252417 | 9/26/2023 |
Willow Rock Energy Storage Center Status Report No 13
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
251921 | 8/25/2023 |
Willow Rock Energy Storage Center Status Report No 12
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
251599 | 8/11/2023 |
Willow Rock Suspension Order
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
251592 | 8/11/2023 |
Willow Rock Suspension Order - Spanish
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
251186 | 7/26/2023 |
Applicant's Response to Motion to Suspend the Application for Certification Proceeding
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
251180 | 7/26/2023 |
CEC Staff Status Report #11 monthly status report 1 page(s)
| | CEC/Andrew McAllister and Noemi Gallardo | California Energy Commission |
251175 | 7/26/2023 |
Willow Rock Energy Storage Center Status Report No 11
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
251174 | 7/26/2023 |
Willow Rock Energy Storage - CURE Status Report 11
4 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
251029 | 7/12/2023 |
Staff’s Motion to Suspend the Application for Certification Proceeding
4 page(s)
| | CEC/Docket Unit | California Energy Commission |
250856 | 6/30/2023 |
Willow Rock Energy Storage Center Response to CEC Staff Status Report #10
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
250726 | 6/23/2023 |
Willow Rock Energy Storage - CURE Status Report 10
3 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
250724 | 6/23/2023 |
Willow Rock Monthly Geotechnical Update – April 2023
274 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
250720 | 6/23/2023 |
CEC Staff Status Report #10 monthly status report 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
250707 | 6/21/2023 |
Willow Rock Energy Storage Center Status Report No 10
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
250431 | 6/1/2023 |
Kern County Planning and Natural Resources Department Comments - Compliance Request Letter
Biological Resources, Cultural Resources, Geology/Paleontology 3 page(s)
| | CEC/Docket Unit | Kern County Planning and Natural Resources Department |
250418 | 5/31/2023 |
CURE Data Request - Response Set 2 Willow Rock Energy Storage Center (21-AFC-02) Responses to California Unions for Reliable Energy (CURE) Data Request Response Set 2 Air Quality, Biological Resources, Geology/Paleontology, Noise and Vibration 44 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
250386 | 5/30/2023 |
Carol Comments - Historical Willow Springs
Cultural Resources, Land Use 1 page(s)
| | CEC/Docket Unit | Carol |
250361 | 5/26/2023 |
Willow Rock Energy Storage Center Status Report No 9
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
250356 | 5/26/2023 |
Willow Rock Energy Storage - CURE Status Report 9
4 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
250354 | 5/26/2023 |
CEC Staff Status Report #9 monthly status report 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
250259 | 5/22/2023 |
Applicant's Notice Pursuant to 20 CCR § 1716(f) for CURE Data Requests Set 2
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
250076 | 5/9/2023 |
Record of Conversation with CDFW biologists ROC involving Western Joshua Tree Biological Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
249982 | 5/3/2023 |
Willow Rock AFC DR68-7 Monthly Geotechnical Update Willow Rock AFC DR68-7 Monthly Geotechnical Update #7 - March 2023 Geology/Paleontology 2 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
249932 | 5/1/2023 |
Willow Rock Energy Storage - CURE Data Request Set 2 with Cover Sheet
32 page(s)
| | Hydrostor, Inc./Curt Hilderbrand | California Unions for Reliable Energy |
249876 | 4/26/2023 |
CEC Staff Status Report #8 monthly status report 1 page(s)
| | CEC/Andrew McAllister and Noemi Gallardo | California Energy Commission |
249875 | 4/26/2023 |
CURE Status Report 8
2 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
249856 | 4/24/2023 |
Willow Rock Energy Storage Center Status Report No 8
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
249844 | 4/21/2023 |
California Native Plant Society Comments
Biological Resources 4 page(s)
| | CEC/Leonidas Payane | Brendan Wilce/California Native Plant Society |
249704 | 4/14/2023 |
Record of Conversation with CDFW biologists Record of Conversation with CDFW biologists regarding Mohave ground squirrel and desert tortoise Biological Resources 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
249626 | 4/12/2023 |
Intervenor CURE POS List Update
2 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
249495 | 3/29/2023 |
Willow Rock Energy Storage Center Data Request Set 4 Responses Data Request Set 4 Responses Biological Resources and Noise and Vibration Biological Resources, Noise and Vibration 31 page(s)
| | California Energy Commission | Golder Associates USA Inc. |
249444 | 3/27/2023 |
Monthly Geotechnical Update 6 Kern County Monthly Geotechnical Update 6 - February 2023 Geology/Paleontology 2 page(s)
| | California Energy Commission | Golder Associates USA Inc. |
249431 | 3/24/2023 |
Willow Rock Energy Storage Center Status Report No 7
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
249428 | 3/24/2023 |
California Unions for Reliable Energy Status Report No 7
2 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
249423 | 3/24/2023 |
CEC Staff Status Report #7 monthly status report 1 page(s)
| | CEC/Andrew McAallister & Noemi Gallardo | California Energy Commission |
249087 | 3/10/2023 |
Order Amending Committee Assignments Order No.: 23-0306-03d 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
248978 | 2/27/2023 |
CEC Staff Data Requests Set 4
Biological Resources 7 page(s)
| | CEC/Docket Unit | California Energy Commission |
248962 | 2/24/2023 |
CEC Staff Status Report #6
2 page(s)
| | CEC/Andrew McAllister | California Energy Commission |
248951 | 2/24/2023 |
Willow Rock Energy Storage Draft Status Report 6
2 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
248950 | 2/24/2023 |
Flores MGS MOU 26 June 2018 Letter from State of California - Natural Resources Agency regarding Memorandum of Understanding re: Mohave ground squirrel Biological Resources 11 page(s)
| | California Energy Commission | Golder Associates USA Inc. |
248949 | 2/24/2023 |
Communication between CEC staff and applicant regarding Crotch's bumblebee Emails dated February 10, 2023 and February 15, 2023. Also U.S. Fish and Wildlife Service Survey Protocols for the Rusty Patched Bumble bee and U.S. Fish and Wildlife Service California Bumble Bee Atlas Participant Handbook 2022 Biological Resources 61 page(s)
| | CEC/Docket Unit | California Energy Commission |
248948 | 2/24/2023 |
Notice of Agenda Item to Consider Order Amending Committee Assignments
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
248942 | 2/23/2023 |
Kern County Planning and Natural Resources Department Comments Kern County Planning and Natural Resources Department Comments - Document Description Kern County Planning and Natural Resources Department Comments - County Response to Willow Rock Energy Storage Center Land Use, Traffic and Transportation, Worker Safety and Fire Protection 14 page(s)
| | CEC/Lon Payne | Kern County Planning and Natural Resources Department |
248939 | 2/23/2023 |
Flores SCP 6 Nov 2018_KFlores_Redacted pdf
35 page(s)
| | CEC/Docket Unit | Golder Associates |
248938 | 2/23/2023 |
Fairchild SCP S-182820007-18333-001 03 Jul 2020_Redacted pdf
24 page(s)
| | CEC/Docket Unit | Golder Associates |
248935 | 2/23/2023 |
Willow Rock Energy Storage Center Status Report No 6
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
248934 | 2/23/2023 |
Updated MGS_LAI_20190319_signed pdf
1 page(s)
| | CEC/Docket Unit | Golder Associates |
248933 | 2/23/2023 |
KFlores Resume 2022 -MGS and Small Mammal pdf
11 page(s)
| | CEC/Docket Unit | Golder Associates |
248932 | 2/23/2023 |
Karl Fairchild MGS Experience_11-27-2022_Redacted pdf
6 page(s)
| | CEC/Docket Unit | Golder Associates |
248931 | 2/23/2023 |
Hydrostor MGS Habitat Assessment_11-30-2022_Reduced pdf
13 page(s)
| | WSPA USA Environment and Infrastructure, Inc./Scott Crawford | Golder Associates |
248930 | 2/23/2023 |
Email - Mohave Ground Squirrel Habitat Assessment for Willow Rock Attachments to email are docketed separately. 1 page(s)
| | CEC/Lon Payne | Golder Associates |
248856 | 2/17/2023 |
DR68-5 Monthly Geotechnical Update 5 - January 2023 Monthly Geotechnical Update 5 for Willow Rock 21-AFC-02 Geology/Paleontology 24 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
248720 | 2/9/2023 |
Staff's Response to Applicant's Objection to Responses to Data Set 3, Item 148 and 149
22 page(s)
| | CEC/Docket Unit | California Energy Commission |
248552 | 1/26/2023 |
Willow Rock Energy Storage Center Status Report No 5
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
248549 | 1/26/2023 |
CEC Staff Status Report #5 monthly status report 1 page(s)
| | CEC/Kourtney Vaccaro and Andrew McAllister | California Energy Commission |
248546 | 1/26/2023 |
Willow Rock Energy Storage - Status Report 5
3 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
248518 | 1/25/2023 |
Attachment DR68-4 Willow Rock (21-AFC-02) Monthly Geotechnical Update 4 - December 2022 Monthly Geotechnical Update for Dec 2022 Geology/Paleontology 2 page(s)
| | CEC/Docket Unit | WSP Golder |
248497 | 1/23/2023 |
Willow Rock Energy Storage Center (21-AFC-02) Data Request Response Set 3 Data Request Response Set 3 for the Willow Rock Energy Storage Center. Biological Resources: DR145, 146, 147, 148 and 149. Project Overview: DR150. Socioeconomics: DR151 and DR152. Water Resources: DR153, 154, 155, and 156. Biological Resources, Facility Design, Socioeconomics, Soil and Water 9 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
248496 | 1/23/2023 |
Willow Rock Energy Storage Center Responses to California Unions for Reliable Energy (CURE) Data Request Response Set 1 Responses to California Unions for Reliable Energy (CURE) Data Request Response Set 1 Air Quality, Biological Resources, Public Health 27 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
248386 | 1/12/2023 |
Applicant's Notice Pursuant to 20 CCR 1716(f) for CEC Staff's Data Requests Set 3
4 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
248367 | 1/11/2023 |
CEC Staff and Gem A-CAES LLC's Joint Statement re Data Request Workshop Outcome
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
248337 | 1/6/2023 |
Joint Statement by CEC Staff, Applicant, and Intervenor re Data Requests
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
248280 | 11/22/2022 |
Attachment DR1151 BUOW and SWHA Shapefiles
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248278 | 11/16/2022 |
Attachment DR34-1 Desert Tortoise Summary Report
17 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248277 | 11/16/2022 |
Attachment DR34-1 Desert Tortoise Summary Report
17 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248276 | 11/16/2022 |
Attachment DR36-1 Desert Kit Fox Biological Memo Report
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248275 | 11/16/2022 |
Attachment DR34-1 Desert Tortoise Summary Report
17 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248274 | 11/16/2022 |
Attachment DR36-1 Desert Kit Fox Biological Memo Report
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248273 | 11/16/2022 |
Attachment DR58-1 Focused Burrowing Owl Survey Report
43 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248247 | 12/29/2022 |
CEC Response Letter re Nov 22 Application for Confidential Designation
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha Neumyer | California Energy Commission |
248224 | 12/23/2022 |
Willow Rock Energy Storage - Status Report 4
3 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
248219 | 12/23/2022 |
CEC Staff Status Report #4 monthly status report 1 page(s)
| | Docket Unit | California Energy Commission |
248218 | 12/23/2022 |
Data Requests Set 3 data requests Biological Resources, Project Description, Socioeconomics, Soil and Water 9 page(s)
| | CEC/Docket Unit | California Energy Commission |
248215 | 12/22/2022 |
Applicant's Notice Pursuant to CCR 1716(f) Regarding CURE Data Requests Set 1
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
248214 | 12/22/2022 |
Willow Rock Energy Storage Center Status Report No 4
1 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
248213 | 12/22/2022 |
Attachment DR68-3 Willow Rock (21-AFC-02) Monthly Geotechnical Update 3 - November 2022 Nov 2022 Monthly Geotechnical Update Geology/Paleontology 2 page(s)
| | CEC/Docket Unit | WSP Golder |
248193 | 12/21/2022 |
CEC Response Letter to Willow Rock's 11-16-22 Repeated Application for Confidential Designation (TN 247495)
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha Neumyer | California Energy Commission |
248126 | 12/16/2022 |
Defenders of Wildlife Comments on Willow Rock Energy Storage Center Set 2
7 page(s)
| | CEC/Leondas Payne and California Department of Fish and Wildlife/Julie Vance | Defenders of Wildlife |
248105 | 12/15/2022 |
Memo re Hearing Officer Assignment
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
247982 | 12/7/2022 |
Cover Letter with Data Request Set 1
16 page(s)
| | Hydrostor, Inc./Curt Hilderbrand | California Unions for Reliable Energy |
247906 | 12/2/2022 |
Revised Architectural History Survey Report ***This document supersedes TN 243019*** Cultural Resources 146 page(s)
| | CEC/Docket Unit | WSP USA |
247723 | 11/28/2022 |
Willow Rock Energy Storage Center Status Report No 3
1 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247679 | 11/23/2022 |
Willow Rock Energy Storage - Status Report
2 page(s)
| | CEC/docket unit | California Unions for Reliable Energy |
247676 | 11/23/2022 |
CEC Staff Status Report #3 monthly status report 1 page(s)
| | CEC | California Energy Commission |
247662 | 11/22/2022 |
Repeated Application for Confidential Designation Biological Resources Information
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247661 | 11/22/2022 |
20221027_WRESC_Data Request_Responses Set 2 Final PDF_and_Attachments
132 page(s)
| | CEC/Docket Office | Golder Associates |
247533 | 8/25/2022 |
Attachment DR2-1_EI_GEM-Construction_Month 26
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247532 | 8/25/2022 |
Attachment DR2-1_EI_GEM-Construction_Month 18
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247531 | 8/25/2022 |
Attachment DR2-1_Emission_GM Operation
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247530 | 8/25/2022 |
Attachment DR2-1_Emission Inventory_GEM
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247529 | 8/25/2022 |
Attachment DR2-1_Construction Off Site
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247495 | 11/16/2022 |
Repeated Application for Confidential Designation for Data Request Response Set 1, Workshop Responses (Biological Resources)
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247494 | 11/16/2022 |
Willow Rock Energy Storage Center Data Request Response 1 Workshop Responses This document provides GEM A-CAES LLC’s (the “Applicant”) written responses to data requests from California
Energy Commission Staff’s Data Requests Set 1 regarding the Application for Certification for the Willow Rock
Energy Storage Center (WRESC) (21-AFC-2). These data requests were the subject of discussion and resolution
at the CEC Staff Workshop held on October 11, 2022, and subsequent information exchange held on October 19,
2022 between the Applicant and CEC Staff. Biological Resources, Geology/Paleontology, Land Use 96 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
247475 | 11/15/2022 |
Notice of Ex Parte Communication
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
247463 | 11/14/2022 |
CEC Notice of Ex Parte Communication
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
247441 | 11/14/2022 |
CEC Response Letter to Willow Rock's 8-25-22 Application for Co9nfidentiality (TN 245701 & 245702)
4 page(s)
| | Golder Associates USA, Inc./Dave A. Stein | California Energy Commission |
247418 | 8/25/2022 |
Attachment DR36-1_Burrow and Den Characteristics
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247417 | 8/25/2022 |
Attachment DR31-1_Desert Tortoise_2021
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247416 | 8/25/2022 |
Attachment DR9-1 Slip Sheet_Biological Resources_GIS Data
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247397 | 11/10/2022 |
APPLICANT'S NOTICE PURSUANT TO 20 CCR § 1716(f) FOR CEC STAFF’S DATA REQUESTS SET 2
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247393 | 11/10/2022 |
Defenders of Wildlife Comments on Willow Rock Energy Storage Center
Biological Resources 18 page(s)
| | CEC/Leonidas Payne | Defenders of Wildlife |
247316 | 11/7/2022 |
CEC Response Letter to Willow Rock's Repeated Application for Confidentiality 8-25-22; TN 245699
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
247218 | 11/1/2022 |
CEC Response Letter to Willow Rock's Repeated Application for Confidentiality 10-13-22; TN 246530
3 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
247183 | 10/13/2022 |
Queue Cluster 13 Phase II Interconnection Study Report
77 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247182 | 10/13/2022 |
QC13 Phase II Appendix L - Subsynchronous Control Interaction Screening Assessment Report
46 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247181 | 10/13/2022 |
Queue Cluster 13 Phase II – Appendix F
152 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247180 | 10/13/2022 |
Queue Cluster 13 Phase II – Appendix D
444 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247179 | 10/13/2022 |
Queue Cluster 13 Phase II – Appendix C
29 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247178 | 10/13/2022 |
Queue Cluster 13 Phase II – Appendix B
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247177 | 10/13/2022 |
QC13 Phase 2 Area Report Appendix E
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247176 | 10/13/2022 |
Area Report Appendix K
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247175 | 10/13/2022 |
SCE's Northern Hemisphere Import Nomogram Study
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247174 | 10/13/2022 |
Appendix G - Generation Sequencing Implementation (GSI)
30 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247173 | 10/13/2022 |
Appendix H – SCD Results
8 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247172 | 10/13/2022 |
Queue Cluster 13 Phase 2 Attachment 2
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247171 | 10/13/2022 |
Appendix A – Q1782
42 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247170 | 10/13/2022 |
Queue Cluster 13 Phase II – Attachment 1
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247169 | 10/13/2022 |
Attachment 3
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247118 | 10/28/2022 |
CEC Response to Willow Rock's Repeated Application for Confidentiality 8-25-22 2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
246904 | 10/26/2022 |
Willow Rock Energy Storage Center Status Report No 2
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
246855 | 10/26/2022 |
CEC Staff Status Report #2 monthly status report 1 page(s)
| | CEC/Kourtney Vaccaro and Andrew McAllister | California Energy Commission |
246832 | 10/26/2022 |
Willow Rock Energy Storage - Status Report 2
3 page(s)
| | CEC/Docket Unit | California Unions for Reliable Energy |
246752 | 8/25/2022 |
Attachment DR95-1_QC13PII-SCE-Northern-Q1782TOT 1002-Gem-Appendiix A-Attachment 1
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246751 | 8/25/2022 |
Attachment DR95-1_C132-North-Q1782-TOT 1002-Gem-Appendix A
42 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246750 | 10/24/2022 |
CEC Response Letter to Willow Rock Regarding Application for Confidentiality
2 page(s)
| | Ellison Schneider Harris & Donlan/Samantha Neumyer | California Energy Commission |
246724 | 10/21/2022 |
Willow Rock Data Requests Set 2 data requests Air Quality, Biological Resources, Cultural Resources, Traffic and Transportation 14 page(s)
| | Hydrostor, Inc./Curt Hilderbrand | California Energy Commission |
246604 | 10/17/2022 |
Attachment DR68-1 Willow Rock Energy Storage Center (21-AFC-02) Monthly Geotechnical Update – September 2022 Attachment DR68-1 Willow Rock Energy Storage Center (21-AFC-02) Monthly Geotechnical Update – September 2022 Geology/Paleontology 5 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
246530 | 10/13/2022 |
Repeated Application for Confidential Designation for Phase II Interconnection Study Documents
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246398 | 10/10/2022 |
Agenda for October 11, 2022 remote workshop on Data Request objections agenda providing order of topics to be discussed, including opportunities for providing public comment 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
246310 | 9/30/2022 |
Notice of Willow Rock Energy Storage Center Workshop October 11, 2022; 10:00 a.m. - workshop to discuss applicant objections to CEC staff data requests 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
246219 | 9/27/2022 |
Attachment DR109-1 Data Response Set 1B Transmittal email to Lon Payne and Attachment DR109-1 Transmission System Engineering 2 page(s)
| | CEC/Leonidas Payne | WSP Golder |
246210 | 9/26/2022 |
Willow Rock Energy Storage Center Data Request Response Set 1B Data Request Response Set 1B Biological Resources, Geology/Paleontology, Project Description 19 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
246209 | 9/26/2022 |
Willow Rock Energy Storage Center Status Report No 1
5 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
246208 | 9/26/2022 |
Willow Rock Energy Storage - Status Report 1 Status Report 2 page(s)
| | CEC/Docket Unit | Tara C Rengifo/Adams Broadwell Joseph & Cardozo |
246207 | 9/26/2022 |
CEC Staff Status Report #1
2 page(s)
| | CEC/Kourtney Vaccaro and Andrew McAllister | California Energy Commission |
246007 | 9/13/2022 |
LindaLouis Miller Comments - We are property owners next to the WillowRock Project and have never received information on this project
| | | Linda/Louis Miller |
245943 | 9/9/2022 |
Committee Order Granting Petition to Intervene Filed by California Unions for Reliable Energy
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
245938 | 9/9/2022 |
CEC Agreement with Willow Rock
3 page(s)
| | CEC/Docket Office | California Energy Commission |
245911 | 9/8/2022 |
Kern County's Additional Comments
Noise and Vibration, Traffic and Transportation, Waste Management 11 page(s)
| | CEC/Leonidas Payne | Kern County Planning and Natural Resources Department |
245782 | 9/1/2022 |
CDFW comments Comments from California Department of Fish and Wildlife Biological Resources 28 page(s)
| | CEC/Leonidas Payne | California Energy Commission |
245754 | 8/31/2022 |
Willow Rock Energy Center Scheduling Order ***This Document Supersedes TN 245708*** 9 page(s)
| | CEC/Docket Office | California Energy Commission |
245753 | 8/31/2022 |
Spanish - Willow Rock Scheduling Order (ORDEN DE PROGRAMACIÓN DEL COMITÉ) ORDEN DE PROGRAMACIÓN DEL COMITÉ 10 page(s)
| | CEC/Docket Office | California Energy Commission |
245740 | 8/30/2022 |
Transcript for August 11, 2022 Gem Public Info Hearing
148 page(s)
| | CEC/Docket Office | California Energy Commission |
245708 | 8/26/2022 |
Willow Rock Energy Center Scheduling Order ***This document is replaced by TN 245754*** 9 page(s)
| | CEC/Docket Office | California Energy Commission |
245702 | 8/25/2022 |
Willow Rock Application for Confidential Designation_Air Quality
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
245701 | 8/25/2022 |
Willow Rock Application for Confidential Designation_Air Quality
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
245700 | 8/25/2022 |
Willow Rock Repeated Application for Confidential Designation_Interconnection
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
245699 | 8/25/2022 |
Willow Rock Repeated Application for Confidential Designation_Biological Resources
| | | Ellison Schneider Harris & Donlan LLP |
245698 | 8/25/2022 |
Willow Rock Energy Storage Center Data Request Response Set 1 This document provides the responses to the Data Request Response for the Willow Rock Energy Storage Center 101 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
245460 | 8/19/2022 |
Direction to Change the Name of the Project in the Application for Certification
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
245452 | 8/19/2022 |
Memo requesting Change of Project Title for Docket No 21-AFC-02
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
245050 | 8/15/2022 |
Applicant's Notice Pursuant to 20 CCR § 1716(f) Regarding Staff's Data Requests Set 1
11 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
244476 | 8/11/2022 |
CURE Petition to Intervene Willow Rock Energy Center Storage CURE Petition to Intervene Willow Rock Energy Center Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 9 page(s)
| | CEC/Docket Unit | Tara Rengifo |
244402 | 8/9/2022 |
Presentation - Willow Rock Energy Storage Center for 8-11-22 Informational Hearing
15 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
244399 | 8/9/2022 |
Applicant's Response to CEC Staff's Issues Identification Report and Proposed Schedule
5 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
244398 | 8/9/2022 |
Presentation - Gem Energy Storage Center Staff Presentation 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
244331 | 8/5/2022 |
Applicant's Notice of Project Name Change
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
244313 | 8/4/2022 |
Issues Identification Report and Proposed Schedule Issues ID Report and Proposed Schedule for the GEM Energy Storage Center Compliance 7 page(s)
| | CEC/Kourtney Vaccaro and Andrew McAllister | California Energy Commission |
244282 | 8/1/2022 |
Notice of Public Site Visit and Informational Hearing, and Committee Order THURSDAY, AUGUST 11, 2022
Site Visit begins at 3:00 p.m.
Public Informational Hearing begins at 4:00 p.m.
9 page(s)
| | CEC/Docket Unit | California Energy Commission |
244281 | 8/1/2022 |
AVISO DE VISITA PÚBLICA AL LUGAR Y AUDIENCIA INFORMATIVA, Y ORDEN DE LA COMISIÓN JUEVES 11 DE AGOSTO DE 2022
La visita al lugar comienza a las 3:00 p.m.
La audiencia pública informativa comienza a las 4:00 p.m.
***Notice of public site visit and informational hearing, and committee order - Spanish version*** 9 page(s)
| | CEC/Docket Unit | California Energy Commission |
244223 | 7/27/2022 |
Tribal Consultation Letters Mailed on July 26, 2022 96 page(s)
| | CEC/Docket Unit | California Energy Commission |
244204 | 7/26/2022 |
CEC Letter to Kern County re CUP Extension
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
244203 | 7/26/2022 |
Data Requests Set 1 for Gem Energy Storage Center
35 page(s)
| | CEC/Docket Unit | California Energy Commission |
244093 | 7/14/2022 |
Order Finding the Application for Certification Complete Order No: 22-0713-5 2 page(s)
| | CEC/Docket Office | California Energy Commission |
243976 | 7/11/2022 |
Memo to Save the Date for Informational Hearing and Site Visit Memo from the Hearing Officer to save the date of August 11, 2022 for a potential informational hearing and site visit in Rosamond, California. 1 page(s)
| | All Parties and Persons Interested | Energy Commission Hearing Office |
243973 | 5/19/2022 |
Data Adequacy Biological Resources Supplement Observed Suitable Burrows
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243972 | 4/25/2022 |
Attachment DA52-3 Burrows
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243971 | 4/25/2022 |
AFC Data Adequacy Supplement No 1 Attachment DA52-1 Biological Technical Report
178 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243863 | 6/28/2022 |
Cultural Resources Assessment Report for Gem Energy Storage Center Project
142 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243853 | 7/6/2022 |
CEC Response GEM Confidential Application June 28, 2022
2 page(s)
| | S. Neumyer Ellison Schneider Harris & Donlan LLP CEM | California Energy Commission |
243839 | 7/5/2022 |
Letter from Los Angeles Department of Water and Power Comments Comment Letter 7 page(s)
| | CEC/Leonidas Payne | LADWP |
243838 | 7/5/2022 |
Gem Data Adequacy Round 2 Executive Director Recommendation Memo Executive Director memo to the Commission recommending that the Gem application be deemed complete, including revised data adequacy worksheets. 67 page(s)
| | CEC/Chair and Commissioners | California Energy Commission |
243742 | 6/28/2022 |
Repeated Application for Confidential Designation for Data Adequacy Response #3 (Cultural Resources)
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243731 | 6/27/2022 |
Data Adequacy Response 3_Cultural Resources_Gem Energy Storage Center Data Adequacy Response 3 for the Cultural Resources Cultural Resources 16 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
243671 | 6/3/2022 |
Confidential Rosamond A-CAES Facility Project Cultural Resources Assessment Report
81 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243670 | 6/3/2022 |
Confidential Appendix A Revised Records Search Results Maps
122 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243669 | 5/20/2022 |
Att DA5
190 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243668 | 5/19/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 1 (Confidential) Replacement from document filed with TN 243083
532 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243667 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 25
312 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243666 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 2
173 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243665 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 15
854 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243664 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 1
965 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243663 | 5/13/2022 |
Gem Additional Records Search (05 mi to 10 mi of Gem Site) and Gem Site Survey Coverage Map
88 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243662 | 5/13/2022 |
Att DA53-2a Rincon Revised Records Search Maps for Original Transmission Routes
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243661 | 5/13/2022 |
Att DA53-2b Appendix A Records Search Results Map Paleowest - Revised (Confidential)
21 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243660 | 5/13/2022 |
Att DA53-3 Paleowest Revised Survey Results Maps for All Transmission Route Alternatives (Confidential)
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243659 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 1
197 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243658 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 2
174 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243657 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 3
178 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243656 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 4
209 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243655 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 5
101 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243654 | 5/13/2022 |
Att DA53-4 Gem Missing DPR Forms Pt 6
154 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243653 | 5/13/2022 |
Att DA535a Rincon Gem Missing Reports Pt 1 Confidential This document is replaced under the application TN 243156 532 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243652 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 2 (Confidential)
123 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243651 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 3 (Confidential)
123 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243650 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 4 (Confidential)
127 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243649 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 5 (Confidential)
276 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243648 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 6 (Confidential)
345 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243647 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 7 (Confidential)
183 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243646 | 5/13/2022 |
Att DA53-5a Rincon Gem Missing Reports Pt 8 (Confidential)
136 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243645 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 10
214 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243644 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 3
246 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243643 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 4
267 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243642 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 5
344 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
243641 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 6
260 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243640 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 7
222 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243639 | 5/13/2022 |
Att DA53-5b Paleowest Confidential Revised Appendix E_Part 8
531 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243633 | 6/22/2022 |
CEC Response Letter to Repeated Application for Confidentiality For request letters dated May 11, 2022; May 19, 2022; May 20, 2022; and June 3, 2022. 3 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
243543 | 6/15/2022 |
Order and Final Commission Decision *** THIS DOCUMENT SUPERCEDES TN 243536 *** - Commission Order and Final Decision on Exemption from Notice of Intention 21 page(s)
| | CEC/Docket Unit | California Energy Commission |
243536 | 6/15/2022 |
Adoption Order on the Joint Decision Regarding Exemption From the Notice of Intention Process *** This document is replaced by TN 243543 *** - Order No: 22-0608-3b 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
243507 | 6/13/2022 |
Gem A-CAES LLC Letter Regarding Cultural Resources Data Adequacy
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243496 | 6/9/2022 |
Rosamond Municipal Advisory Council Comments - Request for Inclusion on Distribution List(s) for GEM Energy
Air Quality, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Transmission Line Safety and Nuisance, Transmission System Engineering, Soil and Water 1 page(s)
| | CEC/Docket Unit | Rosamond Municipal Advisory Council |
243488 | 6/8/2022 |
Presentation - Item 3 - Proposed Joint Decision at June 8th Public Hearing Presentation to the Commission in support of the Proposed Joint Decision Regarding Exemption from the Notice of Intention Process for Pecho and Gem 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
243440 | 6/6/2022 |
Edward Goodwin Comments - Concerns
1 page(s)
| | CEC/Docket Unit | Edward Goodwin |
243425 | 6/3/2022 |
Supplemental Application for Confidential Designation for AFC Data Adequacy Response #2
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243380 | 6/1/2022 |
Back Up Materials June 8, 2022 California Energy Commission Business Meeting
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
243376 | 6/1/2022 |
Proposed Adoption Order on Joint Decision Regarding Exemption from the Notice of Intention Process
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
243369 | 6/1/2022 |
CEC Response Letter for the Application for Confidentiality (4-25-22)
3 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
243351 | 5/27/2022 |
NOTICE OF AVAILABILITY OF THE PROPOSED JOINT DECISION REGARDING EXEMPTION FROM THE NOTICE OF INTENTION PROCESS; NOTICE OF PUBLIC Notice of Availability of the Proposed Joint Decision regarding Exemption from the Notice of Intention Process; Notice of Public Comment Period; Notice of Intent to Prepare Hearing Record; and Notice of California Energy Commission Hearing 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
243349 | 5/27/2022 |
AVISO DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN CONJUNTA RELATIVA A LA EXENCIÓN DEL PROCESO DE AVISO DE INTENCIÓN, AVISO DEL AVISO DE DISPONIBILIDAD DE LA PROPUESTA DE DECISIÓN CONJUNTA RELATIVA A LA EXENCIÓN DEL PROCESO DE AVISO DE INTENCIÓN, AVISO DEL PERÍODO DE COMENTARIOS PÚBLICOS, AVISO DE LA INTENCIÓN DE PREPARAR EL REGISTRO DE AUDIENCIA, Y AVISO DE LA AUDIENCIA DE LA COMISIÓN DE ENERGÍA DE CALIFORNIA 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
243347 | 5/27/2022 |
Proposed Joint Decision Regarding Exemption from the Notice of Intention Process
19 page(s)
| | CEC/Docket Unit | California Energy Commission |
243235 | 5/23/2022 |
General Orders Regarding Motions, Electronic Filing, Service of Documents, and Other Matters
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
243231 | 5/23/2022 |
ÓRDENES GENERALES EN RELACIÓN CON LAS PROPUESTAS, LA PRESENTACIÓN DE DOCUMENTOS ELECTRÓNICOS, LA NOTIFICACIÓN DE DOCUMENTOS Y OT
7 page(s)
| | CEC/Docket Unit | California Energy Commission |
243202 | 5/20/2022 |
Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243169 | 5/19/2022 |
Application for Confidential Designation for AFC Data Adequacy Supplement Biological Resources Figures
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243156 | 5/19/2022 |
Repeated Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243152 | 5/19/2022 |
Kern County Planning and Natural Resources Department Comments - Agency Participation in Review of AFC for GEM Energy Storage Center Project
Land Use 19 page(s)
| | CEC/Docket Unit | Kern County Planning and Natural Resources Department |
243083 | 5/13/2022 |
Repeated Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243019 | 5/11/2022 |
Att DA53-6 Architectural History Survey Report
221 page(s)
| | CEC/Docket Unit | Golder Associates |
243018 | 5/11/2022 |
Gem_Data Adequacy Master Response No 2
11 page(s)
| | CEC/Docket Unit | Golder Associates |
243017 | 5/11/2022 |
Hydrostor Gem Data Adequacy Supplement No 2 Cover Letter
2 page(s)
| | CEC/Docket Unit | Golder Associates |
242927 | 5/4/2022 |
Joint Committee Conference transcript Transcript of Joint Committee Conference on April 25, 2022 36 page(s)
| | CEC/Docket Unit | California Energy Commission |
242801 | 4/25/2022 |
GEM Application for Confidential Designation for AFC Data Adequacy Supplement Biological Resources Figures
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242799 | 4/25/2022 |
Att DA20-1 A-CAES Historical Operational Summary
10 page(s)
| | CEC/Docket Unit | Golder Associates |
242796 | 4/25/2022 |
Att DA51-3 EKAPCD completeness determination
2 page(s)
| | CEC/Docket Unit | Golder Associates |
242794 | 4/25/2022 |
AttDA515-1_Groundwater Drawdown
13 page(s)
| | CEC/Docket Unit | Golder Associates |
242793 | 4/25/2022 |
Att DA56-1_Updated Land Use 56
4 page(s)
| | CEC/Docket Unit | Golder Associates |
242792 | 4/25/2022 |
Att DA54-1 Geologic Figures
2 page(s)
| | CEC/Docket Unit | Golder Associates |
242791 | 4/25/2022 |
Att DA52-6_52-Bio Section
67 page(s)
| | CEC/Docket Unit | Golder Associates |
242790 | 4/25/2022 |
Att DA52-5_Field Notes_Part 5 of 5
2 page(s)
| | CEC/Docket Unit | Golder Associates |
242789 | 4/25/2022 |
Att DA52-5_Field Notes_Part 4 of 5
6 page(s)
| | CEC/Docket Unit | Golder Associates |
242788 | 4/25/2022 |
Att DA52-5_Field Notes_Part 3 of 5
3 page(s)
| | CEC/Docket Unit | Golder Associates |
242787 | 4/25/2022 |
Att DA52-5_Field Notes_Part 2 of 5
1 page(s)
| | CEC/Docket Unit | Golder Associates |
242786 | 4/25/2022 |
Att DA52-5_Field Notes_Part 1 of 5
5 page(s)
| | CEC/Docket Unit | Golder Associates |
242785 | 4/25/2022 |
Att DA52-4_BioResumes
| | | Golder Associates |
242784 | 4/25/2022 |
Att DA52-3_Wetland Delineation_Part 5 of 5
129 page(s)
| | CEC/Docket Unit | Golder Associates |
242783 | 4/25/2022 |
Att DA52-3_Wetland Delineation_Part 4 of 5
88 page(s)
| | CEC/Docket Unit | Golder Associates |
242782 | 4/25/2022 |
Att DA52-3_Wetland Delineation_Part 3 of 5
38 page(s)
| | CEC/Docket Unit | Golder Associates |
242781 | 4/25/2022 |
Att DA52-3_Wetland Delineation_Part 2 of 5
49 page(s)
| | CEC/Docket Unit | Golder Associates |
242780 | 4/25/2022 |
Att DA52-3_Wetland Delineation_Part 1 of 5
89 page(s)
| | CEC/Docket Unit | Golder Associates |
242779 | 4/25/2022 |
Att DA52-1__Biological Technical Report_WITH SELECT FIGS REDACTED PER CEC STAFF
167 page(s)
| | CEC/Docket Unit | Golder Associates |
242778 | 4/25/2022 |
Att DA51-1 - Revised AFC Section Public Health
172 page(s)
| | CEC/Docket Unit | Golder Associates |
242776 | 4/25/2022 |
Gem_Data Adequacy Master Response No 1
41 page(s)
| | CEC/Drew Bohan | Golder Associates |
242775 | 4/25/2022 |
Hydrostor Gem Data Adequacy Supplement 1 Cover Letter
1 page(s)
| | CEC/Drew Bohan | Golder Associates |
242693 | 4/15/2022 |
NOTICE OF JOINT COMMITTEE CONFERENCE (CLOSED SESSION) April 25, 2022 - 2 p.m. 9 page(s)
| | CEC/Docket Unit | California Energy Commission |
242691 | 4/15/2022 |
AVISO DE CONFERENCIA CONJUNTA DEL COMITÉ (A PUERTA CERRADA) Notice of Joint Committee Conference (Closed Session) - Spanish version 10 page(s)
| | CEC/Docket Unit | California Energy Commission |
242632 | 4/12/2022 |
El Popular proof of publication proof of publication of Spanish language newspaper ad 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
242602 | 4/6/2022 |
Procedural Inquiry - Gem (21-AFC-02) and Pecho (21-AFC-01)
1 page(s)
| | CEC/Andrew McAllister | Ellison Schneider Harris & Donlan LLP |
242487 | 3/29/2022 |
Rosamond News proof of publication Proof of publication of English language newspaper ad 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
242486 | 3/29/2022 |
Agency mailing list mailing list of agencies which received notification of project application 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
242449 | 3/24/2022 |
Order Amending Committee Assignments Order No: 22-0324-01 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
242326 | 3/15/2022 |
CEC Notice Letter to Agencies Request for Agency Participation in the Review of the GEM Energy Storage Center Project 6 page(s)
| | Agency Distribution List | California Energy Commission |
242304 | 3/14/2022 |
Notice of Agenda Item to Consider Assignment of Commissioners to Committees
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
242224 | 3/8/2022 |
Joint Reply to CEC Staff's Response to Applicants' Filing Requesting Exemption from the NOI Process
19 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
242191 | 3/2/2022 |
Gem NOR text translated into Spanish Spanish translation of NOR text for use in mailed notice to nearby owners and residents and ad placement in a Spanish language newspaper 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
241982 | 2/28/2022 |
Notice of Receipt notice of receipt of application for certification 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
241936 | 2/23/2022 |
Gem NOI staff response response to applicant filing re NOI issue 8 page(s)
| | CEC/David Hochschild, Siva Gunda, Karen Douglas, J. Andrew McAllister, and Patty Monahan | California Energy Commission |
241503 | 2/9/2022 |
Joint Response of Pecho and Gem Supporting NOI Exemption And Request For Commission Order
14 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
241428 | 12/2/2021 |
CONFIDENTIAL Appendix 3A, Interconnection Study Documents
253 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241371 | 2/2/2022 |
CEC Application for Certification Letter 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
241318 | 1/28/2022 |
Hearing Officer Assignment
1 page(s)
| | CEC/Karen Douglas, Andrew McAllister and All Parties | California Energy Commission |
241305 | 1/27/2022 |
Response Letter to GEM A-CAES LLC Application for Confidential Designation *** This document supersedes TN 241101 *** 5 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha Neumyer | California Energy Commission |
241291 | 1/27/2022 |
Order Order No: 22-0126-6 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
241101 | 12/31/2021 |
CEC Response Letter Gem Energy Storage Facility Confidential Application of Dec 2, 2021 5 page(s)
| | Ellison Schneider Harris & Donlan/Samantha Neumyer | California Energy Commission |
241097 | 12/30/2021 |
Staff's Data Adequacy Recommendation
92 page(s)
| | CEC/David Hochschild, Siva Gunda, Karen Douglas, J. Andrew McAllister, and Patty Monahan | California Energy Commission |
241032 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 10 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241031 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 9 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241030 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 8 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241029 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 7 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241028 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 6 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241027 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 5 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241026 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 4 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241025 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 3 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241024 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 2 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241023 | 12/3/2021 |
Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 1 of 10
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241022 | 12/3/2021 |
Appendix D DPR Forms - Part 12 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241021 | 12/3/2021 |
Appendix D DPR Forms - Part 11 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241020 | 12/3/2021 |
Appendix D DPR Forms - Part 10 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241019 | 12/3/2021 |
Appendix D DPR Forms - Part 9 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241018 | 12/3/2021 |
Appendix D DPR Forms - Part 8 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241017 | 12/3/2021 |
Appendix D DPR Forms - Part 7 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241016 | 12/3/2021 |
Appendix D DPR Forms - Part 6 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241015 | 12/3/2021 |
Appendix D DPR Forms - Part 5 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241014 | 12/3/2021 |
Appendix D DPR Forms - Part 4 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241013 | 12/3/2021 |
Appendix D DPR Forms - Part 3B of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241012 | 12/3/2021 |
Appendix D DPR Forms - Part 3A of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241011 | 12/3/2021 |
Appendix D DPR Forms - Part 2 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241010 | 12/3/2021 |
Appendix D DPR Forms - Part 1 of 12
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241009 | 12/3/2021 |
Appendix C Map Showing Location of Survey Area and Identified Cultural Resources within Project Area
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241008 | 12/3/2021 |
Appendix A Records Search Results Maps
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241005 | 12/21/2021 |
CEC Response Letter GEM A-CAES Confidential Application of Dec 3, 2021
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/S. Neumyer | California Energy Commission |
240820 | 12/3/2021 |
Application for Confidential Designation for Confidential Appendices to the AFC Appendix 53B Cultural Resources
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
240788 | 12/3/2021 |
Section 5_2_Biological_Resources_Gem Energy Storage Center ***This Document Supersedes TN 240751-8*** This section discusses the biological resources and regulatory setting as well as, includes an analysis of potential
impacts associated with the Applicant’s Advanced Compressed Air Energy Storage (A-CAES) facility in
unincorporated Kern County, California (CA). Biological Resources 61 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240784 | 12/2/2021 |
Application for Confidential Designation for AFC Appendix 3A, Phase I Interconnection Study Documents
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
240780 | 12/2/2021 |
Appendix 5_3B_Non-confidential CR Technical Report_Gem Energy Storage Center Appendix 5.3B - non-confidential cultural resources technical report. Cultural Resources 101 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240771 | 12/2/2021 |
Appendix 5_3A and 5_3C_Cultural Resources Supporting documentation to support section 5.3 Cultural Resources. Appendix 5.3A is the NAHC Consultations, and Appendix 5.3C contains staff resumes of those who prepared this section. Cultural Resources 96 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240770 | 12/2/2021 |
Section 2_Project Description_Gem Energy Storage Center *** THIS DOCUMENT SUPERSEDES TN 240751-3 *** - This section provides detailed information on the applicants Section 2, Project Description for the Gem Energy Storage Center. Project Description 33 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-1 | 12/1/2021 |
List of Acronyms_Gem Energy Storage Center
8 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-2 | 12/1/2021 |
Table of Contents_Gem Energy Storage Center
36 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-3 | 12/1/2021 |
Appendix 1A-C
27 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-4 | 12/1/2021 |
Appendix 2A-E_Engineering Design Criteria
53 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-5 | 12/1/2021 |
Appendix 5_1A-G_Air Quality
214 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-6 | 12/1/2021 |
Appendix 5_2A-D_Biological Resources
56 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-7 | 12/1/2021 |
Appendix 5_7A-D_Noise
19 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-8 | 12/1/2021 |
Appendix 5_9A-F
142 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-9 | 12/1/2021 |
Appendix 5_10A_Environmental Justice
6 page(s)
| | | Golder Associates USA Inc. |
240768-10 | 12/1/2021 |
Appendix 5_12A-C_Traffic and Transportation
48 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-11 | 12/1/2021 |
Appendix 5_13A_Visual Resources
19 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-12 | 12/1/2021 |
App 5_13_B Psychrometric Analysis for Decompressed Air Discharge
3 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-13 | 12/1/2021 |
Appendix 5_14A_GEM Phase 1
198 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-14 | 12/1/2021 |
Appendix 5_15A
12 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240768-15 | 12/1/2021 |
Appendix 5_15B
28 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240751-1 | 12/1/2021 |
Cover Letter_Gem Energy Storage Center re AFC Cover letter to the CEC regarding the Application for Certification of the Gem Energy Storage Center 1 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-2 | 12/1/2021 |
Section 1_Introduction_Gem Energy Storage Center Section 1 Introduction introduces the Gem Energy Storage Center Project 10 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-3 | 12/1/2021 |
Section 2_Project Description *** THIS DOCUMENT IS REPLACED BY TN 240770 *** - Section 2 provides the details of Gem Energy Storage Center project 33 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-4 | 12/1/2021 |
Section 3_Electric Transmission_Gem Energy Storage Center Section 3 discusses the transmission interconnection between the Gem Project and the existing electrical grid, and the potential effects that operation of the facility will have on the flow of electrical power in the project region. 19 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-5 | 12/1/2021 |
Section 4_Natural Gas Supply_Gem Energy Storage Center Section 4 provides information regarding natural gas supply for the Gem Energy Storage Center 1 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-6 | 12/1/2021 |
Section 5_Environmental Analysis Section 5 provides an introduction to the 16 individual sections that represent the standard environmental, public health and safety, and local impact assessments needed for the application for certification of the Gem Energy Storage Center 1 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-7 | 12/1/2021 |
Section 5_1_Air Quality_Gem Energy Storage Center This section presents the methodology and results of an analysis performed to assess potential impacts of
airborne emissions from the construction and operation of the Gem Energy Storage Center (GESC or Gem) and
the Project’s compliance with applicable air quality requirements. 31 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-8 | 12/1/2021 |
Section 5_2_Biological Resources 61 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-9 | 12/1/2021 |
Section 5_3_Cultural Resources_Gem Energy Storage Center This section analyzes the potential effects the Gem Energy Storage Center or its appurtenances may have on known or previously unrecorded cultural resources located within the study area. 33 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-10 | 12/1/2021 |
Section 5_4_Geological Hazards and Resources_Gem Energy Storage Center This section provides an evaluation of the proposed Advanced Compressed Air Energy Storage (A-CAES) facility
at the Gem Energy Storage Center (GESC) in terms of potential exposure to geological hazards and potential to
affect geologic resources of commercial, recreational, or scientific value. The information presented in the
following sections is based on readily available information provided online and is limited to surficial soils only.
Construction of the proposed GESC involves the construction of various surface facilities and features (i.e.,
buildings, air processing facility, compressors, turbines, etc.), the excavation of deep vertical shafts on the order
of 2,000 feet deep below the existing ground surface, the excavation of an underground cavern, and the
construction and filling of a hydrostatic compensation surface reservoir. A site-specific geotechnical exploration
has not been performed at the proposed project location to characterize the site-specific surface and subsurface
conditions. 17 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-11 | 12/1/2021 |
Section 5_5_Hazardous Materials_Gem Energy Storage Center 5.5-1
5.5 Hazardous Materials Handling
This section discusses the use and storage of hazardous materials associated with the Gem Energy Storage Center (Gem or GESC) and the potential effects on human health and the environment. Section 5.5.1 describes the existing environment that may be affected, and Section 5.5.2 identifies potential impacts to the environment and on human health during construction and operations. Section 5.5.3 discusses potential cumulative effects; Section 5.5.4 identifies proposed mitigation measures; Section 5.5.5 presents laws, ordinances, and standards (LORS) applicable to hazardous materials. Section 5.5.6 identifies agencies involved and provides agency contacts. Section 5.5.7 describes permits and Section 5.5.8 provides all references used to develop this section 30 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-12 | 12/1/2021 |
Section 5_6_Land Use_Gem Energy Storage Center This section discusses the environmental and regulatory setting as well as, includes an analysis of potential impacts associated with the Gem Advanced Compressed Air Energy Storage (A-CAES) facility in unincorporated Kern County, California. Herein, references to the A-CAES facility equate to the location of the proposed approximately 71-acre Gem Energy Storage Center (GESC). The GESC is located approximately one mile northeast of the community of Willow Springs and seven miles west of Rosamond, California. Gem A-CAES LLC has obtained site control of the approximate 61-acre parcel by virtue of a long-term lease and is expecting to obtain site control for the 10-acre parcel. 36 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240751-13 | 12/1/2021 |
Section 5_7_Noise_Gem Energy Storage Center This section presents the noise impact assessment related to the Gem Energy Storage Center (Gem/GESC).
Section 5.7.1 discusses the fundamentals of acoustics. Section 5.7.2 describes the affected environment,
including baseline noise level survey methodology and results. Section 5.7.3 presents an environmental analysis
of the construction and operation of the energy storage center and associated facilities. Section 5.7.4 discusses
cumulative effects. Section 5.7.5 discusses mitigation measures. Section 5.7.6 presents applicable laws,
ordinances, regulations, and standards (LORS). Section 5.7.7 presents agency contacts, and Section 5.7.8
presents permit requirements and schedules. Section 5.7.9 contains the references used to prepare this section. 32 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-14 | 12/1/2021 |
Section 5_8_Paleontological Resources_Gem Energy Storage Center This section presents the potential effects to paleontological resources from the construction and operation of the
Gem Energy Storage Center (GESC) in unincorporated Kern County, California. 15 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-15 | 12/1/2021 |
Section 5_9_Public Health_Gem Energy Storage Center This section discusses activities that could potentially affect public health as they relate to the construction and
operation of the Gem Energy Storage Center (GESC or Gem). A Health Risk Assessment (HRA) was performed to
assess potential effects and public exposure associated with airborne emissions from the GESC. Section 5.9.1
describes the affected environment. Section 5.9.2 presents an environmental analysis of the operation of the power
facility and associated facilities. Section 5.9.3 discusses cumulative effects. Section 5.9.4 discusses mitigation
measures. Section 5.9.5 presents applicable Laws, Ordinances, and Regulations (LORS), permit requirements,
schedules, and agency contacts. Section 5.9.6 contains references cited or consulted in preparing this section. 26 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-16 | 12/1/2021 |
Section 5_10_Socioeconomics_Gem Energy Storage Center This section describes the potential social and economic effects within the Project vicinity and region arising from the construction and operation of the GESC. This discussion considers Project-related effects to population, housing, public services and utilities, and county tax revenue as well as, evaluates the economic benefits that will arise from the Project. 28 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-17 | 12/1/2021 |
Section 5_11_Soils_Gem Energy Storage Center This section describes the potential affects the construction and operation of the proposed Advanced
Compressed Air Energy Storage (A-CAES) project at the Gem Energy Storage Center (GESC) may have on soil
resources at and in the vicinity of the project site. 13 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-18 | 12/1/2021 |
Section 5_12_Traffic and Transportation_Gem Energy Storage Center This section describes the potential effects of the Gem Energy Storage Center (GESC) on traffic and transportation. 38 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-19 | 12/1/2021 |
Section 5_13_Visual Resources_Gem Energy Storage Center This chapter of the Application for Certification (AFC) discusses the existing condition of visual resources of the
landscape surrounding the Applicant’s (Hydrostor Inc.) Gem Energy Storage Center (Gem) proposed Advanced
Compressed Air Energy Storage (A-CAES) facility in unincorporated Kern County, California (the Project) and the
potential visual impacts associated with its construction and operation. 26 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-20 | 12/1/2021 |
Section 5_14_Waste Management_Gem Energy Storage Center This section is designed to communicate the expected potential effects on human health and the environment from nonhazardous and hazardous waste generated at the Gem Energy Storage Center (“GESC” or the “Project”). The GESC for reference is a 500 MW Advanced Compressed Air Energy Storage (A-CAES) system in unincorporated Kern County, approximately 1 mile north of Willow Springs, CA as described in Section 2, Project Description. The Project will incorporate an Environmental and Sustainability Policy, that will reflect best economical available practices through the life cycle of the Project. 25 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-21 | 12/1/2021 |
Section 5_15_Water Resources_Gem Energy Storage Center This section discusses the existing water resources near the Gem Energy Storage Center (Gem), a 500-
megawatt (MW) Advanced Compressed Air Energy Storage (A-CAES) system in unincorporated Kern County,
near Willow Springs, California, assesses the potential effects of construction and operations on water resources,
and provides mitigation strategies to address the potential effects. 28 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240751-22 | 12/1/2021 |
Section 5_16_Worker Health and Safety_Gem Energy Storage Center This subsection summarizes the worker health and safety issues that may be encountered during the construction and operation of the proposed Gem Energy Storage Center (GESC or Gem). Because of the subject matter, this subsection follows a slightly different format than other subsections in Section 5. Instead of a standard discussion of affected environment followed by the project’s environmental consequences and proposed mitigation measures for significant impacts, this subsection contains worker safety information, including the laws, ordinances, regulations, and standards (LORS) that apply to the GESC. Section 5.16.1 contains a brief description of the work environment and setting. Section 5.16.2 describes the health and safety programs in terms of analyses conducted to identify hazards and also the safety compliance and training programs that will be established onsite. Section 5.16.3 discusses the applicable LORS. Section 5.16.4 lists the regulatory agencies involved and key agency contacts. Section 5.16. 35 page(s)
| | CEC/Docket Unit | Golder Associates USA Inc. |
240751-23 | 12/1/2021 |
Section 6_Alternatives_Gem Energy Storage Center This section discusses alternatives to the proposed Gem Energy Storage Center (Gem / GESC). These include
the “no project” alternative, site alternatives, transmission line route alternatives, technology alternatives, water
supply alternatives, and excavated rock recycling or disposal alternatives. This discussion focuses on alternatives
that could feasibly accomplish most of the basic objectives of the project and could avoid or substantially lessen
one or more of the potential impacts. 16 page(s)
| | CEC/Drew Bohan | Golder Associates USA Inc. |
240730 | 11/29/2021 |
Memo to Open New Docket
1 page(s)
| | CEC/Docket Unit | California Energy Commission |