51294 | 4/24/2009 |
PG&E's Petition for Ownership Change and Extension of License
7 page(s)
| | CEC/ Docket Unit | GalatiBlek/ A. Garner |
39072 | 1/24/2007 |
Letter RE filed Petition for Post-Certification Amendment and that instead of requesting changes to HAZ-6 proposed in petition, they ask HAZ-6 be deleted.
2 page(s)
| | CEC/ S. Munro | Midway Power LLC/ K. Stein |
32325 | 9/13/2004 |
CAlifornia for Renewable Energy, Inc. vs. California Energy Commission - Verified Petition for the Exercise of Original Jurisdiction to Review and Issue a Writ of Mandate Nullifying a Decision of the CEC
25 page(s)
| | CEC/Dockets | Care/Boydgabrielli Law Office/gabrielli |
32257 | 9/8/2004 |
Letter re: Request for Investigation to the Chief Counsel. POS
6 page(s)
| | CEC/Docket | Robert Sarvey |
32203 | 8/26/2004 |
Petitions For Reconsideration.
1 page(s)
| | CEC/Docket | City Of Tracy/D. Bilbrey |
32137 | 8/20/2004 |
Order Denying Intervenors' Petitions for Reconsideration
7 page(s)
| | CEC/Docket | CEC Cec |
32097 | 8/13/2004 |
Order Denying Intervenors' Petitions for Reconsideration.
10 page(s)
| | CEC/Dockets | CEC/Keese/boyd/pfannenstiel/rosenfeld/geesman |
32086 | 8/11/2004 |
Comments on the Air Quality Control for the Tesla Project.
1 page(s)
| | Pao/Docket Optical | Marianne Griffith |
32077 | 8/11/2004 |
Petitions for Reconsideration - Tesla Power Project
1 page(s)
| | CEC/Dockets/keese | City Of Tracy/Bibrey |
32060 | 8/5/2004 |
Applicant's Reply Brief to Intervenors' Petition for Reconsideration for the Tesla Power Project - POS
12 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
32058 | 8/5/2004 |
Commission Staff's Response to Petitions for Reconsideration - POS
7 page(s)
| | CEC/Dockets | CEC/Kramer |
31977 | 7/29/2004 |
Final Biological Opinion - Tesla Power Project
2 page(s)
| | CEC/Dockets/caswell | Broadbent/Usepa/rios |
31919 | 7/20/2004 |
Notice of Commission Hearing on Petitions for Reconsideration - POS
5 page(s)
| | CEC/Docket | CEC/Keese |
31897 | 7/16/2004 |
Errata To Request for Reconsideration. POS
4 page(s)
| | CEC/Dockets | Care/M. Boyd |
31892 | 7/15/2004 |
Request for Reconsideration of CAlifornians for Renewable Energy, Inc. POS
11 page(s)
| | CEC/Dockets | Care/M. Boyd |
31891 | 7/15/2004 |
Petition for Reconsideration of CEC Decision. Pos
7 page(s)
| | CEC/Dockets | Robert Sarvey |
31796 | 6/23/2004 |
Commission Decision for Tesla - POS - Publication Number P800-04-014
535 page(s)
| | CEC/Dockets | CEC/Commissioners |
31788 | 11/7/2001 |
Potential Air Emission Offsets, Confidentiality Application, Tesla Power Project, Dockets Not. 01-AFC-21.
3 page(s)
| | Scott A. Galati | CEC/Larson |
31776 | 6/21/2004 |
Commission Adoption Order for the Tesla Power Project
3 page(s)
| | Dockets | CEC/Commissioners |
31771 | 6/16/2004 |
Tesla - - Notice of Determination
2 page(s)
| | CEC/Dockets | CEC Cec |
31761 | 6/16/2004 |
Commission Adoption Order.
3 page(s)
| | CEC/Dockets | CEC Cec |
31736 | 6/15/2004 |
Errata to the Revised Presiding Member's Proposed Decision. POS
9 page(s)
| | CEC/Dockets | CEC Cec |
31733 | 6/15/2004 |
Commission Staff's Response to Intervener Sarvey's Motion to Delay Certification & Comments on Revised PMPD. POS
10 page(s)
| | CEC/Dockets | CEC/P. Kramer |
31712 | 6/10/2004 |
Staff's Opposition to Intervenor CARE's Request for Clarification
5 page(s)
| | CEC/Docket | CEC/Kramer |
31711 | 6/10/2004 |
Update Regarding the Biological Opinion - POS
4 page(s)
| | CEC/Geesman/rosenfeld | CEC/Kramer |
31671 | 6/9/2004 |
Report of Conversation between Jack Caswell, CEC and Scott Busa, Tesla Power Project regarding submittal of Environmental Filing Fee.
1 page(s)
| | Tesla Power Project/Busa | CEC/Caswell |
31659 | 6/7/2004 |
Comments on the Revised PMPD
12 page(s)
| | CEC/Geesman/rosenfeld | CEC/Kramer |
31658 | 6/7/2004 |
Intervenor Sarvey's Comments on the Revised PMPD and Motion to Delay Certification
34 page(s)
| | CEC/Docket | Bob Sarvey |
31657 | 6/7/2004 |
Applicant's Comments on the Revised PMPD - POS
5 page(s)
| | CEC/Docket | Galati & Blek/Galati |
31651 | 6/7/2004 |
Comments on Revised PMPD - POS
3 page(s)
| | CEC/Docket | San Joaquin Air Pollution Control District/Swaney |
31634 | 6/3/2004 |
Request for formal consultation with the US Fish and Wildlife Service regarding the Environmental Protection Agency's proposed issuance of a Prevention of Sugnificiant Deterioration permit.
37 page(s)
| | CEC/Dockets/rios/caswell | Us Dept Of Interior/Rios/sanchez |
31620 | 6/1/2004 |
Request for Clarification on Biological Resources "toxic emissions"./POS
4 page(s)
| | CEC/Dockets | Californians For Renewable Energy, Ind/Boyd |
31615 | 6/1/2004 |
CARE'S Request for Clarification.
2 page(s)
| | CEC/Dockets | Boyd/Californians For Renewable Energy, Inc. |
31602 | 5/26/2004 |
Tesla Decision - Stating his frustration with the decision for the Tesla power project.
4 page(s)
| | CEC/Flint/docket Unit | Bob Sarvey |
31507 | 5/13/2004 |
REVISED Presiding Member's Proposed Decision. POS
551 page(s)
| | CEC/Dockets | CEC Cec |
31506 | 5/13/2004 |
Submittal of the REVISED Presiding Member's Proposed Decision (PMPD).
1 page(s)
| | List | CEC Cec |
31505 | 5/13/2004 |
Notice of Availability of the REVISED Presiding Member's Proposed Decision. POS
3 page(s)
| | CEC/Dockets | CEC Cec |
31430 | 5/10/2004 |
Exhibit 178 - ARB Particulate Matter <10 Microns Projected Emission Inventory
4 page(s)
| | CEC/Docket | Arb |
31416 | 5/7/2004 |
BRIEF on April 8, 2004 Hearing from Intervenor Robert Sarvey. POS
44 page(s)
| | CEC/Dockets | R. Sarvey |
31388 | 5/6/2004 |
Recommended COCs with Staff Changes for Tesla; originally from Applicant's 8/29/03 testimony- - Air Quality. (Exhibit 123)
3 page(s)
| | CEC/Dockets | CEC Cec |
31387 | 5/6/2004 |
Staff's RESPONSE to Intervenor's April 29, 2004 Request for Clarification of Staff's Testimony & to reopen the Record. POS
5 page(s)
| | CEC/Dockets | CEC/P. Kramer |
31345 | 4/29/2004 |
Request for Clarification of Staff's Testimony at the April 8, 2004 Hearing and Motion to reopen the record to enter clarification
6 page(s)
| | CEC/Docket | Robert Sarvey |
31285 | 4/21/2004 |
Exhibit regarding Division of School Fees for the Tesla Power Project - POS
11 page(s)
| | CEC/Geesman/rosenfeld | CEC/Kramer |
31233 | 4/13/2004 |
Metro Tracy newspaper article entitled, Construction Stirs Up Spores
2 page(s)
| | CEC/Dockets | Bob Sarvey |
31220 | 4/12/2004 |
Comments on the PMPD - Land Use
3 page(s)
| | CEC/Dockets | Sarvey |
31219 | 4/12/2004 |
Comments on the Tesla Power Plant Hearing - Air Quality
1 page(s)
| | CEC/Dockets | Dominguez |
31218 | 4/12/2004 |
Whatcom County's Prefiled Testimony on Revised Application Witness
3 page(s)
| | List | List |
31217 | 4/12/2004 |
Whatcom County's Prefiled Testimony
3 page(s)
| | CEC/Dockets | Dr. Koening |
31216 | 4/12/2004 |
Question regarding use of dry cooling
1 page(s)
| | CEC/Dockets | Sunberg |
31215 | 4/12/2004 |
Comments on the PMPD
1 page(s)
| | CEC/Dockets | Sundberg |
31205 | 4/7/2004 |
Commission Staff's Response to Applicant Proposed Changes to Soil & Water Conditions. POS
10 page(s)
| | CEC/Dockets | CEC/P. Kramer |
31190 | 4/6/2004 |
Responses to the Committee Order Staff Declarations - POS
10 page(s)
| | CEC/Docket | CEC/Caswell |
31184 | 4/2/2004 |
Request for Appearance of CEC air quality expert, Tuan Ngo, at April 8th Evidentiary Hearing on Exhibits 111 and 112 as proposed by Witness Sarvey
3 page(s)
| | CEC/Docket | Care/Boyd |
31181 | 4/1/2004 |
Applicant's Testimony (with Exhibits) for Tesla. POS
147 page(s)
| | CEC/Dockets | Tesla Power/S. Galati |
31179 | 4/1/2004 |
Intervenor R. Sarvey's Supplemental Testimony, Exhibit List, & Exhibits for the April 8, 2004 Hearing. (Ex 111 + cd w/model files (54 pgs) Ex 112 (10 pgs) Ex 113 (65 pgs) Ex 114-1 (14) Ex 115 Tracy Gateway EIR (325 pgs) Ex 116 Tracy Hills Tech. Park (262 pgs) Ex 117 Commonwealth Massachusetts Dept Envir. Protection (32 pgs) Ex 118-1 Attachment B (6
777 page(s)
| | CEC/Dockets | R. Sarvey |
31177 | 4/1/2004 |
Applicant's COMMENTS on the Presiding Member's Proposed Decision for the Tesla Power Project. POS
10 page(s)
| | CEC/Dockets | Midway Power, Llc/S. Galati |
31176 | 4/1/2004 |
Applicant's Proposed Exhibit List (Exhibit #169 thru #177) for the Tesla Power Project. POS
5 page(s)
| | CEC/Dockets | Midway Power, Llc/S. Galati |
31175 | 3/30/2004 |
Response to the Committee Order and Comments on the PMPD for the Tesla Power Project (01-AFC-21)./POS
52 page(s)
| | CEC/Geesman/rosenfeld | CEC/Caswell |
31144 | 3/24/2004 |
Comments on the Presiding Member's Proposed Decision and Notice of Evidentiary Hearing and Notice of Committee Conference, Water Supply for Tesla Power Project.
4 page(s)
| | CEC/Caswell | City Of Tracy/Bayley |
31135 | 3/23/2004 |
Comments on the Tesla Power Project PMPD (01-AFC-21) POS
6 page(s)
| | CEC/Jack Caswell | City Of Tracy/Dan Bilbrey |
31111 | 3/15/2004 |
CEC Staff's Opposition to Intervenor CARE's Request to Reopen the Record - POS
5 page(s)
| | CEC/Docket | CEC/Kramer |
30997 | 2/26/2004 |
Presiding Members Proposed Decision - POS - Publication # P800-04-007
528 page(s)
| | CEC/Dockets | CEC/Geesman/rosenfeld |
30996 | 2/26/2004 |
Signture page for the Presiding Members Proposed Decision
1 page(s)
| | CEC/Dockets | CEC/Geesman/rosenfeld |
30993 | 2/26/2004 |
Notice of Availability of the Presiding Member's Proposed Decision and Notice of Evidentiary Hearing and Notice of Committee Conference - POS
11 page(s)
| | CEC/Dockets | CEC/Geesman/rosenfeld |
30980 | 2/25/2004 |
Request for Supplemental Evidentiary Hearing on Biological Resources - POS
144 page(s)
| | CEC/Dockets | Boyd |
30845 | 2/5/2004 |
Request for Concurrence of No Take of Endangered Species for the Buena Vista Storage District
2 page(s)
| | Buena Vista Water Storage Dist/Milobar/cec/dockets | Us Department Of Interior/Nagano |
30827 | 2/4/2004 |
Energy Commission Staff Change, staff attorney Darcie Houck is replaced by Paul Kramer
1 page(s)
| | Bob Sarvey:fpl Staff; Full Project Staff; Michael | Jack Caswell |
30719 | 1/12/2004 |
Staff's Amended Response to December 16, 20003 Committee Order/POS
33 page(s)
| | CEC/Dockets | CEC/Houck |
30706 | 12/31/2003 |
Intervenor Sarvey's Supplemental Testimony on Staff's Conditions of Certification
12 page(s)
| | CEC/Dockets | R. Sarvey |
30686 | 12/31/2003 |
Staff Response to December 16, 2003 Committee Order - POS
37 page(s)
| | CEC/Dockets | CEC/Houck |
30685 | 12/31/2003 |
Final Staff Assessment and Addendums Conditions of Certification
132 page(s)
| | Dockets | CEC Cec |
30682 | 12/31/2003 |
Applicant's Supplemental Brief Related to Biological Resources for Tesla - POS
5 page(s)
| | CEC/Dockets | Galati & Bled/Galati |
30681 | 12/31/2003 |
Applicant's Supplemental Socioeconomics Testimony of Scott A. Busa for Tesla - POS
5 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
30622 | 12/18/2003 |
Tesla - -Letter from Bob Sarvey regarding biology expert.
1 page(s)
| | CEC/S. Gefter/dockets | Bob Sarvey |
30621 | 12/17/2002 |
Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP)
39 page(s)
| | CEC/Caswell | Foster Wheeler Environmental Corporation/Moussavia |
30613 | 12/17/2003 |
Tesla --COMMITTEE ORDER DIRECTING PARTIES TO CLARIFY EVIDENCE. POS
23 page(s)
| | CEC/Dockets | CEC Cec |
30498 | 12/2/2003 |
Tesla Reply Brief - POS
44 page(s)
| | CEC/Dockets | Care/Boyd |
30489 | 12/1/2003 |
Staff's Reply Brief - POS
25 page(s)
| | CEC/Dockets | CEC Cec Houck |
30488 | 12/1/2003 |
Midway Power LLC's Reply Brief for the Tesla Power Project - POS
29 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
30487 | 12/1/2003 |
Proposed Banking of 200 tons per year of PM10 Emission Reduction Credits from Paving Roads at Altamont Landfill & Resources Recovery facility located in Livermore
2 page(s)
| | Baaqmd/Garvey/cec/dockets | Us Environmental Protection Agency/Rios |
30486 | 12/1/2003 |
Intervenor Sarvey's Reply Brief - POS
45 page(s)
| | CEC/Dockets | Sarvey |
30326 | 11/6/2003 |
Buena Vista WSD/Rosedale - Rio Bravo WSD Banking and Recovery Program - POS
14 page(s)
| | Us Interior Fish & Wildlife Service/White/cec/dock | Buena Vista Water Storage District/Milobar |
30279 | 11/3/2003 |
Opening Brief of Commission Staff - POS
36 page(s)
| | CEC/Dockets | CEC/Houck |
30278 | 11/3/2003 |
Staff Testimony in Response to Committee Questions - POS
33 page(s)
| | CEC/Dockets | CEC/Houck |
30274 | 11/3/2003 |
Request for Supplemental Evidentiary Hearing in Lu of Opening Brief - POS
5 page(s)
| | CEC/Dockets | Care/Boyd |
30273 | 11/3/2003 |
Midway Power LLC's Opening Brief for Tesla - POS
23 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
30271 | 11/3/2003 |
Intervenor Sarvey's Post Hearing Brief and Objection to Omissions and Errors in the Transcript - POS
19 page(s)
| | CEC/Dockets | R. Sarvey |
30265 | 10/30/2003 |
Applicant's Supplemental Testimony on Air Quality for Tesla Power Project
9 page(s)
| | CEC/Docket | Galati & Blek/Galati |
30230 | 3/4/2003 |
Response to Sarvey Data Requests 2/16/03 - POS
3 page(s)
| | Robert Sarvey | CEC/Caswell |
30178 | 10/21/2003 |
Response to Letter of September 6, 2003 regarding Compliance with Alameda County's Measure D
3 page(s)
| | Paul W. Rea | CEC/Chew |
30121 | 10/9/2003 |
Letter of Opposition
1 page(s)
| | CEC/Dockets | Thomas |
30120 | 10/9/2003 |
Recycled Water Agreement POS
4 page(s)
| | Fpl Energy/Busa/cec/dockets | City Of Tracy/Bayley |
30119 | 10/9/2003 |
Clarification of the US Fish and Wildlife Service Testimony at the Sept. 9, 2003 Hearing concerning Water Supply POS
5 page(s)
| | CEC/Caswell/dockets | Us Dept Of The Interior Fish And Wildlife/White |
30118 | 10/9/2003 |
Notification of Change of Address in the Proof of Service POS
4 page(s)
| | CEC/All Parties/dockets | CEC/Fontanilla |
30054 | 10/3/2003 |
Supplemental System Impact Study Report, dated October 4, 2003 POS
98 page(s)
| | CEC/Dockets | Galati And Blek/Galati |
30053 | 10/3/2003 |
Supplemental System Impact Study Report, dated August 30, 2002 POS
23 page(s)
| | CEC/Dockets | Galati And Blek/Galati |
30039 | 10/1/2003 |
Letter of thanks to Mr. Kinnel regarding Mr. Kinnel's letter regarding Tesla & East Altamont, and Alameda County Measure D.
2 page(s)
| | Kinnell/Dockets | CEC/Allen |
30019 | 9/29/2003 |
Letter of Opposition
1 page(s)
| | CEC/Dockets | Eielson |
29996 | 9/24/2003 |
Comments from Susan Sarvey.
1 page(s)
| | CEC/Dockets | Susan Sarvey |
29994 | 9/8/2003 |
Declaration of Donna Jordan.
1 page(s)
| | CEC/Dockets | Jordan/Cec |
29983 | 9/22/2003 |
Comments regarding Tesla Power Project and East Altamont Energy Center - POS.
4 page(s)
| | CEC/Dockets | David Schneider |
29981 | 9/25/2003 |
Public Comment from Irene Sundberg RE: Tesla Power Plant Project
2 page(s)
| | CEC/Dockets | Irene Sundberg |
29970 | 9/22/2003 |
David Schneider's comments regarding East Altamont Energy Center and Tesla Power Project.
4 page(s)
| | CEC Cec | Dr. David Schneider |
29969 | 9/22/2003 |
Public comment for the Tesla Power Project
4 page(s)
| | CEC/Dockets | Sharon Votaw |
29954 | 9/23/2003 |
Comments from Ann Mooney, CEC Tesla Evidentiary Hearing 9/18/03.
2 page(s)
| | CEC/Dockets | Ann Mooney |
29953 | 9/23/2003 |
Comments from Carole Dominguez, Tesla Evidentiary Hearing 9/18/03.
11 page(s)
| | CEC/Dockets | Carole Dominguez |
29952 | 9/23/2003 |
Comments before CEC Tesla Evidentiary Hearing 9/18/03.
5 page(s)
| | CEC/Dockets | Celeste Garamendi |
29950 | 9/19/2003 |
Buena Vista/Rosedale-Rio Bravo Water Banking & Recovery Program
23 page(s)
| | CEC/Dockets | Rosedale-rio Bravo Water Storage District |
29949 | 9/19/2003 |
U.S. Environmental Protection Agency - Enforcement & Compliance History Online (ECHO) Detailed Facility Report
2 page(s)
| | CEC/Dockets | |
29948 | 9/19/2003 |
California Air Resources Board - Highest 4 Daily PM10 Measurements and Annual PM10 Statistics at Stockton-Hazelton Street
1 page(s)
| | CEC/Dockets | |
29947 | 9/19/2003 |
DRAFT-Agreement for Water Supply Service between the Alameda County Flood Control and Water Conservation District - Zone 7 and Midway Power LLC.
12 page(s)
| | CEC/Dockets | Alameda Cty Flood Ctrl & Wtr Conserv Dist-zone 7 & |
29946 | 9/19/2003 |
DRAFT-Agreement by and between the Rosedale-Rio Bravo Water Storage District, the Buena Vista Water Storage District, and Midway Power, LLC
19 page(s)
| | CEC/Dockets | Rosedale-rio Bravo Wsd/Buena Vista Wsd/midway Powe |
29945 | 9/19/2003 |
Testimony of Eric Parfrey, AICP
10 page(s)
| | CEC/Dockets | Eric Parfrey |
29944 | 9/19/2003 |
Notice to Comply
38 page(s)
| | CEC/Dockets | Sjvuapcd |
29943 | 9/19/2003 |
Questions whether the proposed Tesla Power Project complies with Public Resources Code Section 25523(d)(2).
1 page(s)
| | CEC/Dockets | Jang/Bay Area Air Quality Management District |
29942 | 9/19/2003 |
Draft 2003 PM10 Plan
1 page(s)
| | CEC/Dockets | Sjvuapcd |
29938 | 9/22/2003 |
Transcript: Evidentiary Hearing before the California Energy Resources Conservation and Development Commission (9/10/03).
252 page(s)
| | CEC/Dockets | CEC Cec |
29933 | 9/17/2003 |
Letter of Opposition
4 page(s)
| | CEC/Dockets | P. Rea |
29932 | 9/16/2003 |
Letter of Opposition
5 page(s)
| | CEC/Dockets | J. Callahan |
29931 | 9/16/2003 |
Letter of Opposition
4 page(s)
| | CEC/Dockets | J. Mcgraw |
29916 | 9/16/2003 |
Letter of Opposition POS
5 page(s)
| | CEC/Dockets | Mcgraw |
29914 | 9/16/2003 |
Letter of opposition POS
1 page(s)
| | CEC/Docket | J. Callahan |
29913 | 9/16/2003 |
Public Comment Form re: Land Use, Traffic, Construction Dust, Air Quality
3 page(s)
| | CEC/Docket | M. Griffith |
29912 | 9/16/2003 |
Public Comment Form re: Water and Biology
3 page(s)
| | CEC/Docket | G. Griffith |
29911 | 9/16/2003 |
Public Comment Form re: Land Use, Air
3 page(s)
| | CEC/Dockets | E. Sparks |
29910 | 9/16/2003 |
Sign In Sheet for Sept. 11, 2003 Evidentiary Hearing
2 page(s)
| | CEC/Docket | Tesla Power |
29909 | 9/16/2003 |
Public Comment Form Re: Requesting Full Mitigation from Project Impacts to Tracy Fire Dept.
2 page(s)
| | CEC/Docket | C. Dominiguez |
29908 | 9/16/2003 |
Public Comment Form Expressing Support
2 page(s)
| | CEC/Docket | Ben Curran |
29907 | 9/16/2003 |
Public Comment Form re: Opposition to power plant
3 page(s)
| | CEC/Docket | Paul Sundberg |
29906 | 9/16/2003 |
Public Comment Form re: Fire
3 page(s)
| | CEC/Docket | Irene Sundberg |
29905 | 9/16/2003 |
Public Comment Form Re:Fire Protection
6 page(s)
| | CEC/Docket | Susan Sarvey |
29904 | 9/16/2003 |
Sign In Sheet Evidentiary Hearing
2 page(s)
| | CEC/Docket | Tesla Power |
29903 | 9/16/2003 |
Public Comment Form re: Air Quality, Water and Dust Control
4 page(s)
| | CEC/Docket | Griffith/Marianne And Gordon |
29902 | 9/15/2003 |
Buena Vista WSD/Rosedale-Rio Bravo WSD Banking and Recovery Program, Tesla Power Project Water Supply, Buena Vista Shrew - POS.
7 page(s)
| | Jones/Us Dept Of Interior/fish & Wildlife Svc/cec/ | Milobar/Buena Vista Water Storage District |
29901 | 9/15/2003 |
Comments regarding the proposed Calpine and Midway power plants in the eastern County.
1 page(s)
| | Alameda County Board Of Supervisors/Cec/dockets | Ernest Callenbach |
29891 | 9/11/2003 |
Opposition to both the East Altamont Energy Center and the Tesla Power Project.
1 page(s)
| | CEC/Dockets | Erik Ferry |
29885 | 9/12/2003 |
CARE's Public Comments on Water Resources
7 page(s)
| | CEC/Dockets | Boyd/Californians For Renewable Energy Inc. |
29853 | 9/10/2003 |
Testimony of Steve Baker on Power Plant Efficiency and Gas Supply. Declaration and resume attached.
4 page(s)
| | CEC/Dockets | Baker/Cec |
29840 | 9/9/2003 |
Alameda County CDA: Tentative findings related to hypothetical Conditional Use Permit for the Proposed Tesla Power Project - POS.
6 page(s)
| | Allen/Cec/dockets | Jensen/Alameda County Community Development Agency |
29839 | 9/8/2003 |
Staff's Supplemental Exhibits
3 page(s)
| | CEC/Dockets | CEC Cec |
29838 | 9/8/2003 |
Comment letter of August 5 regarding project's potential impacts on the regional trail plans for the former SP railroad alignment that is located adjacent to the Tesla site.
1 page(s)
| | Fiala/East Bay Regional Park District/cec/dockets | Rivasplata/Par Environmental Services, Inc. |
29837 | 9/5/2003 |
Staff's Supplemental Sponsored Testimony and Rebuttal Testimony
17 page(s)
| | CEC/Dockets | Houck/Cec |
29836 | 9/8/2003 |
Supplemental System Impact Study Report, dated 6/20/02, for the Tesla Power Project - POS.
462 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29835 | 9/8/2003 |
Addendum Supplemental System Impact Study Report, dated 12/6/02, for the Tesla Power Project - POS.
143 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29834 | 9/5/2003 |
Letter from Mr. Chris Hansmeyer, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 3/26/03, for the Tesla Power Project - POS.
9 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29833 | 9/5/2003 |
Letter from Mr. Chris Hansmeyer, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 2/6/03, for the Tesla Power Project - POS.
5 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29832 | 9/5/2003 |
Williams, D., and A. Harpster. 2001. Status of the Buena Vista Lake Shrew (Sorex Ornatus Relictus). Report prepared for the US Bureau of Reclamation, dated 10/29/01 - POS.
27 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29831 | 9/5/2003 |
Applicant's Rebuttal Testimony on Biological Resources and Traffic and Transportation, for the Tesla Power Project - POS
18 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29830 | 9/5/2003 |
Letter from Mr. David Osias, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 5/21/03, for the Tesla Power Project - POS.
4 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29829 | 9/5/2003 |
Applicant's Updated Exhibit List as of 9/5/03, for the Tesla Power Project - POS.
9 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29828 | 9/5/2003 |
Intervenor Robert Sarvey's Tentative Exhibit List and Dick Schneider's Resume - POS.
9 page(s)
| | CEC/Dockets | Robert Sarvey |
29827 | 9/5/2003 |
Notice of Revised Evidentiary Hearing Schedule for the Tesla Power Project - POS.
7 page(s)
| | CEC/Dockets | Geesman/Rosenfeld/cec |
29826 | 9/5/2003 |
Prepared Testimony of Steven G. Bayley, Deputy Director of Public Works, City of Tracy, and Susan P. Jones, Chief, San Joaquin Valley Branch Endangered Species Division, United States Fish and Wildlife Service - POS.
12 page(s)
| | CEC/Dockets | Houck/Cec |
29825 | 6/2/2003 |
Alameda County Fire Department's Comments on RPMPD
56 page(s)
| | CEC/Dockets | Alameda County Fire Department |
29810 | 9/8/2003 |
Comments from the Alameda County Fire Department regarding the RPMPD for Tesla.
56 page(s)
| | CEC/Dockets | Alameda County Fire Dept/W. Mccammom, Chief |
29799 | 9/4/2003 |
Midway Power's Request for Modification to Evidentiary Hearing Schedule for the Tesla Power Project - POS
6 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power Llc |
29786 | 8/29/2003 |
CEC's Second Addendum to Staff's Final Staff Assessment - POS.
84 page(s)
| | CEC/Dockets | Houck/Cec |
29784 | 8/29/2003 |
Applicant's Testimony for the Tesla Power Project - POS.
281 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29782 | 9/4/2003 |
Midway Power's Request for Modification to Evidentiary Hearing Schedule for the Tesla Power Project - POS.
6 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29780 | 9/3/2003 |
Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act, dated 1/2/03 for the Tesla Power Project - POS.
21 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29778 | 9/3/2003 |
Map of Water Conveyance Facilities for the Tesla Power Project - POS.
4 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29776 | 9/3/2003 |
BAAQMD Permit Evaluation and Emission Calculations for Altamont Landfill ERC, dated 2/10/03 for the Tesla Power Project - POS.
12 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29774 | 9/3/2003 |
Engineering Report, Tesla Power Project North-Reach User Impacts, dated March 2003 for the Tesla Power Project - POS.
21 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29773 | 9/3/2003 |
Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act Contract, dated 3/18/03 for the Tesla Power Project - POS.
13 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29772 | 9/3/2003 |
Letter from DWR to CEC concerning White Paper, dated 11/26/02 for the Tesla Power Project - POS.
6 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29768 | 9/3/2003 |
Exhibit List for the Tesla Power Project - POS
5 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29767 | 9/3/2003 |
Alameda County Board Resolution Number R-2003-322 Granting the Tentative Partial Cancellation of Williamson Act Contract, dated 2/6/03 for the Tesla Power Project. POS.
11 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29766 | 9/3/2003 |
White Paper relating to DWR reliability, dated 11/15/02 for the Tesla Power Project. POS.
9 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek, Llp/midway Power, Llc |
29765 | 9/3/2003 |
Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act Contract, dated 1/31/2003 for the Tesla Power Project. POS.
5 page(s)
| | Epps/Cec/dockets | Galati/Galati & Blek Llp/midway Power |
29762 | 9/4/2003 |
Alameda County CDA: Tentative findings related to hypothetical conditional use permit for the proposed Tesla Power Plant.
3 page(s)
| | Allen/Cec/dockets | Jensen/Alameda County Community Development Agency |
29761 | 9/3/2003 |
Statement on Witnesses & Exhibits of CAlifornians for Renewable Energy, Inc. (CARE) - POS
70 page(s)
| | CEC/Dockets | Boyd/Care |
29734 | 8/29/2003 |
Intervenor Sarvey Exhibit List - POS
74 page(s)
| | CEC/Dockets | Bob Sarvey |
29732 | 8/29/2003 |
Comments in response to the FSA Addendum, Reclaimed Water Supply Pipeline for the Tesla Power Project Dated July, 2003.
3 page(s)
| | Caswell/Cec/dockets | Nagano/Us Dept Of The Interior, Fish And Wildlife |
29731 | 8/29/2003 |
Contra Costa Water District's supplement to original comment letter dated 3/13/03 - POS.
5 page(s)
| | Caswell/Cec/dockets | Denton/Contra Costa Water District |
29730 | 8/29/2003 |
RE: Alameda County's letter dated 7/24/03 RE: Zone 7 is continuing to work towards a Water Supply Agreement for Tesla. Provided that technical issues and remaining contractual issues are resolved, then an agreement can be prepared to provide water in a timely manner for the power plant start up. - POS.
1 page(s)
| | Caswell/Cec/dockets | Wong/Alameda County Flood Control & Water Conserva |
29729 | 8/29/2003 |
Intervenor Bob Sarvey's Additional Exhibit Declaration of Richard A. Schneider - POS
19 page(s)
| | CEC/Dockets | Bob Sarvey |
29701 | 8/26/2003 |
Water Supply for the Tesla Power Project. Response to the FSA Addendum, Reclaimed Water Supply Pipeline dated 7/03 - POS
6 page(s)
| | CEC/Caswell/dockets | Nagano/U.s. Dept. Of The Interior |
29606 | 8/14/2003 |
Notice of Evidentiary Hearings and Hearing Order for the Tesla Power Project. POS
11 page(s)
| | CEC/Dockets | CEC/J. Geesman/a. Rosenfeld |
29603 | 8/14/2003 |
Public Comments from Gordon & Marianne Griffith regarding the Tesla Power Project; the subjects are: Air Quality, Water, Noise. These comments were sent to the Tracy Press & the TRI-Valley Heald.
2 page(s)
| | CEC/Dockets | Community Resident, G. & M. Griffith |
29580 | 8/11/2003 |
Site Visit and Prehearing Conference Before the California Energy Resources Conservation and Development Commission
159 page(s)
| | CEC/Dockets | CEC Cec |
29494 | 8/6/2003 |
Request by Californians for Renewable Energy, Inc. (CARE) for an Excused Absence from the July 30, 2003 Pre-hearing Conference. POS
5 page(s)
| | CEC/Dockets | Care/Michael Boyd |
29458 | 7/31/2003 |
Tesla Public Comment Form - - regarding Land Use.
1 page(s)
| | CEC/Dockets | Resident/J. Wagner |
29453 | 7/31/2003 |
Prehearing Conference for Tesla -- sign-in sheet.
2 page(s)
| | CEC/Dockets | CEC Cec |
29452 | 7/31/2003 |
Tesla Public Comment Form -- regarding "Air" - "Fire" - "Water."
1 page(s)
| | CEC/Dockets | Community Resident, Laura Simon |
29421 | 7/28/2003 |
Letter to inform Zone 7's continuation in the negotiations with Midway Power LLC - POS
4 page(s)
| | CEC/Casewell/dockets | Alameda County Flood Control And Water Conservatio |
29379 | 7/22/2003 |
Enclosed 12 copies of Midway Power's Pre-hearing Conference Statement for the Tesla Power Project---POS
9 page(s)
| | Docket/Cec | Galati & Blek/Galati |
29356 | 7/22/2003 |
In the Matter of Tesla -- Staff's Pre- Hearing Conference Statement. POS
27 page(s)
| | CEC/Dockets | CEC/D. Houck |
29353 | 7/22/2003 |
Pre- Hearing Conference Statement of CAlifornian's for Renewable Energy, Inc. (CARE). POS
60 page(s)
| | CEC/Dockets | Californians For Renewable Energy, Inc. (care)/M. |
29352 | 7/22/2003 |
Tesla Pre- Hearing Conference -- Statement Intervenor Sarvey. POS
9 page(s)
| | CEC/Dockets | Robert Sarvey |
29342 | 7/21/2003 |
Prehearing Conference Statement for the Tesla Power Project.--POS
3 page(s)
| | CEC/Dockets | San Joaquin Valley Air Pollution Control District/ |
29301 | 7/18/2003 |
Request for Agency Comments on the FSA Addendum for the Tesla Power Project (01-AFC-21) - To: Agency Distribution List
4 page(s)
| | CEC/Dockets | CEC/Richins |
29277 | 7/17/2003 |
Final Staff Assessment Addendum Reclaimed Water Supply Pipeline
232 page(s)
| | CEC/Dockets | |
29273 | 7/16/2003 |
Notice of Availability Distribution.
2 page(s)
| | CEC/Dockets | CEC/P. Richins |
29272 | 7/17/2003 |
Agency Distribution.
1 page(s)
| | CEC/Dockets | CEC/P. Richins |
29271 | 7/18/2003 |
Librarian (Members of the Public) Distribution.
2 page(s)
| | CEC/Dockets | CEC/P. Richins |
29140 | 7/2/2003 |
Final Staff Assessment Addendum Biological Appendices - POS
110 page(s)
| | CEC/Dockets | CEC/Caswell |
29090 | 6/24/2003 |
Request for Designation of Confidential Information for Tesla - POS
4 page(s)
| | CEC/Therkelsen | CEC/De Leon |
29080 | 6/18/2003 |
Current Proof of Service List for Tesla
4 page(s)
| | All Parties/Dockets | CEC/Fontanilla |
29069 | 6/18/2003 |
Notice of Site Visit and Prehearing Conference
5 page(s)
| | CEC/Dockets | CEC/Geesman/rosenfeld |
28971 | 6/11/2003 |
Tesla Power Plant, Alameda County recycled water supply pipeline and interim water supply - POS
4 page(s)
| | CEC/Erichsen/dockets | Ca Dept. Of Fish And Game/Gan |
28919 | 6/6/2003 |
Hearing Officers Assignment - Susan Gefter share duties with Major Williams
1 page(s)
| | Commissioners/Dockets | CEC/Keese |
28872 | 6/2/2003 |
Letter in reply to SWR-02-SA-6153:JSS A POS
5 page(s)
| | CEC/Richins/dockets | Us Epa/Aceituno |
28715 | 5/22/2003 |
TriValley Herald - What's Going on With Altamont Power Plants
3 page(s)
| | CEC/Dockets | Boyd |
28664 | 5/7/2003 |
Request for Agency Comments on the Final Staff Assessment for Tesla
1 page(s)
| | CEC/Caswell/dockets | Public Works/Johnson |
28663 | 5/7/2003 |
Comments on the Final Staff Assessment
1 page(s)
| | CEC/Caswell/dockets | Borrman |
28636 | 5/7/2003 |
Transmission System Reliability for Tesla
36 page(s)
| | CEC/Dockets | California Iso |
28633 | 5/7/2003 |
Livermore Area Trails
2 page(s)
| | CEC/Caswell/dockets | East Bay Regional Park Dist/Fiala |
28613 | 5/3/2003 |
List of errata from the FDOC
5 page(s)
| | CEC/Dockets | Baaqmd/Jang |
28562 | 2/26/2003 |
Comments on the Sempra Proposal
1 page(s)
| | CEC/Dockets | Ghandhi |
28521 | 4/16/2003 |
Meeting Discussing the FPL Energy's Planned Tesla Power Project - POS
6 page(s)
| | City Of Tracy/Pinhey/dockets | Fpl Energy/Grant |
28468 | 4/8/2003 |
Final Staff Assessment - POS
812 page(s)
| | CEC/Dockets | CEC Cec |
28465 | 4/8/2003 |
Document Handling for Tesla
2 page(s)
| | Librarian/Dockets | CEC/Richins |
28464 | 4/8/2003 |
Request for Agency Comments on the Final Staff Assessment
1 page(s)
| | Agency Distribution/Dockets | CEC/Richins |
28463 | 4/8/2003 |
Notice of Availability - Final Staff Assessment for Tesla
2 page(s)
| | CEC/Dockets | CEC/Richins |
28418 | 4/4/2003 |
Petition for Order Directing Response to Intervenor's Data Request - POS
3 page(s)
| | CEC/Dockets | Sarvey |
28390 | 3/24/2003 |
Altamont Landfill and Resource Recovery Facility Banking Application 3421
18 page(s)
| | CEC/O'brien/dockets | Baaqmd/Norton |
28334 | 3/19/2003 |
Report of Conversation Bruce Jensen - Response to 7/26/02 Letter on Visual
6 page(s)
| | CEC/Dockets | Knight/Riverplata |
28270 | 3/14/2003 |
Comments on the Preliminary Staff Assessment POS
9 page(s)
| | CEC/Caswell/dockets | Contra Costa Water District/Denton |
28207 | 3/4/2003 |
FDOC Comment Response Letters - POS
19 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
28206 | 3/4/2003 |
Final Determination of Compliance for Tesla - POS
90 page(s)
| | CEC/Dockets | Galtai & Blek/Galati |
28171 | 3/4/2003 |
Final Determination of Compliance
88 page(s)
| | Tesla Power/Busa/cec/dockets | Baaqmd/Norton |
28113 | 2/20/2003 |
Final Interconnection Approval POS
14 page(s)
| | Pg&e/Daniels/cec/dockets | Cal Iso/Miller |
28109 | 2/19/2003 |
Notice of Preparation of a Draft Environmental Impact Report for the Proposed Altamont Pipeline Project
5 page(s)
| | CEC/Dockets | Zone 7 Water Agency/Fong |
28086 | 2/18/2003 |
Data Request 1 to the California Energy Commission Staff POS
9 page(s)
| | CEC/Dockets | Sarvey |
28039 | 2/11/2003 |
Recycled Water
2 page(s)
| | City Of Tracy/Diaz/cec/dockets | Allen Matkins Leck Gamble/Hansmeyer |
27951 | 2/3/2003 |
Minutes of the Board of Directors
52 page(s)
| | CEC/Dockets | |
27912 | 1/30/2003 |
Recycled Water
7 page(s)
| | Florida Power & Light/Busa | City Of Tracy/Diaz |
27904 | 1/29/2003 |
Letter from D. J. O'Bryant, Dept of Conservation to J. Sorensen Alameda Co. Community Dev Agency Re: Tentative Partial Contract Cancellation of Williamson Act Contract and Letter from G. A. Bakerink of Stroup, Bakerink & McCusker to P. Gatz, DOC Re: partial Cancellation of Land Conservation Contract - POS
6 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
27903 | 1/29/2003 |
Confidential Draft Biological Mitigation Proposal and Figure 3.1
4 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
27880 | 1/24/2003 |
Notice of Intent to Partially Cancel a Land Conservation Contract/Notice of Intent to Adopt a Negative Declarations
2 page(s)
| | CEC/Dockets | Alameda County Community Dev. Dept/Sorensen |
27797 | 1/8/2003 |
Request of Midway Power for Partial Cancellation of Land Conservation Contract
18 page(s)
| | Board Of Supervisors/Cec/dockets | Alameda County Community Development Agency/Martin |
27787 | 1/7/2003 |
Recycled Water for the Tesla Power Project
1 page(s)
| | Florida Power And Light/Busa/cec/dockets | City Of Tracy/Bayley |
27755 | 12/30/2002 |
Landscape Plan and Visual Simulations
7 page(s)
| | CEC/Caswell/dockets | Foster Wheeler Environmental Corp/Moussavian |
27706 | 12/24/2002 |
Status Report # 5 - POS
6 page(s)
| | CEC/Geesman/rosenfeld/dockets | CEC/Caswell |
27664 | 12/17/2002 |
BRMIMP Response to Recent Biological Discussions
33 page(s)
| | CEC/Caswell/dockets | Foster Wheeler Environmental Corp/Moussavian |
27609 | 12/12/2002 |
Request for Confidential Designation for Attachment A, the letter from Linda Moussavian
3 page(s)
| | CEC/Dockets | Galati And Blek/Galati |
27582 | 12/11/2002 |
Details of Proposed Compensation Lands for San Joaquin Kit Fox Impact Mitigation
3 page(s)
| | Us Epa/Ross/cec/dockets | Foster Wheeler Environmental Corp/Moussavian |
27581 | 12/11/2002 |
Recycled Water for the Tesla Power Project
1 page(s)
| | CEC/Dockets | City Of Tracy/Diaz |
27571 | 12/9/2002 |
Summary Notes from Meeting Between Zone 7 and FPLE
5 page(s)
| | CEC/Dockets | |
27569 | 12/5/2002 |
Preliminary Comments on Tesla Power Plant Water Supply Reliability November 15, 2002 White Paper
3 page(s)
| | CEC/Dockets | Zone 7 Water Agency |
27551 | 12/4/2002 |
Answers to Questions in Regard to the Operational Aspects
6 page(s)
| | CEC/Mediati/dockets | Department Of Water Resources/Creel |
27526 | 12/2/2002 |
Consistency of Tesla Power Plant Project with ECAP Policies Relevant to Visual Resources
2 page(s)
| | Alamenda Co. Planning Dept/Sorensen/dockets | CEC/Knight |
27502 | 11/22/2002 |
Biological Resources Kit for Fox Habitat Sue Orloff Comments POS
4 page(s)
| | CEC/Dockets | Sarvey |
27480 | 11/20/2002 |
Status of the Buena Vista Lake Shaw - Final Report in Partial Fulfillment of the Central Valley Project Improvement Act
38 page(s)
| | CEC/Dockets | Csu Stanislaus/Williams/harpster |
27462 | 11/20/2002 |
Proposed Banking of 200 Tons Per Year Emission Reduction Credits from Paving Roads at Altamont Landfill & Resource Recovery Facility Located in Livermore - POS
5 page(s)
| | Baaqmd/Garvey/cec/dockets | Us Environmental Protection Agency/Rios |
27447 | 11/15/2002 |
Public and Agency Comment-Sarvey topic:Water
1 page(s)
| | CEC/Dockets | Tesla Power Plant Project |
27427 | 11/14/2002 |
Public and Agency Comments Form: CACLE
2 page(s)
| | CEC/Dockets | S. Sarvey |
27395 | 11/13/2002 |
Response to Letter dated 10/21/02 re: Ability to Respond from Proposed Fire Station in Livermore
2 page(s)
| | Risk Science Assoc/Greenberg/cec/dockets | Alameda County Fire Dept/Mccammon |
27392 | 11/13/2002 |
Applicant's Counsel's Notice of Firm Name Change for Tesla Power Project - POS
4 page(s)
| | CEC/Dockets | Galati & Blek/Galati |
27391 | 11/13/2002 |
Figure 1 - Water Supply to the Tesla Power Project - POS
4 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
27379 | 11/12/2002 |
Conceptual Landscape Plan Guidelines for Tesla
4 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Heeley |
27322 | 11/6/2002 |
Applicant's Comments on the Preliminary Staff Assessment for Tesla - POS
33 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
27314 | 11/5/2002 |
Final Environmental Impact Report for the Buena Vista/Rosedale - Rio Bravo Water Banking & Recovery Program for Tesla - POS
362 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
27313 | 11/5/2002 |
Visual Resources Guidelines (including map)
7 page(s)
| | Fpl Company/Busa/dockets | CEC/Caswell |
27309 | 11/4/2002 |
Letter re: concerns from the public regarding the proposed calculation of PM10 emissions from the cooling tower
3 page(s)
| | Baaqmd/Jang/cec/dockets | Urs/Stein |
27308 | 11/5/2002 |
Status Report #4 - POS
7 page(s)
| | CEC/Geesman/rosenfeld/dockets | CEC/Caswell |
27305 | 11/5/2002 |
Second Supplement Response to CEC's Third Data Request
125 page(s)
| | CEC/Larson/dockets | Foster Wheeler Environmental Corp/Moussavian |
27298 | 11/5/2002 |
Sempra Energy Utilities Comments on the 2003 Integrated Energy Report
5 page(s)
| | CEC/Dockets | State Governmental Affairs/Orozco |
27268 | 10/31/2002 |
Preliminary Staff Assessment for the Tesla
2 page(s)
| | CEC/Caswell/dockets | Alameda County Flood Control & Water Conservation/ |
27219 | 10/31/2002 |
Workshop Notice - Issue Resolution Workshop - POS
6 page(s)
| | CEC/Dockets | CEC/Geesman |
27160 | 10/24/2002 |
Comment on the Kit fox
1 page(s)
| | CEC/Erichsen/dockets | Ibis/Orloff |
27038 | 10/16/2002 |
Banking Application Evaluation Report and the Notice Inviting Written Public Comment
16 page(s)
| | CEC/Caswell/docket | Baaqmd/Garvey |
26924 | 10/8/2002 |
Current Proof of Service List for Tesla
4 page(s)
| | All Parties/Cec/dockets | CEC/Mcclintock |
26902 | 10/4/2002 |
Comment on concern about the kit fox
1 page(s)
| | CEC/Erichsen/dockets | Ibis/Orloff |
26892 | 10/4/2002 |
Response and comment for consideration on the East Altamont and Tesla Power Project POS
2 page(s)
| | CEC/Dockets | City Of Tracy Fire Department/Estes |
26843 | 10/1/2002 |
Comments on the Preliminary Determination of Compliance BAAQMD = POS
17 page(s)
| | CEC/Dockets | Sarvey |
26842 | 10/1/2002 |
E-mail concerned with the article regarding the PM2.5 not PM10 pollutant
1 page(s)
| | CEC/Pao/dockets | Griffith |
26828 | 10/1/2002 |
Ongoing Violations of CEC Public Notice Requirements - POS
5 page(s)
| | CEC/Dockets | Sarvey |
26787 | 9/26/2002 |
Supplemental Responses to CEC Third Data Request
70 page(s)
| | CEC/Larson/dockets | Foster Wheeler/Moussavian |
26785 | 9/25/2002 |
Project Mailing List - Preliminary Staff Assessment Data Responses # 3 Workshop
1 page(s)
| | Dockets | CEC Cec |
26776 | 9/25/2002 |
Sign-In Sheet for Preliminary Staff Assessment Water Resources Workshop
4 page(s)
| | CEC/Dockets | Tesla Power |
26775 | 9/25/2002 |
U.S. EPA Comments on BAAQMD PDOC
4 page(s)
| | Baaqmd/Garvey/cec/dockets | Us Epa/Rios |
26765 | 9/24/2002 |
Motion by Robert Sarvey for Rescheduling of the TPP Workshop Scheduled for 9/25/02 POS
4 page(s)
| | CEC/Dockets | Sarvey |
26754 | 9/23/2002 |
Comments on the PDOC POS
16 page(s)
| | Baaqmd/Garvey/cec/dockets | Urs/Stein |
26695 | 9/18/2002 |
Order Granting Petition to Intervene and Financial Hardship Petition - M. Boyd
5 page(s)
| | CEC/Dockets | CEC/Geesman/rosenfeld |
26676 | 9/17/2002 |
Errata to CARE's 9-16-02 Comments on Tesla Power Plant: SCONOx Disqualification for BAAQMD
6 page(s)
| | Baaqmd/Cec/dockets | Boyd |
26670 | 9/17/2002 |
Document Handling for the Tesla Power Plant
2 page(s)
| | Librarian/Dockets | CEC/Richins |
26669 | 9/17/2002 |
Request for Agency Comments on the PSA for Tesla Power Project
1 page(s)
| | Agency Dist./Dockets | CEC/Richins |
26665 | 9/17/2002 |
CARE's Comments on the PDOC
45 page(s)
| | CEC/Dockets | M. Boyd |
26661 | 9/18/2002 |
Response to Comments on Draft Environmental Impact Report for the Buena Vista / Rosendale-Rio Water Banking and Recovery Program - POS
14 page(s)
| | CEC/O'brian/dockets | Krieger & Stewart/Scriven |
26656 | 9/13/2002 |
Preliminary Staff Assessment - POS
662 page(s)
| | CEC/Dockets | CEC Cec |
26653 | 9/16/2002 |
Comments on Preliminary Determination of Compliance
3 page(s)
| | Abbqmd/Garvey/cec/dockets | San Joaquin Valley Air Pollution Control Dist/Sadr |
26640 | 9/11/2002 |
Comments about the proposed second electrical generating plant for Blythe
2 page(s)
| | CEC/Dockets | City Of Blythe/Grotke |
26627 | 9/13/2002 |
Public Comment Form - "Take Your Plant Somewhere Else"
1 page(s)
| | CEC/Dockets | Mancebo |
26626 | 9/13/2002 |
Comments on Preliminary Determination of Compliance
4 page(s)
| | Baaqmd/Jang/cec/dockets | CEC/O'brian |
26623 | 9/12/2002 |
Workshop Notice - Preliminary Staff Assessment Data Responses # 3 Workshop for Tesla - POS
6 page(s)
| | CEC/Dockets | CEC/Geesman |
26622 | 9/13/2002 |
Workshop Notice - Preliminary Staff Assessment Water Resources Workshop for Tesla - POS
5 page(s)
| | CEC/Dockets | CEC/Geesman |
26544 | 8/27/2002 |
Repeated Application for Confidential Designation and Confidential Resources Data Responses #297 and #310
10 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
26523 | 8/23/2002 |
Data Response to CEC Staff Data Requests dated 7/23/02 - POS
148 page(s)
| | CEC/Dockets | Foster Wheeler Environmental Corp/Moussavian |
26485 | 8/20/2002 |
Comments on the Draft Environmental Impact Report dated 6/02 - POS
6 page(s)
| | Buena Vista Water Storage Dist/Bartel/cec/dockets | Dept Of Water Resources/Flory |
26481 | 8/19/2002 |
BAAQMD Preliminary Determination of Compliance - POS
88 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
26474 | 8/19/2002 |
Preliminary Determination of Compliance Revised 8/16/2002
80 page(s)
| | CEC/Dockets | Baaqmd/Jang |
26448 | 8/15/2002 |
Preliminary Determination of Compliance
62 page(s)
| | Midway Power/Busa/dockets | Bbaqmd/Garvey |
26442 | 8/13/2002 |
Comments
8 page(s)
| | CEC/Caswell/dockets | County Of Alameda Public Works Agency/Borrmann |
26311 | 7/30/2002 |
Letter to Mr. Adolph Martinelli of the Alameda Co. Community Development Agency regarding a Request for Williamson Act Partial Cancellation and Creation of Agricultural Easement POS
40 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
26253 | 7/23/2002 |
3rd Round of Data Requests Numbering Correction POS
22 page(s)
| | CEC/Dockets | Fpl/Busa |
26209 | 7/17/2002 |
Status Report #3 POS
6 page(s)
| | CEC/Rosenfeld/dockets | CEC/Caswell |
26205 | 7/19/2002 |
3rd Round of Data Requests POS
22 page(s)
| | Fp/Busa/dockets | CEC/Caswell |
26191 | 7/16/2002 |
Repeated Application for Confidential Designation - Cultural Resources Responses # 230 and #238 for Tesla
2 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
26171 | 7/15/2002 |
Report of Conversation between P. Leary and Regional Water Quality Control Board RE: outlook of utilizing city of Tracy's Recycled Water
2 page(s)
| | CEC/Dockets | CEC/Caswell |
26170 | 7/12/2002 |
Supplemental Responses to CEC Second Data Requests - POS
26 page(s)
| | CEC/Larson | Foster Wheeler Environmental/Moussavian |
26143 | 7/10/2002 |
Record of Meeting
3 page(s)
| | CEC/Dockets | Usf&ws/Pau |
26142 | 7/10/2002 |
Public Hearing for Draft Environmental Impact Report - 7/18/02 - Bakersfield
1 page(s)
| | CEC/Dockets | Buena Vista Water Storage Dist./Bartel |
26141 | 7/10/2002 |
Report of Conversation with S. Busa, Midway Power, S. Galati, Midway Power re: Potential Revision by Applicant to the Williamson Act Easement Exchange Request for the Tesla Power Plant Project-Site
1 page(s)
| | CEC/Dockets | CEC/Hamblin |
26074 | 7/2/2002 |
Meeting Notes from 6/28/02
3 page(s)
| | CEC/Erichsen/dockets | N. Pau |
26033 | 6/27/2002 |
TPP cultural resources issues
2 page(s)
| | Moussavian/Cec/caswell/dockets | Foster Wheeler Environmental Corp/Reeve |
26031 | 6/26/2002 |
Draft Environmental Impact Report
363 page(s)
| | CEC/Caswell/dockets | Krieger And Stewart/Scriven |
26030 | 6/26/2002 |
Draft Environmental Impact Report
363 page(s)
| | CEC/Dockets | Krieger And Stewart/Scriven |
26029 | 6/27/2002 |
Supplementary Response to DR 245 Paragraph Addition
1 page(s)
| | CEC/Dockets | CEC/Caswell |
26028 | 6/27/2002 |
Data Response 240 and Data Response 241 Table 241-1 Soil Loss Estimates
1 page(s)
| | CEC/Dockets | Tesla Power Plant |
26008 | 6/26/2002 |
Report of Conversation between A. Zasso and SWP Operations Office, DWR re: SWP Outage Cause/History and Coordination for Construction of New Turnout POS
5 page(s)
| | CEC/Dockets | CEC/Caswell |
25937 | 6/17/2002 |
Sign In Sheet Data Response #2 and Issues Resolution Workshop
1 page(s)
| | CEC/Dockets | Tesla Power Project |
25858 | 6/10/2002 |
Status Report #2 POS
5 page(s)
| | CEC/Laurie/rosenfeld/dockets | CEC/Caswell |
25848 | 6/11/2002 |
Report of Conversation regarding Continuation of discussion of clarifications for data requests
3 page(s)
| | CEC/Dockets | CEC/Reinoehl |
25814 | 6/5/2002 |
Air Quality Mitigation Agreement between San Joaquin Valley Unified Air Pollution Control District and the Applicant, dated May 16, 2002, as further response to Data Requests #11 and #207 POS
11 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
25784 | 5/22/2002 |
System Impact/Facilities Study Report dated December 17, 2001 and Supplemental System Impact Study Report dated May 10, 2002 POS
1333 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
25772 | 5/30/2002 |
Northern Range Kit Fox Planning and Conservation Meeting Minutes
5 page(s)
| | CEC/Dockets | Hau |
25771 | 5/30/2002 |
Workshop Notice Data Response#2 and Issue Resolution Workshop POS
7 page(s)
| | CEC/Dockets | CEC/Laurie |
25688 | 5/22/2002 |
Repeated Application for Confidential Designation Cultural Resources Survey
2 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
25679 | 5/20/2002 |
Technical Assistance for the Preliminary Staff Assessment POS
7 page(s)
| | CEC/Caswell/dockets | Us Dept. Of The Interior/Knight |
25656 | 5/15/2002 |
Preliminary Comments for Tesla Power Project - POS
6 page(s)
| | CEC/Caswell/dockets | County Of Alameda/Borrmann |
25642 | 5/17/2002 |
Data Response to CEC Staff data Request - POS
291 page(s)
| | CEC/Larson/dockets | Foster Wheeler Environmental/Moussavian |
25624 | 5/15/2002 |
Wildlands, Inc in Response to 5/6/02 Conservation Regarding Haera Wildlife Conservation Bank and the Proposed Florida Power and Light (FPL) - POS
8 page(s)
| | CEC/Erichsen/dockets | C. Bailey |
25617 | 5/15/2002 |
Comments on Buena Vista Water Storage District's Notice of Preparation of an EIR for the Proposed Buena Vista-Rio Bravo Water Banking and Recovery Program
3 page(s)
| | Buena Vista Water Storage Dist/Milobar/cec/dockets | CEC/Caswell |
25610 | 5/14/2002 |
Proposed Revision to 24-Hour Average PM10 Emission Rates -
2 page(s)
| | CEC/Jang/dockets | Urs/Eastep |
25536 | 5/8/2002 |
Proposed Tesla Power Plant Consistency with Alameda County General Plan and Williamson Act Contracts POS
8 page(s)
| | CEC/Haussler/dockets | Alameda County Community Development Agency/Martin |
25520 | 5/6/2002 |
Proposed Revision to 24-Hour Average PM 10 Emission - POS
5 page(s)
| | Baaqmd/Jang/cec/dockets | Urs/Eastep |
25495 | 5/3/2002 |
Status Report for Tesla Power Project - POS
6 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
25488 | 5/3/2002 |
Petition for Intervention with Financial Hardship on behalf of CARE
2 page(s)
| | CEC/Dockets | M. Boyd |
25382 | 4/23/2002 |
RR/BV Water Banking and Recovery Program - Scoping Meeting
36 page(s)
| | Tesla Power Plant Workgroup/Dockets | Puena Vista Water Storage Dist./Bartel |
25377 | 4/23/2002 |
Tesla Power Project - Project Background and Summary
3 page(s)
| | National Marine Fisheries Ser/Stuart/cec/dockets | Foster Wheeler Environmental Corp./Moussavian |
25362 | 4/22/2002 |
Memorandum of Understanding Regarding Operation and Monitoring of the Kern Water Bank Groundwater Banking Program POS
24 page(s)
| | CEC/Dockets | Kern Water Bank |
25320 | 4/17/2002 |
2nd Round of Data Requests POS
24 page(s)
| | Fpl Co/Busa/dockets | CEC/Caswell |
25310 | 4/16/2002 |
Initial Study and Environmental Checklist for the Buena Vista/Rosedale Rio-Bravo Water Banking and Recovery Program
53 page(s)
| | CEC/Dockets | Buena Vista Storage District |
25272 | 4/12/2002 |
Status Report #1 POS
6 page(s)
| | CEC/Laurie/rosenfeld/dockets | CEC/Caswell |
25160 | 4/3/2002 |
Data Response to CEC Staff Data Requests 2/5/02
4 page(s)
| | CEC/Larson/dockets | Foster Wheeler Environmental Corp/Moussavian |
25159 | 4/2/2002 |
Response to the inquiry from J. Kessler re: the availability of recycled water from the City of Tracy to serve the Tesla Energy Center - POS
4 page(s)
| | CEC/Caswell/dockets | City Of Tracy/Bayley |
25086 | 3/29/2002 |
Report of Conversation with Caswell, CEC; Dougherty, PAR; Manier, PAR; Davy, FW re: Continuation of discussion of clarifications needed for data requests
3 page(s)
| | CEC/Dockets | CEC/Reinoehl |
25081 | 3/28/2002 |
Tesla Power Project Biological Assessment
129 page(s)
| | Dockets | Foster Wheeler Environmental Corp |
25078 | 3/29/2002 |
Review of Air Quality Impact Analysis
8 page(s)
| | Stationary Source Division/Werner/cec/dockets | Air Resource Board/Ranzieri |
25070 | 3/28/2002 |
Biological Assessment on Tesla Power Plant
129 page(s)
| | Dockets | Foster Sheeler Environmental Corp |
25044 | 3/26/2002 |
Concerns re: the increasing use of course particulate matter emission reduction to offset combustion-generated fine particulate matter increases
2 page(s)
| | Air Pollution Control Dist/Cec/dockets | Air Resources Board/Kenny |
25031 | 3/27/2002 |
Repeated Application for Confidential Designation - Phase I Archaeological Investigation Report for Tesla
2 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
25018 | 3/22/2002 |
Ambient Noise Survey - Tesla Power Project
8 page(s)
| | CEC/Dockets | |
24950 | 3/8/2002 |
Data Responses to CEC Staff Data Requests dated 3/5/02
4 page(s)
| | CEC/Larson/dockets | Foster Wheeler Environmental Corp/Moussavian |
24949 | 3/15/2002 |
Repeated Application for Confidential Designation and Confidential Phase I Archaeological Investigation Report
2 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
24878 | 3/8/2002 |
Data Responses to CEC Staff Data Requests - POS
341 page(s)
| | CEC/Larson/dockets | Foster Wheeler Environmental Corp./Moussavian |
24847 | 3/7/2002 |
Workshop Notice - Issues Resolution and Data Response - March 25-26, 2002 - Livermore - POS
6 page(s)
| | CEC/Dockets | CEC/Laurie |
24836 | 3/7/2002 |
Comments on listed species - POS
7 page(s)
| | CEC/Richins/dockets | Dept. Of Fish & Game/Floerke |
24807 | 3/5/2002 |
Receipt of Initiation of Formal Consultation
2 page(s)
| | Us Environmental Protection Agency/Rios/cec/docket | Us Department Of Interior/Knight |
24757 | 3/4/2002 |
Report of Conversation with Scott Busa, Midway Power regarding Williamson Act Contract Procedure
1 page(s)
| | CEC/Dockets | CEC/Hamblin |
24751 | 3/4/2002 |
Comments on Application for Certification Supplemental Material
1 page(s)
| | CEC/Dockets | County Of San Joaquin/Kirk |
24713 | 2/28/2002 |
Request for Formal Consultation Under Section 7 of the Federal Endangered Species Act for the Proposed Tesla Power Project
2 page(s)
| | Us Fish & Wildlife Service/Knight/cec/dockets | Us Environmental Protection Agency/Rios |
24712 | 2/28/2002 |
Committee Scheduling Order - POS
6 page(s)
| | CEC/Dockets | CEC/Laurie |
24663 | 2/20/2002 |
Letter of opposition
1 page(s)
| | CEC/Mendonca/dockets | Griffith |
24662 | 2/20/2002 |
Letter of concerns
2 page(s)
| | CEC/Mendonca/dockets | Murphy |
24661 | 2/20/2002 |
Technical Assistance for the Proposed Tesla Power Plant POS
6 page(s)
| | CEC/Richins/dockets | Us Dept Of The Interior/Knight |
24660 | 2/20/2002 |
San Joaquin Kit Fox Survey Protocol for the Northern Range POS
12 page(s)
| | CEC/Dockets | Us Fish And Wildlife Services |
24659 | 2/20/2002 |
Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance POS
9 page(s)
| | CEC/Dockets | Us Fish And Wildlife Service |
24658 | 2/20/2002 |
Petition for Intervention - Sadredin - POS
3 page(s)
| | CEC/Dockets | San Joaquin Valley Air Pollution Control Dist/Sadr |
24657 | 2/22/2002 |
Review of Application for Certification
2 page(s)
| | CEC/Caswell/dockets | Dept Of Toxic Substance Control/Wong |
24656 | 2/21/2002 |
Order Granting Petition to Intervene-San Joaquin Valley Air Pollution Control District POS
5 page(s)
| | CEC/Dockets | CEC/Laurie |
24655 | 2/21/2002 |
Sign-In Sheet for Informational Hearing and Site Visit
3 page(s)
| | CEC/Dockets | Fpl Tesla Power Project |
24552 | 2/15/2002 |
Order Granting Petition to Intervene and Financial Hardship Petition POS
5 page(s)
| | CEC/Dockets | CEC/Laurie |
24505 | 2/11/2002 |
Petition for Intervention Robert Sarvey POS
4 page(s)
| | CEC/Dockets | Sarvey |
24477 | 2/11/2002 |
Order Granting Petition to Intervene-CURE POS
4 page(s)
| | CEC/Dockets | CEC/Laurie |
24410 | 2/5/2002 |
Data Requests POS
55 page(s)
| | Fpl/Busa/dockets | CEC/Caswell |
24367 | 2/5/2002 |
Proposed Tesla Power Plant Consistency with Alameda County General Plan and Williamson Act Contract
4 page(s)
| | Alameda Co. Comm Dev. Agency/Martinelli/dockets | CEC/Haussler |
24366 | 2/5/2002 |
Project Issue Identification Report POS
11 page(s)
| | CEC/Laurie/moore/dockets | CEC/Caswell |
24342 | 2/1/2002 |
Notice of Informational Hearing and Site Visit 2/19/2002
7 page(s)
| | CEC/Dockets | CEC/Laurie/moore |
24234 | 1/22/2002 |
Tables and Graphs Referred to in Attachment B of the Tesla's Responses to the CEC Staff's list of Data Inadequacies - POS
5 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
24067 | 1/10/2002 |
Notice of Receipt of the Supplemental Material
1 page(s)
| | CEC/Dockets | CEC/Richins |
24052 | 1/10/2002 |
Document Handling for the Tesla Power Project
1 page(s)
| | Librarian/Dockets | CEC/Richins |
24051 | 1/10/2002 |
Notice of Receipt of the Supplemental Material for the AFC
1 page(s)
| | Dockets | CEC/Richins |
24046 | 1/14/2002 |
Petition to Intervene by CURE - POS
8 page(s)
| | CEC/Dockets | Cure/Josehp |
24039 | 1/10/2002 |
Supplemental Material
2 page(s)
| | Agency Distribution List/Dockets | CEC/Richins |
23945 | 1/10/2002 |
Attachment B of the Tesla's Power Project Responses to the CEC Staff's List of Data Inadequacies
18 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
23934 | 1/10/2002 |
Hearing Officer Assignment-Major Williams Jr.
1 page(s)
| | CEC/Commissioners/dockets | CEC/Keese |
23856 | 1/8/2002 |
Data Adequacy Recommendation (2)
74 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
23800 | 1/4/2002 |
Attachment B of the Responses to the CEC's Staff list of Data Inadequacies
26 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
23799 | 1/4/2002 |
Tesla DA-Air
1 page(s)
| | CEC/Caswell/dockets | Busa |
23770 | 1/4/2002 |
Repeated Application for Confidential Designation and the attached Confidential Cultural Resources Technical Report
2 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
23743 | 1/10/2002 |
Data Adequacy Responses for Telsa Power Project
300 page(s)
| | CEC/Dockets | Midway Power, Llc |
23676 | 12/26/2001 |
Clarification of letter sent to Scott Busa addressing the issue of the completeness of permit application
2 page(s)
| | Tesla Power/Busa/cec/dockets | Baaqmd/Jang |
23606 | 12/21/2001 |
The Existing Williamson Act Contract and the Proposed Tesla Power Plant
1 page(s)
| | CEC/Hamblin/dockets | Dennis O'bryant |
23585 | 12/20/2001 |
E-mail on Tesla's Completeness
1 page(s)
| | Urs/Stein/cec/dockets | Baaqmd/Cordova |
23557 | 12/19/2001 |
Application for an Authority to Construct and/or a Permit to Operate is complete
1 page(s)
| | Tesla Power Project/Bousa/cec/dockets | Bay Area Air Quality Management District/Morales-l |
23494 | 12/17/2001 |
Response Letter to 10/23/01 Request for Agency Participation
1 page(s)
| | CEC/Caswell/dockets | Department Of The Army/Finan |
23391 | 12/5/2001 |
Updated Modeling Analysis for the Tesla Power Plant Project
70 page(s)
| | CEC/Dockets | Urs |
23138 | 11/21/2001 |
Repeated Application for Confidential Designation and the attached Confidential Air Quality Offset information
2 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
23137 | 11/21/2001 |
Repeated Application for Confidential Designation and the attached Confidential Paleontological Resources Technical Report
2 page(s)
| | CEC/Dockets | Grattan And Galati/Grattan |
23057 | 11/13/2001 |
Review of CEC Siting Project
4 page(s)
| | Btandardized Permitting Branch/Sandhu/cec/dockets | Department Of Toxic Substance Control/Moskat |
23034 | 11/9/2001 |
Data Adequacy Recommendation
90 page(s)
| | CEC/Commissioners/dockets | CEC/Larson |
22980 | 11/7/2001 |
Follow-up to telephone conversation regarding summary of suggested approach for initiating Section 7 consultation with the US Fish and Wildlife
2 page(s)
| | Baaqmd/Boisblanc/cec/dockets | Foster Wheeler Environmental Corporation/Moussavin |
22978 | 11/7/2001 |
Cultural and Paleontological Resources Reports, Applications for Confidentiality
2 page(s)
| | Grattan And Galati/Galati/dockets | CEC/Larson |
22949 | 11/1/2001 |
System Impact/Facilities Study
1000 page(s)
| | CEC/Dockets | Pg&e |
22938 | 11/1/2001 |
Items needed to complete the evaluation of Application to Construct and Permit to Operate
4 page(s)
| | Tesla Power Project/Busa/cec/dockets | Baaqmd/Jang |
22932 | 10/30/2001 |
Letter to inform of a proposed power plant
2 page(s)
| | Member Of The Assembly/Leach/dockets | CEC/Keese |
22931 | 10/30/2001 |
Letter to inform of a proposed power plant
2 page(s)
| | Member Of The Senate/Torakson/dockets | CEC/Keese |
22930 | 10/30/2001 |
Letter to inform of a proposed power plant
2 page(s)
| | Mayor Of Tracy/Bilbrey/dockets | CEC/Keese |
22929 | 10/30/2001 |
Letter to inform of a proposed power plant
2 page(s)
| | Mayor Of Livermore/Brown/dockets | CEC/Keese |
22927 | 10/30/2001 |
Letter to inform of a proposed electric power plant
2 page(s)
| | Alameda County Board Of Supervisors/Haggerty/docke | CEC/Keese |
22825 | 10/23/2001 |
Document Handling
3 page(s)
| | Librarian | CEC/Richins |
22824 | 10/23/2001 |
Request for Agency Participation
3 page(s)
| | Agency Distribution List | CEC/Richins |
22787 | 10/23/2001 |
Notice of Receipt AFC
3 page(s)
| | Public Distribution/Dockets | CEC/Richins |
22786 | 10/23/2001 |
Notice of Receipt AFC
2 page(s)
| | Agencies/Dockets | CEC/Richins |
22739 | 10/18/2001 |
Letter of Opposition-traffic
3 page(s)
| | CEC/Dockets | Hand |
22706 | 10/18/2001 |
Application for Confidential Designation Air Quality Offset Information and AFC
4 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
22705 | 10/15/2001 |
Application for Confidential Designation and the attached Appendix O and Appendix 3, AFC
7 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
22681 | 10/15/2001 |
Application for Confidential Designation-Paleontological Resources Technical Report and Cultural Resources Technical Report
7 page(s)
| | CEC/Dockets | Grattan And Galati/Galati |
22678 | 10/12/2001 |
CD-ROM containing Air Quality and Public Health Modeling Files for the Tesla
10 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22677 | 10/12/2001 |
Figure 5.15-1B Complex Terrain within 10 Miles of the TPP Site (East Half)
3 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22676 | 10/12/2001 |
Figure 5.15-1A Complex Terrain within 10 Miles of the TPP Site (West Half)
3 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22675 | 10/12/2001 |
Figure 5.5-3 Biological Resources
3 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
22643 | 10/12/2001 |
Submittal of the Application for Certification - Tesla Power Project
1500 page(s)
| | CEC/Larson/dockets | Fpl Energy |
2030-0 | 8/11/2003 |
Site Visit and Prehearing Conference
164 page(s)
| | | |
1817-0 | 4/19/2004 |
Evidentiary Hearing, Committee Conference on PMPD
0 page(s)
| | | |
1766-0 | 9/30/2003 |
Evidentiary Hearing
431 page(s)
| | | |
1765-0 | 9/24/2003 |
Evidentiary Heaing
232 page(s)
| | | |
1764-0 | 9/23/2003 |
Evidentiary Hearing
278 page(s)
| | | |
1626-0 | 3/26/2002 |
Hearing
670 page(s)
| | | |
1613-0 | 2/26/2002 |
Informational Hearing and Site Visit
110 page(s)
| | | |