Docket Log

Docket: 98-AFC-04
Project Title: Sunrise Cogeneration and Power Project
Generated On: 7/26/2024 5:02:29 PM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
3193610/27/1999 In the Matter of The AFC for Sunrise Cogeneration and Power Project

1 page(s)
 CEC/DocketsAdams Broadwell/Joseph & Gardozo
3094711/17/2000 Change of Ownership of Sunrise Power Company

3 page(s)
 CEC/Pryor/docketsBusiness Development America/Loughman
3094410/27/2000 Final Staff Assessment - POS

182 page(s)
 CEC/DocketsCEC Cec
309419/20/2000 Request for Agency Participation in the Review of an Amendment to the AFC

3 page(s)
 Agency Distribution List/DocketsCEC/Therkelsen
309405/10/2000 Presiding Members's Proposed Decision - POS

376 page(s)
 CEC/DocketsCEC/Moore/pernell
309394/13/2000 Staff Recommendation Related to the Determination of Compliance and DTSC Review of Water Treatment Facility Data - POS

6 page(s)
 CEC/Moore/pernell/docketsCEC/Pryor
309342/3/2000 CURE's Group B Opening Brief - POS

22 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Poole
309301/12/2000 Letter with CEC's FSA enclosed

2 page(s)
 Member Of The Assembly/FlorezCEC/Smith
3090011/22/1999 Poole Letter to Goff/Gruber (11/19/99) re; Sunrise PDOC - POS

5 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cordozo/Heeley
308989/20/1999 Interim DFS Status Report

172 page(s)
 Sunrise Cogen Power Co/Way/cec/docketsPg&e/Tsai
308979/20/1999 Interim DFS Status Report

202 page(s)
 Sunrise Cogen Power Co/Way/cec/docketsPg&e/Tsai
3089010/14/1999 Testimony of Kathryn M. Matthew - Supplement to Staff's Testimony Final Staff Assessment Cultural Resources

2 page(s)
 DocketsMatthews
308521/10/2000 Region 9 Preliminary Remendiation Goals

35 page(s)
 Prg Table List/Cec/docketsUs Environmental Protection Agency/Smucker
3085110/12/1999 Errata to Staff's Testimony Final Staff Assessment Cultural Resources - Testimony of Kathryn M. Matthews

4 page(s)
 CEC/DocketsK. Matthews
308509/2/1999 Sunrise Comments on Preliminary Staff Assessments

175 page(s)
 CEC/DocketRadian International/Mukaoka
308499/2/1999 CURE's Comments on the Sunrise Preliminary Staff Assessment - POS

95 page(s)
 CEC/Pryor/docketsAdams Broadwell Joseph & Cardozo/Poole
3084811/30/1999 Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan - POS

109 page(s)
 CEC/DocketsRadian International/Muraoka
178861/12/2001 Public Adviser's Status Report 2000

44 page(s)
 CEC/DocketCEC/Public Adviser's Office
1748712/6/2000 Committee Amendment to Revised Presiding Member's Proposed Decision (PMPD) (Attachment: Proof of Service)

28 page(s)
 CEC/DocketCEC/Moore/pernell
1748512/6/2000 Notice of Determination (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Pryor
1746912/20/2000 Commission Decision

325 page(s)
 CEC/DocketCEC/Keese/laurie/moore/pernell/rosenfeld
1724812/4/2000 Letter of appreciation for staff's recent efforts to resolve issues and complete review

1 page(s)
 Air Resources Board/KennyCEC/Larson
1721612/8/2000 Corrections to Sunrise's Comments on Air Quality Conditions of Revised PMPD - POS

10 page(s)
 CEC/DocketsGrattan & Galati/Galati
1713711/29/2000 Final Determination of Compliance for the Proposed Sunrise Power Project

177 page(s)
 CEC/PryorSan Joaquin Valley Apcd/Sadredin
1713112/4/2000 Revised PMPD-FDOC Air Quality Conditions - POS

16 page(s)
 CEC/DocketsGrattan & Galati/Galati
1712612/1/2000 Staff Comments - Revised Presiding Member's Proposed Decision of 11/20/2000 - POS

8 page(s)
 CEC/Moore/pernellCEC/Pryor
1707411/22/2000 Determination on Stream Alteration Notification no. R4-2000-0136 (Attachment: Proof of Service)

6 page(s)
 Sunrise Cogeneration And Power Co./SoaresDept. Of Fish And Game/Loudermilk
1707311/22/2000 Affidavit RE: Change of Ownership (Attachment: Proof of Service)

5 page(s)
 CEC/DocketEdison/Loughman
1706611/27/2000 Letter Requesting the that the Undersigned be Removed from the Limited Intervenor List

1 page(s)
 CEC/DocketHdpp Llc/Wolfinger
1693011/20/2000 San Joaquin Valley Air Pollution Control District's Preliminary Determination of Compliance - POS

99 page(s)
 CEC/DocketsGrattan & Galati/Galati
1690311/20/2000 Notice of Commission Hearing Re: Revised Presiding Member's Proposed Decision

6 page(s)
 CEC/DocketsCEC/Moore/pernell
1690111/17/2000 Revised Presiding Member's Proposed Decision - POS - P800-00-010

394 page(s)
 CEC/DocketsCEC/Moore/pernell
1689711/17/2000 Effective November 17, 20000 Edison Mission Energy aquired 100% ownership of Sunrise Power Company from Texaco Inc.

2 page(s)
 CEC/PryorEdison Mission Energy/Loughmair/hall
1689311/16/2000 Revision to Staff's 3rd Geology Condition of Certification (Geo-3) - POS

7 page(s)
 CEC/Moore/pernellCEC/Pryor
1683411/13/2000 1. Sunrise Proposed Revision to PMPD; 2. Errata to Sunrise Proposed Revisions to PMPD; 3. Sunrise Power Company's Brief After November 7, 2000 Evidentiary Hearing (Attachment: Proof of Service)

326 page(s)
 CEC/DocketGrattan & Galati/Galati
1668611/7/2000 Information from Bob Hartmen, Kaddar Enterprises RE: "The Flapper"

1 page(s)
 CEC/DocketCEC/Pryor
1668511/7/2000 Supplemental Testimony of David A. Stein on Air Quality (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Galati
1668411/7/2000 Supplemental Testimony of David A. Stein on Noise (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Galati
1668311/8/2000 Report of Conversation - With John Grattan, Grattan & Galati (Counsel to Sunrise Power Project) RE: Condition of Certification Noise-6. (Attachment: Proof of Service)

5 page(s)
 CEC/DocketCEC/Kisabuli
1668211/8/2000 Declaration of M. Kisabuli

1 page(s)
 CEC/DocketCEC/Kisabuli
1668111/8/2000 Declaration of Joseph Diamond, Ph.D.

1 page(s)
 CEC/DocketCEC/Diamond
1667911/8/2000 Letter RE: Anticipation of Transfer of Ownership and Determination of Compliance (Attachment: Proof of Service)

5 page(s)
 CEC/PryorSan Joaquin Apcd/Sadredin/goff
1661611/7/2000 Staff's Proposed Language for CUL-1

3 page(s)
 CEC/DocketCEC/Staff
1661511/2/2000 Testimony - Evidentiary Hearing

1 page(s)
 CEC/DocketRadian International/Muroaka
1661411/3/2000 Staff Motion for Continuance of Hearing on Air Quality Issues (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Ogata
1660111/6/2000 Opposition to CEC Staff's Motion for Continuance of Hearing on Air Quality Issues - POS

5 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1658711/7/2000 Air Quality

2 page(s)
 CEC/DocketsCEC
1656011/2/2000 Testimony - Evidentiary Hearing (Attached: Proof of Service)

96 page(s)
 CEC/DockerRadian International/Muraoka
1653711/1/2000 Request to change the Address for the TANC General Counsel (Dennis W. De Cuir) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketDennis W. De Cuir
1650310/27/2000 Notice of Evidentiary Hearing and Hearing Order (November 7, 2000)

3 page(s)
 CEC/DocketCEC/Moore/pernell
1649910/30/2000 Notice of Availability - Supplement to the Final Staff Assessment (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCEC/Therkelsen
1649210/26/2000 Report of Conversation W/Mervyn Soares (Sunrise Power Co.) RE: Status of the Prevention of Serious Deterioration Permit (PSD) (Attachment: Proof of Service)

5 page(s)
 CEC/DocketCEC/Pryor
1648310/27/2000 Prehearing Conference Statement of the California Energy Commission - October 27, 2000 (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCEC/Holmes
1648210/27/2000 Notice of Evidentiary Hearing and Hearing Order (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCEC/Moore/pernell
1648110/31/2000 Air Quality Issues Update, and Errata - Response to Data Request 2 (Oct. 6, 2000) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketGrattan & Galati/Grattan
1647710/30/2000 Letters with Attached Compliance Certification by Southern California Edison Company, and by Edison Mission Energy (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1647610/30/2000 United States Environmental Protection Agency's Letter of October 24, 2000 to Gordon Thompson, Vice President of the Sunrise Power Company RE: the PSD Permit for the Sunrise Project (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1642410/26/2000 Prehearing Conference Statement - POS

20 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1642310/26/2000 Errata - Amended Application (Section 2.2.7.1) - POS

6 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1640710/26/2000 Prehearing Conference Statement of the California Unions for Reliable Energy October 26, 2000 (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCure/Joseph/poole
1635410/25/2000 Sunrise Power Company's Notice of Change of Ownership Submitted to the San Joaquin Valley Air Pollution Control District (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1619510/20/2000 Notice of Prehearing Conference and Scheduling Order (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Moore/pernell
1618210/16/2000 San Joaquin Valley Unified APCD's Preliminary Determination of Compliance for the Sunrise Power Project (Attachment: Proof of Service)

166 page(s)
 CEC/DocketSunrise Power Co./Grattan
1600710/11/2000 Request for Proposal

2 page(s)
 Pg&e/SmithEme/Fohrer
1599210/6/2000 Data Responses 1 - 8: Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application; (Enclosures/Attachment: Data Response 5 (Input and Output Files for the Cumulative Impact Modeling (Disks)) Proof of Service)

58 page(s)
 CEC/DocketUrs/Muraoka
1599110/6/2000 Errata Page, Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application (Attachment: Proof of Service)

9 page(s)
 CEC/DocketUrs/Muraoka
1598710/6/2000 Data Responses 1- 8, Responding to CEC Staff Data Requests Issues Sept. 27, 2000

58 page(s)
 CEC/DocketUrs/Muraoka
159669/27/2000 Data Requests - POS

10 page(s)
 Sunrise Power Co./SoaresCEC/Pryor
158559/29/2000 Response of the California Unions for Reliable Energy to Applicant's Proposed Schedule (Attachment: Proof of Service)

7 page(s)
 CEC/DocketCure/Joseph/poole
158549/29/2000 Notice of Committee Conference (October 10, 2000) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketCEC/Moore
158539/29/2000 Status Report No. A1 With Staff's Proposed Schedule (Attachment: Proof of Service)

10 page(s)
 CEC/Moore/pernellCEC/Pryor
158529/18/2000 Report of Conversation RE: Relocation of Main Water Supply Pipelines (Attachment: Proof of Service)

5 page(s)
 CEC/DocketCEC/Pryor
158299/22/2000 Review RE: Notice of Receipt of Complete Application (Attachment: Proof of Service)

5 page(s)
 Sunrise Power Co./SoaresSan Joaquin Valley Apcd/Goff
158219/19/2000 Determination of Compliance Review - POS

178 page(s)
 CEC/DocketsRadian International/Muraoka
158139/20/2000 Document Handling for the Amendment

3 page(s)
 LibrarianCEC/Haussler
158129/20/2000 Notice of Receipt of an Amendment

4 page(s)
 CEC/DocketCEC/Haussler
157829/21/2000 Report of Conversation RE: Biological Resources - Compensation Ratios With Sunrise Power Project (Attachment: Proof of Service)

5 page(s)
 CEC/DocketCEC/York
157819/18/2000 Proposed Schedule

6 page(s)
 CEC/DocketGrattan & Galati/Grattan
157709/19/2000 Committee Requests for Response to Applicant's Proposed Schedule - POS

6 page(s)
 CEC/DocketsCEC/Fay
157559/12/2000 Air Quality and Public Health Modeling CD-ROM (6)

2 page(s)
 CEC/DocketsRadian International/Muraoka
157279/14/2000 Report of Conversation With John Grattan RE: Schedule for Sunrise Amendments to the AFC (Attachment: Proof of Service)

2 page(s)
 CEC/DocketCEC/Holmes
157269/12/2000 Sunrise Power Project Amended AFC

488 page(s)
 CEC/TherkelsenGrattan & Galati
155938/30/2000 Letter to San Joaquin Valley Unified Air and Pollution Control District regarding Raised Issues - POS

7 page(s)
 CEC/Moore/pernellUs Environmental Protection Agency/Rios
155878/25/2000 Address change to TANC's general counsel - POS

4 page(s)
 CEC/DocketsDecuir/Lynch
155868/23/2000 Response to the letter received on 8/16/00 regarding client's intent to file an amendment - POS

6 page(s)
 Grattan & GalatiCEC/Therkelsen
155028/21/2000 Letter to agree to operate in peaking mode for a limited period - from summer peak of 2001 until fall 2004. - POS

7 page(s)
 CEC/TherkelsenGrattan & Galati
149416/27/2000 Opposition to CURE's Motion for Official Notice or to Reopen the Record (Attachment: Proof of Service)

11 page(s)
 CEC/DocketGrattan & Galati/Grattan
149376/27/2000 Sunrise PMPD Biological Resources Condition of Certification BIO-10 - POS

6 page(s)
 CEC/Moore/pernellCEC/Holmes
148256/13/2000 Motion of the California Unions for Reliable Energy for Official Notice of Agency Filings or, in the Alternative, to Reopen the Records (Attachment: Proof of Service)

27 page(s)
 CEC/DocketCure/Joseph/poole
147616/6/2000 Staff Comments on Sunrise PMPD

1 page(s)
 Sunrise Afc ParticipantsCEC/Holmes
147546/2/2000 Transmission Agency of Northern California Comments on the Presiding Member's Proposed Decision (Attachment: Proof of Service)

8 page(s)
 CEC/DocketDe Cuir & Somach/De Cuir
147456/6/2000 Committee Conference - PMPD Project Mailing List

1 page(s)
 CEC/DocketsCEC Cec
147416/2/2000 Comments of the CURE's Presiding Members Proposed Decision - POS

24 page(s)
 CEC/DocketsCure/Joseph/poole
147316/2/2000 Comments on the Presiding Members Proposed Decision - POS

15 page(s)
 CEC/DocketsGrattan & Galati/Grattan
147266/2/2000 Comments of Commission Staff on the Presiding Members' Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)

12 page(s)
 CEC/DocketCEC/Holmes
147186/2/2000 Comments of the Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)

13 page(s)
 CEC/DocketCEC/Holmes
147176/2/2000 Comments of Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)

13 page(s)
 CEC/DocketCEC/Holmes
146565/26/2000 Status Report - POS

5 page(s)
 CEC/Moore/pernellCEC Cec Pryor
146265/26/2000 Energy Commission Order - Order # 00-0523-03

5 page(s)
 CEC/DocketsCEC/Keese
145415/19/2000 PSD permit SJ 99-01 - POS

6 page(s)
 Sunrise Cogeneration/HallUs Environmental Protection Agency/Haber
144395/10/2000 Letter submitting Presiding Member's Proposed Decision - POS

9 page(s)
 CEC/DocketsCEC/Moore/pernell
144215/10/2000 Letter from Poole to Moore/Pernell (5/8/00) - POS

9 page(s)
 CEC/DocketCure/Poole
143575/1/2000 Review RE: Traffic Control Plan (Attachment: Proof of Service)

4 page(s)
 Sunrise Cogeneration And Power Co./SoaresDept. Of Transportation/Sorensen
143415/1/2000 Staff Review of Phase II Environmental Site Assessment (Phase II ESA) and other Documents prepared for the Sunrise Cogeneration and Power Plant. (Attachment: Proof of Service)

3 page(s)
 CEC/PryorDept. Of Toxic Substances Control/Shaddy
141473/30/2000 District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits

2 page(s)
 Sjvuapcd/SadredinUs Environmental Protection Agency/Haber
141413/30/2000 District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits

2 page(s)
 Sjvuapcd/SadredinUs Environmental Protection Agency/Haber
141004/5/2000 Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)

2 page(s)
 CEC/PryorU.s. Epa/Haber
140994/5/2000 Sunrise Cogeneration and Power Company's Letter to Marc Pryor, California Energy Commission RE: Response to Memorandum Dated March 29, 2000 (Attachment: Proof of Service)

4 page(s)
 CEC/DocketGrattan & Galati/Grattan
140964/5/2000 Letter from US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS

7 page(s)
 CEC/DocketCEC/Johnson
140904/5/2000 Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)

3 page(s)
 CEC/PryorU.s. Epa/Haber
140733/31/2000 Comments RE: Review of March 29, 2000 Memorandum to the Sunrise Committee Regarding the Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.

2 page(s)
 CEC/PryorCure/Poole
140563/31/2000 RE: Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.

2 page(s)
 CEC/PryorCure/Poole
140463/29/2000 DTSC Review of Water Treatment Facility Data (Attachment: Proof of Service)

5 page(s)
 CEC/Moore/pernellCEC/Pryor
139413/14/2000 Texaco California, Inc. operations in the Midway Sunset oilfield (PSD permits SJ 78-16 and SJ 78-17) - Proof of Service

6 page(s)
 Texaco California Inc./BulkeleyUs Environmental Protection Agency/Haber
139403/14/2000 Response to Information Request Dated 2/1/00 - Prevention of Significant Deterioration Application (SJ 99-01) - Proof of Service

44 page(s)
 U.s. Epa/HaberSunrise Cogeneration/Soares
138432/29/2000 Notice of Evidentiary Hearing and Hearing Order - Project mailing list

2 page(s)
 CEC/DocketCEC Cec
138143/6/2000 Sunrise Cogeneration and Power Company's Letter RE: Oxidation Catalysts, dated February 23, 2000 (Attachment: Proof of Service)

2 page(s)
 CEC/DocketGrattan & Galati/Galati
136782/23/2000 Amended Proof of Service for Transmission Agency of Northern California Reply Brief on Air Quality.

4 page(s)
 CEC/DocketDecuir & Somach/Lynch
136772/18/2000 Sunrise Cogeneration and Power Company's Reply Brief, Group C Topics, dated February 18, 2000. (Attachment: Proof of Service)

28 page(s)
 CEC/NashGrattan & Galati/Galati
136752/18/2000 Transmission Agency of Northern California Reply Brief on Air Quality (Attached: Proof of Service)

4 page(s)
 CEC/DocketDecuir & Somach/Decuir
136682/18/2000 Group C Reply Brief - February 18, 2000 (Attachment: Proof of Service)

19 page(s)
 CEC/DocketCure/Joseph/poole
136642/18/2000 Reply Brief of Commission Staff

20 page(s)
 CEC/DocketsCEC/Holmes
136532/18/2000 E-mail dated 2/17/00 from Larry Allen to Marc Pryor 2/14/00 RE: Sunrise Cogeneration & Power Project Evidentiary Hearing; Exhibit 107 Haley Declaration (Attachment: Proof of Service)

5 page(s)
 CEC/PryorLarry Allan
136412/14/2000 Hearing Brief of the San Luis Obispo County Air Pollution Control District as an Interested Public Agency - Proof of Service

14 page(s)
 CEC/DocketSan Luis Obispo Co. Apcd/Allen
136132/14/2000 Company's Withdrawal of Suggested Amendments to Air Quality Conditions of Certifications 2, 3, and 4 and Submission of New Air Quality Amendment 41 - Proof of Service

6 page(s)
 CEC/DocketGrattan & Galati/Grattan
135972/11/2000 Transmission Agency of Northern California - Opening Briefing on Air Quality (Attachment: Proof of Service)

5 page(s)
 CEC/DocketDecuir & Somach/Lynch
135952/11/2000 Opening Brief of Commission Staff on The Sunrise Cogeneration and power Project AFC - Feb. 11, 2000 (Attachment: Proof of Service)

12 page(s)
 CEC/DocketCEC/Holmes
135942/11/2000 Sunrise Cogeneration and Power Company's Opening Brief, Group C Topics, Dated Feb. 11, 2000 (Attachment: Proof of Service)

12 page(s)
 CEC/DocketGrattan & Galati/Galati
135922/11/2000 Group C Opening Brief (February 11, 2000) (Attachment: Proof of Service)

29 page(s)
 CEC/DocketCure/Joseph/poole
135792/10/2000 Public Hearing - LCP Amendment No. 1-99 (Harbor Terrace)

1 page(s)
 CEC/DocketCa Coastal Commission
135682/10/2000 Reply Brief of Commission Staff - Proof of Service

15 page(s)
 CEC/DocketCEC/Holmes
135632/7/2000 Sunrise Cogeneration and Power Company (PSD Permit SJ 99-01) and Texaco California, Inc. (TCI) Operating in the Midway Sunset Oilfield (PSD Permits SJ 78-16 and SJ 78-17) (Attachment: proof of Service)

2 page(s)
 Sunrise Cogeneration And Power Co/Hall/texaco Ca/bU.s. Epa/Haber
135552/10/2000 Reply Brief, Group B Topics, Dated February 10, 2000. (Attachment: Proof of Service)

15 page(s)
 CEC/DocketGrattan & Galati/Galati
135522/10/2000 Group B Reply Brief (February 10, 2000) (Attachment: Proof of Service; Cover Letter)

22 page(s)
 CEC/DocketCure/Joseph
135352/8/2000 Amendments to Air Quality Conditions of Certification 2, 3, and 4, dated 2/8/00 - Proof of Service

6 page(s)
 CEC/DocketGrattan & Galati/Grattan
135102/3/2000 Sunrise Power's Reply Brief - Group A Topics, and Opening Brief - Group B Topics - Proof of Service

29 page(s)
 CEC/DocketGrattan & Galati/Galati
135092/3/2000 Opening Brief of Commission Staff - Proof of Service

20 page(s)
 CEC/DocketCEC/Holmes
135082/3/2000 Reply Brief of Commissions Staff - Proof of Service

10 page(s)
 CEC/DocketCEC/Holmes
135052/3/2000 CURE's Group A Reply Brief

11 page(s)
 CEC/DocketCure/Joseph/poole
134621/24/2000 Declaration of Joseph M. Loyer; Hazardous Materials Management Supplementary Testimony By Joseph M. Loyer, January 20, 2000 (Attachment: Proof of Service)

3 page(s)
 CEC/DocketCEC/Loyer
134611/26/2000 Testimony of Phyllis Fox, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results

5 page(s)
 CEC/DocketCure/Joseph/poole
134601/26/2000 Testimony of Bruce W. Page, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results

10 page(s)
 CEC/DocketCure/Joseph/poole
134501/28/2000 Report of Conversation with Susan Jones, Valley Branch, USFWS - Proof of Service

5 page(s)
 CEC/DocketCEC/York
134481/28/2000 Report of Conversation with Warden Brain Naslund regarding: Valley Waste Disposal ponds - Proof of Service

5 page(s)
 CEC/DocketCEC/York
134471/28/2000 Report of Conversation with L. Bright (Valley Waste), M. Soares (Sunrise), C. Jackson (Texaco), P. Dinkle (Texaco), D. Wright (Texaco) and K. Garlick (USFWS) Regarding: Site visit to Valley Waste Disposal facility - Proof of Service

5 page(s)
 CEC/DocketCEC/York
134331/27/2000 Comments of the review of the technical cultural resources inventory report (May 1999) Proof of Service

6 page(s)
 Pacific Legacy/JacksonUs Dept. Of The Interior/Christian
134121/27/2000 Testimony of Bruce W. Page, Ph.D on Behalf of CURE on Water Sampling Results - Attachment: Material Balance on Metals Present in Produced Water - Proof of Service

13 page(s)
 CEC/DocketCure/Joseph/poole
134021/27/2000 Testimony of J. Phyllis Fox, Ph.D on Behalf of CURE on Water Sampling Results - Proof of Service

8 page(s)
 CEC/DocketCure/Joseph/poole
134001/28/2000 Sworn Declaration and Supplemental Air Quality Testimony of John E. Haley, dated January 26, 2000 - Proof of Service

14 page(s)
 CEC/DocketGrattan & Galati/Grattan
133581/24/2000 Transmission Agency of Northern California Brief on Transmission System Engineering. (Attachment: Proof of Service)

4 page(s)
 CEC/DocketDecuir & Somach/Decuir/tanc
133551/24/2000 Sunrise Cogeneration and Power Company Project's Answers of January 21, 2000 to CURE's Questions Regarding TCI's Water Treatment System Dated January 14, 2000. (Attachment: Proof of Service)

18 page(s)
 CEC/DocketGrattan & Galati/Galati
133531/24/2000 Opening Brief of Commission Staff on the Sunrise Cogeneration and Power Project Application for Certification (Attachment: Proof of Service)

11 page(s)
 CEC/DocketCEC/Holmes
133521/24/2000 Sunrise Cogeneration and Power Company Project's Opening Brief - Group A Topics, Dated January 24, 2000. (Attachment: Proof of Service)

13 page(s)
 CEC/DocketGrattan & Galati/Galati
133481/24/2000 California Unions for Reliable Energy - Group A Opening Brief January 24, 2000. (Attachment: Proof of Service)

13 page(s)
 CEC/DocketCure/Joseph/poole
133451/21/2000 ORDER Denying Petition to Intervene - Proof of Service

5 page(s)
 CEC/DocketCEC/Moore
133211/12/2000 Declaration of Amanda Stenick (Attachments: Land Use - Testimony; Letter to CEC/Pryor from Co. of Kern/David B. Rickels, Dated 12/16/1999)

3 page(s)
 CEC/DocketCEC/Stenick
133201/12/2000 Declaration of Gary Walker (CEC) (Attachments: Visual Resources - Testimony of Gary Walker; Letter to CEC/Pryor from Co. of Kern from David Rickels, Dated 12/16/1999)

3 page(s)
 CEC/DocketCEC/Walker
133031/18/2000 Report of Conversation with Larry Bright, Valley Waste - Wastewater stream and the ponds to Valley Waste

1 page(s)
 CEC/DocketCEC/York
132851/18/2000 Letter to Galati from Poole (1/14/2000) regarding 98-AFC-1 with attached questions regarding Texaco's water treatment system - Proof of Service

7 page(s)
 CEC/DocketCure/Poole
132801/13/2000 Certification of Statewide Compliance

2 page(s)
 Us Epa/HaberSjvapcd/Philip M. Jay
132781/12/2000 Certification of Statewide Compliance

4 page(s)
 Seyed Sjvuapcd/SadredinUs Epa/Haber
132621/14/2000 Notice of Evidentiary Hearing Continuation and Briefing Order - Proof of Service

7 page(s)
 CEC/DocketCEC/Moore/rohy
132381/7/2000 Supplemental Testimony of J. Phyllis Fox, Ph.D on Behalf of the CEC Reliable Energy on Public Health Impacts - Proof of Service

7 page(s)
 CEC/DocketCure
132321/12/2000 Letter with CEC's FSA enclosed.

2 page(s)
 Member Of The Senate/CostaCECSCecsmith
132311/12/2000 Letter with enclosed copy of CEC's Final Staff Assessment

2 page(s)
 Kern Co. Board Of Supver./McquistonCEC/Smith
132271/10/2000 Notice to Kern County Operators - Field inspection of Kern County oil fields - Proof of Service

8 page(s)
 CEC/DocketDept. Of Conservation/Hal Bopp
132051/13/2000 Southern Region Hearing Board Meeting Decision.

2 page(s)
 CEC/DocketSjvapcd/Smith
132011/11/2000 Evaluation RE: Manuscript Retitled "Pathological Findings in Kit Foxes and Deer Mice Inhabiting an Oil Field in California" By Charllton et al.

8 page(s)
 Dr. Kristin G. CharltonJournal Of Wildlife Disease Association/Pence
131961/13/2000 OA/QC and Chain of Custody Documentation for Sunrise's Response to CEC Data Request #3 Associated with the Sunrise Cogeneration and Power Company Project, Dated January 7, 2000. (Attachment: Proof of Service)

34 page(s)
 CEC/NashGrattan & Galati/Galati
131856/23/1999 California Endangered Species Act, Section 2081(B) Permit Application

96 page(s)
 California Depart. Of Fish & Game/Cec/docketsSunrise Cogeneration
131841/7/2000 Report of Conversation With Ed Pike (US EPA) RE: PM10 ERCs for Sunrise Project (Attachment: Proof of Service)

1 page(s)
 CEC/DocketCEC/Loyer
131821/7/2000 Report of Conversation with Mervyn Soares (Sunrise Cogeneration & Power Corp. RE: PM10 and NOx ERCs. (Attachment: Proof of Service)

1 page(s)
 CEC/DocketCEC/Loyer
131791/10/2000 Staff Data Request Workshop Notice (Water and Biological Resources) (January 18, 2000) (Attachments: Map (Directions to California Energy Commission); Proof of Service)

3 page(s)
 CEC/DocketCEC/Moore
131751/7/2000 District Response to EPA Comments Sunrise Cogeneration PM10 Emission Reduction Credits.

2 page(s)
 San Joaquin Valley Unified Apcd/SadredinUs Epa/Haber
131621/10/2000 Cure's Comments (to Branoff 1/7/00) RE: PSD Permits SJ 99-01, SJ78-16 and SJ 78-17. (Attachment: Proof of Service)

74 page(s)
 CEC/DocketCure/Poole
131571/7/2000 Response to CEC Data Requests Set 3

65 page(s)
 CEC/DocketGrattan & Galati/Galati
131511/6/2000 Executor Streambed Alteration Agreement associated with the Sunrise Cogeneration and Power Company, Dated December 29, 1999. (Attachment: Proof of Service)

9 page(s)
 CEC/DocketGrattan & Galati/Grattan
131481/6/2000 Review and Comments RE: Air Quality Section of the Final Staff Assessment.

10 page(s)
 CEC/PryorSlo Apcd/Allen
131421/5/2000 Request for Hearing - Petitioner: CURE - Subject: The District's Recent Issuance of the Conditional Determination of Compliance for the Sunrise Cogeneration and Power Project #981220. (Attachment: Proof of Service, Fax Cover Sheet)

17 page(s)
 CEC/DocketSan Joaquin Valley Unified Apcd/
131401/5/2000 Sunrise Cogeneration and Power Company's Opposition to the San Luis Obispo County APCD's Petition to Intervene, Dated January 5, 2000. (Attachment: Proof of Service)

3 page(s)
 CEC/NashGrattan & Galati
131251/5/2000 Revision of Staff's Air Quality Testimony (Attachment: Proof of Service)

6 page(s)
 CEC/Moore/rohyCEC/Pryor
131221/4/2000 Supplemental Testimony to the Worker Safety and Fire Protection (Attachment: Proof of Service)

4 page(s)
 CEC/Moore/rohyCEC/Pryor
131151/3/2000 Declaration of Dr. Kristin Charlton, (December 17, 1999); Curriculum Vitae (Attachment: Proof of Service)

5 page(s)
 CEC/DocketDr. Kristin Charlton
131141/3/2000 Third Amendment to Prehearing Conference Statement, Dated January 3, 2000. (Attachment: Proof of Service)

25 page(s)
 CEC/DocketGrattan & Galati/Galati
131131/3/2000 Testimony of Gregory E. Salyer of Modesto Irrigation District Regarding Cumulative Air Quality Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California. (Attachment: Proof of Service)

17 page(s)
 CEC/DocketDecuir & Somach/Decuir
131051/5/2000 Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (Attachment: Service List)

6 page(s)
 CEC/DocketCure/Heeley
131001/3/2000 TESTIMONY - Evidentiary Hearings Part 3

110 page(s)
 CEC/DocketRadian/Muraoka
130971/4/2000 Sunrise Cogeneration and Power Company's Declaration of James Bunker, Dated January 4, 2000. (Attachment: Proof of Service)

3 page(s)
 CEC/NashGrattan & Galati/Galati
130951/4/2000 Sunrise Cogeneration and Power Company's Water Test Results, (Dated January 4, 2000) Attachment: Proof of Service)

29 page(s)
 CEC/NashGrattan & Galati/Galati
130931/4/2000 Data Requests. (Proof of Service)

6 page(s)
 Texaco Global Gas & Power/SoaresCEC/Pryor
130891/3/2000 Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Air Quality Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)

500 page(s)
 CEC/DocketCure/Joseph
130881/3/2000 Supplemental Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Worker Safety Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)

500 page(s)
 CEC/DocketCure/Joseph
130871/3/2000 Testimony of Phyllis Fox, Ph. D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (January 3, 2000)

113 page(s)
 CEC/DocketCure/Joseph
130861/3/2000 Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Public Health Impacts of the Sunrise Cogen and Power Project. (January 3, 2000)

1000 page(s)
 CEC/DocketCure/Joseph
1307912/30/1999 Letter recommendation that the permit requirement under section AQ-C2, requiring oxidation soot filters be changed

1 page(s)
 CEC/DocketCatalytic Exhaust Products Ltd./Canning
1307412/31/1999 Petition for Intervention as an Individual or Agency (Represented by Larry Allen) (Attachment: Proof of Service)

6 page(s)
 CEC/DocketSan Luis Obispo Co. Apcd
1307012/31/1999 Letter RE: Water used as Feedstock for the Heat Recovery Steam Generator

2 page(s)
 CEC/Moore/rohyDept. Of Toxic Substance Control
1306412/17/1999 Final Staff Assessment Part 3

167 page(s)
 CEC/DocketCEC Cec
1302712/24/1999 NOTICE of Availability - Final Staff Assessment, Part III. (Attachment: Order Form)

3 page(s)
 CEC/DocketCEC/Therkelsen
1301212/22/1999 Request for Agency Comments on the Final Staff Assessment, Part III

2 page(s)
 Agency Distribution ListCEC/Therkelsen
1301012/22/1999 Handling of the Final Staff Assessment, Part III

1 page(s)
 LibrarianCEC/Therkelsen
1300312/14/1999 Formal Consultation Regarding Features Within the Jurisdiction of the Department of Fish & Game

8 page(s)
 CEC/PyrorDept. Of Fish & Game/Loudermilk
1299512/21/1999 District Witness to Sponsor Final Determination of Compliance at CEC Evidentiary Hearing on 1/10/00

3 page(s)
 Sjvapcd/SadredinCEC/Fay
1296512/20/1999 San Joaquin Valley Air Pollution Control District Notice of Public Hearing Before the Hearing Board of the San Joaquin Valley Unified Air Pollution Control District Regarding Permit (meeting date 1/12/00) - Proof of Service

5 page(s)
 CEC/DocketCure/Heeley
1296312/20/1999 Amendment to the CURE and Doug Zimmerman's Request for Hearing - Proof of Service

31 page(s)
 CEC/DocketCure/Joseph
1296112/17/1999 Committee Response to Staff Comments Filed December 14, 1999 (Attachment: Proof of Service)

1 page(s)
 CEC/DocketCEC/Moore/rohy
1294112/17/1999 Landscaping Requirement - Proof of Service

6 page(s)
 CEC/PryorBakersfield Planning Dept./Rickels
1293012/14/1999 California Energy Commission Staff - Comments on Schedule (December 14, 1999)

3 page(s)
 CEC/DocketCEC/Holmes
1288912/9/1999 Status Report (December 10, 1999) (Attachment: Proof of Service)

5 page(s)
 CEC/DocketCure/Joseph
1287212/10/1999 Compliance Certification

2 page(s)
 CEC/TherkelsenSan Joaquin Valley Apcd /Sadredin
1286612/7/1999 Notice of Evidentiary Hearings -and- Hearing Order - CEC - January 10, 11 and 13, 2000 - Attachment

8 page(s)
 CEC/DocketCEC/Rohy/moore
1286212/8/1999 Statutory Deadline for Determination of Compliance - Proof of Service

5 page(s)
 Sunrise/HallSan Joaquin Valley Apcd/Goff
1285012/9/1999 Sunrise Cogeneration and Power Company's Revised Schedule (Attachments: Attachment A - Revised Schedule; Proof of Service)

3 page(s)
 CEC/DocketGrattan & Galati
1284412/8/1999 Answer to CURE Request for Hearing - December 8, 1999 (Attachment: Proof of Service)

6 page(s)
 CEC/DocketGrattan & Galati
1280712/2/1999 Request for Hearing to Review the San Joaquin Valley Unified Air Pollution Control District's Grant of a Conditional Final Determination of Compliance (November 29, 1999) (Attachment: Exhibits; Proof of Service)

1019 page(s)
 CEC/DocketCure/Joseph
1278111/24/1999 Poole Letter to Pryor (11/23/99) Attachments 1 & 2: Excerpts from Environmental Oversight Plan for construction of new federal courthouse in Sacramento; Attachment 3: Copy of a letter sent to U.S. EPA regarding EPA's duties under section 7 of the Endangered Species Act; Attachment 4: Copy of a letter (w/o exhibits) sent to SLO Co.

38 page(s)
 CEC/DocketAdams, Broadwell Joseph & Cardozo/Heeley
1277511/30/1999 Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP) (November 30, 1999)

100 page(s)
 CEC/DocketRadian International/Muraoka
1275911/19/1999 Comments on the District's Preliminary Determination of Compliance for the Proposed Sunrise Project #981220 (Attachment: Proof of Service)

113 page(s)
 CEC/TherkelsenSan Joaquin Valley Apcd/Sadredin
1275811/22/1999 Phase II, Environmental Site Assessment (Attachment: Proof of Service)

150 page(s)
 CEC/DocketRadian International/Muraoka
1275411/30/1999 SUPPLEMENTAL - Testimony - Evidentiary Hearings Part 2 - Proof of Service

14 page(s)
 CEC/DocketRadian/Muraoka
1273611/18/1999 Second Amended Prehearing Conference Statement. (Attachment: Proof of Service)

18 page(s)
 CEC/NashGrattan Galati/Galati
1272711/22/1999 Notice of a Biological and Water Resources Workshop Mailing List - CEC - Proof of Service

4 page(s)
 CEC/DocketSunrise Cogeneration And Power
1265311/12/1999 Poole Letter to Pryor/O'Hagan (11/12/99) - Proof of Service

15 page(s)
 CEC/DocketAdams Broadwell Joseph & Cordozo/Brazil
1264511/10/1999 Poole Letter to Goff/Gruber (11/09/99) regarding Sunrise PDOC - Proof of Service

5 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1263211/9/1999 NOTICE of Evidentiary Hearings - December 2 - 3, 1999 (Attachment: Proof of Service)

4 page(s)
 CEC/DocketCEC/Moore/rohy
1258811/4/1999 Sunrise Socioeconomic FSA Errata

1 page(s)
 CEC/DocketCEC/Diamond
1258711/4/1999 Report of Conversation with Steve Hartsil of Kern County Superintendent of Schools

1 page(s)
 CEC/DocketCEC/Edwards
1257811/4/1999 Response to the revised Prevention of Significant Deterioration application - Proof of Service

25 page(s)
 Sunrise/HallUs Epa/Haber
1257711/4/1999 Additional Response to Committee Order Dated August 26, 1999. (Attachment: Proof of Service)

2 page(s)
 CEC/DocketRadian International/Muraoka
1257611/4/1999 Letter Dated 6/26/96 from EPA/Blanco to Ground Water Protection Council/Paque; Memorandum dated 8/10/87 from CA Dept. of Conservation/Mefferd RE: EPA Approval to Inject Air Scrubber Waste and Water Softner Regeneration Brine in Class II Wells; Letter Dated 1/29/97 from CA Div. of Oil & Gas/Guerard to CA Dept. of Toxic Substances Control/Pilcorn

8 page(s)
 CEC/DocketGrattan & Galati/Grattan
1257511/4/1999 STIPULATION RE: Condition of Certification Entitled Cultural - 18. (Attachment: Proof of Service)

5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1257411/5/1999 Declaration of Dale Edwards

2 page(s)
 CEC/DocketCEC/Staff
1255011/2/1999 Poole Letter to Pryor/O'Hagan (11/1/99) (Attachment: Proof of Service)

97 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1251210/15/1999 Cal-ISO Testimony - Transmission System Reliability Sunrise Cogeneration and Power Project (Sunrise) Interconnection (Testimony of Ron S. Daschmans) (Attachment: proof of Service)

16 page(s)
 CEC/DocketCal-iso
1250510/18/1999 Testimony of Michael Fry on Behalf of the California Unions for Reliable Energy on Biological Impacts of the Sunrise Cogeneration and Power Project (October 15, 1999) (Attacment: Proof of Service)

27 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardoza/Joseph /poole
1250010/27/1999 Poole Letter to Goff/Gruber (10/26/99) (W/Enclosure) (Attachment: Proof of Service)

7 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1249410/25/1999 Testimony of J. Phyllis Fox on Behalf od the California Unions for Reliable Energy on Traffic and Transportation Impacts and Worker Safety Impacts of the Sunrise Cogeneration and Power Project

125 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardoza/Heeley
1248410/25/1999 Testimony - Evidentiary Hearings Part 2 - Proof of Service and Cover for Binder

33 page(s)
 CEC/DocketRadian International/Muraoka
1247610/26/1999 Testimony of David Larsen of Navigant Consulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern Ca. and the Transmission Agency of Northern California Preheating Conference Statement. - Proof of Service

15 page(s)
 CEC/DocketDe Cuir & Somach/Larsen
1247110/26/1999 Testimony of David Larsen of Navigant ounsulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California - Proof of Service

15 page(s)
 CEC/DocketDecuir & Somach/Larsen
1247010/26/1999 Transmission Agency of Northern California Prehearing Conference Statement Oct. 25, 1999 - Proof of Service

6 page(s)
 CEC/DocketDecuir & Somach/De Cuir
1245310/20/1999 California Regional Water Quality Control Board letter of 9/21/99 from William F. Pfister and Shelton R. Gray to Valley Waste Disposal Co. CRWQCBM of 9/20/99 from James K. Dowdall to Shelton R. Gray - Proof of Service

11 page(s)
 CEC/DocketGrattan & Galati/Grattan
1243210/21/1999 Objections and Notice of Inability to Respond to a Data Request - Set Five Extension to File Its Objections and Notice of Inability to Respond to a Data Request - Set Five. Proof of Service

14 page(s)
 CEC/DocketGrattan & Galati/Galati
1237610/14/1999 Report of Conversation w/ Phil Castle (Kern Co. Fire Dept.) Subject: Questions RE: 700 Wells - Fire Protection (Attachment: Service List)

1 page(s)
 CEC/DocketCEC/Pryor
1237310/14/1999 NOTICE of Evidentiary Hearings - November 5, 1999 (Attachment: Attachment A; Proof of Service List)

4 page(s)
 CEC/DocketCEC/Moore/rohy
1236010/21/1999 Letter to Goff/Gruber from Poole (10/21/99) re: Sunrise PDOC (Enclosing Information RE: Additional Violations)

17 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1235710/12/1999 Traffic Study - Review of the Study and Comments

2 page(s)
 CEC/Efs&epdDept. Of Tansportation/Sorensen
1235510/12/1999 Errata to Staff's Testimony Sunrise Cogeneration and Power Project Facility Design - Testimony of Stave Baker, Kisabuli and Al McCuen (10/11/99)

3 page(s)
 CEC/DocketCEC/Baker/kisabuli/mccuen
1235410/12/1999 Declaration of Al McCuen, M. Kisabuli and Steve Baker

1 page(s)
 CEC/DocketCEC/Mccuen/kisabuli/baker
1234010/12/1999 Curriculum Vitae of David M. Einolf (Attachment: Proof of Service)

4 page(s)
 CEC/NashGrattan & Galati/Gratttan
1233910/12/1999 Declaration of David A. Stein

2 page(s)
 CEC/NashGrattan & Galati /Grattan
1233410/12/1999 Letter to Goff/Gruber From Poole (10/08/99) RE: Sunrise PDOC

5 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1233110/13/1999 GE Gas Turbine Start-up Curve Diagram that was Marked for Identification as Exhibit 27 at the CEC Hearing on Tuesday, October 12, 1999 (Attachment: Proof of Service)

2 page(s)
 CEC/NashGrattan & Galati/Grattan
1232010/19/1999 Evidentiary Hearing - Mailing List - CEC

4 page(s)
 CEC/DocketCEC Cec
1231510/18/1999 Handling of the Final Staff Assessment, Part II, For the Sunrise Cogeneration and Power Project

1 page(s)
 Librarian/DocketCEC/Therkelsen
1230210/15/1999 Sign-in Sheet - Evidentiary Hearing

4 page(s)
 CEC/DocketCEC Cec
1230110/15/1999 Recorded Copy - Final Action Lot Line Adjustment 29 - 99 (Attachment: Proof of Service)

9 page(s)
 Sunrise Cogeneration & Power CoKern Co. Planning Dept./James
1230010/15/1999 Notice of A Biological and Water Resources Workshop for the Sunrise Cogeneration and Power Project Application for Certification

2 page(s)
 CEC/DocketCEC/Moore
1229610/15/1999 FINAL STAFF ASSESSMENT (PART 2)

94 page(s)
 CEC/DocketCEC Cec
1225310/8/1999 Copies of the following documents: Valley Waste Disposal Co. Waste Discharge Requirements; Letter from California Regional Quality Control Brd to Radian International dated June 2, 1999; Letter from Radian International to California Regional Water Quality Control Brd dated May 26, 1999; Permit Approval from Div. of Oil, Gas and Geothermal Res.

10 page(s)
 CEC/DocketGrattan & Galati/Grattan
1225210/6/1999 Sunrise Cogeneration and Power Company's First Amendment to Prehearing Conference Statement (Attachment: Proof of Service)

17 page(s)
 CEC/DocketGrattan & Galati/Grattan/galati
1225110/6/1999 Notice of Decision, Lot Line Adjustment No. 29-99, Sunrise Project, From the Planning Department of the Kern County Resource Management Agency (Attachment: Proof of Service)

7 page(s)
 CEC/DocketGrattan & Galati/Grattan
1225010/7/1999 Cal-ISO's Conclusions & Preliminary Findings (Attachment: Proof of Service)

4 page(s)
 CEC/DocketCal Iso/Daschmans
1224910/1/1999 Report of Conversation - w/Phil Castle, Fire Marshal, Kern Co. Fire Dept. RE: Questions Regarding 700 Wells (Attachment: Proof of Service)

2 page(s)
 CEC/DocketCEC/Pryor
1223510/6/1999 SUNRISE Cogeneration and Power Project TESTIMONY - Evidentiary Hearings Part I - (Written Testimony RE: Final Staff Assessment Sections Addressed by CEC Staff in it's October 1, 1999 Submittal)

115 page(s)
 CEC/DocketRadian/Muraoka
1222610/6/1999 Fifth Set of CURE Data Requests

10 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
1222410/1/1999 Letter to Pryor from Poole (9/29/99) (enclosing additional information regarding Texaco's proposed method of waste water discharge. - Maps - Proof of Service

637 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Poole/heeley
122229/28/1999 Geotechnical Report - Revision I - Proof of Service

184 page(s)
 CEC/DocketRadian International/Muraoka
1222010/1/1999 Final Staff Assessment (Part 1) (Attachment: Proof of Service)

421 page(s)
 CEC/DocketCEC/Pryor/therkelsen
1221910/1/1999 Requesting information on Kern Co. Fire's practices regarding providing protection in the oil fields - POS

7 page(s)
 CEC/DocketMarc Pryor
1221510/1/1999 Various e-mails and ROCs that placed between staff and consultant to Adams Broadwell, Joseph and Cordozo.

6 page(s)
 CEC/DocketMarc Pryor
1221210/1/1999 Report of Conversation with Texaco re: Streambed Alteration Agreement

1 page(s)
 CEC/DocketRick York
1220210/4/1999 Order Granting Petition to Intervene - Proof of Service

4 page(s)
 CEC/DocketCEC/Moore
1219410/4/1999 Objections and Notice of Inability to Respond to a Data Request from CURE, Set Four- -Proof of Service

16 page(s)
 CEC/DocketGrattan & Galati/Grattan
1219210/4/1999 Manuscript submitted for publication in the Journal of Wildlife Diseases w/ comments of three reviewers.

9 page(s)
 Phyllis/CharltonJournal Of Wildlife Diseases/Danny B. Pence
1219110/4/1999 Handling of the Final Staff Assessment Part I

1 page(s)
 LibrarianCEC/Therkelsen
1219010/4/1999 Notice of Availability - Final Staff Assessment, Part I

3 page(s)
 CEC/DocketCEC/Therkelsen
1218910/4/1999 Request for Agency Comments on the Final Staff Assessment, Part I

2 page(s)
 Distribution ListCEC/Therkelsen
121669/30/1999 Notice of Evidentiary Hearings and Hearing Order - October 12, 14 and 15, 1999 - CEC

8 page(s)
 CEC/DocketCEC/Moore/rohy
121519/30/1999 Revisions to Application for Transportation and Utility Systems and Facilities on Federal Lands - Standard Form 299 (Attachment: Proof of Service)

8 page(s)
 Us Blm/FellowsSunrise Cogen And Power/Hall
121329/24/1999 Letter to Goff/Gruber from Poole (Enclosing Additional Information NOVs (9/23/99) RE: Sunrise PDOC (Attachment: Proof of Service)

30 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
121319/24/1999 Letter to Pryor from Poole (w/attachments) 9/23/99) Re: Additional Air Quality Sampling Results (Attachment: Proof of Service)

41 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
121309/23/1999 Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - (DFC-1)., and Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - 2 (DFS-2)

500 page(s)
 CEC/NashGrattan & Galati
121269/27/1999 Transmission Agency of Northern California's Reply to Applicant's Opposition to Petition to Intervene (Attachment: Proof of Service)

16 page(s)
 CEC/DocketDecuir & Somach/Decuir/johnson
121149/29/1999 Scheduled of the Work Safety and Fire Protection, Socioeconomics; and Soil and Water Resources Testimonies - Proof of Service

5 page(s)
 CEC/Moore/rohyCEC/Pryor
121019/24/1999 Transportation Impact Analysis - Construction Impacts at Intersection of SR 119 and Midway Road

34 page(s)
 CEC/DocketRadian International/Muraoka
120969/22/1999 Schedule of the Biological Resources Testimony

4 page(s)
 CEC/Moore/rohyCEC/Pryor
120709/23/1999 1. Letter to Goff/Gruber from Poole (9/20/99) regarding Sunrise PDOC 2. Letter to Goff/Gruber from Poole (w/enclosures) (9/12/99) regarding Sunrise PDOC. Proof of Service.

8 page(s)
 CEC/DocketAdams Broadwell Joseph &carodzo/Poole/heeley
120509/15/1999 E-mail on comments on reports and data referred by Phyllis Fox

1 page(s)
 CEC/DocketKristin Charlton
120489/13/1999 Letter to Messrs. Thomas E. Goff, John Gruber and Leonard Scandura of SFVAPCD Regarding Sunrise PDOC (Project #981220) and Equilon ATC (Project #981253) dated 09/09/99. Proof of Service

6 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Katherine S. Pool
120209/20/1999 Letter to Mr. John P. Grattan Dated September 17, 1999 - Fourth Set of CURE Data Requests

9 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
120139/17/1999 Response to Committee Order Dated August 26, 1999 (Attachment: Proof of Service)

14 page(s)
 CEC/DocketRadian International/Muraoka
120129/17/1999 Sunrise Cogeneration and Power Plant - Status of the Final Staff Assessment

3 page(s)
 CEC/Moore/rohyCEC/Pryor
120079/15/1999 Sunrise Cogeneration and Power Company's Notice of Change to Service List (Add: Mervyn Soares) (Attachment: Proof of Service List)

2 page(s)
 CEC/NashGrattan & Galati/Grattan
120069/15/1999 Sunrise Cogeneration and Power Company's Opposition to the Transmission Agency of Northern California's Petition to Intervene. (Attachment: Proof of Service)

12 page(s)
 CEC/NashGrattan & Galati/Grattan
119929/15/1999 Notice of Change to Service List: Add Sunrise Cogeneration & Power (S. Watzke) (Attachment: Proof of Service)

1 page(s)
 CEC/FayGrattan & Galati/Grattan
119839/10/1999 Addendum to Prehearing Conference Statement of Commission Staff (September 10, 1999). (Attachment: Proof of Service)

3 page(s)
 CEC/DocketCEC/Holmes
119819/10/1999 Detailed Comments RE: Preliminary Determination of Complaince (PDOC) (Attached: Proof of Service)

9 page(s)
 San Joaquin Valley Unified Apcd/SadredinU.s. Epa/Haber
119759/9/1999 Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District RE: Additional PDOC Information Dated September 7, 1999. (Attachment: Proof of Service)

4 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
119649/9/1999 Corrected Figures: Revised Figure 2-1 Site Arrangement ; Revised 8.12-1, Hazardous and Toxic Material Locations (Attachment: Proof of Service)

2 page(s)
 CEC/DocketRadian International/ Muraoka
119419/8/1999 Notes on Sunrise e-mail

1 page(s)
 CEC/YorkDonna
119108/31/1999 Letter regarding comments for consideration on the PSA - Proof of Service

4 page(s)
 CEC/JohnsonDepartment Of Conservation/Marshall
118979/2/1999 Sunrise Comments on Preliminary Staff Assessments

175 page(s)
 CEC/DocketRadian International/Mukaoka
118968/26/1999 Committee Order in Response to CURE's Motion to Compel (Attachment: Proof of Service)

9 page(s)
 CEC/DocketCEC/Moore
118958/25/1999 Prehearing Conference Statement of Commission Staff

4 page(s)
 CEC/Docket FileCEC/Holmes
118929/2/1999 Message from Phyllis Fox RE: Measurements in both Midway Sunset and Lokern Summary of the Data.

1 page(s)
 CEC/Loyer/pryor/ringer/odoemelamCEC/Spiegel
118919/2/1999 Staff Determination in Response to Committee Order

4 page(s)
 CEC/Docket FileCEC/Holmes
118888/31/1999 Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District Regarding Preliminary Determination of Compliance Dated August 28, 1999 - Proof of Services

157 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/K. Poole
118758/31/1999 Transmission Agency of Northern California Petition to Intervene

10 page(s)
 CEC/DocketDe Cuir & Somach/Lynch
118728/30/1999 Comments on Preliminary Determination of Compliance (PDOC). (Attachment: Proof of Service)

13 page(s)
 CEC/NashGrattan & Galati/Grattan
118718/25/1999 Prehearing Conference Statement (Attachment: Proof of Service)

163 page(s)
 CEC/NashGrattan & Galati/Galati
118628/26/1999 Addendum to Staff's Comments on CURE's Motion to Compel - Proof of Service

6 page(s)
 CEC/MooreCEC/Bergquist
118348/27/1999 Letter to Mr. Steven Branoff (Air3) EPA, Region 9, Dated July 12, 1999 - Proof of Service

78 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo
118298/27/1999 List of data available, collected at the sites for the period of January 1989 through September 1995.

1 page(s)
 Environmental Management/FoxEsc/Seylar
118288/27/1999 Comments from the Commission Air Quality staff regarding the workshop held on August 16, 1999 in Bakersfield. Proof of Service

5 page(s)
 Sjvuapcd/SadredinRobert Therkelsen/Robert Haussler
118258/25/1999 Sunrise Cogeneration and Power Company's Counsel's Status Report No. 5. (Attachment: Proof of Service)

4 page(s)
 CEC/NashGrattan & Galati/Galati
118248/25/1999 CURE's Comments on the Air Qualify Section of the Sunrise Preliminary Staff Assessment.

54 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
118238/25/1999 California Unions for Reliable Energy (CURE) Prehearing Conference Statement (August 25, 1999)

19 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo Attys For Cure/Jo
118228/25/1999 Pre-Hearing Conference Statement (Attachment: Proof of Service)

2 page(s)
 CEC/Moore/rohyCa Iso/Perez
118218/25/1999 Prehearing Conference Statement of Commission Staff (Attachment: Proof of Service)

4 page(s)
 CEC/Docket FileCEC/Holmes
118128/18/1999 Workshop to Discuss Preliminary Staff Assessment - Project Mailing List - CEC

2 page(s)
 CEC/Docket FileCEC Cec
118108/18/1999 General list of concerns for discussion at Sunrise PSA Workshop

2 page(s)
 CEC/BergquistTexco/Paul Dinkel
118078/23/1999 California Unions for Reliable Energy Second Supplement Regarding its Motion to Compel

21 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo/Joseph
118048/24/1999 Committee Hearing on California Unions for Reliable Energy's CURE Motion to Compel Responses

6 page(s)
 CEC/MooreDowney Brand Seymour & Rohwer/Miller
117998/12/1999 Notice of Hearing on Motion to Compel

4 page(s)
 CEC/Docket FileCEC Cec
117968/20/1999 Staff's Comments on CURE's Motion to Compel Production of Information

19 page(s)
 CEC/MooreCEC/Bergquist
117918/20/1999 ROC with CURE

1 page(s)
 CEC/BergquistCEC/Holmes
117898/23/1999 California Unions for Reliable Energy Notice Regarding the Evidentiary Hearing Scheduled for September 8, 1999 (August 20, 1999) (Attachment: Proof of Service)

4 page(s)
 CEC/Nash/docket UnitAdams Broadwell Joseph & Cardozo/Debonville
117748/18/1999 Follow-up letter of telephone conversation, Kern Council of Governments concurs with Caltrans that a traffic impact analysis should be undertaken.

1 page(s)
 CEC/JohnsonKern Council Of Governments/Beardslee
117718/17/1999 Supplemental Information Regarding CURE'S Motion to Compel

17 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo
117528/16/1999 CURE's Motions to Compel Responses (Attachment: Proof of Service)

4 page(s)
 CEC/Moore/rohyDowney Brand Seymour & Rohwer/Miller
117468/16/1999 Supplemental Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Matrix of Objections; Service List)

12 page(s)
 CEC/Docket UnitGrattan & Galati
117433/23/1999 Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.

1 page(s)
 CEC/MooreTes Energy/P. Ervin
117428/16/1999 Supplemental Information Regarding CURE's Motion to Compel - August 16, 1999

12 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo/Joseph
117398/18/1999 Counsel's Letter to California Unions for Reliable Energy Counsel regarding: Additional Offset Information

4 page(s)
 CEC/Docket FileGrattan & Galati
117367/17/1999 Workshop to discuss preliminary staff assessment

4 page(s)
 CEC/Docket FileCEC Cec Staff
117268/16/1999 Notice of Decision

7 page(s)
 Sunrise Cogeneration And Power CompanyPlanning Dept/James
116878/12/1999 Order Granting Petition to Intervene filed by Elk Hills Power Project (Attachment: Proof of Service)

1 page(s)
 CEC/Docket FileCEC/Moore
116808/12/1999 Supplemental Responses to CURE Data Requests (Attachment: Proof of Service)

7 page(s)
 CEC/NashGrattan & Galati/Grattan
116778/6/1999 Notice of Public Workshops to Discuss the Preliminary Staff Assessment of the Sunrise Cogeneration and Power AFC (August 17-18, 1999) (Attachment: Proof of Service; Map)

3 page(s)
 CEC/Docket FileCEC/Moore
116768/6/1999 Notice of Air Quality Workshop for the Sunrise Cogeneration and Power Project AFC (August 16, 1999) (Attachment: Proof of Service; Map)

2 page(s)
 CEC/Docket FileCEC/Moore
116758/6/1999 Petition for intervention by Elk Hills Power Project, dated August 6, 1999 (Attachment: Proof of Service)

4 page(s)
 CEC/NashDowney Brand Seymour & Rohwer/Miler
116696/23/1999 Application for Transportation and Utility Systems and Facilities on Federal Lands Standard Form 299

200 page(s)
 Us Blm/FellowsSunrise Cogeneration And Power Company/Hall
116687/20/1999 Revised ERC Application Package for the Sunrise Cogen Project #981220

1 page(s)
 Sunrise Cogeneration And Power Co./HallSan Joaquin Valley Apdc/Goff
116677/19/1999 Repeated Application for Confidential Designation: Paleontological Resources

1 page(s)
 CEC/SmithRadian International/Muraoka
116601/28/1999 Supplementary AFC Material in Response to Data Adequacy Worksheets

500 page(s)
 CEC/DocketSunrise Cogeneration & Power/King
116598/6/1999 Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Proof of Service)

28 page(s)
 Sunrise Cogeneration & Power Co./GrattanGrattan & Galati
116588/6/1999 Response to CURE Data Requests - Set 2A (Attachment: Proof of Service)

7 page(s)
 Adams Broadwell & Joseph/JosephRadian Internation/Muraoka
116317/12/1999 Petition for Reconsideration of Chief Counsel's Decision Concerning CURE's Petition for Inspection and Copying of Confidential Records

20 page(s)
 CEC/NashGrattan & Galati
116198/3/1999 Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project

1 page(s)
 LibrarianCEC/Therkelsen
116178/3/1999 Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project

1 page(s)
 CEC/Docket FileCEC/Therkelsen
116168/3/1999 Request for Agency Comments on the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project

2 page(s)
 Agency Distribution ListCEC/Therkelsen
116158/3/1999 NOTICE of Availability Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project Application for Certification

2 page(s)
 CEC/Docket FileCEC/Therkelsen
116107/20/1999 Data Request for the Sunrise Project

1 page(s)
 Environmental Management/FoxSan Joaquin Valley Apcd/Goff
116097/20/1999 Status Report Number 4 of the California Energy Commission Staff July 20, 1999 (Attachment: Proof of Service)

1 page(s)
 CEC/Docket FileCEC/Hough
116087/20/1999 Revised ERC Application Package for the Sunrise Cogen Project #981220

1 page(s)
 Adams Broadweell Joseph & Cardozo/TexierSan Joaquin Valley Apcd/Goff
116077/26/1999 NOTICE of Commission Evidentiary Hearing - AND - Hearing Order (Attachment: Proof of Service)

3 page(s)
 CEC/Docket FileCEC/Keese
116067/23/1999 Sunrise Cogeneration and Power Facility Project - Mitigation for Power Transmission Line

3 page(s)
 CEC/BergquistDept. Of Conservation/D. Mitchell
116057/19/1999 CURE Status Report Number 4 Dated July 18, 1999

3 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
116047/26/1999 CURE's Motion to Compel Production of Information

49 page(s)
 CEC/Docket UnitAdams Broadwell Joseph & Cardozo/Debonville
115937/28/1999 Notice of Preliminary Determination of Compliance

55 page(s)
 CEC/BergquistSan Joaquin Valley Apcd/Sadredin
115928/2/1999 Preliminary Staff Assessment

482 page(s)
 CEC/Docket FileCEC Cec
115697/29/1999 Notice of Prehearing Conference and Scheduling Order

3 page(s)
 CEC/Docket FileCEC/Moore/rohy
115678/2/1999 Notice of Hearing on Motion to Compel - August 12, 1999 (Attachment: Proof of Service)

2 page(s)
 CEC/Docket FileCEC/Moore/rohy
115667/30/1999 Notice Postponing Evidentiary Hearing AND Revised Hearing Order (Attachment: Proof of Service)

2 page(s)
 CEC/Docket FileCEC/Keese
115627/30/1999 Notice Postponing Evidentiary Hearing and Revised Hearing Order (Attachment: proof of Service)

2 page(s)
 CEC/Docket FileCEC/Keese
115407/29/1999 Stipulation of Sunrise Cogeneration and Power Company's and California Unions for Reliable Energy Regarding Emission Offset Information (Attachment: Proof of Service)

6 page(s)
 CEC/NashGrattan & Galati/Grattan
114837/14/1999 Objections and Notice of Inability to Respond to a Data Request From the California Unions for Reliable Energy (CURE), Set 3, Number 114.

7 page(s)
 CEC/DocketGrattan & Galati/Grattan
114777/16/1999 Status Request Number 4

5 page(s)
 CEC/Moore/rohyGrattan & Galati
114747/14/1999 CURE's Confidentiality Petition

2 page(s)
 CEC/DocketCEC/Jonathan Blees
114707/9/1999 Insert for Reliable Energy's Data Request Number 114 that was inadvertently omitted.

3 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
114687/9/1999 Letter to initiate Formal Consultation pursuant to Section 7 of the Endangered Species Act.

4 page(s)
 Field Supervisor Fish & WildlifeUs Department Of The Interior/Acting Fm
114637/9/1999 Notice of Opportunity for Public Hearing - July 13, 1999

5 page(s)
 CEC/DocketPlanning Department/Ted James
114397/8/1999 Response to CURE Data Request - Second Set

12 page(s)
 Adams Broadwell & Joseph/JosephGrattan & Galati/Gratitan
114267/7/1999 Issues Identification Report

14 page(s)
 CEC/Rohy/mooreCEC/Pryor
114017/1/1999 Project # 981220 - Letter of intent to proceed with the notice of the Preliminary Determination of Compliance

1 page(s)
 Sunrise Cogeneration/HallSan Joaquin Valley Air Pollution Control District/
113867/2/1999 Substitution of Counsel

3 page(s)
 CEC/BerguistSunrise Congeneration And Power Company/Scott W. B
113837/1/1999 California Unions for Reliable Energy - Data Request Number 114

6 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Bonnie Heeley
113796/30/1999 Responses to CEC Staff Questions During June 14, 1999 Workshop. With maps and proof of service list.

30 page(s)
 CEC/Docket UnitRadian International/Don Muraoka
113786/30/1999 Repeated Application for Confidential Designation: Cultural and Paleontological Resources.

1 page(s)
 CEC/SmithRadian International/Don Muraoka
113746/17/1999 Data Request and Data Response - CEC

3 page(s)
 CEC/Docket FileCEC Cec
113696/28/1999 Chief Counsel's Decision: CURE's petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)

3 page(s)
 Adams, Broadwell, Joseph & Cardozo/Ellison & SchneCEC/Blees
113686/21/1999 Objections and Notice of Inability to Respond to Certain Data Requests from the California Unions for Reliable Energy (CURE) CURE Data Requests Numbers 34 through 113 (Attachment: Proof of Service)

74 page(s)
 CEC/Docket FileEllison & Schneider/Harris
113676/18/1999 California Unions for Reliable Energy Status Report Number 3 (June 18, 1999) (Attachment: Proof of Service)

4 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardozo/Heeley
113546/17/1999 Status Report Number 3

6 page(s)
 Sunrise Cogeneration Committee/Moore/rohyEllison & Schneider/Jeffery D. Harris
113526/21/1999 Summary of the May 18, 1999 Data Request Workshop

6 page(s)
 Meeting AttendeesCEC/Bergquist
113506/18/1999 Status Report #3

8 page(s)
 Sunrise Cogeneration/Cec/mooreCEC/Bergquist
113256/15/1999 Data Responses - Set 2

48 page(s)
 CEC/Docket UnitRadian International/Muraoka
113166/15/1999 Extension of Time for Chief Counsel's Decision on CURE's Petition for Inspection and Copying of Confidential Records

5 page(s)
 Attorneys For CureCEC/Blees
113156/10/1999 Response to CURE's "Petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration Power Project" (Attachment: Proof of Service)

2 page(s)
 CEC/Moore/bleesEllison & Schneider/J. Harris
112855/6/1999 PG&E Midway Substation - Notice of Staff Workshop - Mailing List - CEC

7 page(s)
 CEC/Docket FileCEC Cec Staff Workshop
112806/8/1999 PSD Application

1 page(s)
 Adams, Broadwell & Joseph/K. PooleRadian International/P. Fields
112796/7/1999 Letter to Jeffrey Harris and CURE Data Requests Numbers 34 through 113

35 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardozo
112746/4/1999 Notice of Data Request and Data Response Workshop

5 page(s)
 CEC/Docket FilesCEC/Moore
112716/8/1999 Transmission Supplement 2 -- Sections 3.0, 4.0, remaining Appendices and Errata

1 page(s)
 CEC/Docket FileRadian International/Don Muraoka
112706/4/1999 Additional Copies of May 21, 1999 Transmission Supplement

10 page(s)
 CEC/Docket FileRadian Interntional/Don Muraoka
112696/7/1999 Letter of concern regarding that the unions through CURE are abusing the system by prolonging the permitting process in order to persuade project owners to perform all construction. . .

8 page(s)
 CEC/Docket FileAssociated Builders And Contractors, Inc./C. J. Ed
112686/4/1999 Repeated Application for Confidential Designation: Cultural and Paleontological Resources

1 page(s)
 CEC/Kent SmithRadian International/Don Muraoka
112656/3/1999 CURE's Petition for Inspection and Copying of Confidential Records

25 page(s)
 Ellison & Schneider/HarrisCEC/Blees
112616/4/1999 Relevant excerpts from the Handbook for Regulatory Compliance

54 page(s)
 Radian/David SteinCEC/Bergquist
112536/2/1999 Committee Order on Scope of Review

4 page(s)
 CEC/Docket FileCEC/Moore
112526/2/1999 Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant (June 2, 1999)

20 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo
112405/27/1999 Letter of Support for the Sunrise Project.

1 page(s)
 CEC/MooreCounty Of Kern/K. Peterson
112395/27/1999 Letter of Support for the Sunrise Project.

1 page(s)
 CEC/MooreArb, Inc. Constructors/B. Pratt
112015/28/1999 Cal-ISO Letter; Updated PG&E Preliminary Facilities Study.

150 page(s)
 CEC/MooreEllison & Schneider/Jeffery D. Harris
111975/28/1999 Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant.

20 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo
111925/27/1999 Letter of Support for the Sunrise Cogeneration and Power Project.

1 page(s)
 CEC/MooreCity Of Taft - Administrative Offices/B. Baker
111825/24/1999 Status Report # 2 and Statement of the Appropriate Scope of Environmental Review

16 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Heely
111735/19/1999 Letter RE: Underground Injection Control

5 page(s)
 CEC/TherkelsenUs Epa
111525/18/1999 Summary of the April 22, 1999 Data Response Workshop (Attachment: Proof of Service)

10 page(s)
 Meeting AttendeesCEC/Bergquist
111515/18/1999 Summary of the May 11, 1999 Data Response Workshop (Attachment: Proof of Service)

15 page(s)
 Meeting AttendeesCEC/Bergquist
111465/21/1999 Comments RE: Application to Transfer Emission Reduction Credits (ERCs)

2 page(s)
 Sunrise Cogenration And Power Co./KingSan Joaquin Valley Unified Apcd/Goff
111445/18/1999 Notice of Receipt of Complete Application - Emission Reduction Credits Project #990380

1 page(s)
 Aera Energy Llc/Daryl Gunderson/cec/docket FilesSan Juan Valley Unified Air Pollution Control Dist
111435/19/1999 Data Request and Issues Workshop and Sign-In Sheet

4 page(s)
 CEC/Docket FileCEC/Berquist
111425/18/1999 Caryn's scope of project and the latest version of blueprints

8 page(s)
 Gwia/David SteinCEC/Bergquist
111405/21/1999 Sunrise Filings (Attachment: Proof of Service)

11 page(s)
 CEC/MooreCEC/Berquist
111305/19/1999 Map: Fig. S1; Transmission Line Routing Alternatives

1 page(s)
 CEC/Docket FileRadian
111275/21/1999 Transmission Alternatives - Supplement Two (Attachment: Proof of Service)

200 page(s)
 CEC/Docket UnitRadian International
111255/21/1999 Support for Joint Blueprint and Response to Argument Made by CURE (Attachment: Proof of Service)

4 page(s)
 CEC/Moore/residing MemberMccutchen, Doyle, Brown & Enersen, Llp/Kostka
111245/21/1999 Joint Blueprint

5 page(s)
 CEC/Moore/presiding MemberElison & Schneider/Harris/cec/berquist
111235/21/1999 Status Report Number 2: Sunrise Cogeneration and Power Company (Attachment: Proof of Service)

6 page(s)
 CEC/MooreEllison & Schneider/Harris
111165/20/1999 Letter RE: Associate Member Vacancy

3 page(s)
 CEC/KeeseEllison & Schneider/Harris
111155/17/1999 Information on Phase I Transmission Supplement Filed by Sunrise Cogeneration and Power Co. (Attachment: Map; Proof of Service)

5 page(s)
 CEC/MooreElison & Schneider/Harris
111145/19/1999 Data Responses - Set 1C

500 page(s)
 CEC/Docket UnitRadian International/Muraoka
111115/11/1999 Data Response and Issues Workshop mailing list

5 page(s)
 CEC/Docket FileCEC Cec
110855/10/1999 Public Records Act Request

2 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Texier
110645/11/1999 Data Requests

12 page(s)
 Texaco Global Gas & Power/Paul DinkelCEC/Bergquist
110405/11/1999 Letter regarding an error in the Visual Resources Data Requests on page 7.

3 page(s)
 Texaco Global Gas & PowerCEC/Bergquist
110245/7/1999 Notice of Data Request and Issues Workshop - Tuesday - May 18, 1999 - CEC

4 page(s)
 CEC/Docket FileCEC/Moore
110215/6/1999 Notice of Status and Scoping Conference - Tuesday, May 25, 1999 - CEC

4 page(s)
 CEC/Docket FileCEC/Moore
110094/26/1999 Data Response and Issue Workshop - CEC - Mailing List

4 page(s)
 CEC/Docket FileCEC Cec
110015/5/1999 Transmission Alternative - Supplement One

25 page(s)
 CEC/Docket UnitRadian International/Muraoka
110005/5/1999 CURE Data Responses - Set 1A

500 page(s)
 Adams, Broadwell & JosephRadian International/Muraoka
109314/30/1999 Notice of Data Response and Issues Workshop for the Sunrise Cogeneration and Power Project (May, 11, 1999) (Attachment: Proof of Service)

4 page(s)
 CEC/Docket FileCEC/Moore
109274/30/1999 Data Responses - Set 1B (Attachment: Proof of Service)

30 page(s)
 CEC/Docket UnitRadian International/Muraoka
109124/23/1999 Notice of a Staff Workshop Regarding Pacific Gas & Electric's Midway Substation May 6, 1999 - CEC

3 page(s)
 CEC/Docket FileCEC/Therkelsen
108994/21/1999 Associate Member Vacancy

3 page(s)
 CEC/KeeseEllison & Schneider/J. Harris
108974/21/1999 Status Report Number 1 of the California Energy Commission Staff

3 page(s)
 CEC/Docket FileEnergy Resources Conservation/Hough
108824/19/1999 Status Report Number 1 (Attachment: Proof of Service)

6 page(s)
 CEC/MooreEllison & Schneider/J. Harrin
108724/16/1999 California Unions for Reliable Energy Status Report Number 1 (Attachment: Proof of Service)

6 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardoza/Debonville
108524/13/1999 Site Visit & Informational Hearing - Derby Acres, California

3 page(s)
 CEC/Docket FileCEC/Hearing Office
108514/13/1999 Informational Hearing & Site Visit Derby Acres, California

2 page(s)
 CEC/Docket FileCEC/Hearing Office
108414/6/1999 Summary of the March 10, 1999 Data Request Meeting (Attachment: Proof of Service)

11 page(s)
 Meeting AttendeesCEC/Berquist
108404/8/1999 Proof of Publication; Notice of Public Hearing

1 page(s)
 CEC/Docket FileThe Bakersfield Californian
108284/15/1999 Data Responses - Set 1A

40 page(s)
 CEC/Docket UnitSunrise Cogeneration And Power Company/King
107724/8/1999 Notice of Data Response and Issues Workshop - April 22, 1999 - CEC

4 page(s)
 CEC/Docket FileCEC/Moore
107694/8/1999 Impact of La Paloma on Fire Protection Services

2 page(s)
 CEC/PryorLa Paloma Generating Company/Garratt
107674/8/1999 CURE Data Responses (Set One)

89 page(s)
 Adams, Broadwell & JosephSunrise Cogeneration & Power/C. G. King
107074/2/1999 Report of Conversation with Radian & Texaco, Dave Stein and Paul Dinkle - Bio surveys for existing access roads that fall outside of the requireed filed survey areas.

1 page(s)
 CEC/Docket FileCEC/
107064/2/1999 Comments regarding the Preliminary Facilities Study, dated 3, 1998

6 page(s)
 Pg&e/MaslowskiCalifornia Iso/Miller
106764/1/1999 Report Purporting to Address Midway Substation "Curnulative" Impacts

16 page(s)
 CEC/Docket FileCameron Mckenna/Hindus
106724/1/1999 Committee Scheduling Order

6 page(s)
 CEC/Docket FileCEC/Moore/sharpless
106573/31/1999 DATA RESPONSES - SET ONE

500 page(s)
 CEC/Docket UnitSunrise Cogeneration & Power Co./King
106223/24/1999 Sunrise Cogeneration and Power Company's - Objections and Notice of Need for Additional Time to Respond to Certain Data Requests From the California Unions For Reliable Energy (CURE) (Attachment: Proof of Service)

16 page(s)
 CEC/Docket FileEllison & Schneider/Harris
106213/23/1999 Sign-in Sheet - Data Requests Workshop (March 10, 1999)

6 page(s)
 CEC/Docket FileCEC/Berquist
106083/23/1999 Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.

1 page(s)
 CEC/MooreTes Energy/P. Ervin
105843/26/1999 Report of Conversation With Kern County Fire Marshall, Chaffin

3 page(s)
 CEC/PryorCEC/Edwards
105063/16/1999 Sunrise Cogeneration and Power Company's Objections and Notice of Inability to Respond to Certain Data Requests from the California Energy Commission Staff

11 page(s)
 CEC/Docket FileEllison & Schneider/Harris
105053/11/1999 Order Granting Petition to Intervene - California Unions for Reliable Energy (CURE) (Attachment: Proof of Service)

4 page(s)
 CEC/Docket FileCEC/Moore
104843/12/1999 Request for the loan of AFC

1 page(s)
 Black & Veatch/LangloisCEC/Bergquist
104823/12/1999 Request for the loan of AFC

1 page(s)
 BlalockCEC/Bergquist
104813/12/1999 Request for Agency Participation in the Review

3 page(s)
 RamirezCEC/Therkelsen
104773/16/1999 Thank you letter regarding the proposed project located at the southwest corner of State Route 33 and Shale Road (APN183-210-06)

2 page(s)
 CEC/Docket FileDepartment Of Transportation
104603/12/1999 Comments on the supplementary AFC material or consideration

2 page(s)
 CEC/BergquistDepartment Of Conservation/Marshall
104363/9/1999 Letter to Jeffrey Harris and First Set of CURE Data Requests

21 page(s)
 CEC/Docket UnitAdams, Broadwell & Joseph/Debonville
104283/9/1999 March 1, 1999 Article regarding Site Visit and Informational Hearing

6 page(s)
 Midway Driller/WoodCEC/Ross
104273/9/1999 Letter regarding Section 711.4(d) of the Fish And Game Code

1 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
104243/9/1999 Notice of Workshop - March 19, 1999 - Derby Acres

4 page(s)
 CEC/Docket FileCEC/Moore
104223/8/1999 Newspaper article - Hearing Set for Proposed Fellows Power Plant

1 page(s)
 CEC/Docket FileDaily Midway Driller Inc.
104073/8/1999 Staff's Issue Identification Report

14 page(s)
 CEC/Moore/keeseCEC/Bergquist
103493/2/1999 Prevention of Significant Deterioration

2 page(s)
 Us Environmental Protection Agency/HaberSunrise Cogeneration And Power Company/King
103443/1/1999 Data Requests

27 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
103422/26/1999 Notice of Data Request Workshop - March 10, 1999

4 page(s)
 CEC/Docket FileCEC/Moore
103082/25/1999 Notice of Site Visit and Informational Hearing - Thursday, March 18, 1999 - Derby Acres Park Recreation Building

8 page(s)
 CEC/Docket FileCEC/Sharpless/moore
103032/25/1999 Notice to Landowners Informational Hearing and Site Visit - March 18, 1999 - 4:00 p.m. Derby Acres Park Recreation Building

6 page(s)
 CEC/Docket FileCEC/Moore/sharpless
102802/19/1999 Letter RE: Submission of Revised Section 8.4 Land Use.

1 page(s)
 CEC/BerquistCounty Of Kern/Rickels
102792/16/1999 Request for "Confidential" Classification of Submitted Information

1 page(s)
 Sunrise Cogenration & Power Co./KingSan Joaquin Valley Unified Air Pollution Control D
102722/15/1999 Confirmation Letter that Texaco Global Gas & Power Entered into an Agreement with General Electric for the Purchase of Two Frame 7FA combustion turbine Generators for the Sunrise Cogeneration and Power Project on November 25, 1998.

1 page(s)
 CEC CecSunrise Cogeneration & Power Co./King
102192/17/1999 Petition to Intervene by California Unions for Reliable Energy dated 2/17/99

7 page(s)
 CEC/Docket FileAdams Broadwell & Joseph/Joseph
102132/16/1999 Requesting additional information regarding AFC.

2 page(s)
 Burbank Media Studios/KingSan Joaquin Valley Unified Air Pollution District/
102102/11/1999 Revisions to Section 8.4 - Consistent with the requirements of Kern County.

1 page(s)
 CEC/BergquistBakersfield Planning Dept./Rickels
102072/10/1999 Review of Additional Information Requested Regarding Application for Certification

2 page(s)
 Sunrise Cogeneration & Power Co/KingSan Joaquin Valley Unified Air Pollution Control D
101942/9/1999 Document Handling

1 page(s)
 LibrarianCEC/Therkelsen
101862/5/1999 Supplement Materials for Sunrise

1 page(s)
 Afc Distribution ListCEC/Therkelsen
101682/5/1999 Sunrise Cogeneration and Power Project Data Adequacy Worksheet

76 page(s)
 CEC/Rohy/sharpless/moore/laurieCEC/Bergquist
101572/5/1999 Commission Order Finding AFC Incomplete-and-Notice of Commission Hearing 2/17/99 at CEC

2 page(s)
 CEC/Docket FileCEC/Sharpless/laurie/moore
101281/29/1999 Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification.

3 page(s)
 Kern Co. Environmental Health/BrownfieldCEC/Therkelsen
101262/1/1999 Sunrise Cogeneration and Power Project Data Adequacy Recommendation

1 page(s)
 CEC/CommissionersCEC Cec Smith
101001/25/1999 Comments and suggestions of the Midway-Sunset oil field.

4 page(s)
 CEC/BergquistDepartment Of Conservation/Marshall
100931/15/1999 Agenda Item for the Feb. 3, 1999 Business Meeting - Commission Consideration of the Executive Director's Data Adequacy Recommendation for the Sunrise Cogeneration and Power Project Application for Certification

2 page(s)
 CEC/SmithCEC/Therkelsen
100681/22/1999 Thank you letter and comments on Sunrise's review of the Project

1 page(s)
 CEC/DocketOffice Of Transportation Planning/Frausto
100671/22/1999 AFC for Sunrise Cogeneration and Power Project dated 1/12/99

6 page(s)
 CEC/BergquistAdams Broadwell & Joseph/Poole
100481/15/1999 Sunrise Cogeneration and Power Project - Data Adequacy Recommendation

117 page(s)
 CEC/CommissionersCEC/Smith
999712/30/1998 RE: Confidential Designation, Dated Dec. 21, 1998, for 5 Subject Areas for the Sunrise Cogeneration and Power Project.

1 page(s)
 Ellison & Schneider/J. HarrisCEC/Bergquist
997312/29/1998 Potential Air Emissions Offsets, Application for Confidentiality

2 page(s)
 Ellison & Schneider/HarrisCEC/Kent Smith
997212/29/1998 Cultural and Paleontological Resources Applications for Confidentiality, Sunrise Cogeneration and Power Project.

2 page(s)
 Ellison & Schneider/HarrisCEC/Kent Smith
99601/7/1999 Delta AFC Pertaining to Transmission Line Shock Hazard.

8 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
99521/6/1999 Data Adequacy Worksheet for Biological Resources

6 page(s)
 Texaco Global Gas & Power/BlekCEC/Bergquist
99511/6/1999 Data Adequacy Worksheet for Visual Resources

5 page(s)
 Texaco Global Gas & Power/BlekCEC/Bergquist
99371/5/1999 Hearing Officer Assignment. Gary Fay to assist the conducting proceedings on Sunrise Cogeneration Power Plant.

1 page(s)
 CEC/DocketCEC/Keese
992512/23/1998 Letter regarding review process and description if the Sunrise Cogeneration and Power Company AFC.

2 page(s)
 Kern County Board Of Supervisors/McquistonCEC/Keese
992412/23/1998 Notice of Receipt of the Application for Certification for the Sunrise Cogeneration and Power Project.

4 page(s)
 CEC/DocketCEC/Therkelsen
992312/23/1998 Letter regarding the review process/information of the Sunrise Cogeneration and Power Co. AFC

2 page(s)
 Member Of The Senate/Hon. CostaCEC/Keese
991712/29/1998 Petition to Intervene by La Paloma Generating Company, LLC.

3 page(s)
 CEC/DocketLa Paloma Generation Co/Thompson
991612/29/1998 Petition to Intervene by High Desert Power Project (RE: 98-AFC-3 and 98-AFC-4)

3 page(s)
 CEC/DocketHdpp/Thompson
991312/22/1998 Document Handling for the Sunrise Cogeneration and Power Project (AFC)

2 page(s)
 Librarian/Members Of The PublicCEC/Therkelsen
991212/22/1998 Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification

3 page(s)
 Agency Distribution ListCEC/Therkelsen
991012/23/1998 Information Regarding the review process and description of the Sunrise Cogeneration Power Company AFC

2 page(s)
 Member Of The Assembly/Hon. Dean FloresCEC/Keese
988812/21/1998 Application for Confidential Designation.

1 page(s)
 CEC/Kent SmithEllison & Schneider/Harris
988712/21/1998 Submittal of Sunrise Cogeneration and Power Cmpany Application for Certification (Attachment: Cover Letter Dated 12/21/98)

125 page(s)
 CEC/Kent SmithSunrise Cogeneration And Power Company/King
1426-012/18/2000 Committee Conference and Evidentiary Hearing

20 page(s)
  CEC
1401-011/7/2000 Prehearing Conference

38 page(s)
  CEC
1399-011/13/2000 Hearing

117 page(s)
  CEC
1393-010/16/2000 Committee Conference

28 page(s)
  CEC
1357-06/9/2000 Committee Conference

104 page(s)
  CEC
1323-02/1/2000 Hearing

218 page(s)
  CEC
1318-01/19/2000 Evidentiary Hearing

320 page(s)
  CEC
1317-01/19/2000 Evidentiary Hearing

291 page(s)
  CEC
1316-01/19/2000 Hearing

309 page(s)
  CEC
1306-012/13/1999 Hearing

192 page(s)
  CEC
1305-012/13/1999 Hearing

119 page(s)
  CEC
1296-011/16/1999 Information Hearing

137 page(s)
  CEC
1292-010/25/1999 Informational Hearing

144 page(s)
  CEC
1275-09/15/1999 Information Hearing and Site Visit

79 page(s)
  CEC
1265-09/15/1999 Information Hearing and Site Visit

79 page(s)
  CEC
1263-08/20/1999 Hearing on Motion to Compel Before the CEC and Development Commission

59 page(s)
  CEC
1256-06/10/1999 98-AFC-4

70 page(s)
  CEC
1239-04/5/1999 Information Hearing Before: Gary Fay

53 page(s)
  CEC