Docket Log

Docket: 01-AFC-21
Project Title: Tesla Power Project - Midway Power, LLC- 1120MW in Alameda County
Generated On: 3/28/2024 4:49:05 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
512944/24/2009 PG&E's Petition for Ownership Change and Extension of License

7 page(s)
 CEC/ Docket UnitGalatiBlek/ A. Garner
390721/24/2007 Letter RE filed Petition for Post-Certification Amendment and that instead of requesting changes to HAZ-6 proposed in petition, they ask HAZ-6 be deleted.

2 page(s)
 CEC/ S. MunroMidway Power LLC/ K. Stein
323259/13/2004 CAlifornia for Renewable Energy, Inc. vs. California Energy Commission - Verified Petition for the Exercise of Original Jurisdiction to Review and Issue a Writ of Mandate Nullifying a Decision of the CEC

25 page(s)
 CEC/DocketsCare/Boydgabrielli Law Office/gabrielli
322579/8/2004 Letter re: Request for Investigation to the Chief Counsel. POS

6 page(s)
 CEC/DocketRobert Sarvey
322038/26/2004 Petitions For Reconsideration.

1 page(s)
 CEC/DocketCity Of Tracy/D. Bilbrey
321378/20/2004 Order Denying Intervenors' Petitions for Reconsideration

7 page(s)
 CEC/DocketCEC Cec
320978/13/2004 Order Denying Intervenors' Petitions for Reconsideration.

10 page(s)
 CEC/DocketsCEC/Keese/boyd/pfannenstiel/rosenfeld/geesman
320868/11/2004 Comments on the Air Quality Control for the Tesla Project.

1 page(s)
 Pao/Docket OpticalMarianne Griffith
320778/11/2004 Petitions for Reconsideration - Tesla Power Project

1 page(s)
 CEC/Dockets/keeseCity Of Tracy/Bibrey
320608/5/2004 Applicant's Reply Brief to Intervenors' Petition for Reconsideration for the Tesla Power Project - POS

12 page(s)
 CEC/DocketsGalati & Blek/Galati
320588/5/2004 Commission Staff's Response to Petitions for Reconsideration - POS

7 page(s)
 CEC/DocketsCEC/Kramer
319777/29/2004 Final Biological Opinion - Tesla Power Project

2 page(s)
 CEC/Dockets/caswellBroadbent/Usepa/rios
319197/20/2004 Notice of Commission Hearing on Petitions for Reconsideration - POS

5 page(s)
 CEC/DocketCEC/Keese
318977/16/2004 Errata To Request for Reconsideration. POS

4 page(s)
 CEC/DocketsCare/M. Boyd
318927/15/2004 Request for Reconsideration of CAlifornians for Renewable Energy, Inc. POS

11 page(s)
 CEC/DocketsCare/M. Boyd
318917/15/2004 Petition for Reconsideration of CEC Decision. Pos

7 page(s)
 CEC/DocketsRobert Sarvey
317966/23/2004 Commission Decision for Tesla - POS - Publication Number P800-04-014

535 page(s)
 CEC/DocketsCEC/Commissioners
3178811/7/2001 Potential Air Emission Offsets, Confidentiality Application, Tesla Power Project, Dockets Not. 01-AFC-21.

3 page(s)
 Scott A. GalatiCEC/Larson
317766/21/2004 Commission Adoption Order for the Tesla Power Project

3 page(s)
 DocketsCEC/Commissioners
317716/16/2004 Tesla - - Notice of Determination

2 page(s)
 CEC/DocketsCEC Cec
317616/16/2004 Commission Adoption Order.

3 page(s)
 CEC/DocketsCEC Cec
317366/15/2004 Errata to the Revised Presiding Member's Proposed Decision. POS

9 page(s)
 CEC/DocketsCEC Cec
317336/15/2004 Commission Staff's Response to Intervener Sarvey's Motion to Delay Certification & Comments on Revised PMPD. POS

10 page(s)
 CEC/DocketsCEC/P. Kramer
317126/10/2004 Staff's Opposition to Intervenor CARE's Request for Clarification

5 page(s)
 CEC/DocketCEC/Kramer
317116/10/2004 Update Regarding the Biological Opinion - POS

4 page(s)
 CEC/Geesman/rosenfeldCEC/Kramer
316716/9/2004 Report of Conversation between Jack Caswell, CEC and Scott Busa, Tesla Power Project regarding submittal of Environmental Filing Fee.

1 page(s)
 Tesla Power Project/BusaCEC/Caswell
316596/7/2004 Comments on the Revised PMPD

12 page(s)
 CEC/Geesman/rosenfeldCEC/Kramer
316586/7/2004 Intervenor Sarvey's Comments on the Revised PMPD and Motion to Delay Certification

34 page(s)
 CEC/DocketBob Sarvey
316576/7/2004 Applicant's Comments on the Revised PMPD - POS

5 page(s)
 CEC/DocketGalati & Blek/Galati
316516/7/2004 Comments on Revised PMPD - POS

3 page(s)
 CEC/DocketSan Joaquin Air Pollution Control District/Swaney
316346/3/2004 Request for formal consultation with the US Fish and Wildlife Service regarding the Environmental Protection Agency's proposed issuance of a Prevention of Sugnificiant Deterioration permit.

37 page(s)
 CEC/Dockets/rios/caswellUs Dept Of Interior/Rios/sanchez
316206/1/2004 Request for Clarification on Biological Resources "toxic emissions"./POS

4 page(s)
 CEC/DocketsCalifornians For Renewable Energy, Ind/Boyd
316156/1/2004 CARE'S Request for Clarification.

2 page(s)
 CEC/DocketsBoyd/Californians For Renewable Energy, Inc.
316025/26/2004 Tesla Decision - Stating his frustration with the decision for the Tesla power project.

4 page(s)
 CEC/Flint/docket UnitBob Sarvey
315075/13/2004 REVISED Presiding Member's Proposed Decision. POS

551 page(s)
 CEC/DocketsCEC Cec
315065/13/2004 Submittal of the REVISED Presiding Member's Proposed Decision (PMPD).

1 page(s)
 ListCEC Cec
315055/13/2004 Notice of Availability of the REVISED Presiding Member's Proposed Decision. POS

3 page(s)
 CEC/DocketsCEC Cec
314305/10/2004 Exhibit 178 - ARB Particulate Matter <10 Microns Projected Emission Inventory

4 page(s)
 CEC/DocketArb
314165/7/2004 BRIEF on April 8, 2004 Hearing from Intervenor Robert Sarvey. POS

44 page(s)
 CEC/DocketsR. Sarvey
313885/6/2004 Recommended COCs with Staff Changes for Tesla; originally from Applicant's 8/29/03 testimony- - Air Quality. (Exhibit 123)

3 page(s)
 CEC/DocketsCEC Cec
313875/6/2004 Staff's RESPONSE to Intervenor's April 29, 2004 Request for Clarification of Staff's Testimony & to reopen the Record. POS

5 page(s)
 CEC/DocketsCEC/P. Kramer
313454/29/2004 Request for Clarification of Staff's Testimony at the April 8, 2004 Hearing and Motion to reopen the record to enter clarification

6 page(s)
 CEC/DocketRobert Sarvey
312854/21/2004 Exhibit regarding Division of School Fees for the Tesla Power Project - POS

11 page(s)
 CEC/Geesman/rosenfeldCEC/Kramer
312334/13/2004 Metro Tracy newspaper article entitled, Construction Stirs Up Spores

2 page(s)
 CEC/DocketsBob Sarvey
312204/12/2004 Comments on the PMPD - Land Use

3 page(s)
 CEC/DocketsSarvey
312194/12/2004 Comments on the Tesla Power Plant Hearing - Air Quality

1 page(s)
 CEC/DocketsDominguez
312184/12/2004 Whatcom County's Prefiled Testimony on Revised Application Witness

3 page(s)
 ListList
312174/12/2004 Whatcom County's Prefiled Testimony

3 page(s)
 CEC/DocketsDr. Koening
312164/12/2004 Question regarding use of dry cooling

1 page(s)
 CEC/DocketsSunberg
312154/12/2004 Comments on the PMPD

1 page(s)
 CEC/DocketsSundberg
312054/7/2004 Commission Staff's Response to Applicant Proposed Changes to Soil & Water Conditions. POS

10 page(s)
 CEC/DocketsCEC/P. Kramer
311904/6/2004 Responses to the Committee Order Staff Declarations - POS

10 page(s)
 CEC/DocketCEC/Caswell
311844/2/2004 Request for Appearance of CEC air quality expert, Tuan Ngo, at April 8th Evidentiary Hearing on Exhibits 111 and 112 as proposed by Witness Sarvey

3 page(s)
 CEC/DocketCare/Boyd
311814/1/2004 Applicant's Testimony (with Exhibits) for Tesla. POS

147 page(s)
 CEC/DocketsTesla Power/S. Galati
311794/1/2004 Intervenor R. Sarvey's Supplemental Testimony, Exhibit List, & Exhibits for the April 8, 2004 Hearing. (Ex 111 + cd w/model files (54 pgs) Ex 112 (10 pgs) Ex 113 (65 pgs) Ex 114-1 (14) Ex 115 Tracy Gateway EIR (325 pgs) Ex 116 Tracy Hills Tech. Park (262 pgs) Ex 117 Commonwealth Massachusetts Dept Envir. Protection (32 pgs) Ex 118-1 Attachment B (6

777 page(s)
 CEC/DocketsR. Sarvey
311774/1/2004 Applicant's COMMENTS on the Presiding Member's Proposed Decision for the Tesla Power Project. POS

10 page(s)
 CEC/DocketsMidway Power, Llc/S. Galati
311764/1/2004 Applicant's Proposed Exhibit List (Exhibit #169 thru #177) for the Tesla Power Project. POS

5 page(s)
 CEC/DocketsMidway Power, Llc/S. Galati
311753/30/2004 Response to the Committee Order and Comments on the PMPD for the Tesla Power Project (01-AFC-21)./POS

52 page(s)
 CEC/Geesman/rosenfeldCEC/Caswell
311443/24/2004 Comments on the Presiding Member's Proposed Decision and Notice of Evidentiary Hearing and Notice of Committee Conference, Water Supply for Tesla Power Project.

4 page(s)
 CEC/CaswellCity Of Tracy/Bayley
311353/23/2004 Comments on the Tesla Power Project PMPD (01-AFC-21) POS

6 page(s)
 CEC/Jack CaswellCity Of Tracy/Dan Bilbrey
311113/15/2004 CEC Staff's Opposition to Intervenor CARE's Request to Reopen the Record - POS

5 page(s)
 CEC/DocketCEC/Kramer
309972/26/2004 Presiding Members Proposed Decision - POS - Publication # P800-04-007

528 page(s)
 CEC/DocketsCEC/Geesman/rosenfeld
309962/26/2004 Signture page for the Presiding Members Proposed Decision

1 page(s)
 CEC/DocketsCEC/Geesman/rosenfeld
309932/26/2004 Notice of Availability of the Presiding Member's Proposed Decision and Notice of Evidentiary Hearing and Notice of Committee Conference - POS

11 page(s)
 CEC/DocketsCEC/Geesman/rosenfeld
309802/25/2004 Request for Supplemental Evidentiary Hearing on Biological Resources - POS

144 page(s)
 CEC/DocketsBoyd
308452/5/2004 Request for Concurrence of No Take of Endangered Species for the Buena Vista Storage District

2 page(s)
 Buena Vista Water Storage Dist/Milobar/cec/docketsUs Department Of Interior/Nagano
308272/4/2004 Energy Commission Staff Change, staff attorney Darcie Houck is replaced by Paul Kramer

1 page(s)
 Bob Sarvey:fpl Staff; Full Project Staff; MichaelJack Caswell
307191/12/2004 Staff's Amended Response to December 16, 20003 Committee Order/POS

33 page(s)
 CEC/DocketsCEC/Houck
3070612/31/2003 Intervenor Sarvey's Supplemental Testimony on Staff's Conditions of Certification

12 page(s)
 CEC/DocketsR. Sarvey
3068612/31/2003 Staff Response to December 16, 2003 Committee Order - POS

37 page(s)
 CEC/DocketsCEC/Houck
3068512/31/2003 Final Staff Assessment and Addendums Conditions of Certification

132 page(s)
 DocketsCEC Cec
3068212/31/2003 Applicant's Supplemental Brief Related to Biological Resources for Tesla - POS

5 page(s)
 CEC/DocketsGalati & Bled/Galati
3068112/31/2003 Applicant's Supplemental Socioeconomics Testimony of Scott A. Busa for Tesla - POS

5 page(s)
 CEC/DocketsGalati & Blek/Galati
3062212/18/2003 Tesla - -Letter from Bob Sarvey regarding biology expert.

1 page(s)
 CEC/S. Gefter/docketsBob Sarvey
3062112/17/2002 Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP)

39 page(s)
 CEC/CaswellFoster Wheeler Environmental Corporation/Moussavia
3061312/17/2003 Tesla --COMMITTEE ORDER DIRECTING PARTIES TO CLARIFY EVIDENCE. POS

23 page(s)
 CEC/DocketsCEC Cec
3049812/2/2003 Tesla Reply Brief - POS

44 page(s)
 CEC/DocketsCare/Boyd
3048912/1/2003 Staff's Reply Brief - POS

25 page(s)
 CEC/DocketsCEC Cec Houck
3048812/1/2003 Midway Power LLC's Reply Brief for the Tesla Power Project - POS

29 page(s)
 CEC/DocketsGalati & Blek/Galati
3048712/1/2003 Proposed Banking of 200 tons per year of PM10 Emission Reduction Credits from Paving Roads at Altamont Landfill & Resources Recovery facility located in Livermore

2 page(s)
 Baaqmd/Garvey/cec/docketsUs Environmental Protection Agency/Rios
3048612/1/2003 Intervenor Sarvey's Reply Brief - POS

45 page(s)
 CEC/DocketsSarvey
3032611/6/2003 Buena Vista WSD/Rosedale - Rio Bravo WSD Banking and Recovery Program - POS

14 page(s)
 Us Interior Fish & Wildlife Service/White/cec/dockBuena Vista Water Storage District/Milobar
3027911/3/2003 Opening Brief of Commission Staff - POS

36 page(s)
 CEC/DocketsCEC/Houck
3027811/3/2003 Staff Testimony in Response to Committee Questions - POS

33 page(s)
 CEC/DocketsCEC/Houck
3027411/3/2003 Request for Supplemental Evidentiary Hearing in Lu of Opening Brief - POS

5 page(s)
 CEC/DocketsCare/Boyd
3027311/3/2003 Midway Power LLC's Opening Brief for Tesla - POS

23 page(s)
 CEC/DocketsGalati & Blek/Galati
3027111/3/2003 Intervenor Sarvey's Post Hearing Brief and Objection to Omissions and Errors in the Transcript - POS

19 page(s)
 CEC/DocketsR. Sarvey
3026510/30/2003 Applicant's Supplemental Testimony on Air Quality for Tesla Power Project

9 page(s)
 CEC/DocketGalati & Blek/Galati
302303/4/2003 Response to Sarvey Data Requests 2/16/03 - POS

3 page(s)
 Robert SarveyCEC/Caswell
3017810/21/2003 Response to Letter of September 6, 2003 regarding Compliance with Alameda County's Measure D

3 page(s)
 Paul W. ReaCEC/Chew
3012110/9/2003 Letter of Opposition

1 page(s)
 CEC/DocketsThomas
3012010/9/2003 Recycled Water Agreement POS

4 page(s)
 Fpl Energy/Busa/cec/docketsCity Of Tracy/Bayley
3011910/9/2003 Clarification of the US Fish and Wildlife Service Testimony at the Sept. 9, 2003 Hearing concerning Water Supply POS

5 page(s)
 CEC/Caswell/docketsUs Dept Of The Interior Fish And Wildlife/White
3011810/9/2003 Notification of Change of Address in the Proof of Service POS

4 page(s)
 CEC/All Parties/docketsCEC/Fontanilla
3005410/3/2003 Supplemental System Impact Study Report, dated October 4, 2003 POS

98 page(s)
 CEC/DocketsGalati And Blek/Galati
3005310/3/2003 Supplemental System Impact Study Report, dated August 30, 2002 POS

23 page(s)
 CEC/DocketsGalati And Blek/Galati
3003910/1/2003 Letter of thanks to Mr. Kinnel regarding Mr. Kinnel's letter regarding Tesla & East Altamont, and Alameda County Measure D.

2 page(s)
 Kinnell/DocketsCEC/Allen
300199/29/2003 Letter of Opposition

1 page(s)
 CEC/DocketsEielson
299969/24/2003 Comments from Susan Sarvey.

1 page(s)
 CEC/DocketsSusan Sarvey
299949/8/2003 Declaration of Donna Jordan.

1 page(s)
 CEC/DocketsJordan/Cec
299839/22/2003 Comments regarding Tesla Power Project and East Altamont Energy Center - POS.

4 page(s)
 CEC/DocketsDavid Schneider
299819/25/2003 Public Comment from Irene Sundberg RE: Tesla Power Plant Project

2 page(s)
 CEC/DocketsIrene Sundberg
299709/22/2003 David Schneider's comments regarding East Altamont Energy Center and Tesla Power Project.

4 page(s)
 CEC CecDr. David Schneider
299699/22/2003 Public comment for the Tesla Power Project

4 page(s)
 CEC/DocketsSharon Votaw
299549/23/2003 Comments from Ann Mooney, CEC Tesla Evidentiary Hearing 9/18/03.

2 page(s)
 CEC/DocketsAnn Mooney
299539/23/2003 Comments from Carole Dominguez, Tesla Evidentiary Hearing 9/18/03.

11 page(s)
 CEC/DocketsCarole Dominguez
299529/23/2003 Comments before CEC Tesla Evidentiary Hearing 9/18/03.

5 page(s)
 CEC/DocketsCeleste Garamendi
299509/19/2003 Buena Vista/Rosedale-Rio Bravo Water Banking & Recovery Program

23 page(s)
 CEC/DocketsRosedale-rio Bravo Water Storage District
299499/19/2003 U.S. Environmental Protection Agency - Enforcement & Compliance History Online (ECHO) Detailed Facility Report

2 page(s)
 CEC/Dockets 
299489/19/2003 California Air Resources Board - Highest 4 Daily PM10 Measurements and Annual PM10 Statistics at Stockton-Hazelton Street

1 page(s)
 CEC/Dockets 
299479/19/2003 DRAFT-Agreement for Water Supply Service between the Alameda County Flood Control and Water Conservation District - Zone 7 and Midway Power LLC.

12 page(s)
 CEC/DocketsAlameda Cty Flood Ctrl & Wtr Conserv Dist-zone 7 &
299469/19/2003 DRAFT-Agreement by and between the Rosedale-Rio Bravo Water Storage District, the Buena Vista Water Storage District, and Midway Power, LLC

19 page(s)
 CEC/DocketsRosedale-rio Bravo Wsd/Buena Vista Wsd/midway Powe
299459/19/2003 Testimony of Eric Parfrey, AICP

10 page(s)
 CEC/DocketsEric Parfrey
299449/19/2003 Notice to Comply

38 page(s)
 CEC/DocketsSjvuapcd
299439/19/2003 Questions whether the proposed Tesla Power Project complies with Public Resources Code Section 25523(d)(2).

1 page(s)
 CEC/DocketsJang/Bay Area Air Quality Management District
299429/19/2003 Draft 2003 PM10 Plan

1 page(s)
 CEC/DocketsSjvuapcd
299389/22/2003 Transcript: Evidentiary Hearing before the California Energy Resources Conservation and Development Commission (9/10/03).

252 page(s)
 CEC/DocketsCEC Cec
299339/17/2003 Letter of Opposition

4 page(s)
 CEC/DocketsP. Rea
299329/16/2003 Letter of Opposition

5 page(s)
 CEC/DocketsJ. Callahan
299319/16/2003 Letter of Opposition

4 page(s)
 CEC/DocketsJ. Mcgraw
299169/16/2003 Letter of Opposition POS

5 page(s)
 CEC/DocketsMcgraw
299149/16/2003 Letter of opposition POS

1 page(s)
 CEC/DocketJ. Callahan
299139/16/2003 Public Comment Form re: Land Use, Traffic, Construction Dust, Air Quality

3 page(s)
 CEC/DocketM. Griffith
299129/16/2003 Public Comment Form re: Water and Biology

3 page(s)
 CEC/DocketG. Griffith
299119/16/2003 Public Comment Form re: Land Use, Air

3 page(s)
 CEC/DocketsE. Sparks
299109/16/2003 Sign In Sheet for Sept. 11, 2003 Evidentiary Hearing

2 page(s)
 CEC/DocketTesla Power
299099/16/2003 Public Comment Form Re: Requesting Full Mitigation from Project Impacts to Tracy Fire Dept.

2 page(s)
 CEC/DocketC. Dominiguez
299089/16/2003 Public Comment Form Expressing Support

2 page(s)
 CEC/DocketBen Curran
299079/16/2003 Public Comment Form re: Opposition to power plant

3 page(s)
 CEC/DocketPaul Sundberg
299069/16/2003 Public Comment Form re: Fire

3 page(s)
 CEC/DocketIrene Sundberg
299059/16/2003 Public Comment Form Re:Fire Protection

6 page(s)
 CEC/DocketSusan Sarvey
299049/16/2003 Sign In Sheet Evidentiary Hearing

2 page(s)
 CEC/DocketTesla Power
299039/16/2003 Public Comment Form re: Air Quality, Water and Dust Control

4 page(s)
 CEC/DocketGriffith/Marianne And Gordon
299029/15/2003 Buena Vista WSD/Rosedale-Rio Bravo WSD Banking and Recovery Program, Tesla Power Project Water Supply, Buena Vista Shrew - POS.

7 page(s)
 Jones/Us Dept Of Interior/fish & Wildlife Svc/cec/Milobar/Buena Vista Water Storage District
299019/15/2003 Comments regarding the proposed Calpine and Midway power plants in the eastern County.

1 page(s)
 Alameda County Board Of Supervisors/Cec/docketsErnest Callenbach
298919/11/2003 Opposition to both the East Altamont Energy Center and the Tesla Power Project.

1 page(s)
 CEC/DocketsErik Ferry
298859/12/2003 CARE's Public Comments on Water Resources

7 page(s)
 CEC/DocketsBoyd/Californians For Renewable Energy Inc.
298539/10/2003 Testimony of Steve Baker on Power Plant Efficiency and Gas Supply. Declaration and resume attached.

4 page(s)
 CEC/DocketsBaker/Cec
298409/9/2003 Alameda County CDA: Tentative findings related to hypothetical Conditional Use Permit for the Proposed Tesla Power Project - POS.

6 page(s)
 Allen/Cec/docketsJensen/Alameda County Community Development Agency
298399/8/2003 Staff's Supplemental Exhibits

3 page(s)
 CEC/DocketsCEC Cec
298389/8/2003 Comment letter of August 5 regarding project's potential impacts on the regional trail plans for the former SP railroad alignment that is located adjacent to the Tesla site.

1 page(s)
 Fiala/East Bay Regional Park District/cec/docketsRivasplata/Par Environmental Services, Inc.
298379/5/2003 Staff's Supplemental Sponsored Testimony and Rebuttal Testimony

17 page(s)
 CEC/DocketsHouck/Cec
298369/8/2003 Supplemental System Impact Study Report, dated 6/20/02, for the Tesla Power Project - POS.

462 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298359/8/2003 Addendum Supplemental System Impact Study Report, dated 12/6/02, for the Tesla Power Project - POS.

143 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298349/5/2003 Letter from Mr. Chris Hansmeyer, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 3/26/03, for the Tesla Power Project - POS.

9 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298339/5/2003 Letter from Mr. Chris Hansmeyer, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 2/6/03, for the Tesla Power Project - POS.

5 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298329/5/2003 Williams, D., and A. Harpster. 2001. Status of the Buena Vista Lake Shrew (Sorex Ornatus Relictus). Report prepared for the US Bureau of Reclamation, dated 10/29/01 - POS.

27 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298319/5/2003 Applicant's Rebuttal Testimony on Biological Resources and Traffic and Transportation, for the Tesla Power Project - POS

18 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298309/5/2003 Letter from Mr. David Osias, Allen Matkins, to Mr. Fred Diaz, City of Tracy, regarding Recycled Water for the Tesla Power Plant, dated 5/21/03, for the Tesla Power Project - POS.

4 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298299/5/2003 Applicant's Updated Exhibit List as of 9/5/03, for the Tesla Power Project - POS.

9 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
298289/5/2003 Intervenor Robert Sarvey's Tentative Exhibit List and Dick Schneider's Resume - POS.

9 page(s)
 CEC/DocketsRobert Sarvey
298279/5/2003 Notice of Revised Evidentiary Hearing Schedule for the Tesla Power Project - POS.

7 page(s)
 CEC/DocketsGeesman/Rosenfeld/cec
298269/5/2003 Prepared Testimony of Steven G. Bayley, Deputy Director of Public Works, City of Tracy, and Susan P. Jones, Chief, San Joaquin Valley Branch Endangered Species Division, United States Fish and Wildlife Service - POS.

12 page(s)
 CEC/DocketsHouck/Cec
298256/2/2003 Alameda County Fire Department's Comments on RPMPD

56 page(s)
 CEC/DocketsAlameda County Fire Department
298109/8/2003 Comments from the Alameda County Fire Department regarding the RPMPD for Tesla.

56 page(s)
 CEC/DocketsAlameda County Fire Dept/W. Mccammom, Chief
297999/4/2003 Midway Power's Request for Modification to Evidentiary Hearing Schedule for the Tesla Power Project - POS

6 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power Llc
297868/29/2003 CEC's Second Addendum to Staff's Final Staff Assessment - POS.

84 page(s)
 CEC/DocketsHouck/Cec
297848/29/2003 Applicant's Testimony for the Tesla Power Project - POS.

281 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297829/4/2003 Midway Power's Request for Modification to Evidentiary Hearing Schedule for the Tesla Power Project - POS.

6 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297809/3/2003 Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act, dated 1/2/03 for the Tesla Power Project - POS.

21 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297789/3/2003 Map of Water Conveyance Facilities for the Tesla Power Project - POS.

4 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297769/3/2003 BAAQMD Permit Evaluation and Emission Calculations for Altamont Landfill ERC, dated 2/10/03 for the Tesla Power Project - POS.

12 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297749/3/2003 Engineering Report, Tesla Power Project North-Reach User Impacts, dated March 2003 for the Tesla Power Project - POS.

21 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297739/3/2003 Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act Contract, dated 3/18/03 for the Tesla Power Project - POS.

13 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297729/3/2003 Letter from DWR to CEC concerning White Paper, dated 11/26/02 for the Tesla Power Project - POS.

6 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297689/3/2003 Exhibit List for the Tesla Power Project - POS

5 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297679/3/2003 Alameda County Board Resolution Number R-2003-322 Granting the Tentative Partial Cancellation of Williamson Act Contract, dated 2/6/03 for the Tesla Power Project. POS.

11 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297669/3/2003 White Paper relating to DWR reliability, dated 11/15/02 for the Tesla Power Project. POS.

9 page(s)
 Epps/Cec/docketsGalati/Galati & Blek, Llp/midway Power, Llc
297659/3/2003 Alameda County Staff Report Concerning Partial Cancellation of the Williamson Act Contract, dated 1/31/2003 for the Tesla Power Project. POS.

5 page(s)
 Epps/Cec/docketsGalati/Galati & Blek Llp/midway Power
297629/4/2003 Alameda County CDA: Tentative findings related to hypothetical conditional use permit for the proposed Tesla Power Plant.

3 page(s)
 Allen/Cec/docketsJensen/Alameda County Community Development Agency
297619/3/2003 Statement on Witnesses & Exhibits of CAlifornians for Renewable Energy, Inc. (CARE) - POS

70 page(s)
 CEC/DocketsBoyd/Care
297348/29/2003 Intervenor Sarvey Exhibit List - POS

74 page(s)
 CEC/DocketsBob Sarvey
297328/29/2003 Comments in response to the FSA Addendum, Reclaimed Water Supply Pipeline for the Tesla Power Project Dated July, 2003.

3 page(s)
 Caswell/Cec/docketsNagano/Us Dept Of The Interior, Fish And Wildlife
297318/29/2003 Contra Costa Water District's supplement to original comment letter dated 3/13/03 - POS.

5 page(s)
 Caswell/Cec/docketsDenton/Contra Costa Water District
297308/29/2003 RE: Alameda County's letter dated 7/24/03 RE: Zone 7 is continuing to work towards a Water Supply Agreement for Tesla. Provided that technical issues and remaining contractual issues are resolved, then an agreement can be prepared to provide water in a timely manner for the power plant start up. - POS.

1 page(s)
 Caswell/Cec/docketsWong/Alameda County Flood Control & Water Conserva
297298/29/2003 Intervenor Bob Sarvey's Additional Exhibit Declaration of Richard A. Schneider - POS

19 page(s)
 CEC/DocketsBob Sarvey
297018/26/2003 Water Supply for the Tesla Power Project. Response to the FSA Addendum, Reclaimed Water Supply Pipeline dated 7/03 - POS

6 page(s)
 CEC/Caswell/docketsNagano/U.s. Dept. Of The Interior
296068/14/2003 Notice of Evidentiary Hearings and Hearing Order for the Tesla Power Project. POS

11 page(s)
 CEC/DocketsCEC/J. Geesman/a. Rosenfeld
296038/14/2003 Public Comments from Gordon & Marianne Griffith regarding the Tesla Power Project; the subjects are: Air Quality, Water, Noise. These comments were sent to the Tracy Press & the TRI-Valley Heald.

2 page(s)
 CEC/DocketsCommunity Resident, G. & M. Griffith
295808/11/2003 Site Visit and Prehearing Conference Before the California Energy Resources Conservation and Development Commission

159 page(s)
 CEC/DocketsCEC Cec
294948/6/2003 Request by Californians for Renewable Energy, Inc. (CARE) for an Excused Absence from the July 30, 2003 Pre-hearing Conference. POS

5 page(s)
 CEC/DocketsCare/Michael Boyd
294587/31/2003 Tesla Public Comment Form - - regarding Land Use.

1 page(s)
 CEC/DocketsResident/J. Wagner
294537/31/2003 Prehearing Conference for Tesla -- sign-in sheet.

2 page(s)
 CEC/DocketsCEC Cec
294527/31/2003 Tesla Public Comment Form -- regarding "Air" - "Fire" - "Water."

1 page(s)
 CEC/DocketsCommunity Resident, Laura Simon
294217/28/2003 Letter to inform Zone 7's continuation in the negotiations with Midway Power LLC - POS

4 page(s)
 CEC/Casewell/docketsAlameda County Flood Control And Water Conservatio
293797/22/2003 Enclosed 12 copies of Midway Power's Pre-hearing Conference Statement for the Tesla Power Project---POS

9 page(s)
 Docket/CecGalati & Blek/Galati
293567/22/2003 In the Matter of Tesla -- Staff's Pre- Hearing Conference Statement. POS

27 page(s)
 CEC/DocketsCEC/D. Houck
293537/22/2003 Pre- Hearing Conference Statement of CAlifornian's for Renewable Energy, Inc. (CARE). POS

60 page(s)
 CEC/DocketsCalifornians For Renewable Energy, Inc. (care)/M.
293527/22/2003 Tesla Pre- Hearing Conference -- Statement Intervenor Sarvey. POS

9 page(s)
 CEC/DocketsRobert Sarvey
293427/21/2003 Prehearing Conference Statement for the Tesla Power Project.--POS

3 page(s)
 CEC/DocketsSan Joaquin Valley Air Pollution Control District/
293017/18/2003 Request for Agency Comments on the FSA Addendum for the Tesla Power Project (01-AFC-21) - To: Agency Distribution List

4 page(s)
 CEC/DocketsCEC/Richins
292777/17/2003 Final Staff Assessment Addendum Reclaimed Water Supply Pipeline

232 page(s)
 CEC/Dockets 
292737/16/2003 Notice of Availability Distribution.

2 page(s)
 CEC/DocketsCEC/P. Richins
292727/17/2003 Agency Distribution.

1 page(s)
 CEC/DocketsCEC/P. Richins
292717/18/2003 Librarian (Members of the Public) Distribution.

2 page(s)
 CEC/DocketsCEC/P. Richins
291407/2/2003 Final Staff Assessment Addendum Biological Appendices - POS

110 page(s)
 CEC/DocketsCEC/Caswell
290906/24/2003 Request for Designation of Confidential Information for Tesla - POS

4 page(s)
 CEC/TherkelsenCEC/De Leon
290806/18/2003 Current Proof of Service List for Tesla

4 page(s)
 All Parties/DocketsCEC/Fontanilla
290696/18/2003 Notice of Site Visit and Prehearing Conference

5 page(s)
 CEC/DocketsCEC/Geesman/rosenfeld
289716/11/2003 Tesla Power Plant, Alameda County recycled water supply pipeline and interim water supply - POS

4 page(s)
 CEC/Erichsen/docketsCa Dept. Of Fish And Game/Gan
289196/6/2003 Hearing Officers Assignment - Susan Gefter share duties with Major Williams

1 page(s)
 Commissioners/DocketsCEC/Keese
288726/2/2003 Letter in reply to SWR-02-SA-6153:JSS A POS

5 page(s)
 CEC/Richins/docketsUs Epa/Aceituno
287155/22/2003 TriValley Herald - What's Going on With Altamont Power Plants

3 page(s)
 CEC/DocketsBoyd
286645/7/2003 Request for Agency Comments on the Final Staff Assessment for Tesla

1 page(s)
 CEC/Caswell/docketsPublic Works/Johnson
286635/7/2003 Comments on the Final Staff Assessment

1 page(s)
 CEC/Caswell/docketsBorrman
286365/7/2003 Transmission System Reliability for Tesla

36 page(s)
 CEC/DocketsCalifornia Iso
286335/7/2003 Livermore Area Trails

2 page(s)
 CEC/Caswell/docketsEast Bay Regional Park Dist/Fiala
286135/3/2003 List of errata from the FDOC

5 page(s)
 CEC/DocketsBaaqmd/Jang
285622/26/2003 Comments on the Sempra Proposal

1 page(s)
 CEC/DocketsGhandhi
285214/16/2003 Meeting Discussing the FPL Energy's Planned Tesla Power Project - POS

6 page(s)
 City Of Tracy/Pinhey/docketsFpl Energy/Grant
284684/8/2003 Final Staff Assessment - POS

812 page(s)
 CEC/DocketsCEC Cec
284654/8/2003 Document Handling for Tesla

2 page(s)
 Librarian/DocketsCEC/Richins
284644/8/2003 Request for Agency Comments on the Final Staff Assessment

1 page(s)
 Agency Distribution/DocketsCEC/Richins
284634/8/2003 Notice of Availability - Final Staff Assessment for Tesla

2 page(s)
 CEC/DocketsCEC/Richins
284184/4/2003 Petition for Order Directing Response to Intervenor's Data Request - POS

3 page(s)
 CEC/DocketsSarvey
283903/24/2003 Altamont Landfill and Resource Recovery Facility Banking Application 3421

18 page(s)
 CEC/O'brien/docketsBaaqmd/Norton
283343/19/2003 Report of Conversation Bruce Jensen - Response to 7/26/02 Letter on Visual

6 page(s)
 CEC/DocketsKnight/Riverplata
282703/14/2003 Comments on the Preliminary Staff Assessment POS

9 page(s)
 CEC/Caswell/docketsContra Costa Water District/Denton
282073/4/2003 FDOC Comment Response Letters - POS

19 page(s)
 CEC/DocketsGalati & Blek/Galati
282063/4/2003 Final Determination of Compliance for Tesla - POS

90 page(s)
 CEC/DocketsGaltai & Blek/Galati
281713/4/2003 Final Determination of Compliance

88 page(s)
 Tesla Power/Busa/cec/docketsBaaqmd/Norton
281132/20/2003 Final Interconnection Approval POS

14 page(s)
 Pg&e/Daniels/cec/docketsCal Iso/Miller
281092/19/2003 Notice of Preparation of a Draft Environmental Impact Report for the Proposed Altamont Pipeline Project

5 page(s)
 CEC/DocketsZone 7 Water Agency/Fong
280862/18/2003 Data Request 1 to the California Energy Commission Staff POS

9 page(s)
 CEC/DocketsSarvey
280392/11/2003 Recycled Water

2 page(s)
 City Of Tracy/Diaz/cec/docketsAllen Matkins Leck Gamble/Hansmeyer
279512/3/2003 Minutes of the Board of Directors

52 page(s)
 CEC/Dockets 
279121/30/2003 Recycled Water

7 page(s)
 Florida Power & Light/BusaCity Of Tracy/Diaz
279041/29/2003 Letter from D. J. O'Bryant, Dept of Conservation to J. Sorensen Alameda Co. Community Dev Agency Re: Tentative Partial Contract Cancellation of Williamson Act Contract and Letter from G. A. Bakerink of Stroup, Bakerink & McCusker to P. Gatz, DOC Re: partial Cancellation of Land Conservation Contract - POS

6 page(s)
 CEC/DocketsGalati & Blek/Galati
279031/29/2003 Confidential Draft Biological Mitigation Proposal and Figure 3.1

4 page(s)
 CEC/DocketsGalati & Blek/Galati
278801/24/2003 Notice of Intent to Partially Cancel a Land Conservation Contract/Notice of Intent to Adopt a Negative Declarations

2 page(s)
 CEC/DocketsAlameda County Community Dev. Dept/Sorensen
277971/8/2003 Request of Midway Power for Partial Cancellation of Land Conservation Contract

18 page(s)
 Board Of Supervisors/Cec/docketsAlameda County Community Development Agency/Martin
277871/7/2003 Recycled Water for the Tesla Power Project

1 page(s)
 Florida Power And Light/Busa/cec/docketsCity Of Tracy/Bayley
2775512/30/2002 Landscape Plan and Visual Simulations

7 page(s)
 CEC/Caswell/docketsFoster Wheeler Environmental Corp/Moussavian
2770612/24/2002 Status Report # 5 - POS

6 page(s)
 CEC/Geesman/rosenfeld/docketsCEC/Caswell
2766412/17/2002 BRMIMP Response to Recent Biological Discussions

33 page(s)
 CEC/Caswell/docketsFoster Wheeler Environmental Corp/Moussavian
2760912/12/2002 Request for Confidential Designation for Attachment A, the letter from Linda Moussavian

3 page(s)
 CEC/DocketsGalati And Blek/Galati
2758212/11/2002 Details of Proposed Compensation Lands for San Joaquin Kit Fox Impact Mitigation

3 page(s)
 Us Epa/Ross/cec/docketsFoster Wheeler Environmental Corp/Moussavian
2758112/11/2002 Recycled Water for the Tesla Power Project

1 page(s)
 CEC/DocketsCity Of Tracy/Diaz
2757112/9/2002 Summary Notes from Meeting Between Zone 7 and FPLE

5 page(s)
 CEC/Dockets 
2756912/5/2002 Preliminary Comments on Tesla Power Plant Water Supply Reliability November 15, 2002 White Paper

3 page(s)
 CEC/DocketsZone 7 Water Agency
2755112/4/2002 Answers to Questions in Regard to the Operational Aspects

6 page(s)
 CEC/Mediati/docketsDepartment Of Water Resources/Creel
2752612/2/2002 Consistency of Tesla Power Plant Project with ECAP Policies Relevant to Visual Resources

2 page(s)
 Alamenda Co. Planning Dept/Sorensen/docketsCEC/Knight
2750211/22/2002 Biological Resources Kit for Fox Habitat Sue Orloff Comments POS

4 page(s)
 CEC/DocketsSarvey
2748011/20/2002 Status of the Buena Vista Lake Shaw - Final Report in Partial Fulfillment of the Central Valley Project Improvement Act

38 page(s)
 CEC/DocketsCsu Stanislaus/Williams/harpster
2746211/20/2002 Proposed Banking of 200 Tons Per Year Emission Reduction Credits from Paving Roads at Altamont Landfill & Resource Recovery Facility Located in Livermore - POS

5 page(s)
 Baaqmd/Garvey/cec/docketsUs Environmental Protection Agency/Rios
2744711/15/2002 Public and Agency Comment-Sarvey topic:Water

1 page(s)
 CEC/DocketsTesla Power Plant Project
2742711/14/2002 Public and Agency Comments Form: CACLE

2 page(s)
 CEC/DocketsS. Sarvey
2739511/13/2002 Response to Letter dated 10/21/02 re: Ability to Respond from Proposed Fire Station in Livermore

2 page(s)
 Risk Science Assoc/Greenberg/cec/docketsAlameda County Fire Dept/Mccammon
2739211/13/2002 Applicant's Counsel's Notice of Firm Name Change for Tesla Power Project - POS

4 page(s)
 CEC/DocketsGalati & Blek/Galati
2739111/13/2002 Figure 1 - Water Supply to the Tesla Power Project - POS

4 page(s)
 CEC/DocketsGrattan & Galati/Galati
2737911/12/2002 Conceptual Landscape Plan Guidelines for Tesla

4 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Heeley
2732211/6/2002 Applicant's Comments on the Preliminary Staff Assessment for Tesla - POS

33 page(s)
 CEC/DocketsGrattan & Galati/Galati
2731411/5/2002 Final Environmental Impact Report for the Buena Vista/Rosedale - Rio Bravo Water Banking & Recovery Program for Tesla - POS

362 page(s)
 CEC/DocketsGrattan & Galati/Galati
2731311/5/2002 Visual Resources Guidelines (including map)

7 page(s)
 Fpl Company/Busa/docketsCEC/Caswell
2730911/4/2002 Letter re: concerns from the public regarding the proposed calculation of PM10 emissions from the cooling tower

3 page(s)
 Baaqmd/Jang/cec/docketsUrs/Stein
2730811/5/2002 Status Report #4 - POS

7 page(s)
 CEC/Geesman/rosenfeld/docketsCEC/Caswell
2730511/5/2002 Second Supplement Response to CEC's Third Data Request

125 page(s)
 CEC/Larson/docketsFoster Wheeler Environmental Corp/Moussavian
2729811/5/2002 Sempra Energy Utilities Comments on the 2003 Integrated Energy Report

5 page(s)
 CEC/DocketsState Governmental Affairs/Orozco
2726810/31/2002 Preliminary Staff Assessment for the Tesla

2 page(s)
 CEC/Caswell/docketsAlameda County Flood Control & Water Conservation/
2721910/31/2002 Workshop Notice - Issue Resolution Workshop - POS

6 page(s)
 CEC/DocketsCEC/Geesman
2716010/24/2002 Comment on the Kit fox

1 page(s)
 CEC/Erichsen/docketsIbis/Orloff
2703810/16/2002 Banking Application Evaluation Report and the Notice Inviting Written Public Comment

16 page(s)
 CEC/Caswell/docketBaaqmd/Garvey
2692410/8/2002 Current Proof of Service List for Tesla

4 page(s)
 All Parties/Cec/docketsCEC/Mcclintock
2690210/4/2002 Comment on concern about the kit fox

1 page(s)
 CEC/Erichsen/docketsIbis/Orloff
2689210/4/2002 Response and comment for consideration on the East Altamont and Tesla Power Project POS

2 page(s)
 CEC/DocketsCity Of Tracy Fire Department/Estes
2684310/1/2002 Comments on the Preliminary Determination of Compliance BAAQMD = POS

17 page(s)
 CEC/DocketsSarvey
2684210/1/2002 E-mail concerned with the article regarding the PM2.5 not PM10 pollutant

1 page(s)
 CEC/Pao/docketsGriffith
2682810/1/2002 Ongoing Violations of CEC Public Notice Requirements - POS

5 page(s)
 CEC/DocketsSarvey
267879/26/2002 Supplemental Responses to CEC Third Data Request

70 page(s)
 CEC/Larson/docketsFoster Wheeler/Moussavian
267859/25/2002 Project Mailing List - Preliminary Staff Assessment Data Responses # 3 Workshop

1 page(s)
 DocketsCEC Cec
267769/25/2002 Sign-In Sheet for Preliminary Staff Assessment Water Resources Workshop

4 page(s)
 CEC/DocketsTesla Power
267759/25/2002 U.S. EPA Comments on BAAQMD PDOC

4 page(s)
 Baaqmd/Garvey/cec/docketsUs Epa/Rios
267659/24/2002 Motion by Robert Sarvey for Rescheduling of the TPP Workshop Scheduled for 9/25/02 POS

4 page(s)
 CEC/DocketsSarvey
267549/23/2002 Comments on the PDOC POS

16 page(s)
 Baaqmd/Garvey/cec/docketsUrs/Stein
266959/18/2002 Order Granting Petition to Intervene and Financial Hardship Petition - M. Boyd

5 page(s)
 CEC/DocketsCEC/Geesman/rosenfeld
266769/17/2002 Errata to CARE's 9-16-02 Comments on Tesla Power Plant: SCONOx Disqualification for BAAQMD

6 page(s)
 Baaqmd/Cec/docketsBoyd
266709/17/2002 Document Handling for the Tesla Power Plant

2 page(s)
 Librarian/DocketsCEC/Richins
266699/17/2002 Request for Agency Comments on the PSA for Tesla Power Project

1 page(s)
 Agency Dist./DocketsCEC/Richins
266659/17/2002 CARE's Comments on the PDOC

45 page(s)
 CEC/DocketsM. Boyd
266619/18/2002 Response to Comments on Draft Environmental Impact Report for the Buena Vista / Rosendale-Rio Water Banking and Recovery Program - POS

14 page(s)
 CEC/O'brian/docketsKrieger & Stewart/Scriven
266569/13/2002 Preliminary Staff Assessment - POS

662 page(s)
 CEC/DocketsCEC Cec
266539/16/2002 Comments on Preliminary Determination of Compliance

3 page(s)
 Abbqmd/Garvey/cec/docketsSan Joaquin Valley Air Pollution Control Dist/Sadr
266409/11/2002 Comments about the proposed second electrical generating plant for Blythe

2 page(s)
 CEC/DocketsCity Of Blythe/Grotke
266279/13/2002 Public Comment Form - "Take Your Plant Somewhere Else"

1 page(s)
 CEC/DocketsMancebo
266269/13/2002 Comments on Preliminary Determination of Compliance

4 page(s)
 Baaqmd/Jang/cec/docketsCEC/O'brian
266239/12/2002 Workshop Notice - Preliminary Staff Assessment Data Responses # 3 Workshop for Tesla - POS

6 page(s)
 CEC/DocketsCEC/Geesman
266229/13/2002 Workshop Notice - Preliminary Staff Assessment Water Resources Workshop for Tesla - POS

5 page(s)
 CEC/DocketsCEC/Geesman
265448/27/2002 Repeated Application for Confidential Designation and Confidential Resources Data Responses #297 and #310

10 page(s)
 CEC/DocketsGrattan And Galati/Galati
265238/23/2002 Data Response to CEC Staff Data Requests dated 7/23/02 - POS

148 page(s)
 CEC/DocketsFoster Wheeler Environmental Corp/Moussavian
264858/20/2002 Comments on the Draft Environmental Impact Report dated 6/02 - POS

6 page(s)
 Buena Vista Water Storage Dist/Bartel/cec/docketsDept Of Water Resources/Flory
264818/19/2002 BAAQMD Preliminary Determination of Compliance - POS

88 page(s)
 CEC/DocketsGrattan And Galati/Grattan
264748/19/2002 Preliminary Determination of Compliance Revised 8/16/2002

80 page(s)
 CEC/DocketsBaaqmd/Jang
264488/15/2002 Preliminary Determination of Compliance

62 page(s)
 Midway Power/Busa/docketsBbaqmd/Garvey
264428/13/2002 Comments

8 page(s)
 CEC/Caswell/docketsCounty Of Alameda Public Works Agency/Borrmann
263117/30/2002 Letter to Mr. Adolph Martinelli of the Alameda Co. Community Development Agency regarding a Request for Williamson Act Partial Cancellation and Creation of Agricultural Easement POS

40 page(s)
 CEC/DocketsGrattan And Galati/Galati
262537/23/2002 3rd Round of Data Requests Numbering Correction POS

22 page(s)
 CEC/DocketsFpl/Busa
262097/17/2002 Status Report #3 POS

6 page(s)
 CEC/Rosenfeld/docketsCEC/Caswell
262057/19/2002 3rd Round of Data Requests POS

22 page(s)
 Fp/Busa/docketsCEC/Caswell
261917/16/2002 Repeated Application for Confidential Designation - Cultural Resources Responses # 230 and #238 for Tesla

2 page(s)
 CEC/DocketsGrattan & Galati/Galati
261717/15/2002 Report of Conversation between P. Leary and Regional Water Quality Control Board RE: outlook of utilizing city of Tracy's Recycled Water

2 page(s)
 CEC/DocketsCEC/Caswell
261707/12/2002 Supplemental Responses to CEC Second Data Requests - POS

26 page(s)
 CEC/LarsonFoster Wheeler Environmental/Moussavian
261437/10/2002 Record of Meeting

3 page(s)
 CEC/DocketsUsf&ws/Pau
261427/10/2002 Public Hearing for Draft Environmental Impact Report - 7/18/02 - Bakersfield

1 page(s)
 CEC/DocketsBuena Vista Water Storage Dist./Bartel
261417/10/2002 Report of Conversation with S. Busa, Midway Power, S. Galati, Midway Power re: Potential Revision by Applicant to the Williamson Act Easement Exchange Request for the Tesla Power Plant Project-Site

1 page(s)
 CEC/DocketsCEC/Hamblin
260747/2/2002 Meeting Notes from 6/28/02

3 page(s)
 CEC/Erichsen/docketsN. Pau
260336/27/2002 TPP cultural resources issues

2 page(s)
 Moussavian/Cec/caswell/docketsFoster Wheeler Environmental Corp/Reeve
260316/26/2002 Draft Environmental Impact Report

363 page(s)
 CEC/Caswell/docketsKrieger And Stewart/Scriven
260306/26/2002 Draft Environmental Impact Report

363 page(s)
 CEC/DocketsKrieger And Stewart/Scriven
260296/27/2002 Supplementary Response to DR 245 Paragraph Addition

1 page(s)
 CEC/DocketsCEC/Caswell
260286/27/2002 Data Response 240 and Data Response 241 Table 241-1 Soil Loss Estimates

1 page(s)
 CEC/DocketsTesla Power Plant
260086/26/2002 Report of Conversation between A. Zasso and SWP Operations Office, DWR re: SWP Outage Cause/History and Coordination for Construction of New Turnout POS

5 page(s)
 CEC/DocketsCEC/Caswell
259376/17/2002 Sign In Sheet Data Response #2 and Issues Resolution Workshop

1 page(s)
 CEC/DocketsTesla Power Project
258586/10/2002 Status Report #2 POS

5 page(s)
 CEC/Laurie/rosenfeld/docketsCEC/Caswell
258486/11/2002 Report of Conversation regarding Continuation of discussion of clarifications for data requests

3 page(s)
 CEC/DocketsCEC/Reinoehl
258146/5/2002 Air Quality Mitigation Agreement between San Joaquin Valley Unified Air Pollution Control District and the Applicant, dated May 16, 2002, as further response to Data Requests #11 and #207 POS

11 page(s)
 CEC/DocketsGrattan And Galati/Galati
257845/22/2002 System Impact/Facilities Study Report dated December 17, 2001 and Supplemental System Impact Study Report dated May 10, 2002 POS

1333 page(s)
 CEC/DocketsGrattan And Galati/Galati
257725/30/2002 Northern Range Kit Fox Planning and Conservation Meeting Minutes

5 page(s)
 CEC/DocketsHau
257715/30/2002 Workshop Notice Data Response#2 and Issue Resolution Workshop POS

7 page(s)
 CEC/DocketsCEC/Laurie
256885/22/2002 Repeated Application for Confidential Designation Cultural Resources Survey

2 page(s)
 CEC/DocketsGrattan And Galati/Galati
256795/20/2002 Technical Assistance for the Preliminary Staff Assessment POS

7 page(s)
 CEC/Caswell/docketsUs Dept. Of The Interior/Knight
256565/15/2002 Preliminary Comments for Tesla Power Project - POS

6 page(s)
 CEC/Caswell/docketsCounty Of Alameda/Borrmann
256425/17/2002 Data Response to CEC Staff data Request - POS

291 page(s)
 CEC/Larson/docketsFoster Wheeler Environmental/Moussavian
256245/15/2002 Wildlands, Inc in Response to 5/6/02 Conservation Regarding Haera Wildlife Conservation Bank and the Proposed Florida Power and Light (FPL) - POS

8 page(s)
 CEC/Erichsen/docketsC. Bailey
256175/15/2002 Comments on Buena Vista Water Storage District's Notice of Preparation of an EIR for the Proposed Buena Vista-Rio Bravo Water Banking and Recovery Program

3 page(s)
 Buena Vista Water Storage Dist/Milobar/cec/docketsCEC/Caswell
256105/14/2002 Proposed Revision to 24-Hour Average PM10 Emission Rates -

2 page(s)
 CEC/Jang/docketsUrs/Eastep
255365/8/2002 Proposed Tesla Power Plant Consistency with Alameda County General Plan and Williamson Act Contracts POS

8 page(s)
 CEC/Haussler/docketsAlameda County Community Development Agency/Martin
255205/6/2002 Proposed Revision to 24-Hour Average PM 10 Emission - POS

5 page(s)
 Baaqmd/Jang/cec/docketsUrs/Eastep
254955/3/2002 Status Report for Tesla Power Project - POS

6 page(s)
 CEC/DocketsGrattan & Galati/Galati
254885/3/2002 Petition for Intervention with Financial Hardship on behalf of CARE

2 page(s)
 CEC/DocketsM. Boyd
253824/23/2002 RR/BV Water Banking and Recovery Program - Scoping Meeting

36 page(s)
 Tesla Power Plant Workgroup/DocketsPuena Vista Water Storage Dist./Bartel
253774/23/2002 Tesla Power Project - Project Background and Summary

3 page(s)
 National Marine Fisheries Ser/Stuart/cec/docketsFoster Wheeler Environmental Corp./Moussavian
253624/22/2002 Memorandum of Understanding Regarding Operation and Monitoring of the Kern Water Bank Groundwater Banking Program POS

24 page(s)
 CEC/DocketsKern Water Bank
253204/17/2002 2nd Round of Data Requests POS

24 page(s)
 Fpl Co/Busa/docketsCEC/Caswell
253104/16/2002 Initial Study and Environmental Checklist for the Buena Vista/Rosedale Rio-Bravo Water Banking and Recovery Program

53 page(s)
 CEC/DocketsBuena Vista Storage District
252724/12/2002 Status Report #1 POS

6 page(s)
 CEC/Laurie/rosenfeld/docketsCEC/Caswell
251604/3/2002 Data Response to CEC Staff Data Requests 2/5/02

4 page(s)
 CEC/Larson/docketsFoster Wheeler Environmental Corp/Moussavian
251594/2/2002 Response to the inquiry from J. Kessler re: the availability of recycled water from the City of Tracy to serve the Tesla Energy Center - POS

4 page(s)
 CEC/Caswell/docketsCity Of Tracy/Bayley
250863/29/2002 Report of Conversation with Caswell, CEC; Dougherty, PAR; Manier, PAR; Davy, FW re: Continuation of discussion of clarifications needed for data requests

3 page(s)
 CEC/DocketsCEC/Reinoehl
250813/28/2002 Tesla Power Project Biological Assessment

129 page(s)
 DocketsFoster Wheeler Environmental Corp
250783/29/2002 Review of Air Quality Impact Analysis

8 page(s)
 Stationary Source Division/Werner/cec/docketsAir Resource Board/Ranzieri
250703/28/2002 Biological Assessment on Tesla Power Plant

129 page(s)
 DocketsFoster Sheeler Environmental Corp
250443/26/2002 Concerns re: the increasing use of course particulate matter emission reduction to offset combustion-generated fine particulate matter increases

2 page(s)
 Air Pollution Control Dist/Cec/docketsAir Resources Board/Kenny
250313/27/2002 Repeated Application for Confidential Designation - Phase I Archaeological Investigation Report for Tesla

2 page(s)
 CEC/DocketsGrattan & Galati/Galati
250183/22/2002 Ambient Noise Survey - Tesla Power Project

8 page(s)
 CEC/Dockets 
249503/8/2002 Data Responses to CEC Staff Data Requests dated 3/5/02

4 page(s)
 CEC/Larson/docketsFoster Wheeler Environmental Corp/Moussavian
249493/15/2002 Repeated Application for Confidential Designation and Confidential Phase I Archaeological Investigation Report

2 page(s)
 CEC/DocketsGrattan & Galati/Galati
248783/8/2002 Data Responses to CEC Staff Data Requests - POS

341 page(s)
 CEC/Larson/docketsFoster Wheeler Environmental Corp./Moussavian
248473/7/2002 Workshop Notice - Issues Resolution and Data Response - March 25-26, 2002 - Livermore - POS

6 page(s)
 CEC/DocketsCEC/Laurie
248363/7/2002 Comments on listed species - POS

7 page(s)
 CEC/Richins/docketsDept. Of Fish & Game/Floerke
248073/5/2002 Receipt of Initiation of Formal Consultation

2 page(s)
 Us Environmental Protection Agency/Rios/cec/docketUs Department Of Interior/Knight
247573/4/2002 Report of Conversation with Scott Busa, Midway Power regarding Williamson Act Contract Procedure

1 page(s)
 CEC/DocketsCEC/Hamblin
247513/4/2002 Comments on Application for Certification Supplemental Material

1 page(s)
 CEC/DocketsCounty Of San Joaquin/Kirk
247132/28/2002 Request for Formal Consultation Under Section 7 of the Federal Endangered Species Act for the Proposed Tesla Power Project

2 page(s)
 Us Fish & Wildlife Service/Knight/cec/docketsUs Environmental Protection Agency/Rios
247122/28/2002 Committee Scheduling Order - POS

6 page(s)
 CEC/DocketsCEC/Laurie
246632/20/2002 Letter of opposition

1 page(s)
 CEC/Mendonca/docketsGriffith
246622/20/2002 Letter of concerns

2 page(s)
 CEC/Mendonca/docketsMurphy
246612/20/2002 Technical Assistance for the Proposed Tesla Power Plant POS

6 page(s)
 CEC/Richins/docketsUs Dept Of The Interior/Knight
246602/20/2002 San Joaquin Kit Fox Survey Protocol for the Northern Range POS

12 page(s)
 CEC/DocketsUs Fish And Wildlife Services
246592/20/2002 Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance POS

9 page(s)
 CEC/DocketsUs Fish And Wildlife Service
246582/20/2002 Petition for Intervention - Sadredin - POS

3 page(s)
 CEC/DocketsSan Joaquin Valley Air Pollution Control Dist/Sadr
246572/22/2002 Review of Application for Certification

2 page(s)
 CEC/Caswell/docketsDept Of Toxic Substance Control/Wong
246562/21/2002 Order Granting Petition to Intervene-San Joaquin Valley Air Pollution Control District POS

5 page(s)
 CEC/DocketsCEC/Laurie
246552/21/2002 Sign-In Sheet for Informational Hearing and Site Visit

3 page(s)
 CEC/DocketsFpl Tesla Power Project
245522/15/2002 Order Granting Petition to Intervene and Financial Hardship Petition POS

5 page(s)
 CEC/DocketsCEC/Laurie
245052/11/2002 Petition for Intervention Robert Sarvey POS

4 page(s)
 CEC/DocketsSarvey
244772/11/2002 Order Granting Petition to Intervene-CURE POS

4 page(s)
 CEC/DocketsCEC/Laurie
244102/5/2002 Data Requests POS

55 page(s)
 Fpl/Busa/docketsCEC/Caswell
243672/5/2002 Proposed Tesla Power Plant Consistency with Alameda County General Plan and Williamson Act Contract

4 page(s)
 Alameda Co. Comm Dev. Agency/Martinelli/docketsCEC/Haussler
243662/5/2002 Project Issue Identification Report POS

11 page(s)
 CEC/Laurie/moore/docketsCEC/Caswell
243422/1/2002 Notice of Informational Hearing and Site Visit 2/19/2002

7 page(s)
 CEC/DocketsCEC/Laurie/moore
242341/22/2002 Tables and Graphs Referred to in Attachment B of the Tesla's Responses to the CEC Staff's list of Data Inadequacies - POS

5 page(s)
 CEC/DocketsGrattan & Galati/Galati
240671/10/2002 Notice of Receipt of the Supplemental Material

1 page(s)
 CEC/DocketsCEC/Richins
240521/10/2002 Document Handling for the Tesla Power Project

1 page(s)
 Librarian/DocketsCEC/Richins
240511/10/2002 Notice of Receipt of the Supplemental Material for the AFC

1 page(s)
 DocketsCEC/Richins
240461/14/2002 Petition to Intervene by CURE - POS

8 page(s)
 CEC/DocketsCure/Josehp
240391/10/2002 Supplemental Material

2 page(s)
 Agency Distribution List/DocketsCEC/Richins
239451/10/2002 Attachment B of the Tesla's Power Project Responses to the CEC Staff's List of Data Inadequacies

18 page(s)
 CEC/DocketsGrattan And Galati/Galati
239341/10/2002 Hearing Officer Assignment-Major Williams Jr.

1 page(s)
 CEC/Commissioners/docketsCEC/Keese
238561/8/2002 Data Adequacy Recommendation (2)

74 page(s)
 CEC/Commissioners/docketsCEC/Larson
238001/4/2002 Attachment B of the Responses to the CEC's Staff list of Data Inadequacies

26 page(s)
 CEC/DocketsGrattan And Galati/Galati
237991/4/2002 Tesla DA-Air

1 page(s)
 CEC/Caswell/docketsBusa
237701/4/2002 Repeated Application for Confidential Designation and the attached Confidential Cultural Resources Technical Report

2 page(s)
 CEC/DocketsGrattan And Galati/Galati
237431/10/2002 Data Adequacy Responses for Telsa Power Project

300 page(s)
 CEC/DocketsMidway Power, Llc
2367612/26/2001 Clarification of letter sent to Scott Busa addressing the issue of the completeness of permit application

2 page(s)
 Tesla Power/Busa/cec/docketsBaaqmd/Jang
2360612/21/2001 The Existing Williamson Act Contract and the Proposed Tesla Power Plant

1 page(s)
 CEC/Hamblin/docketsDennis O'bryant
2358512/20/2001 E-mail on Tesla's Completeness

1 page(s)
 Urs/Stein/cec/docketsBaaqmd/Cordova
2355712/19/2001 Application for an Authority to Construct and/or a Permit to Operate is complete

1 page(s)
 Tesla Power Project/Bousa/cec/docketsBay Area Air Quality Management District/Morales-l
2349412/17/2001 Response Letter to 10/23/01 Request for Agency Participation

1 page(s)
 CEC/Caswell/docketsDepartment Of The Army/Finan
2339112/5/2001 Updated Modeling Analysis for the Tesla Power Plant Project

70 page(s)
 CEC/DocketsUrs
2313811/21/2001 Repeated Application for Confidential Designation and the attached Confidential Air Quality Offset information

2 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2313711/21/2001 Repeated Application for Confidential Designation and the attached Confidential Paleontological Resources Technical Report

2 page(s)
 CEC/DocketsGrattan And Galati/Grattan
2305711/13/2001 Review of CEC Siting Project

4 page(s)
 Btandardized Permitting Branch/Sandhu/cec/docketsDepartment Of Toxic Substance Control/Moskat
2303411/9/2001 Data Adequacy Recommendation

90 page(s)
 CEC/Commissioners/docketsCEC/Larson
2298011/7/2001 Follow-up to telephone conversation regarding summary of suggested approach for initiating Section 7 consultation with the US Fish and Wildlife

2 page(s)
 Baaqmd/Boisblanc/cec/docketsFoster Wheeler Environmental Corporation/Moussavin
2297811/7/2001 Cultural and Paleontological Resources Reports, Applications for Confidentiality

2 page(s)
 Grattan And Galati/Galati/docketsCEC/Larson
2294911/1/2001 System Impact/Facilities Study

1000 page(s)
 CEC/DocketsPg&e
2293811/1/2001 Items needed to complete the evaluation of Application to Construct and Permit to Operate

4 page(s)
 Tesla Power Project/Busa/cec/docketsBaaqmd/Jang
2293210/30/2001 Letter to inform of a proposed power plant

2 page(s)
 Member Of The Assembly/Leach/docketsCEC/Keese
2293110/30/2001 Letter to inform of a proposed power plant

2 page(s)
 Member Of The Senate/Torakson/docketsCEC/Keese
2293010/30/2001 Letter to inform of a proposed power plant

2 page(s)
 Mayor Of Tracy/Bilbrey/docketsCEC/Keese
2292910/30/2001 Letter to inform of a proposed power plant

2 page(s)
 Mayor Of Livermore/Brown/docketsCEC/Keese
2292710/30/2001 Letter to inform of a proposed electric power plant

2 page(s)
 Alameda County Board Of Supervisors/Haggerty/dockeCEC/Keese
2282510/23/2001 Document Handling

3 page(s)
 LibrarianCEC/Richins
2282410/23/2001 Request for Agency Participation

3 page(s)
 Agency Distribution ListCEC/Richins
2278710/23/2001 Notice of Receipt AFC

3 page(s)
 Public Distribution/DocketsCEC/Richins
2278610/23/2001 Notice of Receipt AFC

2 page(s)
 Agencies/DocketsCEC/Richins
2273910/18/2001 Letter of Opposition-traffic

3 page(s)
 CEC/DocketsHand
2270610/18/2001 Application for Confidential Designation Air Quality Offset Information and AFC

4 page(s)
 CEC/DocketsGrattan And Galati/Galati
2270510/15/2001 Application for Confidential Designation and the attached Appendix O and Appendix 3, AFC

7 page(s)
 CEC/DocketsGrattan And Galati/Galati
2268110/15/2001 Application for Confidential Designation-Paleontological Resources Technical Report and Cultural Resources Technical Report

7 page(s)
 CEC/DocketsGrattan And Galati/Galati
2267810/12/2001 CD-ROM containing Air Quality and Public Health Modeling Files for the Tesla

10 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2267710/12/2001 Figure 5.15-1B Complex Terrain within 10 Miles of the TPP Site (East Half)

3 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2267610/12/2001 Figure 5.15-1A Complex Terrain within 10 Miles of the TPP Site (West Half)

3 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2267510/12/2001 Figure 5.5-3 Biological Resources

3 page(s)
 CEC/DocketsGrattan & Galati/Grattan
2264310/12/2001 Submittal of the Application for Certification - Tesla Power Project

1500 page(s)
 CEC/Larson/docketsFpl Energy
2030-08/11/2003 Site Visit and Prehearing Conference

164 page(s)
   
1817-04/19/2004 Evidentiary Hearing, Committee Conference on PMPD

0 page(s)
   
1766-09/30/2003 Evidentiary Hearing

431 page(s)
   
1765-09/24/2003 Evidentiary Heaing

232 page(s)
   
1764-09/23/2003 Evidentiary Hearing

278 page(s)
   
1626-03/26/2002 Hearing

670 page(s)
   
1613-02/26/2002 Informational Hearing and Site Visit

110 page(s)