255303 | 3/27/2024 |
2023 Annual Compliance Report for Cosumnes 2023 ACR for Cosumnes Power Plant 50 page(s)
| | CEC/Docket Unit | California Energy Commission |
244299 | 8/2/2022 |
Steve Uhler Comments - AFC, Facts of my objection, TN244275
3 page(s)
| | CEC/Docket Office | Steve Uhler |
244297 | 8/2/2022 |
July 29, 2022 Email Response to Mr Uhler's Objection July 29 2022 Response to Mr. Uhler's Objection to Cosumnes Power Plant Simple-Cycle Petition and Staff Approval."
2 page(s)
| | Mr Uhler | California Energy Commission |
244289-1 | 8/1/2022 |
Cosumnes Power Plant AFC Supplement A *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volume 1, 2, Supplement B, C & D *** - AFC Supplement A 37 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-2 | 8/1/2022 |
Cosumnes Power Plant - AFC Supplement B (1 of 2) *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volumes 1 & 2, Supplements A, C, & D *** AFC Supplement B 19 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-3 | 8/1/2022 |
Cosumnes Power Plant - AFC Supplement B (page 2 of 2) *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volumes 1 & 2, Supplements A, C, & D *** AFC Supplement B 37 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-4 | 8/1/2022 |
Cosumnes Power Plant - Executive Summary - AFC Supplement C *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volumes 1 & 2, Supplements A, B, & D *** AFC Supplement C 4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-5 | 8/1/2022 |
Cosumnes Power Plant - Site Plan - AFC Supplement C *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volumes 1 & 2, Supplements A, B, & D *** AFC Supplement C 67 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-6 | 8/1/2022 |
Supplement C - Exhibit No-1 *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volumes 1 & 2, Supplements A, B, & D *** AFC Supplement C 1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-7 | 8/1/2022 |
Supplement C - Site Plan Figure 1_1-3R2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-8 | 8/1/2022 |
Supplement C - Figure 1_1-5R
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrieron |
244289-9 | 8/1/2022 |
Supplement C - Figure 2_2-1R2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-10 | 8/1/2022 |
Supplement C - Figure 2_2R2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-11 | 8/1/2022 |
Supplement C - Figure 2_2-6aR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-12 | 8/1/2022 |
Supplement C - Figure 2_2-6bR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-13 | 8/1/2022 |
Supplement C - Figure 2_2-7
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-14 | 8/1/2022 |
Supplement C - Figure 8_11-3bR2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-15 | 8/1/2022 |
Supplement C - Figure 8_14-3aR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-16 | 8/1/2022 |
Supplement C - Figure 8_14-3bR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-17 | 8/1/2022 |
Supplement C - Figure 8_14-3cR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-18 | 8/1/2022 |
Supplement C - Figure 8_143dR
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-19 | 8/1/2022 |
Supplement C - Figure 8_14-6
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-20 | 8/1/2022 |
Supplement C - Figure 8_5-2R2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244289-21 | 8/1/2022 |
Cosumnes Power Plant - AFC Supplement D *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19. in addition to AFC Volume 1, 2, Supplement A, B, & C *** - AFC Supplement D 30 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-1 | 8/1/2022 |
Cosumnes Power Plant AFC - Volume 2 - Appendices Cover Sheet *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM filed in Docket No. 01-AFC-19, in addition to Volume 1, Supplement A, B, C & D *** - VOLUME 2
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-2 | 8/1/2022 |
Appendices Contents
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-3 | 8/1/2022 |
Owners Adjacent to the Site and Linear Corridors - Appendix 1A
150 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-4 | 8/1/2022 |
Owners Adjacent to the Site and Linear Corridors - Appendix 1A - Map-Figure
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-5 | 8/1/2022 |
Owners Adjacent to the Site and Linear Corridors - Appendix 1A - Index
57 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-6 | 8/1/2022 |
Owners Adjacent to the Site - 4 names and addresses
2 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-7 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 198 names and addresses - 1
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-8 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 198 names and addresses - 2
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-9 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 198 names and addresses - 3
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-10 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 155 names and addresses
19 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-11 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 25 names and addresses
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-12 | 8/1/2022 |
Owners Adjacent to the Linear Corridors - 3 names and addresses
2 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-13 | 8/1/2022 |
Persons Who Prepared the AFC - Appendix 1B
2 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-14 | 8/1/2022 |
Cosumnes Power Plant Transmission System Impact Study - Appendix 5A
90 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-15 | 8/1/2022 |
Cosumnes Power Plant Transmission System Impact Study - Appendix A, pages A-1 through C-8 plus figures
72 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-16 | 8/1/2022 |
Cosumnes Power Plant Transmission System Impact Study - Appendix A, 18 pages
18 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-17 | 8/1/2022 |
EMF and Powerline Concepts - Appendix 5B
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-18 | 8/1/2022 |
Application for Natural Gas - Appendix 6A
3 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-19 | 8/1/2022 |
Water Supply Letter - Appendix 7A
2 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-20 | 8/1/2022 |
Air Quality - Appendix 8_1
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-21 | 8/1/2022 |
Construction Phase Impacts - Appendix 8_1A
20 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-22 | 8/1/2022 |
Detailed Emission Calculations
7 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-23 | 8/1/2022 |
Modeling Protocol - Appendix 8_1C
14 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-24 | 8/1/2022 |
Modeling Analysis - Appendix 8_1D
6 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-25 | 8/1/2022 |
Screening Health Risk Assessment - Appendix 8_1E
15 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-26 | 8/1/2022 |
BACT Analysis - Appendix 8_1F
31 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-27 | 8/1/2022 |
Cumulative Impact Protocol - Appendix 8_1G
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-28 | 8/1/2022 |
CNDDB Species Lists
15 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-29 | 8/1/2022 |
Agency Consultation - Appendix 8_2B
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-30 | 8/1/2022 |
Qualifications - Resumes of Field Surveyors - Appendix 8_2C
6 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-31 | 8/1/2022 |
Outline of CPP Biological Resources Mitigation Implementation Plan - Appendix 8_2D
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-32 | 8/1/2022 |
Proposed Native American Burial Protection Plan for the CPP Construction Program - Appendix 8_3A
5 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-33 | 8/1/2022 |
Letter to Native American Heritage Commission (Including Response) - Appendix 8_3B
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-34 | 8/1/2022 |
GANDA Confidential Reports - Appendix 8_3C
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-35 | 8/1/2022 |
WRMS Confidential Southwest Corridor Maps
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-36 | 8/1/2022 |
Confidential Site Form - Appendix 8_3E
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-37 | 8/1/2022 |
Noise Monitoring Results - Appendix 8_5A
9 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-38 | 8/1/2022 |
Records of Conversations - Appendix 8_8A
12 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-39 | 8/1/2022 |
VISTA Info Site Assessment Report - Appendix 8_13A - 3 pages
3 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-40 | 8/1/2022 |
VISTA Info Site Assessment Report - Appendix 8_13A - 56 pages
56 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-41 | 8/1/2022 |
Sites in the Surrounding Area
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-42 | 8/1/2022 |
Sites in the Surrounding Area - 2
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-43 | 8/1/2022 |
Sites in the Surrounding Area - 3
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-44 | 8/1/2022 |
Site Assessment - Special Project - Site Inventory
5 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-45 | 8/1/2022 |
Site Assessment - Special Project - Description of Databases Searched
6 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-46 | 8/1/2022 |
Site Assessment - Special Project - Overview Map
10 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-47 | 8/1/2022 |
Figures
9 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-48 | 8/1/2022 |
Site Assessment - Special Project - Details - 8 pages
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-49 | 8/1/2022 |
NPDES Permit Application - Appendix 8_14A
9 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-50 | 8/1/2022 |
1993 Geological Assessment from Rancho Seco ISFSI - Appendix 8_15A - 22 pages
22 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-51 | 8/1/2022 |
1993 Geological Assessment from Rancho Seco ISFSI - Appendix 8_15A
31 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-52 | 8/1/2022 |
Civil Engineering Design Criteria - Appendix 10A
4 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-53 | 8/1/2022 |
Structural Engineering Design Criteria - Appendix 10B
33 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-54 | 8/1/2022 |
Mechanical Engineering Design Criteria - Appendix 10C
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-55 | 8/1/2022 |
Electrical Engineering Design Criteria - Appendix 10D
6 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-56 | 8/1/2022 |
Control Engineering Design Criteria - Appendix 10E
5 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-57 | 8/1/2022 |
Chemical Engineering Design Criteria - Appendix 10F
5 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244288-58 | 8/1/2022 |
Geologic and Foundation Design Criteria - Appendix 10G
8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-1 | 8/1/2022 |
Cosumnes Power Plant - AFC - Volume 1 - Cover Sheet *** This document supersedes TN 22389 filed 9/17/01 by CD-ROM in Docket No. 01-AFC-19, in addition to AFC Volume 2, Supplements A, B, C, & D *** 1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-2 | 8/1/2022 |
Table of Contents
15 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-3 | 8/1/2022 |
Acronyms and Abbreviations
10 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-4 | 8/1/2022 |
Executive Summary
10 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-5 | 8/1/2022 |
Project Description
35 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-6 | 8/1/2022 |
Demand Conformance
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-7 | 8/1/2022 |
Facility Closure
2 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-8 | 8/1/2022 |
Electric Transmission
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-9 | 8/1/2022 |
Natural Gas Supply
7 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-10 | 8/1/2022 |
Natural Gas Photos
7 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-11 | 8/1/2022 |
Water Supply
9 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-12 | 8/1/2022 |
Air Quality
91 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-13 | 8/1/2022 |
Biological Resources
43 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-14 | 8/1/2022 |
Cultural Resources
44 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-15 | 8/1/2022 |
Land Use
17 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-16 | 8/1/2022 |
Noise
18 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-17 | 8/1/2022 |
Public Health
14 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-18 | 8/1/2022 |
Worker Health and Safety
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-19 | 8/1/2022 |
Socioeconomics
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-20 | 8/1/2022 |
Agriculture and Soils (24 pages)
24 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-21 | 8/1/2022 |
Agriculture and Soils (13 pages)
13 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-22 | 8/1/2022 |
Agriculture and Soils Maps
15 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-23 | 8/1/2022 |
Traffic and Transportation
18 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-24 | 8/1/2022 |
Traffic and Transportation (1 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-25 | 8/1/2022 |
Traffic and Transportation (2 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-26 | 8/1/2022 |
Traffic and Transportation (3 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-27 | 8/1/2022 |
Traffic and Transportation (4 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-28 | 8/1/2022 |
Traffic and Transportation (5 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-29 | 8/1/2022 |
Traffic and Transportation (6 of 6)
1 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-30 | 8/1/2022 |
Visual Resources
22 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-31 | 8/1/2022 |
Hazardous Materials Handling
25 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-32 | 8/1/2022 |
Waste Management
18 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-33 | 8/1/2022 |
Water Resources (47 pages)
47 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-34 | 8/1/2022 |
Water Resources (29 Pages)
29 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-35 | 8/1/2022 |
Water Resources - Maps & Figures
18 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-36 | 8/1/2022 |
Geologic Hazards and Resources
10 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-37 | 8/1/2022 |
Paleontological Resources
22 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-38 | 8/1/2022 |
Alternatives
23 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244287-39 | 8/1/2022 |
Engineering Last chapter in AFC, Volume 1 8 page(s)
| | CEC/Docket Unit | Ch2mhill/Carrier |
244275 | 8/1/2022 |
Steve Uhler Comments - AFC, Objection to Statement of Staff, simple cycle operation petition, 01-19C
3 page(s)
| | CEC/Docket Unit | Steve Uhler |
244177 | 7/22/2022 |
SFA Cosumnes Power Plant Petition to Amend Cover Letter - Revised *** This document supersedes TN 243843 *** - SFA Cosumnes Power Plant Petition to Amend Cover Letter - Revised 2 page(s)
| | CEC/Docket Office | California Energy Commission |
244176 | 7/22/2022 |
Cosumnes Power Plant - Revised Notice of Receipt for Simple-Cycle Petition to Amend *** This document supersedes TN 244052 *** - Cosumnes Power Plant - Revised Notice of Receipt for Simple-Cycle Petition to Amend 3 page(s)
| | CEC/Docket Office | California Energy Commission |
244135 | 7/20/2022 |
STATEMENT OF STAFF APPROVAL OF POST CERTIFICATION CHANGE On July 6, 2022, the Sacramento Municipal Utility District Financing Authority (SFA) filed a post-certification petition (TN# 243844) with the California Energy Commission (CEC) requesting to modify the Cosumnes Power Plant (CPP). Compliance 18 page(s)
| | CEC/Docket Unit | California Energy Commission |
244052 | 7/13/2022 |
Notice of Receipt for Simple-Cycle Petition to Amend ***THIS DOCUMENT HAS BEEN REPLACED BY TN 244176*** Notice of Receipt for Cosumnes Power Plant to run in simple-cycle. Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
243844 | 7/6/2022 |
SFA Cosumnes Power Plant Petition to Amend
42 page(s)
| | CEC/Docket Unit | Jacobs |
243843 | 7/6/2022 |
SFA Cosumnes Power Plant Petition to Amend Cover Letter *** This document is replaced by TN 244177 *** 2 page(s)
| | CEC/Docket Unit | Jacobs |
239591 | 9/3/2021 |
Steve Uhler Comments - AFC-01-19C Lock, Stock, and Barrel
2 page(s)
| | CEC/Docket Unit | Steve Uhler |
238883 | 7/15/2021 |
SFA's Notice of Administrative Name Change for the Cosumnes Power Plant Project
2 page(s)
| | CEC/Docket Unit | Sacramento Municipal Utility District |
233809 | 7/8/2020 |
STATEMENT OF STAFF APPROVAL OF PROPOSED CHANGE
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
233444 | 6/8/2020 |
Information Request Form
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
233083 | 5/22/2020 |
Cosumnes Power Plant - AQ-10 Correction Memo to Commission to correct Condition of Certification AQ-10. Compliance 2 page(s)
| | CEC/Dockets | California Energy Commission |
231118 | 12/11/2019 |
SMUD Cosumnes Power Plant - 2018 Annual Compliance Report 2018 Annual Compliance Report for the SMUD Cosumnes Power Plant. Compliance 49 page(s)
| | CEC/Mary Dyas | EthosEnergy |
226232 | 1/7/2019 |
Cosumnes Power Plant Petition to Amend Notice of Decision Notice of Decision for the Cosumnes Power Plant petition to amend to operate previously installed Advanced Gas Path upgrades. Compliance 1 page(s)
| | CEC/Dockets | California Energy Commission |
226231 | 1/7/2019 |
Cosumnes Power Plant Order Approving Petition to Amend Cosumnes Power Plant Order Approving Petition to Amend to Operate previously installed Advanced Gas Path upgrades. Compliance 3 page(s)
| | | California Energy Commission |
226042 | 12/7/2018 |
Steve Uhler Comments Dear Energy Commission Commissioners, in terms of trying to do it right
Executive Summary 2 page(s)
| | CEC/Docket Unit | Steve Uhler |
226034 | 12/6/2018 |
Cosumnes Power Plant - Petition to Amend - Staff Response to Non-Agency Comments
14 page(s)
| | CEC/Docket Unit | California Energy Commission |
225996 | 12/3/2018 |
SFA's Comments on the the Staff Assessment
Air Quality 4 page(s)
| | Ms. Mary Dyas | Jacobs/SFA |
225963 | 11/27/2018 |
Steve Uhler Comments Dear Energy Commission Commissioners, Please confirm the capacity of SMUD's Hedge Power Plant
Air Quality, Facility Design, Compliance, Reliability, Transmission System Engineering, Greenhouse Gases 5 page(s)
| | CEC/Dockets | Steve Uhler |
225955 | 11/26/2018 |
Steve Uhler Comments Dear Energy Commission Commissioners, Tell me about SMUD's natural gas health, safety, and environmental guidelines
Waste Management, Greenhouse Gases, Air Quality, Facility Design, Compliance, Hazardous Materials, Public Health, Worker Safety and Fire Protection 47 page(s)
| | CEC/Dockets | Steve Uhler |
225954 | 11/26/2018 |
Steve Uhler Comments Dear Energy Commission Commissioners, tell me about staff's training and private agreements with SMUD
Air Quality, Compliance, Hazardous Materials, Public Health, Reliability, Worker Safety and Fire Protection, Waste Management 3 page(s)
| | CEC/Dockets | Steve Uhler |
225863 | 11/8/2018 |
Cosumnes Power Plant - Petition to Amend - AGP Upgrades - Staff Analysis Staff Analysis of the Cosumnes Power Plant AGP Upgrades Petition to Amend. 87 page(s)
| | Interested Parties | California Energy Commission |
225839 | 11/7/2018 |
Cosumnes Power Plant - Petition to Amend - Email - Air Quality Questions and Responses
4 page(s)
| | CEC/Docket Unit | California Energy Commission |
225831 | 11/6/2018 |
SFA Response to Public Comments
Facility Design, Hazardous Materials, Land Use, Public Health 37 page(s)
| | CEC/Mary Dyas | Jacobs |
225800 | 11/5/2018 |
Steve Uhler Comments Energy Commission please verify SFA statements in TN225760
Hazardous Materials, Public Health, Greenhouse Gases, Air Quality, Compliance 3 page(s)
| | CEC/Dockets | Steve Uhler |
225760 | 11/2/2018 |
SFA Response to Steve Uhler Comments
Air Quality, Efficiency, Public Health 5 page(s)
| | CEC/Dockets | CH2M HILL |
225572 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
225075 | 10/24/2018 |
Cosumnes Power Plant - Petition to Amend - Comments Comments from Herald Fire Protection District regarding AGP Upgrades Petition to Amend 8 page(s)
| | CEC/Docket Unit | Herald Fire Protection District |
224983 | 10/15/2018 |
Steve Uhler Comments CPP Heat Rate
Efficiency, Compliance, Reliability 1 page(s)
| | CEC/Docket Unit | Steve Uhler |
224980 | 10/13/2018 |
Steve Uhler Comments CPP Fuel content
Air Quality, Facility Design, Compliance, Hazardous Materials, Public Health, Reliability, Soil and Water 1 page(s)
| | CEC/Docket Unit | Steve Uhler |
224948 | 10/11/2018 |
Steve Uhler Comments CPP PTA TOD Timer adoption modeling
Reliability 2 page(s)
| | CEC/Dockets | Steve Uhler |
224947 | 10/11/2018 |
Steve Uhler Comments CPP PTA LORS (210)Pb
Air Quality, Compliance, Hazardous Materials 1 page(s)
| | CEC/Dockets | Steve Uhler |
224946 | 10/11/2018 |
Steve Uhler Comments CPP PTA LORS SMAQMD BACT
1 page(s)
| | CEC/Dockets | Steve Uhler |
224945 | 10/11/2018 |
Steve Uhler Comments CPP PTA NERC Compliance errors in TN224837
Compliance, Reliability 1 page(s)
| | CEC/Dockets | Steve Uhler |
224837 | 10/1/2018 |
SFA Cosumnes Power Plant Supplemental PTA NERC Compliance Documentation
Facility Design 16 page(s)
| | CEC/Dockets | CH2M HILL |
224683 | 9/11/2018 |
Cosumnes Power Plant - Petition to Amend - AGP_Upgrades - Notice of Receipt Notice of Receipt for the Cosumnes Power Plant Petition to Amend for Advanced Gas Path Upgrades Compliance 3 page(s)
| | CEC/Dockets | California Energy Commission |
224625 | 8/29/2018 |
SFA Cosumnes Power Plant Petition to Amend Petition to Amend to Increase Electrical Production 215 page(s)
| | Lon Payne | CH2M HILL |
62937 | 11/18/2011 |
Notice of Decision
1 page(s)
| | California Resource Agency | CEC/ C. Stora |
62843 | 11/8/2011 |
Order Approving a Petition to Modify the Fuel Supply and Other Modifications
9 page(s)
| | CEC/Docket Unit | CEC/ C. Stora |
61790 | 8/8/2011 |
Revised Staff Analysis of Proposed Modification Fuel Supply
24 page(s)
| | Interested Parties | CEC/ C. Stora |
61440 | 7/21/2011 |
Comments on Staff Analysis of Proposed Modifications
5 page(s)
| | CEC/C.Stora | SFA/R.Gould |
61174 | 6/20/2011 |
Staff Analysis for Fuelo Supply Modifications
22 page(s)
| | Interested Parties | CEC/ C. Stora |
60379 | 4/25/2011 |
Petition for Post Certification License Amendment for Fuel Supply Modifications and Revision
64 page(s)
| | CEC/C. Stora | CH2MHILL |
60317 | 4/22/2011 |
Application to Modify Air Permits for the Gas Turbines and Cooling Tower Application Numbers 22672 22673 and 22674
64 page(s)
| | SMAQMD/ Venk Reddy | Sacramento Municipal Utility District Financial Authority |
60140 | 3/25/2011 |
Data Requests 1-11
5 page(s)
| | CEC/ Docket Unit | CEC/ C. Snow |
59458 | 1/11/2011 |
Notice of Receipt Petition to Amend the Energy Commission Decision for the Cosumnes Power PLant Project
3 page(s)
| | CEC/ Docket Unit | CEC/ C. Marxen |
59371 | 12/29/2010 |
Cosumnes Power Plant Project Petition fro Post Certification License
213 page(s)
| | CEC/ C. Snow | CH2MHILL |
57618 | 7/19/2010 |
Proposed Gate Reorientation Response Letter
5 page(s)
| | Generation Design Power Generation/K. Hudson | CEC/A. Juarez-Garcia |
57455 | 7/6/2010 |
SMUD Cosumes Power Plant Proposed Gate Reorientation.
2 page(s)
| | CEC/ Docket Unit | SMUD/ K. Hudson |
54801 | 1/14/2010 |
Letter to SMUD Scott Flake regarding Energy Commission Jurisdiction
1 page(s)
| | SMUD/ S. Flake | CEC/ M. Jones |
54634 | 12/22/2009 |
Repeated Application for Confidential - Cultural Resources Monitoring Report
3 page(s)
| | CEC/ M. Jones | SMUD/ L. Jimenez-Price |
52057 | 6/17/2009 |
Countersigned CBO MOU for ZLD & OnePass Filter Addition
7 page(s)
| | CEC/ A. Juarez-Garcia | SMUD/ K. Hudson |
51197 | 4/20/2009 |
Request for Delegation of CBO Self Performance
1 page(s)
| | CEC/ J. Caswell | SMUD/ S. Flake |
51120 | 4/16/2009 |
Approval of Modification to Upgrade the Zero Liquid Discharge System
1 page(s)
| | SMUD/ L. Jimenez-Price | CEC/ A. Juarez-Garcia |
50744 | 4/1/2009 |
Notice of Receipt
2 page(s)
| | CEC/ Docket Unit | CEC/ E. Allen |
50342 | 3/2/2009 |
Kevin Hudson Hydrogen Usage Letter
2 page(s)
| | CEC/ A. Juarez-Garcia | SMUD Financing Authority/ Kevin Hudson |
50048 | 2/10/2009 |
SFA's Petition for Post Certification Project Modification
47 page(s)
| | CEC/ A. Juarez-Garcia | SMUD/ Lourdes Jimenez-Price |
49316 | 12/9/2008 |
Response to the Condition of Certification HAZ-1 Requested Additions Letter
5 page(s)
| | SMUC/ K. Hudson | CEC/ A. Juarez-Garcia |
49283 | 12/8/2008 |
Response to the Condition of Certification HAZ-1 Requested Additions Letter
6 page(s)
| | SMUD/ Kevin Hudson | CEC/ A. Juarez-Garcia |
49279 | 12/5/2008 |
Condition of Certifcation HAZ-1: Requested Additions
5 page(s)
| | CEC/ A. Juarez-Garcia | SMUD/ K. Hudson |
48758 | 10/24/2008 |
Notification of CBO Delegate Designation
2 page(s)
| | CEC/ A. Juarez-Garcia | SMUD/ K. Hudson |
48021 | 9/15/2008 |
Consumnes Power Plant Condition of Certification WATER RES-1
6 page(s)
| | CEC/ A. Juarez-Garcia | SFA/ B. Nelson |
47367 | 7/28/2008 |
Repeated Application for Confidential Designation - Cultural Resources
150 page(s)
| | CEC / M. Jones | SMUD / L. Jimenez-Price |
47098 | 7/9/2008 |
Repeated Application for Confidential Designation - Cultural Resources
131 page(s)
| | CEC / M. Jones | SMUD / L. Jimenez-Price |
46697 | 6/13/2008 |
Notice of Decision RE: Modify condition of certification, as well as the project description relating to the coolign tower.
1 page(s)
| | CEC / Docket Unit | CEC / R. Yasny |
46632 | 6/9/2008 |
Application for Confidential Designation - Cultural Resources
131 page(s)
| | CEC / M. Jones | SWCA / N. Sikes |
46617 | 6/6/2008 |
Order to Amend the Energy Commission Decision to Change Three Air Quality Conditions of Certification and Project description
3 page(s)
| | CEC / Docket Unit | CEC / J. Pfannenstiel |
45974 | 4/21/2008 |
Petition to Amend the Project Description and Operating Parameters for the Cooling Tower at the Sacramento Municipal Utility District Financing Authority's Cosumnes Power Plant (01-AFC-19C)
5 page(s)
| | CEC/Docket Unit | CEC/R. Yasney |
43378 | 11/15/2007 |
Notice of Receipt SMUD Financing Authority Petition to Amend the Project Description and Operating Parameters for the Cooling Tower at the Cosumnes Power Plant
3 page(s)
| | CEC / Docket Unit | CEC / R. Johnson |
43259 | 11/7/2007 |
SFA's Petition for Post Certification license Amendment
65 page(s)
| | CEC / Docket Unit | SMUD / L. Jimenez-Price |
42573 | 9/28/2007 |
Email re Withdrawing Sept 6th Petition
1 page(s)
| | CEC / P. David | Sacramento Municipal Utility District / L. Jimenez-Price |
42207 | 9/6/2007 |
SFA's Petition for Post Certification License Amendment for the Cosumnes PPP
62 page(s)
| | CEC/ Docket Unit | SMUD/ L. Jimenez |
41688 | 7/27/2007 |
Cosumnes Power Plant withdrawal of petition to amend dated March 29, 2007
1 page(s)
| | CEC / R. Yasny | Thermal Generation Assets / B. Nelson |
40638 | 5/29/2007 |
Environmental Noise Analysis.
29 page(s)
| | Aspen Environmental Group | Brown-Buntin Associates |
39791 | 3/28/2007 |
Petition to Amend Conditions of Certification
42 page(s)
| | CEC/ J. Scott | SMUD Financing Authority |
36880 | 5/2/2006 |
Acoustic Compliance Test Report (This is the attachment to the letter from SMUD dated 5/2/06 - Condition of Certification Noise-5)
131 page(s)
| | CEC/Docket Unit | ATCO Noise Management |
36879 | 5/2/2006 |
Consumnes Power Plant Condition of Certification Noise-5
139 page(s)
| | CEC/J. Scott/County of Sacramento Planning Dept/R. Sherry | SMUD/Consumnes Power Plant/K. Hudson |
36390 | 2/22/2006 |
Repeated Application for Confidential Designation Pursuant to Section 2505(a)(4) of Title 20: SMUD's Consumnes Power Plant (01-AFC-19): Cultural Resources
175 page(s)
| | CEC/Blevins/Docket Unit | SMUD/Cohn |
36205 | 1/18/2006 |
Environmental Impact Noise Informal Complaint
1 page(s)
| | CEC/Scott/Docket Unit | Salvatore and Pamela Ali |
36196 | 1/18/2006 |
SMUD Consumnes Power Plant Environmental Impact Noise Informal Complaint.
1 page(s)
| | Jeri Scott/CEC/Docket Unit | Bill Warwick |
36089 | 12/14/2005 |
Order No. 05-1019-01(a) - Order Approving Transfer of Ownership to Sacramento Municipal Utility District Financing Authority
1 page(s)
| | CEC/Docket Unit | CEC/Desmond |
35811 | 10/26/2005 |
Order No. 05-1019-01-(a) Order Approving Transfer of Ownership to Sacramento Municipal Utility District Financing Authority.
1 page(s)
| | Docket Unit | CEC |
35499 | 9/15/2005 |
Notice of receipt-Petition to change ownership.
2 page(s)
| | CEC/ Docket Unit | CEC/R. Johnson |
35422 | 8/30/2005 |
SMUD's Post Certification Change in Ownership Petition for the Consumnes Power Plant Project.
3 page(s)
| | CEC/Docket Unit | SMUD/Jan Schori, Steven M Cohn |
33684 | 3/17/2005 |
Repeated Application for Confidential Designation - Cultural Resources
2 page(s)
| | CEC/Therkelsen/dockets | Smud/Cohn |
31928 | 7/21/2004 |
Establishment of Post-Certification Mailing List - POS
2 page(s)
| | CEC/Docket | CEC/Scott |
31885 | 7/14/2004 |
Repeated Application for Confidential Designation Pursuant to section 2505(a)(4) of Title: 20 SMUD's Consumnes Power Plant: Cultural Resources
22 page(s)
| | CEC/Dockets | CEC/J. Scott |
31570 | 5/21/2004 |
Response to Comments on Insignificant Project Change.
2 page(s)
| | CEC/Dockets | CEC/J. Scott |
31331 | 4/29/2004 |
Letter to SMUD dated 4-28-04 regarding Approval of Petition to Modify the Project Description with Enclosures
28 page(s)
| | Smud/Hudson/docket | CEC/Scott |
31316 | 4/26/2004 |
NOTICE OF INSIGNIFICANT PROJECT CHANGE, Consumnes Power Plant Project (01-AFC-19C).
1 page(s)
| | CEC/Scott | Kathy Peasha |
31213 | 4/9/2004 |
Notice of Insignificant Project Change (Relocate Segment of Natural Gas Pipeline)
2 page(s)
| | Interested Parties/Cec/docket | CEC/O'brien |
31212 | 4/9/2004 |
Petition to Modify Project Description to Relocate Gas Pipeline Alignment Along Franklin Blvd. in Elk Grove
27 page(s)
| | CEC/Docket | Smud/Cohen |
31068 | 3/5/2004 |
Repeated Application for Confidential Designation
2 page(s)
| | CEC/Therkelsen | Smud/Cohn |
30800 | 1/29/2004 |
Approval to relocate water supply pipeline.
3 page(s)
| | Kevin Hudson, Smud/Dockets | CEC Cec |
30799 | 1/29/2004 |
Approval to install concrete batch plant.
3 page(s)
| | Kevin M Hudson, Smud/Dockets | CEC Cec |
30642 | 12/19/2003 |
Consumnes (SMUD) -- NOTICE OF INSIGNIFICANT PROJECT CHANGE (Temporary Concrete Batch Plant).
2 page(s)
| | CEC/Dockets | CEC Cec |
30641 | 12/19/2003 |
Consumnes (SMUD) - NOTICE OF INSIGNIFICANT PROJECT CHANGE (Relocate Water Supply Pipeline).
2 page(s)
| | CEC/Dockets | CEC Cec |
30438 | 11/19/2003 |
Petition to Modify Project Description
7 page(s)
| | CEC/Dockets | Smud/Cohn |
30394 | 11/13/2003 |
Order Denying Petition For Reconsideration - POS
7 page(s)
| | CEC/Docket | CEC/Pernell/boyd/rosenfeld |
30242 | 10/27/2003 |
SMUD's Response to Peasha Petition for Reconsideration-POS
12 page(s)
| | CEC/Docket | Smud/Cohn |
30207 | 10/20/2003 |
Notice of Commission Hearing on Petition for Reconsideration POS
5 page(s)
| | CEC/Dockets | CEC/Keese |
30169 | 10/21/2003 |
Revised Proof of Service
4 page(s)
| | CEC/Docket | CEC/Hearing Office |
30073 | 10/8/2003 |
Kathy Peasha's Request for Reconsideration of the Commission Decision on the Consumnes Power Project - POS.
6 page(s)
| | CEC/Dockets | Kathy Peasha |