Project Title: Gem Energy Storage Center
Generated On: 5/22/2022 6:55:00 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2432025/20/2022 Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2431695/19/2022 Application for Confidential Designation for AFC Data Adequacy Supplement Biological Resources Figures

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2431565/19/2022 Repeated Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2431525/19/2022 Kern County Planning and Natural Resources Department Comments - Agency Participation in Review of AFC for GEM Energy Storage Center Project

Land Use
19 page(s)
 CEC/Docket UnitKern County Planning and Natural Resources Department
2430835/13/2022 Repeated Application for Confidential Designation for Data Adequacy Response #2 (Cultural Resources)

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2430195/11/2022 Att DA53-6 Architectural History Survey Report

221 page(s)
 CEC/Docket UnitGolder Associates
2430185/11/2022 Gem_Data Adequacy Master Response No 2

11 page(s)
 CEC/Docket UnitGolder Associates
2430175/11/2022 Hydrostor Gem Data Adequacy Supplement No 2 Cover Letter

2 page(s)
 CEC/Docket UnitGolder Associates
2429275/4/2022 Joint Committee Conference transcript
Transcript of Joint Committee Conference on April 25, 2022
36 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2428014/25/2022 GEM Application for Confidential Designation for AFC Data Adequacy Supplement Biological Resources Figures

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2427994/25/2022 Att DA20-1 A-CAES Historical Operational Summary

10 page(s)
 CEC/Docket UnitGolder Associates
2427964/25/2022 Att DA51-3 EKAPCD completeness determination

2 page(s)
 CEC/Docket UnitGolder Associates
2427944/25/2022 AttDA515-1_Groundwater Drawdown

13 page(s)
 CEC/Docket UnitGolder Associates
2427934/25/2022 Att DA56-1_Updated Land Use 56

4 page(s)
 CEC/Docket UnitGolder Associates
2427924/25/2022 Att DA54-1 Geologic Figures

2 page(s)
 CEC/Docket UnitGolder Associates
2427914/25/2022 Att DA52-6_52-Bio Section

67 page(s)
 CEC/Docket UnitGolder Associates
2427904/25/2022 Att DA52-5_Field Notes_Part 5 of 5

2 page(s)
 CEC/Docket UnitGolder Associates
2427894/25/2022 Att DA52-5_Field Notes_Part 4 of 5

6 page(s)
 CEC/Docket UnitGolder Associates
2427884/25/2022 Att DA52-5_Field Notes_Part 3 of 5

3 page(s)
 CEC/Docket UnitGolder Associates
2427874/25/2022 Att DA52-5_Field Notes_Part 2 of 5

1 page(s)
 CEC/Docket UnitGolder Associates
2427864/25/2022 Att DA52-5_Field Notes_Part 1 of 5

5 page(s)
 CEC/Docket UnitGolder Associates
2427854/25/2022 Att DA52-4_BioResumes
  Golder Associates
2427844/25/2022 Att DA52-3_Wetland Delineation_Part 5 of 5

129 page(s)
 CEC/Docket UnitGolder Associates
2427834/25/2022 Att DA52-3_Wetland Delineation_Part 4 of 5

88 page(s)
 CEC/Docket UnitGolder Associates
2427824/25/2022 Att DA52-3_Wetland Delineation_Part 3 of 5

38 page(s)
 CEC/Docket UnitGolder Associates
2427814/25/2022 Att DA52-3_Wetland Delineation_Part 2 of 5

49 page(s)
 CEC/Docket UnitGolder Associates
2427804/25/2022 Att DA52-3_Wetland Delineation_Part 1 of 5

89 page(s)
 CEC/Docket UnitGolder Associates
2427794/25/2022 Att DA52-1__Biological Technical Report_WITH SELECT FIGS REDACTED PER CEC STAFF

167 page(s)
 CEC/Docket UnitGolder Associates
2427784/25/2022 Att DA51-1 - Revised AFC Section Public Health

172 page(s)
 CEC/Docket UnitGolder Associates
2427764/25/2022 Gem_Data Adequacy Master Response No 1

41 page(s)
 CEC/Drew BohanGolder Associates
2427754/25/2022 Hydrostor Gem Data Adequacy Supplement 1 Cover Letter

1 page(s)
 CEC/Drew BohanGolder Associates
2426934/15/2022 NOTICE OF JOINT COMMITTEE CONFERENCE (CLOSED SESSION)
April 25, 2022 - 2 p.m.
9 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2426914/15/2022 AVISO DE CONFERENCIA CONJUNTA DEL COMITÉ (A PUERTA CERRADA)
Notice of Joint Committee Conference (Closed Session) - Spanish version
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2426324/12/2022 El Popular proof of publication
proof of publication of Spanish language newspaper ad
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2426024/6/2022 Procedural Inquiry - Gem (21-AFC-02) and Pecho (21-AFC-01)

1 page(s)
 CEC/Andrew McAllisterEllison Schneider Harris & Donlan LLP
2424873/29/2022 Rosamond News proof of publication
Proof of publication of English language newspaper ad
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2424863/29/2022 Agency mailing list
mailing list of agencies which received notification of project application
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2424493/24/2022 Order Amending Committee Assignments
Order No: 22-0324-01
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2423263/15/2022 CEC Notice Letter to Agencies
Request for Agency Participation in the Review of the GEM Energy Storage Center Project
6 page(s)
 Agency Distribution ListCalifornia Energy Commission
2423043/14/2022 Notice of Agenda Item to Consider Assignment of Commissioners to Committees

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2422243/8/2022 Joint Reply to CEC Staff's Response to Applicants' Filing Requesting Exemption from the NOI Process

19 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2421913/2/2022 Gem NOR text translated into Spanish
Spanish translation of NOR text for use in mailed notice to nearby owners and residents and ad placement in a Spanish language newspaper
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2419822/28/2022 Notice of Receipt
notice of receipt of application for certification
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2419362/23/2022 Gem NOI staff response
response to applicant filing re NOI issue
8 page(s)
 CEC/David Hochschild, Siva Gunda, Karen Douglas, J. Andrew McAllister, and Patty MonahanCalifornia Energy Commission
2415032/9/2022 Joint Response of Pecho and Gem Supporting NOI Exemption And Request For Commission Order

14 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
24142812/2/2021 CONFIDENTIAL Appendix 3A, Interconnection Study Documents

253 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2413712/2/2022 CEC Application for Certification
Letter
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2413181/28/2022 Hearing Officer Assignment

1 page(s)
 CEC/Karen Douglas, Andrew McAllister and All PartiesCalifornia Energy Commission
2413051/27/2022 Response Letter to GEM A-CAES LLC Application for Confidential Designation

5 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha Neumyer California Energy Commission
2412911/27/2022 Order
Order No: 22-0126-6
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24110112/31/2021 CEC Response Letter Gem Energy Storage Facility Confidential Application of Dec 2, 2021
5 page(s)
 Ellison Schneider Harris & Donlan/Samantha NeumyerCalifornia Energy Commission
24109712/30/2021 Staff's Data Adequacy Recommendation

92 page(s)
 CEC/David Hochschild, Siva Gunda, Karen Douglas, J. Andrew McAllister, and Patty MonahanCalifornia Energy Commission
24103212/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 10 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24103112/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 9 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24103012/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 8 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102912/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 7 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102812/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 6 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102712/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 5 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102612/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 4 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102512/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 3 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102412/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 2 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102312/3/2021 Appendix E Previous Studies Conducted within 025 Miles of Project Area Part 1 of 10
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102212/3/2021 Appendix D DPR Forms - Part 12 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102112/3/2021 Appendix D DPR Forms - Part 11 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24102012/3/2021 Appendix D DPR Forms - Part 10 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101912/3/2021 Appendix D DPR Forms - Part 9 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101812/3/2021 Appendix D DPR Forms - Part 8 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101712/3/2021 Appendix D DPR Forms - Part 7 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101612/3/2021 Appendix D DPR Forms - Part 6 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101512/3/2021 Appendix D DPR Forms - Part 5 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101412/3/2021 Appendix D DPR Forms - Part 4 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101312/3/2021 Appendix D DPR Forms - Part 3B of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101212/3/2021 Appendix D DPR Forms - Part 3A of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101112/3/2021 Appendix D DPR Forms - Part 2 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24101012/3/2021 Appendix D DPR Forms - Part 1 of 12
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24100912/3/2021 Appendix C Map Showing Location of Survey Area and Identified Cultural Resources within Project Area
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24100812/3/2021 Appendix A Records Search Results Maps
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24100512/21/2021 CEC Response Letter GEM A-CAES Confidential Application of Dec 3, 2021

2 page(s)
 Ellison Schneider Harris & Donlan LLP/S. NeumyerCalifornia Energy Commission
24082012/3/2021 Application for Confidential Designation for Confidential Appendices to the AFC Appendix 53B Cultural Resources
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24078812/3/2021 Section 5_2_Biological_Resources_Gem Energy Storage Center
***This Document Supersedes TN 240751-8*** This section discusses the biological resources and regulatory setting as well as, includes an analysis of potential impacts associated with the Applicant’s Advanced Compressed Air Energy Storage (A-CAES) facility in unincorporated Kern County, California (CA).
Biological Resources
61 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
24078412/2/2021 Application for Confidential Designation for AFC Appendix 3A, Phase I Interconnection Study Documents

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24078012/2/2021 Appendix 5_3B_Non-confidential CR Technical Report_Gem Energy Storage Center
Appendix 5.3B - non-confidential cultural resources technical report.
Cultural Resources
101 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
24077112/2/2021 Appendix 5_3A and 5_3C_Cultural Resources
Supporting documentation to support section 5.3 Cultural Resources. Appendix 5.3A is the NAHC Consultations, and Appendix 5.3C contains staff resumes of those who prepared this section.
Cultural Resources
96 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
24077012/2/2021 Section 2_Project Description_Gem Energy Storage Center
*** THIS DOCUMENT SUPERSEDES TN 240751-3 *** - This section provides detailed information on the applicants Section 2, Project Description for the Gem Energy Storage Center.
Project Description
33 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-112/1/2021 List of Acronyms_Gem Energy Storage Center

8 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-212/1/2021 Table of Contents_Gem Energy Storage Center

36 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-312/1/2021 Appendix 1A-C

27 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-412/1/2021 Appendix 2A-E_Engineering Design Criteria

53 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-512/1/2021 Appendix 5_1A-G_Air Quality

214 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-612/1/2021 Appendix 5_2A-D_Biological Resources

56 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-712/1/2021 Appendix 5_7A-D_Noise

19 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-812/1/2021 Appendix 5_9A-F

142 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-912/1/2021 Appendix 5_10A_Environmental Justice

6 page(s)
  Golder Associates USA Inc.
240768-1012/1/2021 Appendix 5_12A-C_Traffic and Transportation

48 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-1112/1/2021 Appendix 5_13A_Visual Resources

19 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-1212/1/2021 App 5_13_B Psychrometric Analysis for Decompressed Air Discharge

3 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-1312/1/2021 Appendix 5_14A_GEM Phase 1

198 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-1412/1/2021 Appendix 5_15A

12 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240768-1512/1/2021 Appendix 5_15B

28 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240751-112/1/2021 Cover Letter_Gem Energy Storage Center re AFC
Cover letter to the CEC regarding the Application for Certification of the Gem Energy Storage Center
1 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-212/1/2021 Section 1_Introduction_Gem Energy Storage Center
Section 1 Introduction introduces the Gem Energy Storage Center Project
10 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-312/1/2021 Section 2_Project Description
*** THIS DOCUMENT IS REPLACED BY TN 240770 *** - Section 2 provides the details of Gem Energy Storage Center project
33 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-412/1/2021 Section 3_Electric Transmission_Gem Energy Storage Center
Section 3 discusses the transmission interconnection between the Gem Project and the existing electrical grid, and the potential effects that operation of the facility will have on the flow of electrical power in the project region.
19 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-512/1/2021 Section 4_Natural Gas Supply_Gem Energy Storage Center
Section 4 provides information regarding natural gas supply for the Gem Energy Storage Center
1 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-612/1/2021 Section 5_Environmental Analysis
Section 5 provides an introduction to the 16 individual sections that represent the standard environmental, public health and safety, and local impact assessments needed for the application for certification of the Gem Energy Storage Center
1 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-712/1/2021 Section 5_1_Air Quality_Gem Energy Storage Center
This section presents the methodology and results of an analysis performed to assess potential impacts of airborne emissions from the construction and operation of the Gem Energy Storage Center (GESC or Gem) and the Project’s compliance with applicable air quality requirements.
31 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-812/1/2021 Section 5_2_Biological Resources
61 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-912/1/2021 Section 5_3_Cultural Resources_Gem Energy Storage Center
This section analyzes the potential effects the Gem Energy Storage Center or its appurtenances may have on known or previously unrecorded cultural resources located within the study area.
33 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1012/1/2021 Section 5_4_Geological Hazards and Resources_Gem Energy Storage Center
This section provides an evaluation of the proposed Advanced Compressed Air Energy Storage (A-CAES) facility at the Gem Energy Storage Center (GESC) in terms of potential exposure to geological hazards and potential to affect geologic resources of commercial, recreational, or scientific value. The information presented in the following sections is based on readily available information provided online and is limited to surficial soils only. Construction of the proposed GESC involves the construction of various surface facilities and features (i.e., buildings, air processing facility, compressors, turbines, etc.), the excavation of deep vertical shafts on the order of 2,000 feet deep below the existing ground surface, the excavation of an underground cavern, and the construction and filling of a hydrostatic compensation surface reservoir. A site-specific geotechnical exploration has not been performed at the proposed project location to characterize the site-specific surface and subsurface conditions.
17 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1112/1/2021 Section 5_5_Hazardous Materials_Gem Energy Storage Center
5.5-1 5.5 Hazardous Materials Handling This section discusses the use and storage of hazardous materials associated with the Gem Energy Storage Center (Gem or GESC) and the potential effects on human health and the environment. Section 5.5.1 describes the existing environment that may be affected, and Section 5.5.2 identifies potential impacts to the environment and on human health during construction and operations. Section 5.5.3 discusses potential cumulative effects; Section 5.5.4 identifies proposed mitigation measures; Section 5.5.5 presents laws, ordinances, and standards (LORS) applicable to hazardous materials. Section 5.5.6 identifies agencies involved and provides agency contacts. Section 5.5.7 describes permits and Section 5.5.8 provides all references used to develop this section
30 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1212/1/2021 Section 5_6_Land Use_Gem Energy Storage Center
This section discusses the environmental and regulatory setting as well as, includes an analysis of potential impacts associated with the Gem Advanced Compressed Air Energy Storage (A-CAES) facility in unincorporated Kern County, California. Herein, references to the A-CAES facility equate to the location of the proposed approximately 71-acre Gem Energy Storage Center (GESC). The GESC is located approximately one mile northeast of the community of Willow Springs and seven miles west of Rosamond, California. Gem A-CAES LLC has obtained site control of the approximate 61-acre parcel by virtue of a long-term lease and is expecting to obtain site control for the 10-acre parcel.
36 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240751-1312/1/2021 Section 5_7_Noise_Gem Energy Storage Center
This section presents the noise impact assessment related to the Gem Energy Storage Center (Gem/GESC). Section 5.7.1 discusses the fundamentals of acoustics. Section 5.7.2 describes the affected environment, including baseline noise level survey methodology and results. Section 5.7.3 presents an environmental analysis of the construction and operation of the energy storage center and associated facilities. Section 5.7.4 discusses cumulative effects. Section 5.7.5 discusses mitigation measures. Section 5.7.6 presents applicable laws, ordinances, regulations, and standards (LORS). Section 5.7.7 presents agency contacts, and Section 5.7.8 presents permit requirements and schedules. Section 5.7.9 contains the references used to prepare this section.
32 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1412/1/2021 Section 5_8_Paleontological Resources_Gem Energy Storage Center
This section presents the potential effects to paleontological resources from the construction and operation of the Gem Energy Storage Center (GESC) in unincorporated Kern County, California.
15 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1512/1/2021 Section 5_9_Public Health_Gem Energy Storage Center
This section discusses activities that could potentially affect public health as they relate to the construction and operation of the Gem Energy Storage Center (GESC or Gem). A Health Risk Assessment (HRA) was performed to assess potential effects and public exposure associated with airborne emissions from the GESC. Section 5.9.1 describes the affected environment. Section 5.9.2 presents an environmental analysis of the operation of the power facility and associated facilities. Section 5.9.3 discusses cumulative effects. Section 5.9.4 discusses mitigation measures. Section 5.9.5 presents applicable Laws, Ordinances, and Regulations (LORS), permit requirements, schedules, and agency contacts. Section 5.9.6 contains references cited or consulted in preparing this section.
26 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1612/1/2021 Section 5_10_Socioeconomics_Gem Energy Storage Center
This section describes the potential social and economic effects within the Project vicinity and region arising from the construction and operation of the GESC. This discussion considers Project-related effects to population, housing, public services and utilities, and county tax revenue as well as, evaluates the economic benefits that will arise from the Project.
28 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1712/1/2021 Section 5_11_Soils_Gem Energy Storage Center
This section describes the potential affects the construction and operation of the proposed Advanced Compressed Air Energy Storage (A-CAES) project at the Gem Energy Storage Center (GESC) may have on soil resources at and in the vicinity of the project site.
13 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1812/1/2021 Section 5_12_Traffic and Transportation_Gem Energy Storage Center
This section describes the potential effects of the Gem Energy Storage Center (GESC) on traffic and transportation.
38 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-1912/1/2021 Section 5_13_Visual Resources_Gem Energy Storage Center
This chapter of the Application for Certification (AFC) discusses the existing condition of visual resources of the landscape surrounding the Applicant’s (Hydrostor Inc.) Gem Energy Storage Center (Gem) proposed Advanced Compressed Air Energy Storage (A-CAES) facility in unincorporated Kern County, California (the Project) and the potential visual impacts associated with its construction and operation.
26 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-2012/1/2021 Section 5_14_Waste Management_Gem Energy Storage Center
This section is designed to communicate the expected potential effects on human health and the environment from nonhazardous and hazardous waste generated at the Gem Energy Storage Center (“GESC” or the “Project”). The GESC for reference is a 500 MW Advanced Compressed Air Energy Storage (A-CAES) system in unincorporated Kern County, approximately 1 mile north of Willow Springs, CA as described in Section 2, Project Description. The Project will incorporate an Environmental and Sustainability Policy, that will reflect best economical available practices through the life cycle of the Project.
25 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-2112/1/2021 Section 5_15_Water Resources_Gem Energy Storage Center
This section discusses the existing water resources near the Gem Energy Storage Center (Gem), a 500- megawatt (MW) Advanced Compressed Air Energy Storage (A-CAES) system in unincorporated Kern County, near Willow Springs, California, assesses the potential effects of construction and operations on water resources, and provides mitigation strategies to address the potential effects.
28 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
240751-2212/1/2021 Section 5_16_Worker Health and Safety_Gem Energy Storage Center
This subsection summarizes the worker health and safety issues that may be encountered during the construction and operation of the proposed Gem Energy Storage Center (GESC or Gem). Because of the subject matter, this subsection follows a slightly different format than other subsections in Section 5. Instead of a standard discussion of affected environment followed by the project’s environmental consequences and proposed mitigation measures for significant impacts, this subsection contains worker safety information, including the laws, ordinances, regulations, and standards (LORS) that apply to the GESC. Section 5.16.1 contains a brief description of the work environment and setting. Section 5.16.2 describes the health and safety programs in terms of analyses conducted to identify hazards and also the safety compliance and training programs that will be established onsite. Section 5.16.3 discusses the applicable LORS. Section 5.16.4 lists the regulatory agencies involved and key agency contacts. Section 5.16.
35 page(s)
 CEC/Docket UnitGolder Associates USA Inc.
240751-2312/1/2021 Section 6_Alternatives_Gem Energy Storage Center
This section discusses alternatives to the proposed Gem Energy Storage Center (Gem / GESC). These include the “no project” alternative, site alternatives, transmission line route alternatives, technology alternatives, water supply alternatives, and excavated rock recycling or disposal alternatives. This discussion focuses on alternatives that could feasibly accomplish most of the basic objectives of the project and could avoid or substantially lessen one or more of the potential impacts.
16 page(s)
 CEC/Drew BohanGolder Associates USA Inc.
24073011/29/2021 Memo to Open New Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
   AFC Data Adequacy Supplement No 1 Attachment DA52-1 Biological Technical Report

178 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Attachment DA52-3 Burrows

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 8

531 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 7

222 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 6

260 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 5

344 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 4

267 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 3

246 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 10

214 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 8 (Confidential)

136 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 7 (Confidential)

183 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 6 (Confidential)

345 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 5 (Confidential)

276 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 4 (Confidential)

127 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 3 (Confidential)

123 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 2 (Confidential)

123 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA535a Rincon Gem Missing Reports Pt 1 Confidential
This document is replaced under the application TN 243156
532 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 6

154 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 5

101 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 4

209 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 3

178 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 2

174 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-4 Gem Missing DPR Forms Pt 1

197 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-3 Paleowest Revised Survey Results Maps for All Transmission Route Alternatives (Confidential)

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-2b Appendix A Records Search Results Map Paleowest - Revised (Confidential)

21 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-2a Rincon Revised Records Search Maps for Original Transmission Routes

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Gem Additional Records Search (05 mi to 10 mi of Gem Site) and Gem Site Survey Coverage Map

88 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 1

965 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 15

854 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 2

173 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5b Paleowest Confidential Revised Appendix E_Part 25

312 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA53-5a Rincon Gem Missing Reports Pt 1 (Confidential)
Replacement from document filed with TN 243083
532 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Data Adequacy Biological Resources Supplement Observed Suitable Burrows

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   Att DA5

190 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP