Docket Log

Docket: 20-SPPE-01
Project Title: Great Oaks South Backup Generating Facility Small Power Plant Exemption
Generated On: 12/8/2024 1:56:14 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2432065/20/2022 Memo re Request to Close Docket

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24092612/13/2021 Filing fees receipt for FEIR
Required with filing of the NOD to the State Clearinghouse.
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24092512/13/2021 Notice of Determination
Great Oaks South Backup Generating Facility
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24090212/10/2021 Commission Final Decision

701 page(s)
 CEC/docket unitCalifornia Energy Commission
24088312/9/2021 Adoption Order on Committee Proposed Decision
Order No: 21-1208-2
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24087312/8/2021 ERRATA TO THE COMMITTEE PROPOSED DECISION

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24084112/6/2021 Staff's Comments on the Committee Proposed Decision

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24083512/6/2021 Robert Sarvey's Comments on the Proposed Decision
Sarvey pd comments
Air Quality
8 page(s)
 CEC/Docket UnitRobert Sarvey
24072511/24/2021 [PROPOSED] ADOPTION ORDER ON COMMITTEE PROPOSED DECISION

3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
24072411/24/2021 NOTICE OF AVAILABILITY OF THE COMMITTEE PROPOSED DECISION, NOTICE OF PUBLIC COMMENT PERIOD, AND NOTICE OF CALIFORNIA ENERGY COMM
NOTICE OF AVAILABILITY OF THE COMMITTEE PROPOSED DECISION, NOTICE OF PUBLIC COMMENT PERIOD, AND NOTICE OF CALIFORNIA ENERGY COMMISSION HEARING
6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
24071711/24/2021 THÔNG BÁO VỀ TÌNH TRẠNG SẴN CÓ QUYẾT ĐỊNH ĐƯỢC ĐỀ XUẤT CỦA ỦY BAN, THÔNG BÁO VỀ GIAI ĐOẠN BÌNH LUẬN CÔNG KHAI, VÀ THÔNG BÁO VỀ P
THÔNG BÁO VỀ TÌNH TRẠNG SẴN CÓ QUYẾT ĐỊNH ĐƯỢC ĐỀ XUẤT CỦA ỦY BAN, THÔNG BÁO VỀ GIAI ĐOẠN BÌNH LUẬN CÔNG KHAI, VÀ THÔNG BÁO VỀ PHIÊN ĐIỀU TRẦN CỦA ỦY BAN NĂNG LƯỢNG CALIFORNIA
7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
24071611/24/2021 AVISO DE DISPONIBILIDAD DE LA DECISIÓN PROPUESTA POR EL COMITÉ, AVISO DE PERÍODO DE COMENTARIOS PÚBLICOS Y AVISO DE LA AUDIENCIA

7 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
24071511/24/2021 Great Oaks Committee Proposed Decision

699 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
23998310/5/2021 Robert Sarvey's Post Hearing Brief
Great South Oaks Opening Brief FINAL Sarvey
Air Quality
9 page(s)
 CEC/Docket UnitRobert Sarvey
23998010/5/2021 CEC Staff's Opening Brief

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23997910/5/2021 Intervenor Sarvey Request for Official notice of certain Commission Documents

Air Quality
3 page(s)
 CEC/Docket UnitRobert Sarvey
2398589/28/2021 ORDER CLOSING THE EVIDENTIARY RECORD AND PROVIDING DIRECTION FOR THE SUBMISSION OF OPTIONAL POST-HEARING BRIEFS

3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2398399/24/2021 Transcript 9-21-21 of Evidentiary Hearing

88 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2398019/20/2021 Transcript of Prehearing Conference

43 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2397849/17/2021 Staff Supplemental Information in Response to Committee Questions, List of Witnesses, and Updated Exhibit List

9 page(s)
209CEC/KCalifornia Energy Commission
2397809/17/2021 ROC with David Keyon, City of San Jose and Tao Jiang, CEC
Email from David Keyon, Principal Planner, City of San Jose to Tao Jiang, Air Resources Engineer, CEC, December 1, 2020
Greenhouse Gases
3 page(s)
208CEC/Docket UnitCalifornia Energy Commission
2397729/17/2021 SV1 LLC Revised Exhibit List - Reflect Supplemental Testimony GOSBGF Committe Questions

5 page(s)
 CEC/Docket UnitDayZenLLC
2397709/17/2021 SV1 Supplemental Testimony Package

Noise and Vibration, Greenhouse Gases
7 page(s)
35CEC/Docket UnitDayZenLLC
2397539/16/2021 San Jose Greenhouse Gas Reduction Strategy 2030 Update Initial Study Addendum, August 2020

256 page(s)
207CEC/Docket UnitCity of San Jose
2397529/16/2021 City of San Jose 2030 Greenhouse Gas Reduction Strategy, August 2020

118 page(s)
34CEC/Docket UnitCity of San Jose
2397239/15/2021 ORDERS DENYING MOTION TO STRIKE, GRANTING APPLICANT LEAVE TO FILE EXHIBITS, DENYING WRITTEN CROSS-EXAMINATION, AND REQUESTING IN
ORDERS DENYING MOTION TO STRIKE, GRANTING APPLICANT LEAVE TO FILE EXHIBITS, DENYING WRITTEN CROSS-EXAMINATION, AND REQUESTING INFORMATION
10 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2396719/10/2021 NOTICE AND ORDER RESCHEDULING THE EVIDENTIARY HEARING TO SEPTEMBER 21, 2021

6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2396659/10/2021 AVISO Y ORDEN DE REPROGRAMACIÓN DE LA AUDIENCIA PROBATORIA PARA EL 21 DE SEPTIEMBRE DE 2021

6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2396649/10/2021 THÔNG BÁO VÀ CHỈ THỊ ĐỔI LỊCH PHIÊN ĐIỀU TRẦN DỰA TRÊN BẰNG CHỨNG SANG NGÀY 21 THÁNG 9 NĂM 2021

6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2396409/8/2021 Corrected Staff Response to SV1 LLC's Motion in Limine
***This document supersedes TN 239638***
Compliance
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2396399/8/2021 Sarvey’s Reply To Applicant's Motion To Strike Reply Testimony
Sarvey’s Reply To Applicant Motion To Strike Reply Testimony
Air Quality
3 page(s)
 CEC/Docket UnitRobert Sarvey
2396389/8/2021 Staff's Response to SV1 LLC's Motion in Limine
***This document has been replaced by TN 239640***
Compliance
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2396379/8/2021 Updated Staff Exhibit List

Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2395999/3/2021 ORDER SHORTENING TIME ON APPLICANT’S MOTION IN LIMINE

3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2395929/3/2021 Additional Staff Declarations and Resumes
For Great Oaks South Backup Generating Facility (20-SPPE-01)
8 page(s)
206CEC/Docket UnitCalifornia Energy Commission
2395879/3/2021 CEC STAFF RESPONSE TO INTERVENOR SARVEY'S REPLY TESTIMONY

4 page(s)
205CEC/Docket UnitCalifornia Energy Commission
2395859/2/2021 SV1's Responses to Committee Questions - GOSBGF

Biological Resources, Compliance, Noise and Vibration, Project Description, Traffic and Transportation, Greenhouse Gases
12 page(s)
 CEC/Docket UnitDayZenLLC
2395849/2/2021 GOS Exhibit List

Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2395829/2/2021 CEC STAFF RESPONSE TO ORDER REQUESTING SUPPLEMENTAL INFORMATION IN RESPONSE TO COMMITTEE QUESTIONS

10 page(s)
204CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2395789/2/2021 Intervenor Sarvey’s Exhibit List
Intervenor Sarvey’s Exhibit List
Air Quality
1 page(s)
 CEC/Docket UnitRobert Sarvey
2395779/2/2021 Exhibit 304 ADDENDUM TO THE GREAT OAKS MIXED USE PROJECT FINAL ENVIRONMENTAL IMPACT REPORT (SCH# 2013032047) AND THE ENVISION SA
ADDENDUM TO THE GREAT OAKS MIXED USE PROJECT FINAL ENVIRONMENTAL IMPACT REPORT (SCH# 2013032047) AND THE ENVISION SAN JOSE 2040 GENERAL PLAN FINAL SUPPLEMENT AL ENVIRONMENTAL IMPACT REPORT (SCH# 2009072096)
Air Quality
121 page(s)
304CEC/Docket UnitRobert Sarvey
2395769/2/2021 Great South Oaks Data Center Exhibit 305
Pulte Homes Great Oaks Residential development
Air Quality
1 page(s)
305CEC/Docket UnitRobert Sarvey
2395688/31/2021 Sarvey Prehearing Conference Statement
Prehearing conference statement
Air Quality
3 page(s)
 CEC/Docket UnitRobert Sarvey
2395678/31/2021 SV1's Prehearing Conference Statement - GOSBGF

Executive Summary
7 page(s)
 CEC/Docket UnitDayZenLLC
2395648/31/2021 SJCE 2020 IRP
San Jose Clean Energy 2020 Integrated Resource Plan
Greenhouse Gases
67 page(s)
301CEC/Docket UnitRobert Sarvey
2395638/31/2021 CEC Staff's Prehearing Conference Statement
Responding to Great Oaks scheduling order.
Compliance
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2394898/27/2021 SV1 Motion In Limine to Strike Sarvey Reply Testimony - GOSBGF

Introduction
175 page(s)
 CEC/Docket UnitDayZenLLC
2394828/26/2021 Order Requesting Supplemental Information In Response to Committee Questions

6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2394768/25/2021 City of San Jose - Acceptance of MMRP and Mitigation Compliance

1 page(s)
203CEC/Lisa WorrallCity of San Jose
2394588/25/2021 SV1 LLC's Reply Testimony - GOSBGF

Greenhouse Gases
3 page(s)
33CEC/Docket UnitDayZenLLC
2394498/24/2021 Great Oaks South intervenor Sarvey's Reply Testimony

Air Quality
13 page(s)
300CEC/Docket UnitRobert Sarvey
2393618/18/2021 Addendum to Final Environmental Impact Report for the Great Oaks South Backup Generating Facility

33 page(s)
202CEC/Docket UnitCalifornia Energy Commission
2392768/11/2021 SV1 Opening Testimony Package - GOSBGF

Air Quality, Alternatives, Biological Resources, Cultural Resources, Facility Design, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Transmission System Engineering, Soil and Water, Greenhouse Gases
15 page(s)
32CEC/Docket UnitDayZenLLC
2392588/11/2021 Staff's Opening Testimony
For the Great Oaks South Backup Generating Facility project
44 page(s)
201CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2392238/10/2021 Staff Status Report #12

1 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2391998/6/2021 SV1 Alternative Measure to Comply wiht City of San Jose GHGRS Plan - GOSDC

Project Description, Greenhouse Gases
34 page(s)
31CEC/Docket UnitDayZenLLC
2391518/2/2021 COMMITTEE ORDER ON PETITION TO INTERVENE FILED BY ROBERT SARVEY

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2390637/28/2021 Great Oaks South Backup Generating Facility Final Environmental Impact Report

579 page(s)
200CEC/Docket UnitCalifornia Energy Commission
2389687/22/2021 Record of Conversation with Zach Struyk, Assistant Director, and Kate Ziemba, Public Information Manager, San Jose Clean Energy

Greenhouse Gases
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2389347/19/2021 AMENDED Enchanted Rock Response to SV1 Comments on Draft EIR

Alternatives
5 page(s)
 CEC/Docket UnitEnchanted Rock
2388737/14/2021 Enchanted Rock Response to SV1 Comments on Draft EIR

Alternatives
5 page(s)
 CEC/Docket UnitEnchanted Rock
2388227/13/2021 Adam Petersen Comments - City of San Jose Comments - Great Oaks South Draft EIR

11 page(s)
 CEC/Docket UnitAdam Petersen
2387697/9/2021 Staff Status Report #11

1 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2387077/6/2021 SV1 Comments on the Draft Environmental Impact Report - - GOSBGF

Air Quality, Greenhouse Gases
3 page(s)
30CEC/Docket UnitDayZenLLC
2387007/6/2021 Bay Area Air Quality Management District Comments - Comment Letter for Great Oaks South Backup Generating Facility DEIR

Air Quality, Greenhouse Gases
6 page(s)
303CEC/Lisa WorrallBay Area Air Quality Management District
2386797/6/2021 Great Oaks South Data Center Petition to Intervene
Sarvey Great Oaks South Data Center Petition to Intervene
Air Quality
2 page(s)
 CEC/Docket UnitRobert Sarvey
2384716/24/2021 NOTICE OF PREHEARING CONFERENCE, EVIDENTIARY HEARING, SCHEDULING ORDER, AND FURTHER ORDERS

16 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2384676/24/2021 AVISO DE CONFERENCIA PREVIA A LA AUDIENCIA, AUDIENCIA PROBATORIA, ORDEN DE PROGRAMACIÓN Y DEMÁS ÓRDENES

17 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2384666/24/2021 THÔNG BÁO VỀ HỘI NGHỊ TRƯỚC PHIÊN ĐIỀU TRẦN, PHIÊN ĐIỀU TRẦN DỰA TRÊN BẰNG CHỨNG, CHỈ THỊ VỀ LỊCH TRÌNH VÀ CÁC CHỈ THỊ KHÁC

16 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2382236/15/2021 Claire A Warshaw Comments - 2021_06_15 comments for the Great Oaks Backup Generating Facility DRAFT EIR

5 page(s)
 CEC/Docket UnitClaire A. Warshaw
2382096/15/2021 Memo re Deadline to Petition to Intervene, Prehearing Conference, and Evidentiary Hearing

2 page(s)
 All Parties and Persons InterestedCalifornia Energy Commission
2382086/15/2021 Memorándum Fecha límite para la Petición para Intervenir, Conferencia previa a la audiencia y Audiencia probatoria

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2382076/15/2021 Thư Thông Báo Hạn Chót Nộp Đơn Thỉnh Nguyện Tham Gia Hội Nghị Trước Phiên Điều Trần, và Phiên Điều Trần Dựa Trên Bằng Chứng

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381766/10/2021 Staff Status Report #10

1 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2381756/10/2021 SV1 Status Report Number 7 - GOSBGF

Executive Summary
1 page(s)
 CEC/Docket UnitDayZenLLC
2380045/27/2021 THÔNG BÁO VỀ TÍNH KHẢ DỤNG CỦA DỰ THẢO BÁO CÁO TÁC ĐỘNG MÔI TRƯỜNG

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2380035/27/2021 AVISO DE DISPONIBILIDAD DEL PROYECTO DE ESTUDIO DE IMPACTO AMBIENTAL

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2379905/26/2021 Notice of Availability of a Draft Environmental Impact Report
For the Great Oaks South Backup Generating Facility Distributed to project mailing list on May 21, 2021
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2378755/21/2021 Great Oaks South Backup Generating Facility Draft Environmental Impact Report
State Clearinghouse # 2020100431
523 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2377675/10/2021 Staff Status Report #9

1 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2377245/6/2021 SV1 Status Report 6 - GOSBGF

1 page(s)
 CEC/Docket UnitDayZenLLC
2376315/3/2021 Record of Conversation with J Zielkiewicz, BAAQMD staff regarding emergency Operations

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2375754/28/2021 Record of Conversation with Tom Borden, City of San Jose Public Works Development Services Division
Regarding CFD 6 fees
Traffic and Transportation
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2375084/20/2021 Miratech Emission Information

Air Quality
1 page(s)
29CEC/Docket UnitDayZenLLC
2374054/9/2021 Staff Status Report #8

1 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2374044/9/2021 SV1 Status Report Number 5

Introduction
1 page(s)
 CEC/Docket OfficeDayZenLLC
2373654/2/2021 Memo Re Making Requests for Committee Action

1 page(s)
 All Parties and Persons InterestedEnergy Commission Hearing Office
2373093/25/2021 ROC with Kevin Ice, City of San Jose re Approved Projects In Southern City

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2373083/25/2021 ROC with Adam Petersen, City of San Jose re Status of Original Special Use Permit

10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2372983/25/2021 ROC with Xuna Cai, BAAQMD re China Mobile Data Center

46 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2372433/19/2021 Memo re Amended Hearing Officer Assignment

1 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2372053/18/2021 GOSBGF Ammonia Emissions Description and Spreadsheet

Air Quality, Public Health
5 page(s)
28CEC/DocketsDayZenLLC
2371523/12/2021 GOSBGF Revised Air Quality and Public Health Analysis

Air Quality, Public Health
38 page(s)
27CEC/Docket OfficeDayZenLLC
2371503/12/2021 Hexagon Consultants Transportation Analysis - GOSBGF

Traffic and Transportation
67 page(s)
26CEC/Docket OfficeDayZenLLC
2371493/12/2021 GSOBGF Revised Project Description

Project Description
32 page(s)
25CEC/Docket OfficeDayZenLLC
2371483/12/2021 SV1 Revised Noise Analysis - GOSBGF

Noise and Vibration
6 page(s)
24CEC/Docket OfficeDayZenLLC
2371233/10/2021 SV1 Status Report 4 - GOSBGF

Introduction
1 page(s)
 CEC/Docket UnitDayZenLLC
2371163/10/2021 Staff Status Report #7

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2367252/10/2021 Staff Status Report #6

1 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2367212/10/2021 SV 1 LLC Status Report 3 - GOSBGF

Introduction
2 page(s)
 CEC/Docket UnitDayZenLLC
2365412/1/2021 SV1 Supplemental Response to DR 63 - Draft VMT Analysis

Traffic and Transportation
66 page(s)
23CEC/Docket OfficeDayZenLLC
2363381/15/2021 SV1 Status Report Number 2 - GOSBGF

Introduction
2 page(s)
 CEC/DocketsDayZenLLC
2363361/15/2021 SV1 City of San Jose GHGRS Compliance Checklist

Greenhouse Gases
18 page(s)
22CEC/DocketsDayZenLLC
2362681/12/2021 Agenda for Workshop to Discuss Research into Clean Energy Alternatives to Diesel Backup Generator Systems

2 page(s)
 CEC and Docket UnitEnergy Commission Hearing Office
2362591/11/2021 Staff Status Report #5
For Great Oaks South Backup Generating Facility
3 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2362521/8/2021 Hearing Officer Memo Great Oaks

1 page(s)
 CEC/docket unitCalifornia Energy Commission
2362271/5/2021 Notice of Workshop to Discuss Research into Clean Energy Alternatives to Diesel Backup Generator Systems
January 21, 2021
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23617212/29/2020 DRAFT Transcript 12-16-20 on Committee Conference and Closed Session
*** THIS DOCUMENT WAS DOCKETED IN ERROR. SHOULD BE IN 19-SPPE-03 ***
64 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23609112/22/2020 BAAQMD letter Re BACT Determination For Diesel Back-up Engines Greater Than or Equal to 1,000 Brake Horsepower
From Jack P. Broadbent, Executive Officer, APCO, Bay Area Quality Management District
2 page(s)
 CEC/Drew Bohan, Executive DirectorBay Area Quality Management District
23591512/10/2020 Record of Conversation with California Air Resources Board Re low carbon fuel standard program
With G. Bemis, CEC Air Quality Unit staff
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23591412/10/2020 NOP Comments from Native American Heritage Commission
For the Great Oaks South Backup Generating Facility Received Oct. 30, 2020
5 page(s)
 CEC/DocketsCalifornia Energy Commission
23591312/10/2020 NOP Comments Oak Grove School District
For Great Oaks South Backup Generating Facility Received Nov. 20, 2020
7 page(s)
 CEC/DocketsCalifornia Energy Commission
23590812/10/2020 Staff Status Report #4
For the Great Oaks South Backup Generating Facility
3 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
23581812/1/2020 Agenda for Continued Public Scoping Meeting
For the Great Oaks South Backup Generating Facility
2 page(s)
 CEC/DocketsCalifornia Energy Commission
23581412/1/2020 Notice of Continued Scoping Meeting
For the Great Oaks South Backup Generating Facility
3 page(s)
 CEC/DocketsCalifornia Energy Commission
23580411/25/2020 LH Comments - Scoping comment

Air Quality, Facility Design, Public Health, Traffic and Transportation, Greenhouse Gases
1 page(s)
 CEC/DocketsLH
23580311/24/2020 Bay Area Air Quality Management District Comments - Comment Letter for Great Oaks South Data Center NOP

Air Quality, Greenhouse Gases
17 page(s)
302CEC/DocketsBay Area Air Quality Management District
23568411/18/2020 Presentation - Public Advisor's SPPE Public Scoping Meeting
pdf. - Presentation - Great Oaks South Data Center - Public Advisor's SPPE Public Scoping Meeting on 11-17-2020
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23567711/18/2020 Presentation - Public Advisor's SPPE Public Scoping Meeting on 11-17-2020

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23561711/16/2020 Agenda for the Public Scoping Meeting for the Great Oaks South Backup Generating Facility
*** THIS DOCUMENT SUPERSEDES TN 235588 *** - November 17, 2020 Public Scoping Meeting
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23560811/16/2020 Patrick Comments - Zoom link for 11 17 zoning meeting please, thank you

1 page(s)
 CEC/DocketsPatrick
23558811/13/2020 Agenda for the Public Scoping Meeting for the Great Oaks South Backup Generating Facility
*** THIS DOCUMENT IS REPLACED BY TN 235617 *** - November 17, 2020 Public Scoping Meeting
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23556611/10/2020 Revised SV1 Supplemental DR-47 Response GOSBGF
*** THIS DOCUMENT SUPERSEDES TN 235547 ***
Air Quality
29 page(s)
21CEC/Docket UnitDayZenLLC
23554911/10/2020 Staff Status Report #3
For Great Oaks South Backup Generating Facility
2 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
23554711/10/2020 SV1 Supplemental DR-47 Response GOSBGF
****THIS DOCUMENT IS REPLACED BY TN 235566 ***
Air Quality
29 page(s)
 CEC/Docket UnitDayZenLLC
23552811/6/2020 Vietnamese Version- Thông Báo Cuộc Họp Xác Định Phạm Vi Công Cộng của Cơ Sở Phát Điện Dự Phòng Great Oaks South
For Great Oaks South Backup Generating Facility
3 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23552711/6/2020 Spanish Version- Aviso de la reunión pública para determinar el alcance de la Instalación generadora de respaldo de Great Oaks S
For the Great Oaks Backup Generating Facility
4 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23551811/4/2020 Claire Ann Warshaw Comments - 2020_11_04 for recent diesel backup generation plant designs_Clean Energy Group's, Understanding Solar + Storage

Facility Design
71 page(s)
 CEC/Docket OfficeClaire Ann Warshaw
23550611/4/2020 Notice of Public Scoping Meeting
For Great Oaks South Backup Generating Facility
3 page(s)
 CEC/DocketsCalifornia Energy Commission
23542810/26/2020 Vietnamese Version - Chi ThI Ve Lich Trinh Cua Uy Ban Va Cac Chi Thi Lien Quan
This is a Vietnamese translation of the order of TN 235279
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23542710/26/2020 Spanish Version - Orden De Programacion Del Comite Y Ordenes Afines
This is a Spanish translation of the order of TN 235279
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23541610/26/2020 Nick Renna Comments - EIR SCOPE GOSBGF

Public Health
1 page(s)
 CEC/DocketsNick Renna
23541410/23/2020 Notice of Preparation

10 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23541310/23/2020 Patricia Sheehan's email to San Jose Mayor Liccardo Regarding - Equinix Great Oaks Data Center

2 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
23538910/22/2020 10-15-2020 Email from Mimi Patterson

1 page(s)
 CEC/DocketsCalifornia Energy Commission
23538810/22/2020 10-21-2021 Email from Mimi Patterson

173 page(s)
 CEC/DocketsCalifornia Energy Commission
23531610/19/2020 John Thalin Comments - Increase in noise and polution equals decrease in property value

1 page(s)
 CEC/DocketsJohn Thalin
23527910/16/2020 COMMITTEE SCHEDULING ORDER AND RELATED ORDERS

7 page(s)
 CEC/DocketsCalifornia Energy Commission
23520610/12/2020 Email from Mimi Patterson Re Information

2 page(s)
 CEC/DocketsCalifornia Energy Commission
23520510/12/2020 Email from Ken Hares Re Equinix - Great Oaks South Backup Generating Facility, Great Oaks South

2 page(s)
 CEC/DocketsCalifornia Energy Commission
23519410/9/2020 CEC Memorandum Regarding Status Report #2

2 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
23516410/8/2020 Mimi Patterson email to Angela Wang re permits for GOS
Email Communications re City of San Jose's public outreach and permits for Great Oaks South SP15-031
10 page(s)
 CEC/DocketsCalifornia Energy Commission
23516310/8/2020 Mimi Patterson email to Patrick Kelly
Mimi Patterson email communication with City of San Jose re GOS Billboard, public outreach and EIR
17 page(s)
 CEC/DocketsCalifornia Energy Commission
23516210/8/2020 Mimi Patterson email to Wesley Dyer of CARB
Email string communications between Mimi Patterson and Wesley Dyer.
8 page(s)
 CEC/DocketsCalifornia Energy Commission
23516110/8/2020 Mimi Patterson email to San Jose CCM Jimenez
Public notice & public outreach to community near GOS project site
1 page(s)
 CEC/DocketsCalifornia Energy Commission
23501010/5/2020 Email with CARB
*** THIS DOCUMENT SUPERSEDES TN 235006 ***
6 page(s)
 CEC/Ralph LeeCalifornia Energy Commission
23500610/2/2020 Email from CARB
*** THIS DOCUMENT IS REPLACED BY TN 235010 ***
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2349629/30/2020 DPF Specifications for Life Safety Generators - GOSBGF

Air Quality, Public Health
1 page(s)
20CEC/DocketsDayZenLLC
2349559/30/2020 Mimi Patterson Comments - Email to Sergio Jimenez

Compliance
2 page(s)
 CEC/DocketsMimi Patterson
2349299/28/2020 Mimi Patterson Comments - Public Comment re Equinix Data Centers & Sm Power Plant - Great Oaks South Projecet

3 page(s)
 CEC/Docket UnitMimi Patterson
2349059/24/2020 Transcript 09-23-20 re Committee Conference

79 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2349029/24/2020 Mimi Patterson Comments - Public Comment - Great Oaks South Data Center

2 page(s)
 CEC/Docket UnitMimi Patterson
2348819/23/2020 Mimi Patterson Comments - Equinix Data Centers

1 page(s)
 CEC/Docket UnitMimi Patterson
2348789/23/2020 Email communication re September 23, 2020 Committee Conference will begin at 1_30 pm

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2348779/23/2020 Email re September 23, 2020 Committee Conference

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2348759/23/2020 SV1 Supplemental Response to DR-62 - GOSBGF

Air Quality
2 page(s)
19CEC/DocketsDayZenLLC
2348449/21/2020 Email communications between Bay Area Air Quality Management District Staff

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2348209/17/2020 Email Communications between Hearing Officer and Air Resources Board Staff

2 page(s)
 CEC/Ralph LeeCalifornia Energy Commission
2346609/11/2020 SV1 LLC Status Report Number 1 - GOSBGF

Compliance
7 page(s)
 CEC/DocketsDayZenLLC
2346579/10/2020 Staff's September 10, 2020 Status Report

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2345869/4/2020 SV1 Supplemental Responses to Revised AQ Analysis

Air Quality, Public Health
6 page(s)
18CEC/DocketsDayZenLLC
2345398/31/2020 Notice of Committee Conference and Related Orders
September 23, 2020; 1:00 p.m.
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2345388/31/2020 AVISO DE LA CONFERENCIA DEL COMITÉ Y ÓRDENES AFINES
23 de septiembre de 2020 a la 1:00 p. m.
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2345378/31/2020 THÔNG BÁO VỀ BUỔI HỘI NGHỊ ỦY BAN VÀ CÁC LỆNH LIÊN QUAN
NGÀY 23 THÁNG 09 NĂM 2020 1:00 chiều
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2345298/28/2020 Email from Scott Galati

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2345198/27/2020 Report of Conversation and Notice Intent to Reschedule the Proposed Sept 16, 2020 Committee Conference to Sept 23, 2020
Report of conversation and notice intent to reschedule the proposed September 16, 2020 Committee Conference to September 23, 2020 at 1:00 p.m.
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2345028/26/2020 Great Oaks Memo Committee Conference

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2344858/25/2020 GOS Revised Alternatives Chapter 5 - SPPE Application

Alternatives
8 page(s)
17CEC/DocketsDayZenLLC
2344818/25/2020 Report of Conversation between CEC staff J Hinde and City of San Jose staff A Wang
--Supersedes TN 234435-- Regarding special use permit
Land Use
23 page(s)
 CEC/DocketsCalifornia Energy Commission
2344808/25/2020 Report of Conversation betwewn CEC staff A Stroud and Santa Clara Valley Habitat Agency staff G Haas
Regarding nitrogen deposition
Biological Resources
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2344798/25/2020 Revise AQ and HRA Modeling Analysis
Revised AQ and HRA Modeling Analysis with Overlapping Construction and Operation and with Diesel Particulate Filters
Air Quality, Public Health, Greenhouse Gases
95 page(s)
16CEC/DocketsDayZenLLC
2344358/25/2020 Report of Coversation between CEC staff J Hinde and City of San Jose staff A Wang
--Superseded by TN 234481--
Land Use
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2343928/20/2020 PG&E Responses to Staff Data Requests Concerning Interconnection of Great Oaks South Backup Generating Facility
Submitted to staff by PG&E on August 17, 2020
Transmission System Engineering
8 page(s)
 CEC/Docket UnitPG&E
2343538/19/2020 ROC with US EPA and CEC staff G Bemis
---Supersedes TN 234348--- Regarding Federal credits on renewable diesel and bio diesel
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2343488/18/2020 ROC with US EPA and CEC Staff G Bemis
***SUPERSEDED BY TN 234353***
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2343358/18/2020 Public Comment from Bill Dunmyer Comments - Public Comment from Bill Dunmyer

Air Quality, Hazardous Materials, Noise and Vibration, Socioeconomics, Waste Management, Soil and Water
3 page(s)
 Lisa WorrallCalifornia Energy Commission
2343338/17/2020 Lisa Campbell Comments - Great Oaks South Project - Safety

Air Quality
1 page(s)
 CEC/Docket UnitLisa Campbell
2343318/17/2020 Public Comments from Nick Renna

1 page(s)
 CEC/Lisa WorrallNick Renna
2343298/17/2020 Public comments from Nick Renna

Air Quality, Hazardous Materials, Noise and Vibration, Waste Management
1 page(s)
 CEC/Lisa WorrallNick Renna
2342718/7/2020 Staff's Status and Issues Identification Update and Updated Staff Proposed Schedule
For the Great Oaks Backup Generating Facility
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2342438/6/2020 Memo - Hearing Officer Assignment

1 page(s)
 CEC/Karen Douglas, David Hochschild and All PartiesCalifornia Energy Commission
2340837/31/2020 Nick Renna Comments - Opposed to the Great Oaks South Backup Generating Facility Small Power Plant Exemption

Hazardous Materials, Noise and Vibration, Public Health
1 page(s)
 CEC/Docket UnitNick Renna
2340507/29/2020 Jeffrey R. Shelton Comments - Great Oaks South is in Residential Area

Public Health
1 page(s)
 CEC/Docket UnitJeffrey R. Shelton
2339997/23/2020 SV1 Responses to CEC Data Requests Set 1 (1-5) - GOSBGF

Project Description
5 page(s)
15CEC/Docket UnitDayZenLLC
2339887/22/2020 Transcript of July 13, 2020 Committee Conference
***SUPERSEDES TN 233973***
70 page(s)
 CEC/DocketsCalifornia Energy Commission
2339737/21/2020 Transcript of July 13, 2020 Committee Conference
***SUPERSEDED BY TN 233988***
68 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2339247/17/2020 Supplemental Responses to Data Requests 65-69 - GOSBGF

Air Quality
9 page(s)
14CEC/DocketsDayZenLLC
2338757/15/2020 SV1 Supplemental Response to DR 58 - GOSBGF

Transmission System Engineering
14 page(s)
13CEC/DocketsDayZenLLC
2338587/14/2020 Great Oaks South Backup Generating Facility Committee Conference PowerPoint
Great Oaks South Backup Generating Facility Committee Conference PowerPoint by Hearing Officer Susan Cochran
20 page(s)
 CEC/DocketsCalifornia Energy Commission
2338567/14/2020 Proof of publication of Notice of Receipt in El Obsavador
Published on July 10, 2020
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2338557/14/2020 Record of Conversation-G Bemis, CEC staff with B Brown, Western States Oil
Regarding renewable diesel supply
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2338527/14/2020 Proof of publication of Notice of Reciept in Vietnam Daily
Published July 10, 2020
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2338457/14/2020 Presentation - SPPE Committee Conference - Great Oaks South Data Center 7-13-20
Public Advisor's Office Presentation
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2338407/13/2020 Presentation - Siting Committee Conference
SV1 Status Conference GOSBGF by Equinix
Project Description
6 page(s)
12CEC/Docket UnitDayZenLLC
2338327/10/2020 SV1 Response to Staff IIR - GOSBGF

2 page(s)
11CEC/Docket UnitDayZenLLC
2338217/9/2020 Proof of publication of Notice of Receipt in the San Jose Metro News
Published July 9, 2020
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2338167/8/2020 Report of Conversation - Email communication regarding construction emissions and public health impacts

9 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2338137/8/2020 General Orders Regarding Motions, Electronic Filing, Service of Documents, and Other Matters

4 page(s)
 CEC/DocketsCalifornia Energy Commission
2337957/7/2020 Staff's Issues Identification, Status, and Proposed Schedule for the Great Oaks South Backup Generating Facility

4 page(s)
 CEC/Karen Douglas and David HochschildCalifornia Energy Commission
2337767/6/2020 Public Comment on Great Oaks South from Santa Clara Valley Transportation Authority

8 page(s)
 CEC/DocketsCalifornia Energy Commission
2337557/6/2020 Vipul Rahane Comments - Issues with air and sound pollution

Air Quality, Noise and Vibration
1 page(s)
 CEC/DocketsVipul Rahane
2337547/6/2020 Lisa Cordray Comments - Opposition to small power plant on Santa Teresa and Great Oaks

Alternatives
1 page(s)
 CEC/DocketsLisa Cordray
2337537/6/2020 Terry Schumacher Comments - Proposed Power Plant Great Oaks Blvd

Air Quality
1 page(s)
 CEC/DocketsTerry Schumacher
2337527/6/2020 Maria Carmen Moreno munoz Comments - Extremely close to residential areas!

Facility Design
1 page(s)
 CEC/DocketsMaria Carmen Moreno munoz
2337517/6/2020 Maria Carmen Moreno munoz Comments - Extremely close to Residential Areas in South San Jose!!

1 page(s)
 CEC/DocketsMaria Carmen Moreno munoz
2337507/6/2020 Sue Stucker Comments - power plant

Alternatives
1 page(s)
 CEC/DocketsSue Stucker
2337467/6/2020 Lafayette Data Requests Set One
24 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2337437/3/2020 Richard Lawson Comments - Poor location for diesel generators

Air Quality, Land Use
1 page(s)
 CEC/Docket UnitRichard Lawson
2337427/3/2020 Nelson Perez Comments - AS A NEIGHBOR I OPPOSE THIS PROJECT

Air Quality, Compliance, Land Use, Noise and Vibration, Public Health
1 page(s)
 CEC/Docket UnitNelson Perez
2337217/2/2020 Notice of Committee Conference and Related Orders
Monday, July 13, 2020 at 1:30 p.m.
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2336836/30/2020 Notice of Receipt of an Application for a Small Power Plant Exemption for the Great Oaks South Backup Generating Facility

6 page(s)
 CEC/DocketsCalifornia Energy Commission
2336816/30/2020 SV1 Supplemental Responses to CEC Data Requests 18 and 56

Air Quality, Project Description, Public Health, Soil and Water
10 page(s)
10CEC/DocketsDayZenLLC
2336386/24/2020 SV1 Responses to CEC Data Request Set 3 - GOSBGF
Set 3, (65-75)
Air Quality, Cultural Resources, Land Use, Greenhouse Gases
56 page(s)
9CEC/Docket UnitDayZenLLC
2334876/15/2020 Request for Agency Participation in the Review of the Great Oaks South Backup Generating Facility
Mailed June 15, 2020 *** THIS DOCUMENT SUPERSEDES TN 232772 ***
9 page(s)
 Agency Distribution ListCalifornia Energy Commission
2334856/15/2020 Report of Conversation- Edits to PD BIO-3
Email between L. Worrall, CEC staff and S. Galati, applicant representative, regarding minor edits to survey timing in PDF BIO-3.
Biological Resources
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2333406/5/2020 Sustainable Energy, Inc. Comments - Sustainable Energy Inc Comment on 20-SPPE-01

2 page(s)
 CEC/DocketsSustainable Energy, Inc.
2332425/29/2020 Report of Conversation- FMMP land classification
Conversation between CEC Staff J. Hinde and Dept. of Conservation Staff K. Kisko
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2331235/26/2020 Order Establishing Committee

2 page(s)
 CEC/DocketsCalifornia Energy Commission
2330365/20/2020 Hearing Officer Assignment

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2330095/18/2020 Staff Data Requests, Set 3
Staff Data Requests Set 3 for the Great Oaks South Backup Generating Facility
8 page(s)
 SV1, LLC/Scott GalatiCalifornia Energy Commission
233005-15/18/2020 SV1 Responses to CEC Data Request Set 2 GOSBGF - Part I

463 page(s)
5CEC/DocketsDayZenLLC
233005-25/18/2020 SV1 Responses to CEC Data Requests Set 2 GOSBGF - Part II

326 page(s)
6CEC/DocketsDayZenLLC
233005-35/18/2020 SV1 Responses to CEC Data Requests Set GOSBGF - Part III

245 page(s)
7CEC/DocketsDayZenLLC
233005-45/18/2020 SV1 Responses to CEC Data Requests Set 2 GOSBGF - Part IV

114 page(s)
8CEC/DocketsDayZenLLC
2329545/8/2020 Native American Heritage Commission Correspondence
California Energy Commission correspondence with the Native American Heritage Commission for the Great Oaks South Backup Generating Facility, including a Sacred Lands File Search and a list of California Native American Tribes.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2328975/1/2020 Response Letter for Confidential Designation re Cultural Resources Data

2 page(s)
 Scott Galati, DayZen LLCalifornia Energy Commission
2328594/13/2020 GOSDC CRTR

43 page(s)
 CEC/DocketsDayZenLLC
2327804/20/2020 Tribal letters for Great Oaks South Backup Generating Facility

25 page(s)
 CEC/DocketsCalifornia Energy Commission
2327724/17/2020 Request for Agency Participation in the Review of the Great Oaks South Backup Generating Facility
Mailed April 14, 2020 - *** THIS DOCUMENT IS REPLACED BY TN 233487 ***
6 page(s)
 CEC/DocketsCalifornia Energy Commission
2327554/16/2020 Great Oaks South Backup Generating Facility Data Requests Set 2
Staff's data requests set 2 for the Great Oaks Backup Generating Facility SPPE
19 page(s)
 Scott A. GalatiCalifornia Energy Commission
2327274/13/2020 Request For Confidentiality - GOSBGF CRTR

3 page(s)
 CEC/DocketsDayZenLLC
2326824/7/2020 GOSBGF Data Requests Set 1
Staff data requests set 1 for the Great Oaks South Backup Generating Facility
2 page(s)
 CEC/DocketsCalifornia Energy Commission
232467-13/19/2020 GOSBGF SPPE Application Appendices A-F

282 page(s)
2CEC/DocketsDayZenLLC
232467-23/19/2020 GOSBGF SPPE Application Appendix G

741 page(s)
3CEC/DocketsDayZenLLC
232467-33/19/2020 GOSBGF SPPE Application Appendices H-K

212 page(s)
4CEC/DocketsDayZenLLC
2324663/19/2020 GOSBGF SPPE Application

Air Quality, Alternatives, Biological Resources, Cultural Resources, Executive Summary, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
239 page(s)
1CEC/DocketsDayZenLLC
2324553/18/2020 Open new docket file for Great Oaks South Backup Generating Facility Small Power Plant Exemption

1 page(s)
 CEC/DocketsCalifornia Energy Commission