31936 | 10/27/1999 |
In the Matter of The AFC for Sunrise Cogeneration and Power Project
1 page(s)
| | CEC/Dockets | Adams Broadwell/Joseph & Gardozo |
30947 | 11/17/2000 |
Change of Ownership of Sunrise Power Company
3 page(s)
| | CEC/Pryor/dockets | Business Development America/Loughman |
30944 | 10/27/2000 |
Final Staff Assessment - POS
182 page(s)
| | CEC/Dockets | CEC Cec |
30941 | 9/20/2000 |
Request for Agency Participation in the Review of an Amendment to the AFC
3 page(s)
| | Agency Distribution List/Dockets | CEC/Therkelsen |
30940 | 5/10/2000 |
Presiding Members's Proposed Decision - POS
376 page(s)
| | CEC/Dockets | CEC/Moore/pernell |
30939 | 4/13/2000 |
Staff Recommendation Related to the Determination of Compliance and DTSC Review of Water Treatment Facility Data - POS
6 page(s)
| | CEC/Moore/pernell/dockets | CEC/Pryor |
30934 | 2/3/2000 |
CURE's Group B Opening Brief - POS
22 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Poole |
30930 | 1/12/2000 |
Letter with CEC's FSA enclosed
2 page(s)
| | Member Of The Assembly/Florez | CEC/Smith |
30900 | 11/22/1999 |
Poole Letter to Goff/Gruber (11/19/99) re; Sunrise PDOC - POS
5 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cordozo/Heeley |
30898 | 9/20/1999 |
Interim DFS Status Report
172 page(s)
| | Sunrise Cogen Power Co/Way/cec/dockets | Pg&e/Tsai |
30897 | 9/20/1999 |
Interim DFS Status Report
202 page(s)
| | Sunrise Cogen Power Co/Way/cec/dockets | Pg&e/Tsai |
30890 | 10/14/1999 |
Testimony of Kathryn M. Matthew - Supplement to Staff's Testimony Final Staff Assessment Cultural Resources
2 page(s)
| | Dockets | Matthews |
30852 | 1/10/2000 |
Region 9 Preliminary Remendiation Goals
35 page(s)
| | Prg Table List/Cec/dockets | Us Environmental Protection Agency/Smucker |
30851 | 10/12/1999 |
Errata to Staff's Testimony Final Staff Assessment Cultural Resources - Testimony of Kathryn M. Matthews
4 page(s)
| | CEC/Dockets | K. Matthews |
30850 | 9/2/1999 |
Sunrise Comments on Preliminary Staff Assessments
175 page(s)
| | CEC/Docket | Radian International/Mukaoka |
30849 | 9/2/1999 |
CURE's Comments on the Sunrise Preliminary Staff Assessment - POS
95 page(s)
| | CEC/Pryor/dockets | Adams Broadwell Joseph & Cardozo/Poole |
30848 | 11/30/1999 |
Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan - POS
109 page(s)
| | CEC/Dockets | Radian International/Muraoka |
17886 | 1/12/2001 |
Public Adviser's Status Report 2000
44 page(s)
| | CEC/Docket | CEC/Public Adviser's Office |
17487 | 12/6/2000 |
Committee Amendment to Revised Presiding Member's Proposed Decision (PMPD) (Attachment: Proof of Service)
28 page(s)
| | CEC/Docket | CEC/Moore/pernell |
17485 | 12/6/2000 |
Notice of Determination (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | CEC/Pryor |
17469 | 12/20/2000 |
Commission Decision
325 page(s)
| | CEC/Docket | CEC/Keese/laurie/moore/pernell/rosenfeld |
17248 | 12/4/2000 |
Letter of appreciation for staff's recent efforts to resolve issues and complete review
1 page(s)
| | Air Resources Board/Kenny | CEC/Larson |
17216 | 12/8/2000 |
Corrections to Sunrise's Comments on Air Quality Conditions of Revised PMPD - POS
10 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
17137 | 11/29/2000 |
Final Determination of Compliance for the Proposed Sunrise Power Project
177 page(s)
| | CEC/Pryor | San Joaquin Valley Apcd/Sadredin |
17131 | 12/4/2000 |
Revised PMPD-FDOC Air Quality Conditions - POS
16 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
17126 | 12/1/2000 |
Staff Comments - Revised Presiding Member's Proposed Decision of 11/20/2000 - POS
8 page(s)
| | CEC/Moore/pernell | CEC/Pryor |
17074 | 11/22/2000 |
Determination on Stream Alteration Notification no. R4-2000-0136 (Attachment: Proof of Service)
6 page(s)
| | Sunrise Cogeneration And Power Co./Soares | Dept. Of Fish And Game/Loudermilk |
17073 | 11/22/2000 |
Affidavit RE: Change of Ownership (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Edison/Loughman |
17066 | 11/27/2000 |
Letter Requesting the that the Undersigned be Removed from the Limited Intervenor List
1 page(s)
| | CEC/Docket | Hdpp Llc/Wolfinger |
16930 | 11/20/2000 |
San Joaquin Valley Air Pollution Control District's Preliminary Determination of Compliance - POS
99 page(s)
| | CEC/Dockets | Grattan & Galati/Galati |
16903 | 11/20/2000 |
Notice of Commission Hearing Re: Revised Presiding Member's Proposed Decision
6 page(s)
| | CEC/Dockets | CEC/Moore/pernell |
16901 | 11/17/2000 |
Revised Presiding Member's Proposed Decision - POS - P800-00-010
394 page(s)
| | CEC/Dockets | CEC/Moore/pernell |
16897 | 11/17/2000 |
Effective November 17, 20000 Edison Mission Energy aquired 100% ownership of Sunrise Power Company from Texaco Inc.
2 page(s)
| | CEC/Pryor | Edison Mission Energy/Loughmair/hall |
16893 | 11/16/2000 |
Revision to Staff's 3rd Geology Condition of Certification (Geo-3) - POS
7 page(s)
| | CEC/Moore/pernell | CEC/Pryor |
16834 | 11/13/2000 |
1. Sunrise Proposed Revision to PMPD; 2. Errata to Sunrise Proposed Revisions to PMPD; 3. Sunrise Power Company's Brief After November 7, 2000 Evidentiary Hearing (Attachment: Proof of Service)
326 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
16686 | 11/7/2000 |
Information from Bob Hartmen, Kaddar Enterprises RE: "The Flapper"
1 page(s)
| | CEC/Docket | CEC/Pryor |
16685 | 11/7/2000 |
Supplemental Testimony of David A. Stein on Air Quality (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
16684 | 11/7/2000 |
Supplemental Testimony of David A. Stein on Noise (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
16683 | 11/8/2000 |
Report of Conversation - With John Grattan, Grattan & Galati (Counsel to Sunrise Power Project) RE: Condition of Certification Noise-6. (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | CEC/Kisabuli |
16682 | 11/8/2000 |
Declaration of M. Kisabuli
1 page(s)
| | CEC/Docket | CEC/Kisabuli |
16681 | 11/8/2000 |
Declaration of Joseph Diamond, Ph.D.
1 page(s)
| | CEC/Docket | CEC/Diamond |
16679 | 11/8/2000 |
Letter RE: Anticipation of Transfer of Ownership and Determination of Compliance (Attachment: Proof of Service)
5 page(s)
| | CEC/Pryor | San Joaquin Apcd/Sadredin/goff |
16616 | 11/7/2000 |
Staff's Proposed Language for CUL-1
3 page(s)
| | CEC/Docket | CEC/Staff |
16615 | 11/2/2000 |
Testimony - Evidentiary Hearing
1 page(s)
| | CEC/Docket | Radian International/Muroaka |
16614 | 11/3/2000 |
Staff Motion for Continuance of Hearing on Air Quality Issues (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | CEC/Ogata |
16601 | 11/6/2000 |
Opposition to CEC Staff's Motion for Continuance of Hearing on Air Quality Issues - POS
5 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
16587 | 11/7/2000 |
Air Quality
2 page(s)
| | CEC/Dockets | CEC |
16560 | 11/2/2000 |
Testimony - Evidentiary Hearing (Attached: Proof of Service)
96 page(s)
| | CEC/Docker | Radian International/Muraoka |
16537 | 11/1/2000 |
Request to change the Address for the TANC General Counsel (Dennis W. De Cuir) (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | Dennis W. De Cuir |
16503 | 10/27/2000 |
Notice of Evidentiary Hearing and Hearing Order (November 7, 2000)
3 page(s)
| | CEC/Docket | CEC/Moore/pernell |
16499 | 10/30/2000 |
Notice of Availability - Supplement to the Final Staff Assessment (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | CEC/Therkelsen |
16492 | 10/26/2000 |
Report of Conversation W/Mervyn Soares (Sunrise Power Co.) RE: Status of the Prevention of Serious Deterioration Permit (PSD) (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | CEC/Pryor |
16483 | 10/27/2000 |
Prehearing Conference Statement of the California Energy Commission - October 27, 2000 (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | CEC/Holmes |
16482 | 10/27/2000 |
Notice of Evidentiary Hearing and Hearing Order (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | CEC/Moore/pernell |
16481 | 10/31/2000 |
Air Quality Issues Update, and Errata - Response to Data Request 2 (Oct. 6, 2000) (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
16477 | 10/30/2000 |
Letters with Attached Compliance Certification by Southern California Edison Company, and by Edison Mission Energy (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
16476 | 10/30/2000 |
United States Environmental Protection Agency's Letter of October 24, 2000 to Gordon Thompson, Vice President of the Sunrise Power Company RE: the PSD Permit for the Sunrise Project (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
16424 | 10/26/2000 |
Prehearing Conference Statement - POS
20 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
16423 | 10/26/2000 |
Errata - Amended Application (Section 2.2.7.1) - POS
6 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
16407 | 10/26/2000 |
Prehearing Conference Statement of the California Unions for Reliable Energy October 26, 2000 (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | Cure/Joseph/poole |
16354 | 10/25/2000 |
Sunrise Power Company's Notice of Change of Ownership Submitted to the San Joaquin Valley Air Pollution Control District (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
16195 | 10/20/2000 |
Notice of Prehearing Conference and Scheduling Order (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | CEC/Moore/pernell |
16182 | 10/16/2000 |
San Joaquin Valley Unified APCD's Preliminary Determination of Compliance for the Sunrise Power Project (Attachment: Proof of Service)
166 page(s)
| | CEC/Docket | Sunrise Power Co./Grattan |
16007 | 10/11/2000 |
Request for Proposal
2 page(s)
| | Pg&e/Smith | Eme/Fohrer |
15992 | 10/6/2000 |
Data Responses 1 - 8: Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application; (Enclosures/Attachment: Data Response 5 (Input and Output Files for the Cumulative Impact Modeling (Disks)) Proof of Service)
58 page(s)
| | CEC/Docket | Urs/Muraoka |
15991 | 10/6/2000 |
Errata Page, Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket | Urs/Muraoka |
15987 | 10/6/2000 |
Data Responses 1- 8, Responding to CEC Staff Data Requests Issues Sept. 27, 2000
58 page(s)
| | CEC/Docket | Urs/Muraoka |
15966 | 9/27/2000 |
Data Requests - POS
10 page(s)
| | Sunrise Power Co./Soares | CEC/Pryor |
15855 | 9/29/2000 |
Response of the California Unions for Reliable Energy to Applicant's Proposed Schedule (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | Cure/Joseph/poole |
15854 | 9/29/2000 |
Notice of Committee Conference (October 10, 2000) (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | CEC/Moore |
15853 | 9/29/2000 |
Status Report No. A1 With Staff's Proposed Schedule (Attachment: Proof of Service)
10 page(s)
| | CEC/Moore/pernell | CEC/Pryor |
15852 | 9/18/2000 |
Report of Conversation RE: Relocation of Main Water Supply Pipelines (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | CEC/Pryor |
15829 | 9/22/2000 |
Review RE: Notice of Receipt of Complete Application (Attachment: Proof of Service)
5 page(s)
| | Sunrise Power Co./Soares | San Joaquin Valley Apcd/Goff |
15821 | 9/19/2000 |
Determination of Compliance Review - POS
178 page(s)
| | CEC/Dockets | Radian International/Muraoka |
15813 | 9/20/2000 |
Document Handling for the Amendment
3 page(s)
| | Librarian | CEC/Haussler |
15812 | 9/20/2000 |
Notice of Receipt of an Amendment
4 page(s)
| | CEC/Docket | CEC/Haussler |
15782 | 9/21/2000 |
Report of Conversation RE: Biological Resources - Compensation Ratios With Sunrise Power Project (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | CEC/York |
15781 | 9/18/2000 |
Proposed Schedule
6 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
15770 | 9/19/2000 |
Committee Requests for Response to Applicant's Proposed Schedule - POS
6 page(s)
| | CEC/Dockets | CEC/Fay |
15755 | 9/12/2000 |
Air Quality and Public Health Modeling CD-ROM (6)
2 page(s)
| | CEC/Dockets | Radian International/Muraoka |
15727 | 9/14/2000 |
Report of Conversation With John Grattan RE: Schedule for Sunrise Amendments to the AFC (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | CEC/Holmes |
15726 | 9/12/2000 |
Sunrise Power Project Amended AFC
488 page(s)
| | CEC/Therkelsen | Grattan & Galati |
15593 | 8/30/2000 |
Letter to San Joaquin Valley Unified Air and Pollution Control District regarding Raised Issues - POS
7 page(s)
| | CEC/Moore/pernell | Us Environmental Protection Agency/Rios |
15587 | 8/25/2000 |
Address change to TANC's general counsel - POS
4 page(s)
| | CEC/Dockets | Decuir/Lynch |
15586 | 8/23/2000 |
Response to the letter received on 8/16/00 regarding client's intent to file an amendment - POS
6 page(s)
| | Grattan & Galati | CEC/Therkelsen |
15502 | 8/21/2000 |
Letter to agree to operate in peaking mode for a limited period - from summer peak of 2001 until fall 2004. - POS
7 page(s)
| | CEC/Therkelsen | Grattan & Galati |
14941 | 6/27/2000 |
Opposition to CURE's Motion for Official Notice or to Reopen the Record (Attachment: Proof of Service)
11 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
14937 | 6/27/2000 |
Sunrise PMPD Biological Resources Condition of Certification BIO-10 - POS
6 page(s)
| | CEC/Moore/pernell | CEC/Holmes |
14825 | 6/13/2000 |
Motion of the California Unions for Reliable Energy for Official Notice of Agency Filings or, in the Alternative, to Reopen the Records (Attachment: Proof of Service)
27 page(s)
| | CEC/Docket | Cure/Joseph/poole |
14761 | 6/6/2000 |
Staff Comments on Sunrise PMPD
1 page(s)
| | Sunrise Afc Participants | CEC/Holmes |
14754 | 6/2/2000 |
Transmission Agency of Northern California Comments on the Presiding Member's Proposed Decision (Attachment: Proof of Service)
8 page(s)
| | CEC/Docket | De Cuir & Somach/De Cuir |
14745 | 6/6/2000 |
Committee Conference - PMPD Project Mailing List
1 page(s)
| | CEC/Dockets | CEC Cec |
14741 | 6/2/2000 |
Comments of the CURE's Presiding Members Proposed Decision - POS
24 page(s)
| | CEC/Dockets | Cure/Joseph/poole |
14731 | 6/2/2000 |
Comments on the Presiding Members Proposed Decision - POS
15 page(s)
| | CEC/Dockets | Grattan & Galati/Grattan |
14726 | 6/2/2000 |
Comments of Commission Staff on the Presiding Members' Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
12 page(s)
| | CEC/Docket | CEC/Holmes |
14718 | 6/2/2000 |
Comments of the Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | CEC/Holmes |
14717 | 6/2/2000 |
Comments of Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | CEC/Holmes |
14656 | 5/26/2000 |
Status Report - POS
5 page(s)
| | CEC/Moore/pernell | CEC Cec Pryor |
14626 | 5/26/2000 |
Energy Commission Order - Order # 00-0523-03
5 page(s)
| | CEC/Dockets | CEC/Keese |
14541 | 5/19/2000 |
PSD permit SJ 99-01 - POS
6 page(s)
| | Sunrise Cogeneration/Hall | Us Environmental Protection Agency/Haber |
14439 | 5/10/2000 |
Letter submitting Presiding Member's Proposed Decision - POS
9 page(s)
| | CEC/Dockets | CEC/Moore/pernell |
14421 | 5/10/2000 |
Letter from Poole to Moore/Pernell (5/8/00) - POS
9 page(s)
| | CEC/Docket | Cure/Poole |
14357 | 5/1/2000 |
Review RE: Traffic Control Plan (Attachment: Proof of Service)
4 page(s)
| | Sunrise Cogeneration And Power Co./Soares | Dept. Of Transportation/Sorensen |
14341 | 5/1/2000 |
Staff Review of Phase II Environmental Site Assessment (Phase II ESA) and other Documents prepared for the Sunrise Cogeneration and Power Plant. (Attachment: Proof of Service)
3 page(s)
| | CEC/Pryor | Dept. Of Toxic Substances Control/Shaddy |
14147 | 3/30/2000 |
District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
2 page(s)
| | Sjvuapcd/Sadredin | Us Environmental Protection Agency/Haber |
14141 | 3/30/2000 |
District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
2 page(s)
| | Sjvuapcd/Sadredin | Us Environmental Protection Agency/Haber |
14100 | 4/5/2000 |
Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
2 page(s)
| | CEC/Pryor | U.s. Epa/Haber |
14099 | 4/5/2000 |
Sunrise Cogeneration and Power Company's Letter to Marc Pryor, California Energy Commission RE: Response to Memorandum Dated March 29, 2000 (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
14096 | 4/5/2000 |
Letter from US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS
7 page(s)
| | CEC/Docket | CEC/Johnson |
14090 | 4/5/2000 |
Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
3 page(s)
| | CEC/Pryor | U.s. Epa/Haber |
14073 | 3/31/2000 |
Comments RE: Review of March 29, 2000 Memorandum to the Sunrise Committee Regarding the Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
2 page(s)
| | CEC/Pryor | Cure/Poole |
14056 | 3/31/2000 |
RE: Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
2 page(s)
| | CEC/Pryor | Cure/Poole |
14046 | 3/29/2000 |
DTSC Review of Water Treatment Facility Data (Attachment: Proof of Service)
5 page(s)
| | CEC/Moore/pernell | CEC/Pryor |
13941 | 3/14/2000 |
Texaco California, Inc. operations in the Midway Sunset oilfield (PSD permits SJ 78-16 and SJ 78-17) - Proof of Service
6 page(s)
| | Texaco California Inc./Bulkeley | Us Environmental Protection Agency/Haber |
13940 | 3/14/2000 |
Response to Information Request Dated 2/1/00 - Prevention of Significant Deterioration Application (SJ 99-01) - Proof of Service
44 page(s)
| | U.s. Epa/Haber | Sunrise Cogeneration/Soares |
13843 | 2/29/2000 |
Notice of Evidentiary Hearing and Hearing Order - Project mailing list
2 page(s)
| | CEC/Docket | CEC Cec |
13814 | 3/6/2000 |
Sunrise Cogeneration and Power Company's Letter RE: Oxidation Catalysts, dated February 23, 2000 (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13678 | 2/23/2000 |
Amended Proof of Service for Transmission Agency of Northern California Reply Brief on Air Quality.
4 page(s)
| | CEC/Docket | Decuir & Somach/Lynch |
13677 | 2/18/2000 |
Sunrise Cogeneration and Power Company's Reply Brief, Group C Topics, dated February 18, 2000. (Attachment: Proof of Service)
28 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
13675 | 2/18/2000 |
Transmission Agency of Northern California Reply Brief on Air Quality (Attached: Proof of Service)
4 page(s)
| | CEC/Docket | Decuir & Somach/Decuir |
13668 | 2/18/2000 |
Group C Reply Brief - February 18, 2000 (Attachment: Proof of Service)
19 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13664 | 2/18/2000 |
Reply Brief of Commission Staff
20 page(s)
| | CEC/Dockets | CEC/Holmes |
13653 | 2/18/2000 |
E-mail dated 2/17/00 from Larry Allen to Marc Pryor 2/14/00 RE: Sunrise Cogeneration & Power Project Evidentiary Hearing; Exhibit 107 Haley Declaration (Attachment: Proof of Service)
5 page(s)
| | CEC/Pryor | Larry Allan |
13641 | 2/14/2000 |
Hearing Brief of the San Luis Obispo County Air Pollution Control District as an Interested Public Agency - Proof of Service
14 page(s)
| | CEC/Docket | San Luis Obispo Co. Apcd/Allen |
13613 | 2/14/2000 |
Company's Withdrawal of Suggested Amendments to Air Quality Conditions of Certifications 2, 3, and 4 and Submission of New Air Quality Amendment 41 - Proof of Service
6 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
13597 | 2/11/2000 |
Transmission Agency of Northern California - Opening Briefing on Air Quality (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Decuir & Somach/Lynch |
13595 | 2/11/2000 |
Opening Brief of Commission Staff on The Sunrise Cogeneration and power Project AFC - Feb. 11, 2000 (Attachment: Proof of Service)
12 page(s)
| | CEC/Docket | CEC/Holmes |
13594 | 2/11/2000 |
Sunrise Cogeneration and Power Company's Opening Brief, Group C Topics, Dated Feb. 11, 2000 (Attachment: Proof of Service)
12 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13592 | 2/11/2000 |
Group C Opening Brief (February 11, 2000) (Attachment: Proof of Service)
29 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13579 | 2/10/2000 |
Public Hearing - LCP Amendment No. 1-99 (Harbor Terrace)
1 page(s)
| | CEC/Docket | Ca Coastal Commission |
13568 | 2/10/2000 |
Reply Brief of Commission Staff - Proof of Service
15 page(s)
| | CEC/Docket | CEC/Holmes |
13563 | 2/7/2000 |
Sunrise Cogeneration and Power Company (PSD Permit SJ 99-01) and Texaco California, Inc. (TCI) Operating in the Midway Sunset Oilfield (PSD Permits SJ 78-16 and SJ 78-17) (Attachment: proof of Service)
2 page(s)
| | Sunrise Cogeneration And Power Co/Hall/texaco Ca/b | U.s. Epa/Haber |
13555 | 2/10/2000 |
Reply Brief, Group B Topics, Dated February 10, 2000. (Attachment: Proof of Service)
15 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13552 | 2/10/2000 |
Group B Reply Brief (February 10, 2000) (Attachment: Proof of Service; Cover Letter)
22 page(s)
| | CEC/Docket | Cure/Joseph |
13535 | 2/8/2000 |
Amendments to Air Quality Conditions of Certification 2, 3, and 4, dated 2/8/00 - Proof of Service
6 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
13510 | 2/3/2000 |
Sunrise Power's Reply Brief - Group A Topics, and Opening Brief - Group B Topics - Proof of Service
29 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13509 | 2/3/2000 |
Opening Brief of Commission Staff - Proof of Service
20 page(s)
| | CEC/Docket | CEC/Holmes |
13508 | 2/3/2000 |
Reply Brief of Commissions Staff - Proof of Service
10 page(s)
| | CEC/Docket | CEC/Holmes |
13505 | 2/3/2000 |
CURE's Group A Reply Brief
11 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13462 | 1/24/2000 |
Declaration of Joseph M. Loyer; Hazardous Materials Management Supplementary Testimony By Joseph M. Loyer, January 20, 2000 (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket | CEC/Loyer |
13461 | 1/26/2000 |
Testimony of Phyllis Fox, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
5 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13460 | 1/26/2000 |
Testimony of Bruce W. Page, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
10 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13450 | 1/28/2000 |
Report of Conversation with Susan Jones, Valley Branch, USFWS - Proof of Service
5 page(s)
| | CEC/Docket | CEC/York |
13448 | 1/28/2000 |
Report of Conversation with Warden Brain Naslund regarding: Valley Waste Disposal ponds - Proof of Service
5 page(s)
| | CEC/Docket | CEC/York |
13447 | 1/28/2000 |
Report of Conversation with L. Bright (Valley Waste), M. Soares (Sunrise), C. Jackson (Texaco), P. Dinkle (Texaco), D. Wright (Texaco) and K. Garlick (USFWS) Regarding: Site visit to Valley Waste Disposal facility - Proof of Service
5 page(s)
| | CEC/Docket | CEC/York |
13433 | 1/27/2000 |
Comments of the review of the technical cultural resources inventory report (May 1999) Proof of Service
6 page(s)
| | Pacific Legacy/Jackson | Us Dept. Of The Interior/Christian |
13412 | 1/27/2000 |
Testimony of Bruce W. Page, Ph.D on Behalf of CURE on Water Sampling Results - Attachment: Material Balance on Metals Present in Produced Water - Proof of Service
13 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13402 | 1/27/2000 |
Testimony of J. Phyllis Fox, Ph.D on Behalf of CURE on Water Sampling Results - Proof of Service
8 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13400 | 1/28/2000 |
Sworn Declaration and Supplemental Air Quality Testimony of John E. Haley, dated January 26, 2000 - Proof of Service
14 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
13358 | 1/24/2000 |
Transmission Agency of Northern California Brief on Transmission System Engineering. (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | Decuir & Somach/Decuir/tanc |
13355 | 1/24/2000 |
Sunrise Cogeneration and Power Company Project's Answers of January 21, 2000 to CURE's Questions Regarding TCI's Water Treatment System Dated January 14, 2000. (Attachment: Proof of Service)
18 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13353 | 1/24/2000 |
Opening Brief of Commission Staff on the Sunrise Cogeneration and Power Project Application for Certification (Attachment: Proof of Service)
11 page(s)
| | CEC/Docket | CEC/Holmes |
13352 | 1/24/2000 |
Sunrise Cogeneration and Power Company Project's Opening Brief - Group A Topics, Dated January 24, 2000. (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13348 | 1/24/2000 |
California Unions for Reliable Energy - Group A Opening Brief January 24, 2000. (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | Cure/Joseph/poole |
13345 | 1/21/2000 |
ORDER Denying Petition to Intervene - Proof of Service
5 page(s)
| | CEC/Docket | CEC/Moore |
13321 | 1/12/2000 |
Declaration of Amanda Stenick (Attachments: Land Use - Testimony; Letter to CEC/Pryor from Co. of Kern/David B. Rickels, Dated 12/16/1999)
3 page(s)
| | CEC/Docket | CEC/Stenick |
13320 | 1/12/2000 |
Declaration of Gary Walker (CEC) (Attachments: Visual Resources - Testimony of Gary Walker; Letter to CEC/Pryor from Co. of Kern from David Rickels, Dated 12/16/1999)
3 page(s)
| | CEC/Docket | CEC/Walker |
13303 | 1/18/2000 |
Report of Conversation with Larry Bright, Valley Waste - Wastewater stream and the ponds to Valley Waste
1 page(s)
| | CEC/Docket | CEC/York |
13285 | 1/18/2000 |
Letter to Galati from Poole (1/14/2000) regarding 98-AFC-1 with attached questions regarding Texaco's water treatment system - Proof of Service
7 page(s)
| | CEC/Docket | Cure/Poole |
13280 | 1/13/2000 |
Certification of Statewide Compliance
2 page(s)
| | Us Epa/Haber | Sjvapcd/Philip M. Jay |
13278 | 1/12/2000 |
Certification of Statewide Compliance
4 page(s)
| | Seyed Sjvuapcd/Sadredin | Us Epa/Haber |
13262 | 1/14/2000 |
Notice of Evidentiary Hearing Continuation and Briefing Order - Proof of Service
7 page(s)
| | CEC/Docket | CEC/Moore/rohy |
13238 | 1/7/2000 |
Supplemental Testimony of J. Phyllis Fox, Ph.D on Behalf of the CEC Reliable Energy on Public Health Impacts - Proof of Service
7 page(s)
| | CEC/Docket | Cure |
13232 | 1/12/2000 |
Letter with CEC's FSA enclosed.
2 page(s)
| | Member Of The Senate/Costa | CECSCecsmith |
13231 | 1/12/2000 |
Letter with enclosed copy of CEC's Final Staff Assessment
2 page(s)
| | Kern Co. Board Of Supver./Mcquiston | CEC/Smith |
13227 | 1/10/2000 |
Notice to Kern County Operators - Field inspection of Kern County oil fields - Proof of Service
8 page(s)
| | CEC/Docket | Dept. Of Conservation/Hal Bopp |
13205 | 1/13/2000 |
Southern Region Hearing Board Meeting Decision.
2 page(s)
| | CEC/Docket | Sjvapcd/Smith |
13201 | 1/11/2000 |
Evaluation RE: Manuscript Retitled "Pathological Findings in Kit Foxes and Deer Mice Inhabiting an Oil Field in California" By Charllton et al.
8 page(s)
| | Dr. Kristin G. Charlton | Journal Of Wildlife Disease Association/Pence |
13196 | 1/13/2000 |
OA/QC and Chain of Custody Documentation for Sunrise's Response to CEC Data Request #3 Associated with the Sunrise Cogeneration and Power Company Project, Dated January 7, 2000. (Attachment: Proof of Service)
34 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
13185 | 6/23/1999 |
California Endangered Species Act, Section 2081(B) Permit Application
96 page(s)
| | California Depart. Of Fish & Game/Cec/dockets | Sunrise Cogeneration |
13184 | 1/7/2000 |
Report of Conversation With Ed Pike (US EPA) RE: PM10 ERCs for Sunrise Project (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket | CEC/Loyer |
13182 | 1/7/2000 |
Report of Conversation with Mervyn Soares (Sunrise Cogeneration & Power Corp. RE: PM10 and NOx ERCs. (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket | CEC/Loyer |
13179 | 1/10/2000 |
Staff Data Request Workshop Notice (Water and Biological Resources) (January 18, 2000) (Attachments: Map (Directions to California Energy Commission); Proof of Service)
3 page(s)
| | CEC/Docket | CEC/Moore |
13175 | 1/7/2000 |
District Response to EPA Comments Sunrise Cogeneration PM10 Emission Reduction Credits.
2 page(s)
| | San Joaquin Valley Unified Apcd/Sadredin | Us Epa/Haber |
13162 | 1/10/2000 |
Cure's Comments (to Branoff 1/7/00) RE: PSD Permits SJ 99-01, SJ78-16 and SJ 78-17. (Attachment: Proof of Service)
74 page(s)
| | CEC/Docket | Cure/Poole |
13157 | 1/7/2000 |
Response to CEC Data Requests Set 3
65 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13151 | 1/6/2000 |
Executor Streambed Alteration Agreement associated with the Sunrise Cogeneration and Power Company, Dated December 29, 1999. (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
13148 | 1/6/2000 |
Review and Comments RE: Air Quality Section of the Final Staff Assessment.
10 page(s)
| | CEC/Pryor | Slo Apcd/Allen |
13142 | 1/5/2000 |
Request for Hearing - Petitioner: CURE - Subject: The District's Recent Issuance of the Conditional Determination of Compliance for the Sunrise Cogeneration and Power Project #981220. (Attachment: Proof of Service, Fax Cover Sheet)
17 page(s)
| | CEC/Docket | San Joaquin Valley Unified Apcd/ |
13140 | 1/5/2000 |
Sunrise Cogeneration and Power Company's Opposition to the San Luis Obispo County APCD's Petition to Intervene, Dated January 5, 2000. (Attachment: Proof of Service)
3 page(s)
| | CEC/Nash | Grattan & Galati |
13125 | 1/5/2000 |
Revision of Staff's Air Quality Testimony (Attachment: Proof of Service)
6 page(s)
| | CEC/Moore/rohy | CEC/Pryor |
13122 | 1/4/2000 |
Supplemental Testimony to the Worker Safety and Fire Protection (Attachment: Proof of Service)
4 page(s)
| | CEC/Moore/rohy | CEC/Pryor |
13115 | 1/3/2000 |
Declaration of Dr. Kristin Charlton, (December 17, 1999); Curriculum Vitae (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Dr. Kristin Charlton |
13114 | 1/3/2000 |
Third Amendment to Prehearing Conference Statement, Dated January 3, 2000. (Attachment: Proof of Service)
25 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
13113 | 1/3/2000 |
Testimony of Gregory E. Salyer of Modesto Irrigation District Regarding Cumulative Air Quality Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California. (Attachment: Proof of Service)
17 page(s)
| | CEC/Docket | Decuir & Somach/Decuir |
13105 | 1/5/2000 |
Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (Attachment: Service List)
6 page(s)
| | CEC/Docket | Cure/Heeley |
13100 | 1/3/2000 |
TESTIMONY - Evidentiary Hearings Part 3
110 page(s)
| | CEC/Docket | Radian/Muraoka |
13097 | 1/4/2000 |
Sunrise Cogeneration and Power Company's Declaration of James Bunker, Dated January 4, 2000. (Attachment: Proof of Service)
3 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
13095 | 1/4/2000 |
Sunrise Cogeneration and Power Company's Water Test Results, (Dated January 4, 2000) Attachment: Proof of Service)
29 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
13093 | 1/4/2000 |
Data Requests. (Proof of Service)
6 page(s)
| | Texaco Global Gas & Power/Soares | CEC/Pryor |
13089 | 1/3/2000 |
Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Air Quality Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
500 page(s)
| | CEC/Docket | Cure/Joseph |
13088 | 1/3/2000 |
Supplemental Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Worker Safety Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
500 page(s)
| | CEC/Docket | Cure/Joseph |
13087 | 1/3/2000 |
Testimony of Phyllis Fox, Ph. D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (January 3, 2000)
113 page(s)
| | CEC/Docket | Cure/Joseph |
13086 | 1/3/2000 |
Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Public Health Impacts of the Sunrise Cogen and Power Project. (January 3, 2000)
1000 page(s)
| | CEC/Docket | Cure/Joseph |
13079 | 12/30/1999 |
Letter recommendation that the permit requirement under section AQ-C2, requiring oxidation soot filters be changed
1 page(s)
| | CEC/Docket | Catalytic Exhaust Products Ltd./Canning |
13074 | 12/31/1999 |
Petition for Intervention as an Individual or Agency (Represented by Larry Allen) (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | San Luis Obispo Co. Apcd |
13070 | 12/31/1999 |
Letter RE: Water used as Feedstock for the Heat Recovery Steam Generator
2 page(s)
| | CEC/Moore/rohy | Dept. Of Toxic Substance Control |
13064 | 12/17/1999 |
Final Staff Assessment Part 3
167 page(s)
| | CEC/Docket | CEC Cec |
13027 | 12/24/1999 |
NOTICE of Availability - Final Staff Assessment, Part III. (Attachment: Order Form)
3 page(s)
| | CEC/Docket | CEC/Therkelsen |
13012 | 12/22/1999 |
Request for Agency Comments on the Final Staff Assessment, Part III
2 page(s)
| | Agency Distribution List | CEC/Therkelsen |
13010 | 12/22/1999 |
Handling of the Final Staff Assessment, Part III
1 page(s)
| | Librarian | CEC/Therkelsen |
13003 | 12/14/1999 |
Formal Consultation Regarding Features Within the Jurisdiction of the Department of Fish & Game
8 page(s)
| | CEC/Pyror | Dept. Of Fish & Game/Loudermilk |
12995 | 12/21/1999 |
District Witness to Sponsor Final Determination of Compliance at CEC Evidentiary Hearing on 1/10/00
3 page(s)
| | Sjvapcd/Sadredin | CEC/Fay |
12965 | 12/20/1999 |
San Joaquin Valley Air Pollution Control District Notice of Public Hearing Before the Hearing Board of the San Joaquin Valley Unified Air Pollution Control District Regarding Permit (meeting date 1/12/00) - Proof of Service
5 page(s)
| | CEC/Docket | Cure/Heeley |
12963 | 12/20/1999 |
Amendment to the CURE and Doug Zimmerman's Request for Hearing - Proof of Service
31 page(s)
| | CEC/Docket | Cure/Joseph |
12961 | 12/17/1999 |
Committee Response to Staff Comments Filed December 14, 1999 (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket | CEC/Moore/rohy |
12941 | 12/17/1999 |
Landscaping Requirement - Proof of Service
6 page(s)
| | CEC/Pryor | Bakersfield Planning Dept./Rickels |
12930 | 12/14/1999 |
California Energy Commission Staff - Comments on Schedule (December 14, 1999)
3 page(s)
| | CEC/Docket | CEC/Holmes |
12889 | 12/9/1999 |
Status Report (December 10, 1999) (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Cure/Joseph |
12872 | 12/10/1999 |
Compliance Certification
2 page(s)
| | CEC/Therkelsen | San Joaquin Valley Apcd /Sadredin |
12866 | 12/7/1999 |
Notice of Evidentiary Hearings -and- Hearing Order - CEC - January 10, 11 and 13, 2000 - Attachment
8 page(s)
| | CEC/Docket | CEC/Rohy/moore |
12862 | 12/8/1999 |
Statutory Deadline for Determination of Compliance - Proof of Service
5 page(s)
| | Sunrise/Hall | San Joaquin Valley Apcd/Goff |
12850 | 12/9/1999 |
Sunrise Cogeneration and Power Company's Revised Schedule (Attachments: Attachment A - Revised Schedule; Proof of Service)
3 page(s)
| | CEC/Docket | Grattan & Galati |
12844 | 12/8/1999 |
Answer to CURE Request for Hearing - December 8, 1999 (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | Grattan & Galati |
12807 | 12/2/1999 |
Request for Hearing to Review the San Joaquin Valley Unified Air Pollution Control District's Grant of a Conditional Final Determination of Compliance (November 29, 1999) (Attachment: Exhibits; Proof of Service)
1019 page(s)
| | CEC/Docket | Cure/Joseph |
12781 | 11/24/1999 |
Poole Letter to Pryor (11/23/99) Attachments 1 & 2: Excerpts from Environmental Oversight Plan for construction of new federal courthouse in Sacramento; Attachment 3: Copy of a letter sent to U.S. EPA regarding EPA's duties under section 7 of the Endangered Species Act; Attachment 4: Copy of a letter (w/o exhibits) sent to SLO Co.
38 page(s)
| | CEC/Docket | Adams, Broadwell Joseph & Cardozo/Heeley |
12775 | 11/30/1999 |
Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP) (November 30, 1999)
100 page(s)
| | CEC/Docket | Radian International/Muraoka |
12759 | 11/19/1999 |
Comments on the District's Preliminary Determination of Compliance for the Proposed Sunrise Project #981220 (Attachment: Proof of Service)
113 page(s)
| | CEC/Therkelsen | San Joaquin Valley Apcd/Sadredin |
12758 | 11/22/1999 |
Phase II, Environmental Site Assessment (Attachment: Proof of Service)
150 page(s)
| | CEC/Docket | Radian International/Muraoka |
12754 | 11/30/1999 |
SUPPLEMENTAL - Testimony - Evidentiary Hearings Part 2 - Proof of Service
14 page(s)
| | CEC/Docket | Radian/Muraoka |
12736 | 11/18/1999 |
Second Amended Prehearing Conference Statement. (Attachment: Proof of Service)
18 page(s)
| | CEC/Nash | Grattan Galati/Galati |
12727 | 11/22/1999 |
Notice of a Biological and Water Resources Workshop Mailing List - CEC - Proof of Service
4 page(s)
| | CEC/Docket | Sunrise Cogeneration And Power |
12653 | 11/12/1999 |
Poole Letter to Pryor/O'Hagan (11/12/99) - Proof of Service
15 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cordozo/Brazil |
12645 | 11/10/1999 |
Poole Letter to Goff/Gruber (11/09/99) regarding Sunrise PDOC - Proof of Service
5 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12632 | 11/9/1999 |
NOTICE of Evidentiary Hearings - December 2 - 3, 1999 (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | CEC/Moore/rohy |
12588 | 11/4/1999 |
Sunrise Socioeconomic FSA Errata
1 page(s)
| | CEC/Docket | CEC/Diamond |
12587 | 11/4/1999 |
Report of Conversation with Steve Hartsil of Kern County Superintendent of Schools
1 page(s)
| | CEC/Docket | CEC/Edwards |
12578 | 11/4/1999 |
Response to the revised Prevention of Significant Deterioration application - Proof of Service
25 page(s)
| | Sunrise/Hall | Us Epa/Haber |
12577 | 11/4/1999 |
Additional Response to Committee Order Dated August 26, 1999. (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | Radian International/Muraoka |
12576 | 11/4/1999 |
Letter Dated 6/26/96 from EPA/Blanco to Ground Water Protection Council/Paque; Memorandum dated 8/10/87 from CA Dept. of Conservation/Mefferd RE: EPA Approval to Inject Air Scrubber Waste and Water Softner Regeneration Brine in Class II Wells; Letter Dated 1/29/97 from CA Div. of Oil & Gas/Guerard to CA Dept. of Toxic Substances Control/Pilcorn
8 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12575 | 11/4/1999 |
STIPULATION RE: Condition of Certification Entitled Cultural - 18. (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12574 | 11/5/1999 |
Declaration of Dale Edwards
2 page(s)
| | CEC/Docket | CEC/Staff |
12550 | 11/2/1999 |
Poole Letter to Pryor/O'Hagan (11/1/99) (Attachment: Proof of Service)
97 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12512 | 10/15/1999 |
Cal-ISO Testimony - Transmission System Reliability Sunrise Cogeneration and Power Project (Sunrise) Interconnection (Testimony of Ron S. Daschmans) (Attachment: proof of Service)
16 page(s)
| | CEC/Docket | Cal-iso |
12505 | 10/18/1999 |
Testimony of Michael Fry on Behalf of the California Unions for Reliable Energy on Biological Impacts of the Sunrise Cogeneration and Power Project (October 15, 1999) (Attacment: Proof of Service)
27 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardoza/Joseph /poole |
12500 | 10/27/1999 |
Poole Letter to Goff/Gruber (10/26/99) (W/Enclosure) (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12494 | 10/25/1999 |
Testimony of J. Phyllis Fox on Behalf od the California Unions for Reliable Energy on Traffic and Transportation Impacts and Worker Safety Impacts of the Sunrise Cogeneration and Power Project
125 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardoza/Heeley |
12484 | 10/25/1999 |
Testimony - Evidentiary Hearings Part 2 - Proof of Service and Cover for Binder
33 page(s)
| | CEC/Docket | Radian International/Muraoka |
12476 | 10/26/1999 |
Testimony of David Larsen of Navigant Consulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern Ca. and the Transmission Agency of Northern California Preheating Conference Statement. - Proof of Service
15 page(s)
| | CEC/Docket | De Cuir & Somach/Larsen |
12471 | 10/26/1999 |
Testimony of David Larsen of Navigant ounsulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California - Proof of Service
15 page(s)
| | CEC/Docket | Decuir & Somach/Larsen |
12470 | 10/26/1999 |
Transmission Agency of Northern California Prehearing Conference Statement
Oct. 25, 1999 - Proof of Service
6 page(s)
| | CEC/Docket | Decuir & Somach/De Cuir |
12453 | 10/20/1999 |
California Regional Water Quality Control Board letter of 9/21/99 from William F. Pfister and Shelton R. Gray to Valley Waste Disposal Co.
CRWQCBM of 9/20/99 from James K. Dowdall to Shelton R. Gray - Proof of Service
11 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12432 | 10/21/1999 |
Objections and Notice of Inability to Respond to a Data Request - Set Five
Extension to File Its Objections and Notice of Inability to Respond to a Data Request - Set Five. Proof of Service
14 page(s)
| | CEC/Docket | Grattan & Galati/Galati |
12376 | 10/14/1999 |
Report of Conversation w/ Phil Castle (Kern Co. Fire Dept.) Subject: Questions RE: 700 Wells - Fire Protection (Attachment: Service List)
1 page(s)
| | CEC/Docket | CEC/Pryor |
12373 | 10/14/1999 |
NOTICE of Evidentiary Hearings - November 5, 1999 (Attachment: Attachment A; Proof of Service List)
4 page(s)
| | CEC/Docket | CEC/Moore/rohy |
12360 | 10/21/1999 |
Letter to Goff/Gruber from Poole (10/21/99) re: Sunrise PDOC (Enclosing Information RE: Additional Violations)
17 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12357 | 10/12/1999 |
Traffic Study - Review of the Study and Comments
2 page(s)
| | CEC/Efs&epd | Dept. Of Tansportation/Sorensen |
12355 | 10/12/1999 |
Errata to Staff's Testimony Sunrise Cogeneration and Power Project Facility Design - Testimony of Stave Baker, Kisabuli and Al McCuen (10/11/99)
3 page(s)
| | CEC/Docket | CEC/Baker/kisabuli/mccuen |
12354 | 10/12/1999 |
Declaration of Al McCuen, M. Kisabuli and Steve Baker
1 page(s)
| | CEC/Docket | CEC/Mccuen/kisabuli/baker |
12340 | 10/12/1999 |
Curriculum Vitae of David M. Einolf (Attachment: Proof of Service)
4 page(s)
| | CEC/Nash | Grattan & Galati/Gratttan |
12339 | 10/12/1999 |
Declaration of David A. Stein
2 page(s)
| | CEC/Nash | Grattan & Galati /Grattan |
12334 | 10/12/1999 |
Letter to Goff/Gruber From Poole (10/08/99) RE: Sunrise PDOC
5 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12331 | 10/13/1999 |
GE Gas Turbine Start-up Curve Diagram that was Marked for Identification as Exhibit 27 at the CEC Hearing on Tuesday, October 12, 1999 (Attachment: Proof of Service)
2 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
12320 | 10/19/1999 |
Evidentiary Hearing - Mailing List - CEC
4 page(s)
| | CEC/Docket | CEC Cec |
12315 | 10/18/1999 |
Handling of the Final Staff Assessment, Part II, For the Sunrise Cogeneration and Power Project
1 page(s)
| | Librarian/Docket | CEC/Therkelsen |
12302 | 10/15/1999 |
Sign-in Sheet - Evidentiary Hearing
4 page(s)
| | CEC/Docket | CEC Cec |
12301 | 10/15/1999 |
Recorded Copy - Final Action Lot Line Adjustment 29 - 99 (Attachment: Proof of Service)
9 page(s)
| | Sunrise Cogeneration & Power Co | Kern Co. Planning Dept./James |
12300 | 10/15/1999 |
Notice of A Biological and Water Resources Workshop for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
| | CEC/Docket | CEC/Moore |
12296 | 10/15/1999 |
FINAL STAFF ASSESSMENT (PART 2)
94 page(s)
| | CEC/Docket | CEC Cec |
12253 | 10/8/1999 |
Copies of the following documents: Valley Waste Disposal Co. Waste Discharge Requirements; Letter from California Regional Quality Control Brd to Radian International dated June 2, 1999; Letter from Radian International to California Regional Water Quality Control Brd dated May 26, 1999; Permit Approval from Div. of Oil, Gas and Geothermal Res.
10 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12252 | 10/6/1999 |
Sunrise Cogeneration and Power Company's First Amendment to Prehearing Conference Statement (Attachment: Proof of Service)
17 page(s)
| | CEC/Docket | Grattan & Galati/Grattan/galati |
12251 | 10/6/1999 |
Notice of Decision, Lot Line Adjustment No. 29-99, Sunrise Project, From the Planning Department of the Kern County Resource Management Agency (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12250 | 10/7/1999 |
Cal-ISO's Conclusions & Preliminary Findings (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | Cal Iso/Daschmans |
12249 | 10/1/1999 |
Report of Conversation - w/Phil Castle, Fire Marshal, Kern Co. Fire Dept. RE: Questions Regarding 700 Wells (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | CEC/Pryor |
12235 | 10/6/1999 |
SUNRISE Cogeneration and Power Project TESTIMONY - Evidentiary Hearings Part I - (Written Testimony RE: Final Staff Assessment Sections Addressed by CEC Staff in it's October 1, 1999 Submittal)
115 page(s)
| | CEC/Docket | Radian/Muraoka |
12226 | 10/6/1999 |
Fifth Set of CURE Data Requests
10 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo |
12224 | 10/1/1999 |
Letter to Pryor from Poole (9/29/99) (enclosing additional information regarding Texaco's proposed method of waste water discharge. - Maps - Proof of Service
637 page(s)
| | CEC/Dockets | Adams Broadwell Joseph & Cardozo/Poole/heeley |
12222 | 9/28/1999 |
Geotechnical Report - Revision I - Proof of Service
184 page(s)
| | CEC/Docket | Radian International/Muraoka |
12220 | 10/1/1999 |
Final Staff Assessment (Part 1) (Attachment: Proof of Service)
421 page(s)
| | CEC/Docket | CEC/Pryor/therkelsen |
12219 | 10/1/1999 |
Requesting information on Kern Co. Fire's practices regarding providing protection in the oil fields - POS
7 page(s)
| | CEC/Docket | Marc Pryor |
12215 | 10/1/1999 |
Various e-mails and ROCs that placed between staff and consultant to Adams Broadwell, Joseph and Cordozo.
6 page(s)
| | CEC/Docket | Marc Pryor |
12212 | 10/1/1999 |
Report of Conversation with Texaco re: Streambed Alteration Agreement
1 page(s)
| | CEC/Docket | Rick York |
12202 | 10/4/1999 |
Order Granting Petition to Intervene - Proof of Service
4 page(s)
| | CEC/Docket | CEC/Moore |
12194 | 10/4/1999 |
Objections and Notice of Inability to Respond to a Data Request from CURE, Set Four- -Proof of Service
16 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
12192 | 10/4/1999 |
Manuscript submitted for publication in the Journal of Wildlife Diseases w/ comments of three reviewers.
9 page(s)
| | Phyllis/Charlton | Journal Of Wildlife Diseases/Danny B. Pence |
12191 | 10/4/1999 |
Handling of the Final Staff Assessment Part I
1 page(s)
| | Librarian | CEC/Therkelsen |
12190 | 10/4/1999 |
Notice of Availability - Final Staff Assessment, Part I
3 page(s)
| | CEC/Docket | CEC/Therkelsen |
12189 | 10/4/1999 |
Request for Agency Comments on the Final Staff Assessment, Part I
2 page(s)
| | Distribution List | CEC/Therkelsen |
12166 | 9/30/1999 |
Notice of Evidentiary Hearings and Hearing Order - October 12, 14 and 15, 1999 - CEC
8 page(s)
| | CEC/Docket | CEC/Moore/rohy |
12151 | 9/30/1999 |
Revisions to Application for Transportation and Utility Systems and Facilities on Federal Lands - Standard Form 299 (Attachment: Proof of Service)
8 page(s)
| | Us Blm/Fellows | Sunrise Cogen And Power/Hall |
12132 | 9/24/1999 |
Letter to Goff/Gruber from Poole (Enclosing Additional Information NOVs (9/23/99) RE: Sunrise PDOC (Attachment: Proof of Service)
30 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12131 | 9/24/1999 |
Letter to Pryor from Poole (w/attachments) 9/23/99) Re: Additional Air Quality Sampling Results (Attachment: Proof of Service)
41 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
12130 | 9/23/1999 |
Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - (DFC-1)., and Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - 2 (DFS-2)
500 page(s)
| | CEC/Nash | Grattan & Galati |
12126 | 9/27/1999 |
Transmission Agency of Northern California's Reply to Applicant's Opposition to Petition to Intervene (Attachment: Proof of Service)
16 page(s)
| | CEC/Docket | Decuir & Somach/Decuir/johnson |
12114 | 9/29/1999 |
Scheduled of the Work Safety and Fire Protection, Socioeconomics; and Soil and Water Resources Testimonies - Proof of Service
5 page(s)
| | CEC/Moore/rohy | CEC/Pryor |
12101 | 9/24/1999 |
Transportation Impact Analysis - Construction Impacts at Intersection of SR 119 and Midway Road
34 page(s)
| | CEC/Docket | Radian International/Muraoka |
12096 | 9/22/1999 |
Schedule of the Biological Resources Testimony
4 page(s)
| | CEC/Moore/rohy | CEC/Pryor |
12070 | 9/23/1999 |
1. Letter to Goff/Gruber from Poole (9/20/99) regarding Sunrise PDOC 2. Letter to Goff/Gruber from Poole (w/enclosures) (9/12/99) regarding Sunrise PDOC. Proof of Service.
8 page(s)
| | CEC/Docket | Adams Broadwell Joseph &carodzo/Poole/heeley |
12050 | 9/15/1999 |
E-mail on comments on reports and data referred by Phyllis Fox
1 page(s)
| | CEC/Docket | Kristin Charlton |
12048 | 9/13/1999 |
Letter to Messrs. Thomas E. Goff, John Gruber and Leonard Scandura of SFVAPCD Regarding Sunrise PDOC (Project #981220) and Equilon ATC (Project #981253) dated 09/09/99. Proof of Service
6 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Katherine S. Pool |
12020 | 9/20/1999 |
Letter to Mr. John P. Grattan Dated September 17, 1999 - Fourth Set of CURE Data Requests
9 page(s)
| | CEC/Nash | Adams Broadwell Joseph & Cardozo/Debonville/poole |
12013 | 9/17/1999 |
Response to Committee Order Dated August 26, 1999 (Attachment: Proof of Service)
14 page(s)
| | CEC/Docket | Radian International/Muraoka |
12012 | 9/17/1999 |
Sunrise Cogeneration and Power Plant - Status of the Final Staff Assessment
3 page(s)
| | CEC/Moore/rohy | CEC/Pryor |
12007 | 9/15/1999 |
Sunrise Cogeneration and Power Company's Notice of Change to Service List (Add: Mervyn Soares) (Attachment: Proof of Service List)
2 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
12006 | 9/15/1999 |
Sunrise Cogeneration and Power Company's Opposition to the Transmission Agency of Northern California's Petition to Intervene. (Attachment: Proof of Service)
12 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
11992 | 9/15/1999 |
Notice of Change to Service List: Add Sunrise Cogeneration & Power (S. Watzke) (Attachment: Proof of Service)
1 page(s)
| | CEC/Fay | Grattan & Galati/Grattan |
11983 | 9/10/1999 |
Addendum to Prehearing Conference Statement of Commission Staff (September 10, 1999). (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket | CEC/Holmes |
11981 | 9/10/1999 |
Detailed Comments RE: Preliminary Determination of Complaince (PDOC) (Attached: Proof of Service)
9 page(s)
| | San Joaquin Valley Unified Apcd/Sadredin | U.s. Epa/Haber |
11975 | 9/9/1999 |
Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District RE: Additional PDOC Information Dated September 7, 1999. (Attachment: Proof of Service)
4 page(s)
| | CEC/Nash | Adams Broadwell Joseph & Cardozo/Debonville/poole |
11964 | 9/9/1999 |
Corrected Figures: Revised Figure 2-1 Site Arrangement ; Revised 8.12-1, Hazardous and Toxic Material Locations (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | Radian International/ Muraoka |
11941 | 9/8/1999 |
Notes on Sunrise e-mail
1 page(s)
| | CEC/York | Donna |
11910 | 8/31/1999 |
Letter regarding comments for consideration on the PSA - Proof of Service
4 page(s)
| | CEC/Johnson | Department Of Conservation/Marshall |
11897 | 9/2/1999 |
Sunrise Comments on Preliminary Staff Assessments
175 page(s)
| | CEC/Docket | Radian International/Mukaoka |
11896 | 8/26/1999 |
Committee Order in Response to CURE's Motion to Compel (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket | CEC/Moore |
11895 | 8/25/1999 |
Prehearing Conference Statement of Commission Staff
4 page(s)
| | CEC/Docket File | CEC/Holmes |
11892 | 9/2/1999 |
Message from Phyllis Fox RE: Measurements in both Midway Sunset and Lokern Summary of the Data.
1 page(s)
| | CEC/Loyer/pryor/ringer/odoemelam | CEC/Spiegel |
11891 | 9/2/1999 |
Staff Determination in Response to Committee Order
4 page(s)
| | CEC/Docket File | CEC/Holmes |
11888 | 8/31/1999 |
Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District Regarding Preliminary Determination of Compliance Dated August 28, 1999 - Proof of Services
157 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/K. Poole |
11875 | 8/31/1999 |
Transmission Agency of Northern California Petition to Intervene
10 page(s)
| | CEC/Docket | De Cuir & Somach/Lynch |
11872 | 8/30/1999 |
Comments on Preliminary Determination of Compliance (PDOC). (Attachment: Proof of Service)
13 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
11871 | 8/25/1999 |
Prehearing Conference Statement (Attachment: Proof of Service)
163 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
11862 | 8/26/1999 |
Addendum to Staff's Comments on CURE's Motion to Compel - Proof of Service
6 page(s)
| | CEC/Moore | CEC/Bergquist |
11834 | 8/27/1999 |
Letter to Mr. Steven Branoff (Air3) EPA, Region 9, Dated July 12, 1999 - Proof of Service
78 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cardozo |
11829 | 8/27/1999 |
List of data available, collected at the sites for the period of January 1989 through September 1995.
1 page(s)
| | Environmental Management/Fox | Esc/Seylar |
11828 | 8/27/1999 |
Comments from the Commission Air Quality staff regarding the workshop held on August 16, 1999 in Bakersfield. Proof of Service
5 page(s)
| | Sjvuapcd/Sadredin | Robert Therkelsen/Robert Haussler |
11825 | 8/25/1999 |
Sunrise Cogeneration and Power Company's Counsel's Status Report No. 5. (Attachment: Proof of Service)
4 page(s)
| | CEC/Nash | Grattan & Galati/Galati |
11824 | 8/25/1999 |
CURE's Comments on the Air Qualify Section of the Sunrise Preliminary Staff Assessment.
54 page(s)
| | CEC/Nash | Adams Broadwell Joseph & Cardozo/Debonville/poole |
11823 | 8/25/1999 |
California Unions for Reliable Energy (CURE) Prehearing Conference Statement (August 25, 1999)
19 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo Attys For Cure/Jo |
11822 | 8/25/1999 |
Pre-Hearing Conference Statement (Attachment: Proof of Service)
2 page(s)
| | CEC/Moore/rohy | Ca Iso/Perez |
11821 | 8/25/1999 |
Prehearing Conference Statement of Commission Staff (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket File | CEC/Holmes |
11812 | 8/18/1999 |
Workshop to Discuss Preliminary Staff Assessment - Project Mailing List - CEC
2 page(s)
| | CEC/Docket File | CEC Cec |
11810 | 8/18/1999 |
General list of concerns for discussion at Sunrise PSA Workshop
2 page(s)
| | CEC/Bergquist | Texco/Paul Dinkel |
11807 | 8/23/1999 |
California Unions for Reliable Energy Second Supplement Regarding its Motion to Compel
21 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cardozo/Joseph |
11804 | 8/24/1999 |
Committee Hearing on California Unions for Reliable Energy's CURE Motion to Compel Responses
6 page(s)
| | CEC/Moore | Downey Brand Seymour & Rohwer/Miller |
11799 | 8/12/1999 |
Notice of Hearing on Motion to Compel
4 page(s)
| | CEC/Docket File | CEC Cec |
11796 | 8/20/1999 |
Staff's Comments on CURE's Motion to Compel Production of Information
19 page(s)
| | CEC/Moore | CEC/Bergquist |
11791 | 8/20/1999 |
ROC with CURE
1 page(s)
| | CEC/Bergquist | CEC/Holmes |
11789 | 8/23/1999 |
California Unions for Reliable Energy Notice Regarding the Evidentiary Hearing Scheduled for September 8, 1999 (August 20, 1999) (Attachment: Proof of Service)
4 page(s)
| | CEC/Nash/docket Unit | Adams Broadwell Joseph & Cardozo/Debonville |
11774 | 8/18/1999 |
Follow-up letter of telephone conversation, Kern Council of Governments concurs with Caltrans that a traffic impact analysis should be undertaken.
1 page(s)
| | CEC/Johnson | Kern Council Of Governments/Beardslee |
11771 | 8/17/1999 |
Supplemental Information Regarding CURE'S Motion to Compel
17 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cardozo |
11752 | 8/16/1999 |
CURE's Motions to Compel Responses (Attachment: Proof of Service)
4 page(s)
| | CEC/Moore/rohy | Downey Brand Seymour & Rohwer/Miller |
11746 | 8/16/1999 |
Supplemental Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Matrix of Objections; Service List)
12 page(s)
| | CEC/Docket Unit | Grattan & Galati |
11743 | 3/23/1999 |
Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
1 page(s)
| | CEC/Moore | Tes Energy/P. Ervin |
11742 | 8/16/1999 |
Supplemental Information Regarding CURE's Motion to Compel - August 16, 1999
12 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cardozo/Joseph |
11739 | 8/18/1999 |
Counsel's Letter to California Unions for Reliable Energy Counsel regarding: Additional Offset Information
4 page(s)
| | CEC/Docket File | Grattan & Galati |
11736 | 7/17/1999 |
Workshop to discuss preliminary staff assessment
4 page(s)
| | CEC/Docket File | CEC Cec Staff |
11726 | 8/16/1999 |
Notice of Decision
7 page(s)
| | Sunrise Cogeneration And Power Company | Planning Dept/James |
11687 | 8/12/1999 |
Order Granting Petition to Intervene filed by Elk Hills Power Project (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket File | CEC/Moore |
11680 | 8/12/1999 |
Supplemental Responses to CURE Data Requests (Attachment: Proof of Service)
7 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
11677 | 8/6/1999 |
Notice of Public Workshops to Discuss the Preliminary Staff Assessment of the Sunrise Cogeneration and Power AFC (August 17-18, 1999) (Attachment: Proof of Service; Map)
3 page(s)
| | CEC/Docket File | CEC/Moore |
11676 | 8/6/1999 |
Notice of Air Quality Workshop for the Sunrise Cogeneration and Power Project AFC (August 16, 1999) (Attachment: Proof of Service; Map)
2 page(s)
| | CEC/Docket File | CEC/Moore |
11675 | 8/6/1999 |
Petition for intervention by Elk Hills Power Project, dated August 6, 1999 (Attachment: Proof of Service)
4 page(s)
| | CEC/Nash | Downey Brand Seymour & Rohwer/Miler |
11669 | 6/23/1999 |
Application for Transportation and Utility Systems and Facilities on Federal Lands Standard Form 299
200 page(s)
| | Us Blm/Fellows | Sunrise Cogeneration And Power Company/Hall |
11668 | 7/20/1999 |
Revised ERC Application Package for the Sunrise Cogen Project #981220
1 page(s)
| | Sunrise Cogeneration And Power Co./Hall | San Joaquin Valley Apdc/Goff |
11667 | 7/19/1999 |
Repeated Application for Confidential Designation: Paleontological Resources
1 page(s)
| | CEC/Smith | Radian International/Muraoka |
11660 | 1/28/1999 |
Supplementary AFC Material in Response to Data Adequacy Worksheets
500 page(s)
| | CEC/Docket | Sunrise Cogeneration & Power/King |
11659 | 8/6/1999 |
Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Proof of Service)
28 page(s)
| | Sunrise Cogeneration & Power Co./Grattan | Grattan & Galati |
11658 | 8/6/1999 |
Response to CURE Data Requests - Set 2A (Attachment: Proof of Service)
7 page(s)
| | Adams Broadwell & Joseph/Joseph | Radian Internation/Muraoka |
11631 | 7/12/1999 |
Petition for Reconsideration of Chief Counsel's Decision Concerning CURE's Petition for Inspection and Copying of Confidential Records
20 page(s)
| | CEC/Nash | Grattan & Galati |
11619 | 8/3/1999 |
Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
1 page(s)
| | Librarian | CEC/Therkelsen |
11617 | 8/3/1999 |
Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
11616 | 8/3/1999 |
Request for Agency Comments on the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
2 page(s)
| | Agency Distribution List | CEC/Therkelsen |
11615 | 8/3/1999 |
NOTICE of Availability Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
11610 | 7/20/1999 |
Data Request for the Sunrise Project
1 page(s)
| | Environmental Management/Fox | San Joaquin Valley Apcd/Goff |
11609 | 7/20/1999 |
Status Report Number 4 of the California Energy Commission Staff July 20, 1999 (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket File | CEC/Hough |
11608 | 7/20/1999 |
Revised ERC Application Package for the Sunrise Cogen Project #981220
1 page(s)
| | Adams Broadweell Joseph & Cardozo/Texier | San Joaquin Valley Apcd/Goff |
11607 | 7/26/1999 |
NOTICE of Commission Evidentiary Hearing - AND - Hearing Order (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket File | CEC/Keese |
11606 | 7/23/1999 |
Sunrise Cogeneration and Power Facility Project - Mitigation for Power Transmission Line
3 page(s)
| | CEC/Bergquist | Dept. Of Conservation/D. Mitchell |
11605 | 7/19/1999 |
CURE Status Report Number 4 Dated July 18, 1999
3 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo |
11604 | 7/26/1999 |
CURE's Motion to Compel Production of Information
49 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/Debonville |
11593 | 7/28/1999 |
Notice of Preliminary Determination of Compliance
55 page(s)
| | CEC/Bergquist | San Joaquin Valley Apcd/Sadredin |
11592 | 8/2/1999 |
Preliminary Staff Assessment
482 page(s)
| | CEC/Docket File | CEC Cec |
11569 | 7/29/1999 |
Notice of Prehearing Conference and Scheduling Order
3 page(s)
| | CEC/Docket File | CEC/Moore/rohy |
11567 | 8/2/1999 |
Notice of Hearing on Motion to Compel - August 12, 1999 (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket File | CEC/Moore/rohy |
11566 | 7/30/1999 |
Notice Postponing Evidentiary Hearing AND Revised Hearing Order (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket File | CEC/Keese |
11562 | 7/30/1999 |
Notice Postponing Evidentiary Hearing and Revised Hearing Order (Attachment: proof of Service)
2 page(s)
| | CEC/Docket File | CEC/Keese |
11540 | 7/29/1999 |
Stipulation of Sunrise Cogeneration and Power Company's and California Unions for Reliable Energy Regarding Emission Offset Information (Attachment: Proof of Service)
6 page(s)
| | CEC/Nash | Grattan & Galati/Grattan |
11483 | 7/14/1999 |
Objections and Notice of Inability to Respond to a Data Request From the California Unions for Reliable Energy (CURE), Set 3, Number 114.
7 page(s)
| | CEC/Docket | Grattan & Galati/Grattan |
11477 | 7/16/1999 |
Status Request Number 4
5 page(s)
| | CEC/Moore/rohy | Grattan & Galati |
11474 | 7/14/1999 |
CURE's Confidentiality Petition
2 page(s)
| | CEC/Docket | CEC/Jonathan Blees |
11470 | 7/9/1999 |
Insert for Reliable Energy's Data Request Number 114 that was inadvertently omitted.
3 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo |
11468 | 7/9/1999 |
Letter to initiate Formal Consultation pursuant to Section 7 of the Endangered Species Act.
4 page(s)
| | Field Supervisor Fish & Wildlife | Us Department Of The Interior/Acting Fm |
11463 | 7/9/1999 |
Notice of Opportunity for Public Hearing - July 13, 1999
5 page(s)
| | CEC/Docket | Planning Department/Ted James |
11439 | 7/8/1999 |
Response to CURE Data Request - Second Set
12 page(s)
| | Adams Broadwell & Joseph/Joseph | Grattan & Galati/Gratitan |
11426 | 7/7/1999 |
Issues Identification Report
14 page(s)
| | CEC/Rohy/moore | CEC/Pryor |
11401 | 7/1/1999 |
Project # 981220 - Letter of intent to proceed with the notice of the Preliminary Determination of Compliance
1 page(s)
| | Sunrise Cogeneration/Hall | San Joaquin Valley Air Pollution Control District/ |
11386 | 7/2/1999 |
Substitution of Counsel
3 page(s)
| | CEC/Berguist | Sunrise Congeneration And Power Company/Scott W. B |
11383 | 7/1/1999 |
California Unions for Reliable Energy - Data Request Number 114
6 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo/Bonnie Heeley |
11379 | 6/30/1999 |
Responses to CEC Staff Questions During June 14, 1999 Workshop. With maps and proof of service list.
30 page(s)
| | CEC/Docket Unit | Radian International/Don Muraoka |
11378 | 6/30/1999 |
Repeated Application for Confidential Designation: Cultural and Paleontological Resources.
1 page(s)
| | CEC/Smith | Radian International/Don Muraoka |
11374 | 6/17/1999 |
Data Request and Data Response - CEC
3 page(s)
| | CEC/Docket File | CEC Cec |
11369 | 6/28/1999 |
Chief Counsel's Decision: CURE's petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
3 page(s)
| | Adams, Broadwell, Joseph & Cardozo/Ellison & Schne | CEC/Blees |
11368 | 6/21/1999 |
Objections and Notice of Inability to Respond to Certain Data Requests from the California Unions for Reliable Energy (CURE) CURE Data Requests Numbers 34 through 113 (Attachment: Proof of Service)
74 page(s)
| | CEC/Docket File | Ellison & Schneider/Harris |
11367 | 6/18/1999 |
California Unions for Reliable Energy Status Report Number 3 (June 18, 1999) (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardozo/Heeley |
11354 | 6/17/1999 |
Status Report Number 3
6 page(s)
| | Sunrise Cogeneration Committee/Moore/rohy | Ellison & Schneider/Jeffery D. Harris |
11352 | 6/21/1999 |
Summary of the May 18, 1999 Data Request Workshop
6 page(s)
| | Meeting Attendees | CEC/Bergquist |
11350 | 6/18/1999 |
Status Report #3
8 page(s)
| | Sunrise Cogeneration/Cec/moore | CEC/Bergquist |
11325 | 6/15/1999 |
Data Responses - Set 2
48 page(s)
| | CEC/Docket Unit | Radian International/Muraoka |
11316 | 6/15/1999 |
Extension of Time for Chief Counsel's Decision on CURE's Petition for Inspection and Copying of Confidential Records
5 page(s)
| | Attorneys For Cure | CEC/Blees |
11315 | 6/10/1999 |
Response to CURE's "Petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration Power Project" (Attachment: Proof of Service)
2 page(s)
| | CEC/Moore/blees | Ellison & Schneider/J. Harris |
11285 | 5/6/1999 |
PG&E Midway Substation - Notice of Staff Workshop - Mailing List - CEC
7 page(s)
| | CEC/Docket File | CEC Cec Staff Workshop |
11280 | 6/8/1999 |
PSD Application
1 page(s)
| | Adams, Broadwell & Joseph/K. Poole | Radian International/P. Fields |
11279 | 6/7/1999 |
Letter to Jeffrey Harris and CURE Data Requests Numbers 34 through 113
35 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardozo |
11274 | 6/4/1999 |
Notice of Data Request and Data Response Workshop
5 page(s)
| | CEC/Docket Files | CEC/Moore |
11271 | 6/8/1999 |
Transmission Supplement 2 -- Sections 3.0, 4.0, remaining Appendices and Errata
1 page(s)
| | CEC/Docket File | Radian International/Don Muraoka |
11270 | 6/4/1999 |
Additional Copies of May 21, 1999 Transmission Supplement
10 page(s)
| | CEC/Docket File | Radian Interntional/Don Muraoka |
11269 | 6/7/1999 |
Letter of concern regarding that the unions through CURE are abusing the system by prolonging the permitting process in order to persuade project owners to perform all construction. . .
8 page(s)
| | CEC/Docket File | Associated Builders And Contractors, Inc./C. J. Ed |
11268 | 6/4/1999 |
Repeated Application for Confidential Designation: Cultural and Paleontological Resources
1 page(s)
| | CEC/Kent Smith | Radian International/Don Muraoka |
11265 | 6/3/1999 |
CURE's Petition for Inspection and Copying of Confidential Records
25 page(s)
| | Ellison & Schneider/Harris | CEC/Blees |
11261 | 6/4/1999 |
Relevant excerpts from the Handbook for Regulatory Compliance
54 page(s)
| | Radian/David Stein | CEC/Bergquist |
11253 | 6/2/1999 |
Committee Order on Scope of Review
4 page(s)
| | CEC/Docket File | CEC/Moore |
11252 | 6/2/1999 |
Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant (June 2, 1999)
20 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo |
11240 | 5/27/1999 |
Letter of Support for the Sunrise Project.
1 page(s)
| | CEC/Moore | County Of Kern/K. Peterson |
11239 | 5/27/1999 |
Letter of Support for the Sunrise Project.
1 page(s)
| | CEC/Moore | Arb, Inc. Constructors/B. Pratt |
11201 | 5/28/1999 |
Cal-ISO Letter; Updated PG&E Preliminary Facilities Study.
150 page(s)
| | CEC/Moore | Ellison & Schneider/Jeffery D. Harris |
11197 | 5/28/1999 |
Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant.
20 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo |
11192 | 5/27/1999 |
Letter of Support for the Sunrise Cogeneration and Power Project.
1 page(s)
| | CEC/Moore | City Of Taft - Administrative Offices/B. Baker |
11182 | 5/24/1999 |
Status Report # 2 and Statement of the Appropriate Scope of Environmental Review
16 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo/Heely |
11173 | 5/19/1999 |
Letter RE: Underground Injection Control
5 page(s)
| | CEC/Therkelsen | Us Epa |
11152 | 5/18/1999 |
Summary of the April 22, 1999 Data Response Workshop (Attachment: Proof of Service)
10 page(s)
| | Meeting Attendees | CEC/Bergquist |
11151 | 5/18/1999 |
Summary of the May 11, 1999 Data Response Workshop (Attachment: Proof of Service)
15 page(s)
| | Meeting Attendees | CEC/Bergquist |
11146 | 5/21/1999 |
Comments RE: Application to Transfer Emission Reduction Credits (ERCs)
2 page(s)
| | Sunrise Cogenration And Power Co./King | San Joaquin Valley Unified Apcd/Goff |
11144 | 5/18/1999 |
Notice of Receipt of Complete Application - Emission Reduction Credits Project #990380
1 page(s)
| | Aera Energy Llc/Daryl Gunderson/cec/docket Files | San Juan Valley Unified Air Pollution Control Dist |
11143 | 5/19/1999 |
Data Request and Issues Workshop and Sign-In Sheet
4 page(s)
| | CEC/Docket File | CEC/Berquist |
11142 | 5/18/1999 |
Caryn's scope of project and the latest version of blueprints
8 page(s)
| | Gwia/David Stein | CEC/Bergquist |
11140 | 5/21/1999 |
Sunrise Filings (Attachment: Proof of Service)
11 page(s)
| | CEC/Moore | CEC/Berquist |
11130 | 5/19/1999 |
Map: Fig. S1; Transmission Line Routing Alternatives
1 page(s)
| | CEC/Docket File | Radian |
11127 | 5/21/1999 |
Transmission Alternatives - Supplement Two (Attachment: Proof of Service)
200 page(s)
| | CEC/Docket Unit | Radian International |
11125 | 5/21/1999 |
Support for Joint Blueprint and Response to Argument Made by CURE (Attachment: Proof of Service)
4 page(s)
| | CEC/Moore/residing Member | Mccutchen, Doyle, Brown & Enersen, Llp/Kostka |
11124 | 5/21/1999 |
Joint Blueprint
5 page(s)
| | CEC/Moore/presiding Member | Elison & Schneider/Harris/cec/berquist |
11123 | 5/21/1999 |
Status Report Number 2: Sunrise Cogeneration and Power Company (Attachment: Proof of Service)
6 page(s)
| | CEC/Moore | Ellison & Schneider/Harris |
11116 | 5/20/1999 |
Letter RE: Associate Member Vacancy
3 page(s)
| | CEC/Keese | Ellison & Schneider/Harris |
11115 | 5/17/1999 |
Information on Phase I Transmission Supplement Filed by Sunrise Cogeneration and Power Co. (Attachment: Map; Proof of Service)
5 page(s)
| | CEC/Moore | Elison & Schneider/Harris |
11114 | 5/19/1999 |
Data Responses - Set 1C
500 page(s)
| | CEC/Docket Unit | Radian International/Muraoka |
11111 | 5/11/1999 |
Data Response and Issues Workshop mailing list
5 page(s)
| | CEC/Docket File | CEC Cec |
11085 | 5/10/1999 |
Public Records Act Request
2 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo/Texier |
11064 | 5/11/1999 |
Data Requests
12 page(s)
| | Texaco Global Gas & Power/Paul Dinkel | CEC/Bergquist |
11040 | 5/11/1999 |
Letter regarding an error in the Visual Resources Data Requests on page 7.
3 page(s)
| | Texaco Global Gas & Power | CEC/Bergquist |
11024 | 5/7/1999 |
Notice of Data Request and Issues Workshop - Tuesday - May 18, 1999 - CEC
4 page(s)
| | CEC/Docket File | CEC/Moore |
11021 | 5/6/1999 |
Notice of Status and Scoping Conference - Tuesday, May 25, 1999 - CEC
4 page(s)
| | CEC/Docket File | CEC/Moore |
11009 | 4/26/1999 |
Data Response and Issue Workshop - CEC - Mailing List
4 page(s)
| | CEC/Docket File | CEC Cec |
11001 | 5/5/1999 |
Transmission Alternative - Supplement One
25 page(s)
| | CEC/Docket Unit | Radian International/Muraoka |
11000 | 5/5/1999 |
CURE Data Responses - Set 1A
500 page(s)
| | Adams, Broadwell & Joseph | Radian International/Muraoka |
10931 | 4/30/1999 |
Notice of Data Response and Issues Workshop for the Sunrise Cogeneration and Power Project (May, 11, 1999) (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket File | CEC/Moore |
10927 | 4/30/1999 |
Data Responses - Set 1B (Attachment: Proof of Service)
30 page(s)
| | CEC/Docket Unit | Radian International/Muraoka |
10912 | 4/23/1999 |
Notice of a Staff Workshop Regarding Pacific Gas & Electric's Midway Substation
May 6, 1999 - CEC
3 page(s)
| | CEC/Docket File | CEC/Therkelsen |
10899 | 4/21/1999 |
Associate Member Vacancy
3 page(s)
| | CEC/Keese | Ellison & Schneider/J. Harris |
10897 | 4/21/1999 |
Status Report Number 1 of the California Energy Commission Staff
3 page(s)
| | CEC/Docket File | Energy Resources Conservation/Hough |
10882 | 4/19/1999 |
Status Report Number 1 (Attachment: Proof of Service)
6 page(s)
| | CEC/Moore | Ellison & Schneider/J. Harrin |
10872 | 4/16/1999 |
California Unions for Reliable Energy Status Report Number 1 (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardoza/Debonville |
10852 | 4/13/1999 |
Site Visit & Informational Hearing - Derby Acres, California
3 page(s)
| | CEC/Docket File | CEC/Hearing Office |
10851 | 4/13/1999 |
Informational Hearing & Site Visit Derby Acres, California
2 page(s)
| | CEC/Docket File | CEC/Hearing Office |
10841 | 4/6/1999 |
Summary of the March 10, 1999 Data Request Meeting (Attachment: Proof of Service)
11 page(s)
| | Meeting Attendees | CEC/Berquist |
10840 | 4/8/1999 |
Proof of Publication; Notice of Public Hearing
1 page(s)
| | CEC/Docket File | The Bakersfield Californian |
10828 | 4/15/1999 |
Data Responses - Set 1A
40 page(s)
| | CEC/Docket Unit | Sunrise Cogeneration And Power Company/King |
10772 | 4/8/1999 |
Notice of Data Response and Issues Workshop - April 22, 1999 - CEC
4 page(s)
| | CEC/Docket File | CEC/Moore |
10769 | 4/8/1999 |
Impact of La Paloma on Fire Protection Services
2 page(s)
| | CEC/Pryor | La Paloma Generating Company/Garratt |
10767 | 4/8/1999 |
CURE Data Responses (Set One)
89 page(s)
| | Adams, Broadwell & Joseph | Sunrise Cogeneration & Power/C. G. King |
10707 | 4/2/1999 |
Report of Conversation with Radian & Texaco, Dave Stein and Paul Dinkle - Bio surveys for existing access roads that fall outside of the requireed filed survey areas.
1 page(s)
| | CEC/Docket File | CEC/ |
10706 | 4/2/1999 |
Comments regarding the Preliminary Facilities Study, dated 3, 1998
6 page(s)
| | Pg&e/Maslowski | California Iso/Miller |
10676 | 4/1/1999 |
Report Purporting to Address Midway Substation "Curnulative" Impacts
16 page(s)
| | CEC/Docket File | Cameron Mckenna/Hindus |
10672 | 4/1/1999 |
Committee Scheduling Order
6 page(s)
| | CEC/Docket File | CEC/Moore/sharpless |
10657 | 3/31/1999 |
DATA RESPONSES - SET ONE
500 page(s)
| | CEC/Docket Unit | Sunrise Cogeneration & Power Co./King |
10622 | 3/24/1999 |
Sunrise Cogeneration and Power Company's - Objections and Notice of Need for Additional Time to Respond to Certain Data Requests From the California Unions For Reliable Energy (CURE) (Attachment: Proof of Service)
16 page(s)
| | CEC/Docket File | Ellison & Schneider/Harris |
10621 | 3/23/1999 |
Sign-in Sheet - Data Requests Workshop (March 10, 1999)
6 page(s)
| | CEC/Docket File | CEC/Berquist |
10608 | 3/23/1999 |
Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
1 page(s)
| | CEC/Moore | Tes Energy/P. Ervin |
10584 | 3/26/1999 |
Report of Conversation With Kern County Fire Marshall, Chaffin
3 page(s)
| | CEC/Pryor | CEC/Edwards |
10506 | 3/16/1999 |
Sunrise Cogeneration and Power Company's Objections and Notice of Inability to Respond to Certain Data Requests from the California Energy Commission Staff
11 page(s)
| | CEC/Docket File | Ellison & Schneider/Harris |
10505 | 3/11/1999 |
Order Granting Petition to Intervene - California Unions for Reliable Energy (CURE) (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket File | CEC/Moore |
10484 | 3/12/1999 |
Request for the loan of AFC
1 page(s)
| | Black & Veatch/Langlois | CEC/Bergquist |
10482 | 3/12/1999 |
Request for the loan of AFC
1 page(s)
| | Blalock | CEC/Bergquist |
10481 | 3/12/1999 |
Request for Agency Participation in the Review
3 page(s)
| | Ramirez | CEC/Therkelsen |
10477 | 3/16/1999 |
Thank you letter regarding the proposed project located at the southwest corner of State Route 33 and Shale Road (APN183-210-06)
2 page(s)
| | CEC/Docket File | Department Of Transportation |
10460 | 3/12/1999 |
Comments on the supplementary AFC material or consideration
2 page(s)
| | CEC/Bergquist | Department Of Conservation/Marshall |
10436 | 3/9/1999 |
Letter to Jeffrey Harris and First Set of CURE Data Requests
21 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Debonville |
10428 | 3/9/1999 |
March 1, 1999 Article regarding Site Visit and Informational Hearing
6 page(s)
| | Midway Driller/Wood | CEC/Ross |
10427 | 3/9/1999 |
Letter regarding Section 711.4(d) of the Fish And Game Code
1 page(s)
| | Texaco Global Gas & Power/Dinkel | CEC/Bergquist |
10424 | 3/9/1999 |
Notice of Workshop - March 19, 1999 - Derby Acres
4 page(s)
| | CEC/Docket File | CEC/Moore |
10422 | 3/8/1999 |
Newspaper article - Hearing Set for Proposed Fellows Power Plant
1 page(s)
| | CEC/Docket File | Daily Midway Driller Inc. |
10407 | 3/8/1999 |
Staff's Issue Identification Report
14 page(s)
| | CEC/Moore/keese | CEC/Bergquist |
10349 | 3/2/1999 |
Prevention of Significant Deterioration
2 page(s)
| | Us Environmental Protection Agency/Haber | Sunrise Cogeneration And Power Company/King |
10344 | 3/1/1999 |
Data Requests
27 page(s)
| | Texaco Global Gas & Power/Dinkel | CEC/Bergquist |
10342 | 2/26/1999 |
Notice of Data Request Workshop - March 10, 1999
4 page(s)
| | CEC/Docket File | CEC/Moore |
10308 | 2/25/1999 |
Notice of Site Visit and Informational Hearing - Thursday, March 18, 1999 - Derby Acres Park Recreation Building
8 page(s)
| | CEC/Docket File | CEC/Sharpless/moore |
10303 | 2/25/1999 |
Notice to Landowners Informational Hearing and Site Visit - March 18, 1999 - 4:00 p.m. Derby Acres Park Recreation Building
6 page(s)
| | CEC/Docket File | CEC/Moore/sharpless |
10280 | 2/19/1999 |
Letter RE: Submission of Revised Section 8.4 Land Use.
1 page(s)
| | CEC/Berquist | County Of Kern/Rickels |
10279 | 2/16/1999 |
Request for "Confidential" Classification of Submitted Information
1 page(s)
| | Sunrise Cogenration & Power Co./King | San Joaquin Valley Unified Air Pollution Control D |
10272 | 2/15/1999 |
Confirmation Letter that Texaco Global Gas & Power Entered into an Agreement with General Electric for the Purchase of Two Frame 7FA combustion turbine Generators for the Sunrise Cogeneration and Power Project on November 25, 1998.
1 page(s)
| | CEC Cec | Sunrise Cogeneration & Power Co./King |
10219 | 2/17/1999 |
Petition to Intervene by California Unions for Reliable Energy dated 2/17/99
7 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Joseph |
10213 | 2/16/1999 |
Requesting additional information regarding AFC.
2 page(s)
| | Burbank Media Studios/King | San Joaquin Valley Unified Air Pollution District/ |
10210 | 2/11/1999 |
Revisions to Section 8.4 - Consistent with the requirements of Kern County.
1 page(s)
| | CEC/Bergquist | Bakersfield Planning Dept./Rickels |
10207 | 2/10/1999 |
Review of Additional Information Requested Regarding Application for Certification
2 page(s)
| | Sunrise Cogeneration & Power Co/King | San Joaquin Valley Unified Air Pollution Control D |
10194 | 2/9/1999 |
Document Handling
1 page(s)
| | Librarian | CEC/Therkelsen |
10186 | 2/5/1999 |
Supplement Materials for Sunrise
1 page(s)
| | Afc Distribution List | CEC/Therkelsen |
10168 | 2/5/1999 |
Sunrise Cogeneration and Power Project Data Adequacy Worksheet
76 page(s)
| | CEC/Rohy/sharpless/moore/laurie | CEC/Bergquist |
10157 | 2/5/1999 |
Commission Order Finding AFC Incomplete-and-Notice of Commission Hearing 2/17/99 at CEC
2 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie/moore |
10128 | 1/29/1999 |
Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification.
3 page(s)
| | Kern Co. Environmental Health/Brownfield | CEC/Therkelsen |
10126 | 2/1/1999 |
Sunrise Cogeneration and Power Project Data Adequacy Recommendation
1 page(s)
| | CEC/Commissioners | CEC Cec Smith |
10100 | 1/25/1999 |
Comments and suggestions of the Midway-Sunset oil field.
4 page(s)
| | CEC/Bergquist | Department Of Conservation/Marshall |
10093 | 1/15/1999 |
Agenda Item for the Feb. 3, 1999 Business Meeting - Commission Consideration of the Executive Director's Data Adequacy Recommendation for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
| | CEC/Smith | CEC/Therkelsen |
10068 | 1/22/1999 |
Thank you letter and comments on Sunrise's review of the Project
1 page(s)
| | CEC/Docket | Office Of Transportation Planning/Frausto |
10067 | 1/22/1999 |
AFC for Sunrise Cogeneration and Power Project dated 1/12/99
6 page(s)
| | CEC/Bergquist | Adams Broadwell & Joseph/Poole |
10048 | 1/15/1999 |
Sunrise Cogeneration and Power Project - Data Adequacy Recommendation
117 page(s)
| | CEC/Commissioners | CEC/Smith |
9997 | 12/30/1998 |
RE: Confidential Designation, Dated Dec. 21, 1998, for 5 Subject Areas for the Sunrise Cogeneration and Power Project.
1 page(s)
| | Ellison & Schneider/J. Harris | CEC/Bergquist |
9973 | 12/29/1998 |
Potential Air Emissions Offsets, Application for Confidentiality
2 page(s)
| | Ellison & Schneider/Harris | CEC/Kent Smith |
9972 | 12/29/1998 |
Cultural and Paleontological Resources Applications for Confidentiality, Sunrise Cogeneration and Power Project.
2 page(s)
| | Ellison & Schneider/Harris | CEC/Kent Smith |
9960 | 1/7/1999 |
Delta AFC Pertaining to Transmission Line Shock Hazard.
8 page(s)
| | Texaco Global Gas & Power/Dinkel | CEC/Bergquist |
9952 | 1/6/1999 |
Data Adequacy Worksheet for Biological Resources
6 page(s)
| | Texaco Global Gas & Power/Blek | CEC/Bergquist |
9951 | 1/6/1999 |
Data Adequacy Worksheet for Visual Resources
5 page(s)
| | Texaco Global Gas & Power/Blek | CEC/Bergquist |
9937 | 1/5/1999 |
Hearing Officer Assignment. Gary Fay to assist the conducting proceedings on Sunrise Cogeneration Power Plant.
1 page(s)
| | CEC/Docket | CEC/Keese |
9925 | 12/23/1998 |
Letter regarding review process and description if the Sunrise Cogeneration and Power Company AFC.
2 page(s)
| | Kern County Board Of Supervisors/Mcquiston | CEC/Keese |
9924 | 12/23/1998 |
Notice of Receipt of the Application for Certification for the Sunrise Cogeneration and Power Project.
4 page(s)
| | CEC/Docket | CEC/Therkelsen |
9923 | 12/23/1998 |
Letter regarding the review process/information of the Sunrise Cogeneration and Power Co. AFC
2 page(s)
| | Member Of The Senate/Hon. Costa | CEC/Keese |
9917 | 12/29/1998 |
Petition to Intervene by La Paloma Generating Company, LLC.
3 page(s)
| | CEC/Docket | La Paloma Generation Co/Thompson |
9916 | 12/29/1998 |
Petition to Intervene by High Desert Power Project (RE: 98-AFC-3 and 98-AFC-4)
3 page(s)
| | CEC/Docket | Hdpp/Thompson |
9913 | 12/22/1998 |
Document Handling for the Sunrise Cogeneration and Power Project (AFC)
2 page(s)
| | Librarian/Members Of The Public | CEC/Therkelsen |
9912 | 12/22/1998 |
Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification
3 page(s)
| | Agency Distribution List | CEC/Therkelsen |
9910 | 12/23/1998 |
Information Regarding the review process and description of the Sunrise Cogeneration Power Company AFC
2 page(s)
| | Member Of The Assembly/Hon. Dean Flores | CEC/Keese |
9888 | 12/21/1998 |
Application for Confidential Designation.
1 page(s)
| | CEC/Kent Smith | Ellison & Schneider/Harris |
9887 | 12/21/1998 |
Submittal of Sunrise Cogeneration and Power Cmpany Application for Certification
(Attachment: Cover Letter Dated 12/21/98)
125 page(s)
| | CEC/Kent Smith | Sunrise Cogeneration And Power Company/King |
1426-0 | 12/18/2000 |
Committee Conference and Evidentiary Hearing
20 page(s)
| | | CEC |
1401-0 | 11/7/2000 |
Prehearing Conference
38 page(s)
| | | CEC |
1399-0 | 11/13/2000 |
Hearing
117 page(s)
| | | CEC |
1393-0 | 10/16/2000 |
Committee Conference
28 page(s)
| | | CEC |
1357-0 | 6/9/2000 |
Committee Conference
104 page(s)
| | | CEC |
1323-0 | 2/1/2000 |
Hearing
218 page(s)
| | | CEC |
1318-0 | 1/19/2000 |
Evidentiary Hearing
320 page(s)
| | | CEC |
1317-0 | 1/19/2000 |
Evidentiary Hearing
291 page(s)
| | | CEC |
1316-0 | 1/19/2000 |
Hearing
309 page(s)
| | | CEC |
1306-0 | 12/13/1999 |
Hearing
192 page(s)
| | | CEC |
1305-0 | 12/13/1999 |
Hearing
119 page(s)
| | | CEC |
1296-0 | 11/16/1999 |
Information Hearing
137 page(s)
| | | CEC |
1292-0 | 10/25/1999 |
Informational Hearing
144 page(s)
| | | CEC |
1275-0 | 9/15/1999 |
Information Hearing and Site Visit
79 page(s)
| | | CEC |
1265-0 | 9/15/1999 |
Information Hearing and Site Visit
79 page(s)
| | | CEC |
1263-0 | 8/20/1999 |
Hearing on Motion to Compel Before the CEC and Development Commission
59 page(s)
| | | CEC |
1256-0 | 6/10/1999 |
98-AFC-4
70 page(s)
| | | CEC |
1239-0 | 4/5/1999 |
Information Hearing Before: Gary Fay
53 page(s)
| | | CEC |