Docket Log

Docket: 19-BSTD-02
Project Title: Residential Alternative Calculation Method Variable Capacity Heat Pump Modeling Approach
Generated On: 11/21/2024 3:47:01 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2344498/25/2020 VCHP Compliance Option Final Staff Report
***SUPERSEDES TN 230470*** This document is the final Variable Capacity Heat Pump Performance Compliance Option Staff Report. This document makes one edit and one correction in response to received stakeholder comments, and includes a cover letter describing the edit.
80 page(s)
 CEC/DocketsCalifornia Energy Commission
23104312/10/2019 Email to Close Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23104212/10/2019 Resolution Number 19-1113-8 Approved at the November 13th Business Meeting
Resolution Number 19-1113-8. RESOLUTION OF THE ENERGY COMMISSION APPROVING INCORPORATION OF VCHP COMPUTER ALGORITHMS INTO THE ALTERNATIVE CALCULATION METHOD AND THE RESIDENTIAL CALIFORNIA BUILDING ENERGY CODE COMPLIANCE PERFORMANCE COMPLIANCE SOFTWARE, AND USE OF ASSOCIATED FIELD VERIFICATION PROCEDURES IN DEMONSTRATING COMPLIANCE WITH STANDARDS SPECIFIED IN TITLE 24 PART 6, §150.1(B)
2 page(s)
 CEC/DocketsCalifornia Energy Commission
23102512/9/2019 Steve Uhler Comments - Resolution adopting final report

81 page(s)
 CEC/Docket UnitSteve Uhler
23102312/9/2019 Steve Uhler Comments - BSTD-19-02 SEER 14 rating and Title 20 1606(h)(1)(C)(3)(b)

4 page(s)
 CEC/Docket UnitSteve Uhler
23077311/18/2019 Steve Uhler Comments - BSTD-19-08 Perhaps SMUD's legal staff overlooked some rulemaking hurdles

1 page(s)
 CEC/DocketsSteve Uhler
23063111/13/2019 Steve Uhler Comments - Typing regulatory language into a form

1 page(s)
 CEC/Docket UnitSteve Uhler
23063011/13/2019 Steve Uhler Comments - Statute requires NOPA

2 page(s)
 CEC/Docket UnitSteve Uhler
23058711/12/2019 Steve Uhler Comments - BSTD-19-02 Express Terms, ISOR and NOPA for VCHP rulemaking

1 page(s)
 CEC/DocketsSteve Uhler
23055411/8/2019 NRDC Comments on VCHP Compliance Credit 2019-11-08

5 page(s)
 CEC/DocketsPierre Delforge/NRDC
23052511/7/2019 Chandra Gollapudi Comments - Samsung Comments - VCHP Compliance Option Staff Report

2 page(s)
 CEC/DocketsChandra Gollapudi
23051311/5/2019 Steve Uhler Comments - BSTD-16-02 Product Performance, Monitored versus Reported

131 page(s)
 CEC/DocketsSteve Uhler
23051111/5/2019 Variable Capacity Heat Pump (VCHP) Compliance Option Comment Log
This document records the substantive public comments received by the Energy Commission on the Variable Capacity Heat Pump (VCHP) Compliance Option proceeding, as well as staff's consideration of and responses to the received comments
74 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23048611/3/2019 Carrier Comments - Carrier comments to Docket 19-BSTD-02 CBECC Res VSHP

3 page(s)
 CEC/DocketsCarrier
23047010/31/2019 VCHP Compliance Option Final Staff Report
***SUPERSEDED BY TN 234449***
79 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23037210/28/2019 Steve Uhler Comments - BSTD-19-02 CVRH Project, Red Bead Experiment, Speculation and Paradigms

48 page(s)
 CEC/DocketsSteve Uhler
23030510/21/2019 2019 Residential VCHP Software
Efficiency inputs related to the 2019 residential variable capacity heat pump (VCHP) research software.
2 page(s)
 CEC/DocketsCalifornia Energy Commission
23024010/17/2019 Sean Armstrong Comments - 19- BSTD-02 and Residential Alternative Calculation Method Variable Capacity Heat Pump Modeling Approach

3 page(s)
 CEC/DocketsSean Armstrong
23023810/16/2019 Accessing the VCHP Compliance Option Software
Instructions for locating and downloading the VCHP Compliance Option research software.
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23023710/16/2019 Staff Report on the Variable Capacity Heat Pump Performance Compliance Option
Final staff report on the Variable Capacity Heat Pump performance compliance option for the California Energy Code.
79 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23023310/16/2019 Notice of Availablity and Public Comment Period
Notice of availability and public comment period for the Variable Capacity Heat Pump performance compliance option. Public comment period ends Friday, November 8, 2019.
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
23009310/9/2019 Mitsubishi Electric Comments - Proposed VCHP Compliance Option Specifications are Misaligned
Mitsubishi Electric Comments - Proposed VCHP Compliance Option Specifications are Misaligned with Product Specifications and Applications
2 page(s)
 CEC/Andrew McAllister and StaffMitsubishi Electric/Bruce Severance
2297239/12/2019 Resolution of the Energy Commission Approving 2019 Residential Compliance Software EnergyPro Version 8.0
***SUPERSEDED BY TN 229724*** RESOLUTION ACCIDENTALLY DOCKETED IN THE WRONG DOCKET
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2292048/2/2019 Bruce Severance Comments Regulation Needs a Firm Foundation in Science

4 page(s)
 CEC/Docket UnitBruce Severance
2273223/12/2019 Daikin North America Comments on Residential ACM VCHP Modeling Approach and Its Workshop on 2-15-2019

2 page(s)
 CEC/Docket UnitDaikin North America, LLC
2273013/8/2019 Transcript of 02152019 Residential Alternative Calculations Methods Variable Capacity Heat Pump Modeling Approach Workshop

168 page(s)
 CEC/DocketsCalifornia Energy Commission
2272873/7/2019 Lucas Morton Comments Comment on Residential Alternative Calculation Method for VCHP

1 page(s)
 CEC/DocketsLucas Morton
2272213/1/2019 Mitsubishi Electric Comments on Residential ACM VCHP Modeling Approach

2 page(s)
 CEC/aLrry FroessMitsubishi Electric US
2272203/1/2019 AHRI Comments to February 2019 Workshop – Variable Capacity Heat Pumps

5 page(s)
 CEC/Larry FroessAHRI/Laura Petrillo-Groh
2271842/28/2019 GLUMAC's Comments on Title 24 2019 ACM Draft Comments

4 page(s)
 CEC/Docket UnitGLUMAC/Michael J. Adams
2271242/21/2019 Presentation - Residential Alternative Calculation Method Avariable Capacity Heat Pump Modeling Approach - Public Workshop
VCHP Workshop Presentation Slides
56 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2264702/6/2019 Download link to ETCC VCHP Report
Supporting material for VCHP workshop
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2264692/6/2019 Download link to ETCC Ducted and Ductless Configurations Report
Supporting material for VCHP workshop.
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2264682/6/2019 Variable Capacity Heat Pump Proposed Compliance Option
Proposed compliance option to be discussed at the February 15, 2019 public workshop.
24 page(s)
 CEC/DocketsCalifornia Energy Commission
2264432/1/2019 2019 Residential VCHP Software
Download hyperlinks and other information related to the 2019 residential variable capacity heat pump (VCHP) research software.
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2263881/28/2019 Notice of Public Workshop for Variable Capacity Heat Pump Model
Friday, February 15, 2019, 9:00 a.m. Warren-Alquist State Energy Building 1516 Ninth Street First Floor, Art Rosenfeld Hearing Room Sacramento, California 95814 (Wheelchair Accessible)
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2263201/15/2019 Memo to Open New Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission