262318 | 3/24/2025 |
2024 Mayacma CEC Annual Compliance Report 2024 Mayacma CEC Annual Compliance Report 25 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262317 | 3/24/2025 |
Appendix 1_Rev2
Compliance 7 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262316 | 3/24/2025 |
Appendix 2 Compiled Part 1
Compliance 17 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262315 | 3/24/2025 |
Appendix 2 Compiled Part 2
Compliance 21 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262314 | 3/24/2025 |
Appendix 2 Compiled Part 3_Rev1
Compliance 18 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262313 | 3/24/2025 |
Appendix 3
Compliance 110 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
262183 | 3/13/2025 |
PETITION TO AMEND - DECEMBER 18, 2024 PART 2 PETITION TO AMEND - DECEMBER 18, 2024
PAGES 226-450 Compliance 225 page(s)
| | CEC/Docket Unit | California Energy Commission |
262182 | 3/13/2025 |
PETITION TO AMEND - DECEMBER 18, 2024 PART 1 PETITION TO AMEND - DECEMBER 18, 2024
PAGES 1-225 Compliance 225 page(s)
| | CEC/Docket Unit | California Energy Commission |
260744 | 12/19/2024 |
2023 Annual Compliance Report (Bottle Rock Power) _Part2 2023 Annual Compliance Report (Bottle Rock Power) Compliance 150 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
260740 | 12/19/2024 |
2023 Annual Compliance Report (Bottle Rock Power) 2023 Annual Compliance Report (Bottle Rock Power) 79 page(s)
| | CEC/Docket Unit | Mayacma Geothermal LLC |
252241 | 9/14/2023 |
2022 ANNUAL COMPLIANCE REPORT 2022 ANNUAL COMPLIANCE REPORT Compliance 195 page(s)
| | CEC/Docket Unit | California Energy Commission |
249901 | 4/28/2023 |
Bottle Rock Power Petition to Amend Petition to Amend Bottle Rock Geothermal Power Plant permit Project Description 308 page(s)
| | CEC/Docket Unit | AltaRock Energy |
249817 | 4/19/2023 |
Bottle Rock Petition to Amend Petition to Amend Bottle Rock Geothermal Project Permit Project Description 308 page(s)
| | CEC/Drew Bohan | AltaRock Energy |
249365 | 3/20/2023 |
STATEMENT OF STAFF APPROVAL FOR CHANGE OF OPERATIONAL CONTROL STATEMENT OF STAFF APPROVAL FOR CHANGE OF OPERATIONAL CONTROL. APPROVAL OF PETITION TO CHANGE OPERATIONAL CONTROL FROM BOTTLE ROCK POWER LLC TO MAYACMA GEOTHERMAL LLC. Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
248791 | 2/14/2023 |
Petition for Change of Operational Control
7 page(s)
| | CEC/Docket Unit | AltaRock Energy, Inc. |
247996 | 12/8/2022 |
David Coleman Comments - Sale of Bottle Rock Power LLC power plant to Kaishan
1 page(s)
| | CEC/Docket Unit | David Coleman |
237637 | 5/3/2021 |
2020 ANNUAL CALIFORNIA ENERGY COMMISION INTERIM CONDITIONS OF COMPLIANCE REPORT
210 page(s)
| | CEC/Docket Unit | Bottle Rock Power, LLC |
237208 | 3/18/2021 |
David Coleman Comments - Proposed R&D project in the Bottle Rock Power Steam field
Compliance 1 page(s)
| | CEC/Dockets | David Coleman |
232906 | 5/5/2020 |
2018 Annual CEC Interim Conditions of Compliance Report 2018 Annual CEC Interim Conditions of Compliance Report Compliance 272 page(s)
| | California Energy Commision | Bottle Rock Power, LLC |
232905 | 5/4/2020 |
2019 Annual CEC Interim Conditions of Compliance Report 2019 Annual CEC Interim Conditions of Compliance Report 237 page(s)
| | California Energy Commision | Bottle Rock Power, LLC |
225565 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
214745 | 12/12/2016 |
Response to David Coleman Comments Response to David Coleman Comments Compliance 2 page(s)
| | | California Energy Commission |
214091 | 10/18/2016 |
David Comments: Power Plant operation
Compliance
| | | David |
211533 | 5/17/2016 |
Declaration of Aaron Mandell in Support of Clean Energy Partners LLC's Change of Ownership Petition
Compliance 1 page(s)
| | CEC/Docket Unit | Clean Energy Partners LLC/Parent Corporation for Bottle Rock Power, LLC |
211529 | 5/17/2016 |
Baseload Clean Energy Partners LLC's Request to Withdrawl a Change of Ownership Petition for BRP
Compliance 1 page(s)
| | CEC/Camille Remy-Obad | Bottle Rock Power, LLC |
210953 | 4/6/2016 |
Declaration of Aaron Mandell in Support of Petition for Change of Ownership
1 page(s)
| | | Baseload Clean Energy Partners, LLC/ Aaron Mandell |
207150 | 12/30/2015 |
Bottle Rock Power - Letter Notification of Ownership Transfer
1 page(s)
| | CEC/Camille Remy Obad | Bottle Rock Power, LLC |
206770 | 11/24/2015 |
Non-Operational Status Report (COM-14)
1 page(s)
| | California Energy Commission/ Camille Remy Obad | Bottle Rock Power LLC |
204069 | 4/6/2015 |
Bottle Rock Geothermal Facility Plant Shut Down-Standby Notice
1 page(s)
| | CEC/C. Obad | Bottle Rock Power LLC |
203766 | 3/4/2015 |
Closure of the Proof of Service List for the Bottle Rock Amendment Proceeding
1 page(s)
| | Parties | Energy Commission Hearing Office |
201756 | 2/18/2014 |
Draft Order Approving Withdrawal of Appeal and Determining Penalty Draft order for consideration by the Energy Commission at its February 18,
2014, Business Meeting. Prepared by Hearing Office 3 page(s)
| | | California Energy Commission Hearing Office |
201755 | 2/18/2014 |
Staff Response to Bottle Rock Power LLC's Request to Close the
3 page(s)
| | | California Energy Commission |
201746 | 2/14/2014 |
David Coleman's Response to Bottle Rock Power LLC's Request to Withdraw Appeal of the Committee's Decision Sustaining Complaint
Public Health 6 page(s)
| | CEC/Dockets Unit | Law Office of Donald B. Mooney |
201678 | 2/7/2014 |
Notice of Commission Hearing Hearing on Appeal of Committee Decision Notice 4 page(s)
| | CEC | California Energy Commission |
201631 | 2/4/2014 |
Bottle Rock Power LLC's Request to Withdraw Appeal and Exhibit A
17 page(s)
| | CEC/ Commissioners | Stoel Rives, LLP |
201448 | 12/18/2013 |
Bottle Rock Geothermal Power Plant 2013 Notice of Decision
Compliance 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201441 | 12/16/2013 |
Commission Decision on the Petition to Amend the Conditions of Certification for the Bottle Rock Geothermal Power Plant Includes complilation of all project conditions. 92 page(s)
| | | California Energy Commission |
201403 | 12/11/2013 |
Updated Memo re Start Time for Bottle Rock Item on December 11 Commission Agenda
1 page(s)
| | | Energy Commission Hearing Office |
201401 | 12/11/2013 |
Memo re Delayed Start of Bottle Rock Item on December 11 Commission Agenda
1 page(s)
| | Parties and Public | Energy Commission Hearing Office |
201399 | 12/10/2013 |
Randall Fung Comments: Public comment to hearing proceedings
8 page(s)
| | CEC/Dockets Unit | Randall Fung |
201397 | 12/10/2013 |
Project Landowner Comments
1 page(s)
| | CEC/Dockets Unit | Diepenbrock Elkin LLP |
201392 | 12/10/2013 |
Letter re Objection to Bottle Rock Power's December 6, 2013 Letter and Attachments
3 page(s)
| | CEC/Karen Douglas & Janea Scott | Law Office of Donald B. Mooney |
201388 | 12/9/2013 |
Closure Financial Assurance Proposal Comparison Table Table comparing the closure financial assurance amounts proposed by the Presiding Member’s Proposed Decision issued on November 27, 2013 (TN 201344), and the Request for Consideration of Revisions to Presiding Member’s Proposed Decision filed by Bottle Rock Power LLC on December 6, 2013 (TN 201378). Prepared by Chief Hearing Adviser Paul Kramer Compliance 1 page(s)
| | | Energy Commission Hearing Office |
201378 | 12/6/2013 |
Request for Consideration of Revisions to Presiding Member's Proposed Decision
9 page(s)
| | CEC/Dockets Unit | Stoel Rives LLP |
201347 | 11/27/2013 |
Transcript of 11-19-2013 Committee Conference in Sacramento
10 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201346 | 11/27/2013 |
Transcript of 11-18-2013 Committee Hearing in Cobb
170 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201344 | 11/27/2013 |
Presiding Member's Proposed Decision on the Bottle Rock Amendment Petition Includes exhibit list and compilation of conditions of certification. See related Notice of Availability for info about 12-11-2013 Energy Commission hearing on the PMPD 91 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201343 | 11/27/2013 |
Notice of Availability of Presiding Member's Proposed Decision and Notice of 12-11-2013 Full Commission Hearing on the PMPD
4 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201333 | 11/26/2013 |
Email Response to Inquiry RE: Status of Bottle Rock Power Plant Sump Fill
Compliance 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201326 | 11/25/2013 |
Jay Hepper Comments: Enough is Enough, a rebuttal and reality toward the negativity directed at Bottle Rock Power
4 page(s)
| | CEC/Dockets Unit | Jay Hepper |
201275 | 11/20/2013 |
Graphs and Photos submitted by Kelly Fletcher Air monitoring graphs and annotated photos accompanying Kelly Fletcher's public comments at the 11-18-13 Committee Hearing 4 page(s)
| | California Energy Commission | Kelly Fletcher |
201274 | 11/20/2013 |
Gerri Finn's public comments Letter read by Gerri Finn during the public comment portion of the 11-18-19 Committee Hearing 3 page(s)
| | California Energy Commission | Gerri Finn |
201273 | 11/20/2013 |
Randall Fung's public comment questions Written questions accompanying Randall Fung's public comments during the 11-18-13 Committee Hearing 2 page(s)
| | California Energy Commission | Randall Fung |
201272 | 11/20/2013 |
STEP Deputy Director Response to Congressman Thompson re: BRPP Financial Assurances
Compliance 2 page(s)
| | Honorable Mike Thompson Congress of the United States House of Representatives | California Energy Commission |
201227 | 11/15/2013 |
Randall Fung Comments: Public Response from Fung for BRP
9 page(s)
| | CEC/Dockets Unit | Randall Fung |
201224 | 11/15/2013 |
Intervenors' David Coleman and Friends of Cobb Mountain's Revised Pre-Hearing Statement Pre-Hearing Statement Compliance 15 page(s)
| 203 | Committee | Law Office of Donald B. Mooney |
201222 | 11/15/2013 |
Bottle Rock's Rebuttal Testimony and Revised Prehearing Statement and Exhibit List
10 page(s)
| 26 | CEC/Dockets Unit | Stoel Rives LLP |
201218 | 11/15/2013 |
BRP's Proposed Exhibit 25 Excerpts from Various Commission Decisions on AFCs 20 page(s)
| 25 | CEC/Dockets Unit | Stoel Rives LLP |
201217 | 11/15/2013 |
BRP's Proposed Exhibit 24 Excerpts from Beacon Solar Energy Project Final Decision (08-AFC-2) 8 page(s)
| 24 | CEC/Dockets Unit | Stoel Rives LLP |
201216 | 11/15/2013 |
BRP's Proposed Exhibit 23 Excerpt from SEGS Final Decision (89-AFC-1) 6 page(s)
| 23 | CEC/Dockets Unit | Stoel Rives LLP |
201215 | 11/15/2013 |
BRP's Proposed Exhibit 22 Excerpts from Sutter Power Plant Project Final Decision (97-AFC-2) 7 page(s)
| 22 | CEC/Dockets Unit | Stoel Rives LLP |
201214 | 11/15/2013 |
BRP's Proposed Exhibit 21 Transcript Excerpts of Sutter Power Plant Evidentiary Hearing (97-AFC-2) 7 page(s)
| 21 | CEC/Dockets Unit | Stoel Rives LLP |
201213 | 11/15/2013 |
Email and Record of Conversation re CA Energy Commission History of Requiring a Closure Bond
2 page(s)
| | Terry O’Brien/ERM | California Energy Commission |
201196 | 11/13/2013 |
Hearing Officer's Memo re Exhibit Number adjustments Memo describing why and how some proposed exhibits were given different numbers in the e-filing system; includes chart showing old and new numbers 1 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201166 | 11/12/2013 |
Intervenors' David Coleman and Friends of Cobb Mountain Pre-Hearing Statement
Compliance 13 page(s)
| 202 | Committee | Law Office of Donald B. Mooney |
201165 | 11/12/2013 |
BRPP Prehearing Statement Applicant's Prehearing Statement 16 page(s)
| 20 | | Stoel Rives LLP |
201164 | 11/12/2013 |
Staff Prehearing Conference Statement Direct Testimony and Exhibit List CEC Staff Prehearing Conference Statement, Direct Testimony and Exhibit List Compliance 7 page(s)
| | | California Energy Commission |
201160 | 11/12/2013 |
V.V. & J. Coleman LLC Prehearing Statement
Facility Design, Compliance 11 page(s)
| | CEC/Dockets Unit | Diepenbrock Elkin LLP |
201157 | 11/12/2013 |
Caltrans Project Development Procedure Manual, Appendix AA, Cost Estimates
Facility Design, Compliance 24 page(s)
| 103 | | California Energy Commission |
201156 | 11/12/2013 |
Caltrans Project Development Procedure Manual, Chapter 20, Project Development Cost Estimates
Facility Design, Compliance 20 page(s)
| 102 | | California Energy Commission |
201155 | 11/12/2013 |
Direct Written Testimony of Brian Harms Bottle Rock's Proposed Exhibit for Hearing 2 page(s)
| 18 | CEC/Dockets Unit | Stoel Rives LLP |
201154 | 11/12/2013 |
Direct Written Testimony of Robert Francisco Bottle Rock's Proposed Exhibit for Hearing 1 page(s)
| 19 | CEC/Dockets Unit | Stoel Rives LLP |
201148 | 11/8/2013 |
BRPS Use Permit Bonds Project Owner's Proposed Exhibit for Hearing (11/18/2013) 20 page(s)
| 16 | CEC/Dockets Unit | Stoel Rives LLP |
201139 | 11/6/2013 |
County of Lake Use Permits and Time Extensions Project Owner's Proposed Exhibit for Hearing (11/18/2013) 29 page(s)
| 17 | | Stoel Rives LLP |
201128 | 11/6/2013 |
01-10-13 County of Lake's Comments and Exhibits Regarding Bottle Rock Complaint
31 page(s)
| 14 | CEC/Dockets Unit | Stoel Rives, LLP |
201127 | 11/6/2013 |
12-28-12 Bottle Rock's Correspondence and Attachments One (Settlement Agreement) and Two (Lease Agreement)
31 page(s)
| 15 | CEC/Dockets Unit | Stoel Rives, LLP |
201122 | 11/6/2013 |
Hearing Officer's Memo re: Corrected Reference to Compilation of Bottle Rock Conditions Corrects reference in the Notice of the November 18, 2013 Committee Hearing 1 page(s)
| | | Energy Commission Hearing Office |
201118 | 11/5/2013 |
Notice of Committee Hearing, Committee Conference & Hearing Orders Committee Notice for the November 19, 2013 Conference and Hearing 12 page(s)
| | | California Energy Commission |
201087 | 10/31/2013 |
Save the date notice of Bottle Rock Committee Hearing Memo giving advance (of formal) notice of Nov 18 2013 Bottle Rock Amendment Committee Hearing; likely filing deadlines; tips about assembling exhibits 1 page(s)
| | CEC/Dockets Unit | Energy Commission Hearing Office |
201062 | 10/28/2013 |
Staff Response to Comments Received Regarding Staff's Analysis of the Bottle Rock Geothermal Power Plant-BRPP Petition to Amend
Compliance 7 page(s)
| 101 | | California Energy Commission |
201017 | 10/23/2013 |
Revised General Orders Regarding Electronic Filing, etc Committee Orders re Use of Electronic Filing System (mandatory after 11-01-13), format of documents, exhibits, motions, and transcripts 18 page(s)
| | Parties | Energy Commission Hearing Office |
200982 | 10/21/2013 |
Supplement to Status Report No. 2, Bottle Rock Geothermal Power Plant (BRPP) Petition to Amend (79-AFC-4C)
Compliance 2 page(s)
| | | California Energy Commission |
200834 | 10/11/2013 |
Bottle Rock Power, LLC's Comments on Staff Assessment
5 page(s)
| 13 | CEC/Dockets Unit | Stoel Rives LLP |
200826 | 10/10/2013 |
Bottle Rock Power, LLC's Updated Status Report
2 page(s)
| 11 | CEC/Dockets Unit | Stoel Rives LLP |
200785 | 10/7/2013 |
Letter from Congressman Thompson re Proposed Amendment to Compliance Conditions of Certification Relating to Financial Assurance
3 page(s)
| 12 | California Energy Commission | Congress of the United States |
200734 | 10/3/2013 |
1996-Final Report Decommissioning and Cleanup Cost Estimates Bottle Rock Power Plant
Compliance 388 page(s)
| | CEC/Dockets Unit | California Energy Commission |
200724 | 10/2/2013 |
V.V. & J. Coleman LLC Comments to Staff Analysis
1 page(s)
| | | Diepenbrock Elkin LLP |
200721 | 10/2/2013 |
Status Report Number 2, Bottle Rock Geothermal Power Plant Petition to Amend
Compliance 2 page(s)
| | | California Energy Commission |
200716 | 10/2/2013 |
FOCM in Accord With Attorney on October 4 Workshop Submission
1 page(s)
| | CEC/Camille Remy-Obad | Friends of Cobb Mountain |
200714 | 10/2/2013 |
Bottle Rock Power, LLC's Initial Comments on Staff Assessment
3 page(s)
| 10 | CEC/Dockets Unit | Stoel Rives LLP |
200693 | 10/1/2013 |
John Dunnigan Comments: Compilation of the Conditions of Certification for Bottle Rock Geothermal Power Plant 79-AFC-4C, September 2013
1 page(s)
| | CEC/Dockets Unit | John Dunnigan |
200662 | 9/30/2013 |
David Coleman and Friends of Cobb Mountain's Second Status Report Status Report Compliance 11 page(s)
| | Committee | Law Office of Donald B. Mooney |
200630 | 9/27/2013 |
Applicant's Status Report (Sept. 27, 2013) Status Report 2 page(s)
| 9 | CEC/K. Douglas/J. Scott/P. Kramer | Stoel Rives LLP/K. Castanos |
200475 | 9/6/2013 |
Compilation of the Conditions of Certification for Bottle Rock Project
57 page(s)
| | CEC/Dockets Unit | California Energy Commission |
200474 | 9/13/2013 |
Public Notice of Staff Workshop Staff's Analyis of the Bottle Rock LLC's Petition to Amend
Compliance 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
200462 | 9/12/2013 |
Revised Interested Parties Letter Extending the Comment Period for the Staff Analysis of the Proposed Modifications to the Compl
2 page(s)
| | Interested Parties | California Energy Commission |
200419 | 9/6/2013 |
Staff Analysis of Proposed Modifications to the Compliance Conditions of Certification (formerly the general provisions) Supersedes TN 200414 49 page(s)
| 100 | Interested Parties | California Energy Commission |
200146 | 8/9/2013 |
Bottle Rock Geothermal Power Plant (BRPP) Petition to Amend Status Report No. 1
2 page(s)
| 8 | CEC/Karen Douglas | CEC/Camille Remy-Obad |
200135 | 8/9/2013 |
David Coleman and Friends of Cobb Mountain's Status Report Status Report 12 page(s)
| | California Energy Commission | Law Office of Donald B. Mooney |
200134 | 8/9/2013 |
Bottle Rock's Status Report
3 page(s)
| | CEC/Karen Douglas | Stoel Rives, LLP |
200053 | 7/29/2013 |
Bottle Rock Power, LLC's Response to Staff's Data Requests, Set 1
19 page(s)
| 7 | CEC/ C. Remy Obad | Bottle Rock Power, LLP/ Stoel Rives/ K. Hellwig |
71652 | 7/18/2013 |
Bottle Rock Power, LLC's Objections to Staff's Data Requests, Set 1 (No.1-5)
7 page(s)
| 6 | CEC/C.Obad-Remy | Bottle Rock Power LLC/Stoel Rives LLP/K.Castanos |
71458 | 6/28/2013 |
Committee Scheduling Order, Order Granting Petition to Intervene, and Other Orders
8 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /J.Scott |
71455 | 6/28/2013 |
Bottle Rock Power LLP's Letter to CEC's Karen Douglas and Robert Weisenmiller re Request for Extension of Stay of Filing of Surety Bond
6 page(s)
| 5 | CEC/K.Douglas /R.Weisenmiller | Stoel Rives LLP/K.Castanos |
71454 | 6/28/2013 |
Staff's Data Request Set One (Nos. 1-5)
8 page(s)
| | Bottle Rock Power, LLC/B.Hams /Stoel Rives LLP/K.Castanos /Locke Lord LLP/J.McKinsey | CEC/C.Remy-Obad |
71352 | 6/21/2013 |
Memo re Bottle Rock Geothermal Project Amendment Schedule Modification Request
5 page(s)
| | CEC/K.Douglas /J.Scott /P.Kramer | CEC/C.Remy-Obad |
71128 | 6/5/2013 |
Anonymous Public Comment Letter to CEC Hearing Advisor Paul Kramer
3 page(s)
| | CEC/P.Kramer | Anonymous |
71084 | 6/3/2013 |
Notice of Continuance of May 31, 2013 Committee Conference regarding Bottle Rock Geothermal Power Plant Amendment
8 page(s)
| | POS List | CEC/ J. Scott |
71025 | 5/29/2013 |
David Coleman and Friends of Cobb Mountain's Response to Staff's Issues Identification Report
5 page(s)
| | CEC/K.Douglas /R.Weisenmiller /P.Krammer | David Coleman /Friends of Cobb Mountain /Law Offices of Donald B. Mooney/D.Mooney |
71022 | 5/30/2013 |
CEC Staff's Issues Identification Report with POS
14 page(s)
| | CEC/Docket Unit | CEC/ C. Remy-Obad |
71020 | 5/29/2013 |
V. V. & J. Coleman LLC's Response to Staff's Issues Identification Report
4 page(s)
| | CEC/K.Douglas /J.Scott | V.V & J Coleman, LLC/Diepenbrock Elkin LLP/M.Peterson |
71018 | 5/29/2013 |
Bottle Rock Power, LLC's response to Staff's Issues Identification Report
7 page(s)
| 4 | CEC/K.Douglas /J.Scott | Bottle Rock Power LLC/Stoel Rives LLP/K.Castaños |
70984 | 5/28/2013 |
CEC Staff's Issues Identification Report with POS
14 page(s)
| | CEC/Docket Unit | CEC/ C. Remy-Obad |
70959 | 5/24/2013 |
CEC Staff's Issue Identification Report
10 page(s)
| | CEC/K.Douglas/R.Weisenmiller /P.Krammer | CEC/C.Remy-Obad |
70842 | 5/16/2013 |
General Orders Regarding Electronic Document Formats, Filing and Service of Documents and Other Matters
7 page(s)
| | CEC/Docket Unit | CEC/K.Douglas |
70841 | 5/16/2013 |
Notice of Public Site Visit and Committee Conference
11 page(s)
| | CEC/Docket Unit | CEC/K.Douglas /J.Scott |
70551 | 4/30/2013 |
Memorandum re Hearing Adviser Assignment
1 page(s)
| | CEC/All Commissioner | CEC/R.Weisenmiller |
70304 | 4/15/2013 |
Bottle Rock Power's Letter to CEC's Karen Douglas and Robert Weisenmiller re Decommissioning Estimate
14 page(s)
| 3 | CEC/K.Douglas /R.Weisenmiller | Bottle Rock Power LLC/Stoel Rives LLP/K.Castanos |
69922 | 3/14/2013 |
Notice of Receipt for the March 8, 2013 Petiton to Amend
4 page(s)
| | CEC/Docket Unit | CEC/ C. Marxen |
69915 | 3/13/2013 |
Bottle Rock Power LLC's Compliance with the Committee’s Decision Sustaining Complaint Against Bottle Rock Power, LLC
5 page(s)
| 2 | CEC/K.Douglas /R.Weisenmiller | Bottle Rock Power LLC/K.Castanos |
69879 | 3/8/2013 |
Bottle Rock Power, LLC's Petition to Amend
31 page(s)
| 1 | CEC/Docket Unit | Bottle Rock Power LLC/Stoel Rives LLP/K.Castanos |
69299 | 6/28/2006 |
Application for Certification of Eligibility to Participate in the CA. Renewables Portfolio Standards
29 page(s)
| | CEC/RPS Certification Staff | Bottle Rock Power Corporation |
69298 | 4/12/2005 |
CEC Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
14 page(s)
| | Interested Parties | CEC/Nancy Tronaas |
69297 | 7/28/2006 |
Petiton to Amend Final Decisionto Change Type of Owning Entity
10 page(s)
| | CEC/C.Meyers | Bottle Rock Power LLC/ Stoel Rives/ J. McKinsey |
69296 | 10/24/2003 |
Petiton of Bottle Rock Power Corporation for Transfer of Ownership, Operational Control of Bottle Rok Power Plant
5 page(s)
| | CEC/Docket Office | The Hagan Law Firm, Inc/James Hagan |
68986 | 12/28/2012 |
Applicant's Correspondence and Attachments One (Settlement Agreement) and Two (Lease Agreement)
31 page(s)
| | CEC/K.Douglas /R.Weisenmiller | Applicant/Stoel Rives LLP/K.Castanos |
66224 | 7/13/2012 |
CEC Letter to Bottle Rock Power Regarding Noise 16-1
3 page(s)
| | Bottle Rock Power LLC/B.Harms | CEC/C.Marxen |
63557 | 2/6/2012 |
Email Regarding Noise Standards in Lake County
1 page(s)
| | Public/ W. Evans | CEC/ S. Khosmashrab |
61539 | 7/26/2011 |
Letter Regarding Withdrawl Petition to Amend
1 page(s)
| | CEC/ C. Stora | Applicant/ B. Harms |
59242 | 12/15/2010 |
Responses to Comments Final Environmental Impact Report/ Environmental Assessment
415 page(s)
| | CEC/ Docket Unit | County of Lake |
58583 | 9/22/2010 |
Draft Environmental Impact Report for BRP
1175 page(s)
| | CEC/ Docket Unit | County of Lake |
55883 | 3/15/2010 |
Water Resources Addendum for the Petition to Amend
40 page(s)
| | CEC/Docket Unit | CEC/M. Trask |
55882 | 3/15/2010 |
Traffic Addendum for the Petition to Amend
40 page(s)
| | CEC/Docket Unit | CEC/M. Trask |
54146 | 11/17/2009 |
High Valley Preservation Question Regarding Bottle Rock Facilities
2 page(s)
| | High Valley Committee/ R. Fong | Dept of Water Resources/ R. James |
54092 | 11/16/2009 |
Comments & Concerns in the EIR for the Bottle Rock Power Geothermal Expansion Project
2 page(s)
| | CEC/ Docket Unit | Gerri Fletcher/ G. Fletcher |
54079 | 11/16/2009 |
Comments & Questions Concerning the Preparation of an Environmental Impact Report
8 page(s)
| | Community Development Department/ R. Coel & EDAW/AECOM/ M. Winsor | Public/ Coleman Family |
54054 | 11/12/2009 |
CEC Response Letter Regarding Application for Confidentiality
2 page(s)
| | Stoel Rives/ J. McKinsey | CEC/ M. Jones |
53834 | 10/27/2009 |
Notice of Receipt RE Petition to Amend the CEC Decision
3 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
53727 | 10/7/2009 |
Application for Confidential - Petition to Amend Cultural Resources
3 page(s)
| | CEC/ M. Jones | Stoel Rives/ J. McKinsey |
53681 | 10/19/2009 |
Notice of Preparation of a Draft Environmental Impact Report
6 page(s)
| | CEC/ Energy Facilities Siting & Environmental Protection Division | Lake County Community Development Department/ K. Ingram |
53600 | 10/8/2009 |
Notice of Preparation of an Environmental Impact Report & Notice of Scoping Meeting & E-mail
10 page(s)
| | Responsible Agencies | County of Lake/ R. Coel |
53499 | 10/12/2009 |
Petition to Amend Final Decision
767 page(s)
| | CEC/ D. Rundquist | Bottle Rock Power LLC/ B. Harms |
53427 | 9/25/2009 |
September 24th Letter to Brian Harms from Bob James
2 page(s)
| 201 | Department of Water Resource/ B. Harms | CEC/ R. James |
51816 | 6/4/2009 |
Bottle Rock Power Binkley Leasehold Expansion Project - from County of Lake
2 page(s)
| | CEC/ E. Allen | County of Lake/ R. Coel |
51733 | 5/28/2009 |
Power Plant Noise Complaint
1 page(s)
| | Bottle Rock Power, LLC/ B. Harms | County of Lake/ M. Floyd |
51637 | 5/21/2009 |
Letter to T. King - Managing Director USRG Management
2 page(s)
| 200 | USRG/ T. King | Bottle Rock Power/ R. James |
49451 | 12/18/2008 |
Letter RE Dewatering Unit
3 page(s)
| | CEC/ D. Rundquist | Bottle Rock Power, LLC/ K. Thomas |
49380 | 12/11/2008 |
Coleman Meadow Spoils Project
2 page(s)
| | CEC/ D. Rundquist | Bottle Rock Power/ K. Thomas |
48742 | 10/23/2008 |
Bottle Rock Power Plant Drilling Sump Compliance
2 page(s)
| | CEC/ D. Rundquist | Karon Thomas |
48717 | 10/22/2008 |
Letter re DWR Complete review for Estimate of Cost to Remove Bottle Rock PP Facilities
3 page(s)
| | Ronald E. Seus | CEC/ R. James |
48481 | 10/9/2008 |
Incident Corrective Action Response
2 page(s)
| | CEC/ D. Rundquist | Bottle Rock Power/ K. Thomas |
48368 | 10/3/2008 |
Bottle Rock Power, LLC Notification of Diesel Fuel Release OES Control # 08-6232
2 page(s)
| | CEC/ Docket Unit/ D.Rundquist | Bottle Rock PP, LLC/ K. Thomas |
47894 | 9/3/2008 |
Order Approving the Change of Ownership The restart of Operation after Suspension and 11 facility Design Changes
21 page(s)
| | State of California Energy Resources Conservation and Development Commission | CEC/J. Pfannenstiel |
47836 | 8/29/2008 |
Letter re: Bottle Rock Removal/ cutting and drilling of mud spoils from the Well Pad stumps in order to preserve Compliance
2 page(s)
| | CEC/ D. Stone | Bottle Rock Power/ K. Thomas |
39825 | 3/30/2007 |
Bottle Rock Submittals to Conditions of Cert 10-3 & 10-4
6 page(s)
| | CEC/C. Meyer/Docket Unit | Stoel Rives/J. McKinsey |
39787 | 3/28/2007 |
Bottle Rock Power Plant -Cond. of Cert 13-8
4 page(s)
| | CEC/C. Meyer | Stoel Rives/A. Cook |
39050 | 1/23/2007 |
Monthly construction progress report for DEC. 2006
4 page(s)
| | CEC/ C. Meyer | S&R/ K. Hellwig |
38867 | 1/5/2007 |
Biological Resources Mitigation Implementation and Monitoring Plan
13 page(s)
| | CEC/ C. Meyer | Stoel Rives/ J. McKinsey |
38800 | 12/22/2006 |
Bottle Rock Power Plant - Pre Operation Compliance and Submittals
20 page(s)
| | C. Meyer | J. A. McKinsey / STOEL RIVES |
38655 | 12/14/2006 |
Bottle rock construction and start-up plan
5 page(s)
| | CEC/ C. Meyer | S&R,LLP/ J. McKinsey |
38653 | 12/14/2006 |
Bottle rock compliance submittal condition of certification 10-5 pack
35 page(s)
| | CEC/ C. Meyer | S&R,LLP/J. Mckinsey |
38650 | 12/14/2006 |
Letter verifying Bottle rock power corporations compliance with COC4-4
2 page(s)
| | CEC/ C. Meyer | BRPC/J. McKinsey |
38646 | 12/14/2006 |
Order No. 06-1213-12, Order Approving the Change of Ownership, the Restart of Operation after Suspension, and !! Facility Design Changes.
48 page(s)
| | Docket Unit | CEC/ J. Pfannenstiel |
38637 | 12/13/2006 |
Bottle rocket power corporations Biological annual resources report.
80 page(s)
| | CEC/ C. Meyer | BRPC/ J. Mckinsey |
38585 | 12/7/2006 |
State energy resources conservation and development commission
1 page(s)
| | CEC/ Dockets Unit | SERC&DC/ J. Pfannenstiel |
38579 | 12/8/2006 |
Stoel & Rives on behalf of bottle rocket power corporation comments regarding change of ownership.
1 page(s)
| | CEC/ Dockets Unit | S&R,BRCP/ J. McKinsey |
38381 | 11/13/2006 |
Staff Analysis of Petition to Change Ownership, Allow the Restart of Operation After Suspension, and Allow 11 Facility Design Changes
84 page(s)
| | Interested Parties | CEC/ C. Meyer |
37893 | 9/18/2006 |
Responses to Data Requests for the Bottle Rock Power Plant
12 page(s)
| | CEC/ C. Meyer | Stoel Rives LLP/ J.A. McKinsey |
37891 | 9/18/2006 |
Bottle Rocket Power Plant Resonse to Data Requests
13 page(s)
| | CEC/ C. Meyer | BRPP/ J. McKinsey |
37710 | 8/29/2006 |
Notice of Site Visit and Staff Workshop for Bottle Rock Geothermal Power Plant Petition to Restart Operation
3 page(s)
| | Docket Unit | R. Johnson / CEC |
37683 | 8/21/2006 |
Notice of Receipt of Petition to Amend CEC Decision. Mail List #771.
4 page(s)
| | Interested Parties and Property Owners | CEC/ R. Johnson |
37594 | 8/4/2006 |
E-mail 1 of 2 for Bottle Rock PP - Exhibit E, Exhibit F, Exhibit G, Exhibit H, Exhibit I, Exhibit J
125 page(s)
| | CEC/ Docket Unit | Stoel Rives, LLP/ E. Hecox |
37586 | 8/4/2006 |
Petition to Amend Final Decision to Re-Fire Bottle Rock Power Plant
80 page(s)
| | CEC/ C. Meyer | Stoel Rives LLP, Attorneys at Law/ J. McKinsey |
37572 | 8/4/2006 |
pentition to Amend Final Decisionto Re-Fire Plant Bottle Rock Power Plant.(79-AFC-4C)
124 page(s)
| | Christopher Meyer | John Mckensey |
37497 | 7/28/2006 |
Petition to Amend Final Decision to Change Type of Owning Entity Bottle Rock Power Plant
12 page(s)
| | CEC/C. Meyers | Stoel Rives/J. McKinsey |
37205 | 6/28/2006 |
Bottle Rock Power Corporation Application for Certification CEC -RPS-1
30 page(s)
| | CEC | J. A. Mckinsey / Stoel Rives |
34372 | 5/16/2005 |
Notice of Decision by the CEC
1 page(s)
| | CEC/Docket Unit | CEC/N. Tronaas |
33911 | 4/12/2005 |
Bottle Rock Geo Power Plant - Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
14 page(s)
| | Interested Parties/Cec/dockets | CEC/Tronaas |
33200 | 1/25/2005 |
Notice of Receipt - Petition to Amend the CEC Decision for the Bottle Rock Geothermal Power Project - Extension of Environmental Monitoring Program for Suspended Operations
3 page(s)
| | CEC/Dockets | CEC/O'brian |
33144 | 1/19/2005 |
Petition for Extending Environmental Monitoring Program for Suspended Operation
26 page(s)
| | CEC/Tronaas | Bottle Rock Power Corp./Suess |
30476 | 11/25/2003 |
Petition for Change of Owenership/Operational Control
1 page(s)
| | CEC/Tronaas/dockets | Bottle Rock Power Corp/Lewis |
30262 | 10/30/2003 |
Notice of Receipt Bottle Rock Geothermal Power Plant Request for Ownership Change
2 page(s)
| | CEC/Docket | CEC/O'brien |
20748 | 6/11/2001 |
Petition for Ownership Change
12 page(s)
| | CEC/Najarian/tronaas/dockets | Livingston & Mattesich/Varanini |
20574 | 4/19/2001 |
Petition for License Transfer
1 page(s)
| | Docket | Dept. Of Water Resources/Suess |
20552 | 5/30/2001 |
Commission Order Approving Ownership Transfer
4 page(s)
| | CEC/Docket | CEC/Keese |
20477 | 5/25/2001 |
Petition for Ownership Change; Response to Request for Additional Information
109 page(s)
| | CEC/Troaas/dockets | Depart. Of Water Resources |
20474 | 5/25/2001 |
Proposed Ownership Change: Request for Additional Information
1 page(s)
| | Livingston & Mattesich/Varanini/dockets | CEC/Tronaas |
20473 | 5/25/2001 |
DWR Bottle Rock Geothermal Power Plant Ownership Change
1 page(s)
| | Depart Of Water Resources/Hannigan/dockets | CEC/Larson |
20472 | 5/25/2001 |
The Department of Water Resources Bottle Rock Power Plant Ownership Change
4 page(s)
| | CEC/Larson | Water Resources/Hannigan |
20471 | 5/25/2001 |
Petition for Ownership Change
5 page(s)
| | CEC/Tronaas/dockets | Livingston & Mattesich/Varanini |
20470 | 5/25/2001 |
Appraisal Review
5 page(s)
| | Depart. Of Water Resources/Perkins/dockets | General Services/Crandall |
20469 | 5/25/2001 |
Petition for Ownership Change: Request for Additional Information
1 page(s)
| | Depart. Of Water Resources/James/dockets | CEC/Tronaas |
20468 | 5/25/2001 |
Item for the May 30, 2001 Business Meeting - California Department of Water Resources Petition for Ownership Change for the Bottle Rock Geothermal Power Plant
6 page(s)
| | CEC/Larson/dockets | CEC/Therkelsen |
20467 | 5/25/2001 |
Petition for Ownership Change - POS
30 page(s)
| | CEC/Najarian/tronaas/dockets | Livingston & Mattesich/Varanini |
20368 | 5/21/2001 |
Four Copies of the Purchase Agreement for the Bottle Rock Power Plant and Assignment of Geothermal Steam Lease
91 page(s)
| | The Hagan Law Firm/Hagan/docket | James |
20212 | 5/15/2001 |
Notice of Receipt - Request for Ownership Change
2 page(s)
| | CEC/Dockets | CEC/Therkelsen |
19796 | 4/19/2001 |
Petition for Licence Transfer
1 page(s)
| | Docket | Dept. Of Water Resources/Suess |
7613 | 12/15/1997 |
Order Number 97-1203-1(a) Commission Order Approving Extention of Reduced Monitoring During Suspended Operations
1 page(s)
| | CEC/Docket File | CEC/Keese |
7389 | 10/29/1997 |
Notice of Receipt: Dept. of Water Resources' request for a three-year extension of Commission Order No 93-0426-02 (approved April 26, 1993).
Attached is an Information Request Form.
2 page(s)
| | CEC/Docket Office | CEC/Therkelsen |
7193 | 10/8/1997 |
Request for Extension of Order No. 93-0426-02 (Order Approving Modified and Reduced Environmental Monitoring During the Suspension of Operations - Bottle Rock Project).
1 page(s)
| | CEC/Brand | State Water Project Analysis Office/Herdocia |
2954-0 | 6/10/2013 |
Transcript of Continuance of Committee Conference
9 page(s)
| | | CEC |
2953-0 | 6/10/2013 |
Transcript of Public Site Visit and Committee Conference
75 page(s)
| | | CEC |