Docket Log

Docket: 79-AFC-04C
Project Title: Compliance - Application for Certification of DWR Bottlerock Geothermal Project
Generated On: 4/18/2014 3:37:42 AM

TN #Docketed DateDocument TitleExhibit #ToFrom
2017552/18/2014Staff Response to Bottle Rock Power LLC's Request to Close the

3 page(s)
  California Energy Commission
2017562/18/2014Draft Order Approving Withdrawal of Appeal and Determining Penalty
Draft order for consideration by the Energy Commission at its February 18, 2014, Business Meeting. Prepared by Hearing Office
3 page(s)
  California Energy Commission Hearing Office
2017462/14/2014David Coleman's Response to Bottle Rock Power LLC's Request to Withdraw Appeal of the Committee's Decision Sustaining Complaint

Public Health
6 page(s)
 CEC/Dockets UnitLaw Office of Donald B. Mooney
2016782/7/2014Notice of Commission Hearing
Hearing on Appeal of Committee Decision Notice
4 page(s)
 CECCalifornia Energy Commission
2016312/4/2014Bottle Rock Power LLC's Request to Withdraw Appeal and Exhibit A

17 page(s)
 CEC/ CommissionersStoel Rives, LLP
20144812/18/2013Bottle Rock Geothermal Power Plant 2013 Notice of Decision

Compliance
1 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20144112/16/2013Commission Decision on the Petition to Amend the Conditions of Certification for the Bottle Rock Geothermal Power Plant
Includes complilation of all project conditions.
92 page(s)
  California Energy Commission
20140112/11/2013Memo re Delayed Start of Bottle Rock Item on December 11 Commission Agenda

1 page(s)
 Parties and PublicEnergy Commission Hearing Office
20140312/11/2013Updated Memo re Start Time for Bottle Rock Item on December 11 Commission Agenda

1 page(s)
  Energy Commission Hearing Office
20139212/10/2013Letter re Objection to Bottle Rock Power's December 6, 2013 Letter and Attachments

3 page(s)
 CEC/Karen Douglas & Janea ScottLaw Office of Donald B. Mooney
20139712/10/2013Project Landowner Comments

1 page(s)
 CEC/Dockets UnitDiepenbrock Elkin LLP
20139912/10/2013Randall Fung Comments: Public comment to hearing proceedings

8 page(s)
 CEC/Dockets UnitRandall Fung
20138812/9/2013Closure Financial Assurance Proposal Comparison Table
Table comparing the closure financial assurance amounts proposed by the Presiding Member’s Proposed Decision issued on November 27, 2013 (TN 201344), and the Request for Consideration of Revisions to Presiding Member’s Proposed Decision filed by Bottle Rock Power LLC on December 6, 2013 (TN 201378). Prepared by Chief Hearing Adviser Paul Kramer
Compliance
1 page(s)
  Energy Commission Hearing Office
20137812/6/2013Request for Consideration of Revisions to Presiding Member's Proposed Decision

9 page(s)
 CEC/Dockets UnitStoel Rives LLP
20134311/27/2013Notice of Availability of Presiding Member's Proposed Decision and Notice of 12-11-2013 Full Commission Hearing on the PMPD

4 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20134411/27/2013Presiding Member's Proposed Decision on the Bottle Rock Amendment Petition
Includes exhibit list and compilation of conditions of certification. See related Notice of Availability for info about 12-11-2013 Energy Commission hearing on the PMPD
91 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20134611/27/2013Transcript of 11-18-2013 Committee Hearing in Cobb

170 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20134711/27/2013Transcript of 11-19-2013 Committee Conference in Sacramento

10 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20133311/26/2013Email Response to Inquiry RE: Status of Bottle Rock Power Plant Sump Fill

Compliance
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20132611/25/2013Jay Hepper Comments: Enough is Enough, a rebuttal and reality toward the negativity directed at Bottle Rock Power

4 page(s)
 CEC/Dockets UnitJay Hepper
20127211/20/2013STEP Deputy Director Response to Congressman Thompson re: BRPP Financial Assurances

Compliance
2 page(s)
 Honorable Mike Thompson Congress of the United States House of RepresentativesCalifornia Energy Commission
20127311/20/2013Randall Fung's public comment questions
Written questions accompanying Randall Fung's public comments during the 11-18-13 Committee Hearing
2 page(s)
 California Energy CommissionRandall Fung
20127411/20/2013Gerri Finn's public comments
Letter read by Gerri Finn during the public comment portion of the 11-18-19 Committee Hearing
3 page(s)
 California Energy CommissionGerri Finn
20127511/20/2013Graphs and Photos submitted by Kelly Fletcher
Air monitoring graphs and annotated photos accompanying Kelly Fletcher's public comments at the 11-18-13 Committee Hearing
4 page(s)
 California Energy CommissionKelly Fletcher
20121311/15/2013Email and Record of Conversation re CA Energy Commission History of Requiring a Closure Bond

2 page(s)
 Terry O’Brien/ERMCalifornia Energy Commission
20121411/15/2013BRP's Proposed Exhibit 21
Transcript Excerpts of Sutter Power Plant Evidentiary Hearing (97-AFC-2)
7 page(s)
21CEC/Dockets UnitStoel Rives LLP
20121511/15/2013BRP's Proposed Exhibit 22
Excerpts from Sutter Power Plant Project Final Decision (97-AFC-2)
7 page(s)
22CEC/Dockets UnitStoel Rives LLP
20121611/15/2013BRP's Proposed Exhibit 23
Excerpt from SEGS Final Decision (89-AFC-1)
6 page(s)
23CEC/Dockets UnitStoel Rives LLP
20121711/15/2013BRP's Proposed Exhibit 24
Excerpts from Beacon Solar Energy Project Final Decision (08-AFC-2)
8 page(s)
24CEC/Dockets UnitStoel Rives LLP
20121811/15/2013BRP's Proposed Exhibit 25
Excerpts from Various Commission Decisions on AFCs
20 page(s)
25CEC/Dockets UnitStoel Rives LLP
20122211/15/2013Bottle Rock's Rebuttal Testimony and Revised Prehearing Statement and Exhibit List
Bottle Rock's Rebuttal Testimony and Revised Prehearing Statement and Exhibit List
10 page(s)
26CEC/Dockets UnitStoel Rives LLP
20122411/15/2013Intervenors' David Coleman and Friends of Cobb Mountain's Revised Pre-Hearing Statement
Pre-Hearing Statement
Compliance
15 page(s)
203CommitteeLaw Office of Donald B. Mooney
20122711/15/2013Randall Fung Comments: Public Response from Fung for BRP

9 page(s)
 CEC/Dockets UnitRandall Fung
20119611/13/2013Hearing Officer's Memo re Exhibit Number adjustments
Memo describing why and how some proposed exhibits were given different numbers in the e-filing system; includes chart showing old and new numbers
1 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20115411/12/2013Direct Written Testimony of Robert Francisco
Bottle Rock's Proposed Exhibit for Hearing
1 page(s)
19CEC/Dockets UnitStoel Rives LLP
20115511/12/2013Direct Written Testimony of Brian Harms
Bottle Rock's Proposed Exhibit for Hearing
2 page(s)
18CEC/Dockets UnitStoel Rives LLP
20115611/12/2013Caltrans Project Development Procedure Manual, Chapter 20, Project Development Cost Estimates

Facility Design, Compliance
20 page(s)
102 California Energy Commission
20115711/12/2013Caltrans Project Development Procedure Manual, Appendix AA, Cost Estimates

Facility Design, Compliance
24 page(s)
103 California Energy Commission
20116011/12/2013V.V. & J. Coleman LLC Prehearing Statement

Facility Design, Compliance
11 page(s)
 CEC/Dockets UnitDiepenbrock Elkin LLP
20116411/12/2013Staff Prehearing Conference Statement Direct Testimony and Exhibit List
CEC Staff Prehearing Conference Statement, Direct Testimony and Exhibit List
Compliance
7 page(s)
  California Energy Commission
20116511/12/2013BRPP Prehearing Statement
Applicant's Prehearing Statement
16 page(s)
20 Stoel Rives LLP
20116611/12/2013Intervenors' David Coleman and Friends of Cobb Mountain Pre-Hearing Statement
Intervenors' David Coleman and Friends of Cobb Mountain Pre-Hearing Statement
Compliance
13 page(s)
202CommitteeLaw Office of Donald B. Mooney
20114811/8/2013BRPS Use Permit Bonds
Project Owner's Proposed Exhibit for Hearing (11/18/2013)
20 page(s)
16CEC/Dockets UnitStoel Rives LLP
20112211/6/2013Hearing Officer's Memo re: Corrected Reference to Compilation of Bottle Rock Conditions
Corrects reference in the Notice of the November 18, 2013 Committee Hearing
1 page(s)
  Energy Commission Hearing Office
20112711/6/201312-28-12 Bottle Rock's Correspondence and Attachments One (Settlement Agreement) and Two (Lease Agreement)

31 page(s)
15CEC/Dockets UnitStoel Rives, LLP
20112811/6/201301-10-13 County of Lake's Comments and Exhibits Regarding Bottle Rock Complaint

31 page(s)
14CEC/Dockets UnitStoel Rives, LLP
20113911/6/2013County of Lake Use Permits and Time Extensions
Project Owner's Proposed Exhibit for Hearing (11/18/2013)
29 page(s)
17 Stoel Rives LLP
20111811/5/2013Notice of Committee Hearing, Committee Conference & Hearing Orders
Committee Notice for the November 19, 2013 Conference and Hearing
12 page(s)
  California Energy Commission
20108710/31/2013Save the date notice of Bottle Rock Committee Hearing
Memo giving advance (of formal) notice of Nov 18 2013 Bottle Rock Amendment Committee Hearing; likely filing deadlines; tips about assembling exhibits
1 page(s)
 CEC/Dockets UnitEnergy Commission Hearing Office
20106210/28/2013Staff Response to Comments Received Regarding Staff's Analysis of the Bottle Rock Geothermal Power Plant-BRPP Petition to Amend

Compliance
7 page(s)
101 California Energy Commission
20101710/23/2013Revised General Orders Regarding Electronic Filing, etc
Committee Orders re Use of Electronic Filing System (mandatory after 11-01-13), format of documents, exhibits, motions, and transcripts
18 page(s)
 PartiesEnergy Commission Hearing Office
20098210/21/2013Supplement to Status Report No. 2, Bottle Rock Geothermal Power Plant (BRPP) Petition to Amend (79-AFC-4C)

Compliance
2 page(s)
  California Energy Commission
20083410/11/2013Bottle Rock Power, LLC's Comments on Staff Assessment

5 page(s)
13CEC/Dockets UnitStoel Rives LLP
20082610/10/2013Bottle Rock Power, LLC's Updated Status Report

2 page(s)
11CEC/Dockets UnitStoel Rives LLP
20078510/7/2013Letter from Congressman Thompson re Proposed Amendment to Compliance Conditions of Certification Relating to Financial Assurance

3 page(s)
12California Energy CommissionCongress of the United States
20073410/3/20131996-Final Report Decommissioning and Cleanup Cost Estimates Bottle Rock Power Plant
1996-Final Report Decommissioning and Cleanup Cost Estimates Bottle Rock Power Plant
Compliance
388 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20071410/2/2013Bottle Rock Power, LLC's Initial Comments on Staff Assessment

3 page(s)
10CEC/Dockets UnitStoel Rives LLP
20071610/2/2013FOCM in Accord With Attorney on October 4 Workshop Submission

1 page(s)
 CEC/Camille Remy-ObadFriends of Cobb Mountain
20072110/2/2013Status Report Number 2, Bottle Rock Geothermal Power Plant Petition to Amend

Compliance
2 page(s)
  California Energy Commission
20072410/2/2013V.V. & J. Coleman LLC Comments to Staff Analysis

1 page(s)
  Diepenbrock Elkin LLP
20069310/1/2013John Dunnigan Comments: Compilation of the Conditions of Certification for Bottle Rock Geothermal Power Plant 79-AFC-4C, September 2013

1 page(s)
 CEC/Dockets UnitJohn Dunnigan
2006629/30/2013David Coleman and Friends of Cobb Mountain's Second Status Report
Status Report
Compliance
11 page(s)
 CommitteeLaw Office of Donald B. Mooney
2006309/27/2013Applicant's Status Report (Sept. 27, 2013)
Status Report
2 page(s)
9CEC/K. Douglas/J. Scott/P. KramerStoel Rives LLP/K. Castanos
2004749/13/2013Public Notice of Staff Workshop Staff's Analyis of the Bottle Rock LLC's Petition to Amend

Compliance
5 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2004629/12/2013Revised Interested Parties Letter Extending the Comment Period for the Staff Analysis of the Proposed Modifications to the Compl

2 page(s)
 Interested PartiesCalifornia Energy Commission
2004199/6/2013Staff Analysis of Proposed Modifications to the Compliance Conditions of Certification (formerly the general provisions)

49 page(s)
100Interested PartiesCalifornia Energy Commission
2004759/6/2013Compilation of the Conditions of Certification for Bottle Rock Project

57 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2001348/9/2013Bottle Rock's Status Report

3 page(s)
 CEC/Karen DouglasStoel Rives, LLP
2001358/9/2013David Coleman and Friends of Cobb Mountain's Status Report
Status Report
12 page(s)
 California Energy CommissionLaw Office of Donald B. Mooney
2001468/9/2013Bottle Rock Geothermal Power Plant (BRPP) Petition to Amend Status Report No. 1

2 page(s)
8CEC/Karen DouglasCEC/Camille Remy-Obad
2000537/29/2013Bottle Rock Power, LLC's Response to Staff's Data Requests, Set 1

19 page(s)
7CEC/ C. Remy ObadBottle Rock Power, LLP/ Stoel Rives/ K. Hellwig
716527/18/2013Bottle Rock Power, LLC's Objections to Staff's Data Requests, Set 1 (No.1-5)
Bottle Rock Power, LLC's Objections to Staff's Data Requests, Set 1 (No.1-5)
7 page(s)
6CEC/C.Obad-RemyBottle Rock Power LLC/Stoel Rives LLP/K.Castanos
714546/28/2013Staff's Data Request Set One (Nos. 1-5)
Staff's Data Request Set One (Nos. 1-5)
8 page(s)
 Bottle Rock Power, LLC/B.Hams /Stoel Rives LLP/K.Castanos /Locke Lord LLP/J.McKinseyCEC/C.Remy-Obad
714556/28/2013Bottle Rock Power LLP's Letter to CEC's Karen Douglas and Robert Weisenmiller re Request for Extension of Stay of Filing of Surety Bond
Bottle Rock Power LLP's Letter to CEC's Karen Douglas and Robert Weisenmiller re Request for Extension of Stay of Filing of Surety Bond
6 page(s)
5CEC/K.Douglas /R.WeisenmillerStoel Rives LLP/K.Castanos
714586/28/2013Committee Scheduling Order, Order Granting Petition to Intervene, and Other Orders
Committee Scheduling Order, Order Granting Petition to Intervene, and Other Orders
8 page(s)
 CEC/Docket UnitCEC/K.Douglas /J.Scott
713526/21/2013Memo re Bottle Rock Geothermal Project Amendment Schedule Modification Request
Memo re Bottle Rock Geothermal Project Amendment Schedule Modification Request
5 page(s)
 CEC/K.Douglas /J.Scott /P.KramerCEC/C.Remy-Obad
711286/5/2013Anonymous Public Comment Letter to CEC Hearing Advisor Paul Kramer
Anonymous Public Comment Letter to CEC Hearing Advisor Paul Kramer
3 page(s)
 CEC/P.KramerAnonymous
711286/5/2013Anonymous Public Comment Letter to CEC Hearing Advisor Paul Kramer
Anonymous Public Comment Letter to CEC Hearing Advisor Paul Kramer
3 page(s)
 CEC/P.KramerAnonymous
710846/3/2013Notice of Continuance of May 31, 2013 Committee Conference regarding Bottle Rock Geothermal Power Plant Amendment
Notice of Continuance of May 31, 2013 Committee Conference regarding Bottle Rock Geothermal Power Plant Amendment
8 page(s)
 POS ListCEC/ J. Scott
710225/30/2013CEC Staff's Issues Identification Report with POS
CEC Staff's Issues Identification Report with POS
14 page(s)
 CEC/Docket UnitCEC/ C. Remy-Obad
710185/29/2013Bottle Rock Power, LLC's response to Staff's Issues Identification Report
Bottle Rock Power, LLC's response to Staff's Issues Identification Report
7 page(s)
4CEC/K.Douglas /J.ScottBottle Rock Power LLC/Stoel Rives LLP/K.Castaños
710205/29/2013V. V. & J. Coleman LLC's Response to Staff's Issues Identification Report
V. V. & J. Coleman LLC's Response to Staff's Issues Identification Report
4 page(s)
 CEC/K.Douglas /J.ScottV.V & J Coleman, LLC/Diepenbrock Elkin LLP/M.Peterson
710255/29/2013David Coleman and Friends of Cobb Mountain's Response to Staff's Issues Identification Report
David Coleman and Friends of Cobb Mountain's Response to Staff's Issues Identification Report
5 page(s)
 CEC/K.Douglas /R.Weisenmiller /P.KrammerDavid Coleman /Friends of Cobb Mountain /Law Offices of Donald B. Mooney/D.Mooney
709845/28/2013CEC Staff's Issues Identification Report with POS
CEC Staff's Issues Identification Report with POS
14 page(s)
 CEC/Docket UnitCEC/ C. Remy-Obad
709595/24/2013CEC Staff's Issue Identification Report
CEC Staff's Issue Identification Report
10 page(s)
 CEC/K.Douglas/R.Weisenmiller /P.KrammerCEC/C.Remy-Obad
708415/16/2013Notice of Public Site Visit and Committee Conference
Notice of Public Site Visit and Committee Conference
11 page(s)
 CEC/Docket UnitCEC/K.Douglas /J.Scott
708425/16/2013General Orders Regarding Electronic Document Formats, Filing and Service of Documents and Other Matters
General Orders Regarding Electronic Document Formats, Filing and Service of Documents and Other Matters
7 page(s)
 CEC/Docket UnitCEC/K.Douglas
705514/30/2013Memorandum re Hearing Adviser Assignment
Memorandum re Hearing Adviser Assignment
1 page(s)
 CEC/All CommissionerCEC/R.Weisenmiller
703044/15/2013Bottle Rock Power's Letter to CEC's Karen Douglas and Robert Weisenmiller re Decommissioning Estimate
Bottle Rock Power's Letter to CEC's Karen Douglas and Robert Weisenmiller re Decommissioning Estimate
14 page(s)
3CEC/K.Douglas /R.WeisenmillerBottle Rock Power LLC/Stoel Rives LLP/K.Castanos
699223/14/2013Notice of Receipt for the March 8, 2013 Petiton to Amend
Notice of Receipt for the March 8, 2013 Petiton to Amend
4 page(s)
 CEC/Docket UnitCEC/ C. Marxen
699153/13/2013Bottle Rock Power LLC's Compliance with the Committee’s Decision Sustaining Complaint Against Bottle Rock Power, LLC
Bottle Rock Power LLC's Compliance with the Committee’s Decision Sustaining Complaint Against Bottle Rock Power, LLC
5 page(s)
2CEC/K.Douglas /R.WeisenmillerBottle Rock Power LLC/K.Castanos
698793/8/2013Bottle Rock Power, LLC's Petition to Amend
Bottle Rock Power, LLC's Petition to Amend
31 page(s)
1CEC/Docket UnitBottle Rock Power LLC/Stoel Rives LLP/K.Castanos
6898612/28/2012Applicant's Correspondence and Attachments One (Settlement Agreement) and Two (Lease Agreement)
Applicant's Correspondence and Attachments One (Settlement Agreement) and Two (Lease Agreement)
31 page(s)
 CEC/K.Douglas /R.WeisenmillerApplicant/Stoel Rives LLP/K.Castanos
662247/13/2012CEC Letter to Bottle Rock Power Regarding Noise 16-1
CEC Letter to Bottle Rock Power Regarding Noise 16-1
3 page(s)
 Bottle Rock Power LLC/B.HarmsCEC/C.Marxen
635572/6/2012Email Regarding Noise Standards in Lake County
Email Regarding Noise Standards in Lake County
1 page(s)
 Public/ W. EvansCEC/ S. Khosmashrab
615397/26/2011Letter Regarding Withdrawl Petition to Amend
Letter Regarding Withdrawl Petition to Amend
1 page(s)
 CEC/ C. StoraApplicant/ B. Harms
5924212/15/2010Responses to Comments Final Environmental Impact Report/ Environmental Assessment
Responses to Comments Final Environmental Impact Report/ Environmental Assessment
415 page(s)
 CEC/ Docket UnitCounty of Lake
585839/22/2010Draft Environmental Impact Report for BRP
Draft Environmental Impact Report for BRP
1175 page(s)
 CEC/ Docket UnitCounty of Lake
558823/15/2010Traffic Addendum for the Petition to Amend
Traffic Addendum for the Petition to Amend
40 page(s)
 CEC/Docket UnitCEC/M. Trask
558833/15/2010Water Resources Addendum for the Petition to Amend
Water Resources Addendum for the Petition to Amend
40 page(s)
 CEC/Docket UnitCEC/M. Trask
5414611/17/2009High Valley Preservation Question Regarding Bottle Rock Facilities
High Valley Preservation Question Regarding Bottle Rock Facilities
2 page(s)
 High Valley Committee/ R. FongDept of Water Resources/ R. James
5407911/16/2009Comments & Questions Concerning the Preparation of an Environmental Impact Report
Comments & Questions Concerning the Preparation of an Environmental Impact Report
8 page(s)
 Community Development Department/ R. Coel & EDAW/AECOM/ M. WinsorPublic/ Coleman Family
5409211/16/2009Comments & Concerns in the EIR for the Bottle Rock Power Geothermal Expansion Project
Comments & Concerns in the EIR for the Bottle Rock Power Geothermal Expansion Project
2 page(s)
 CEC/ Docket UnitGerri Fletcher/ G. Fletcher
5405411/12/2009CEC Response Letter Regarding Application for Confidentiality
CEC Response Letter Regarding Application for Confidentiality
2 page(s)
 Stoel Rives/ J. McKinseyCEC/ M. Jones
5383410/27/2009Notice of Receipt RE Petition to Amend the CEC Decision
Notice of Receipt RE Petition to Amend the CEC Decision
3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
5368110/19/2009Notice of Preparation of a Draft Environmental Impact Report
Notice of Preparation of a Draft Environmental Impact Report
6 page(s)
 CEC/ Energy Facilities Siting & Environmental Protection DivisionLake County Community Development Department/ K. Ingram
5349910/12/2009Petition to Amend Final Decision
Petition to Amend Final Decision
767 page(s)
 CEC/ D. RundquistBottle Rock Power LLC/ B. Harms
5360010/8/2009Notice of Preparation of an Environmental Impact Report & Notice of Scoping Meeting & E-mail
Notice of Preparation of an Environmental Impact Report & Notice of Scoping Meeting & E-mail
10 page(s)
 Responsible AgenciesCounty of Lake/ R. Coel
5372710/7/2009Application for Confidential - Petition to Amend Cultural Resources
Application for Confidential - Petition to Amend Cultural Resources
3 page(s)
 CEC/ M. JonesStoel Rives/ J. McKinsey
534279/25/2009September 24th Letter to Brian Harms from Bob James
September 24th Letter to Brian Harms from Bob James
2 page(s)
201Department of Water Resource/ B. HarmsCEC/ R. James
518166/4/2009Bottle Rock Power Binkley Leasehold Expansion Project - from County of Lake
Bottle Rock Power Binkley Leasehold Expansion Project - from County of Lake
2 page(s)
 CEC/ E. AllenCounty of Lake/ R. Coel
517335/28/2009Power Plant Noise Complaint
Power Plant Noise Complaint
1 page(s)
 Bottle Rock Power, LLC/ B. HarmsCounty of Lake/ M. Floyd
516375/21/2009Letter to T. King - Managing Director USRG Management
Letter to T. King - Managing Director USRG Management
2 page(s)
200USRG/ T. KingBottle Rock Power/ R. James
4945112/18/2008Letter RE Dewatering Unit
Letter RE Dewatering Unit
3 page(s)
 CEC/ D. RundquistBottle Rock Power, LLC/ K. Thomas
4938012/11/2008Coleman Meadow Spoils Project
Coleman Meadow Spoils Project
2 page(s)
 CEC/ D. RundquistBottle Rock Power/ K. Thomas
4874210/23/2008Bottle Rock Power Plant Drilling Sump Compliance
Bottle Rock Power Plant Drilling Sump Compliance
2 page(s)
 CEC/ D. RundquistKaron Thomas
4871710/22/2008Letter re DWR Complete review for Estimate of Cost to Remove Bottle Rock PP Facilities
Letter re DWR Complete review for Estimate of Cost to Remove Bottle Rock PP Facilities
3 page(s)
 Ronald E. SeusCEC/ R. James
4848110/9/2008Incident Corrective Action Response
Incident Corrective Action Response
2 page(s)
 CEC/ D. RundquistBottle Rock Power/ K. Thomas
4836810/3/2008Bottle Rock Power, LLC Notification of Diesel Fuel Release OES Control # 08-6232
Bottle Rock Power, LLC Notification of Diesel Fuel Release OES Control # 08-6232
2 page(s)
 CEC/ Docket Unit/ D.RundquistBottle Rock PP, LLC/ K. Thomas
478949/3/2008Order Approving the Change of Ownership The restart of Operation after Suspension and 11 facility Design Changes
Order Approving the Change of Ownership The restart of Operation after Suspension and 11 facility Design Changes
21 page(s)
 State of California Energy Resources Conservation and Development CommissionCEC/J. Pfannenstiel
478368/29/2008Letter re: Bottle Rock Removal/ cutting and drilling of mud spoils from the Well Pad stumps in order to preserve Compliance
Letter re: Bottle Rock Removal/ cutting and drilling of mud spoils from the Well Pad stumps in order to preserve Compliance
2 page(s)
 CEC/ D. StoneBottle Rock Power/ K. Thomas
398253/30/2007Bottle Rock Submittals to Conditions of Cert 10-3 & 10-4
Bottle Rock Submittals to Conditions of Cert 10-3 & 10-4
6 page(s)
 CEC/C. Meyer/Docket UnitStoel Rives/J. McKinsey
397873/28/2007Bottle Rock Power Plant -Cond. of Cert 13-8
Bottle Rock Power Plant -Cond. of Cert 13-8
4 page(s)
 CEC/C. MeyerStoel Rives/A. Cook
390501/23/2007Monthly construction progress report for DEC. 2006
Monthly construction progress report for DEC. 2006
4 page(s)
 CEC/ C. MeyerS&R/ K. Hellwig
388671/5/2007Biological Resources Mitigation Implementation and Monitoring Plan
Biological Resources Mitigation Implementation and Monitoring Plan
13 page(s)
 CEC/ C. MeyerStoel Rives/ J. McKinsey
3880012/22/2006Bottle Rock Power Plant - Pre Operation Compliance and Submittals
Bottle Rock Power Plant - Pre Operation Compliance and Submittals
20 page(s)
 C. MeyerJ. A. McKinsey / STOEL RIVES
3864612/14/2006Order No. 06-1213-12, Order Approving the Change of Ownership, the Restart of Operation after Suspension, and !! Facility Design Changes.
Order No. 06-1213-12, Order Approving the Change of Ownership, the Restart of Operation after Suspension, and !! Facility Design Changes.
48 page(s)
 Docket UnitCEC/ J. Pfannenstiel
3865012/14/2006Letter verifying Bottle rock power corporations compliance with COC4-4
Letter verifying Bottle rock power corporations compliance with COC4-4
2 page(s)
 CEC/ C. MeyerBRPC/J. McKinsey
3865312/14/2006Bottle rock compliance submittal condition of certification 10-5 pack
Bottle rock compliance submittal condition of certification 10-5 pack
35 page(s)
 CEC/ C. MeyerS&R,LLP/J. Mckinsey
3865512/14/2006Bottle rock construction and start-up plan
Bottle rock construction and start-up plan
5 page(s)
 CEC/ C. MeyerS&R,LLP/ J. McKinsey
3863712/13/2006Bottle rocket power corporations Biological annual resources report.
Bottle rocket power corporations Biological annual resources report.
80 page(s)
 CEC/ C. MeyerBRPC/ J. Mckinsey
3857912/8/2006Stoel & Rives on behalf of bottle rocket power corporation comments regarding change of ownership.
Stoel & Rives on behalf of bottle rocket power corporation comments regarding change of ownership.
1 page(s)
 CEC/ Dockets UnitS&R,BRCP/ J. McKinsey
3858512/7/2006State energy resources conservation and development commission
State energy resources conservation and development commission
1 page(s)
 CEC/ Dockets UnitSERC&DC/ J. Pfannenstiel
3838111/13/2006Staff Analysis of Petition to Change Ownership, Allow the Restart of Operation After Suspension, and Allow 11 Facility Design Changes
Staff Analysis of Petition to Change Ownership, Allow the Restart of Operation After Suspension, and Allow 11 Facility Design Changes
84 page(s)
 Interested PartiesCEC/ C. Meyer
378919/18/2006Bottle Rocket Power Plant Resonse to Data Requests
Bottle Rocket Power Plant Resonse to Data Requests
13 page(s)
 CEC/ C. MeyerBRPP/ J. McKinsey
378939/18/2006Responses to Data Requests for the Bottle Rock Power Plant
Responses to Data Requests for the Bottle Rock Power Plant
12 page(s)
 CEC/ C. MeyerStoel Rives LLP/ J.A. McKinsey
377108/29/2006Notice of Site Visit and Staff Workshop for Bottle Rock Geothermal Power Plant Petition to Restart Operation
Notice of Site Visit and Staff Workshop for Bottle Rock Geothermal Power Plant Petition to Restart Operation
3 page(s)
 Docket UnitR. Johnson / CEC
376838/21/2006Notice of Receipt of Petition to Amend CEC Decision. Mail List #771.
Notice of Receipt of Petition to Amend CEC Decision. Mail List #771.
4 page(s)
 Interested Parties and Property OwnersCEC/ R. Johnson
375728/4/2006pentition to Amend Final Decisionto Re-Fire Plant Bottle Rock Power Plant.(79-AFC-4C)
pentition to Amend Final Decisionto Re-Fire Plant Bottle Rock Power Plant.(79-AFC-4C)
124 page(s)
 Christopher MeyerJohn Mckensey
375868/4/2006Petition to Amend Final Decision to Re-Fire Bottle Rock Power Plant
Petition to Amend Final Decision to Re-Fire Bottle Rock Power Plant
80 page(s)
 CEC/ C. MeyerStoel Rives LLP, Attorneys at Law/ J. McKinsey
375948/4/2006E-mail 1 of 2 for Bottle Rock PP - Exhibit E, Exhibit F, Exhibit G, Exhibit H, Exhibit I, Exhibit J
E-mail 1 of 2 for Bottle Rock PP - Exhibit E, Exhibit F, Exhibit G, Exhibit H, Exhibit I, Exhibit J
125 page(s)
 CEC/ Docket UnitStoel Rives, LLP/ E. Hecox
374977/28/2006Petition to Amend Final Decision to Change Type of Owning Entity Bottle Rock Power Plant
Petition to Amend Final Decision to Change Type of Owning Entity Bottle Rock Power Plant
12 page(s)
 CEC/C. MeyersStoel Rives/J. McKinsey
692977/28/2006Petiton to Amend Final Decisionto Change Type of Owning Entity
Petiton to Amend Final Decisionto Change Type of Owning Entity
10 page(s)
 CEC/C.MeyersBottle Rock Power LLC/ Stoel Rives/ J. McKinsey
372056/28/2006Bottle Rock Power Corporation Application for Certification CEC -RPS-1
Bottle Rock Power Corporation Application for Certification CEC -RPS-1
30 page(s)
 CECJ. A. Mckinsey / Stoel Rives
692996/28/2006Application for Certification of Eligibility to Participate in the CA. Renewables Portfolio Standards
Application for Certification of Eligibility to Participate in the CA. Renewables Portfolio Standards
29 page(s)
 CEC/RPS Certification StaffBottle Rock Power Corporation
343725/16/2005Notice of Decision by the CEC
Notice of Decision by the CEC
1 page(s)
 CEC/Docket UnitCEC/N. Tronaas
339114/12/2005Bottle Rock Geo Power Plant - Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
Bottle Rock Geo Power Plant - Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
14 page(s)
 Interested Parties/Cec/docketsCEC/Tronaas
692984/12/2005CEC Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
CEC Staff Analysis of Petition to Extend Environmental Monitoring Program during Suspended Operations
14 page(s)
 Interested PartiesCEC/Nancy Tronaas
332001/25/2005Notice of Receipt - Petition to Amend the CEC Decision for the Bottle Rock Geothermal Power Project - Extension of Environmental Monitoring Program for Suspended Operations
Notice of Receipt - Petition to Amend the CEC Decision for the Bottle Rock Geothermal Power Project - Extension of Environmental Monitoring Program for Suspended Operations
3 page(s)
 CEC/DocketsCEC/O'brian
331441/19/2005Petition for Extending Environmental Monitoring Program for Suspended Operation
Petition for Extending Environmental Monitoring Program for Suspended Operation
26 page(s)
 CEC/TronaasBottle Rock Power Corp./Suess
3047611/25/2003Petition for Change of Owenership/Operational Control
Petition for Change of Owenership/Operational Control
1 page(s)
 CEC/Tronaas/docketsBottle Rock Power Corp/Lewis
3026210/30/2003Notice of Receipt Bottle Rock Geothermal Power Plant Request for Ownership Change
Notice of Receipt Bottle Rock Geothermal Power Plant Request for Ownership Change
2 page(s)
 CEC/DocketCEC/O'brien
6929610/24/2003Petiton of Bottle Rock Power Corporation for Transfer of Ownership, Operational Control of Bottle Rok Power Plant
Petiton of Bottle Rock Power Corporation for Transfer of Ownership, Operational Control of Bottle Rok Power Plant
5 page(s)
 CEC/Docket OfficeThe Hagan Law Firm, Inc/James Hagan
207486/11/2001Petition for Ownership Change
Petition for Ownership Change
12 page(s)
 CEC/Najarian/tronaas/docketsLivingston & Mattesich/Varanini
205525/30/2001Commission Order Approving Ownership Transfer
Commission Order Approving Ownership Transfer
4 page(s)
 CEC/DocketCEC/Keese
204675/25/2001Petition for Ownership Change - POS
Petition for Ownership Change - POS
30 page(s)
 CEC/Najarian/tronaas/docketsLivingston & Mattesich/Varanini
204685/25/2001Item for the May 30, 2001 Business Meeting - California Department of Water Resources Petition for Ownership Change for the Bottle Rock Geothermal Power Plant
Item for the May 30, 2001 Business Meeting - California Department of Water Resources Petition for Ownership Change for the Bottle Rock Geothermal Power Plant
6 page(s)
 CEC/Larson/docketsCEC/Therkelsen
204695/25/2001Petition for Ownership Change: Request for Additional Information
Petition for Ownership Change: Request for Additional Information
1 page(s)
 Depart. Of Water Resources/James/docketsCEC/Tronaas
204705/25/2001Appraisal Review
Appraisal Review
5 page(s)
 Depart. Of Water Resources/Perkins/docketsGeneral Services/Crandall
204715/25/2001Petition for Ownership Change
Petition for Ownership Change
5 page(s)
 CEC/Tronaas/docketsLivingston & Mattesich/Varanini
204725/25/2001The Department of Water Resources Bottle Rock Power Plant Ownership Change
The Department of Water Resources Bottle Rock Power Plant Ownership Change
4 page(s)
 CEC/LarsonWater Resources/Hannigan
204735/25/2001DWR Bottle Rock Geothermal Power Plant Ownership Change
DWR Bottle Rock Geothermal Power Plant Ownership Change
1 page(s)
 Depart Of Water Resources/Hannigan/docketsCEC/Larson
204745/25/2001Proposed Ownership Change: Request for Additional Information
Proposed Ownership Change: Request for Additional Information
1 page(s)
 Livingston & Mattesich/Varanini/docketsCEC/Tronaas
204775/25/2001Petition for Ownership Change; Response to Request for Additional Information
Petition for Ownership Change; Response to Request for Additional Information
109 page(s)
 CEC/Troaas/docketsDepart. Of Water Resources
203685/21/2001Four Copies of the Purchase Agreement for the Bottle Rock Power Plant and Assignment of Geothermal Steam Lease
Four Copies of the Purchase Agreement for the Bottle Rock Power Plant and Assignment of Geothermal Steam Lease
91 page(s)
 The Hagan Law Firm/Hagan/docketJames
202125/15/2001Notice of Receipt - Request for Ownership Change
Notice of Receipt - Request for Ownership Change
2 page(s)
 CEC/DocketsCEC/Therkelsen
197964/19/2001Petition for Licence Transfer
Petition for Licence Transfer
1 page(s)
 DocketDept. Of Water Resources/Suess
205744/19/2001Petition for License Transfer
Petition for License Transfer
1 page(s)
 DocketDept. Of Water Resources/Suess
761312/15/1997Order Number 97-1203-1(a) Commission Order Approving Extention of Reduced Monitoring During Suspended Operations
Order Number 97-1203-1(a) Commission Order Approving Extention of Reduced Monitoring During Suspended Operations
1 page(s)
 CEC/Docket FileCEC/Keese
738910/29/1997Notice of Receipt: Dept. of Water Resources' request for a three-year extension of Commission Order No 93-0426-02 (approved April 26, 1993). Attached is an Information Request Form.
Notice of Receipt: Dept. of Water Resources' request for a three-year extension of Commission Order No 93-0426-02 (approved April 26, 1993). Attached is an Information Request Form.
2 page(s)
 CEC/Docket OfficeCEC/Therkelsen
719310/8/1997Request for Extension of Order No. 93-0426-02 (Order Approving Modified and Reduced Environmental Monitoring During the Suspension of Operations - Bottle Rock Project).
Request for Extension of Order No. 93-0426-02 (Order Approving Modified and Reduced Environmental Monitoring During the Suspension of Operations - Bottle Rock Project).
1 page(s)
 CEC/BrandState Water Project Analysis Office/Herdocia