258610 | 8/21/2024 |
Diego Sanchez Arvizu Comments - Where i can contact the manager plant
1 page(s)
| | CEC/Docket Unit | Diego Sanchez Arvizu |
254317 | 2/5/2024 |
Ivanpah WEST Annual Monitoring Report 2021 - 2022 and ABMMP Rev 14 Appendix D 2021-2022 Ivanpah Avian Monitoring Report-Year 9 and Appendix D of the Avian and Bat Monitoring and Management Plan (ABMMP) Rev 14 Biological Resources, Compliance 56 page(s)
| | CEC/Docket Unit | California Energy Commission |
248302 | 1/4/2023 |
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM AVIAN & BAT MONITORING PLAN 2020 – 2021 Annual Report Year 8 IVANPAH SOLAR ELECTRIC GENERATING SYSTEM
AVIAN & BAT MONITORING PLAN
2020 – 2021 Annual Report
Year 8
Biological Resources 43 page(s)
| | CEC/Docket Unit | California Energy Commission |
246355 | 10/5/2022 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan 2019-2020 Annual Report Biological Resources 63 page(s)
| | CEC/Docket Unit | Solar Partners I, II, and VIII, LLCs |
235702 | 11/19/2020 |
ORDER APPROVING SETTLEMENT 3 page(s)
| | CEC/Dockets | California Energy Commission |
235408 | 10/23/2020 |
Avian & Bat Monitoring and Management Plan
56 page(s)
| | CEC/Dockets | California Energy Commission |
235407 | 10/23/2020 |
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM 2018-2019 AVIAN & BAT MONITORING PLAN
44 page(s)
| | CEC/Dockets | California Energy Commission |
235398 | 10/23/2020 |
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM 2017-2018 AVIAN & BAT MONITORING PLAN
88 page(s)
| | CEC/Dockets | California Energy Commission |
231194 | 12/12/2019 |
2018 ISEGS Annual Compliance Report
496 page(s)
| | CEC/Leonidas Payne | NRG Ivanpah Solar Electric Generating System |
227847 | 4/24/2019 |
Tools to Address Glare and Avian Flux Hazards from Solar Energy Systems
66 page(s)
| | CEC/Dockets | California Energy Commission |
226139 | 12/17/2018 |
Avian & Bat Technical Advisory Committee (TAC) Meeting August 9, 2018 - Meeting Notes 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
226138 | 12/17/2018 |
Avian & Bat Monitoring Plan 2017 Fall Report 199 page(s)
| | CEC/Docket Unit | California Energy Commission |
225606 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
224646 | 9/5/2018 |
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM - 2016-2017 Annual Report
111 page(s)
| | CEC/Dockets | California Energy Commission |
223780 | 6/12/2018 |
Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee Meeting, February 15, 2018 – Meeting Notes
4 page(s)
| | CEC/Docket Unit | California Energy Commission |
223723 | 6/7/2018 |
2017 Annual Compliance Report - Ivanpah Solar Electric Generating System
507 page(s)
| | CEC/Joseph Douglas | NRG Ivanpah Solar Electric Generating system |
223073 | 3/28/2018 |
Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee Meeting December 2017
7 page(s)
| | CEC/Dockets | California Energy Commission |
222357 | 1/25/2018 |
Ivanpah Solar Electric Generating System; Avian and Bat Monitoring Plan- 2017 Spring Report
54 page(s)
| | CEC/Dockets | California Energy Commission |
222356 | 1/25/2018 |
Ivanpah Solar Electric Generating System; Avian and Bat Monitoring Plan-2017 Summer Report
62 page(s)
| | CEC/Dockets | California Energy Commission |
222025 | 12/20/2017 |
Ivanpah TAC Meeting Notes; September 20, 2017
4 page(s)
| | CEC/Dockets | California Energy Commission |
222024 | 12/20/2017 |
Ivanpah Avian & Bat Monitoring Plan; 2016-2017 Winter Report
55 page(s)
| | CEC/Dockets | California Energy Commission |
220829 | 8/18/2017 |
Ivanpah Solar Electric Generating System Avian and Bat Technical Advisory Meeting June 28, 2017 - Meeting Notes
4 page(s)
| | CEC/Dockets | California Energy Commission |
220764 | 8/15/2017 |
Ivanpah Solar Electric Generating System Avian and Bat Monitoring Plan - 2015-2016 Annual Report
177 page(s)
| | CEC/Docket Unit | California Energy Commission |
218912 | 6/16/2017 |
Ivanpah Solar Electric Generating System TAC Meeting Notes - March 2017
8 page(s)
| | CEC/Docket Unit | California Energy Commission |
218911 | 6/16/2017 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2016 Fall Report
97 page(s)
| | CEC/Docket Unit | California Energy Commission |
218910 | 6/16/2017 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2016 Summer Report
60 page(s)
| | CEC/Docket Unit | California Energy Commission |
218296 | 6/13/2017 |
2016 Annual Compliance Report Part 2 of 2
190 page(s)
| | CEC/Docket Unit | NRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs |
218289 | 6/13/2017 |
2016 Annual Compliance Report Part 1 of 2
333 page(s)
| | CEC/Docket Unit | NRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs |
217149 | 4/18/2017 |
Ivanpah Solar Electric Generating System Meeting Notes Avian & Bat Technical Advisory Committee (TAC) Meeting, September 15, 2016 - Meeting Notes 5 page(s)
| | CEC/Docket Unit | California Energy Commission |
217148 | 4/18/2017 |
Ivanpah Solar Electric Generating System Meeting Notes Avian & Bat Technical Advisory Committee (TAC) meeting, December 13, 2016 - Meeting Notes 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
213886 | 10/4/2016 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan Ivanpah Avian Report- Winter 2015 57 page(s)
| | CEC/Docket Unit | Western EcoSystems Technology, Inc. for Solar Partners I, II, and VIII |
213859 | 9/30/2016 |
Ivanpah Solar Technical Advisory Committee (TAC) July 5, 2016 Meeting Notes
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
213858 | 9/30/2016 |
Ivanpah Solar Technical Advisory Committee (TAC) April 19, 2016 Meeting Notes
8 page(s)
| | CEC/Docket Unit | California Energy Commission |
213857 | 9/30/2016 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan, Spring 2016 Avian Report
61 page(s)
| | CEC/Docket Unit | Western Ecosystems Technology, Inc. for Solar Partners I, II, and VIII |
212652 | 6/21/2016 |
Investigation Root Cause Report
5 page(s)
| | California Energy Commission/ R. Oglesby | Solar Partners VIII, LLC |
212616 | 8/4/2016 |
Response to Application for Confidential Designation - NRG Renewables, LLC
3 page(s)
| | Solar Partners V111, LLC | California Energy Commission |
212114 | 7/5/2016 |
Monthly Compliance Report No. 42 - March 2014
966 page(s)
| | CEC/Docket Unit | Energyservices an NRG service on behalf of Solar Partners I, II, and VIII LLC |
212098 | 7/5/2016 |
2015 Annual Compliance Report
510 page(s)
| | CEC/Joseph Douglas and Bureau of Land Management/Michael Ahrens | NRG Energy Services on behalf of Solar Partners I, II, and VIII, LLCs |
212042 | 6/30/2016 |
ISEGS Avian and Bat Monitoring Plan 2014-2015
230 page(s)
| | | Western EcoSystems Technology, Inc. |
212041 | 6/30/2016 |
April 2016 TAC Meeting Notes
| | | California Energy Commission |
211916 | 6/21/2016 |
Application for Confidential Designation
2 page(s)
| | | Solar Partners VIII, LLC |
210707 | 3/14/2016 |
ISEGS Avian & Bat Monitoring Report - Summer 2015
82 page(s)
| | CEC/Dockets Unit | California Energy Commission |
210621 | 3/7/2016 |
Ivanpah Technical Advisory Meeting Notes
4 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207105 | 12/23/2015 |
Avian & Bat Monitoring and Management Plan Nov. 2015 Report prepared for Solar Partners, I, LLC: Solar Partners II, LLC; and Solar Partners VIII, LLC Biological Resources 37 page(s)
| | CEC/Dockets Unit | California Energy Commission |
207104 | 12/23/2015 |
Avian & Bat Monitoring Plan Spring 2015 Report is prepared for Solar Partners I, II, and VIII Biological Resources 99 page(s)
| | CEC/Dockets Unit | Western EcoSystems Technology, Inc. |
207094 | 12/21/2015 |
Ivanpah Solar Electric Generating System Avian and Bat Technical Advisory Meeting Notes
7 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206897 | 12/8/2015 |
Notice of Decision by the California Energy Commission Notice 1 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206686 | 11/19/2015 |
Order Approving a Petition to Amend to Update Equipment Descriptions
8 page(s)
| | CEC/Dockets Unit | California Energy Commission |
206252 | 10/1/2015 |
IVANPAH SOLAR ELECTRIC GENERATING SYSTEM - Staff Analysis of Petition to Amend Updated Equipment Descriptions
24 page(s)
| | Interested Parties | California Energy Commission |
205745 | 8/14/2015 |
Ivanpah Solar Electric Generating System; Avian & Bat Technical Advisory Committee Meeting: July 2, 2015 - Meeting Notes
5 page(s)
| | CEC/Docket Unit | California Energy Commission |
205744 | 8/14/2015 |
Ivanpah Solar Electric Generating System; Avian & Bat Monitoring Plan: 2014-2015 Winter Report
| | | Solar Partners I, II, and VIII |
204258 | 4/20/2015 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2013-2014 Annual Report (Revised) 29 October 2013 - 20 October 2014 - Report prepared by H.T. Harvey & Associates 105 page(s)
| | CEC/Docket Unit | California Energy Commission |
204257 | 4/20/2015 |
Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee (TAC) Meeting TAC Meeting on March 6, 2015 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
204256 | 4/20/2015 |
Ivanpah Solar Electric Generating System Avian & Bat Monitoring Plan - 2014 Fall Report 18 August - 20 October 2014 -Report prepared by H.T. Harvey & Associates 114 page(s)
| | CEC/Docket Unit | California Energy Commission |
204189 | 4/14/2015 |
Notice of Receipt - Petition to Amend for Ivanpah Solar Electric Generating System
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
203905 | 3/17/2015 |
Petition to Amend Air Quality Conditions of Certification
57 page(s)
| | CEC/Dockets Unit | Sierra Research |
203569 | 1/28/2015 |
Avian & Bat Technical Advisory Committee December 2014 Meeting Notes
3 page(s)
| | CEC/ Docket Unit | California Energy Commission |
203461 | 12/17/2014 |
IVANPAH SUMMER 2014 QUARTERLY REPORT
94 page(s)
| | CEC/Dockets Unit | HT Harvey and Associates |
203460 | 12/17/2014 |
IVANPAH 2014 SPRING REPORT FINAL Replaces TN #202990 111 page(s)
| | CEC/Dockets Unit | HT Harvey and Associates |
203435 | 12/12/2014 |
September-October 2014 TAC Meeting Notes
7 page(s)
| | | California Energy Commission |
203426 | 12/10/2014 |
Ivanpah Solar Electric Generating System Addendum to Heliostat Positioning Plan
5 page(s)
| | CEC/Dockets Unit | Ellison, Schneider & Harris L.L.P. |
203395 | 12/3/2014 |
IVANPAH SOLAR GENERATING SYSTEM GLARE INVESTIGATION REPORT 121 page(s)
| | | California Energy Commission |
203101 | 9/25/2014 |
Kathryn Hackett-Fields Comments: Letter and Newspaper Article Attachment
3 page(s)
| | CEC/Dockets Unit | Kathryn Hackett-Fields |
203065 | 9/15/2014 |
ISEGS Notice of Decision
2 page(s)
| | California Resouces Agency | CEC/ Chris Marxen |
203064 | 9/15/2014 |
ISEGS Order Approving Petition to Amend
4 page(s)
| | CEC/Docket Unit | CEC/Harriet Kallemeyn |
203010 | 8/29/2014 |
Final Cultural Resources Report End of Construction Final Cultural Resources Report CUL-4. Note: Two hard copies with Confidential Appendix B were delivered to the Dockets Unit on 8-29-14. Cultural Resources 54 page(s)
| | CEC/Joseph Douglas | CH2M Hill |
203009 | 8/29/2014 |
Paleontological Resources Report Required by Condition of Certification PAL-7. End of Construction Paleo Resources Report Compliance 6 page(s)
| | CEC/Joseph Douglas | CH2M Hill |
203002 | 8/28/2014 |
Ivanpah Solar Electric Generating System (Ivanpah) Avian & Bat Technical Advisory Committee (TAC) Meeting July 2014
4 page(s)
| | CEC / Docket UNit | California Energy Commission/ Joe Douglas |
202990 | 8/27/2014 |
Ivanpah SEGS Spring 2014 Avian Quarterly Report 96 page(s)
| | CEC /Docket Unit | Ellison, Schneider & Harris L.L.P. |
202834 | 7/28/2014 |
140728 ISEGS Support Letter
1 page(s)
| | Joe Douglas | Ellison, Schneider & Harris L.L.P. |
202718 | 7/17/2014 |
Evaluation of Glare at the Ivanpah Electric Generating System
33 page(s)
| | CEC/Dockets Unit | Ellison, Schneider & Harris L.L.P. |
202660 | 7/1/2014 |
Construction Termination Report
57 page(s)
| | CEC/Joseph Douglas | Ellison, Schneider & Harris L.L.P. |
202625 | 6/27/2014 |
Staff Analysis of the Proposed Increase in Boiler Fuel Usage Limit
27 page(s)
| | CEC/Dockets Unit | CEC/Joseph Douglas |
202617 | 6/26/2014 |
Avian & Bat Monitoring Plan; 2013-2014 Winter Report
90 page(s)
| | CEC/Dockets Unit | California Energy Commission |
202588 | 6/25/2014 |
Ivanpah Solar Electric Generating System Avian & Bat Technical Advisory Committee (TAC) Meeting Notes - May, 2014
| | | California Energy Commission |
202461 | 6/16/2014 |
Monthly Compliance Report No. 44 - May 2014
359 page(s)
| | | Ellison, Schneider & Harris L.L.P. |
202368 | 5/22/2014 |
Monthly Compliance Report #43 April 2014
1130 page(s)
| | CEC/Joseph Douglas | Ellison, Schneider & Harris L.L.P. |
202363 | 5/22/2014 |
Avian & Bat Technical Advisory CommitteeTAC 2-6-14 Meeting Notes Ivanpah Solar Energy Generating System 4 page(s)
| | CEC / Docket Unit | California Energy Commission |
202356 | 5/20/2014 |
Ivanpah Solar Electric Generating System Monthly Compliance Report #43 1130 page(s)
| | CEc / Docket Unit | California Energy Commission |
202344 | 5/19/2014 |
Condition of Certification COMP -6 April 201 Monthly Compliance Report No. 43 Air Quality, Biological Resources 1129 page(s)
| | CEC / Siting/ Joe Douglas | California Energy Commission |
202152 | 4/21/2014 |
Email to Withdraw Petition for Staff Modification (TN#200313)
1 page(s)
| | CEC/Joseph Douglas | Ellison, Schneider & Harris LLP |
202096 | 4/17/2014 |
Ivanpah Solar Electric Generating System March 2014 Monthly Compliance Report Condition of Certification COMPLIANCE-6 Air Quality, Biological Resources, Cultural Resources 966 page(s)
| | CEC/Dockets Unit / J. Douglas | Energyservices / M. Huizar |
202085 | 4/16/2014 |
Notice of Receipt for Petition to Amend
2 page(s)
| | | California Energy Commission |
201928 | 3/26/2014 |
Ivanpah Petition to Amend No. 4
Air Quality 60 page(s)
| | CEC/Joe Douglas | Ellison, Schneider & Harris L.L.P. |
201915 | 3/25/2014 |
Ivanpah Solar Electric Generating System Response to Clark County Department of Aviation Pilot Reports
6 page(s)
| | CEC/Joseph Douglas | EnergyServices, an NRG service |
201891 | 3/19/2014 |
February 2014 Monthly Compliance Report #41
1042 page(s)
| | CEC/Dockets Unit | Ivanpah Solar Electric Generating System |
201847 | 3/10/2014 |
Letter re Pilot Complaints of Visual Impacts from Ivanpah Solar Electric Generating System
7 page(s)
| | CEC/Joseph Douglas | Las Vegas McCarran International Airport |
201764 | 2/20/2014 |
January 2014 Monthly Compliance Report
850 page(s)
| | CEC/Dockets Unit | energyservices an NRG Service |
201571 | 1/17/2014 |
Monthly Compliance Report No. 39
466 page(s)
| | CEC/Joseph Douglas | BrightSouce Energy |
201443 | 12/17/2013 |
Monthly Compliance Report - November 2013
550 page(s)
| | CEC/Joseph Douglas | Bright Source Energy |
201318 | 11/22/2013 |
Fish and Wildlife Service Review of Ivanpah Solar Electric Generating System Avian and Bat Monitoring and Management Plan Rev 12
2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201317 | 11/22/2013 |
Bureau of Land Management Approval of Ivanpah Solar Electric Generating System Avian & Bat Monitoring & Management Plan
2 page(s)
| | Bright Source Energy/ Marc Sydnor | U.S Department of the Interior |
201316 | 11/22/2013 |
Ivanpah Solar Electric Generation System Avian & Bat Monitoring Letter of Aproval
1 page(s)
| | Bright Source/Marc Sydnor | California Energy Commission |
201315 | 11/22/2013 |
Ivanpah Soloar Electric Generating System Avian Monitoring Plan rev 12 Avian & Bat Monitoring and Management Plan 45 page(s)
| | | Ivanpah Solar Electric Generating System |
201254 | 11/18/2013 |
October 2013 Monthly Compliance Report
610 page(s)
| | CEC/Dockets Unit | Bright Source Enegy Inc. |
200939 | 10/18/2013 |
Ivanpah Solar Electric Generating System September 2013 Monthly Compliance Report Monthky Compliance Report # 36 Air Quality, Biological Resources, Cultural Resources, Geology/Paleontology 736 page(s)
| | CEC/Joseph Douglas | BrightSource Energy, Inc. |
200643 | 9/30/2013 |
Injured Northern Rough-winged Swallow Found Colosseum Rd.
7 page(s)
| | California Energy Commission | BrightSource Energy, Inc. |
200642 | 9/30/2013 |
Avian Mortality Report 9-1-2013
| | California Energy Commission | BrightSource Energy, Inc. |
200641 | 9/30/2013 |
BrightSource email attaching Avian Mortality Report
1 page(s)
| | California Energy Commission | BrightSource Energy, Inc. |
200540 | 9/20/2013 |
Ivanpah Solar Electric Generating System Monthly Compliance Report #35
Air Quality, Biological Resources, Cultural Resources, Geology/Paleontology 828 page(s)
| | CEC/Joseph Douglas | Bright Source Energy, Inc. |
200316 | 8/22/2013 |
July 2013 Monthly Compliance Report
Compliance 600 page(s)
| | CEC/Joseph Douglas | Bright Source Energy, Inc. |
200313 | 8/22/2013 |
Ivanpah Petition for Staff Approved Modification
Compliance 2 page(s)
| | CEC/Joe Douglas | BrightSource Energy |
69908 | 3/13/2013 |
CEC Order 12-0213-8 Approving a Petition to Modify Air Quality Conditions of Certification
15 page(s)
| | CEC/Docket Unit | CEC/ H. Kallemeyn |
69694 | 2/27/2013 |
Order Approving a Petition to Modify BIO -20
3 page(s)
| | CEC/Docket Unit | CEC/ J. Douglas |
69597 | 2/19/2013 |
Notice of Decision Regarding BIO-20
1 page(s)
| | CEC/ Docket Unit | CEC/ Joe Douglas |
69529 | 2/14/2013 |
Notice of Decision Regarding Condition of Certification BIO-21
1 page(s)
| | California Resources Agency | CEC/J.Douglas |
69528 | 2/14/2013 |
Notice of Decision Regarding Modifying Several AQ Conditions
1 page(s)
| | California Resources Agency | CEC/J.Douglas |
69082 | 1/9/2013 |
CEC Staff - J. Douglas ISEGS AQ Extension Letter CEC Staff - J. Douglas Ivanpah Solar Electric Generating System AQ Extension Letter 2 page(s)
| | CEC?Docket Unit | CEC Staff/J. Douglas |
69081 | 1/9/2013 |
CEC Staff -J. Douglas ISEGS BIO 20 Extension Letter
2 page(s)
| | CEC/Docket Unit | CEC Staff/J. Douglas |
68960 | 12/21/2012 |
Staff Analysis of Proposed Modifications to Condition of Certification BIO-20 Streambed Impact Minimization and Conservation Measures
12 page(s)
| | Interested Parties | CEC/ J. Douglas |
68959 | 12/21/2012 |
CEC Staff Analysis of Proposed Modifications to Air Quality Conditions
39 page(s)
| | Interested Parties | CEC/ J. Douglas |
68801 | 12/7/2012 |
Notice of Receipt for Petition to Amend BIO-20
3 page(s)
| | CEC/Docket Unit | CEC/C.Marxen |
68668 | 11/27/2012 |
Petition to Amend
13 page(s)
| | CEC/Docket Unit | CEC/J.Douglas |
65910 | 6/22/2012 |
AQ Amendment Data Responses Set 1 - 9
29 page(s)
| | CEC/J.Douglas | Bright Source |
65239 | 5/15/2012 |
Data Requests no.1 through 9
4 page(s)
| | BrightSource Energy/D.Davis | CEC/J.Douglas |
64628 | 4/6/2012 |
Notice of Receipt - Petition to Amend
3 page(s)
| | CEC/Docket Unit | CEC/C.Marxen |
64038 | 3/8/2012 |
Petition to Amend-Equipment Change to Reduce Emissions
61 page(s)
| | CEC/Dockets Unit | CEC/Joseph Douglas |
58740 | 10/8/2010 |
Authorization to Start Construction
1 page(s)
| | Bright Source Energy/ Steve De Young | CEC/ Joseph Douglas |