254720 | 2/28/2024 |
2023 Annual Compliance Report for La Paloma Generating Plant 2023 Annual Compliance Report for La Paloma Generating Plant Air Quality, Biological Resources, Compliance, Hazardous Materials, Visual Resources, Waste Management 120 page(s)
| | Public | California Energy Commission |
254632 | 2/22/2024 |
Notice of Receipt for La Paloma Generating Project MeeFog Upgrade NOR for La Paloma Generating Project MeeFog Upgrade Air Quality 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
254308 | 2/2/2024 |
La Paloma Petition for Approval of Proposed Modification Inlet Foggers v20 Petition for Approval of Proposed Modification of the LPGP Gas Turbine Generators; MeeFog Wet Compressions Upgrade. Air Quality 158 page(s)
| | CEC/Docket Unit | CXA La Paloma, LLC |
243044 | 5/12/2022 |
Order Approving Post Certification Petition To Amend Order No: 22-0511-5 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
242923 | 5/3/2022 |
Frank Schneider Comments - New Remote Separate Stationary Source
Executive Summary 1 page(s)
| | CEC/Docket Unit | Frank Schneider |
242697 | 4/18/2022 |
Staff Analysis of Post Certification Petition Staff Analysis of Post Certification Petition and Staff Recommendation 32 page(s)
| | CEC/Docket Unit | California Energy Commission |
242240 | 3/10/2022 |
La Paloma Generating Project - Responses to Cultural Resources Data Requests
Cultural Resources 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
242195 | 3/2/2022 |
La Paloma Cultural Resource Data Request La Paloma Data Request
***THIS DOCUMENT SUPERSEDES TN242194*** 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
242194 | 3/2/2022 |
La Paloma Cultural Resource Data Request ***THIS DOCUMENT HAS BEEN REPLACED BY TN 242195*** Cultural Resources 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
242186 | 3/1/2022 |
La Paloma Generating Plant - Petition to Amend Data Response - District GHG Significance La Paloma Generating Plant - Response to staff request for air district GHG significance. Air Quality 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
241508 | 2/10/2022 |
NOTICE OF RECEIPT PETITION FOR POST-CERTIFICATION PROJECT CHANGE La Paloma Generating Project 98-AFC-02C-Installation of an emergency standby electrical generator. Compliance 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
241487 | 2/8/2022 |
Petition to Amend This petition is provided to request approval of changes to the LPGP operating under the California Energy Commission (CEC) Application for Certification No. 98-AFC-02C as required under Title 20, California Code of Regulations (CCR), section 1769. The sections of this petition follow the requirements under CCR 1769(a)(1). Air Quality, Biological Resources, Cultural Resources, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Land Use, Noise and Vibration, Public Health, Socioeconomics, Traffic and Transportation, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases 16 page(s)
| | CEC/Ms. Mary Dyas | Stantec |
231097 | 12/11/2019 |
La Paloma Generating Plant - 2018 Annual Compliance Report 2018 Annual Compliance Report for the La Paloma Generating Plant. Compliance 258 page(s)
| | CEC/Mary Dyas | CXA La Paloma, LLC |
225599 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
224795 | 9/25/2018 |
La Paloma Generating Plant - Ownership Change - Notice of Decision Notice of Decision for the La Paloma Generating Plant Ownership Change 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
224786 | 9/24/2018 |
Order Approving Transfer of Ownership from La Paloma Generating Company, LLC to CXA La Paloma, LLC
2 page(s)
| | CEC/Dockets | California Energy Commission |
224424 | 8/7/2018 |
La Paloma Generating Plant_Ownership Change_Notice of Receipt Notice of Receipt for La Paloma Generating Plant Ownership Change Compliance 2 page(s)
| | CEC/Dockets | California Energy Commission |
224379 | 8/3/2018 |
Petition to Transfer Ownership and Operational Control of the La Paloma Generating Plant Petition for Ownership Change of La Paloma Generating Plant Compliance 19 page(s)
| | CEC/Docket Unit | Hunton Andrews Kurth LLP |
70969 | 5/28/2013 |
CEC Staff Approved Project Modification Approval Letter
1 page(s)
| | La Paloma Generating Station | CEC/ M. Dyas |
70620 | 5/6/2013 |
Notice of Determination - Petition to Amend
4 page(s)
| | CEC/Docket Unit | CEC/C.Marxen |
69906 | 3/13/2013 |
Notice of Receipt for La Paloma Generating Company, LLC's Petiton to Amend
3 page(s)
| | CEC/Docket Unit | CEC/ C. Marxen |
69417 | 2/6/2013 |
Petition for Approval of Proposed Modifications - Inlet Foggers
184 page(s)
| | CEC/M.Dyas | La Paloma Generating Plant/R.Cooper |
61937 | 8/19/2011 |
Letter to Rockland Capital re SunGen Tie Interconnection
3 page(s)
| | Rockland Capital | CEC/ M. Dyas |
61936 | 8/18/2011 |
Letter from Rockland Capital re SunGen Tie Interconnection
2 page(s)
| | CEC/ M. Dyas | Rockland Capital |
58127 | 8/20/2010 |
Amendment Approvement Letter to Project Owner with Order & NOD
1 page(s)
| | La Paloma Generating Company, LLC/N. Park | CEC/M. Dyas |
58118 | 8/18/2010 |
Notice of Decision
1 page(s)
| | CA Resources Agency | CEC |
58035 | 8/16/2010 |
Order Amending the Energy Commission Decision
2 page(s)
| | CEC/Docket Unit | CEC/M. Dyas |
56593 | 5/6/2010 |
AQ-51 Amendment - Letter to Interested Parties with AQ Analysis
5 page(s)
| | CEC/Docket Unit | CEC/M. Dyas |
56235 | 4/14/2010 |
Notice of Receipt, Petition to Amend the Energy Commission Decision
3 page(s)
| | CEC/Docket Unit | CEC/M. Errecart |
56129 | 4/5/2010 |
La Paloma Generating Plant's Petition for Amendment
74 page(s)
| | CEC/M. Dyas | La Paloma Generating Plant/T. Romesberg |
51999 | 6/15/2009 |
Response to CEC April 10, 2009 Letter RE Hydrogen Use
1 page(s)
| | CEC/ J. Caswell | La Paloma Generating Plant/ N. Park |
51766 | 6/1/2009 |
Staff Analysis of Proposed SunGen 1 Gen- Tie Interconnection
7 page(s)
| | Complete Energy/ Zenis M. Walley | CEC/ Mary Dyas |
41860 | 8/9/2007 |
Commission Approval of the March 26, 2007 Petition to Allow Use of Either Zero Liquid Discharge of Injection Wells for Wastewater Discharge
1 page(s)
| | CEC / N. Park | CEC / C. Meyer |
41805 | 8/6/2007 |
Order Amending The Energy Commission Decision
3 page(s)
| | CEC / Docket Unit | State of California Energy Resources Conservation And Development Commission |
41795 | 8/3/2007 |
Approval To Develop Injection Well System For Wastewater Deposal
1 page(s)
| | CEC | CEC / C. Meyer |
41471 | 7/11/2007 |
Staff Analysis of the La Paloma Generating Company, LLC Petition to Allow Use Staff Analysis of the La Paloma Generating Company, LLC Petition to Allow Use of Either the Zero Liquid Discharge System or New Injection Wells for Wastewater Discharge 6 page(s)
| | CEC/ Interested Parties | CEC/ C. Meyer |
39802 | 3/29/2007 |
Notice of Receipt - Petition to Amend Commission Decision
3 page(s)
| | Mail List # 713 | CEC/ R. Johnson |
39766 | 3/26/2007 |
Petition for Amendment-Condition of Certification S&W-4
1 page(s)
| | CEC/C. Meyer/Docket Unit | La Paloma/N. Park |
36084 | 12/14/2005 |
Order No 05-0713-01(d) - Order Approving Transfer of Equity Ownership Order No 05-0713-01(d) - Order Approving Transfer of Equity Ownership to the La Paloma Acquisition company, LLC, and transfer of Operations to CEP La Paloma Operating Company, LLC 2 page(s)
| | CEC/Docket Unit | CEC/Desmond |
34777 | 6/27/2005 |
Notice of Receipt Petition to Transfer Equity Ownership and Operator of The La Paloma Generating Project.
2 page(s)
| | Docket Unit | CEC |
34652 | 6/17/2005 |
Petition for Transfer of Equity Ownership.
3 page(s)
| | Docket Unit | La Paloma |
32708 | 11/9/2004 |
Commission Order Approving Transfer of Ownership to the La Paloma generating Company LLC
1 page(s)
| | Dockets | CEC/Keese |
32561 | 10/15/2004 |
Notice of Receipt - Petition to Change Ownership for La Paloma Gen
2 page(s)
| | CEC/Dockets | CEC/O'brian |
32464 | 10/13/2004 |
Commission Order Approving Project Modifications to Clarify Startup, Shutdown, SCR Ammonia Injections, and Other Changes Affecting Air Quality Conditions
16 page(s)
| | CEC/Dockets | CEC/Boyd |
32462 | 10/12/2004 |
Notice of Decision in Compliance with Public Resources for La Paloma Generating Project
1 page(s)
| | Office Of Planning & Research/Cec/dockets | CEC/Tronaas |
32405 | 9/30/2004 |
Petition for Transfer of Equity Ownership
3 page(s)
| | CEC/Tronaas | La Paloma Generating Co./Romesberg |
32236 | 8/31/2004 |
Staff Analysis of Proposed Modification to Revise Startup-Shutdown Parameters, Clarify SCR Catalyst Operating Temperatures, and Other Air Quality Conditions of Certification
12 page(s)
| | Interested Parties/Cec/dockets | CEC/Tronaas |
31868 | 7/8/2004 |
Supplement to June 15, 2004 Petition for Minor Amendments to Commission Decision Air Quality Conditions
10 page(s)
| | CEC/Tronaas/dockets | La Paloma Generating Co. Llc/Romesberg |
31773 | 6/17/2004 |
Petition for Minor Amendments to Commission Decision Air Quality Conditions
52 page(s)
| | CEC/Dockets | La Paloma Generating Project/T. Romesberg |
28738 | 5/5/2003 |
Notice of Decision by the CEC
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/Tronaas |
28654 | 5/5/2003 |
Commission Order Approving Project Modifications
3 page(s)
| | CEC/Dockets | CEC/Keese |
28579 | 4/24/2003 |
Public Review of Staff Analysis for Proposed Modifications
4 page(s)
| | Interested Parties/Dockets | CEC/Tronaas |
28467 | 4/4/2003 |
Notice of Receipt Petition to Amend the CEC Decision for La Paloma
2 page(s)
| | CEC/Dockets | CEC/O'brien |
28429 | 4/1/2003 |
Petition for Modification of PM10 Emission Limits
23 page(s)
| | CEC/Tronaas/dockets | La Paloma/Romesberg |
27805 | 1/11/2000 |
Pacific Gas and Electric Company's Applicant for Authorization to Sell Certain Generating Plants and Related Assets - Draft Environmental Impact Report
500 page(s)
| | Dockets | Environmental Science Assoc. |
26823 | 9/30/2002 |
Commission Order Approving Project Modifications
2 page(s)
| | CEC/Docket Unit | CEC/Keese |
26784 | 9/26/2002 |
Notice of Decision by the CEC
1 page(s)
| | Dockets | CEC/Tronaas |
26577 | 9/3/2002 |
Public Review of Staff Analysis for Proposed Modifications Ignition Fuel Modification
3 page(s)
| | CEC/Dockets | CEC/Tronaas |
26461 | 8/15/2002 |
Notice of Receipt Petition to Amend the Energy Commission Decision
2 page(s)
| | CEC/Dockets | CEC/O'brien |
26370 | 8/6/2002 |
Petition to Amend Commission Decision-Ignition Fuel
14 page(s)
| | CEC/Tronaas/dockets | Pg&e/Ward |
26297 | 7/25/2002 |
Submission for Cultural Resources Condition
173 page(s)
| | CEC/Tronaas/docket | Pg&e/Haney |
24841 | 3/7/2002 |
Notice of Decision by the CEC
1 page(s)
| | Dockets | CEC/Tronaas |
24832 | 3/7/2002 |
Commission Order Approving Project Modifications
3 page(s)
| | CEC/Dockets | CEC/Laurie |
24600 | 2/21/2002 |
Public Review of Staff Analysis for Proposed Modifications: PM 10 Limits and Commissioning Variance
7 page(s)
| | CEC/Dockets | CEC/Tronnas |
24244 | 1/24/2002 |
Notice of Receipt - Petition to Amend the CEC Decision for the La Paloma Gen. Project
2 page(s)
| | CEC/Dockets | CEC/Therkelsen |
24043 | 1/11/2002 |
Petition for Post Certification Amendment and Changes
18 page(s)
| | CEC/Tronaas/dockets | Pg&e/Hanley |
22969 | 11/6/2001 |
Verification Change for Transmission Line Safety and Nuisance
1 page(s)
| | CEC/Tronaas/dockets | Pg&e/Hanley |
22968 | 11/6/2001 |
Approval of Verification Change TLSN-3
1 page(s)
| | La Paloma Generating Company/Hanley/dockets | CEC/Tronaas |
22797 | 10/24/2001 |
Application for Confidential Designation
88 page(s)
| | CEC/Tronaas/dockets | Urs/Steiner |
21934 | 8/16/2001 |
Notice of Exemption-Addition of Condition of Certification to Ensure Coordinated Integration of New Generating Unit with California's Electricity Grid
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Bruins |
21387 | 7/11/2001 |
Notice of Exemption: to temporarily expand the construction parking and equipment storage area
1 page(s)
| | Office Of Planning & Research/Dockets | CEC/Tronaas |
21386 | 7/11/2001 |
Approval of temporary Construction Parking and Equipment Storage
1 page(s)
| | La Paloma Gen Co/Hanley/dockets | CEC/Therkelsen |
20752 | 6/11/2001 |
Request to Use Existing Disturbed Sites for Temporary Construction Parking and Equipment Storage - File # 6.3.2.11.2.9
6 page(s)
| | CEC/Tronaas/dockets | Pg&e |
18845 | 2/27/2001 |
Commission Order Approving Project Modifications
3 page(s)
| | CEC/Dockets | CEC/Keese |
18317 | 1/31/2001 |
Commission Order Approving Project Modifications
3 page(s)
| | CEC/Docket | CEC/Keese |
18117 | 1/31/2001 |
Commission Orders Approving Project Modifications
3 page(s)
| | CEC/Docket | CEC/Keese |
18054 | 1/26/2001 |
Notice of Exemption
1 page(s)
| | Office Of Planning & Research | CEC/Tronaas |
18053 | 1/26/2001 |
Notice of Completion & Environmental Document Transmittal
3 page(s)
| | CEC/Dockets | CEC/Larson |
17436 | 12/15/2000 |
Public Review of Staff Analysis of the Petition for Proposed Modifications - Condition of Certification AQ-5, and to Change the Vendor for the Zero Discharge
4 page(s)
| | Interested Parties | CEC/Tronaas |
16844 | 11/15/2000 |
Notice of Receipt: Request to Amend the Energy Commission Decision for the La Paloma Generating Project (Attachment: Information Request Form)
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
16613 | 11/3/2000 |
Petition for Proposed Air Quality Conditions Modifications
39 page(s)
| | CEC/Tronaas | Pg&e Generating/Derosa |
14895 | 6/13/2000 |
Application for Confidential Designation
1 page(s)
| | CEC/Tronaas | Urs Corp./Steiner |
14698 | 6/1/2000 |
RE: Copy sent of the BRMIMP developed for the La Paloma Project. (Attachment: Proof of Service)
3 page(s)
| | Les Toth | CEC/Buell |
14177 | 4/12/2000 |
Modification of PSD Permit - Attachment: Permit Modification
4 page(s)
| | Us Generating Co./Garratt | Us Environmental Protection Agency/Haber |
14176 | 4/12/2000 |
Authorities to Construct; Applications to Modify Units S-3412-1-1 through "4-1 and S-3412-5-0 and '6-0; Application for Authority to Construct a new Boiler
9 page(s)
| | Sjvuapcd/Goff | Urs Greiner Woodward Clyde/Steiner |
14175 | 4/12/2000 |
Supplement to December 10, 1999 Application for Authority to Construct a Boiler - Attachment: San Joaquin Valley Unified Air Pollution Control District Supplemental Application Form (Boilers, Steam Generators, Dryers, & Process Heaters
4 page(s)
| | Sjvuapcd/Goff | Urs Greiner Woodward Clyde/Steiner |
14174 | 4/12/2000 |
Request for Amendment of Approval to Construct Attachment: Petition to Modify Project Description of Cooling Towers - Map: General Arrangement Drainage Plan
19 page(s)
| | Us Epa/Haber | Urs Greiner Woodward Cylde/Steiner |
14173 | 4/12/2000 |
Letter of request for an appeal to the Administrator for review of the permit decision - Attachment: Permit Modification
4 page(s)
| | Us Generating Co./Garratt | Us Environmental Protection Agency/Howekamp |
14077 | 3/24/2000 |
Notice of Exemption
1 page(s)
| | Office Of Planning And Research | CEC/Tronaas |
14063 | 3/29/2000 |
Commission Order Approving Project Modifications
11 page(s)
| | CEC/Docket | CEC/Keese |
14050 | 3/29/2000 |
Intervention of PG&E in Petition for Reconsideration and, in the Alternative for Reopening the Record of Southern Energy Delta - POS
7 page(s)
| | CEC/Docket | Pg&e/Witalis |
14047 | 3/29/2000 |
La Paloma Generating Project Electric Transmission Line Pole Foundation and Soil Boring Information Review No. 2
3 page(s)
| | CEC/Tronaas | CEC/Anderson |
14034 | 3/28/2000 |
La Paloma Generating Project Electric Transmission Line Tower Footings and Soil Boring Information Review.
7 page(s)
| | CEC/Tronaas | CEC/Anderson |
13822 | 3/7/2000 |
Commission Order Approving Ownership Transfer
1 page(s)
| | CEC/Docket | CEC/Keese |
13779 | 3/2/2000 |
Revised Staff Analysis of the Petition for Proposed Project Modifications: Zero Discharge System Boiler and Steam Injection Power Augmentation.
14 page(s)
| | Interested Parties | CEC/Tronaas |
13746 | 2/18/2000 |
Public Review of Staff Analysis of the Petition for Proposed Project Modifications; Zero Discharge System Boiler and Steam Injection Power Aqumentation
12 page(s)
| | Interested Parties | CEC/Tronaas |
13666 | 2/18/2000 |
Public Review of Staff Analysis of the Petition for Proposed Project Modifications; Zero Discharge System Boiler and Steam Injection Power Aqumentation
12 page(s)
| | Interested Parties | CEC/Tronaas |
13665 | 2/18/2000 |
Approval of Petition for Plant Site Modifications
2 page(s)
| | Lapaloma Gen./Derosa | CEC/Tronaas |
13589 | 2/11/2000 |
Notice of Final Decision - Authority to Construct (Project Number : 9911251)
23 page(s)
| | La Paloma Generating Co Llc/Garratt | San Joaquin Valley Apcd/Sadredin |
13525 | 2/7/2000 |
NOTICE of Insignificant Project Change (Plant Site Modifications)
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
13519 | 2/2/2000 |
Request for Project Modifications
2 page(s)
| | CEC/Tronaas | Nossaman, Guthner, Knox & Elliott, Llp/Cole |
13518 | 2/2/2000 |
Letter from Nossaman, Gunthner, Knox & Elliott, LLP
2 page(s)
| | CEC/Tronaas | Pg&e Generating/Garratt |
13500 | 2/4/2000 |
Approval of Petition to Modify Alignment of Transmission and Water Lines
2 page(s)
| | La Paloma Gen. Co./Derosa | CEC/Tronaas |
13499 | 2/4/2000 |
Approval of Petition to Modify Project Description of Cooling Towers
2 page(s)
| | La Paloma Gen. Co./Hanley | CEC/Tronaas |
13335 | 1/19/2000 |
Notice of Insignificant Project Change (Cooling Tower Cells) - Attachment: Information Request Form
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
13334 | 1/19/2000 |
Notice of Insignificant Project Change (Realignment of Transmission and Raw Lines) - Attachment: Information Request Form
2 page(s)
| | CEC/Docket | Cwec/Haussler For Therkelsen |
13319 | 1/12/2000 |
Submission for Air Quality Conditions #2 and #41
1 page(s)
| | CEC/Tronaas | Pg&e Generating/Hanley |
13128 | 1/4/2000 |
NOTICE of Receipt - La Paloma Generating Project Request for Change of Ownership.
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
13109 | 1/5/2000 |
Supplemental Information for Petition for Proposed Modifications: Zero Discharge System Boiler and Steam Injection Power Augmentation.
18 page(s)
| | CEC/Tronaas | Pg&e Generating/Derosa |
13102 | 1/4/2000 |
Notice of Preliminary Decision - Authority to Construct Project Number: 991251
72 page(s)
| | La Paloma Generating Facility/Garratt | San Joaquin Valley Apcd/Sadredin |
13007 | 12/22/1999 |
Notice of Receipt - Information Request Form
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
12911 | 12/10/1999 |
Petition to Modify Project Description of Cooling Towers.
5 page(s)
| | CEC/Tronaas | Pg&e Generating/Lapaloma Generating Project/hanley |
12902 | 12/10/1999 |
Petition for Proposed Plant Site Modifications (December 9, 1999)
10 page(s)
| | CEC/Tronaas | Pg&e Generating/La Paloma Gnerating Project/derosa |
12900 | 12/10/1999 |
Petition for Proposed Plant Site Modifications.
11 page(s)
| | CEC/Tronaas | Pg&e Generating/La Paloma Generating/derosa |
12898 | 12/13/1999 |
Petition for Proposed Modifications: Zero Discharge System Boiler and Steam Injection Power Augmentation (December 9, 1999) (Attachment: CD)
104 page(s)
| | CEC/Tronaas | Pg&e Generating/La Paloma Generating Project/deros |
12724 | 11/22/1999 |
Memo including Post-Certification Mailing List Form
3 page(s)
| | Interested Parties | CEC/Tronaas |