Docket Log

Docket: 79-AFC-01C
Project Title: Compliance - Application for Certification for PG&E Geysers Unit 17 (78-NOI-3)
Generated On: 4/26/2024 1:55:53 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2559703/29/2024 CONFIDENTIAL Unit 17 Annual Fire Alarm Inspection Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559693/29/2024 CONFIDENTIAL Unit 17 Semi-Annual Fire Alarm Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559683/29/2024 CONFIDENTIAL Unit 17 Annual Fire Pump Report

19 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559673/29/2024 CONFIDENTIAL Unit 17 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559663/29/2024 CONFIDENTIAL Unit 17 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559653/29/2024 CONFIDENTIAL Unit 17 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559643/29/2024 CONFIDENTIAL Unit 17 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559633/29/2024 CONFIDENTIAL Unit 17 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559623/29/2024 CONFIDENTIAL Unit 17 Standpipe and Hose System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559613/29/2024 CONFIDENTIAL Unit 17 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559603/29/2024 CONFIDENTIAL Unit 17 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559593/29/2024 CONFIDENTIAL Unit 17 Standpipe and Hose System Quarterly and Annual Report_First Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559583/29/2024 CONFIDENTIAL Unit 17 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2558974/24/2024 CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2553673/29/2024 GPC Unit 17_2023 ITM Reports_Repeated Application for Confidential Designation

19 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2553613/29/2024 GPC Unit 17 Letter to John Heiser Regarding Fire Protection-3 Submission

1 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2552103/7/2024 CONFIDENTIAL_U17_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

18 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2552032/16/2024 CONFIDENTIAL Unit 17 GPC Q1 2024 FIRE PROTECTION Compliance Submission

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2551893/20/2024 CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2549123/7/2024 Repeated Application for Confidentiality_U17_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2545382/16/2024 GPC Unit 17_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2508766/30/2023 2022 Annual Compliance Report - Lakeview (U17)

55 page(s)
 CEC/John HeiserGeysers Power Company, LLC
2498104/19/2023 CEC Response Letter re Application for Confidential Designation dated March 30, 2023

Compliance
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2497883/30/2023 Geysers Power Company, Unit 17, 4Q22 ITM Report Wet Sprinkler Inspection

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497873/30/2023 Geysers Power Company, Unit 17, 4Q22 ITM Report Deluge Inspection

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497863/30/2023 Geysers Power Company, Unit 17, ITM Report Cover Letter

6 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2495123/30/2023 Geysers Power Company, Unit 17, Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2487022/8/2023 Alina Russ Comments - Thank you

Greenhouse Gases
1 page(s)
 CEC/Docket UnitAlina Russ
24804512/13/2022 November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Lake View Unit 17 Facility

6 page(s)
 CEC/John Heiser and Keith WinsteadEllison Schneider Harris & Donlan LLP
24759711/21/2022 CEC response for Confidential Designation Geysers Unit 17, Lakeview

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24757511/4/2022 GPC Unit 17_Q3 2022 Wet Pipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24757411/4/2022 GPC Unit 17_Q3 2022 Deluge Inspection Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24757311/4/2022 GPC Unit 17_Q3 2022 Second Semiannual FireScan Report

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24757211/4/2022 GPC Unit 17_Q3 2022 ITM Report Cover Letter

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24737511/10/2022 GPC October 2022 Monthly Recommissioning Report_Unit 17

3 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
24730111/4/2022 GPC Unit 17_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24727311/3/2022 CEC Response to Geysers Unit 17 Repeated Application for Confidentiality

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24721010/19/2022 GPC Unit 17_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24719910/20/2022 GPC Unit 17_Wet Pipe Q2 2022 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24719810/20/2022 GPC Unit 17_Deluge Q2 2022 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24719710/20/2022 GPC Unit 17_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24718610/21/2022 GPC Unit 17 Basis of Design Narrative and Recommissioning Report_Rev2_Cover Letter_CONFIDENTIAL

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24673310/21/2022 GPC Unit 17 Basis of Design Narrative and Recommissioning Report_Rev2_Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24670110/20/2022 GPC Unit 17_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24664810/19/2022 GPC Unit 17_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24640910/10/2022 Geysers Unit 17 September 2022 Monthly Recommissioning Report and Cover Letter

3 page(s)
 CEC/John HeiserEllison Schneider Harris & Donlan LLP
2460049/12/2022 GPC_August 2022 Monthly Recommissioning Report and Cover Letter_Unit 17

2 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2449667/11/2022 GPC_June 2022 Monthly Compliance Report_Unit 17_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2449448/3/2022 GPC Unit 17 Basis of Design Narrative and Cover Letter_CONFIDENTIAL

16 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2448238/12/2022 CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Samantha G. NeumyerCalifornia Energy Commission
2444568/10/2022 GPC_July 2022 Monthly Recommissioning Report and Cover Letter_Unit 17

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2444178/10/2022 CEC Response Letter to Geysers' Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2443038/3/2022 GPC Unit 17 Basis of Design Narrative Repeated Application for Confidential Designation
  Ellison Schneider Harris & Donlan LLP
2440057/11/2022 GPC_June 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 3

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2440017/11/2022 GPC_June 2022 Monthly Compliance Report_Unit 17_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2439206/13/2022 GPC May 2022 Monthly Compliance Report_Unit 17_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438946/1/2022 Unit 17_Standpipe and Hose System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438936/1/2022 Unit 17_Fire Alarm and Life Safety System Inspection Certificate

10 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438926/1/2022 Unit 17_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438916/1/2022 Unit 17_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438906/1/2022 Unit 17_Electric Fire Pump Annual Report # 3

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438896/1/2022 Unit 17_Electric Fire Pump Annual Report # 2

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438886/1/2022 Unit 17_Electric Fire Pump Annual Report # 1

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438876/1/2022 Unit 17_Wet Pipe Fire Sprinkler System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438866/1/2022 Unit 17_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438587/6/2022 CEC Response Geyser Unit 17 Confidential Application June 1, 2022

2 page(s)
 C. Maxwell Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2438066/30/2022 2021 Annual Compliance Report - Lake View

Compliance
53 page(s)
 CEC/Docket UnitGeysers Power Company, LLC
2435196/13/2022 GPC May 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Geysers Unit 17

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2435166/13/2022 GPC May 2022 Monthly Compliance Report_Unit 17_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2433816/1/2022 Unit 17_GPC Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2431005/10/2022 GPC April 2022 Monthly Compliance Report_Unit 17_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2430935/16/2022 CEC Response Letter to Repeated Application for Confidentiality for Units 3, 17 & 19

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2430224/27/2022 Revised Basis of Design Narrative for Lakeview Geothermal Project Unit 17

15 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429985/10/2022 GPC April 2022 Monthly Compliance Report Repeated Application for Confidential Designation_Unit 17

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2429945/10/2022 GPC April 2022 Monthly Compliance Report_Unit 17_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2429885/10/2022 CEC Response Letter for Repeated Application for Confidentiality - Geysers Unit 17

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2428594/27/2022 REPEATED APPLICATION FOR CONFIDENTIAL DESIGNATION for the Basis of Design Narrative for Lakeview Geothermal Project, Unit 17

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2427124/12/2022 GPC March 2022 Monthly Compliance Report_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2427064/19/2022 CEC Response to Repeated Applications for Confidential Designation, Units 3, 17 & 19
Application dated 4-11-22
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2427044/11/2022 GPC Unit 17 BOD Narrative Cover Letter and BOD Narrative_CONFIDENTIAL

16 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2426764/14/2022 CEC Response Letter to Repeated Application for Confidential Designation - Geysers Unit 17

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2426384/12/2022 GPC March 2022 Monthly Compliance Report Repeated Application for Confidential Designation

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2426294/12/2022 GPC March 2022 Monthly Compliance Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2426284/11/2022 GPC Unit 17 Repeated Application for Confidential Designation for Basis of Design Narrative

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2425744/5/2022 2020 Revised Annual Compliance Report - Lake View
N/A
Compliance
52 page(s)
 CEC/Eric Veerkamp, CPMGeysers Power Company, LLC
2424283/8/2022 Geysers Power Company Unit 17 Basis of Design Narrative - CONFIDENTIAL

16 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423973/21/2022 CEC Response Letter to Repeated Applications for Confidential Designation

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2423203/10/2022 GPC February 2022 Monthly Compliance Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423162/10/2022 GPC January 2022 Monthly Recommissioning Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2423133/15/2022 CEC Letter Regarding Response to Repeated Applications for Confidential Designation

2 page(s)
 Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2422543/10/2022 GPC Repeated Application for Confidential Designation for February 2022 Monthly Compliance Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2422533/10/2022 February 2022 Monthly Compliance Report- PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2422263/8/2022 Geysers Power Company Repeated Application for Confidential Designation

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24217912/3/2021 Unit 17 Lakeview - Geysers Update 2-8-2019-presentation design plan

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24216011/22/2021 Confidential GPD October 2021 Monthly Recommissioning Report

7 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24215911/22/2021 Confidential Fire Scan 2021 Report

11 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24215811/22/2021 Confidential Deluge 2021 Report

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24215711/22/2021 Confidential Wet-Pipe 2021 Report

3 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24215611/22/2021 Confidential Cover Letter for Geysers Power Company ITM Report Q 3 2021

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24204112/3/2021 Lakeview-undated-detailed drawing-cooling tower system

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24204012/3/2021 Lakeview undated-detailed drawing-nozzle positions

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203912/3/2021 Lakeview undated cooling tower Nozzle Location diagram

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203812/3/2021 Lakeview Nozzle Location Sketch

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203712/3/2021 Lakeview-ITM-2019-fire alarm inspection report

9 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203612/3/2021 20190321 Geysers Unit _17 BOD & ReCx Privileged and Confidential DRAFT_CEC comments1

25 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203512/3/2021 20190321 Geysers Unit _17 BOD & ReCx Privileged and Confidential DRAFT_CEC comments

25 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203412/3/2021 Lakeview-ITM-2019-Standpipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203312/3/2021 Lakeview-ITM-2019 #3 Fire Pump Test Data

2 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203212/3/2021 Lakeview-ITM-2019 #2 Fire Pump test Data

2 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203112/3/2021 Lakeview-ITM-2019 #1 Fire Pump test Data

2 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24203012/3/2021 Lakeview-2019-engineering drawings of Wetting System

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202912/3/2021 Geysers Lake View (Unit 17) Review of BOD and Recom Plan_191205_PC1_200116

2 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202812/3/2021 20190321 Geysers Unit #17 BOD & ReCx Privileged and Confidential DRAFT

25 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202712/3/2021 Lakeview-ITM-2021-fire alarm inspection report_CONFIDENTIAL

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202612/3/2021 Lakeview-ITM-2021 Wet Pipe CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202512/3/2021 Lakeview-ITM-2021 Standpipe CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202412/3/2021 Lakeview-ITM-2021 Fire Pump_3 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202312/3/2021 Lakeview-ITM-2021 Fire Pump_2 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202212/3/2021 Lakeview-ITM-2021 Fire Pump_1 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202112/3/2021 Lakeview-ITM-2021 Deluge CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24202012/3/2021 Lakeview-ITM_8-31-16_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201912/3/2021 Lakeview-ITM_8-06-15_Fire Sprinkler Insp_Q

10 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201812/3/2021 Lakeview-ITM_7-16-14_Fire Sprinkler Insp_A

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201712/3/2021 Lakeview-ITM_6-10-13_Fire Sprinkler Insp_Q

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201612/3/2021 Lakeview-ITM_5-26-16_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201512/3/2021 Lakeview-ITM_5-07-15_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201412/3/2021 Lakeview-ITM_3-03-16_Fire Sprinkler Insp_A

5 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201312/3/2021 Lakeview-ITM_11-30-16_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201212/3/2021 Lakeview-ITM_11-04-15_Fire Sprinkler Insp_Q

9 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201112/3/2021 Lakeview-ITM_10-30-14_FireSprinkler Insp_Q

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24201012/3/2021 Lakeview-ITM_1-28-15_Fire Sprinkler Insp_A

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200912/3/2021 County 2016 Cooling Tower Rebuild Permit 7-22-16

9 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200812/3/2021 Cooling tower flow calculation-2016

153 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200712/3/2021 2016-engineering report-wet down system

153 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200612/3/2021 Lakeview-ITM_9-27-17_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200512/3/2021 Lakeview-ITM_6-28-17_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200412/3/2021 Lakeview-ITM_3-23-17_Fire Sprinkler Insp_A

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200312/3/2021 Lakeview-ITM_12-12-17_Fire Sprinkler Insp_Q

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200212/3/2021 Lakeview-ITM-121918 RK5089 QFA

18 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200112/3/2021 Lakeview-ITM-121918 RK5088 QSP

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24200012/3/2021 Lakeview-ITM-121718 RK5139 QFA

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24199912/3/2021 Lakeview-ITM-121718 RK5138 QSP

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24199712/10/2021 GPC November 2021 Monthly Recommissioning Report_CONFIDENTIAL

9 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2419941/10/2022 GPC December 2021 Monthly Compliance Report and Appendices_CONFIDENTIAL

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417011/27/2022 U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417001/27/2022 U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416991/27/2022 U19-Calistoga Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416981/27/2022 U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416971/27/2022 U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416961/27/2022 U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416951/27/2022 U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416941/27/2022 U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416931/27/2022 U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416921/27/2022 U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416911/27/2022 U18-Socrates Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416901/27/2022 U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416891/27/2022 U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416881/27/2022 U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416871/27/2022 U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416861/27/2022 U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416851/27/2022 Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2415622/16/2022 GPC Response to Executive Director's Confidentiality Determination

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2415202/10/2022 GPC Repeated Application for Confidential Designation for January 2022 Monthly Recommissioning Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2415152/10/2022 GPC January 2022 Monthly Recommissioning Report_PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2413742/2/2022 CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022

Compliance
11 page(s)
 J Harris of Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2413001/27/2022 Application for Confidential Designation

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2411331/10/2022 GPC December 2021 Monthly Recommissioning Report _PUBLIC

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2411291/10/2022 GPC Application for Confidential Designation for December Monthly Recommissioning Report

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24099612/20/2021 2020 Annual Compliance Report - Lakeview

Compliance
75 page(s)
 CEC/Mr. Eric W. Veerkamp, Compliance Project ManagerGeysers Power Company, LLC
24091312/10/2021 GPC Application for Confidential Designation Monthly Recommissioning Report Appedices

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24090912/10/2021 GPC November 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24081612/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24081512/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24081412/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24081312/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24081212/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24079612/3/2021 Unit 17 Lakeview applications for confidential designation - fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24067911/22/2021 Application for Confidential Designation

9 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24065911/22/2021 GPC October 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24055811/10/2021 June 2021 Monthly Recommissioning Report

Compliance
3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris Donlan
24055111/10/2021 Monthly Recommissioning Report_August 2020_PUBLIC

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24052911/9/2021 December 2020 Geysers Monthly Recommissioning Report

4 page(s)
 CEC/docket unitCalifornia Energy Commission
24052311/9/2021 November 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051711/9/2021 October 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051111/9/2021 September 2020 Geysers Monthly Recommissioning Report

5 page(s)
 CEC/docket unitCalifornia Energy Commission
24050511/9/2021 Monthly Recommissioning Report_July 2020

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049911/9/2021 Monthly Recommissioning Report (June 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049311/9/2021 Monthly Recommissioning Report (May 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24047911/9/2021 GPC Monthly Recommissioning Report - April 2020

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24045911/9/2021 August 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045811/9/2021 July 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045711/9/2021 September 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045611/9/2021 May 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045511/9/2021 February 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045411/9/2021 April 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045311/9/2021 March 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045211/9/2021 January 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
23570111/19/2020 ORDER APPROVING SETTLEMENT

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2326954/8/2020 Geysers Power Company, LLC Comments - 2019 Annual Compliance Report

Compliance
14 page(s)
 CEC/DocketsGeysers Power Company, LLC
2318041/30/2020 Notice of Decision-Lake View Unit 17
Notice of Decision in compliance with PRC Section 21080_5 and Title 20, California Code of Regulations, Section 1749
Compliance
1 page(s)
 CEC/Docket UnitEnergy Commission
2317851/29/2020 Order Approving Petition for Modification

2 page(s)
 CEC/DocketsCalifornia Energy Commission
23132412/26/2019 2018 Annual Compliance Report for the Lake View Power Plant (Unit 17)
2018 Annual Compliance Report for the Lake View Power Plant (Unit 17) at the Geysers
Compliance
14 page(s)
 Mr Eric W VeerkampGeysers Power Company, LLC
23130812/23/2019 Staff Analysis of Petition to Amend for Recommissioning Activities
Staff Analysis of Petition to Amend for Recommissioning Activities; Installation of a permanent standby diesel engine driven pump
57 page(s)
 Interested PartiesCalifornia Energy Commission
23027810/18/2019 RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING
Resolution No: 19-1014-4
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22989910/1/2019 Lake View Geothermal Project Revised Petition for Modification - Fire System Recommissioning Activities

33 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2295268/23/2019 Notice of Receipt - Petition for Post Certification Project Change
Geysers Lake View, Unit 17
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2291277/29/2019 Lake View Geothermal Project Petition for Modification Regarding Fire System Recommissioning Activities

36 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
22559710/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
21477312/13/2016 Lakeview Geothermal Project Steam Turbine Bypass Approval Letter

Facility Design
1 page(s)
 Director Geysers Environmental Services/Bruce CarlsenCalifornia Energy Commission
21457311/29/2016 Notice of Determination - Petition to Amend the Final Decision for the Lakeview Geothermal Project
*** THIS DOCUMENT SUPERSEDES TN 214572 *** Notice of Determination for the Lakeview Geothermal Project
Air Quality, Biological Resources, Cultural Resources, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21457211/29/2016 Notice of Determination - Petition to Amend the Final Decision for the Lakeview Geothermal Project
*** THIS DOCUMENT IS REPLACED BY TN 214573 *** Notice of Determination Lakeview Geothermal Project
Air Quality, Biological Resources, Cultural Resources, Facility Design, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Project Description, Public Health, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
21454211/22/2016 Notice of Receipt-Lakeview Steam Turbine Bypass
Notice of Receipt-Lakeview Steam Turbine Bypass
Air Quality, Biological Resources, Cultural Resources, Facility Design, Geology/Paleontology, Hazardous Materials, Noise and Vibration, Project Description, Public Health, Worker Safety and Fire Protection, Waste Management, Soil and Water
2 page(s)
  California Energy Commission
21449611/15/2016 Clarification of Description of Work Being Performed
LakeView79-AFC-01C Turbine bypass augering clarification
Soil and Water
1 page(s)
 CEC/Bruce BoyerCalifornia Energy Commission
21411710/20/2016 Petition For Staff Approved Project Modification
Petition for a staff approved project modification to install a steam turbine bypass
Air Quality, Biological Resources, Cultural Resources, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water
7 page(s)
  California Energy Commission
20675411/24/2015 Lakeview (Unit 17) 1979 Final Decision

122 page(s)
  California Energy Commission
20675311/24/2015 Lakeview (Unit 17) Compliance Plan

74 page(s)
  California Energy Commission
319507/23/2004 REVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES---GEYSERS POWER COMPANY, LLC

4 page(s)
 CEC/DocketsRtp Environmental Associates
319447/23/2004 Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.

42 page(s)
 CEC/K. Defolo/docketsCa Rwqcb
311083/12/2004 Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes

3 page(s)
 Calpine/Carlsen/docketsCEC/Tronaas
310973/12/2004 Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater

1 page(s)
 Office Of Planning And Research/DocketsCEC/Tronaas
309582/20/2004 Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater
Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C)
2 page(s)
 CEC/DocketsCEC/O'brien
296868/15/2003 Comments on the Petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'brien/CecCalifornia Regional Water Quality Control Board/Ma
291376/25/2003 License Amendments

42 page(s)
 CEC/Tronaas/docketsCh2mhill/Salamy
117574/22/1999 Commission Order Approving Ownership Transfers

1 page(s)
 CEC/Docket FileCEC/Keese
107333/30/1999 Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18 and 20.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
107293/30/1999 Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18 and 20

2 page(s)
 CEC/Docket FileCEC/Therkelsen
6503/14/1995 LETTER REQUESTING THAT MODIFICATIONS BE GRANTED BY CEC STAFF AFTER REVIEW OF THE REQUEST DATED 9-14-95

3 page(s)
 CEC/BrandPg&e
64910/19/1994 NOTICE OF RECEIPT - REQUEST TO AMEND DECISION - ASSESS IMPACTS ON ENVIRONMNETAL QUALTIY, PUBLIC HEALTH, AND SAFETY AND ASSESS CONSISTENCY OF PROPSED CHANGES

1 page(s)
 CEC/Docket FileCEC/Therkelsen
6489/22/1994 PG&E GEYERS POWER PLANT - MODIFICATION REQUEST TO COMPLIANCE MONITORING PLANS FOR UNITS 16-20

54 page(s)
 CEC/BrandPg&e/Speer