36652 | 3/30/2006 |
California Rule 21 Working Group Report CPUC Decision 05-08-013 August 25, 2005 CPUC Oll 04-03-017
35 page(s)
| | Docket Unit | Reflective Energies |
36053 | 12/13/2005 |
SCE's Reply Comments on the Draft Decision Adopting Policies and Funding for the California Solar Initiative
16 page(s)
| | CPUC/Docket Clerk/CEC/Docket Unit | SCE/Dean |
36048 | 12/12/2005 |
SCEC U 338 Reply Comments on the Draft Decision Adopting Policies and Funding for the California Solar Initiative.
7 page(s)
| | Docket Unit | SCEC |
35999 | 12/6/2005 |
SCE's Comments the Draft Decision Adopting Policies and Funding for the CA Solar Initiative
14 page(s)
| | CEC/Docket | SCE/Dean |
35349 | 8/23/2005 |
Reply Comments of SCE Company (U338-E) On Draft Decision Adopting Changes In Interconnection Rules For Distributed Generation.
8 page(s)
| | Docket Unit | CPU/ M. D. Momtoya/ A. E. Dean |
35286 | 8/15/2005 |
Comments of Southern California Edison Company (U 338-E) on Draft Decision Adoption in Interconnection Rules for Distributed Generation.
27 page(s)
| | CEC/Docket Unit | Attorneys for SCE/Michael Montoya |
35038 | 7/21/2005 |
Rely Comments of SCE Co. (U338-E) On Assigned Commissioner and Administrative Law Judge's Ruling Seeking Comment Staff Solar Report.
21 page(s)
| | Docket Unit | CEC |
34845 | 7/7/2005 |
Comments of SCE Company (U 338-E) on assigned Commissioner & Administrative Law Judge's Ruling seeking Comment on Staff Solar Report.
11 page(s)
| | CEC/Docket Unit | Southern CA Edison Company/M. Montoya |
34334 | 5/13/2005 |
Alternatives to Grid Expansion GTI Future Grid Study, sponsored by DOE
4 page(s)
| | Dockets | Gas Technology/Wong |
34330 | 5/13/2005 |
Comments on the Assessment of California's CHP Market and Policy Options for Increased Market Penetration
4 page(s)
| | CEC/Geesman/Boyd/Dockets | Cummins Power Gen/Wong |
34311 | 5/12/2005 |
CHP Workshop April 28, 2005 - Post Workshop Comments
3 page(s)
| | Dockets | Capstone Trubine Corp/Dugga |
34253 | 5/9/2005 |
Comments on CHP Workshop 4-28-05
2 page(s)
| | Dockets | Berry Petroleum Co/Lovell |
34251 | 5/6/2005 |
Comments of Committee Workshop on Combined Heat and Power and Distribution Generation Policy
8 page(s)
| | Dockets | Pg&e/Guliasi |
34243 | 5/6/2005 |
Comments of the Cogeneration Association of California and The Energy Producers and Users Coalition on the 2005 Energy Report-CHP Workshop April 28, 2005
21 page(s)
| | CEC/Docket Unit | Alcantar & Kahl |
34241 | 5/6/2005 |
SCE's Comments on the CEC Integrated Policy Report Committee's April 28, 2005 Workshop
14 page(s)
| | CEC/Docket Unit | Sce/Dean |
34240 | 5/6/2005 |
Comments of the California Cogeneration Council
55 page(s)
| | CEC/Geesman/boyd | California Cogeneration Council/Lennon |
34231 | 5/6/2005 |
Comments of Watson Cogeneration Company
11 page(s)
| | CEC/Docket Unit | Watson Cogeneration Company/Hawley |
34229 | 5/6/2005 |
Comments of Berry Petroleum Company
2 page(s)
| | CEC/Dockets Unit | Berry Petroleum Company/Lovell |
34228 | 5/6/2005 |
Comments of CogenWorks Coalition
4 page(s)
| | CEC/Docket Unit | Cogenworks Coalition/George |
34196 | 4/29/2005 |
Prepared Rebuttal Testimony of Southern California Edison Company
22 page(s)
| | Dockets | Sce/Silsbee/lacy |
34195 | 3/15/2005 |
Comments of Southern California Edison Company on Interconnection Report Issued by the CEC
14 page(s)
| | Dockets | Sce/Montoya/dean |
34192 | 4/29/2005 |
Prepared Rebuttal testimony of Souther California Edison Company
22 page(s)
| | Dockets | So. Ca Edison Company |
34115 | 4/26/2005 |
CEPS Comments
2 page(s)
| | CEC/Geesman | Ceps/Clemons |
34106 | 4/28/2005 |
Comments on the 2005 Energy Report - CHP Workshop
50 page(s)
| | CEC/Geesman | California Cogeneration Council/Lennon |
33924 | 4/13/2005 |
Prepared Direct Testimony of Southern California Edison Company
45 page(s)
| | CEC/Docket Unit | Sce |
33675 | 3/15/2005 |
Comments of Southern California Edison Company on Interconnection Report Issues by CEC
14 page(s)
| | Dockets | So. California Edison/Montoya/dean |
33466 | 2/18/2005 |
Joint Response of the SGIP Working Group to the Petition of the California Independent Petroleum Association to Modify Decision #04-12-045
15 page(s)
| | Dockets | So. Cal Edison/Dean |
33449 | 2/16/2005 |
Joint Response of the SGIP Working Group to the Petition of the California Independent Petroleum Association to Modify Decision 04-12-025
8 page(s)
| | Dockets | M. D. Montoya / A. E. Dean/ Southern California Ed |
33309 | 2/10/2005 |
Adoption Order # 04-0202-05
2 page(s)
| | CEC/Docket Unit | CEC/Keese/rosenfeld/geesman/pfannenstiel |
33172 | 1/20/2005 |
Comments re: the Committee Final Report "Recommended Changes to Interconnection Rules."
6 page(s)
| | CEC/Docket Unit | D. Tunnicliff, Sce |
33170 | 1/20/2005 |
Comments on the "Recommended Changes to Interconnection Rules - Committee Final Report.
7 page(s)
| | CEC/Docket Unit | Pg&e, Stacy Walters |
33168 | 1/20/2005 |
Comments re: the Committee Final Report "Recommended Changes to Interconnection Rules."
6 page(s)
| | CEC/Docket Unit | Cac/Epuc, K. Terranova |
33166 | 1/20/2005 |
Comments on the report, Recommended Changes to Interconnection Rules.
3 page(s)
| | CEC/Docket Unit | The City Attorney-city Of San Diego, M. Aguirre |
32945 | 12/15/2004 |
Response of Southern California Edison Company to Assigned Commissioner's Ruling Soliciting Comments for Proposed Solar Roofs Initiative
22 page(s)
| | CEC/Dockets Unit | Southern California Edison Co/Montoya/dean |
32879 | 11/30/2004 |
Comments to the Rule 21 Working Group Report.
57 page(s)
| | CEC/Docket Unit | Pg&e |
32861 | 12/2/2004 |
Comments on the Report Rule 21 Working Group Recommended Changes to Interconnection Rules.
6 page(s)
| | CEC/Docket Unit | Casey Gwinn, City Of San Diego, The City Attorney |
32843 | 11/30/2004 |
Comments related to the Rule 21 Working Group Recommended Changes to Interconnection Rules Report.
2 page(s)
| | CEC/Docket Unit | Southern Ca Edison |
32842 | 11/30/2004 |
Comments of the Cogeneration Association of CA & The Energy Producers & Users Coalition on the Rule 21 Working Group Recommended Changes to Interconnection Rules.
22 page(s)
| | CEC/Docket Unit | Cac, Epuc |
32840 | 11/30/2004 |
Comments on the Rule 21 Working Group Report Regarding Recommended Changes to Interconnection Rules issued on November 10, 2004.
56 page(s)
| | CEC/Docket Unit | Pg And E Company |
32772 | 11/22/2004 |
Comments for hearing Friday, December 10, 2004 on Rule 21 Working Group paper submitted November 10,
6 page(s)
| | Docket Optical | Rcm Digesters, Inc/Mark A. Moser |
32740 | 11/16/2004 |
Reply Comments of Southern California Edison Company on Draft Order to Modify the Self Generation Incentive Program and Implement Assembly Bill 1685 - POS
13 page(s)
| | CEC/Docket Unit | Southern California Edison Co Attys/Montoya/dean |
32727 | 11/10/2004 |
Notice of Committee Hearing & Schedule Update on Recommended Changes to Interconnection Rules.
5 page(s)
| | CEC/Docket | CEC Cec |
32716 | 11/9/2004 |
Comments of So. CA Edison Company (U-338-E) on Draft Order To Modify the Self Generation Incentive Program and Implement Assembly Bill 1685. POS
19 page(s)
| | CEC/Docket | So. Ca Edison/M. Montoya |
32655 | 11/4/2004 |
Follow-up to Rule 21 Working Group Meeting
56 page(s)
| | All Parties/Cec/docket Unit | CEC/Tomashefsky |
32597 | 10/25/2004 |
Comments on the Los Angeles Department of Water and Power on the Committee Draft Report, September 2004.
6 page(s)
| | CEC/Dockets | Dept Of Water & Power City Of La/Howard |
32592 | 10/21/2004 |
Notice of Availability of the Final Draft Committee 2004 Energy Report Update.
91 page(s)
| | CEC/Dockets | CEC/Geesman/boyd |
32557 | 10/15/2004 |
Reply Comments of the Utility Reform Network on Committee Draft Report
10 page(s)
| | CEC/Dockets | Jbs Energy For Turn/Hawiger |
32543 | 10/14/2004 |
Comments on the Commission's Draft Integrated Energy Policy Report 2004 Update
3 page(s)
| | CEC/Dockets | Public Utilities Commission/Larson |
32541 | 10/13/2004 |
Comments of West Coast Power on the Committee Draft Report
3 page(s)
| | CEC/Dockets | Goodin, Macbride, Squeri, Ritchie & Day/Cragg |
32480 | 10/13/2004 |
Comments on the Draft Report for 2004
3 page(s)
| | CEC/Dockets | Iid Energy/Barbera |
32479 | 10/13/2004 |
Comments in response to the CEC 2004 Update on the Integrated Energy Policy Report
7 page(s)
| | CEC/Dockets | Power System/Howard |
32478 | 10/14/2004 |
Comments of the City and County of San Francisco on the Draft 2004 Energy Report
24 page(s)
| | CEC/Dockets | City & County Of San Francisco/Mueller |
32477 | 10/13/2004 |
Comments of the Cities of Alameda, Palo Alto and Santa Clara
3 page(s)
| | CEC/Dockets | Flynn Resource Consultants Inc./Chang |
32476 | 10/13/2004 |
Committee's 2004 Draft Committee Energy Report Update
3 page(s)
| | CEC/Dockets | Southern Cal Edison/Alvarez |
32343 | 9/15/2004 |
Notice of Committee Hearings and Availability of Draft Committee 2004 Energy Report Update.
3 page(s)
| | CEC/Dockets | CEC/Geesman/boyd |
32339 | 9/15/2004 |
Comments submitted in response to the workshop held on August 27, 2004 concerning the Accelerated Renewable Energy Development.
7 page(s)
| | CEC/Dockets | Dept Of W&p The City Of Los Angeles/Howard |
32313 | 9/7/2004 |
SDGE's Comments to the Joint 2004-2005 IEPR Workshop
3 page(s)
| | CEC/Docket | Sdge/Orozco |
32296 | 9/7/2004 |
Comments, Questions, Suggestions Response to Energy Commission Workshop Aug 27th On Accelerated Renewable Energy Development.
3 page(s)
| | Docket Optical System | L. Harris Hicks |
32293 | 9/7/2004 |
Comments on the Accelerated Development Renewable Energy Draft White Paper, 8-27-04 Workshop, Distributed PV.
8 page(s)
| | CEC/Dockets | The Rahus Institute/Tor Allen |
32283 | 9/7/2004 |
Comments submitted in response to the workshop held on August 27, 2004 concerning the Accelerated Renewable Energy Development.
7 page(s)
| | CEC Cec | Randy S. Howard |
32279 | 9/7/2004 |
Comments for the Committee on the Accelerated Renewable Energy Development Draft Staff White Paper and August 27, 2004.
4 page(s)
| | CEC/Dockets | City Of Palo Alto Utilities/Knapp |
32267 | 9/8/2004 |
Joint Comments of the Green Power Institute and the California Biomass Energy Alliance on the Accelerated Renewable Energy Development Report.
5 page(s)
| | Dockets | Green Power Institute/Morris |
32263 | 9/8/2004 |
Comments on the Draft Staff White Paper on Accelerated Renewable Energy Development and the August 27, 2004 Workshop
5 page(s)
| | Dockets | City Of Palo Alto/Knapp |
32260 | 9/8/2004 |
Comments of the Union of Concerned Scientists on the Accelerated Renewable Energy Development Draft Staff White Paper
7 page(s)
| | CEC/Dockets | Union Of Concerned Scientists/Galloway |
32252 | 9/7/2004 |
Comments of Southern California Water Company
1 page(s)
| | Dockets | So. California Water Co./Juels |
32242 | 9/2/2004 |
Committee Order Regarding Rule 21 Working Group Schedule
2 page(s)
| | CEC/Docket Usetnit | CEC/Geesman/boyd |
32214 | 8/27/2004 |
SMUD's Comments for the August 27, 2004 Workshop
17 page(s)
| | CEC/Docket | Smud/Beebe |
32211 | 8/27/2004 |
Comments on the Draft Staff White Paper
7 page(s)
| | CEC/Docket | Northern California Power Agency/Cirricione |
32180 | 8/25/2004 |
L.H. Hick's Comments on the IEPR and Renewables Committee Workshop
3 page(s)
| | CEC/Docket | Creed |
32177 | 8/25/2004 |
Comments on the IEPR Renewables Committee Workshop
3 page(s)
| | CEC/Docket | Lynn Harris Hicks |
32174 | 8/24/2004 |
Comments on the Draft Staff White Paper
4 page(s)
| | CEC/Docket | Capstone Turbine Corporation |
32150 | 8/20/2004 |
Comments on the 2004 IEPR Draft Staff White Paper
4 page(s)
| | CEC/Docket | Genself/Bloom |
32129 | 8/19/2004 |
Comments on Staff White Paper re: Accelerated Renewable Dev.
6 page(s)
| | CEC/Docket | Ca Municipal Utilities Assoc |
32118 | 8/18/2004 |
Committee Order Regarding Scope of Proceeding
5 page(s)
| | CEC/Dockets | CEC/Geesman/boyd |
32025 | 8/3/2004 |
Draft Staff White Paper - Accelerated Renewable Energy Development (100-04-003)
200 page(s)
| | CEC/Dockets | CEC Cec |
31959 | 7/23/2004 |
Comments of Southern California Edison re: the CEC's recommendation on the "Self Generation Incentive" program. POS
20 page(s)
| | CEC/Dockets | Southern Ca Edison Company |
31767 | 6/18/2004 |
Comments in response to questions posed by the Committee with re: to renewable distributed generation in Attachment A of the workshop held on June 8, 2004. These comments are reflective of comments offered orally at the hearing.
5 page(s)
| | CEC/Dockets | Cal Seia/J. E. Mcfarland |
31741 | 6/16/2004 |
Comments of Pacific Gas & Electric Company on Questions asked at the June 8, 2004 Committee Workshop on Renewable Distribution Generation.
9 page(s)
| | CEC/Dockets | Pg&e Company/R. Litteneker |
31737 | 6/15/2004 |
Comments re: the presentations at the CEC workshop on Renewable Distributed Generation on June 8, 2004, and responses to CEC's questions; second letter included refers to May 5, 2004 (letter dated May 17, 2004) comments and response to CEC's questions.
8 page(s)
| | CEC/Dockets | Sempra/B. Orozco |
31718 | 6/14/2004 |
Power Point presentation for the June 8, 2004 Hearing
16 page(s)
| | CEC/Docket | Bergey Windpower Company/Bergey |
31689 | 6/10/2004 |
Comments on the IEPR Committee Workshop on Renewable DG
1 page(s)
| | CEC/Geesman/docket | Us Home/Ainsworth |
31682 | 6/9/2004 |
Presentations for the June 8, 2004 Committee Workshop
53 page(s)
| | CEC/Docket | CEC/Lieberg |
31677 | 6/9/2004 |
Comments to CEC Emerging Renewables Program
2 page(s)
| | CEC/Docket | Sma/Sheldon |
31674 | 6/9/2004 |
Possible Cost Offsets and Incentives for Residential Photovoltaic Energy Systems
20 page(s)
| | CEC/Docket | Cbia/Raymer |
31670 | 6/9/2004 |
Reply Comments to the June 8, 2004 Workshop on Renewable Distributed Generation
2 page(s)
| | CEC/Docket | Energy Ideas/Mccabe |
31664 | 6/8/2004 |
Reply Comments on the Order Instituting Rulemaking re: Policies, Procedures and Incentives for Distributed Generation and Distributed Energy Resources
20 page(s)
| | CEC/Docket | Southern Ca Edison/Montoya |
31661 | 6/8/2004 |
Power Point Presentation for the CEC IEPR Committee Workshop on Renewable DG (24 slides)
6 page(s)
| | CEC/Docket | Ge Energy/Nyberg |
31649 | 6/7/2004 |
CEC Workshop on Renewable Distributed Generation Presentation (17 slides)
17 page(s)
| | CEC/Docket | Black & Veatch/Pletka |
31626 | 6/2/2004 |
Comments in response to e-mail request sent 6/2/04 for 03-IEP-01, 02-REN-1038 and 04 DIST-GEN-1.
2 page(s)
| | Dockets | Tom Barron |
31618 | 6/1/2004 |
Notice of Committee Workshop on Renewable Distributed Generation.
7 page(s)
| | CEC/Dockets | CEC/Geesman/boyd/pfannenstiel |
31567 | 5/21/2004 |
COMMENTS on the Order Instituting Rulemaking Regarding Policies, Procedures & Incentives. POS
63 page(s)
| | CEC/Dockets | Southern Ca Edison/M. Montoya |
31545 | 5/19/2004 |
Comments of the Tracy K. Saville re: Policies, Procedures, and Incentives for Distributed Generation and Distributed Energy Resources and Issues Associated with Implementation and Distribution Planning of Distributed Generation
11 page(s)
| | CEC/Dockets | Tk & Company Inc./Saville |
31537 | 4/15/2004 |
Request to Open Docket and Establish Distribution List RE: Order Instituting Investigation for Exploring Issues Associated with Implementation and Distribution Planning of Distributed Generation
1 page(s)
| | CEC/Dockets | CEC/Keese |
31533 | 5/18/2004 |
Reply Comments of San Diego Gas & Electric Company (U902-M) on the Proposed Decision of Commissioner Lynch
17 page(s)
| | CEC/Dockets | San Diego Gas & Electric Company/Nelson/roberts |
31531 | 5/18/2004 |
Response of the Joint Parties Interested in Distributed Generation/Distributed Energy Resources to the Questions Presented in the Order Instituting Rulemaking Regarding Distributed Generation and Distributed Energy Resources
20 page(s)
| | CEC/Dockets | Downey Brand/Luckhardt |
31522 | 5/17/2004 |
Comments of Tracy K. Saville, Regarding Policies, Procedures, and Incentives for Distributed Generation and Distributed Energy Resources and Issues Associated with Implementation and Distribution Planning of Distributed Generation.
10 page(s)
| | CEC/Dockets | Tk & Company, Inc./Saville |
31517 | 5/17/2004 |
Comments of the Pacific Southwest Combined Heat and Power Initiative regarding costs and benefits of distributed generation in the above captioned dockets.
3 page(s)
| | CEC/Dockets | Pswchpi/Tanton |
31512 | 5/17/2004 |
Cost and Benefit Methods for Deployment of Distributed Generation.
206 page(s)
| | CEC/Dockets | CEC Cec |
31503 | 5/14/2004 |
Order Instituting Investigation (order # 04-0421-13).
3 page(s)
| | CEC/Dockets | CEC Cec |
31308 | 4/26/2004 |
NOTICE OF STAFF WORKSHOP RE: Cost-Benefit Methodologies.
3 page(s)
| | CEC/Docket | CEC/Geesman/boyd |
1939-0 | 5/19/2005 |
Intergrated Energy Policy Report and Distributed Generation & Demand Respon
266 page(s)
| | | |
1896-0 | 12/24/2004 |
Informational Proceeding & Preparation of the 2004 IEP Report Update
193 page(s)
| | | |
1878-0 | 10/19/2004 |
Informational Proceeding and Preparation of the 2004 IEPR Update
37 page(s)
| | | |
1875-0 | 10/18/2004 |
Informational Proceedings & Preparation of the 2004 IEPR Update
86 page(s)
| | | |
1869-0 | 10/18/2004 |
Informational Proceedings & Preparation of the 2004 IEPR Update
32 page(s)
| | | |
1868-0 | 10/14/2004 |
Committee Hearing
103 page(s)
| | | |
1851-0 | 8/31/2004 |
Joint Committee Workshop
228 page(s)
| | | |
1832-0 | 6/23/2004 |
Joint Committee Workshop
81 page(s)
| | | |