Docket Log

Docket: 17-IEPR-07
Project Title: Integrated Resource Planning
Generated On: 3/28/2024 9:39:27 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2239296/25/2018 Email to Close Docket

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2236886/5/2018 COMMENTS OF ROSEVILLE ELECTRIC UTILITY ON PUBLICLY OWNED UTILITY INTEGRATED RESOURCE PLAN SUBMISSION AND REVIEW GUIDELINES
This document is also docketed in Docket No. 18-IRP-01
IEPR 2017 02-23 PM POU IRP Workshop
3 page(s)
 CEC/Docket UnitRoseville Electric
2234495/15/2018 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines - Second Edition - Track Changes Version
***THIS DOCUMENT SUPERSEDES TN# 223226*** - This document is also docketed in Docket No. 18-IRP-01
53 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2234485/15/2018 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines - Second Edition - Clean Version
***THIS DCUMENT SUPERSEDES TN# 223227***
51 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2233925/8/2018 Presentation - Proposed Changes to Publicly Owned Utility Integrated Resource Plans (SB 338)
Presentation by Paul Deaver, May 8, 2018 - This document is also docketed in Docket No. 18-IRP-01
11 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2232924/30/2018 Notice of Staff Webinar to Consider Proposed Changes to POU IRP Submission and Review Guidelines, Second Edition
***THIS DOCUMENT SUPERSEDES TN# 223229***
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2232294/18/2018 Notice of Staff Webinar to Consider Proposed Changes to POU IRP Submission and Review Guidelines, Second Edition
*** THIS DOCUMENT SUPERSEDES TN # 223228 *** - Notice of Staff Webinar to Consider Proposed Changes to Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines, Second Edition. - Tuesday, May 8, 2018
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2232284/18/2018 Notice of Staff Webinar to Consider Proposed Changes to POU IRP Submission and Review Guidelines, Second Edition
*** THIS DOCUMENT IS REPLACED BY TN 223229 *** - Notice of Staff Webinar to Consider Proposed Changes to Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines, Second Edition - Tuesday, May 8, 2018
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2232274/18/2018 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines - Second Edition - Clean Version
*** THIS DOCUMENT IS REPLACED BY TN 223448 *** - Commission Guidelines
51 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2232264/18/2018 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines - Second Edition - Track Changes Version
*** THIS DOCUMENT IS REPLACED BY TN 223449 *** - Commission Guidelines
53 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2231924/13/2018 04.12.18 Letter to Chair Mary D. Nichols re POU-Specific GHG for IRP
04.12.18 Letter to Chair Mary D. Nichols re POU-Specific GHG for IRP
7 page(s)
 California Air Resources Board/Chair Mary Nichols California Energy Commission
2223991/30/2018 Western EIM Benefits Report Fourth Quarter 2017
Western EIM Benefits Report Fourth Quarter 2017
15 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2223651/25/2018 Final US tax bill effect on project finance market
Author: Keith Martin Publication | December 16, 2017
IEPR Public Comments
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2222521/19/2018 FERC ORDER ON PETITION FOR DECLARATORY ORDER ON AEE
FERC Order on AEE Petition
IEPR Public Comments, IEPR General Information
36 page(s)
 CEC/DOCKET UNITCalifornia Energy Commission
22198112/14/2017 The Changing Electricity Landscape, the growth of community choice aggregators in California
A special informational hearing of the Senate Standing Committee on Energy, Utilities and Communications was held on 08-23-2017. The hearing was titled “the Changing Electricity Landscape, the growth of community choice aggregators in California”
IEPR Public Comments
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22198012/14/2017 10.12.17 Letter from Governor Brown to Members of the CA State Assembly
Also docketed in 17-IEPR-02 as TN #: 221968
IEPR Public Comments
1 page(s)
 California State AssemblyOffice of the Governor
22192212/7/2017 Notice of Availability Light-Duty Plug-in Electric Vehicle Energy and Emission Calculator
Notice of Availability Light-Duty Plug-in Electric Vehicle Energy and Emission Calculator
IEPR 2017-05-31_9:30AM_Staff Webinar
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22174111/13/2017 Oxygen Initiative 2017 IEPR Comments

IEPR Public Comments
5 page(s)
 CEC/Docket UnitOxygen Initiative
22165611/1/2017 GTM warns of solar installation declines ahead of ITC trade case remedy vote
A new report paints a troubling portrait of the U.S. solar industry should a range of tariffs be imposed. Report by Krysti Shallenberger of D Utility Dive.
IEPR Public Comments
6 page(s)
 CEC/Docket UnitD Utility Dive
22164810/31/2017 The Clean Power and Electrification Pathway
The Clean Power and Electrification Pathway by Edison International
3 page(s)
 CEC/Docket UnitEdison International
22164710/31/2017 Southern California Edison Introduces Clean Energy Proposal to Meet State's Climate, Air Quality Goals
News Releases: Southern California Edison Introduces Clean Energy Proposal to Meet State’s Climate, Air Quality Goals
IEPR General Information
3 page(s)
 CEC/Docket UnitSouthern California Edison
22151610/16/2017 Letter to Senator De Leon re Renewable Energy Procurement dated 08-01-17
8.1.17 Letter to Senator De Leon From CPUC and CEC re:Renewable Energy Procurement
IEPR Public Comments
2 page(s)
 Honorable Kevin de LeonCalifornia Energy Commission and the California Public Utilities Commission
22150210/13/2017 China is About to Bury Elon Musk in Batteries
Bloomberg article about China's plans to build enough lithium-ion batteries to supply 1.5 million Tesla vehicles.
1 page(s)
 CEC/Tami HaasCalifornia Energy Commission
22150110/13/2017 Global EV Outlook 2017
This report conveys information collected from EVI members and partners to analyse the global evolution of the EV market, the growth of the EV stock and the deployment of EVSE.
1 page(s)
 CEC/Tami HaasCalifornia Energy Commission
22149510/12/2017 The 2017 Climate Change Scoping Plan Update
The proposed strategy for achieving California's 2030 greenhouse gas target.
156 page(s)
 CEC/DocketsCalifornia Energy Commission
22149410/12/2017 Load Research Report Compliance Filing of So Cal Edison Co, on Behalf of Itself, Pacific Gas and Electric Co, and San Diego Elec
This December 2016 report (5th Load Research Report) includes data through October 2016 for service line and distribution system upgrades, and for the period September 2015 through August 2016 for load research data, along with the conclusions reached through analyzing this data.
130 page(s)
 CEC/DocketsCalifornia Energy Commission
22149310/12/2017 The Clean Vehicle Rebate Project Summary Documentation of the Electric Vehicle Consumer Survey, 2013-2015 Edition
Summary documentation of results from the Electric Vehicle Consumer Survey.
51 page(s)
 CEC/Docket UnitCalifornia Air Resources Board
22149210/12/2017 Energy Star, Energy Star Program Requirements for Electric Vehicle Supply Equipment Version 1.0, (April 7, 2017)
terms of the ENERGY STAR Partnership Agreement as it pertains to the manufacture and labeling of ENERGY STAR certified products.
16 page(s)
 CEC/Docket UnitEnergy Star
22149110/12/2017 ADVICE LETTER (AL) SUSPENSION NOTICE
SCE proposes to modify Schedule V2G Pilot to allow the Los Angeles Air Force Base (LAAFB) to continue to access the California Independent System Operator’s (CAISO’s) markets.
17 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission
22149010/12/2017 Tesla Fourth Quarter and Full Year 2016 Update
Tesla's 2016 fourth quarter and full 2016 financial update, this update also covers Tesla's advances in sustainable transport and sustainable energy.
10 page(s)
 CEC/Docket UnitTesla
22148910/12/2017 BMW I ChargeForward PG&E's Electric Vehicle Smart Charging Pilot
Report of The BMW I ChargeForward Project.
51 page(s)
 CEC/Docket UnitBMW
22148610/12/2017 ZEV Action Plan
Updated roadmap toward 1.5 million zero-emission vehicles on California roadways by 2025.
42 page(s)
 CEC/Docket UnitOffice of Governor Edmund G. Brown Jr.
22148510/12/2017 Presentation - The Path to a Global Charging Standard
Presentation from Charin regarding the benefits of electric vehicle charging stations.
19 page(s)
 CEC/Docket UnitCharin
22148410/12/2017 Staff Analysis of Electrify America's First Zero Emission Vehicle Investment Plan
CARB staff analysis report of Electrify America's Zero-Emission Vehicle Investment Plan.
31 page(s)
 CEC/Docket UnitCalifornia Air Resources Board
22148310/12/2017 ZEV Action Plan
Updated roadmap toward 1.5 million zero-emission vehicles on California roadways by 2025.
42 page(s)
 CEC/Docket UnitOffice of Governor Edmund G. Brown Jr.
22148210/12/2017 Summary of the Car Sharing and Mobility Options Pilot Project
One page document containing an overview of the Car Sharing and Mobility Aoptions Pilot Project.
1 page(s)
 CEC/Docket UnitCalifornia Air Resources Board
22148110/12/2017 CPUC - Amended Phase III. B. Scoping Memo and Ruling of Assigned Commissioner
Order instituting rulemaking on regulations relating to passenger carriers, ridesharing, and new online enabled transportation services.
20 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission (CPUC)
22148010/12/2017 California's Advanced Clean Cars Midterm Review
Midterm review of California's advance clean cars dated March 24, 2017.
50 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22147910/12/2017 Policy Brief Electric Vehicle Charging Considerations for Shared, Automated Fleets
"This brief identifies key considerations for stakeholders regarding the EV charging infrastructure necessary to enable and optimize an automated, electric, and shared mobility future. "
9 page(s)
 CEC/Docket UnitITS UC Davis Institute of Transportation Studies
22147810/12/2017 Written Testimony Before the House Committee on Energy and Commerce, Subcommittee on Digital Commerce and Consumer Protection
Written testimony of Robbie Diamond and Dr. Amitai Y. Bin-Nun regarding the deployment of autonomous vehicles
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22147710/12/2017 Testing of Autonomous Vehicles
Findings regarding the two public workshops the DMV conducted in 2013, relating to developing regulations for testing of autonomous vehicles.
4 page(s)
 CEC/Docket UnitCalifornia Department of Motor Vehicles
22147610/12/2017 California Transportation Electrification Assesment
Assessment that found the electrification of trucks, buses, forklifts, truck stops, and truck refrigeration provided net benefits to participants and society as measured against the total resource cost, and societal cost tests.
62 page(s)
 CEC/Docket UnitEnergy+Environmental Economics
22147510/12/2017 CPUC Assigned Commissioner's Ruling Regarding the Filing of the Transportation Electrification Applications Pursuant to SB 350
"Order Instituting Rulemakers to Consider Alternative-Fueled Vehicle Programs, Tariffs, and Policies. "
45 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission (CPUC)
22147410/12/2017 CPUC - Decision Making Small Electrical Corportations Respondents to this Rulemaking
Rulemaking opened to address the issues relating to expanding the use of alternative-fueled vehicles in California.
7 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission (CPUC)
22145910/10/2017 FROM GAS TO GRID
BUILDING CHARGING INFRASTRUCTURE TO POWER ELECTRIC VEHICLE DEMAND BY: BY GARRETT FITZGERALD, CHRIS NELDER ***Also Docketed in 17-IEPR-05***
IEPR General Information
90 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22145010/9/2017 2016 ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

276 page(s)
 CEC/Docket UnitCalifornia ISO
22138410/5/2017 Presentation - DMM 2017 Q2 Report Hightlights
Presentation by Kyle Westendorf, Market Monitoring Analyst, Department of Market Monitoring of CA ISO California ISO
IEPR General Information
27 page(s)
 CEC/Docket UnitCalifornia ISO
22138310/5/2017 Presentation - Western Electricity Market Forum Update on Market Acticities in the West
Presentation by: Stacey Crowley, VP, Regional and Federal Affairs of CA ISO
IEPR General Information
16 page(s)
 CEC/Docket UnitCalifornia ISO
22137410/4/2017 Greenhouse Gas Emission Tracking Report September 30, 2017
Greenhouse Gas Emission Tracking Report September 30, 2017
IEPR General Information
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2211149/11/2017 Standardized Reporting Tables for Publicly Owned Utility IRP Filing
*** THIS DOCUMENT SUPERSEDES TN # 220088 & TN # 217704-2
  California Energy Commission
2210519/6/2017 1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
*** THIS DOCUMENT SUPERSEDES TN 221037 DUE TO SYSTEM ERROR *** - Southern California 8/16/2016 Event - June 2017 - Report by: North American Electric Reliability Corporation (NERC)
IEPR General Information
38 page(s)
 CEC/Docket UnitNorth American Electric Reliability Corporation
2210459/5/2017 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
***SUPESEDES TN 220089***Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines. Publication Number CEC-200-2017-004-CMF
IEPR 2017-08-09 POU IRP Business Meeting
47 page(s)
 CEC/DOCKET UNITCalifornia Energy Commission
2210379/5/2017 1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report
*** THIS DOCUMENT IS REPLACED BY TN 221051 DUE TO SYSTEM ERROR *** - Southern California 8/16/2016 Event - June 2017 - Report by: North American Electric Reliability Corporation (NERC).
IEPR General Information
38 page(s)
 CEC/Docket UnitNorth American Electric Reliability Corporation
2208328/18/2017 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
***This Document Supersedes TN# 220820***
47 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2208208/17/2017 Publicy Owned Utility Intergrated Resource Plan Submission and Review Guidelines
*** This Document is Replaced by TN 220832 ***
50 page(s)
 CEC/DocketsCalifornia Energy Commission
2208198/17/2017 Notice of Availability POU IRP Submission and Review Guidelines

1 page(s)
 CEC/DocketsCalifornia Energy Commission
2206568/10/2017 California Hydrogen Business Council Comments Market Development Opportunities and Pathways for Renewable Hydrogen in California

IEPR Public Comments
8 page(s)
 CEC/Docket UnitCalifornia Hydrogen Business Council
2206468/10/2017 PowerPoint Presentation Proposed Adoption of Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
Item 5 PowerPoint presentation given at the August 9th Business Meeting by Garry O'Neill-Mariscal from the Supply Analysis Office - Energy Assessments Division
12 page(s)
 CEC/DocketsCalifornia Energy Commission
2205308/2/2017 CMUA, NCPA, and SCPPA Comments on Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines

5 page(s)
 CEC/DocketsCMUA, NCPA, and SCPPA
2203097/21/2017 Emanuel Wagner Comments CHBC Comments on Docket 17-IEPR-07 - Integrated Resource Planning

11 page(s)
 CEC/Docket UnitEmanuel Wagner
2200987/10/2017 Transcript of the 05/12/2017 IEPR Joint Agency Workshop on the Increasing Need for Flexibility in the

256 page(s)
 CEC/DocketsCalifornia Energy Commission
2200897/7/2017 Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
***SUPERSEDED BY TN 221045*** Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines. Publication Number CEC-200-2017-004-CMD
IEPR General Information, IEPR 2017-08-09 POU IRP Business Meeting
50 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2200887/7/2017 Standardized IRP Reporting Tables
*** THIS DOCUMENT IS REPLACED BY TN 221114 *** - 08.09.2017: Standardized IRP Reporting Tables
IEPR General Information, IEPR 2017-08-09 POU IRP Business Meeting
 CEC/Docket UnitCalifornia Energy Commission
2200877/7/2017 Notice to Consider Adoption of Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
08.09.2017: Notice to Consider Adoption of Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines Publication No. CEC 200-17-004-CMD Docket No. 17-IEPR-07
IEPR Notice, IEPR 2017-08-09 POU IRP Business Meeting
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2192006/16/2017 CalETC Comments Re Light-Duty Plug-In EV Calculator Tool for POU IRPs

IEPR 2017-05-31_9:30AM_Staff Webinar
3 page(s)
 CEC/DocketsCalETC
2189276/16/2017 CMUA, NCPA, and SCPPA Comments on Draft POU IRP Submission and Review Guidelines

IEPR Public Comments, IEPR 2017-05-25 Workshop
19 page(s)
 CEC/Docket UnitCMUA, NCPA, and SCPPA
2189196/15/2017 Turlock Irrigation District's Comments on the May 25, 2017 POU IRP Workshop

8 page(s)
 CEC/Docket UnitTurlock Irrigation District/Dan B. Severson
2188836/15/2017 Imperial Irrigation District Comments on Draft Guidelines for Publicly Owned Utility Integrated Resource Plans, Docket No. 17-IE

4 page(s)
 CEC/DocketsImperial Irrigation District
2188756/15/2017 Los Angeles Department of Water and Power Comments IEPR Commissioner Workshop on Draft Guidelines for POU IRP

IEPR Public Comments, IEPR 2017-05-25 Workshop
4 page(s)
 CEC/DocketsLos Angeles Department of Water and Power
2188606/15/2017 SMUD Comments on Draft Publicly Owned Utlity Integrated Resource Plan Guidelines and Related Material

7 page(s)
 CEC/Docket UnitSMUD/William Westerfield
2188286/15/2017 Valley Electric Association, Inc. Comments on Draft IRP Guidelines

IEPR 2017-05-31_9:30AM_Staff Webinar
4 page(s)
 CEC/DocketsValley Electric Association, Inc.
2185696/14/2017 6.5.2017 Email to Chair Weisenmiller re an Ormat and LADWP Press Release

IEPR Public Comments
1 page(s)
 CEC/Robert WeisenmillerOrmat/Paul Thomsen
2185596/14/2017 LADWP Comments re CEC Light Duty EV Calculator

5 page(s)
 CEC/DocketsLADWP
2182526/13/2017 Transcript of the 05252017 IEPR Commissioner Workshop on Draft Guidelines for Publicly Owned Utility Integrated Resource Plans

95 page(s)
 CEC/DocketsCalifornia Energy Commission
2182026/13/2017 NOTICE TO EXTEND COMMENT PERIOD
***SUPERSEDES TN #: 218022
IEPR Notice, IEPR 2017-05-31_9:30AM_Staff Webinar, IEPR 2017-05-31_11AM_Staff Webinar
2 page(s)
 CEC/DOCKET UNITCalifornia Energy Commission
2180226/12/2017 Notice Extend Comment Period for Two IEPR Staff Webinar
05.31.2017: Notice Extend Comment Period for Two IEPR Staff Webinar:
IEPR Notice, IEPR 2017-05-31_9:30AM_Staff Webinar, IEPR 2017-05-31_11AM_Staff Webinar
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2180146/9/2017 SMUD Request to Consolidate POU IPR comments.

IEPR 2017-05-25 Workshop, IEPR 2017-05-31_9:30AM_Staff Webinar, IEPR 2017-05-31_11AM_Staff Webinar
1 page(s)
 CEC/Docket UnitSMUD/Timothy Tutt
2180116/9/2017 Scott Samuelsen Comments Final Report SGIP 2014-2015 Impacts Evaluation Report Submitted by the National Fuel Cell Research Center

IEPR Public Comments
283 page(s)
 CEC/DocketsNational Fuel Cell Research Center, UC Irvine
2180006/8/2017 University of California Comments Managing the Dynamics of a 100% Renewable Electric Grid

IEPR Public Comments
6 page(s)
 CEC/Docket UnitUniversity of California/Dr. Scott Samuelsen
2179326/7/2017 Comments of the National Fuel Cell Research Center, IEPR Integrated Resource Planning for Renewable Fuel Cell Applications

IEPR Public Comments
5 page(s)
 CEC/DocketsNational Fuel Cell Research Center, UC Irvine
2178906/7/2017 Presentation - Tables and Instructions for POU Integrated Resource Plan Filings
Staff Webinar on Tables and Instructions, May 31, 2017 by Paul Deaver
17 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2178226/2/2017 Presentation - Transportation Electrification Common Assumptions (For Integrated Resource Planning Submittals)
Presentation by Gary Yowell for SB 350 Transportation Electrification Webinar May 31, 2017. Presentation outlines staff developed tool to help utilities with EV assumptions.
IEPR 2017-05-31_9:30AM_Staff Webinar
20 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2177956/1/2017 Bonneville Power Administration Comments - Joint Agency Workshop on Increasing Need for Flexibility in the Electricity System

IEPR 2017-05-12 Workshop
6 page(s)
 CEC/Docket UnitBonneville Power Administration
2177555/26/2017 SoCalGas Comments on Joint Agency Workshop on Increasing the Need for Flexibility in the Electricity System

IEPR 2017-05-12 Workshop
9 page(s)
 CEC/Robert Weisenmiller and CommissionersSoCalGas
2177525/26/2017 Need for Flexibility in the Electricity System

IEPR 2017-05-12 Workshop
4 page(s)
 CEC/DocketsCalifornia Wind Energy Association
2177445/25/2017 Comments Re May 12, 2017 Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity System

5 page(s)
 CEC/Chair Weisenmiller and StaffTesla
2177435/26/2017 5.19.2017 Letter from Senator De Leon to CPUC and CEC
5.19.2017 Letter from Senator De Leon to President Picker and Chair Weisenmiller
IEPR Public Comments
2 page(s)
 CEC/Chair Weisenmiller and CPUC President Michael PickerCalifornia State Senate
2177425/25/2017 SDG&E Comments on May 12 IEPR Workshop

IEPR 2017-05-12 Workshop
3 page(s)
 CEC/Robert Weisenmiller and CommissionersSDG&E
2177405/25/2017 California Municipal Utilities Association Comments on the Joint Agency Workshop on the Increasing Need for Flexibility

IEPR Public Comments, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Municipal Utilities Association
2177395/25/2017 California Biomass Energy Alliance Comments Re IEPR 2017-05-12 Workshop; IEPR Public Comments

8 page(s)
 CEC/Docket UnitCalifornia Biomass Energy Alliance
2177355/25/2017 National Grid USA Comments re Need for Flexibility in the Electricity System

IEPR Public Comments
8 page(s)
 CEC/Docket UnitNational Grid USA
2177345/25/2017 California Hydrogen Business Council request for acceptance of late comments

IEPR 2017-05-12 Workshop
2 page(s)
 CEC/Docket UnitCalifornia Hydrogen Business Council
2177335/25/2017 California Hydrogen Business Council Comments on the May 12 IEPR Workshop

IEPR 2017-05-12 Workshop
6 page(s)
 CEC/Docket UnitCalifornia Hydrogen Business Council
2177285/25/2017 5.22.17 Letter from California Utilites Support Reauthorization of Cap-and-Trade Program
5.22.17 Letter from California Utilities to Gov Brown, President pro Tempore de Leon, Speaker Rendon
IEPR Public Comments
2 page(s)
 Honorable Jerry Brown, Kevin de Leon and Anthony RendonCalifornia Utilities
2177275/25/2017 ITM Power Comments Hydrogen energy storage can play a key role just like it does in Europe

IEPR 2017-05-12 Workshop
3 page(s)
 CEC/Docket UnitITM Power/Steve Jones
2177265/25/2017 2016 Power Integrated Resource Plan
5.25.2017 Presentation by James Barner
IEPR Presentations, IEPR 2017-05-12 Workshop
16 page(s)
 CEC/Docket UnitLADWP
2177255/25/2017 DRAFT Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
5.25.2017 Presentation by Garry O'Neill-Mariscal of CEC
IEPR Presentations, IEPR 2017-05-25 Workshop
24 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2177235/25/2017 PGP Comments - Joint Agency Workshop on Increasing Need for Flexibility in the Electricity System

IEPR Public Comments, IEPR 2017-05-12 Workshop
6 page(s)
 CEC/CPUC and CAISOPublic Generating Pool
2177125/24/2017 Email Regarding How to Achieve 65% Renewable Electricity in CA by 2021
5.15.17 Email from Jan G. Juran to Chair Weisenmiller
IEPR Public Comments, IEPR 2017-05-12 Workshop
2 page(s)
 CEC/Chair WeisenmillerJan G. Juran
217704-15/24/2017 DRAFT Guidelines Tables Instructions Appendix C
IRP Guidelines Appendix C
14 page(s)
 CEC/DocketsCalifornia Energy Commission
217704-25/24/2017 DRAFT Appendix C Standarized IRP Reporting Tables
*** THIS DOCUMENT IS REPLACED BY TN 221114 *** - IRP Guidelines-Excel speardsheet.
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2177025/24/2017 Meeting Schedule for Lead Commissioner Workshop on Draft Guidelines for Publicly Owned Utility Integrated Resource Plans

IEPR Meeting Schedule, IEPR 2017-05-25 Workshop
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2176795/22/2017 Revised POU IRPs Inputs and Assumptions Webinar Notice May 22 2017
Webex link has been corrected. *** THIS DOCUMENT SUPERSEDES TN# 217637 *** - Wednesday, May 31, 2017
IEPR 2017-05-31_9:30AM_Staff Webinar
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2176665/19/2017 CCAEJ, EYCEJ, and Earthjustice Comments on Freight Electrification

IEPR 2017-04-27 Workshop
11 page(s)
 CEC/Chair WeisenmillerAdenike Adeyeye
2176655/19/2017 Joint POU Comments on the Proposed Transportation Electrification Guidelines for POU IRPs

IEPR 2017-04-18 Workshop, IEPR 2017-05-25 Workshop
7 page(s)
 CEC/Docket UnitCMUA/SCPPA/NCPA
2176645/19/2017 Notice of IEPR Staff Webinar on Standardized Tables and Instructions for Publicly Owned Utility Integrated Resource Plans
Wednesday, May 31, 2017 at 11:00 a.m.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2176615/19/2017 ChargePoint Comments on TE Guidance for POU IRPs

IEPR 2017-04-18 Workshop
  ChargePoint
2176535/19/2017 CalETC Comments Re IRP Workshops on Transportation Electrification

10 page(s)
  Cal ETC
2176435/19/2017 CTC Global Comments on Increasing Need for Electric System Flexibility Workshop

IEPR 2017-05-12 Workshop
2 page(s)
 CEC/Chairman WeisenmillerCTC Global/David Townley
2176375/19/2017 Notice of IEPR Staff Webinar on Light-Duty Plug-in Electric Vehicle Calculator Tool
Notice of IEPR Staff Webinar on Light-Duty Plug-in Electric Vehicle Calculator Tool for Publicly Owned Utility Integrated Resource Plans - 5.31.2017: 9:30 AM START TIME
IEPR Notice, IEPR 2017-05-31_9:30AM_Staff Webinar
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2176215/17/2017 Enhanced Western Grid Integration - A Legal and Policy Analysis of the Effects on California's Clean Energy Laws
Yale Environmental Protection Clinic
IEPR General Information, IEPR 2017-05-12 Workshop
53 page(s)
 CEC/Docket UnitYale Environmental Protection Clinic
2176105/15/2017 DRAFT Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
STAFF GUIDELINES for The DRAFT Publicly Owned Utility Integrated Resource Plan Submission and Review Guidelines
42 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175645/11/2017 ANATOMY OF BTM BATTERY OPERATIATIONS
5.12.2017 Presentation by Alex Sherman of Advanced Microgrid Solutions
IEPR Presentations, IEPR 2017-05-12 Workshop
2 page(s)
 CEC/Docket UnitAdvanced Microgrid Solutions
2175635/11/2017 Integrated Resource Planning - Addressing Grid Operational Issues
5.12.2017 Presentation by Edward Randolph of CPUC
IEPR Presentations, IEPR 2017-05-12 Workshop
13 page(s)
 CEC/Docket UnitCalifornia Utilities Commission
2175595/11/2017 Regional Integration
5.12.2017 Presentation by Peter Miller of Natural Resources Defense Council
IEPR Presentations, IEPR 2017-05-12 Workshop
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175495/11/2017 Demonstration of Advanced Reliability Services from Utility-Scale Solar PV Plant
5.12.2017 Presentation by Clyde Loutan of California ISO
IEPR Presentations, IEPR 2017-05-12 Workshop
12 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175485/11/2017 Bonneville Power Administration: CEC/CPUC Integrated Energy Policy Report
***SUPERSEDES TN217526*** 5.12.2017 Presentation by Kieran Connolly of Bonneville Power Administration
IEPR Presentations, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175475/11/2017 MEETING SCHEDULE - 2017 IEPR Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity Systems
***SUPERSEDES TN 217524*** MEETING SCHEDULE: May 12, 2017 — 9:30 am First Floor Rosenfeld Hearing Room
IEPR Meeting Schedule, IEPR 2017-05-12 Workshop
2 page(s)
  California Energy Commission
2175465/11/2017 Renewable Integration
5.12.2017 Presentation by Mark Rothleder of California Independent Systems Operator
IEPR Presentations, IEPR 2017-05-12 Workshop
35 page(s)
 CEC/Docket unitCalifornia Energy Commission
2175455/11/2017 IEPR Commissioner Workshop on Draft Guidelines for Publicly Owned Utility Integrated Resource Plans
5.25.2017: Notice of IEPR Commissioner Workshop on Draft Guidelines for Publicly Owned Utility Integrated Resource Plans
IEPR Notice, IEPR 2017-05-25 Workshop
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175335/10/2017 Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity System
5.12.2017 Presentation by Ivo Steklac of Aquahydrex
IEPR Presentations, IEPR 2017-05-12 Workshop
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175325/10/2017 Preliminary Results CEC Project EPC15-049
5.12.2017 Presentation by Lon W. House, Ph.D. of Water & Energy Consulting
IEPR Presentations, IEPR 2017-05-12 Workshop
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175315/10/2017 ERCOT
5.12.2017 Presentation by Resmi Surendran of Electric Reliability Council of Texas
IEPR Presentations, IEPR 2017-05-12 Workshop
9 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175305/10/2017 Signs of Change
5.12.2017 Presentations by Brian Theaker of NRG
IEPR Presentations, IEPR 2017-05-12 Workshop
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175295/10/2017 Geothermal as a Flexible Resource
5.12.2017 Presentation by Josh Nordquist of Ormat
IEPR Presentations, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175285/10/2017 Calpine flexibility solutions
5.12.2017 Presentation by Matthew Barmack of Calpine
IEPR Presentations, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket unitCalifornia Energy Commission
2175275/10/2017 TRANSFORMATIONS GE's Energy Ecosystem Portforlio
5.12.2017 Presentation by Amol Mody of GE
IEPR Presentations, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175265/10/2017 Bonneville Power Administration CECCPUC Integrated Energy Policy Report
5.12.17 Presentation by Kieran Connolly of Bonneville Power Administration
IEPR Presentations, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175255/10/2017 Transcript of 04/17/2017 Joint Agency Workshop
Joint Agency Workshop on Potential Methodologies to Establish Greenhouse Gas Emission Reduction Targets for Publicly Owned Utility Integrated Resource Plans
82 page(s)
 CEC/DocketsCalifornia Energy Commission
2175245/10/2017 MEETING SCHEDULE - 2017 IEPR Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity System
5.12.2017: MEETING SCHEDULE: 2017 IEPR Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity System; First Floor Rosenfeld Hearing Room
IEPR Meeting Schedule, IEPR 2017-05-12 Workshop
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2175065/9/2017 SMUD Comments on Publicly Owned Utility Integrated Resource Plans Webinar
Also filed in 17-IEPR-01 as TN 217351.
  SMUD
2175045/9/2017 Transcript of 04/27/2017 IEPR Commissioner Workshop on Integrated Resource Plans Medium and Heavy-Duty Vehicle Sector

176 page(s)
 CEC/DocketsCalifornia Energy Commission
2174685/8/2017 MD commercial EV lacks data and EV inventory

IEPR 2017-04-27 Workshop
23 page(s)
 CEC/Docketslisa mcghee
2174195/4/2017 Discussion Document- Integrating Renewables in the CAISO Market

IEPR General Information, IEPR 2017-05-12 Workshop
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2174035/4/2017 Transcript of 04/18/2017 IEPR Commissioner Workshop on Integrated Resource Plans Light Duty Vehicle Sector

255 page(s)
 CEC/DocketsCalifornia Energy Commission
2173865/1/2017 California Municipal Utilities Association Comments on Joint Agency Workshop on Potential Methodologies to Establish GHG Reduction Targets for POU IRPs

IEPR Public Comments, IEPR 2017-04-17 Workshop
6 page(s)
 CEC/Docket UnitCalifornia Municipal Utilities Association
2173855/1/2017 Turlock Irrigation District Commens on Ptential Methodologies to Establish GHG Reduction Targets for POU IRPs

6 page(s)
 CEC/Docket UnitTurlock Irrigation District (TID)/Dan Severson
2173845/1/2017 LADWP's Comments on IEPR 2017-04-17 IRP Workshop

4 page(s)
 CEC/Docket UnitLos Angeles Department of Water and Power
2173815/1/2017 Comments of Center for Resource Solutions (CRS) on April 17, 2017 Joint Agency Workshop

IEPR Public Comments, IEPR 2017-04-17 Workshop
4 page(s)
 CEC/Heather RaittCenter for Resource Solutions (CRS)/Todd Jones
2173805/1/2017 MID Comments April 17, 2017 SB 350 IRP Workshop

IEPR 2017-04-17 Workshop
3 page(s)
 CEC/Docket UnitModesto Irrigation District (MID)
2173795/1/2017 SMUD Comments on April 17th Joint Agency Workshop Re Integrated Resource Planning

IEPR General Information
5 page(s)
 CEC/Docket UnitSMUD/William Westerfield
2173765/1/2017 Irrigation District Comments in Response to April 17, 2017 Workshop on Potential Methodologies to Establish Greenhouse Gas Emiss

4 page(s)
 CEC/Docket UnitImperial Irrigation District (IID)
2173735/1/2017 SCPPA Comments on CECARB Workshop on GHG Targets and Baselines

IEPR 2017 02-23 AM GHG Reduction Target Workshop
  SCPPA
2173725/1/2017 Notice of Joint Agency Workshop on the Increasing Need for Flexibility in the Electricity System
May 12, 2017 at the California Energy Commission, First Floor, Art Rosenfeld Hearing Room
IEPR Notice, IEPR 2017-05-12 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2173374/27/2017 California Municipal Utilities Association Comments on IEPR Staff Webinar on Inputs, Assumptions, and Administrative Review for POU IRPs

IEPR Public Comments, IEPR 2017-04-20 Staff Webinar
8 page(s)
 CEC/DocketsCalifornia Municipal Utilities Association
2173364/27/2017 Susie Berlin Comments Northern California Power Agency Comments on IEPR Staff Webinar On Inputs, Assumptions, And Administrative Review For POU IRPs

IEPR 2017-04-20 Staff Webinar
7 page(s)
 CEC/DocketsSusie Berlin
2173354/27/2017 Dan B. Severson Comments TID Comments on CEC Staff Proposal for POU IRP Guideline Development

5 page(s)
 CEC/DocketsDan B. Severson/Turlock Irrigation District (TID)
2173344/27/2017 Sarah TaheriSouthern California Public Power Authority Comments SCPPA Comments on April 20, 2017, Staff Webinar on POU IRP Inputs, Assumptions, and Administrative Review

IEPR Public Comments, IEPR 2017-04-20 Staff Webinar
5 page(s)
 CEC/DocketsSarah Taheri/Southern California Public Power Authority
2173164/27/2017 SMUD MediumHeavy Duty Electric Vehicle Integrated Resource Plan Elements SB350 Input
04.27.2017: Presentation by Bill Westerfield of SMUD
IEPR Presentations, IEPR 2017-04-27 Workshop
7 page(s)
 CEC/Docket UnitSMUD
2173144/27/2017 Enormous Mobile Source Emission Reductions in Short Timeframe Needed to Meet Federal Clean Air Act Mandates
04.27.2017: Presentation by Chay Thao from San Joaquin Valley Air Pollution District
IEPR Presentations, IEPR 2017-04-27 Workshop
6 page(s)
 CEC/Docket UnitSan Joaquin Valley Air Pollution District
2173134/27/2017 Transportation Electrification
04.27.2017: Presentation by Marvin Moon of LADWP
IEPR Presentations, IEPR 2017-04-27 Workshop
19 page(s)
 CEC/Docket UnitLADWP
2173114/27/2017 Research in Support of Transportation Electrification in California Medium-and Heavy-Duty Vehicles Sector
04.27.2017: Presentation by Kanok Boriboonsomsin
IEPR Presentations, IEPR 2017-04-27 Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2173084/26/2017 Transportation Electrification Guidance for Publicly Owned Utilities Integrated Resource Plans
04.27.2017 Presentation by Noel Crisostomo of CEC
IEPR Presentations, IEPR 2017-04-27 Workshop
14 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2173054/26/2017 Technology Advancement Program Demonstration Projects
Presentation by Naveen Berry of SCAQMD
IEPR Presentations, IEPR 2017-04-27 Workshop
19 page(s)
 CEC/Docket UnitSCAQMD
2173044/26/2017 Update on Policies for Electrification of the Heavy Duty Sector
Presentation by Tony Brazil of CARB
IEPR Presentations, IEPR 2017-04-27 Workshop
22 page(s)
 CEC/Docket UnitCARB
2173034/26/2017 SCE January 2017 Transportation
04.27.2017 Presentation by Eric Seilo of SCE
IEPR Presentations, IEPR 2017-04-27 Workshop
20 page(s)
 CEC/Docket UnitSCE
2173024/26/2017 MEETING SCHEDULE 2017 IEPR Lead Commissioner Workshop on Publicly Owned Utility Integrated Resource Plans Transportat
04.27.2017: MEETING SCHEDULE: 2017 IEPR Lead Commissioner Workshop on Publicly Owned Utility Integrated Resource Plans Transportation Electrification, Medium- and Heavy-Duty Vehicles Sector
IEPR Meeting Schedule, IEPR 2017-04-27 Workshop
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2172934/25/2017 Notice to Extend Comment Period for Two IEPR Workshops on Transportation Electrification
This notice extends the public comment period for the following two IEPR workshops: 1) April 18, 2017, workshop titled Publicly Owned Utility Integrated Resource Plans Transportation Electrification, Light-Duty Vehicles Sector 2) April 27, 2017, workshop on Integrated Resource Plans – Medium- and Heavy-Duty Vehicle Sector
IEPR Notice, IEPR General Information, IEPR 2017-04-18 Workshop, IEPR 2017-04-27 Workshop
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2172254/21/2017 Bill Leighty Comments: Bigger Market than Electricity Grid ? Wind-source Hydrogen Fuel for California Transportation and Combined Heat and Power (CHP)

IEPR 2017-04-20 Staff Webinar, IEPR 2017-04-27 Workshop
  Bill Leighty
2171824/19/2017 EVGO FLEET AND TARIFF ANALYSIS
BY GARRETT FITZGERALD AND CHRIS NELDER
IEPR 2017-04-18 Workshop
31 page(s)
 CEC/Docket UnitRocky Mountain Institute
2171534/18/2017 SMUD Plug-in Electric Vehicles Light Duty Integrated Resource Plan SB350 Input
4.18.17 Presentation by Bill Boyce of SMUD
IEPR Presentations, IEPR 2017-04-18 Workshop
9 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2171434/17/2017 Transportation Electrification Guidance
Transportation Electrification Guidance for Publicly Owned Utilities' Integrated Resource Plans - 4.18.17 Presentation by Noel Crisostomo of CEC
IEPR Presentations, IEPR 2017-04-18 Workshop
14 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2171414/18/2017 Update on Carbs Policies for Electrification of Light-duty Sector
4.18.17 Presentation by Dr Alberto Ayala of California Air Resources Board
IEPR Presentations, IEPR 2017-04-18 Workshop
10 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2171404/17/2017 IEPR workshop on Light Duty Vehicle Transportation Electrification
4.18.17 Presentation of Geof Syphers of Sonoma Clean Power
IEPR Presentations, IEPR 2017-04-18 Workshop
9 page(s)
 CEC/Docket UnitSonoma Clean Power
2171394/17/2017 Improving Commercial Viability of Fast Charging
Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple - 4.18.17 Presentation by Thomas Ashley from Greenlots
IEPR Presentations, IEPR 2017-04-18 Workshop
9 page(s)
 CEC/Docket UnitGreenlots
2171384/17/2017 Overview of Proposed Guidelines
Overview of Proposed Guidelines for Publicly Owned Utility Integrated Resource Plans - 4.18.17 Presentation by Mike Sokol of CEC
IEPR 2017-04-18 Workshop, IEPR Presentations
12 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2171364/17/2017 Future of Zero Emissions Automobiles
4.18.17 Presentation by Douglas Steven of Alliance of Automobiles Manufacturers
IEPR Presentations, IEPR 2017-04-18 Workshop
22 page(s)
 CEC/Docket UnitAlliance of Automobiles Manufacturers
2171354/17/2017 Future of Zero Emissions Automobiles
4.18.17 Presentation by Douglas Steven of Alliance of Automobiles Manufacturers
IEPR Presentations, IEPR 2017-04-18 Workshop
22 page(s)
 CEC/Docket UnitAlliance of Automobiles Manufacturers
2171344/17/2017 Burbank Water and Power IRP Transportation Electrification
4.18.17 Presentation by Kapil Kulkarni
IEPR Presentations, IEPR 2017-04-18 Workshop
10 page(s)
 CEC/Docket UnitBurbank Water and Power
2171334/17/2017 SB 350 Transportation Electrification
4.48.17 Presentation by Amy Mesrobian of CPUC
IEPR Presentations, IEPR 2017-04-18 Workshop
8 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission
2171324/17/2017 Global EV trends and forecast
4.18.17 Presentation by Alejandro Zamorano of Bloomberg
IEPR Presentations, IEPR 2017-04-18 Workshop
25 page(s)
 CEC/Docket UnitBloomberg
2171314/17/2017 High Speed DC Network Considerations
4.18.17 Presentation by Dave Packard of ChargePoint
IEPR Presentations, IEPR 2017-04-18 Workshop
14 page(s)
 CEC/Docket UnitChargePoint
2171054/17/2017 SCENARIOS FOR FUTURE PENETRATION OF ZEVS
4.18.17 Presentation by Derek Jones of Navigant
IEPR 2017-04-18 Workshop
23 page(s)
 CEC/Docket UnitNavigant
2170974/17/2017 comments by eMotorWorks

IEPR 2017 02-23 PM POU IRP Workshop
10 page(s)
  eMotorWorks
2170584/14/2017 Meeting Schedule for April 18 IEPR Workshop
on Publicly Owned Utility Integrated Resource Plans- Transportation Electrification, Light-Duty Vehicles Sector
IEPR Meeting Schedule, IEPR 2017-04-18 Workshop
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2170574/14/2017 POU IRP Guidelines Development Administration, Review Process, and Reporting

IEPR General Information
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2170524/14/2017 Proposal for Allocating GHG Emissions Targets to POUs
Presentation by Dave Vidaver of the California Energy Commission
IEPR Presentations, IEPR 2017-04-17 Workshop
15 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2170484/14/2017 Presentation- Overview of Joint Agency Target Setting Process and Potential Bottom-Up Methodology
Presentation by Mary Jane Coombs from the California Air Resources Board
IEPR Presentations, IEPR 2017-04-17 Workshop
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2170474/14/2017 Presentation- Staff Update on Greenhouse Gas Accounting in AB 1110 Power Source Disclosure Program
Presentation by Jordan Scavo from the California Energy Commission
IEPR 2017-04-17 Workshop, IEPR Presentations
4 page(s)
 CEC/DocketsCalifornia Energy Commission
2170454/14/2017 Presentation- Proposed Methodology for Determining GHG Baselines for Publicly Owned Utilities
Presentation by Garry O'Neill-Mariscal from the California Energy Commission
IEPR Presentations, IEPR 2017-04-17 Workshop
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2170404/14/2017 Transportation Electrification Guidance for Publicly Owned Utilities Integrated Resource Plans
Supplemental material for the April 18 IEPR workshop
IEPR General Information, IEPR 2017-04-18 Workshop
3 page(s)
 CEC/DocketsCalifornia Energy Commission
2170124/13/2017 REVISED Meeting Schedule for April 17 Joint Agency Workshop
on Potential Methodologies to Establish Greenhouse Gas Emission Reduction Targets for Publicly Owned Utility Integrated Resource Plans This document supercedes TN# 217008
IEPR Meeting Schedule, IEPR 2017-04-17 Workshop
1 page(s)
  California Energy Commission
2170084/13/2017 Meeting Schedule April 17 Joint Agency Workshop
on Potential Methodologies to Establish Greenhouse Gas Emission Reduction Targets for Publicly Owned Utility Integrated Resource Plans
IEPR Meeting Schedule, IEPR 2017-04-17 Workshop
1 page(s)
 CEC/DocketsCalifornia Energy Commission
2170004/13/2017 Developing Guidelines for the Submission of POU IRPs
Presentation by Garry O'Neill-Mariscal
IEPR 2017-04-20 Staff Webinar
15 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2169954/12/2017 Notice of IEPR Commissioner Workshop
Thursday, April 27, 2017 1:00 p.m. California Energy Commission First Floor, Art Rosenfeld Hearing Room
  California Energy Commission
2169184/10/2017 Notice of IEPR Staff Webinar on Inputs, Assumptions, and Review for Publicly Owned Utility Integrated Resource Plans
04.20.2017: Notice of IEPR Staff Webinar on Inputs, Assumptions, and Administrative Review for Publicly Owned Utility Integrated Resource Plans
IEPR 2017-04-20 Staff Webinar
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2167944/4/2017 Notice of IEPR Commissioner Workshop on Integrated Resource Plans – Light-Duty Vehicle Sector
4.48.2017: Notice of IEPR Commissioner Workshop on Integrated Resource Plans – Light-Duty Vehicle Sector
IEPR 2017-04-18 Workshop
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2167834/3/2017 Joint Agency Workshop on Potential Methodologies to Establish Greenhouse Gas Emission Reduction Targets for POU IRP
Monday, April 17, 2017 1:00 p.m
IEPR 2017-04-17 Workshop
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2167774/3/2017 3.30.2017 Weisenmiller Response to IRP POU
3.30.2017 IRP Response to POUs
IEPR 2017 02-23 AM GHG Reduction Target Workshop, IEPR 2017 02-23 PM POU IRP Workshop
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2167373/29/2017 3.23.2017 IRP Leaders Letter
3.23.2017 IRP Leaders Letter to CEC Commissioners
IEPR General Information
4 page(s)
 CEC/CommissionersCalifornia Energy Commission
2167093/24/2017 CHBC Comments on California Energy Commission's 2017 IEPR

IEPR Public Comments
3 page(s)
  California Hydrogen Business Council (CHBC)
2166983/23/2017 Sierra Club Comments on the Proposed Guideline Topics for POU IRPs

IEPR 2017 02-23 PM POU IRP Workshop, IEPR 2017-03-13 Staff Webinar on POU IRPs
5 page(s)
  Sierra Club
2166973/23/2017 CMUA, NCPA, and SCPPA Comments: Joint POU Comments on CEC Staff Workshop and Discussion Document Regarding IRP Guidelines for POUs

IEPR Public Comments, IEPR 2017 02-23 PM POU IRP Workshop
  CMUA, NCPA, and SCPPA
2166963/23/2017 Comments of the Sacramento Municipal Utility District on the IEPR Workshop on Publicly Owned Utility Integrated Resource Plans

17 page(s)
 CEC/Docket UnitSMUD/William Westerfield
2166953/23/2017 Imperial Irrigation District Comments in Response to February 23, 2017 Workshop on Integrated Resource Plan Guidelines

IEPR Public Comments, IEPR 2017 02-23 PM POU IRP Workshop
10 page(s)
  Imperial Irrigation District
2166843/23/2017 Pathfinder CAES I LLC Comments on Proposed Guideline Topics for Publicly Owned Utilities’ Integrated Resource Plans

IEPR 2017 02-23 PM POU IRP Workshop
8 page(s)
 CEC/CommissionersPathfinder CAES I LLC/Molly Croll
2166823/23/2017 Comments of the Center for Energy Efficiency and Renewable Technologies on the Joint Agency Workshop on 2030 Greenhouse Gas Em

IEPR 2017 02-23 AM GHG Reduction Target Workshop
  CEERT
2166783/23/2017 Pacific Gas and Electric Company Comments on the March 13, 2017 Integrated Energy Policy Report Webinar on Integrated Resource

2 page(s)
 CEC/Docket UnitPacific Gas and Electric
2166683/23/2017 SoCalGas Comments on Integrated Resource Planning, Opportunity for Power-to-Gas Technology

IEPR Public Comments, IEPR 2017 02-23 PM POU IRP Workshop
5 page(s)
  SoCalGas
2166673/23/2017 LADWP's Comments to CEC Draft Staff Paper on Proposed Guideline Topics for POUs IRPs 03232017

6 page(s)
 CEC/Docket UnitLos Angeles Deparment of Water and Power
2166663/23/2017 Anaheim Public Utilities Comments on IRP Draft Staff Paper

10 page(s)
 CEC/Docket UnitCity of Anaheim
2166653/23/2017 Comments of Roseville Electric Utility on the Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans

IEPR 2017-03-13 Staff Webinar on POU IRPs, IEPR 2017 02-23 PM POU IRP Workshop
14 page(s)
 CEC/Docket UnitCity of Roseville
2166643/22/2017 Comments of Roseville Electric Utility on the Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans

IEPR 2017 02-23 PM POU IRP Workshop, IEPR 2017-03-13 Staff Webinar on POU IRPs
   Roseville Electric Utility
2166423/21/2017 2017 IEPR Supply Form Eastside Power Authority
This document was erroneously filed in this docket. It should have been filed in 17-IEPR-02, see TN 216816; 2017 IEPR Supply Form Eastside Power Authority filing.
IEPR General Information
  Robertson-Bryan, Inc.
2165813/16/2017 Steve Uhler Comments: Minimize Overlapping Reporting Requirements

IEPR 2017 02-23 AM GHG Reduction Target Workshop, IEPR 2017 02-23 PM POU IRP Workshop
4 page(s)
 CEC/Docket UnitSteve Uhler
2164993/9/2017 Joint POU Comments on GHG Target Setting for IRP Planning

IEPR 2017 02-23 AM GHG Reduction Target Workshop
16 page(s)
  CMUA, NCPA and SCPPA
2164953/9/2017 SCEs Reply Comments on Feb. 23, 2017 Joint CPUC-CEC Workshop on GHG Target Setting for the Integrated Resource Planning (IRP)

IEPR 2017 02-23 AM GHG Reduction Target Workshop
  Southern California Edison
2164943/9/2017 Comments of the Sacramento Municipal Utility District on the Joint Agency Workshop Regarding Integrated Resource Planning

IEPR 2017 02-23 AM GHG Reduction Target Workshop
10 page(s)
  Sacramento Municipal Utility District
2164933/9/2017 Pacific Gas & Electric Comments: Pacific Gas and Electric Comments on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Planning

IEPR 2017 02-23 AM GHG Reduction Target Workshop
12 page(s)
  Pacific Gas & Electric
2164913/9/2017 LADWP's Comments to CEC re Options for Setting GHG Planning Targets for IRP Apportioning Targets (03.09.2017)

7 page(s)
  Los Angeles Department of Water and Power
2164903/9/2017 Mohit Chhabra Comments: Reply Cmts NRDC on Options for Setting GHG Planning Targets for Integrated Resource Planning and Apportioning Targets Following the February 23, 2017 Public Workshop

IEPR Public Comments, IEPR 2017 02-23 AM GHG Reduction Target Workshop
4 page(s)
 CEC/Docket UnitMohit Chhabra
2164553/9/2017 William Rostov, Earthjustice Comments: Post-Workshop Informal Comments of Sierra Club on Options for Setting GHG Planning Targets for Integrated Resource Planning and Apportioning Targets Among Publicly Owned Utilities and Load Serving Entities

IEPR Public Comments, IEPR 2017 02-23 AM GHG Reduction Target Workshop
9 page(s)
 CEC/Docket UnitWilliam Rostov, Earthjustice
2164543/9/2017 Steve Uhler Comments: No WOMs correct data-methods
  Steve Uhler
2164463/9/2017 Transcript of 02/23/2017 2017 IEPR Lead Commissioner Workshop
2017 IEPR Lead Commissioner Workshop on Proposed Guideline Topics for Publicly-Owned Utilities Integrated Resource Plans
59 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2164263/7/2017 Transcript of 02/23/2017 Joint Agency Workshop on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Plan

137 page(s)
 PartiesCalifornia Energy Commission
2163793/3/2017 Notice of IEPR Staff Webinar on Publicly Owned Utilities Integrated Resource Plans
03.13.2017: Notice of IEPR Staff Webinar on Publicly Owned Utilities Integrated Resource Plans
IEPR Notice, IEPR 2017-03-13 Staff Webinar on POU IRPs
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2163203/2/2017 SCPPA-NCPA "Energy Principals" Letter

IEPR 2017 02-23 AM GHG Reduction Target Workshop
3 page(s)
  Southern California Public Power Authority (SCPPA) and Northern California Power Agency (NCPA)
2162162/23/2017 Overview of Guidelines for Integrated Resource Plans of Publicly Owned Utilities
***SUPERCEDES TN 216156*** Garry O’Neill-Mariscal, Energy Commission Staff
IEPR Presentations, IEPR 2017 02-23 PM POU IRP Workshop
19 page(s)
 CEC/DOCKET UNITCalifornia Energy Commission
2161912/23/2017 Presentation - SB 350 Integrated Resource Planning Interagency Meeting
**** SUPERCEDES TN 216159 **** - By: Rajinder Sahota, California Air Resources Board
IEPR Presentations, IEPR 2017 02-23 AM GHG Reduction Target Workshop
10 page(s)
 CEC/Docket UnitCalifornia Air Resources Board
2161682/22/2017 IEPR Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans
February 23, 2017 – 2:00 P.M.
IEPR Presentations, IEPR 2017 02-23 PM POU IRP Workshop
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2161672/22/2017 SCE Comments on IRP GHG Planning Targets

IEPR 2017 02-23 AM GHG Reduction Target Workshop
6 page(s)
 CEC/Robert OglesbySouthern California Edison (SCE)
2161622/21/2017 ORA Informal Comments on GHG Targets

IEPR 2017 02-23 AM GHG Reduction Target Workshop
6 page(s)
 CEC/Docket UnitOffice of Ratepayer Advocates, (ORA), California Public Utilities Commission
2161612/22/2017 MEETING SCHEDULE: 2017 IEPR Joint Agency Workshop on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Plan
2.23.2017 9:30 AM 2017 IEPR Joint Agency Workshop on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Planning
IEPR Meeting Schedule, IEPR 2017 02-23 AM GHG Reduction Target Workshop
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2161602/22/2017 Presentation - Panel 1: Defining an Overall Electric Sector GHG Reduction Target for 2030 in IRP
By: Jason Ortego, California Public Utilities Commission
IEPR Presentations, IEPR 2017 02-23 AM GHG Reduction Target Workshop
5 page(s)
 CEC/Docket UnitCalifornia Public Utilities Commission
2161592/22/2017 Presentation - SB 350 Integrated Resource Planning Interagency Meeting
*** THIS DOCUMENT IS REPLACED BY TN 216191 *** - By: Rajinder Sahota, California Air Resources Board
IEPR Presentations, IEPR 2017 02-23 AM GHG Reduction Target Workshop
10 page(s)
 CEC/Docket UnitCalifornia Air Resources Board
2161582/22/2017 Presentation - Panel 2: Dividing Sector-Wide GHG Planning Target Between CEC and CPUC
Staff Presentation: Garry O’Neill-Mariscal, California Energy Commission
IEPR Presentations, IEPR 2017 02-23 AM GHG Reduction Target Workshop
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2161572/22/2017 MEETING SCHEDULE: 2017 IEPR Lead Commissioner Workshop
2.23.2017 PM: 2017 IEPR Lead Commissioner Workshop on Proposed Guideline Topics for Publicly-Owned Utilities' Integrated Resource Plans
IEPR Meeting Schedule, IEPR 2017 02-23 PM POU IRP Workshop
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2161562/22/2017 Presentation - Overview of Guidelines for Integrated Resource Plans of Publicly Owned Utilities
By: Garry O’Neill-Mariscal, Energy Commission Staff
IEPR Presentations, IEPR 2017 02-23 PM POU IRP Workshop
17 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2160932/17/2017 DRAFT STAFF PAPER: Proposed Guideline Topics for Publicly Owned Utilities’ Integrated Resource Plans
***SUPERCEDES TN #: 216088 02/23/2017 AFTERNOON WORKSHOP-DRAFT STAFF PAPER: Proposed Guideline Topics for Publicly Owned Utilities’ Integrated Resource Plans
IEPR Reports, IEPR 2017 02-23 PM POU IRP Workshop
36 page(s)
 CEC/DOCKET UNITCalifornia Energy Commission
2160882/17/2017 DRAFT STAFF PAPER: Proposed Guideline Topics for Publicly Owned Utilities’ Integrated Resource Plans
*** THIS DOCUMENT IS REPLACED BY TN 216093 *** - 2.23.2017 PM Workshop: DRAFT STAFF PAPER: Proposed Guideline Topics for Publicly Owned Utilities’ Integrated Resource Plans
IEPR Reports, IEPR 2017 02-23 PM POU IRP Workshop
36 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2159302/13/2017 Notice of IEPR Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans
This document supersedes TN 215819
IEPR Notice, IEPR 2017 02-23 PM POU IRP Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2159252/13/2017 Alliance for Nuclear Responsibility Comments: 021317 A4NR-IEPR draft comments

IEPR Public Comments
3 page(s)
  Alliance for Nuclear Responsibility
2158502/10/2017 Notice of Joint Agency Workshop on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Planning
02.23.2017: Notice of Joint Agency Workshop on 2030 Greenhouse Gas Emission Reduction Targets for Integrated Resource Planning-AM
IEPR Notice, IEPR 2017 02-23 AM GHG Reduction Target Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2158492/10/2017 Options for Setting GHG Planning Targets for Integrated Resource Planning & Apportioning Targets
02.23.2017: Options for Setting GHG Planning Targets for Integrated Resource Planning and Apportioning Targets among Publicly Owned Utilities and Load Serving Entities - CPUC and California Energy Commission Staff Discussion Document
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2158192/8/2017 Notice of IEPR Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans
02.23.2017: Notice of IEPR Commissioner Workshop on Publicly Owned Utilities Integrated Resource Plans- PM
IEPR Notice, IEPR 2017 02-23 PM POU IRP Workshop
5 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2158162/8/2017 Open New Docket Memo

1 page(s)
 CEC/Docket UnitCalifornia Energy Commission