264349 | 6/18/2025 |
Second Determination of Incomplete Application and Request for Information for the Soda Mountain Solar Project (24-OPT-03)
70 page(s)
| | CEC/Docket Unit | California Energy Commission |
262621 | 4/9/2025 |
Christina Aiello Comments - Response to Appendix AA regarding impacts to bighorn sheep
Biological Resources 4 page(s)
| | CEC/Docket Unit | Christina Aiello |
262246 | 3/19/2025 |
Christina Aiello Comments - subtitle corrections to submitted documents under comment titled Impacts to Bighorn Sheep
Biological Resources 24 page(s)
| | CEC/Docket Unit | Christina Aiello |
261858 | 2/18/2025 |
Donald Priest Comments - Opposition to Soda Mountain Solar Project Due to Conservation and Recreational Concerns
3 page(s)
| | CEC/Docket Unit | Donald Priest |
261719 | 1/30/2025 |
Soda_Mountain_Solar_HRA Soda_Mountain_Solar_Historic Resources Assessment 111 page(s)
| | CEC/Drew Bohan | Bureau of Land Management |
261718 | 1/30/2025 |
Soda Mountain Solar CRTR Soda Mountain Solar cultural resources report 177 page(s)
| | CEC/Drew Bohan | Bureau of Land Management |
261671 | 2/10/2025 |
Appendix BB - Stormwater Pollution Prevention Plan Part 2 of the Stormwater Pollution Prevention Plan. Soil and Water 207 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261670 | 2/10/2025 |
Appendix BB1 - Stormwater Pollution Prevention Plan Part 1 of the Stormwater Pollution Prevention Plan. Soil and Water 115 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261668 | 2/10/2025 |
CEC Data Request Response Set #2 This document provides detailed information on each item included in Data Request Response Set #2. Alternatives, Biological Resources, Cultural Resources, Project Description, Transmission Line Safety and Nuisance, Visual Resources, Soil and Water 32 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261667 | 2/10/2025 |
Appendix AA_Determination of Infeasibility for DR BIO-20 Appendix AA provides a determination of infeasibility for CEC Data Request BIO-20, which requested an assessment of the feasibility of a 0.25-mile buffer from areas with 10% slope. Alternatives, Biological Resources 43 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261666 | 2/10/2025 |
Chapter 4 Alternatives – February 2025 – Revision 1 **This document supersedes in full document TN #257936.** Revisions made address CEC data requests ALT-1 through ALT-3. The Alternatives chapter discusses a range of alternatives to the proposed project, including alternative locations, alternative designs, and a No Project Alternative. Alternatives 77 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261606 | 2/7/2025 |
Appendix E-3 Request for Jurisdictional Determination This file contains the request for jurisdictional determination to the Army Corp of Engineers. Biological Resources 35 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261605 | 2/7/2025 |
Appendix J Water Supply Report – February 2025 – Revision 1 This document replaces in full TN 257930. Revisions made address CEC data requests WATER-1 through WATER-30. Soil and Water 100 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261604 | 2/7/2025 |
Appendix E-1 Aquatic Resources Delineation This document replaces in full TN 257933. This file contains the aquatic resources delineation for the project. Biological Resources 136 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261603 | 2/7/2025 |
Appendix D-1 Biological Resources Technical Report – February 2025 – Revision 1 This document replaces in full TN 257902. Revisions made address CEC data requests BIO-1 through BIO-20. This report describes how biological resources surveys were performed, and how, based on the results of the surveys, biological resources may be potentially affected by the construction, operation, maintenance, and decommissioning of the project. Desert bighorn sheep (Ovis canadensis nelsoni) information and analysis is not covered in this report. Biological Resources 254 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261602 | 2/7/2025 |
Appendix B Visual Resources Technical Report - February 2025 – Revision 1 This document replaces in full TN 257950. Revisions made address CEC data requests VIS-1 through VIS-12. This technical report details results of the visual resource analysis and accompanying studies relating to the potential for impacts associated with the construction, operation, maintenance, and decommissioning of the Project. Visual Resources 189 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261601 | 2/7/2025 |
Section 310 Hydrology and Water Quality – February 2025 – Revision 1 This document replaces in full TN 257909. Revisions made address CEC data requests WATER-1 through WATER-30. This Section evaluates the direct, indirect and cumulative impacts the Project may have on hydrology and water quality and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Soil and Water 34 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261600 | 2/7/2025 |
Section 318 Tribal Cultural Resources – February 2025 – Revision 1 This document replaces in full TN 257917. Revisions made address CEC data requests CUL/TRI-1 through CUL/TRI-21. This Section evaluates the direct, indirect and cumulative impacts the Project may have on Tribal Cultural Resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Cultural Resources 16 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261599 | 2/7/2025 |
Section 319 Utilities and Service Systems – February 2025 – Revision 1 This document replaces in full TN 257916. Revisions made address CEC data requests WATER-1 through WATER-30. This Section evaluates the direct, indirect and cumulative impacts the Project may have related to utilities and service systems and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Soil and Water 14 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261598 | 2/7/2025 |
Section 31_Aesthetics – February 2025 – Revision 1 This document replaces in full TN 257910. Revisions made address CEC data requests VIS-1 through VIS-12. This Section evaluates the direct, indirect and cumulative impacts the Project may have on visual resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Visual Resources 38 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261597 | 2/7/2025 |
Section 34 Biological Resources – February 2025 – Revision 1 This document replaces in full TN 257926. Revisions made address CEC data requests BIO-1 through BIO-20. This Section evaluates the direct, indirect and cumulative impacts the Project may have on biological resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Biological Resources 75 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261596 | 2/7/2025 |
Section 35, Cultural Resources – February 2025 – Revision 1 This document replaces in full TN 257925. Revisions made address CEC data requests CUL/TRI-1 through CUL/TRI-21. This Section evaluates the direct, indirect and cumulative impacts the Project may have on cultural resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Cultural Resources 59 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261595 | 2/7/2025 |
Chapter 2_Project Description – February 2025 – Revision 1 This document replaces in full TN 257912. Revisions made address CEC data requests PD-1 through PD-3. This Chapter provides a detailed description of the Proposed Soda Mountain Solar Project. Project Description 28 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261594 | 2/7/2025 |
Appendix D4b – Appendices for Incidental Take Permit Application This file contains the appendices to the Incidental Take Permit Application 106 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261593 | 2/7/2025 |
Appendix D4 – Incidental Take Permit Application This file contains the Section 2081 Incidental Take Permit Application for the Mojave Desert Tortoise and Burrowing Owl. Biological Resources 41 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261592 | 2/7/2025 |
Appendix E-4 Waste Discharge Requirements This file contains the application for discharges of dredged or fill material to waters of the State. Biological Resources, Soil and Water 396 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261591 | 2/7/2025 |
Appendix D-5 Biologist Resumes This file contains the resumes for the project biologists. Biological Resources 61 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261590 | 2/7/2025 |
Appendix D2 Appendices for Biological Resources Technical Report– February 2025 – Revision 1 This document provides the appendices to Appendix D1 Biological Resources Technical Report – February 2025 – Revision 1 Biological Resources 244 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261589 | 2/7/2025 |
Appendix D3 – Restoration and Revegetation Plan for Temporary Impact Areas This document guides the restoration of areas temporarily disturbed by construction activities. Biological Resources 42 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261588 | 2/7/2025 |
Appendix E-5 CDFW LSAA This document contains the application for a Lake and Streambed Alteration Agreement. Biological Resources 20 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261587 | 2/7/2025 |
Appendix Z – Mitigation Measure MM BIO-3 This document provides specific information related to MM BIO-3. Biological Resources 34 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261586 | 2/7/2025 |
Appendix Y Electric and Magnetic Field Study Report This report is an assessment of the electric and magnetic field (EMF) and Electric Field for the Soda Mt. interconnection facilities. This document address CEC data requests TSSN-1 through TSSN-5. Transmission Line Safety and Nuisance 24 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261585 | 2/7/2025 |
Appendix X2 – FAA Informal Review Determination This supplements Appendix X and provides the FAA informal determination for the project. Land Use 1 page(s)
| | CEC/Docket Unit | Resolution Environmental |
261464 | 1/30/2025 |
Confidential Docket Request -Soda Mountain_Bureau of Land Management Request for docket confidentiality 2 page(s)
| | CEC/Drew Bohan | Bureau of Land Management |
261255 | 1/23/2025 |
Christina Aiello Comments - Impacts to desert bighorn sheep
Biological Resources 24 page(s)
| | CEC/Docket Unit | Christina Aiello |
260487 | 11/4/2024 |
Confidential Appendix P Soda Mountain Solar Economic Impact Report Confidential Appendix P Soda Mountain Solar Economic Impact Report 70 page(s)
| | CEC/Docket Unit | Resolution Environmental |
260486 | 12/5/2024 |
CEC Response to Soda Mountain Solar, LLC's Application for Confidential Designation - Appendix P, Socioeconomic Impacts
Socioeconomics 3 page(s)
| | Michael Cocchimiglio / Soda Mountain Solar LLC | California Energy Commission |
260187 | 11/20/2024 |
CEC Response Letter to Soda Mountain's Application for Confidential Designation - Transmission
2 page(s)
| | Michael Cocchimiglio Soda Mountain Solar LLC | California Energy Commission |
260186 | 10/25/2024 |
Confidential Appendix O3, Interconnection Facilities Study Report Interconnection Facilities Study Report. This document addresses CEC data request TSD-5. 22 page(s)
| | CEC/Drew Bohan | Resolution Environmental |
260185 | 10/25/2024 |
Confidential Appendix O4, Interconnection Facilities Study Report – Supplement No 1 Interconnection Facilities Study Report – Supplement No 1. This document addresses CEC data request TSD-5. 11 page(s)
| | CEC/Drew Bohan | Resolution Environmental |
260184 | 10/25/2024 |
Confidential Appendix O5, Interconnection Facilities Study Report – Supplement No 2 Interconnection Facilities Study Report – Supplement No 2. This document addresses CEC data request TSD-5. 23 page(s)
| | CEC/Drew Bohan | Resolution Environmental |
259903 | 11/5/2024 |
Non-Confidential Appendix P Soda Mountain Solar Economic Impact Report This document contains the Non-Confidential Appendix P Soda Mountain Solar Economic Impact Report. Revisions were made to address CEC DR MAND-1 and DR SOCIO-1 through SOCIO-10. Socioeconomics 70 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259878 | 11/4/2024 |
Application for Confidential Designation - Appendix P Application for Confidential Designation - Appendix P 4 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259876 | 11/4/2024 |
CEC Data Request Response Set #1 This document provides detailed information on each item included in Data Request Response Set #1. Air Quality, Executive Summary, Geology/Paleontology, Hazardous Materials, Land Use, Public Health, Socioeconomics, Traffic and Transportation, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 152 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259712 | 10/25/2024 |
Appendix R Waste Management Plan - October 2024 - Revision 1 This document replaces in full TN # 257903. Revisions made address CEC data request WASTE-1. Waste Management 40 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259711 | 10/25/2024 |
Appendix C-1 Air Quality and Greenhouse Gas Technical Report - October 2024 - Revision 1 This document replaces in full TN # 257949. Revisions made address CEC data requests AQ-1 through AQ-6 and GHG-1 through GHG-7. This report analyzes potential air quality and climate change impacts related to the Soda Mountain Solar Project, conducted to comply with Mojave Desert Air Quality Management District (MDAQMD) requirements for air quality and climate change assessments and to satisfy CEQA. Air Quality 175 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259710 | 10/25/2024 |
Section 3-21 Public Health Section 3-21 was created to address CEC data requests PH-1 through PH-10. This section evaluates the public health impacts of the proposed project. Public Health 19 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259709 | 10/25/2024 |
Section 3-22 Paleontological Resources Section 3-22 was created to address CEC data requests PALEO-1 through PALEO-4. This section evaluates the potential for impacts to known and unknown paleontological resources. Geology/Paleontology 16 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259708 | 10/25/2024 |
Appendix A1 Engineering Generation Facility Description, Design and Operation - October 2024 - Revision 1 This document replaces in full TN # 257906. Revisions made address CEC data requests TSD-1 through TSD-7. Transmission Line Safety and Nuisance, Transmission System Engineering 9 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259707 | 10/25/2024 |
Appendix C-2 – Dust Control Plan This document addresses CEC Data Request AQ-1. Air Quality 28 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259706 | 10/25/2024 |
Appendix I Phase I Environmental Site Assessment - October 2024 - Revision 1 This document replaces in full TN # 257931. Revisions made address CEC data request SOIL-3. This document includes a Phase I ESA of the subject property, performed in conformance with the scope and limitations of ASTM International Standard 2247-16. Hazardous Materials 231 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259705 | 10/25/2024 |
Appendix M Transportation Analysis - October 2024 - Revision 1 This document replaces in full TN # 257944. Revisions made address CEC data requests TRANS-1 through TRANS-12. This report presents the findings of the analysis conducted under CEQA and the local transportation analysis for the Project. This report adheres to the California Energy Commission (CEC) requirements for CEQA analyses, while also being consistent with the San Bernardino County Transportation Impact Study Guidelines (2019) for the Desert region of San Bernardino County, and Caltrans1 Guidelines for the preparation of transportation studies. Traffic and Transportation 156 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259704 | 10/25/2024 |
Appendix Q Worker Safety - October 2024 - Revision 1 This document replaces in full TN # 257942. Revisions made address CEC data requests WS-1 through WS-4. This worker safety plan summarizes the worker health and safety issues that may be encountered during construction and operation of the Project, as specified in Title 20, California Code of Regulations, Section 1704, Appendix B for worker safety. Worker Safety and Fire Protection 43 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259703 | 10/25/2024 |
Section 3-3 Air Quality - October 2024 - Revision 1 This document replaces in full TN # 257927. Revisions made address CEC data requests AQ-1 through AQ-6. The Air Quality Section evaluates the direct, indirect and cumulative impacts the Project may have on air quality and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Air Quality 34 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259702 | 10/25/2024 |
Section 37 Geology and Soils - October 2024 - Revision 1 This document replaces in full TN # 257923. Revisions made address CEC data requests SOILS-1 through SOILS-3. This Section evaluates the direct, indirect and cumulative impacts the Project may have on geology and soil resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Geology/Paleontology 27 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259701 | 10/25/2024 |
Section 3-8 Greenhouse Gas Emissions - October 2024 - Revision 1 This document replaces in full TN # 257922. Revisions made address CEC data requests GHG-1 through GHG-7. This Section evaluates the direct, indirect and cumulative impacts the Project may have on greenhouse gas emissions and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures Greenhouse Gases 17 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259700 | 10/25/2024 |
Section 3-9 Hazards and Hazardous Materials - October 2024 - Revision 1 This document replaces in full TN # 257937. Revisions made address CEC data requests HAZ-1 through HAZ-9. This Section evaluates the direct, indirect and cumulative impacts the Project may have related to hazards and hazardous materials and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Hazardous Materials 49 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259699 | 10/25/2024 |
Section 3-11 Land Use and Planning - October 2024 - Revision 1 This document replaces in full TN # 257908. Revisions made address CEC data requests LAND-1 through LAND-5. The Land Use and Planning Section evaluates the direct, indirect and cumulative impacts the Project may have on land use and planning and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Land Use 13 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259698 | 10/25/2024 |
Section 3-17 Transportation - October 2024 - Revision 1 This document replaces in full TN # 257918. Revisions made address CEC data requests TRANS-1 through TRANS-12. The Transportation Section evaluates the direct, indirect and cumulative impacts the Project may have on transportation resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Traffic and Transportation 25 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259697 | 10/25/2024 |
Appendix W, BLM Record of Decision This document provides the 2016 Bureau of Land Management Record of Decision. This document addresses CEC data request LAND-1. Land Use 205 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259696 | 10/25/2024 |
Appendix X – FAA Informal Review DOD Siting Clearinghouse – Informal Review Request Form and Correspondence Land Use 6 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259695 | 10/25/2024 |
Data Request Response #1 Data Request Response #1 to September 3, 2024 Determination of Incomplete Application and Request for Information Compliance 5 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259694 | 10/25/2024 |
Appendix N Public Notice Package - October 2024 - Revision 1 This document replaces in full TN # 257941. Revisions made address CEC data request ES-2. The document identifies parcels within 500 feet of the proposed transmission line and other linear facilities and parcels within 1000 feet of the proposed powerplant and related facilities. Executive Summary 14 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259693 | 10/25/2024 |
Chapter 1 Executive Summary – Revision 1 -October 2024 This document replaces in full the Executive Summary document (TN 257913) that was previously docketed on July 23, 2024. Revisions made address CEC data requests ES-1 through ES-4. This Chapter summarizes the Project objectives, location, elements, schedule, ownership and history. Executive Summary 8 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259692 | 10/25/2024 |
Application for Confidential Designation Application for Confidential Designation
• Appendix O3, Interconnection Facilities Study Report. Generation Interconnection. May 2013, All Pages
• Appendix O4 Interconnection Facilities Study Report – Supplement No 1. Generation Interconnection. Final. May 15 2017, All Pages
• Appendix O5, Interconnection Facilities Study Report – Supplement No 2. Large Generation Interconnection. Final. May 31 2024, All Pages 4 page(s)
| | CEC/Drew Bohan | Resolution Environmental |
259486 | 10/8/2024 |
PROJECT COMMENT – NOTICE OF APPLICATION FOR THE SODA MOUNTAIN SOLAR PROJECT (24-OPT-03) IN BARSTOW, SAN BERNARDINO COUNTY Comment from San Bernadino County Department of Public Works 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
259334 | 9/27/2024 |
Courtesy Tribal Notification for Soda Mountain Solar Project (24-OPT-03) and Distribution List Emailed September 27, 2024 Cultural Resources 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
259262 | 8/15/2024 |
Confidential Appendix P Socioeconomic Impacts Confidential Appendix P Socioeconomic Impacts 42 page(s)
| | CEC/Docket Unit | Resolution Environmental |
259211 | 9/18/2024 |
CEC Response Letter to Soda Mountain's Application for Confidentiality socioeconomic
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
259189 | 7/30/2024 |
Cultural Resources Inventory 2013 Cultural resources inventory report for additional survey for soda mountain solar 19 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
259188 | 7/30/2024 |
Cultural Inventory Report 2009 Cultural Inventory Report 2009 for Soda Mtn Solar 70 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
259149 | 9/13/2024 |
CEC Response to Soda Mountain Solar - BLM's App for Confidential Designation
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
259064 | 9/9/2024 |
CEC response letter to Bureau of Land Management – Barstow Field Office’s Application for Confidentiality, dated August 1, 24
2 page(s)
| | Bureau of Land Management - Barstow Field Office/Alexis Francois | California Energy Commission |
259063 | 8/1/2024 |
Soda Mountain Solar Reconnaissance survey 2024 2024 inventory report 163 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
259062 | 8/1/2024 |
Soda Solar Blue Bell Mine Survey Additional survey associated with original 2009 report 12 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
259061 | 8/1/2024 |
Soda_Mountain_Solar_HRA 2024 historic resources assessment 181 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
258896 | 9/3/2024 |
Determination of Incomplete Application and Request for Information for the Soda Mountain Solar Project (24-OPT-03)
199 page(s)
| | CEC/Docket Unit | California Energy Commission |
258672 | 7/23/2024 |
Confidential H Appendix A and B EIR Appendix H, Paleontological Resources Technical Report for the Soda Mountain Solar Project, February 2024
o Appendix A, Natural History Museum of Los Angeles County Paleontological Records Search, All Pages
o Appendix B, San Bernardino County Museum Paleontological Records Search, All Pages 8 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258671 | 7/23/2024 |
Confidential D1 Appendix C EIR Appendix D-1, Soda Mountain Solar Project Biological Resources Technical Report – Appendix C, California Natural Diversity Database 10-Mile Search 1:6,000 Scale Map, June 2024, All Pages 49 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258670 | 7/23/2024 |
Appendix O1 System Impact Restudy System Impact Restudy (CONFIDENTIAL) 86 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258669 | 7/23/2024 |
Appendix O2 Large Generator Interconnection Agreement Large Generator Interconnection Agreement (CONFIDENTIAL) 98 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258578 | 8/20/2024 |
CEC Response Letter to Soda Mountain Solar LLC re Confidentiality Application, dated July 23, 2024
4 page(s)
| | Soda Mountain Solar, LLC/Michael Cocchimiglio | California Energy Commission |
258506 | 8/15/2024 |
Non-confidential Appendix P Socioeconomic Impacts This document contains the non-confidential Appendix P, Socioeconomic Impacts. 42 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258504 | 8/15/2024 |
Application for Confidential Designation Appendix P, Socioeconomic Impacts on San Bernardino County of the Proposed Soda Mountain Project: Highlighted text on pages: 1-2, 15-17, 19-23 and 34-37. 5 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258484 | 8/13/2024 |
Mojave Water District Response to NOR of Opt-In Application for Soda Mountain Solar Project Response Received via email on August 13, 2024 Soil and Water 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
258461 | 8/12/2024 |
Appendix D4 - Appendix A to 2024 Biological Resources Technical Report This file contains Appendix A to the 2024 Biological Resources Technical Report. Biological Resources 263 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258460 | 8/12/2024 |
Appendix D5 – Appendices D-G to 2024 Biological Resources Technical Report This file contains Appendices D through G to the 2024 Biological Resources Technical Report. Biological Resources 93 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258459 | 8/12/2024 |
Appendix D6 – Appendices H-R to 2024 Biological Resources Technical Report This file contains Appendices H through R to the 2024 Biological Resources Technical Report. Biological Resources 179 page(s)
| | CEC/Docket Unit | Resolution Environmental |
258375 | 8/7/2024 |
Attorney General Notification of Application Receipt for Soda Mountain Solar Project (24-OPT-03) & distribution list Distributed via email on August 7, 2024 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
258374 | 8/7/2024 |
Federal, State, Other Agency Notification of Application Receipt for Soda Mountain Solar Project (24-OPT-03) & distribution list Distributed via email on August 7, 2024 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
258373 | 8/7/2024 |
Local Agency Notification of Receipt of Opt-In Application for Soda Mountain Solar Project (24-OPT-03) and distribution list Distributed via email on August 7, 2024 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
258280 | 8/2/2024 |
Notice of Receipt of an Opt-In Application for MOU Agencies and distribution list Emailed to California Fish and Wildlife- Region 6, Department of Toxic Substances Control, State Water Control Board, and Lahontan Regional (R6) Water Quality Control Board on August 2, 2024 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
258272 | 8/1/2024 |
Receipt of Opt-in Application For the Soda Mountain Solar Project (24-OPT-03) 1 page(s)
| | Bureau of Land Management | California Energy Commission |
258263 | 8/1/2024 |
Confidential Docket Resubmit -Soda Mountain_Bureau of Land Management Confidentiality statement 2 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
258195 | 7/30/2024 |
Confidential Docket Request -Soda Mountain_Bureau of Land Management
2 page(s)
| | CEC/Drew Brohan | Bureau of Land Management |
257955 | 7/23/2024 |
Application for Confidential Designation Application for Confidential Designation for:
- EIR Appendix D-1, Soda Mountain Solar Project Biological Resources Technical Report – Appendix C, California Natural Diversity Database 10-Mile Search 1:6,000 Scale Map, June 2024, All Pages
- EIR Appendix H, Paleontological Resources Technical Report for the Soda Mountain Solar Project, February 2024
o Appendix A, Natural History Museum of Los Angeles County Paleontological Records Search, All Pages
o Appendix B, San Bernardino County Museum Paleontological Records Search, All Pages 3 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257950 | 7/23/2024 |
Appendix B Visual Resources Technical Report This technical report details results of the visual resource analysis and accompanying studies relating to the potential for impacts associated with the construction, operation, maintenance, and decommissioning of the Project. 120 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257949 | 7/23/2024 |
Appendix C Air Quality and Greenhouse Gas Technical Report This report analyzes potential air quality and climate change impacts related to the Soda Mountain Solar Project, conducted to comply with Mojave Desert Air Quality Management District (MDAQMD) requirements for air quality and climate change assessments and to satisfy CEQA.
180 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257948 | 7/23/2024 |
Appendix D2 Desert Bighorn Sheep Study This Technical Report provides an evaluation of the Soda Mountain Solar Project on Desert bighorn sheep (Ovis canadensis nelsoni).
Biological Resources 120 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257947 | 7/23/2024 |
Appendix D 3 Biologist Resumes
Biological Resources 49 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257946 | 7/23/2024 |
Appendix K Stormwater Drainage Report In this Appendix, hydrologic conditions were analyzed to understand the existing and future flood hazards for the proposed
Project site; determine inundation areas and spatial distribution of stormwater depths and velocities for the 2-year, 10-year, and 100-year 24-hour storm events; and identify any flood hazard areas within the site.
Soil and Water 47 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257945 | 7/23/2024 |
Appendix L Noise and Ground Vibration Technical Report The purpose of this report is to present the analysis and noise impact estimates for the construction and operation of the project. The analysis outlines the existing noise environment at the project site, estimates
future noise and vibration levels at neighboring locations as a result of the project’s construction and operation, and evaluates the potential for significant impacts. Also provided is an assessment of the project’s contribution to potential cumulative noise impacts.
63 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257944 | 7/23/2024 |
Appendix M Transportation Analysis This report presents the findings of the analysis conducted under CEQA and the local transportation analysis for the Project. This report adheres to the California Energy Commission (CEC) requirements for CEQA analyses, while also being consistent with the San Bernardino County Transportation Impact Study Guidelines (2019) for the Desert
region of San Bernardino County, and Caltrans1 Guidelines for the preparation of transportation studies.
Traffic and Transportation 94 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257943 | 7/23/2024 |
Appendix V Supplemental Information Facility Definitions, Permit Applications Submitted, Permits Required, Relevant Regulatory Framework, Prohibited Area Analysis and Environmental Leadership and Development Project Requirements. Compliance 19 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257942 | 7/23/2024 |
Appendix Q Worker Safety Plan This worker safety plan summarizes the worker health and safety issues that may be encountered during construction and operation of the Project, as specified in Title 20, California Code of Regulations, Section 1704, Appendix B for worker safety. Worker Safety and Fire Protection 36 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257941 | 7/23/2024 |
Appendix N Public Noticing Package Parcels within 500 feet of the proposed transmission line and other linear facilities and parcels within 1000 feet of the proposed powerplant and related facilities.
Compliance 13 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257940 | 7/23/2024 |
Appendix S Community Benefit Agreement Strategy
Compliance 3 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257939 | 7/23/2024 |
Appendix U Closure and Decommissioning Plan The Closure and Decommissioning Plan outlines the framework for decommissioning and reclamation of the Soda Mountain Solar Project. Compliance 8 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257938 | 7/23/2024 |
Appendix T Labor Certifications Certification the Project will comply with the prevailing wage and workforce requirements set forth in Assembly Bill 205 (“AB 205”), including compliance with Public Resources Code sections 25545.3.3 and 25545.3.5.
Compliance 3 page(s)
| | CEC/Docket Unit/Eric Knight | Resolution Environmental |
257937 | 7/23/2024 |
Section 3-9 Hazards and Hazardous Materials This Section evaluates the direct, indirect and cumulative impacts the Project may have related to hazards and hazardous materials and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Hazardous Materials 33 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257936 | 7/23/2024 |
Chapter 4 Alternatives ** This document has been superseded by document TN #261666.** This chapter discusses a range of alternatives to the proposed project, including alternative locations, alternative designs, and a No Project Alternative. Alternatives 6 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257935 | 7/23/2024 |
Chapter 5 Other CEQA Considerations This Chapter evaluates growth-inducing impacts, significant and unavoidable impacts and significant irreversible environmental changes. 3 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257934 | 7/23/2024 |
Chapter 6 Report Preparation This Chapter identifies the preparers of the Environmental Impact Report. 2 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257933 | 7/23/2024 |
Appendix E1 Aquatic Resources Delineation This Appendix describes the desktop data, field data, remote sensing data, and modeling and machine learning that were used to delineate aquatic resources potentially subject to regulation by the U.S. Army Corps of Engineers (USACE) pursuant to Clean Water Act (CWA) Section 404 (for discharge of fill material into “waters of the United States”), the California Water Boards by the Lahontan Regional Water Quality Control Board (RWQCB) pursuant to the CWA Section 401 (for discharge of fill material into “waters of the United States / waters of the State”) and the Porter Cologne Water Quality Control Act (Porter-Cologne) waste discharge requirements (for discharge into “waters of the State”), and the California Department of Fish and Wildlife (CDFW) pursuant to the California Fish and Game Code Section 1602 Lake and Streambed Alteration Program and its subsequent revisions (for substantial changes to “streambed”).
Biological Resources 132 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257932 | 7/23/2024 |
Appendix H Paleontological Resources Technical Report This Appendix summarize the results of a renewed paleontological resources assessment, which includes a review of geologic maps, geotechnical investigation data, scientific literature, confidential
fossil locality records from the Natural History Museum of Los Angeles County (NHMLA) and the San Bernardino County Museum (SBCM), the BLM’s Potential Fossil Yield Classification (PFYC) mapping, and a reconnaissance survey. This technical report also includes a discussion of the potential of the project to impact scientifically significant paleontological resources and provides mitigation recommendations to reduce potential impacts to less-than-significant levels, pursuant to CEQA. Geology/Paleontology 56 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257931 | 7/23/2024 |
Appendix I Phase I Environmental Site Assessment A Phase I ESA of the subject property, performed in conformance with the scope and limitations of ASTM International Standard 2247-16. Compliance, Hazardous Materials 231 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257930 | 7/23/2024 |
Appendix J Water Supply Assessment California Senate Bill (SB) 610 and SB 221 amended the California Water Code (CWC) to stipulate projects subject to the California Environmental Quality Act (CEQA) require preparation of a water supply assessment (WSA) for industrial facilities occupying more than 40 acres of land (CWC Section 10912(a)). The Soda Mountain Solar Project comprises more than 40 acres; therefore, this WSA has been prepared.
Soil and Water 55 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257929 | 7/23/2024 |
Section 3-2 Agriculture and Forestry Resources This Section evaluates the direct, indirect and cumulative impacts the Project may have on agriculture and forestry resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Soil and Water 9 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257928 | 7/23/2024 |
Section 3-20 Wildfire This Section evaluates the direct, indirect and cumulative impacts the Project may have related to wildfire and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. 23 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257927 | 7/23/2024 |
Section 3-3 Air Quality This Section evaluates the direct, indirect and cumulative impacts the Project may have on air quality and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Air Quality 37 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257926 | 7/23/2024 |
Section 3-4 Biological Resources This Section evaluates the direct, indirect and cumulative impacts the Project may have on biological resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. 65 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257925 | 7/23/2024 |
Section 3-5 Cultural Resources This Section evaluates the direct, indirect and cumulative impacts the Project may have on cultural resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Cultural Resources 34 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257924 | 7/23/2024 |
Section 3-6 Energy This Section evaluates the direct, indirect and cumulative impacts the Project may have on energy resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. 8 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257923 | 7/23/2024 |
Section 3-7 Geology and Soils This Section evaluates the direct, indirect and cumulative impacts the Project may have on geology and soil resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Geology/Paleontology, Soil and Water 32 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257922 | 7/23/2024 |
Section 3-8 Greenhouse Gas Emissions This Section evaluates the direct, indirect and cumulative impacts the Project may have on greenhouse gas emissions and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Greenhouse Gases 14 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257921 | 7/23/2024 |
Section 3-13 Noise This Section evaluates the direct, indirect and cumulative impacts the Project may have related to noise and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Noise and Vibration 29 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257920 | 7/23/2024 |
Section 3-14 Population and Housing This Section evaluates the direct, indirect and cumulative impacts the Project may have related to population and housing and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Socioeconomics 6 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257919 | 7/23/2024 |
Section 3-15 Public Services This Section evaluates the direct, indirect and cumulative impacts the Project may have on public services and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. 9 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257918 | 7/23/2024 |
Section 3-17 Transportation This Section evaluates the direct, indirect and cumulative impacts the Project may have on transportation resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Traffic and Transportation 23 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257917 | 7/23/2024 |
Section 3-18 Tribal Cultural Resources This Section evaluates the direct, indirect and cumulative impacts the Project may have on Tribal Cultural Resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Cultural Resources 15 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257916 | 7/23/2024 |
Section 3-19 Utilities and Service Systems This Section evaluates the direct, indirect and cumulative impacts the Project may have related to utilities and service systems and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Waste Management 20 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257915 | 7/23/2024 |
Appendix A3 Engineering Generation Facility Description, Design and Operation Appendix A contains information on facility and transmission design, reliability, efficiency and 30% Civil Design Plans. (Part 3 of 3) Efficiency, Facility Design, Compliance, Reliability, Transmission Line Safety and Nuisance, Transmission System Engineering 24 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257914 | 7/23/2024 |
Chapter 0 Application and Data Responses This document contains the Soda Mountain Solar Project AB 205 Opt-In Application Cover Letter and Data Response Worksheet 118 page(s)
| | CEC/Docket Unit/Eric Knight | Resolution Environmental |
257913 | 7/23/2024 |
Chapter 1 Executive Summary This Chapter summarizes the Project objectives, location, elements, schedule, ownership and history. Executive Summary 6 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257912 | 7/23/2024 |
Chapter 2 Project Description This Chapter provides a detailed description of the Proposed Soda Mountain Solar Project. Project Description 23 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257911 | 7/23/2024 |
Chapter 3 Environmental Impacts Analysis This Chapter describes the format of the environmental topic sections and contains a list of cumulative projects. 8 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257910 | 7/23/2024 |
Section 3-1 Aesthetics This Section evaluates the direct, indirect and cumulative impacts the Project may have on visual resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Visual Resources 36 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257909 | 7/23/2024 |
Section 3-10 Hydrology and Water Quality This Section evaluates the direct, indirect and cumulative impacts the Project may have on hydrology and water quality and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Soil and Water 36 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257908 | 7/23/2024 |
Section 3-11 Land Use and Planning This Section evaluates the direct, indirect and cumulative impacts the Project may have on land use and planning and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Land Use 12 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257907 | 7/23/2024 |
Section 3-12 Mineral Resources This Section evaluates the direct, indirect and cumulative impacts the Project may have on mineral resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. Soil and Water 10 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257906 | 7/23/2024 |
Appendix A1 Engineering Generation Facility Description, Design and Operation Appendix A contains information on facility and transmission design, reliability, efficiency and 30% Civil Design Plans. (Part 1 of 3) Efficiency, Facility Design, Compliance, Reliability, Transmission Line Safety and Nuisance, Transmission System Engineering 5 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257905 | 7/23/2024 |
Appendix A2 Engineering Generation Facility Description, Design and Operation Appendix A contains information on facility and transmission design, reliability, efficiency and 30% Civil Design Plans. (Part 2 of 3) Efficiency, Facility Design, Compliance, Reliability, Transmission Line Safety and Nuisance, Transmission System Engineering 14 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257904 | 7/23/2024 |
Appendix E2 Aquatic Resources Impact Assessment The purpose of the Preliminary Aquatic Resources Impact Assessment (30% Design) is to overlay the proposed Soda Mountain Solar project’s 30% design limits of disturbance (LOD) onto the aquatic resources delineation to assess the amount and location of impacts to non-wetland waters of the State under CDFW and RWQCB jurisdiction. 45 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257903 | 7/23/2024 |
Appendix R Waste Management Plan This Appendix discusses the potential effect on human health and the environment from existing site conditions as well as nonhazardous and hazardous waste generated during construction and operation at the Project. Waste Management 35 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257902 | 7/23/2024 |
Appendix D1 Biological Resources Technical Report This report describes how biological resources surveys were performed,
and how, based on the results of the surveys, biological resources may be potentially affected by the construction, operation, maintenance, and decommissioning of the project. Desert bighorn sheep (Ovis canadensis nelsoni) information and analysis is not covered in this report.
Biological Resources 130 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257901 | 7/23/2024 |
Section 3-16 Recreation This Section evaluates the direct, indirect and cumulative impacts the Project may have on recreational resources and identifies any required Applicant-Proposed Measures (APM) and any required Mitigation Measures. 13 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257900 | 7/23/2024 |
Application for Confidential Designation - System Impact Restudy (CONFIDENTIAL) Application for Confidential Designation for Appendix O1 and Appendix O2 4 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257899 | 7/23/2024 |
Application for Confidential Designation Appendix P, Socioeconomic Impacts on San Bernardino County of the Proposed Soda Mountain Project, All Pages. 4 page(s)
| | CEC/Docket Unit | Resolution Environmental |
257756 | 7/16/2024 |
Memo to Open New Docket
1 page(s)
| | CEC/Docket Unit | California Energy Commission |