Docket Log

Docket: 07-AFC-05C
Project Title: Ivanpah Solar Electric Generating System (Compliance)
Generated On: 12/22/2024 11:15:35 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2586108/21/2024 Diego Sanchez Arvizu Comments - Where i can contact the manager plant

1 page(s)
 CEC/Docket UnitDiego Sanchez Arvizu
2543172/5/2024 Ivanpah WEST Annual Monitoring Report 2021 - 2022 and ABMMP Rev 14 Appendix D
2021-2022 Ivanpah Avian Monitoring Report-Year 9 and Appendix D of the Avian and Bat Monitoring and Management Plan (ABMMP) Rev 14
Biological Resources, Compliance
56 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2483021/4/2023 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM AVIAN & BAT MONITORING PLAN 2020 – 2021 Annual Report Year 8
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM AVIAN & BAT MONITORING PLAN 2020 – 2021 Annual Report Year 8
Biological Resources
43 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24635510/5/2022 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan 2019-2020 Annual Report
Biological Resources
63 page(s)
 CEC/Docket UnitSolar Partners I, II, and VIII, LLCs
23570211/19/2020 ORDER APPROVING SETTLEMENT
3 page(s)
 CEC/DocketsCalifornia Energy Commission
23540810/23/2020 Avian & Bat Monitoring and Management Plan

56 page(s)
 CEC/DocketsCalifornia Energy Commission
23540710/23/2020 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM 2018-2019 AVIAN & BAT MONITORING PLAN

44 page(s)
 CEC/DocketsCalifornia Energy Commission
23539810/23/2020 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM 2017-2018 AVIAN & BAT MONITORING PLAN

88 page(s)
 CEC/DocketsCalifornia Energy Commission
23119412/12/2019 2018 ISEGS Annual Compliance Report

496 page(s)
 CEC/Leonidas PayneNRG Ivanpah Solar Electric Generating System
2278474/24/2019 Tools to Address Glare and Avian Flux Hazards from Solar Energy Systems

66 page(s)
 CEC/DocketsCalifornia Energy Commission
22613912/17/2018 Avian & Bat Technical Advisory Committee (TAC) Meeting
August 9, 2018 - Meeting Notes
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22613812/17/2018 Avian & Bat Monitoring Plan
2017 Fall Report
199 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22560610/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2246469/5/2018 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM - 2016-2017 Annual Report

111 page(s)
 CEC/DocketsCalifornia Energy Commission
2237806/12/2018 Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee Meeting, February 15, 2018 – Meeting Notes

4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2237236/7/2018 2017 Annual Compliance Report - Ivanpah Solar Electric Generating System

507 page(s)
 CEC/Joseph DouglasNRG Ivanpah Solar Electric Generating system
2230733/28/2018 Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee Meeting December 2017

7 page(s)
 CEC/DocketsCalifornia Energy Commission
2223571/25/2018 Ivanpah Solar Electric Generating System; Avian and Bat Monitoring Plan- 2017 Spring Report

54 page(s)
 CEC/DocketsCalifornia Energy Commission
2223561/25/2018 Ivanpah Solar Electric Generating System; Avian and Bat Monitoring Plan-2017 Summer Report

62 page(s)
 CEC/DocketsCalifornia Energy Commission
22202512/20/2017 Ivanpah TAC Meeting Notes; September 20, 2017

4 page(s)
 CEC/DocketsCalifornia Energy Commission
22202412/20/2017 Ivanpah Avian & Bat Monitoring Plan; 2016-2017 Winter Report

55 page(s)
 CEC/DocketsCalifornia Energy Commission
2208298/18/2017 Ivanpah Solar Electric Generating System Avian and Bat Technical Advisory Meeting June 28, 2017 - Meeting Notes

4 page(s)
 CEC/DocketsCalifornia Energy Commission
2207648/15/2017 Ivanpah Solar Electric Generating System Avian and Bat Monitoring Plan - 2015-2016 Annual Report

177 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2189126/16/2017 Ivanpah Solar Electric Generating System TAC Meeting Notes - March 2017

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2189116/16/2017 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2016 Fall Report

97 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2189106/16/2017 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2016 Summer Report

60 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2182966/13/2017 2016 Annual Compliance Report Part 2 of 2

190 page(s)
 CEC/Docket UnitNRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs
2182896/13/2017 2016 Annual Compliance Report Part 1 of 2

333 page(s)
 CEC/Docket UnitNRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs
2171494/18/2017 Ivanpah Solar Electric Generating System Meeting Notes
Avian & Bat Technical Advisory Committee (TAC) Meeting, September 15, 2016 - Meeting Notes
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2171484/18/2017 Ivanpah Solar Electric Generating System Meeting Notes
Avian & Bat Technical Advisory Committee (TAC) meeting, December 13, 2016 - Meeting Notes
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21388610/4/2016 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan
Ivanpah Avian Report- Winter 2015
57 page(s)
 CEC/Docket UnitWestern EcoSystems Technology, Inc. for Solar Partners I, II, and VIII
2138599/30/2016 Ivanpah Solar Technical Advisory Committee (TAC) July 5, 2016 Meeting Notes

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2138589/30/2016 Ivanpah Solar Technical Advisory Committee (TAC) April 19, 2016 Meeting Notes

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2138579/30/2016 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan, Spring 2016 Avian Report

61 page(s)
 CEC/Docket UnitWestern Ecosystems Technology, Inc. for Solar Partners I, II, and VIII
2126526/21/2016 Investigation Root Cause Report

5 page(s)
 California Energy Commission/ R. OglesbySolar Partners VIII, LLC
2126168/4/2016 Response to Application for Confidential Designation - NRG Renewables, LLC

3 page(s)
 Solar Partners V111, LLCCalifornia Energy Commission
2121147/5/2016 Monthly Compliance Report No. 42 - March 2014

966 page(s)
 CEC/Docket UnitEnergyservices an NRG service on behalf of Solar Partners I, II, and VIII LLC
2120987/5/2016 2015 Annual Compliance Report

510 page(s)
 CEC/Joseph Douglas and Bureau of Land Management/Michael AhrensNRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs
2120426/30/2016 ISEGS Avian and Bat Monitoring Plan 2014-2015

230 page(s)
  Western EcoSystems Technology, Inc.
2120416/30/2016 April 2016 TAC Meeting Notes
  California Energy Commission
2119166/21/2016 Application for Confidential Designation

2 page(s)
  Solar Partners VIII, LLC
2107073/14/2016 ISEGS Avian & Bat Monitoring Report - Summer 2015

82 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2106213/7/2016 Ivanpah Technical Advisory Meeting Notes

4 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20710512/23/2015 Avian & Bat Monitoring and Management Plan Nov. 2015
Report prepared for Solar Partners, I, LLC: Solar Partners II, LLC; and Solar Partners VIII, LLC
Biological Resources
37 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20710412/23/2015 Avian & Bat Monitoring Plan Spring 2015
Report is prepared for Solar Partners I, II, and VIII
Biological Resources
99 page(s)
 CEC/Dockets UnitWestern EcoSystems Technology, Inc.
20709412/21/2015 Ivanpah Solar Electric Generating System Avian and Bat Technical Advisory Meeting Notes

7 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20689712/8/2015 Notice of Decision by the California Energy Commission
Notice
1 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20668611/19/2015 Order Approving a Petition to Amend to Update Equipment Descriptions

8 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20625210/1/2015 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM - Staff Analysis of Petition to Amend Updated Equipment Descriptions

24 page(s)
 Interested PartiesCalifornia Energy Commission
2057458/14/2015 Ivanpah Solar Electric Generating System; Avian & Bat Technical Advisory Committee Meeting: July 2, 2015 - Meeting Notes

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2057448/14/2015 Ivanpah Solar Electric Generating System; Avian & Bat Monitoring Plan: 2014-2015 Winter Report
  Solar Partners I, II, and VIII
2042584/20/2015 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2013-2014 Annual Report (Revised)
29 October 2013 - 20 October 2014 - Report prepared by H.T. Harvey & Associates
105 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2042574/20/2015 Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee (TAC) Meeting
TAC Meeting on March 6, 2015
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2042564/20/2015 Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2014 Fall Report
18 August - 20 October 2014 -Report prepared by H.T. Harvey & Associates
114 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2041894/14/2015 Notice of Receipt - Petition to Amend for Ivanpah Solar Electric Generating System

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2039053/17/2015 Petition to Amend Air Quality Conditions of Certification

57 page(s)
 CEC/Dockets UnitSierra Research
2035691/28/2015 Avian & Bat Technical Advisory Committee December 2014 Meeting Notes

3 page(s)
 CEC/ Docket UnitCalifornia Energy Commission
20346112/17/2014 IVANPAH SUMMER 2014 QUARTERLY REPORT

94 page(s)
 CEC/Dockets UnitHT Harvey and Associates
20346012/17/2014 IVANPAH 2014 SPRING REPORT FINAL
Replaces TN #202990
111 page(s)
 CEC/Dockets UnitHT Harvey and Associates
20343512/12/2014 September-October 2014 TAC Meeting Notes

7 page(s)
  California Energy Commission
20342612/10/2014 Ivanpah Solar Electric Generating System Addendum to Heliostat Positioning Plan

5 page(s)
 CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
20339512/3/2014 IVANPAH SOLAR GENERATING SYSTEM GLARE INVESTIGATION
REPORT
121 page(s)
  California Energy Commission
2031019/25/2014 Kathryn Hackett-Fields Comments: Letter and Newspaper Article Attachment

3 page(s)
 CEC/Dockets UnitKathryn Hackett-Fields
2030659/15/2014 ISEGS Notice of Decision

2 page(s)
 California Resouces AgencyCEC/ Chris Marxen
2030649/15/2014 ISEGS Order Approving Petition to Amend

4 page(s)
 CEC/Docket UnitCEC/Harriet Kallemeyn
2030108/29/2014 Final Cultural Resources Report
End of Construction Final Cultural Resources Report CUL-4. Note: Two hard copies with Confidential Appendix B were delivered to the Dockets Unit on 8-29-14.
Cultural Resources
54 page(s)
 CEC/Joseph DouglasCH2M Hill
2030098/29/2014 Paleontological Resources Report
Required by Condition of Certification PAL-7. End of Construction Paleo Resources Report
Compliance
6 page(s)
 CEC/Joseph DouglasCH2M Hill
2030028/28/2014 Ivanpah Solar Electric Generating System (Ivanpah) Avian & Bat Technical Advisory Committee (TAC) Meeting July 2014

4 page(s)
 CEC / Docket UNitCalifornia Energy Commission/ Joe Douglas
2029908/27/2014 Ivanpah SEGS Spring 2014 Avian Quarterly Report
96 page(s)
 CEC /Docket UnitEllison, Schneider & Harris L.L.P.
2028347/28/2014 140728 ISEGS Support Letter

1 page(s)
 Joe DouglasEllison, Schneider & Harris L.L.P.
2027187/17/2014 Evaluation of Glare at the Ivanpah Electric Generating System

33 page(s)
 CEC/Dockets UnitEllison, Schneider & Harris L.L.P.
2026607/1/2014 Construction Termination Report

57 page(s)
 CEC/Joseph DouglasEllison, Schneider & Harris L.L.P.
2026256/27/2014 Staff Analysis of the Proposed Increase in Boiler Fuel Usage Limit

27 page(s)
 CEC/Dockets UnitCEC/Joseph Douglas
2026176/26/2014 Avian & Bat Monitoring Plan; 2013-2014 Winter Report

90 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
2025886/25/2014 Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee (TAC) Meeting Notes - May, 2014
  California Energy Commission
2024616/16/2014 Monthly Compliance Report No. 44 - May 2014

359 page(s)
  Ellison, Schneider & Harris L.L.P.
2023685/22/2014 Monthly Compliance Report #43 April 2014

1130 page(s)
 CEC/Joseph DouglasEllison, Schneider & Harris L.L.P.
2023635/22/2014 Avian & Bat Technical Advisory CommitteeTAC 2-6-14 Meeting Notes
Ivanpah Solar Energy Generating System
4 page(s)
 CEC / Docket UnitCalifornia Energy Commission
2023565/20/2014 Ivanpah Solar Electric Generating System Monthly Compliance Report #43
1130 page(s)
 CEc / Docket UnitCalifornia Energy Commission
2023445/19/2014 Condition of Certification COMP -6 April 201 Monthly Compliance Report No. 43
Air Quality, Biological Resources
1129 page(s)
 CEC / Siting/ Joe DouglasCalifornia Energy Commission
2021524/21/2014 Email to Withdraw Petition for Staff Modification (TN#200313)

1 page(s)
 CEC/Joseph DouglasEllison, Schneider & Harris LLP
2020964/17/2014 Ivanpah Solar Electric Generating System March 2014 Monthly Compliance Report
Condition of Certification COMPLIANCE-6
Air Quality, Biological Resources, Cultural Resources
966 page(s)
 CEC/Dockets Unit / J. DouglasEnergyservices / M. Huizar
2020854/16/2014 Notice of Receipt for Petition to Amend

2 page(s)
  California Energy Commission
2019283/26/2014 Ivanpah Petition to Amend No. 4

Air Quality
60 page(s)
 CEC/Joe DouglasEllison, Schneider & Harris L.L.P.
2019153/25/2014 Ivanpah Solar Electric Generating System Response to Clark County Department of Aviation Pilot Reports

6 page(s)
 CEC/Joseph DouglasEnergyServices, an NRG service
2018913/19/2014 February 2014 Monthly Compliance Report #41

1042 page(s)
 CEC/Dockets UnitIvanpah Solar Electric Generating System
2018473/10/2014 Letter re Pilot Complaints of Visual Impacts from Ivanpah Solar Electric Generating System

7 page(s)
 CEC/Joseph DouglasLas Vegas McCarran International Airport
2017642/20/2014 January 2014 Monthly Compliance Report

850 page(s)
 CEC/Dockets Unitenergyservices an NRG Service
2015711/17/2014 Monthly Compliance Report No. 39

466 page(s)
 CEC/Joseph DouglasBrightSouce Energy
20144312/17/2013 Monthly Compliance Report - November 2013

550 page(s)
 CEC/Joseph DouglasBright Source Energy
20131811/22/2013 Fish and Wildlife Service Review of Ivanpah Solar Electric Generating System Avian and Bat Monitoring and Management Plan Rev 12

2 page(s)
 CEC/Dockets UnitCalifornia Energy Commission
20131711/22/2013 Bureau of Land Management Approval of Ivanpah Solar Electric Generating System Avian & Bat Monitoring & Management Plan

2 page(s)
 Bright Source Energy/ Marc SydnorU.S Department of the Interior
20131611/22/2013 Ivanpah Solar Electric Generation System Avian & Bat Monitoring Letter of Aproval

1 page(s)
 Bright Source/Marc SydnorCalifornia Energy Commission
20131511/22/2013 Ivanpah Soloar Electric Generating System Avian Monitoring Plan rev 12
Avian & Bat Monitoring and Management Plan
45 page(s)
  Ivanpah Solar Electric Generating System
20125411/18/2013 October 2013 Monthly Compliance Report

610 page(s)
 CEC/Dockets UnitBright Source Enegy Inc.
20093910/18/2013 Ivanpah Solar Electric Generating System September 2013 Monthly Compliance Report
Monthky Compliance Report # 36
Air Quality, Biological Resources, Cultural Resources, Geology/Paleontology
736 page(s)
 CEC/Joseph DouglasBrightSource Energy, Inc.
2006439/30/2013 Injured Northern Rough-winged Swallow Found Colosseum Rd.

7 page(s)
 California Energy CommissionBrightSource Energy, Inc.
2006429/30/2013 Avian Mortality Report 9-1-2013
 California Energy CommissionBrightSource Energy, Inc.
2006419/30/2013 BrightSource email attaching Avian Mortality Report

1 page(s)
 California Energy CommissionBrightSource Energy, Inc.
2005409/20/2013 Ivanpah Solar Electric Generating System Monthly Compliance Report #35

Air Quality, Biological Resources, Cultural Resources, Geology/Paleontology
828 page(s)
 CEC/Joseph DouglasBright Source Energy, Inc.
2003168/22/2013 July 2013 Monthly Compliance Report

Compliance
600 page(s)
 CEC/Joseph DouglasBright Source Energy, Inc.
2003138/22/2013 Ivanpah Petition for Staff Approved Modification

Compliance
2 page(s)
 CEC/Joe DouglasBrightSource Energy
699083/13/2013 CEC Order 12-0213-8 Approving a Petition to Modify Air Quality Conditions of Certification

15 page(s)
 CEC/Docket UnitCEC/ H. Kallemeyn
696942/27/2013 Order Approving a Petition to Modify BIO -20

3 page(s)
 CEC/Docket UnitCEC/ J. Douglas
695972/19/2013 Notice of Decision Regarding BIO-20

1 page(s)
 CEC/ Docket UnitCEC/ Joe Douglas
695292/14/2013 Notice of Decision Regarding Condition of Certification BIO-21

1 page(s)
 California Resources AgencyCEC/J.Douglas
695282/14/2013 Notice of Decision Regarding Modifying Several AQ Conditions

1 page(s)
 California Resources AgencyCEC/J.Douglas
690821/9/2013 CEC Staff - J. Douglas ISEGS AQ Extension Letter
CEC Staff - J. Douglas Ivanpah Solar Electric Generating System AQ Extension Letter
2 page(s)
 CEC?Docket UnitCEC Staff/J. Douglas
690811/9/2013 CEC Staff -J. Douglas ISEGS BIO 20 Extension Letter

2 page(s)
 CEC/Docket UnitCEC Staff/J. Douglas
6896012/21/2012 Staff Analysis of Proposed Modifications to Condition of Certification BIO-20 Streambed Impact Minimization and Conservation Measures

12 page(s)
 Interested PartiesCEC/ J. Douglas
6895912/21/2012 CEC Staff Analysis of Proposed Modifications to Air Quality Conditions

39 page(s)
 Interested PartiesCEC/ J. Douglas
6880112/7/2012 Notice of Receipt for Petition to Amend BIO-20

3 page(s)
 CEC/Docket UnitCEC/C.Marxen
6866811/27/2012 Petition to Amend

13 page(s)
 CEC/Docket UnitCEC/J.Douglas
659106/22/2012 AQ Amendment Data Responses Set 1 - 9

29 page(s)
 CEC/J.DouglasBright Source
652395/15/2012 Data Requests no.1 through 9

4 page(s)
 BrightSource Energy/D.DavisCEC/J.Douglas
646284/6/2012 Notice of Receipt - Petition to Amend

3 page(s)
 CEC/Docket UnitCEC/C.Marxen
640383/8/2012 Petition to Amend-Equipment Change to Reduce Emissions

61 page(s)
 CEC/Dockets UnitCEC/Joseph Douglas
5874010/8/2010 Authorization to Start Construction

1 page(s)
 Bright Source Energy/ Steve De YoungCEC/ Joseph Douglas