Docket Log

Docket: 01-AFC-17C
Project Title: Inland Empire Energy Center Project Compliance
Generated On: 3/28/2024 6:33:36 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
24059111/13/2021 7386 EVANS STREET RIVERSIDE

Efficiency
10 page(s)
 CEC/Docket UnitRahul Bhayani
2374814/16/2021 Item 3_Order Approving Request to Terminate License
ORDER NO: 21-0414-03
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2373914/7/2021 Inland Empire Energy Center Request to Terminate

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2373784/5/2021 April 14, 2021 CEC Business Meeting Item 3
Inland Empire Energy Center Decommissioning /Demolition Plan. NOR, Staff Closure Recommendation and Revised Closure Plan
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23587412/7/2020 Monthly Compliance Report for September 2020

33 page(s)
 CEC/Keith WinsteadLatham & Watkins LLP
23587312/7/2020 Monthly Compliance Report for August 2020

62 page(s)
 CEC/Keith WinsteadLatham & Watkins LLP
23587212/7/2020 Monthly Compliance Report for July 2020

51 page(s)
 CEC/Keith WinsteadLatham & Watkins LLP
2348769/23/2020 Monthly Compliance Report for June 2020

59 page(s)
 CEC/DocketsLatham & Watkins LLP
2336866/30/2020 May 2020 Monthly Compliance Report

41 page(s)
 CEC/Keith WinsteadLatham & Watkins LLP
2334556/12/2020 February 2020 Monthly Compliance Report

32 page(s)
 CEC/DocketsLatham & Watkins LLP
2334546/12/2020 March 2020 Monthly Compliance Report

54 page(s)
 CEC/DocketsLatham & Watkins LLP
2334536/12/2020 April 2020 Monthly Compliance Report

49 page(s)
 CEC/DocketsLatham & Watkins LLP
2321902/24/2020 Full Notice to Proceed for Decommissioning and Demolition Plan Activities
Full Notice to Proceed for Decommissioning and Demolition Plan Activities
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2319732/7/2020 Stormwater Pollution Prevention Plan, Appendices Volume 3

116 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319722/7/2020 Stormwater Pollution Prevention Plan, Appendices Volume 2

92 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319712/7/2020 Stormwater Pollution Prevention Plan, Appendices Volume 1

23 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319702/6/2020 Traffic Management Plan, Demolition of the IEEC Power Generating Station

7 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319692/6/2020 Health and Safety Plan, Demolition of the IEEC Power Generation Station

243 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319682/6/2020 Dust Control Plan, Demolition of the IEEC Power Generating Station

19 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319672/6/2020 Decontamination and Demolition Activity Work Plan

32 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319462/5/2020 Initial Waste Management Plan

2 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319442/5/2020 Stormwater Pollution Prevention Plan

66 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319432/5/2020 Injury and Illness Prevention Program 2019

12 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2319422/5/2020 Air Quality Construction Mitigation Plan

15 page(s)
 CEC/Docket UnitLatham & Watkins LLP
23126612/17/2019 Order Approving Revised Closure Plan

4 page(s)
 CEC/DocketsCalifornia Energy Commission
23118012/12/2019 Notice of Decision in Compliance

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23102412/9/2019 Letter from Francisco Escobedo to Mary Dyas re Condition of Certification COM-7, 2018 Annual Operations Report, dated 3-26-18

248 page(s)
 CEC/Mary DyasLatham & Watkins LLP
23088211/27/2019 Inland Empire Energy Center Closure Plan Staff's Recommendation

18 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23071111/14/2019 Inland Empire Energy Center Decommissioning and Demolition Plan

230 page(s)
 CEC/Docket UnitLatham & Watkins LLP
2297299/12/2019 Section 106 Consultation - Inland Empire Energy Center Decommissioning and Demolition
3 page(s)
 CEC/Thomas Gates, Ph.D.Soboba Band of Luiseno Indians
2288797/1/2019 List of Property Owners Within 1000 foot Radius of Plant

6 page(s)
 CEC/DocketsLatham & Watkins LLP
2288506/26/2019 NOTICE OF RECEIPT
TERMINATION OF LICENSE/CLOSURE PLAN FOR INLAND EMPIRE ENERGY CENTER PROJECT (01-AFC-17C)
Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2288066/20/2019 Inland Empire Energy Center Decommissioning and Demolition Plan

224 page(s)
 CEC/Docket UnitLatham & Watkins LLP
22559310/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2200147/5/2017 Letter to Inland Empire Energy Center Regarding Unit 2 Cold Lay-Up
Letter from the California Energy Commission
2 page(s)
 Inland Empire Energy Center, LLC/Francisco EscobedoCalifornia Energy Commission
2168734/7/2017 Withdrawal Letter for Petition to Amend Turbine Replacement Project

1 page(s)
  Inland Empire Energy Center LLC
2052937/9/2015 South County Fire Authority E-mail Response
*** THIS DOCUMENT SHOULD HAVE BEEN DOCKETED IN 08-AFC-07C. SEE TN 211119 ***
Worker Safety and Fire Protection
2 page(s)
 Brett Fooks/CEC/Docket UnitCalifornia Energy Commission
20334811/18/2014 Petition to Intervene

4 page(s)
 California Energy CommissionAdams Broadwell Joseph & Cardozo
20334711/18/2014 Preliminary CURE Comments

5 page(s)
 CEC/ Dale RundquistAdams Broadwell Joseph & Cardozo
20325210/24/2014 Notice of Receipt - Petition to Amend the California Energy Commission Decision for the Inland Empire Energy Center
Turbine Replacement
2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20317810/7/2014 Inland Empire Energy Center Petition to Amend Turbine Replacement Project

181 page(s)
 CEC/Dockets UnitURS
659836/27/2012 GHG Reporting Per AQ-SC17

2 page(s)
 Inland Empire Energy Center/F.EscobedoCEC/C.Marxen
5932512/21/2010 Notice of Decision

1 page(s)
 CEC/ Dokcet UNitCEC/ D.Rundquist
5888210/27/2010 Revised Staff Analysis to Amend AQ Conditions

17 page(s)
 Interested PartiesCEC/D. Rundquist
583579/2/2010 Revised Staff Analysis

16 page(s)
 Interested PartiesCEC/D. Rundquist
567055/17/2010 IEEP Staff Analysis to Amend AQ COCs

15 page(s)
 Interested PartiesCEC/D. Rundquist
5446112/16/2009 Notice of Receipt RE Petition to Amend the CEC Decision

3 page(s)
 CEC/ Docket UnitCEC/ A. Allen
5404511/10/2009 Inland Empire Energy Center License Amendment

27 page(s)
 CEC/ Docket UnitInland Empire Energy Center LLC
523437/8/2009 Construction Completion

1 page(s)
 CEC/ D. RundquistGE Energy/ F. Escobedo
504823/13/2009 RECLAIM/ Title V Facility Permit

9 page(s)
 South Coast AQMD/ J. YeeSierra Research/ T. Andrews
479969/11/2008 Inland Empire Energy Center Delegation of Authority

1 page(s)
 CEC/ D. RundquistInland Empire Energy Center/ B. Heppenstall
477018/25/2008 Letter from PGE RE Update on Operations at Inland Empire Energy Center

1 page(s)
 CEC / D. RundquistPGE / J. Gates
475268/13/2008 Approval to Leave Temporary Improvements of Construction Lay Down Area

1 page(s)
 IEEC, LLC / J. GatesCEC / D. Rundquist
475078/8/2008 INLDEM_5_Unit_1 and INLDEM_5_Unit_2 California ISO Notification of Commercial Operation

2 page(s)
 CalISO/R. KottGE/J. Gates
475068/11/2008 Approval to Leave Temporary Improvements of Construction Lay Down Area in Place for Land Owner

1 page(s)
 Inland Empire/J. GatesCEC/D. Rundquist
471517/21/2008 Notice of Insignificant Project Change

3 page(s)
 CEC / Docket UnitCEC / E. Allen
457503/24/2008 Letter to SCAQMD from Sierra Research RE: RECLAIM/Title V Facility Permit

9 page(s)
 SCAQMD / J. YeeSR / G. Rubenstien
413917/3/2007 Notice of Insignificant Project Change

2 page(s)
 Interested Parties/ CEC/ Dockets UnitCEC/ E. Allen for R. Johnson
410776/20/2007 Petition from IEEC for Additional Laydown Area.

19 page(s)
 CEC/ C. BruinsCalpine Construction Management/ J. Gavaldon
410346/18/2007 Revision to letter submittes to District earlier in the month RE annual NOx RTC demonstration.

4 page(s)
 South Coast AQMD/ J. LevyGE Energy/ J. Gates
410316/18/2007 Letter stating they would like to withdraw the petition for the lay down area located at 27285 Murrieta Road, Sun City, CA 92586.

1 page(s)
 CEC/ C. BruinsCalpine/ J. Gavaldon
409316/11/2007 Letter for the Annual Nox RTC Confirmation for the Inland Empire Energy Center.

7 page(s)
 South Coast AQMD/ J. LevyGE Energy/ R. Hintay
404615/17/2007 RECLAIM / Title V Facility Permit for the Inland Empire Energy Center

2 page(s)
 South Coast AQMD/L. ChenSierra Research/T. Andrews
403625/10/2007 01-AFC-17C RECLAIM/Title V Facility Permit for the IEEC (Facility ID 129816)

10 page(s)
 South Coast AQMD/John YeeIEEC/J. Gates
400114/16/2007 CEC Filing of Notice of Decision in compliance with Public Resources Code Section 21080.5 and Title 20, California Code of Regulations, Section 1768

1 page(s)
 California Resources AgencyCEC/C. Bruins
399954/13/2007 Order Approving a Petition to Modify Various Air Quality Conditions of Certification

27 page(s)
 CEC/Docket UnitCEC/J. Pfannenstiel
398133/30/2007 District application forms requesting an administrative revision to the RECLAIM/Title V permit for the IEEC.

8 page(s)
 South Coast AQMD/ J. YeeGeneral Electric Company/ J. Gates
396213/14/2007 Request for additional laydown.

17 page(s)
 CEC/C. BruinsGE/J. Gates
395743/12/2007 Staff analysisof prop mod's to amend air quality conditions of cert.

39 page(s)
 CEC/Docket UnitCEC/C. Bruins
388111/3/2007 Air Quality data requests for amendment petition dated september 22, 2006

3 page(s)
 IEEC/ D. PetrinCEC/ C. Bruin
388041/2/2007 Letter Inland Empire Energy Center Air Quality Data Request for Amendment Petition Dated September 22, 2006

3 page(s)
 Dana Petrin / Inland Empire Energy CenterC. Bruins / CEC
388031/2/2007 Letter Re: Air Quality Amendment Data Response

4 page(s)
 C. Bruins /CECJ. Gates /GE
3839111/15/2006 Notice of Receipt Petition to Amend

3 page(s)
 CEC/Dockets UnitCEC/R. Johnson
3820510/19/2006 Inland Empire Energy Center License Amendment #5

51 page(s)
 CEC/ Docket UnitInland Empire Energy Center, LLC
3815610/13/2006 Source specific PSD delegation agreement.

7 page(s)
 EPA/ D. JordanSCAQMD/M. Nazemi
3812210/11/2006 Notice of Exemption

1 page(s)
 CEC/ Dockets UnitCEC/ M. Errecart
3811710/11/2006 Inland Empire Energy Center Project 01-AFC-17C Approval to Add Temporary Construction Laydown Area.

1 page(s)
 J. Gates / Inland Empire Energy CenterCEC/ C. Bruins
3805410/2/2006 Approval to move natural gas pipeline 300 feet east.

1 page(s)
 IEEC,LLC/ J. GatesCEC/ C. Bruins
379599/26/2006 Notice of insignificant project changeto add approximately six acres for temp. constuct. laydown.

2 page(s)
 CEC/ Dockets UnitCEC/ R. Johnson
378779/13/2006 Amendment #4, Requesting Approval for Additional Laydown

44 page(s)
 CEC/ C. BruinsInland Empire Energy Center, LLC/ J. Gates
378769/13/2006 Inland Empire Energy Center License Amendment #4

44 page(s)
 CEC/ C. BruinsIEEC/ J. Gates
368715/1/2006 Reclaim Title V Facility Permit For The Inland Empire Energy Center (Facility ID 129816)

2 page(s)
 Docket Unit / Li Chen SCAQMDSierra Research / G. Rubenstein
3608812/14/2005 Order No 05-1103-03 - Order Approving a Petition to Change Ownership of the Transmission Line

2 page(s)
 CEC/Docket UnitCEC/Desmond
3587811/14/2005 Order Approving a Petition to Change Ownership of the Transmission Line and Two TLSN Conditions of Certification. (Order No. 05-1103-03)

2 page(s)
 CEC/Docket UnitCEC/Chairman Desmond
3583911/4/2005 Notice of Decision.

1 page(s)
 CEC/Docket UnitCEC/Connie Bruins
3566010/12/2005 RECLAIM/Title V Facility Permit for the Inland Empire Energy Center (Facility ID 129816)

2 page(s)
 CEC/Docket UnitSierra Research/Rubenstein
3559310/4/2005 Notice of Receipt of Petition to Change Ownership of The Transmission Line and Change the Energy Commission Decision, and Public Review of Staff Analysis.

7 page(s)
 Interested Parties/CEC/Docket UnitCEC/C. Bruins
355409/26/2005 Addendum to the Petition for Modification of Conditions Pertaining to the Transmission Facilities
Addendum to the Petition for Modification of Conditions Pertaining to the Transmission Facilities, and Petition for Change of Ownership of Such Facilities.
2 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
354349/1/2005 Petition for Modification of Conditions Pertaining to the Transmission Facilities
Petition for Modification of Conditions Pertaining to the Transmission Facilities and Petition for Change of Ownership of such Facilities
9 page(s)
 CEC/Docket UnitEllison, Schneider & Harris LLP
353898/29/2005 RECLAIM/Title V Facility Permit for the Inland Empire Energy Center.

101 page(s)
 Mr. Li Chen, Air Quality Engineer/CEC/Docket UnitSierra Research
353788/25/2005 Response to Application for Confidentiality: RECLAIM Trading Credit Call Option

2 page(s)
 Ellison Schneider & Harris/Wheatland/CEC/Docket UnitCEC/Blevins
352988/19/2005 Copy of August 5, 2005 South Coast Air Quality Management District Facility Permit For The Inland Empire Energy Center.

94 page(s)
 Docket UnitSierra Research/ T. Andrews
351398/1/2005 Inland Empire Approval of Petition to Modify a Portion of the Natural-Gas Pipeline Route

3 page(s)
 GE Energy/Kohl/DocketsCEC/Bruins
350967/26/2005 Application for Confidential Designation and additional information regarding ERC/RTC credits

12 page(s)
 CEC/Blevins/Docket UnitEllison Schneider & Harris/Wheatland
349227/15/2005 Notice of Insignificant Project Change To Modify A Portion of the Natural-Gas Pipeline Route for the Inland Empire.

2 page(s)
 CEC/Docket UnitCEC/R. Johnson
347986/29/2005 Notice of Decision by CEC

1 page(s)
 CA Resources Agency/CEC/DocketsCEC/Bruins
347946/29/2005 Draft Permit Evaluation For The Inland Empire Energy Center Project Facility ID 129816

105 page(s)
 Docket Unit/ P. MuellarSierra Research/
347796/27/2005 Order Approving a Petition to Change To GE 107H Combined Cycle Systems and add secondary laydown parking area

32 page(s)
 Docket UnitCEC
346926/16/2005 Applicant's Response to the Staff Analysis of Proposed Modifications to Change to GE 107H Combined-Cycle Systems, Increase Generation and Add Additional Laydown Areas

11 page(s)
 CEC/Bruins/Docket UnitEllison Schneider & Harris/Wheatland
346596/20/2005 Commission Staff's Errata and Amendments to Staff Analysis and Responses to Project Owner's Comments

13 page(s)
 CEC/Docket UnitCEC/Kramer
345706/10/2005 Staff Analysis of Proposed Modification
Staff Analysis of Proposed Modification to Change to GE 107H Combined-Cycle Systems, Increase Generation and Add Additions Laydown Areas
128 page(s)
 Interested Parties/DocketsCEC/Bruins
345166/3/2005 Letter Requesting approval of the additional 1.97 acre laydown area be accepted/approved

1 page(s)
 CEC/OBrien/Docket UnitEllison Schneider & Harris/Wheatland
344665/26/2005 Request for Approval for Additional 1-97 Acre Laydown Area as a Supplement or Addendum to Amendment #1

18 page(s)
 CEC/O'Brien/DocketsEllison Scheider & Harris/Wheatland
343755/17/2005 Request for Approval, Additional 1.97-Acre Laydown Area Inland Empire Energy Center.

27 page(s)
 Connie Bruins/CEC/Docket UnitCH2MHill/Douglas M Davy
341454/29/2005 Revised Class I Air Quality Impacts Analysis Responses to Comments

27 page(s)
 Usfs Southern California/Mccorison/docketsSierra Research/Rubenstein
340144/25/2005 Amendment of Certification for Inland Empire Energy Center

2 page(s)
 CEC/Bruins/docketsSierra Research/Rubenstein
339614/20/2005 Sierra Research's Responses to questions raised in the district's 4/13/05 email

4 page(s)
 South Coast Aqmd/Chen/cec/docket UnitSierra Research/Rubenstein
339594/20/2005 Amendment of Certification for Inland Empire - CD containing the modeling files referred to in Air Quality data responses submitted to CEC on 4/15/05.

1 page(s)
 CEC/Bruins/cec/docket UnitSierra Research/Andrews
339344/15/2005 Modeling Comments

9 page(s)
 Aqmd/Yee/docketsSierra Research/Rubenstein
339334/15/2005 Air Quality Cumulative Impact Analysis

13 page(s)
 CEC/Bruins/docketsSierra Reseach/Rubenstein
338853/7/2005 Permit Application Package for the Inland Empire; Revised Class I Air Quality Impacts Analysis.

215 page(s)
 John Yee/South Coast Aqmd/cec/docket UnitCalpine/Michael Hatfield
338724/11/2005 Letters of support for the proposed modifications

10 page(s)
 DocketsVarious Residents
338674/11/2005 Comments for April 12, 2005 Workshop

4 page(s)
 CEC/Pao/docketsEndangered Habitats League/Silver
338204/6/2005 Amendment of Certification for Inland Empire

13 page(s)
 CEC/Bruins/docket UnitSierra Research/Rubenstein
338064/4/2005 Inland Empire Energy Center Air Quality Modeling CD (No CD was included/letter only)

1 page(s)
 Air Division, Permits Office/Stewart/cec/docket UnSierra Research/Andrews
337623/28/2005 Workshop Notice - Inland Empire Energy Center Project Modification Workshop

2 page(s)
 CEC/Docket UnitCEC/Johnson
337143/21/2005 Notice of Receipt: Petition To Amend.

4 page(s)
 CEC/Docket UnitCEC/R. Johnson
336853/16/2005 Inland Empire Amendment # 1 GE H Technology and Additional Laydown Area

121 page(s)
 CEC/Docket UnitInland Empire Energy Center
336253/7/2005 Permit Application Package for The Inland Empire Energy Center Revised Class 1 Air Quality Impacts Analysis. Letter to John Yee, John Notar and Mike DeCorison.

215 page(s)
 DocketsCalpine / M. Hatfield
335182/23/2005 Proposed Permit Changes.

1 page(s)
 CEC/Docket UnitCalpine/M. Hatfield
332712/4/2005 Inland Empire Center Project-Proposed Permit Changes

202 page(s)
 DocketsCalpine
318396/30/2004 Establishment of Post Certification Mailing List for the Inland Empire Energy Center Project Compliance

2 page(s)
 DocketsCEC/Truins
307251/13/2004 Commission Adoption Order No. 03-1217-05.

4 page(s)
 CEC/DocketsCEC/Commissioners