Docket Log

Docket: 06-AFC-07C
Project Title: Humboldt Bay Generating Station - Compliance
Generated On: 9/27/2016 1:54:06 PM

TN #Docketed DateDocument TitleExhibit #ToFrom
2137229/19/2016Approval of Request to Withdraw Humboldt Bay Generating Station Petition ot Amend Site Boundary
Approval of Request to Withdraw Humboldt Bay Generating Station Petition ot Amend Site Boundary
Compliance
1 page(s)
  California Energy Commission
2137219/19/2016Request to withdraw the Humboldt Bay Generating Station Petition to Amend the Site Boundary
Request to withdraw the Humboldt Bay Generating Station Petition to Amend the Site Boundary
Compliance
1 page(s)
 California Energy Commission/ Bruce BoyerHumboldt Bay Generating Station/ C. Holm
2137009/16/2016Letter - Withdrawal of Site Boundary Expansion and Project Modification
Letter of Withdrawal
1 page(s)
 CEC/Bruce BoyerPacific Gas & Electric Company
2136379/14/2016Humboldt Bay Generating Station Notice of Determination for petition to install a fiber optic line
Humboldt Bay Generating Station Notice of Determination for petition to install a fiber optic line
Air Quality, Biological Resources, Cultural Resources, Facility Design, Compliance, Hazardous Materials, Noise and Vibration, Public Health, Transmission Line Safety and Nuisance, Transmission System Engineering
8 page(s)
  California Energy Commission
2136309/13/2016Notice of Approval
Notice of Approval for petition to move the existing natural gas meter
Compliance
1 page(s)
 Humboldt Bay Generating Station Manager/Chuck HolmCalifornia Energy Commission
2129468/25/2016Notice of Determination
Petition to Amend Humboldt Bay Generating Station (06-AFC-7C)
7 page(s)
  California Energy Commission
2123127/15/2016Letter to CEC staff regarding Humboldt Bay Generating Station (06-AFC-07C)
Humboldt Bay Generating Station (06-AFC-07C), Minor Project Description Changes to Project Modification for Fiber Optic Communications System, Installation of a Microwave Dish and Monopole, and Re-Routing of an Existing Water Line Segment
4 page(s)
 CEC/Bruce BoyerChuck Holm, PG&E
2122927/14/2016Notice of Receipt
Petition for Project Modification Humboldt Bay Generating Station (06-AFC-7C)
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2122917/14/2016Notice of Receipt
Petition for Project Modification Humboldt Bay Generating Station (06-AFC-7C)
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2118866/20/2016Petition for Project Modification (06-AFC-07C), Relocation of Gas Meter
The meter relocation consists of four elements: • Installation of a new pipeline connection from a new first point of interconnection with Line 189 on the HBGS site to the relocated gas meter • Relocation of the meter • Installation of above and below ground pipe for the meter • Removal of the original 32-foot pipeline connection from Line 189
Compliance
10 page(s)
 California Energy CommissionCalifornia Energy Commission
2117646/9/2016Notice of Receipt 20160609 - Petition for Project Modification Fiber Line and Microwave Dish

Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2117286/6/2016Pacific Gas & Electric Company's Petition to Amend

Air Quality
139 page(s)
 CEC/Docket UnitDayZen LLC
2114595/13/2016Humboldt Bay Generating Station - Petition for Project Modification
Modification of Fiber Optic Communications System, Relocation of Network Communications System, Installation of New Microwave Dish and Monopole, and Re-Routing of Existing Water Line Segment
Compliance
14 page(s)
 CEC/Jonathan FongPacific Gas and Electric Company
20636210/14/2015Notice of Determination, Petition to Modify, Temporary Warehouse Tent

Compliance
6 page(s)
 Interested PartiesCalifornia Energy Commission
20636110/14/2015Notice of Determination, Petition to Modify, Temporary Warehouse Tent

Compliance
6 page(s)
 Interested PartiesCalifornia Energy Commission
2060009/3/2015Petition for Project Modification- Temporary Tent

Compliance
14 page(s)
 California Energy ComissionPG&E/ Humbolt Bay Generating Station PM/ Chuck Holm
2059478/31/2015 Notice of Determination Spare Transformer

Compliance
8 page(s)
 All Interested PartiesCalifornia Energy Commission
2051046/23/2015Notice of Receipt
Notice of Receipt of Petition for Project Modification to install spare transformer
Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2049796/11/2015Petition for Project Modification- Spare Transformer

Compliance
17 page(s)
 CEC/Jonathan FongPG&E
2049416/8/2015Notice of Receipt
Petition to Amend Project Boundary Expansion and Minor Site Modifications
Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2048236/2/2015PG & E's Supplement to the Site Boundary Petition for Project Modification

Soil and Water
104 page(s)
 CEC/Jonathan FongPacific Gas & Electric Company/Scott Washington
2045285/7/2015Site Boundary Expansion & Project Modification
Petition to Amend to expand the site boundary
Air Quality, Cultural Resources, Compliance, Geology/Paleontology, Hazardous Materials, Traffic and Transportation, Visual Resources, Soil and Water
284 page(s)
 Jonathan FongCH2M HILL
2041424/13/2015Notice of Determination - Petition to Modify - Additional Eyewash/Shower Stations

Compliance
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2036352/9/2015Petition for Project Modification - Additional Emergency Eyewash and Shower Stations 02/06/15

Compliance
36 page(s)
 CEC/Jonathan FongCH2M Hill
5870910/4/2010Letter to PG&E Regarding Compliance with Pre-Operation COC's

1 page(s)
 Pacific Gas & Electric Company/J. MaringCEC/C. Davis
570715/31/2010Petitioner Robert Sarvey's Verified Petition for Writ of Mandate and Complaint for Declaratory and Injuctive Releif and Atorney Fee's in the Matter of Sarvey v. North Coast United AQMD

21 page(s)
 CEC/ Docket UnitAtorney for R. Sarvey/ S. Volker
565555/4/2010Order Approving Petition to Modify air Quality & Public Health Conditions of Certification

62 page(s)
 CEC/Docket UnitCEC/C. Davis
563934/23/2010Filing of Notice of Decision by the CEC

1 page(s)
 CA Resources AgencyCEC
556752/25/2010Staff Analysis of Proposed Modifications to Air Quality Conditions of Certification

72 page(s)
 Interested PartiesCEC/M. Errecart
547971/14/2010Deed Restrictions

22 page(s)
 CEC/ Compliance ManagerPG&E
521996/29/2009Notice of Receipt: Petition to Amend the CEC's Decision

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
515645/13/2009Approval to Temporarily Use Two Additional Laydown Areas During Construction

3 page(s)
 PG&E/ J. MaringCEC/ C. Davis
514005/1/2009Applicant's Petiton to Amend Air Quality Conditions

182 page(s)
 CEC/ C. DavisPG&E/ D. Parish
511464/17/2009Notice of Receipt-Petition to Modify

2 page(s)
 CEC/ Docket UnitCEC/ E. Allen
498101/22/2009Letter Regarding Humboldt Bay Generating Station Insignificant Project Change Request

45 page(s)
 CEC/ C. DavisHumboldt Bay Generating Station/ D. Parish
496581/8/2009Establishment of Post-Certification Mailing List

2 page(s)
 CEC/ Docket UnitCEC/ C. Davis
496241/6/2009Humboldt Bay Generating Station Phase Two Start of Construction

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4955012/30/2008CEC Response Re Approval of Project Name Change

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4944912/18/2008Humbolt Bay Repowering Project Name Change Notification

1 page(s)
 CEC/ C. DavisPG&E/ J. Maring
4851210/10/2008Phase One Limited Start of Construction

3 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4850710/10/2008CBO Preconstructed Approval Letter

1 page(s)
 CEC/ C. DavisKevin Wedman
4837410/3/2008Limited Start of Construction

3 page(s)
 CEC/ D. RundquistCEC/ C. Davis
4829410/1/2008CBO Approval Letter

1 page(s)
 Bureau Veritas/ K. WedmanCEC/ C. Davis
472027/24/2008MOU between CEC Staff and Bureau Veritas North America, Inc. for Design Review, Plan Check and Construction Inspection

6 page(s)
 CEC/ Docket UnitBVNA, Inc./ K. Wedman/ CEC/ T. O'Brien