Docket Log

Docket: 80-AFC-01C
Project Title: Sacramento Municipal Utility District SMUDGEO #1
Generated On: 4/25/2024 5:57:12 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2558954/24/2024 CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2553603/29/2024 GPC Unit 3 Letter to John Heiser Regarding Fire Protection-3 Submission

1 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2553563/29/2024 GPC Unit 3_2023 ITM Reports_Repeated Application for Confidential Designation

19 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2552083/7/2024 CONFIDENTIAL_U3_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

18 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2552022/16/2024 CONFIDENTIAL Unit 3 GPC Q1 2024 FIRE PROTECTION Compliance Submission

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2551873/20/2024 CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2549103/7/2024 Repeated Application for Confidentiality_U3_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2545372/16/2024 GPC Unit 3_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential Designation

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2508796/30/2023 2022 Annual Compliance Report - Sonoma (U3)

54 page(s)
 CEC/John HeiserGeysers Power Company, LLC
2498084/19/2023 CEC Response Letter re Application for Confidential Designation dated March 30, 2023

Compliance
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2497913/30/2023 Geysers Power Company, Unit 3, ITM Report Cover Letter

6 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2497903/30/2023 Geysers Power Company, Unit 3, 4Q22 ITM Report Wet Sprinkler Inspection

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497893/30/2023 Geysers Power Company, Unit 3, 4Q22 ITM Report Deluge Inspection

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2495113/30/2023 Geysers Power Company, Unit 3, Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2487112/9/2023 Gayle Grimshaw Comments
  Gayle Grimshaw
24804312/13/2022 November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Sonoma Unit 3 Facility

6 page(s)
 CEC/John Heiser and Keith WinsteadEllison Schneider Harris & Donlan LLP
24759511/21/2022 CEC response for Confidential Designation Geysers Unit 3, Sonoma

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24756711/4/2022 GPC Unit 3_Q3 2022 Wet Pipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24756611/4/2022 GPC Unit 3_Q3 2022 Pre-Action Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24756511/4/2022 GPC Unit 3_Q3 2022 Deluge Inspection Report

4 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
24756411/4/2022 GPC Unit 3_Q3 2022 Second Semiannual FireScan Report

24 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24756311/4/2022 GPC Unit 3_Q3 2022 ITM Report Cover Letter

6 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
24737411/10/2022 GPC October 2022 Monthly Recommissioning Report and Cover Letter_Unit 3

3 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
24729811/4/2022 GPC Unit 3_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24727111/3/2022 CEC Response to Geysers Unit 3 Repeated Application for Confidentiality

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24720610/20/2022 GPC Unit 3 _Wet Pipe Q2 2022 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720510/20/2022 GPC Unit 3 _Pre-Action Q2 2022 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720410/20/2022 GPC Unit 3_Deluge Q2 2022 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720310/20/2022 GPC Unit 3_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24718510/19/2022 GPC Unit 3_Q2 2022 ITM Report Cover Letter_ CONFIDENTIAL

5 page(s)
 CEC/Drew Bohan and Eric VeerkampEllison Schneider Harris & Donlan LLP
24669910/20/2022 GPC Unit 3_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24664610/19/2022 GPC Unit 3_Q2 2022 ITM Reports and Compliance Documents_ Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2465649/21/2022 220901_GPC Unit 3 BOD Narrative_220920-Rev3 and Cover Letter_CONFIDENTIAL

118 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2465619/20/2022 220920_GPC Unit 3 BOD Narrative and Cover Letter_CONFIDENTIAL

18 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24654710/14/2022 CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3 &19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24640810/10/2022 Geysers Unit 3 September 2022 Monthly Reccommissioning Report and Cover Letter

3 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2461679/21/2022 220901_GPC Unit 3 BOD and ReCx Rev3_Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2461589/20/2022 220920_GPC Unit 3 BOD Narrative_Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2461279/16/2022 CEC Response Letter re Geysers Unit 3 & 19 Confidential Application dated August 18, 2022

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2460988/18/2022 Comment Logs Responding to CEC Staff Comments on Basis of Design Narratives for Sonoma Geothermal Project, Unit 3

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2460039/12/2022 GPC_August 2022 Monthly Recommissioning Report and Cover Letter_Unit 3

2 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2453598/18/2022 Repeated Application for Confidential Designation
REPEATED APPLICATION FOR CONFIDENTIAL DESIGNATION for Comment Logs Responding to CEC Staff Comments on Basis of Design Narratives for the following plants: Sonoma Geothermal Project, Unit 3 (80-AFC-01C); and Calistoga Geothermal Project, Unit 19 (81-AFC-01C)
2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2449577/11/2022 GPC_June 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2449458/3/2022 GPC Unit 3 Basis of Design Narrative and Cover Letter_CONFIDENTIAL

17 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2448228/12/2022 CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha G. NeumyerCalifornia Energy Commission
2444558/10/2022 GPC_July 2022 Monthly Recommissioning Report and Cover Letter_Unit 3

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2444168/10/2022 CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2443028/3/2022 GPC Unit 3 Basis of Design Narrative Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2440047/11/2022 GPC_June 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 3

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2440007/11/2022 GPC_June 2022 Monthly Compliance Report_Unit 3_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2439437/8/2022 CEC Response Geyser #3 Sonoma Confidential Application

2 page(s)
 C Maxwell Ellison Schneider Harris & DonlanCalifornia Energy Commission
2439116/13/2022 GPC May 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438756/1/2022 Unit 3_Wet Pipe Fire Sprinkler System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438746/1/2022 Unit 3_Standpipe and Hose System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438736/1/2022 Unit 3_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438726/1/2022 Unit 3_Pre-Action Fire Sprinkler System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438716/1/2022 Unit 3_Fire Alarm and Life Safety System Inspection Certificate

22 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438706/1/2022 Unit 3_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438696/1/2022 Unit 3_Private Fire Service Main Quarterly and Annual Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438686/1/2022 Unit 3_Electric Fire Pump Annual Report

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438676/1/2022 Unit 3_Diesel Fire Pump Graph Annual Report

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438666/1/2022 Unit 3_Diesel Fire Pump Annual Report

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438656/1/2022 Unit 3_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438567/6/2022 CEC Response Geyser Unit 3 Confidential Application June 1, 2022

2 page(s)
 C. Maxwell Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2438046/30/2022 2021 Annual Compliance Report - Sonoma

Compliance
56 page(s)
 CEC/Docket UnitGeysers Power Company, LLC
2435186/13/2022 GPC May 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Geysers Unit 3

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2435156/13/2022 GPC May 2022 Monthly Compliance Report_Unit 3_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2433776/1/2022 Unit 3_Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation
  Ellison Schneider Harris & Donlan LLP
2431015/10/2022 GPC April 2022 Monthly Compliance Report_Unit 3_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2430925/16/2022 CEC Response Letter to Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2429975/10/2022 GPC April 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 3

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429935/10/2022 GPC April 2022 Monthly Compliance Report_Unit 3_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2429144/20/2022 GPC Unit 3 Basis of Design Cover Letter and Narrative_ReCx_Rev 2_CONFIDENTIAL

114 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429105/2/2022 CEC Response Letter Regarding Application for Confidentiality (Geysers, Unit 3 (BOD))

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2427304/20/2022 GPC Unit 3 Repeated Application for Confidential Designation for Basis of Design Narrative and Recommissioning Plan_Rev 2

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2427114/12/2022 GPC March 2022 Monthly Compliance Report_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2427054/19/2022 CEC Response to Repeated Applications for Confidential Designation, Units 3, 17 & 19
Application for 4-11-22
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2426394/12/2022 GPC March 2022 Monthly Compliance Report Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2426304/12/2022 GPC March 2022 Monthly Compliance Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2425724/5/2022 2020 Revised Annual Compliance Report - Sonoma
N/A
Compliance
76 page(s)
 CEC/Eric Veerkamp, CPMGeysers Power Company, LLC
2425483/16/2022 GPC Unit 3 Basis of Design Cover Letter and Narrative_CONFIDENTIAL

16 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2425424/4/2022 CEC Response to Application for Confidential Designation - Geysers BOD Unit 3

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2423453/16/2022 GPC Unit 3 Repeated Application for Confidential Designation for Basis of Design Narrative

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423213/10/2022 GPC February 2022 Monthly Compliance Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423172/10/2022 GPC January 2022 Monthly Recommissioning Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423113/15/2022 CEC Letter Regarding Response to Repeated Applications for Confidential Designation

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2422593/11/2022 GPC February 2022 Monthly Compliance Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2422583/10/2022 GPC Repeated Application for Confidential Designation for the February 2022 Monthly Compliance Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24217712/3/2021 Geysers Update 2-8-2019-presentation design plan
Unit 3 Sonoma
8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24199612/10/2021 GPC November 2021 Monthly Recommissioning Report_CONFIDENTIAL

9 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2419931/10/2022 GPC December 2021 Monthly Recommissioning Report and Appendices_CONFIDENTIAL

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24186912/3/2021 summary-schedule-corrective action Q1 2021
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186812/3/2021 Summary corrective action 2019 Unit 3 Sonoma
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179212/3/2021 Sonoma-ITM-stand pipe inspection 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179112/3/2021 Sonoma-ITM-fire system inspection 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179012/3/2021 Sonoma-ITM-fire pump inspection 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178912/3/2021 Sonoma-ITM-diesel fire pump inspection 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178812/3/2021 Sonoma-ITM-automatic sprinker inspection 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178712/3/2021 Sonoma-ITM fire pump inspection - 4-23-19
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178612/3/2021 Sonoma--Unit-3-fire system inspection certif-2019
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178512/3/2021 Sonoma (Unit 3) comments on BOD 2020-Jensen Engin
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178412/3/2021 TM-automatic sprinkler-03-27-19 RK5797
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178312/3/2021 Geysers Unit 3_Standpipe Inspection Report_April 2019 (00502307xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178212/3/2021 fire alarm inspection 03-27-19 RK5798
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178112/3/2021 20190319 Geysers Unit #3 BOD & ReCx Privileged and Confidential DRAFT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24178012/3/2021 GPC-Sonoma Unit 3_Q1 Wet-Pipe 2021 CONFIDENTIAL (00543725xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177912/3/2021 GPC-Sonoma Unit 3_Q1 Standpipe 2021 CONFIDENTIAL (00543726xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177812/3/2021 GPC-Sonoma Unit 3_Q1 Private Main 2021 CONFIDENTIAL (00543727xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177712/3/2021 GPC-Sonoma Unit 3_Q1 Pre-Action 2021 CONFIDENTIAL (00543729xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177612/3/2021 GPC-Sonoma Unit 3_Q1 Main Drain 2021 CONFIDENTIAL (00544959xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177512/3/2021 GPC-Sonoma Unit 3_Q1 Electric Pump 2021 CONFIDENTIAL (00543730xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177412/3/2021 GPC-Sonoma Unit 3_Q1 Diesel Pump 2021 CONFIDENTIAL (00543732xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177312/3/2021 GPC-Sonoma Unit 3_Q1 Deluge 2021 CONFIDENTIAL (00543731xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177212/3/2021 Fire alarm-life safety inspection report 2021-Sonoma Unit 3-CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177112/3/2021 20210309 Geysers Unit 3 BOD & ReCx_REV1
 CEC/Drew BohanEllison Schneider Harris & Donlan
24177012/3/2021 20210309 Geysers Unit 3 BOD & ReCx_CEC_REV3 (1) 04302021
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176912/3/2021 Compliance_Sonoma_2016_Dseal_Fire_Pump_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176812/3/2021 Compliance_Sonoma_2016_Annual_Fire_Pump_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176712/3/2021 Compliance_Sonoma_11-29-16_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176612/3/2021 Compliance_Sonoma_11-29-16_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176512/3/2021 Compliance_Sonoma_11-19-13_Fire_Sprinkler_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176412/3/2021 Compliance_Sonoma_11-19-13_Fire_Alarm_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176312/3/2021 Compliance_Sonoma_8-29-16_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176212/3/2021 Compliance_Sonoma_11-3-15_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176112/3/2021 Compliance_Sonoma_11-2-15_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24176012/3/2021 Compliance_Sonoma_10-27-14_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175912/3/2021 Compliance_Sonoma_10-24-14_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175812/3/2021 Compliance_Sonoma_8-3-15_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175712/3/2021 Compliance_Sonoma_8-3-15_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175612/3/2021 Compliance_Sonoma_8-29-16_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175512/3/2021 Compliance_Sonoma_7-17-14_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175412/3/2021 Compliance_Sonoma_6-10-13_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175312/3/2021 Compliance_Sonoma_5-23-16_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175212/3/2021 Compliance_Sonoma_5-5-15_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175112/3/2021 Compliance_Sonoma_5-23-16_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24175012/3/2021 Compliance_Sonoma_5-10-13_Fire_Alarm_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24174912/3/2021 Compliance_Sonoma_3-1-16_Fire_Sprinkler_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24174812/3/2021 Compliance_Sonoma_3-1-16_Fire_Alarm_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24174712/3/2021 Compliance_Sonoma_2-4-15_Fire_Sprinkler_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24174612/3/2021 Compliance_Sonoma_2-4-15_Fire_Alarm_Insp-A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24174512/3/2021 Quarterly-ITM-Fire sprinkler-12-17-18
 CEC/Drew BohanEllison Schneider Harris Donlan
24174412/3/2021 Quarterly-ITM-Fire Alarm-12-17-18
 CEC/Drew BohanEllison Schneider Harris Donlan
24174312/3/2021 Compliance_Sonoma_9-26-17_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24174212/3/2021 Compliance_Sonoma_12-13-17_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24174112/3/2021 Compliance_Sonoma_12-13-17_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24174012/3/2021 Compliance_Sonoma_9-25-17_Fire_Alarm_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24173912/3/2021 Compliance_Sonoma_6-27-17_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24173812/3/2021 Compliance_Sonoma_3-29-18_Fire_Sprinkler_Insp-Q
 CEC/Drew BohanEllison Schneider Harris Donlan
24173712/3/2021 Compliance_Sonoma_3-28-18_Fire_Alarm_Insp-A
 CEC/Drew BohanEllison Schneider Harris Donlan
24173612/3/2021 Compliance_Sonoma_3-20-17_Fire_Sprinkler_Insp-A
 CEC/Drew BohanEllison Schneider Harris Donlan
2417351/27/2022 U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417341/27/2022 U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417331/27/2022 U19-Calistoga Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417321/27/2022 U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417311/27/2022 U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417301/27/2022 U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417291/27/2022 U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417281/27/2022 U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417271/27/2022 U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417261/27/2022 U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417251/27/2022 U18-Socrated Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417241/27/2022 U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417231/27/2022 U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417221/27/2022 U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417211/27/2022 U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417201/27/2022 U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417191/27/2022 Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24163311/22/2021 Confidential GPC October 2021 Monthly Recommissioning Report

7 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24163211/22/2021 Confidential Fire Scan 2021 Report

27 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24163111/22/2021 Confidential Deluge 2021 Report

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24163011/22/2021 Confidential Pre-action 2021 Report

3 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24162911/22/2021 Confidential Wet-Pipe 2021 Report

3 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24162811/22/2021 Confidential Cover Letter for Geysers Power Company ITM Report Q3 2021

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
2415662/16/2022 GPC Response to Executive Director's Confidentiality Determination

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2415212/10/2022 GPC Repeated Application for Confidential Designation for January 2022 Monthly Recommissioning Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2415162/10/2022 GPC January 2022 Monthly Recommissioning Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2413722/2/2022 CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022

Compliance
11 page(s)
 J Harris of Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2413011/27/2022 Application for Confidential Designation

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2411341/10/2022 GPC December 2021 Monthly Recommissioning Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2411301/10/2022 GPC Application for Confidential Designation for December Monthly Recommissioning Report

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24099912/20/2021 Annual Compliance Report - Sonoma

Compliance
86 page(s)
 CEC/Mr. Eric W. Veerkamp, Compliance Project ManagerGeysers Power Company, LLC
24091412/10/2021 GPC Application for Confidential Designation Monthly Recommissioning Report Appendicies

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24090812/10/2021 CPC November 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24083112/3/2021 Unit 3 Sonoma applications-fire suppression docs-2018
2017-2018
33 page(s)
 CEC/Drew BohanEllison Schneder Harris Donlan
24083012/3/2021 Unit 3 Sonoma applications-fire suppression docs-2018
2013-2016
33 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24082912/3/2021 Unit 3 Sonoma applications-fire suppression docs-2018

33 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan
24082812/3/2021 Unit 3 Sonoma applications-fire suppression docs-2018
BOD 2021
 CEC/Drew BohanEllison Schneider Harris & Donlan
24082712/3/2021 Unit 3 Sonoma applications-fire suppression docs-201
 CEC/Drew BohanEllison Schneider Harris & Donlan
24079212/3/2021 Unit 3 Sonoma applications for confidential designation - fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24066411/22/2021 Application for Confidential Designation

8 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24065711/22/2021 GPC October 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24056111/10/2021 June 2021 Monthly Recommissioning Report

Compliance
3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris Donlan
24055411/10/2021 Monthly Recommissioning Report_August 2020_PUBLIC

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24053211/9/2021 December 2020 Geysers Monthly Recommissioning Report

4 page(s)
 CEC/docket unitCalifornia Energy Commission
24052611/9/2021 November 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24052011/9/2021 October 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051411/9/2021 September 2020 Geysers Monthly Recommissioning Report

5 page(s)
 CEC/docket unitCalifornia Energy Commission
24050811/9/2021 Monthly Recommissioning Report_July 2020

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24050211/9/2021 Monthly Recommissioning Report (June 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049611/9/2021 Monthly Recommissioning Report (May 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049111/9/2021 August 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049011/9/2021 July 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/docket unitCalifornia Energy Commission
24048911/9/2021 September 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/docket unitCalifornia Energy Commission
24048811/9/2021 May 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/docket unitCalifornia Energy Commission
24048611/9/2021 GPC Monthly Recommissioning Report - April 2020

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24048411/9/2021 February 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24048311/9/2021 April 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24048211/9/2021 March 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24048111/9/2021 January 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
23570311/19/2020 ORDER APPROVING SETTLEMENT

3 page(s)
 CEC/DocketsCalifornia Energy Commission
23532910/20/2020 ORDER APPROVING PETITION TO AMEND THE FACILITY LICENSE
Order Number 20-1014-4
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2347099/15/2020 Staff Analysis PTA - Sonoma
Staff Analysis of Petition to Amend for Recommissioning Activities; Installation of a permanent standby diesel engine driven pump
Compliance
72 page(s)
 CEC/DocketsEnergy Commission
2339727/21/2020 Sonoma (Unit 3) Petition for Modification for Installation of Diesel Standby - Air District Health Risk Analysis

22 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2336046/23/2020 Notice of Receipt
Notice of Receipt Petition for Post Certification Project Change Geysers Sonoma Unit 3
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2326924/8/2020 Geysers Power Company, LLC Comments - 2019 Annual Compliance Report

Compliance
16 page(s)
 CEC/DocketsGeysers Power Company, LLC
2326084/1/2020 Sonoma (Unit 3) Petition for Modification

11 page(s)
 CEC/DocketsEllison Schneider Harris & Donlan LLP
23132112/26/2019 2018 Annual Compliance Report for the Sonoma Power Plant (Unit 3, SMUD GEO 1)
2018 Annual Compliance Report for the Sonoma Power Plant (Unit 3, SMUD GEO 1) at the Geysers
Compliance
17 page(s)
 Mr Eric VeerkampGeysers Power Company, LLC
23027610/18/2019 RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING
Resolution No: 19-1014-4
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22566310/31/2018 Compliance Docketing Policy

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2102312/8/2016 Final Permission for Exec. Order B-36-16 Expedited Processing & N. Sonoma Air Pollution Control Dist Authority to Construct(ATC)

8 page(s)
 Geysers Power Company, LLC/James KluesenerCalifornia Energy Commission
2101862/5/2016 Sonoma (Unit 3) Response to Rotor Petition to Amend Data Request

2 page(s)
 CEC/Dockets UnitGeysers Power Company, LLC
2101842/5/2016 Sonoma (Unit 3) Petition to Amend for Low Pressure Rotor Replacement

6 page(s)
 CEC/Camille Remy-ObadGeysers Power Company, LLC
2072941/13/2016 Sonoma (Unit 3) Executive Director's Approval of Expedited Processing for Cooling Tower Replacement

2 page(s)
 Geysers Power Company, LLC/James KluesenerCalifornia Energy Commission
2071981/6/2016 Geysers Power Sonoma (Unit 3)- Cooling Tower Replacement Project Description and Request for Expedited Processing

19 page(s)
 CEC/Robert OglesbyGeysers Power Company, LLC
20676511/24/2015 Sonoma (Unit 3) Compliance Plan

114 page(s)
  California Energy Commission
20676411/24/2015 Sonoma (Unit 3) 1981 Final Decision

174 page(s)
  California Energy Commission
20664611/16/2015 Executive Director's Response Letter to Calpine's Request to Obtain & Implement County-Issued Demolition Permit for Fire Damage

2 page(s)
 Rosemary Antonopoulos/Calpine CorporationCalifornia Energy Commission
586089/23/2010 Notice of Decision

1 page(s)
 CA Resources AgencyCEC
584919/16/2010 Order Approving Termination of the MOU & LOU Between CEC & USGS

3 page(s)
 CEC/Docket UnitCEC/C. Stora
568945/28/2010 Letter requesting Termination of MOU between Energy Commission and the USGS

7 page(s)
 CEC/ M. DyasUnited States Department of Interior
319497/23/2004 REVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES - - GEYSERS POWER COMPY, LLC

180 page(s)
 CEC/DocketsRtp Environmental Associates
319467/23/2004 Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.

42 page(s)
 CEC/K. Defolo/docketsCa Rwqcb
311063/12/2004 Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes

3 page(s)
 Calpine/Carlsen/docketsCEC/Tronaas
310943/12/2004 Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater

1 page(s)
 Office Of Planning & Research/DocketsCEC/Tronaas
309592/20/2004 Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater
Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C)
2 page(s)
 CEC/DocketsCEC/O'brien
304798/15/2003 Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'brien/CecCalifornia Regional Water Quality Control Board/Ma
296888/15/2003 Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'brien/CecCalifornia Regional Water Quality Control Board/Ma
291586/27/2003 Notice of Receipt, Petition to Amend the Energy Commission Decisions

3 page(s)
 DocketsCEC/O'brien
291526/25/2003 Notice of Receipt, Petition to Amend the Energy Commission Decisions (79-AFC-1C)

1 page(s)
 DocketsCEC/O'brien
291386/25/2003 License Amendments

40 page(s)
 CEC/Tronaas/complianceCh2mhill/Salamy
117944/22/1999 Commission Order Approving Ownership Transfer

1 page(s)
 CEC/Docket FileCEC/Keese
107343/30/1999 Notice of Receipt - The CEC has received a petition requesting an ownership change for the Sonoma Geothermal Power Project.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
90697/16/1998 Transfer of SMUDGEO #1 Geothermal Power Projcet License to Calpine Geysers Company, L.P. - SMUD Requests that the Commission Execute License Transfer, Effective July 16, 1998.

1 page(s)
 CEC/Docket UnitSmud/Ingwers
90217/14/1998 Commission Order Approving Transfer of License (Order No. 98-0624-1(a))

2 page(s)
 CEC/Docket FileCEC/Keese
88046/12/1998 Notice of Receipt SMUD Petition transfer SMUDGEO #1 Geothermal Power Plant License, to Calpine Geysers Company, L.P.
Information Request Form is attached
2 page(s)
 CEC/Docket UnitCEC/Haussler For Therkelsen
   CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_First Quarter

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Standpipe and Hose System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_Second Quarter

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Private Fire Service Main Quarterly and Annual Report_Second Quarter

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Main Drain Test Continuation Form_Third Quarter

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Third Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter

4 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Main Drain Test Continuation_Fourth Quarter

1 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Pre-Action Sprinkler System Quarterly and Annual Report_Fourth Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Annual Deluge Sprinkler System Report_Fourth Quarter

15 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Annual Fire Pump Report

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Semi-Annual Fire Alarm Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 3 Annual Fire Alarm Report

9 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP