2120046/28/2016Pacific Gas & Electric Company's Petition for Amendment for Colusa Generating Station

Air Quality, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
32 page(s)
 CEC/Docket UnitDayZen LLC
2112994/29/2016COM-7, 2016 Annual Compliance Report
2016 Annual Compliance Report (2015 Operating Year) (ACR)
Compliance
140 page(s)
  Pacific Gas & Electric Company
20703612/15/2015Order Approving a Petition to Amend to Revise Air Quality Conditions of Certification

11 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20649911/3/2015PTA Cover letter, Executive Summary and Staff Analysis
Cover letter, Executive Summary and Staff Analysis for the Colusa Generating Station (CGS) Petition to Amend (PTA) for Air Quality
Compliance
44 page(s)
 Interested Parties California Energy Commission
2058238/12/2015Colusa Generating Station's Water Line Cultural Monitoring Daily Logs

Cultural Resources
18 page(s)
  CH2M HILL
2057518/17/2015Notice of Receipt for Air Quality Petition to Amend
Notice of Receipt (NOR), Colusa Petition to Amend Air Quality Conditions of Certification
Compliance
2 page(s)
  California Energy Commission
2057038/12/2015Repeated Application for Confidential Designation
Back-up Water Supply Pipeline daily cultural resources monitoring logs
Cultural Resources
1 page(s)
 CEC/ Robert OglesbyCH2M HILL
2055447/29/2015PG&E's Revised Petition to Amend - Appendix A
Appendix A to PG&E's Revised Petition to Amend
Air Quality
27 page(s)
  Galati | Blek LLP
2055247/27/2015PG&E's Revised Petition to Amend

15 page(s)
 CEC/ Docket UnitGalati | Blek LLP
2051596/25/2015PG&E’s PETITION FOR AMENDMENT

16 page(s)
 CEC/Eric VeerkampGalati | Blek LLP
2044474/29/2015Pacific Gas & Electric Company's 2015 1st Quarter Operating Report
Quarterly Operating Report
Air Quality
1617 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2043124/22/2015Colusa fin fan cooler SAPM final approval
Final approval letter, Staff Approved Project Modification for fin fan cooler and expanded deck grating
Compliance
1 page(s)
 Colusa Generating StationCalifornia Energy Commission
2041974/7/2015PG&E CGS Back-Up Water Pipeline Cultural Monitoring Report

Cultural Resources
57 page(s)
 CEC/ Robert OglesbyCH2M HILL
2040814/7/2015PG&E Confidential Designation Request

Cultural Resources
1 page(s)
 CEC/ Robert OglesbyCH2M HILL
2039593/25/2015Notice of Determination, Colusa Fin fan cooler and deck grating
NOD for Staff Approved Modification (SAPM) for fin fan cooler and deck grating improvements
Compliance
6 page(s)
 CEC/ Docket UnitCEC/ Christine Stora
2037623/3/2015Colusa Generating Station Condition of Certification Soil and Water 10 - ZLD Management Plan
Revised Zero Liquid Discharge (ZLD) Management Plan
Soil and Water
57 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2037442/27/20152014 Colusa Generating Station Annual Compliance Report

Biological Resources, Hazardous Materials, Noise and Vibration, Transmission Line Safety and Nuisance, Visual Resources, Waste Management, Soil and Water
206 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2036112/6/2015Application for Staff Approved Project Change to Amend Docket - Steam Turbine Deck Grating

Facility Design
4 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2036102/6/2015Application for Staff Approved Project Change to Amend Docket
Fin Fan Cooler
Facility Design
5 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2036042/5/20152014 4th Quarter Operating Report
Air Quality Report for Fourth Quarter 2014 including required Annual Data.
Air Quality
1680 page(s)
 Eric VeerkampPacific Gas & Electric Co.
2035401/16/20152015 Final Source Test Results

579 page(s)
 CEC/Dockets UnitPacific Gas & Electric Co.
2033438/13/2014Confidential Cultural Resources Report

Cultural Resources
38 page(s)
 CEC / Docket UnitCH2M HILL
20328810/30/2014Title V Operating Permit
Initial Title V Operating Permit
Air Quality
15 page(s)
 Eric VeerkampPacific Gas & Electric Co.
20328710/30/20142014 3rd Quarter Operating Report
Quarterly Operating Report
Air Quality
1551 page(s)
 Eric VeerkampPacific Gas & Electric Co.
20328610/30/2014Glenn Colusa Irrigation District Revised Agreement
GCID Agreement
Soil and Water
8 page(s)
 Eric VeerkampPacific Gas & Electric Co.
20321010/20/2014Response to Application for Confidentiality
Cultural Resources Survey
2 page(s)
 CH2M Hill/Jerry SalamyCEC/ Rob Oglesby
20320110/17/2014Cover Letter attaching 2014 Source Test Protocol

Air Quality
44 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2031738/20/2014Department of Parks and Recreation Primary Record - Forms

50 page(s)
 CEC / Robert OglesbyCH2M Hill
2031728/20/2014Record Search Bibliography Studies

15 page(s)
 CEC / Robert OglesbyCH2M Hill
2030569/12/2014Colusa GenerationTRANS-2 Compliance

Traffic and Transportation
1 page(s)
 CEC / Docket Unit / E VerrkampCH2M HILL
2030379/5/2014Colusa Generating Station Revised Drainage Erosion and Sedimentation Control Plan

Soil and Water
262 page(s)
 CEC / Eric Verrkamp CH2M HILL
2029748/22/2014Notice of Determination - Colusa Back-Up Water Pipeline
Notice of Determination for SAPM for Colusa Generating Station (CGS) Permanent Back-Up Water Supply Pipeline
Compliance
6 page(s)
 CEC/DocketCalifornia Energy Commission
2029687/29/2014Confidential Colusa Generating Station Cultural Resource Survey Report

Cultural Resources
19 page(s)
 CEC / Eric VeerkampCH2M HILL / Jerry Salmy
2029568/20/2014Colusa Generating Station Repeated Application for Confidential Designation

1 page(s)
 CEC / Robert OglesbyCH2M Hill
2029558/20/2014Cover Letter for 2014 2nd Quarter Operating Report
Cover Letter
Air Quality
1 page(s)
 CEC / Eric VeerkampPacific Gas & Electric Co. / Charles Price
202954-18/20/2014Cover Letter for 2014 2nd Quarter Operating Report
Cover Letter
Air Quality
1 page(s)
 Eric VeerkampPacific Gas & Electric Co.
202954-28/20/2014Colusa Generating Station 2014 2nd Quarter Operating Report (Revised)
Revised 2014 2nd Quarter Operating Report
Air Quality
1644 page(s)
 Eric VeerkampPacific Gas & Electric Co.
2029448/18/2014Response letter for Application for Confidentiality

Cultural Resources
2 page(s)
 Jerry Salamy/CH2M Hill California Energy Commission / R. Oglesby
2029228/13/2014Request for Confidential Designation

Cultural Resources
2 page(s)
 CEC / Erik VeerKampCH2M HILL
2028417/29/2014Request for Confidential Designation
Letter Requesting Confidential Designation for Cultural Resource Survey Report
Cultural Resources
2 page(s)
 CEC / Robert P. Oglesby CH2M HILL
2028407/29/2014AQSC-9 - 2014 2nd Quarter Operating Report
Quarterly Operating Report
Air Quality
1727 page(s)
 Eric Veerkamp / CEC Pacific Gas & Electric Co./ Colusa Generating Station
2024556/12/2014Notice of Receipt (NOR)
Notice of Receipt for Petition for alternate water supply pipeline
Compliance
2 page(s)
 PublicCalifornia Energy Commission
2023855/28/2014Petition to Install a Water Line
Petition for Project Modification for the Colusa Generating Station
47 page(s)
 CEC / Reic VeerkampCH2M HILL
2022704/29/2014Quarter Operating Report Quarter Ending March 31, 2014

Air Quality
1787 page(s)
 Eric VeerkampPacific Gas & Electric Co.
2019854/8/2014Colusa Amendment Cover Letter/Executive Summary
Summary and Staff Analyses for Colusa Amendment requesting to truck water to the site
Compliance
20 page(s)
  California Energy Commission
2019624/4/2014Senior Environmental Consultant
Colusa Generating Station Annual Biological Report
Biological Resources
23 page(s)
 Eric VeerkampPacific Gas & Electric Co.
2019313/27/2014Data Request Response re Trucking Water to the CGS

Compliance
1 page(s)
 CEC/Eric VeerkampColusa Generating Station/Charles Price
2019293/27/2014Notice of Receipt for Petition to Amend

Compliance
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2018783/14/2014Notice of Determination
A Notice of Determination of staff level approval to store spare GSU transformer on site
Compliance
4 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2018763/14/2014Colusa Generating Station's Emergency Petition for Amendment

14 page(s)
 CEC/Eric VeerkampGalati | Blek LLP
2018293/4/20142013 Annual Compliance Report

Biological Resources, Facility Design, Compliance, Hazardous Materials, Noise and Vibration, Transmission Line Safety and Nuisance, Soil and Water
178 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
2016612/7/2014Letter to CEC re Petition for Project Change
Petition to house spare Generator Step-Up transformer at the Colusa Generating Station
Facility Design
10 page(s)
 CEC/Eric VeerkampPacific Gas & Electric Co.
20143112/13/2013Notice of Determination
Staff level approval of a project modification for a clarifier
Compliance
4 page(s)
  California Energy Commission
20118411/13/2013PG&E's Petition to Amend the Commission Decision

5 page(s)
 1516 Ninth Street, MS-2000, Sacramento, CA 95814Pacific Gas & Electric Co.
524447/16/2009Notice of Decision by the California Energy Commission(CEC)

1 page(s)
 CEC/ Docket UnitCEC/ C. Davis
524437/16/2009Order Approving Colusa Petition to Amend

9 page(s)
 CEC/ Docket UnitCEC/ K. Douglas
511194/16/2009CEC Amendment #2 Approval Letter

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
509304/8/2009Staff Analysis of Proposed Modifications to Amend

16 page(s)
 Interested PartiesCEC/ D. Rundquist
506473/25/2009Notice of Receipt Petition to Modify Electrical Switchyard and Transmission Facilities

2 page(s)
 CEC/ Docket UnitCEC/ E. Allen
503112/27/2009Response to Data Request 20-24

16 page(s)
 CEC/ D. RundquistPG&E/ T/ Miller
499762/4/2009Round 3 Data Requests 20 to 24

2 page(s)
 Grenier&Associaties/ Andrea GrenierCEC/ D. Rundquist
498171/22/2009PG&E License Petition Amendment #2

19 page(s)
 CEC/ Docket UnitPG&E/ J. Maring
4911411/25/2008PG&E Comments Re Colusa Generating Station Activies

2 page(s)
 CEC/ C. DavisPG&E/ T. Miller
4888411/5/2008Response to Data Request 1-17

17 page(s)
 CEC/ D. RundquistPublic/ PG&E J. Maring
4881710/29/2008Data Request 1-17 Re Colusa Generating Station

7 page(s)
 Andrea GrenierCEC/ D. Rundquist
4829010/1/2008Colusa Generating Station Start of Construction

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
480719/19/2008Notice of Receipt

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
478919/3/2008Letter RE: Temporary DESCP and SWPPP for the Colusa Generating Station

1 page(s)
 CEC/ Docket UnitCEC/ C. Davis
478909/3/2008Letter RE: Colusa Generating Project

2 page(s)
 CEC/ Docket UnitCEC/ C. Davis
475838/15/2008Air Quality Modeling Files

1 page(s)
 CEC/ Docket UnitSAC/ S. Madams
475828/15/2008PG&E's Colusa Generating Station Project

132 page(s)
 CEC/ Docket UnitPG&E/ J. Maring
474477/31/2008CARE's Comments on PSD Permit for the Colusa Generating Station

45 page(s)
 CEC / Docket UnitCARE / M. Boyd
471677/23/2008Colusa Generating Station (06-AFC-9C) Limited Start of Construction

2 page(s)
 PG&E/J. MaringCEC/C. Davis