240591 | 11/13/2021 |
7386 EVANS STREET RIVERSIDE
Efficiency 10 page(s)
| | CEC/Docket Unit | Rahul Bhayani |
237481 | 4/16/2021 |
Item 3_Order Approving Request to Terminate License ORDER NO: 21-0414-03 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
237391 | 4/7/2021 |
Inland Empire Energy Center Request to Terminate
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
237378 | 4/5/2021 |
April 14, 2021 CEC Business Meeting Item 3 Inland Empire Energy Center Decommissioning /Demolition Plan. NOR, Staff Closure Recommendation and Revised Closure Plan Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
235874 | 12/7/2020 |
Monthly Compliance Report for September 2020
33 page(s)
| | CEC/Keith Winstead | Latham & Watkins LLP |
235873 | 12/7/2020 |
Monthly Compliance Report for August 2020
62 page(s)
| | CEC/Keith Winstead | Latham & Watkins LLP |
235872 | 12/7/2020 |
Monthly Compliance Report for July 2020
51 page(s)
| | CEC/Keith Winstead | Latham & Watkins LLP |
234876 | 9/23/2020 |
Monthly Compliance Report for June 2020
59 page(s)
| | CEC/Dockets | Latham & Watkins LLP |
233686 | 6/30/2020 |
May 2020 Monthly Compliance Report
41 page(s)
| | CEC/Keith Winstead | Latham & Watkins LLP |
233455 | 6/12/2020 |
February 2020 Monthly Compliance Report
32 page(s)
| | CEC/Dockets | Latham & Watkins LLP |
233454 | 6/12/2020 |
March 2020 Monthly Compliance Report
54 page(s)
| | CEC/Dockets | Latham & Watkins LLP |
233453 | 6/12/2020 |
April 2020 Monthly Compliance Report
49 page(s)
| | CEC/Dockets | Latham & Watkins LLP |
232190 | 2/24/2020 |
Full Notice to Proceed for Decommissioning and Demolition Plan Activities Full Notice to Proceed for Decommissioning and Demolition Plan Activities Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
231973 | 2/7/2020 |
Stormwater Pollution Prevention Plan, Appendices Volume 3
116 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231972 | 2/7/2020 |
Stormwater Pollution Prevention Plan, Appendices Volume 2
92 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231971 | 2/7/2020 |
Stormwater Pollution Prevention Plan, Appendices Volume 1
23 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231970 | 2/6/2020 |
Traffic Management Plan, Demolition of the IEEC Power Generating Station
7 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231969 | 2/6/2020 |
Health and Safety Plan, Demolition of the IEEC Power Generation Station
243 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231968 | 2/6/2020 |
Dust Control Plan, Demolition of the IEEC Power Generating Station
19 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231967 | 2/6/2020 |
Decontamination and Demolition Activity Work Plan
32 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231946 | 2/5/2020 |
Initial Waste Management Plan
2 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231944 | 2/5/2020 |
Stormwater Pollution Prevention Plan
66 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231943 | 2/5/2020 |
Injury and Illness Prevention Program 2019
12 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231942 | 2/5/2020 |
Air Quality Construction Mitigation Plan
15 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
231266 | 12/17/2019 |
Order Approving Revised Closure Plan
4 page(s)
| | CEC/Dockets | California Energy Commission |
231180 | 12/12/2019 |
Notice of Decision in Compliance
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
231024 | 12/9/2019 |
Letter from Francisco Escobedo to Mary Dyas re Condition of Certification COM-7, 2018 Annual Operations Report, dated 3-26-18
248 page(s)
| | CEC/Mary Dyas | Latham & Watkins LLP |
230882 | 11/27/2019 |
Inland Empire Energy Center Closure Plan Staff's Recommendation
18 page(s)
| | CEC/Docket Unit | California Energy Commission |
230711 | 11/14/2019 |
Inland Empire Energy Center Decommissioning and Demolition Plan
230 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
229729 | 9/12/2019 |
Section 106 Consultation - Inland Empire Energy Center Decommissioning and Demolition 3 page(s)
| | CEC/Thomas Gates, Ph.D. | Soboba Band of Luiseno Indians |
228879 | 7/1/2019 |
List of Property Owners Within 1000 foot Radius of Plant
6 page(s)
| | CEC/Dockets | Latham & Watkins LLP |
228850 | 6/26/2019 |
NOTICE OF RECEIPT TERMINATION OF LICENSE/CLOSURE PLAN FOR INLAND EMPIRE ENERGY
CENTER PROJECT
(01-AFC-17C) Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
228806 | 6/20/2019 |
Inland Empire Energy Center Decommissioning and Demolition Plan
224 page(s)
| | CEC/Docket Unit | Latham & Watkins LLP |
225593 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
220014 | 7/5/2017 |
Letter to Inland Empire Energy Center Regarding Unit 2 Cold Lay-Up Letter from the California Energy Commission 2 page(s)
| | Inland Empire Energy Center, LLC/Francisco Escobedo | California Energy Commission |
216873 | 4/7/2017 |
Withdrawal Letter for Petition to Amend Turbine Replacement Project
1 page(s)
| | | Inland Empire Energy Center LLC |
205293 | 7/9/2015 |
South County Fire Authority E-mail Response *** THIS DOCUMENT SHOULD HAVE BEEN DOCKETED IN 08-AFC-07C. SEE TN 211119 *** Worker Safety and Fire Protection 2 page(s)
| | Brett Fooks/CEC/Docket Unit | California Energy Commission |
203348 | 11/18/2014 |
Petition to Intervene
4 page(s)
| | California Energy Commission | Adams Broadwell Joseph & Cardozo |
203347 | 11/18/2014 |
Preliminary CURE Comments
5 page(s)
| | CEC/ Dale Rundquist | Adams Broadwell Joseph & Cardozo |
203252 | 10/24/2014 |
Notice of Receipt - Petition to Amend the California Energy Commission Decision for the Inland Empire Energy Center Turbine Replacement 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
203178 | 10/7/2014 |
Inland Empire Energy Center Petition to Amend Turbine Replacement Project
181 page(s)
| | CEC/Dockets Unit | URS |
65983 | 6/27/2012 |
GHG Reporting Per AQ-SC17
2 page(s)
| | Inland Empire Energy Center/F.Escobedo | CEC/C.Marxen |
59325 | 12/21/2010 |
Notice of Decision
1 page(s)
| | CEC/ Dokcet UNit | CEC/ D.Rundquist |
58882 | 10/27/2010 |
Revised Staff Analysis to Amend AQ Conditions
17 page(s)
| | Interested Parties | CEC/D. Rundquist |
58357 | 9/2/2010 |
Revised Staff Analysis
16 page(s)
| | Interested Parties | CEC/D. Rundquist |
56705 | 5/17/2010 |
IEEP Staff Analysis to Amend AQ COCs
15 page(s)
| | Interested Parties | CEC/D. Rundquist |
54461 | 12/16/2009 |
Notice of Receipt RE Petition to Amend the CEC Decision
3 page(s)
| | CEC/ Docket Unit | CEC/ A. Allen |
54045 | 11/10/2009 |
Inland Empire Energy Center License Amendment
27 page(s)
| | CEC/ Docket Unit | Inland Empire Energy Center LLC |
52343 | 7/8/2009 |
Construction Completion
1 page(s)
| | CEC/ D. Rundquist | GE Energy/ F. Escobedo |
50482 | 3/13/2009 |
RECLAIM/ Title V Facility Permit
9 page(s)
| | South Coast AQMD/ J. Yee | Sierra Research/ T. Andrews |
47996 | 9/11/2008 |
Inland Empire Energy Center Delegation of Authority
1 page(s)
| | CEC/ D. Rundquist | Inland Empire Energy Center/ B. Heppenstall |
47701 | 8/25/2008 |
Letter from PGE RE Update on Operations at Inland Empire Energy Center
1 page(s)
| | CEC / D. Rundquist | PGE / J. Gates |
47526 | 8/13/2008 |
Approval to Leave Temporary Improvements of Construction Lay Down Area
1 page(s)
| | IEEC, LLC / J. Gates | CEC / D. Rundquist |
47507 | 8/8/2008 |
INLDEM_5_Unit_1 and INLDEM_5_Unit_2 California ISO Notification of Commercial Operation
2 page(s)
| | CalISO/R. Kott | GE/J. Gates |
47506 | 8/11/2008 |
Approval to Leave Temporary Improvements of Construction Lay Down Area in Place for Land Owner
1 page(s)
| | Inland Empire/J. Gates | CEC/D. Rundquist |
47151 | 7/21/2008 |
Notice of Insignificant Project Change
3 page(s)
| | CEC / Docket Unit | CEC / E. Allen |
45750 | 3/24/2008 |
Letter to SCAQMD from Sierra Research RE: RECLAIM/Title V Facility Permit
9 page(s)
| | SCAQMD / J. Yee | SR / G. Rubenstien |
41391 | 7/3/2007 |
Notice of Insignificant Project Change
2 page(s)
| | Interested Parties/ CEC/ Dockets Unit | CEC/ E. Allen for R. Johnson |
41077 | 6/20/2007 |
Petition from IEEC for Additional Laydown Area.
19 page(s)
| | CEC/ C. Bruins | Calpine Construction Management/ J. Gavaldon |
41034 | 6/18/2007 |
Revision to letter submittes to District earlier in the month RE annual NOx RTC demonstration.
4 page(s)
| | South Coast AQMD/ J. Levy | GE Energy/ J. Gates |
41031 | 6/18/2007 |
Letter stating they would like to withdraw the petition for the lay down area located at 27285 Murrieta Road, Sun City, CA 92586.
1 page(s)
| | CEC/ C. Bruins | Calpine/ J. Gavaldon |
40931 | 6/11/2007 |
Letter for the Annual Nox RTC Confirmation for the Inland Empire Energy Center.
7 page(s)
| | South Coast AQMD/ J. Levy | GE Energy/ R. Hintay |
40461 | 5/17/2007 |
RECLAIM / Title V Facility Permit for the Inland Empire Energy Center
2 page(s)
| | South Coast AQMD/L. Chen | Sierra Research/T. Andrews |
40362 | 5/10/2007 |
01-AFC-17C RECLAIM/Title V Facility Permit for the IEEC (Facility ID 129816)
10 page(s)
| | South Coast AQMD/John Yee | IEEC/J. Gates |
40011 | 4/16/2007 |
CEC Filing of Notice of Decision in compliance with Public Resources Code Section 21080.5 and Title 20, California Code of Regulations, Section 1768
1 page(s)
| | California Resources Agency | CEC/C. Bruins |
39995 | 4/13/2007 |
Order Approving a Petition to Modify Various Air Quality Conditions of Certification
27 page(s)
| | CEC/Docket Unit | CEC/J. Pfannenstiel |
39813 | 3/30/2007 |
District application forms requesting an administrative revision to the RECLAIM/Title V permit for the IEEC.
8 page(s)
| | South Coast AQMD/ J. Yee | General Electric Company/ J. Gates |
39621 | 3/14/2007 |
Request for additional laydown.
17 page(s)
| | CEC/C. Bruins | GE/J. Gates |
39574 | 3/12/2007 |
Staff analysisof prop mod's to amend air quality conditions of cert.
39 page(s)
| | CEC/Docket Unit | CEC/C. Bruins |
38811 | 1/3/2007 |
Air Quality data requests for amendment petition dated september 22, 2006
3 page(s)
| | IEEC/ D. Petrin | CEC/ C. Bruin |
38804 | 1/2/2007 |
Letter Inland Empire Energy Center Air Quality Data Request for Amendment Petition Dated September 22, 2006
3 page(s)
| | Dana Petrin / Inland Empire Energy Center | C. Bruins / CEC |
38803 | 1/2/2007 |
Letter Re: Air Quality Amendment Data Response
4 page(s)
| | C. Bruins /CEC | J. Gates /GE |
38391 | 11/15/2006 |
Notice of Receipt Petition to Amend
3 page(s)
| | CEC/Dockets Unit | CEC/R. Johnson |
38205 | 10/19/2006 |
Inland Empire Energy Center License Amendment #5
51 page(s)
| | CEC/ Docket Unit | Inland Empire Energy Center, LLC |
38156 | 10/13/2006 |
Source specific PSD delegation agreement.
7 page(s)
| | EPA/ D. Jordan | SCAQMD/M. Nazemi |
38122 | 10/11/2006 |
Notice of Exemption
1 page(s)
| | CEC/ Dockets Unit | CEC/ M. Errecart |
38117 | 10/11/2006 |
Inland Empire Energy Center Project 01-AFC-17C Approval to Add Temporary Construction Laydown Area.
1 page(s)
| | J. Gates / Inland Empire Energy Center | CEC/ C. Bruins |
38054 | 10/2/2006 |
Approval to move natural gas pipeline 300 feet east.
1 page(s)
| | IEEC,LLC/ J. Gates | CEC/ C. Bruins |
37959 | 9/26/2006 |
Notice of insignificant project changeto add approximately six acres for temp. constuct. laydown.
2 page(s)
| | CEC/ Dockets Unit | CEC/ R. Johnson |
37877 | 9/13/2006 |
Amendment #4, Requesting Approval for Additional Laydown
44 page(s)
| | CEC/ C. Bruins | Inland Empire Energy Center, LLC/ J. Gates |
37876 | 9/13/2006 |
Inland Empire Energy Center License Amendment #4
44 page(s)
| | CEC/ C. Bruins | IEEC/ J. Gates |
36871 | 5/1/2006 |
Reclaim Title V Facility Permit For The Inland Empire Energy Center (Facility ID 129816)
2 page(s)
| | Docket Unit / Li Chen SCAQMD | Sierra Research / G. Rubenstein |
36088 | 12/14/2005 |
Order No 05-1103-03 - Order Approving a Petition to Change Ownership of the Transmission Line
2 page(s)
| | CEC/Docket Unit | CEC/Desmond |
35878 | 11/14/2005 |
Order Approving a Petition to Change Ownership of the Transmission Line and Two TLSN Conditions of Certification. (Order No. 05-1103-03)
2 page(s)
| | CEC/Docket Unit | CEC/Chairman Desmond |
35839 | 11/4/2005 |
Notice of Decision.
1 page(s)
| | CEC/Docket Unit | CEC/Connie Bruins |
35660 | 10/12/2005 |
RECLAIM/Title V Facility Permit for the Inland Empire Energy Center (Facility ID 129816)
2 page(s)
| | CEC/Docket Unit | Sierra Research/Rubenstein |
35593 | 10/4/2005 |
Notice of Receipt of Petition to Change Ownership of The Transmission Line and Change the Energy Commission Decision, and Public Review of Staff Analysis.
7 page(s)
| | Interested Parties/CEC/Docket Unit | CEC/C. Bruins |
35540 | 9/26/2005 |
Addendum to the Petition for Modification of Conditions Pertaining to the Transmission Facilities Addendum to the Petition for Modification of Conditions Pertaining to the Transmission Facilities, and Petition for Change of Ownership of Such Facilities. 2 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris LLP |
35434 | 9/1/2005 |
Petition for Modification of Conditions Pertaining to the Transmission Facilities Petition for Modification of Conditions Pertaining to the Transmission Facilities and Petition for Change of Ownership of such Facilities 9 page(s)
| | CEC/Docket Unit | Ellison, Schneider & Harris LLP |
35389 | 8/29/2005 |
RECLAIM/Title V Facility Permit for the Inland Empire Energy Center.
101 page(s)
| | Mr. Li Chen, Air Quality Engineer/CEC/Docket Unit | Sierra Research |
35378 | 8/25/2005 |
Response to Application for Confidentiality: RECLAIM Trading Credit Call Option
2 page(s)
| | Ellison Schneider & Harris/Wheatland/CEC/Docket Unit | CEC/Blevins |
35298 | 8/19/2005 |
Copy of August 5, 2005 South Coast Air Quality Management District Facility Permit For The Inland Empire Energy Center.
94 page(s)
| | Docket Unit | Sierra Research/ T. Andrews |
35139 | 8/1/2005 |
Inland Empire Approval of Petition to Modify a Portion of the Natural-Gas Pipeline Route
3 page(s)
| | GE Energy/Kohl/Dockets | CEC/Bruins |
35096 | 7/26/2005 |
Application for Confidential Designation and additional information regarding ERC/RTC credits
12 page(s)
| | CEC/Blevins/Docket Unit | Ellison Schneider & Harris/Wheatland |
34922 | 7/15/2005 |
Notice of Insignificant Project Change To Modify A Portion of the Natural-Gas Pipeline Route for the Inland Empire.
2 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
34798 | 6/29/2005 |
Notice of Decision by CEC
1 page(s)
| | CA Resources Agency/CEC/Dockets | CEC/Bruins |
34794 | 6/29/2005 |
Draft Permit Evaluation For The Inland Empire Energy Center Project Facility ID 129816
105 page(s)
| | Docket Unit/ P. Muellar | Sierra Research/ |
34779 | 6/27/2005 |
Order Approving a Petition to Change To GE 107H Combined Cycle Systems and add secondary laydown parking area
32 page(s)
| | Docket Unit | CEC |
34692 | 6/16/2005 |
Applicant's Response to the Staff Analysis of Proposed Modifications to Change to GE 107H Combined-Cycle Systems, Increase Generation and Add Additional Laydown Areas
11 page(s)
| | CEC/Bruins/Docket Unit | Ellison Schneider & Harris/Wheatland |
34659 | 6/20/2005 |
Commission Staff's Errata and Amendments to Staff Analysis and Responses to Project Owner's Comments
13 page(s)
| | CEC/Docket Unit | CEC/Kramer |
34570 | 6/10/2005 |
Staff Analysis of Proposed Modification Staff Analysis of Proposed Modification to Change to GE 107H Combined-Cycle Systems, Increase Generation and Add Additions Laydown Areas 128 page(s)
| | Interested Parties/Dockets | CEC/Bruins |
34516 | 6/3/2005 |
Letter Requesting approval of the additional 1.97 acre laydown area be accepted/approved
1 page(s)
| | CEC/OBrien/Docket Unit | Ellison Schneider & Harris/Wheatland |
34466 | 5/26/2005 |
Request for Approval for Additional 1-97 Acre Laydown Area as a Supplement or Addendum to Amendment #1
18 page(s)
| | CEC/O'Brien/Dockets | Ellison Scheider & Harris/Wheatland |
34375 | 5/17/2005 |
Request for Approval, Additional 1.97-Acre Laydown Area Inland Empire Energy Center.
27 page(s)
| | Connie Bruins/CEC/Docket Unit | CH2MHill/Douglas M Davy |
34145 | 4/29/2005 |
Revised Class I Air Quality Impacts Analysis Responses to Comments
27 page(s)
| | Usfs Southern California/Mccorison/dockets | Sierra Research/Rubenstein |
34014 | 4/25/2005 |
Amendment of Certification for Inland Empire Energy Center
2 page(s)
| | CEC/Bruins/dockets | Sierra Research/Rubenstein |
33961 | 4/20/2005 |
Sierra Research's Responses to questions raised in the district's 4/13/05 email
4 page(s)
| | South Coast Aqmd/Chen/cec/docket Unit | Sierra Research/Rubenstein |
33959 | 4/20/2005 |
Amendment of Certification for Inland Empire - CD containing the modeling files referred to in Air Quality data responses submitted to CEC on 4/15/05.
1 page(s)
| | CEC/Bruins/cec/docket Unit | Sierra Research/Andrews |
33934 | 4/15/2005 |
Modeling Comments
9 page(s)
| | Aqmd/Yee/dockets | Sierra Research/Rubenstein |
33933 | 4/15/2005 |
Air Quality Cumulative Impact Analysis
13 page(s)
| | CEC/Bruins/dockets | Sierra Reseach/Rubenstein |
33885 | 3/7/2005 |
Permit Application Package for the Inland Empire; Revised Class I Air Quality Impacts Analysis.
215 page(s)
| | John Yee/South Coast Aqmd/cec/docket Unit | Calpine/Michael Hatfield |
33872 | 4/11/2005 |
Letters of support for the proposed modifications
10 page(s)
| | Dockets | Various Residents |
33867 | 4/11/2005 |
Comments for April 12, 2005 Workshop
4 page(s)
| | CEC/Pao/dockets | Endangered Habitats League/Silver |
33820 | 4/6/2005 |
Amendment of Certification for Inland Empire
13 page(s)
| | CEC/Bruins/docket Unit | Sierra Research/Rubenstein |
33806 | 4/4/2005 |
Inland Empire Energy Center Air Quality Modeling CD (No CD was included/letter only)
1 page(s)
| | Air Division, Permits Office/Stewart/cec/docket Un | Sierra Research/Andrews |
33762 | 3/28/2005 |
Workshop Notice - Inland Empire Energy Center Project Modification Workshop
2 page(s)
| | CEC/Docket Unit | CEC/Johnson |
33714 | 3/21/2005 |
Notice of Receipt: Petition To Amend.
4 page(s)
| | CEC/Docket Unit | CEC/R. Johnson |
33685 | 3/16/2005 |
Inland Empire Amendment # 1 GE H Technology and Additional Laydown Area
121 page(s)
| | CEC/Docket Unit | Inland Empire Energy Center |
33625 | 3/7/2005 |
Permit Application Package for The Inland Empire Energy Center Revised Class 1 Air Quality Impacts Analysis. Letter to John Yee, John Notar and Mike DeCorison.
215 page(s)
| | Dockets | Calpine / M. Hatfield |
33518 | 2/23/2005 |
Proposed Permit Changes.
1 page(s)
| | CEC/Docket Unit | Calpine/M. Hatfield |
33271 | 2/4/2005 |
Inland Empire Center Project-Proposed Permit Changes
202 page(s)
| | Dockets | Calpine |
31839 | 6/30/2004 |
Establishment of Post Certification Mailing List for the Inland Empire Energy Center Project Compliance
2 page(s)
| | Dockets | CEC/Truins |
30725 | 1/13/2004 |
Commission Adoption Order No. 03-1217-05.
4 page(s)
| | CEC/Dockets | CEC/Commissioners |