59322 | 12/17/2010 |
Notice of Decision
3 page(s)
| | CEC/ Docket Unit | CEC/ F. Miller |
59274 | 12/17/2010 |
Notice of Availability of the Commission Decision
1 page(s)
| | CEC/ Docket Unit | CEC/ Hearing Office |
59270 | 12/17/2010 |
Commission Decision
494 page(s)
| | CEC/ Docket Unit | CEC/ Hearing Office |
59207 | 12/10/2010 |
Errata to the Presiding Member's Proposed Decision
20 page(s)
| | CEC/ Docket Unit | CEC/ Hearing Office |
59163 | 12/7/2010 |
Responses to Staff Assessment Workshop Request for Data
13 page(s)
| | CEC/ C. Hoffman | CH2MHILL/ J. Salamy |
59159 | 12/3/2010 |
Commission Adoption Order
5 page(s)
| | CEC/ Docket Unit | CEC/ Commissioners |
59026 | 11/17/2010 |
Applicant's Comments on the Presiding Member's Proposed Decision
10 page(s)
| | CEC/ Docket Unit | Ellison Shneider and Harris for Applicant |
59025 | 11/17/2010 |
Staff's Comments on PMPD
17 page(s)
| | CEC / K. Douglas / A. Eggert | CEC / F. Miller |
58969 | 11/5/2010 |
Notice of Availability of PMPD & Committee Conference & Notice of Full Commission Hearing
6 page(s)
| | CEC/Docket Unit | CEC/R. Avalos |
58967 | 11/5/2010 |
Presiding Member's Proposed Decision
487 page(s)
| | CEC/Docket Uni | CEC/R. Avalos |
58682 | 9/30/2010 |
Applicant’s Revised Testimony and Additional Expert Witness Declarations
197 page(s)
| | CEC/ F. Miller | CH2MHill/ S. Madams |
58679 | 9/29/2010 |
Applicant's Hughson-Gryason 115kV Transmission Line and Substation Project
8 page(s)
| | CEC/ K. Douglas | Ellison, Schneider & Harris/ K. Mitchell |
58678 | 9/29/2010 |
Hughson-Grayson Transmission Line - Revised Draft Environmental Impact Report November 2010 Exhibit
125 page(s)
| | CEC/ F. Miller | CEC/ S. Madams |
58677 | 9/29/2010 |
Hughson-Grayson Transmission Line - Revised Draft Environmental Impact Report July 2010 Exhibit
383 page(s)
| | CEC/ F. Miller | CH2M Hill/ S. Madams |
58650 | 9/29/2010 |
Supplemental Revised Staff Assessment
142 page(s)
| | CEC / Docket Unit | CEC / F. Miller |
58633 | 9/27/2010 |
Applicant's Pehearing Conference Statement
31 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris LLP/J. Harris |
58631 | 9/27/2010 |
Letter Regarding Water Supply & Discharge Hypotheticals
5 page(s)
| | CEC/Docket Unit | Ellison, Schneider, & Harris LLP/J. Harris |
58630 | 9/27/2010 |
Energy Commission Staff's Tentative Exhibit List
4 page(s)
| | CEC/Docket Unit | CEC/J. Preis |
58619 | 9/27/2010 |
CEC Staff's Prehearing Conference Statement
146 page(s)
| | CEC/ Dokcet Unit | CEC/ F. Miller |
58618 | 9/27/2010 |
Staff's Prehearing Conference Statement
5 page(s)
| | CEC/Docket Unit | CEC/J. Preis |
58548 | 9/20/2010 |
Applicant's Testimony
179 page(s)
| | CEC/F. Miller | CH2M Hill/S. Madams |
58340 | 9/9/2010 |
Staff's Comments to the Applicant's Reccommended Changes to the Revised Staff Assessment
10 page(s)
| | CEC/ Docket Unit | CEC/ F. Miller |
58331 | 9/8/2010 |
Notice of Prehearing Conference & Evidentiary Hearing
12 page(s)
| | CEC/Docket Unit | CEC/R. Avalos |
58285 | 9/3/2010 |
Notice of Mandatory Status Conference
5 page(s)
| | CEC/Docket Unit | CEC/R. Avalos |
58183 | 8/26/2010 |
Revised Staff Assessment Workshop Notice
4 page(s)
| | CEC/ Docket Unit | CEC/ T. O'Brien |
58177 | 8/25/2010 |
Letter of Request to Schedule Hearings
4 page(s)
| | CEC/Commissioners | TID Water & Power/C. Hashimoto |
57917 | 8/6/2010 |
Applicant's Revised Conditions of Certification
11 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris/ K. Mitchell |
57851 | 8/2/2010 |
Almond 2 Power Plant Status Report #12
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/J. Harris |
57806 | 7/30/2010 |
Revised Staff Assessment
624 page(s)
| | CEC/ Dockets Staff | CEC/ F. Miller |
57736 | 7/26/2010 |
A2 ROC Noise
28 page(s)
| | CEC/F. Miller | DCN/S. Strachan |
57509 | 7/9/2010 |
Memo RE Two Compact Discs Kept in Hearing Office - Contains Web-Ex Audio Recording of July Status Conference
1 page(s)
| | CEC/Docket Unit | CEC/R. Avalos |
57453 | 7/2/2010 |
Technical Memorandum- Description of Suspected Special-Status Species Habitat along PG&E Line
7 page(s)
| | CEC/ F. Miller | CH2MHILL/ Sarah Madams |
57436 | 7/1/2010 |
Almond 2 Power Plant Status Report #11
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/J. Harris |
57323 | 6/25/2010 |
Turlock Irrigation District in Stanislaus County
2 page(s)
| | CEC/ Docket Unit | DOPW/ A. Halverson |
57252 | 6/21/2010 |
Notice of Mandatory Status Conference
5 page(s)
| | CEC/Docket Unit | CEC/M. Read |
57131 | 6/14/2010 |
Comments from Stanislaus County
2 page(s)
| | CEC/ Docket Unit | Stanislaus County/ DPW/ M. Machado |
57036 | 6/7/2010 |
A2 Applicant's Comments on SA
550 page(s)
| | CEC/F. Miller | CH2M Hill/S. Madams |
57026 | 6/7/2010 |
City of Ceres Comments on SA-DEIS
2 page(s)
| | CEC/F. Miller | City of Ceres/T. Westbrook |
56953 | 6/1/2010 |
Almond 2 Power Plant Status Report Number 10
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/J. Harris |
56673 | 5/17/2010 |
Antelope Valley AQMD Final Determination of Compliance (FDOC)
46 page(s)
| | CEC/ Docket Unit | Antelope Valley AQMD/ E. Heaston |
56559 | 5/6/2010 |
Agency Letters Regarding Notice of Availability of the Staff Assessment
8 page(s)
| | CEC/ Docket Unit | CEC/ R. Johnson |
56558 | 5/6/2010 |
Library Letters Regarding Notice of Availability of the Staff Assessment
7 page(s)
| | CEC/ Docket Unit | CEC/ R. Johnson |
56557 | 5/6/2010 |
Notice of Availability of the Staff Assessment
6 page(s)
| | Members of the Public | CEC/ R. Johnson |
56551 | 5/4/2010 |
MOU Between CEC & TRB Associates
6 page(s)
| | CEC/Docket Unit | CEC/C. Davis |
56520 | 5/4/2010 |
Notice of Energy Commission Staff Workshop to Discuss the Staff Assessment
6 page(s)
| | CEC/Docket Unit | CEC/T. O'Brien |
56508 | 5/3/2010 |
Applicant’s Status Report No. 9
5 page(s)
| | CEC/ Docket Unit | ELLISON, SCHNEIDER & HARRI S L.L.P/ D. Wittenborn |
56477 | 4/30/2010 |
Staff Assessment
625 page(s)
| | CEC/Docket Unit | CEC/ F. Miller |
56471 | 4/13/2010 |
Applicant's Staff Query Set 3, Responses to CEC Staff Query 4
9 page(s)
| | CEC/F. Miller | CH2M Hill/S. Madams |
56391 | 4/23/2010 |
Applicant's Delineation of Wetlands & Waters of the U.S. for Line 7216-03 Project Draft Report
88 page(s)
| | CEC/F. Miller | CH2M Hill/S. Madams |
56379 | 4/21/2010 |
ROC Between V. Geronimo & Central Valley RWQCB re Onsite Treatment of Reclaimed Water
3 page(s)
| | CEC/Docket Unit | CEC/F. Miller |
56313 | 4/20/2010 |
Notice of Opportunity to File Statements of Concern re Eileen Allen
7 page(s)
| | CEC/Docket Unit | CEC/M. Read |
56265 | 4/16/2010 |
CH2M Hill ROC, CH2M Hill Convo w/ SWRCB re Recycled Water Treatment Permit
1 page(s)
| | CEC/Docket Unit | CEC/F. Miller |
56206 | 4/12/2010 |
E-mail from Nancy reguarding School Bus Traffic Routes
1 page(s)
| | CEC/ Docket Unit | N. Krigbaum |
56119 | 4/5/2010 |
Counsel's Status Report Number 8
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/J. Harris |
56117 | 4/5/2010 |
Updated Route Map
2 page(s)
| | CEC/Docket Unit | CEC/F. Miller |
56112 | 4/5/2010 |
California for Reliable Energy's Status Report Number 8
5 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardozo/C. Horton |
55743 | 3/3/2010 |
CURE's Status Report Number 7
5 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardozo/B. Heeley |
55730 | 3/3/2010 |
Email from Wanda Doscher to Susan Strachan Regarding Parking & T-line Pole Color
2 page(s)
| | CEC/H. Anderson | CEC/ F. Miller |
55727 | 3/2/2010 |
Applicant's Status Report Number 7
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris/J. Harris |
55530 | 2/22/2010 |
Final Determination of Compliance
178 page(s)
| | CEC/ F. Miller | CH2M Hill/S. Madams |
55146 | 2/2/2010 |
Applicant's Status Report #6
4 page(s)
| | CEC/Docket Unit | Ellison, Schneider, & Harris/J. Harris |
55140 | 2/2/2010 |
CURE's Status Report No. 6
5 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/C. Horton |
55090 | 1/29/2010 |
Repeated Application for Confidential Cultural Resources
5 page(s)
| | CEC/ M. Jones | Ellison, Schneider, & Harris/ J. Harris |
55023 | 1/26/2010 |
Memo Regarding Newly Revised Proof of Service List
4 page(s)
| | All Parties | CEC/ R. Avalos |
54898 | 1/20/2010 |
Newly Revised Proof of Service List
4 page(s)
| | All Parties | CEC/ R. Avalos |
54847 | 1/15/2010 |
Email Modesto Planning Dept. Providing Exeptions from Condition Use Permit
2 page(s)
| | CEC/ Docket Unit | CEC/ W. Doscher |
54823 | 1/13/2010 |
Letter to the CEC Discussing Irrigation District Legal Authorities Regarding Land Use
6 page(s)
| | CEC/ F. Miller | Ellison, Schneider & Harris/ K. Mitchell |
54693 | 1/4/2010 |
California Unions for Reliable Energy Status Report No. 5
4 page(s)
| | CEC/ Docket Unit | Adams Broadwell Joseph & Cardozo/ L. Miles |
54678 | 1/5/2010 |
Status Report # 5
4 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris/ J. Harris |
54613 | 12/30/2009 |
Applicant's Comments on Preliminary Determination of Compliance
4 page(s)
| | San Joaquin Valley Air Pollution Control District/ David Warner | Sierra Research/ Jeffrey Adkins |
54407 | 12/10/2009 |
Letter Newly Revised Proof of Service
4 page(s)
| | All Parties | CEC/ R. Avalos |
54363 | 12/8/2009 |
Notice of Prelininary Determination of Compliance (PDOC)
172 page(s)
| | CEC/ Docket Unit | SJVAPCD/ D. Warner |
54339 | 12/3/2009 |
ROC - A. Greenberg/S. Strachan RE: Pipeline Info
3 page(s)
| | CEC/ Docket Unit | CEC/ F. Miller |
54326 | 12/2/2009 |
Submittal of Predevelopment Application Information
8 page(s)
| | City of Ceres/ T. Westbrook | Turlock Irrigation District/ R. Baysinger |
54321 | 12/2/2009 |
Applicant's Status Report #4
4 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris LLP/ J. Harris |
54320 | 12/1/2009 |
CURE's Status Report #4
5 page(s)
| | CEC/ Docket Unit | Adams Broadwell Joseph & Cardozo/ B. Heeley |
54307 | 12/1/2009 |
Letter of Project Specific Conditions to Applicant
4 page(s)
| | Turlock Irrigation District/ R. Baysinger | City of Ceres/ J. Michaels |
54257 | 11/25/2009 |
Data Response Set 1D, Responses to CEC Staff Data Requests 18, & 77-79
605 page(s)
| | CEC/ F. Miller | CH2MHILL/ S. Madams |
54228 | 11/20/2009 |
CURE Data Responses Set 1A
95 page(s)
| | CEC/ F. Miller | CH2MHILL/ S. Madams |
54101 | 11/16/2009 |
ROC TID & CURE Meet & Confer on Fiday November 13th
1 page(s)
| | CEC/ F. Miller | Ellison, Schneider & Harris LLP/ J. Harris |
54077 | 11/16/2009 |
ROC TID/ A. Greenberg, Site Visit Response
1 page(s)
| | Alvin Greenberg | Strachan Consulting/ S. Strachan |
53967 | 11/2/2009 |
California Unions for Reliable Energy Status Report #3
4 page(s)
| | CEC/ Docket Unit | Adams Broadwell Joseph/ L. Miles |
53966 | 11/3/2009 |
Objections to Data Requests of California Union for Reliable Energy Set 1
29 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris/ J. Harris |
53964 | 11/2/2009 |
Almond 2 Power Plant Status Report #3
5 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris/ J. Harris |
53947 | 11/3/2009 |
Satus Report #2
3 page(s)
| | CEC/ J. Levin/ K. Douglas | CEC/ F. Miller |
53901 | 10/30/2009 |
Data Response Set 1C - Responses to CEC Staff Data Requests 61b 68 & 72
707 page(s)
| | CEC/ F. Miller | CH2M Hill/ S. Madams |
53736 | 10/22/2009 |
Staff Query Set - 2 Responses to CEC Staff Queries 2 & 3
18 page(s)
| | CEC/ F. Miller | CH2M Hill/ S. Madams |
53663 | 10/14/2009 |
CURE’s Data Requests, Set One, Nos. 1-106
37 page(s)
| | Turlock Irrigation District/ R. Baysinger | Adams Broadwell Joseph/ L. Miles |
53606 | 10/12/2009 |
Data Response Set 1B, Response to CEC staff Data Request 19 and Workshop Queries 1 through 19
39 page(s)
| | CEC/ F. Miller | CH2MHILL/ Sarah Madams |
53523 | 10/1/2009 |
California Unions for Reliable Energy’s Status Report No. 2
4 page(s)
| | CEC/ Docket Unit | Adams Broadwell Joseph & Cardozo/ L. Miles |
53515 | 10/1/2009 |
Applicant's Status Report #2
5 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris/ K. Mitchell |
53349 | 9/23/2009 |
City of Ceres - Public Works Department Comments to AFC
6 page(s)
| | CEC/ E. Allen | City of Ceres/ M. Riddell |
53282 | 9/21/2009 |
Acid Rain Permit Application for the Almond Power Plant Unit 2, 3, & 4 per 40 CRF 72.30 & 72.31
6 page(s)
| | United States Enviornmental Protection Agency/ C. Aldred | TID/ G. Davies |
53280 | 9/21/2009 |
Letter RE Additional Requierments for New Major Sources & Federal Major Modification
1 page(s)
| | San Joaquin Valley APCD/ J. Kahlon | TID/ R. Baysinger |
53279 | 9/21/2009 |
E-mail RE Revised Study Plan Outline & Map
2 page(s)
| | CEC/ L. Ng | Utility System Efficiencies, Inc./ R. Daschmans |
53278 | 9/21/2009 |
E-Mail RE Draft PDOC
2 page(s)
| | CEC/ F. Miller | Strachan Consulting/ S. Strachan |
53245 | 9/14/2009 |
Repeated Cultural Application for Confidential Designation
2 page(s)
| | CEC/ M. Jones | Ellison, Schneider & Harris/ J. Harris |
53225 | 9/14/2009 |
Data Response Set 1A, Response to CEC Staff Request 1-84 & Staff Query 1
758 page(s)
| | CEC/ F. Miller | CH2MHILL/ S. Madams |
53213 | 9/14/2009 |
Data Response Set 1A, Air Modeling Files
3 page(s)
| | CEC/Docket Unit | CH2MHill/S. Madams |
53142 | 9/8/2009 |
Data Responses & Issues Resolution Workshop Notice, Spanish Version
6 page(s)
| | CEC/ Docket Unit | CEC/ T. O'Brien |
53140 | 9/8/2009 |
Data Responses & Issues Resolution Workshop Notice
6 page(s)
| | CEC/ Docket Unit | CEC/ T. O'Brien |
53133 | 9/3/2009 |
Status Report #1
3 page(s)
| | CEC/ J. Levin/ K. Douglas | CEC/ F. Miller |
53120 | 9/2/2009 |
Notice Pursuant to 20 CCR 1716(f): Data Request 1-84
4 page(s)
| | CEC/ K. Douglas & J. Levin | Ellison, Schneider & Harris LLP/ J. Harris |
53103 | 9/1/2009 |
Applicant's Status Report #1
5 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris L.L.P/ J. Harris |
53102 | 9/1/2009 |
CURE's Status Report #1
4 page(s)
| | CEC/ Docket Unit | Adams Broadwell Joseph & Cardozo/ L. M |
52924 | 8/24/2009 |
Stanislaus County Comment Letter Regarding Fire Prevention Bureau
1 page(s)
| | CEC/ F. Miller | Stanislaus County/ R. Mendez |
52923 | 8/24/2009 |
Stanislaus County Comment Letter Regarding Department of Public Works
1 page(s)
| | CEC/ F. Miller | Stanislaus County/ R. Mendez |
52867 | 8/13/2009 |
Data Request Set 1 (#s 1-84)
29 page(s)
| | TID/ R. Baysinger | CEC/ F. Miller |
52837 | 8/11/2009 |
A2 ROC KOP Revision
1 page(s)
| | CH2MHILL/ S. Madams | CEC/ F. Miller |
52794 | 8/10/2009 |
Committee Scheduling Order
6 page(s)
| | Interested Parties | CEC/ M.Read |
52701 | 8/4/2009 |
Public Comments from Robert Beires Jr. RE Radiation Concerns
1 page(s)
| | CEC/ F. Miller | Public/ R. Beires Jr. |
52663 | 8/3/2009 |
Elected Officials Letter
1 page(s)
| | Jim DeMartini/ District 5, Stanislaus County Board of Supervisors | CEC/ M. Jones |
52661 | 8/3/2009 |
Elected Officials Letter
1 page(s)
| | California State Senate/ Jeffery Denham | CEC/ M. Jones |
52660 | 8/3/2009 |
Elected Officals Letter
1 page(s)
| | Anthony Cannella/ Mayor of Ceres | CEC/ M. Jones |
52659 | 8/3/2009 |
Elected Officials Letter
1 page(s)
| | California State Assembly/ Honorable Bill Berryhill | CEC/ M. Jones |
52648 | 7/31/2009 |
Informational Hearing Powerpoint Presentation
11 page(s)
| | CEC/ F. Miller | CH2MHILL/ S. Madams |
52634 | 7/31/2009 |
Staff Power Point Presentation for Informational Hearing
18 page(s)
| | CEC/ Docket Unit | CEC/ F. Miller |
52597 | 7/28/2009 |
Committee Order Granting CURE Petition to Intervene
2 page(s)
| | CEC/ Docket Unit | CEC/ K. Douglas & J. Levin |
52593 | 7/28/2009 |
Request for Agency Participation in the Review of Supplement to the AFC
5 page(s)
| | Agency Distribution List | CEC/ E. Allen |
52592 | 7/28/2009 |
Library Letter
5 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
52591 | 7/28/2009 |
Notice of Receipt of a Supplement to the AFC
5 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
52539 | 7/23/2009 |
The Applicant's Proposed Schedule
6 page(s)
| | CEC/ Docket Unit | Ellison, Schneider & Harris LLP/ J. Harris |
52525 | 7/23/2009 |
Petition to Intervene by California Unions for Reliable Energy
6 page(s)
| | CEC/ Docket Unit | Adams Broadwell/ T. Gulesserian |
52498 | 7/21/2009 |
Applicant's Email Queries Set 1, Responses to CEC Staff Email Query 1
8 page(s)
| | CEC/ F. Miller | CH2M Hill/ S. Madams |
52426 | 7/15/2009 |
Issues Identification Report
9 page(s)
| | CEC/ Docket Unit | CEC/ F. Miller |
52402 | 7/13/2009 |
CEC Respondence Regarding Application for Confidentiality - Cultural Resources DA5.3-1
2 page(s)
| | Ellison, Schneider & Harris, LLP/ J. Harris | CEC/ M. Jones |
52273 | 7/2/2009 |
All Parties Letter
4 page(s)
| | CEC/ All Parties | CEC/ R. Avalos |
52262 | 7/2/2009 |
Commission Appointment of Committee
3 page(s)
| | CEC/ Docket Unit | CEC/ K. Douglas |
52255 | 7/1/2009 |
Notice of Public Site Visit & Information Hearing & Committee Order
8 page(s)
| | CEC/ Docket Unit | CEC/ J. Levin & K. Douglas |
52254 | 7/1/2009 |
Hearing Office Assignment
1 page(s)
| | CEC/ All Commissioners | CEC/ K. Douglas |
52184 | 6/29/2009 |
Data Adequacy Reccommendation
37 page(s)
| | CEC/ Docket Unit | CEC/ M. Jones |
52172 | 6/26/2009 |
TID Department of Compliance to US EPA
1 page(s)
| | US. EPA Region/ G. Rios | Sierra Reaserch/ J. Adkins |
52137 | 6/23/2009 |
Applicants Supplement B - Data Adequacy Responses DA5.3-5 (Cultural Resources)
11 page(s)
| | CEC/ F. Miller | CH2M Hill/ S. Madams |
52022 | 6/9/2009 |
Applicant Supplement A - Data Adequacy Responses
64 page(s)
| | CEC/ F. Miller | CH2MHILL/ S. Madams |
51954 | 6/11/2009 |
CEC Response to Application for Confidentiality - Cultural Technical Report
2 page(s)
| | Ellison, Schneider&Harris/ J. Harris | CEC/ M. Jones |
51930 | 6/10/2009 |
Application for Confidential Cultural Resources - Attachment DA5.3-1
3 page(s)
| | CEC/ M. Jones | Ellison, Schneider,&Harris/ J. Harris |
51856 | 6/5/2009 |
Data Adequacy Recommendation
103 page(s)
| | CEC/ Docket Unit | CEC/ M. Jones |
51826 | 6/4/2009 |
Potential Federal PSD Applicability
3 page(s)
| | Turlock Irrigation District/ R. Baysinger | San Joaquin Valley Air Pollution Control District/ D. Warner |
51825 | 6/4/2009 |
Notice of Complete Application
2 page(s)
| | Turlock Irrigation District/ R. Baysinger | San Joaquin Valley Air Pollution Control District/ D. Warner |
51824 | 6/4/2009 |
Data Adequacy Discussions
8 page(s)
| | CEC/ F. Miller | Strachan Consulting/ S. Strachan |
51753 | 5/29/2009 |
Request for Agency Participation in the Review
3 page(s)
| | Agency Distribution List | CEC/ E. Allen |
51742 | 5/29/2009 |
Notice of Receipt of Application for Certification
3 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
51725 | 5/28/2009 |
Library Letters for Application for Certification
3 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
51530 | 5/11/2009 |
Application for Confidential Cultural Resources - Appendix 5.3E and 5.3C
3 page(s)
| | CEC/ M. Jones | Ellision, Schneider & Harris/ J. Harris |
51503 | 5/11/2009 |
Air Quality Modeling & Screening Health Risk Assessment Files
1 page(s)
| | CEC/ Docket Unit | CH2MHILL/ S. Madams |
51502 | 5/11/2009 |
Application for Certification, Volume 1 & 2
1800 page(s)
| | CEC/ Docket Unit | TID/ R. Baysinger |
2674-0 | 11/30/2010 |
Committee Conference
20 page(s)
| | | CEC |
2651-0 | 10/6/2010 |
Evidentiary Hearing
21 page(s)
| | | CEC |
2644-0 | 9/20/2010 |
Mandatory Status Conference
24 page(s)
| | | CEC |
2469-0 | 8/10/2009 |
Informational Hearing and Site Visit
79 page(s)
| | | CEC |