2586588/22/2024 Notice of Availability of 15 Final Renewables Portfolio Standard 2017-2020 Verification Results Reports for POUs

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2586028/20/2024 Pittsburg Power Company - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2586018/20/2024 Pasadena Water and Power - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2586008/20/2024 Modesto Irrigation District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585998/20/2024 Lassen Municipal Utility District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585988/20/2024 Los Angeles Department of Water and Power - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585978/20/2024 Industry Public Utilities - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585968/20/2024 Gridley Electric Utility - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585958/20/2024 Glendale Water and Power - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585948/20/2024 Corona Utilities Department - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585938/20/2024 San Francisco Public Utilities Commission - Final RPS Verification Results Report for Compliance Period 3

11 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585928/20/2024 Burbank, City of - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585918/20/2024 Turlock Irrigation District - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585908/20/2024 Silicon Valley Power - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585898/20/2024 Roseville, City of - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2585888/20/2024 Rancho Cucamonga, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2568546/13/2024 Resolution Adopting Renewables Portfolio Standard

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2566926/5/2024 Steve Uhler Comments - RPS-2021-01 Reasons for audit of RPS Period 3 verification

2 page(s)
 CEC/Docket UnitSteve Uhler
2565615/28/2024 Notice to Consider Adoption of the RPS 2017-2020 Verification Results for POUs, Staff Draft Reports - Group 2
Docket No. 21-RPS-01. Renewables Portfolio Standard (RPS) Compliance Period 3 Staff Draft Reports for 15 remaining Local Publicly Owned Electric Utilities (POUs)
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562575/9/2024 Steve Uhler Comments - RPS-2021-01 Record request for authority to define electricity as a product

3 page(s)
 CEC/Docket UnitSteve Uhler
2562565/9/2024 Steve Uhler Comments - RPS-2021-01 How are Green Pricing Program RECs certified

1 page(s)
 CEC/Docket UnitSteve Uhler
2562515/8/2024 Notice of Availability and Request for Comments on RPS 2017-2020 Verification Results for POUs Staff Draft Reports - Group 2
15 POU Reports. Comments due May 23, 2024
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562505/8/2024 Pasadena Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562495/8/2024 Pittsburg Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562485/8/2024 Rancho Cucamonga, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562475/8/2024 Roseville, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562465/8/2024 San Francisco Public Utilities Commission - Staff Draft - RPS Verification Results Report for Compliance Period
San Francisco Public Utilities Commission - Hetch Hetchy Power
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562455/8/2024 Silicon Valley Power - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562445/8/2024 Turlock Irrigation District - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562435/8/2024 Burbank, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562425/8/2024 Corona Utilities Department - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562415/8/2024 Glendale Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562405/8/2024 Gridley Electric Utility - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562395/8/2024 Industry Public Utilities - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562385/8/2024 Los Angeles Department of Water and Power - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562375/8/2024 Lassen Municipal Utility District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2562365/8/2024 Modesto Irrigation District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2548383/5/2024 Steve Uhler Comments - RPS-2021-01 OBG RPS ID 60760, EIA ID 55970, QFER ID G0889, output data comparison

2 page(s)
 CEC/Docket UnitSteve Uhler
2541691/26/2024 Notice of Availability of 28 Final Renewables Portfolio Standard 2017-2020 Verification Results Reports for POUs

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541411/25/2024 Imperial Irrigation District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541401/25/2024 Eastside Power Authority - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541391/25/2024 Colton Electric - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541381/25/2024 Vernon, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541371/25/2024 Ukiah, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541361/25/2024 Shasta Lake, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541351/25/2024 Victorville Municipal Utility Services - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541341/25/2024 Truckee Donner Public Utility District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541331/25/2024 Sacramento Municipal Utility District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541321/25/2024 Power and Water Resources Pooling Authority - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541311/25/2024 Stockton Port District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541301/25/2024 Merced Irrigation District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541291/25/2024 Lodi Electric Utility - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541281/25/2024 Kirkwood Meadows Public Utility District - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541271/25/2024 Palo Alto, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541261/25/2024 Oakland, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541251/25/2024 Needles, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541241/25/2024 Moreno Valley, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541231/25/2024 Lompoc, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541221/25/2024 Healdsburg, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541211/25/2024 Banning, City of - Final RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541201/25/2024 Cerritos Electric Utility - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541191/25/2024 Biggs Municipal Services - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541181/25/2024 Azusa Light and Water - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541171/25/2024 Anaheim Public Utilities - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541161/25/2024 Alameda Municipal Power - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541151/25/2024 Riverside, City of - Final RPS Verification Results Report for Compliance Period 3

8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2541141/25/2024 Redding, City of - Final RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25362612/14/2023 Resolution Adopting Renewables Portfolio Standard 2017-2020 Verification Results Reports for 28 Local Publicly Owned Electric
Resolution No. 23-1213-05. Resolution Adopting Renewables Portfolio Standard 2017-2020 Verification Results Reports for 28 Local Publicly Owned Electric Utilities for Compliance Period 3
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25361012/14/2023 Steve Uhler Comments - RPS-2021-01 Reminder to CEC staff to comply with 20 CCR 1208,1 and 1208

2 page(s)
 CEC/Docket unitSteve Uhler
25360712/14/2023 Steve Uhler Comments - RPS-2021-01 Other Pre-June 2010 RECs, please identify regulatory authority

1 page(s)
 CEC/Docket UnitSteve Uhler
25360612/14/2023 Steve Uhler Comments - RPS-2021-01 CEC staff also verifies that any RECs reported for the Green Pricing Program reduction in retail sales

1 page(s)
 CEC/Docket UnitSteve Uhler
25357312/11/2023 Steve Uhler Comments - RPS-2021-01 Balancing SMUD's RPS compliance account, do not approve staff verification

2 page(s)
 CEC/Docket UnitSteve Uhler
25346212/1/2023 Notice to Consider Adoption of the RPS 2017-2020 Verification Results for POUs, Staff Draft Reports
Docket No. 21-RPS-01. Renewables Portfolio Standard (RPS) Compliance Period 3 Staff Draft Reports for 28 Local Publicly Owned Electric Utilities (POUs).
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25325411/20/2023 Steve Uhler Comments - RPS-2021-01 The portion of annual sales derived from unbundled renewable energy credits

2 page(s)
 CEC/Docket UnitSteve Uhler
25307711/13/2023 RPS-2021-01 Provide certificate numbers, missing utility data, and extend comment period

2 page(s)
 CEC/Docket UnitSteve Uhler
25304411/8/2023 Steve Uhler Comments - RPS-2021-01 Tracking environmental attribute ownership for RECs

2 page(s)
 CEC/Docket UnitSteve Uhler
25304311/8/2023 Steve Uhler Comments - RPS-2021-01 Authority to define electricity as a product

1 page(s)
 CEC/Docket UnitSteve Uhler
25301811/7/2023 Notice of Availability and Request for Comments on RPS 2017-2020 Verification Results for POUs Staff Draft Reports
28 POU Reports. Comments due November 21, 2023.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301711/7/2023 Banning, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301611/7/2023 Cerritos, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301511/7/2023 Azusa Light and Water - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301411/7/2023 Anaheim Public Utilities - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301311/7/2023 Alameda Municipal Power - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301211/7/2023 Riverside, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301111/7/2023 Redding, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25301011/7/2023 Needles, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300911/7/2023 Healdsburg, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300811/7/2023 Shasta Lake, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300711/7/2023 Lompoc, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300611/7/2023 Lodi Electric Utility - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300511/7/2023 Kirkwood Meadows Public Utility District - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300411/7/2023 Imperial Irrigation District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300311/7/2023 Eastside Power Authority - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300211/7/2023 Colton, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300111/7/2023 Victorville, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25300011/7/2023 Vernon, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299911/7/2023 Ukiah, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299811/7/2023 Oakland, Port of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299711/7/2023 Moreno Valley, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299611/7/2023 Merced Irrigation District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299511/7/2023 Truckee Donner Public Utility District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299411/7/2023 Stockton Port District - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299311/7/2023 Sacramento Municipal Utility District - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299211/7/2023 Power and Water Resources Pooling Authority - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299111/7/2023 Palo Alto, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
25299011/7/2023 Biggs, City of - Staff Draft RPS Verification Results Report for Compliance Period 3

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2493863/22/2023 Steve Uhler Comments - RPS-2021-01 CEC-300-2022-012-SF-REV methodology guideline and 21-RPS-02

3 page(s)
 CEC/Docket UnitSteve Uhler
2490973/13/2023 Notice of Availability of Updated March 2023 RPS Verification and Compliance Methodology Report, 3rd Edition

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2490963/13/2023 Verification and Compliance Methodology Report, 3rd Edition (Updated March 2023)
*** THIS DOCUMENT SUPERSEDES TN 247672 *** Updated March 2023. CEC-300-2022-012-SF-REV
43 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2486211/31/2023 Notice of Availability of the Renewables Portfolio Standard Retail Sellers Procurement Verification Commission Final Report

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2486161/31/2023 Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification - Commission Final Report
CEC-300-2022-011-CMF
372 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2484741/20/2023 Steve Uhler Comments - RPS-2021-01 Perhaps CEC's accounting system is counting more than once

2 page(s)
 CEC/Docket UnitSteve Uhler
2484501/19/2023 January 25, 2023 Business Meeting Agenda
10:00 a.m. – 3:30 p.m. In-person and remote public access via Zoom.
12 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2483831/12/2023 Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification Staff Draft Report
*** THIS DOCUMENT SUPERSEDES TN 248316 *** - Non-substantive changes to Ch. 4, Tbl. 46, p. 35. Values in CP 1 and CP 2 rows updated. - Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification Staff Draft Report CEC-300-2022-011-SD-REV
372 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2483171/4/2023 Notice of Availability and Request for Comments on the RPS 2017-2020 Retail Sellers Procurement Verification Staff Draft Report
January 25, 2023; 10:00 a.m.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2483161/4/2023 Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification Staff Draft Report
*** This document is replaced by TN 248383 *** - CEC-300-2022-011-SD-REV
372 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24802012/12/2022 Notice of Postponement of Adoption of Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification Report
***THIS DOCUMENT SUPERSEDES TN 248013*** Updated notice title only.
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24801712/12/2022 Steve Uhler Comments - RPS-2021-01 Request for notice of specific meetings pursuant to GOV 11125(d)

1 page(s)
 CEC/Docket UnitSteve Uhler
24801312/9/2022 Notice of Postponement of Adoption of 2017-2020 Retail Sellers Procurement Verification Report
***This document is replaced by TN 248020***
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24799912/8/2022 Steve Uhler Comments - RPS-2021-01 Guidelines not updated

2 page(s)
 CEC/Docket UnitSteve Uhler
24799512/8/2022 Steve Uhler Comments - RPS-2021-01 double counting of renewable energy generation tracked within WREGIS

2 page(s)
 CEC/Docket UnitSteve Uhler
24799412/8/2022 Steve Uhler Comments - RPS-2021-01 first retirement date rule

2 page(s)
 CEC/Docket UnitSteve Uhler
24796312/7/2022 Steve Uhler Comments - RPS-2021-01 Hokus Focus how many differences can you find

2 page(s)
 CEC/Docket UnitSteve Uhler
24796112/6/2022 December 14, 2022 Business Meeting Agenda
10:00 a.m. – 3:30 p.m. In-person and remote public access via Zoom.
7 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24780011/30/2022 Steve Uhler Comments - RPS-2021-01 Tracking renewable energy consumed by a LSE

1 page(s)
 CEC/Docket UnitSteve Uhler
24773011/28/2022 Steve Uhler Comments - RPS-2021-01 Ensuring the tracking system is operational

2 page(s)
 CEC/Docket UnitSteve Uhler
24772811/28/2022 Steve Uhler Comments - RPS-2021-01 Please provide power plant ID cross reference and capacities

1 page(s)
 CEC/Docket UnitSteve Uhler
24772711/28/2022 Steve Uhler Comments - RPS-2021-01 Vintage year is after reporting year

1 page(s)
 CEC/Docket UnitSteve Uhler
24767811/23/2022 Steve Uhler Comments - RPS-2021-01 Definition and measurement of electricity as a product

1 page(s)
 CEC/docket unitSteve Uhler
24767411/23/2022 Renewables Portfolio Standard 2017-2020 Retail Sellers Procurement Verification Staff Draft Report
CEC-300-2022-011-SD
372 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24767311/23/2022 Notice of Availability of the RPS Verification and Compliance Methodology Staff Report, Third Edition

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24767211/23/2022 Renewables Portfolio Standard Verification and Compliance Methodology Report, Third Edition
CEC-300-2022-012-SF
42 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24767111/23/2022 Notice of Availability and Request for Comments on the RPS Staff Draft 2017-2020 Retail Sellers Procurement Verification Report

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2387207/7/2021 Memo to Open New Docket