259793 | 10/30/2024 |
Q3 2024 - QUARTERLY OPERATING REPORT Q3 2024 - QUARTERLY OPERATING REPORT Compliance 1674 page(s)
| | Public | California Energy Commission |
259773 | 10/30/2024 |
STATEMENT OF STAFF APPROVAL OF POST CERTIFICATION CHANGE - GRAVEL REPLACEMENT STATEMENT OF STAFF APPROVAL OF POST CERTIFICATION CHANGE - GRAVEL REPLACEMENT Compliance 13 page(s)
| | CEC/Docket Unit | California Energy Commission |
258462 | 8/12/2024 |
Notice of Receipt - Petition to Amend (PTA) - Gravel Replacement Notice of Receipt - Petition to Amend (PTA) - Gravel Replacement with Pervious Asphalt Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
258231 | 7/31/2024 |
Gravel Replacement Project PTA (PTA) - Gravel Replacement with Pervious Asphalt Pavement Compliance 64 page(s)
| | CEC/Docket Unit | California Energy Commission |
254645 | 2/23/2024 |
ANNUAL COMPLIANCE REPORT- 2023 ANNUAL COMPLIANCE REPORT- 2023 196 page(s)
| | CEC/Docket Unit | PG&E |
254644 | 2/23/2024 |
ANNUAL COMPLIANCE REPORT- 2022 ANNUAL COMPLIANCE REPORT- 2022 Compliance 190 page(s)
| | CEC/Docket Unit | PG&E |
248626 | 2/1/2023 |
QUARTERLY OPERATING REPORT- Q4 2022 QUARTERLY OPERATING REPORT- Q4 2022 Compliance 3265 page(s)
| | CEC/Docket Unit | PG&E |
246833 | 10/26/2022 |
ANNUAL COMPLIANCE REPORT- 2021 ANNUAL COMPLIANCE REPORT- 2021 Compliance 208 page(s)
| | CEC/Anwar Ali, Ph.D. | PG&E |
242938 | 5/6/2022 |
QUARTERLY OPERATING REPORT- Q1 2022
Compliance 1624 page(s)
| | CEC/Anwar Ali | PG&E |
241281 | 1/26/2022 |
2021 3rd Quarter Operating Report
1640 page(s)
| | CEC/Docket Unit | Pacific Gas and Electric |
241280 | 1/26/2022 |
2021 4th Quarter Operating Report
1653 page(s)
| | CEC/Docket Unit | Pacific Gas and Electric |
239457 | 8/25/2021 |
2nd QTR Operating Report
1637 page(s)
| | CEC/Docket Unit | Pacific Gas and Electric |
237843 | 5/18/2021 |
Annual Compliance Report- 2020 Annual Compliance Report- 2020 Compliance 191 page(s)
| | CEC/Anwar Ali, Ph.D. | PG&E |
237546 | 4/26/2021 |
2021 1st Quarter Operating Report Operating Report 1603 page(s)
| | CEC/Docket Office | Pacific Gas and Electric |
237545 | 4/26/2021 |
1st Qtr Operating Report Cover Letter 1603 page(s)
| | CEC/Docket Office | Pacific Gas and Electric |
236686 | 2/8/2021 |
2020 Qtr 4 Operating Report Operating Report Air Quality 1628 page(s)
| | CEC/Dockets | Pacific Gas and Electric |
235635-1 | 11/17/2020 |
CEC Cover QOR CEC Cover Letter 2 page(s)
| | CEC/Dockets | Pacific Gas and Electric |
235635-2 | 11/17/2020 |
2020 3rd QTR QOR Quarterly Operating Report 1646 page(s)
| | CEC/Dockets | Pacific Gas and Electric |
234006 | 7/24/2020 |
2020 Q2 Operating Report Quarterly Operating Report Air Quality 1637 page(s)
| | CEC/Dockets | Pacific Gas and Electric |
232807 | 4/21/2020 |
Quarterly Operating Report 1St Quarter Operating Report Colusa Generating Station 1641 page(s)
| | Anwar Ali | Pacific Gas and Electric |
232806 | 4/21/2020 |
Quarterly Operating Report 1st Quarter 2020 Operating Report 1639 page(s)
| | Anwar Ali | Pacific Gas and Electric |
232289 | 3/3/2020 |
2019 ACR Cover 2019 Annual Compliance Report Cover Letter Compliance 2 page(s)
| | Anwar Ali - Compliance Manager - CEC | Pacific Gas and Electric |
232288 | 3/3/2020 |
2019 Annual Compliance Report Annual Compliance Report Compliance 171 page(s)
| | Anwar Ali - Compliance Manager - CEC | Pacific Gas and Electric |
232133 | 2/19/2020 |
Annual and Fourth Quarter 2019 Quarterly Operating Report
Compliance 1625 page(s)
| | Public | Pacific Gas & Electric Company |
231056 | 12/10/2019 |
Annual Compliance Report 2018 Annual compliance Report Compliance 156 page(s)
| | CEC/Anwar Ali | PG&E |
230335 | 10/24/2019 |
Air Quality Quarterly Operation Report Third Quarter 2019 Air Quality Quarterly Operation Report Third Quarter 2019 Air Quality 1636 page(s)
| | Public | PG&E |
229607-1 | 8/27/2019 |
Quarterly Operation Report - Second Quarter 2019 - Part 1 of 2 Air Quality Quarterly Operation Report 800 page(s)
| | CEC/Anwar Ali | PG&E |
229607-2 | 8/27/2019 |
Quarterly Operation Report - Second Quarter - 2019 Part 2 of 2 Air Quality Quarterly Operation Report 809 page(s)
| | CEC/Anwar Ali | PG&E |
229606-1 | 8/29/2019 |
Air Quality Quarterly Operating Report First Quarter 2019p1 800 page(s)
| | | PG&E |
229606-2 | 8/29/2019 |
Air Quality Quarterly Operating Report First Quarter 2019p2 809 page(s)
| | | PG&E |
227907 | 4/30/2019 |
Air Quality Quarterly Operating Report First Quarter 2019 Contains information on complaints, emissions, fuel quality data, emissions, and water bath heater operation 1588 page(s)
| | CEC/Anwar Ali | Pacific Gas and Electric Company |
225570 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
217922 | 6/7/2017 |
Notice of Determination Petition to Amend
6 page(s)
| | CEC/Dockets | California Energy Commission |
217920 | 6/7/2017 |
Notice of Determination Petition to Amend
6 page(s)
| | CEC/Dockets | California Energy Commission |
217513 | 5/9/2017 |
Notice of Determination Petition to Amend Colusa Generating Station Notice of Determination 7 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
216756 | 3/30/2017 |
Notice of Receipt for a Petition to Amend (PTA) Colusa Generating Station (CGS). Petition to Amend to construct an Air-Cooled Condenser Pump Pit Stairway Compliance 2 page(s)
| | | California Energy Commission |
216317 | 3/2/2017 |
Pacific Gas & Electric Company's Petition to Amend for Colusa Generating Station ACC Pump Pit Stairway
Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Greenhouse Gases, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water 21 page(s)
| | CEC/Docket Unit | DayZen LLC |
215455 | 1/19/2017 |
NOTICE OF RECEIPT FOR PETITION TO AMEND COLUSA GENERATING STATION Petition to amend Colusa Generating Station to install rotating intake screens to control algae blooms at the water intakes for the Tehama Colusa Canal. 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
215092 | 12/22/2016 |
Pacific Gas & Electric Company's Petition for Amendment for CGS - Rotating Intake Screens
Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases, Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description 26 page(s)
| | CEC/Docket Unit | DayZen LLC |
214076 | 10/17/2016 |
Notice of Determination for the Revised Petition to Amend Colusa Generating Station On September 30, 2016, PG&E submitted a revision to its original Petition for Amendment filed on June 28, 2016. The revised petition to amend requests approval of: 1) addition of a warehouse; 2)
addition of electrical equipment and three electrical cabinets to allow gradual
increase of load to the electric motors for each fan on the Air-Cooled Condenser. Compliance 7 page(s)
| | CEC/Docket Unit | California Energy Commission |
214072 | 10/17/2016 |
Yocha Dehe Cultural Resources Comments: On Review of Project on Proposed Petition to Amend
1 page(s)
| | CEC/Docket Unit | Yocha Dehe Cultural Resources |
213864 | 9/30/2016 |
Revision to Pacific Gas & Electric Company's Petition for Amendment for Colusa Generating Station
Project Description 2 page(s)
| | CEC/Anwar Ali | DayZen LLC |
213632 | 9/13/2016 |
Pacific Gas & Electric Company's Response to CEC Staff Data Request Set No. 1 (CR-1 and CR-2)
5 page(s)
| | | DayZen LLC |
212743 | 8/11/2016 |
NOTICE OF RECEIPT- PETITION TO AMEND COLUSA GENERATING STATION (06-AFC-09C) The petition to amend (PTA) is seeking approval to modify the Colusa Generating Station to: 1) add a new warehouse; 2) add electrical equipment and three electrical cabinets to allow gradual increase of load to the electric motors for each fan on the Air Cooled Condenser (ACC); and 3) install rotating intake screens to control algae blooms at the water intakes for the Tehama Colusa Canal (TCC). Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
212004 | 6/28/2016 |
Pacific Gas & Electric Company's Petition for Amendment for Colusa Generating Station
Air Quality, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 32 page(s)
| | CEC/Docket Unit | DayZen LLC |
211299 | 4/29/2016 |
COM-7, 2016 Annual Compliance Report 2016 Annual Compliance Report (2015 Operating Year) (ACR) Compliance 140 page(s)
| | | Pacific Gas & Electric Company |
207036 | 12/15/2015 |
Order Approving a Petition to Amend to Revise Air Quality Conditions of Certification
11 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206499 | 11/3/2015 |
PTA Cover letter, Executive Summary and Staff Analysis Cover letter, Executive Summary and Staff Analysis for the Colusa Generating Station (CGS) Petition to Amend (PTA) for Air Quality Compliance 44 page(s)
| | Interested Parties | California Energy Commission |
205823 | 8/12/2015 |
Colusa Generating Station's Water Line Cultural Monitoring Daily Logs
Cultural Resources 18 page(s)
| | | CH2M HILL |
205751 | 8/17/2015 |
Notice of Receipt for Air Quality Petition to Amend Notice of Receipt (NOR), Colusa Petition to Amend Air Quality Conditions of Certification Compliance 2 page(s)
| | | California Energy Commission |
205703 | 8/12/2015 |
Repeated Application for Confidential Designation Back-up Water Supply Pipeline daily cultural resources monitoring logs Cultural Resources 1 page(s)
| | CEC/ Robert Oglesby | CH2M HILL |
205544 | 7/29/2015 |
PG&E's Revised Petition to Amend - Appendix A Appendix A to PG&E's Revised Petition to Amend Air Quality 27 page(s)
| | | Galati | Blek LLP |
205524 | 7/27/2015 |
PG&E's Revised Petition to Amend
15 page(s)
| | CEC/ Docket Unit | Galati | Blek LLP |
205159 | 6/25/2015 |
PG&E’s PETITION FOR AMENDMENT
16 page(s)
| | CEC/Eric Veerkamp | Galati | Blek LLP |
204447 | 4/29/2015 |
Pacific Gas & Electric Company's 2015 1st Quarter Operating Report Quarterly Operating Report Air Quality 1617 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
204312 | 4/22/2015 |
Colusa fin fan cooler SAPM final approval Final approval letter, Staff Approved Project Modification for fin fan cooler and expanded deck grating Compliance 1 page(s)
| | Colusa Generating Station | California Energy Commission |
204197 | 4/7/2015 |
PG&E CGS Back-Up Water Pipeline Cultural Monitoring Report
Cultural Resources 57 page(s)
| | CEC/ Robert Oglesby | CH2M HILL |
204081 | 4/7/2015 |
PG&E Confidential Designation Request
Cultural Resources 1 page(s)
| | CEC/ Robert Oglesby | CH2M HILL |
203959 | 3/25/2015 |
Notice of Determination, Colusa Fin fan cooler and deck grating NOD for Staff Approved Modification (SAPM) for fin fan cooler and deck grating improvements Compliance 6 page(s)
| | CEC/ Docket Unit | CEC/ Christine Stora |
203762 | 3/3/2015 |
Colusa Generating Station Condition of Certification Soil and Water 10 - ZLD Management Plan Revised Zero Liquid Discharge (ZLD) Management Plan Soil and Water 57 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
203744 | 2/27/2015 |
2014 Colusa Generating Station Annual Compliance Report
Biological Resources, Hazardous Materials, Noise and Vibration, Transmission Line Safety and Nuisance, Visual Resources, Waste Management, Soil and Water 206 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
203611 | 2/6/2015 |
Application for Staff Approved Project Change to Amend Docket - Steam Turbine Deck Grating
Facility Design 4 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
203610 | 2/6/2015 |
Application for Staff Approved Project Change to Amend Docket Fin Fan Cooler Facility Design 5 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
203604 | 2/5/2015 |
2014 4th Quarter Operating Report Air Quality Report for Fourth Quarter 2014 including required Annual Data. Air Quality 1680 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
203540 | 1/16/2015 |
2015 Final Source Test Results
579 page(s)
| | CEC/Dockets Unit | Pacific Gas & Electric Co. |
203343 | 8/13/2014 |
Confidential Cultural Resources Report
Cultural Resources 38 page(s)
| | CEC / Docket Unit | CH2M HILL |
203288 | 10/30/2014 |
Title V Operating Permit Initial Title V Operating Permit Air Quality 15 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
203287 | 10/30/2014 |
2014 3rd Quarter Operating Report Quarterly Operating Report Air Quality 1551 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
203286 | 10/30/2014 |
Glenn Colusa Irrigation District Revised Agreement GCID Agreement Soil and Water 8 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
203210 | 10/20/2014 |
Response to Application for Confidentiality Cultural Resources Survey 2 page(s)
| | CH2M Hill/Jerry Salamy | CEC/ Rob Oglesby |
203201 | 10/17/2014 |
Cover Letter attaching 2014 Source Test Protocol
Air Quality 44 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
203173 | 8/20/2014 |
Department of Parks and Recreation Primary Record - Forms
50 page(s)
| | CEC / Robert Oglesby | CH2M Hill |
203172 | 8/20/2014 |
Record Search Bibliography Studies
15 page(s)
| | CEC / Robert Oglesby | CH2M Hill |
203056 | 9/12/2014 |
Colusa GenerationTRANS-2 Compliance
Traffic and Transportation 1 page(s)
| | CEC / Docket Unit / E Verrkamp | CH2M HILL |
203037 | 9/5/2014 |
Colusa Generating Station Revised Drainage Erosion and Sedimentation Control Plan
Soil and Water 262 page(s)
| | CEC / Eric Verrkamp | CH2M HILL |
202974 | 8/22/2014 |
Notice of Determination - Colusa Back-Up Water Pipeline Notice of Determination for SAPM for Colusa Generating Station (CGS) Permanent Back-Up Water Supply Pipeline Compliance 6 page(s)
| | CEC/Docket | California Energy Commission |
202968 | 7/29/2014 |
Confidential Colusa Generating Station Cultural Resource Survey Report
Cultural Resources 19 page(s)
| | CEC / Eric Veerkamp | CH2M HILL / Jerry Salmy |
202956 | 8/20/2014 |
Colusa Generating Station Repeated Application for Confidential Designation
1 page(s)
| | CEC / Robert Oglesby | CH2M Hill |
202955 | 8/20/2014 |
Cover Letter for 2014 2nd Quarter Operating Report Cover Letter Air Quality 1 page(s)
| | CEC / Eric Veerkamp | Pacific Gas & Electric Co. / Charles Price |
202954-1 | 8/20/2014 |
Cover Letter for 2014 2nd Quarter Operating Report Cover Letter Air Quality 1 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
202954-2 | 8/20/2014 |
Colusa Generating Station 2014 2nd Quarter Operating Report (Revised) Revised 2014 2nd Quarter Operating Report Air Quality 1644 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
202944 | 8/18/2014 |
Response letter for Application for Confidentiality
Cultural Resources 2 page(s)
| | Jerry Salamy/CH2M Hill | California Energy Commission / R. Oglesby |
202922 | 8/13/2014 |
Request for Confidential Designation
Cultural Resources 2 page(s)
| | CEC / Erik VeerKamp | CH2M HILL |
202844 | 7/29/2014 |
Colusa Generating Station 2014 2nd Quarter Operating Report (Revised) Air Quality 1645 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co./ Charles Price |
202841 | 7/29/2014 |
Request for Confidential Designation Letter Requesting Confidential Designation for Cultural Resource Survey Report Cultural Resources 2 page(s)
| | CEC / Robert P. Oglesby | CH2M HILL |
202840 | 7/29/2014 |
AQSC-9 - 2014 2nd Quarter Operating Report Quarterly Operating Report Air Quality 1727 page(s)
| | Eric Veerkamp / CEC | Pacific Gas & Electric Co./ Colusa Generating Station |
202455 | 6/12/2014 |
Notice of Receipt (NOR) Notice of Receipt for Petition for alternate water supply pipeline Compliance 2 page(s)
| | Public | California Energy Commission |
202385 | 5/28/2014 |
Petition to Install a Water Line Petition for Project
Modification for the Colusa Generating Station 47 page(s)
| | CEC / Reic Veerkamp | CH2M HILL |
202270 | 4/29/2014 |
Quarter Operating Report Quarter Ending March 31, 2014
Air Quality 1787 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
201985 | 4/8/2014 |
Colusa Amendment Cover Letter/Executive Summary Summary and Staff Analyses for Colusa Amendment requesting to truck water to the site Compliance 20 page(s)
| | | California Energy Commission |
201962 | 4/4/2014 |
Senior Environmental Consultant Colusa Generating Station Annual Biological Report Biological Resources 23 page(s)
| | Eric Veerkamp | Pacific Gas & Electric Co. |
201931 | 3/27/2014 |
Data Request Response re Trucking Water to the CGS
Compliance 1 page(s)
| | CEC/Eric Veerkamp | Colusa Generating Station/Charles Price |
201929 | 3/27/2014 |
Notice of Receipt for Petition to Amend
Compliance 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201878 | 3/14/2014 |
Notice of Determination A Notice of Determination of staff level approval to store spare GSU transformer on site Compliance 4 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201876 | 3/14/2014 |
Colusa Generating Station's Emergency Petition for Amendment
14 page(s)
| | CEC/Eric Veerkamp | Galati | Blek LLP |
201829 | 3/4/2014 |
2013 Annual Compliance Report
Biological Resources, Facility Design, Compliance, Hazardous Materials, Noise and Vibration, Transmission Line Safety and Nuisance, Soil and Water 178 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
201661 | 2/7/2014 |
Letter to CEC re Petition for Project Change Petition to house spare Generator Step-Up transformer at the Colusa Generating Station Facility Design 10 page(s)
| | CEC/Eric Veerkamp | Pacific Gas & Electric Co. |
201431 | 12/13/2013 |
Notice of Determination Staff level approval of a project modification for a clarifier Compliance 4 page(s)
| | | California Energy Commission |
201184 | 11/13/2013 |
PG&E's Petition to Amend the Commission Decision
5 page(s)
| | 1516 Ninth Street, MS-2000, Sacramento, CA 95814 | Pacific Gas & Electric Co. |
52444 | 7/16/2009 |
Notice of Decision by the California Energy Commission(CEC)
1 page(s)
| | CEC/ Docket Unit | CEC/ C. Davis |
52443 | 7/16/2009 |
Order Approving Colusa Petition to Amend
9 page(s)
| | CEC/ Docket Unit | CEC/ K. Douglas |
51119 | 4/16/2009 |
CEC Amendment #2 Approval Letter
1 page(s)
| | PG&E/ J. Maring | CEC/ C. Davis |
50930 | 4/8/2009 |
Staff Analysis of Proposed Modifications to Amend
16 page(s)
| | Interested Parties | CEC/ D. Rundquist |
50647 | 3/25/2009 |
Notice of Receipt Petition to Modify Electrical Switchyard and Transmission Facilities
2 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
50311 | 2/27/2009 |
Response to Data Request 20-24
16 page(s)
| | CEC/ D. Rundquist | PG&E/ T/ Miller |
49976 | 2/4/2009 |
Round 3 Data Requests 20 to 24
2 page(s)
| | Grenier&Associaties/ Andrea Grenier | CEC/ D. Rundquist |
49817 | 1/22/2009 |
PG&E License Petition Amendment #2
19 page(s)
| | CEC/ Docket Unit | PG&E/ J. Maring |
49114 | 11/25/2008 |
PG&E Comments Re Colusa Generating Station Activies
2 page(s)
| | CEC/ C. Davis | PG&E/ T. Miller |
48884 | 11/5/2008 |
Response to Data Request 1-17
17 page(s)
| | CEC/ D. Rundquist | Public/ PG&E J. Maring |
48817 | 10/29/2008 |
Data Request 1-17 Re Colusa Generating Station
7 page(s)
| | Andrea Grenier | CEC/ D. Rundquist |
48290 | 10/1/2008 |
Colusa Generating Station Start of Construction
1 page(s)
| | PG&E/ J. Maring | CEC/ C. Davis |
48071 | 9/19/2008 |
Notice of Receipt
3 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
47891 | 9/3/2008 |
Letter RE: Temporary DESCP and SWPPP for the Colusa Generating Station
1 page(s)
| | CEC/ Docket Unit | CEC/ C. Davis |
47890 | 9/3/2008 |
Letter RE: Colusa Generating Project
2 page(s)
| | CEC/ Docket Unit | CEC/ C. Davis |
47583 | 8/15/2008 |
Air Quality Modeling Files
1 page(s)
| | CEC/ Docket Unit | SAC/ S. Madams |
47582 | 8/15/2008 |
PG&E's Colusa Generating Station Project
132 page(s)
| | CEC/ Docket Unit | PG&E/ J. Maring |
47447 | 7/31/2008 |
CARE's Comments on PSD Permit for the Colusa Generating Station
45 page(s)
| | CEC / Docket Unit | CARE / M. Boyd |
47167 | 7/23/2008 |
Colusa Generating Station (06-AFC-9C) Limited Start of Construction
2 page(s)
| | PG&E/J. Maring | CEC/C. Davis |