Docket Log

Docket: 01-AFC-07C
Project Title: 01-AFC-7C Russell City Energy Company
Generated On: 3/18/2024 10:00:56 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2504746/2/2023 Item_07_Russell_City_Order_ada-1
***THIS DOCUMENT REPLACES TN 250473***
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2504736/2/2023 Item_07_Russell_City_Order_ada
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2502675/23/2023 CEQA Exemption Memo for the May 31, 2023 Business Meeting

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2502665/23/2023 Agenda of the May 31, 2023 Business Meeting

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2496034/10/2023 Senator Wahab and Assembly Member Ortega Comments - Russell City Energy Center (RCEC) Settlement Agreement

Compliance
2 page(s)
 CEC/David HochschildSenator Wahab and Assembly Member Ortega
2461229/15/2022 Attachment A Photos Figures 17, 25-37 to Investigation Report Calpine Russell City Steam Turbine Event
***Please See Report TN242911*** Attachment A Photos Figures 17, 25-37 to Investigation Report Calpine Russell City Steam Turbine Event
14 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2461119/15/2022 Bay Valve Service's Photos of Butterfly Valve Inspection and Disassembly

81 page(s)
 CEC/docket unitCalifornia Energy Commission
2459299/9/2022 ESHD Response Letter

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2455678/19/2022 Limited Request for Reconsideration and Tolling of Time for Appeal of Executive Director’s Determination

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2444048/10/2022 CEC Response to Russell City Energy's Repeated Applications for Confidential Designation, 7-5-22

5 page(s)
 Ellison Schneider Harris & Donlan/Jeffery HarrisCalifornia Energy Commission
2438427/5/2022 Supplementa Repeated Application for Confidential Designation

26 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2435936/17/2022 Russell City Energy Center Final Bi-Weekly Compliance Report

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2434486/6/2022 CEC Letter Regarding Response to Repeated Applications for Confidential Designation (5-6-22)

3 page(s)
 Ellison Schneider Harris & Donlan/Jeffery HarrisCalifornia Energy Commission
2434286/3/2022 Russell City Energy Center Bi-Weekly Compliance Report

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2434226/3/2022 CEC Authorization Letter for Russell City Energy Center to Restart
Letter to Cameron White and Barbara McBride -Calpine
Compliance
8 page(s)
 Russell City Energy Center - Calpine/Cameron WhiteCalifornia Energy Commission
24326511/8/2021 photos worker safety
 CEC/docket unitCalifornia Energy Commission
24326411/8/2021 photos hazardous waste
 CEC/docket unitCalifornia Energy Commission
24326311/8/2021 photos GSU transformers
 CEC/docket unitCalifornia Energy Commission
24326211/8/2021 photos fire pumps
 CEC/docket unitCalifornia Energy Commission
24326111/8/2021 photos bulk chemical storage areas
 CEC/docket unitCalifornia Energy Commission
24326011/8/2021 photos ammonia storage
 CEC/docket unitCalifornia Energy Commission
24325911/8/2021 05-2 fire protection systems
 CEC/docket unitCalifornia Energy Commission
24325811/8/2021 05-1 fire protection systems
 CEC/docket unitCalifornia Energy Commission
24325711/8/2021 13 complaints NOVs injuries citations
 CEC/docket unitCalifornia Energy Commission
24325611/8/2021 12 RCEC Personal Protective Equipment Standard_Rev01 CONFIDENTIAL
 CEC/docket unitCalifornia Energy Commission
24325511/8/2021 10 lockout tagout permits procedures
 CEC/docket unitCalifornia Energy Commission
24325411/8/2021 09 confined space permits procedure
 CEC/docket unitCalifornia Energy Commission
24325311/8/2021 08 hot work permits procedure
 CEC/docket unitCalifornia Energy Commission
24325211/8/2021 07 Job Safety and Hazard Analyses procedures
 CEC/docket unitCalifornia Energy Commission
24325111/8/2021 06 RCEC Emergency Action Plan - 2021
 CEC/docket unitCalifornia Energy Commission
24325011/8/2021 04 RCEC_Risk Management Plan (RMP)_20180730
 CEC/docket unitCalifornia Energy Commission
24324911/8/2021 03 RCEC Spill Prevention Control and Countermeasure Plan (SPCC)_Rev07_2021
 CEC/docket unitCalifornia Energy Commission
24324811/8/2021 02 Safety Management
 CEC/docket unitCalifornia Energy Commission
24324711/8/2021 01 Pandemic Guide for Power Operations_CONFIDENTIAL
 CEC/docket unitCalifornia Energy Commission
2432395/24/2022 CEC Response to RCEC Supplemental Application for Confidential Designation (3-11-22)

5 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha G. NeumyerCalifornia Energy Commission
2432105/20/2022 Russell City Energy Center Bi-Weekly Compliance Report #2

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2431094/15/2022 Blank Document Filed With Supplemental Application for Confidentiality

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24310211/23/2021 Investigation Report Calpine Russell City Steam Turbine Generator Event May 27, 2021

40 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429724/12/2022 CONFIDENTIAL - Russell City Energy Center - Biological Resources Assessment

12 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2429555/6/2022 Russell City Energy Center Bi-Weekly Compliance Report

Compliance
3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429545/6/2022 Repeated Application for Confidential Designation Attachment A to RCEC STG Event Investigation Report & Bay Valve Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429335/5/2022 CEQA Memo

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2429245/4/2022 Order Adopting Staff Recommended Corrective Actions and Delegating Authority to the Executive Director
Order No: 22-0426-3
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2429115/2/2022 Calpine Russell City Steam Turbine Generator Event Investigation Report - Redacted

40 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2428074/26/2022 CEC's Response to Russell City's Supplemental Application for Confidential Designation

6 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha G. NeumyerCalifornia Energy Commission
2427694/25/2022 CEC Staff Report - Russell City Energy Center May 2021 Incident Root Cause Gap Analysis
***This document supersedes TN 242757***
41 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2427574/22/2022 Russell City Energy Center 2021 Incident Root Cause Gap Analysis
***This document has been replaced by TN 242769***
42 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2427384/21/2022 CEC Response Letter to Application for Confidential Designation (Application date 4-12-22)

6 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha G. NeumyerCalifornia Energy Commission
2426944/15/2022 Russell City Energy Center Supplemental Application for Confidential Designation

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2426454/12/2022 Redacted RCEC Biological Resources Assessment

10 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2426444/12/2022 RCEC Application for Confidential Designation

4 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2422883/11/2022 Russell City Energy Center Application for Confidential Designation (Supplemental)

19 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2419662/25/2022 Root Cause Analysis - Restoration Recommendations

4 page(s)
  Ellison Schneider Harris & Donlan LLP
2419652/25/2022 Root Cause Analysis - Executive Summary

2 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
24162312/16/2021 CONFIDENTIAL RCEC RCA Presentation Slides 37-38

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2413792/2/2022 CEC Response Letter Russell City Energy Center Application for Confidential Designations dated Oct 22, Nov 23, and Dec 16, 2021

Compliance
10 page(s)
 S Neumyer - Ellison Schneider Harris & DonlanCalifornia Energy Commission
2413782/2/2022 CEC Response Letter Russell City Energy Center Application for Confidential Designation dated 10-11-2021
***This Document Supersedes TN241314***
Compliance
12 page(s)
 S Neumyer - Ellison Schneider Harris & DonlanCalifornia Energy Commission
2413141/28/2022 CEC Response Letter Russell City Energy Center Application for Confidential Designation dated 10-11-2021
***This Document Has Been Replaced By TN 241378***
12 page(s)
 Samantha G. Neumyer Ellison Schneider Harris & Donlan LLP for Russell City Energy CenterCalifornia Energy Commission
2412701/24/2022 Letter Regarding RCEC May 27, 2021 Steam Turbine Overspeed Event

6 page(s)
 CEC/David Hochschild, CPUC Alice Reynolds and CISO/Elliot MainzerRussell City Energy Company, LLC
24097012/16/2021 Russell City Energy Center Application for Confidential Designation

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24071311/23/2021 Application for Confidential Designation

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24043411/8/2021 Confidential Designation Application RCA Exec Summary & Restoration Recs

4 page(s)
 CEC/docket unitCalifornia Energy Commission
24043311/8/2021 RCEC Application for Confidentiality Designation
Application for Confidentiality
4 page(s)
 CEC/docket unitCalifornia Energy Commission
2393898/19/2021 Tracey Adams-Bailey Comments - Explosion at Russell power plant

Public Health
1 page(s)
 CEC/Docket UnitTracey Adams-Bailey
2389437/20/2021 Order Approving Post Certification Petition for Modification
Resolution No. 21-0715-3
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2389257/16/2021 Stephania Widger Comments - Oppose Restart of the Russell City Power Plant

1 page(s)
 CEC/Docket UnitStephania Widger
2389167/15/2021 Second Revised Proposed Order Approving Post Certification Petition for Modification

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2388957/15/2021 Calpine Proposed Revisions to Revised Proposed Order

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2388937/15/2021 Revised Proposed Order Approving Post Certification Petition for Modification

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2388897/15/2021 Jessica Tovar Comments - Oppose restart of Russell City Power Plant-Environmental Hazard

Air Quality, Public Health, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitJessica Tovar
2388727/14/2021 Yvonne K DeBone Comments - Oppose Calpine application for power plant modification and restart

Public Health
1 page(s)
 CEC/Docket UnitYvonne K DeBone
2388597/14/2021 Ming Ho Comments - Safety Comes First

Compliance, Reliability, Socioeconomics, Transmission Line Safety and Nuisance, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitMing Ho
2388577/14/2021 Maggie Ballard Comments - Re-Opening without an Investigation

1 page(s)
 CEC/Docket UnitMaggie Ballard
2388067/12/2021 Joyce Elliott Comments - Russell City Energy Center

Compliance
1 page(s)
 CEC/Docket UnitJoyce Elliott
2387487/8/2021 Robert & Vicky Riendeau Comments - Calpine power plant

1 page(s)
 CEC/Docket UnitRobert & Vicky Riendeau
2386997/6/2021 Rodrigues Farm & Nursery Comments - Full investigation

Efficiency, Executive Summary, Facility Design, Compliance, Hazardous Materials, Public Health, Reliability, Socioeconomics, Worker Safety and Fire Protection, Soil and Water, Greenhouse Gases
1 page(s)
 CEC/Docket UnitRodrigues Farm & Nursery
2386927/5/2021 Ms. Alwine Knowles Comments - Explosion on May 26, 2021

Hazardous Materials
1 page(s)
 CEC/Docket UnitMs. Alwine Knowles
2386747/2/2021 Staff Alameda County Airport Land Use Commission Comments - Opposition to Calpine Russell City Energy Center (RCEC) Reopening

Traffic and Transportation
1 page(s)
 CEC/docket unitStaff Alameda County Airport Land Use Commission
2386737/2/2021 DACAG July 16 2021 Meeting Notice
DACAG July 16 2021 Meeting Notice
4 page(s)
 CEC/docket unitCalifornia Energy Commission
2386667/2/2021 Robert Sarvey’s Testimony Opposing the RCEC Amendment Approval by CEC Staff

Air Quality
14 page(s)
 CEC/docket unitRobert Sarvey
2386607/2/2021 California ISO - Andrew Ulmer Comments Russell City Energy Company - CAISO comments

Reliability
3 page(s)
 CEC/docket unitCalifornia ISO - Andrew Ulmer
2386497/2/2021 Fred Henderson Comments - Russel City Restart without Steam Turbine

Air Quality
1 page(s)
 CEC/docket unitFred Henderson
2386357/2/2021 City of Hayward Comments Opposition to RCEC’s Petition for Temporary Safety Modifications

Air Quality, Compliance, Public Health, Worker Safety and Fire Protection
4 page(s)
 CEC/docket unitCity of Hayward
2386337/2/2021 David Herrera Comments - Do Not Restart the Power Plant

Hazardous Materials, Public Health, Worker Safety and Fire Protection
1 page(s)
 CEC/docket unitDavid Herrera
2386307/2/2021 JoAnne Gross Comments - No restart

Air Quality, Compliance, Public Health, Worker Safety and Fire Protection, Greenhouse Gases
1 page(s)
 CEC/docket unitJoAnne Gross
2386287/2/2021 Daisy Gonzales Comments - The Russell City Energy Plant

Public Health
1 page(s)
 CEC/Docket UnitDaisy Gonzales
2386187/1/2021 Dolly Vierra Comments - Restart of the Calpine plant after explosion

1 page(s)
 CEC/Docket UnitDolly Vierra
2386167/1/2021 Tim Willson Comments - Not Yet

1 page(s)
 CEC/Docket UnitTim Willson
2386157/1/2021 Jaime Puga Comments - Russell City Energy Center

Air Quality
1 page(s)
 CEC/Docket UnitJaime Puga
2386147/1/2021 CalPIlots Comments - Opposition to Calpine Russell City Energy Center Reopening

Compliance
2 page(s)
 CEC/Docket UnitCalPIlots
2386137/1/2021 Rauf Adil Comments - Unsafe and environmental hazard

1 page(s)
 CEC/Docket UnitRauf Adil
2385926/30/2021 Patrick Turney Comments - Please don't restart the Russel City Energy Plant

Worker Safety and Fire Protection
1 page(s)
 CEC/docket unitPatrick Turney
2385866/30/2021 01-AFC-07C Public Comment
Comment from Elizabeth Gonzalez on Safety Modifications
1 page(s)
 CEC/docket unitCalifornia Energy Commission
2385856/30/2021 Henry J Quintel Comments - Calpine restart

Air Quality
1 page(s)
 CEC/docket unitHenry J Quintel
2385786/30/2021 Dave Casini Comments - Shut it down

Air Quality, Public Health, Socioeconomics, Greenhouse Gases
1 page(s)
 CEC/docket unitDave Casini
2385726/30/2021 Yumiko Abe-Jones Comments - Request root cause analysis and fix before restarting Cal Pine

Public Health, Reliability
1 page(s)
 CEC/docket unitYumiko Abe-Jones
2385716/30/2021 Alex Sahagun Comments - Russel City Energy Center

Hazardous Materials
1 page(s)
 CEC/docket unitAlex Sahagun
2385706/29/2021 SFFZ Comments - Oppose restarting Russell City Energy Power plant, I work on Bay Center Place in Hayward

Compliance
1 page(s)
 CEC/docket unitSFFZ
2385696/29/2021 Tomas Gomez Comments - Do not open Power Plant

1 page(s)
 CEC/docket unitTomas Gomez
2385676/29/2021 Pamela Ferris Comments - Do Not Reopen Russel City Energy

1 page(s)
 CEC/Docket UnitPamela Ferris
2385666/29/2021 Blanca Limon Comments - Oppose to restart its Russell City Energy Center

Public Health
1 page(s)
 CEC/Docket UnitBlanca Limon
2385656/29/2021 David Cerqua Comments - Russel City Energy Center

Facility Design, Reliability, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitDavid Cerqua
2385596/29/2021 Rebecca Long Comments - Opposition to Calpine Russell City Energy Center Reopening

Hazardous Materials, Public Health, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitRebecca Long
2385586/29/2021 Catherine M. Keith Comments - Calpine Application to Restart Hayward's Russel City Power Plant

Public Health
1 page(s)
 CEC/Docket UnitCatherine M. Keith
2385546/29/2021 Paul Davis Comments - Calpine Explosion Investigation

Public Health, Reliability
1 page(s)
 CEC/Docket UnitPaul Davis
2385536/29/2021 Dwight Turner Comments - Russell City Energy Center (CalPine)

Facility Design, Public Health, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitDwight Turner
2385526/29/2021 Daisy Pineda Comments - Spot this

1 page(s)
 CEC/Docket UnitDaisy Pineda
2385516/29/2021 Virginia Nevarez Comments - Russell City Energy company

1 page(s)
 CEC/Docket UnitVirginia Nevarez
2385506/29/2021 Izamar Duenas Comments - Concern over Russell City Energy Company

1 page(s)
 CEC/Docket UnitIzamar Duenas
2385476/29/2021 Yvonne Dardenne Comments - Citizen Opinion

1 page(s)
 CEC/Docket UnitYvonne Dardenne
2385466/29/2021 Ken White Comments - Russell City Energy Center (Calpine)

Hazardous Materials, Public Health, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitKen White
2385456/29/2021 Felix Truong Comments - I do not support the plant restarting until all repairs are finished

1 page(s)
 CEC/Docket UnitFelix Truong
2385436/29/2021 Alan Leung Comments - Failure Analysis and Risk Assessment

Facility Design, Reliability, Worker Safety and Fire Protection
1 page(s)
 CEC/Docket UnitAlan Leung
2385426/28/2021 Marilou and Lyn Kerns Comments - Do Not Reopen Calpine

Public Health
1 page(s)
 CEC/Docket UnitMarilou and Lyn Kerns
2385416/28/2021 Guadalupe Rojas Gil Comments - S T O P !!!!! Russell City Power Center

1 page(s)
 CEC/Docket UnitGuadalupe Rojas Gil
2385406/28/2021 Terrence McMahon Comments - Delay restart of the Russell City Energy Center

Public Health
1 page(s)
 CEC/Docket UnitTerrence McMahon
2385396/28/2021 A B Mechanical Inc Comments - Explosion at plant

Compliance
1 page(s)
 CEC/Docket UnitA B Mechanical Inc
2385386/28/2021 Gilbert J. Negrette, Jr. Comments - CalPine Power Plant

1 page(s)
 CEC/Docket UnitGilbert J. Negrette, Jr.
2385376/28/2021 Thomas Lucius Comments - Opposed to reopening without thorough investigation into cause of Catastrophic Failure

Facility Design, Reliability
1 page(s)
 CEC/Docket UnitThomas Lucius
2385366/28/2021 Elizabeth Maciel Comments - Do not restart the power plant!

1 page(s)
 CEC/Docket UnitElizabeth Maciel
2385346/28/2021 Mike de la Rocha Comments - Calpine Russell City Energy Center Restart

Public Health
1 page(s)
 CEC/Docket UnitMike de la Rocha
2385336/28/2021 Janevette Cole Comments - Investigation prior to re start

1 page(s)
 CEC/Docket UnitJanevette Cole
2385286/28/2021 Nixon garcia Comments - Very worried about this

Hazardous Materials, Public Health, Greenhouse Gases
1 page(s)
 CEC/Docket UnitNixon garcia
2385276/28/2021 Lawrence J Ratto Comments - Concerns about the reopening of operations

Public Health
1 page(s)
 CEC/Docket UnitLawrence J. Ratto
2382926/18/2021 Statement of Staff Approval of Post Certification Change
Russell City Energy Center (01-AFC-07C)
Compliance
13 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381266/3/2021 Petition for Temporary Safety Modifications

8 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2333656/8/2020 Petition for Modification No 3

23 page(s)
 CEC/Bruce BoyerCalifornia Energy Commission
2333466/5/2020 Removal of the City Finger Parcel from the RCEC Amendment

1 page(s)
 CEC/Mary DyasCalifornia Energy Commission
2325003/23/2020 Annual Compliance Report
annual compliance report from July 1 2018 through June 30 2019
Compliance
118 page(s)
 CEC/DocketsRussell City Energy Center
2271662/25/2019 Order Approving Petition to Amend Facility License
Order No: 19-0220-2
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2271172/20/2019 Notice of Decision by the California Energy Commission

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2264862/8/2019 Staff Response to Russell City Energy Company, LLC's Comments on Staff Analysis of Petition to Amend

2 page(s)
 Interested PartiesCalifornia Energy Commission
2264552/4/2019 Russell City Energy Center Comments on Staff Analysis of Petition to Amend to Add Black Start Capability

3 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2263541/23/2019 Staff Analysis of Petition to Amend to Add Black Start Capability

37 page(s)
 Interested PartiesCEC/John Heiser
22563610/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2240196/29/2018 Applicant's Responses to Staff's Data Requests, Set 1, A1 through A15

30 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2237526/11/2018 Amendment to Russell City Energy Center's License (01-AFC-07C), Staff's Data Requests, Set 1, A1 through A15

9 page(s)
 Calpine Corporation/Barbara McBrideCalifornia Energy Commission
2230973/30/2018 Notice of Receipt - Petition for Modification the California Energy Commission Decision for the Russell City Energy Center

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2228363/2/2018 Russell City Energy Center Petition for Modification Black Start Capabilities

17 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
22185011/22/2017 Notice of Decision Re Russell City Energy Center Petition to Amend

1 page(s)
 CEC/DocketsCalifornia Energy Commission
22169211/7/2017 Notice of Determination Petition to Amend to Install a New 6,667 Gallon Sodium Hydroxide Storage Tank at the Russell City EC

9 page(s)
 CEC/DocketsCalifornia Energy Commission
2213599/11/2017 Russell City Energy Company LLC Confidential Attachment
Confidential site map for data response A7
1 page(s)
 Mr. Robert Oglesby, Executive Director and Eric Veerkamp, Compliance Project ManagerEllison Schneider Harris & Donlan LLP
2211219/11/2017 Russell City Energy Company LLC Repeated Application for Confidential Designation
Confidential site map re: Data Response A7
2 page(s)
 CEC/Robert OglesbyEllison Schneider Harris & Donlan LLP
2211189/11/2017 Russell City Energy Company, LLC Responses to CEC's Data Requests, Set 1A, A1 through A16

15 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2206988/11/2017 Amendment to Russell City Energy Center's License (01-AFC-07C), Staff's Data Requests, Set 1, A1 through A16
Letter
6 page(s)
 Calpine Corporation - Russell City Energy Center/Lauren BresnahanCalifornia Energy Commission
2204467/27/2017 Charles Cameron Comments On Notice of Receipt for Petition to Amend

2 page(s)
 CEC/Docket UnitCharles Cameron
2201167/11/2017 Notice of Receipt - Petition to Amend the CEC Decision for the Russell City Energy Center

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2187846/15/2017 Letter re Russell City Energy Company Petition to Amend
Petition to Amend Russell City Energy Co - Sodium Hydroxide Tank Storage Request
1 page(s)
 Calpine Corporation - Russell City Energy Company/Lauren BresnahanCalifornia Energy Commission
2173544/28/2017 RCEC Petition to Amend_Sodium Hydroxide

5 page(s)
 CEC/DocketsEllison Schneider Harris & Donlan LLP
2127328/10/2016 Order Approving a Petition to Amend to Implement Recycled Water Demineralization System

4 page(s)
  California Energy Commission
2126908/8/2016 Charlie Cameron Comments: Russel City Staff Analysis of Proposed Recycled Water Demineralization System
  Charlie Cameron
2123247/15/2016 Russell City Energy Center Staff Analyis of PTA for Demineralization System
Russell City Energy Center (RCEC) Executive Summary and Staff Analysis of Petition to Amend (PTA) for proposed recycled water demineralization system
19 page(s)
 Interested PartiesCalifornia Energy Commission
2121367/6/2016 Russell City Energy Center Pre-Construction Matrix
Russell City Energy Center Pre-Construction Matrix
Compliance
1 page(s)
  California Energy Commission
2121347/6/2016 Annual Compliance Report - Year 2 and AQ-19

173 page(s)
 CEC/Jonathan FongRussell City Energy Company, LLC
2121337/6/2016 Monthly Compliance Report #37

48 page(s)
 CEC/Docket UnitRussell City Energy Company, LLC
2121327/6/2016 Monthly Compliance Report #1

91 page(s)
 CEC/Docket UnitRussell City Energy Company, LLC
2116916/1/2016 Response to Staff's Informational Request for Demineralized Water System
Project owner responses to staff structural information request for the proposed demineralized water system for Russell City
Compliance
4 page(s)
 CEC/Jonathan FongRussell City Energy Company, LLC
2115495/18/2016 Notice of Decision

1 page(s)
  California Energy Commission
2115395/18/2016 Order Approving Petition to Amend the Visual Resources Conditions of Certification

4 page(s)
  California Energy Commission
2109894/8/2016 Staff Analysis of Proposed Petition to Amend Visual Resources Condition of Certification VIS-10

Compliance, Visual Resources
19 page(s)
 Interested PartiesCalifornia Energy Commission
2102022/5/2016 Notice of Receipt Petition to Amend, Water Demineralization System
Petition to Amend to install a new recycled water demineralization system for the Russell City Energy Center
Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2100841/29/2016 Petition for Modification Amendment No. 6
Petition for a project modification to the Russell City Energy Center to allow the installation of a recycled water demineralization system.
Compliance
14 page(s)
 CEC/DocketCalifornia Energy Commission
2049276/5/2015 Notice of Receipt of VIS-10 Amend to Revise Visual Enhancement Plan

Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2048176/1/2015 Russell City Energy Center Amendment No. 5 VIS-10
Amendment of Visual Resources Condition of Certification VIS-10
Visual Resources
19 page(s)
 CEC/Jonathan FongRussell City Energy Center
2029677/24/2014 Russell City Appendix B DPR Forms
Appendix B of the Cultural Resources Monitoring Report for RCEC
Cultural Resources
11 page(s)
  Ellison, Schneider & Harris L.L.P.
2029538/20/2014 Response letter re: application for confidentiality

Cultural Resources
2 page(s)
 Ellison, Schneider & Harris LLP/C. KappelCalifornia Energy Commission / R Oglesby
2028207/28/2014 AQ-44 Approval Letter
RUSSELL CITY ENERGY CENTER (RCEC) (01-AFC-7C) COMPLIANCE WITH CONDITION OF CERTIFICATION AQ-44
Air Quality
1 page(s)
 Calpine Corporation/ Gevan ReevesCEC/ Chris Marxen
2028067/24/2014 Russell City Energy Center Application for Confidentiality

Cultural Resources
3 page(s)
 CEC / Robert P. OgelsbyEllison, Schneider & Harris L.L.P.
2018443/10/2014 Letter re CEC Approved Amendment #4 and Payment to Hayward Area Recreation and Park District to Upgrade Signange.

Compliance
3 page(s)
 CEC/Bruce BoyerRussell City Energy Center, LLC.
2017662/21/2014 AQ-44 Compliance Advice Letter

2 page(s)
 Calpine Corporation/Gevan ReevesCalifornia Energy Commission
2015771/21/2014 City of Hayward Letter - Objection to Approval of VIS-10 Amendment

Visual Resources
1 page(s)
 CEC/Docket unitCity of Hayward/ A. Ameri
20084410/11/2013 Kevin Bell Response to Jewell Hargleroad Email Entitled Your Correspondence

2 page(s)
 California Pilots Association/Jewell HargelroadCalifornia Energy Commission
20083110/11/2013 California Pilots Association Comments: Your Correspondence

2 page(s)
 CEC/Kevin BellCalifornia Pilots Association
20082310/9/2013 California Pilots Association Comments: CEC Staff Meeting With CalPilots Aug. 9, 2013 at 1 p.m.- Attachment 3

2 page(s)
 CEC/Dockets UnitCalifornia Pilots Association
20082210/9/2013 California Pilots Association Comments: CEC Staff Meeting With CalPilots Aug. 9, 2013 at 1 p.m. - Attachment 2

3 page(s)
 CEC/Dockets UnitCalifornia Pilots Association
20082110/9/2013 California Pilots Association Comments: CEC Staff Meeting With CalPilots Aug. 9, 2013 at 1 p.m - Attachment 1

2 page(s)
 CEC/Dockets UnitCalifornia Pilots Association
20082010/9/2013 California Pilots Association Comments: CEC Staff Meeting With CalPilots Aug. 9, 2013 at 1 p.m.
supersedes TN 200791
5 page(s)
 CEC/Dockets UnitCalifornia Pilots Association
20079510/9/2013 CEC 11-07-07 Order Denying Intervene and Reconsideration, Etc

12 page(s)
  California Pilots Association
20079410/9/2013 FAA Charting Notice
1 page(s)
  California Pilots Association
20079310/9/2013 CLPCCD ExhA1 Supp RJN Caltrans 1-16-12Doc-144
1 page(s)
  California Pilots Association
20079210/9/2013 Exh A to CLPCCD RJN Caltrans 1-4-12Doc-137
2 page(s)
  California Pilots Association
20079110/9/2013 Email from California Pilots Association to Roger Johnson
4 page(s)
 CEC/Roger JohnsonCalifornia Pilots Association
20078810/8/2013 Roger Johnson Response Letter to Jewel Hargleroad RE: CalPilots Concerns

Traffic and Transportation, Visual Resources
10 page(s)
 Jewell J. Hargleroad, EsqCEC/Roger E. Johnson
714987/1/2013 Order No. 13-0508-6 - Order Approving a Petition to Amend Air Quality, Hazardous Materials Management and Visual Resources Conditions of Certification

20 page(s)
 CEC/Docket UnitCEC/H.Kallemeyn
714536/27/2013 Notice of Decision

1 page(s)
 California Resources AgencyCEC/B.Boyer
711856/7/2013 CEC's Bruce Boyer's Response Email to Jewell Hargleroad re CalPilots Letter

13 page(s)
 Law Offices of Jewell Hargleroad/J.HargleroadCEC/B.Boyer
710735/31/2013 CalPilots Letter to CEC Record Correction FAA Plume Model

10 page(s)
 CEC/Docket UnitCalPilots
706385/6/2013 San Francisco Bay Chapter, Sierra Club Request the Formation of a Committee and Evidentiary Hearings to Address the Request to Amend the Conditions of Certification

1 page(s)
 CEC/Docket UnitSan Francisco Bay Chapter, Sierra Club
704324/23/2013 Notice of Receipt for Petition to Amend Final Decision

3 page(s)
 CEC/Docket UnitCEC/C. Marxen
702454/8/2013 Errata to the Staff Analysis of Proposed Modifications to Amend Air Quality, Visual and Hazardous Materials

52 page(s)
 Interested PartiesCEC/B.Boyer
702254/5/2013 Calpine Corporation's Email Regarding Questions for HAZ-5 Proposed Change

3 page(s)
 CEC/B.Boyer /G.LeshCalpine/A.Bryan
702244/8/2013 Final Staff Analysis of Proposed Modifications to Amend Air Quality, Visual and Hazardous Materials

50 page(s)
 Interested PartiesCEC/B.Boyer
700553/25/2013 CEC Hearing Advisor Paul Kramer's Email re Change in the Process for Obtaining the Current Proof of Service List

1 page(s)
 Proof of ServiceCEC/P.Kramer
700243/22/2013 League of Woman Voters Eden Area's Comment Letter

5 page(s)
 CEC/B.BoyerLeague of Woman Voters Eden Area/J.Hargleroad
699703/20/2013 Addendum to Amendment No. 4

14 page(s)
 CEC/B.BoyerEllison, Schneider, & Harris LLP/G.Wheatland
696002/20/2013 Chair's Order Denying Robert Sarvey's Petition to Intervene

4 page(s)
 CEC/Docket UnitCEC/R.Weisenmiller
695702/19/2013 Email from Calpine's Barbara McBride to CEC's Bruce Boyer re Request to Amend Amendment No. 4

3 page(s)
 CEC/B.BoyerCalpine/B.McBride
695192/13/2013 Chair's Order Denying Hayward Area Recreation and Park District's Petiton to Intervene

4 page(s)
 CEC/Docket UnitCEC/R.Weisenmiller
693932/4/2013 Petition for Intervention of Robert Sarvey filed by Robert Sarvey

1 page(s)
 CEC/ Docket UnitR. Sarvey
692851/23/2013 City of Hayward's Comments Regarding Amendment Four

2 page(s)
 CEC/Doket UnitCity of Hayward
692341/23/2013 Hayward Area Recreation and Park District's Petition to Intervene

4 page(s)
 CEC/Docket UnitHayward Area Recreation and Park District
690311/3/2013 CEC Staff's Email to John Gouveia, Interim Director of HARD and its Supporting Attachments

30 page(s)
 CEC/D.Flores /M.HamblinCEC/B.Boyer
6899112/31/2012 Hayward Area Recreation and Park District's Comments on Applicant's Amendment Number Four

13 page(s)
 CEC/Docket UnitHayward Area Recreation and Park District/J.Gouveia
6895612/21/2012 Request for Bifurcation of the Fourth Petition to Amend the Final Decision for the Russell City Energy Center

2 page(s)
 CEC/R. JohnsonEllison Shneider & Harris LLP
6855911/19/2012 Notice of Receipt - Petition to Amend

3 page(s)
 CEC/Docket UnitCEC/C.Marxen
6847511/8/2012 Russell City Energy Center Amendment Number 4

36 page(s)
 CEC/Doket UnitRussell City Energy Center, LLC
661597/9/2012 Notice of Determination - Petition to Modify the Energy Commission Decision

2 page(s)
 CEC/Docket UnitCEC/C.Marxen
654465/24/2012 Modification No. 3

23 page(s)
 CEC/B.BoyerRussell City Energy Center LLC/ Ellison Shneider and Harris
6291711/17/2011 Response Letter to M. James Regarding Project Impact

2 page(s)
 Hayward Area Rec/ M. JamesonCEC/ M. Dyas
6277611/3/2011 Letter from B. McBride to M. Jameson Regarding RCEC

30 page(s)
 Hayward Area Rec & Par/ M. JamesonRussell City/ B. McBride
612917/5/2011 Letter Re RCEC Sludge Return Pipeline Interconnection

3 page(s)
 CEC/Dockets UnitCEC/M.Dyas
606075/12/2011 Letter to Hayward Fire Department Regarding Jurisdiction

2 page(s)
 Fire Prevention/C.GielCEC/C.Marxen
5880810/19/2010 CBO Notice to Proceed Conformance Letter

1 page(s)
 CEC/M. DyasTRB Associates/T. Bailey
582588/30/2010 Delegate CBO Notice to Proceed

1 page(s)
 CEC/M. DyasTRB Associates, Inc./T. Bailey
582118/26/2010 Start of Construction Approval Letter

1 page(s)
 Calpine Corp./G. ReevesCEC/M. Dyas
581518/24/2010 Soil & Water-8 Verification Change Approval Letter

1 page(s)
 CEC/ Docket UnitCEC/ M. Dyas
581268/20/2010 Amendment Approval Letter to Project Owner with Order & NOD

1 page(s)
 Calpine Corporation/G. ReevesCEC/M. Dyas
581058/18/2010 Notice of Decision

1 page(s)
 CEC/ Docket Unit/ CRACEC
580348/16/2010 Order Amending the Energy Commission Decision

12 page(s)
 CEC/Docket UnitCEC/M. Dyas
579698/10/2010 Public Comment

1 page(s)
 CEC/M. DyasSierry Club California/J. Metropulos
579688/10/2010 Public Comment

9 page(s)
 CEC/M. DyasHARD Board/M. Jameson
579678/10/2010 Chabot-Las Positas Community College District Request for Continuance

15 page(s)
 CEC/M. DyasLaw Office of Jewell J. Hargleroad/Chabot-Las Positas Community
579668/10/2010 Public Comment

17 page(s)
 CEC/M. DyasEast Bay Chaptero f the CA Native Plant Society/E. Pacheco
579658/10/2010 Public Comment

3 page(s)
 CEC/M. DyasIntervenor/R. Sarvey
579648/10/2010 Public Comment

2 page(s)
 CEC/M. DyasGolden Gate University/L. Williams
579638/10/2010 Public Comment

18 page(s)
 CEC/M. DyasIntervenor/R. Simpson
579628/10/2010 Public Comments - Andrew Wilson III

86 page(s)
 CEC/M. DyasCAL PILOTS
579588/9/2010 Pentition to Amend Air Quality Conditions of Certifiacation

2 page(s)
 CEC/ Docket UnitGolden Gate/ L. Williams
577617/26/2010 SSA Attachment A: 1 Hr NO2 Modeling Assesment ( Revised)

4 page(s)
 CEC/ Docket UnitAD, Inc
575117/9/2010 Amendment No. 2 - Supplemental Staff Analysis

42 page(s)
 Interested PartiesCEC/M. Dyas
573626/28/2010 Amendment - Letter to Interested Parties & Staff Assessment

25 page(s)
 Interested PartiesCEC/M. Dyas
5467112/21/2009 A. Wilson Comments on Russell City energy Center Amendment No. 2

2 page(s)
 CEC/ M. DyasPublic/ A. Wilson
546561/4/2010 HASPA Letter Regarding Dec 24th Comment Letter

3 page(s)
 CEC/ M. DyasHASPA/ C. Severin
546551/4/2010 HASPA Comments Regarding Petition for Amendment

3 page(s)
 CEC/ M. DyasHSCAC/ C. Severin
5437412/8/2009 Notice of Receipt - Petition to Amend

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
5417511/18/2009 Petition for Amendment #2

1508 page(s)
 CEC/ M. DyasRussell City Energy Company LLC/ R. Thomas
5355110/5/2009 Letter from Congressman Stark to FAA

2 page(s)
 US Dept of Transportation/ R. BabbittCongress of the US/ P. Stark
504173/9/2009 Response to Mr. R. Simpson Re Compliance with Condition of Certification AQ-SC-6

1 page(s)
 Public/ R. SimpsonCEC/ K. Bell
496801/12/2009 Public Records Act Request

2 page(s)
 CEC/ M. DyasPublic/ A. Wilson
4898011/13/2008 Public Comment - Ohlone Audubon Society, Inc

1 page(s)
 CEC/ L. ShawResident/ E. Cormier
481749/24/2008 Order Denying Petitions for Reconsideration Concerning Extension of Construction Deadline.

9 page(s)
 CEC/ Docket UnitCEC/ L. Tien-Tran
481719/24/2008 Comments by C.V. McCarthy

2 page(s)
 CEC/ PfannenstielUSAR Retired J.V.McCarthy
480929/19/2008 Chabot-Las Positas Community College District's Written Repoonse to Rob Simpson's Petition for Reconsideration of Commission's July 30, 2008 Decision Granting russel City Energy Company, LLC's Petition to Extend Construction Deadline

6 page(s)
 CEC/Docket UnitLiebert Cassidy Whitmore/L. Schulkind/A. Kachalia
480919/19/2008 Petition for Reconsideration

2 page(s)
 CEC/Docket UnitR. simpson
480909/19/2008 Comments regarding Russell City

2 page(s)
 CEC/Docket UnitJ.V. McCarthy
480899/19/2008 Group Objectors California Pilots Association, San Lorenzo Village Homeowners Association, and Hayward Area Planning Association's Objections to Staff Councel's JULY 17 Letter and JULY 24, 2008 Recommendation to Grant RCEC’S Deficient

8 page(s)
 Docket UnitLaw Office of J. Hargleroad/ Group Objectors California
480889/19/2008 Hayward Area Shoreline Planning Agency Comments on petition for extension of the construction start deadline

1 page(s)
 CEC/M. Dyas/Docket UnitHayward Area Shoreline Planning Agency/C. Severin
480879/19/2008 Group Objectors California Pilots Association, San Lorenzo Village Homeowners Association, and Hayward Area Planning Association's GROUP OBJECTORS OBJECTIONS TO PETITION TO EXTEND CONSTRUCTION DEADLINE FOR RCEC PROJECT; AND GROUP OBJECTORS DEMAND FOR EVIDENTIARY HEARING

9 page(s)
 Docket UnitGroup Objectors California Pilots Association, San Lorenzo Village Homeowners Association, and Haywa
480869/19/2008 Communicating with the City of Hayward to provide comments RE the proposed Eastshore Energy Center that would be located one mile fiom Hayward Executive Airport

2 page(s)
 US Department of Transportation/ R. DurbarryCEC/ J. S. Adams
480859/19/2008 Re: Application for extension of time to construct Russell City Energy Center

2 page(s)
 Docket UnitCalifornia Pilots Association/ A. Richards
480849/19/2008 In the Matter of: Initially noticed as “Petition to Amend the Commission Decision Approving the Application for Certification for the Russell

3 page(s)
 Docket UnitLaw Office of J.Hargleroad/Group Objectors California Pilots Association and San Lorenzo Village Hom
480839/19/2008 Project Owner's Opposition to Petition for Reconsideration of the Order Approving Extension of the Deadline for Commencent of Construction

15 page(s)
 CEC/ Docket UnitEnergy Resources Conservation and Development Commission/ K. A. Mitchell
480789/19/2008 Staff Response to Petition for Reconsideration concerning extension of Construction Deadline.

8 page(s)
 CEC Docket UnitCEC/ K.Bell
478979/3/2008 Order on Petitions for Reconsideration Concerning Extension of Construction Deadline

4 page(s)
 CEC/ Docket UnitCEC/ C. Hong
478699/2/2008 Petition for Reconsideration of California Energy Commission Business Meeting Agenda Item 3 Russell City Energy Center Wednesday, July 30, 2008

18 page(s)
 CEC/ Docket UnitPublic/ R. Simpson
478538/29/2008 Petition for Reconsideration

2 page(s)
 CEC/ Docket UnitCare Member/ Rob Simpson
474628/5/2008 Letter from CEC M. Dyas RE Approval of Petition to Extend the deadline for Commencement of Construction

3 page(s)
 PD / R. ThomasCEC / M. Dyas
474587/31/2008 Filing of Notice of Decision in Compliance RE Russell City Energy Center

1 page(s)
 CEC / Docket UnitCEC / M. Dyas
474347/29/2008 Public Comments of K. Combs RE Russel City Power Plant

2 page(s)
 CEC / J. ByronMember of Public / K. Combs
473897/31/2008 Signed Petition regarding RCEC

6 page(s)
 CEC/ City of Hayward/ Alameda County SupervisorsMembers of the Public
473607/28/2008 E-mail - Comments RE Application for Extension

1 page(s)
 CEC/ Docket UnitMember of the Public/ J. Gross
473417/28/2008 K.Lall Comments on RCPP

1 page(s)
 CEC Docket UnitT.Solorio/ K.Lall
473407/28/2008 Comments from Stephania Widger

1 page(s)
 CEC Docket UnitT.Solorio
473337/28/2008 Teresa Frank Comments on RCPP: We do not want any

1 page(s)
 CEC Docket UnitT.Solorio
473297/31/2008 Order Approving a Petition to Extend the Deadline for Commencement of Construction

2 page(s)
 CEC/ Docket UnitCEC/ J. Boyd
473147/29/2008 County of Alameda's Objection to Staff's Recommendation to Approve Petition for Extension of Deadline for Commencement of Construction for the Russell City Energy Center

9 page(s)
 CEC/Docket UnitACC/L. Stern
473137/29/2008 A. Richards Comments Regarding the Application for Extension of Time to Contruct Russell City Energy Center

4 page(s)
 CEC/CommissionersSF ATCD/A. Richards
473097/29/2008 Objections to Staff Counsel's July 17 Letter and July 24, 2008 Recommendation to Grant RCEC's Deficient and Barred Petition to Extend Construction Deadline a SEcond Time Without a Required Evidentiary Hearing Pilots Association, San Lorenzo Village Homeowners Association, and Hayward Area Planning Association

8 page(s)
 CEC/Docket UnitJ. Hargleroad/ Pilots Association, San Lorenzo Village Homeowners Association, and Hayward Area Pla
473077/28/2008 A. Perez's Email Comments Regarding Russell City Extension

1 page(s)
 CEC/Docket UnitMember of the Public/A. Perez
473027/31/2008 Email FW Please Deny the app for extension to build the Russell CITY PP in Hayward.

1 page(s)
 CEC Docket UnitT.Solorio
473007/28/2008 Chabot-Las Positas Community College District Intervenors' Comments on Applicant's Motion to Reopen the Evidentiary Record and Notice of Joinder to County of Alameda's Opposition

6 page(s)
 CEC/Docket UnitLCW Legal/L. Schulkind/A. Kachalia
472957/30/2008 Petition for Intervention

2 page(s)
 CEC Dockets UnitR. Simpson
472717/30/2008 Email FW: Russell City Power Plant in Hayward

1 page(s)
 CEC Docket UnitT.Solorio/ E.Carmack
472277/28/2008 Letter to Deny the Application to Extend the Deadline to build the Russell City Energy Center.

1 page(s)
 Dockets/ CECTiffany Solorio/Kindra Mendall
472267/28/2008 Letter to Deny Calpine's APPLICATION for the Extention on Building the Russell City Energy Center.

1 page(s)
 Dockets/ CECTiffany Solorio/ Jo Anne Gross
472257/28/2008 Carlton Huang & Rita Liang are writing to ask to Please Reject thre Russell City application for Extention.

1 page(s)
 Dockets/CECTiffany Solorio
472247/28/2008 E-mail to the Commissioner's Bryons Office

1 page(s)
 Dockets/ CECTiffany Solorio
472237/28/2008 Deny the Application for Extention to Build the Russell City Powere Plant in Hayward.

1 page(s)
 Dockets/ CECTiffany Solorio/ James E. Millet
472227/25/2008 E-mail - comments from Member of the Public regarding RCEC

1 page(s)
 CEC/ J. Pfannenstiel/ J. Boyd/ A. Rosenfeld/ J. Byron/ K. DouglasMember of the Public/ D. Ligibel
472217/25/2008 E-mail - comments from Member of the Public regarding RCEC

1 page(s)
 CEC/ J. Pfannenstiel/ J. Boyd/ A. Rosenfeld/ J. Byron/ K. DouglasMember of the Public/ K. Finn
472207/25/2008 E-mail - comments from Member of the Public regarding RCEC

1 page(s)
 CEC/ T. SolorioMember of the Public/ D. Giles
471897/24/2008 Staff's Recommendation

7 page(s)
 POS ListCEC/ K. Bell
471857/24/2008 Project Owner's Response to the Comments of Interested Parties on the Petition for Extension of the Deadline for Commencement of Construction of the Russell City Energy Center

20 page(s)
 CEC/Docket UnitES&H/G. Wheatland
471717/23/2008 17 Responses to Public Comment Letters

18 page(s)
 CEC / Docket UnitCEC / M. Dyas
471467/18/2008 Letter from Audubon California

2 page(s)
 CEC / Docket UnitAudubon California / M. Perlmutter
469527/9/2008 Comments of Robert Sarvey RE Extension Request

3 page(s)
 CEC / Docket UnitR. Sarvey
469037/2/2008 Comment Letter & POS from East Bay Regional Park District Regarding Petition for Extension of the Construction Deadline

10 page(s)
 CEC/Docket UnitEast Bay RPD/L. Tong
468897/2/2008 J.V McCarthy's Comments RE: Airport Issues

2 page(s)
 CEC / Docket UnitJ.V. McCarthy
468887/2/2008 Corrected Letter from California Native Plant Society RE: Application for Extension

5 page(s)
 CEC / Docket UnitCNPS / L. Baker, L. Naumovich
468877/1/2008 Citizens Committee to Complete the Refuge's Comments RE Construction Deadline

2 page(s)
 CEC / Docket UnitCCCR / F. LaRiviere
468717/1/2008 Group Comments Regarding Petition to Extend Construction Deadline for RCEC Project; and Group Demand for Evidentiary Hearing

9 page(s)
 CEC/Docket UnitGroup Objectors/J. Hargleroad
468677/1/2008 Comment Letter Regarding Calpine Corp's Extension Request

1 page(s)
 CEC/ Dockets UnitSCVAS/ B. Power
468667/1/2008 Written Comments on behalf of Local Green Energy Alliance regarding RCEC

6 page(s)
 CEC/ Docket UnitPacific Environmental/ R. Cox
468657/1/2008 Chabot-Las Positas Community College District's Written Comments & Objections RE Petition to Extend Construction Deadline

7 page(s)
 CEC/ Docket UnitChabot-Las Positas CCD/ A. Kachalia
468536/30/2008 County of Alameda's Comments on RCEC LLC's Petition for Extension of Deadline for Commencement of Construction

15 page(s)
 CEC/ Docket UnitCounty of Alameda/ A. Massey
468526/30/2008 Cmts on Applicant's Petition for Extension of Deadline

300 page(s)
 CEC/ M. DyasR. Simpson
468496/30/2008 Letter from the AOPA regarding the RCEC Request for Extension of Construction Start Date

1 page(s)
 CEC/ Docket UnitAOPA/ J. Collins
468226/30/2008 Letter Regarding the Review of the Notification of Petition to Extend the Construction Deadline

7 page(s)
 CEC/ Docket UnitEast Bay Regional Park District/ L. Tong
468206/30/2008 Letter from the Hayward Area Shoreline Planning Agency RE comment period extension

1 page(s)
 CEC/ M. DyasHASPA/ C. Severin
468036/25/2008 Audubon California comment letter RE biological impacts

2 page(s)
 CEC/ Docket UnitAudubon California/ M. Perlmutter
468006/24/2008 COmment letter from a Member of the Public regarding RCEC

1 page(s)
 CEC/ Docket UnitMember of the Public
467966/16/2008 Letter from EBCNPS: Request for notification of regulatory proceedings with the CEC

1 page(s)
 CEC / Docket UnitEBCNPS / L. Naumovich
467946/25/2008 Letter from National Audubon Society RE: Delays

3 page(s)
 CEC / Docket UnitNAS / R. Cimino
466836/13/2008 Notice of Receipt - Petition to Extend Construction Deadline

3 page(s)
 CEC / Docket UnitCEC / M. Dyas
466746/11/2008 Email from Jewell Hargleroad RE: RCEC's Petition

1 page(s)
 CEC / M. DyasJewell Hargleroad
465205/30/2008 Petition for Extension of Deadline for Commencement of Construction

4 page(s)
 CEC/ Docket UnitEllison, Schneider & Harris LLP/ J.D. Harris
4385012/21/2007 Email from S. Gill RE: Petition to Reconsider the Approval of Russell City Energy Center.

1 page(s)
 CEC / Docket UnitS. Gill
4380912/18/2007 Email to Commissioner Byron from Felicia Oliveras in Opposition to Russell City and Eastshore Power Plants

1 page(s)
 CEC / J. ByronFelicia Olivares
4363312/7/2007 Application of PG&E For a Certificate of Public Convenience and Necessity to Construct the Russell City-Eastshore 230 KV Transmission Line

580 page(s)
 CEC/Docket UnitPG&E/J. Lambert
4330211/9/2007 Close of Administrative Record for Russell City Energy Center Amendment

1 page(s)
 CEC / Docket UnitCEC / R. Ratliff
4328111/8/2007 Declaration of Carol Ford in Support of Group Petitoners' Petition to Intervene, Reopen and Reconsideration

3 page(s)
 CEC / Docket UnitCalifornia Pilots Association / C. Ford
4328011/8/2007 Declaration of Michael Toth in Support of Group Petitioners' Reply to Commission Staff's Opposition to Petition to Intervene, Reopen and Reconsideration

7 page(s)
 CEC / Docket UnitResident of Hayward / M. Toth
4327811/7/2007 Order Denying Petition for Intervention and Denying Petitions for Reconsideration, Etc.

9 page(s)
 CEC / Docket UnitCEC / Commissioners
4326811/7/2007 Petition dated 10-25-07 to reconsider approval of Russell City Energy Center.

44 page(s)
 CEC / Docket UnitPetitioners
4326511/7/2007 Department of Transportation Federal Aviation Administration Grant Agreement Part 1 - Offer

5 page(s)
 COHFAA
4326411/7/2007 Hayward Executive, CA; AIP Project No. 3-06-0103-14; Grant Offer

4 page(s)
 COH / R. DubarryFAA / A. Richards
4321511/5/2007 Certification of Completion of Mt. Eden Reorganization Phase I

1 page(s)
 County of Alameda / County RecorderLocal Agency Formation Commission / C. Hishida Graff
4321411/5/2007 Summary Action Minutes Alameda Local Agency Formation Commission Special Meeting

3 page(s)
 CEC / Docket UnitCEC
4320511/5/2007 Email from Carolyn L. Arnold in Opposition to the Russell City Power Plant

1 page(s)
 CEC / J. ByronOffice of Institutional Research and Grants / C. L. Arnold
4318011/1/2007 Request for Russell City Amendment Mailing Lists and Notices for Agency Participation

19 page(s)
 County Development Agency/J. SorensenCEC/R. Ratliff
4314110/31/2007 Opposition to the Petitions to Intervene of the County of Almeda, The Chabot-Las Positas Community College District and the Group Petitioners

98 page(s)
 CEC / Docket UnitEllison, Schneider & Harris LLP / K. Mitchell
4314010/31/2007 Opposition to the Petitions for Reconsideration of the County of Almeda, The Chabot-Las Positas Community College District and the Group Petitioners

37 page(s)
 CEC / Docket UnitEllison, Schneider & Harris, LLP / K. Mitchell
4313110/31/2007 Commission Staff Response to Petitions For Reconsideration and Intervention

38 page(s)
 CEC/Docket UnitCEC/R. Ratliff
4312910/31/2007 Intervenor's Objection and Response to Petitions to Intervene and Reconsideration

8 page(s)
 CEC / Docket UnitPaul N. Haavik
4310410/29/2007 Email From Dr. P. Wilkins Regarding Russell City Project in Hayward

1 page(s)
 CEC/Docket UnitDr. P. Wilkins
4310310/29/2007 Memo re Date for CEC Consideration of Intervention and Reconsideration Petitons Filed by Alameda County, Group Petitoners, and Chabot College Revised Deadline and Instructiond for Submittal of Responses to Petition

5 page(s)
 CEC / Russell City Energy POS ListCEC / P. Kramer
4309910/26/2007 Chabot-Las Positas Community College District's Petiton to Re-Open the Administrative Proceedings; To Re-Open the Evidentiary Record; For Reconsideration of Energy Commission Decision; and For Stay of Final Decision

11 page(s)
 CEC / Docket UnitLiebert Cassidy Whitmore / S. Solomon
4309810/26/2007 Petition by Chabot-Las Positas Community College District for Intervention as an Agency

7 page(s)
 CEC / Docket UnitLiebert Cassidy Whitmore / L. Schulkind
4308310/26/2007 Declaration of Chancellor Joel L. Kinnamon in Support of Intervenor Chabot-Las Positas Community College Districts Motion to Intervene and Consideration and Stay

4 page(s)
 CEC / Docket UnitLiebert Cassidy Whitmore / Dr. J. Kinnamon
4308210/26/2007 Proof of Service

4 page(s)
 CEC / Docket UnitLiebert Cassidy Whitmore / L. Gaddi
4308110/26/2007 Group Petitioners Objections to Final Decision Effective Septemeber 26, 2007

2 page(s)
 CEC / Docket UnitLaw Offices of Jewell J. Hargleroad on behalf of Group Petitioners
4308010/26/2007 Group Petitioners Objections to Final Decision Effective September 26, 2007

5 page(s)
 CEC / Docket UnitLaw Offices of Jewell J. Hargleroad /Group Petitioners
4307510/26/2007 Comments opposing Russell City Power Plant

1 page(s)
 CEC / Docket UnitNanette Aldana
4306810/26/2007 Date for CEC Consideration of Intervention and Reconsideration Petition Filed by Alameda County

1 page(s)
 CEC / Docket UnitCEC / P. Kramer
4305610/26/2007 Group Petitioners's Petition to Intervene

7 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4305510/26/2007 Declaration of Gary Cathey in support of Group Petitioners' Petition to Intervene

6 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4305410/26/2007 Declaration of Jay White in Support of Group Petitioners' Petition to Intervene

7 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4305310/26/2007 Declaration of Tom Kerston in Support of Group Petitioners' Petition to Intervene

5 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4305110/26/2007 Memorandum of Points and Authorities in Support of Group Petitioners' Petition to Intervene

18 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4305010/26/2007 Declaration of Michael Toth in Support of Group Petitioners' Petition to Intervene

15 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4304910/26/2007 Declaration of Sherman Lewis in Support of Group Petitioners' Petition to Intervene

6 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4304810/26/2007 Declaration of jewell Hargleroad in Support of Group Petitioner's Petition to Intervene

48 page(s)
 CEC / Docket UnitLOOJH / J. Hargleroad
4304710/26/2007 Declaration of Andrew Wilson III in Support of Group Petitioners' Petition to Intervene

25 page(s)
 CEC / Dockets UnitLOOJH / J. Hargleroad
4304610/26/2007 Proof of Service of Petitions to Intervene

6 page(s)
 CEC / Dockets UnitLOOJH / J. Hargleroad
4304510/26/2007 Attorney POS of Petitions to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration; Petition Re Financial Hardship; Request for Stay of Compliance Proceedings; and Supporting Declarations of White, Cathey, Toth, Lewis and Hargleroad

6 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4304410/26/2007 Declaration of G. Cathey in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration

6 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4304210/26/2007 Declaration of J. White in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration

4 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4304110/26/2007 Declaration of S. Lewis in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration

3 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4304010/26/2007 Declaration of T. Kerston in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration

2 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4303910/26/2007 Memorandum of Points and Authorities in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration; and Request for Stay of Compliance Proceedings

18 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4303810/26/2007 Group Petitioners' Petition to Intervene as a Group to Reopen the Adminstartive Prodeedings, Reopen the Evidentiary Record and for Reconsideration; and Petition Re Financial Hardship

7 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4303710/26/2007 Declaration of A. Wison III in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Proceedings, Reopen the Evidentiary Record and for Reconsideration

4 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4303610/26/2007 Declaration of J. Hargleroad in Support of Group Petitioners' Petition to Intervene, Reopen the Administrative Prodeedings, Reopen the Evidentiary Record and for Reconsideration

3 page(s)
 CEC/Docket UnitLaw Office of J. Hargleroad
4297910/23/2007 Declaration of James Sorensen

26 page(s)
 CEC / Docket UnitCounty of Almeda / J. Sorensen
4297810/23/2007 Petition for Intervention as an Agency or Individual

9 page(s)
 CEC / Docket UnitAttorneys for the County of Almeda / A. Massey
4297710/23/2007 Petition for Re-Opening, Reconsideration, Request for Stay

14 page(s)
 CEC / Docket UnitAutorneys for the County of Almeda / A. Massey
4268210/5/2007 Letter to the Members of the CEC from the Residents of Hayward regarding a few objections to the proceeding

1 page(s)
 CEC/ P. KramerHayward Residents/ K. Finn/ J. Spalding/ K. Lall/ J. Gutierez/ E. Pacheco
4263710/3/2007 Notice of Availability of the Commission Decision

4 page(s)
 CEC / Docket UnitCEC / M. Read
4259810/2/2007 Final Commission Decision Including Adoption Order

223 page(s)
 CEC / Docket UnitCEC / Commissioners
425759/28/2007 Commission Adoption Order

3 page(s)
 CEC / Docket UnitCEC / Energy Commissioners
425629/28/2007 Notice of Decision by CEC

1 page(s)
 CEC / Docket UnitCEC / L. Shaw
425319/27/2007 Letter of opposition to the proposed RCEC, pack #2

2 page(s)
 CEC/ L. ShawThe Public
425149/26/2007 RCEC Impact on Hayward Executive Airport

7 page(s)
 CEC / J. AdamsU.S. DOT / FAA
425119/25/2007 Tax Exchange Agreement with the Alameda County Redevelopment Agency

9 page(s)
 Mayor and City CouncilCity of Hayward, CA / J. Armas
425109/25/2007 Noticing of Amendment

1 page(s)
 CEC / Docket UnitCEC / S. Strattan
425099/25/2007 Report of Conversation - Jurisdictional Authority over Mt. Eden annexed lands

1 page(s)
 CEC / Docket UnitCEC / S. Strattan
425089/25/2007 Report of Conversation - Jurisdictional Authority over Mt. Eden annexed lands

1 page(s)
 CEC / Docket UnitCEC / S. Strattan
425079/25/2007 Report of Conversation - FAA - National Flight Data Center

1 page(s)
 CEC / Docket UnitCEC / S. Strattan
425059/25/2007 Letter from HAPA

5 page(s)
 CEC / J. PfannenstielHAPA / S. Lewis
425039/25/2007 S. Barba

4 page(s)
 CEC / Docket UnitLeague of Women Eden Area
424939/25/2007 Report of Conversation - Comments on RCEC

1 page(s)
 CEC / Docket UnitCEC / L. Shaw
424929/25/2007 Report of Conversation - Comments on RCEC

1 page(s)
 CEC / Docket UnitCEC / L. Shaw
424919/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitJ. Gonzalez
424909/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitS. Cabrera
424899/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitE. Garcia
424889/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitA. Vea
424879/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitD. Zambrano-Vasquez
424869/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitJ. Barrera
424859/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitY. Lutierros
424849/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitR. Campos
424839/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitM. Nava
424829/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitG. Romero
424799/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitE. Ramos
424779/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitE. Cuevas
424749/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitS. Ruiz
424719/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitJ. Nunez
424709/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitBrendon
424699/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitM. Cardenas
424679/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitK. Osorio
424639/25/2007 Opposition Letter RE the Poposed HPP

1 page(s)
 CEC / Docket UnitJ. Ibal
424609/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitL. Gonzalez
424589/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitS. Pena
424569/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitF. Fausto
424529/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitA. Martinez
424509/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitJ. Maldonade
424489/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitC. Katoa
424459/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitR. Martinez Jr.
424439/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitW. Gracia
424409/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitP. Moreno
424379/25/2007 Opposition Letter RE the Proposed HPP

1 page(s)
 CEC / Docket UnitG. Plascencia
424359/25/2007 Opposition Letter RE Proposed HPP

1 page(s)
 CEC / Docket UnitM. Orozco
424339/25/2007 Opposition Letter RE Proposed HPP

1 page(s)
 CEC / Docket UnitChabot College / V. Teran
424249/24/2007 Opposition Letter from Sierra Club

5 page(s)
 CEC / P. KramerSierra Club / D. Hanna
424199/24/2007 Letter of Opposition for the Russell City Energy Plant

1 page(s)
 CEC/ L. ShawHayward Resident/ M. Soymani
424189/24/2007 Letter of Opposition for the Proposed Russell City Energy Center.

2 page(s)
 CEC/ L. ShawHayward Resident/ S. Carr
424129/24/2007 Letter Regarding Request to Delay any Decision to Approve RCEC so County may Review Comments

5 page(s)
 CEC / J. PfannestielAlmeda County Community Development Agency / J. Sorensen
423809/21/2007 Letter from A. Lai-Bitker RE to Continuance on the RCEC

4 page(s)
 CEC / J. PfannenstielAlameda County Board of supervisors / A. Lai-Bitker
423629/20/2007 Letters of Opposition to proposed RCEC, pack #1

4 page(s)
 CEC/ L. ShawThe Public
423539/19/2007 FAA Writeen Response Regarding Hayward Powerplant Issue

7 page(s)
 CEC / P. KramerFAA / L. Suttmeier
423149/14/2007 Letter to Commissioners from Calpine Urging Final Action on PMPD at September 26 Business Meeting

5 page(s)
 CEC / CommissionersCalpine Corporation / R. Thomas
423109/14/2007 Report of Conversation - Aviation Concerns Related to RCEC

1 page(s)
 CEC / Docket UnitCEC / J. Adams
422989/14/2007 Report of Conversation with G. Aiken/FAA regarding Aviation concerns related to RCEC

1 page(s)
 CEC/ Dockets UnitCEC/ J. Adams
422949/13/2007 Filing of Notice of Decision in Compliance with PRCS 21080.5 and Title 20, CA Code of Regulations, Section 1768

1 page(s)
 CEC / Docket UnitCEC / L. Shaw
422879/13/2007 Email Regarding Additional Information on Aviation Hazards

1 page(s)
 FAA Western-Pacific Region / G. AikenCEC / P. Kramer
422759/13/2007 E-mail regarding concern over the two power plants proposed for Hayward

1 page(s)
 CEC/ Media OfficeL.G. Parado
422659/12/2007 Additional Information - Russell City Energy Center Comments

1 page(s)
 CEC / P. KramerManager, Safety and Standards Branch / G. Aiken
422649/12/2007 Project Owner's Comments on the PMPD Condition of Certification TRANS-10

1 page(s)
 CEC / Docket UnitCH2M HILL / D. Davy
422639/12/2007 TCEC Amendment No. 1 Project Owner's Comments on Condition of Certification TRANS-10

2 page(s)
 CEC / P. KramerProject Owner
422629/12/2007 Power Plant

1 page(s)
 CEC / P. KramerD.D.S. / W. Skinner
422619/12/2007 City of Hayward Comments For Russell City Commission Hearing

1 page(s)
 CEC / P. KramerHayward / Director of Public Works / B. Bauman
422609/12/2007 Hayward, CA Calpine Plant - Stop It

1 page(s)
 CEC / Docket UnitP. Guernsey / Hayward
422589/12/2007 RCEC Amended Application - Proposed Construction of A Power Plant in Hayward

2 page(s)
 CEC / P. Kramer / J. Pfannenstiel / J. Boyd / J. Geesman / A. Rosenfeld / J. ByronHayward City / T. Kersten
422559/12/2007 Additional Information - Russell City Energy Center Comments

1 page(s)
 CEC / P. KramerManager, Safety and Standards Branch / G. Aiken
422529/11/2007 Letter from B. Rogers - RCEC - Amendment Proceeding

2 page(s)
 CEC / P. KramerB. Rogers
422519/11/2007 Letter from T. Kersten

3 page(s)
 T. KerstenCEC / P. Kramer
422509/11/2007 Letter from A. LePell

1 page(s)
 CEC / P. KramerA. LePell
422369/10/2007 Project Owner's Comments on Condition of Certification Trans-10

6 page(s)
 CEC / Docket UnitEllison, Schneider & Harris LLP / G. Wheatland
422359/10/2007 Errata and Revisions to the PMPD, POS attached

14 page(s)
 POS ListCEC/ J. Byron/ J. Geesman
422139/7/2007 Comments on Russell City Energy Center Presiding Member's Proposed Decision

4 page(s)
 CEC / J. Geesman / J. ByronDowney Brand Attorneys LLP
422119/7/2007 CEC Commission Staff Comments on PMPD (01-AFC-7C)

1 page(s)
 CEC / J. Geesman / J. ByronCEC
422099/7/2007 Intervener's Comments to Paul Kramar on Comments on the Proposed Decision, Russell City Plan Amendent.

6 page(s)
 CEC / Docket UnitP. Haavik / Intervener
421838/31/2007 Project Owner's Comments on the Presiding Member's Proposed Decision

15 page(s)
 CEC / Docket UnitEllison, Schneider & Harris LLP / G. Wheatland
421818/31/2007 Letter of Opposition for the proposed Russell City Energy Plant

1 page(s)
 CEC/ L. ShawAl and Kindra Mendall
421668/31/2007 Order Approving Extension of Deadline for Commencement Construction

1 page(s)
 CEC / Docket UnitCEC / J. Pfannenstiel
420268/24/2007 Notice of Availability of the Presiding Members Proposed Decision Notice of Committee Conference Notice of Further Evidentiary Hearing Notice of Commission Hearing

6 page(s)
 CECCEC / J. Geesman / J. Byron
419818/21/2007 Letter of opposition for the Russell City Energy Center.

3 page(s)
 CEC/ P. KramerHayward Resident/ J. Gardiner
419508/17/2007 ALUC Commissioner Needle Comments on RCEC

2 page(s)
 CEC / J. Adams / E. KnightACCDA / D. Needle
419498/17/2007 The Airport Land Use Commission of Alameda County Resolution

4 page(s)
 CEC / L. ShawACALUC / S. Grossman
419388/17/2007 Response to L. Adams Letter dated July 3, 2007

3 page(s)
 CEC/ P. KramerCalifornia Pilots Association/ C. Ford
419378/17/2007 Email Regarding Opposition to RCEC

1 page(s)
 CEC / P. KramerC. Watters
419148/15/2007 Letter of opposition to the proposed RCEC and EEC.

1 page(s)
 CEC/ B. PfannerC. Watters
418998/13/2007 Notice of Decision

1 page(s)
 California Resources AgencyCEC/ L. Shaw
418978/13/2007 TEST TEST TEST

1 page(s)
 ceccec
418928/13/2007 R. DeBiaso's Letter in Opposition of Proposed RCEC and EEC

1 page(s)
 CEC / P. KramerR. DeBiaso
418898/13/2007 Notice of Receipt Petition to Extend the Deadline for Commencement of Construction

3 page(s)
 CEC / Docket UnitCEC / R. Johnson
418798/13/2007 E-mail - Opposition to proposed RCEC and EEC

1 page(s)
 CEC/ B. PfannerV. Rodriguez
418448/8/2007 Email to C. Ford re: Invitation to the ALUC meeting to provide testimony.

1 page(s)
 CEC/ J. AdamsSBC Global/ Carol Ford
418078/6/2007 Order Approving Transfer of Ownership to Russell City Energy Company, LLC

1 page(s)
 CEC / Docket UnitState of California Energy Resources Conservation And Development Commission/J. Boyd
417948/3/2007 CPA and SCAPA's request to not approve the amendment for RCEC.

4 page(s)
 CEC/ P. KramerCPA/ C. Ford
417938/3/2007 E-mail regarding Alameda County Airport Land Use Commission Hearing on the RCEC Amendment

1 page(s)
 CEC/ P. KramerAlameda County CDA/ C. Horvath
417888/3/2007 Request for Comments on the RCEC 145-foot Above Level Exhaust Stacks

3 page(s)
 CEC/ J. AdamsUS Dept of Transportation / J. Rodriguez
417878/3/2007 Letter opposing RCEC Construction

2 page(s)
 CEC / J. AdamsAircraft Owners and Pilots Association / B. Dunn
417638/1/2007 Charlie Cameron Letter received Jan 19, 07 re: Russell City

5 page(s)
 CEC/ L. ShawCharlie Cameron
417628/1/2007 Letter from Don Gills Opposing the RCEC Project.

2 page(s)
 CEC/ L. ShawDon Gills
417568/1/2007 Letter from the Bristow's Opposing RCEC.

4 page(s)
 CEC/ L. ShawThe Bristow's
417548/1/2007 Letter from Audry Clark Opposing RCEC.

2 page(s)
 CEC/ L. ShawAudry Clark
417538/1/2007 Letter from the Kring's Opposing the RCEC Project.

2 page(s)
 CEC/ L. ShawDaniel & Katia Kring
417528/1/2007 Letter from Kathy Gamez, Opposing the RCEC Project.

2 page(s)
 CEC/ L. ShawKathy Gamez
417518/1/2007 Letter opposing the RCEC Project in Hayward, CA

2 page(s)
 CEC/ L. ShawR. Mahood
417417/31/2007 Evidentary Hearing Before the CEC and Development Commission for Modification of Application for RDEC

289 page(s)
 CEC / Docket UnitP. Petty
417407/31/2007 CEC- Prehearing for RCEC Regarding Modification of the Application for Certification

22 page(s)
 CEC / Docket UnitP. Petty
417397/31/2007 RCEC Request to Change some ERC's Dedicated to RCEC

6 page(s)
 CEC / J. Geesman / J. ByronEllison, Schneider & Harris /
417357/31/2007 RCEC Petition to Change Ownership

5 page(s)
 CEC / K. BellG. Wheatland
417087/27/2007 Declaration of P. Richins; POS attached

4 page(s)
 POS list/ CEC/ Dockets UnitCEC/ J. Preis/ P. Richins
417077/27/2007 Modification of Certification for the Russell City Energy Center

7 page(s)
 CECCEC / J. Preis
417067/27/2007 Waste and transmission Conditions

5 page(s)
 CEC / Docket UnitRussell City Energy Center / K. Bell
416687/25/2007 Petition for extension of deadline for commencement of construction for the Russell City Energy Center

6 page(s)
 CECEllison Schneider & Harris L.L.P/ G. Wheatland
416647/25/2007 Letter of oposition for the proposed Russell City Energy Center

1 page(s)
 CEC /B. PfannerL. Ramsay
416637/25/2007 Russell City Energy Center Amendment-Elimination of the "Wave"

3 page(s)
 CEC / E. KnightCity of Hayward / F. David
416557/25/2007 Testimony Regarding Thermal Plumes and Aviation-Cumulative Impacts

5 page(s)
 CEC/ Dockets UnitCEC/ M. Read
416547/25/2007 Assurances Airport Sponsors

14 page(s)
 CEC/ Dockets UnitCEC/ M. Read
416327/23/2007 Memo re: Document handling for the Staff Assesment for the Russell City Energy Center Amendment

3 page(s)
 CEC/ LibrarianCEC/ R. Johnson
416307/23/2007 Report of Conversation with Hayward Executive Airport Operations re: Noise abatement procedures

1 page(s)
 CEC/ Dockets UnitCEC/ J. Adams
415877/18/2007 Intervener's Prehearing Conference Testimonies of C. Ford and D. Stark, for the RCEC; POS attached.

10 page(s)
 CEC/ Dockets UnitP. Haavik
415867/20/2007 Comments for the July 9, 2007 Request for Comments on the RCEC 145-Foot Above Ground Level Exhaust Plume

3 page(s)
 CEC/ J. AdamsFFA/ J. Rodriguez
415847/20/2007 RCEC Amendment- Elimination of the "Wave"

1 page(s)
 CEC/ E. KnightCity of Hayward/ F. David
415757/19/2007 Staff Assessment Tech Area Had Mat Mgm

9 page(s)
 CEC/Docket UnitCEC/ A. Greenberg
415747/19/2007 William Walters Resume

4 page(s)
 CEC/Docket UnitW. Walters
415707/19/2007 ROC regarding Pilots & Flying

1 page(s)
 CEC/Docket UnitCEC/J. Adams
415697/19/2007 ROC regarding Pilots & Flying

1 page(s)
 CEC/Docket UnitCEC/J. Adams
415687/19/2007 ROC regarding Pilots & Flying

1 page(s)
 CEC/Docket UnitCEC/J. Adams
415677/19/2007 ROC regarding Pilots & Flying

1 page(s)
 CEC/Docket UnitCEC/J. Adams
415637/18/2007 RCEC Amendment no. 1 Energy Commission Staff Errata to Staff Assessment Part 1 and 2

41 page(s)
 CEC/ J. Geesman/ J. ByronCEC/ Lance Shaw
415527/18/2007 Comment letter from the department regarding RCEC.

2 page(s)
 CEC/ J. AdamsDept. of Transportation/ G. Cathey
415497/18/2007 Letter from the AOPA regarding the Staff Assessment.

2 page(s)
 CEC/ J. AdamsAOPA/ B. Dunn
415487/17/2007 Staff's Pre-Hearing Conference Statement; POS attached.

6 page(s)
 POS/ CEC/ Dockets UnitCEC/ R. Ratliff
415457/16/2007 Letter RE concerns about RCEC and EEC.

1 page(s)
 CEC/ W. PfannerL. Umeh
415367/16/2007 RCEC Testimony, Exhibits 2 through 16 & 30 Amendment 1

70 page(s)
 CEC/L. ShawCH2MHill/D. DAvy
415357/16/2007 Project Owner's Prehearing Conference Statement, POS attached.

11 page(s)
 CEC/ Dockets UnitEllison, Schneider & Harris/ G. Wheatland
415347/16/2007 Original and 12 copies of Intervener's Prehearing Conference Statement, for the RCEC, POS attached.

92 page(s)
 CEC/ Dockets UnitP. N. Haavik
415227/16/2007 Testimony Regarding Plumes and Aviation

67 page(s)
 CEC/L. ShawCH2MHill/D. Davy
415097/13/2007 Plume Vertical Velocity Assessment - Addendum 2, prepared by Katestone Environmental; POS attached.

12 page(s)
 CEC/ L. ShawCH2MHILL/ J. Harris for D. Davy
415007/13/2007 Renewal of Request for an official, full-size copy of the Airport Approach Zoning Plan Map.

1 page(s)
 City of Hayward Public Works Dept./ R. BaumanCEC/ S. Strattan
414997/13/2007 Letter of response and Comments re PDOC for the RCEC.

75 page(s)
 CEC/ P. RichinsBay Area AQMD/ J. Broadbent
414987/13/2007 Letter of opposition for the Russell City Energy Center and request to comment on the July 18, 2007 Traffic and Transportation Supplement

2 page(s)
 CEC/ L. ShawCATS/ A. Lepell
414967/13/2007 Russell City Energy Center Amendment No. 1 Comments on Staff Assessment, Parts 1 and 2

8 page(s)
 CEC/CEC/ Dockets UnitRCEC
414757/11/2007 Letter of Opposition for the Proposed Russell City Energy Center.

2 page(s)
 CEC/ B. PfannerMr. & Mrs. S. Vierra
414687/11/2007 Amended Final Determination of Compliance-Bay Area Air Quality Management District Application 15487

71 page(s)
 CEC/ M. ErecartCEC/ L. Shaw
414557/10/2007 Report by Katestone, titled "Plume Vertical Velocity Assessment of a Proposed Gas-Fired Power Station at RCEC" (final); "Plume Vertical Velocity Assessment of a Proposed Gas-Fired Power Station at RCEC - Addendum"; POS attached

100 page(s)
 CEC/ L. ShawCH2MHILL/ J. Harris for D. Davy
414467/9/2007 Letter of opposition from A. Rosan regarding RCEC and EEC.

1 page(s)
 CEC/ B. PfannerA. Rosan
414247/6/2007 All Parties Letter with updated POS list.

4 page(s)
 All PartiesCEC/ C. Hillhouse
414207/3/2007 Opposition letter from a member of the public.

2 page(s)
 CEC/ B. PfannerS. Velez
414187/3/2007 Opposition letter from a member of the public.

1 page(s)
 CEC/ B. PfannerS. Siegfried
414167/3/2007 Opposition letter from a member of the public.

1 page(s)
 CEC/ B. PfannerL. White
414157/5/2007 Seven Letters from James Adams

10 page(s)
 M. Blakely/ D. Rizk/ C. Ford/ G. Cathey/ M. McClardy/ C. Horvath/ A. RichardsCEC/ J. Adams
413806/29/2007 Staff Assessment - Part 1 and 2 combined

494 page(s)
 CEC/ Dockets UnitCEC/ M. Errecart
413437/2/2007 Opposition letter to the RCEC & EEC

1 page(s)
 CEC/B. PfannerM. Loera
413427/2/2007 Opposition letter to the RCEC & EEC

1 page(s)
 CEC/B. PfannerL. Hillery
413417/2/2007 Opposition letter to the RCEC & EEC

1 page(s)
 CEC/B. PfannerY. Gillian
413407/2/2007 Opposition Letter from B. Turner & K. Brown on RCEC & EEC

1 page(s)
 CEC/B. PfannerB. Turner/K. Brown
413397/2/2007 Opposition letter from U. Husaini on RCEC & EEC

1 page(s)
 CEC/B. PfannerU. Husaini
413387/2/2007 Opposition letter on RCEC & EEC from K. Prasad

2 page(s)
 CEC/B. PfannerK. Prasad
413377/2/2007 Notice of Staff Assessment Workshop for RCEC Amend. No. 1

4 page(s)
 CEC/Docket UnitCEC/T. O'Brien
413367/2/2007 Committee Order Granting Petition to Intervene

4 page(s)
 CEC/Docket UnitCEC/J. Geesman/J. Byron
412896/29/2007 Email of Response to B. Flowers re Proposed Energy Plant in Hayward

2 page(s)
 B. FlowersCEC/ P. Kramer
412876/27/2007 Letter of Opposition to the proposed Russell City Energy Center

1 page(s)
 CEC/ Public AdvisorHayward Resident/ S. Siegfried
412796/29/2007 Response letter from J. Armas regarding Airport Approach Zoning Regulations pertaining to Russell City Energy Center.

6 page(s)
 CEC/ S. StrattenCity of Hayward/ J. Armas
412716/27/2007 Letter of Opposition for the Proposed Russell City Energy Center

1 page(s)
 CEC/ B. PfannerM. Hurlbert
412696/25/2007 Letters of Opposition for the Proposed Russell City Energy Center

9 page(s)
 CEC/ B. PfannerThe Public
412676/25/2007 Letter of Opposition for the Proposed Russell City Energy Center

1 page(s)
 CEC/ B. PfannerC. Freeman Stamper
412656/25/2007 Letter of Opposition for the Proposed Russell City Energy Center

1 page(s)
 CEC/ B. PfannerR. Notrangelo
412346/28/2007 (Revised) Notice of Prehearing Conference and Evidentiary Hearing

7 page(s)
 CEC/ Interested PartiesCEC/ J. Geesman/ J. Byron
411996/27/2007 Request for Informal Consultation under Section 7 of the Endangered Species Act, with POS (by D. Tercero).

16 page(s)
 USFWS/ R. OlahUSEPA/ G. Rios
411786/25/2007 Notice of Prehearing Conference and Evidentiary Hearing

7 page(s)
 CEC/Docket UnitCEC/J Geesman/J Byron
411486/22/2007 Follow-Up Email to Russell City Assessment - Level of Risk

1 page(s)
 City of Hayward/D. RizkCEC/ S. Strattan
411056/22/2007 Plume Vertical Velocity Assesment of a Proposed Gas-Fired Power Station at RCEC Atmospheric Dynamics Pty LtdJune 2007 Draft- Revision 1-dated June 15, 2007 & Revision 2 dated June 20, 2007.

55 page(s)
 CEC/Dockets UnitKatestone Environmental
411026/22/2007 Letter in response to May 2, 2007 CEC Request.

1 page(s)
 CEC/ E. KnightCity of Hayward/ D. Ritzk
410826/18/2007 Copy of Email from Livia Hillery re Opposition to EEC-RCEC

1 page(s)
 CEC/ PAOPepsico/ L. Hillery
410796/20/2007 Petition for Paul N. Haavik to be an Intervener for the Russell City Energy Center (POS attached, by P. Haavik).

7 page(s)
 CEC/ Dockets UnitP. Haavik
409936/14/2007 Notice of Receipt: Petition to Change Ownership of the RCEC Project.

3 page(s)
 Interested partiesCEC/ R. Johnson
409126/11/2007 (Second) Revised Committe Scheduling Order.

6 page(s)
 Dockets UnitCEC/ J. Geesman/ J. Byron
408986/8/2007 Report by Katestone Environmental, Toowong, Australia, titled "Plume Vertical Velocity Assessment of a Proposed Gas-Fired Power Station at RCEC"

61 page(s)
 CEC/ L. ShawCH2MHILL/ J. Harris for D. Davy
408676/7/2007 Updated POS list and labels.

4 page(s)
 CEC/ Dockets UnitCEC/ C. Hillhouse
407646/4/2007 Cooperation and option Agreement Re: Russell City Energy Center.

4 page(s)
 CEC/Dockets UnitCity of Hayward/ City Manager
407606/4/2007 Cooperation and option Agreement Re: Russell City Energy Center.

5 page(s)
 CEC/Dockets UnitCity of Hayward/City Manager
407546/4/2007 Proposed Energy Facility in Mt. Eden, Hayward

1 page(s)
 CEC/Dockets UnitBCDC/E.Sampson
407316/1/2007 Letter in response to the Committees' request for comments.

2 page(s)
 CEC/Geesman/ByronCity of Hayward/J.Armas
407206/1/2007 Commitee status conference comments.

5 page(s)
 CEC/J.Geesman/J.ByronCEC/L.Shaw
406955/31/2007 E-mail in Response to questions RE June 6 Status Conference (POS, by C. Hillhouse, attached).

4 page(s)
 CEC/ E. Dorman/ J. Ikle/ R. StraussCEC/ P. Kramer
406435/29/2007 Amended Preliminary Determination of Compliance

3 page(s)
 Bay Area AQMD/ J. BroadbentCEC/ P. Richins
405475/23/2007 Request to Reschedule Status Conference for RCEC Amendment # 1

5 page(s)
 CEC/ J. Geesman/J. ByronES&H/ G. Wheatland
405455/23/2007 Notice of Staff Data Response & Issue Resolution Workshop for Russell City Energy Center Amendment 1

3 page(s)
 CEC/Dockets UnitCEC/T. O'Brien
404855/18/2007 Notice of Committee Status Conference re Petition to Amend the CD Approving AFC on 6/06/07

9 page(s)
 CEC/Dockets UnitCEC/J. Geesman/J. Byron
404655/16/2007 Response to Status Report #2 re Petition to Amend CD

12 page(s)
 ES&H/G. Wheatland/J. HarrisCEC/Dockets Unit
403905/11/2007 Russell City Energy Center Status Report #2

5 page(s)
 CEC/J. Geesman/J. BryonCEC/L. Shaw
403555/9/2007 PG&E's Long Term RFO Projects

6 page(s)
 CEC/R. RodriquezGalati Blek/M. Cosens
403415/9/2007 Complete Mt. Eden Annexation Project FEIR.

101 page(s)
 CEC/Docket UnitCity of Hayward/Lead Agency
403395/9/2007 3/27/07 Letter with embedded SFBRWQCB comments by Mary Rose Cassa 4/30/07.

11 page(s)
 CEC/J. ScottLFR/C. Pardini/L. Goldstein
403385/9/2007 05/01/07 DTSC Comments by Janet Naito on feedback from LFR & SFBRWQCB.

3 page(s)
 CEC/Dockets UnitDTSC/J. Naito
402905/7/2007 ROC/Land use and transportation issues re clear air turbulence (CAT) from plumes.

1 page(s)
 CEC/Docket UnitCEC/S. Strattan
402545/3/2007 ROC-Russell City Waste

4 page(s)
 CEC/D. Edwards/D. Ratliff/L. Shaw/P. RichinsCEC/E. Townsend-Hough
402535/3/2007 RCEC License Amendment-City Conditions

4 page(s)
 City of Hayward/D. RizkCEC/E. Knight
402525/3/2007 Final Environmental Impact Report-Mt. Eden Annexation Project

28 page(s)
 CEC/Docket UnitCity of Hayward
401484/25/2007 City of Hayward Response to CEC Letter dated 3/16/07 RE: Land Use Issues

11 page(s)
 CEC/P. RichinsCity of Hayward/D. Rizk
401474/25/2007 Calpine Corp. Response to DTSC's Comments to Environ Document Related to Russell City

11 page(s)
 CEC/J. ScottLFR/C. Pardini/L. Goldstein
401374/24/2007 Petition for Ownership Change

2 page(s)
 CEC/Docket UnitRussell City Energy Co./R. Thomas
400544/18/2007 Update Email Distribution List

2 page(s)
 Docket UnitCEC/R. Yasny
400044/13/2007 Applicant's Response to Data Requests 73-96 and Workshop Queries 1-3

48 page(s)
 CEC/L. ShawCH2MHILL/D. Davy
400024/13/2007 Applicant's Comments on Preliminary Staff Assessment, Part 1 - Amendment 1

10 page(s)
 CEC/L. ShawCH2MHILL/D. Davy
399904/13/2007 Notice of Data Response & Issue Resolution Staff Workshop

3 page(s)
 CEC/Docket UnitCEC/T. O'Brien
399834/12/2007 RCEC Amendment 1 Data Requests 82-96

3 page(s)
 Docket UnitCEC/S. Yeh
399714/12/2007 BAAQMD Notiec Infiting Written Public Comment on PDOC

33 page(s)
 Docket UnitBAAQMD/J. Broadbent
399644/3/2007 Staff Assessment-Part 1 -- RCEC Amendment 1

192 page(s)
 Docket UnitCEC
399584/10/2007 RCEC Amendment 1 - Data Requests

3 page(s)
 Docket UnitCEC/S. Yeh
399334/9/2007 Updated POS

4 page(s)
 All PartiesCEC/C. Hillhouse
399194/6/2007 Document handling for Part 1 of the Staff Assessment for the Russell City Energy Center Amendment No.1

3 page(s)
 LibrarianCEC/R. Johnson
399184/6/2007 Request for Agency Participation in the Review of the Staff Assessment Part 1 for the Russell City Energy Center Amendment Petition No.1

1 page(s)
 Outside AgenciesCEC/R. Johnson
398784/4/2007 Revised Third Round Data Requests

8 page(s)
 Russell City Energy City Proof of Services ListCEC/J. Scott
398494/3/2007 Noticeof Availability: Staff Assessment - Part 1

3 page(s)
 Interested PartiesCEC/ R. Johnson
398404/2/2007 Third Round Data Requests for Russel City Amendment

7 page(s)
 Calpine/M. ArgentineCEC/J. Zene Scott
398213/30/2007 Notice of Data Response, Issue Resolution, Staff Assmt Workshop

4 page(s)
 Docket UnitCEC/T. OBrien
397853/28/2007 RCEC: FAA Determination

8 page(s)
 CEC/J. ScottCH2M HILL/D. Davy
397773/27/2007 Accident Records-Hayward

1 page(s)
 CEC/S. StrattonHayward/R. Bauman
397763/27/2007 New PDOC Date

1 page(s)
 CEC/T.NGOBAAQMD/W. Lee
397753/27/2007 Hayward Lead Agency Haz Waste

1 page(s)
 CEC/J.ScottCity of Hayward/J. Armas
397693/27/2007 ROC with CH2MHill regarding Cultural Resources Survey Locations.

1 page(s)
 Docket UnitCEC/ D. Torres
397553/23/2007 Russell City Response to Data Requests 16 & 55-72

1 page(s)
 CEC/J. Scott/Docket UnitCH2MHILL/D. Davy
397093/21/2007 Revised Committee Scheduling Order

1 page(s)
 Docket UnitCEC/Com. J. Geesman & J. Byron
396583/16/2007 Staff's Proposed Schedule for the Russell City Amendment

6 page(s)
 CEC/ P. KramerCEC/ R. Ratliff
396513/16/2007 CEC Land use issues letter to planning manager david rizk from paul richins

5 page(s)
 CofH/D.Rizk/CEC/ Docket UnitCEC/ P. Richins
396363/15/2007 Opposition Letter from K. Lall

1 page(s)
 CEC/Commissioner J. Geesman/Docket UnitM. Elliott/K.Lall
395633/12/2007 FAA letter to Ross Dubarry regarding russell city stack height.

2 page(s)
 HEA/R. DubarryFAA/ J. Rodriguez
395423/8/2007 Staff Requests Second Round Data Requests (#55-72).

10 page(s)
 Calpine/ M. HatfieldCEC/ J. Z. Scott
395373/8/2007 E-mail RE follow up on the filing of the Staff and Applicant status reports.

1 page(s)
 CEC/ A. Ichien/ D. Edwards/ D. Ratliff/ G. Wheatland/ J. ScottCEC/ P. Kramer
394773/2/2007 Response to CEC Staff Traffic and Transportation Data Requests 53 and 54.

6 page(s)
 CEC/ J. ScottCH2M Hill/ J. Harris for D. Davy
394743/2/2007 Applicant's Status Report #1, submitted in response to the Committee's order of December 21, 2006.

14 page(s)
 CEC/ Docket UnitEllison, Schneider & Harris LLP/ E. Janssen/ Calpine Corporation
394453/1/2007 Comments from the Department of Toxic Substances Control.

7 page(s)
 CEC/ J. ScottDTSC/ B. Cook
394072/27/2007 Russell city energy center status report #1

4 page(s)
 CEC/ Comm. Byron, GeesmanCEC/ J. Scott
393852/16/2007 Applicants Response to Data Request # 28. Cover Letter and POS Docketed. Full version saved to s drive.

4 page(s)
 CEC/J. ScottCH2Mhilll/ D. Davy
393692/22/2007 Letter RE Approval of Paleo Resources Application for Confidentiality.

2 page(s)
 Ellison, Schneider & Harris LLP/ G. WheatlandCEC/ B. B. Blevins
393452/21/2007 CH2M HILL RESPONSE TO RUSSELL CITY ENERGY CENTER ANALYSIS

8 page(s)
 CEC/DOCKETS UNITCEC/J. SCOTT
393282/20/2007 Fax Cover Letter with Letter from LMEC attached RE Comments on Proposed Amendment to Los Medanos Decision.

3 page(s)
 CEC/ J. ScottCalpine/ Los Medanos E.C./ C. German
392572/13/2007 Final Interconnection Approval

3 page(s)
 PG&E/ C. GillisCalifornia ISO/ G. DeShazo
392412/13/2007 ROC with D. Davy/ CH2M Hill RE Traffic and Transportation.

2 page(s)
 Docket UnitCEC/ J. Scott
392402/13/2007 ROC regarding Land Use and Transportation Issues re CAT from plumes

1 page(s)
 Docket UnitCEC/ S. Strattan/ J. Scott
392382/9/2007 ROC report of conversation: Project impacts on hayward executive airport.

1 page(s)
 CEC/ Docket UnitCEC/ J. ADams
392232/8/2007 RCEC Water Quality Data Responses.

206 page(s)
 Docket UnitCEC/ J. Scott
391842/5/2007 Responses from pg&e to follow up trasmission questions.

19 page(s)
 CEC/J. ScottCH2MHill./ D. Davy
391822/5/2007 Comments from Janet Niato of DTSC.

12 page(s)
 CEC/ J. ScottCEC/ E. Townsend-Hough
391782/5/2007 Revised Figure 2.1-1

2 page(s)
 CEC/J. ScottCh2Mhill/ D. McDavy
389481/17/2007 Applicant's Responses to Staff Data Requests 1-52. Cover letter docketed, transmittal letter, and attached POS.

691 page(s)
 CEC/ J. ScottCH2M Hill/ D.M. Davy
388801/5/2007 Email from doug davy to jeri scott

1 page(s)
 CH2MHill/ D. DavyCEC/ J. Scott
388091/3/2007 Notice of public information hearing and site visit.

6 page(s)
 CEC/ Dockets UnitCEC/ J. Scott
388051/2/2007 Letter Re; Post card Dated 12-16-06 Requesting a hard copy of the Record of Decision for the Russell City Energy Center dated September 11, 2002.

1 page(s)
 Charlie CameronM. A. Errecart /CEC
388021/2/2007 Return of Notice of Public Information Hearing and Site Visit with writing expressing complaints.

1 page(s)
 Jeri ScottCharlie Cameion
3878412/28/2006 Transcript informational hearing and site visit.

60 page(s)
 CEC/ Dockets UnitPSRC/ P. Petty
3876612/22/2006 Russell City Energy Center Amendment Data Requests.

30 page(s)
 Calpine/ M.A. HatfieldCEC/ J.Z. Scott
3875312/21/2006 Committee Scheduling Order.

6 page(s)
 Docket UnitJ L. Geesman / J. D. Byron / CEC
3875212/20/2006 application for confidential designation of Paleo for russell city with Figure Map

6 page(s)
 CEC/ Docket UnitES&H/G. Wheatland
3874312/21/2006 Comments on the Request for Agency Participation in the Review of the Russell City Energy Company, LLC, Amendment Petition - SCH No. 200509293

3 page(s)
 Jeri Scott / CECBrian Wines /CRWQB
3863212/13/2006 Russell City Proof of Service list and all parties letter.

5 page(s)
 CEC/ Dockets UnitCEC/ C. Hillhouse
3860612/11/2006 Letter from city manager jesus armas to b.b. blevins regarding noise compliance

2 page(s)
 CEC/ B.B.BlevinsCOH/ J. Armas
3860112/11/2006 Issues Identification Report

14 page(s)
 CEC/ Geesman, ByronCEC/ R. Johnson
3858312/8/2006 Proof of service list for russell city energy center power plant

4 page(s)
 All PartiesCEC/ C. Hillhouse
3856512/6/2006 Russell city energy company's Michael Hatfield letter to US Fish & Wildlife Service's Ryan Olah regarding interest in an informal consultation.

2 page(s)
 USF&WS/ R. OlahRCEC/M. Hatfield
3855712/5/2006 Library letter for russell city amendment petition

3 page(s)
 CEC/ Dockets UnitCEC/R. Johnson
3853512/4/2006 Cover Letter and CD for Modeling file for the Russell city energy center

1 page(s)
 CEC/J. ScottAD/G. Darvin
3853312/1/2006 Notice of Receipt.

2 page(s)
 PublicR. Johnson /CEC
3853212/1/2006 Agency Notice- Request for Agency Participation

7 page(s)
 Agency Distribution ListR. Johnson /CEC
3849811/29/2006 Notice of Public Informational Hearing and Site Visit and POS.

8 page(s)
 Docket UnitJohn Geesman / Jeff Byron
3849111/17/2006 Erosion and Sediment Control Plan Appendix 2B

51 page(s)
 Docket UnitLFR / Levine & Fricke
3849011/17/2006 Revised Draft Phase II Environmental Site Assessments Parcel # 001-09301-01

46 page(s)
 Docket UnitLFR/ Levine & Fricke
3848911/17/2006 Phase I Environmental Site Assessment Two Parcels on Enterprise Avenue. Parcel # 001-09301-00

94 page(s)
 Docket UnitLFR/ Levine & Fricke
3848811/17/2006 Phase 1 Environmental Site Assessment Parcel # 001-09301-00

126 page(s)
 Docket UnitLFR/ Levine / Fricke
3848711/17/2006 Draft Phase 1 Envormental Site Assessment - Parcel # 001-09301-01

249 page(s)
 Docket UnitLFR/ Levine / Fricke
3848411/17/2006 Limited Soil and Groundwater Sampling Report, 3862 and 3878 Depot Road. Hayward California -- 001-09301-00

258 page(s)
 B. McBrideLFR / Levine - Fricke
3841011/17/2006 Petition for Amendment NO. 1, Russell City Energy Center.

400 page(s)
 J. Scott / CECM. Hatfield / Russell City
2197-09/19/2007 Committee Conference Further Evidentiary Hearing Before CAERC and DC

173 page(s)
  CEC
2156-06/20/2007 Joint Committee Status Conference

213 page(s)
  CEC