Docket Log

Docket: 06-AFC-07
Project Title: 06-AFC-7 Humboldt Bay Repowering Project 163 MW
Generated On: 4/20/2014 1:55:44 PM

TN #Docketed DateDocument TitleExhibit #ToFrom
570725/31/2010Petitioner Robert Sarvey's Verified Petition for Writ of Mandate and Complaint for Declaratory and Injuctive Releif and Atorney Fee's in the Matter of Sarvey v. North Coast United AQMD
Petitioner Robert Sarvey's Verified Petition for Writ of Mandate and Complaint for Declaratory and Injuctive Releif and Atorney Fee's in the Matter of Sarvey v. North Coast United AQMD
21 page(s)
 CEC/ Docket UnitAtorney for R. Sarvey/ S. Volker
566354/30/2010Petition for Review, Petitioner's Informal Brief
Petition for Review, Petitioner's Informal Brief
30 page(s)
 CEC/Docket UnitPetitioner/R. Simpson
4888510/30/2008Humbolt Bay Exhibit List & Exhibits
Humbolt Bay Exhibit List & Exhibits
10 page(s)
 CEC/ Docket UnitCEC/ R. Avalos
4831510/2/2008CEC Staff Comments
CEC Staff Comments
26 page(s)
 CEC/ Docket UnitEnegy Resources Conservation and Development Commission
482489/30/2008Notice of Availability of Commission Decision
Notice of Availability of Commission Decision
1 page(s)
 CEC/ Docket UnitCEC
482499/30/2008Commission Adoption Order
Commission Adoption Order
5 page(s)
 CEC/ Docket UnitCEC/Rose M. Avalos
482559/30/2008Final Commission Decision
Final Commission Decision
414 page(s)
 CEC/ Docket UnitCEC/ BOYD
482159/26/2008Notice of Decision by CEC
Notice of Decision by CEC
7 page(s)
 Office Plannning & ResearchCEC/ J. Kessler
481449/22/2008PG&E's Response to CARE and Rob Simpson Comments on PMPD
PG&E's Response to CARE and Rob Simpson Comments on PMPD
30 page(s)
 CEC/ A. HockadayGalatiBlek/ M. Mills
480549/18/2008CARE's Comments on PMPD
CARE's Comments on PMPD
12 page(s)
 CEC/ Docket UnitPublic/ M. Boyd
480559/18/2008US EPA EAB Remand
US EPA EAB Remand
44 page(s)
 CEC/ Docket UnitPublic/ M. Boyd
480569/18/2008Comments from R. Simpson RE PMPD
Comments from R. Simpson RE PMPD
1 page(s)
 Public/ M. BoydPublic/ R. Simpson
480499/17/2008Errata to the Presiding Member's Proposed Decision
Errata to the Presiding Member's Proposed Decision
9 page(s)
 CEC/ Docket UnitCEC/ M. Read
480369/16/2008Declaration of Obed Odemelam
Declaration of Obed Odemelam
1 page(s)
 CEC/ Docket UnitCEC/ P. Guinn
480229/15/2008401 Certificaiton Report of Conversation
401 Certificaiton Report of Conversation
4 page(s)
 CEC/ A. HockadayGalatiBlek/ M. Mills
479889/10/2008PG&E's Comments on the Presiding Member's Proposed Decision
PG&E's Comments on the Presiding Member's Proposed Decision
8 page(s)
 CEC/ A. HockadayGalatiBlek/ D. Wiseman
477608/26/2008PG&E's Comments RE: Work Force
PG&E's Comments RE: Work Force
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
476498/20/2008Order Granting Motion to Reopen Evidentiary Record and Notice of Evidentiary Hearing
Order Granting Motion to Reopen Evidentiary Record and Notice of Evidentiary Hearing
4 page(s)
 CEC/ Docket UnitCEC/ J. Bryon/ K. Douglas
475958/18/2008Notice of Availability of Presiding Member's Proposed Decision
Notice of Availability of Presiding Member's Proposed Decision
5 page(s)
 CEC/ Docket UnitCEC/ J. Byron/ K. Douglas
475968/18/2008Letter to Submit PMPD for Humbolt Bay Power Project
Letter to Submit PMPD for Humbolt Bay Power Project
1 page(s)
 CEC/ Docket UnitCEC/ J. Byron/ K. Douglas
475988/18/2008Humboldt Bay Presiding Member's Proposed Decision
Humboldt Bay Presiding Member's Proposed Decision
378 page(s)
 CEC Docket UnitCEC J.Byron/ K. Douglas
476128/18/2008HBRP Condition of Certification CUL-2, Submittal of Maps and Drawings of HBRP Footprint and Linear Facilities.
HBRP Condition of Certification CUL-2, Submittal of Maps and Drawings of HBRP Footprint and Linear Facilities.
2 page(s)
 CEC Docket UnitD. Davy
475368/13/2008PG&E's Motion to Reopen Evidentiary Record
PG&E's Motion to Reopen Evidentiary Record
6 page(s)
 CEC / A. HockadayGalati Blek LLP / D. Wiseman
475438/13/2008PG&E's Bioretention Area Submittal
PG&E's Bioretention Area Submittal
7 page(s)
 CEC / Docket UnitCH2M HILL / D. Davy
475448/13/2008PG&E's Bioretention Area Submittal
PG&E's Bioretention Area Submittal
7 page(s)
 CEC/Docket UnitCH2M HILL/ D. Davy
472007/24/2008MOU between CEC and Bureau Veritas North America, Inc. for Design Review, Plan Check and Construction Inspection for HBRP
MOU between CEC and Bureau Veritas North America, Inc. for Design Review, Plan Check and Construction Inspection for HBRP
6 page(s)
 CEC/ Docket UnitCEC/ T. O'Brien/ BVNA, Inc./ K. Wedman
469417/8/2008PG&E and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Conditions of Certification
PG&E and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Conditions of Certification
9 page(s)
 CEC/ Docket UnitCEC/ L. De Carlo/ GalatiBlek/ S. Galati
467676/19/2008Staff's Exhibits from June 17, 2008 Evidentiary Hearing
Staff's Exhibits from June 17, 2008 Evidentiary Hearing
5 page(s)
 CEC / Docket UnitCEC / L. DeCarlo
466846/13/2008Letter HBRP (06-AFC-7) Submittal of Compliance Documents.
Letter HBRP (06-AFC-7) Submittal of Compliance Documents.
2 page(s)
 Mr. Scott A. GalatiCEC/Eileen Allen
466926/13/2008Letter in Response to June 3, 2008 Ruestions Regarding Cultural Resources
Letter in Response to June 3, 2008 Ruestions Regarding Cultural Resources
2 page(s)
 CEC/ J. KesslerCCC/ T. Luster
466956/13/2008Energy Commission Staff's Response and Objection to PG&E's Motion in Limine to Strike CEC Staff Testimony
Energy Commission Staff's Response and Objection to PG&E's Motion in Limine to Strike CEC Staff Testimony
11 page(s)
 CEC / Docket UnitCEC / L. DeCarlo
466806/11/2008PG&E's Motion in Limine to Strike CEC Staff Testimony
PG&E's Motion in Limine to Strike CEC Staff Testimony
13 page(s)
 CEC / Docket UnitGB / D. Wiseman
466206/6/2008Energy Commision Staff's Notice regarding Designation of Alternate Witness
Energy Commision Staff's Notice regarding Designation of Alternate Witness
13 page(s)
 POS ListCEC/ L. DeCarlo
465916/4/2008Letter to State Historic Preservation Office RE: Historical Resources at Humbolt Bay
Letter to State Historic Preservation Office RE: Historical Resources at Humbolt Bay
3 page(s)
 SHP / M. MessingerCEC / B. Bastian
466046/4/2008PG&E's Testimony for the Humboldt Bay Repowering Project Docket No. (06-AFC-7)
PG&E's Testimony for the Humboldt Bay Repowering Project Docket No. (06-AFC-7)
148 page(s)
 CEC/A. HockadayG&B/M. Cosens
465866/3/2008E-mail - Request for letter re CCC, HBRP, and historic resources
E-mail - Request for letter re CCC, HBRP, and historic resources
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
465246/2/2008PG&E Company and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Condistions of Certification
PG&E Company and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Condistions of Certification
8 page(s)
 CEC / Docket UnitCEC / S. Galati
465296/2/2008Notice of Final Staff Assignment Workshop for the Humboldt Bay Repowering Project ( 06-AFC-7)
Notice of Final Staff Assignment Workshop for the Humboldt Bay Repowering Project ( 06-AFC-7)
5 page(s)
 CECCEC/ Terry O Brian
464955/29/2008Risk Assessment Forum, US Environmental Protection Agency, Guidelines for Carcinogen Risk Assessment
Risk Assessment Forum, US Environmental Protection Agency, Guidelines for Carcinogen Risk Assessment
166 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
464965/29/2008Peter M.J. Bos, Bert-Jan Baars, Marcel T.M. van Raaij, Risk Assessment of Peak Exposure to Genotoxic Carcinogens: A Pragmatic Approach
Peter M.J. Bos, Bert-Jan Baars, Marcel T.M. van Raaij, Risk Assessment of Peak Exposure to Genotoxic Carcinogens: A Pragmatic Approach
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
464975/29/2008Memo from L. Rhomburg, Carcinogen Assessment Group, Office of Health and Environmental Assessment, United States EPA on Correcting Methylene Chloride Risk Estimates for Pharmacokinetic Dose-Rate Effects
Memo from L. Rhomburg, Carcinogen Assessment Group, Office of Health and Environmental Assessment, United States EPA on Correcting Methylene Chloride Risk Estimates for Pharmacokinetic Dose-Rate Effects
9 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
464995/29/2008Declaration of J. Kessler for preparation of the Project Description section in the FSA
Declaration of J. Kessler for preparation of the Project Description section in the FSA
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
465015/29/2008Risk Assessment Forum, USEPA, Supplemental Guidance for Assessing Susceptibility from Early-Life Exposure to Carcinogens
Risk Assessment Forum, USEPA, Supplemental Guidance for Assessing Susceptibility from Early-Life Exposure to Carcinogens
126 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
465025/29/2008Facsimile communication from Dr. Edward Calabrese, Northeast Environmental Health Canter to Dr. Alvin Greenberg
Facsimile communication from Dr. Edward Calabrese, Northeast Environmental Health Canter to Dr. Alvin Greenberg
9 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
464455/21/2008Energy Commission Staff's Pre-Hearing Conference Statement
Energy Commission Staff's Pre-Hearing Conference Statement
6 page(s)
 CEC / Docket UnitCEC / L. DeCarlo
464465/21/2008PG&E's Prehearing Conference Statement
PG&E's Prehearing Conference Statement
29 page(s)
 CEC / Docket UnitGB / M. Cosens
464365/20/2008DOCUMENT HANDLING FOR THE HUMBOLDT BAY POWERING PROJECT(06-AFC-7)W/ PUBLIC PARTICIPATION IN THE REVIEW OF FSA
DOCUMENT HANDLING FOR THE HUMBOLDT BAY POWERING PROJECT(06-AFC-7)W/ PUBLIC PARTICIPATION IN THE REVIEW OF FSA
4 page(s)
 CEC/LIBRARYCEC/EILEEN ALLEN
463935/16/2008Email Comments of D. Byrd RE Humboldt Bay Power Plant Historic District Review
Email Comments of D. Byrd RE Humboldt Bay Power Plant Historic District Review
4 page(s)
 CEC / B. BastianOHP / D. Byrd
464045/16/2008Request for Agency Comments on the FSA
Request for Agency Comments on the FSA
2 page(s)
 Agency Distribution ListCEC/Eileen Allen
464055/16/2008Notice of Availability of the FSA
Notice of Availability of the FSA
3 page(s)
 Property Owners and GeneralCEC/Eileen Allen
466815/15/2008Humboldt Bay Repowering AFC (06-AFC-7) FSA
Humboldt Bay Repowering AFC (06-AFC-7) FSA
732 page(s)
 CEC/ Dockets UnitCEC/ John Kessler/ Terry O Brian
462225/9/2008E-mail regarding ISFSI Update
E-mail regarding ISFSI Update
1 page(s)
 CEC/ J. KesslerStrachan Consulting/ S. Strachan
461435/2/2008Notice of Prehearing Conference and Evidentiary Hearing
Notice of Prehearing Conference and Evidentiary Hearing
9 page(s)
 POS List/ Mail Lists #7211-7214CEC/ J. Byron/ K. Douglas
459964/23/2008FDOC Engineering Evaluation Package
FDOC Engineering Evaluation Package
120 page(s)
 CEC/ J. KesslerNCUAQMD/ R. Martin
459974/23/2008Title V Federal Operating Permit NCUAQMD Permit to Operate and FDOC
Title V Federal Operating Permit NCUAQMD Permit to Operate and FDOC
52 page(s)
 CEC/ J. KesslerNCUAQMD/ R. Martin
459144/17/2008Applicant's Supplemental Infomation in Responses to Workshop Queries Historical Resources Evaluation of the Humboldt Bay Power Plant Units 1 & 2 Humboldt Bay Repowering Project.
Applicant's Supplemental Infomation in Responses to Workshop Queries Historical Resources Evaluation of the Humboldt Bay Power Plant Units 1 & 2 Humboldt Bay Repowering Project.
5 page(s)
 CEC/ J. KesslerAFC Project Manager/ D. M. Davy
458964/14/2008City of Eureka's Support for PG&E's Contribution to a Public Use
City of Eureka's Support for PG&E's Contribution to a Public Use
2 page(s)
 CEC / J. KesslerCOE / D. Tyson
458314/2/2008Post-Shutdown Decommissioning Activities Report, Humboldt Bay Power Plant Unit 3
Post-Shutdown Decommissioning Activities Report, Humboldt Bay Power Plant Unit 3
13 page(s)
 CEC/ J. KesslerCH2MHILL/ D. Davy
457333/21/2008Updated POS List as of March. 21, 2008
Updated POS List as of March. 21, 2008
3 page(s)
 CEC/ All PartiesCEC/ M. Read
456983/14/2008Energy Commission Order No. 08-0312-6 RE: Siting committees
Energy Commission Order No. 08-0312-6 RE: Siting committees
4 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
455212/29/2008Revised Modeling for Increments Analysis; CD containing CTSCREEN-related modeling files
Revised Modeling for Increments Analysis; CD containing CTSCREEN-related modeling files
1 page(s)
 U.S. EPA/ G. RiosSierra Research/ G. Rubenstein
454512/25/2008Status Report 5
Status Report 5
6 page(s)
 CEC/J. ByronCEC/J. Kessler
454202/21/2008Report of Conversation with Tiffany Cable and Crescent City/ Del Norte Chamber of Comerce
Report of Conversation with Tiffany Cable and Crescent City/ Del Norte Chamber of Comerce
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
454212/21/2008Applicant's Responses to CEC Staff Workshop Queries 16 and 17
Applicant's Responses to CEC Staff Workshop Queries 16 and 17
14 page(s)
 CEC/J. KesslerCH2MHILL/D. Davy
453302/14/2008Record of Conversation - B. Bastian with John Hickman NRC Project Manager RE: Jurisdiction over Demolition of HBPP units 1 and 2
Record of Conversation - B. Bastian with John Hickman NRC Project Manager RE: Jurisdiction over Demolition of HBPP units 1 and 2
2 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
452932/8/2008Modeling Files-Supplemental Screening Health Risk Assessment
Modeling Files-Supplemental Screening Health Risk Assessment
1 page(s)
 CEC/J. KesslerSierra Research/G. Rubenstein
452942/8/2008Elk River Access Project Recommendations
Elk River Access Project Recommendations
64 page(s)
 City of EurekaNRS Division of RCAA
452772/6/2008Pacific Gas & Electric Company's Supplemental Screening Health Risk Assessment
Pacific Gas & Electric Company's Supplemental Screening Health Risk Assessment
40 page(s)
 CEC/A. HockadayGalati & Blek/M. Cosens
446861/22/2008Email re: Humbolt ManPower Schedule
Email re: Humbolt ManPower Schedule
2 page(s)
 CEC/ J. DiamondMike Momber
446451/18/2008Email Comments of S. and A. Arbaugh RE: Humbolt Bay Repowering Project by PG & E
Email Comments of S. and A. Arbaugh RE: Humbolt Bay Repowering Project by PG & E
1 page(s)
 CEC / Docket UnitCEC / J. Kessler
443331/15/2008Summary of the December 14, 2007 Prelimary Staff Assessment Workshop for the Humboldt Bay Repowering Project
Summary of the December 14, 2007 Prelimary Staff Assessment Workshop for the Humboldt Bay Repowering Project
23 page(s)
 CEC/Docket UnitCEC/J. Kessler
443351/15/2008Amendment to Facility License (Amendment No. 23, License No. DPR-7)
Amendment to Facility License (Amendment No. 23, License No. DPR-7)
20 page(s)
 CEC/ J. KesselerCH2MHILL/ J. Harris for D. Davy
442891/14/2008CCC Post-LCP Certification Permit and Appeal Jurisdiction
CCC Post-LCP Certification Permit and Appeal Jurisdiction
3 page(s)
 CEC/ M. HamblinCalifornia Coastal Commission/ T. Luster
442981/14/2008Email of Concern from M. Turcotte re Humbolt Bay
Email of Concern from M. Turcotte re Humbolt Bay
1 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
442991/14/2008Email from J. Kessler to Mr. Black re Power Plant in Eureka
Email from J. Kessler to Mr. Black re Power Plant in Eureka
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
441831/11/2008Letter regarding CDP #E07-005 for the SDPP
Letter regarding CDP #E07-005 for the SDPP
2 page(s)
 CCC/ T. LusterPG&E/ P. Mullen
441841/11/2008E-07-005 SR & exhibits
E-07-005 SR & exhibits
19 page(s)
 CEC/ J. KesslerCalifornia Coastal Commission/ T. Luster
440591/9/2008PG&E Pipeline Removal Project
PG&E Pipeline Removal Project
27 page(s)
 HBHR & CD/ D. HullPG&E/ M. Momber
439521/4/2008Notice of Second Preliminary Staff Assessment Workshop for the Humboldt Bay Repowering Project
Notice of Second Preliminary Staff Assessment Workshop for the Humboldt Bay Repowering Project
5 page(s)
 CEC / Docket UnitCEC / T. O'Brien
439161/2/2008Pacific Gas & Electric Company's Supplemental Comments on the Preliminary Staff Assessment
Pacific Gas & Electric Company's Supplemental Comments on the Preliminary Staff Assessment
13 page(s)
 CEC/Docket UnitGalati & Blek/D. Wiseman
4373512/14/2007Notice of Availability of PSA
Notice of Availability of PSA
3 page(s)
 CEC/Docket UnitCEC/E. Allen
4373612/14/2007Request for Agency Comments on the PSA
Request for Agency Comments on the PSA
2 page(s)
 Agency Distribution ListCEC/E. Allen
4373712/14/2007Document Handling for the Humboldt PSA
Document Handling for the Humboldt PSA
4 page(s)
 LibrariesCEC/E. Allen
4362612/7/2007Email from NPS to NCUAMD re: Quality Related Impacts on Resources
Email from NPS to NCUAMD re: Quality Related Impacts on Resources
2 page(s)
 NCUAQMD / Rick MartinNatural Park Service / Dee Morse
4362712/7/2007Letter on Behalf of PG&E Comments on the HBRP PDOC
Letter on Behalf of PG&E Comments on the HBRP PDOC
48 page(s)
 NCUAQMD / R. MartinSierra Research / G. Rubenstein
4353811/30/2007Notice of Preliminary Staff Assessment Workshop
Notice of Preliminary Staff Assessment Workshop
5 page(s)
 CEC/Docket UnitCEC/T. O'Brien
4353511/29/2007HBRP Preliminary Staff Assessment
HBRP Preliminary Staff Assessment
619 page(s)
 CEC/Docket UnitCEC
4347911/21/2007Letter to R. Martin re: Preliminary Determination of Compliance
Letter to R. Martin re: Preliminary Determination of Compliance
11 page(s)
 NCUAQMD / R. MartinCEC / P. Richins
4342811/19/2007Revised Visual Simulations
Revised Visual Simulations
9 page(s)
 CEC/ J. KesslerCH2MHILL/ D. Davy
4340511/16/2007Applicant's Responses to CEC Staff Data Request 103
Applicant's Responses to CEC Staff Data Request 103
5 page(s)
 CEC / J. KesslerCHM2HILL / D. Davy
4332111/13/2007Supplemental Screening Health Risk Assessment
Supplemental Screening Health Risk Assessment
8 page(s)
 NCUAPCD/ R. MartinSierra Research/ G. Rubenstein
4325411/7/2007Report of Conversation Between S. Goulet and H. Lindsdadt re: Railroad Use
Report of Conversation Between S. Goulet and H. Lindsdadt re: Railroad Use
1 page(s)
 Aspen / S. GouletNorth Coast Railroad Authority / H. Lindsdadt
4326111/7/2007Affirmation of Scheduling Order
Affirmation of Scheduling Order
4 page(s)
 CEC / Docket UnitCEC / J. Geesman and J. Byron
4324711/6/2007Applicant's Responses to CEC Staff Data Requests 104 and 105
Applicant's Responses to CEC Staff Data Requests 104 and 105
4 page(s)
 CEC / J. KesslerCH2M HILL / J. Harris for D. Davy
4318411/2/2007Response to Staff's Status Report Number 4
Response to Staff's Status Report Number 4
9 page(s)
 CEC / Docket UnitGB / M. Cosens
4319811/2/2007Applicant's Response to CEC Staff Data Request 100
Applicant's Response to CEC Staff Data Request 100
25 page(s)
 CEC/J. KesslerCH2M HILL/D. Davy
4316311/1/2007Responses to CEC Staff Requests 86-105
Responses to CEC Staff Requests 86-105
18 page(s)
 CEC / Docket UnitCH2M HILL / D. Davy
4316611/1/2007Applicant's Responses to CEC Staff Data Requests 86-105
Applicant's Responses to CEC Staff Data Requests 86-105
18 page(s)
 CEC / J. KesslerCH2MH / M. Davy
4312810/31/2007Data Requests #s 86-105
Data Requests #s 86-105
10 page(s)
 Radback Energy/G. LambergCEC/J. Kessler
4316010/31/2007Status Report 4
Status Report 4
8 page(s)
 CEC/J. Geesman/J. ByronCEC/J. Kessler
4307010/26/2007Committee Order and POS
Committee Order and POS
3 page(s)
 CEC / Docket UnitCEC / J. Geesman, J. Byron
4307210/26/2007Preliminary Determination of Compliance Permit to Construct Evaluation
Preliminary Determination of Compliance Permit to Construct Evaluation
56 page(s)
 CEC / Dockets UnitNCUAQMD / Staff
4307410/26/2007Preliminary Determination of Compliance
Preliminary Determination of Compliance
41 page(s)
 CEC / Docket UnitNCUAQMD / R. Martin
4300210/24/2007Status Report Number 4
Status Report Number 4
7 page(s)
 CEC / R. RodriguezGalati Blek LLP / M. Cosens
4285010/16/2007Review of Projects Subject to the Application For Certification
Review of Projects Subject to the Application For Certification
3 page(s)
 CEC / B. B. BlevinsCalifornia Coastal Commission / P. Douglas
4285710/16/2007Letter in Response to PG&E's July and August 8-9, 2007 Submittal
Letter in Response to PG&E's July and August 8-9, 2007 Submittal
6 page(s)
 PG&E/R. WillisDepart. of Army USACE/J. Hicks
4265410/4/2007Email Regarding Response to HBRP Data Requests
Email Regarding Response to HBRP Data Requests
2 page(s)
 CEC / J. KesslerNCUAQMD / R. Martin
425789/28/2007Supplement to Address Revised Air Quality Modeling and Increased Stack Height
Supplement to Address Revised Air Quality Modeling and Increased Stack Height
359 page(s)
 CEC / J. KesslerCH2MHILL / D. Davy
425139/26/2007Revised Air Quality Analysis for HBRP
Revised Air Quality Analysis for HBRP
2 page(s)
 CEC / J. KesslerCEC / R. Martin
424269/24/2007NCUAQMD Questions RE HBRP
NCUAQMD Questions RE HBRP
3 page(s)
 NCUAQMD / R. MartinRadback Energy / G. Lamberg
423739/20/2007Memo Regarding PM Control Efficiency of Diesel Oxidation Catalysts
Memo Regarding PM Control Efficiency of Diesel Oxidation Catalysts
21 page(s)
 APCO North Coast Unified Air Pollution Control District / R. MartinSierra Research / G. Rubenstein
422579/12/2007Revised Air Quality Analysis Section 8.1A - 8.1G
Revised Air Quality Analysis Section 8.1A - 8.1G
1 page(s)
 CEC / Docket UnitSierra Research / G. Rubenstein
420768/27/2007National Park Service Humboldt Bay Letter
National Park Service Humboldt Bay Letter
2 page(s)
 EPS / D. MorseNCUAQMD / R. Martin
419528/17/2007CDP Application # E-07-005 for Proposed Offices and Parking at Humboldt
CDP Application # E-07-005 for Proposed Offices and Parking at Humboldt
4 page(s)
 CECEbergy, Ocean Resources, and Federal Consistency Division / T. Luster
418558/9/2007Humboldt Bay Repowering Project
Humboldt Bay Repowering Project
3 page(s)
 NCUAQMD / R. MartinCEC / J. Kessler
416927/27/2007CEC Staff Comments on the Revised Modeling Protocol for the Humboldt Bay Repowering Project
CEC Staff Comments on the Revised Modeling Protocol for the Humboldt Bay Repowering Project
7 page(s)
 CEC / J. KesslerSierra Reasearch / G. Rubenstein
415737/19/2007Email correspondence with John McNiel regarding new construction
Email correspondence with John McNiel regarding new construction
1 page(s)
 CEC/Docket UnitCEC/J. Kessler
415507/18/2007Letter in response to July 5, 2007 letter to G. Lamberg/PG&E regarding revised modeling protocol submitted June 13, 2007.
Letter in response to July 5, 2007 letter to G. Lamberg/PG&E regarding revised modeling protocol submitted June 13, 2007.
2 page(s)
 NCAQMD/ R. MartinSierra Research/ G. Rubenstein
415517/18/2007Modeling Protocol, Revised July 17, 2007.
Modeling Protocol, Revised July 17, 2007.
25 page(s)
 NCAQMD/ CEC/ J. KesslerSierra Research
415387/17/2007PG&E's Proposed and Revised Air Quality Modeling Protocol as of 6-13-07 in Track Changes Format
PG&E's Proposed and Revised Air Quality Modeling Protocol as of 6-13-07 in Track Changes Format
27 page(s)
 CEC/Docket UnitCEC/J. Kessler
415327/16/2007Comments on the HBPPRP Modeling Protocol, June 13, 2007.
Comments on the HBPPRP Modeling Protocol, June 13, 2007.
3 page(s)
 CEC/ J. KesslerARB/ K. Howard
415337/16/2007E-mail from J. Mc Niel regarding the proposed construction of the HBRP.
E-mail from J. Mc Niel regarding the proposed construction of the HBRP.
1 page(s)
 CEC/ J. KesslerJ. McNiel
414337/6/2007Buhne Point Wetlands Preserve Mitigation and Monitoring Plan; and Coastal Access Anhancement Proposal; POS included.
Buhne Point Wetlands Preserve Mitigation and Monitoring Plan; and Coastal Access Anhancement Proposal; POS included.
100 page(s)
 CEC/ J. KesslerCH2MHILL/ J. Harris for D. Davy
414007/5/2007HBRP Revised Modeling Protocol
HBRP Revised Modeling Protocol
42 page(s)
 PG&E/G. LambergNCUAQMD/R. Martin, Jr.
411566/25/2007Memo in response to the request that the CARB review and comment on the Humbolt Bay Repowering Project Modeling Protocol dared May 2007
Memo in response to the request that the CARB review and comment on the Humbolt Bay Repowering Project Modeling Protocol dared May 2007
5 page(s)
 CEC/ Dockets UnitAir Resources Board/ K. Howard
410196/15/2007Initial Comments on PG&E's Revised Modeling Protocol for the Humbolt Bay Repowering Project.
Initial Comments on PG&E's Revised Modeling Protocol for the Humbolt Bay Repowering Project.
27 page(s)
 NCUAQMD/ R. MartinCEC/ J. Kessler
408976/8/2007E-mail from the California Department of Fish and Game (CDFG) indicating that no CDFG permits are required for the PGE HBRP project, sent on June 6, 2007.
E-mail from the California Department of Fish and Game (CDFG) indicating that no CDFG permits are required for the PGE HBRP project, sent on June 6, 2007.
4 page(s)
 CEC/ J. KesslerCH2MHILL/ J. Harris for D. Davy
408696/7/2007Updated POS list and labels.
Updated POS list and labels.
3 page(s)
 CEC/ Dockets UnitCEC/ C. Hillhouse
408366/6/2007Committee Order--Order responds to a May 17, 2007 petition filed by PG&E.
Committee Order--Order responds to a May 17, 2007 petition filed by PG&E.
3 page(s)
 CEC/ Dockets UnitCEC/ J. Geesman/ J. Byron
408486/6/2007POS list current as of June 6, 2007.
POS list current as of June 6, 2007.
3 page(s)
 All PartiesCEC/ C. Hillhouse
408146/5/2007PG&E Proposed New Modeling Protocol for HBRP May 2007
PG&E Proposed New Modeling Protocol for HBRP May 2007
25 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
406655/30/2007CA Coastal Commission Comments on HBRP, PG&E Petition for Bifurcation & Revised Scheduling Order
CA Coastal Commission Comments on HBRP, PG&E Petition for Bifurcation & Revised Scheduling Order
2 page(s)
 CEC/ J. Geesman/ J. Byron/ Dockets UnitCCC/ T. Luster
406725/30/2007CEC Response to PG&E Petition for Bifurcation & Revised Scheduling Order
CEC Response to PG&E Petition for Bifurcation & Revised Scheduling Order
8 page(s)
 CEC/Dockets UnitCEC/L. DeCarlo
406465/29/2007U.S Army Corps of Engineers Wetland Delineation Verification Letter and Map, Dated April 23,2007(POS, By J. Harris, Attached)
U.S Army Corps of Engineers Wetland Delineation Verification Letter and Map, Dated April 23,2007(POS, By J. Harris, Attached)
6 page(s)
 CEC/J.KesslerCH2MHILL/J.Harris for D. Davy
405565/24/2007Notice of Public Hearing regarding the PG&E Petition
Notice of Public Hearing regarding the PG&E Petition
4 page(s)
 CEC/Dockets UnitCEC/J. Geesman/J. Byron
404895/18/2007PG&E Petition for Bifurcation and Revised Scheduling Order
PG&E Petition for Bifurcation and Revised Scheduling Order
10 page(s)
 CEC/R. RodriguezGalati Blek/M. Cosens
404915/18/2007Humboldt Bay Repowering Project's Preliminary Air Quality & Public Health Issues
Humboldt Bay Repowering Project's Preliminary Air Quality & Public Health Issues
7 page(s)
 CEC/R. RodriguezGalati Blek/M. Cosens
404205/15/2007HBRP - Letter to PG&E & Status Rpt by PG&E & CEC
HBRP - Letter to PG&E & Status Rpt by PG&E & CEC
2 page(s)
 CEC/J. KesslerNorth Coast Unified AQMD/B. Wilson
404215/15/2007HBRP Letter to PG&E & Status Report by PG&E and CEC
HBRP Letter to PG&E & Status Report by PG&E and CEC
2 page(s)
 CEC/J. KesslerNCUAQMD/R. Martin
403725/11/2007HBRP Status Report Number 3
HBRP Status Report Number 3
7 page(s)
 CEC/R. RodriquezGalati Blek/M. Cosens
403835/11/200706-AFC-7 Humboldt Bay Repowering Project Status Report 3
06-AFC-7 Humboldt Bay Repowering Project Status Report 3
6 page(s)
 CEC/J. Geesman/J. ByronCEC/J. Kessler
403845/11/2007Humboldt Bay Repowering Project Prelim Air Quality & Public Health Issues
Humboldt Bay Repowering Project Prelim Air Quality & Public Health Issues
7 page(s)
 PG&E/G. LambergCEC/J. Kessler
403125/9/2007ROC with Wartsila on CBO Requirements
ROC with Wartsila on CBO Requirements
1 page(s)
 CEC/Docket UnitCEC/J. Kessler
403265/9/200706-AFC-7 REVISED Humboldt Bay Power Plant Activities
06-AFC-7 REVISED Humboldt Bay Power Plant Activities
3 page(s)
 CEC/J. KesslerPG&E/G. Lamberg
403485/9/2007PG&E's 2004 Long Term RFO Projects Letter
PG&E's 2004 Long Term RFO Projects Letter
6 page(s)
 CEC/R. RodriguezGalatiBlek/M. Cosens
402735/4/2007Humboldt Bay Power Plant Activities
Humboldt Bay Power Plant Activities
3 page(s)
 CEC/J. KesslerPG&E/G. Lamberg
401004/23/2007ROC with Doug Davy of CH2MHill on Historic District
ROC with Doug Davy of CH2MHill on Historic District
1 page(s)
 CEC/Docket UnitCEC/J. Kessler
401094/23/2007Humboldt Bay Repowering Project - Preliminary Phase II ESA Report
Humboldt Bay Repowering Project - Preliminary Phase II ESA Report
78 page(s)
 CEC/J. KesslerCH2MHill/D. Davy
400594/18/2007Letter Report on Air Quality Modeling Methodology for the Humboldt Bay Repowering Project, prepared by D. Burce Turner, Trinity Consultants
Letter Report on Air Quality Modeling Methodology for the Humboldt Bay Repowering Project, prepared by D. Burce Turner, Trinity Consultants
18 page(s)
 CEC/J. KesslerCH2MHill/D. Davy
400104/16/2007Redwood Coast Energy Authority Support Letter for Humboldt Bay Repowering Project
Redwood Coast Energy Authority Support Letter for Humboldt Bay Repowering Project
2 page(s)
 CEC/J. KesslerRCEA/J. Leonard
399654/11/2007Wartsila Memo Confirming the Emission Values Contained in the AFC
Wartsila Memo Confirming the Emission Values Contained in the AFC
16 page(s)
 CEC/J. KesslerCH2MHILL/D. Davy
399534/10/2007Review of Modeling Analysis in Humboldt Power Plant AFC
Review of Modeling Analysis in Humboldt Power Plant AFC
3 page(s)
 ARB/M. TollstrupARB/J. DaMassa
398834/4/2007PG&E Revisions to the Air Quality Analysis Baseline Period & Emission Reduction Credits
PG&E Revisions to the Air Quality Analysis Baseline Period & Emission Reduction Credits
9 page(s)
 CEC/J. Kessler/Docket UnitPG&E/D. Davy
398283/30/2007PG&E Responses to Wkshp Queries 3, 11, 14 & 15 and Data Requests 11, 55, 82 & 83
PG&E Responses to Wkshp Queries 3, 11, 14 & 15 and Data Requests 11, 55, 82 & 83
3 page(s)
 CEC/J. Kessler/Docket UnitCH2MHILL/D. Davy
397723/27/2007POS List
POS List
3 page(s)
 All PartiesCEC/C. Hillhouse
397543/23/2007PG&E Responses to Wkshp Queries 8 & 23-27
PG&E Responses to Wkshp Queries 8 & 23-27
1 page(s)
 CEC/J. Kessler/Docket UnitCH2MHILL/D. Davy
396873/20/2007SCR Efficiency Info from Wartsila
SCR Efficiency Info from Wartsila
2 page(s)
 Docket UnitCEC/J. Kessler
396483/16/2007CH2MHILL responses to data requests 79-85 & Wkshp queries
CH2MHILL responses to data requests 79-85 & Wkshp queries
56 page(s)
 CEC/J. Kessler/Dockets UnitCH2MHILL/D. Davy
396293/15/2007Wartsila Emission Factor Guarantees for HBPR
Wartsila Emission Factor Guarantees for HBPR
1 page(s)
 Air Resources Board/S. Altman/CEC/Docket UnitSierra Research/G. Rubenstein
396223/14/2007STATUS REPORT #2
STATUS REPORT #2
5 page(s)
 CEC/J. GEESMAN, J. BYRONCEC/J. KESSLER
396263/14/2007Galati and Blek Status Report #2
Galati and Blek Status Report #2
5 page(s)
 CEC/Dockt UnitG&B/ M. Mills
395513/9/2007Wartsila Uncontrolled Emissions
Wartsila Uncontrolled Emissions
1 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
395573/9/2007CAISO letter concerning their concurrence with the use of a SPS at Humboldt to mitigate the potential emergency overload on the Humboldt-Trinity 115 kV line and dynamic stability issues.
CAISO letter concerning their concurrence with the use of a SPS at Humboldt to mitigate the potential emergency overload on the Humboldt-Trinity 115 kV line and dynamic stability issues.
2 page(s)
 PG&E/ R. JenkinsCAISO/P. Didsayabutra
395133/8/2007ROC with Humboldt County Plannning Department RE the School Impact Fees.
ROC with Humboldt County Plannning Department RE the School Impact Fees.
1 page(s)
 Docket UnitCEC/ J. Diamond
395023/7/20075 YEAR STUDY OF PROPERTY TAXES FOR HUMBOLDT
5 YEAR STUDY OF PROPERTY TAXES FOR HUMBOLDT
1 page(s)
 CEC/DOCKETS UNITDCN/S. STRACHAN
394573/2/2007NOTICE OF DATA RESPONSE & ISSUE RESOLUTION STAFF WORKSHOP FOR HUMBOLDT
NOTICE OF DATA RESPONSE & ISSUE RESOLUTION STAFF WORKSHOP FOR HUMBOLDT
5 page(s)
 CEC/DOCKETS UNITCEC/T. OBRIEN
394753/2/2007Response to Air Quality Workshop Query #1.
Response to Air Quality Workshop Query #1.
4 page(s)
 CEC/ J. KesslerCH2M Hill/ J. Harris for D. Davy
394142/28/2007RESPONSE FROM NCAQMD TO SIERRA RESEARCH, CONSULTANT TO PG&E
RESPONSE FROM NCAQMD TO SIERRA RESEARCH, CONSULTANT TO PG&E
2 page(s)
 CEC/DOCKETS UNITCEC/J. KESSLER
394152/28/2007RESPONSE TO N. MATTHEWS OF SIERRA RESEARCH FROM R. MARTIN OF NCUAQMD
RESPONSE TO N. MATTHEWS OF SIERRA RESEARCH FROM R. MARTIN OF NCUAQMD
1 page(s)
 CEC/DOCKETS UNITCEC/J. KESSLER
394192/28/2007HBRP DATA REQUESTS 79-85
HBRP DATA REQUESTS 79-85
8 page(s)
 PGE/G. LAMBERGCEC/J. KESSLER
393912/26/2007REPORT OF CONVERSATION - HUMBOLDT SITE VISIT
REPORT OF CONVERSATION - HUMBOLDT SITE VISIT
1 page(s)
 CEC/DOCKETS UNITCEC/J. MATHIAS
393722/23/2007ROC School impact fees for the HBRP
ROC School impact fees for the HBRP
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
392632/14/200702-08-07 Response to ARB Questions
02-08-07 Response to ARB Questions
7 page(s)
 CEC/ Docket UnitCEC/ J. KEssler
392552/13/2007Submittal of PG&E's REsponses to Staff DR 58-78 and WQ 1-22
Submittal of PG&E's REsponses to Staff DR 58-78 and WQ 1-22
127 page(s)
 CEC/ J. KesslerCH2M Hill/ D. Davy
391592/2/2007ARB REsponses
ARB REsponses
1 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
391772/2/2007Additional responses to questions forom Simona Altman of the air resources board, by nancy matthews of sierra research.
Additional responses to questions forom Simona Altman of the air resources board, by nancy matthews of sierra research.
13 page(s)
 CEC/ DOcket UnitCH2MHill/ D. McDavy
391171/30/2007Humboldt Bay Repowering Project Status Report 1
Humboldt Bay Repowering Project Status Report 1
4 page(s)
 CEC/J. Geesman, J. ByronCEC/J. Kessler
391061/29/2007Responses to ARB Questions Regarding HBRP
Responses to ARB Questions Regarding HBRP
2 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
391121/29/2007Status Report Number One
Status Report Number One
5 page(s)
 CEC/ DocketUnitG&B/ M. Cosens
390911/26/2007Responses to ARB questions regarding HBRP.
Responses to ARB questions regarding HBRP.
2 page(s)
 CEC/ Docket SUnCEC/ J. Kessler
390241/23/2007ROC with Minnesota IMPLAN Group RE Calaculation of IMPLAN Income and Output Multipliers
ROC with Minnesota IMPLAN Group RE Calaculation of IMPLAN Income and Output Multipliers
1 page(s)
 Docket UnitCEC/ J. Kessler/ J. Diamond
390121/22/2007ROC Dr. Yusef with ch2mhill regarding calculation income multipliers for HBRP
ROC Dr. Yusef with ch2mhill regarding calculation income multipliers for HBRP
2 page(s)
 CEC/ Docket UnitCEC/ J. Diamond
389651/19/2007Sierra Research's REsponses to Emission Calculations from Nancy Matthews
Sierra Research's REsponses to Emission Calculations from Nancy Matthews
7 page(s)
 CEC/ J. KesslerSR/N. Matthews
389701/19/2007Notice of Data Response & Issues Resolution Staff Workshop for the Humboldt Bay Repowering Project 06-AFC-7. and POS.
Notice of Data Response & Issues Resolution Staff Workshop for the Humboldt Bay Repowering Project 06-AFC-7. and POS.
4 page(s)
 Docket UnitJ. Kessler / T. O'Brien / CEC
389791/19/2007Transmittal of E-Copy of Draft Wetland Delineation Report.
Transmittal of E-Copy of Draft Wetland Delineation Report.
1 page(s)
 CEC/ J. KesslerCH2M Hill/ D. J. Crowe
389441/18/2007Web Team, N. Matthews' Responses to ARB Questions
Web Team, N. Matthews' Responses to ARB Questions
3 page(s)
 S. AltmanSierra Research/ N. Matthews
389531/18/2007Sign In Sheet for Site Visit Workshop held on Dec. 18
Sign In Sheet for Site Visit Workshop held on Dec. 18
6 page(s)
 Docket UnitCEC/ J. Kessler
389391/17/2007Responses to Questions RE HBRP Emission Calculations.
Responses to Questions RE HBRP Emission Calculations.
10 page(s)
 Docket UnitCEC/ J. Kessler
389451/17/2007Responses to Questions from S. Altman by N. Matthews.
Responses to Questions from S. Altman by N. Matthews.
15 page(s)
 CEC/ J. KesslerCH2M Hill/ D.M. Davy
389121/12/2007Data responses to data requests 1-57
Data responses to data requests 1-57
503 page(s)
 CEC/J. KesslerCH2MHill/ D. Davy
389141/12/2007Drainage, erosion, and sediment control plan
Drainage, erosion, and sediment control plan
300 page(s)
 CEC/ Docket UnitCH2MHill
388931/11/2007Data Requests #'s 58-78
Data Requests #'s 58-78
12 page(s)
 PG&E/ G. LambergCEC/ J. Kessler
388171/3/2007Committee Scheduling Order +POS
Committee Scheduling Order +POS
5 page(s)
 CEC/ Dockets UnitCEC/Geesman, Byron
387991/2/2007Informational Heaing and Site Visit.
Informational Heaing and Site Visit.
81 page(s)
 CEC/ Dockets UnitPSRC/ P. Petty
3876512/22/2006Notes from Informational Hearing on 12-18-06 and POS
Notes from Informational Hearing on 12-18-06 and POS
4 page(s)
 Docket UnitGary Fay / CEC
3876812/22/2006Humboldt Bay Repowering Project Proposed Schedule
Humboldt Bay Repowering Project Proposed Schedule
4 page(s)
 Docket UnitM. Cosens / Galati & Blek
3874712/21/2006Description of Ex Parte Communication
Description of Ex Parte Communication
1 page(s)
 CEC/ Dockets UnitCEC/ J. Byron
3871112/19/2006Letter to assembly member Berg
Letter to assembly member Berg
2 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
3871212/19/2006Letter to senator wiggins
Letter to senator wiggins
2 page(s)
 CEC/ Dockets UnitCEC. J. Kessler
3871312/19/2006Cumulative impacts analysis letter to Nancy matthews.
Cumulative impacts analysis letter to Nancy matthews.
2 page(s)
 CEC/ Dockets UnitNCUAQMD/ S. Altman
3871412/19/2006Draft Wetland delineation report with transmittal letters.
Draft Wetland delineation report with transmittal letters.
90 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
3860412/11/2006Letter to Mayor La Vallee
Letter to Mayor La Vallee
2 page(s)
 CEC/ Docket UnitCEC/ J, Kessler
3860512/11/2006Letter to Supervisor Smith
Letter to Supervisor Smith
2 page(s)
 CEC/ Docket UnitCEC/ J. Kessler
3858112/8/2006Data Request Package.
Data Request Package.
25 page(s)
 PG&E/ G. LambergCEC/ J. Kessler
3849511/30/2006Issues Identification Report and POS.
Issues Identification Report and POS.
12 page(s)
 Commissioner J. Geesman/ Commissioner J. ByronCEC/ J. Kessler
3847111/27/2006Letter dated November 27, 2006 Re: Proposed Repowering Project on Humboldt Bay, Humboldt County. (Separate letters to different Tribal Leaders and or members.)
Letter dated November 27, 2006 Re: Proposed Repowering Project on Humboldt Bay, Humboldt County. (Separate letters to different Tribal Leaders and or members.)
7 page(s)
 Tribal Leaders / MembersP. Richins /CEC
3847211/27/2006Notice of Receipt -- Supplemental Information for the Humboldt Bay Repowering Project AFC
Notice of Receipt -- Supplemental Information for the Humboldt Bay Repowering Project AFC
3 page(s)
 Docket UnitR. Johnson /CEC
3842011/17/2006Notice of Public Informational Hearing and Site Visit and POS.
Notice of Public Informational Hearing and Site Visit and POS.
7 page(s)
 PublicCEC/ j> Geesman / J. Byron
3845011/17/2006Notice of Public Informational Hearing and Site Visit.
Notice of Public Informational Hearing and Site Visit.
7 page(s)
 Interested PartiesCEC/ J. Geesman and J. Byron
3838411/14/2006Cumulative Impacts Analysis
Cumulative Impacts Analysis
2 page(s)
 Sierra Research/ N. MatthewsNorth Coast AQMD/ S. Altman
3838511/14/2006Letter in response to Request for Agency Participation
Letter in response to Request for Agency Participation
2 page(s)
 PG&E/ G. LambergDept. of the Army/ K. Reid for J. Hicks
3836511/9/2006Hearing Officer Assignment
Hearing Officer Assignment
1 page(s)
 All CommissionersChairman Pfannenstiel
3832611/6/2006Letter regarding HBRP - Enlarged AFC Electrical One-Line Diagram and Copies of Transmission Electronic Files.
Letter regarding HBRP - Enlarged AFC Electrical One-Line Diagram and Copies of Transmission Electronic Files.
370 page(s)
 CEC/ J. KesslerStrachan Consulting/ S. Strachan
3831211/3/2006LARGE MAPS -- Electrical System One Line Diagrams.
LARGE MAPS -- Electrical System One Line Diagrams.
5 page(s)
 CEC/ J. KesslerHumboldt Bay Repowering Project
3831511/3/2006Humboldt Bay Repowering Project, Revised Data Adequacy Recommendation
Humboldt Bay Repowering Project, Revised Data Adequacy Recommendation
10 page(s)
 J. Pfannenstiel, and all commissionersCEC/ B.B Blevins
3832111/3/2006Data Adequacy Supplement
Data Adequacy Supplement
35 page(s)
 CEC/ Dockets UnitPG&E/R. Kuga
3828311/1/2006Data adequacy recommendation and summary.
Data adequacy recommendation and summary.
77 page(s)
 CEC/ CommissionersCEC/ J. Kessler
3822110/23/2006Determination of Compliance of the PG&E Humboldt Bay Repowering Project Application for Certification.
Determination of Compliance of the PG&E Humboldt Bay Repowering Project Application for Certification.
1 page(s)
 R. B. WillisS. Altman / NCUAQMD
3823610/23/2006CA Coastal Com comments on AFC
CA Coastal Com comments on AFC
1 page(s)
 CEC/J. KesslerCCC/T. Luster
3819910/18/2006Request by North Coast Unified AQMD fulfilled by Sierra Research.
Request by North Coast Unified AQMD fulfilled by Sierra Research.
7 page(s)
 North Coast Unified AQMD/ S. AltmanSierra Research/ N. Matthews
3838710/13/2006Document Handling for the PG&E Humboldt Bay Repowering Project
Document Handling for the PG&E Humboldt Bay Repowering Project
3 page(s)
 LibrianR. Johnson /CEC
3814310/12/2006Request for Agency Participation in the Review of the PG&E Humboldt Bay RP, AFC
Request for Agency Participation in the Review of the PG&E Humboldt Bay RP, AFC
3 page(s)
 Agency Distribution ListCEC/ R.E. Johnson
3838810/12/2006Notice of Receipt
Notice of Receipt
3 page(s)
 Property and General listR. Johnson / CEC
3811010/11/2006Report of conversation J. Diamond with T. Smithers: Occupancy rate for Hotels/ Motels in the Eureka area.
Report of conversation J. Diamond with T. Smithers: Occupancy rate for Hotels/ Motels in the Eureka area.
1 page(s)
 CEC/ Dockets UnitCEC/ J. Kessler
3810210/10/2006Application for Determination of Compliance - HBRP.
Application for Determination of Compliance - HBRP.
28 page(s)
 North Coast Unified AQMD/ S. AltmanPG&E/ R. Willis
3808110/6/2006Humboldt application for confidential designation and historica resources info.
Humboldt application for confidential designation and historica resources info.
8 page(s)
 CEC/ B. B. BlevinsG&B, LLP/ S. Galati
3808210/6/2006App. for conf. desig. and paleo. report
App. for conf. desig. and paleo. report
6 page(s)
 CEC/ B. B. BlevinsG&B, LLP/ S. Galati
380509/29/200606-AFC-7 Humbolt Bay Repowering Project Volume 1 and 2, 1 AFC CD and 1 Air, Modeling CD.
06-AFC-7 Humbolt Bay Repowering Project Volume 1 and 2, 1 AFC CD and 1 Air, Modeling CD.
1545 page(s)
 B.B. BlevinsR. M. Kuga / PG&E
380519/29/200606-AFC-7 Humboldt Bay Repowering Project Cover Letter.
06-AFC-7 Humboldt Bay Repowering Project Cover Letter.
1 page(s)
 B.B. BlevinsR. M. Kuga/ PG&E