216200 | 2/23/2017 |
Appendix B of RETI 2.0 Final Plenary Report Supersedes TN 216196 10 page(s)
| | | California Energy Commission |
216198 | 2/23/2017 |
RETI 2.0 Final Plenary Report
69 page(s)
| | | California Energy Commission |
216197 | 2/23/2017 |
Appendix A of RETI 2.0 Final Plenary Report Transmission Assessment Focus Area Information 59 page(s)
| | | California Energy Commission |
216196 | 2/23/2017 |
Appendix B of RETI 2.0 Final Plenary Report This document is superseded by TN 216200. 10 page(s)
| | | California Energy Commission |
215777 | 2/6/2017 |
Supplemental Comments of the California Municipal Utilities Association
4 page(s)
| | CEC/Docket Unit | California Municipal Utilities Association |
215321 | 1/13/2017 |
Noah Youngelson Comments: Comment on Western Transmission Expansion
1 page(s)
| | CEC/Docket Unit | Noah Youngelson |
215270 | 1/12/2017 |
Bay Area Municipal Transmission Group’s Comments on the Renewable Energy Transmission Initiative 2.0 Plenary Report
5 page(s)
| | | Bay Area Municipal Transmission Group |
215261 | 1/11/2017 |
National Renewable Energy Laboratory Comments: On RETI 2.0 Plenary Report *** THIS DOCUMENT SUPERSEDES TN 215232 *** 7 page(s)
| | CEC/Docket Unit | National Renewable Energy Laboratory |
215235 | 1/11/2017 |
Comments from TANC on the RETI 2.0 Plenary Group Report-Public Review Draft
3 page(s)
| | CEC/Docket Unit | Transmission Agency of Northern California |
215234 | 1/11/2017 |
California Department of Fish and Wildlife Comments: Comment on RETI 2.0 Plenary Report *** This Document Supersedes TN 215230 *** 3 page(s)
| | CEC/Docket Unit | California Department of Fish and Wildlife |
215232 | 1/11/2017 |
Renewable Energy Laboratory Comments: On RETI 2.0 Plenary Report *** THIS DOCUMENT IS REPLACED BY TN 215261 *** 7 page(s)
| | CEC/Docket Unit | Renewable Energy Laboratory |
215231 | 1/11/2017 |
County of Imperial Comments: On Draft RETI 2.0 Plenary Report
3 page(s)
| | CEC/Robert Weisenmiller | County of Imperial |
215230 | 1/11/2017 |
Comment from the Department of Fish and Wildlife *** This document has been replaced by TN 215234 *** 3 page(s)
| | CEC/Docket Unit | California Department of Fish and Wildlife/Armand Gonzales |
215229 | 1/11/2017 |
Black Forest Partners Comments on RETI 2.0 draft Plenary Group Report
3 page(s)
| | CEC/Docket Unit | Black Forest Partners/Doug Patterson |
215228 | 1/11/2017 |
Clean Coalition Comments on RETI 2.0 Plenary Report
7 page(s)
| | CEC/Docket Unit | Clean Coalition |
215227 | 1/11/2017 |
Morongo Basin Conservation Association Comments: MBCA RETI 2.0 Comments 11017
4 page(s)
| | CEC/Docket Unit | Morongo Basin Conservation Association/Pat Flanagan |
215225 | 1/11/2017 |
LS Power Comments: RETI Draft Plenary Report - LS Power comments
4 page(s)
| | CEC/Docket Unit | LS Power |
215224 | 1/10/2017 |
San Diego Gas & Electric Comments on RETI 2.0 Plenary Report
3 page(s)
| | CEC/Docket Unit | San Diego Gas & Electric |
215223 | 1/10/2017 |
Smart Wires, Inc. Comments on the January 3, 2017 RETI 2.0 Plenary Group Meeting and Draft Report
4 page(s)
| | CEC/Docket Unit | Smart Wires |
215222 | 1/10/2017 |
Large-scale Solar Association Comments on RETI 2.0 Plenary Report - Public Review Draft
3 page(s)
| | CEC/Docket Unit | Large-scale Solar Association/Danielle Mills |
215221 | 1/10/2017 |
CalWEA Comments on RETI 2.0 Draft Plenary Report
7 page(s)
| | CEC/Docket Unit | California Wind Energy Association (CalWEA)/Nancy Rader |
215220 | 1/10/2017 |
California Municipal Utilities Association Comments: on the Meeting regarding the Renewable Energy Transmission Initiative 2.0 Plenary Report
4 page(s)
| | CEC/Docket Unit | California Municipal Utilities Association |
215219 | 1/10/2017 |
NRDC Comments: On NRDC on Renewable Energy Transmission Initiative 2.0 Plenary Report - Public Review Draft
3 page(s)
| | CEC/Docket Unit | NRDC |
215218 | 1/10/2017 |
Pacific Gas & Electric Comments: PG&E Comments on RETI 2.0 Final Draft Report
3 page(s)
| | | Pacific Gas & Electric |
215216 | 1/10/2017 |
TransCanyon Comments on RETI 2.0 Plenary Report
8 page(s)
| | CEC/Docket Unit | TransCanyon |
215215 | 1/10/2017 |
Coalition of High Desert Groups and Citizens Comments: Plenary Group Report
15 page(s)
| | CEC/Robert Weisenmiller and CPUC/Michael Picker | Coalition of High Desert Groups and Citizens |
215214 | 1/10/2017 |
Ormat Technologies Inc. comments on RETI 2.0 Plenary Report
4 page(s)
| | CEC/Docket Unit | Ormat Technologies, Inc. |
215213 | 1/10/2017 |
Center for Biological Diversity comments on RETI2 Draft Plenary Report
3 page(s)
| | CEC/Docket Unit | Center for Biological Diversity/Ileene Anderson |
215210 | 1/10/2017 |
ITC Grid Development/Brian Studenka Comments: ITC Grid Development's Comments on Draft RETI 2.0 Plenary Report
1 page(s)
| | CEC/Docket Unit | ITC Grid Development/Brian Studenka |
215209 | 1/10/2017 |
Joel VanderWerf Comments: Solar rooftops and desert preservation
1 page(s)
| | CEC/Docket Unit | Joel VanderWerf |
215207 | 1/10/2017 |
TransWest Express' Comments on Draft RETI 2.0 Plenary Group Report
8 page(s)
| | CEC/Docket Unit | TransWest Express LLC/David F. Smith |
215206 | 1/10/2017 |
Basin and Range Watch Comments on RETI 2.0
1 page(s)
| | CEC/Docket Unit | Basin and Range Watch |
215205 | 1/10/2017 |
Conservation Organizations' comments on RETI 2.0 Plenary Report Conservation Organizations are: The Nature Conservancy, Defenders of Wildlife, Sierra Club, Natural Resources Defense Council, and Audubon California 24 page(s)
| | CEC/Docket Unit | Conservation Organizations/Erica Brand |
215204 | 1/10/2017 |
Southwest Transmission Partners Draft Plenary Report Comments
6 page(s)
| | CEC/Docket Unit | Southwest Transmission Partners |
215202 | 1/9/2017 |
Imperial Irrigation District Comments on Renewable Energy Transmission Initiative
3 page(s)
| | CEC/Robert Weisenmiller | Imperial Irrigation District |
215195 | 1/9/2017 |
WebEx Recording for Plenary Webinar and Meeting 1-3-17
| | | California Energy Commission |
215194 | 1/9/2017 |
Terry Frewin Comments: Renewable Energy Transmission Initiative 2.0
1 page(s)
| | CEC/Docket Unit | Terry Frewin |
215193 | 1/9/2017 |
Parke Ewing Comments: Small Nuclear Reactors
1 page(s)
| | CEC/Docket Unit | Parke Ewing |
215192 | 1/9/2017 |
Parke Ewing Comments: Reduce the footprint go rooftop solar
1 page(s)
| | CEC/Docket Unit | Parke Ewing |
215191 | 1/9/2017 |
Parke Ewing Comments: No more towers through Ocotillo
1 page(s)
| | CEC/Docket Unit | Parke Ewing |
215184 | 1/6/2017 |
Janet Westbrook Comments: Transmission lines for renewable energy
1 page(s)
| | CEC/Docket Unit | Janet Westbrook |
215183 | 1/6/2017 |
Katie Fite Comments: RETI 2 TAFAS and HSR
1 page(s)
| | CEC/Docket Unit | Katie Fite |
215182 | 1/6/2017 |
Jamaka Petzak Comments: RE: Docket #15-RETI-02
1 page(s)
| | CEC/Docket Unit | Jamaka Petzak |
215181 | 1/6/2017 |
Ellen Schafhauser Comments: Distributed Power Generation
1 page(s)
| | CEC/Docket Unit | Ellen Schafhauser |
215134 | 1/3/2017 |
Presentation - Draft Plenary Report for January 1, 2017 Webinar and Meeting Presentation is by State of California Resources Agency; California Public Utilities Commission, California Energy Commission and California ISO 32 page(s)
| | CEC/Docket Unit | California Energy Commission |
215109 | 12/27/2016 |
Agenda for the Renewable Energy Transmission Initiative (RETI) 2.0 - Plenary Group Meeting/Webinar on 1/3/17
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214835 | 12/16/2016 |
Renewable Energy Transmission Initiative 2.0 RETI 2.0 Plenary Report - Public Review Draft 60 page(s)
| | | California Energy Commission |
214834 | 12/16/2016 |
Appendix A. Transmission Assessment Focus Area Information
58 page(s)
| | | California Energy Commission |
214833 | 12/16/2016 |
Notice of Webinar and Meeting RE Renewable Energy Transmission Initiative 2.0 Tuesday, January 3, 2017 1:00 p.m. to 3:00 p.m. 5 page(s)
| | | California Energy Commission |
214525 | 11/18/2016 |
Postpone RETI 2.0 Plenary Group Presentation on November 22, 2016 *** THIS DOCUMENT SUPERSEDES TN 214482 *** 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
214485 | 11/14/2016 |
Letter to RETI 2.0 Leadership Team 11/14/2016
7 page(s)
| | CEC/Michael Picket, John Laird, Robert Weisenmiller, Stephen Berberich, and Jerome Perez | California Energy Commission |
214482 | 11/14/2016 |
Notice of RETI 2.0 Plenary Group Presentation - November 22, 2016 *** THIS DOCUMENT HAS BEEN REPLACED BY TN 214525 *** 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
214445 | 11/9/2016 |
Environmental and Land Use Information to Support the Renewable Energy Transmission Initiative (RETI) 2.0 Process Final Report of the RETI 2.0 Environmental and Land Use Technical Group 53 page(s)
| | CEC/Docket Unit | California Energy Commission |
214382 | 11/7/2016 |
CTC Global Corporation Comments: Comments on RETI 2.0 Transmission Capability and Requirements Report
3 page(s)
| | CEC/Commissioners | CTC Global Corporation |
214339 | 11/2/2016 |
RETI 2.0 Western Outreach Project Report *** THIS DOCUMENT SUPERSEDES TN 214121 *** - October 28, 2016 Revised Version, Prepared by Western Interstate Energy Board with technical support from Energy
Strategies LLC 92 page(s)
| | CEC/Docket Unit | California Energy Commission |
214168 | 10/25/2016 |
Transmission Capability and Requirements Report Final Report, RETI 2.0 Transmission Technical Input Group 85 page(s)
| | CEC/Docket Unit | California Energy Commission |
214121 | 10/21/2016 |
RETI 2.0 Western Outreach Project Report *** THIS DOCUMENT IS REPLACED BY TN 214339 *** 90 page(s)
| | | Western Interstate Energy Board with technical support from Energy Strategies LLC |
213617 | 9/12/2016 |
Western Outreach - VEA Comments
5 page(s)
| | | Valley Electric Association, Inc. |
213616 | 9/12/2016 |
Transcript of 08/15/16 Renewable Energy Transmission Initiative 2.0 Joint Agency Workshop
121 page(s)
| | CEC/Docket Unit | California Energy Commission |
213596 | 9/9/2016 |
LS Power Comments: Western Outreach workshops - LS Power comments
4 page(s)
| | CEC/Docket Unit | LS Power/SANDEEP ARORA |
213507 | 9/6/2016 |
Workshop Intro Slides RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 10 page(s)
| | CEC/Docket Unit | California Energy Commission |
213506 | 9/6/2016 |
Panel 1 Presentation - Western Outreach Project By Brian Turner - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 17 page(s)
| | CEC/Docket Unit | California Natural Resources Agency, California Energy Commission, CPUC and California ISO |
213505 | 9/6/2016 |
Panel 1 Presentation - RETI 2.0 Western Outreach Workshop By David Hurlbut - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 20 page(s)
| | CEC/Docket Unit | National Renewable Energy Laboratory (NREL) |
213504 | 9/6/2016 |
Panel 1 Presentation - Nevada: Renewable Energy Demand, Supply, and Exportation By Angie Dykema - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 9 page(s)
| | CEC/Docket Unit | Governor's Office of Energy |
213503 | 9/6/2016 |
Panel 1 Presentation - RETI 2.0 Plenary Meeting By Josh Norquist - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 10 page(s)
| | CEC/Docket Unit | Ormat Nevada, Inc. |
213502 | 9/6/2016 |
Panel 1 Presentation - RETI 2Western Outreach Las Vegas Workshop By Michael Wong - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 10 page(s)
| | CEC/Docket Unit | E.ON Climate & Renewables North America, LLC |
213501 | 9/6/2016 |
Panel 2 Presentation - Initiation of Periodic Regional Reviews By - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 20 page(s)
| | CEC/Docket Unit | BLM Washington Office |
213500 | 9/6/2016 |
Panel 3 Presentation - Zephyr Power Transmission Project By Bill Hosie - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 12 page(s)
| | CEC/Docket Unit | Duke American Transmission Co. |
213499 | 9/6/2016 |
Panel 3 Presentation - RETI 2.0 Western Outreach Project By Doug Fant - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 20 page(s)
| | CEC/Docket Unit | Sun Zia |
213498 | 9/6/2016 |
Panel 3 Presentation - Clean Energy. Delivered. By Keith Sparks - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 11 page(s)
| | CEC/Docket Unit | Clean Line Energy Partners |
213497 | 9/6/2016 |
Panel 3 Presentation - RETI 2.0 Western Outreach Workshop By Doug Patterson - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 14 page(s)
| | CEC/Docket Unit | Southline Transmission Project |
213496 | 9/6/2016 |
Panel 3 Presentation - HVDC Conversion of Southwest Powerlink By John Jontry and Huang Lin - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 7 page(s)
| | CEC/Docket Unit | SDG&E |
213495 | 9/6/2016 |
Panel 2 Presentation - RETI 2.0 Western Outreach By Patrick Harwood - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 10 page(s)
| | CEC/Docket Unit | Western Area Power Administration |
213494 | 9/6/2016 |
Panel 2 Presentation - Understanding Impacts of Greater Renewable Development & Coal Plant Reitrements on Neighboring Systems By Ron Belval - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 13 page(s)
| | CEC/Docket Unit | Tucson Electric Power and Unisource Energy Services |
213493 | 9/6/2016 |
Panel 2 Presentation - California Renewable Energy Transmission Initiative Discussion By Walter Spansel - RETI 2.0 Western Outreach Project: Las Vegas Workshop 9-1-16 5 page(s)
| | CEC/Docket Unit | NV Energy |
213491 | 9/6/2016 |
RETI 2.0 Western Outreach Project Workshop Recordings 9-1-16
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
213490 | 9/6/2016 |
Revised agenda and focus questions for Las Vegas workshop 9-1-16 *** This document supersedes TN 213025 *** Final panel participants updated. 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
213484 | 9/6/2016 |
Alliance for Desert Preservation Comments: Regarding RETI 2.0
40 page(s)
| | CEC/Robert Weisenmiller and CPUC/Michael Picker | Alliance for Desert Preservation |
213025 | 8/30/2016 |
RETI 2 Western Outreach Las Vegas Workshop Agenda and Focus Questions *** This document is replaced by TN 213490 *** 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
213023 | 8/30/2016 |
SunPower Corporation Comments on the August 15, 2016 RETI 2.0 Joint Agency Workshop
3 page(s)
| | CEC/Docket Unit | SunPower Corporation/Alan Comnes |
213022 | 8/29/2016 |
LS Power Comments: RETI Joint Agency Workshop (Aug 15, 2016) – Docket 15-RETI-02
2 page(s)
| | CEC/Docket Unit | LS Power/Sandeep Arora |
213021 | 8/29/2016 |
Large-Scale Solar Association Comments on August 15, 2016 Joint Agency Workshop on RETI 2.0
4 page(s)
| | CEC/Docket Unit | Large-Scale Solar Association/Danielle Mills |
213020 | 8/29/2016 |
Conservation Parties Comments on August 15, 2016 RETI 2.0 Joint Agency Workshop
6 page(s)
| | CEC/Docket Unit | Conservation Parties |
213019 | 8/29/2016 |
Pacific Gas & Electric Comments on August 15 RETI 2.0 Workshop
3 page(s)
| | CEC/Docket Unit | Pacific Gas & Electric |
212926 | 8/24/2016 |
CTC Global Corporation Comments: on August 15th Joint Agency Workshop Report
5 page(s)
| | CEC/Commissioners | CTC Global Corporation |
212907 | 8/22/2016 |
WebEx Recording for TTIG Meeting 7-29-16
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212878 | 8/19/2016 |
Panel 3 presentation - Richard Vail RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | PacifiCorp |
212877 | 8/19/2016 |
Presentation - Workshop Overview RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | Western Interstate Energy Board |
212876 | 8/19/2016 |
Workshop Agenda and Focus Questions RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | Western Interstate Energy Board |
212875 | 8/19/2016 |
Panel 2 presentation - Kevin Harris RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 9 page(s)
| | | Columbia Grid |
212874 | 8/19/2016 |
Panel 3 presentation - Keegan Moyer RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 5 page(s)
| | | Energy Strategies for WEIB and Western Outreach Project |
212873 | 8/19/2016 |
Panel 3 presentation - David Smith RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | Anschutz |
212872 | 8/19/2016 |
Panel 3 presentation - Robert Smith RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 9 page(s)
| | | TransCanyon |
212871 | 8/19/2016 |
Panel 3 presentation - Sandeep Arora RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 13 page(s)
| | | Bringing Energy Forward |
212870 | 8/19/2016 |
Panel 2 presentation - John Fazio RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 11 page(s)
| | | RETI Western Outreach Project |
212869 | 8/19/2016 |
Panel 1 presentation - Tony Usibelli RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | Department of Commerce |
212868 | 8/19/2016 |
Panel 1 presentation - Cameron Yourkowski RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | Renewable North West for RETI Western Outreach Effort |
212867 | 8/19/2016 |
Panel 1 presentation - Rick Link RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16
| | | PacifiCorp |
212866 | 8/19/2016 |
Panel 2 presentation - The Exisiting System: Capacity, Constraints, and Current Trends RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 6 page(s)
| | | Bonneville Power Administration/ Anders Johnson |
212865 | 8/19/2016 |
Panel 1 Presentation - Overview of Renewables in WECC's 2026 Common Case RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 3 page(s)
| | | Western Interstate Energy Board/ Thomas Carr |
212864 | 8/19/2016 |
Panel 1 presentation - Western Outreach Project RETI 2.0 Western Outreach Project: Portland Workshop 8-12-16 16 page(s)
| | | California Natural Resources Agency/ Brian Turner |
212828 | 8/18/2016 |
WebEx Recording 8-15-16
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212803 | 8/16/2016 |
Presentation - Next Steps for RETI 2.0 - 8-15-16 by Brian Turner - Completing evaluation of TAFAs. Preparing conclusions and recommendations 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
212802 | 8/16/2016 |
Revised Presentation - Transmission Technical Input Group 8-15-16 Supersedes TN # 212772. Revised to correct a typographical error. 18 page(s)
| | CEC/Docket Unit | California Energy Commission |
212784 | 8/15/2016 |
RETI 2.0 - Invitation to Consult for Native American tribes
9 page(s)
| | 97 Native American Tribes | California Energy Commission |
212772 | 8/12/2016 |
Presentation - Transmission Technical Input Group 8-15-16 *** This document is replaced by TN 212802 *** 18 page(s)
| | CEC/Docket Unit | California Energy Commission |
212757 | 8/12/2016 |
Presentation - Environmental and Land Use Technical Group Presentation 8-15-16 By Scott Flint, Eli Harland and Tom Gates 22 page(s)
| | CEC/Docket Unit | California Energy Commission |
212750 | 8/11/2016 |
Presentation - RETI 2.0 Western Outreach Project By Thomas Carr and Keegan Moyer 7 page(s)
| | CEC/Docket Unit | Western Interstate Energy Board and Energy Strategies |
212749 | 8/11/2016 |
Presentation - Renewable Energy Transmission Initiative v2.0 - Joint Agency Workshop By Brian Turner 8-15-16 17 page(s)
| | CEC/Docket Unit | California Natural Resources Agency, California Energy Commission, CPUC, and California ISO |
212723 | 8/10/2016 |
Sandeep Arora Comments: RETI TTIG presentation on July 29
2 page(s)
| | | Sandeep Arora |
212679 | 8/8/2016 |
RETI 2.0 Western Outreach Project Workshops Notice
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
212676 | 8/8/2016 |
TransCanyon Comments: On RETI 2.0 Transmission Technical Input Group Meeting On July 29, 2016
3 page(s)
| | CEC/Docket Unit | TransCanyon |
212674 | 8/8/2016 |
Bay Area Municipal Transmission Group’s Comments on the Renewable Energy Transmission Initiative 2.0
7 page(s)
| | CEC/Docket Unit | Bay Area Municipal Transmission Group through Joyce Kinnear |
212672 | 8/8/2016 |
Smart Wires Comments on July 29 TTIG meeting
5 page(s)
| | CEC/Docket Unit | Smart Wires |
212653 | 8/5/2016 |
Conservation Parties Comments: Conservation Parties Comments on July 21 RETI 2.0 ELUWG County Meeting - Land Use
6 page(s)
| | | Conservation Parties |
212620 | 8/4/2016 |
Notice of Joint Agency Workshop 8/15/16
| | | California Energy Commission |
212595 | 8/2/2016 |
Cancellation of 8-3-16 Environmental and Land Use Group Meeting
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212509 | 7/29/2016 |
County of San Bernardino Comments Re: RETI 2.0
3 page(s)
| | Board of Commissioners | San Bernardino County, Governmental & Legislative Affairs |
212497 | 7/28/2016 |
Conservation Parties (Defenders of Wildlife, TNC, Sierra Club, CDB, Audubon) Comments on RETI 2.0 Environmental and Land Use T
| | | Conservation Parties |
212495 | 7/28/2016 |
Transmission Technical Input Group Update
29 page(s)
| | | California Energy Commission |
212492 | 7/28/2016 |
Agenda for the 7/29/16 Transmission Technical Input Group (TTIG) Meeting
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
212442 | 7/25/2016 |
Proposed Bioenergy Facilities and Status
2 page(s)
| | Brian Turner | Sierra Nevada Conservancy |
212387 | 7/22/2016 |
Notice of RETI 2.0 Environmental and Land Use Technical Group Meeting - August 3, 2016
| | | California Energy Commission |
212377 | 7/21/2016 |
Presentation by Scott Flint 7-21-16
| | | California Energy Commission |
212376 | 7/21/2016 |
Brian Turner Presentation for ELUTG County Workshop
| | | California Natural Resources Agency |
212370 | 7/20/2016 |
Imperial County Planning Grant Handout Imperial County Planning Grant Handout
| | | Imperial County |
212369 | 7/20/2016 |
Imperial County Presentation Imperial County Presentation
| | | Imperial County |
212366 | 7/20/2016 |
Agenda - Renewable Energy Transmission Initiative 2.0 Agenda and discussion questions for the July 21, 2016 Renewable Energy Transmission Initiative 2.0 Environmental and Land Use Technical Group county meeting
2 page(s)
| | | California Energy Commission |
212356 | 7/19/2016 |
Notice of RETI 2.0 Transmission Technical Input Group Meeting - July 29, 2016
| | | California Energy Commission |
212234 | 7/11/2016 |
Notice of Renewable Energy Transmission Initiative 2.0 Environmental and Land Use Technical Group Meeting Notice for RETI 2.0 ELUTG Meeting with California Counties 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
212117 | 7/5/2016 |
Revised Transmission Technical Input Group Interim Report *** THIS DOCUMENT SUPERSEDES TN 211864 and TN 211927. THE TITLE PAGE UPDATED TO DESCRIBE REVISIONS MADE *** - Existing and Planned Transmission Capability Information to Support the RETI 2.0 Process 53 page(s)
| | CEC/Docket Unit | California Energy Commission |
212059 | 7/1/2016 |
Presentation - Environmental and Land Use Technical Group Outreach to County Planning Agencies Presentation delivered via webinar with county planning staff. 32 page(s)
| | CEC/Docket Unit | California Energy Commission |
212005 | 6/28/2016 |
Imperial Irrigation District (IID) Comments on the June 9, 2016 Workshop
3 page(s)
| | CEC/Docket Unit | Imperial Irrigation District |
211992 | 6/27/2016 |
Kern County Planning & Natural Resources Comments: Request for Transmission Special Study Area - Solar
3 page(s)
| | CPUC/Michael Picker, CEC/Robert Weisenmiller, and California ISO/Richard Maullin | Kern County Planning & Natural Resources |
211976 | 6/24/2016 |
CTC Global Corporation Comments: on June 9th TTIG Workshop
3 page(s)
| | CEC/Docket Unit | CTC Global Corporation |
211963 | 6/23/2016 |
Smart Wires Inc. Comments on June 9 TTIG Meeting
39 page(s)
| | CEC/Docket Unit | Smart Wires Inc. |
211960 | 6/23/2016 |
California Dept. of Water Resources Comments for RETI 2.0 Transmission Technical Input Group Meeting
3 page(s)
| | CEC/Docket Unit | California Dept. of Water Resources |
211957 | 6/23/2016 |
Conservation Parties (Defenders of Wildlife, TNC, & Sierra Club Comments: Comments on RETI 2.0 Transmission Technical Input Group Meeting (June 9, 2016)
| | | Conservation Parties (Defenders of Wildlife, TNC, & Sierra Club |
211953 | 6/23/2016 |
Bay Area Municipal Transmission Group’s Comments on the Renewable Energy Transmission Initiative 2.0
8 page(s)
| | CEC/Docket Unit | Bay Area Municipal Transmission Group |
211951 | 6/23/2016 |
California Wind Energy Association Comments: Comments following the June 9, 2016, RETI 2.0 Technical Input Group Meeting
3 page(s)
| | CEC/Docket Unit | California Wind Energy Association/Nancy Rader |
211927 | 6/21/2016 |
Revised Transmission Technical Input Group Interim Report *** THIS DOCUMENT IS REPLACED BY TN 212117 *** - supersedes TN 211864 53 page(s)
| | | California Energy Commission |
211914 | 6/21/2016 |
WebEx Recording for TTIG Meeting 6-9-16
1 page(s)
| | | California Energy Commission |
211902 | 6/20/2016 |
HVDC Conversion of Southwest Powerlink
| | | SDGE |
211882 | 6/20/2016 |
South Western Power Group Comments on June 13, 2016 RETI 2.0 Transmission Technical Input Group Workshop
3 page(s)
| | CEC/Docket Unit | David Getts/South Western Power Group |
211864 | 6/17/2016 |
Revised Transmission Technical Input Group Interim Report *** THIS DOCUMENT IS REPLACED BY TN 212117 *** Superseded by TN 211927 53 page(s)
| | | California Energy Commission |
211863 | 6/17/2016 |
Letter Re: Base Case Renewable Resource Portfolio for the CAISO 2016-2017 Transmission Planning Process
3 page(s)
| | | California Energy Commission/ Public Utilities Commission |
211760 | 6/9/2016 |
Presentation - Transmission Technical Input Group Update Revised presentation by Neil Millar 6/9/16 44 page(s)
| | CEC/Docket Unit | California Energy Commission |
211758 | 6/8/2016 |
Existing and Planned Transmission Capability Information to Support the RETI 2.0 Process TTIG Interim Report 53 page(s)
| | CEC/Docket Unit | California Energy Commission |
211753 | 6/8/2016 |
Presentation - Transmission Technical Input Group Update by Neil Millar 6/9/16
46 page(s)
| | CEC/Docket Unit | California Energy Commission |
211750 | 6/8/2016 |
Agenda for the 6/9/16 Transmission Technical Input Group (TTIG) Meeting Thursday, June 9, 2016 at 9:00 a.m. 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
211674 | 5/31/2016 |
Transcript of 05/02/16 Renewable Energy Transmission Initiative 2.0 Joint Agency Workshop
142 page(s)
| | CEC/Docket Unit | California Energy Commission |
211663 | 5/27/2016 |
Notice of RETI 2.0 Transmission Technical Input Group Meeting - June 9, 2016
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
211646 | 5/25/2016 |
CEERT Comments: Benefits of the Southwest Intertie Project- North (SWIP-N)
25 page(s)
| | CEC/Docket Unit | CEERT |
211645 | 5/25/2016 |
CEERT Comments: Low Carbon Grid Study: SWIP N Benefits
32 page(s)
| | CEC/Docket Unit | CEERT |
211644 | 5/25/2016 |
CEERT Comments: The Value of Regional Wind in California's Carbon Constrained Future
31 page(s)
| | CEC/Docket Unit | CEERT |
211573 | 5/20/2016 |
Steve Uhler Comments: Regulatory Grade Data, E3, 15-RETI-02, 20160502
2 page(s)
| | CEC/Docket Unit | Steve Uhler |
211572 | 5/20/2016 |
Steve Uhler Comments: Regulatory Grade Data, IEPR, 15-RETI-02, 20160502
2 page(s)
| | CEC/Docket Unit | Steve Uhler |
211571 | 5/20/2016 |
Steve Uhler Comments: Regulatory Grade Data, Picker, 15-RETI-02, 20160502
3 page(s)
| | CEC/Docket Unit | Steve Uhler |
211532 | 5/18/2016 |
Sierra Club Comments: RETI 2.0 Joint Agencies Workshop (May 2, 2016) Comments are from Sierra Club, Defenders of Wildlife, California Native Plant Society and Center for Biological Diversity 7 page(s)
| | CEC/Docket Unit | Sierra Club |
211501 | 5/16/2016 |
Pacific Gas & Electric Company Comments: Regarding RETI 2.0
4 page(s)
| | CEC/Docket Unit | Pacific Gas & Electric Company |
211498 | 5/16/2016 |
Transmission Agency of Northern California Comments on the RETI 2.0 process
4 page(s)
| | CEC/Docket Unit | Transmission Agency of Northern California |
211497 | 5/16/2016 |
Duke American Transmission Company’s Comments on the May 2, 2016 Renewable Energy Transmission Initiative 2.0 Workshop Joint Agency Workshop 4 page(s)
| | California Natural Resources Agency/Brian Turner | Ellison, Schneider & Harris L.L.P./Brian S. Biering |
211491 | 5/16/2016 |
Smart Wires, Inc. Comments: on the May 2, RETI 2.0 Transmission Joint Agency Group Workshop
5 page(s)
| | CEC//Docket Unit | Smart Wires, Inc. |
211487 | 5/16/2016 |
Bay Area Municipal Transmission Group’s Comments on the Renewable Energy Transmission Initiative 2.0 May 2, 2016 Workshop
11 page(s)
| | CEC/Docket Unit | Bay Area Municipal Transmission Group |
211456 | 5/12/2016 |
W. M. Beaty & Associates, Inc. Comments: Lassen & Round Mountain Transmission Focus Area
3 page(s)
| | CEC/Docket Unit | W. M. Beaty & Associates, Inc./Jeff Pudlicki |
211450 | 5/12/2016 |
Lassen Municipal Utility District Comments: Lassen and Round Mountain Transmission Assessment Focus Area
3 page(s)
| | CEC/Docket Unit | Lassen Municipal Utility District |
211445 | 5/12/2016 |
Geothermal Energy Association Comments: RE: Comments on May 2nd Workshop
2 page(s)
| | CEC/Docket Unit | Geothermal Energy Association/Benjamin Matek |
211410 | 5/9/2016 |
WebEx Recording for Joint Agency Workshop 5-2-16
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
211397 | 5/6/2016 |
California Wind Energy Association Comments: Comments following the May 2, 2016, RETI 2.0 Joint Agency Workshop
4 page(s)
| | CEC/Docket Unit | California Wind Energy Association/Nancy Rader |
211358 | 5/4/2016 |
Presentation - 50Hertz Transmission: Present and Future Challenges of RES Integration
57 page(s)
| | CEC/Docket Unit | 50Hertz Transmission |
211341 | 5/3/2016 |
Revised Presentation on Update on Existing Transmission Capability for Renewable Resources by Neil Millar 5-2-16
12 page(s)
| | CEC/Docket Unit | California Energy Commission |
211340 | 5/3/2016 |
Presentation on Resource Values Summary by Brian Turner 5-2-16
28 page(s)
| | CEC/Docket Unit | California Energy Commission |
211336 | 5/2/2016 |
Large-scale Solar Association Comments on the April 18, 2016 RETI 2.0 Plenary Group Meeting
7 page(s)
| | CEC/Docket Unit | Danielle Mills |
211335 | 5/2/2016 |
Westlands Solar Park Comment to April 18, 2016 RETI 2.0 Plenary Group Meeting
3 page(s)
| | CEC/Docket Unit | Daniel Kim |
211334 | 5/2/2016 |
Pacific Gas and Electric Company Comments: on the RETI 2.0 Initial Transmission Assessment Focus Areas
5 page(s)
| | CEC/Docket Unit | Pacific Gas and Electric Company |
211333 | 5/2/2016 |
TransCanyon's Comments - RETI 2.0
3 page(s)
| | CEC/Docket Unit | Jason Smith |
211331 | 5/2/2016 |
Modesto Irrigation District Comments in Response to RETI 2.0 Plenary Group Meeting, April 18, 2016
4 page(s)
| | CEC/Docket Unit | Modesto Irrigation District |
211330 | 5/2/2016 |
Erica Brand Comments: Conservation Organization comments on April 18 Plenary Group Meeting Comments from The Natural Conservancy, Defenders of Wildlife, Sierra Club, Natural Resources Defense Council, Audubon California, California Native Plant Society, The Wilderness Society, and the Center for Biological Diversity. 6 page(s)
| | CEC/Docket Unit | Erica Brand |
211313 | 4/29/2016 |
Presentation - Environmental and Land Use Technical Group - Progress Update by Scott Flint, 5-2-16
13 page(s)
| | CEC/Docket Unit | California Energy Commission |
211309 | 4/29/2016 |
Presentation - Achieving a More Flexible Power System by Hal Harvey, 5-2-16
25 page(s)
| | CEC/Docket Unit | America's Power Plan and Energy Innovation Policy & Technology LLC |
211308 | 4/29/2016 |
Presentation - Update on Existing Transmission Capability for Renewable Resources by Neil Millar, 5-2-16
12 page(s)
| | CEC/Docket Unit | California Energy Commission |
211307 | 4/29/2016 |
Presentation - Planning Goals Summary by Brian Turner - 5-2-16
13 page(s)
| | CEC/Docket Unit | California Energy Commission |
211306 | 4/29/2016 |
Presentation - Transmission Assessment Focus Areas Introduction, Proposed List, and Next Steps by RETI Management Team 5-2-16
20 page(s)
| | CEC/Docket Unit | California Energy Commission |
211303 | 4/29/2016 |
CTC Global Comments: CTC Global Comments to Renewable Energy Transmission Initiative v2.0 following RETI 2.0 Plenary Meeting 4/18
| | | CTC Global |
211288 | 4/29/2016 |
David Getts Comments: SWPG Comments on April 18, 2016 RETI 2 Plenary Workshop
| | | David Getts/ SouthWestern Power Group |
211286 | 4/28/2016 |
Nancy Rader Comments: Comments Following the April 18, 2016, RETI 2.0 Plenary Group Meeting
| | | Cal WEA |
211285 | 4/29/2016 |
Agenda for Joint Agency Workshop 5-2-16
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
211240 | 4/25/2016 |
WebEx Recording for Plenary Meeting 4-18-16
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
211198 | 4/22/2016 |
Imperial Irrigation District Comments on the Renewable Energy Transmission Initiative
2 page(s)
| | CEC/Robert Weisenmiller | Imperial Irrigation District |
211197 | 4/22/2016 |
TransWest Express Comments to RETI 2.0 Plenary Group
8 page(s)
| | CEC/Docket Unit | TransWest Express/David Smith |
211156 | 4/20/2016 |
Notice of RETI 2.0 Joint Agency Workshop -- May 2, 2016
6 page(s)
| | | California Energy Commission |
211124 | 4/18/2016 |
04-18-16 Intro Slides Plenary Group Meeting on
Long-Term Renewable Scenarios and
Preliminary Transmission Assessment Focus Areas 7 page(s)
| | | California Natural Resources Agency |
211118 | 4/18/2016 |
04-18-16 Presentation by Brian Turner
14 page(s)
| | | California Natural Resources Agency |
211116 | 4/18/2016 |
The Renewable Energy Transmission Initiative 2.0 - Save the Date - May 2, 2016
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
211104 | 4/18/2016 |
Presentation - TEPPC's Resource Options Cases for RETI 2.0 - 4-18-16 by Tom Carr
20 page(s)
| | CEC/Docket Unit | Western Interstate Energy Board |
211085 | 4/15/2016 |
04-18-16 Meeting Presentation by Forest Kaser - Revised This document supersedes TN 211083
| | | Public Utilities Commission |
211084 | 4/15/2016 |
Agenda for the 04-08-16 Plenary Meeting
| | | California Energy Commission |
211083 | 4/15/2016 |
04-18-16 Meeting Presentation by Forest Kaser
| | | California Energy Commission |
211082 | 4/15/2016 |
04-18-16 Meeting Presentation by Jim Caldwell
| | | California Energy Commission |
211081 | 4/15/2016 |
04-18-16 Meeting Presentation by Greg Brinkman
| | | California Energy Commission |
211080 | 4/15/2016 |
04-18-16 Meeting Presentation by Erica Brand
| | | California Energy Commission |
211028 | 4/13/2016 |
CEERT's Comments: The Value of Salton Sea Geothermal Development in California's Carbon Constrained Future
| | | The Center for Energy Efficiency and Renewable Technologies |
210941 | 4/4/2016 |
Notice of 4/18/16 RETI 2.0 Plenary Group Meeting
5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210911 | 3/30/2016 |
Duke America Transmission Company Comments on RETI 2.0 Plenary Group Meeting
5 page(s)
| | California Natural Resources Agency/Brian Turner | Ellison, Schneider & Harris, L.L.P./Brian S. Biering |
210909 | 3/30/2016 |
Modesto Irrigation District Comments to March 16, 2016 RETI 2.0 Plenary Group Meeting
4 page(s)
| | CEC/Dockets Unit | Modesto Irrigation District |
210908 | 3/30/2016 |
California Department of Water Resources - State Water Project Comments on RETI 2.0
2 page(s)
| | CEC/Dockets Unit | California Department of Water Resources - State Water Project |
210906 | 3/30/2016 |
Pacific Gas and Electric Company Comments: On RETI 2.0 Plenary Group Discussion of Resource Valuation
4 page(s)
| | CEC/Dockets Unit | Pacific Gas and Electric Company |
210905 | 3/30/2016 |
Ormat Nevada Inc. Comments on March 16 RETI 2.0 Workshop
3 page(s)
| | CEC/Dockets Unit | ORMAT Nevada Inc. |
210904 | 3/30/2016 |
South Western Power Group's Comments on March 16, 2016 RETI 2 Plenary Workshop
4 page(s)
| | CEC/Dockets Unit | South Western Power Group/David Getts |
210903 | 3/30/2016 |
Westlands Solar Park's Comments to RETI 2.0 plenary group meeting on March 16, 2016 on renewable resource areas
3 page(s)
| | CEC/Dockets Unit | Westlands Solar Park/Daniel Kim |
210902 | 3/30/2016 |
TransCanyon's Comments - On RETI 2.0
5 page(s)
| | RETI 2.0 Plenary Group | TransCanyon/Jason Smith |
210898 | 3/30/2016 |
Bay Area Municipal Transmission Group's Comments on RETI 2.0 Plenary Group Meeting on Renewable Resource Areas
4 page(s)
| | CEC/Dockets Unit | Bay Area Municipal Transmission Group/Joyce Kinnear |
210894 | 3/29/2016 |
Large-Scale Solar Association Comments on RETI 2.0 Resource Values Workshop
4 page(s)
| | CEC/Dockets Unit | Rachel Gold |
210884 | 3/29/2016 |
Geothermal Energy Association Comments: RE: RETI 2.0 Plenary Group Meeting On Renewable Resource Areas March 16, 2016
6 page(s)
| | CEC/Dockets Unit | Geothermal Energy Association/Benjmain Matek |
210850 | 3/24/2016 |
Environmental and Land Use Technical Group Sign-up
1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210808 | 3/22/2016 |
WebEx Recording for March 16, 2016 Plenary Meeting WebEx Recording note for the Transmission Technical and Input Technical Group Meeting 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210773 | 3/17/2016 |
Presentation RETI 2.0 Plenary Meeting - Chowdhury 8minutenergy presentation 7 page(s)
| | CEC/Dockets Unit | 8minutenergy |
210772 | 3/17/2016 |
Presentation RETI 2.0 Plenary Meeting - Orenstein Ormat Presenation 9 page(s)
| | CEC/Dockets Unit | Ormat Nevada, Inc. |
210771 | 3/17/2016 |
Presentation SMUD: 50% RPS by 2030 - Tutt
12 page(s)
| | CEC/Dockets Unit | SMUD |
210770 | 3/17/2016 |
Presentation - CPUC RETI 2.0 Workshop First Solar Presentation - Chadliev 10 page(s)
| | CEC/Dockets Unit | First Solar |
210755 | 3/16/2016 |
CPUC RETI 2.0 Workshop First Solar Presentation - Chadliev 10 page(s)
| | CEC/Dockets Unit | First Solar |
210754 | 3/16/2016 |
RETI 2.0 Plenary Meeting 8minutenergy Presentation - A. Chowdhury 7 page(s)
| | CEC/Dockets Unit | 8minutenergy |
210753 | 3/16/2016 |
Commercial Interests for Developing Renewable Energy in California Presentation - C Mclean 12 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210752 | 3/15/2016 |
Renewable Resources to Meet 2030 Goals - SDG&E SDG&E Presentation 6 page(s)
| | CEC/Dockets Unit | SDG&E |
210748 | 3/15/2016 |
Identifying High Value Renewable Resources - E3 E3 Presentation - Arne Olson 22 page(s)
| | CEC/Dockets Unit | Energy Environmental Economics, Inc. |
210746 | 3/15/2016 |
RETI 2.0 Plenary Group Workshop: Resource Values PG&E Presentation - Wyspianski 10 page(s)
| | CEC/Dockets Unit | PG&E |
210745 | 3/15/2016 |
LADWP 2015 Integrated Resource Plan Presentation - LADWP - Koch 12 page(s)
| | CEC/Dockets Unit | Los Angeles Department Water and Power |
210743 | 3/15/2016 |
Salton Sea Geothermal: Capabilities, Benefits, and Limitations Presentation - Benson 4 page(s)
| | CEC/Dockets Unit | Energy Source |
210742 | 3/15/2016 |
Westlands Solar Park Presentation - Kim 5 page(s)
| | CEC/Dockets Unit | Westlands Solar Park |
210738 | 3/15/2016 |
REVISED RETI 1.0 Background and RPS Calculator Resource Development
19 page(s)
| | CEC/Dockets Unit | Black & Veatch |
210730 | 3/15/2016 |
Second Revised Agenda for March 16, 2016 Plenary Meeting
2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210727 | 3/15/2016 |
Black & Veatch CREZ Maps
8 page(s)
| | CEC/Dockets Unit | Black and Veatch |
210726 | 3/15/2016 |
Imperial Irrigation District IID presentation - Vicken Kasarjian 12 page(s)
| | CEC/Dockets Unit | Imperial Irrigation District |
210725 | 3/15/2016 |
RETI 1.0 Background and RPS Calculator Resource Development B&V Presentation 18 page(s)
| | CEC/Dockets Unit | Black & Veatch |
210724 | 3/15/2016 |
Wyoming Wind Energy Projects and Characteristics Ryan Jacobson presentation 13 page(s)
| | CEC/Dockets Unit | Power Company of Wyoming, LLC |
210719 | 3/15/2016 |
Southern California Edison - IOU Panel Presentation - Catherine Hackney 5 page(s)
| | CEC/Dockets Unit | Southern California Edison |
210718 | 3/15/2016 |
Imperial County Perspective Presentation - Andy Horne 15 page(s)
| | CEC/Dockets Unit | Imperial County |
210717 | 3/15/2016 |
Cost of Generation Model: Cost Competition and Technology Trends Presentation - Bryan Neff 8 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210716 | 3/15/2016 |
The (Limited) Wind Energy Potential in California Presentation - Nancy Rader 8 page(s)
| | CEC/Dockets Unit | California Wind Energy Association |
210715 | 3/15/2016 |
Introduction to Plenary Meeting Presentation - Brian Turner 8 page(s)
| | CEC/Dockets Unit | California Natural Resources Agency |
210713 | 3/15/2016 |
Revised Agenda for RETI 2.0 Meeting on March 16, 2016 Revised Agenda 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210692 | 3/11/2016 |
March 16, 2016 RETI 2.0 Plenary Meeting Agenda Agenda 1 page(s)
| | | California Energy Commission |
210613 | 3/4/2016 |
RETI 2.0 Plenary Group Meeting Notice for March 16, 2016 Notice 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210494 | 2/22/2016 |
WebEx Recording for January 29, 2016 Plenary Meeting WebEx Recording 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210488 | 2/22/2016 |
Plenary Group Meeting Notice for March 1, 2016 Meeting Notice 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210329 | 2/16/2016 |
California Wind Energy Association Comments Following January 29, 2016, Joint Agency Workshop on 15-RETI-02 Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting 3 page(s)
| | California Wind Energy Association | Nancy Rader |
210299 | 2/12/2016 |
Pacific Gas and Electric Company Comments on RETI 2.0 Plenary Group Meeting Held 1.29.16 Regarding Planning Goals
4 page(s)
| | CEC/Dockets Unit | Pacific Gas and Electric Company/Nathan Bengtsson |
210296 | 2/12/2016 |
Alliance For Desert Preservation Comments: Renewable Energy Transmission Initiative 2.0
71 page(s)
| | CEC/Robert Weisenmiller and CPUC/Michael Picker | Alliance For Desert Preservation |
210238 | 2/9/2016 |
IID Transmission Projects
2 page(s)
| | CEC/Dockets Unit | IID |
210199 | 2/5/2016 |
Pacific Gas and Electric Company Comments on RETI 2.0 Technical Group Meetings Held 1.22.16
6 page(s)
| | CEC/Dockets Unit | Pacific Gas and Electric Company |
210191 | 2/5/2016 |
Smart Wires, Inc. Comments on the January 22, RETI 2.0 Transmission Technical Input Group Workshop
5 page(s)
| | CEC/Dockets Unit | Smart Wires, Inc. |
210190 | 2/5/2016 |
Joint Comments of the Renewable Energy Parties on the 1.22.16 RETI 2.0 Environmental and Land Use Technical Group Workshop
4 page(s)
| | CEC/Dockets Unit | IEP Association, Large-scale Solar Association, and California Wind Energy Association |
210188 | 2/5/2016 |
PacifiCorp Comments Related to the Transmission Technical Input Group
4 page(s)
| | CEC/Robert Weisenmiller | Matthew McVee |
210178 | 2/5/2016 |
David Smith Comments: TransWest Express Comments to RETI 2.0 TTIG (15-RETI-02)
| | | David Smith |
210159 | 2/4/2016 |
Carrie Bentley Comments: SWPG Comments on RETI 2.0 Transmission Technical Input Group
| | | Carrie Bentley |
210151 | 2/4/2016 |
Joyce Kinnear Comments: Bay Area Municipal Transmission Group Comments on the Renewable Energy Transmission Initiative 2.0 Transmission Technical Input Group
| | | Joyce Kinnear |
210129 | 2/2/2016 |
Geothermal Energy Association Comments on RPS Calculator Cost Assumptions
4 page(s)
| | CEC/Dockets Unit | Geothermal Energy Association/Benjamin Matek |
210105 | 1/29/2016 |
REVISED California Energy Demand Forecast for RETI 2.0 Meeting on January 29, 2016 Revised Energy Demand Forecast 18 page(s)
| | | California Energy Commission |
210104 | 1/29/2016 |
Planning for a Reliable Western Interconnection for RETI 2.0 Plenary Meeting January 29, 2016
21 page(s)
| | | Western Interconnection Planning |
210103 | 1/29/2016 |
RPS Calculator for RETI 2.0 Plenary Meeting on January 29, 2016 RPS Calculator 17 page(s)
| | | California Energy Commission |
210095 | 1/29/2016 |
LADWP 2015 Integrated Resource Planning Transformation Review for RETI 2.0 Plenary Mtg on Jan 29, 2016 LADWP 2015 IRP 12 page(s)
| | CEC/Dockets Unit | Los Angeles Department of Water and Power |
210094 | 1/29/2016 |
California PATHWAYS Model for RETI 2.0 Plenary Meeting on January 29, 2016 PATHWAYS 35 page(s)
| | CEC/Dockets Unit | Energy and Environmental Economics, Inc. |
210093 | 1/29/2016 |
Agenda Slide for RETI 2.0 Plenary Meeting on January 29, 2016 Agenda slide 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210092 | 1/29/2016 |
Renewable Energy Transmission Initiative 2.0 Plenary Group Planning Goals Workshop Introduction for RETI 2.0 Plenary Meeting on January 29, 2016 - Introduction Slides 10 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210091 | 1/29/2016 |
California Climate Strategy (CARB) for RETI 2.0 Plenary Meeting on Jan 29, 2016 California Climate Strategy 20 page(s)
| | CEC/Dockets Unit | Air Resources Board |
210075 | 1/29/2016 |
Demand Forecast Presentation Presentation 18 page(s)
| | | California Energy Commission |
210071 | 1/28/2016 |
Agenda for RETI 2.0 Plenary Meeting on January 29,2016 Agenda 2 page(s)
| | | California Energy Commission |
210034 | 1/27/2016 |
Link to January 22, 2016 WebEx AM Recording Link to WebEx recording 1 page(s)
| | | California Energy Commission |
210033 | 1/27/2016 |
Link to January 22, 2016 PM WebEx Recording Link to WebEx recording 1 page(s)
| | | California Energy Commission |
210032 | 1/27/2016 |
Link to December 4, 2015 WebEx Recording Link to WebEx Recording 1 page(s)
| | | California Energy Commission |
210031 | 1/27/2016 |
Link to November 23, 2015 WebEx Recording Link to WebEx recording 1 page(s)
| | | California Energy Commission |
210030 | 1/27/2016 |
Link to WebEx Recording from RETI 2.0 meeting held September 10, 2015 Link to WebEx recording 1 page(s)
| | | California Energy Commission |
210029 | 1/27/2016 |
Link to November 2, 2015 WebEx Recording of RETI 2.0 meeting Link to WebEx recording 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208937 | 1/25/2016 |
Black Forest Partners Comments on 12216 TTIG Workshop & Southline Transmission Project Presentation
21 page(s)
| | CEC/Dockets Unit | Black Forest Partners/Doug Patterson |
208930 | 1/25/2016 |
Presentation - Environmental and Land Use Technical Group Workshop Introduction Introduction slides 10 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208929 | 1/25/2016 |
Data Sets and Model Approaches Presentation 30 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208697 | 1/22/2016 |
Revised Agenda for RETI 2.0 Environmental and Land Use Group Workshop on 1-22-2016 Workshop #3 - Environmental Data, Data Gaps and Data Use 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208403 | 1/21/2016 |
Agenda - RETI 2.0 Transmission Technical Input Group Agenda - afternoon workshop, January 22, 2016 - Workshop #1 - Transmission Technical Input Group 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208402 | 1/21/2016 |
Agenda - RETI 2.0 Environmental and Land Use Technical Group Agenda - morning workshop for January 22, 2016 - Workshop #3 - Environmental Data, Data Gaps and Data Use 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
208297 | 1/21/2016 |
California ISO Presentation
15 page(s)
| | | California ISO |
208296 | 1/21/2016 |
WestConnect Transmission Planning Presentation
7 page(s)
| | | WestConnect Transmission Planning |
208295 | 1/21/2016 |
Northern Tier Transmission Group
5 page(s)
| | | Northern Tier Transmission Group |
208294 | 1/21/2016 |
WECC Reliability Planning Presentation WECC Reliability Planning 12 page(s)
| | | DATC - Zephyr Power |
208293 | 1/21/2016 |
DATC - Zephyr Power Transmission Project Presentation
10 page(s)
| | | DATC - Zephyr Power |
208292 | 1/21/2016 |
TransWest Express Transmission Project
11 page(s)
| | | TransWest Express Transmission Project |
208291 | 1/21/2016 |
PacifiCorp Energy Gateway Presentation
4 page(s)
| | | PacifiCorp Energy Gateway |
208290 | 1/21/2016 |
SunZia Southwest Transmission Project Presentation
13 page(s)
| | | SunZia Southwest Transmission Project |
208289 | 1/21/2016 |
LS Power - Southwest Intertie Project
13 page(s)
| | | LS Power - Southwest Intertie Project |
208288 | 1/21/2016 |
Clean Line Transmission Project Presentation
8 page(s)
| | | Clean Line Transmission Project |
208287 | 1/21/2016 |
Introduction Presentation Introduction 7 page(s)
| | | California Energy Commission |
208286 | 1/21/2016 |
Los Angeles Department of Water and Power Presentation
5 page(s)
| | | Los Angeles Department of Water and Power |
208285 | 1/21/2016 |
Imperial Irrigation District Presentation
5 page(s)
| | | Imperial Irrigation District |
208284 | 1/21/2016 |
San Diego Gas & Electric Company Presentation
6 page(s)
| | | San Diego Gas & Electric Company |
208283 | 1/21/2016 |
ColumbiaGrid Presentation
5 page(s)
| | | ColumbiaGrid |
207323 | 1/14/2016 |
For Reference: PG&E Comments to the Air Resources Board on SB 350 IRP Targets 1/11/16
4 page(s)
| | California Air Resources Board/Rajinder Sahota | Pacific Gas and Electric Company/Nathan Bengtsson |
207322 | 1/14/2016 |
Pacific Gas and Electric Company Comments on RETI 2.0, Initial Plenary Group Workshop Held 12/18/15
6 page(s)
| | CEC/Dockets Unit | Pacific Gas and Electric Company/Nathan Bengtsson |
207319 | 1/14/2016 |
Notice of 1/29/16 Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting Plenary Workshop Notice - January 29, 2016 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207293 | 1/13/2016 |
Notice of 1/22/16 Staff Workshop Notice of Staff Workshops of the Environmental and Land Use Technical Group and Transmission Technical Input Group for the Renewable Energy Transmission Initiative 2.0, Friday, January 22, 2016 6 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207228 | 1/7/2016 |
Black & Veatch Comments: RETI 2.0 Plenary Group Preliminary Work Plan
12 page(s)
| | CEC/Dockets Unit | Black & Veatch |
207227 | 1/7/2016 |
Southwestern Power Group Comments on Plenary Group Work Plan Meeting
1 page(s)
| | | Carrie Bentley |
207223 | 1/7/2016 |
TransCanyon Comments: Comments on RETI 2.0 Plenary Group Meeting
5 page(s)
| | | TransCanyon |
207222 | 1/7/2016 |
State Waters Contractors: Renewable Energy Transmission Initiative (RETI) 2.0 Plenary Group Preliminary Work Plan
4 page(s)
| | | The State Water Contractors (SWC) |
207221 | 1/7/2016 |
Comments of the Modesto Irrigation District to RETI 2.0 Dec. 18, 2015 Plenary Group Meeting/Webinar
| | | Modesto Irrigation District |
207220 | 1/7/2016 |
Smart Wires, Inc. Comments on the December 17, 2015 RETI 2.0 Plenary Group workshop, Response to Planning Goals Question 3
4 page(s)
| | | Smart Wires, Inc. |
207199 | 1/6/2016 |
The Nevada Hydro Company Comments: on Renewable Energy Transmission Initiative 2.0
101 page(s)
| | CEC/Dockets Unit | The Nevada Hydro Company |
207185 | 1/5/2016 |
Link to December 18, 2015 WebEx recording Link to WebEx recording from December 18, 2015 meeting of RETI 2.0 Plenary Group 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207091 | 12/18/2015 |
SDG&E Comments on RETI 2.0 Staff Workshop 12-4-15
3 page(s)
| | CEC/Dockets Unit | SDG&E/Tamara Rasberry |
207061 | 12/17/2015 |
Renewable Energy Transmission Initiative 2.0 Plenary Group Preliminary Work Plan Work Plan, December 18, 2015 21 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206942 | 12/11/2015 |
Imperial Irrigation District Comments: RETI 2.0 Workshop Comments of 120415
1 page(s)
| | CEC/Al Alvarado | Imperial Irrigation District/Robert Laurie |
206902 | 12/8/2015 |
Notice of Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting/Webinar Notice of Workshop 6 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206892 | 12/8/2015 |
Transcript of 11/02/15 Joint Agency Workshop Joint Agency Workshop on the Proposed Governance Structure and Work Plan for the Renewable Energy Transmission Initiative 2.0. 81 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206876 | 12/8/2015 |
Comments on the Renewable Energy Transmission Initiative (RETI) 2.0 Environmental and Land Use Technical Group
5 page(s)
| | CEC/Dockets Unit | TransWest Express LLC/David Smith |
206874 | 12/7/2015 |
Power Company of Wyoming LLC Comment on RETI 2.0 Environmental and Lnad Use Technical Group Response
5 page(s)
| | CEC/Dockets Unit | Power Company of Wyoming LLC/Garry L. Miller |
206842 | 12/1/2015 |
Imperial Irrigation District (IID) Comments: Regarding 11.23.2015 Workshop
3 page(s)
| | CEC/Al Alvaredo | Imperial Irrigation District (IID)/Robert Laurie |
206838 | 12/4/2015 |
Presentation - Integrating Land Conservation and Renewable Energy Goals in California Presentation by Erica Brand 25 page(s)
| | CEC/Dockets Unit | The Nature Conservancy/Erica Brand |
206837 | 12/4/2015 |
Presentation - Areas of Conservation Emphasis ACE-II Presentation by Melanie Gogol-Prokurat 22 page(s)
| | CEC/Dockets Unit | California Department of Fish and Wildlife/Melanie Gogol-Prokurat |
206834 | 12/4/2015 |
Aspen Environmental Group Comments: Suggestions to the RETI 2.0 Process
4 page(s)
| | CEC/Dockets Unit | Aspen Environmental Group/Susan Lee |
206832 | 12/4/2015 |
Staff Presentation for Environmental Land Use Technical Group Workshop on December 4, 2015
8 page(s)
| | CEC/Docket Unit | California Energy Commission |
206831 | 12/4/2015 |
Environmental Land Use Technical Group Second Workshop Agenda for December 4, 2015 Agenda for ELUTG Workshop 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206814 | 12/1/2015 |
Imperial Irrigation District Comments on Support of the RETI 2.0 Initiative
2 page(s)
| | CEC/Robert Weisenmiller | Imperial Irrigation District/Vicken Kasarjian |
206802 | 12/1/2015 |
WebEx Recording of Nov. 23, 2015 Workshop WebEx Recording
| | | California Energy Commission |
206741 | 11/23/2015 |
Draft Questions for the Environmental and Land Use Technical Group Draft Questions 1 page(s)
| | | California Energy Commission |
206737 | 11/23/2015 |
Solar Energy and Conservation in the San Joaquin Valley Presentation 58 page(s)
| | | California Energy Commission |
206734 | 11/23/2015 |
San Joaquin Valley Landscape-scale Planning for Solar Energy and Conservation Presentation 7 page(s)
| | | California Energy Commission |
206733 | 11/23/2015 |
Solar Energy and Conservation in the San Joaquin Valley Presentation 58 page(s)
| | | California Energy Commission |
206727 | 11/23/2015 |
WECC - Environmental & Cultural Data Use in Planning WECC presentation 27 page(s)
| | | California Energy Commission |
206726 | 11/23/2015 |
RETI 2.0 Environmental Workshop Staff Presenation Staff Presentation 12 page(s)
| | | California Energy Commission |
206718 | 11/20/2015 |
Agenda: Environmental Data and Data Use - Agenda for Staff Workshop on November 23, 2015 Workshop Agenda 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206717 | 11/20/2015 |
Notice of Second Staff Workshop on the Environmental and Land Use Technical Group for the RETI 2.0 Workshop Notice 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206704 | 11/19/2015 |
Erica Brand Comments: Conservation Organization Comments to 11/2 RETI 2 Workshop
7 page(s)
| | | The Nature Conservancy |
206667 | 11/18/2015 |
CTC Global Comments to RETI 2.0
4 page(s)
| | CEC/Commissioners | CTC Global/Dave Bryant |
206647 | 11/16/2015 |
PacifiCorp Comments on RETI 2.0 Organization and Work Plan
3 page(s)
| | CEC/Robert Weisenmiller | PacifiCorp/Matthew McVee |
206645 | 11/16/2015 |
Comments of Pacific Gas and Electric Company on the Organization and Work Plan for RETI 2.0
3 page(s)
| | CEC/Dockets Unit | Pacific Gas and Electric Company/Nathan Bengtsson |
206644 | 11/16/2015 |
California Wind Association Comments Following November 2, 2015, Joint Agency
5 page(s)
| | CEC/Dockets Unit | California Wind Energy Association/Nancy Rader |
206641 | 11/16/2015 |
Large-Scale Solar Association Comments: On RETI 2.0 Scope and Work Plan
4 page(s)
| | CEC/Robert Weisenmiller | Large-Scale Solar Association/Rachel Gold |
206640 | 11/16/2015 |
Wetlands Solar Park Comments to Nov 2, 2015 Joint Workshop on RETI 2.0
2 page(s)
| | CEC/Dockets Unit | Wetlands Solar Park/Daniel Kim |
206639 | 11/16/2015 |
California Consumers Alliance Comments On Joint Agency Workshop on the Proposed Organization Structure and Workplan
5 page(s)
| | CEC/Docket Unit | Ron Dickerson |
206637 | 11/16/2015 |
Duke American Transmission Company Comments on November Workshop
4 page(s)
| | CEC/Commissioners | Chase B. Kappel |
206635 | 11/16/2015 |
TransCanyon Comments: RETI 2.0 Organization and Work Plan
3 page(s)
| | CEC/Robert Weisenmiller | TransCanyon |
206632 | 11/16/2015 |
Transmission Agency of Northern California Comments: Preliminary Comments in the RETI 2.0 Process
3 page(s)
| | CEC/Dockets Unit | Transmission Agency of Northern California/Amy Cuellar |
206626 | 11/16/2015 |
Independent Energy Producers Association Comments: On RETI 2.0 Organizational Structure and Work Plan
4 page(s)
| | CEC/Dockets Unit | Independent Energy Producers Association/Amber Blixt |
206623 | 11/13/2015 |
Workshop Notice for RETI 2.0 Environmental and Land Use Technical Group Workshop Notice for November 23, 2015 6 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206610 | 11/13/2015 |
John Jimison Comments on the Renewable Energy Transmission Initiative 2.0
3 page(s)
| | CEC/Dockets Unit | Americans for a Clean Energy Grid/John Jimison |
206595 | 11/12/2015 |
GEA Comments on 11/02/2015 Workshop
2 page(s)
| | | Geothermal Energy Association/Benjamin Matek |
206557 | 11/10/2015 |
Southwestern Power Group Comments on November 2nd RETI 2.0 Workshop
2 page(s)
| | CEC/Dockets Unit | Southwestern Power Group/David Getts |
206496 | 11/2/2015 |
Second Revised Workshop Agenda Second Revised Agenda to reflect additional Commissioner in attendance. *** THIS DOCUMENT IS SUPERCEDES TN 206477 *** 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206489 | 11/2/2015 |
Imperial Irrigation District Comments on RETI 2.0
2 page(s)
| | CEC/Dockets Unit | Imperial Irrigation District |
206482-1 | 11/2/2015 |
RETI 2.0 Notice Mailing List All Tribal Leaders Names List 7 page(s)
| | All California Tribal Leaders | Energy Commission |
206482-2 | 11/2/2015 |
Final Letter for Notice of Joint Agency Workshop on the Proposed Organization Structure and Work Plan for the RETI 2.0 Final RETI 2.0 Letter / Workshop Notice 5 page(s)
| | Tribal Leaders | Energy Commission |
206479 | 11/2/2015 |
Presentation: RETI 2.0 Organizational Structure and Work Plan - Joint Workshop Presentation
12 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206477 | 11/2/2015 |
Revised Final Workshop Agenda for November 2, 2015 **** THIS DOCUMENT IS REPLACED BY TN 206496 **** Revised Final Agenda for RETI 2.0 Workshop - Agenda: Renewable Energy Transmission Initiative 2.0 Introduction 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206462 | 10/30/2015 |
Workshop Agenda: Renewable Energy Transmission Initiative 2.0 Introduction Agenda for November 2, 2015 Workshop 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206416 | 10/23/2015 |
Notice of Joint Agency Workshop on the Proposed Organization Structure and Work Plan Workshop Notice for 11-2-2015 5 page(s)
| | Stakeholders and interested parties | California Energy Commission |
206323 | 10/9/2015 |
TransCanyon Comments: On the Renewable Energy Transmission Initiative
3 page(s)
| | CEC/Robert Weisenmiller | TransCanyon |
206289 | 10/6/2015 |
Transcript of the September 10, 2015 Joint Agency Workshop on Renewable Energy Transmission Initiative (RETI) 2.0
131 page(s)
| | | California Energy Commission |
206237 | 9/30/2015 |
John Shepard Comments: Engaging AZ Stakeholders in RETI 2.0
| | | John Shepard |
206235 | 9/29/2015 |
Nathan Bengtsson Comments: PG&E Comments on RETI 2.0
| | | PG&E |
206224 | 9/29/2015 |
Anthony Andreoni Comments: CMUA Comments
3 page(s)
| | | California Municipal Utilities Commission |
206211 | 9/25/2015 |
Sheila Bowers Comments: LOCAL DG and Efficiency are being ignored again
1 page(s)
| | CEC/Dockets Unit | Sheila Bowers |
206208 | 9/24/2015 |
San Diego Gas and Electric Comments on 09-10-15 Renewable Energy Transmission Initiative Kick-Off Meeting
3 page(s)
| | CEC/Dockets Unit | SDG&E/Tamara Rasberry |
206207 | 9/24/2015 |
Photo by John C. Monohan
1 page(s)
| | CEC/Dockets Unit | John C. Monohan |
206206 | 9/24/2015 |
John C. Monohan Comments on Utility Scale Renewable Energy Projects in Lucerne Valley to CPUC
2 page(s)
| | CPUC/Michael Picker | John C. Monohan |
206205 | 9/24/2015 |
John C. Monohan Comments on Utility Scale Renewable Energy Projects in Lucerne Valley
2 page(s)
| | CEC/Robert Weisenmiller | John C. Monohan |
206204 | 9/24/2015 |
Coalition of Community Groups Comments on Renewable Energy Transmission Initiative 2.0
21 page(s)
| | CEC/Robert Weisenmiller | California Energy Commission |
206203 | 9/24/2015 |
WSP comment on RETI 2.0 kick off meeting on Sept 14, 2015
2 page(s)
| | | Westlands Solar Park |
206202 | 9/24/2015 |
Beth Olhasso Comments: Comments on the Joint Agency Workshop to Introduce Renewable Transmission Iniative 2.0
22 page(s)
| | | The Agricultural Energy Consumers Association |
206201 | 9/24/2015 |
Pushkar Wagle Comments: BAMx Comments on RETI 2.0
6 page(s)
| | | BAMx |
206199 | 9/24/2015 |
Duke America Transmission Company's Comments on Joint Agency Workshop to Introduce RETI 2.0
12 page(s)
| | | Christopher T. Ellison |
206198 | 9/24/2015 |
Large-Scale Solar Association Comments on RETI 2.0 Renewable Energy Transmission Initiative 2.0
3 page(s)
| | CEC/Robert Weisenmiller | Large-Scale Solar Association/Rachel Gold |
206197 | 9/24/2015 |
Clean Coalition Comments on RETI 2.0 Workshop - Transmission Access Charges
10 page(s)
| | CEC/Dockets Unit | Kenneth Sahm White |
206196 | 9/24/2015 |
Sierra Club, Defenders of Wildlife, The Nature Conservancy Comments: On the Notice of Joint Agency Workshop to Introduce the Renewable Energy
Transmission Initiative 2.0 8 page(s)
| | CEC/Dockets Unit | Erica Brand |
206195 | 9/24/2015 |
Alliance for Desert Preservation Comments: Renewable Energy Transmission Initiative 2.0
22 page(s)
| | | Alliance for Desert Preservation |
206194 | 9/24/2015 |
Matthew McVee Comments: PacifiCorp Comments on RETI 2.0
3 page(s)
| | | Pacificorp |
206192 | 9/24/2015 |
Comments of the Modesto Irrigation District to RETI 2.0 Joint Workshop
3 page(s)
| | | Sean Neal |
206190 | 9/24/2015 |
Nancy Rader Comments: CalWEA Comments on RETI 2.0
9 page(s)
| | | Nancy Rader |
206177 | 9/23/2015 |
National Grid Comments: National Grid Comments in Support of RETI 2.0
| | cec/ Robert Weisenmiller | National Grid |
206174 | 9/23/2015 |
Jenny Wilder Comments: Renewable energy transmission
1 page(s)
| | CEC/Robert Weisenmiller | Jenny Wilder |
206170 | 9/22/2015 |
Bill Lembright Comments: RETI-02 and distributed generation
3 page(s)
| | CEC/Robert Weisenmiller | Bill Lembright |
206143 | 9/18/2015 |
Geothermal Energy Association Comments on Transmission Planning Issues that Hinder Geothermal Power's Growth
3 page(s)
| | CEC/Dockets Unit, Commissioners, CPUC and CAISO | Geothermal Energy Association/Benjamin Matek |
206106 | 9/15/2015 |
Steve Palermo Comments: Energy storage
1 page(s)
| | CEC/Dockets Unit | Steve Palermo |
206044 | 9/10/2015 |
Presentation - An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) by Roger Johnson Joint Agency Workshop to Introduce the Renewable Energy Transmission Initiative 2.0, September 10, 2015 5 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206043 | 9/10/2015 |
Presentation - California's Transmission Planning Experience for Renewable Energy by Roger Johnson Joint Agency Workshop to Introduce the Renewable Energy Transmission Initiative 2.0, September 10, 2015 4 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206041 | 9/10/2015 |
Presentation - Transmission Planning at the California ISO September 10, 2015 6 page(s)
| | CEC/Dockets Unit | California ISO |
206040 | 9/10/2015 |
Presentation - An Approach to Environmental Analysis for the Support of Statewide Renewable Energy Planning By Scott Flint - Joint Agency Workshop Renewable Energy Transmission Initiative 2.0, September 10, 2015 11 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206039 | 9/10/2015 |
Presentation - Next Steps for RETI 2.0 by Al Alvarado Joint Agency Workshop to Introduce the Renewable Energy Transmission Initiative 2.0, September 10, 2015 3 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206012 | 9/4/2015 |
Workshop Agenda for September 10, 2015 Workshop agenda 1 page(s)
| | | California Energy Commission |
206007 | 9/3/2015 |
Notice of Joint Agency Workshop to Introduce the RETI 2.0 Letter to Tribal Leader 4 page(s)
| | | California Energy Commission |
205964 | 9/1/2015 |
Letter to CAISO re RETI 2.0
2 page(s)
| | CAISO/ Stephen Berberich | California Energy Commission |
205941 | 8/31/2015 |
Notice of 09/10/15 Joint Agency Workshop - RETI 2.0
5 page(s)
| | CEC/ Docket Unit | California Energy Commission |
205883 | 8/27/2015 |
Open New Docket Memo
1 page(s)
| | CEC/Docket Unit | California Energy Commission |