217218/3/2001 Commission Order Approving Project Modifications

3 page(s)
 DocketsCEC/Pernell
216947/31/2001 Commission Order Approving Project Modification

3 page(s)
 DocketsCEC/Pernell
216777/30/2001 Notice of Exemption-Approval of Project Change: Conversion to Anhydrous Ammonia

1 page(s)
 Office Of Planning And Research/DocketsCEC/Tronaas
216367/25/2001 Following requirements relates to Calpine's request to convert from aqueous to anhydrous ammonia storage and use at the Pastoria facility

1 page(s)
 CEC/DocketsKern County Fire Department/Clark
215937/23/2001 Approval of Verification Changes: BIO 10 and BIO-12

1 page(s)
 Pastoria Energy Facility/Salzmann/docketsCEC/Tronaas
215127/18/2001 Staff Analysis of Proposed Project Modification: Conversion from Aqueous to Anhydrous Ammonia

5 page(s)
 Interested Parties/DocketCEC/Tronaas
212036/29/2001 Ammonia Conversion License Amendment

83 page(s)
 CEC/Tronaas/docketUrs/Scholl
210436/12/2001 General Arrangement Changes License Amendment

150 page(s)
 CEC/Tronaas/docketUrs/Scholl
205145/29/2001 Approval of Modification to the Requirement of High Desert Power Project Condition of Certification HA-5 from a Non-Enclosed Double Walled Ammonia Tank to a Single Walled Enclosed Ammonia Tank POS

5 page(s)
 Constellation Power Source Generation Inc./Pearce/CEC/Therkelsen
205135/29/2001 Notice of Receipt Pastoria Energy Facility Request for Ownership Change

2 page(s)
 DocketCEC/Therkelsen
203985/23/2001 Pastoria Energy Facility Petition for Transfer of Ownership Under CCR 1769(b) POS

5 page(s)
 DocketPastoria Energy Facility/Thompson
184674/25/2000 Status Report No. 1 (Attachment: Proof of ServiceList)

6 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
181151/29/2001 Confirmation That no Requests for Reconsideration Were Filed During the 30-Day Reconsideration Period - POS

4 page(s)
 CEC/DocketsCEC/Gefter
180521/26/2001 Notice of Determination

2 page(s)
 Planning & ResearchCEC/Lewis
179081/12/2001 Public Adviser's Status Reports 2000

41 page(s)
 CEC/DocketCEC/Pao
176681/2/2001 Response to 12/99 application to the US Environmental Protection Agency for an Approval to Construct pursuant to the Prevention of Significant Deterioration air quality regulations

25 page(s)
 Enron North American Corp./WehnUs Environmental Protection Agency/Rios
1754312/21/2000 Notice of Availability of the Commission Decision - Publication # P800-00-014

1 page(s)
 CEC/DocketsCEC Cec
1752712/21/2000 Commission Adoption Order

3 page(s)
 CEC/DocketsCEC Cec Commissioners
1752212/20/2000 Letter concered about the location and the planning process

1 page(s)
 CEC/DocketsKern Audubon Society/Griffin
1751012/18/2000 Supplemental Comments on the Presiding Member's Proposed Decision - POS

2 page(s)
 CEC/DocketsUrs/Scholl
1745012/21/2000 Commission Decision

391 page(s)
 CEC/DocketCEC/Keese/laurie/moore/pernell/rosenfeld
1742612/19/2000 Letter from the Pastoria Energy Facility, LLC RE: Supplemental Comments on the PMPD (Attachment: Proof of Service)

6 page(s)
 CEC/DocketUrs/Scholl
1741712/18/2000 Comments RE: Pastoria Commission Hearing

2 page(s)
 CEC/DocketKern Audobon Society/Griffin
1741212/19/2000 Errata to the Presiding Members Proposed Decision (Attachment: Proof of Service)

8 page(s)
 CEC/DocketCEC/Laurie/moore
1740712/18/2000 Supplemental Comments on the PMPD

3 page(s)
 CEC/GefterPastoria Energy Facility/Scholl
1736212/15/2000 Letter from Arvin High School (Dated Dec. 11, 2000) (Attachment: Proof of Service)

5 page(s)
 CEC/DocketUrs/Scholl
1736112/15/2000 Pastoria LLC Comments on the Presiding Member's Proposed Decision (Attachment: Proof of Service)

8 page(s)
 CEC/DocketUrs/Scholl
1729612/12/2000 Staff Comments on the Draft PMPD of Nov. 17, 2000

12 page(s)
 CEC/Laurie/mooreCEC/Lewis
1710411/29/2000 NOTICE of Commission Hearing Regarding: Presiding Member's Proposed Decision - POS - 12/20/00 - CEC

5 page(s)
 CEC/DocketsCEC/Laurie/moore
1683211/17/2000 Notice of Availability of Presiding Member's Proposed Decision and Notice of Committee Conference

5 page(s)
 CEC/DocketsCEC/Laurie/moore
1683011/16/2000 Presiding Member's Proposed Decision (Publication No. P800-00-009) November 2000

305 page(s)
 CEC/DocketCEC/Laurie/moore
1660211/8/2000 Southern California Edison Company Facilities Study - POS

74 page(s)
 CEC/DocketsThompson
1653211/1/2000 Pastoria Exhibits #60, 61, 62 (Attachment: Proof of Service)

4 page(s)
 CEC/MendoncaMary Griffen
1649310/30/2000 Applicant's Request to Reopen Record for New Exhibits Including Designation of Previously-Filed Documents (Attachment: Proof of Service)

8 page(s)
 CEC/DocketPastoria Energy Facility/Tholistmpson
1603710/5/2000 Exhibit 59 - Kern Co. Approval of the Request for Cancellation of the WIlliamson Act; New Proposed Condition -Visual Section (VIS-8); Suggested Rivisions - Proposed Condition of Certification TSE-1; Suggested Addition - Proposed Condition of Certification BIO-13; Suggested Textual Changes - Cultural Resources Language (Attached: Service List)

49 page(s)
 CEC/DocketPastoria/Thompson
160369/29/2000 Responding Brief - (RE: Transcript for Monday, Sept. 18th Unless Otherwise Noted) (Attachment: Proof of Service)

5 page(s)
 CEC/DocketKern Audubon Society/Griffin
1603510/5/2000 Clarification of Biology-Related Issues (Attachment: 3 Location Maps)

10 page(s)
 Us Epa/SchultzUrs/Knowlton/scholl
159829/29/2000 Responding Brief

5 page(s)
 CEC/Siting CommitteeArthur D. Unger
158689/21/2000 Sign-in Sheet RE: Evidentiary Hearing (Sept. 19, 2000)

4 page(s)
 CEC/DocketCEC/Staff
158419/25/2000 Reponse to 7/14/2000 request for agency comments on the Preliminary Staff Assessment

3 page(s)
 CEC/TherkelsenDepartment Of The Army/Roukey
158409/25/2000 Native American Heritage Issues

1 page(s)
 DominguezUrs/Scholl
158389/25/2000 Notice o Approval of (a) Tentative Parcel Map # 10694; (b) Zone Variance CaseNo.1, Map # 218R

33 page(s)
 Enron North America CorpResource Management Agency/Ellis
157659/12/2000 STAFF REPORT: Cancellation of Land Use Restrictions, Land Conservation Act, Agricultural Preserve No. 19 (Zoning Map No. 218R)

16 page(s)
 CEC/DocketKern County Planning Department/Planning Commissio
157479/13/2000 Request for Water Quality Certification, Access Road and Fuel Gas Supplyline

1 page(s)
 Urs/KnowltonCalifornia Regional Water Quality Control Board/Pa
157329/13/2000 Craft Labor Support for the Pastoria Energy Facility

1 page(s)
 CEC/LewisBuilding Trades Council/Zimmermna
157319/13/2000 Additional Biology - Related Mitigation Measures for the Pastoria Energy Facility

2 page(s)
 San Joaquin Valley Branch Chief/CrossUrs/Knowlton/scholl
157309/7/2000 Transmission System Reliability: Connection of the Pastoria Power Project (Attachment: Declaration of Catalin M. Micsa (CA ISO); Proof of Service)

17 page(s)
 CEC/DocketCalifornia Iso/Micsa
157299/14/2000 Transmission System Reliability: Connection of the Pastoria Power Plant

14 page(s)
 CEC/DocketsCalifornia Iso/Micsa
157289/13/2000 Disputed Topic Areas

7 page(s)
 CEC/Commissioners/applicant And StaffSierra Club/Unger
157249/8/2000 Response to Request for a Department of the Army Authorization to Construct an Access Road and Fuel Gas Supply Line Associated with the Pastoria Energy Facility Project.

2 page(s)
 Pastoria Energy Facility, Llc/WehnDepartment Of The Army/Roukey
157239/13/2000 Ammonia Emmission Inventory Development: Needs, Limitations, and What is Available Now (Dated October 22, 1999)

12 page(s)
 CEC/DocketCa Air Resources Board/Gaffney/shimp
156999/11/2000 Final Staff Assessment

6 page(s)
 CEC/LaurieAir Pollution Control District/Allen
156919/8/2000 Supplemental Testimony - POS

25 page(s)
 CEC/Laurie/mooreCEC/Lewis
156849/8/2000 1. Applicant Testimony & Exhibits 2. Exhibit List 3. Testimonies & Resumes POS

109 page(s)
 CEC/DocketsThompson
156579/5/2000 Biological Assessment Materials - POS

250 page(s)
 CEC/DocketsThompson
156569/5/2000 Biological Assessment Materials - POS

250 page(s)
 CEC/DocketsThompson
156559/5/2000 Final Determination of Compliance - POS

108 page(s)
 CEC/DocketsThompson
156379/1/2000 Letter requesting information regarding the topics of land use, water resources, biological resources, socioeconomics, and worker safety/fire protection - POS

4 page(s)
 Kern County Planning Dept.CEC/Laurie
156148/23/2000 Letter of support

1 page(s)
 State Assembly/FlorezKern County Farm Bureau, Inc./Carter
156138/31/2000 Notice of Evidentiary Hearing and Hearing Order - POS

11 page(s)
 CEC/DocketsCEC/Laurie/moore
155328/23/2000 Energy Commission Staff's Prehearing Conference Statement - POS

6 page(s)
 CEC/DocketsCEC/Munstock
155258/18/2000 PSA Comments

4 page(s)
 CEC/RossMary Griffin
155078/23/2000 Prehearing Conference Statement - -POS

88 page(s)
 CEC/DocketsThompson
154818/18/2000 Encroachment Permit Applications

3 page(s)
 CEC/ForeDept. Of Water Resource/Chin
154808/18/2000 Comments/Review of the PSA

2 page(s)
 CEC/LewisKern Co./Planning Dept./rickels
154798/18/2000 Review/Comments RE: Preliminary Staff Assessment

2 page(s)
 Kern Co./Land Div. Program/hardyKern Co./Solid Waste Program/o'rullian
154748/17/2000 Comments and Recommendations RE: Preliminary Staff Assessment

4 page(s)
 CEC/LewisDept. Of Water Resources/Ramirez
154688/16/2000 ORDER Granting Petition to Intervene and Financial Hardship Petition (Kern Kaweah Chapter of Sierra Club) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Laurie
154658/16/2000 ORDER Granting Petition to Intervene and Financial Hardship Petition (Kern Audobon Society) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Laurie
154648/18/2000 Comments: RE: Environmental Consultation for Pastoria Facility

1 page(s)
 Kern Co./JamesKern Co./Environmental Health Services Dept./mccal
154098/14/2000 Petition for Intervention and Financial Hardship Petition (Attachment: Proof of Service)

4 page(s)
 CEC/DocketSierra Club-kern Kaweah Chapter/Unger
154088/14/2000 COmments of the SIerra Club - Kern Kaweah Chapter

4 page(s)
 CEC/CommissionersSierra Club Kern-kaweah Chapter/Unger
154078/14/2000 Petition for Intervention and Financial Hardship Petition (Attachment: Proof of Service)

7 page(s)
 CEC/DocketKern Audobon Society/Griffin
153408/7/2000 Comments on the District's Preliminary Determination of Compliance by San Joaquin Valley APCD (Attachment: Proof of Service)

127 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
153398/7/2000 Applicant Status Report #4 (Attachment: Proof of Service)

5 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
153388/7/2000 Sign-in Sheet RE: PSA Workshop (Auguust 3, 2000)

2 page(s)
 CEC/DocketCEC/Staff
153378/1/2000 NOTICE of Committee Status Conference (August 16, 2000) -and- Prehearing Conference (August 28, 2000) (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCEC/Laurie/moore
153368/2/2000 Water Plan Agreement

1 page(s)
 CEC/WhiteKern Co. Water Agency/Clark
152817/24/2000 Cancellation of Williamson Act Contract; Tentative Parcel Map No. 10694

1 page(s)
 CEC/LewisResource Mgmt. Agency/James
152807/24/2000 Information RE: State Water project for Kern County.

2 page(s)
 CEC/DocketKern Co. Water Agency/Clark
152648/2/2000 Status Report #4 - August 1, 2000 (Attachment: Proof of Service)

9 page(s)
 CEC/Laurie/mooreCEC/Lewis
152527/14/2000 Preliminary Staff Assessment (Attachment: Proof of Service)

592 page(s)
 CEC/DocketCEC/Staff
152517/14/2000 Applicant Responses to Unresolved Issues. (Attachment: Proof of Service)

14 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
152507/17/2000 Project Schedule

8 page(s)
 CEC/TherkelsenPastoria Energy Facility Llc/Wehn
152057/24/2000 Workshop Notice - August 3, 2000 - Bakersfield Service Center - Map - POS

5 page(s)
 CEC/DocketsCEC/Laurie
151214/25/2000 Applicant Status Report #1 (Attachment: Proof of Service)

3 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
151097/14/2000 1. Monterey Ageement 2. Memorandum of Understanding Regarding Operation and Monitoring of the Kern Water Bank Groundwater Banking Program 3. Resolution Making Findings and Adopting Mitigatin Measures Pursuant to the California Environmental Quality Act - Implementation of Kern Water Bank - POS

246 page(s)
 CEC/DocketsThompson
150927/18/2000 Pastoria Energy Facility Schedule

1 page(s)
 CEC/Laurie/mooreAlan Thompson
150907/14/2000 Transmittal Letter for the Preliminary Staff Assessment

1 page(s)
 Library Distribution ListCEC/Therkelsen
150897/14/2000 Request for Agency Comments on the Preliminary Staff Assessment

1 page(s)
 Agency Distribution ListCEC/Therkelsen
150887/14/2000 Request for Comments on the Preliminary Staff Assessment

1 page(s)
 Proof Of Service Distribution ListCEC/Therkelsen
150877/14/2000 NOTICE of Availability - Preliminary Staff Assessment (Attachment: Order Form)

2 page(s)
 CEC/DocketCEC/Therkelsen
150867/10/2000 Draft Habitat Conservation Plan (HCP)

95 page(s)
 U.s. Fish And Wildlife Service/CrossUrs/Scholl
149726/30/2000 Pastoria Scheduled Status Report #4 by the Public Advisor's Office - POS

6 page(s)
 CEC/DocketsCEC/Yepez
149576/22/2000 Review of Preliminary Determination of Compliance

4 page(s)
 San Joaquin Valley Unified Apcd/SadredinArb/Menebroker
149566/22/2000 Comments RE: Preliminary Determination of Compliance

7 page(s)
 San Joaquin Valley Unified Apcd/SadredinUs Epa/Haber
148756/19/2000 1. Agreement with Rosedale/Rop Bravo Water District - Backup supply & exchange. 2. Resolution from Kern County Water Agency - "Initial Study and Proposed Negative Declaration for Pioneer Groundwater Recharge & Recovery Project. 3. Initial Study the Pioneer Groundwater Recharge & Recovery Project. 4. Initial Study & Proposed Negative Declaration

67 page(s)
 CEC/DocketsThompson
148466/14/2000 Response to CEC Data Requests Dated May 31, 2000 (Attachment: Proof of Service)

17 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
148456/13/2000 Applicant Status Report #3 (Attachment: Proof of Service)

5 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
148446/12/2000 Water Supply Plan Supplement (Attachment: Proof of Service)

17 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
147926/9/2000 Status Report #3 - POS

5 page(s)
 CEC/Laurie/mooreCEC/Lewis
147836/7/2000 ORDER Granting Petition to Intervene - POS

4 page(s)
 CEC/DocketsCEC/Laurie
147826/7/2000 ORDER Granting Limited Purpose Intervention - POS

5 page(s)
 CEC/DocketsCEC/Laurie
147666/7/2000 Comments to Pastoria Energy Facility PDOC (Attachment: Proof of Service; Letter to San Joaquin Valley APCD/Sadredin dated June 7, 2000)

8 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
147466/2/2000 Water Supply Plan

5 page(s)
 Enron No. America Corp./ChengWheeler Ridge-maricopa Water Storage Dist./Taube
147406/5/2000 Notice of Workshop on Water Supply Plans for Pastoria - June 13, 2000 - Bakersfield - Map - POS

5 page(s)
 CEC/DocketsCEC/Laurie
147275/31/2000 Confidential Designation: Final Results - Cultural Resources Testing

1 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
147016/1/2000 Petition to Intervene by CURE Reliable Energy - POS

7 page(s)
 CEC/DocketsCure/Joseph
146915/31/2000 Second Set of Data Requests

7 page(s)
 Urs Greiner Woodward Clyde/SchollCEC/Lewis
146335/26/2000 Energy Commission Order - Order # 00-0523-03

5 page(s)
 CEC/DocketsCEC/Keese
146185/16/2000 Status Report #2 - May 15, 2000

2 page(s)
 CEC/Laurie/mooreCEC/Lewin
146175/16/2000 Electronic Air Quality Data Related to Responses to California Energy Commission Data Requests (Attachment: Compact Disk - Air Modeling Files)

2 page(s)
 CEC/LewisUrs Corp./School
146055/24/2000 Petition for Intervention as an Individual or Agency - POS

5 page(s)
 CEC/DocketsAir Pollution Control District/Allen
145275/16/2000 Pastoria Energy Facility Water Supply Plan - POS

10 page(s)
 CEC/DocketThompson
145215/16/2000 Preliminary Determination of Compliance (Atachment: Proof of Service)

120 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
145185/15/2000 1. ERC's pruchased from AERA Energy and Occidental of Elk Hills/Chevron 2. A memorandum of Option for the project site 3. Amendment 1 to the Pastoria Energy Facility-Southern California Edison Transmission Owner Tariff Facilities Study Agreement

22 page(s)
 CEC/DocketsThompson
145175/15/2000 Applicant Status Report #2 - POS

8 page(s)
 CEC/DocketsThompson
145165/15/2000 Applicant's Responses to CEC Staff Data Requests 27, 38, 39, 40, 41, and 42 - POS

62 page(s)
 CEC/DocketsThompson
143905/4/2000 ORDER GrantingLimited Purpose Intervention - POS

4 page(s)
 CEC/DocketsCEC/Laurie
143895/4/2000 Status Report # 1 - POS

4 page(s)
 CEC/Laurie/mooreCEC/Lewis
143484/25/2000 Applicant Opposition to Petition to Intervene by Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)

6 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
143354/28/2000 Application for Confidential Designation - Cultural Resoources Testing Plan

1 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
143294/28/2000 Response to Applicant Opposition to Petition to Intervene and Clarification of the Extent of Such Opposition (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
142404/17/2000 Sunrise Cogeneration and Power Company's Petition to intervene in the Pastoria Energy Facility Application for Certification Proceeding (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
142384/17/2000 Review/Comments RE: Traffis information Prepared for the Pastoria Energy Facility

1 page(s)
 CEC/ForeDept. Of Transportation/Sorensen
142054/20/2000 Responses to CEC Data Requests Modified REsponse to Data Request Soil & Water-6 - POS

5 page(s)
 CEC/DocketThompson
141604/10/2000 Committee Scheduling Order - POS

6 page(s)
 CEC/DocketCEC/Laurie/moore
141554/7/2000 Applicant's Data Request Responses - POS

23 page(s)
 CEC/DocketThompson
141274/4/2000 Letter from the US Environmental Protection Agency Region IX Letter from the US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS

7 page(s)
 CEC/DocketCEC/Johnson
140844/3/2000 Applicant's Working Draft Habitat Conservation Plan

109 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
140834/3/2000 Applicant's Data Request Responses (Attachment: Proof of Service)

188 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
140824/3/2000 Cultural Resources Map J1.0-2 Modified to Depict Archaeological Site Locations, Proposed Flood Retention Berms and Proposed Bridge.

1 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
140723/31/2000 Joint Applicant - CEC Staff Proposed Schedule for Pastoria Energy Facility (CEC/Kae Lewis and Pastoria Energy Facility LLC/Allan Thompson) (Attachment: Proposed Schedule)

2 page(s)
 CEC/Laurie/mooreCEC/Lewis
140703/31/2000 Sign-in Sheet: Project Schedule Workshop (March 29, 2000)

2 page(s)
 CEC/DocketCEC/Staff
140453/30/2000 Submittal of Confidential Document - Cultural Resources Test Plan.

1 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
139853/20/2000 Response to Staff Data Requests (Attachment: Service List)

5 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
139643/16/2000 Sign-in Sheet RE: Data Request Workshop - March 14, 2000

2 page(s)
 CEC/DocketCEC/Staff
139633/16/2000 Sign-in Sheet RE: Data Request Workshop - March 15, 2000

2 page(s)
 CEC/DocketCEC/Staff
139603/17/2000 Workshop Notice on Project Schedule - March 29, 2000 (Attachment: Proof of Service)

1 page(s)
 CEC/DocketCEC/Laurie
139533/17/2000 Document Handling - Supplemental Material

1 page(s)
 LibrarianCEC/Therkelsen
139523/17/2000 Transmittal Letter - Supplemental Material

1 page(s)
 Agency Distribution ListCEC/Therkelsen
139323/17/2000 Sign-in Sheet: Workshop on Habitatat Conservation Plans (March 16, 2000)

2 page(s)
 CEC/DocketCEC/Staff
139053/14/2000 Recommended Mitigation Measures and Draft Compliance Plans/Outlines (Attachment: Proof of Service)

1 page(s)
 CEC/LewisSan Joaquin Valley Apcd/O'bannon
139023/14/2000 Sign-in Sheet: Informational Hearing (March 13, 2000)

3 page(s)
 CEC/DocketCEC/Staff
138883/13/2000 Response to Data Requests - Maps

211 page(s)
 CEC/DocketUrs Greiner Woodward Clyde/Scholl
138633/9/2000 Applicant Comments on Proposed Schedule. (Attachment: Proof of Service)

9 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
138613/9/2000 Applicant Comments on Staff Proposed Schedule (Attachment: Proof of Service)

9 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
138163/6/2000 Notice of Workshop on Habitat Conservation Plans Pastoria Energy Facility Project (March 16, 22000) (Attacment: Location Map; Proof of Service)

2 page(s)
 CEC/DocketCEC/Laurie
138123/7/2000 Errata Sheets for Section 5.2, Air Quality for the Pastoria Energy Facility (Attachment: Proof of Service; Cover Letter)

18 page(s)
 CEC/RhoadsPastoria Energy Facility Llc/Parquet
138113/7/2000 Concerns RE: the effects of the prospective construction and inconnection of the Pastoria Energy Facility to Southern California Edison's Pastoria Substation.

2 page(s)
 CEC/DocketDept. Of Water Resources/Ramirez
138033/6/2000 Recommended Mitigation Measures and Draft Compliance Plans/Outlines (Attachment: Proof of Service)

203 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
138013/3/2000 Staff Data Request Workshop Notice (Attachment: Proof of Service)

2 page(s)
 CEC/DocketCEC/Laurie
138003/3/2000 Pastoria Energy Facility - First Set of Data Requests

19 page(s)
 Urs Grenier Woodward Clyde/SchollCEC/Lewis
137993/3/2000 Pastoria Energy Facility Issue Identification Report

8 page(s)
 CEC/Laurie/mooreCEC/Lewis
137673/1/2000 Project Description Clarification for the Pastoria Energy Facility. (Attachments: Location Maps; Proof of Service)

5 page(s)
 CEC/DocketUrs Greiner/Scholl
137062/23/2000 Letter to Robert Therkelsen (CEC) dated February 21, 2000, R: Air Offsets and Transmission Studies for the Pastoria Energy Facility, and a Memorandum of Agreement between Chevron USA Inc. and Pastoria Energy Facility, LLC. (Attachment: Proof of Service)

2 page(s)
 CEC/TherkelsenPastoria Energy Facility Llc/Wehn
136952/24/2000 Comments RE: Request for Participation in the Review of the Pastoria Energy Facility Application for Certificaiton, Kern County. (Attachment: Map)

3 page(s)
 CEC/RichinsDept. Of Conservation/Marshall
136912/24/2000 Pastoria Energy Facility LLC-Southern California Edison Company Transmission Owner Tariff Facilities Study Agreement (Attachment: Proof of Service)

7 page(s)
 CEC/DocketPastoria Energy Cacility/Thompson
136012/11/2000 NOTICE to Landowners of Informational Hearing (Attachment: Map)

5 page(s)
 CEC/DocketCEC/Laurie/moore
135722/9/2000 Letter requesting clarificaiton on how they intend to address the need for enhancements to the existing transmission system - Proof of Service

4 page(s)
 Pastoria/WehnCEC/Therkelsen
135692/10/2000 Notice of Informational Hearing and Site Visit - Lebec, CA - Map - Proof of Service

8 page(s)
 CEC/DocketCEC/Laurie/moore
135652/10/2000 Phase 1 Environmental Assessment for the Pastoria Power Project.

2 page(s)
 CEC/RingerDept. Of Toxic Substances Control/Moskat
135302/8/2000 NOTICE of Site Visit and Workshop - (February 17, 2000 ( Site Visit -Lebec, CA) and February 18, 2000 (Workshop at California Energy Commission- Sacramento, CA) (Attachments: Maps (2) to Meeting Locations)

3 page(s)
 CEC/DocketCEC/Laurie
135142/4/2000 SUPPLEMENTAL INFORMATION

1 page(s)
 LibrarianCEC/Therkelsen
135132/4/2000 SUPPLEMENTAL FILING - Clarification in Technical Project Areas

1 page(s)
 Agency Distribution ListCEC/Therkelsen
134811/5/2000 Request for Designation of Confidential Records.

1 page(s)
 CEC/DocketPastoria Energy Facility Llc/Wehn
134011/27/2000 Hearing Officer Assignment to assist Committee in conducting proceedings

1 page(s)
 All CommissionersCEC/Chairman Keese
133231/20/2000 Revised Data Adequacy Recommendation.

53 page(s)
 CEC/Keese/rohy/pernell/moore/laurieCEC/Smith
1328811/30/1999 Environmental Site Assessment US Generating Company Otay Power Plant Site Alta Road, San Diego County, California (June 19, 1997)

50 page(s)
 CEC/RichinsUrs Greiner Woodward Clyde/Ray
1327611/30/1999 Property Owner Information - (Electronic format)

24 page(s)
 CEC/RichinsUrs Greiner Woodward Clyde/Ray
1327311/30/1999 Air Quality and Health Risk Assessment Modeling Files. (Attachments: Electronic Copies on CD-ROM)

16 page(s)
 CEC/RichinsUrs Greiner Woodward Clyde/Ray
132111/7/2000 Correspondence from San Joaquin Valley APCD Dated January 5,2000 to Joan Heredia (URS Greiner Woodward Clyde) Regarding Modeling Protocol.

2 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
132041/7/2000 Request to Loan the Pastoria Energy Facility AFC.

1 page(s)
 Wzi, Inc/BlalockCEC/Richins
132021/5/2000 Request for Designation of Confidential Records.

1 page(s)
 CEC/DocketPastoria Energy Facility Llc/Wehn
131991/5/2000 Review and Cmments of the Pastoria Energy Facility Application.

3 page(s)
 CEC/RichinsDept. Of Conservation/Marshall
131831/7/2000 Comments RE: The Electrical Transmission System Impact Study.

2 page(s)
 CEC/RichinsDept. Of Water Resources/Ramirez
131781/6/2000 Correspondence from San Joaquin Valley APCD Dated January 5, 2000 to Joan Heredia (URS Greiner Woodward Clyde) Regarding Modeling Protocol. (Attachment: Fax Cover Sheet)

3 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
131551/7/2000 Appendix L - Preliminary Geotechnical Investigation Report Dated January 5, 2000.

86 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
131541/7/2000 Correspondence Dated January 7, 2000 from the San Joaquin Valley APCD to Samuel Wehn Regarding Notice of Complete Application.

3 page(s)
 CEC/DocketPastoria Energy Facility/Thompson
131081/5/2000 RESPONSE to CEC Data Adequacy Comments Dated December 29, 1999)

268 page(s)
 CEC/DocketPastoria Energy Facility, Llc/Parquet
1310112/29/1999 Data Adequacy Recommendation.

73 page(s)
 CEC/Keese/rohy/pernell/moore/laurieCEC/Smith
1309212/31/1999 System Impact Study (December 22, 1999)

283 page(s)
 CEC/DocketSouthern California Edison/Vartanian/mayfield
1308412/31/1999 System Impact Study

447 page(s)
 CEC/DocketThompson
1307312/31/1999 Substation Single Line Diagram

2 page(s)
 CEC/DocketThompson
1306212/27/1999 Regional Haze Analysis

6 page(s)
 Us Epa/HaberUrs Greiner Woodward Clyde/Hoffman
1302912/21/1999 Cultural Resources Technical Report, Application for Confidentiality.

2 page(s)
 Urs Grenier Woodward Clyde/RayCEC/Smith
1299412/16/1999 Transmittal of Phase I Environmental Site Assessment Prepared for the Pastoria Energy Facility Application for Certification.

220 page(s)
 CEC/RichinsUrs Greiner Woodward Clyde/Scholl
1293612/16/1999 Notice of Incomplete Application (S-3636) - Project # 991233

2 page(s)
 Pastoria Energy/WehnSan Jose Valley Apcd/Goff
1293212/16/1999 Paleontologicial Resources Technical Report

2 page(s)
 Pastoria/RayCEC/Smith
1287712/13/1999 Application of Determination of Compliance.

225 page(s)
 San Joaquin Valley Unified Apcd/GoffUrs Greiner Woodward Clyde/Heredia
1287612/13/1999 Prevention of Significant Deterioration (PSD) Application for the Proposed Pastoria Energy Facility Project. (December 1999)

450 page(s)
 Us Epa/HaberUrs Greiner Woodward Clyde/Heredia
1284612/3/1999 NOTICE of Receipt - Application for Certification - Pastoria Energy Facility (Attachment: Proof of Service)

2 page(s)
 CEC/DocketCEC/Therkelsen
1282912/3/1999 Document Handling for the Pastoria Energy Facility (Attachment: Letter to Members of the Public RE: Public Participation on the Review of Pastoria Energy Facility)

2 page(s)
 LibrarianCEC/Therkelsen
1281812/3/1999 Request for Agency Participation

2 page(s)
 Agency Distribution ListCEC/Therkelsen
1280111/30/1999 Transmittal of Items Related: Property Owner Information; Confidential Cultural Resources Technical Report; Confidential Paleontological Resources Technical Report; Air Quality and Health Risk Assessment Modeling Files.

2 page(s)
 CEC/RichensUrs Greiner Woodward Clyde/Ray
1280011/30/1999 Application for Confidential Designation RE: Paleontological Site Descriptions

2 page(s)
 CEC/DocketUsr Greiner Woodward Clyde/Ray
1279612/1/1999 Application for Confidential Designation - RE: Cultural Resources Site Descriptions.

2 page(s)
 CEC/DocketUrs Greiner Woodward Clyde/Ray
1277611/30/1999 Pastoria Energy Facility, LLC hereby submits this Applicaition for Certification. This Application seeks authority to construct and operate a nominal 750 MW natural gas-fired electric generating power plant to be located on Tejon Ranch near the Edmonston Pumping Station. (November 30, 1999) (Volumes I and II)

4000 page(s)
 CEC/RhoadsPastoria Energy Facility, Llc/Piper
1429-012/20/2000 Committee Conference

11 page(s)
  CEC
1388-09/25/2000 Hearing

232 page(s)
  CEC
1387-09/25/2000 Hearing

220 page(s)
  CEC
1380-09/6/2000 Prehearing Conference

102 page(s)
  CEC
1376-08/25/2000 Status Conference

80 page(s)
  CEC
1337-03/20/2000 Informational Hearing and Site Visit

89 page(s)