Docket Log

Docket: 98-AFC-04
Project Title: Sunrise Cogeneration and Power Project
Generated On: 4/18/2014 11:11:01 AM

TN #Docketed DateDocument TitleExhibit #ToFrom
178861/12/2001Public Adviser's Status Report 2000
Public Adviser's Status Report 2000
44 page(s)
 CEC/DocketCEC/Public Adviser's Office
1746912/20/2000Commission Decision (Attachment: Proof of Service)
Commission Decision (Attachment: Proof of Service)
318 page(s)
 CEC/DocketCEC/Keese/laurie/moore/pernell/rosenfeld
1721612/8/2000Corrections to Sunrise's Comments on Air Quality Conditions of Revised PMPD - POS
Corrections to Sunrise's Comments on Air Quality Conditions of Revised PMPD - POS
10 page(s)
 CEC/DocketsGrattan & Galati/Galati
1748512/6/2000Notice of Determination (Attachment: Proof of Service)
Notice of Determination (Attachment: Proof of Service)
6 page(s)
 CEC/DocketCEC/Pryor
1748712/6/2000Committee Amendment to Revised Presiding Member's Proposed Decision (PMPD) (Attachment: Proof of Service)
Committee Amendment to Revised Presiding Member's Proposed Decision (PMPD) (Attachment: Proof of Service)
28 page(s)
 CEC/DocketCEC/Moore/pernell
1713112/4/2000Revised PMPD-FDOC Air Quality Conditions - POS
Revised PMPD-FDOC Air Quality Conditions - POS
16 page(s)
 CEC/DocketsGrattan & Galati/Galati
1724812/4/2000Letter of appreciation for staff's recent efforts to resolve issues and complete review
Letter of appreciation for staff's recent efforts to resolve issues and complete review
1 page(s)
 Air Resources Board/KennyCEC/Larson
1712612/1/2000Staff Comments - Revised Presiding Member's Proposed Decision of 11/20/2000 - POS
Staff Comments - Revised Presiding Member's Proposed Decision of 11/20/2000 - POS
8 page(s)
 CEC/Moore/pernellCEC/Pryor
1713711/29/2000Final Determination of Compliance for the Proposed Sunrise Power Project
Final Determination of Compliance for the Proposed Sunrise Power Project
177 page(s)
 CEC/PryorSan Joaquin Valley Apcd/Sadredin
1706611/27/2000Letter Requesting the that the Undersigned be Removed from the Limited Intervenor List
Letter Requesting the that the Undersigned be Removed from the Limited Intervenor List
1 page(s)
 CEC/DocketHdpp Llc/Wolfinger
1707311/22/2000Affidavit RE: Change of Ownership (Attachment: Proof of Service)
Affidavit RE: Change of Ownership (Attachment: Proof of Service)
5 page(s)
 CEC/DocketEdison/Loughman
1707411/22/2000Determination on Stream Alteration Notification no. R4-2000-0136 (Attachment: Proof of Service)
Determination on Stream Alteration Notification no. R4-2000-0136 (Attachment: Proof of Service)
6 page(s)
 Sunrise Cogeneration And Power Co./SoaresDept. Of Fish And Game/Loudermilk
1690311/20/2000Notice of Commission Hearing Re: Revised Presiding Member's Proposed Decision
Notice of Commission Hearing Re: Revised Presiding Member's Proposed Decision
6 page(s)
 CEC/DocketsCEC/Moore/pernell
1693011/20/2000San Joaquin Valley Air Pollution Control District's Preliminary Determination of Compliance - POS
San Joaquin Valley Air Pollution Control District's Preliminary Determination of Compliance - POS
99 page(s)
 CEC/DocketsGrattan & Galati/Galati
1689711/17/2000Effective November 17, 20000 Edison Mission Energy aquired 100% ownership of Sunrise Power Company from Texaco Inc.
Effective November 17, 20000 Edison Mission Energy aquired 100% ownership of Sunrise Power Company from Texaco Inc.
2 page(s)
 CEC/PryorEdison Mission Energy/Loughmair/hall
1690111/17/2000Revised Presiding Member's Proposed Decision - POS - P800-00-010
Revised Presiding Member's Proposed Decision - POS - P800-00-010
394 page(s)
 CEC/DocketsCEC/Moore/pernell
3094711/17/2000Change of Ownership of Sunrise Power Company
Change of Ownership of Sunrise Power Company
3 page(s)
 CEC/Pryor/docketsBusiness Development America/Loughman
1689311/16/2000Revision to Staff's 3rd Geology Condition of Certification (Geo-3) - POS
Revision to Staff's 3rd Geology Condition of Certification (Geo-3) - POS
7 page(s)
 CEC/Moore/pernellCEC/Pryor
1683411/13/20001. Sunrise Proposed Revision to PMPD; 2. Errata to Sunrise Proposed Revisions to PMPD; 3. Sunrise Power Company's Brief After November 7, 2000 Evidentiary Hearing (Attachment: Proof of Service)
1. Sunrise Proposed Revision to PMPD; 2. Errata to Sunrise Proposed Revisions to PMPD; 3. Sunrise Power Company's Brief After November 7, 2000 Evidentiary Hearing (Attachment: Proof of Service)
326 page(s)
 CEC/DocketGrattan & Galati/Galati
1667911/8/2000Letter RE: Anticipation of Transfer of Ownership and Determination of Compliance (Attachment: Proof of Service)
Letter RE: Anticipation of Transfer of Ownership and Determination of Compliance (Attachment: Proof of Service)
5 page(s)
 CEC/PryorSan Joaquin Apcd/Sadredin/goff
1668111/8/2000Declaration of Joseph Diamond, Ph.D.
Declaration of Joseph Diamond, Ph.D.
1 page(s)
 CEC/DocketCEC/Diamond
1668211/8/2000Declaration of M. Kisabuli
Declaration of M. Kisabuli
1 page(s)
 CEC/DocketCEC/Kisabuli
1668311/8/2000Report of Conversation - With John Grattan, Grattan & Galati (Counsel to Sunrise Power Project) RE: Condition of Certification Noise-6. (Attachment: Proof of Service)
Report of Conversation - With John Grattan, Grattan & Galati (Counsel to Sunrise Power Project) RE: Condition of Certification Noise-6. (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCEC/Kisabuli
1658711/7/2000Air Quality
Air Quality
2 page(s)
 CEC/DocketsCEC
1661611/7/2000Staff's Proposed Language for CUL-1
Staff's Proposed Language for CUL-1
3 page(s)
 CEC/DocketCEC/Staff
1668411/7/2000Supplemental Testimony of David A. Stein on Noise (Attachment: Proof of Service)
Supplemental Testimony of David A. Stein on Noise (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Galati
1668511/7/2000Supplemental Testimony of David A. Stein on Air Quality (Attachment: Proof of Service)
Supplemental Testimony of David A. Stein on Air Quality (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Galati
1668611/7/2000Information from Bob Hartmen, Kaddar Enterprises RE: "The Flapper"
Information from Bob Hartmen, Kaddar Enterprises RE: "The Flapper"
1 page(s)
 CEC/DocketCEC/Pryor
1660111/6/2000Opposition to CEC Staff's Motion for Continuance of Hearing on Air Quality Issues - POS
Opposition to CEC Staff's Motion for Continuance of Hearing on Air Quality Issues - POS
5 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1661411/3/2000Staff Motion for Continuance of Hearing on Air Quality Issues (Attachment: Proof of Service)
Staff Motion for Continuance of Hearing on Air Quality Issues (Attachment: Proof of Service)
6 page(s)
 CEC/DocketCEC/Ogata
1656011/2/2000Testimony - Evidentiary Hearing (Attached: Proof of Service)
Testimony - Evidentiary Hearing (Attached: Proof of Service)
96 page(s)
 CEC/DockerRadian International/Muraoka
1661511/2/2000Testimony - Evidentiary Hearing
Testimony - Evidentiary Hearing
1 page(s)
 CEC/DocketRadian International/Muroaka
1653711/1/2000Request to change the Address for the TANC General Counsel (Dennis W. De Cuir) (Attachment: Proof of Service)
Request to change the Address for the TANC General Counsel (Dennis W. De Cuir) (Attachment: Proof of Service)
6 page(s)
 CEC/DocketDennis W. De Cuir
1648110/31/2000Air Quality Issues Update, and Errata - Response to Data Request 2 (Oct. 6, 2000) (Attachment: Proof of Service)
Air Quality Issues Update, and Errata - Response to Data Request 2 (Oct. 6, 2000) (Attachment: Proof of Service)
6 page(s)
 CEC/DocketGrattan & Galati/Grattan
1647610/30/2000United States Environmental Protection Agency's Letter of October 24, 2000 to Gordon Thompson, Vice President of the Sunrise Power Company RE: the PSD Permit for the Sunrise Project (Attachment: Proof of Service)
United States Environmental Protection Agency's Letter of October 24, 2000 to Gordon Thompson, Vice President of the Sunrise Power Company RE: the PSD Permit for the Sunrise Project (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1647710/30/2000Letters with Attached Compliance Certification by Southern California Edison Company, and by Edison Mission Energy (Attachment: Proof of Service)
Letters with Attached Compliance Certification by Southern California Edison Company, and by Edison Mission Energy (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1649910/30/2000Notice of Availability - Supplement to the Final Staff Assessment (Attachment: Proof of Service)
Notice of Availability - Supplement to the Final Staff Assessment (Attachment: Proof of Service)
7 page(s)
 CEC/DocketCEC/Therkelsen
1648210/27/2000Notice of Evidentiary Hearing and Hearing Order (Attachment: Proof of Service)
Notice of Evidentiary Hearing and Hearing Order (Attachment: Proof of Service)
7 page(s)
 CEC/DocketCEC/Moore/pernell
1648310/27/2000Prehearing Conference Statement of the California Energy Commission - October 27, 2000 (Attachment: Proof of Service)
Prehearing Conference Statement of the California Energy Commission - October 27, 2000 (Attachment: Proof of Service)
7 page(s)
 CEC/DocketCEC/Holmes
1650310/27/2000Notice of Evidentiary Hearing and Hearing Order (November 7, 2000)
Notice of Evidentiary Hearing and Hearing Order (November 7, 2000)
3 page(s)
 CEC/DocketCEC/Moore/pernell
3094410/27/2000Final Staff Assessment - POS
Final Staff Assessment - POS
182 page(s)
 CEC/DocketsCEC Cec
1640710/26/2000Prehearing Conference Statement of the California Unions for Reliable Energy October 26, 2000 (Attachment: Proof of Service)
Prehearing Conference Statement of the California Unions for Reliable Energy October 26, 2000 (Attachment: Proof of Service)
7 page(s)
 CEC/DocketCure/Joseph/poole
1642310/26/2000Errata - Amended Application (Section 2.2.7.1) - POS
Errata - Amended Application (Section 2.2.7.1) - POS
6 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1642410/26/2000Prehearing Conference Statement - POS
Prehearing Conference Statement - POS
20 page(s)
 CEC/DocketsGrattan & Galati/Grattan
1649210/26/2000Report of Conversation W/Mervyn Soares (Sunrise Power Co.) RE: Status of the Prevention of Serious Deterioration Permit (PSD) (Attachment: Proof of Service)
Report of Conversation W/Mervyn Soares (Sunrise Power Co.) RE: Status of the Prevention of Serious Deterioration Permit (PSD) (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCEC/Pryor
1635410/25/2000Sunrise Power Company's Notice of Change of Ownership Submitted to the San Joaquin Valley Air Pollution Control District (Attachment: Proof of Service)
Sunrise Power Company's Notice of Change of Ownership Submitted to the San Joaquin Valley Air Pollution Control District (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1619510/20/2000Notice of Prehearing Conference and Scheduling Order (Attachment: Proof of Service)
Notice of Prehearing Conference and Scheduling Order (Attachment: Proof of Service)
6 page(s)
 CEC/DocketCEC/Moore/pernell
1618210/16/2000San Joaquin Valley Unified APCD's Preliminary Determination of Compliance for the Sunrise Power Project (Attachment: Proof of Service)
San Joaquin Valley Unified APCD's Preliminary Determination of Compliance for the Sunrise Power Project (Attachment: Proof of Service)
166 page(s)
 CEC/DocketSunrise Power Co./Grattan
1600710/11/2000Request for Proposal
Request for Proposal
2 page(s)
 Pg&e/SmithEme/Fohrer
1598710/6/2000Data Responses 1- 8, Responding to CEC Staff Data Requests Issues Sept. 27, 2000
Data Responses 1- 8, Responding to CEC Staff Data Requests Issues Sept. 27, 2000
58 page(s)
 CEC/DocketUrs/Muraoka
1599110/6/2000Errata Page, Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application (Attachment: Proof of Service)
Errata Page, Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application (Attachment: Proof of Service)
9 page(s)
 CEC/DocketUrs/Muraoka
1599210/6/2000Data Responses 1 - 8: Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application; (Enclosures/Attachment: Data Response 5 (Input and Output Files for the Cumulative Impact Modeling (Disks)) Proof of Service)
Data Responses 1 - 8: Amendments to Application for Certification and Prevention of Significant Deterioration Permit Application; (Enclosures/Attachment: Data Response 5 (Input and Output Files for the Cumulative Impact Modeling (Disks)) Proof of Service)
58 page(s)
 CEC/DocketUrs/Muraoka
158539/29/2000Status Report No. A1 With Staff's Proposed Schedule (Attachment: Proof of Service)
Status Report No. A1 With Staff's Proposed Schedule (Attachment: Proof of Service)
10 page(s)
 CEC/Moore/pernellCEC/Pryor
158549/29/2000Notice of Committee Conference (October 10, 2000) (Attachment: Proof of Service)
Notice of Committee Conference (October 10, 2000) (Attachment: Proof of Service)
6 page(s)
 CEC/DocketCEC/Moore
158559/29/2000Response of the California Unions for Reliable Energy to Applicant's Proposed Schedule (Attachment: Proof of Service)
Response of the California Unions for Reliable Energy to Applicant's Proposed Schedule (Attachment: Proof of Service)
7 page(s)
 CEC/DocketCure/Joseph/poole
159669/27/2000Data Requests - POS
Data Requests - POS
10 page(s)
 Sunrise Power Co./SoaresCEC/Pryor
158299/22/2000Review RE: Notice of Receipt of Complete Application (Attachment: Proof of Service)
Review RE: Notice of Receipt of Complete Application (Attachment: Proof of Service)
5 page(s)
 Sunrise Power Co./SoaresSan Joaquin Valley Apcd/Goff
157829/21/2000Report of Conversation RE: Biological Resources - Compensation Ratios With Sunrise Power Project (Attachment: Proof of Service)
Report of Conversation RE: Biological Resources - Compensation Ratios With Sunrise Power Project (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCEC/York
158129/20/2000Notice of Receipt of an Amendment
Notice of Receipt of an Amendment
4 page(s)
 CEC/DocketCEC/Haussler
158139/20/2000Document Handling for the Amendment
Document Handling for the Amendment
3 page(s)
 LibrarianCEC/Haussler
309419/20/2000Request for Agency Participation in the Review of an Amendment to the AFC
Request for Agency Participation in the Review of an Amendment to the AFC
3 page(s)
 Agency Distribution List/DocketsCEC/Therkelsen
157709/19/2000Committee Requests for Response to Applicant's Proposed Schedule - POS
Committee Requests for Response to Applicant's Proposed Schedule - POS
6 page(s)
 CEC/DocketsCEC/Fay
158219/19/2000Determination of Compliance Review - POS
Determination of Compliance Review - POS
178 page(s)
 CEC/DocketsRadian International/Muraoka
157819/18/2000Proposed Schedule
Proposed Schedule
6 page(s)
 CEC/DocketGrattan & Galati/Grattan
158529/18/2000Report of Conversation RE: Relocation of Main Water Supply Pipelines (Attachment: Proof of Service)
Report of Conversation RE: Relocation of Main Water Supply Pipelines (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCEC/Pryor
157279/14/2000Report of Conversation With John Grattan RE: Schedule for Sunrise Amendments to the AFC (Attachment: Proof of Service)
Report of Conversation With John Grattan RE: Schedule for Sunrise Amendments to the AFC (Attachment: Proof of Service)
2 page(s)
 CEC/DocketCEC/Holmes
157269/12/2000Sunrise Power Project Amended AFC
Sunrise Power Project Amended AFC
488 page(s)
 CEC/TherkelsenGrattan & Galati
157559/12/2000Air Quality and Public Health Modeling CD-ROM (6)
Air Quality and Public Health Modeling CD-ROM (6)
2 page(s)
 CEC/DocketsRadian International/Muraoka
155938/30/2000Letter to San Joaquin Valley Unified Air and Pollution Control District regarding Raised Issues - POS
Letter to San Joaquin Valley Unified Air and Pollution Control District regarding Raised Issues - POS
7 page(s)
 CEC/Moore/pernellUs Environmental Protection Agency/Rios
155878/25/2000Address change to TANC's general counsel - POS
Address change to TANC's general counsel - POS
4 page(s)
 CEC/DocketsDecuir/Lynch
155868/23/2000Response to the letter received on 8/16/00 regarding client's intent to file an amendment - POS
Response to the letter received on 8/16/00 regarding client's intent to file an amendment - POS
6 page(s)
 Grattan & GalatiCEC/Therkelsen
155028/21/2000Letter to agree to operate in peaking mode for a limited period - from summer peak of 2001 until fall 2004. - POS
Letter to agree to operate in peaking mode for a limited period - from summer peak of 2001 until fall 2004. - POS
7 page(s)
 CEC/TherkelsenGrattan & Galati
149376/27/2000Sunrise PMPD Biological Resources Condition of Certification BIO-10 - POS
Sunrise PMPD Biological Resources Condition of Certification BIO-10 - POS
6 page(s)
 CEC/Moore/pernellCEC/Holmes
149416/27/2000Opposition to CURE's Motion for Official Notice or to Reopen the Record (Attachment: Proof of Service)
Opposition to CURE's Motion for Official Notice or to Reopen the Record (Attachment: Proof of Service)
11 page(s)
 CEC/DocketGrattan & Galati/Grattan
148256/13/2000Motion of the California Unions for Reliable Energy for Official Notice of Agency Filings or, in the Alternative, to Reopen the Records (Attachment: Proof of Service)
Motion of the California Unions for Reliable Energy for Official Notice of Agency Filings or, in the Alternative, to Reopen the Records (Attachment: Proof of Service)
27 page(s)
 CEC/DocketCure/Joseph/poole
147456/6/2000Committee Conference - PMPD Project Mailing List
Committee Conference - PMPD Project Mailing List
1 page(s)
 CEC/DocketsCEC Cec
147616/6/2000Staff Comments on Sunrise PMPD
Staff Comments on Sunrise PMPD
1 page(s)
 Sunrise Afc ParticipantsCEC/Holmes
147176/2/2000Comments of Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
Comments of Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
13 page(s)
 CEC/DocketCEC/Holmes
147186/2/2000Comments of the Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
Comments of the Commission Staff on the Presiding Member's Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
13 page(s)
 CEC/DocketCEC/Holmes
147266/2/2000Comments of Commission Staff on the Presiding Members' Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
Comments of Commission Staff on the Presiding Members' Proposed Decision for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
12 page(s)
 CEC/DocketCEC/Holmes
147316/2/2000Comments on the Presiding Members Proposed Decision - POS
Comments on the Presiding Members Proposed Decision - POS
15 page(s)
 CEC/DocketsGrattan & Galati/Grattan
147416/2/2000Comments of the CURE's Presiding Members Proposed Decision - POS
Comments of the CURE's Presiding Members Proposed Decision - POS
24 page(s)
 CEC/DocketsCure/Joseph/poole
147546/2/2000Transmission Agency of Northern California Comments on the Presiding Member's Proposed Decision (Attachment: Proof of Service)
Transmission Agency of Northern California Comments on the Presiding Member's Proposed Decision (Attachment: Proof of Service)
8 page(s)
 CEC/DocketDe Cuir & Somach/De Cuir
146265/26/2000Energy Commission Order - Order # 00-0523-03
Energy Commission Order - Order # 00-0523-03
5 page(s)
 CEC/DocketsCEC/Keese
146565/26/2000Status Report - POS
Status Report - POS
5 page(s)
 CEC/Moore/pernellCEC Cec Pryor
145415/19/2000PSD permit SJ 99-01 - POS
PSD permit SJ 99-01 - POS
6 page(s)
 Sunrise Cogeneration/HallUs Environmental Protection Agency/Haber
144215/10/2000Letter from Poole to Moore/Pernell (5/8/00) - POS
Letter from Poole to Moore/Pernell (5/8/00) - POS
9 page(s)
 CEC/DocketCure/Poole
144395/10/2000Letter submitting Presiding Member's Proposed Decision - POS
Letter submitting Presiding Member's Proposed Decision - POS
9 page(s)
 CEC/DocketsCEC/Moore/pernell
309405/10/2000Presiding Members's Proposed Decision - POS
Presiding Members's Proposed Decision - POS
376 page(s)
 CEC/DocketsCEC/Moore/pernell
143415/1/2000Staff Review of Phase II Environmental Site Assessment (Phase II ESA) and other Documents prepared for the Sunrise Cogeneration and Power Plant. (Attachment: Proof of Service)
Staff Review of Phase II Environmental Site Assessment (Phase II ESA) and other Documents prepared for the Sunrise Cogeneration and Power Plant. (Attachment: Proof of Service)
3 page(s)
 CEC/PryorDept. Of Toxic Substances Control/Shaddy
143575/1/2000Review RE: Traffic Control Plan (Attachment: Proof of Service)
Review RE: Traffic Control Plan (Attachment: Proof of Service)
4 page(s)
 Sunrise Cogeneration And Power Co./SoaresDept. Of Transportation/Sorensen
309394/13/2000Staff Recommendation Related to the Determination of Compliance and DTSC Review of Water Treatment Facility Data - POS
Staff Recommendation Related to the Determination of Compliance and DTSC Review of Water Treatment Facility Data - POS
6 page(s)
 CEC/Moore/pernell/docketsCEC/Pryor
140904/5/2000Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
3 page(s)
 CEC/PryorU.s. Epa/Haber
140964/5/2000Letter from US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS
Letter from US Environmental Protection Agency Region IX regarding an update on the air pollution control technology - POS
7 page(s)
 CEC/DocketCEC/Johnson
140994/5/2000Sunrise Cogeneration and Power Company's Letter to Marc Pryor, California Energy Commission RE: Response to Memorandum Dated March 29, 2000 (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Letter to Marc Pryor, California Energy Commission RE: Response to Memorandum Dated March 29, 2000 (Attachment: Proof of Service)
4 page(s)
 CEC/DocketGrattan & Galati/Grattan
141004/5/2000Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
Issues Related to the San Joaquin Valley Unified Air Pollution Control District's Determination of Compliance Issued to Sunrise Cogeneration and Power Company. (Attachment: Proof of Service)
2 page(s)
 CEC/PryorU.s. Epa/Haber
140563/31/2000RE: Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
RE: Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
2 page(s)
 CEC/PryorCure/Poole
140733/31/2000Comments RE: Review of March 29, 2000 Memorandum to the Sunrise Committee Regarding the Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
Comments RE: Review of March 29, 2000 Memorandum to the Sunrise Committee Regarding the Department of Toxic Substances Control's Review of Texaco's Water Treatment Facility Data.
2 page(s)
 CEC/PryorCure/Poole
141413/30/2000District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
2 page(s)
 Sjvuapcd/SadredinUs Environmental Protection Agency/Haber
141473/30/2000District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
District Response to EPA Comments on Sunrise Cogeneration PM (10) Emission Reduction Credits
2 page(s)
 Sjvuapcd/SadredinUs Environmental Protection Agency/Haber
140463/29/2000DTSC Review of Water Treatment Facility Data (Attachment: Proof of Service)
DTSC Review of Water Treatment Facility Data (Attachment: Proof of Service)
5 page(s)
 CEC/Moore/pernellCEC/Pryor
139403/14/2000Response to Information Request Dated 2/1/00 - Prevention of Significant Deterioration Application (SJ 99-01) - Proof of Service
Response to Information Request Dated 2/1/00 - Prevention of Significant Deterioration Application (SJ 99-01) - Proof of Service
44 page(s)
 U.s. Epa/HaberSunrise Cogeneration/Soares
139413/14/2000Texaco California, Inc. operations in the Midway Sunset oilfield (PSD permits SJ 78-16 and SJ 78-17) - Proof of Service
Texaco California, Inc. operations in the Midway Sunset oilfield (PSD permits SJ 78-16 and SJ 78-17) - Proof of Service
6 page(s)
 Texaco California Inc./BulkeleyUs Environmental Protection Agency/Haber
138143/6/2000Sunrise Cogeneration and Power Company's Letter RE: Oxidation Catalysts, dated February 23, 2000 (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Letter RE: Oxidation Catalysts, dated February 23, 2000 (Attachment: Proof of Service)
2 page(s)
 CEC/DocketGrattan & Galati/Galati
138432/29/2000Notice of Evidentiary Hearing and Hearing Order - Project mailing list
Notice of Evidentiary Hearing and Hearing Order - Project mailing list
2 page(s)
 CEC/DocketCEC Cec
136782/23/2000Amended Proof of Service for Transmission Agency of Northern California Reply Brief on Air Quality.
Amended Proof of Service for Transmission Agency of Northern California Reply Brief on Air Quality.
4 page(s)
 CEC/DocketDecuir & Somach/Lynch
136532/18/2000E-mail dated 2/17/00 from Larry Allen to Marc Pryor 2/14/00 RE: Sunrise Cogeneration & Power Project Evidentiary Hearing; Exhibit 107 Haley Declaration (Attachment: Proof of Service)
E-mail dated 2/17/00 from Larry Allen to Marc Pryor 2/14/00 RE: Sunrise Cogeneration & Power Project Evidentiary Hearing; Exhibit 107 Haley Declaration (Attachment: Proof of Service)
5 page(s)
 CEC/PryorLarry Allan
136642/18/2000Reply Brief of Commission Staff
Reply Brief of Commission Staff
20 page(s)
 CEC/DocketsCEC/Holmes
136682/18/2000Group C Reply Brief - February 18, 2000 (Attachment: Proof of Service)
Group C Reply Brief - February 18, 2000 (Attachment: Proof of Service)
19 page(s)
 CEC/DocketCure/Joseph/poole
136752/18/2000Transmission Agency of Northern California Reply Brief on Air Quality (Attached: Proof of Service)
Transmission Agency of Northern California Reply Brief on Air Quality (Attached: Proof of Service)
4 page(s)
 CEC/DocketDecuir & Somach/Decuir
136772/18/2000Sunrise Cogeneration and Power Company's Reply Brief, Group C Topics, dated February 18, 2000. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Reply Brief, Group C Topics, dated February 18, 2000. (Attachment: Proof of Service)
28 page(s)
 CEC/NashGrattan & Galati/Galati
136132/14/2000Company's Withdrawal of Suggested Amendments to Air Quality Conditions of Certifications 2, 3, and 4 and Submission of New Air Quality Amendment 41 - Proof of Service
Company's Withdrawal of Suggested Amendments to Air Quality Conditions of Certifications 2, 3, and 4 and Submission of New Air Quality Amendment 41 - Proof of Service
6 page(s)
 CEC/DocketGrattan & Galati/Grattan
136412/14/2000Hearing Brief of the San Luis Obispo County Air Pollution Control District as an Interested Public Agency - Proof of Service
Hearing Brief of the San Luis Obispo County Air Pollution Control District as an Interested Public Agency - Proof of Service
14 page(s)
 CEC/DocketSan Luis Obispo Co. Apcd/Allen
135922/11/2000Group C Opening Brief (February 11, 2000) (Attachment: Proof of Service)
Group C Opening Brief (February 11, 2000) (Attachment: Proof of Service)
29 page(s)
 CEC/DocketCure/Joseph/poole
135942/11/2000Sunrise Cogeneration and Power Company's Opening Brief, Group C Topics, Dated Feb. 11, 2000 (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Opening Brief, Group C Topics, Dated Feb. 11, 2000 (Attachment: Proof of Service)
12 page(s)
 CEC/DocketGrattan & Galati/Galati
135952/11/2000Opening Brief of Commission Staff on The Sunrise Cogeneration and power Project AFC - Feb. 11, 2000 (Attachment: Proof of Service)
Opening Brief of Commission Staff on The Sunrise Cogeneration and power Project AFC - Feb. 11, 2000 (Attachment: Proof of Service)
12 page(s)
 CEC/DocketCEC/Holmes
135972/11/2000Transmission Agency of Northern California - Opening Briefing on Air Quality (Attachment: Proof of Service)
Transmission Agency of Northern California - Opening Briefing on Air Quality (Attachment: Proof of Service)
5 page(s)
 CEC/DocketDecuir & Somach/Lynch
135522/10/2000Group B Reply Brief (February 10, 2000) (Attachment: Proof of Service; Cover Letter)
Group B Reply Brief (February 10, 2000) (Attachment: Proof of Service; Cover Letter)
22 page(s)
 CEC/DocketCure/Joseph
135552/10/2000Reply Brief, Group B Topics, Dated February 10, 2000. (Attachment: Proof of Service)
Reply Brief, Group B Topics, Dated February 10, 2000. (Attachment: Proof of Service)
15 page(s)
 CEC/DocketGrattan & Galati/Galati
135682/10/2000Reply Brief of Commission Staff - Proof of Service
Reply Brief of Commission Staff - Proof of Service
15 page(s)
 CEC/DocketCEC/Holmes
135792/10/2000Public Hearing - LCP Amendment No. 1-99 (Harbor Terrace)
Public Hearing - LCP Amendment No. 1-99 (Harbor Terrace)
1 page(s)
 CEC/DocketCa Coastal Commission
135352/8/2000Amendments to Air Quality Conditions of Certification 2, 3, and 4, dated 2/8/00 - Proof of Service
Amendments to Air Quality Conditions of Certification 2, 3, and 4, dated 2/8/00 - Proof of Service
6 page(s)
 CEC/DocketGrattan & Galati/Grattan
135632/7/2000Sunrise Cogeneration and Power Company (PSD Permit SJ 99-01) and Texaco California, Inc. (TCI) Operating in the Midway Sunset Oilfield (PSD Permits SJ 78-16 and SJ 78-17) (Attachment: proof of Service)
Sunrise Cogeneration and Power Company (PSD Permit SJ 99-01) and Texaco California, Inc. (TCI) Operating in the Midway Sunset Oilfield (PSD Permits SJ 78-16 and SJ 78-17) (Attachment: proof of Service)
2 page(s)
 Sunrise Cogeneration And Power Co/Hall/texaco Ca/bU.s. Epa/Haber
135052/3/2000CURE's Group A Reply Brief
CURE's Group A Reply Brief
11 page(s)
 CEC/DocketCure/Joseph/poole
135082/3/2000Reply Brief of Commissions Staff - Proof of Service
Reply Brief of Commissions Staff - Proof of Service
10 page(s)
 CEC/DocketCEC/Holmes
135092/3/2000Opening Brief of Commission Staff - Proof of Service
Opening Brief of Commission Staff - Proof of Service
20 page(s)
 CEC/DocketCEC/Holmes
135102/3/2000Sunrise Power's Reply Brief - Group A Topics, and Opening Brief - Group B Topics - Proof of Service
Sunrise Power's Reply Brief - Group A Topics, and Opening Brief - Group B Topics - Proof of Service
29 page(s)
 CEC/DocketGrattan & Galati/Galati
309342/3/2000CURE's Group B Opening Brief - POS
CURE's Group B Opening Brief - POS
22 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Poole
134001/28/2000Sworn Declaration and Supplemental Air Quality Testimony of John E. Haley, dated January 26, 2000 - Proof of Service
Sworn Declaration and Supplemental Air Quality Testimony of John E. Haley, dated January 26, 2000 - Proof of Service
14 page(s)
 CEC/DocketGrattan & Galati/Grattan
134471/28/2000Report of Conversation with L. Bright (Valley Waste), M. Soares (Sunrise), C. Jackson (Texaco), P. Dinkle (Texaco), D. Wright (Texaco) and K. Garlick (USFWS) Regarding: Site visit to Valley Waste Disposal facility - Proof of Service
Report of Conversation with L. Bright (Valley Waste), M. Soares (Sunrise), C. Jackson (Texaco), P. Dinkle (Texaco), D. Wright (Texaco) and K. Garlick (USFWS) Regarding: Site visit to Valley Waste Disposal facility - Proof of Service
5 page(s)
 CEC/DocketCEC/York
134481/28/2000Report of Conversation with Warden Brain Naslund regarding: Valley Waste Disposal ponds - Proof of Service
Report of Conversation with Warden Brain Naslund regarding: Valley Waste Disposal ponds - Proof of Service
5 page(s)
 CEC/DocketCEC/York
134501/28/2000Report of Conversation with Susan Jones, Valley Branch, USFWS - Proof of Service
Report of Conversation with Susan Jones, Valley Branch, USFWS - Proof of Service
5 page(s)
 CEC/DocketCEC/York
134021/27/2000Testimony of J. Phyllis Fox, Ph.D on Behalf of CURE on Water Sampling Results - Proof of Service
Testimony of J. Phyllis Fox, Ph.D on Behalf of CURE on Water Sampling Results - Proof of Service
8 page(s)
 CEC/DocketCure/Joseph/poole
134121/27/2000Testimony of Bruce W. Page, Ph.D on Behalf of CURE on Water Sampling Results - Attachment: Material Balance on Metals Present in Produced Water - Proof of Service
Testimony of Bruce W. Page, Ph.D on Behalf of CURE on Water Sampling Results - Attachment: Material Balance on Metals Present in Produced Water - Proof of Service
13 page(s)
 CEC/DocketCure/Joseph/poole
134331/27/2000Comments of the review of the technical cultural resources inventory report (May 1999) Proof of Service
Comments of the review of the technical cultural resources inventory report (May 1999) Proof of Service
6 page(s)
 Pacific Legacy/JacksonUs Dept. Of The Interior/Christian
134601/26/2000Testimony of Bruce W. Page, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
Testimony of Bruce W. Page, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
10 page(s)
 CEC/DocketCure/Joseph/poole
134611/26/2000Testimony of Phyllis Fox, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
Testimony of Phyllis Fox, Ph.D. on Behalf of California Unions for Reliable Energy on Water Samplings Results
5 page(s)
 CEC/DocketCure/Joseph/poole
133481/24/2000California Unions for Reliable Energy - Group A Opening Brief January 24, 2000. (Attachment: Proof of Service)
California Unions for Reliable Energy - Group A Opening Brief January 24, 2000. (Attachment: Proof of Service)
13 page(s)
 CEC/DocketCure/Joseph/poole
133521/24/2000Sunrise Cogeneration and Power Company Project's Opening Brief - Group A Topics, Dated January 24, 2000. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company Project's Opening Brief - Group A Topics, Dated January 24, 2000. (Attachment: Proof of Service)
13 page(s)
 CEC/DocketGrattan & Galati/Galati
133531/24/2000Opening Brief of Commission Staff on the Sunrise Cogeneration and Power Project Application for Certification (Attachment: Proof of Service)
Opening Brief of Commission Staff on the Sunrise Cogeneration and Power Project Application for Certification (Attachment: Proof of Service)
11 page(s)
 CEC/DocketCEC/Holmes
133551/24/2000Sunrise Cogeneration and Power Company Project's Answers of January 21, 2000 to CURE's Questions Regarding TCI's Water Treatment System Dated January 14, 2000. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company Project's Answers of January 21, 2000 to CURE's Questions Regarding TCI's Water Treatment System Dated January 14, 2000. (Attachment: Proof of Service)
18 page(s)
 CEC/DocketGrattan & Galati/Galati
133581/24/2000Transmission Agency of Northern California Brief on Transmission System Engineering. (Attachment: Proof of Service)
Transmission Agency of Northern California Brief on Transmission System Engineering. (Attachment: Proof of Service)
4 page(s)
 CEC/DocketDecuir & Somach/Decuir/tanc
134621/24/2000Declaration of Joseph M. Loyer; Hazardous Materials Management Supplementary Testimony By Joseph M. Loyer, January 20, 2000 (Attachment: Proof of Service)
Declaration of Joseph M. Loyer; Hazardous Materials Management Supplementary Testimony By Joseph M. Loyer, January 20, 2000 (Attachment: Proof of Service)
3 page(s)
 CEC/DocketCEC/Loyer
133451/21/2000ORDER Denying Petition to Intervene - Proof of Service
ORDER Denying Petition to Intervene - Proof of Service
5 page(s)
 CEC/DocketCEC/Moore
132851/18/2000Letter to Galati from Poole (1/14/2000) regarding 98-AFC-1 with attached questions regarding Texaco's water treatment system - Proof of Service
Letter to Galati from Poole (1/14/2000) regarding 98-AFC-1 with attached questions regarding Texaco's water treatment system - Proof of Service
7 page(s)
 CEC/DocketCure/Poole
133031/18/2000Report of Conversation with Larry Bright, Valley Waste - Wastewater stream and the ponds to Valley Waste
Report of Conversation with Larry Bright, Valley Waste - Wastewater stream and the ponds to Valley Waste
1 page(s)
 CEC/DocketCEC/York
132621/14/2000Notice of Evidentiary Hearing Continuation and Briefing Order - Proof of Service
Notice of Evidentiary Hearing Continuation and Briefing Order - Proof of Service
7 page(s)
 CEC/DocketCEC/Moore/rohy
131961/13/2000OA/QC and Chain of Custody Documentation for Sunrise's Response to CEC Data Request #3 Associated with the Sunrise Cogeneration and Power Company Project, Dated January 7, 2000. (Attachment: Proof of Service)
OA/QC and Chain of Custody Documentation for Sunrise's Response to CEC Data Request #3 Associated with the Sunrise Cogeneration and Power Company Project, Dated January 7, 2000. (Attachment: Proof of Service)
34 page(s)
 CEC/NashGrattan & Galati/Galati
132051/13/2000Southern Region Hearing Board Meeting Decision.
Southern Region Hearing Board Meeting Decision.
2 page(s)
 CEC/DocketSjvapcd/Smith
132801/13/2000Certification of Statewide Compliance
Certification of Statewide Compliance
2 page(s)
 Us Epa/HaberSjvapcd/Philip M. Jay
132311/12/2000Letter with enclosed copy of CEC's Final Staff Assessment
Letter with enclosed copy of CEC's Final Staff Assessment
2 page(s)
 Kern Co. Board Of Supver./McquistonCEC/Smith
132321/12/2000Letter with CEC's FSA enclosed.
Letter with CEC's FSA enclosed.
2 page(s)
 Member Of The Senate/CostaCECSCecsmith
132781/12/2000Certification of Statewide Compliance
Certification of Statewide Compliance
4 page(s)
 Seyed Sjvuapcd/SadredinUs Epa/Haber
133201/12/2000Declaration of Gary Walker (CEC) (Attachments: Visual Resources - Testimony of Gary Walker; Letter to CEC/Pryor from Co. of Kern from David Rickels, Dated 12/16/1999)
Declaration of Gary Walker (CEC) (Attachments: Visual Resources - Testimony of Gary Walker; Letter to CEC/Pryor from Co. of Kern from David Rickels, Dated 12/16/1999)
3 page(s)
 CEC/DocketCEC/Walker
133211/12/2000Declaration of Amanda Stenick (Attachments: Land Use - Testimony; Letter to CEC/Pryor from Co. of Kern/David B. Rickels, Dated 12/16/1999)
Declaration of Amanda Stenick (Attachments: Land Use - Testimony; Letter to CEC/Pryor from Co. of Kern/David B. Rickels, Dated 12/16/1999)
3 page(s)
 CEC/DocketCEC/Stenick
309301/12/2000Letter with CEC's FSA enclosed
Letter with CEC's FSA enclosed
2 page(s)
 Member Of The Assembly/FlorezCEC/Smith
132011/11/2000Evaluation RE: Manuscript Retitled "Pathological Findings in Kit Foxes and Deer Mice Inhabiting an Oil Field in California" By Charllton et al.
Evaluation RE: Manuscript Retitled "Pathological Findings in Kit Foxes and Deer Mice Inhabiting an Oil Field in California" By Charllton et al.
8 page(s)
 Dr. Kristin G. CharltonJournal Of Wildlife Disease Association/Pence
131621/10/2000Cure's Comments (to Branoff 1/7/00) RE: PSD Permits SJ 99-01, SJ78-16 and SJ 78-17. (Attachment: Proof of Service)
Cure's Comments (to Branoff 1/7/00) RE: PSD Permits SJ 99-01, SJ78-16 and SJ 78-17. (Attachment: Proof of Service)
74 page(s)
 CEC/DocketCure/Poole
131791/10/2000Staff Data Request Workshop Notice (Water and Biological Resources) (January 18, 2000) (Attachments: Map (Directions to California Energy Commission); Proof of Service)
Staff Data Request Workshop Notice (Water and Biological Resources) (January 18, 2000) (Attachments: Map (Directions to California Energy Commission); Proof of Service)
3 page(s)
 CEC/DocketCEC/Moore
132271/10/2000Notice to Kern County Operators - Field inspection of Kern County oil fields - Proof of Service
Notice to Kern County Operators - Field inspection of Kern County oil fields - Proof of Service
8 page(s)
 CEC/DocketDept. Of Conservation/Hal Bopp
308521/10/2000Region 9 Preliminary Remendiation Goals
Region 9 Preliminary Remendiation Goals
35 page(s)
 Prg Table List/Cec/docketsUs Environmental Protection Agency/Smucker
131571/7/2000Response to CEC Data Requests Set 3
Response to CEC Data Requests Set 3
65 page(s)
 CEC/DocketGrattan & Galati/Galati
131751/7/2000District Response to EPA Comments Sunrise Cogeneration PM10 Emission Reduction Credits.
District Response to EPA Comments Sunrise Cogeneration PM10 Emission Reduction Credits.
2 page(s)
 San Joaquin Valley Unified Apcd/SadredinUs Epa/Haber
131821/7/2000Report of Conversation with Mervyn Soares (Sunrise Cogeneration & Power Corp. RE: PM10 and NOx ERCs. (Attachment: Proof of Service)
Report of Conversation with Mervyn Soares (Sunrise Cogeneration & Power Corp. RE: PM10 and NOx ERCs. (Attachment: Proof of Service)
1 page(s)
 CEC/DocketCEC/Loyer
131841/7/2000Report of Conversation With Ed Pike (US EPA) RE: PM10 ERCs for Sunrise Project (Attachment: Proof of Service)
Report of Conversation With Ed Pike (US EPA) RE: PM10 ERCs for Sunrise Project (Attachment: Proof of Service)
1 page(s)
 CEC/DocketCEC/Loyer
132381/7/2000Supplemental Testimony of J. Phyllis Fox, Ph.D on Behalf of the CEC Reliable Energy on Public Health Impacts - Proof of Service
Supplemental Testimony of J. Phyllis Fox, Ph.D on Behalf of the CEC Reliable Energy on Public Health Impacts - Proof of Service
7 page(s)
 CEC/DocketCure
131481/6/2000Review and Comments RE: Air Quality Section of the Final Staff Assessment.
Review and Comments RE: Air Quality Section of the Final Staff Assessment.
10 page(s)
 CEC/PryorSlo Apcd/Allen
131511/6/2000Executor Streambed Alteration Agreement associated with the Sunrise Cogeneration and Power Company, Dated December 29, 1999. (Attachment: Proof of Service)
Executor Streambed Alteration Agreement associated with the Sunrise Cogeneration and Power Company, Dated December 29, 1999. (Attachment: Proof of Service)
9 page(s)
 CEC/DocketGrattan & Galati/Grattan
131051/5/2000Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (Attachment: Service List)
Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (Attachment: Service List)
6 page(s)
 CEC/DocketCure/Heeley
131251/5/2000Revision of Staff's Air Quality Testimony (Attachment: Proof of Service)
Revision of Staff's Air Quality Testimony (Attachment: Proof of Service)
6 page(s)
 CEC/Moore/rohyCEC/Pryor
131401/5/2000Sunrise Cogeneration and Power Company's Opposition to the San Luis Obispo County APCD's Petition to Intervene, Dated January 5, 2000. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Opposition to the San Luis Obispo County APCD's Petition to Intervene, Dated January 5, 2000. (Attachment: Proof of Service)
3 page(s)
 CEC/NashGrattan & Galati
131421/5/2000Request for Hearing - Petitioner: CURE - Subject: The District's Recent Issuance of the Conditional Determination of Compliance for the Sunrise Cogeneration and Power Project #981220. (Attachment: Proof of Service, Fax Cover Sheet)
Request for Hearing - Petitioner: CURE - Subject: The District's Recent Issuance of the Conditional Determination of Compliance for the Sunrise Cogeneration and Power Project #981220. (Attachment: Proof of Service, Fax Cover Sheet)
17 page(s)
 CEC/DocketSan Joaquin Valley Unified Apcd/
130931/4/2000Data Requests. (Proof of Service)
Data Requests. (Proof of Service)
6 page(s)
 Texaco Global Gas & Power/SoaresCEC/Pryor
130951/4/2000Sunrise Cogeneration and Power Company's Water Test Results, (Dated January 4, 2000) Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Water Test Results, (Dated January 4, 2000) Attachment: Proof of Service)
29 page(s)
 CEC/NashGrattan & Galati/Galati
130971/4/2000Sunrise Cogeneration and Power Company's Declaration of James Bunker, Dated January 4, 2000. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Declaration of James Bunker, Dated January 4, 2000. (Attachment: Proof of Service)
3 page(s)
 CEC/NashGrattan & Galati/Galati
131221/4/2000Supplemental Testimony to the Worker Safety and Fire Protection (Attachment: Proof of Service)
Supplemental Testimony to the Worker Safety and Fire Protection (Attachment: Proof of Service)
4 page(s)
 CEC/Moore/rohyCEC/Pryor
130861/3/2000Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Public Health Impacts of the Sunrise Cogen and Power Project. (January 3, 2000)
Testimony of J. Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Public Health Impacts of the Sunrise Cogen and Power Project. (January 3, 2000)
1000 page(s)
 CEC/DocketCure/Joseph
130871/3/2000Testimony of Phyllis Fox, Ph. D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (January 3, 2000)
Testimony of Phyllis Fox, Ph. D. on Behalf of the California Unions for Reliable Energy on Water Quality Impacts of the Sunrise Cogeneration and Power Project. (January 3, 2000)
113 page(s)
 CEC/DocketCure/Joseph
130881/3/2000Supplemental Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Worker Safety Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
Supplemental Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Worker Safety Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
500 page(s)
 CEC/DocketCure/Joseph
130891/3/2000Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Air Quality Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
Testimony of Phyllis Fox, Ph.D. on Behalf of the California Unions for Reliable Energy on Air Quality Impacts of the Sunrise Cogeneration and Power Project (January 3, 2000)
500 page(s)
 CEC/DocketCure/Joseph
131001/3/2000TESTIMONY - Evidentiary Hearings Part 3
TESTIMONY - Evidentiary Hearings Part 3
110 page(s)
 CEC/DocketRadian/Muraoka
131131/3/2000Testimony of Gregory E. Salyer of Modesto Irrigation District Regarding Cumulative Air Quality Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California. (Attachment: Proof of Service)
Testimony of Gregory E. Salyer of Modesto Irrigation District Regarding Cumulative Air Quality Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California. (Attachment: Proof of Service)
17 page(s)
 CEC/DocketDecuir & Somach/Decuir
131141/3/2000Third Amendment to Prehearing Conference Statement, Dated January 3, 2000. (Attachment: Proof of Service)
Third Amendment to Prehearing Conference Statement, Dated January 3, 2000. (Attachment: Proof of Service)
25 page(s)
 CEC/DocketGrattan & Galati/Galati
131151/3/2000Declaration of Dr. Kristin Charlton, (December 17, 1999); Curriculum Vitae (Attachment: Proof of Service)
Declaration of Dr. Kristin Charlton, (December 17, 1999); Curriculum Vitae (Attachment: Proof of Service)
5 page(s)
 CEC/DocketDr. Kristin Charlton
1307012/31/1999Letter RE: Water used as Feedstock for the Heat Recovery Steam Generator
Letter RE: Water used as Feedstock for the Heat Recovery Steam Generator
2 page(s)
 CEC/Moore/rohyDept. Of Toxic Substance Control
1307412/31/1999Petition for Intervention as an Individual or Agency (Represented by Larry Allen) (Attachment: Proof of Service)
Petition for Intervention as an Individual or Agency (Represented by Larry Allen) (Attachment: Proof of Service)
6 page(s)
 CEC/DocketSan Luis Obispo Co. Apcd
1307912/30/1999Letter recommendation that the permit requirement under section AQ-C2, requiring oxidation soot filters be changed
Letter recommendation that the permit requirement under section AQ-C2, requiring oxidation soot filters be changed
1 page(s)
 CEC/DocketCatalytic Exhaust Products Ltd./Canning
1302712/24/1999NOTICE of Availability - Final Staff Assessment, Part III. (Attachment: Order Form)
NOTICE of Availability - Final Staff Assessment, Part III. (Attachment: Order Form)
3 page(s)
 CEC/DocketCEC/Therkelsen
1301012/22/1999Handling of the Final Staff Assessment, Part III
Handling of the Final Staff Assessment, Part III
1 page(s)
 LibrarianCEC/Therkelsen
1301212/22/1999Request for Agency Comments on the Final Staff Assessment, Part III
Request for Agency Comments on the Final Staff Assessment, Part III
2 page(s)
 Agency Distribution ListCEC/Therkelsen
1299512/21/1999District Witness to Sponsor Final Determination of Compliance at CEC Evidentiary Hearing on 1/10/00
District Witness to Sponsor Final Determination of Compliance at CEC Evidentiary Hearing on 1/10/00
3 page(s)
 Sjvapcd/SadredinCEC/Fay
1296312/20/1999Amendment to the CURE and Doug Zimmerman's Request for Hearing - Proof of Service
Amendment to the CURE and Doug Zimmerman's Request for Hearing - Proof of Service
31 page(s)
 CEC/DocketCure/Joseph
1296512/20/1999San Joaquin Valley Air Pollution Control District Notice of Public Hearing Before the Hearing Board of the San Joaquin Valley Unified Air Pollution Control District Regarding Permit (meeting date 1/12/00) - Proof of Service
San Joaquin Valley Air Pollution Control District Notice of Public Hearing Before the Hearing Board of the San Joaquin Valley Unified Air Pollution Control District Regarding Permit (meeting date 1/12/00) - Proof of Service
5 page(s)
 CEC/DocketCure/Heeley
1294112/17/1999Landscaping Requirement - Proof of Service
Landscaping Requirement - Proof of Service
6 page(s)
 CEC/PryorBakersfield Planning Dept./Rickels
1296112/17/1999Committee Response to Staff Comments Filed December 14, 1999 (Attachment: Proof of Service)
Committee Response to Staff Comments Filed December 14, 1999 (Attachment: Proof of Service)
1 page(s)
 CEC/DocketCEC/Moore/rohy
1306412/17/1999Final Staff Assessment Part 3
Final Staff Assessment Part 3
167 page(s)
 CEC/DocketCEC Cec
1293012/14/1999California Energy Commission Staff - Comments on Schedule (December 14, 1999)
California Energy Commission Staff - Comments on Schedule (December 14, 1999)
3 page(s)
 CEC/DocketCEC/Holmes
1300312/14/1999Formal Consultation Regarding Features Within the Jurisdiction of the Department of Fish & Game
Formal Consultation Regarding Features Within the Jurisdiction of the Department of Fish & Game
8 page(s)
 CEC/PyrorDept. Of Fish & Game/Loudermilk
1287212/10/1999Compliance Certification
Compliance Certification
2 page(s)
 CEC/TherkelsenSan Joaquin Valley Apcd /Sadredin
1285012/9/1999Sunrise Cogeneration and Power Company's Revised Schedule (Attachments: Attachment A - Revised Schedule; Proof of Service)
Sunrise Cogeneration and Power Company's Revised Schedule (Attachments: Attachment A - Revised Schedule; Proof of Service)
3 page(s)
 CEC/DocketGrattan & Galati
1288912/9/1999Status Report (December 10, 1999) (Attachment: Proof of Service)
Status Report (December 10, 1999) (Attachment: Proof of Service)
5 page(s)
 CEC/DocketCure/Joseph
1284412/8/1999Answer to CURE Request for Hearing - December 8, 1999 (Attachment: Proof of Service)
Answer to CURE Request for Hearing - December 8, 1999 (Attachment: Proof of Service)
6 page(s)
 CEC/DocketGrattan & Galati
1286212/8/1999Statutory Deadline for Determination of Compliance - Proof of Service
Statutory Deadline for Determination of Compliance - Proof of Service
5 page(s)
 Sunrise/HallSan Joaquin Valley Apcd/Goff
1286612/7/1999Notice of Evidentiary Hearings -and- Hearing Order - CEC - January 10, 11 and 13, 2000 - Attachment
Notice of Evidentiary Hearings -and- Hearing Order - CEC - January 10, 11 and 13, 2000 - Attachment
8 page(s)
 CEC/DocketCEC/Rohy/moore
1280712/2/1999Request for Hearing to Review the San Joaquin Valley Unified Air Pollution Control District's Grant of a Conditional Final Determination of Compliance (November 29, 1999) (Attachment: Exhibits; Proof of Service)
Request for Hearing to Review the San Joaquin Valley Unified Air Pollution Control District's Grant of a Conditional Final Determination of Compliance (November 29, 1999) (Attachment: Exhibits; Proof of Service)
1019 page(s)
 CEC/DocketCure/Joseph
1275411/30/1999SUPPLEMENTAL - Testimony - Evidentiary Hearings Part 2 - Proof of Service
SUPPLEMENTAL - Testimony - Evidentiary Hearings Part 2 - Proof of Service
14 page(s)
 CEC/DocketRadian/Muraoka
1277511/30/1999Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP) (November 30, 1999)
Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan (BRMIMP) (November 30, 1999)
100 page(s)
 CEC/DocketRadian International/Muraoka
3084811/30/1999Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan - POS
Revised Draft Biological Resources Mitigation Implementation and Monitoring Plan - POS
109 page(s)
 CEC/DocketsRadian International/Muraoka
1278111/24/1999Poole Letter to Pryor (11/23/99) Attachments 1 & 2: Excerpts from Environmental Oversight Plan for construction of new federal courthouse in Sacramento; Attachment 3: Copy of a letter sent to U.S. EPA regarding EPA's duties under section 7 of the Endangered Species Act; Attachment 4: Copy of a letter (w/o exhibits) sent to SLO Co.
Poole Letter to Pryor (11/23/99) Attachments 1 & 2: Excerpts from Environmental Oversight Plan for construction of new federal courthouse in Sacramento; Attachment 3: Copy of a letter sent to U.S. EPA regarding EPA's duties under section 7 of the Endangered Species Act; Attachment 4: Copy of a letter (w/o exhibits) sent to SLO Co.
38 page(s)
 CEC/DocketAdams, Broadwell Joseph & Cardozo/Heeley
1272711/22/1999Notice of a Biological and Water Resources Workshop Mailing List - CEC - Proof of Service
Notice of a Biological and Water Resources Workshop Mailing List - CEC - Proof of Service
4 page(s)
 CEC/DocketSunrise Cogeneration And Power
1275811/22/1999Phase II, Environmental Site Assessment (Attachment: Proof of Service)
Phase II, Environmental Site Assessment (Attachment: Proof of Service)
150 page(s)
 CEC/DocketRadian International/Muraoka
3090011/22/1999Poole Letter to Goff/Gruber (11/19/99) re; Sunrise PDOC - POS
Poole Letter to Goff/Gruber (11/19/99) re; Sunrise PDOC - POS
5 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cordozo/Heeley
1275911/19/1999Comments on the District's Preliminary Determination of Compliance for the Proposed Sunrise Project #981220 (Attachment: Proof of Service)
Comments on the District's Preliminary Determination of Compliance for the Proposed Sunrise Project #981220 (Attachment: Proof of Service)
113 page(s)
 CEC/TherkelsenSan Joaquin Valley Apcd/Sadredin
1273611/18/1999Second Amended Prehearing Conference Statement. (Attachment: Proof of Service)
Second Amended Prehearing Conference Statement. (Attachment: Proof of Service)
18 page(s)
 CEC/NashGrattan Galati/Galati
1265311/12/1999Poole Letter to Pryor/O'Hagan (11/12/99) - Proof of Service
Poole Letter to Pryor/O'Hagan (11/12/99) - Proof of Service
15 page(s)
 CEC/DocketAdams Broadwell Joseph & Cordozo/Brazil
1264511/10/1999Poole Letter to Goff/Gruber (11/09/99) regarding Sunrise PDOC - Proof of Service
Poole Letter to Goff/Gruber (11/09/99) regarding Sunrise PDOC - Proof of Service
5 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1263211/9/1999NOTICE of Evidentiary Hearings - December 2 - 3, 1999 (Attachment: Proof of Service)
NOTICE of Evidentiary Hearings - December 2 - 3, 1999 (Attachment: Proof of Service)
4 page(s)
 CEC/DocketCEC/Moore/rohy
1257411/5/1999Declaration of Dale Edwards
Declaration of Dale Edwards
2 page(s)
 CEC/DocketCEC/Staff
1257511/4/1999STIPULATION RE: Condition of Certification Entitled Cultural - 18. (Attachment: Proof of Service)
STIPULATION RE: Condition of Certification Entitled Cultural - 18. (Attachment: Proof of Service)
5 page(s)
 CEC/DocketGrattan & Galati/Grattan
1257611/4/1999Letter Dated 6/26/96 from EPA/Blanco to Ground Water Protection Council/Paque; Memorandum dated 8/10/87 from CA Dept. of Conservation/Mefferd RE: EPA Approval to Inject Air Scrubber Waste and Water Softner Regeneration Brine in Class II Wells; Letter Dated 1/29/97 from CA Div. of Oil & Gas/Guerard to CA Dept. of Toxic Substances Control/Pilcorn
Letter Dated 6/26/96 from EPA/Blanco to Ground Water Protection Council/Paque; Memorandum dated 8/10/87 from CA Dept. of Conservation/Mefferd RE: EPA Approval to Inject Air Scrubber Waste and Water Softner Regeneration Brine in Class II Wells; Letter Dated 1/29/97 from CA Div. of Oil & Gas/Guerard to CA Dept. of Toxic Substances Control/Pilcorn
8 page(s)
 CEC/DocketGrattan & Galati/Grattan
1257711/4/1999Additional Response to Committee Order Dated August 26, 1999. (Attachment: Proof of Service)
Additional Response to Committee Order Dated August 26, 1999. (Attachment: Proof of Service)
2 page(s)
 CEC/DocketRadian International/Muraoka
1257811/4/1999Response to the revised Prevention of Significant Deterioration application - Proof of Service
Response to the revised Prevention of Significant Deterioration application - Proof of Service
25 page(s)
 Sunrise/HallUs Epa/Haber
1258711/4/1999Report of Conversation with Steve Hartsil of Kern County Superintendent of Schools
Report of Conversation with Steve Hartsil of Kern County Superintendent of Schools
1 page(s)
 CEC/DocketCEC/Edwards
1258811/4/1999Sunrise Socioeconomic FSA Errata
Sunrise Socioeconomic FSA Errata
1 page(s)
 CEC/DocketCEC/Diamond
1255011/2/1999Poole Letter to Pryor/O'Hagan (11/1/99) (Attachment: Proof of Service)
Poole Letter to Pryor/O'Hagan (11/1/99) (Attachment: Proof of Service)
97 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1250010/27/1999Poole Letter to Goff/Gruber (10/26/99) (W/Enclosure) (Attachment: Proof of Service)
Poole Letter to Goff/Gruber (10/26/99) (W/Enclosure) (Attachment: Proof of Service)
7 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
3193610/27/1999In the Matter of The AFC for Sunrise Cogeneration and Power Project
In the Matter of The AFC for Sunrise Cogeneration and Power Project
1 page(s)
 CEC/DocketsAdams Broadwell/Joseph & Gardozo
1247010/26/1999Transmission Agency of Northern California Prehearing Conference Statement Oct. 25, 1999 - Proof of Service
Transmission Agency of Northern California Prehearing Conference Statement Oct. 25, 1999 - Proof of Service
6 page(s)
 CEC/DocketDecuir & Somach/De Cuir
1247110/26/1999Testimony of David Larsen of Navigant ounsulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California - Proof of Service
Testimony of David Larsen of Navigant ounsulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern California - Proof of Service
15 page(s)
 CEC/DocketDecuir & Somach/Larsen
1247610/26/1999Testimony of David Larsen of Navigant Consulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern Ca. and the Transmission Agency of Northern California Preheating Conference Statement. - Proof of Service
Testimony of David Larsen of Navigant Consulting, Inc. Regarding Transmission Impacts of the Sunrise Project Submitted on Behalf of the Transmission Agency of Northern Ca. and the Transmission Agency of Northern California Preheating Conference Statement. - Proof of Service
15 page(s)
 CEC/DocketDe Cuir & Somach/Larsen
1248410/25/1999Testimony - Evidentiary Hearings Part 2 - Proof of Service and Cover for Binder
Testimony - Evidentiary Hearings Part 2 - Proof of Service and Cover for Binder
33 page(s)
 CEC/DocketRadian International/Muraoka
1249410/25/1999Testimony of J. Phyllis Fox on Behalf od the California Unions for Reliable Energy on Traffic and Transportation Impacts and Worker Safety Impacts of the Sunrise Cogeneration and Power Project
Testimony of J. Phyllis Fox on Behalf od the California Unions for Reliable Energy on Traffic and Transportation Impacts and Worker Safety Impacts of the Sunrise Cogeneration and Power Project
125 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardoza/Heeley
1236010/21/1999Letter to Goff/Gruber from Poole (10/21/99) re: Sunrise PDOC (Enclosing Information RE: Additional Violations)
Letter to Goff/Gruber from Poole (10/21/99) re: Sunrise PDOC (Enclosing Information RE: Additional Violations)
17 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1243210/21/1999Objections and Notice of Inability to Respond to a Data Request - Set Five Extension to File Its Objections and Notice of Inability to Respond to a Data Request - Set Five. Proof of Service
Objections and Notice of Inability to Respond to a Data Request - Set Five Extension to File Its Objections and Notice of Inability to Respond to a Data Request - Set Five. Proof of Service
14 page(s)
 CEC/DocketGrattan & Galati/Galati
1245310/20/1999California Regional Water Quality Control Board letter of 9/21/99 from William F. Pfister and Shelton R. Gray to Valley Waste Disposal Co. CRWQCBM of 9/20/99 from James K. Dowdall to Shelton R. Gray - Proof of Service
California Regional Water Quality Control Board letter of 9/21/99 from William F. Pfister and Shelton R. Gray to Valley Waste Disposal Co. CRWQCBM of 9/20/99 from James K. Dowdall to Shelton R. Gray - Proof of Service
11 page(s)
 CEC/DocketGrattan & Galati/Grattan
1232010/19/1999Evidentiary Hearing - Mailing List - CEC
Evidentiary Hearing - Mailing List - CEC
4 page(s)
 CEC/DocketCEC Cec
1231510/18/1999Handling of the Final Staff Assessment, Part II, For the Sunrise Cogeneration and Power Project
Handling of the Final Staff Assessment, Part II, For the Sunrise Cogeneration and Power Project
1 page(s)
 Librarian/DocketCEC/Therkelsen
1250510/18/1999Testimony of Michael Fry on Behalf of the California Unions for Reliable Energy on Biological Impacts of the Sunrise Cogeneration and Power Project (October 15, 1999) (Attacment: Proof of Service)
Testimony of Michael Fry on Behalf of the California Unions for Reliable Energy on Biological Impacts of the Sunrise Cogeneration and Power Project (October 15, 1999) (Attacment: Proof of Service)
27 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardoza/Joseph /poole
1229610/15/1999FINAL STAFF ASSESSMENT (PART 2)
FINAL STAFF ASSESSMENT (PART 2)
94 page(s)
 CEC/DocketCEC Cec
1230010/15/1999Notice of A Biological and Water Resources Workshop for the Sunrise Cogeneration and Power Project Application for Certification
Notice of A Biological and Water Resources Workshop for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
 CEC/DocketCEC/Moore
1230110/15/1999Recorded Copy - Final Action Lot Line Adjustment 29 - 99 (Attachment: Proof of Service)
Recorded Copy - Final Action Lot Line Adjustment 29 - 99 (Attachment: Proof of Service)
9 page(s)
 Sunrise Cogeneration & Power CoKern Co. Planning Dept./James
1230210/15/1999Sign-in Sheet - Evidentiary Hearing
Sign-in Sheet - Evidentiary Hearing
4 page(s)
 CEC/DocketCEC Cec
1251210/15/1999Cal-ISO Testimony - Transmission System Reliability Sunrise Cogeneration and Power Project (Sunrise) Interconnection (Testimony of Ron S. Daschmans) (Attachment: proof of Service)
Cal-ISO Testimony - Transmission System Reliability Sunrise Cogeneration and Power Project (Sunrise) Interconnection (Testimony of Ron S. Daschmans) (Attachment: proof of Service)
16 page(s)
 CEC/DocketCal-iso
1237310/14/1999NOTICE of Evidentiary Hearings - November 5, 1999 (Attachment: Attachment A; Proof of Service List)
NOTICE of Evidentiary Hearings - November 5, 1999 (Attachment: Attachment A; Proof of Service List)
4 page(s)
 CEC/DocketCEC/Moore/rohy
1237610/14/1999Report of Conversation w/ Phil Castle (Kern Co. Fire Dept.) Subject: Questions RE: 700 Wells - Fire Protection (Attachment: Service List)
Report of Conversation w/ Phil Castle (Kern Co. Fire Dept.) Subject: Questions RE: 700 Wells - Fire Protection (Attachment: Service List)
1 page(s)
 CEC/DocketCEC/Pryor
3089010/14/1999Testimony of Kathryn M. Matthew - Supplement to Staff's Testimony Final Staff Assessment Cultural Resources
Testimony of Kathryn M. Matthew - Supplement to Staff's Testimony Final Staff Assessment Cultural Resources
2 page(s)
 DocketsMatthews
1233110/13/1999GE Gas Turbine Start-up Curve Diagram that was Marked for Identification as Exhibit 27 at the CEC Hearing on Tuesday, October 12, 1999 (Attachment: Proof of Service)
GE Gas Turbine Start-up Curve Diagram that was Marked for Identification as Exhibit 27 at the CEC Hearing on Tuesday, October 12, 1999 (Attachment: Proof of Service)
2 page(s)
 CEC/NashGrattan & Galati/Grattan
1233410/12/1999Letter to Goff/Gruber From Poole (10/08/99) RE: Sunrise PDOC
Letter to Goff/Gruber From Poole (10/08/99) RE: Sunrise PDOC
5 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
1233910/12/1999Declaration of David A. Stein
Declaration of David A. Stein
2 page(s)
 CEC/NashGrattan & Galati /Grattan
1234010/12/1999Curriculum Vitae of David M. Einolf (Attachment: Proof of Service)
Curriculum Vitae of David M. Einolf (Attachment: Proof of Service)
4 page(s)
 CEC/NashGrattan & Galati/Gratttan
1235410/12/1999Declaration of Al McCuen, M. Kisabuli and Steve Baker
Declaration of Al McCuen, M. Kisabuli and Steve Baker
1 page(s)
 CEC/DocketCEC/Mccuen/kisabuli/baker
1235510/12/1999Errata to Staff's Testimony Sunrise Cogeneration and Power Project Facility Design - Testimony of Stave Baker, Kisabuli and Al McCuen (10/11/99)
Errata to Staff's Testimony Sunrise Cogeneration and Power Project Facility Design - Testimony of Stave Baker, Kisabuli and Al McCuen (10/11/99)
3 page(s)
 CEC/DocketCEC/Baker/kisabuli/mccuen
1235710/12/1999Traffic Study - Review of the Study and Comments
Traffic Study - Review of the Study and Comments
2 page(s)
 CEC/Efs&epdDept. Of Tansportation/Sorensen
3085110/12/1999Errata to Staff's Testimony Final Staff Assessment Cultural Resources - Testimony of Kathryn M. Matthews
Errata to Staff's Testimony Final Staff Assessment Cultural Resources - Testimony of Kathryn M. Matthews
4 page(s)
 CEC/DocketsK. Matthews
1225310/8/1999Copies of the following documents: Valley Waste Disposal Co. Waste Discharge Requirements; Letter from California Regional Quality Control Brd to Radian International dated June 2, 1999; Letter from Radian International to California Regional Water Quality Control Brd dated May 26, 1999; Permit Approval from Div. of Oil, Gas and Geothermal Res.
Copies of the following documents: Valley Waste Disposal Co. Waste Discharge Requirements; Letter from California Regional Quality Control Brd to Radian International dated June 2, 1999; Letter from Radian International to California Regional Water Quality Control Brd dated May 26, 1999; Permit Approval from Div. of Oil, Gas and Geothermal Res.
10 page(s)
 CEC/DocketGrattan & Galati/Grattan
1225010/7/1999Cal-ISO's Conclusions & Preliminary Findings (Attachment: Proof of Service)
Cal-ISO's Conclusions & Preliminary Findings (Attachment: Proof of Service)
4 page(s)
 CEC/DocketCal Iso/Daschmans
1222610/6/1999Fifth Set of CURE Data Requests
Fifth Set of CURE Data Requests
10 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
1223510/6/1999SUNRISE Cogeneration and Power Project TESTIMONY - Evidentiary Hearings Part I - (Written Testimony RE: Final Staff Assessment Sections Addressed by CEC Staff in it's October 1, 1999 Submittal)
SUNRISE Cogeneration and Power Project TESTIMONY - Evidentiary Hearings Part I - (Written Testimony RE: Final Staff Assessment Sections Addressed by CEC Staff in it's October 1, 1999 Submittal)
115 page(s)
 CEC/DocketRadian/Muraoka
1225110/6/1999Notice of Decision, Lot Line Adjustment No. 29-99, Sunrise Project, From the Planning Department of the Kern County Resource Management Agency (Attachment: Proof of Service)
Notice of Decision, Lot Line Adjustment No. 29-99, Sunrise Project, From the Planning Department of the Kern County Resource Management Agency (Attachment: Proof of Service)
7 page(s)
 CEC/DocketGrattan & Galati/Grattan
1225210/6/1999Sunrise Cogeneration and Power Company's First Amendment to Prehearing Conference Statement (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's First Amendment to Prehearing Conference Statement (Attachment: Proof of Service)
17 page(s)
 CEC/DocketGrattan & Galati/Grattan/galati
1218910/4/1999Request for Agency Comments on the Final Staff Assessment, Part I
Request for Agency Comments on the Final Staff Assessment, Part I
2 page(s)
 Distribution ListCEC/Therkelsen
1219010/4/1999Notice of Availability - Final Staff Assessment, Part I
Notice of Availability - Final Staff Assessment, Part I
3 page(s)
 CEC/DocketCEC/Therkelsen
1219110/4/1999Handling of the Final Staff Assessment Part I
Handling of the Final Staff Assessment Part I
1 page(s)
 LibrarianCEC/Therkelsen
1219210/4/1999Manuscript submitted for publication in the Journal of Wildlife Diseases w/ comments of three reviewers.
Manuscript submitted for publication in the Journal of Wildlife Diseases w/ comments of three reviewers.
9 page(s)
 Phyllis/CharltonJournal Of Wildlife Diseases/Danny B. Pence
1219410/4/1999Objections and Notice of Inability to Respond to a Data Request from CURE, Set Four- -Proof of Service
Objections and Notice of Inability to Respond to a Data Request from CURE, Set Four- -Proof of Service
16 page(s)
 CEC/DocketGrattan & Galati/Grattan
1220210/4/1999Order Granting Petition to Intervene - Proof of Service
Order Granting Petition to Intervene - Proof of Service
4 page(s)
 CEC/DocketCEC/Moore
1221210/1/1999Report of Conversation with Texaco re: Streambed Alteration Agreement
Report of Conversation with Texaco re: Streambed Alteration Agreement
1 page(s)
 CEC/DocketRick York
1221510/1/1999Various e-mails and ROCs that placed between staff and consultant to Adams Broadwell, Joseph and Cordozo.
Various e-mails and ROCs that placed between staff and consultant to Adams Broadwell, Joseph and Cordozo.
6 page(s)
 CEC/DocketMarc Pryor
1221910/1/1999Requesting information on Kern Co. Fire's practices regarding providing protection in the oil fields - POS
Requesting information on Kern Co. Fire's practices regarding providing protection in the oil fields - POS
7 page(s)
 CEC/DocketMarc Pryor
1222010/1/1999Final Staff Assessment (Part 1) (Attachment: Proof of Service)
Final Staff Assessment (Part 1) (Attachment: Proof of Service)
421 page(s)
 CEC/DocketCEC/Pryor/therkelsen
1222410/1/1999Letter to Pryor from Poole (9/29/99) (enclosing additional information regarding Texaco's proposed method of waste water discharge. - Maps - Proof of Service
Letter to Pryor from Poole (9/29/99) (enclosing additional information regarding Texaco's proposed method of waste water discharge. - Maps - Proof of Service
637 page(s)
 CEC/DocketsAdams Broadwell Joseph & Cardozo/Poole/heeley
1224910/1/1999Report of Conversation - w/Phil Castle, Fire Marshal, Kern Co. Fire Dept. RE: Questions Regarding 700 Wells (Attachment: Proof of Service)
Report of Conversation - w/Phil Castle, Fire Marshal, Kern Co. Fire Dept. RE: Questions Regarding 700 Wells (Attachment: Proof of Service)
2 page(s)
 CEC/DocketCEC/Pryor
121519/30/1999Revisions to Application for Transportation and Utility Systems and Facilities on Federal Lands - Standard Form 299 (Attachment: Proof of Service)
Revisions to Application for Transportation and Utility Systems and Facilities on Federal Lands - Standard Form 299 (Attachment: Proof of Service)
8 page(s)
 Us Blm/FellowsSunrise Cogen And Power/Hall
121669/30/1999Notice of Evidentiary Hearings and Hearing Order - October 12, 14 and 15, 1999 - CEC
Notice of Evidentiary Hearings and Hearing Order - October 12, 14 and 15, 1999 - CEC
8 page(s)
 CEC/DocketCEC/Moore/rohy
121149/29/1999Scheduled of the Work Safety and Fire Protection, Socioeconomics; and Soil and Water Resources Testimonies - Proof of Service
Scheduled of the Work Safety and Fire Protection, Socioeconomics; and Soil and Water Resources Testimonies - Proof of Service
5 page(s)
 CEC/Moore/rohyCEC/Pryor
122229/28/1999Geotechnical Report - Revision I - Proof of Service
Geotechnical Report - Revision I - Proof of Service
184 page(s)
 CEC/DocketRadian International/Muraoka
121269/27/1999Transmission Agency of Northern California's Reply to Applicant's Opposition to Petition to Intervene (Attachment: Proof of Service)
Transmission Agency of Northern California's Reply to Applicant's Opposition to Petition to Intervene (Attachment: Proof of Service)
16 page(s)
 CEC/DocketDecuir & Somach/Decuir/johnson
121019/24/1999Transportation Impact Analysis - Construction Impacts at Intersection of SR 119 and Midway Road
Transportation Impact Analysis - Construction Impacts at Intersection of SR 119 and Midway Road
34 page(s)
 CEC/DocketRadian International/Muraoka
121319/24/1999Letter to Pryor from Poole (w/attachments) 9/23/99) Re: Additional Air Quality Sampling Results (Attachment: Proof of Service)
Letter to Pryor from Poole (w/attachments) 9/23/99) Re: Additional Air Quality Sampling Results (Attachment: Proof of Service)
41 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
121329/24/1999Letter to Goff/Gruber from Poole (Enclosing Additional Information NOVs (9/23/99) RE: Sunrise PDOC (Attachment: Proof of Service)
Letter to Goff/Gruber from Poole (Enclosing Additional Information NOVs (9/23/99) RE: Sunrise PDOC (Attachment: Proof of Service)
30 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Heeley
120709/23/19991. Letter to Goff/Gruber from Poole (9/20/99) regarding Sunrise PDOC 2. Letter to Goff/Gruber from Poole (w/enclosures) (9/12/99) regarding Sunrise PDOC. Proof of Service.
1. Letter to Goff/Gruber from Poole (9/20/99) regarding Sunrise PDOC 2. Letter to Goff/Gruber from Poole (w/enclosures) (9/12/99) regarding Sunrise PDOC. Proof of Service.
8 page(s)
 CEC/DocketAdams Broadwell Joseph &carodzo/Poole/heeley
121309/23/1999Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - (DFC-1)., and Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - 2 (DFS-2)
Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - (DFC-1)., and Sunrise Cogen. and Power Company's Interim Des Status Report Prepared by PG&E as a Supplement to the Detailed Facilities Study - 2 (DFS-2)
500 page(s)
 CEC/NashGrattan & Galati
120969/22/1999Schedule of the Biological Resources Testimony
Schedule of the Biological Resources Testimony
4 page(s)
 CEC/Moore/rohyCEC/Pryor
120209/20/1999Letter to Mr. John P. Grattan Dated September 17, 1999 - Fourth Set of CURE Data Requests
Letter to Mr. John P. Grattan Dated September 17, 1999 - Fourth Set of CURE Data Requests
9 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
308979/20/1999Interim DFS Status Report
Interim DFS Status Report
202 page(s)
 Sunrise Cogen Power Co/Way/cec/docketsPg&e/Tsai
308989/20/1999Interim DFS Status Report
Interim DFS Status Report
172 page(s)
 Sunrise Cogen Power Co/Way/cec/docketsPg&e/Tsai
120129/17/1999Sunrise Cogeneration and Power Plant - Status of the Final Staff Assessment
Sunrise Cogeneration and Power Plant - Status of the Final Staff Assessment
3 page(s)
 CEC/Moore/rohyCEC/Pryor
120139/17/1999Response to Committee Order Dated August 26, 1999 (Attachment: Proof of Service)
Response to Committee Order Dated August 26, 1999 (Attachment: Proof of Service)
14 page(s)
 CEC/DocketRadian International/Muraoka
119929/15/1999Notice of Change to Service List: Add Sunrise Cogeneration & Power (S. Watzke) (Attachment: Proof of Service)
Notice of Change to Service List: Add Sunrise Cogeneration & Power (S. Watzke) (Attachment: Proof of Service)
1 page(s)
 CEC/FayGrattan & Galati/Grattan
120069/15/1999Sunrise Cogeneration and Power Company's Opposition to the Transmission Agency of Northern California's Petition to Intervene. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Opposition to the Transmission Agency of Northern California's Petition to Intervene. (Attachment: Proof of Service)
12 page(s)
 CEC/NashGrattan & Galati/Grattan
120079/15/1999Sunrise Cogeneration and Power Company's Notice of Change to Service List (Add: Mervyn Soares) (Attachment: Proof of Service List)
Sunrise Cogeneration and Power Company's Notice of Change to Service List (Add: Mervyn Soares) (Attachment: Proof of Service List)
2 page(s)
 CEC/NashGrattan & Galati/Grattan
120509/15/1999E-mail on comments on reports and data referred by Phyllis Fox
E-mail on comments on reports and data referred by Phyllis Fox
1 page(s)
 CEC/DocketKristin Charlton
120489/13/1999Letter to Messrs. Thomas E. Goff, John Gruber and Leonard Scandura of SFVAPCD Regarding Sunrise PDOC (Project #981220) and Equilon ATC (Project #981253) dated 09/09/99. Proof of Service
Letter to Messrs. Thomas E. Goff, John Gruber and Leonard Scandura of SFVAPCD Regarding Sunrise PDOC (Project #981220) and Equilon ATC (Project #981253) dated 09/09/99. Proof of Service
6 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/Katherine S. Pool
119819/10/1999Detailed Comments RE: Preliminary Determination of Complaince (PDOC) (Attached: Proof of Service)
Detailed Comments RE: Preliminary Determination of Complaince (PDOC) (Attached: Proof of Service)
9 page(s)
 San Joaquin Valley Unified Apcd/SadredinU.s. Epa/Haber
119839/10/1999Addendum to Prehearing Conference Statement of Commission Staff (September 10, 1999). (Attachment: Proof of Service)
Addendum to Prehearing Conference Statement of Commission Staff (September 10, 1999). (Attachment: Proof of Service)
3 page(s)
 CEC/DocketCEC/Holmes
119649/9/1999Corrected Figures: Revised Figure 2-1 Site Arrangement ; Revised 8.12-1, Hazardous and Toxic Material Locations (Attachment: Proof of Service)
Corrected Figures: Revised Figure 2-1 Site Arrangement ; Revised 8.12-1, Hazardous and Toxic Material Locations (Attachment: Proof of Service)
2 page(s)
 CEC/DocketRadian International/ Muraoka
119759/9/1999Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District RE: Additional PDOC Information Dated September 7, 1999. (Attachment: Proof of Service)
Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District RE: Additional PDOC Information Dated September 7, 1999. (Attachment: Proof of Service)
4 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
119419/8/1999Notes on Sunrise e-mail
Notes on Sunrise e-mail
1 page(s)
 CEC/YorkDonna
118919/2/1999Staff Determination in Response to Committee Order
Staff Determination in Response to Committee Order
4 page(s)
 CEC/Docket FileCEC/Holmes
118929/2/1999Message from Phyllis Fox RE: Measurements in both Midway Sunset and Lokern Summary of the Data.
Message from Phyllis Fox RE: Measurements in both Midway Sunset and Lokern Summary of the Data.
1 page(s)
 CEC/Loyer/pryor/ringer/odoemelamCEC/Spiegel
118979/2/1999Sunrise Comments on Preliminary Staff Assessments
Sunrise Comments on Preliminary Staff Assessments
175 page(s)
 CEC/DocketRadian International/Mukaoka
308499/2/1999CURE's Comments on the Sunrise Preliminary Staff Assessment - POS
CURE's Comments on the Sunrise Preliminary Staff Assessment - POS
95 page(s)
 CEC/Pryor/docketsAdams Broadwell Joseph & Cardozo/Poole
308509/2/1999Sunrise Comments on Preliminary Staff Assessments
Sunrise Comments on Preliminary Staff Assessments
175 page(s)
 CEC/DocketRadian International/Mukaoka
118758/31/1999Transmission Agency of Northern California Petition to Intervene
Transmission Agency of Northern California Petition to Intervene
10 page(s)
 CEC/DocketDe Cuir & Somach/Lynch
118888/31/1999Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District Regarding Preliminary Determination of Compliance Dated August 28, 1999 - Proof of Services
Letter to Messrs. Thomas E. Goff and John Gruber of San Joaquin Valley Air Pollution Control District Regarding Preliminary Determination of Compliance Dated August 28, 1999 - Proof of Services
157 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo/K. Poole
119108/31/1999Letter regarding comments for consideration on the PSA - Proof of Service
Letter regarding comments for consideration on the PSA - Proof of Service
4 page(s)
 CEC/JohnsonDepartment Of Conservation/Marshall
118728/30/1999Comments on Preliminary Determination of Compliance (PDOC). (Attachment: Proof of Service)
Comments on Preliminary Determination of Compliance (PDOC). (Attachment: Proof of Service)
13 page(s)
 CEC/NashGrattan & Galati/Grattan
118288/27/1999Comments from the Commission Air Quality staff regarding the workshop held on August 16, 1999 in Bakersfield. Proof of Service
Comments from the Commission Air Quality staff regarding the workshop held on August 16, 1999 in Bakersfield. Proof of Service
5 page(s)
 Sjvuapcd/SadredinRobert Therkelsen/Robert Haussler
118298/27/1999List of data available, collected at the sites for the period of January 1989 through September 1995.
List of data available, collected at the sites for the period of January 1989 through September 1995.
1 page(s)
 Environmental Management/FoxEsc/Seylar
118348/27/1999Letter to Mr. Steven Branoff (Air3) EPA, Region 9, Dated July 12, 1999 - Proof of Service
Letter to Mr. Steven Branoff (Air3) EPA, Region 9, Dated July 12, 1999 - Proof of Service
78 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo
118628/26/1999Addendum to Staff's Comments on CURE's Motion to Compel - Proof of Service
Addendum to Staff's Comments on CURE's Motion to Compel - Proof of Service
6 page(s)
 CEC/MooreCEC/Bergquist
118968/26/1999Committee Order in Response to CURE's Motion to Compel (Attachment: Proof of Service)
Committee Order in Response to CURE's Motion to Compel (Attachment: Proof of Service)
9 page(s)
 CEC/DocketCEC/Moore
118218/25/1999Prehearing Conference Statement of Commission Staff (Attachment: Proof of Service)
Prehearing Conference Statement of Commission Staff (Attachment: Proof of Service)
4 page(s)
 CEC/Docket FileCEC/Holmes
118228/25/1999Pre-Hearing Conference Statement (Attachment: Proof of Service)
Pre-Hearing Conference Statement (Attachment: Proof of Service)
2 page(s)
 CEC/Moore/rohyCa Iso/Perez
118238/25/1999California Unions for Reliable Energy (CURE) Prehearing Conference Statement (August 25, 1999)
California Unions for Reliable Energy (CURE) Prehearing Conference Statement (August 25, 1999)
19 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo Attys For Cure/Jo
118248/25/1999CURE's Comments on the Air Qualify Section of the Sunrise Preliminary Staff Assessment.
CURE's Comments on the Air Qualify Section of the Sunrise Preliminary Staff Assessment.
54 page(s)
 CEC/NashAdams Broadwell Joseph & Cardozo/Debonville/poole
118258/25/1999Sunrise Cogeneration and Power Company's Counsel's Status Report No. 5. (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's Counsel's Status Report No. 5. (Attachment: Proof of Service)
4 page(s)
 CEC/NashGrattan & Galati/Galati
118718/25/1999Prehearing Conference Statement (Attachment: Proof of Service)
Prehearing Conference Statement (Attachment: Proof of Service)
163 page(s)
 CEC/NashGrattan & Galati/Galati
118958/25/1999Prehearing Conference Statement of Commission Staff
Prehearing Conference Statement of Commission Staff
4 page(s)
 CEC/Docket FileCEC/Holmes
118048/24/1999Committee Hearing on California Unions for Reliable Energy's CURE Motion to Compel Responses
Committee Hearing on California Unions for Reliable Energy's CURE Motion to Compel Responses
6 page(s)
 CEC/MooreDowney Brand Seymour & Rohwer/Miller
117898/23/1999California Unions for Reliable Energy Notice Regarding the Evidentiary Hearing Scheduled for September 8, 1999 (August 20, 1999) (Attachment: Proof of Service)
California Unions for Reliable Energy Notice Regarding the Evidentiary Hearing Scheduled for September 8, 1999 (August 20, 1999) (Attachment: Proof of Service)
4 page(s)
 CEC/Nash/docket UnitAdams Broadwell Joseph & Cardozo/Debonville
118078/23/1999California Unions for Reliable Energy Second Supplement Regarding its Motion to Compel
California Unions for Reliable Energy Second Supplement Regarding its Motion to Compel
21 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo/Joseph
117918/20/1999ROC with CURE
ROC with CURE
1 page(s)
 CEC/BergquistCEC/Holmes
117968/20/1999Staff's Comments on CURE's Motion to Compel Production of Information
Staff's Comments on CURE's Motion to Compel Production of Information
19 page(s)
 CEC/MooreCEC/Bergquist
117398/18/1999Counsel's Letter to California Unions for Reliable Energy Counsel regarding: Additional Offset Information
Counsel's Letter to California Unions for Reliable Energy Counsel regarding: Additional Offset Information
4 page(s)
 CEC/Docket FileGrattan & Galati
117748/18/1999Follow-up letter of telephone conversation, Kern Council of Governments concurs with Caltrans that a traffic impact analysis should be undertaken.
Follow-up letter of telephone conversation, Kern Council of Governments concurs with Caltrans that a traffic impact analysis should be undertaken.
1 page(s)
 CEC/JohnsonKern Council Of Governments/Beardslee
118108/18/1999General list of concerns for discussion at Sunrise PSA Workshop
General list of concerns for discussion at Sunrise PSA Workshop
2 page(s)
 CEC/BergquistTexco/Paul Dinkel
118128/18/1999Workshop to Discuss Preliminary Staff Assessment - Project Mailing List - CEC
Workshop to Discuss Preliminary Staff Assessment - Project Mailing List - CEC
2 page(s)
 CEC/Docket FileCEC Cec
117718/17/1999Supplemental Information Regarding CURE'S Motion to Compel
Supplemental Information Regarding CURE'S Motion to Compel
17 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo
117268/16/1999Notice of Decision
Notice of Decision
7 page(s)
 Sunrise Cogeneration And Power CompanyPlanning Dept/James
117428/16/1999Supplemental Information Regarding CURE's Motion to Compel - August 16, 1999
Supplemental Information Regarding CURE's Motion to Compel - August 16, 1999
12 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cardozo/Joseph
117468/16/1999Supplemental Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Matrix of Objections; Service List)
Supplemental Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Matrix of Objections; Service List)
12 page(s)
 CEC/Docket UnitGrattan & Galati
117528/16/1999CURE's Motions to Compel Responses (Attachment: Proof of Service)
CURE's Motions to Compel Responses (Attachment: Proof of Service)
4 page(s)
 CEC/Moore/rohyDowney Brand Seymour & Rohwer/Miller
116808/12/1999Supplemental Responses to CURE Data Requests (Attachment: Proof of Service)
Supplemental Responses to CURE Data Requests (Attachment: Proof of Service)
7 page(s)
 CEC/NashGrattan & Galati/Grattan
116878/12/1999Order Granting Petition to Intervene filed by Elk Hills Power Project (Attachment: Proof of Service)
Order Granting Petition to Intervene filed by Elk Hills Power Project (Attachment: Proof of Service)
1 page(s)
 CEC/Docket FileCEC/Moore
117998/12/1999Notice of Hearing on Motion to Compel
Notice of Hearing on Motion to Compel
4 page(s)
 CEC/Docket FileCEC Cec
116588/6/1999Response to CURE Data Requests - Set 2A (Attachment: Proof of Service)
Response to CURE Data Requests - Set 2A (Attachment: Proof of Service)
7 page(s)
 Adams Broadwell & Joseph/JosephRadian Internation/Muraoka
116598/6/1999Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Proof of Service)
Opposition to California Unions for Reliable Energy's Motion to Compel Production of Information (Attachment: Proof of Service)
28 page(s)
 Sunrise Cogeneration & Power Co./GrattanGrattan & Galati
116758/6/1999Petition for intervention by Elk Hills Power Project, dated August 6, 1999 (Attachment: Proof of Service)
Petition for intervention by Elk Hills Power Project, dated August 6, 1999 (Attachment: Proof of Service)
4 page(s)
 CEC/NashDowney Brand Seymour & Rohwer/Miler
116768/6/1999Notice of Air Quality Workshop for the Sunrise Cogeneration and Power Project AFC (August 16, 1999) (Attachment: Proof of Service; Map)
Notice of Air Quality Workshop for the Sunrise Cogeneration and Power Project AFC (August 16, 1999) (Attachment: Proof of Service; Map)
2 page(s)
 CEC/Docket FileCEC/Moore
116778/6/1999Notice of Public Workshops to Discuss the Preliminary Staff Assessment of the Sunrise Cogeneration and Power AFC (August 17-18, 1999) (Attachment: Proof of Service; Map)
Notice of Public Workshops to Discuss the Preliminary Staff Assessment of the Sunrise Cogeneration and Power AFC (August 17-18, 1999) (Attachment: Proof of Service; Map)
3 page(s)
 CEC/Docket FileCEC/Moore
116158/3/1999NOTICE of Availability Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project Application for Certification
NOTICE of Availability Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
 CEC/Docket FileCEC/Therkelsen
116168/3/1999Request for Agency Comments on the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
Request for Agency Comments on the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
2 page(s)
 Agency Distribution ListCEC/Therkelsen
116178/3/1999Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
1 page(s)
 CEC/Docket FileCEC/Therkelsen
116198/3/1999Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
Handling of the Preliminary Staff Assessment for the Sunrise Cogeneration and Power Project
1 page(s)
 LibrarianCEC/Therkelsen
115678/2/1999Notice of Hearing on Motion to Compel - August 12, 1999 (Attachment: Proof of Service)
Notice of Hearing on Motion to Compel - August 12, 1999 (Attachment: Proof of Service)
2 page(s)
 CEC/Docket FileCEC/Moore/rohy
115928/2/1999Preliminary Staff Assessment
Preliminary Staff Assessment
482 page(s)
 CEC/Docket FileCEC Cec
115627/30/1999Notice Postponing Evidentiary Hearing and Revised Hearing Order (Attachment: proof of Service)
Notice Postponing Evidentiary Hearing and Revised Hearing Order (Attachment: proof of Service)
2 page(s)
 CEC/Docket FileCEC/Keese
115667/30/1999Notice Postponing Evidentiary Hearing AND Revised Hearing Order (Attachment: Proof of Service)
Notice Postponing Evidentiary Hearing AND Revised Hearing Order (Attachment: Proof of Service)
2 page(s)
 CEC/Docket FileCEC/Keese
115407/29/1999Stipulation of Sunrise Cogeneration and Power Company's and California Unions for Reliable Energy Regarding Emission Offset Information (Attachment: Proof of Service)
Stipulation of Sunrise Cogeneration and Power Company's and California Unions for Reliable Energy Regarding Emission Offset Information (Attachment: Proof of Service)
6 page(s)
 CEC/NashGrattan & Galati/Grattan
115697/29/1999Notice of Prehearing Conference and Scheduling Order
Notice of Prehearing Conference and Scheduling Order
3 page(s)
 CEC/Docket FileCEC/Moore/rohy
115937/28/1999Notice of Preliminary Determination of Compliance
Notice of Preliminary Determination of Compliance
55 page(s)
 CEC/BergquistSan Joaquin Valley Apcd/Sadredin
116047/26/1999CURE's Motion to Compel Production of Information
CURE's Motion to Compel Production of Information
49 page(s)
 CEC/Docket UnitAdams Broadwell Joseph & Cardozo/Debonville
116077/26/1999NOTICE of Commission Evidentiary Hearing - AND - Hearing Order (Attachment: Proof of Service)
NOTICE of Commission Evidentiary Hearing - AND - Hearing Order (Attachment: Proof of Service)
3 page(s)
 CEC/Docket FileCEC/Keese
116067/23/1999Sunrise Cogeneration and Power Facility Project - Mitigation for Power Transmission Line
Sunrise Cogeneration and Power Facility Project - Mitigation for Power Transmission Line
3 page(s)
 CEC/BergquistDept. Of Conservation/D. Mitchell
116087/20/1999Revised ERC Application Package for the Sunrise Cogen Project #981220
Revised ERC Application Package for the Sunrise Cogen Project #981220
1 page(s)
 Adams Broadweell Joseph & Cardozo/TexierSan Joaquin Valley Apcd/Goff
116097/20/1999Status Report Number 4 of the California Energy Commission Staff July 20, 1999 (Attachment: Proof of Service)
Status Report Number 4 of the California Energy Commission Staff July 20, 1999 (Attachment: Proof of Service)
1 page(s)
 CEC/Docket FileCEC/Hough
116107/20/1999Data Request for the Sunrise Project
Data Request for the Sunrise Project
1 page(s)
 Environmental Management/FoxSan Joaquin Valley Apcd/Goff
116687/20/1999Revised ERC Application Package for the Sunrise Cogen Project #981220
Revised ERC Application Package for the Sunrise Cogen Project #981220
1 page(s)
 Sunrise Cogeneration And Power Co./HallSan Joaquin Valley Apdc/Goff
116057/19/1999CURE Status Report Number 4 Dated July 18, 1999
CURE Status Report Number 4 Dated July 18, 1999
3 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
116677/19/1999Repeated Application for Confidential Designation: Paleontological Resources
Repeated Application for Confidential Designation: Paleontological Resources
1 page(s)
 CEC/SmithRadian International/Muraoka
117367/17/1999Workshop to discuss preliminary staff assessment
Workshop to discuss preliminary staff assessment
4 page(s)
 CEC/Docket FileCEC Cec Staff
114777/16/1999Status Request Number 4
Status Request Number 4
5 page(s)
 CEC/Moore/rohyGrattan & Galati
114747/14/1999CURE's Confidentiality Petition
CURE's Confidentiality Petition
2 page(s)
 CEC/DocketCEC/Jonathan Blees
114837/14/1999Objections and Notice of Inability to Respond to a Data Request From the California Unions for Reliable Energy (CURE), Set 3, Number 114.
Objections and Notice of Inability to Respond to a Data Request From the California Unions for Reliable Energy (CURE), Set 3, Number 114.
7 page(s)
 CEC/DocketGrattan & Galati/Grattan
116317/12/1999Petition for Reconsideration of Chief Counsel's Decision Concerning CURE's Petition for Inspection and Copying of Confidential Records
Petition for Reconsideration of Chief Counsel's Decision Concerning CURE's Petition for Inspection and Copying of Confidential Records
20 page(s)
 CEC/NashGrattan & Galati
114637/9/1999Notice of Opportunity for Public Hearing - July 13, 1999
Notice of Opportunity for Public Hearing - July 13, 1999
5 page(s)
 CEC/DocketPlanning Department/Ted James
114687/9/1999Letter to initiate Formal Consultation pursuant to Section 7 of the Endangered Species Act.
Letter to initiate Formal Consultation pursuant to Section 7 of the Endangered Species Act.
4 page(s)
 Field Supervisor Fish & WildlifeUs Department Of The Interior/Acting Fm
114707/9/1999Insert for Reliable Energy's Data Request Number 114 that was inadvertently omitted.
Insert for Reliable Energy's Data Request Number 114 that was inadvertently omitted.
3 page(s)
 CEC/DocketAdams Broadwell Joseph & Cardozo
114397/8/1999Response to CURE Data Request - Second Set
Response to CURE Data Request - Second Set
12 page(s)
 Adams Broadwell & Joseph/JosephGrattan & Galati/Gratitan
114267/7/1999Issues Identification Report
Issues Identification Report
14 page(s)
 CEC/Rohy/mooreCEC/Pryor
113867/2/1999Substitution of Counsel
Substitution of Counsel
3 page(s)
 CEC/BerguistSunrise Congeneration And Power Company/Scott W. B
113837/1/1999California Unions for Reliable Energy - Data Request Number 114
California Unions for Reliable Energy - Data Request Number 114
6 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Bonnie Heeley
114017/1/1999Project # 981220 - Letter of intent to proceed with the notice of the Preliminary Determination of Compliance
Project # 981220 - Letter of intent to proceed with the notice of the Preliminary Determination of Compliance
1 page(s)
 Sunrise Cogeneration/HallSan Joaquin Valley Air Pollution Control District/
113786/30/1999Repeated Application for Confidential Designation: Cultural and Paleontological Resources.
Repeated Application for Confidential Designation: Cultural and Paleontological Resources.
1 page(s)
 CEC/SmithRadian International/Don Muraoka
113796/30/1999Responses to CEC Staff Questions During June 14, 1999 Workshop. With maps and proof of service list.
Responses to CEC Staff Questions During June 14, 1999 Workshop. With maps and proof of service list.
30 page(s)
 CEC/Docket UnitRadian International/Don Muraoka
113696/28/1999Chief Counsel's Decision: CURE's petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
Chief Counsel's Decision: CURE's petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration and Power Project (Attachment: Proof of Service)
3 page(s)
 Adams, Broadwell, Joseph & Cardozo/Ellison & SchneCEC/Blees
116696/23/1999Application for Transportation and Utility Systems and Facilities on Federal Lands Standard Form 299
Application for Transportation and Utility Systems and Facilities on Federal Lands Standard Form 299
200 page(s)
 Us Blm/FellowsSunrise Cogeneration And Power Company/Hall
131856/23/1999California Endangered Species Act, Section 2081(B) Permit Application
California Endangered Species Act, Section 2081(B) Permit Application
96 page(s)
 California Depart. Of Fish & Game/Cec/docketsSunrise Cogeneration
113526/21/1999Summary of the May 18, 1999 Data Request Workshop
Summary of the May 18, 1999 Data Request Workshop
6 page(s)
 Meeting AttendeesCEC/Bergquist
113686/21/1999Objections and Notice of Inability to Respond to Certain Data Requests from the California Unions for Reliable Energy (CURE) CURE Data Requests Numbers 34 through 113 (Attachment: Proof of Service)
Objections and Notice of Inability to Respond to Certain Data Requests from the California Unions for Reliable Energy (CURE) CURE Data Requests Numbers 34 through 113 (Attachment: Proof of Service)
74 page(s)
 CEC/Docket FileEllison & Schneider/Harris
113506/18/1999Status Report #3
Status Report #3
8 page(s)
 Sunrise Cogeneration/Cec/mooreCEC/Bergquist
113676/18/1999California Unions for Reliable Energy Status Report Number 3 (June 18, 1999) (Attachment: Proof of Service)
California Unions for Reliable Energy Status Report Number 3 (June 18, 1999) (Attachment: Proof of Service)
4 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardozo/Heeley
113546/17/1999Status Report Number 3
Status Report Number 3
6 page(s)
 Sunrise Cogeneration Committee/Moore/rohyEllison & Schneider/Jeffery D. Harris
113746/17/1999Data Request and Data Response - CEC
Data Request and Data Response - CEC
3 page(s)
 CEC/Docket FileCEC Cec
113166/15/1999Extension of Time for Chief Counsel's Decision on CURE's Petition for Inspection and Copying of Confidential Records
Extension of Time for Chief Counsel's Decision on CURE's Petition for Inspection and Copying of Confidential Records
5 page(s)
 Attorneys For CureCEC/Blees
113256/15/1999Data Responses - Set 2
Data Responses - Set 2
48 page(s)
 CEC/Docket UnitRadian International/Muraoka
113156/10/1999Response to CURE's "Petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration Power Project" (Attachment: Proof of Service)
Response to CURE's "Petition for Inspection and Copying of Confidential Records for the Sunrise Cogeneration Power Project" (Attachment: Proof of Service)
2 page(s)
 CEC/Moore/bleesEllison & Schneider/J. Harris
112716/8/1999Transmission Supplement 2 -- Sections 3.0, 4.0, remaining Appendices and Errata
Transmission Supplement 2 -- Sections 3.0, 4.0, remaining Appendices and Errata
1 page(s)
 CEC/Docket FileRadian International/Don Muraoka
112806/8/1999PSD Application
PSD Application
1 page(s)
 Adams, Broadwell & Joseph/K. PooleRadian International/P. Fields
112696/7/1999Letter of concern regarding that the unions through CURE are abusing the system by prolonging the permitting process in order to persuade project owners to perform all construction. . .
Letter of concern regarding that the unions through CURE are abusing the system by prolonging the permitting process in order to persuade project owners to perform all construction. . .
8 page(s)
 CEC/Docket FileAssociated Builders And Contractors, Inc./C. J. Ed
112796/7/1999Letter to Jeffrey Harris and CURE Data Requests Numbers 34 through 113
Letter to Jeffrey Harris and CURE Data Requests Numbers 34 through 113
35 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardozo
112616/4/1999Relevant excerpts from the Handbook for Regulatory Compliance
Relevant excerpts from the Handbook for Regulatory Compliance
54 page(s)
 Radian/David SteinCEC/Bergquist
112686/4/1999Repeated Application for Confidential Designation: Cultural and Paleontological Resources
Repeated Application for Confidential Designation: Cultural and Paleontological Resources
1 page(s)
 CEC/Kent SmithRadian International/Don Muraoka
112706/4/1999Additional Copies of May 21, 1999 Transmission Supplement
Additional Copies of May 21, 1999 Transmission Supplement
10 page(s)
 CEC/Docket FileRadian Interntional/Don Muraoka
112746/4/1999Notice of Data Request and Data Response Workshop
Notice of Data Request and Data Response Workshop
5 page(s)
 CEC/Docket FilesCEC/Moore
112656/3/1999CURE's Petition for Inspection and Copying of Confidential Records
CURE's Petition for Inspection and Copying of Confidential Records
25 page(s)
 Ellison & Schneider/HarrisCEC/Blees
112526/2/1999Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant (June 2, 1999)
Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant (June 2, 1999)
20 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo
112536/2/1999Committee Order on Scope of Review
Committee Order on Scope of Review
4 page(s)
 CEC/Docket FileCEC/Moore
111975/28/1999Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant.
Petition of the California Unions for Reliable Energy Requesting Inspection and Copying of Records Submitted by Applicant.
20 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo
112015/28/1999Cal-ISO Letter; Updated PG&E Preliminary Facilities Study.
Cal-ISO Letter; Updated PG&E Preliminary Facilities Study.
150 page(s)
 CEC/MooreEllison & Schneider/Jeffery D. Harris
111925/27/1999Letter of Support for the Sunrise Cogeneration and Power Project.
Letter of Support for the Sunrise Cogeneration and Power Project.
1 page(s)
 CEC/MooreCity Of Taft - Administrative Offices/B. Baker
112395/27/1999Letter of Support for the Sunrise Project.
Letter of Support for the Sunrise Project.
1 page(s)
 CEC/MooreArb, Inc. Constructors/B. Pratt
112405/27/1999Letter of Support for the Sunrise Project.
Letter of Support for the Sunrise Project.
1 page(s)
 CEC/MooreCounty Of Kern/K. Peterson
111825/24/1999Status Report # 2 and Statement of the Appropriate Scope of Environmental Review
Status Report # 2 and Statement of the Appropriate Scope of Environmental Review
16 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Heely
111235/21/1999Status Report Number 2: Sunrise Cogeneration and Power Company (Attachment: Proof of Service)
Status Report Number 2: Sunrise Cogeneration and Power Company (Attachment: Proof of Service)
6 page(s)
 CEC/MooreEllison & Schneider/Harris
111245/21/1999Joint Blueprint
Joint Blueprint
5 page(s)
 CEC/Moore/presiding MemberElison & Schneider/Harris/cec/berquist
111255/21/1999Support for Joint Blueprint and Response to Argument Made by CURE (Attachment: Proof of Service)
Support for Joint Blueprint and Response to Argument Made by CURE (Attachment: Proof of Service)
4 page(s)
 CEC/Moore/residing MemberMccutchen, Doyle, Brown & Enersen, Llp/Kostka
111275/21/1999Transmission Alternatives - Supplement Two (Attachment: Proof of Service)
Transmission Alternatives - Supplement Two (Attachment: Proof of Service)
200 page(s)
 CEC/Docket UnitRadian International
111405/21/1999Sunrise Filings (Attachment: Proof of Service)
Sunrise Filings (Attachment: Proof of Service)
11 page(s)
 CEC/MooreCEC/Berquist
111465/21/1999Comments RE: Application to Transfer Emission Reduction Credits (ERCs)
Comments RE: Application to Transfer Emission Reduction Credits (ERCs)
2 page(s)
 Sunrise Cogenration And Power Co./KingSan Joaquin Valley Unified Apcd/Goff
111165/20/1999Letter RE: Associate Member Vacancy
Letter RE: Associate Member Vacancy
3 page(s)
 CEC/KeeseEllison & Schneider/Harris
111145/19/1999Data Responses - Set 1C
Data Responses - Set 1C
500 page(s)
 CEC/Docket UnitRadian International/Muraoka
111305/19/1999Map: Fig. S1; Transmission Line Routing Alternatives
Map: Fig. S1; Transmission Line Routing Alternatives
1 page(s)
 CEC/Docket FileRadian
111435/19/1999Data Request and Issues Workshop and Sign-In Sheet
Data Request and Issues Workshop and Sign-In Sheet
4 page(s)
 CEC/Docket FileCEC/Berquist
111735/19/1999Letter RE: Underground Injection Control
Letter RE: Underground Injection Control
5 page(s)
 CEC/TherkelsenUs Epa
111425/18/1999Caryn's scope of project and the latest version of blueprints
Caryn's scope of project and the latest version of blueprints
8 page(s)
 Gwia/David SteinCEC/Bergquist
111445/18/1999Notice of Receipt of Complete Application - Emission Reduction Credits Project #990380
Notice of Receipt of Complete Application - Emission Reduction Credits Project #990380
1 page(s)
 Aera Energy Llc/Daryl Gunderson/cec/docket FilesSan Juan Valley Unified Air Pollution Control Dist
111515/18/1999Summary of the May 11, 1999 Data Response Workshop (Attachment: Proof of Service)
Summary of the May 11, 1999 Data Response Workshop (Attachment: Proof of Service)
15 page(s)
 Meeting AttendeesCEC/Bergquist
111525/18/1999Summary of the April 22, 1999 Data Response Workshop (Attachment: Proof of Service)
Summary of the April 22, 1999 Data Response Workshop (Attachment: Proof of Service)
10 page(s)
 Meeting AttendeesCEC/Bergquist
111155/17/1999Information on Phase I Transmission Supplement Filed by Sunrise Cogeneration and Power Co. (Attachment: Map; Proof of Service)
Information on Phase I Transmission Supplement Filed by Sunrise Cogeneration and Power Co. (Attachment: Map; Proof of Service)
5 page(s)
 CEC/MooreElison & Schneider/Harris
110405/11/1999Letter regarding an error in the Visual Resources Data Requests on page 7.
Letter regarding an error in the Visual Resources Data Requests on page 7.
3 page(s)
 Texaco Global Gas & PowerCEC/Bergquist
110645/11/1999Data Requests
Data Requests
12 page(s)
 Texaco Global Gas & Power/Paul DinkelCEC/Bergquist
111115/11/1999Data Response and Issues Workshop mailing list
Data Response and Issues Workshop mailing list
5 page(s)
 CEC/Docket FileCEC Cec
110855/10/1999Public Records Act Request
Public Records Act Request
2 page(s)
 CEC/Docket FileAdams Broadwell Joseph & Cordozo/Texier
110245/7/1999Notice of Data Request and Issues Workshop - Tuesday - May 18, 1999 - CEC
Notice of Data Request and Issues Workshop - Tuesday - May 18, 1999 - CEC
4 page(s)
 CEC/Docket FileCEC/Moore
110215/6/1999Notice of Status and Scoping Conference - Tuesday, May 25, 1999 - CEC
Notice of Status and Scoping Conference - Tuesday, May 25, 1999 - CEC
4 page(s)
 CEC/Docket FileCEC/Moore
112855/6/1999PG&E Midway Substation - Notice of Staff Workshop - Mailing List - CEC
PG&E Midway Substation - Notice of Staff Workshop - Mailing List - CEC
7 page(s)
 CEC/Docket FileCEC Cec Staff Workshop
110005/5/1999CURE Data Responses - Set 1A
CURE Data Responses - Set 1A
500 page(s)
 Adams, Broadwell & JosephRadian International/Muraoka
110015/5/1999Transmission Alternative - Supplement One
Transmission Alternative - Supplement One
25 page(s)
 CEC/Docket UnitRadian International/Muraoka
109274/30/1999Data Responses - Set 1B (Attachment: Proof of Service)
Data Responses - Set 1B (Attachment: Proof of Service)
30 page(s)
 CEC/Docket UnitRadian International/Muraoka
109314/30/1999Notice of Data Response and Issues Workshop for the Sunrise Cogeneration and Power Project (May, 11, 1999) (Attachment: Proof of Service)
Notice of Data Response and Issues Workshop for the Sunrise Cogeneration and Power Project (May, 11, 1999) (Attachment: Proof of Service)
4 page(s)
 CEC/Docket FileCEC/Moore
110094/26/1999Data Response and Issue Workshop - CEC - Mailing List
Data Response and Issue Workshop - CEC - Mailing List
4 page(s)
 CEC/Docket FileCEC Cec
109124/23/1999Notice of a Staff Workshop Regarding Pacific Gas & Electric's Midway Substation May 6, 1999 - CEC
Notice of a Staff Workshop Regarding Pacific Gas & Electric's Midway Substation May 6, 1999 - CEC
3 page(s)
 CEC/Docket FileCEC/Therkelsen
108974/21/1999Status Report Number 1 of the California Energy Commission Staff
Status Report Number 1 of the California Energy Commission Staff
3 page(s)
 CEC/Docket FileEnergy Resources Conservation/Hough
108994/21/1999Associate Member Vacancy
Associate Member Vacancy
3 page(s)
 CEC/KeeseEllison & Schneider/J. Harris
108824/19/1999Status Report Number 1 (Attachment: Proof of Service)
Status Report Number 1 (Attachment: Proof of Service)
6 page(s)
 CEC/MooreEllison & Schneider/J. Harrin
108724/16/1999California Unions for Reliable Energy Status Report Number 1 (Attachment: Proof of Service)
California Unions for Reliable Energy Status Report Number 1 (Attachment: Proof of Service)
6 page(s)
 CEC/Docket UnitAdams, Broadwell, Joseph & Cardoza/Debonville
108284/15/1999Data Responses - Set 1A
Data Responses - Set 1A
40 page(s)
 CEC/Docket UnitSunrise Cogeneration And Power Company/King
108514/13/1999Informational Hearing & Site Visit Derby Acres, California
Informational Hearing & Site Visit Derby Acres, California
2 page(s)
 CEC/Docket FileCEC/Hearing Office
108524/13/1999Site Visit & Informational Hearing - Derby Acres, California
Site Visit & Informational Hearing - Derby Acres, California
3 page(s)
 CEC/Docket FileCEC/Hearing Office
107674/8/1999CURE Data Responses (Set One)
CURE Data Responses (Set One)
89 page(s)
 Adams, Broadwell & JosephSunrise Cogeneration & Power/C. G. King
107694/8/1999Impact of La Paloma on Fire Protection Services
Impact of La Paloma on Fire Protection Services
2 page(s)
 CEC/PryorLa Paloma Generating Company/Garratt
107724/8/1999Notice of Data Response and Issues Workshop - April 22, 1999 - CEC
Notice of Data Response and Issues Workshop - April 22, 1999 - CEC
4 page(s)
 CEC/Docket FileCEC/Moore
108404/8/1999Proof of Publication; Notice of Public Hearing
Proof of Publication; Notice of Public Hearing
1 page(s)
 CEC/Docket FileThe Bakersfield Californian
108414/6/1999Summary of the March 10, 1999 Data Request Meeting (Attachment: Proof of Service)
Summary of the March 10, 1999 Data Request Meeting (Attachment: Proof of Service)
11 page(s)
 Meeting AttendeesCEC/Berquist
107064/2/1999Comments regarding the Preliminary Facilities Study, dated 3, 1998
Comments regarding the Preliminary Facilities Study, dated 3, 1998
6 page(s)
 Pg&e/MaslowskiCalifornia Iso/Miller
107074/2/1999Report of Conversation with Radian & Texaco, Dave Stein and Paul Dinkle - Bio surveys for existing access roads that fall outside of the requireed filed survey areas.
Report of Conversation with Radian & Texaco, Dave Stein and Paul Dinkle - Bio surveys for existing access roads that fall outside of the requireed filed survey areas.
1 page(s)
 CEC/Docket FileCEC/
106724/1/1999Committee Scheduling Order
Committee Scheduling Order
6 page(s)
 CEC/Docket FileCEC/Moore/sharpless
106764/1/1999Report Purporting to Address Midway Substation "Curnulative" Impacts
Report Purporting to Address Midway Substation "Curnulative" Impacts
16 page(s)
 CEC/Docket FileCameron Mckenna/Hindus
106573/31/1999DATA RESPONSES - SET ONE
DATA RESPONSES - SET ONE
500 page(s)
 CEC/Docket UnitSunrise Cogeneration & Power Co./King
105843/26/1999Report of Conversation With Kern County Fire Marshall, Chaffin
Report of Conversation With Kern County Fire Marshall, Chaffin
3 page(s)
 CEC/PryorCEC/Edwards
106223/24/1999Sunrise Cogeneration and Power Company's - Objections and Notice of Need for Additional Time to Respond to Certain Data Requests From the California Unions For Reliable Energy (CURE) (Attachment: Proof of Service)
Sunrise Cogeneration and Power Company's - Objections and Notice of Need for Additional Time to Respond to Certain Data Requests From the California Unions For Reliable Energy (CURE) (Attachment: Proof of Service)
16 page(s)
 CEC/Docket FileEllison & Schneider/Harris
106083/23/1999Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
1 page(s)
 CEC/MooreTes Energy/P. Ervin
106213/23/1999Sign-in Sheet - Data Requests Workshop (March 10, 1999)
Sign-in Sheet - Data Requests Workshop (March 10, 1999)
6 page(s)
 CEC/Docket FileCEC/Berquist
117433/23/1999Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
Letter RE: Consideration of Compatibility Studies of Electric Substation and Power Delivery System Alternatives with Surrounding Communities and the Environment.
1 page(s)
 CEC/MooreTes Energy/P. Ervin
104773/16/1999Thank you letter regarding the proposed project located at the southwest corner of State Route 33 and Shale Road (APN183-210-06)
Thank you letter regarding the proposed project located at the southwest corner of State Route 33 and Shale Road (APN183-210-06)
2 page(s)
 CEC/Docket FileDepartment Of Transportation
105063/16/1999Sunrise Cogeneration and Power Company's Objections and Notice of Inability to Respond to Certain Data Requests from the California Energy Commission Staff
Sunrise Cogeneration and Power Company's Objections and Notice of Inability to Respond to Certain Data Requests from the California Energy Commission Staff
11 page(s)
 CEC/Docket FileEllison & Schneider/Harris
104603/12/1999Comments on the supplementary AFC material or consideration
Comments on the supplementary AFC material or consideration
2 page(s)
 CEC/BergquistDepartment Of Conservation/Marshall
104813/12/1999Request for Agency Participation in the Review
Request for Agency Participation in the Review
3 page(s)
 RamirezCEC/Therkelsen
104823/12/1999Request for the loan of AFC
Request for the loan of AFC
1 page(s)
 BlalockCEC/Bergquist
104843/12/1999Request for the loan of AFC
Request for the loan of AFC
1 page(s)
 Black & Veatch/LangloisCEC/Bergquist
105053/11/1999Order Granting Petition to Intervene - California Unions for Reliable Energy (CURE) (Attachment: Proof of Service)
Order Granting Petition to Intervene - California Unions for Reliable Energy (CURE) (Attachment: Proof of Service)
4 page(s)
 CEC/Docket FileCEC/Moore
104243/9/1999Notice of Workshop - March 19, 1999 - Derby Acres
Notice of Workshop - March 19, 1999 - Derby Acres
4 page(s)
 CEC/Docket FileCEC/Moore
104273/9/1999Letter regarding Section 711.4(d) of the Fish And Game Code
Letter regarding Section 711.4(d) of the Fish And Game Code
1 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
104283/9/1999March 1, 1999 Article regarding Site Visit and Informational Hearing
March 1, 1999 Article regarding Site Visit and Informational Hearing
6 page(s)
 Midway Driller/WoodCEC/Ross
104363/9/1999Letter to Jeffrey Harris and First Set of CURE Data Requests
Letter to Jeffrey Harris and First Set of CURE Data Requests
21 page(s)
 CEC/Docket UnitAdams, Broadwell & Joseph/Debonville
104073/8/1999Staff's Issue Identification Report
Staff's Issue Identification Report
14 page(s)
 CEC/Moore/keeseCEC/Bergquist
104223/8/1999Newspaper article - Hearing Set for Proposed Fellows Power Plant
Newspaper article - Hearing Set for Proposed Fellows Power Plant
1 page(s)
 CEC/Docket FileDaily Midway Driller Inc.
103493/2/1999Prevention of Significant Deterioration
Prevention of Significant Deterioration
2 page(s)
 Us Environmental Protection Agency/HaberSunrise Cogeneration And Power Company/King
103443/1/1999Data Requests
Data Requests
27 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
103422/26/1999Notice of Data Request Workshop - March 10, 1999
Notice of Data Request Workshop - March 10, 1999
4 page(s)
 CEC/Docket FileCEC/Moore
103032/25/1999Notice to Landowners Informational Hearing and Site Visit - March 18, 1999 - 4:00 p.m. Derby Acres Park Recreation Building
Notice to Landowners Informational Hearing and Site Visit - March 18, 1999 - 4:00 p.m. Derby Acres Park Recreation Building
6 page(s)
 CEC/Docket FileCEC/Moore/sharpless
103082/25/1999Notice of Site Visit and Informational Hearing - Thursday, March 18, 1999 - Derby Acres Park Recreation Building
Notice of Site Visit and Informational Hearing - Thursday, March 18, 1999 - Derby Acres Park Recreation Building
8 page(s)
 CEC/Docket FileCEC/Sharpless/moore
102802/19/1999Letter RE: Submission of Revised Section 8.4 Land Use.
Letter RE: Submission of Revised Section 8.4 Land Use.
1 page(s)
 CEC/BerquistCounty Of Kern/Rickels
102192/17/1999Petition to Intervene by California Unions for Reliable Energy dated 2/17/99
Petition to Intervene by California Unions for Reliable Energy dated 2/17/99
7 page(s)
 CEC/Docket FileAdams Broadwell & Joseph/Joseph
102132/16/1999Requesting additional information regarding AFC.
Requesting additional information regarding AFC.
2 page(s)
 Burbank Media Studios/KingSan Joaquin Valley Unified Air Pollution District/
102792/16/1999Request for "Confidential" Classification of Submitted Information
Request for "Confidential" Classification of Submitted Information
1 page(s)
 Sunrise Cogenration & Power Co./KingSan Joaquin Valley Unified Air Pollution Control D
102722/15/1999Confirmation Letter that Texaco Global Gas & Power Entered into an Agreement with General Electric for the Purchase of Two Frame 7FA combustion turbine Generators for the Sunrise Cogeneration and Power Project on November 25, 1998.
Confirmation Letter that Texaco Global Gas & Power Entered into an Agreement with General Electric for the Purchase of Two Frame 7FA combustion turbine Generators for the Sunrise Cogeneration and Power Project on November 25, 1998.
1 page(s)
 CEC CecSunrise Cogeneration & Power Co./King
102102/11/1999Revisions to Section 8.4 - Consistent with the requirements of Kern County.
Revisions to Section 8.4 - Consistent with the requirements of Kern County.
1 page(s)
 CEC/BergquistBakersfield Planning Dept./Rickels
102072/10/1999Review of Additional Information Requested Regarding Application for Certification
Review of Additional Information Requested Regarding Application for Certification
2 page(s)
 Sunrise Cogeneration & Power Co/KingSan Joaquin Valley Unified Air Pollution Control D
101942/9/1999Document Handling
Document Handling
1 page(s)
 LibrarianCEC/Therkelsen
101572/5/1999Commission Order Finding AFC Incomplete-and-Notice of Commission Hearing 2/17/99 at CEC
Commission Order Finding AFC Incomplete-and-Notice of Commission Hearing 2/17/99 at CEC
2 page(s)
 CEC/Docket FileCEC/Sharpless/laurie/moore
101682/5/1999Sunrise Cogeneration and Power Project Data Adequacy Worksheet
Sunrise Cogeneration and Power Project Data Adequacy Worksheet
76 page(s)
 CEC/Rohy/sharpless/moore/laurieCEC/Bergquist
101862/5/1999Supplement Materials for Sunrise
Supplement Materials for Sunrise
1 page(s)
 Afc Distribution ListCEC/Therkelsen
101262/1/1999Sunrise Cogeneration and Power Project Data Adequacy Recommendation
Sunrise Cogeneration and Power Project Data Adequacy Recommendation
1 page(s)
 CEC/CommissionersCEC Cec Smith
101281/29/1999Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification.
Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification.
3 page(s)
 Kern Co. Environmental Health/BrownfieldCEC/Therkelsen
116601/28/1999Supplementary AFC Material in Response to Data Adequacy Worksheets
Supplementary AFC Material in Response to Data Adequacy Worksheets
500 page(s)
 CEC/DocketSunrise Cogeneration & Power/King
101001/25/1999Comments and suggestions of the Midway-Sunset oil field.
Comments and suggestions of the Midway-Sunset oil field.
4 page(s)
 CEC/BergquistDepartment Of Conservation/Marshall
100671/22/1999AFC for Sunrise Cogeneration and Power Project dated 1/12/99
AFC for Sunrise Cogeneration and Power Project dated 1/12/99
6 page(s)
 CEC/BergquistAdams Broadwell & Joseph/Poole
100681/22/1999Thank you letter and comments on Sunrise's review of the Project
Thank you letter and comments on Sunrise's review of the Project
1 page(s)
 CEC/DocketOffice Of Transportation Planning/Frausto
100481/15/1999Sunrise Cogeneration and Power Project - Data Adequacy Recommendation
Sunrise Cogeneration and Power Project - Data Adequacy Recommendation
117 page(s)
 CEC/CommissionersCEC/Smith
100931/15/1999Agenda Item for the Feb. 3, 1999 Business Meeting - Commission Consideration of the Executive Director's Data Adequacy Recommendation for the Sunrise Cogeneration and Power Project Application for Certification
Agenda Item for the Feb. 3, 1999 Business Meeting - Commission Consideration of the Executive Director's Data Adequacy Recommendation for the Sunrise Cogeneration and Power Project Application for Certification
2 page(s)
 CEC/SmithCEC/Therkelsen
99601/7/1999Delta AFC Pertaining to Transmission Line Shock Hazard.
Delta AFC Pertaining to Transmission Line Shock Hazard.
8 page(s)
 Texaco Global Gas & Power/DinkelCEC/Bergquist
99511/6/1999Data Adequacy Worksheet for Visual Resources
Data Adequacy Worksheet for Visual Resources
5 page(s)
 Texaco Global Gas & Power/BlekCEC/Bergquist
99521/6/1999Data Adequacy Worksheet for Biological Resources
Data Adequacy Worksheet for Biological Resources
6 page(s)
 Texaco Global Gas & Power/BlekCEC/Bergquist
99371/5/1999Hearing Officer Assignment. Gary Fay to assist the conducting proceedings on Sunrise Cogeneration Power Plant.
Hearing Officer Assignment. Gary Fay to assist the conducting proceedings on Sunrise Cogeneration Power Plant.
1 page(s)
 CEC/DocketCEC/Keese
999712/30/1998RE: Confidential Designation, Dated Dec. 21, 1998, for 5 Subject Areas for the Sunrise Cogeneration and Power Project.
RE: Confidential Designation, Dated Dec. 21, 1998, for 5 Subject Areas for the Sunrise Cogeneration and Power Project.
1 page(s)
 Ellison & Schneider/J. HarrisCEC/Bergquist
991612/29/1998Petition to Intervene by High Desert Power Project (RE: 98-AFC-3 and 98-AFC-4)
Petition to Intervene by High Desert Power Project (RE: 98-AFC-3 and 98-AFC-4)
3 page(s)
 CEC/DocketHdpp/Thompson
991712/29/1998Petition to Intervene by La Paloma Generating Company, LLC.
Petition to Intervene by La Paloma Generating Company, LLC.
3 page(s)
 CEC/DocketLa Paloma Generation Co/Thompson
997212/29/1998Cultural and Paleontological Resources Applications for Confidentiality, Sunrise Cogeneration and Power Project.
Cultural and Paleontological Resources Applications for Confidentiality, Sunrise Cogeneration and Power Project.
2 page(s)
 Ellison & Schneider/HarrisCEC/Kent Smith
997312/29/1998Potential Air Emissions Offsets, Application for Confidentiality
Potential Air Emissions Offsets, Application for Confidentiality
2 page(s)
 Ellison & Schneider/HarrisCEC/Kent Smith
991012/23/1998Information Regarding the review process and description of the Sunrise Cogeneration Power Company AFC
Information Regarding the review process and description of the Sunrise Cogeneration Power Company AFC
2 page(s)
 Member Of The Assembly/Hon. Dean FloresCEC/Keese
992312/23/1998Letter regarding the review process/information of the Sunrise Cogeneration and Power Co. AFC
Letter regarding the review process/information of the Sunrise Cogeneration and Power Co. AFC
2 page(s)
 Member Of The Senate/Hon. CostaCEC/Keese
992412/23/1998Notice of Receipt of the Application for Certification for the Sunrise Cogeneration and Power Project.
Notice of Receipt of the Application for Certification for the Sunrise Cogeneration and Power Project.
4 page(s)
 CEC/DocketCEC/Therkelsen
992512/23/1998Letter regarding review process and description if the Sunrise Cogeneration and Power Company AFC.
Letter regarding review process and description if the Sunrise Cogeneration and Power Company AFC.
2 page(s)
 Kern County Board Of Supervisors/McquistonCEC/Keese
991212/22/1998Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification
Request for Agency Participation in the Review of the Sunrise Cogeneration and Power Facility Project Application for Certification
3 page(s)
 Agency Distribution ListCEC/Therkelsen
991312/22/1998Document Handling for the Sunrise Cogeneration and Power Project (AFC)
Document Handling for the Sunrise Cogeneration and Power Project (AFC)
2 page(s)
 Librarian/Members Of The PublicCEC/Therkelsen
988712/21/1998Submittal of Sunrise Cogeneration and Power Cmpany Application for Certification (Attachment: Cover Letter Dated 12/21/98)
Submittal of Sunrise Cogeneration and Power Cmpany Application for Certification (Attachment: Cover Letter Dated 12/21/98)
125 page(s)
 CEC/Kent SmithSunrise Cogeneration And Power Company/King
988812/21/1998Application for Confidential Designation.
Application for Confidential Designation.
1 page(s)
 CEC/Kent SmithEllison & Schneider/Harris