Docket Log

Docket: 06-AFC-07C
Project Title: Humboldt Bay Generating Station - Compliance
Generated On: 10/15/2024 6:12:48 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2497194/18/2023 Humboldt Bay Generating Station
Statement of Staff Approval of Post Certification Change-Boundary Expansion
Compliance
13 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2495053/30/2023 Notice of Receipt
Petition for Post Certification Change Humboldt Bay Generating Station
Compliance
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2493913/22/2023 Site Boundary Expansion Project Modification PTA
Petition to amend for modification of site boundary.
Project Description
23 page(s)
 CEC/Docket UnitPacific Gas & Electric Company
2429785/9/2022 Statement of Staff Approval of Post Certification Change
Humboldt Bay Generating Station
Compliance
29 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2372903/24/2021 Petition for Post Certification Project Change Humboldt Bay Generating Station
Notice of Receipt
2 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2371983/17/2021 HBGS Islanding Petition to Amend

Air Quality, Project Description, Public Health
225 page(s)
 CEC/Docket UnitJacobs
23126212/17/2019 2018 Annual Compliance Report
Humboldt Bay Generating Station 2018 Annual Compliance Report
Compliance
103 page(s)
 CEC/Keith WinsteadPacific Gas & Electric Company
2298629/26/2019 CEC Letter Regarding Approval to Construct a Platform for Rupture Disc Inspection and Maintenance
Humboldt Bay Generating Station - Compliance
Compliance
2 page(s)
 PG&E/Ryan MessingerCalifornia Energy Commission
22559010/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
2239916/28/2018 Notice of Decision
Notice of in compliance with Public Records code section 21080.5 and Title 20 California Code of Regulations, section 1768
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2239456/26/2018 Order Approving Petition to Amend
Order No: 18-0613-1a
2 page(s)
 CEC/DocketsCalifornia Energy Commission
2233375/7/2018 Staff Analysis on Petition to Amend
PG&E proposes to make several administrative changes, and the following substantive changes, to the air quality conditions of certification (conditions), as written in the September 24, 2008 Final Decision.
Air Quality
2 page(s)
 Interested PartiesCalifornia Energy Commission
2233105/2/2018 Letter Regarding Staff Analysis on Petition to Amend
PG&E proposes to make several administrative changes, and the following substantive changes, to the air quality conditions of certification (conditions), as written in the September 24, 2008 Final Decision.
Air Quality
109 page(s)
 Interested PartiesCalifornia Energy Commission
2221671/18/2018 North Coast Unified Air Quality Management District - Permit Issued to PG&E
Title V Federal Operating Permit & District Permit to Operate Title V Permit No: NCU 059-12
Compliance
43 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22202812/21/2017 Humboldt Bay Generating Station's Responses to Data Request No. 2 - Humboldt Diesel Pilot Fuel Increase Amendment.
Attached is the HBGS response to the data request received back on September 26, 2017.
Air Quality
4 page(s)
 CEC/Docket UnitHumboldt Bay Generating Station
2199776/29/2017 Letter from PG&E to Winslow Condon re Modification to Humboldt Bay Generating Station Title V Permit No. NCU 059-12

3 page(s)
 North Coast Unified AQMD/Winslow CondonPG&E
2199736/29/2017 Petition to Amend TN 211728 Data Request Letter
Pacific Gas & Electric Company HBGS
5 page(s)
 CEC/DocketsCalifornia Energy Commission
2199726/29/2017 Petition to Amend Data Request Response
Air Quality
21 page(s)
 CEC/DocketsCalifornia Energy Commission
2137229/19/2016 Approval of Request to Withdraw Humboldt Bay Generating Station Petition ot Amend Site Boundary
Approval of Request to Withdraw Humboldt Bay Generating Station Petition ot Amend Site Boundary
Compliance
1 page(s)
  California Energy Commission
2137219/19/2016 Request to withdraw the Humboldt Bay Generating Station Petition to Amend the Site Boundary
Request to withdraw the Humboldt Bay Generating Station Petition to Amend the Site Boundary
Compliance
1 page(s)
 California Energy Commission/ Bruce BoyerHumboldt Bay Generating Station/ C. Holm
2137009/16/2016 Letter - Withdrawal of Site Boundary Expansion and Project Modification
Letter of Withdrawal
1 page(s)
 CEC/Bruce BoyerPacific Gas & Electric Company
2136379/14/2016 Humboldt Bay Generating Station Notice of Determination for petition to install a fiber optic line
Humboldt Bay Generating Station Notice of Determination for petition to install a fiber optic line
Cultural Resources, Facility Design, Compliance, Hazardous Materials, Noise and Vibration, Public Health, Transmission Line Safety and Nuisance, Transmission System Engineering, Air Quality, Biological Resources
8 page(s)
  California Energy Commission
2136309/13/2016 Notice of Approval
Notice of Approval for petition to move the existing natural gas meter
Compliance
1 page(s)
 Humboldt Bay Generating Station Manager/Chuck HolmCalifornia Energy Commission
2129468/25/2016 Notice of Determination
Petition to Amend Humboldt Bay Generating Station (06-AFC-7C)
7 page(s)
  California Energy Commission
2123127/15/2016 Letter to CEC staff regarding Humboldt Bay Generating Station (06-AFC-07C)
Humboldt Bay Generating Station (06-AFC-07C), Minor Project Description Changes to Project Modification for Fiber Optic Communications System, Installation of a Microwave Dish and Monopole, and Re-Routing of an Existing Water Line Segment
4 page(s)
 CEC/Bruce BoyerChuck Holm, PG&E
2122927/14/2016 Notice of Receipt
Petition for Project Modification Humboldt Bay Generating Station (06-AFC-7C)
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2122917/14/2016 Notice of Receipt
Petition for Project Modification Humboldt Bay Generating Station (06-AFC-7C)
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2118866/20/2016 Petition for Project Modification (06-AFC-07C), Relocation of Gas Meter
The meter relocation consists of four elements: • Installation of a new pipeline connection from a new first point of interconnection with Line 189 on the HBGS site to the relocated gas meter • Relocation of the meter • Installation of above and below ground pipe for the meter • Removal of the original 32-foot pipeline connection from Line 189
Compliance
10 page(s)
 California Energy CommissionCalifornia Energy Commission
2117646/9/2016 Notice of Receipt 20160609 - Petition for Project Modification Fiber Line and Microwave Dish

Compliance
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2117286/6/2016 Pacific Gas & Electric Company's Petition to Amend

Air Quality
139 page(s)
 CEC/Docket UnitDayZen LLC
2114595/13/2016 Humboldt Bay Generating Station - Petition for Project Modification
Modification of Fiber Optic Communications System, Relocation of Network Communications System, Installation of New Microwave Dish and Monopole, and Re-Routing of Existing Water Line Segment
Compliance
14 page(s)
 CEC/Jonathan FongPacific Gas and Electric Company
20636210/14/2015 Notice of Determination, Petition to Modify, Temporary Warehouse Tent

Compliance
6 page(s)
 Interested PartiesCalifornia Energy Commission
20636110/14/2015 Notice of Determination, Petition to Modify, Temporary Warehouse Tent

Compliance
6 page(s)
 Interested PartiesCalifornia Energy Commission
2060009/3/2015 Petition for Project Modification- Temporary Tent

Compliance
14 page(s)
 California Energy ComissionPG&E/ Humbolt Bay Generating Station PM/ Chuck Holm
2059478/31/2015 Notice of Determination Spare Transformer

Compliance
8 page(s)
 All Interested PartiesCalifornia Energy Commission
2051046/23/2015 Notice of Receipt
Notice of Receipt of Petition for Project Modification to install spare transformer
Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2049796/11/2015 Petition for Project Modification- Spare Transformer

Compliance
17 page(s)
 CEC/Jonathan FongPG&E
2049416/8/2015 Notice of Receipt
Petition to Amend Project Boundary Expansion and Minor Site Modifications
Compliance
2 page(s)
 Interested PartiesCalifornia Energy Commission
2048236/2/2015 PG & E's Supplement to the Site Boundary Petition for Project Modification

Soil and Water
104 page(s)
 CEC/Jonathan FongPacific Gas & Electric Company/Scott Washington
2045285/7/2015 Site Boundary Expansion & Project Modification
Petition to Amend to expand the site boundary
Air Quality, Cultural Resources, Compliance, Geology/Paleontology, Hazardous Materials, Traffic and Transportation, Visual Resources, Soil and Water
284 page(s)
 Jonathan FongCH2M HILL
2041424/13/2015 Notice of Determination - Petition to Modify - Additional Eyewash/Shower Stations

Compliance
6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2036352/9/2015 Petition for Project Modification - Additional Emergency Eyewash and Shower Stations 02/06/15

Compliance
36 page(s)
 CEC/Jonathan FongCH2M Hill
5870910/4/2010 Letter to PG&E Regarding Compliance with Pre-Operation COC's

1 page(s)
 Pacific Gas & Electric Company/J. MaringCEC/C. Davis
570715/31/2010 Petitioner Robert Sarvey's Verified Petition for Writ of Mandate and Complaint for Declaratory and Injuctive Releif and Atorney Fee's in the Matter of Sarvey v. North Coast United AQMD

21 page(s)
 CEC/ Docket UnitAtorney for R. Sarvey/ S. Volker
565555/4/2010 Order Approving Petition to Modify air Quality & Public Health Conditions of Certification

62 page(s)
 CEC/Docket UnitCEC/C. Davis
563934/23/2010 Filing of Notice of Decision by the CEC

1 page(s)
 CA Resources AgencyCEC
556752/25/2010 Staff Analysis of Proposed Modifications to Air Quality Conditions of Certification

72 page(s)
 Interested PartiesCEC/M. Errecart
547971/14/2010 Deed Restrictions

22 page(s)
 CEC/ Compliance ManagerPG&E
521996/29/2009 Notice of Receipt: Petition to Amend the CEC's Decision

3 page(s)
 CEC/ Docket UnitCEC/ E. Allen
515645/13/2009 Approval to Temporarily Use Two Additional Laydown Areas During Construction

3 page(s)
 PG&E/ J. MaringCEC/ C. Davis
514005/1/2009 Applicant's Petiton to Amend Air Quality Conditions

182 page(s)
 CEC/ C. DavisPG&E/ D. Parish
511464/17/2009 Notice of Receipt-Petition to Modify

2 page(s)
 CEC/ Docket UnitCEC/ E. Allen
498101/22/2009 Letter Regarding Humboldt Bay Generating Station Insignificant Project Change Request

45 page(s)
 CEC/ C. DavisHumboldt Bay Generating Station/ D. Parish
496581/8/2009 Establishment of Post-Certification Mailing List

2 page(s)
 CEC/ Docket UnitCEC/ C. Davis
496241/6/2009 Humboldt Bay Generating Station Phase Two Start of Construction

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4955012/30/2008 CEC Response Re Approval of Project Name Change

1 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4944912/18/2008 Humbolt Bay Repowering Project Name Change Notification

1 page(s)
 CEC/ C. DavisPG&E/ J. Maring
4851210/10/2008 Phase One Limited Start of Construction

3 page(s)
 PG&E/ J. MaringCEC/ C. Davis
4850710/10/2008 CBO Preconstructed Approval Letter

1 page(s)
 CEC/ C. DavisKevin Wedman
4837410/3/2008 Limited Start of Construction

3 page(s)
 CEC/ D. RundquistCEC/ C. Davis
4829410/1/2008 CBO Approval Letter

1 page(s)
 Bureau Veritas/ K. WedmanCEC/ C. Davis
472027/24/2008 MOU between CEC Staff and Bureau Veritas North America, Inc. for Design Review, Plan Check and Construction Inspection

6 page(s)
 CEC/ Docket UnitBVNA, Inc./ K. Wedman/ CEC/ T. O'Brien