57072 | 5/31/2010 |
Petitioner Robert Sarvey's Verified Petition for Writ of Mandate and Complaint for Declaratory and Injuctive Releif and Atorney Fee's in the Matter of Sarvey v. North Coast United AQMD
21 page(s)
| | CEC/ Docket Unit | Atorney for R. Sarvey/ S. Volker |
56635 | 4/30/2010 |
Petition for Review, Petitioner's Informal Brief
30 page(s)
| | CEC/Docket Unit | Petitioner/R. Simpson |
48885 | 10/30/2008 |
Humbolt Bay Exhibit List & Exhibits
10 page(s)
| | CEC/ Docket Unit | CEC/ R. Avalos |
48315 | 10/2/2008 |
CEC Staff Comments
26 page(s)
| | CEC/ Docket Unit | Enegy Resources Conservation and Development Commission |
48255 | 9/30/2008 |
Final Commission Decision
414 page(s)
| | CEC/ Docket Unit | CEC/ BOYD |
48249 | 9/30/2008 |
Commission Adoption Order
5 page(s)
| | CEC/ Docket Unit | CEC/Rose M. Avalos |
48248 | 9/30/2008 |
Notice of Availability of Commission Decision
1 page(s)
| | CEC/ Docket Unit | CEC |
48215 | 9/26/2008 |
Notice of Decision by CEC
7 page(s)
| | Office Plannning & Research | CEC/ J. Kessler |
48144 | 9/22/2008 |
PG&E's Response to CARE and Rob Simpson Comments on PMPD
30 page(s)
| | CEC/ A. Hockaday | GalatiBlek/ M. Mills |
48056 | 9/18/2008 |
Comments from R. Simpson RE PMPD
1 page(s)
| | Public/ M. Boyd | Public/ R. Simpson |
48055 | 9/18/2008 |
US EPA EAB Remand
44 page(s)
| | CEC/ Docket Unit | Public/ M. Boyd |
48054 | 9/18/2008 |
CARE's Comments on PMPD
12 page(s)
| | CEC/ Docket Unit | Public/ M. Boyd |
48049 | 9/17/2008 |
Errata to the Presiding Member's Proposed Decision
9 page(s)
| | CEC/ Docket Unit | CEC/ M. Read |
48036 | 9/16/2008 |
Declaration of Obed Odemelam
1 page(s)
| | CEC/ Docket Unit | CEC/ P. Guinn |
48022 | 9/15/2008 |
401 Certificaiton Report of Conversation
4 page(s)
| | CEC/ A. Hockaday | GalatiBlek/ M. Mills |
47988 | 9/10/2008 |
PG&E's Comments on the Presiding Member's Proposed Decision
8 page(s)
| | CEC/ A. Hockaday | GalatiBlek/ D. Wiseman |
47760 | 8/26/2008 |
PG&E's Comments RE: Work Force
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
47649 | 8/20/2008 |
Order Granting Motion to Reopen Evidentiary Record and Notice of Evidentiary Hearing
4 page(s)
| | CEC/ Docket Unit | CEC/ J. Bryon/ K. Douglas |
47612 | 8/18/2008 |
HBRP Condition of Certification CUL-2, Submittal of Maps and Drawings of HBRP Footprint and Linear Facilities.
2 page(s)
| | CEC Docket Unit | D. Davy |
47598 | 8/18/2008 |
Humboldt Bay Presiding Member's Proposed Decision
378 page(s)
| | CEC Docket Unit | CEC J.Byron/ K. Douglas |
47596 | 8/18/2008 |
Letter to Submit PMPD for Humbolt Bay Power Project
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Byron/ K. Douglas |
47595 | 8/18/2008 |
Notice of Availability of Presiding Member's Proposed Decision
5 page(s)
| | CEC/ Docket Unit | CEC/ J. Byron/ K. Douglas |
47544 | 8/13/2008 |
PG&E's Bioretention Area Submittal
7 page(s)
| | CEC/Docket Unit | CH2M HILL/ D. Davy |
47543 | 8/13/2008 |
PG&E's Bioretention Area Submittal
7 page(s)
| | CEC / Docket Unit | CH2M HILL / D. Davy |
47536 | 8/13/2008 |
PG&E's Motion to Reopen Evidentiary Record
6 page(s)
| | CEC / A. Hockaday | Galati Blek LLP / D. Wiseman |
47200 | 7/24/2008 |
MOU between CEC and Bureau Veritas North America, Inc. for Design Review, Plan Check and Construction Inspection for HBRP
6 page(s)
| | CEC/ Docket Unit | CEC/ T. O'Brien/ BVNA, Inc./ K. Wedman |
46941 | 7/8/2008 |
PG&E and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Conditions of Certification
9 page(s)
| | CEC/ Docket Unit | CEC/ L. De Carlo/ GalatiBlek/ S. Galati |
46767 | 6/19/2008 |
Staff's Exhibits from June 17, 2008 Evidentiary Hearing
5 page(s)
| | CEC / Docket Unit | CEC / L. DeCarlo |
46695 | 6/13/2008 |
Energy Commission Staff's Response and Objection to PG&E's Motion in Limine to Strike CEC Staff Testimony
11 page(s)
| | CEC / Docket Unit | CEC / L. DeCarlo |
46692 | 6/13/2008 |
Letter in Response to June 3, 2008 Ruestions Regarding Cultural Resources
2 page(s)
| | CEC/ J. Kessler | CCC/ T. Luster |
46684 | 6/13/2008 |
Letter HBRP (06-AFC-7) Submittal of Compliance Documents.
2 page(s)
| | Mr. Scott A. Galati | CEC/Eileen Allen |
46681 | 5/15/2008 |
Humboldt Bay Repowering AFC (06-AFC-7) FSA
732 page(s)
| | CEC/ Dockets Unit | CEC/ John Kessler/ Terry O Brian |
46680 | 6/11/2008 |
PG&E's Motion in Limine to Strike CEC Staff Testimony
13 page(s)
| | CEC / Docket Unit | GB / D. Wiseman |
46620 | 6/6/2008 |
Energy Commision Staff's Notice regarding Designation of Alternate Witness
13 page(s)
| | POS List | CEC/ L. DeCarlo |
46604 | 6/4/2008 |
PG&E's Testimony for the Humboldt Bay Repowering Project Docket No. (06-AFC-7)
148 page(s)
| | CEC/A. Hockaday | G&B/M. Cosens |
46591 | 6/4/2008 |
Letter to State Historic Preservation Office RE: Historical Resources at Humbolt Bay
3 page(s)
| | SHP / M. Messinger | CEC / B. Bastian |
46586 | 6/3/2008 |
E-mail - Request for letter re CCC, HBRP, and historic resources
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46529 | 6/2/2008 |
Notice of Final Staff Assignment Workshop for the Humboldt Bay Repowering Project ( 06-AFC-7)
5 page(s)
| | CEC | CEC/ Terry O Brian |
46524 | 6/2/2008 |
PG&E Company and CEC Staff Joint Stipulation on Modifications to FSA and Proposed Condistions of Certification
8 page(s)
| | CEC / Docket Unit | CEC / S. Galati |
46502 | 5/29/2008 |
Facsimile communication from Dr. Edward Calabrese, Northeast Environmental Health Canter to Dr. Alvin Greenberg
9 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46501 | 5/29/2008 |
Risk Assessment Forum, USEPA, Supplemental Guidance for Assessing Susceptibility from Early-Life Exposure to Carcinogens
126 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46499 | 5/29/2008 |
Declaration of J. Kessler for preparation of the Project Description section in the FSA
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46497 | 5/29/2008 |
Memo from L. Rhomburg, Carcinogen Assessment Group, Office of Health and Environmental Assessment, United States EPA on Correcting Methylene Chloride Risk Estimates for Pharmacokinetic Dose-Rate Effects
9 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46496 | 5/29/2008 |
Peter M.J. Bos, Bert-Jan Baars, Marcel T.M. van Raaij, Risk Assessment of Peak Exposure to Genotoxic Carcinogens: A Pragmatic Approach
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46495 | 5/29/2008 |
Risk Assessment Forum, US Environmental Protection Agency, Guidelines for Carcinogen Risk Assessment
166 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
46446 | 5/21/2008 |
PG&E's Prehearing Conference Statement
29 page(s)
| | CEC / Docket Unit | GB / M. Cosens |
46445 | 5/21/2008 |
Energy Commission Staff's Pre-Hearing Conference Statement
6 page(s)
| | CEC / Docket Unit | CEC / L. DeCarlo |
46436 | 5/20/2008 |
DOCUMENT HANDLING FOR THE HUMBOLDT BAY POWERING PROJECT(06-AFC-7)W/ PUBLIC PARTICIPATION IN THE REVIEW OF FSA
4 page(s)
| | CEC/LIBRARY | CEC/EILEEN ALLEN |
46405 | 5/16/2008 |
Notice of Availability of the FSA
3 page(s)
| | Property Owners and General | CEC/Eileen Allen |
46404 | 5/16/2008 |
Request for Agency Comments on the FSA
2 page(s)
| | Agency Distribution List | CEC/Eileen Allen |
46393 | 5/16/2008 |
Email Comments of D. Byrd RE Humboldt Bay Power Plant Historic District Review
4 page(s)
| | CEC / B. Bastian | OHP / D. Byrd |
46222 | 5/9/2008 |
E-mail regarding ISFSI Update
1 page(s)
| | CEC/ J. Kessler | Strachan Consulting/ S. Strachan |
46143 | 5/2/2008 |
Notice of Prehearing Conference and Evidentiary Hearing
9 page(s)
| | POS List/ Mail Lists #7211-7214 | CEC/ J. Byron/ K. Douglas |
45997 | 4/23/2008 |
Title V Federal Operating Permit NCUAQMD Permit to Operate and FDOC
52 page(s)
| | CEC/ J. Kessler | NCUAQMD/ R. Martin |
45996 | 4/23/2008 |
FDOC Engineering Evaluation Package
120 page(s)
| | CEC/ J. Kessler | NCUAQMD/ R. Martin |
45914 | 4/17/2008 |
Applicant's Supplemental Infomation in Responses to Workshop Queries Historical Resources Evaluation of the Humboldt Bay Power Plant Units 1 & 2 Humboldt Bay Repowering Project.
5 page(s)
| | CEC/ J. Kessler | AFC Project Manager/ D. M. Davy |
45896 | 4/14/2008 |
City of Eureka's Support for PG&E's Contribution to a Public Use
2 page(s)
| | CEC / J. Kessler | COE / D. Tyson |
45831 | 4/2/2008 |
Post-Shutdown Decommissioning Activities Report, Humboldt Bay Power Plant Unit 3
13 page(s)
| | CEC/ J. Kessler | CH2MHILL/ D. Davy |
45733 | 3/21/2008 |
Updated POS List as of March. 21, 2008
3 page(s)
| | CEC/ All Parties | CEC/ M. Read |
45698 | 3/14/2008 |
Energy Commission Order No. 08-0312-6 RE: Siting committees
4 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45521 | 2/29/2008 |
Revised Modeling for Increments Analysis; CD containing CTSCREEN-related modeling files
1 page(s)
| | U.S. EPA/ G. Rios | Sierra Research/ G. Rubenstein |
45451 | 2/25/2008 |
Status Report 5
6 page(s)
| | CEC/J. Byron | CEC/J. Kessler |
45421 | 2/21/2008 |
Applicant's Responses to CEC Staff Workshop Queries 16 and 17
14 page(s)
| | CEC/J. Kessler | CH2MHILL/D. Davy |
45420 | 2/21/2008 |
Report of Conversation with Tiffany Cable and Crescent City/ Del Norte Chamber of Comerce
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
45330 | 2/14/2008 |
Record of Conversation - B. Bastian with John Hickman NRC Project Manager RE: Jurisdiction over Demolition of HBPP units 1 and 2
2 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
45294 | 2/8/2008 |
Elk River Access Project Recommendations
64 page(s)
| | City of Eureka | NRS Division of RCAA |
45293 | 2/8/2008 |
Modeling Files-Supplemental Screening Health Risk Assessment
1 page(s)
| | CEC/J. Kessler | Sierra Research/G. Rubenstein |
45277 | 2/6/2008 |
Pacific Gas & Electric Company's Supplemental Screening Health Risk Assessment
40 page(s)
| | CEC/A. Hockaday | Galati & Blek/M. Cosens |
44686 | 1/22/2008 |
Email re: Humbolt ManPower Schedule
2 page(s)
| | CEC/ J. Diamond | Mike Momber |
44645 | 1/18/2008 |
Email Comments of S. and A. Arbaugh RE: Humbolt Bay Repowering Project by PG & E
1 page(s)
| | CEC / Docket Unit | CEC / J. Kessler |
44335 | 1/15/2008 |
Amendment to Facility License (Amendment No. 23, License No. DPR-7)
20 page(s)
| | CEC/ J. Kesseler | CH2MHILL/ J. Harris for D. Davy |
44333 | 1/15/2008 |
Summary of the December 14, 2007 Prelimary Staff Assessment Workshop for the Humboldt Bay Repowering Project
23 page(s)
| | CEC/Docket Unit | CEC/J. Kessler |
44299 | 1/14/2008 |
Email from J. Kessler to Mr. Black re Power Plant in Eureka
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
44298 | 1/14/2008 |
Email of Concern from M. Turcotte re Humbolt Bay
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
44289 | 1/14/2008 |
CCC Post-LCP Certification Permit and Appeal Jurisdiction
3 page(s)
| | CEC/ M. Hamblin | California Coastal Commission/ T. Luster |
44184 | 1/11/2008 |
E-07-005 SR & exhibits
19 page(s)
| | CEC/ J. Kessler | California Coastal Commission/ T. Luster |
44183 | 1/11/2008 |
Letter regarding CDP #E07-005 for the SDPP
2 page(s)
| | CCC/ T. Luster | PG&E/ P. Mullen |
44059 | 1/9/2008 |
PG&E Pipeline Removal Project
27 page(s)
| | HBHR & CD/ D. Hull | PG&E/ M. Momber |
43952 | 1/4/2008 |
Notice of Second Preliminary Staff Assessment Workshop for the Humboldt Bay Repowering Project
5 page(s)
| | CEC / Docket Unit | CEC / T. O'Brien |
43916 | 1/2/2008 |
Pacific Gas & Electric Company's Supplemental Comments on the Preliminary Staff Assessment
13 page(s)
| | CEC/Docket Unit | Galati & Blek/D. Wiseman |
43737 | 12/14/2007 |
Document Handling for the Humboldt PSA
4 page(s)
| | Libraries | CEC/E. Allen |
43736 | 12/14/2007 |
Request for Agency Comments on the PSA
2 page(s)
| | Agency Distribution List | CEC/E. Allen |
43735 | 12/14/2007 |
Notice of Availability of PSA
3 page(s)
| | CEC/Docket Unit | CEC/E. Allen |
43627 | 12/7/2007 |
Letter on Behalf of PG&E Comments on the HBRP PDOC
48 page(s)
| | NCUAQMD / R. Martin | Sierra Research / G. Rubenstein |
43626 | 12/7/2007 |
Email from NPS to NCUAMD re: Quality Related Impacts on Resources
2 page(s)
| | NCUAQMD / Rick Martin | Natural Park Service / Dee Morse |
43538 | 11/30/2007 |
Notice of Preliminary Staff Assessment Workshop
5 page(s)
| | CEC/Docket Unit | CEC/T. O'Brien |
43535 | 11/29/2007 |
HBRP Preliminary Staff Assessment
619 page(s)
| | CEC/Docket Unit | CEC |
43479 | 11/21/2007 |
Letter to R. Martin re: Preliminary Determination of Compliance
11 page(s)
| | NCUAQMD / R. Martin | CEC / P. Richins |
43428 | 11/19/2007 |
Revised Visual Simulations
9 page(s)
| | CEC/ J. Kessler | CH2MHILL/ D. Davy |
43405 | 11/16/2007 |
Applicant's Responses to CEC Staff Data Request 103
5 page(s)
| | CEC / J. Kessler | CHM2HILL / D. Davy |
43321 | 11/13/2007 |
Supplemental Screening Health Risk Assessment
8 page(s)
| | NCUAPCD/ R. Martin | Sierra Research/ G. Rubenstein |
43261 | 11/7/2007 |
Affirmation of Scheduling Order
4 page(s)
| | CEC / Docket Unit | CEC / J. Geesman and J. Byron |
43254 | 11/7/2007 |
Report of Conversation Between S. Goulet and H. Lindsdadt re: Railroad Use
1 page(s)
| | Aspen / S. Goulet | North Coast Railroad Authority / H. Lindsdadt |
43247 | 11/6/2007 |
Applicant's Responses to CEC Staff Data Requests 104 and 105
4 page(s)
| | CEC / J. Kessler | CH2M HILL / J. Harris for D. Davy |
43198 | 11/2/2007 |
Applicant's Response to CEC Staff Data Request 100
25 page(s)
| | CEC/J. Kessler | CH2M HILL/D. Davy |
43184 | 11/2/2007 |
Response to Staff's Status Report Number 4
9 page(s)
| | CEC / Docket Unit | GB / M. Cosens |
43166 | 11/1/2007 |
Applicant's Responses to CEC Staff Data Requests 86-105
18 page(s)
| | CEC / J. Kessler | CH2MH / M. Davy |
43163 | 11/1/2007 |
Responses to CEC Staff Requests 86-105
18 page(s)
| | CEC / Docket Unit | CH2M HILL / D. Davy |
43160 | 10/31/2007 |
Status Report 4
8 page(s)
| | CEC/J. Geesman/J. Byron | CEC/J. Kessler |
43128 | 10/31/2007 |
Data Requests #s 86-105
10 page(s)
| | Radback Energy/G. Lamberg | CEC/J. Kessler |
43074 | 10/26/2007 |
Preliminary Determination of Compliance
41 page(s)
| | CEC / Docket Unit | NCUAQMD / R. Martin |
43072 | 10/26/2007 |
Preliminary Determination of Compliance Permit to Construct Evaluation
56 page(s)
| | CEC / Dockets Unit | NCUAQMD / Staff |
43070 | 10/26/2007 |
Committee Order and POS
3 page(s)
| | CEC / Docket Unit | CEC / J. Geesman, J. Byron |
43002 | 10/24/2007 |
Status Report Number 4
7 page(s)
| | CEC / R. Rodriguez | Galati Blek LLP / M. Cosens |
42857 | 10/16/2007 |
Letter in Response to PG&E's July and August 8-9, 2007 Submittal
6 page(s)
| | PG&E/R. Willis | Depart. of Army USACE/J. Hicks |
42850 | 10/16/2007 |
Review of Projects Subject to the Application For Certification
3 page(s)
| | CEC / B. B. Blevins | California Coastal Commission / P. Douglas |
42654 | 10/4/2007 |
Email Regarding Response to HBRP Data Requests
2 page(s)
| | CEC / J. Kessler | NCUAQMD / R. Martin |
42578 | 9/28/2007 |
Supplement to Address Revised Air Quality Modeling and Increased Stack Height
359 page(s)
| | CEC / J. Kessler | CH2MHILL / D. Davy |
42513 | 9/26/2007 |
Revised Air Quality Analysis for HBRP
2 page(s)
| | CEC / J. Kessler | CEC / R. Martin |
42426 | 9/24/2007 |
NCUAQMD Questions RE HBRP
3 page(s)
| | NCUAQMD / R. Martin | Radback Energy / G. Lamberg |
42373 | 9/20/2007 |
Memo Regarding PM Control Efficiency of Diesel Oxidation Catalysts
21 page(s)
| | APCO North Coast Unified Air Pollution Control District / R. Martin | Sierra Research / G. Rubenstein |
42257 | 9/12/2007 |
Revised Air Quality Analysis Section 8.1A - 8.1G
1 page(s)
| | CEC / Docket Unit | Sierra Research / G. Rubenstein |
42076 | 8/27/2007 |
National Park Service Humboldt Bay Letter
2 page(s)
| | EPS / D. Morse | NCUAQMD / R. Martin |
41952 | 8/17/2007 |
CDP Application # E-07-005 for Proposed Offices and Parking at Humboldt
4 page(s)
| | CEC | Ebergy, Ocean Resources, and Federal Consistency Division / T. Luster |
41855 | 8/9/2007 |
Humboldt Bay Repowering Project
3 page(s)
| | NCUAQMD / R. Martin | CEC / J. Kessler |
41692 | 7/27/2007 |
CEC Staff Comments on the Revised Modeling Protocol for the Humboldt Bay Repowering Project
7 page(s)
| | CEC / J. Kessler | Sierra Reasearch / G. Rubenstein |
41573 | 7/19/2007 |
Email correspondence with John McNiel regarding new construction
1 page(s)
| | CEC/Docket Unit | CEC/J. Kessler |
41551 | 7/18/2007 |
Modeling Protocol, Revised July 17, 2007.
25 page(s)
| | NCAQMD/ CEC/ J. Kessler | Sierra Research |
41550 | 7/18/2007 |
Letter in response to July 5, 2007 letter to G. Lamberg/PG&E regarding revised modeling protocol submitted June 13, 2007.
2 page(s)
| | NCAQMD/ R. Martin | Sierra Research/ G. Rubenstein |
41538 | 7/17/2007 |
PG&E's Proposed and Revised Air Quality Modeling Protocol as of 6-13-07 in Track Changes Format
27 page(s)
| | CEC/Docket Unit | CEC/J. Kessler |
41533 | 7/16/2007 |
E-mail from J. Mc Niel regarding the proposed construction of the HBRP.
1 page(s)
| | CEC/ J. Kessler | J. McNiel |
41532 | 7/16/2007 |
Comments on the HBPPRP Modeling Protocol, June 13, 2007.
3 page(s)
| | CEC/ J. Kessler | ARB/ K. Howard |
41433 | 7/6/2007 |
Buhne Point Wetlands Preserve Mitigation and Monitoring Plan; and Coastal Access Anhancement Proposal; POS included.
100 page(s)
| | CEC/ J. Kessler | CH2MHILL/ J. Harris for D. Davy |
41400 | 7/5/2007 |
HBRP Revised Modeling Protocol
42 page(s)
| | PG&E/G. Lamberg | NCUAQMD/R. Martin, Jr. |
41156 | 6/25/2007 |
Memo in response to the request that the CARB review and comment on the Humbolt Bay Repowering Project Modeling Protocol dared May 2007
5 page(s)
| | CEC/ Dockets Unit | Air Resources Board/ K. Howard |
41019 | 6/15/2007 |
Initial Comments on PG&E's Revised Modeling Protocol for the Humbolt Bay Repowering Project.
27 page(s)
| | NCUAQMD/ R. Martin | CEC/ J. Kessler |
40897 | 6/8/2007 |
E-mail from the California Department of Fish and Game (CDFG) indicating that no CDFG permits are required for the PGE HBRP project, sent on June 6, 2007.
4 page(s)
| | CEC/ J. Kessler | CH2MHILL/ J. Harris for D. Davy |
40869 | 6/7/2007 |
Updated POS list and labels.
3 page(s)
| | CEC/ Dockets Unit | CEC/ C. Hillhouse |
40848 | 6/6/2007 |
POS list current as of June 6, 2007.
3 page(s)
| | All Parties | CEC/ C. Hillhouse |
40836 | 6/6/2007 |
Committee Order--Order responds to a May 17, 2007 petition filed by PG&E.
3 page(s)
| | CEC/ Dockets Unit | CEC/ J. Geesman/ J. Byron |
40814 | 6/5/2007 |
PG&E Proposed New Modeling Protocol for HBRP May 2007
25 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
40672 | 5/30/2007 |
CEC Response to PG&E Petition for Bifurcation & Revised Scheduling Order
8 page(s)
| | CEC/Dockets Unit | CEC/L. DeCarlo |
40665 | 5/30/2007 |
CA Coastal Commission Comments on HBRP, PG&E Petition for Bifurcation & Revised Scheduling Order
2 page(s)
| | CEC/ J. Geesman/ J. Byron/ Dockets Unit | CCC/ T. Luster |
40646 | 5/29/2007 |
U.S Army Corps of Engineers Wetland Delineation Verification Letter and Map, Dated April 23,2007(POS, By J. Harris, Attached)
6 page(s)
| | CEC/J.Kessler | CH2MHILL/J.Harris for D. Davy |
40556 | 5/24/2007 |
Notice of Public Hearing regarding the PG&E Petition
4 page(s)
| | CEC/Dockets Unit | CEC/J. Geesman/J. Byron |
40491 | 5/18/2007 |
Humboldt Bay Repowering Project's Preliminary Air Quality & Public Health Issues
7 page(s)
| | CEC/R. Rodriguez | Galati Blek/M. Cosens |
40489 | 5/18/2007 |
PG&E Petition for Bifurcation and Revised Scheduling Order
10 page(s)
| | CEC/R. Rodriguez | Galati Blek/M. Cosens |
40421 | 5/15/2007 |
HBRP Letter to PG&E & Status Report by PG&E and CEC
2 page(s)
| | CEC/J. Kessler | NCUAQMD/R. Martin |
40420 | 5/15/2007 |
HBRP - Letter to PG&E & Status Rpt by PG&E & CEC
2 page(s)
| | CEC/J. Kessler | North Coast Unified AQMD/B. Wilson |
40384 | 5/11/2007 |
Humboldt Bay Repowering Project Prelim Air Quality & Public Health Issues
7 page(s)
| | PG&E/G. Lamberg | CEC/J. Kessler |
40383 | 5/11/2007 |
06-AFC-7 Humboldt Bay Repowering Project Status Report 3
6 page(s)
| | CEC/J. Geesman/J. Byron | CEC/J. Kessler |
40372 | 5/11/2007 |
HBRP Status Report Number 3
7 page(s)
| | CEC/R. Rodriquez | Galati Blek/M. Cosens |
40348 | 5/9/2007 |
PG&E's 2004 Long Term RFO Projects Letter
6 page(s)
| | CEC/R. Rodriguez | GalatiBlek/M. Cosens |
40326 | 5/9/2007 |
06-AFC-7 REVISED Humboldt Bay Power Plant Activities
3 page(s)
| | CEC/J. Kessler | PG&E/G. Lamberg |
40312 | 5/9/2007 |
ROC with Wartsila on CBO Requirements
1 page(s)
| | CEC/Docket Unit | CEC/J. Kessler |
40273 | 5/4/2007 |
Humboldt Bay Power Plant Activities
3 page(s)
| | CEC/J. Kessler | PG&E/G. Lamberg |
40109 | 4/23/2007 |
Humboldt Bay Repowering Project - Preliminary Phase II ESA Report
78 page(s)
| | CEC/J. Kessler | CH2MHill/D. Davy |
40100 | 4/23/2007 |
ROC with Doug Davy of CH2MHill on Historic District
1 page(s)
| | CEC/Docket Unit | CEC/J. Kessler |
40059 | 4/18/2007 |
Letter Report on Air Quality Modeling Methodology for the Humboldt Bay Repowering Project, prepared by D. Burce Turner, Trinity Consultants
18 page(s)
| | CEC/J. Kessler | CH2MHill/D. Davy |
40010 | 4/16/2007 |
Redwood Coast Energy Authority Support Letter for Humboldt Bay Repowering Project
2 page(s)
| | CEC/J. Kessler | RCEA/J. Leonard |
39965 | 4/11/2007 |
Wartsila Memo Confirming the Emission Values Contained in the AFC
16 page(s)
| | CEC/J. Kessler | CH2MHILL/D. Davy |
39953 | 4/10/2007 |
Review of Modeling Analysis in Humboldt Power Plant AFC
3 page(s)
| | ARB/M. Tollstrup | ARB/J. DaMassa |
39883 | 4/4/2007 |
PG&E Revisions to the Air Quality Analysis Baseline Period & Emission Reduction Credits
9 page(s)
| | CEC/J. Kessler/Docket Unit | PG&E/D. Davy |
39828 | 3/30/2007 |
PG&E Responses to Wkshp Queries 3, 11, 14 & 15 and Data Requests 11, 55, 82 & 83
3 page(s)
| | CEC/J. Kessler/Docket Unit | CH2MHILL/D. Davy |
39772 | 3/27/2007 |
POS List
3 page(s)
| | All Parties | CEC/C. Hillhouse |
39754 | 3/23/2007 |
PG&E Responses to Wkshp Queries 8 & 23-27
1 page(s)
| | CEC/J. Kessler/Docket Unit | CH2MHILL/D. Davy |
39687 | 3/20/2007 |
SCR Efficiency Info from Wartsila
2 page(s)
| | Docket Unit | CEC/J. Kessler |
39648 | 3/16/2007 |
CH2MHILL responses to data requests 79-85 & Wkshp queries
56 page(s)
| | CEC/J. Kessler/Dockets Unit | CH2MHILL/D. Davy |
39629 | 3/15/2007 |
Wartsila Emission Factor Guarantees for HBPR
1 page(s)
| | Air Resources Board/S. Altman/CEC/Docket Unit | Sierra Research/G. Rubenstein |
39626 | 3/14/2007 |
Galati and Blek Status Report #2
5 page(s)
| | CEC/Dockt Unit | G&B/ M. Mills |
39622 | 3/14/2007 |
STATUS REPORT #2
5 page(s)
| | CEC/J. GEESMAN, J. BYRON | CEC/J. KESSLER |
39557 | 3/9/2007 |
CAISO letter concerning their concurrence with the use of a SPS at Humboldt to mitigate the potential emergency overload on the Humboldt-Trinity 115 kV line and dynamic stability issues.
2 page(s)
| | PG&E/ R. Jenkins | CAISO/P. Didsayabutra |
39551 | 3/9/2007 |
Wartsila Uncontrolled Emissions
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
39513 | 3/8/2007 |
ROC with Humboldt County Plannning Department RE the School Impact Fees.
1 page(s)
| | Docket Unit | CEC/ J. Diamond |
39502 | 3/7/2007 |
5 YEAR STUDY OF PROPERTY TAXES FOR HUMBOLDT
1 page(s)
| | CEC/DOCKETS UNIT | DCN/S. STRACHAN |
39475 | 3/2/2007 |
Response to Air Quality Workshop Query #1.
4 page(s)
| | CEC/ J. Kessler | CH2M Hill/ J. Harris for D. Davy |
39457 | 3/2/2007 |
NOTICE OF DATA RESPONSE & ISSUE RESOLUTION STAFF WORKSHOP FOR HUMBOLDT
5 page(s)
| | CEC/DOCKETS UNIT | CEC/T. OBRIEN |
39419 | 2/28/2007 |
HBRP DATA REQUESTS 79-85
8 page(s)
| | PGE/G. LAMBERG | CEC/J. KESSLER |
39415 | 2/28/2007 |
RESPONSE TO N. MATTHEWS OF SIERRA RESEARCH FROM R. MARTIN OF NCUAQMD
1 page(s)
| | CEC/DOCKETS UNIT | CEC/J. KESSLER |
39414 | 2/28/2007 |
RESPONSE FROM NCAQMD TO SIERRA RESEARCH, CONSULTANT TO PG&E
2 page(s)
| | CEC/DOCKETS UNIT | CEC/J. KESSLER |
39391 | 2/26/2007 |
REPORT OF CONVERSATION - HUMBOLDT SITE VISIT
1 page(s)
| | CEC/DOCKETS UNIT | CEC/J. MATHIAS |
39372 | 2/23/2007 |
ROC School impact fees for the HBRP
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
39263 | 2/14/2007 |
02-08-07 Response to ARB Questions
7 page(s)
| | CEC/ Docket Unit | CEC/ J. KEssler |
39255 | 2/13/2007 |
Submittal of PG&E's REsponses to Staff DR 58-78 and WQ 1-22
127 page(s)
| | CEC/ J. Kessler | CH2M Hill/ D. Davy |
39177 | 2/2/2007 |
Additional responses to questions forom Simona Altman of the air resources board, by nancy matthews of sierra research.
13 page(s)
| | CEC/ DOcket Unit | CH2MHill/ D. McDavy |
39159 | 2/2/2007 |
ARB REsponses
1 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
39117 | 1/30/2007 |
Humboldt Bay Repowering Project Status Report 1
4 page(s)
| | CEC/J. Geesman, J. Byron | CEC/J. Kessler |
39112 | 1/29/2007 |
Status Report Number One
5 page(s)
| | CEC/ DocketUnit | G&B/ M. Cosens |
39106 | 1/29/2007 |
Responses to ARB Questions Regarding HBRP
2 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
39091 | 1/26/2007 |
Responses to ARB questions regarding HBRP.
2 page(s)
| | CEC/ Docket SUn | CEC/ J. Kessler |
39024 | 1/23/2007 |
ROC with Minnesota IMPLAN Group RE Calaculation of IMPLAN Income and Output Multipliers
1 page(s)
| | Docket Unit | CEC/ J. Kessler/ J. Diamond |
39012 | 1/22/2007 |
ROC Dr. Yusef with ch2mhill regarding calculation income multipliers for HBRP
2 page(s)
| | CEC/ Docket Unit | CEC/ J. Diamond |
38979 | 1/19/2007 |
Transmittal of E-Copy of Draft Wetland Delineation Report.
1 page(s)
| | CEC/ J. Kessler | CH2M Hill/ D. J. Crowe |
38970 | 1/19/2007 |
Notice of Data Response & Issues Resolution Staff Workshop for the Humboldt Bay Repowering Project 06-AFC-7. and POS.
4 page(s)
| | Docket Unit | J. Kessler / T. O'Brien / CEC |
38965 | 1/19/2007 |
Sierra Research's REsponses to Emission Calculations from Nancy Matthews
7 page(s)
| | CEC/ J. Kessler | SR/N. Matthews |
38953 | 1/18/2007 |
Sign In Sheet for Site Visit Workshop held on Dec. 18
6 page(s)
| | Docket Unit | CEC/ J. Kessler |
38945 | 1/17/2007 |
Responses to Questions from S. Altman by N. Matthews.
15 page(s)
| | CEC/ J. Kessler | CH2M Hill/ D.M. Davy |
38944 | 1/18/2007 |
Web Team,
N. Matthews' Responses to ARB Questions
3 page(s)
| | S. Altman | Sierra Research/ N. Matthews |
38939 | 1/17/2007 |
Responses to Questions RE HBRP Emission Calculations.
10 page(s)
| | Docket Unit | CEC/ J. Kessler |
38914 | 1/12/2007 |
Drainage, erosion, and sediment control plan
300 page(s)
| | CEC/ Docket Unit | CH2MHill |
38912 | 1/12/2007 |
Data responses to data requests 1-57
503 page(s)
| | CEC/J. Kessler | CH2MHill/ D. Davy |
38893 | 1/11/2007 |
Data Requests #'s 58-78
12 page(s)
| | PG&E/ G. Lamberg | CEC/ J. Kessler |
38817 | 1/3/2007 |
Committee Scheduling Order +POS
5 page(s)
| | CEC/ Dockets Unit | CEC/Geesman, Byron |
38799 | 1/2/2007 |
Informational Heaing and Site Visit.
81 page(s)
| | CEC/ Dockets Unit | PSRC/ P. Petty |
38768 | 12/22/2006 |
Humboldt Bay Repowering Project Proposed Schedule
4 page(s)
| | Docket Unit | M. Cosens / Galati & Blek |
38765 | 12/22/2006 |
Notes from Informational Hearing on 12-18-06 and POS
4 page(s)
| | Docket Unit | Gary Fay / CEC |
38747 | 12/21/2006 |
Description of Ex Parte Communication
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Byron |
38714 | 12/19/2006 |
Draft Wetland delineation report with transmittal letters.
90 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
38713 | 12/19/2006 |
Cumulative impacts analysis letter to Nancy matthews.
2 page(s)
| | CEC/ Dockets Unit | NCUAQMD/ S. Altman |
38712 | 12/19/2006 |
Letter to senator wiggins
2 page(s)
| | CEC/ Dockets Unit | CEC. J. Kessler |
38711 | 12/19/2006 |
Letter to assembly member Berg
2 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
38605 | 12/11/2006 |
Letter to Supervisor Smith
2 page(s)
| | CEC/ Docket Unit | CEC/ J. Kessler |
38604 | 12/11/2006 |
Letter to Mayor La Vallee
2 page(s)
| | CEC/ Docket Unit | CEC/ J, Kessler |
38581 | 12/8/2006 |
Data Request Package.
25 page(s)
| | PG&E/ G. Lamberg | CEC/ J. Kessler |
38495 | 11/30/2006 |
Issues Identification Report and POS.
12 page(s)
| | Commissioner J. Geesman/ Commissioner J. Byron | CEC/ J. Kessler |
38472 | 11/27/2006 |
Notice of Receipt -- Supplemental Information for the Humboldt Bay Repowering Project AFC
3 page(s)
| | Docket Unit | R. Johnson /CEC |
38471 | 11/27/2006 |
Letter dated November 27, 2006 Re: Proposed Repowering Project on Humboldt Bay, Humboldt County. (Separate letters to different Tribal Leaders and or members.)
7 page(s)
| | Tribal Leaders / Members | P. Richins /CEC |
38450 | 11/17/2006 |
Notice of Public Informational Hearing and Site Visit.
7 page(s)
| | Interested Parties | CEC/ J. Geesman and J. Byron |
38420 | 11/17/2006 |
Notice of Public Informational Hearing and Site Visit and POS.
7 page(s)
| | Public | CEC/ j> Geesman / J. Byron |
38388 | 10/12/2006 |
Notice of Receipt
3 page(s)
| | Property and General list | R. Johnson / CEC |
38387 | 10/13/2006 |
Document Handling for the PG&E Humboldt Bay Repowering Project
3 page(s)
| | Librian | R. Johnson /CEC |
38385 | 11/14/2006 |
Letter in response to Request for Agency Participation
2 page(s)
| | PG&E/ G. Lamberg | Dept. of the Army/ K. Reid for J. Hicks |
38384 | 11/14/2006 |
Cumulative Impacts Analysis
2 page(s)
| | Sierra Research/ N. Matthews | North Coast AQMD/ S. Altman |
38365 | 11/9/2006 |
Hearing Officer Assignment
1 page(s)
| | All Commissioners | Chairman Pfannenstiel |
38326 | 11/6/2006 |
Letter regarding HBRP - Enlarged AFC Electrical One-Line Diagram and Copies of Transmission Electronic Files.
370 page(s)
| | CEC/ J. Kessler | Strachan Consulting/ S. Strachan |
38321 | 11/3/2006 |
Data Adequacy Supplement
35 page(s)
| | CEC/ Dockets Unit | PG&E/R. Kuga |
38315 | 11/3/2006 |
Humboldt Bay Repowering Project, Revised Data Adequacy Recommendation
10 page(s)
| | J. Pfannenstiel, and all commissioners | CEC/ B.B Blevins |
38312 | 11/3/2006 |
LARGE MAPS -- Electrical System One Line Diagrams.
5 page(s)
| | CEC/ J. Kessler | Humboldt Bay Repowering Project |
38283 | 11/1/2006 |
Data adequacy recommendation and summary.
77 page(s)
| | CEC/ Commissioners | CEC/ J. Kessler |
38236 | 10/23/2006 |
CA Coastal Com comments on AFC
1 page(s)
| | CEC/J. Kessler | CCC/T. Luster |
38221 | 10/23/2006 |
Determination of Compliance of the PG&E Humboldt Bay Repowering Project Application for Certification.
1 page(s)
| | R. B. Willis | S. Altman / NCUAQMD |
38199 | 10/18/2006 |
Request by North Coast Unified AQMD fulfilled by Sierra Research.
7 page(s)
| | North Coast Unified AQMD/ S. Altman | Sierra Research/ N. Matthews |
38143 | 10/12/2006 |
Request for Agency Participation in the Review of the PG&E Humboldt Bay RP, AFC
3 page(s)
| | Agency Distribution List | CEC/ R.E. Johnson |
38110 | 10/11/2006 |
Report of conversation J. Diamond with T. Smithers: Occupancy rate for Hotels/ Motels in the Eureka area.
1 page(s)
| | CEC/ Dockets Unit | CEC/ J. Kessler |
38102 | 10/10/2006 |
Application for Determination of Compliance - HBRP.
28 page(s)
| | North Coast Unified AQMD/ S. Altman | PG&E/ R. Willis |
38082 | 10/6/2006 |
App. for conf. desig. and paleo. report
6 page(s)
| | CEC/ B. B. Blevins | G&B, LLP/ S. Galati |
38081 | 10/6/2006 |
Humboldt application for confidential designation and historica resources info.
8 page(s)
| | CEC/ B. B. Blevins | G&B, LLP/ S. Galati |
38051 | 9/29/2006 |
06-AFC-7 Humboldt Bay Repowering Project Cover Letter.
1 page(s)
| | B.B. Blevins | R. M. Kuga/ PG&E |
38050 | 9/29/2006 |
06-AFC-7 Humbolt Bay Repowering Project Volume 1 and 2, 1 AFC CD and 1 Air, Modeling CD. The AFC is too large to docket. Contact the Docket Unit or the Siting Division. 1545 page(s)
| | B.B. Blevins | R. M. Kuga / PG&E |
2342-0 | 9/23/2008 |
Committee Conference, PMPD, Evidentiary Hearing
24 page(s)
| | | CEC |
2302-0 | 6/30/2008 |
Evidentiary Hearing
111 page(s)
| | | CEC |
2294-0 | 6/2/2008 |
Prehearing Conference
34 page(s)
| | | CEC |
2151-0 | 6/11/2007 |
Public Hearing In the Matter of the Humboldt Bay AFC
52 page(s)
| | | CEC |