High Desert Power Project LLC's Response to Staff Issues Report, Status Conference Statement and Proposed Schedule

10 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P.
2126778/8/2016 Petition to Amend Energy Commission Staff Status Conference Statement

4 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2126568/5/2016 State of CA Dept of Fish and Wildlife Status Conference Statement
Petition to Amend the High Desert Power Plant - DRAFT - Scope of Work for a Transition Zone Water Balance Study of Alto Sub-basin to Evaluate the Potential Impacts of Using Recycled Water from the VVWRA Treatment Plant
Biological Resources
22 page(s)
 CEC/Docket UnitCalifornia Department of Fish and Wildlife
2126478/5/2016 General Orders Regarding Electronic Document Formats, Electronic Filing and Service of Documents and Other Matters

6 page(s)
 All PartiesEnergy Commission Hearing Office
2126238/4/2016 Transcript of the 05/23/2016 Committee Status Conference

76 page(s)
 PartiesCalifornia Energy Commission
2125358/1/2016 PETITION TO AMEND ISSUES REPORT TO COMMITTEE QUESTIONS

11 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2123977/22/2016 High Desert Power Project, LLC Summary of Relief Requested

11 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P.
2122637/13/2016 Notice of August 11, 2016 Committee Status Conference and Related Orders
Notice of Status Conference, etc.
11 page(s)
 All PartiesCalifornia Energy Commission
2122627/12/2016 Committee Orders Regarding the Scope of Future Proceedings (Scoping Order)
Scoping Order
12 page(s)
 All PartiesEnergy Commission Hearing Office
2120527/1/2016 Commission Adoption Order - Commission Decision Granting Interim Relief
Compiled Commission Decision Granting Interim Relief to Drought-Proof the Facility
20 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2118596/17/2016 Adoption Order

4 page(s)
 PartiesCalifornia Energy Commission
2117956/13/2016 Comments on Revised Committee Recommended Decision

2 page(s)
  Ellison, Schneider & Harris LLP
2117926/13/2016 Redlined Comparison between May 6 and June 10 Committee Recommended Decisions

23 page(s)
  Energy Commission Hearing Office
2117916/10/2016 Hearing Office Proposed Commission Order Adopting June 10, 2016 Recommended Decision
Proposed Order
3 page(s)
 PartiesCalifornia Energy Commission
2117906/10/2016 Revised Committee Recommended Decision Granting Interim Relief to Drought-Proof the Facility
Renames June 9, 2016 Second Revised Committee Recommended Decision Granting Interim Relief to Drought Proof the Facility without substantive changes and supersedes May 27, 2016 Committee Revised Decision Granting Interim Relief to Drought-Proof the Facility
19 page(s)
 All PartiesEnergy Commission Hearing Office
2117836/9/2016 Redlined Comparison of May 6 and June 9 Committee Recommended Decisions

22 page(s)
  Energy Commission Hearing Office
2117826/9/2016 Second Revised Committee Recommended Decision Granting Interim Relief to Drought-Proof the Facility
*** This document is superseded by TN 211790 *** For Consideration at the Energy Commission's June 14, 2016, Business Meeting
21 page(s)
  Energy Commission Hearing Office
2117236/3/2016 Joint Response of the Parties to Committee Questions Docketed on June 2, 2016 (TN 211712)

2 page(s)
  Ellison, Schneider & Harris LLP
2117126/2/2016 Committee Questions on Stipulation
Committee Questions on “Stipulation Between High Desert Power Plant, LLC, California Energy Commission Staff, and California Department of Fish and Wildlife in Support of Proposed Amendments to Soil & Water Conditions of Certification to Provide for Interim Drought Relief” (TN 211710)
2 page(s)
 All PartiesEnergy Commission Hearing Office
2117106/2/2016 CDFW, CEC Staff and HDPP Stipulation for Interim Drought Relief

4 page(s)
  Ellison, Schneider & Harris LLP
2116936/1/2016 Past Participation of Certain Committee Advisers in Previous High Desert Proceedings

2 page(s)
 All Parties and Persons Energy Commission Hearing Office
2116695/27/2016 Revised Committee Recommended Decision Granting Interim Relief to Drought-Proof the Facility
*** This document is superseded by TN 211790 ***
16 page(s)
 Energy CommissionEnergy Commission Hearing Office
2116515/25/2016 Notice of Service List Update

2 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2116155/23/2016 Notice of Continuance of May 23, 2016 Committee Status Conference
Committee Status Conference continued to 06/02/2016 at 1:00 p.m.
4 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2115005/16/2016 Transcript of 04/29/16 Committee Status Conference (Closed Session)

5 page(s)
 PartiesCalifornia Energy Commission
2114935/16/2016 Transcript of 04/21/16 Committee Status Conference

57 page(s)
 PartiesCalifornia Energy Commission
211481-15/13/2016 Notice of June 14 2016 Full Commission Hearing on Committee Recommendation Granting Interim Relief
Includes Notice of Cancellation of May 17 2016 Full Commission Hearing on Committee Recommendation Granting Interim Relief
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
211481-25/13/2016 Notice of May 23 2016 Committee Status Conference
Committee Status Conference to commence at 9:00 a.m. on May 23, 2016
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2114425/11/2016 High Desert Power Project, LLC Comments on Committee Recommended Decision Granting Interim Relief

9 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
2114385/10/2016 Energy Commission Staff Response to the Committee Recommended Decision

7 page(s)
  California Energy Commission
2114025/6/2016 Committee Recommended Decision Granting Interim Relief to Drought-Proof the Facility

13 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2114015/6/2016 Updated Notice of Availability of the Committee Recommended Decision and Notice of Full Commission Hearing
May 17, 2016 10:00 Business Meeting at the California Energy Commission
5 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
2113785/5/2016 Email from Jeffery Harris Regarding Percolation

1 page(s)
 CEC/Susan CochranEllison, Schneider & Harris LLP
2113595/4/2016 Corrected Notice of Availability of the Presiding Member's Proposed Decision and Notice of Full Commission Hearing

5 page(s)
 All PartiesEnergy Commission Hearing Office
2113545/4/2016 Assembly Califorina Legislature Response to Aliso Canyon Gas Storage Facility Leak
3.8.16 Letter from Assemblyman Jay Obernolte to Chair Weisenmiller
2 page(s)
 CEC/Docket UnitJay Obernolte/ Assemblyman, 33rd District
2113495/3/2016 Notice of Availability of the Presiding Member's Proposed Decision and Notice of Full Commission Hearing
May 17, 2016 10:00 am Commission Hearing
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2113485/3/2016 Presiding Member's Proposed Decision Granting Interim Relief to Drought-Proof the Facility

13 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2113154/29/2016 Notice of Continuance of April 29, 2016 Committee Status Conference (Closed Session)
Closed Session May 4, 2016 at 4:00 pm at the California Energy Commission
5 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2112584/26/2016 Staff Proposed Changes to Provide Interim Relief
  California Energy Commission
2112094/22/2016 Notice of Continuance of April 21, 2016 Committee Status Conference (Closed Session)

3 page(s)
 PartiesCalifornia Energy Commission
2110014/11/2016 Notice of April 21, 2016 Committee Status Conference
Notice
8 page(s)
 All PartiesEnergy Commission Hearing Office
2109904/8/2016 High Desert Power Project LLC's Reply Brief Points and Authorities in Response to Committee's Orders
After 3/16/16 Prehearing Conference
12 page(s)
  Ellison, Schneider & Harris L.L.P.
2109864/8/2016 Staff's Reply Brief Responding to Petitioner's Points and Authorities

8 page(s)
 CEC/ Docket UnitCalifornia Energy Commission
2109314/1/2016 High Desert Power Project, LLC's Points and Authorities in Response to Committee's Orders after March 16, 2016 PHC
Prehearing Conference (PHC)
31 page(s)
 CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
2109304/1/2016 Legal Briefing Pursuant to Orders After Prehearing Conference
Legal Brief
Compliance
7 page(s)
 Commission California Department of Fish and Wildlife
2109294/1/2016 Staff's Brief - Responding to Committee's Legal Questions

13 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2108993/30/2016 Public Notice of Staff Workshop - Petition to Amend the High Desert Power Project

6 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2108603/25/2016 Staff Proposed Changes to Exhibit 1000 (TN 210088) Project Owner's Opening Testimony of High Desert Power Project

3 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2108043/22/2016 ORDERS AFTER MARCH 16, 2016 PREHEARING CONFERENCE

5 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
2108003/22/2016 Transcript of 03/15/2016 Prehearing Conference

81 page(s)
 PartiesCalifornia Energy Commission
2106893/11/2016 Postponement of Evidentiary Portion of the Prehearing Conference Scheduled for March 15, 2016
Memorandum
1 page(s)
 All PartiesEnergy Commission Hearing Office
2106743/10/2016 Notice of Pending Upstream Sale

2 page(s)
 CEC/Joseph DouglasEllison, Schneider & Harris LLP
2106673/9/2016 Letter from MRB Watermaster RE discharge of recycled water to Mojave River
Letter sent by Mojave Water Agency (Basin Watermaster) to CEC staff regarding discharge of recycled water from VVWRA to the Mojave River.
Soil and Water
2 page(s)
 Abdel-Karim AbulabanMojave Water Agency
2106553/8/2016 Energy Commission Staff's Pre-Hearing Conference Statement and Exhibit List

11 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2106543/8/2016 High Desert Power Project's Prehearing Conference Statement

13 page(s)
 CEC/Docket UnitEllison, Schneider & Harris L.L.P.
2106483/8/2016 Energy Commission Staff's Rebuttal to CDFWS's Opening Testimony

20 page(s)
2012California Department of Fish and WildlifeCalifornia Energy Commission
2106473/8/2016 Prehearing Conference Statement

Biological Resources, Soil and Water
4 page(s)
 Energy Commission California Department of Fish and Wildlife
2106333/7/2016 Record of Conversation regarding the MOU between CDFG and VVWRA

1 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2106083/4/2016 Followup email exchange between P Kramer and Nancee Murray (Fish and Wildlife)
Nancee Murray's response to previously docketed email (TN 210597) and P Kramer's reply thereto, regarding availability of a witness at the upcoming hearing
1 page(s)
 Fish and Wildlife/Nancee MurrayEnergy Commission Hearing Office
2105973/3/2016 P Kramer email to Nancee Murray (Fish and Wildlife) regarding intervener status and notice lists

1 page(s)
 Nancee MurrayEnergy Commission Hearing Office
2105853/1/2016 Answers to Committee Questions

9 page(s)
2011CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2105843/1/2016 High Desert Power Project Response to Committee Questions

25 page(s)
1009CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
2105653/1/2016 Opening Testimony

Biological Resources
26 page(s)
3001Docket ClerkCalifornia Department of Fish and Wildlife
2105542/29/2016 Committee Questions for Parties, Docket Number 97-AFC-01C

Biological Resources
9 page(s)
3000CEC/Paul Kramer, Hearing OfficerCalifornia Department of Fish and Wildlife
2105032/23/2016 MOU between California Department of Fish and Game and the Victor Valley Wastewater Reclamation Authority
(MOU) Memorandum of Understanding
8 page(s)
2010CEC/Dockets UnitCalifornia Energy Commission
2105002/22/2016 Transcript of 02/11/16 Closed Session

7 page(s)
 PartiesCalifornia Energy Commission
2104982/22/2016 Supplemental Information to TN 210280
Letter from Mojave Water Agency describing how groundwater utilized by the High Desert Power Project is accounted for.
Soil and Water
2 page(s)
1010CEC/Abdel-Karim AbulabanMojave Water Agency
2104792/19/2016 Notice of Postponed Prehearing Conference and Evidentiary Hearing, Revised Committee Schedule, and Further Orders
March 15, 2016 9:30 am High Desert Prehearing Conference & Evidentiary Hearing
12 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2104742/19/2016 Memorandum - Hearing Adviser Assignment

1 page(s)
 All CommissionersEnergy Commission Hearing Office
2104442/18/2016 COMMENTS TO STAFF REPORT
Request to deny HDPP's to continue to use water to cool a power plant that from the beginning was not reliable with the conditions that have never been complied with.
Reliability
7 page(s)
 Energy ComissionGary A. Ledford/Party in Intervention
2104432/18/2016 Response Letter to Application for Confidentiality
Exhibits A, B, C, D, F, and updated Exhibit F - Water Feasibility Study Report
3 page(s)
 Ellison, Shcneider, & Harris LLP/Jeffery D. Harris California Energy Commission
2103582/17/2016 Hearing Officer Memo re Postponement of 2-19-16 Committee Conference and 2-22-16 Prehearing Conference and Evidentiary Hearing

1 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
2103552/17/2016 Request for Delay in Scheduled Hearing

1 page(s)
 CEC/Public Adviser's Office, Elena Miller and Joseph DouglasCalifornia Department of Fish and Wildlife/Nancee Murray
2103402/16/2016 Comments to Staff Report Request to Deny HDPP's Proposal to Use Recycled Water - For Failure to Comply With Conditions

7 page(s)
 CEC/Dockets UnitGary A. Ledford
2103392/16/2016 Energy Commission Staff's Declarations and Resumes
*** THIS DOCUMENT SUPERCEDES TN 210304, 210305 and 210306 ***
8 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2103162/16/2016 Hearing Officer Paul Kramer's February 15, 2016 email to Gary Ledford
Responses to questions regarding participating in the amendment proceeding
3 page(s)
 Gary LedfordEnergy Commission Hearing Office
2103152/16/2016 Committee Questions for Parties and Other Interested Persons
Response deadline: 5 pm on February 18, 2016
2 page(s)
 All Parties and Persons Interested in the High Desert Power Plant Amendments ProceedingEnergy Commission Hearing Office
2103072/16/2016 AMENDED NOTICE OF CONTINUANCE OF FEBRUARY 11, 2016 COMMITTEE CONFERENCE (CLOSED SESSION)
Friday, February 19, 2016 10:00 a.m. continuance of High Desert Committee Conference - Art Rosenfeld room (Hearing Room A)
3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2103062/16/2016 Energy Commisison Staff's Declarations and Resumes
*** THIS DOCUMENT IS REPLACED BY TN 210339 ***
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2103052/16/2016 Energy Commisison Staff's Declarations and Resumes
*** THIS DOCUMENT IS REPLACED BY TN 210339 ***
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2103042/16/2016 Energy Commisison Staff's Declarations and Resumes
*** THIS DOCUMENT IS REPLACED BY TN 210339 ***
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2103032/12/2016 Energy Commission Staff's Rebuttal Testimony

41 page(s)
2007CEC/Docket UnitCalifornia Energy Commission
2103012/12/2016 Rebuttal Testimony of High Desert Power Project, LLC
Petition for Modification to Drought-Proof the High Desert Power Project, Filed October 30, 2015
37 page(s)
1001CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
2102891/29/2016 Confidential Updated Exhibit F
  Ellison, Schneider & Harris L.L.P.
2102881/13/2016 High Desert Power Project, LLC Confidential Records
Confidential financial information and revised Exhibit D and Recycled Water Feasibility Study Report
18 page(s)
 CEC/Robert OglesbyEllison, Schneider & Harris L.L.P.
2102842/12/2016 Notice of Continuance of February 11, 2016 Committee Conference (Closed Session)
Continued on February 19, 2016 at 10:00 a.m. in Art Rosenthal Room (Hearing Room A) - California Energy Commission
3 page(s)
 CEC/DocketEnergy Commission Hearing Office
2102802/11/2016 Report of Conversation for phone conference with MWA and City of Victorville Representatives
(NOTE: Supersedes the document uploaded as TN# 210234) This is a report of conversation (ROC) for a phone conference between Energy Commission Staff and representatives of Mojave Water Agency (MWA) and City of Victorville that took place on December 22, 2015.
Soil and Water
3 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2102612/10/2016 Response Letter to Application for Confidentiality

3 page(s)
 Ellison, Schneider, Harris LLP/Jeffery D. HarrisCalifornia Energy Commission
2102342/8/2016 ROC - Phone conference with MWA and City of Victorville Representatives
*** THIS DOCUMENT IS REPLACED BY TN 210280 *** Report of Conversation for phone conference with Mojave Water Agency and City of Victorville representatives to discuss availability of groundwater from the Mojave River Basin to the High Desert Power Project
Soil and Water
3 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2100881/29/2016 Opening Testimony

64 page(s)
1000CEC/DocketEllison, Schneider & Harris L.L.P.
2100851/29/2016 Notice of February 11, 2016, Committee Conference (Closed Session)
Notice of Committee Conference (Closed Session) to be held on February 11, 2016
6 page(s)
 CEC/DocketEnergy Commission Hearing Office
2100831/29/2016 Staff Analysis/ Opening Testimony of Proposed Petition to drought proof the project

37 page(s)
2006CEC/DocketCalifornia Energy Commission
2100811/29/2016 High Desert Power Project Application for Confidential Designation
1008 Ellison, Schneider & Harris L.L.P.
2075521/19/2016 Energy Commission Order
Order No. 16-0113-2a
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2074411/15/2016 Notice of Prehearing Conference & Evidentiary Hearing Committee Schedule, and Further Orders
February 22, 2016 1:00 p.m. Prehearing Conference Evidentiary Hearing at CEC
11 page(s)
 CEC/DocketEnergy Commission Hearing Office
2073201/14/2016 Memorandum Assigning Paul Kramer as Hearing Officer

1 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
2073111/13/2016 High Desert Power Project Application for Confidential Designation

4 page(s)
1006CEC/Robert OglesbyEllison, Schneider & Harris L.L.P.
2072871/12/2016 Response Letter Regarding the California Enegy Commission's Review of the High Desert Power Plant's Petition to Amend

2 page(s)
 Victor Valley Chamber of Commerce/Michele SpearsCalifornia Energy Commission
2072861/12/2016 City of Victorville's Support Letter Regarding High Desert Power Project

1 page(s)
 CEC/Robert WeisenmillerCity of Victorville
2072851/12/2016 Victor Valley Chamber of Commerce Letter Regarding Review of Amendment Proposal

1 page(s)
 Honorable Robert Weisenmiller, Ph.D.California Energy Commission
2072831/12/2016 Response Letter to Douglas B. Robertson, City of Victorville, dated January 5, 2016

2 page(s)
 Douglas B. Robertson, City of VictorvilleCalifornia Energy Commission
20690912/9/2015 High Desert Power Project, LLC Reply to Staff Review of Feasibility Study
Reply of High Desert Power Project, LLC to California Energy Commission Staff’s Analysis of the High Desert Power Plant Recycled Water Feasibility Report dated October 9, 2015
15 page(s)
1004CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
20686612/7/2015 Presentation - Petition for Modification to Drought-Proof the High Desert Power Project

14 page(s)
1007CEC/Dockets UnitTenaska/Jeffery D. Harris
20683912/4/2015 Letter Regarding Industrial Consumptive Use of Mojave River Basin Waters

Soil and Water
2 page(s)
 Mojave Water Agency/Valerie WiegensteinCalifornia Energy Commission
20680112/1/2015 Workshop Notice - CORRECTED WEBEX NUMBER
Supersedes TN 206799
Compliance
6 page(s)
  California Energy Commission
20679911/30/2015 Notice of Staff Workshop on Petition for Modification to Drought-Proof The High Desert Power Project
High Desert Power Project - Workshop Notice for December 10, 2015
Compliance
6 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20675211/24/2015 Gary Ledford's Revised Request to Deny HDPPs Proposal to Use Recycled Water For Failure to Comply With Conditions
In anticipation of a request to modify the conditions of approval this Request to Deny is Submitted - Request to Deny Amendment to Soil and Water Conditions
7 page(s)
  Gary Ledford
20671611/20/2015 Notice of Receipt; Petition to Amend

2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20654811/10/2015 Comments Regarding Requesting the California Energy Commission Approve High Desert Power Project's Petiton to Amend

2 page(s)
 CEC/Robert WeisenmillerCol. Paul Cook (Ret.), U.S. Congressman California District 8
20653411/6/2015 Applicant's Letter Requesting Agenda Item for Motion and Motion for Appointment of a Committee and Expedited Processing

6 page(s)
 CEC/Robert WeisenmillerEllison, Schneider & Harris LLP
20653011/6/2015 Assemblyman Jay Obernolte Comments on Support for Approval of High Desert Power Project's Petition to Amend its Permit

2 page(s)
 CEC/Robert WeisenmillerAssemblyman Jay Obernolte
20646810/30/2015 Applicant's Petition for Modification to Drought-Proof the High Desert Power Project

140 page(s)
1002CEC/Dockets UnitEllison, Schneider & Harris LLP
20645410/29/2015 Petition for Modification

3 page(s)
 cec/ Robert Weisenmiller Ellison, Schneider & Harris LLP
20639710/19/2015 Gary Ledford's Request to Deny HDPP’s Proposal to Use Recycled Water – For Failure to Comply With Conditions
In anticipation of a request to modify the conditions of approval this Request to Deny is Submitted - Request to Deny Amendment to Soil and Water Conditions
Soil and Water
7 page(s)
 Energy Commission StaffGary A. Ledford/Party in Intervention
20632110/9/2015 Response to recycled water feasibility study summary report

Compliance, Soil and Water
16 page(s)
2005Bradley K. Heisey/High Desert Power Project 14302 FNB Parkway I Omaha, Nebraska 68154California Energy Commission
20632010/9/2015 Support of California Energy Commission Approving High Desert Power Plant's Petition to Amend

2 page(s)
 CEC/Robert WeisenmillerBoard of Supervisors, County of San Bernardino/Robert A. Lovingood
20630010/8/2015 ROC between CEC staff and City of Victorville and VVWRA treatment plant representatives
Report of Conversation for a phone conference between CEC staff Abdel-Karim Abulaban and Sean McGlade from city of Victorville and Logan Olds from VVWRA plant regarding issues with delivery of recycled water to the High Desert Power Project
Soil and Water
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20629610/7/2015 Record of Conversation for Staff Visit to VVWRA Treatment Plant in May 2014
ROC documenting information that staff learned during a visit to the VVWRA treatment plant to discuss issues with recycled water delivery to HDPP.
Soil and Water
2 page(s)
 DocketsCalifornia Energy Commission
20629510/7/2015 Record of Conversation between CEC Staff and city of Victorville
ROC for email communication between Energy Commission staff and city of Victorville regarding pump test results at Victor Valley Wastewater Reclamation Authority's treatment plant
Soil and Water
2 page(s)
 DocketsCalifornia Energy Commission
20330711/3/2014 HDPP Application for Confidentiality

4 page(s)
1005CEC/R. OglesbyEllison, Schneider & Harris L.L.P.
20330611/3/2014 High Desert Power Project Recycled Water Feasibility Study Report

40 page(s)
1003CEC/J. DouglasEllison, Schneider & Harris L.L.P.
20321610/20/2014 Order Approving Petition to Modify the Project Description

2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2031269/30/2014 Notice of Decision for temporary water source

1 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2031199/26/2014 Analysis of the Proposed Installation of Ultraviolet Treatment and Cold Lime Systems, dated September 26, 2014
4 page(s)
 Interested PartiesCalifornia Energy Commission
2031189/26/2014 Analysis of the proposed installation of ultraviolet treatment and cold lime systems

4 page(s)
 Interested PartiesCalifornia Energy Commission
2031089/26/2014 Order Approving Petition to Amend

5 page(s)
 CEC/ Docket UnitCEC/ Douglas/ Hochschild/ McAllister/ Scott/ H. Kallemeyn
2030439/8/2014 Robert Sarvey Comments: Comments of Robert Sarvey on the Staff Analysis of the High Desert Poer Plant Amendment
Comments
7 page(s)
 CEC / Docket UnitRobert Sarvey
2030419/8/2014 Gary Ledford Reply to Comments of the High Desert Power Trust on the Staff Analysis of the Petition
Reply as to why the Commission cannot make an administrative approval on these critical issues
Compliance, Soil and Water
29 page(s)
 CEC/Dockets UnitGary A. Ledford
2030399/5/2014 Comments on Staff Analysis
High Desert Power Trust Comments on Staff Analysis of Petition to Allow HDPP to Use Alternative Water Supplies
19 page(s)
 CEC / Docket UnitEllison, Schneider & Harris L.L.P.
2030369/4/2014 Motion to Conduct Evidentiary Hearing

Compliance
11 page(s)
 CEC/Dockets UnitGary A. Ledford
2030359/4/2014 Motion to Continue Hearing

Compliance
4 page(s)
 CEC/Dockets UnitGary A. Ledford
2030349/4/2014 Opposition to Staff Recommendation
This projects conditions cannot be amended without reopening the entire proceeding.
Reliability, Soil and Water
41 page(s)
 CEC/Dockets UnitGary A. Ledford
2030038/28/2014 Staff Analysis of the Proposed Petition to Allow High Desert Power Project to use Alternative Water Supplies

Public Health, Soil and Water
20 page(s)
 CEC / DocketedCalifornia Energy Commission / Joe Dougals
2030008/28/2014 Feasibility Study Extension Email to HDPP
  California Energy Commission
2029968/28/2014 Petition for Staff Approved Modification

12 page(s)
 CEC/ Joseph DouglasHigh Desert Power Trust
2024025/30/2014 Notice of Receipt Petition to Amend

2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2022114/23/2014 High Desert Power's Amendment Petition Alternative Water Supplies
Address Drought Related Reliability Impacts
25 page(s)
 CEC/ Dockets UnitEllison, Schneider & Harris L.L.P.
20147012/23/2013 Water Supply Issues - Report of Conversation with CEC staff

Soil and Water
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
633741/13/2012 Notice of Receipt-Petition to Amend

3 page(s)
 CEC/ Docket unitCEC/ C. Marxen
6283511/8/2011 Notice of Decision

1 page(s)
 California Resources AgencyCEC/ F. Miller
6274611/3/2011 Order Approving Petition to Modify Soil and Water Condition

3 page(s)
 CEC/ Docket UnitCEC/ H. Kallemeyn
6260910/19/2011 Applicant's Comment on Staff Analysis of Proposed Modifications

2 page(s)
 CEC/ F. MillerApplicant/ M. Fred Strauss
623629/28/2011 Staff Analysis of proposed Modifications to Extend Sate of Recycled Water Feasability Study

11 page(s)
 Interested PartiesCEC/ F. Miller
614447/21/2011 Report of Conversation K.Abulaban and L.Carlson

1 page(s)
 CEC/Dockets UnitCEC/C.Hoffman
607015/19/2011 Notice of Receipt Petition to Amend the Energy Commission Decision for the High Desert Power Project

3 page(s)
 CEC/Dockets UnitCEC/C.Marxen
606495/16/2011 Petition to Extend Reclaimed Water Use Feasibility Study Submittal Date

5 page(s)
 CEC/ C. HoffmanHigh Desert Power Project LLC
5428611/30/2009 Notice of Decision in Compliance

1 page(s)
 California Resource AgencyCEC/ J. Douglas
5427711/30/2009 Order Approving Petition to Modify Soil and Water Conditions

8 page(s)
2004CEC/ Docket UnitCEC/ K. Douglas
5410811/16/2009 Staff Response to Comments by Robert Sarvey

2 page(s)
 CEC/ Docket UnitCEC/ K. Bell
5408711/10/2009 G. Wheatland Comments Regarding November 2009 Business Meeting Agenda Item

9 page(s)
 CEC/ J. ByronEllison, Schneider, & Harris/ G. Wheatland
5408511/10/2009 Response to Comments Submitted by Robert Sarvey

4 page(s)
 CEC/ J. LevinEllison, Schneider, & Harris/ G. Wheatland
5375910/21/2009 R. Sarvey Comments Regarding Applicant's Previous Petition

9 page(s)
 CEC/ Docket UnitIntervenor/ R. Sarvey
5370610/20/2009 High Desert Power Project Comments on September Revised Staff Analysis

13 page(s)
 CEC/ S. MunroEllison, Schneider, & Harris/ G. Wheatland
535009/30/2009 Revised Staff Analysis of Proposed Modification to Remove the Prohibition of the Use of Recycled Water for Project Operations

18 page(s)
 Interested PartiesCEC/ S. Munro
534119/24/2009 Revised Staff Analysis of Proposed Modificaions to Remove the Prohibition of the use of Recycled Water for Project Operations

17 page(s)
 Interested PartiesCEC/ S. Munro
525057/22/2009 Response to Data Request

34 page(s)
 CEC/ S. MunroHigh Desert Power Project, LLC/ F. Strauss
511964/20/2009 Staff Analysis of Proposed Modifications to Remove the Prohibition of the Use of Recycled Water for Project Operations

13 page(s)
2003Interested PartiesCEC/ Steve Munro
477198/25/2008 Notice of Receipt Petition to Amend the Commission Decision

2 page(s)
 CEC / Docket UnitCEC / E. Allen
475478/14/2008 Petiton for Modification to Use Reclaimed Water

12 page(s)
2002CEC/Docket UnitCEC/ Steve Munro
474577/31/2008 Filing of Notice of Decision in Compliance RE High Desert Power Project

1 page(s)
 CEC / Docket UnitCEC / D. Rundquist
473387/31/2008 High Desert Power Project, Order Approving a Pentition to Modify Air Quality Conditions Relating to Source Test Intervals and Other Administrative Changes.

3 page(s)
 CEC Docket UnitJ.Boyd
466226/9/2008 Staff Analysis of Proposed Modifications of AQ Conditions Relating to Source Test Intervals and Other Administrative Changes

2 page(s)
 Interested PartiesCEC/ D. Rundquist
466216/6/2008 Staff Analysis Petition to Amend the Commission Decision for High Desert PP

5 page(s)
 CEC/ Docket UnitCEC/ D. Rundquist
458624/8/2008 Staff Analysis of Proposed Modifications of Air Quality Conditions Relating to Source Test Intervals and Other Administrative Changes

7 page(s)
 Interested PartiesCEC / S. Munro
4307110/26/2007 Request for USEPA Concurrence Regarding Two Air Quality Amendment Requests

2 page(s)
 USEPA/D. JordanCEC/T. O'Brien
3858412/8/2006 Thelen Reid & Priest LLP Notification of Upstream ownership change.

2 page(s)
 CEC/S. MunroTR&P,LLP
3806510/4/2006 Adddendum 1 to Petition for Revisions/ Administration Changes to Air Quality Conditions Commission Decision.

46 page(s)
 CEC/ S. MunroHDPP/ R. Garcia
379589/26/2006 Notice of recipt petition to amend the CEC decision for the High Desert PP.

3 page(s)
 CEC/ Dockets unitCEC/ R. Johnson
378379/8/2006 Petition for revisions/ Administrative change for air quality conditions commission decision.

1 page(s)
 CEC/ S. MunroHDPP/R. Garcia
374717/21/2006 Notice of Decision by The CEC

1 page(s)
 Docket UnitCEC / S. Munro
374677/21/2006 High Desert Power Project -- Order Approving a Petition to Extend The Period To Inject Surface Water Into The Groundwater for a Backup Water Supply.

4 page(s)
 Docket UnitCEC /J. Pfannenstiel
374167/14/2006 E- mail Comments Re: Reply Brief (see attached) Believes several conditions including soil and Water are being violated.

12 page(s)
 S. MunroGary Ledford
373807/11/2006 High Desert Power Staff Response to Comments Regarding Staff Analysis of Proposed Modifications to Conditions Soil and Water 4 Regarding Extension of Water Banking Requirement

18 page(s)
 Interested PartiesS. Munro /CEC
372116/29/2006 Comments on Staff Analysis to Amend Condition of Certification S&W-4, High Desert Power Project, LLC

2 page(s)
 S. Munro/ CECR. R. Garcia/ Constellation Energy
371986/27/2006 Opposition for Petition for Revision/ Administrative Changes to Soil & Water - 4. Commission Decision High Desert Power Project.

47 page(s)
 S. Monroe/ CEC/ Docket UnitG. Ledford
371966/27/2006 Objection to HDPP's Petition for Revisions Administrative Changes to Soil and Conditions No. 4.

15 page(s)
 Docket Unit/ CECG. A. Ledford
371896/27/2006 E-mail from G. Ledford to Docket Unit and Steve munro Re: Formal Objection to HDPP Petition for Revision

1 page(s)
 Steve Munro / Docket UnitG. Ledford
370335/26/2006 Notice of Staff Workshop to Discuss Analysis of the Petition to Extend the Period to inject the Backup Water Supply for high Desert Power Project 97-AFC-1c

21 page(s)
 Docket UnitR. Johnson / S. Munro / CEC
366343/24/2006 Addendum 2 -- Petition for Revisions/Administrative Changes to Soil & Water - 4.

23 page(s)
 Mr. Steve Munro/CEC/Docket UnitHigh Desert Power/R. Garcia
366333/24/2006 Email from Mr. Garcia re: withdraw of Addendum 1 to HDPP's petition for extension dated February 10, 2006, and replace with the REVISED Addendum 1 dated March 10, 2006.

1 page(s)
 Steve Munro/CEC/Docket UnitHigh Desert Power/R. Garcia
366323/24/2006 Addendum 1-- Petition for Revisions/Administrative Changes to Soil & Water - 4.

37 page(s)
 Mr. Steve Munro/CEC/Docket UnitHigh Desert Power/R. Garcia
364713/3/2006 Addendum 1__Petition for Revisions/Administrative Changes to Soil and Water-4__Commission Decision

37 page(s)
 CEC/S. MunroHigh Desert Power Project LLC/R. Garcia
3578510/24/2005 Notice of Receipt Petition to Amend

3 page(s)
 Docket UnitCEC
3566310/12/2005 Petition for Revisions/Administrative Changes to Soil & Water - 4 Commission Decision

10 page(s)
 CEC/Docket UnitHigh Desert Power Project LLC/Penna
355809/30/2005 Request to Withdraw Petition for Revisions to Soil & Water.

1 page(s)
 Steve Munro/CEC/Docket UnitHigh Desert Power Project/D. Boward
355219/21/2005 Petition for Revisions/Administrative Changes to Soil & Water Condition 4.

9 page(s)
 S. Munro/CEC/Docket UnitHigh Desert Power Project LLC
345496/7/2005 Response to Governors' Request to Have New Generation On-line and Available This Summer

5 page(s)
 CEC/Desmond/DocketsEllison Schneider & Harris/Harris
3260710/26/2004 Order Approving a Petition to Modify Air Quality Conditions Regarding Startup and Other Requirements.

5 page(s)
 CEC/DocketsCEC/Rosenfeld
3258110/22/2004 Notice of Decision by CEC

1 page(s)
 Opr/Cec/docket UnitCEC/Munro
323879/24/2004 Staff Analysis of Proposed Modifications to Air Quality Startup Condition & other Technical Air Quality Condition Modifications.

22 page(s)
 CEC/DocketCEC/S. Munro
322469/3/2004 Notice of Receipt Petition to Amend the Energy Commission Decision for the High Desert Power Project

3 page(s)
 CEC/Docket UnitCEC/O'brien
322198/30/2004 Petition for Revision/Administrative Changes to Air Quality Conditions Commission Decision.

14 page(s)
 CEC/DocketHigh Desert Power Project Llc
306889/3/2003 Notice of Project Issues Resolution & Project Status Workshop - POS

6 page(s)
 CEC/DocketsCEC/Sharpless
248823/12/2002 Request for Change to Biological Resources Condition BIO-7

4 page(s)
 CEC/Munro/docketsHigh Desert Power Project/Pearson
248813/12/2002 Approval of Additional 7 Acres on Project Site

1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
239421/10/2002 Notice of Submittal of Work Plan to Conduct Pumping Tests for Water Injection Wells

1 page(s)
 CEC/DocketsCEC/Munro
2328912/3/2001 Respondent's Substitution of Attorney POS

7 page(s)
 CEC/DocketsLatham And Watkins/Kihm
2317211/21/2001 Parties removed from POS - Am Cuellar (Steck) and Janine Kelly Whitken

1 page(s)
 DocketsLatham & Watkins/Carroll
2301111/9/2001 Notice of Compliant Proceeding and Order Establishing Scope of Proceeding and Setting Schedule POS

6 page(s)
 DocketsCEC/Keese
2300911/9/2001 Order Dismissing the Request for Investigation and Motion to Show Cause POS

4 page(s)
 DocketsCEC/Keese
2274210/18/2001 Notice of Exemption-Approval of Requests for Site Arrangement and Equipment Changes

1 page(s)
 Office Of Planning And Research/DocketsCEC/Munro
2266710/12/2001 Request for Investigation CCR Title 20 Sec. 1231 to Determine Whether Certification Was Granted Based on Applicant's Fraud; Perjured Testimony; Deciet; or Bad Faith - POS

18 page(s)
 CEC/DocketsGary Ledford
2266110/11/2001 Declaration of Gary Ledford: To Compel Compliance of the CEC to Enforce Conditions of Certification in Final Order

25 page(s)
 CEC/DocketsGary Ledford
2251810/1/2001 Motion to Show Cause and Compel Compliance with Conditions POS

31 page(s)
 CEC/DocketsLedford
222829/10/2001 Approval of Requests for Site Arrangement and Equipment Changes

2 page(s)
 Constellation Power Source Gen/Parece/docketCEC/Therkelsen
221919/7/2001 Reply of Southern California Edison Company

14 page(s)
 DocketsSouthern California Edison Co./Miller
220738/28/2001 Approval of Elimination of the 16 Hours-Per-Day Limit on Fossil Fuel Electrical Generation at the SEGS III-VII Facility

2 page(s)
 Manage Of Regulatory Affairs/Rib/docketsCEC/Therkelsen
219548/16/2001 Notice of Exemption-Addition of Condition of Certification to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid

1 page(s)
 Office Of Planning And Research/DocketsCEC/Bruins
215617/19/2001 Notice of Application for a Certificate of Public Convenience and Necessity to Construct the High Desert 230 kV Power Line Project

6 page(s)
 CEC/DocketsSouthern California Edison/Martin
210776/27/2001 Petition for Modification: Transfer of Transmission Line Ownership to Southern California Edison

50 page(s)
 CEC/Munro/docketHigh Desert Power Project Llc/Barnett
210746/27/2001 Approval of Request to Change Ownership of the High Desert Power Project Transmission Line

2 page(s)
 Constellation Power Source Generation Inc/Parece/dCEC/Therkelsen
207406/11/2001 Approval of Request to Modify the Requirement of Condition of Certification HAZ-5 from a Non-Enclosed Double-Walled Ammonia Tank to a Single Walled Enclosed Ammonia Tank

1 page(s)
 Planning & Research/DocketsCEC/Munro
204355/24/2001 Notice of Exemption - Approval of Request to Change Condition of Certification VIS-1 to Require Painting the Project an Earth Color to Blend with the Surroundings

1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
204325/24/2001 Notice of Exemption - Approval of Request to Change Ownership Transmission Line

1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
204275/24/2001 Notice of Exemption - Approval of Request to Change Condition of Certification AQ-3 to Substitute Low Sulfur Fuel Requirement for Soot Filter Requirement

1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
204135/24/2001 Notice of Exemption - Approval of Request to Change Condition of Certification AQ-33 to Require Surrender of ERCs Prior to Commercial Operation

1 page(s)
 Office Of Planning & Research/DocketsCEC/Munro
203905/22/2001 Approval of Request to Change High Desert Power Project Condition of Certification VIS-1

2 page(s)
 Constellation Power Source Generation Inc./Pearce/CEC/Therkelsen
203895/22/2001 Approval of Request to Change High Desert Power Project Condition AQ-3 to Substitute Low Sulfur Fuel Requirement for Soot Filter Requirement

2 page(s)
 Constellation Power Source Generation Inc./Pearce/CEC/Therkelsen
203885/22/2001 Approval of Request to Change High Desert Power Plant Project Condition or Certificate AQ-33 to Require Surrender of ERCs Prior to Commercial Operation

2 page(s)
 Constellation Power Source Generation Inc/Pearce/dCEC/Therkelsen
203875/22/2001 Emission Reduction Credits (ERC's)

1 page(s)
 High Desert Power Project Llc/Pearce/docketMojave Desert Air Quality Management District/Fryx
203865/22/2001 Request for Modification to Air Quality Conditions AQ-33

1 page(s)
 CEC/MunroHigh Desert Power Project Llc/Pearson
202635/17/2001 Approval of Request to Change Ownership of the High Desert Power Project Transmission

3 page(s)
 Constellation Power Source Generation Inc/Parece/dCEC/Therkelsen
183161/31/2001 Order Approving a Petition to Transfer Ownership to the High Desert Power Trust

1 page(s)
 CEC/DocketCEC/Keese
179541/19/2001 Statement of High Desert Power Project

1 page(s)
 CEC/DocketHigh Desert Power Project Llc/ Barnett
179531/19/2001 Statement of High Desert Power Trust

1 page(s)
 CEC/MunroHigh Desert Power Trust/Ferrucci
1718312/7/2000 Petition for Approval of Ownership Transfer

4 page(s)
 CEC/MonroePaul Hastings Janofsky & Walker Llp/Clem
1692011/20/2000 Establishment of Post-Certification Mailing List

2 page(s)
 CEC/DocketsCEC/Munro
156486/21/2000 Use of Fresh Inland Water for Cooling the High Desert Power Project

5 page(s)
 CEC/DocketsBurney Resource Group/Marcy Crockett
155176/14/2000 Response of Commission Staff to Petition for Reconsideration of Commission Decision - POS

12 page(s)
 CEC/DocketsCEC/Holmes
153827/14/2000 Filing of Notice of Determination

1 page(s)
 Office Of Planning And ResearchCEC/Buell
152827/20/2000 Notice of Appeal; Notice RE: Clerk's Transcript and Original Papers (Attachment: Proof of Service)

13 page(s)
 CEC/DocketGary A. Ledford
152047/17/2000 Notice of Appeal - Clerk's Transcript and Original Papers

13 page(s)
 CEC/DocketsGary Ledford
152017/27/2000 Notice of Determination

1 page(s)
 CEC/DocketCEC/Buell
151377/18/2000 Notice of Appeal; Notice RE: Clerk's Transcript and Original Papers (Attachment" Proof of Service)

13 page(s)
 CEC/DocketGary Ledford
151167/11/2000 Transmittal Letter RE: Final Decision of the High Desert Power Project

1 page(s)
 Resources Agency/NicholasCEC/Buell
151157/11/2000 Receipt of Fee in Payment of Environmental Filing Fee

1 page(s)
 Hdpp Llc/WelchDept. Of Fish & Game/Avants
149296/16/2000 Applicant Comments RE: Petition for Reconsideration (Attachment: Proof of Service)

7 page(s)
 CEC/DocketThomspon
149256/19/2000 Cover letter with Gary Ledford's Ruling Reflects Crucial Shift in Water Policy

5 page(s)
 CEC/DocketsCEC/Hearing Office
148896/21/2000 SWRCB Resolution 75-58 (Water Quality Policy on the use and Disposal of Inland Water Used for Powerplant Cooling) and Water Code Section 13550 ET SEQ

1 page(s)
 Cure/JosephState Water Resources Control Board/Wilson
148866/21/2000 Order Denying Reconsideration (Order No. 00--0621-03) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Keese/moore/laurie/pernell/rosenfeld
148736/21/2000 Response of Gary Ledford to Commission Staff Comments

41 page(s)
 CEC/DocketsGary Ledford
147906/7/2000 Environmental Filing Fee Cash Receipt

2 page(s)
 CEC/DocketsHigh Desert/Welch
147446/2/2000 NOTICE of Hearing on Petition for Reconsideration (June 21, 2000) (Attachment: Proof of Service)

4 page(s)
 CEC/DocketCEC/Keese
147236/2/2000 Petition for Reconsideration of the Decision to Certify High Desert Power Project (Attachment: Proof of Service)

28 page(s)
 CEC/DocketGary A. Ledford
145915/23/2000 Final Environmental Impact Statement

102 page(s)
 Interested PartiesUs Department Of The Interior/Noda
145715/18/2000 Petition to Amend, Modify, Clarity and Revise SWRCB Resolution 75-58 - POS

11 page(s)
 CEC/DocketsLedford
145705/18/2000 Statewide Compliance with: Article X Section 2 of the California Constitution SWRCB Resolution 75-58 and Water Code Section 13550 et.seq.; and Permits of SWRCB on Power Plants

25 page(s)
 State Water Resource Board MembersJess Ranch Development Co./Ledford
145295/16/2000 Statewide Compliance with: Article X Section 2 of the California Constitution; SWRCB Resolution 75-58 and Water Code Section 13550 et.seq.; and Permits of SERCB on Power Plants

37 page(s)
 State Water Resource Control BoardGary Ledford
144905/5/2000 Presentation material - The Argument Not to Use: Inland Waters for Power Plant Cooling

21 page(s)
 CEC/DocketsCare/Gary Ledford
143945/5/2000 Notice of Availability of the Commission Decision on the AFC for High Desert Power Project

1 page(s)
 CEC/DocketsCEC Cec