Docket Log

Docket: 01-AFC-07
Project Title: Russell City Energy Center, 600MW, Hayward, CA.
Generated On: 4/18/2014 1:03:18 AM

TN #Docketed DateDocument TitleExhibit #ToFrom
420518/24/2007Russell City Energy Center Amendment No. 1
Russell City Energy Center Amendment No. 1
223 page(s)
 CEC / Docket UnitCEC / J. Geesman / J. Byron
388101/2/2007Letter to citizen Charlie Cameron regarding hard copy request.
Letter to citizen Charlie Cameron regarding hard copy request.
1 page(s)
 C. CameronCEC/ M. Errecart
266349/12/2002Notice of Availability of the Commission Decision for the AFC Russell City
Notice of Availability of the Commission Decision for the AFC Russell City
1 page(s)
 DocketsCEC Cec
266359/12/2002Commission Decision for Russell City - POS
Commission Decision for Russell City - POS
310 page(s)
 CEC/DocketsCEC/Keese/pernell/fay
266389/11/2002Notice of Determination for Russell City
Notice of Determination for Russell City
4 page(s)
 DocketsCEC/Caswell
266129/6/2002Biological Issues Summary POS
Biological Issues Summary POS
22 page(s)
 CEC/Bartridge/docketsDowney Brand Seymour And Rohwer/Luckhardt
265959/4/2002Errata to the Presiding Member's Proposed Decision-and-Response to Comments POS
Errata to the Presiding Member's Proposed Decision-and-Response to Comments POS
10 page(s)
 CEC/DocketsCEC/Keese/pernell
265738/30/2002Public comments
Public comments
2 page(s)
 CEC/DocketsBeckman
265678/29/2002Response to the RCEC Application for Certification
Response to the RCEC Application for Certification
2 page(s)
 CEC/Keese/docketsOhlone Aubudon Society/Delfino
265418/27/2002Comments on PMPD - Language for Conditions re: Site Monitoring for PM 10 - POS
Comments on PMPD - Language for Conditions re: Site Monitoring for PM 10 - POS
5 page(s)
 CEC/Fay/docketsCEC/Ratliff
265228/23/2002Resumes and Declarations
Resumes and Declarations
7 page(s)
 DocketsCEC/Flores/york/behymer
264928/20/2002Commission Order Denying Woman's Energy Matters Petition for Review - POS
Commission Order Denying Woman's Energy Matters Petition for Review - POS
5 page(s)
 CEC/DocketsCEC/Commissioners
264938/20/2002Notice of Commission Hearing re: Presiding Member's Proposed Decision - 9/11/02 - CEC - POS
Notice of Commission Hearing re: Presiding Member's Proposed Decision - 9/11/02 - CEC - POS
5 page(s)
 CEC/DocketsCEC/Keese/pernell
264568/16/2002Applicant's Comments on Presiding Member's Proposed Decision - POS
Applicant's Comments on Presiding Member's Proposed Decision - POS
6 page(s)
 CEC/DocketsEllsion, Schnieder $ Harris/Wheatland
264678/16/2002Comments on the Presiding Member's Proposed Decision -POS
Comments on the Presiding Member's Proposed Decision -POS
7 page(s)
 CEC/Keese/pernell/docketsCEC/Caswell
264318/12/2002Staff's Statement in Support of Committee Order - POS
Staff's Statement in Support of Committee Order - POS
6 page(s)
 CEC/DocketsCEC/Aichien
263978/7/2002Opposition to the Petition for Reconsideration by Women's Energy Matters - POS
Opposition to the Petition for Reconsideration by Women's Energy Matters - POS
7 page(s)
 CEC/DocketsEllison, Schneider And Harris/Wheatland
263407/31/2002Notice and Notice of Committee Conference for the Presiding Member's Proposed Decision POS
Notice and Notice of Committee Conference for the Presiding Member's Proposed Decision POS
6 page(s)
 All Parties/DocketsCEC/Read
264077/31/2002Presiding Member's Proposed Decision #P800-02-007
Presiding Member's Proposed Decision #P800-02-007
300 page(s)
 CEC/DocketsCEC/Keese/pernell
263397/30/2002Notice of Availability of Presiding Member's Proposed Decision and Notice of Committee Conference - POS
Notice of Availability of Presiding Member's Proposed Decision and Notice of Committee Conference - POS
5 page(s)
 CEC/DocketsCEC/Keese/pernell
264117/30/2002Recommendation of Approval-Presiding Member's Proposed Decision
Recommendation of Approval-Presiding Member's Proposed Decision
1 page(s)
 CEC/DocketsCEC/Keese/pernell
262507/23/2002Bio-10 POS
Bio-10 POS
6 page(s)
 CEC/DocketsCEC/Ichien/ratliff
262527/23/2002Committee Order Denying Petition for Consideration and Notice of Hearing for Full Commission Review POS
Committee Order Denying Petition for Consideration and Notice of Hearing for Full Commission Review POS
6 page(s)
 CEC/DocketsCEC/Keese/pernell
261827/15/2002Comments
Comments
4 page(s)
 CEC/DocketsHoward Perry Beckman/Beckman
261567/11/2002Hearing Notice and Committee Revised Scheduling Order
Hearing Notice and Committee Revised Scheduling Order
3 page(s)
 CEC/DocketsEnergy Resorces
261577/11/2002Evidentiary Hearing
Evidentiary Hearing
34 page(s)
 CEC/DocketsEnergy Resources
261587/11/2002Petition for Reconsideration of Energy Commission Committee Order by the Full Commission
Petition for Reconsideration of Energy Commission Committee Order by the Full Commission
9 page(s)
 CEC/DocketsWomen's Energy Matters/George
261777/11/2002Petition for Reconsideration of Energy Commission Committee Order by The Full Commission and Memorandum of Points and Authorities in Support of Reconsideration of Energy Commission Committee Order by the Full Commission POS
Petition for Reconsideration of Energy Commission Committee Order by The Full Commission and Memorandum of Points and Authorities in Support of Reconsideration of Energy Commission Committee Order by the Full Commission POS
14 page(s)
 CEC/DocketsWomen's Energy Matters/George
261257/10/2002Post-Hearing Brief of Russell City Energy Center - POS
Post-Hearing Brief of Russell City Energy Center - POS
244 page(s)
 CEC/DocketsEllison Schneider & Harris/Wheatland
261407/10/2002Staff Brief - POS
Staff Brief - POS
10 page(s)
 CEC/DocketsCEC/Ratliff
261097/9/2002Alternatives Energy Sources
Alternatives Energy Sources
3 page(s)
 CEC/DocketsE. Cormier
260577/1/2002Proposed Exhibit List for Russell City - POS
Proposed Exhibit List for Russell City - POS
6 page(s)
 CEC/DocketsEllison Schneider & Harris/Wheatland
260346/27/2002Letter of support
Letter of support
2 page(s)
 CEC/Keese/docketsHawyard Area Shoreline Planning Agency/Hilson
260376/27/2002Petition to Intervene-Women's Energy Matters
Petition to Intervene-Women's Energy Matters
2 page(s)
 CEC/DocketsWomen's Energy Matters/George
259916/24/2002Sign In Sheet for Evidentiary Hearing on June 20, 2002
Sign In Sheet for Evidentiary Hearing on June 20, 2002
2 page(s)
 CEC/DocketsRussell City Energy Center
259746/20/2002Statement of Intervenor Parker Ventures LLC Regarding Documents Which May Be Introduced as Evidence POS
Statement of Intervenor Parker Ventures LLC Regarding Documents Which May Be Introduced as Evidence POS
68 page(s)
 CEC/Caswell/docketsRehon And Roberts/Roberts
259606/19/2002Opposition of Intervenor Parker Ventures LLC to Applicant's Motion to Strike - POS
Opposition of Intervenor Parker Ventures LLC to Applicant's Motion to Strike - POS
5 page(s)
 CEC/DocketsRehon & Roberts/Delany
259766/19/2002Opposition of Intervenor Parker Ventures LLC to Applicant's Motion to Strike POS
Opposition of Intervenor Parker Ventures LLC to Applicant's Motion to Strike POS
5 page(s)
 CEC/DocketsRehon And Roberts
259496/18/2002Addendum to Testimony, Errata, and Comments on the Final Staff Assessment for Russell City - POS
Addendum to Testimony, Errata, and Comments on the Final Staff Assessment for Russell City - POS
36 page(s)
 CEC/Caswell/docketsCalpine/Leahy
259396/17/2002Statement of Intervenor Parker Ventures LLC Regarding Documents Which May be Introduced as Evidence POS
Statement of Intervenor Parker Ventures LLC Regarding Documents Which May be Introduced as Evidence POS
4 page(s)
 CEC/DocketsRehon And Roberts/Rehon
259076/12/2002Statement of Intervenor Parker Ventures LLC Summarizing Witness Qualification and Testimony - POS
Statement of Intervenor Parker Ventures LLC Summarizing Witness Qualification and Testimony - POS
6 page(s)
 CEC/DocketsParker Ventures Limited Liability Co./Roberts
258556/10/2002Notice of Availability Final Staff Assessment POS
Notice of Availability Final Staff Assessment POS
5 page(s)
 CEC/DocketsCEC/Richins
258566/10/2002Document Handling FSA
Document Handling FSA
1 page(s)
 CEC/Librarian/docketsCEC/Richins
258576/10/2002Final Staff Assessment Letter
Final Staff Assessment Letter
1 page(s)
 Agency Distribution ListCEC/Richins
260866/10/2002Final Staff Assessment
Final Staff Assessment
574 page(s)
 CEC/DocketsCEC Cec
258406/7/2002Testimony in Support of the Application for Certification POS
Testimony in Support of the Application for Certification POS
117 page(s)
 CEC/Caswell/docketsCalpine/Leahy
257626/3/2002Agreement Between Russell City Energy LLC and the Easy Bay Regional Park District POS
Agreement Between Russell City Energy LLC and the Easy Bay Regional Park District POS
9 page(s)
 CEC/DocketsArgonaut Consulting
256955/22/2002Notice of Evidentiary Hearings POS
Notice of Evidentiary Hearings POS
8 page(s)
 CEC/DocketsCEC/Pernell/keese
256265/15/2002Revised Project Description and Wetland Migigation Plan - POS
Revised Project Description and Wetland Migigation Plan - POS
54 page(s)
 CEC/Caswell/docketsCalpine/Leahy
255725/9/2002Follow-up on conversation re: CEC's description of the site of the proposed Russell City Energy Center
Follow-up on conversation re: CEC's description of the site of the proposed Russell City Energy Center
4 page(s)
 Gwia/Cec/docketsCostamagna
254905/6/2002Environmental Assessment of Reconductoring the East Shore to San Mateo 230 KV Transmission Line97 - POS
Environmental Assessment of Reconductoring the East Shore to San Mateo 230 KV Transmission Line97 - POS
97 page(s)
 CEC/Caswell/docketsCalpine/Leahy
254915/6/2002Amendment to Federal Aviation Administration Notice of Proposed Construction or Alteration - POS
Amendment to Federal Aviation Administration Notice of Proposed Construction or Alteration - POS
18 page(s)
 CEC/Caswell/docketsCalpine/Leahy
254935/6/2002Status Report - POS
Status Report - POS
5 page(s)
 CEC/Keese/pernell/docketsCEC/Caswell
254745/1/2002Additional information Pile Driver Noise Mitigation Predator Pech Deterrent and Monitoring Plan Visual Resources
Additional information Pile Driver Noise Mitigation Predator Pech Deterrent and Monitoring Plan Visual Resources
19 page(s)
 CEC/DocketsRussell Energy Center
254634/30/2002Additional Information: Pile Driver Noise Mitigation - Predator Perch Deterrent & Monitoring Plan - Visual Resources Mitigation
Additional Information: Pile Driver Noise Mitigation - Predator Perch Deterrent & Monitoring Plan - Visual Resources Mitigation
30 page(s)
 CEC/Caswell/docketsCalpine/Leahy
254134/26/2002Notice of Committee Scheduling Conference and Order Granting Request for Conversion to 12-month Process POS
Notice of Committee Scheduling Conference and Order Granting Request for Conversion to 12-month Process POS
6 page(s)
 CEC/DocketsCEC/Keese/pernell
253074/16/2002Additional Information POS
Additional Information POS
13 page(s)
 CEC/Caswell/docketsCalpine/Leahy
252924/15/2002Russell City Energy Center Status Report #3 and Request for Conversion to a 12-month Proceeding POS
Russell City Energy Center Status Report #3 and Request for Conversion to a 12-month Proceeding POS
11 page(s)
 CEC/DocketsEllison Schneider And Harris/Wheatland
251454/5/2002PM 10 Mitigation Plan - Amendments to the Visual Plan Measures 2 & 3 - POS
PM 10 Mitigation Plan - Amendments to the Visual Plan Measures 2 & 3 - POS
14 page(s)
 CEC/Caswell/docketsCalpine/Leahy
251133/29/2002Additional Information - Predator Perching Deterrent and Monitoring Plan - Construction Noise Mitigation - POS
Additional Information - Predator Perching Deterrent and Monitoring Plan - Construction Noise Mitigation - POS
22 page(s)
 CEC/Caswell/docketsCalpine/Leahy
251003/26/2002Status Report - #2
Status Report - #2
48 page(s)
 CEC/Keese/pernell/docketsCEC/Caswell
250173/22/2002Final Determination of Compliance - BACT and Emission Offset Requirement
Final Determination of Compliance - BACT and Emission Offset Requirement
68 page(s)
 CEC/Lewis/docketsBaaqmd/Garvey
250193/21/2002Transmission System Reliability: Interconnection of the Russell City Energy Project
Transmission System Reliability: Interconnection of the Russell City Energy Project
23 page(s)
 CEC/DocketsCalifornia Iso
250203/21/2002Transmission System Engineering
Transmission System Engineering
4 page(s)
 CEC/Cawell/docketsCalpine/Leahy
250293/21/2002RCEC Conference Call 3/20/02 - Participation Request
RCEC Conference Call 3/20/02 - Participation Request
2 page(s)
 Utility System Efficiencies/Daschmans/cec/docketsCalifornia Iso/Tobias
249983/20/2002Facilities Study Agreement and Study Fee for Russell City Energy Center Project - POS
Facilities Study Agreement and Study Fee for Russell City Energy Center Project - POS
2 page(s)
 Pg&e/Daniels/cec/docketsCalpine/Brown
249993/20/2002Facilities Study - Study Plan Final
Facilities Study - Study Plan Final
12 page(s)
 CEC/DocketsPg&e
249773/19/2002New Proof of Service
New Proof of Service
4 page(s)
 CEC/DocketsCEC/Read
249073/14/2002Transmission System Engineering - POS
Transmission System Engineering - POS
6 page(s)
 CEC/Caswell/docketsCalpine/Leahy
249623/14/2002Comments on KFAX Radio Tower Relocation Environmental Analysis Report - POS
Comments on KFAX Radio Tower Relocation Environmental Analysis Report - POS
13 page(s)
 CEC/Caswell/docketsCalpine/Leahy
249013/13/2002General Transmission Planning Issues - POS
General Transmission Planning Issues - POS
18 page(s)
 CEC/Mccuen/docketsPg&e/Daniels
246882/26/2002E-mail from Larry Tong, re: The East Bay Regional Park District (EBRPD) believes that its potential concerns relating to the impact of the relocation of the KFAX facilities will be addressed in the pending Russell City Energy Center/East Bay Regional Park District (RCEC/EBRPD) agreement to be executed by the parties.
E-mail from Larry Tong, re: The East Bay Regional Park District (EBRPD) believes that its potential concerns relating to the impact of the relocation of the KFAX facilities will be addressed in the pending Russell City Energy Center/East Bay Regional Park District (RCEC/EBRPD) agreement to be executed by the parties.
1 page(s)
 CEC/Lewis/docketsEbrpd/Tong
246352/25/2002Comments regarding the CEC Radio Tower Relocation Environmental Analysis POS
Comments regarding the CEC Radio Tower Relocation Environmental Analysis POS
5 page(s)
 CEC/DocketsCity Of Hayward/Armas
246362/19/2002Regarding Staff Assessment
Regarding Staff Assessment
5 page(s)
 CEC/Lewis/docketsPacific Gas And Electric/Daniels
245572/15/2002Sign In Sheet Biological Resources Workshop
Sign In Sheet Biological Resources Workshop
3 page(s)
 CEC/DocketsCEC Cec
244602/11/2002Letter to Douglas Davy, Foster Wheeler Environmental Corporation re: Revised Mitigation Plan POS
Letter to Douglas Davy, Foster Wheeler Environmental Corporation re: Revised Mitigation Plan POS
5 page(s)
 CEC/Lewis/docketsOhlone Aubudone Society/Delfino
244612/7/2002Request for Review of Energy Commission's Staff's Draft KFAX Radio Tower Relocation Analysis-25 page Draft included
Request for Review of Energy Commission's Staff's Draft KFAX Radio Tower Relocation Analysis-25 page Draft included
20 page(s)
 CEC/DocketsCEC/Richins
243962/5/2002Letter of support
Letter of support
1 page(s)
 CEC/DocketsHarvell
243972/5/2002Request for review of the Energy Commission Staff's Draft KFAX Radio Tower Relocation Analysis POS
Request for review of the Energy Commission Staff's Draft KFAX Radio Tower Relocation Analysis POS
5 page(s)
 CEC/DocketsCEC/Richins
243582/4/2002Request for information about the status and location of Russell City Energy Center
Request for information about the status and location of Russell City Energy Center
2 page(s)
 CEC/Lewis/docktsSan Francisco Bay Conservation & Dev. Commission/L
242951/31/2002Workshop Notice Biological Resources for 2/14/2002 POS
Workshop Notice Biological Resources for 2/14/2002 POS
7 page(s)
 CEC/DocketsCEC/Keese
243321/31/2002Revised Mitigation Plans and Additional Information POS
Revised Mitigation Plans and Additional Information POS
107 page(s)
 CEC/Lewis/docketsCalpine/Grenier
242051/24/2002Biological Resources Workshop Notice
Biological Resources Workshop Notice
4 page(s)
 CEC/DocketsRussell City
241421/23/2002Comments regarding Staff Assessment
Comments regarding Staff Assessment
15 page(s)
 CEC/Lewis/docketsCity Of Hayward/Armas
237841/4/2002Letter of Concern
Letter of Concern
2 page(s)
 CEC/Lewis/docketsDelfino
237851/2/2002Preliminary Determination of Compliance
Preliminary Determination of Compliance
4 page(s)
 Baaqmdgarvey/Cec/docketsUs Epa/Rios
237861/2/2002Certification Process
Certification Process
1 page(s)
 CEC/Fay/docketsBeckman
2369312/28/2001Letter expressing concerns about the KFAX Radio Tower relocation POS
Letter expressing concerns about the KFAX Radio Tower relocation POS
14 page(s)
 CEC/Lewis/docketsJunge
2371812/28/2001Notice of Committee Scheduling Conference - 1/14/02 - CEC
Notice of Committee Scheduling Conference - 1/14/02 - CEC
2 page(s)
 CEC/DocketsCEC/Keese/pernell
2372112/28/2001Workshop Notice - Biological Resources Workshop - 1/8/02 - CEC - POS
Workshop Notice - Biological Resources Workshop - 1/8/02 - CEC - POS
5 page(s)
 CEC/DocketsCEC/Keese
2369812/27/2001Change in Parent Company
Change in Parent Company
3 page(s)
 CEC/Keese/pernell/docketsCalpine/Thomas
2364912/21/2001Mitigation Plans - POS
Mitigation Plans - POS
83 page(s)
 CEC/Lewis/docketsCapline/Grenier
2351512/14/2001Sign-In-Sheet Public and Agency Comment Form-Charlie Cameron
Sign-In-Sheet Public and Agency Comment Form-Charlie Cameron
6 page(s)
 CEC/DocketsRussell City Energy Center
2354412/14/2001Comments on Russell City Energy Center Project's Staff Assessment
Comments on Russell City Energy Center Project's Staff Assessment
8 page(s)
 CEC/Lewis/docketsCalifornia Regional Water Quality Control Board/Bo
2340012/10/2001General Plan recognizes that the entrance into Hayward via the Hayward-San Mateo Bridge
General Plan recognizes that the entrance into Hayward via the Hayward-San Mateo Bridge
2 page(s)
 CEC/Lewis/docketsCity Of Hayward/Armas
2341012/10/2001Russell City Energy Center Workshop Notice Project Mailing List - Staff Assessment
Russell City Energy Center Workshop Notice Project Mailing List - Staff Assessment
3 page(s)
 CEC/DocketsCEC Cec
2335612/6/2001CEC Committee Hearing on Revised Scheduling Order
CEC Committee Hearing on Revised Scheduling Order
2 page(s)
 CEC/DocketsCEC Cec
2330111/30/2001endangered Species Issues Related to the Russell City Energy Center
endangered Species Issues Related to the Russell City Energy Center
2 page(s)
 CEC/Lewis/docketsUs Dept Of Interior Fish And Wildlife Service/Knig
2324111/20/2001Preliminary Determination of Compliance - Notice Inviting Written Comments
Preliminary Determination of Compliance - Notice Inviting Written Comments
78 page(s)
 CEC/Lewis/docketsBaaqmd/Garvey
2309611/16/2001Staff Assessment Workshop POS
Staff Assessment Workshop POS
7 page(s)
 CEC/DocketsCEC/Keese
2302711/9/2001Hearing Notice and Committee Revised Scheduling Order POS
Hearing Notice and Committee Revised Scheduling Order POS
7 page(s)
 DocketsCEC/Keese, Pernell
2302811/9/2001Transmission System Reliability Testimony POS
Transmission System Reliability Testimony POS
22 page(s)
 CEC/DocketsCal Iso/Hunt
2299311/6/2001Request for Agency Comments on the Staff Assessment for the Russell City Energy Project
Request for Agency Comments on the Staff Assessment for the Russell City Energy Project
1 page(s)
 Agency Distribution List/DocketsCEC/Richins
2295211/5/2001Sign-In Sheet 11/5/01 Committee Scheduling Conference
Sign-In Sheet 11/5/01 Committee Scheduling Conference
1 page(s)
 DocketsCEC/Pao
2291511/2/2001Proposed Dates for Workshops on the Staff Assessment POS
Proposed Dates for Workshops on the Staff Assessment POS
3 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Leahy
2291410/31/2001Document Handling
Document Handling
1 page(s)
 LibrarianCEC/Richins
2291610/31/2001Notice of Availability Staff Assessment
Notice of Availability Staff Assessment
3 page(s)
 DocketsCEC/Richins
2291710/30/2001Comments on East Bay Regional Park District on Staffs's Petition to Convert Proceeding POS
Comments on East Bay Regional Park District on Staffs's Petition to Convert Proceeding POS
7 page(s)
 CEC/DocketsRoger Beers/Boney
2328010/30/2001Staff Assessment
Staff Assessment
513 page(s)
 CEC/DocketsCEC Cec
2287010/29/2001Motion to Extend the Schedule Under the Provisions of Article 7 and Opposition to the Petition to Convert Proceeding POS
Motion to Extend the Schedule Under the Provisions of Article 7 and Opposition to the Petition to Convert Proceeding POS
8 page(s)
 CEC/DocketsEllison, Schnieder And Harris/Wheatland
2279810/25/2001Notice of Committee Scheduling Conference POS
Notice of Committee Scheduling Conference POS
5 page(s)
 DocketsCEC/Keese, Pernell
2272010/18/2001Petition to Convert Proceeding POS
Petition to Convert Proceeding POS
5 page(s)
 DocketsCEC/Ratliff
2275810/17/2001System Impact Study - Generation Interconnection
System Impact Study - Generation Interconnection
1500 page(s)
 DocketsRussell City Energy Center
2276310/17/2001Response to City of Hayward Data Request 13 for the Russell City Energy Center
Response to City of Hayward Data Request 13 for the Russell City Energy Center
11 page(s)
 DocketsCalpine/Bechtel Joint Development
2272110/16/2001Response to City of Hayward Data Request 13 POS
Response to City of Hayward Data Request 13 POS
13 page(s)
 CEC/Lewis/docketsRussell Energyb Center/Davy
2276010/16/2001System Impact Study - POS
System Impact Study - POS
66 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Grenier
2264410/15/2001Geologic Foundation Criteria and Seizmic Hazards Study - POS
Geologic Foundation Criteria and Seizmic Hazards Study - POS
22 page(s)
 CEC/Lewis/docketsFoster Wheeler Environmental Corp./Davy
2269410/15/2001RCEC and Mt. Diablo News
RCEC and Mt. Diablo News
3 page(s)
 CEC/Lewis/docketsAlex@ci.hayward
2264510/9/2001Cooling Tower and HRSG Exhaust Visible Plume Analysis Testimony of William Waters
Cooling Tower and HRSG Exhaust Visible Plume Analysis Testimony of William Waters
6 page(s)
 DocketsRussell City Energy Center Project
2264610/9/2001Russell City Energy Center Status Report # 2 - POS
Russell City Energy Center Status Report # 2 - POS
5 page(s)
 CEC/DocketsBechtel Enterprises Holdings, Inc./Wheatland
2257910/3/2001Appendix 10G Geologic and Foundation Design Criteria and a Seismic Hazards Study
Appendix 10G Geologic and Foundation Design Criteria and a Seismic Hazards Study
125 page(s)
 CEC/Lewis/docketsFoster Wheeler Environmental Corporation/Davy
2253210/1/2001Historical Evaluation of the Eastshore-Grant Transmission Line, Hayward, Alameda County, CA
Historical Evaluation of the Eastshore-Grant Transmission Line, Hayward, Alameda County, CA
25 page(s)
 CEC/DocketsPar Environmental Services Inc
224629/27/2001Request for Schedule Change
Request for Schedule Change
5 page(s)
 CEC/Keese, Pernell/docketsCEC/Lewis
224379/25/2001Order Granting Petition to Intervene-Ted Radosevich POS
Order Granting Petition to Intervene-Ted Radosevich POS
4 page(s)
 DocketsCEC/Keese,pernell
223989/21/2001Petition to Intervene by East Bay Regional Park District
Petition to Intervene by East Bay Regional Park District
8 page(s)
 CEC/DocketsLaw Office Of Roger Beers/Boney
224059/21/2001Resposes to City of Hayward Data Requests 25 and 53 POS
Resposes to City of Hayward Data Requests 25 and 53 POS
29 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Davy
224069/21/2001Biological Assessment
Biological Assessment
85 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Davy
224199/21/2001Petition to Intervene by East Bay Regional Park District POS
Petition to Intervene by East Bay Regional Park District POS
7 page(s)
 CEC/DocketsBeers
223279/19/2001RCEC Data Workshop Follow Up Items
RCEC Data Workshop Follow Up Items
102 page(s)
 CEC/Lewis/docketsCity Of Hayward/Ameri
223059/17/2001Revised Responses to CEC Staff Data Request 98 and Additional Information Request Visual-2 POS
Revised Responses to CEC Staff Data Request 98 and Additional Information Request Visual-2 POS
8 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Davy
222249/13/2001Duct Firing at Power Plants in California
Duct Firing at Power Plants in California
21 page(s)
 CEC/DocketsCape/Cec/lewis
223039/13/2001Status Report #1
Status Report #1
4 page(s)
 CEC/Keese, Pernell/docketsCEC/Lewis
223049/13/2001Clarification of written comments submitted by the East Bay Regional Park District at the August 20, 2001 issues workshop
Clarification of written comments submitted by the East Bay Regional Park District at the August 20, 2001 issues workshop
2 page(s)
 CEC/Lewis/docketsEast Bay Regional Park District/Tong
222529/12/2001Response to Additional CEC Staff Data Requests and Additional Information in Support of the AFC - POS
Response to Additional CEC Staff Data Requests and Additional Information in Support of the AFC - POS
89 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Davy
222009/7/2001Russell City Energy Center Status Report - POS
Russell City Energy Center Status Report - POS
6 page(s)
 CEC/DocketsBechtel Enterprises Holdings, Inc/Wheatland
222019/7/2001Applicant's Notice of Objection and Inability to Respond to Staff Additional Visual Requests 3, 4, 5 and 6 - POS
Applicant's Notice of Objection and Inability to Respond to Staff Additional Visual Requests 3, 4, 5 and 6 - POS
7 page(s)
 CEC/DocketsEllison, Schneider & Harris, Llp/Wheatland
221659/5/2001Order Granting Petition to Intervene - POS
Order Granting Petition to Intervene - POS
4 page(s)
 CEC/DocketsCEC/Keese/pernell
221308/30/2001Hayward Regional Shoreline/Calpine-Russell City Energy Center Visual Impact
Hayward Regional Shoreline/Calpine-Russell City Energy Center Visual Impact
3 page(s)
 CEC/Knight/docketsEast Bay Regional Park Dist./Tong
220238/28/2001Comments regarding the Russell City Energy Center POS
Comments regarding the Russell City Energy Center POS
5 page(s)
 Us Army Corps Of Engineers/Fong/cec/docketsUnited States Department Of The Interior/Knight
220678/28/2001Additional Information in Support POS
Additional Information in Support POS
50 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Davy
219918/24/2001Public and Agency Comment Form - Siol/Water, Visual Resource and Air Quality
Public and Agency Comment Form - Siol/Water, Visual Resource and Air Quality
1 page(s)
 CEC/DocketsEvelyn Cormier
219938/24/2001Public and Agency Comment Form - Land Use
Public and Agency Comment Form - Land Use
1 page(s)
 CEC/DocketsJanice Delfino
220178/24/2001Petition for Intervention by Adjacent Landowner Parker Ventures LLC POS
Petition for Intervention by Adjacent Landowner Parker Ventures LLC POS
3 page(s)
 CEC/DocketsRehon And Roberts/Delany
219748/23/2001Comments on the Hearing
Comments on the Hearing
3 page(s)
 CEC/DocketsAudrey Lepell
219828/23/2001Data Requests - POS
Data Requests - POS
48 page(s)
 CEC/Lewis/docketsRussell City Energy Center/Grenier
219998/22/2001Data Response & Issue Workshop Project Mailing List
Data Response & Issue Workshop Project Mailing List
7 page(s)
 CEC/DocketsRussell City
220018/22/2001Public and Agency Comment Form - Visual Resources
Public and Agency Comment Form - Visual Resources
3 page(s)
 CEC/DocketsViola Saima-barklow
220828/21/2001Public Comment Form-Field of Dreams Project
Public Comment Form-Field of Dreams Project
1 page(s)
 DocketsCEC/Mendonca/pacheco Brothers Gardening/pacheco
219538/20/2001Response to information request from CEC
Response to information request from CEC
3 page(s)
 Calpine/Bechtel Joint Development/leahy/cec/docketCalifornia Regional Water Quality Control Board/Li
228868/20/2001CEC Information Requests, Russell City Energy Center
CEC Information Requests, Russell City Energy Center
3 page(s)
 Calpine/Bechtel Joint Delevopment/leahy/cec/docketCalifornia Regional Water Control Board/Lichten
218418/14/2001Calpine/Bechtel Power Point Presentation at the August 7, 2001 Informational Hearing and Site Visit
Calpine/Bechtel Power Point Presentation at the August 7, 2001 Informational Hearing and Site Visit
22 page(s)
 CEC/Fay/docketsRussell City Energy Center/Grenier
218658/14/2001Calpine/Bechtel Responses to Staff Data Requests
Calpine/Bechtel Responses to Staff Data Requests
352 page(s)
 CEC/Lewis/docketsRussell City Energy Center
218088/10/2001Committee Scheduling Order POS
Committee Scheduling Order POS
6 page(s)
 DocketsCEC/Keese, Pernell
217798/9/2001Data Response and Issue Workshop Notice for 8/20/01 POS
Data Response and Issue Workshop Notice for 8/20/01 POS
5 page(s)
 DocketsCEC/Keese
218128/9/2001An addition to the Russell City POS
An addition to the Russell City POS
3 page(s)
 DocketsCEC/Harris
217758/8/2001Letter of Support
Letter of Support
1 page(s)
 CEC/DocketsConnie Danielson
217808/8/2001Data Requests Related to Russell City Energy Center
Data Requests Related to Russell City Energy Center
20 page(s)
 CEC/Lewis/docketsCity Of Hayward/Butler
217818/8/2001Hayward Regional Shoreline
Hayward Regional Shoreline
8 page(s)
 CEC/Keese/docketsEast Bay Regional Park District/Tong
217838/8/2001August 7, 2001 Informational Hearing and Site Visit
August 7, 2001 Informational Hearing and Site Visit
11 page(s)
 DocketsCEC/Mendonca
217858/8/2001Status Report #1
Status Report #1
1 page(s)
 CEC/Keese, Pernell/docketsCEC/Mendonca
217868/8/2001Public Comment Form- from Mr. Griebrok topic-U.S. Consticution Article III giving aid and comfort
Public Comment Form- from Mr. Griebrok topic-U.S. Consticution Article III giving aid and comfort
1 page(s)
 DocketsCEC/Mendonca
217378/3/2001Applicant's Notice of Objection and Inability to Respond to Certain CEC Staff Data Requests POS
Applicant's Notice of Objection and Inability to Respond to Certain CEC Staff Data Requests POS
5 page(s)
 CEC/DocketsEllison, Schneider, Harris/Wheatland
217388/3/2001Applicant's Proposed Schedule POS
Applicant's Proposed Schedule POS
4 page(s)
 CEC/DocketsEllison, Schneider, Harris/Wheatland
216977/31/2001Issue Identification Report POS
Issue Identification Report POS
10 page(s)
 CEC/Keese, Pernell/docketsCEC/Lewis
216237/24/2001Order Granting Petition to Intervene
Order Granting Petition to Intervene
1 page(s)
 DocketsCEC/Keese, Pernell
216287/24/2001Staff Data Requests
Staff Data Requests
31 page(s)
 Calpine/Bethel /leahy/cec/docketsCEC/Lewis
215667/19/2001Notice of Informational Hearing and Site Visit POS
Notice of Informational Hearing and Site Visit POS
8 page(s)
 DocketsCEC/Keese, Pernell
215117/18/2001Hearing Office Assignment
Hearing Office Assignment
1 page(s)
 CEC/Commissioners/docketCEC/Pernell
214927/17/2001Petition to Intervene by CURE - POS
Petition to Intervene by CURE - POS
5 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cordozo/Joseph
213587/6/2001Revised Data Adequacy Recommendation
Revised Data Adequacy Recommendation
45 page(s)
 CEC DocketsCEC/Larson
213077/5/2001Letter from Regional Water Quality Control Board
Letter from Regional Water Quality Control Board
4 page(s)
 CEC/Fromm/docketFoster Wheeler Environmental Corporation/Davy
213127/5/2001Faxed Copy from D. Davy-National Pollutant Discharge Sysrem Permitting Consideration Regarding Russell City Energy Center and Advanced Water Treatment Facility
Faxed Copy from D. Davy-National Pollutant Discharge Sysrem Permitting Consideration Regarding Russell City Energy Center and Advanced Water Treatment Facility
3 page(s)
 Public Work Utilities City Of Hayward/Ameri/cec/frCalifornia Regional Water Quality Control Board/Le
212327/2/2001Request that the Commission continue Items 2 and 3 from the June 27th, 2001 Business Meeting Agenda
Request that the Commission continue Items 2 and 3 from the June 27th, 2001 Business Meeting Agenda
1 page(s)
 CEC/Keese/docketCalpine Corporation/Leahy
212817/2/2001Letter supporting the project
Letter supporting the project
1 page(s)
 CEC DocketsSilicon Valley Manufacturing Group/Guardino
211106/26/2001CD's - Cumulative Impacts Met Data
CD's - Cumulative Impacts Met Data
4 page(s)
 DocketsRussell City Energy Center
211036/20/2001Document Handling for Russell City Energy Center Project Supplemental
Document Handling for Russell City Energy Center Project Supplemental
1 page(s)
 Librarian/DocketsCEC/Richins
211046/20/2001Request for Agency Participation in the Review of the Russell City Energy Center AFC Supplemental Information
Request for Agency Participation in the Review of the Russell City Energy Center AFC Supplemental Information
1 page(s)
 Agency Distribution List/DocketsCEC/Richins
211876/20/2001Notice of Receipt Supplemental Information
Notice of Receipt Supplemental Information
1 page(s)
 DocketCEC/Richins
209706/19/2001Russell City Energy Center Supplement Information
Russell City Energy Center Supplement Information
160 page(s)
 CEC/Larson/docketsCalpine Corp/Leahy
208776/14/2001Fax-Completion of initial review of the Application for Certification
Fax-Completion of initial review of the Application for Certification
1 page(s)
 CEC/Larson/docketBay Area Air Quality/Lee
208406/13/2001Projects wetlands and storm water issues
Projects wetlands and storm water issues
7 page(s)
 CEC/Lewis/docketsSf Bay Regional Water Quality Control Board/Lichte
208556/13/2001Incompleteness Letter
Incompleteness Letter
3 page(s)
 Baaqmd/Wocaske/docketsRtp Environmental Assoc/Darvin
209066/13/2001Fax-Incompleteness Letter for the Calpine Corporation Russell City Energy Center Application 2896, Plant 13161
Fax-Incompleteness Letter for the Calpine Corporation Russell City Energy Center Application 2896, Plant 13161
3 page(s)
 Bay Area Quality Management District/Wocasek/dockeRtp Environmental Associates Inc./Darvin
209076/13/2001Fax-Incomplete application
Fax-Incomplete application
4 page(s)
 Rtp Environmental Associates/Davin/docketBay Area Air Quality Management District/Wocasek
208116/12/2001Data Adequacy Recommendation
Data Adequacy Recommendation
94 page(s)
 CEC DocketsCEC/Larson
207796/11/2001CD-ROM version of AFC
CD-ROM version of AFC
1 page(s)
 CEC/Fromm/docketsFoster Wheeler Environmental Corp/Davy
207106/6/2001Paleontological Resources Locations, Application for Confidentiality
Paleontological Resources Locations, Application for Confidentiality
2 page(s)
 Ellison, Schneider & Harris/Wheatland/docketCEC/Larson
207186/5/2001Request for Agency Participation
Request for Agency Participation
1 page(s)
 Agency Distribution ListCEC Cec
206916/4/2001Notice of Receipt
Notice of Receipt
2 page(s)
 CEC/DocketCEC/Richins
207196/4/2001Document Handling
Document Handling
1 page(s)
 LibrarianCEC/Richins
205806/1/2001Additional Page 8.6-6
Additional Page 8.6-6
2 page(s)
 CEC/Fromm/docketsFoster Wheeler Environmental Corp/Davy
205925/31/2001Requesting that the 5/22/01 filing be removed from the confidential treatment
Requesting that the 5/22/01 filing be removed from the confidential treatment
1 page(s)
 CEC/Fromm/docketsCalpine Corp./Leahy
208345/31/2001Docketed as Confidential filing that contained information regarding emission reduction credits
Docketed as Confidential filing that contained information regarding emission reduction credits
5 page(s)
 CEC/Fromm/docketsCalpine Corp/Leahy
205065/29/2001Air Quality (5 CD-Roms)
Air Quality (5 CD-Roms)
1 page(s)
 CEC/Fromm/docketCalpine Corp./Grenier
205195/29/2001Application for Authority to Construct Submitted to the Bay Area Quality Management District
Application for Authority to Construct Submitted to the Bay Area Quality Management District
150 page(s)
 CEC/FrommCalpine Corporation/Grenier
203735/22/2001Application for Certification
Application for Certification
1500 page(s)
 CEC/Larson/docketCalpine Corp./Hildebrand
203745/22/2001Application for Confidential Designation
Application for Confidential Designation
7 page(s)
 CEC/LarsonEllison, Schneider & Harris/Wheatland