Docket Log

Docket: 17-SPPE-01
Project Title: McLaren Backup Generating Facility
Generated On: 5/1/2024 2:28:27 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2436926/23/2022 Memo re Close Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2262931/10/2019 Order on Petition for Reconsideration

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2262841/9/2019 Robert Sarvey Comments Pulling the plug Why We Chose to Black out an Entire Campus - and How It Went

5 page(s)
 CEC/Docket UnitRobert Sarvey
2262221/4/2019 Vantage Data Centers' Response to Intervenor's Petition For Reconsideration

Air Quality, Facility Design, Compliance
10 page(s)
 CEC/DocketsDayZenLLC
2262011/3/2019 Jan Eric Nordmo Comments Neighbor Concerns Re. Vantage Project and the McLaren Backup Generating Facility

Alternatives, Facility Design, Public Health
2 page(s)
 CEC/DocketsJan Eric Nordmo
2262001/3/2019 Janet Benassi Comments Project across the street

Air Quality, Cultural Resources, Facility Design
1 page(s)
 CEC/DocketsJanet Benassi
22616212/20/2018 Energy Commission Staff's Reply to Helping Hand Tools Petition

7 page(s)
 CEC/ Docket UnitCalifornia Energy Commission
22615912/19/2018 Notice of Energy Commission Hearing on Petition, etc.

3 page(s)
 All parties and interested personsEnergy Commission Hearing Office
226041-112/7/2018 Form CEC-108 - Service on the Chief Counsel - Request for Reconsideration of Commission Decision Granting SPPE to McLaren

1 page(s)
 CEC/Chief CounselRobert Sarvey for Helping Hand Tools
226041-212/7/2018 Helping Hand Tools Request for Reconsideration of the Final Decision for the McLaren Data Center

9 page(s)
 CEC/Chief CounselRobert Sarvey for Helping Hand Tools
22604012/6/2018 Helping Hand Tools Request for Reconsideration of the Final Decision for the McLaren Data Center

Air Quality
9 page(s)
 CEC/Docket UnitHelping Hand Tools filed by Robert Sarvey
22603912/7/2018 Email Exchange - CEC Chief Counsel and Robert Sarvey Regarding Request for Reconsideration of 11-7-18 Energy Commission Decision
Email confirming receipt of Helping Hand Tools Request for Reconsideration of the November 7, 2018 Energy Commission Decision Approving an SPPE for the McLaren Data Center and needing completion of service of the document
10 page(s)
 Robert SarveyCalifornia Energy Commission
22597011/27/2018 Final Commission Decision with Corrected Publication Number
*** THIS DOCUMENT SUPERSEDES TN 225887 *** - The only change is the publication number on the front cover
360 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22590411/15/2018 Notice of Determination
Filed with the State Clearinghouse on November 13, 2018
1 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22588711/13/2018 Final Commission Decision
*** THIS DOCUMENT IS REPLACED BY TN 225970 *** - Compilation of Committee Proposed Decision and Errata as adopted by the Energy Commission at its November 7, 2018, Business Meeting
360 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22588411/13/2018 Commission Adoption Order
Order No: 18-1107-2
3 page(s)
 CEC/DocketsCalifornia Energy Commission
22583011/6/2018 Helping Hand Tools (2HT) Comments on the Proposed Decision

Air Quality
8 page(s)
 CEC/Docket UnitRobert Sarvey
22582811/6/2018 ERRATA TO COMMITTEE PROPOSED DECISION
Proposed changes to Committee Proposed Decision issued October 26, 2018, to be considered at the November 7, 2018, Business Meeting
2 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22580911/5/2018 Proposed Commission Adoption Order
For consideration at the November 7, 2018, Business Meeting
3 page(s)
 CEC/DocketsEnergy Commission Hearing Office
22579311/2/2018 Staff's Suggested Errata to Committee's Proposed Decision

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22511510/26/2018 Letter to John Laird and Michael Picker
Transmittal document for the Committee Proposed Decision to the Secretary for Natural Resources and the President of the California Public Utilities Commission
1 page(s)
 California Natural Resources Agency/John Laird and California Public Utilities Commission/Michael PickerEnergy Commission Hearing Office
22511410/26/2018 Notice of Availability of Committee Proposed Decision and Notice of Business Meeting
The Committee Proposed Decision will be considered at the November 7, 2018, Business Meeting, beginning at 10:00 a.m.
3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22511210/26/2018 Committee Proposed Decision
Recommends that the Energy Commission make findings under the California Environmental Quality Act and grant a Small Power Plant Exemption
357 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
22510810/26/2018 Transcript of the 10-10-2018 Committee Status Conference

49 page(s)
 CEC/DocketsCalifornia Energy Commission
22505510/22/2018 VDC's Response to Helping Hand Tools Additional Testimony and Proposed Exhibits

Air Quality, Facility Design, Project Description
5 page(s)
 CEC/DocketsDayZenLLC
22501410/17/2018 Supplemental Testimony of Robert Sarvey for Helping Hand Tools (2HT)
Exhibit 307 McLaren staus conferenence additional testimony 10-16-18
Air Quality
8 page(s)
307CEC/Docket UnitRobert Sarvey
22500810/17/2018 McLaren Data Center Rosedine PUE determination v6 letter
McLaren Data Center Exhibit 309 Rosedine PUE determination V6
Efficiency
2 page(s)
309DPR/Scott ChappelleRobert Sarvey
22500710/17/2018 Rosedine V5 PUE determination letter
McLaren Data Center Exhibit 308 Rosedine V5 PUE determination
Efficiency
2 page(s)
308Truebeck Construction/Cory KellerRobert Sarvey
22497510/12/2018 Orders after October 10 2018 Status Conference
Full title: Orders on Motions to Dismiss, to Amend Procedural Schedule, and to Strike Testimony; Order Granting Helping Hand Tools Additional Time to File Testimony; and Revised Schedule
4 page(s)
 Parties and Interested PersonsEnergy Commission Hearing Office
22493810/10/2018 Memo Regarding Staff Transcript Corrections

2 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
22491310/8/2018 McLaren Data Center Motion to Strike applicants October 5 testimony.
McLaren Data Center Motion to Strike applicants October 5 testimony.
Air Quality
2 page(s)
 CEC/DocketsRobert Sarvey
22491210/5/2018 Helping Hand Tools response to Commitee Notice of Status Conference and Further Orders - 9-28-18
McLaren Data Center response to commitee 9-28-18 order 2HT
Air Quality, Alternatives
7 page(s)
 CEC/Docket UnitRobert Sarvey
22491110/5/2018 Attachment 1 to 2HT 10-5-18 Helping Hand Tools Response to Committee Notice of Status Conference and Further Orders
Attachment 1 Helping Hand Tools Response to Committee Notice of Status Conference and Further Orders
Air Quality
6 page(s)
 CEC/Docket UnitRobert Sarvey
22490910/5/2018 ENERGY COMMISSION STAFF’S ISSUES STATEMENT
Notice of Order
13 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22489710/5/2018 VDC's Response Package to Committee Order
VDC's Response Package to Committee Order Questions related to Generating Capacity and Air Quality
Air Quality, Project Description
49 page(s)
 CEC/DocketsDayZenLLC
22489610/5/2018 VDC's Supplemental Project Description Testimony
Supplemental Project Description Testimony of Michael Stoner and Spencer Myers in Response to Committee Order Generating Capacity Question 3
Project Description
1 page(s)
31CEC/DocketsDayZenLLC
22489510/5/2018 VDC's Supplemental Air Quality Testimony
VDC's Supplemental Testimony of Dr. Shari Beth Libicki in Response to Committee Order Air Quality Question 1
Air Quality
1 page(s)
34CEC/DocketsDayZenLLC
22488410/4/2018 Executive Director's Jurisdictional Determination Vantage

Facility Design, Project Description
2 page(s)
30CEC/DocketsDayZenLLC
22488310/4/2018 SVP Letter to Vantage 10-4-18

Facility Design, Project Description
1 page(s)
33CEC/DocketsDayZenLLC
22488210/4/2018 SVP Vantage Electricity Supply Agreement

Facility Design, Project Description
1 page(s)
32CEC/DocketsDayZenLLC
2248229/28/2018 Notice of Status Conference and Further Orders
Status Conference to be held on October 10, 2018, at 10:00 a.m. in Sacramento.
9 page(s)
 CEC/DocketsEnergy Commission Hearing Office
2247939/25/2018 Transcript of the 8/30/2018 Prehearing Conference and Evidentiary Hearing

122 page(s)
 CEC/DocketsCalifornia Energy Commission
2247269/14/2018 Order Extending Time to Rule on Motions to Dismiss and To Amend Procedural Schedule
Extends Committee time to rule on the pending motions to October 12, 2018
3 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2246829/11/2018 McLaren Data Center Request for Offical Notice Melissa Jones.pdf
Request for Official Notice of April 22, 2008 letter from Melissa Jones to W. Cantrell
Air Quality
4 page(s)
306CEC/DocketsRobert Sarvey
2246819/10/2018 Closing Argument of Helping Hand Tools (2HT)

Air Quality
15 page(s)
 CEC/Docket UnitRobert Sarvey
2246629/7/2018 Comments of Helping Hand Tools (2HT)
McLaren Data Center Evidentiary hearing comments 9-7-18.
Air Quality
12 page(s)
 CEC/Docket UnitRobert Sarvey
2246619/7/2018 Memo from the Hearing Officer re Closing ArgumentFinal Statment
Providing a deadline of September 10, 2018, for closing arguments/final statements
2 page(s)
 CEC/DocketsEnergy Commission Hearing Office
2246378/29/2018 Staff Response to Committee Questions

5 page(s)
205CEC/Docket UnitCalifornia Energy Commission
2246368/29/2018 Helping Hand Tools Response to Committee questions

Air Quality
4 page(s)
305CEC/Docket UnitRobert Sarvey/Helping Hand Tools
2246278/29/2018 Vantage Data Centers Response to Committee Questions 8-29-18

Air Quality, Public Health
5 page(s)
27CEC/Docket UnitDayZenLLC
2246268/29/2018 McLaren Data Center Revised pre hearing confernce statemnt to include exhibit number
Revised pre hearing conference statement to add exhibit numbers All changes listed in Red which are just adding exhibit numbers.
Air Quality
3 page(s)
  Robert Sarvey
2246208/28/2018 Committee Questions for Evidentiary Hearing
Memo from the Hearing Officer regarding additional information sought for evidentiary hearing on August 30, 2018
2 page(s)
 All Parties and Interested PersonsEnergy Commission Hearing Office
2245548/21/2018 Mclaren Evidentiary Hearing Declarations and Resumes of Energy Commission Staff

65 page(s)
204CEC/Docket UnitCalifornia Energy Commission
2245428/20/2018 Order Regarding Motions - Revised Agenda
Thursday, August 30, 2018 1:00 p.m. California Energy Commission Charles Imbrecht Room (Hearing Room B) 1516 Ninth Street Sacramento, CA 95814
6 page(s)
 CEC/Docket UnitEnergy Commission Hearing Office
2245398/20/2018 Prehearing Conference Statement of Helping Hand Tools (2HT)

Air Quality, Efficiency, Project Description, Public Health
3 page(s)
 CEC/Docket UnitHelping Hand Tools/Robert Sarvey
2245368/20/2018 REPLY TESTIMONY OF ROBERT SARVEY FOR HELPING HAND TOOLS
Reply testimony
8 page(s)
300CEC/Docket UnitRobert Sarvey
2245358/20/2018 Vantage Data Centers' PreHearing Conference Statement and Exhibit List

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
7 page(s)
 CEC/Docket UnitDayZenLLC
2245348/20/2018 Energy Commission Staff's Prehearing Conference Statement

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2245328/20/2018 Revised Response to Comment CC-2
See TN 224479 for Staff's Response to Comment CC-2
8 page(s)
203CEC/DocketsCalifornia Energy Commission
2245308/20/2018 VDC's Rebuttal Testimony Package for the MBGF SPPE Application

Air Quality, Project Description, Public Health
1 page(s)
29CEC/DocketsDayZenLLC
2245268/20/2018 Santa Clara Data Center Energy Cosmmission Decision
CEC Final Decision Santa Clara Data Center
Air Quality
141 page(s)
304CEC/DocketsRobert Sarvey
2245258/20/2018 Sarvey Reply Testimony Attachemnt 3 Technical Support Document for the Third Tier Petition for Microsoft Columbia Data Center Ex
Technical Support Document for the Third Tier Petition for Microsoft Columbia Data Center Expansion Project Quincy, Washington August 20, 2010
Air Quality
38 page(s)
303 Robert Sarvey
2245248/20/2018 Sarvey Rebbutal testimony attachment 2 Microsoft data Center Enginerring Evfaluation Center
Engineering Evaluation Microsoft Data Center Santa Clara
Air Quality
9 page(s)
302CEC/DocketsRobert Sarvey
2245238/20/2018 Revised Health Impact Assessment Review Document for Vantage Data Center Quincy, Washington
Sarvey Rebuttal Testimony Attachment 1 Revised Health Impact Assessment Review Document for Vantage Data Center Quincy, Washington
Air Quality
25 page(s)
301CEC/DocketsRobert Sarvey
2244798/13/2018 Staff's Response to Comments, Response to Motion to Dismiss, Response to Motion for New Schedule
See TN 224532 for Revised Response to Comment CC-2 with augmented map and corrected figure citations.
30 page(s)
202CEC/Docket UnitCalifornia Energy Commission
2244758/11/2018 VDC's Opening Testimony Package for the MBGF Application For SPPE

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
14 page(s)
28CEC/DocketsDayZenLLC
2244608/10/2018 MOTION OF HELPING HAND TOOLS (2HT) TO AMEND THE PROCEDURAL SCHEDULE
motion
Air Quality
2 page(s)
 CEC/DocketsRobert Sarvey
2244508/8/2018 Data Clarification Questions And Responses For The McLaren Backup Generation Facility SPPE Application Review
Response to Comments on Air Quality and Public Health Issues
30 page(s)
201CEC/Karen Douglas and Janea ScottCalifornia Energy Commission
2244118/6/2018 Vantage Data Centers Opposition to Helping Hand Tools Motion to Dismiss

Project Description
3 page(s)
26CEC/DocketsDayZenLLC
2244028/3/2018 Motion of Helping Hand Tools to Dismiss the Proceeding
2HT Motion to dismiss application
Alternatives
3 page(s)
 CEC/Docket UnitRobert Sarvey
2243748/2/2018 Memo - Updated Scheduling Information Regarding the McLaren Backup Generation Facility - Response to Applicant's Statement
Updated scheduling information regarding the McLaren Backup Generation Facility SPPE application review; Response to Applicant's Statement
2 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2242967/25/2018 Clean Coalition Comments on McLaren Initial Study and Mitigated Neg Dec

8 page(s)
 CEC/Docket UnitClean Coalition
2242907/24/2018 Clean Coalition Comments on Initial Study and Mitigated Neg Dec

Air Quality, Alternatives, Public Health
8 page(s)
 CEC/Docket UnitClean Coalition
2242847/24/2018 COMMENTS OF HELPING HAND TOOLS (2HT) ON CEC STAFF’S INITIAL STUDY

Air Quality, Alternatives, Efficiency, Socioeconomics, Greenhouse Gases
6 page(s)
 CEC Staff and CommissionersRobert Sarvey
2242377/23/2018 Notice of Prehearing Conference, Evidentiary Hearing, Scheduling Order, and Further Order

9 page(s)
 CEC/DocketsCalifornia Energy Commission
2241707/13/2018 Vantage Data Center's Comments on the ISMND and Response to Committee Memorandum Dated July 5, 2018

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
1 page(s)
25CEC/Docket UnitDayZenLLC
224079-17/6/2018 Email from City of Santa Clara Regarding Comment to Committee Mitigation for City Approval
With attached comment letter from Matt Braun
1 page(s)
 CEC/Docket UnitCity of Santa Clara
224079-27/6/2018 Cultural Resources Mitigation Measures
Attachment to Email
4 page(s)
 CEC/Docket UnitCity of Santa Clara
2240597/5/2018 Memorandum re Proposed Mitigation Measures
Memorandum from the Hearing Officer seeking input on the changes proposed to the mitigation measures and new mitigation measures in the Initial Study and Mitigated Negative Declaration
1 page(s)
 All Parties and Persons Interested in the McLaren Backup Generating Facility SPPEEnergy Commission Hearing Office
2239116/22/2018 McLaren Data Center Project Initial Study and Proposed Mitigated Negative Declaration
Initial Study
328 page(s)
200CEC/Docket UnitCalifornia Energy Commission
2239106/22/2018 Notice of Intent to Adopt a Mitigated Negative Declaration and Recommend a Small Power Plant Exemption
Notice of Intent
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237736/11/2018 Data Clarification Questions and Responses for the McLaren Backup Generation Facility SPPE Application Review

3 page(s)
24CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2237696/11/2018 Vantage Data Center's Revised N02 Modeling Report for McLaren Backup Generating Facility
McLaren Data Center: Air Dispersion Modeling Report for One-Hour N02 CAAQS and NAAQS
Air Quality
43 page(s)
23CEC/Docket UnitDayZen LLC
2237446/8/2018 Compilation of data clarification questions and responses for the McLaren Backup Generation Facility SPPE application review
Staff's review of the McLaren SPPE application
15 page(s)
22CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2236616/4/2018 Updated Joint Schedule the Mclaren Backup Generation Facility SPPE Application Review
The proposed joint schedule reflects agreement between staff and the applicant, while providing adequate time for public participation.
2 page(s)
 CEC/Karen Douglas, Janea Scott and Susan CochranCalifornia Energy Commission
2234845/21/2018 Vantage Data Center's Revised SPPE Application for McLaren Backup Generaring Facility - Air Quality and Public Health

Air Quality
154 page(s)
21CEC/Docket UnitDayZen LLC
2234835/21/2018 Vantage Data Center's Revised SPPE Application for McLaren Backup Generating Facility

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
38 page(s)
20CEC/Docket UnitDayZen LLC
2234385/14/2018 Memorandum Assigning Hearing Officer
Memorandum from Chair Weisenmiller appointing Susan Cochran as Hearing Officer
1 page(s)
 CEC/All CommissionersEnergy Commission Hearing Office
2232914/30/2018 Order Granting Petition to Intervene
Order Granting Petition of Helping Hand Tools to Intervene in Small Power Plant Exemption proceedings
Air Quality, Alternatives, Biological Resources, Public Health, Reliability
3 page(s)
 CEC/DocketsEnergy Commission Hearing Office
2231624/9/2018 Email to Parties re Deadline to Respond to Petition to Intervene
Email forwarded from Hearing Officer Celli to parties regarding the April 23, 2018 deadline to respond to Helping Hand Tools' Petition to Intervene.
Air Quality, Alternatives, Biological Resources, Public Health, Reliability
2 page(s)
 All PartiesEnergy Commission Hearing Office
2231584/9/2018 rob simpson Comments petition to intervene

3 page(s)
 cec/docketsrob simpson
2230213/22/2018 Vantage Data Center's NWIC Records Search Results for MBGF
Email
Cultural Resources
6 page(s)
19Jennifer RenkDayZen LLC
2229043/6/2018 Vantage Data Center's Application for Confidential Designation - Cultural Resources
Confidential documents are NWIC Records Search Results for cultural resources and sites.
3 page(s)
 CEC/Drew BohanDayZen LLC
2227242/26/2018 Email re schedule change
Email from Applicant's counsel to hearing officer and reply regarding equipment change and schedule delay
1 page(s)
 Hearing Officer/Applicant's counselEnergy Commission Hearing Office
2226812/22/2018 General Orders Regarding Motions, Electronic Filing, Service of Documents, and Other Matters

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2226122/20/2018 Updated Scheduling Information Regarding the McLaren Backup Generation Facility SPPE Application Review
Scheduling Information
2 page(s)
 CEC/Karen Douglas, Janea Scott and Ken CelliCalifornia Energy Commission
2225602/14/2018 McLaren SPPE Letters Notifying Elected Officials
Vantage Data Centers proposes to deploy 48 diesel-fueled generators with a total backup generation capacity of up to 98.7 megawatts (MW), which would allow the McLaren Data Center (MDC) to provide an uninterruptible power supply for its servers. The MDC is currently being constructed at 651, 725, and 825 Mathew Street in Santa Clara, California
14 page(s)
 Various Elected OfficialsCalifornia Energy Commission
2224742/8/2018 Vantage Data Center's Supplemental Response to CEC Staff DR2 and DR23

Air Quality
3 page(s)
18CEC/DocketsDayZen LLC
2224472/5/2018 Vantage Data Center's Response to CEC Staff DR Set No.1 (1-34)

Air Quality, Biological Resources, Cultural Resources, Land Use, Greenhouse Gases
56 page(s)
17CEC/DocketsDayZen LLC
2223811/26/2018 Vantage Data Center's Proposed SPPE Schedule for McLaren Backup Generating Facility

3 page(s)
 CEC/Docket UnitDayZen LLC
2223801/26/2018 Memo Regarding Scheduling for McLaren Backup Generation Facility SPPE Application
Scheduling for McLaren Backup Generation Facility SPPE Application
2 page(s)
 CEC/Karen Douglas, Janea Scott and Ken CelliCalifornia Energy Commission
2223641/25/2018 Letter to Scott Galati Regarding Data Request Set #1 for McLaren Backup Generating Facility

Air Quality, Biological Resources, Cultural Resources, Land Use
19 page(s)
 Scott GalatiCalifornia Energy Commission
2223371/23/2018 Letter from Native American Heritage Commission Sacred Lands File
Completed Sacred Lands File Search for Records - Cultural Resources Letter to Matt Braun, CEC from Frank Lienert, AGPA NAHC
Cultural Resources
2 page(s)
 CEC/Matt BraunNative American Heritage Commission
2223361/23/2018 Letter to Honorable Chairperson Katherine Erolina Perez re Invitation to Participate in CEC Consultation
Letter -McLaren Data Center and McLaren Backup Generating Facility (17-SPPE-01 Invitation to Participate in California Energy Commission Consultation
Cultural Resources
2 page(s)
 Honorable Chairperson Katherine Erolina Perez/Northern Valley Yokuts TribeCalifornia Energy Commission
2223261/22/2018 Memo re Scheduling for the McLaren Backup Generation Facility SPPE application
Memorandum to the parties requesting submission of their proposed schedules by Friday, January 26, 2018.
1 page(s)
 All PartiesEnergy Commission Hearing Office
2222861/19/2018 Order Establishing Committee
Order No: 18-0117-2a
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2221551/17/2018 CEC Letters Regarding Tribal Consultation
Tribal Consultation Letters
26 page(s)
 Various TribesCalifornia Energy Commission
2221321/11/2018 Notice of Receipt of an Application for a Small Power Plant Exemption for McLaren Backup Generating Facility (17-SPPE-01)

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2221311/11/2018 Request for Agency Participation in the Review of the McLaren Backup Generating Facility (17-SPPE-01)

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2221041/8/2018 Air Quality Technical Report Replacement for MBGF Application for SPPE - Appendix E-1

Air Quality
49 page(s)
16CEC/DocketsDayZen LLC
2220971/5/2018 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix E-2 Part 2

148 page(s)
15CEC/Docket UnitDayZen LLC
222096-11/5/2018 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix E-2_Part 1

65 page(s)
14CEC/DocketsDayZen LLC
22205712/26/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 1
*** THIS DOCUMENT SUPERSEDES TN 222041-2 *** - This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
413 page(s)
3CEC/Docket UnitDayZen LLC
222041-112/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix A
This document is Appendix A of the SPPE application, and provides specs for the diesel generators.
15 page(s)
2CEC/DocketsDayZen LLC
222041-212/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 1
*** THIS DOCUMENT IS REPLACED BY 222057 ***
428 page(s)
 CEC/DocketsDayZen LLC
222041-312/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 2
- This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
1098 page(s)
4CEC/DocketsDayZen LLC
222041-412/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 3
- This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
64 page(s)
5CEC/DocketsDayZen LLC
222041-512/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 4
- This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
647 page(s)
6CEC/DocketsDayZen LLC
222041-612/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 5
- This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
209 page(s)
7CEC/DocketsDayZen LLC
222041-712/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix B Part 6
- This document is the City of Santa Clara’s Feb. 2017 IS/MND is docketed as TN 222041-2 through TN 222041-7.
310 page(s)
8CEC/DocketsDayZen LLC
222041-812/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix C Part 1
TN 222041-8 and 9 are Appendix C of the SPPE application, consisting of drawings of the proposed site plan.
5 page(s)
9CEC/DocketsDayZen LLC
222041-912/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix C Part 2
TN 222041-8 and 9 are Appendix C of the SPPE application, consisting of drawings of the proposed site plan.
6 page(s)
10CEC/DocketsDayZen LLC
222041-1012/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix D
This document is Appendix D of the SPPE application, the Spill Control plan.
132 page(s)
11CEC/DocketsDayZen LLC
222041-1112/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix E
This document is Appendix E of the SPPE application, the backup documents for the Air Quality analysis associated with the updated project description.
141 page(s)
12CEC/DocketsDayZen LLC
222041-1212/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility - Appendix F
This document is Appendix F of the SPPE application, the thermal plume technical report associated with the updated project description.
27 page(s)
13CEC/DocketsDayZen LLC
222041-1312/21/2017 Application for Small Power Plant Exemption for McLaren Backup Generating Facility
This is the main application, absent appendices.
87 page(s)
1 DayZen LLC
22203812/21/2017 Memo to Open Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission