261736 | 2/12/2025 |
Repeated Application for Confidentiality for Q4 2024 Fire Protection Compliance Submission
| | | Ellison Schneider Harris Donlan |
260181 | 10/25/2024 |
CONFIDENTIAL_Unit 3_GPC Q3 Fire Protection Compliance Submission
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
260176 | 11/20/2024 |
CEC Response letter to Geyser LLC's Repeated application for Confidential Designation
2 page(s)
| | Chase Maxwell | California Energy Commission |
259715 | 10/25/2024 |
GPC Unit 3_Q3 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential Designation
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
257806 | 6/21/2024 |
CONFIDENTIAL Unit 3_GPC Q2 2024 Fire Protection Compliance Submission
5 page(s)
| | John Heiser | Ellison Schneider Harris & Donlan LLP |
257793 | 7/18/2024 |
CEC response letter to Geysers Power Company, LLC re confidentiality applications, dated June 21, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
257428 | 6/26/2024 |
2023 Annual Compliance Report - Sonoma (U3)
58 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
257312 | 6/21/2024 |
GPC Unit 3_Q2 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential Designation
3 page(s)
| | Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255944 | 3/29/2024 |
CONFIDENTIAL Unit 3 Annual Fire Alarm Report
9 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255943 | 3/29/2024 |
CONFIDENTIAL Unit 3 Semi-Annual Fire Alarm Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255942 | 3/29/2024 |
CONFIDENTIAL Unit 3 Annual Fire Pump Report
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255941 | 3/29/2024 |
CONFIDENTIAL Unit 3 Annual Deluge Sprinkler System Report_Fourth Quarter
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255940 | 3/29/2024 |
CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255939 | 3/29/2024 |
CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Fourth Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255938 | 3/29/2024 |
CONFIDENTIAL Unit 3 Main Drain Test Continuation_Fourth Quarter
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255937 | 3/29/2024 |
CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter
4 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
255936 | 3/29/2024 |
CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255935 | 3/29/2024 |
CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Third Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255934 | 3/29/2024 |
CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_Third Quarter
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255933 | 3/29/2024 |
CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255932 | 3/29/2024 |
CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255931 | 3/29/2024 |
CONFIDENTIAL Unit 3 Private Fire Service Main Quarterly and Annual Report_Second Quarter
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255930 | 3/29/2024 |
CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Second Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255929 | 3/29/2024 |
CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_Second Quarter
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255928 | 3/29/2024 |
CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255927 | 3/29/2024 |
CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255926 | 3/29/2024 |
CONFIDENTIAL Unit 3 Standpipe and Hose System Quarterly and Annual Report_First Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255925 | 3/29/2024 |
CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_First Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255924 | 3/29/2024 |
CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_First Quarter
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255923 | 3/29/2024 |
CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255895 | 4/24/2024 |
CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
255360 | 3/29/2024 |
GPC Unit 3 Letter to John Heiser Regarding Fire Protection-3 Submission
1 page(s)
| | CEC/John Heiser | Ellison Schneider Harris & Donlan LLP |
255356 | 3/29/2024 |
GPC Unit 3_2023 ITM Reports_Repeated Application for Confidential Designation
19 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255208 | 3/7/2024 |
CONFIDENTIAL_U3_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
18 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255202 | 2/16/2024 |
CONFIDENTIAL Unit 3 GPC Q1 2024 FIRE PROTECTION Compliance Submission
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255187 | 3/20/2024 |
CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
254910 | 3/7/2024 |
Repeated Application for Confidentiality_U3_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
254537 | 2/16/2024 |
GPC Unit 3_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential Designation
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
250879 | 6/30/2023 |
2022 Annual Compliance Report - Sonoma (U3)
54 page(s)
| | CEC/John Heiser | Geysers Power Company, LLC |
249808 | 4/19/2023 |
CEC Response Letter re Application for Confidential Designation dated March 30, 2023
Compliance 2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
249791 | 3/30/2023 |
Geysers Power Company, Unit 3, ITM Report Cover Letter
6 page(s)
| | CEC/John Heiser | Ellison Schneider Harris & Donlan LLP |
249790 | 3/30/2023 |
Geysers Power Company, Unit 3, 4Q22 ITM Report Wet Sprinkler Inspection
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249789 | 3/30/2023 |
Geysers Power Company, Unit 3, 4Q22 ITM Report Deluge Inspection
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249511 | 3/30/2023 |
Geysers Power Company, Unit 3, Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248711 | 2/9/2023 |
Gayle Grimshaw Comments
| | | Gayle Grimshaw |
248043 | 12/13/2022 |
November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Sonoma Unit 3 Facility
6 page(s)
| | CEC/John Heiser and Keith Winstead | Ellison Schneider Harris & Donlan LLP |
247595 | 11/21/2022 |
CEC response for Confidential Designation Geysers Unit 3, Sonoma
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247567 | 11/4/2022 |
GPC Unit 3_Q3 2022 Wet Pipe Inspection Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247566 | 11/4/2022 |
GPC Unit 3_Q3 2022 Pre-Action Inspection Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247565 | 11/4/2022 |
GPC Unit 3_Q3 2022 Deluge Inspection Report
4 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247564 | 11/4/2022 |
GPC Unit 3_Q3 2022 Second Semiannual FireScan Report
24 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247563 | 11/4/2022 |
GPC Unit 3_Q3 2022 ITM Report Cover Letter
6 page(s)
| | CEC/John Heiser | Ellison Schneider Harris & Donlan LLP |
247374 | 11/10/2022 |
GPC October 2022 Monthly Recommissioning Report and Cover Letter_Unit 3
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
247298 | 11/4/2022 |
GPC Unit 3_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247271 | 11/3/2022 |
CEC Response to Geysers Unit 3 Repeated Application for Confidentiality
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247206 | 10/20/2022 |
GPC Unit 3 _Wet Pipe Q2 2022 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247205 | 10/20/2022 |
GPC Unit 3 _Pre-Action Q2 2022 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247204 | 10/20/2022 |
GPC Unit 3_Deluge Q2 2022 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247203 | 10/20/2022 |
GPC Unit 3_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247185 | 10/19/2022 |
GPC Unit 3_Q2 2022 ITM Report Cover Letter_ CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan and Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
246699 | 10/20/2022 |
GPC Unit 3_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246646 | 10/19/2022 |
GPC Unit 3_Q2 2022 ITM Reports and Compliance Documents_ Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246564 | 9/21/2022 |
220901_GPC Unit 3 BOD Narrative_220920-Rev3 and Cover Letter_CONFIDENTIAL
118 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246561 | 9/20/2022 |
220920_GPC Unit 3 BOD Narrative and Cover Letter_CONFIDENTIAL
18 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246547 | 10/14/2022 |
CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3 &19
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
246408 | 10/10/2022 |
Geysers Unit 3 September 2022 Monthly Reccommissioning Report and Cover Letter
3 page(s)
| | CEC/John Heiser | Ellison Schneider Harris & Donlan LLP |
246167 | 9/21/2022 |
220901_GPC Unit 3 BOD and ReCx Rev3_Repeated Application for Confidential Designation
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246158 | 9/20/2022 |
220920_GPC Unit 3 BOD Narrative_Repeated Application for Confidential Designation
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246127 | 9/16/2022 |
CEC Response Letter re Geysers Unit 3 & 19 Confidential Application dated August 18, 2022
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
246098 | 8/18/2022 |
Comment Logs Responding to CEC Staff Comments on Basis of Design Narratives for Sonoma Geothermal Project, Unit 3
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246003 | 9/12/2022 |
GPC_August 2022 Monthly Recommissioning Report and Cover Letter_Unit 3
2 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
245359 | 8/18/2022 |
Repeated Application for Confidential Designation REPEATED APPLICATION FOR CONFIDENTIAL DESIGNATION for Comment Logs Responding to CEC Staff Comments on Basis of Design Narratives for the following plants: Sonoma Geothermal Project, Unit 3 (80-AFC-01C); and Calistoga Geothermal Project, Unit 19 (81-AFC-01C) 2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
244957 | 7/11/2022 |
GPC_June 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
244945 | 8/3/2022 |
GPC Unit 3 Basis of Design Narrative and Cover Letter_CONFIDENTIAL
17 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
244822 | 8/12/2022 |
CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Samantha G. Neumyer | California Energy Commission |
244455 | 8/10/2022 |
GPC_July 2022 Monthly Recommissioning Report and Cover Letter_Unit 3
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
244416 | 8/10/2022 |
CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
244302 | 8/3/2022 |
GPC Unit 3 Basis of Design Narrative Repeated Application for Confidential Designation
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
244004 | 7/11/2022 |
GPC_June 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 3
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
244000 | 7/11/2022 |
GPC_June 2022 Monthly Compliance Report_Unit 3_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
243943 | 7/8/2022 |
CEC Response Geyser #3 Sonoma Confidential Application
2 page(s)
| | C Maxwell Ellison Schneider Harris & Donlan | California Energy Commission |
243911 | 6/13/2022 |
GPC May 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243875 | 6/1/2022 |
Unit 3_Wet Pipe Fire Sprinkler System Quarterly and Annual Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243874 | 6/1/2022 |
Unit 3_Standpipe and Hose System Quarterly and Annual Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243873 | 6/1/2022 |
Unit 3_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243872 | 6/1/2022 |
Unit 3_Pre-Action Fire Sprinkler System Quarterly and Annual Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243871 | 6/1/2022 |
Unit 3_Fire Alarm and Life Safety System Inspection Certificate
22 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243870 | 6/1/2022 |
Unit 3_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243869 | 6/1/2022 |
Unit 3_Private Fire Service Main Quarterly and Annual Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243868 | 6/1/2022 |
Unit 3_Electric Fire Pump Annual Report
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243867 | 6/1/2022 |
Unit 3_Diesel Fire Pump Graph Annual Report
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243866 | 6/1/2022 |
Unit 3_Diesel Fire Pump Annual Report
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243865 | 6/1/2022 |
Unit 3_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243856 | 7/6/2022 |
CEC Response Geyser Unit 3 Confidential Application June 1, 2022
2 page(s)
| | C. Maxwell Ellison Schneider Harris & Donlan LLP | California Energy Commission |
243804 | 6/30/2022 |
2021 Annual Compliance Report - Sonoma
Compliance 56 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
243518 | 6/13/2022 |
GPC May 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Geysers Unit 3
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243515 | 6/13/2022 |
GPC May 2022 Monthly Compliance Report_Unit 3_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
243377 | 6/1/2022 |
Unit 3_Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation
| | | Ellison Schneider Harris & Donlan LLP |
243101 | 5/10/2022 |
GPC April 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243092 | 5/16/2022 |
CEC Response Letter to Repeated Application for Confidentiality for Units 3, 17 & 19
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
242997 | 5/10/2022 |
GPC April 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 3
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242993 | 5/10/2022 |
GPC April 2022 Monthly Compliance Report_Unit 3_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
242914 | 4/20/2022 |
GPC Unit 3 Basis of Design Cover Letter and Narrative_ReCx_Rev 2_CONFIDENTIAL
114 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242910 | 5/2/2022 |
CEC Response Letter Regarding Application for Confidentiality (Geysers, Unit 3 (BOD))
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
242730 | 4/20/2022 |
GPC Unit 3 Repeated Application for Confidential Designation for Basis of Design Narrative and Recommissioning Plan_Rev 2
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242711 | 4/12/2022 |
GPC March 2022 Monthly Compliance Report_CONFIDENTIAL
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242705 | 4/19/2022 |
CEC Response to Repeated Applications for Confidential Designation, Units 3, 17 & 19 Application for 4-11-22 2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
242639 | 4/12/2022 |
GPC March 2022 Monthly Compliance Report Repeated Application for Confidential Designation
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242630 | 4/12/2022 |
GPC March 2022 Monthly Compliance Report_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
242572 | 4/5/2022 |
2020 Revised Annual Compliance Report - Sonoma N/A Compliance 76 page(s)
| | CEC/Eric Veerkamp, CPM | Geysers Power Company, LLC |
242548 | 3/16/2022 |
GPC Unit 3 Basis of Design Cover Letter and Narrative_CONFIDENTIAL
16 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242542 | 4/4/2022 |
CEC Response to Application for Confidential Designation - Geysers BOD Unit 3
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
242345 | 3/16/2022 |
GPC Unit 3 Repeated Application for Confidential Designation for Basis of Design Narrative
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242321 | 3/10/2022 |
GPC February 2022 Monthly Compliance Report_CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242317 | 2/10/2022 |
GPC January 2022 Monthly Recommissioning Report_CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242311 | 3/15/2022 |
CEC Letter Regarding Response to Repeated Applications for Confidential Designation
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
242259 | 3/11/2022 |
GPC February 2022 Monthly Compliance Report_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
242258 | 3/10/2022 |
GPC Repeated Application for Confidential Designation for the February 2022 Monthly Compliance Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242177 | 12/3/2021 |
Geysers Update 2-8-2019-presentation design plan Unit 3 Sonoma 8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241996 | 12/10/2021 |
GPC November 2021 Monthly Recommissioning Report_CONFIDENTIAL
9 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241993 | 1/10/2022 |
GPC December 2021 Monthly Recommissioning Report and Appendices_CONFIDENTIAL
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241869 | 12/3/2021 |
summary-schedule-corrective action Q1 2021
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241868 | 12/3/2021 |
Summary corrective action 2019 Unit 3 Sonoma
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241792 | 12/3/2021 |
Sonoma-ITM-stand pipe inspection 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241791 | 12/3/2021 |
Sonoma-ITM-fire system inspection 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241790 | 12/3/2021 |
Sonoma-ITM-fire pump inspection 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241789 | 12/3/2021 |
Sonoma-ITM-diesel fire pump inspection 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241788 | 12/3/2021 |
Sonoma-ITM-automatic sprinker inspection 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241787 | 12/3/2021 |
Sonoma-ITM fire pump inspection - 4-23-19
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241786 | 12/3/2021 |
Sonoma--Unit-3-fire system inspection certif-2019
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241785 | 12/3/2021 |
Sonoma (Unit 3) comments on BOD 2020-Jensen Engin
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241784 | 12/3/2021 |
TM-automatic sprinkler-03-27-19 RK5797
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241783 | 12/3/2021 |
Geysers Unit 3_Standpipe Inspection Report_April 2019 (00502307xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241782 | 12/3/2021 |
fire alarm inspection 03-27-19 RK5798
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241781 | 12/3/2021 |
20190319 Geysers Unit #3 BOD & ReCx Privileged and Confidential DRAFT
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241780 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Wet-Pipe 2021 CONFIDENTIAL (00543725xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241779 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Standpipe 2021 CONFIDENTIAL (00543726xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241778 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Private Main 2021 CONFIDENTIAL (00543727xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241777 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Pre-Action 2021 CONFIDENTIAL (00543729xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241776 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Main Drain 2021 CONFIDENTIAL (00544959xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241775 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Electric Pump 2021 CONFIDENTIAL (00543730xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241774 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Diesel Pump 2021 CONFIDENTIAL (00543732xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241773 | 12/3/2021 |
GPC-Sonoma Unit 3_Q1 Deluge 2021 CONFIDENTIAL (00543731xBA8E1)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241772 | 12/3/2021 |
Fire alarm-life safety inspection report 2021-Sonoma Unit 3-CONFIDENTIAL
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241771 | 12/3/2021 |
20210309 Geysers Unit 3 BOD & ReCx_REV1
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241770 | 12/3/2021 |
20210309 Geysers Unit 3 BOD & ReCx_CEC_REV3 (1) 04302021
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241769 | 12/3/2021 |
Compliance_Sonoma_2016_Dseal_Fire_Pump_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241768 | 12/3/2021 |
Compliance_Sonoma_2016_Annual_Fire_Pump_Insp_A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241767 | 12/3/2021 |
Compliance_Sonoma_11-29-16_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241766 | 12/3/2021 |
Compliance_Sonoma_11-29-16_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241765 | 12/3/2021 |
Compliance_Sonoma_11-19-13_Fire_Sprinkler_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241764 | 12/3/2021 |
Compliance_Sonoma_11-19-13_Fire_Alarm_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241763 | 12/3/2021 |
Compliance_Sonoma_8-29-16_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241762 | 12/3/2021 |
Compliance_Sonoma_11-3-15_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241761 | 12/3/2021 |
Compliance_Sonoma_11-2-15_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241760 | 12/3/2021 |
Compliance_Sonoma_10-27-14_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241759 | 12/3/2021 |
Compliance_Sonoma_10-24-14_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241758 | 12/3/2021 |
Compliance_Sonoma_8-3-15_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241757 | 12/3/2021 |
Compliance_Sonoma_8-3-15_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241756 | 12/3/2021 |
Compliance_Sonoma_8-29-16_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241755 | 12/3/2021 |
Compliance_Sonoma_7-17-14_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241754 | 12/3/2021 |
Compliance_Sonoma_6-10-13_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241753 | 12/3/2021 |
Compliance_Sonoma_5-23-16_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241752 | 12/3/2021 |
Compliance_Sonoma_5-5-15_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241751 | 12/3/2021 |
Compliance_Sonoma_5-23-16_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241750 | 12/3/2021 |
Compliance_Sonoma_5-10-13_Fire_Alarm_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241749 | 12/3/2021 |
Compliance_Sonoma_3-1-16_Fire_Sprinkler_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241748 | 12/3/2021 |
Compliance_Sonoma_3-1-16_Fire_Alarm_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241747 | 12/3/2021 |
Compliance_Sonoma_2-4-15_Fire_Sprinkler_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241746 | 12/3/2021 |
Compliance_Sonoma_2-4-15_Fire_Alarm_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
241745 | 12/3/2021 |
Quarterly-ITM-Fire sprinkler-12-17-18
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241744 | 12/3/2021 |
Quarterly-ITM-Fire Alarm-12-17-18
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241743 | 12/3/2021 |
Compliance_Sonoma_9-26-17_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241742 | 12/3/2021 |
Compliance_Sonoma_12-13-17_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241741 | 12/3/2021 |
Compliance_Sonoma_12-13-17_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241740 | 12/3/2021 |
Compliance_Sonoma_9-25-17_Fire_Alarm_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241739 | 12/3/2021 |
Compliance_Sonoma_6-27-17_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241738 | 12/3/2021 |
Compliance_Sonoma_3-29-18_Fire_Sprinkler_Insp-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241737 | 12/3/2021 |
Compliance_Sonoma_3-28-18_Fire_Alarm_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241736 | 12/3/2021 |
Compliance_Sonoma_3-20-17_Fire_Sprinkler_Insp-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241735 | 1/27/2022 |
U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241734 | 1/27/2022 |
U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241733 | 1/27/2022 |
U19-Calistoga Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241732 | 1/27/2022 |
U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241731 | 1/27/2022 |
U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241730 | 1/27/2022 |
U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241729 | 1/27/2022 |
U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241728 | 1/27/2022 |
U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241727 | 1/27/2022 |
U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241726 | 1/27/2022 |
U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241725 | 1/27/2022 |
U18-Socrated Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241724 | 1/27/2022 |
U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241723 | 1/27/2022 |
U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241722 | 1/27/2022 |
U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241721 | 1/27/2022 |
U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241720 | 1/27/2022 |
U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241719 | 1/27/2022 |
Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL
5 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
241633 | 11/22/2021 |
Confidential GPC October 2021 Monthly Recommissioning Report
7 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241632 | 11/22/2021 |
Confidential Fire Scan 2021 Report
27 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241631 | 11/22/2021 |
Confidential Deluge 2021 Report
4 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241630 | 11/22/2021 |
Confidential Pre-action 2021 Report
3 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241629 | 11/22/2021 |
Confidential Wet-Pipe 2021 Report
3 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241628 | 11/22/2021 |
Confidential Cover Letter for Geysers Power Company ITM Report Q3 2021
4 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241566 | 2/16/2022 |
GPC Response to Executive Director's Confidentiality Determination
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241521 | 2/10/2022 |
GPC Repeated Application for Confidential Designation for January 2022 Monthly Recommissioning Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241516 | 2/10/2022 |
GPC January 2022 Monthly Recommissioning Report_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
241372 | 2/2/2022 |
CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022
Compliance 11 page(s)
| | J Harris of Ellison Schneider Harris & Donlan LLP | California Energy Commission |
241301 | 1/27/2022 |
Application for Confidential Designation
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241134 | 1/10/2022 |
GPC December 2021 Monthly Recommissioning Report_PUBLIC
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
241130 | 1/10/2022 |
GPC Application for Confidential Designation for December Monthly Recommissioning Report
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
240999 | 12/20/2021 |
Annual Compliance Report - Sonoma
Compliance 86 page(s)
| | CEC/Mr. Eric W. Veerkamp, Compliance Project Manager | Geysers Power Company, LLC |
240914 | 12/10/2021 |
GPC Application for Confidential Designation Monthly Recommissioning Report Appendicies
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
240908 | 12/10/2021 |
CPC November 2021 Monthly Recommissioning Report
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
240831 | 12/3/2021 |
Unit 3 Sonoma applications-fire suppression docs-2018 2017-2018 33 page(s)
| | CEC/Drew Bohan | Ellison Schneder Harris Donlan |
240830 | 12/3/2021 |
Unit 3 Sonoma applications-fire suppression docs-2018 2013-2016 33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
240829 | 12/3/2021 |
Unit 3 Sonoma applications-fire suppression docs-2018
33 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan |
240828 | 12/3/2021 |
Unit 3 Sonoma applications-fire suppression docs-2018 BOD 2021
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
240827 | 12/3/2021 |
Unit 3 Sonoma applications-fire suppression docs-201
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan |
240792 | 12/3/2021 |
Unit 3 Sonoma applications for confidential designation - fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240664 | 11/22/2021 |
Application for Confidential Designation
8 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
240657 | 11/22/2021 |
GPC October 2021 Monthly Recommissioning Report
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
240561 | 11/10/2021 |
June 2021 Monthly Recommissioning Report
Compliance 3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris Donlan |
240554 | 11/10/2021 |
Monthly Recommissioning Report_August 2020_PUBLIC
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
240532 | 11/9/2021 |
December 2020 Geysers Monthly Recommissioning Report
4 page(s)
| | CEC/docket unit | California Energy Commission |
240526 | 11/9/2021 |
November 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240520 | 11/9/2021 |
October 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240514 | 11/9/2021 |
September 2020 Geysers Monthly Recommissioning Report
5 page(s)
| | CEC/docket unit | California Energy Commission |
240508 | 11/9/2021 |
Monthly Recommissioning Report_July 2020
3 page(s)
| | CEC/docket unit | California Energy Commission |
240502 | 11/9/2021 |
Monthly Recommissioning Report (June 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240496 | 11/9/2021 |
Monthly Recommissioning Report (May 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240491 | 11/9/2021 |
August 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/docket unit | California Energy Commission |
240490 | 11/9/2021 |
July 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/docket unit | California Energy Commission |
240489 | 11/9/2021 |
September 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/docket unit | California Energy Commission |
240488 | 11/9/2021 |
May 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/docket unit | California Energy Commission |
240486 | 11/9/2021 |
GPC Monthly Recommissioning Report - April 2020
3 page(s)
| | CEC/docket unit | California Energy Commission |
240484 | 11/9/2021 |
February 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240483 | 11/9/2021 |
April 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240482 | 11/9/2021 |
March 2021 Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240481 | 11/9/2021 |
January 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
235703 | 11/19/2020 |
ORDER APPROVING SETTLEMENT
3 page(s)
| | CEC/Dockets | California Energy Commission |
235329 | 10/20/2020 |
ORDER APPROVING PETITION TO AMEND THE FACILITY LICENSE Order Number 20-1014-4 2 page(s)
| | CEC/Dockets | California Energy Commission |
234709 | 9/15/2020 |
Staff Analysis PTA - Sonoma Staff Analysis of Petition to Amend for Recommissioning Activities; Installation of a permanent standby diesel engine driven pump Compliance 72 page(s)
| | CEC/Dockets | Energy Commission |
233972 | 7/21/2020 |
Sonoma (Unit 3) Petition for Modification for Installation of Diesel Standby - Air District Health Risk Analysis
22 page(s)
| | CEC/Docket Unit | California Energy Commission |
233604 | 6/23/2020 |
Notice of Receipt Notice of Receipt Petition for Post Certification Project Change Geysers Sonoma Unit 3 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
232692 | 4/8/2020 |
Geysers Power Company, LLC Comments - 2019 Annual Compliance Report
Compliance 16 page(s)
| | CEC/Dockets | Geysers Power Company, LLC |
232608 | 4/1/2020 |
Sonoma (Unit 3) Petition for Modification
11 page(s)
| | CEC/Dockets | Ellison Schneider Harris & Donlan LLP |
231321 | 12/26/2019 |
2018 Annual Compliance Report for the Sonoma Power Plant (Unit 3, SMUD GEO 1) 2018 Annual Compliance Report for the Sonoma Power Plant (Unit 3, SMUD GEO 1) at the Geysers Compliance 17 page(s)
| | Mr Eric Veerkamp | Geysers Power Company, LLC |
230276 | 10/18/2019 |
RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING Resolution No: 19-1014-4 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
225663 | 10/31/2018 |
Compliance Docketing Policy
3 page(s)
| | CEC/Dockets | California Energy Commission |
210231 | 2/8/2016 |
Final Permission for Exec. Order B-36-16 Expedited Processing & N. Sonoma Air Pollution Control Dist Authority to Construct(ATC)
8 page(s)
| | Geysers Power Company, LLC/James Kluesener | California Energy Commission |
210186 | 2/5/2016 |
Sonoma (Unit 3) Response to Rotor Petition to Amend Data Request
2 page(s)
| | CEC/Dockets Unit | Geysers Power Company, LLC |
210184 | 2/5/2016 |
Sonoma (Unit 3) Petition to Amend for Low Pressure Rotor Replacement
6 page(s)
| | CEC/Camille Remy-Obad | Geysers Power Company, LLC |
207294 | 1/13/2016 |
Sonoma (Unit 3) Executive Director's Approval of Expedited Processing for Cooling Tower Replacement
2 page(s)
| | Geysers Power Company, LLC/James Kluesener | California Energy Commission |
207198 | 1/6/2016 |
Geysers Power Sonoma (Unit 3)- Cooling Tower Replacement Project Description and Request for Expedited Processing
19 page(s)
| | CEC/Robert Oglesby | Geysers Power Company, LLC |
206765 | 11/24/2015 |
Sonoma (Unit 3) Compliance Plan
114 page(s)
| | | California Energy Commission |
206764 | 11/24/2015 |
Sonoma (Unit 3) 1981 Final Decision
174 page(s)
| | | California Energy Commission |
206646 | 11/16/2015 |
Executive Director's Response Letter to Calpine's Request to Obtain & Implement County-Issued Demolition Permit for Fire Damage
2 page(s)
| | Rosemary Antonopoulos/Calpine Corporation | California Energy Commission |
58608 | 9/23/2010 |
Notice of Decision
1 page(s)
| | CA Resources Agency | CEC |
58491 | 9/16/2010 |
Order Approving Termination of the MOU & LOU Between CEC & USGS
3 page(s)
| | CEC/Docket Unit | CEC/C. Stora |
56894 | 5/28/2010 |
Letter requesting Termination of MOU between Energy Commission and the USGS
7 page(s)
| | CEC/ M. Dyas | United States Department of Interior |
31949 | 7/23/2004 |
REVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES - - GEYSERS POWER COMPY, LLC
180 page(s)
| | CEC/Dockets | Rtp Environmental Associates |
31946 | 7/23/2004 |
Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.
42 page(s)
| | CEC/K. Defolo/dockets | Ca Rwqcb |
31106 | 3/12/2004 |
Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes
3 page(s)
| | Calpine/Carlsen/dockets | CEC/Tronaas |
31094 | 3/12/2004 |
Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/Tronaas |
30959 | 2/20/2004 |
Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C) 2 page(s)
| | CEC/Dockets | CEC/O'brien |
30479 | 8/15/2003 |
Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater
3 page(s)
| | O'brien/Cec | California Regional Water Quality Control Board/Ma |
29688 | 8/15/2003 |
Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater
3 page(s)
| | O'brien/Cec | California Regional Water Quality Control Board/Ma |
29158 | 6/27/2003 |
Notice of Receipt, Petition to Amend the Energy Commission Decisions
3 page(s)
| | Dockets | CEC/O'brien |
29152 | 6/25/2003 |
Notice of Receipt, Petition to Amend the Energy Commission Decisions (79-AFC-1C)
1 page(s)
| | Dockets | CEC/O'brien |
29138 | 6/25/2003 |
License Amendments
40 page(s)
| | CEC/Tronaas/compliance | Ch2mhill/Salamy |
11794 | 4/22/1999 |
Commission Order Approving Ownership Transfer
1 page(s)
| | CEC/Docket File | CEC/Keese |
10734 | 3/30/1999 |
Notice of Receipt - The CEC has received a petition requesting an ownership change for the Sonoma Geothermal Power Project.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
9069 | 7/16/1998 |
Transfer of SMUDGEO #1 Geothermal Power Projcet License to Calpine Geysers Company, L.P. - SMUD Requests that the Commission Execute License Transfer, Effective July 16, 1998.
1 page(s)
| | CEC/Docket Unit | Smud/Ingwers |
9021 | 7/14/1998 |
Commission Order Approving Transfer of License (Order No. 98-0624-1(a))
2 page(s)
| | CEC/Docket File | CEC/Keese |
8804 | 6/12/1998 |
Notice of Receipt SMUD Petition transfer SMUDGEO #1 Geothermal Power Plant License, to Calpine Geysers Company, L.P. Information Request Form is attached 2 page(s)
| | CEC/Docket Unit | CEC/Haussler For Therkelsen |
| |
CONFIDENTIAL Unit 3 Fire Protection Compliance Submission
| | | Ellison Schneider Harris Donlan |