51155 | 4/17/2009 |
Petition for Modification to Use Reclaimed Water Response to March 4, 2009 E-mail & Data Request
4 page(s)
| | CEC/ S. Munro | High Desert Power Project LLC/ F. Strauss |
51154 | 4/17/2009 |
E-mail RE VVWRA Reclaimed Water
4 page(s)
| | WWRA/ L. Olds | CEC/ C. Weaver |
51153 | 4/17/2009 |
E-mail RE Data Request-Recycled Water Availability
2 page(s)
| | High Desert Power Project LLC/ J. Boyer | CEC/ C. Weaver |
51152 | 4/17/2009 |
Letter RE Information in Support of Reclaimed Water Petition
13 page(s)
| | CEC/ S. Munro | High Desert Power Project LLC/ J. Boyer |
51151 | 4/17/2009 |
Petition for Modification to Use Reclaimed Water Response to October 29, 2008 Data Request
11 page(s)
| | CEC/ S. Munro | High Desert Power Project, LLC/ F. Strauss |
37190 | 6/27/2006 |
Objection to HDPP's Petition for Revisions / Administrative Changes to Soil and Conditions # 4.
15 page(s)
| | CEC/Docket Unit | G. A. Ledford |
32573 | 5/4/2000 |
Notice of Availability of the Commission Decision on the AFC
1 page(s)
| | Dockets | CEC Cec |
32572 | 5/5/2000 |
COMMISSION DECISION
355 page(s)
| | CEC/Dockets | CEC Cec |
30772 | 12/15/1999 |
Letter recommending the Application for Certification not be approved and the Commission not grant the Applicant a license to construct and operate the project
1 page(s)
| | CEC/Dockets | CEC/Laurie/rohy |
30771 | 11/22/1999 |
Aquifer storage and Recovery Agreement Between the VVWD and HDPP - POS
4 page(s)
| | Victor Valley Water District/Hill/cec/dockets | Mojave Water Agency/Caouette |
30768 | 10/12/1999 |
Notice of Evidentiary Hearing and Hearing Order Sign-In Sheet
3 page(s)
| | CEC/Dockets | CEC Cec |
30767 | 10/12/1999 |
Notice of Evidentiary Hearing and Hearing Order Sign-In Sheet
6 page(s)
| | CEC/Dockets | CEC Cec |
30766 | 7/6/1999 |
Applicant's Status Report #2 and Final DOC from MDAQMD - POS
63 page(s)
| | CEC/Dockets | Thompson |
30756 | 5/21/1999 |
Response to Linda Bond's Memorandum on High Desert Power Project Draft Outline of Modeling Analysis of Project Impacts to Local Water Conditions
7 page(s)
| | CEC/Bond/o'hagan/dockets | G. Ledford |
30740 | 1/12/1999 |
Revised Preliminary Determination of Compliance - POS
5 page(s)
| | CEC/Dockets | G. Ledford |
30737 | 12/22/1998 |
Applicant's Report of Waste Discharge and Permute Application
48 page(s)
| | CEC/Docket | Rmi/Cuellar |
30723 | 11/16/1998 |
Proposed Issuance of Emission Reduction Credits for George Air Force Base - POS
6 page(s)
| | Mojave Desert Aqmd/Fryxell/cec/dockets | CEC/Therkelsen |
30722 | 11/17/1998 |
Submittals Regarding the 32-Mile Natural Gas Pipeline
2 page(s)
| | CEC/Buell/dockets | Rmi, Inc/Cuellar |
30721 | 11/17/1998 |
Environmental Permitting Documents
1 page(s)
| | Southern Ca. Gas Co./Marelli/dockets | CEC/Buell |
30720 | 11/17/2003 |
Environmental Permitting Documents
1 page(s)
| | CEC/Dockets | Southern Ca Gas Co/Marelli |
30703 | 9/8/1998 |
Data Request # 140 - 142 - POS
4 page(s)
| | High Desert Power/Welch/cec/dockets | CEC/Buell |
30702 | 9/4/1998 |
Statue Report # 7 - POS
12 page(s)
| | CEC/Sharpless/laurie/dockets | CEC/Buell |
30701 | 9/3/1998 |
1. CURE's Responses to Applicant's Data Request # 1 and 2
2. Status Report of the California Unions for Reliable Energy; Proof of Service
291 page(s)
| | CEC/Dockets | Adams Broadwell & Joseph/Reynolds |
30700 | 9/3/1998 |
Information re: CEC Draft PSA and Staff's Projected Schedule
9 page(s)
| | Us Fish & Wildlife Services/Harris/cec/dockets | CEC/Buell |
30679 | 9/2/1998 |
June 12, 1998 Proposed ERC Issuance for ERCs from Hinkley Engine Retrofits - POS
5 page(s)
| | CEC/Therkelsen/dockets | Mojave Desert/Zeller |
30678 | 8/11/1998 |
Letter re: Background and the Energy Commission Review Procedures
6 page(s)
| | Air Force Base Conversion Agency/Reid/cec/dockets | CEC/Buell |
30677 | 8/6/1998 |
Applicant's Comments Regarding the J. Phillis Fox Report Date June 29, 1998 and Data Request #'s 1 and 2 to CURE
16 page(s)
| | CEC/Dockets | Thompson |
30676 | 7/27/1998 |
Cultural Resources Assessment Report for the 32-mile pipeline
2 page(s)
| | CEC/Buell/dockets | Rmi/Cuellar |
30672 | 5/29/1998 |
Applicant's Preliminary Draft Map showing the route of the proposed 32-mile natural gas pipeline - POS
5 page(s)
| | CEC/Dockets | Rmi/Cuellar |
30671 | 5/29/1998 |
Summary of Landowners Along Northern Gas Pipeline Route, Revised 5/27/98 - POS
63 page(s)
| | Dockets | Thompson |
30670 | 5/27/1998 |
Proposed Schedule - POS
6 page(s)
| | CEC/Valkosky/dockets | Hdpp/Wolfinger |
30669 | 5/26/1998 |
Response to Staff's Proposed schedule by CURE - POS
6 page(s)
| | CEC/Dockets | Adams Broadwell & Joseph/Reynolds |
30668 | 5/26/1998 |
Proposed Schedule - POS
7 page(s)
| | CEC/Sharpless/laurie/dockets | CEC/Buell |
30667 | 5/26/1998 |
Objection to CURE Data Requests Numbers 139 - 151 - POS
10 page(s)
| | CEC/Dockets | Thompson |
30666 | 5/22/1998 |
1. Simple Cycle "F" Class Power Plant Water Usage and 2. Projections of Groundwater Pumpage
19 page(s)
| | CEC/Dockets | Thompson |
30665 | 5/21/1998 |
High Desert Power Project Interconnection Study - POS
70 page(s)
| | Dockets | Southern Ca Edison Company/Save/he |
30663 | 4/25/1998 |
Status Report by CURE - POS
26 page(s)
| | CEC/Dockets | Adams Broadwell & Joseph/Joseph |
30661 | 2/11/1998 |
Data Request Nos. 108 - 110 - POS
5 page(s)
| | High Desert Power Project/Welch/cec/dockets | CEC/Buell |
30660 | 2/9/1998 |
Data Requests Nos. 95 - 107 - POS
7 page(s)
| | High Desert Power Project/Welch/cec/docket | CEC/Buell |
30658 | 3/17/1999 |
Files for HDPP Conference Call Workshop
1 page(s)
| | CEC/Buell | Gary Ledford |
30656 | 9/21/1999 |
Exhibit 111 Regional Water Management Plan - Bookman Edmonston - Beebe
67 page(s)
| | CEC/Docket | Gary A. Ledford |
18505 | 12/15/1999 |
Notice of Availability of Presiding Member's Proposed Decision and Notice of Committee Conference (Jan. 27, 2000)
2 page(s)
| | CEC/Docket | CEC/Laurie/rohy |
16231 | 10/26/1998 |
Pre-proposed Issuance of Emission Reduction Credits for PG&E Hinkley Engine Retrofits
10 page(s)
| | Mojave Desert Aqmd/Fryxell/cec/docket | Us Environmental Protection Agency/Harber |
14807 | 6/9/2000 |
Pages Omitted from the Commission Decision (Publication No. P800-00-003) (Pages 75, 76, 77) (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | CEC Cec |
14476 | 5/9/2000 |
ORDER Denying Motions - POS
4 page(s)
| | CEC/Dockets | CEC/Keese |
14445 | 12/31/1997 |
HDPP LLC Request for Procedural Ruling.
7 page(s)
| | CEC/Docket | Hdpp Llp/Thompson |
14418 | 5/5/2000 |
The Argument Not to Certify HDPP
51 page(s)
| | CEC/Dockets | Gary Ledford |
14407 | 5/5/2000 |
COMMISSION DECISION
355 page(s)
| | CEC/Dockets | CEC Cec |
14368 | 4/27/2000 |
Motion of Gary A Ledford to Set aside the Revised Presiding Member's Proposed Decision and Reopen the Record to Correct Procedural Errors and Conform the Evidentiary Record to the Facts
20 page(s)
| | CEC/Docket | Gary Ledford |
14367 | 4/27/2000 |
Request to Make a Brief Presentation of Public
6 page(s)
| | CEC/Dockets | Gary Ledford |
14366 | 4/27/2000 |
Request of Gary Ledford - Public Intervenor to Make Oral Argument to Full Commission on the Revised Presiding Member's Proposed Decision
21 page(s)
| | CEC/Dockets | Gary Ledford |
14314 | 4/27/2000 |
Points and Authorities in Support of Motion to Set Aside the Revised Presiding Member's Proposed Decision (RPMPD) and Reopen the Record to Correct Procedural Errors and Conform the Evidentiary Records to the Facts - POS
7 page(s)
| | CEC/Dockets | Gary Ledford |
14310 | 5/2/2000 |
Motion for Stay of Site Certification Proceedings - POS
13 page(s)
| | CEC/Dockets | Gary A. Ledford |
14308 | 4/27/2000 |
ERRATA to the Revise Presiding Member's Proposed Decision - POS
7 page(s)
| | CEC/Dockets | CEC/Laurie/keese |
14269 | 4/14/2000 |
Comments of the Department of Fish and Game on the Revised Presiding Member's Proposed Decision - POS
5 page(s)
| | CEC/Dockets | CEC/Wilcox |
14241 | 4/17/2000 |
Request to Review the Docket Log RE: Communication from Tom Dodson & Associates to Mr. Randy Hill, Dated Mar. 14, 2000 (Attachment: Master Log for High Desert (2000))
3 page(s)
| | Gary Ledford | CEC/Ross |
14226 | 4/14/2000 |
Letter from Richard and Julie Bagwill RE: Transmission of Power Produced (Attachment: Proof of Service)
4 page(s)
| | CEC/Laurie/buell | Richard & Julie Bagwill |
14225 | 4/17/2000 |
Comments of Gary A. Ledford - Public Intervenor on Revised PMPD for the High Desert Power Project (Attachment: Proof of Service)
21 page(s)
| | CEC/Docket | Gary A. Ledford |
14212 | 4/17/2000 |
Discussion RE: Historic Discussion of Growth Inducement Related to Water Resource Availability in the Mojave River Basin.
169 page(s)
| | Victor Valley Water Dist./Hill | Dodson & Assoc./Dodson |
14200 | 4/13/2000 |
Letter of support and approval of the High Desert Power Project.
1 page(s)
| | Dennis J. Nowicki | CEC/Pao |
14186 | 4/13/2000 |
Comments of the Commission Staff on the Revised Presiding Member's Proposed Decision for the High Desert Power Project. (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket | CEC/Holmes |
14112 | 4/6/2000 |
New paper clip from the Sacramento Bee, regarding Water or mirage?
1 page(s)
| | CEC/Docket | Gary Ledford |
14095 | 4/5/2000 |
Revised Presiding Members Proposed Decision. (Attachment: Proof of Service)
1 page(s)
| | U.s. Fish & Wildlife Service/Walker | CEC/Buell |
14058 | 3/31/2000 |
REVISED Proposed Member's Proposed Decision (P800-00-002) (Attachment: Proof of Service)
274 page(s)
| | CEC/Docket | CEC Cec |
14030 | 3/24/2000 |
Executive Summary to the California Water Plan.
117 page(s)
| | CEC/Docket | CEC/Valkosky |
14021 | 3/24/2000 |
DFG Comments RE: Staff Proposed Changes to Soil and Water COCs (Attachment: Proof of Service)
2 page(s)
| | CEC/Haussler/holmes/docket/pao/buell | Dfg/Adams |
14020 | 3/24/2000 |
Staff Proposed Alternative Soil & Water Resources Conditions (Attachment: Proof of Service)
5 page(s)
| | CEC/Laurie/keese | CEC/Buell |
13993 | 3/21/2000 |
Applicant Response to Comments of Gary Ledford (Attachment: Cover Letter; Service List)
4 page(s)
| | CEC/Docket | Hdpp/Thompson |
13983 | 3/20/2000 |
Staff Proposed Changes to Soil and Water COCs (Attachment: Proof of Service)
4 page(s)
| | High Desert Pos | CEC/Buell |
13982 | 3/20/2000 |
Comments RE: Staff Proposed Changes to Soil and Water COCs (Attachment: Proof of Service)
6 page(s)
| | CEC/Buell | Gary Ledford |
13981 | 3/20/2000 |
Article in March 14th Daily Press (Attachment: Proof of Service; E-mailed comments)
2 page(s)
| | CEC/Buell | Gary Ledford |
13926 | 3/16/2000 |
Order Denying Motion. (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | CEC/Laurie/keese |
13882 | 3/13/2000 |
Motion to Strike to Purge Docket Reject the Brief of Victor Valley Water District - Proof of Service
7 page(s)
| | CEC/Docket | Gary Ledford |
13830 | 3/8/2000 |
Brief of Commission Staff on the Commission's Responsibility to Analyze the Growth-Inducing Impacts of the Water Supply Plan the HDPP Project - Proof of Service
11 page(s)
| | CEC/Docket | CEC/Holmes/decarlo |
13810 | 3/7/2000 |
Applicant's Brief Regarding the Potential for Project Water Facilities to Result in Growth Inducing Impacts Under the California Environmental Quality Act (Attachment: Proof of Service)
16 page(s)
| | CEC/Docket | Hdpp/Thompson |
13809 | 3/7/2000 |
Brief of the Victor Valley Water District (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket | Hdpp/Thompson |
13807 | 3/7/2000 |
Wall Street Article on Cadiz and Water Banking by Marc Lifsher "Scientist Criticize Water Plan" (Dated March 1, 2000)
4 page(s)
| | CEC/Buell | Gary A. Ledford |
13805 | 3/7/2000 |
Brief on Reopened Hearings and Revised Comments of Ledford - Public Intervenor on Presiding Members Proposed Decision - Proof of Service
37 page(s)
| | CEC/Docket | Gary Ledford |
13743 | 2/28/2000 |
Environmental Protection Agency has Reviewed the Draft Environmental Impact Statement (DEIS) - Proof of Service
36 page(s)
| | Fish & Wildlife Service/Noda | Us Environmental Projection Agency/Farrel |
13742 | 2/28/2000 |
Pamphlet From the Water Resources VVWD (District Seeking to Falling Groundwater Table - Proof of Service
6 page(s)
| | CEC/Buell | Ron Leatz |
13723 | 2/24/2000 |
Editorial printed in the February 20, 2000, edition of the Daily Press. (Attachment: Fax Cover Page)
2 page(s)
| | CEC/Lauire | City Of Victorville/Roberts |
13711 | 2/22/2000 |
Items Submitted at the February 18, 2000 High Desert Evidentiary Hearing.
7 page(s)
| | CEC/Docket | CEC/Valkosky |
13673 | 2/17/2000 |
Reply to Applicant (HDPP) Motion to Exclude Proffered Evidence (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | Gary A. Ledford |
13632 | 2/16/2000 |
Comments of the Department of Fish and Game on Testimony Submitted for the Hearing on February 18, 2000 (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | Dept. Of Fish & Game/Adams |
13619 | 2/15/2000 |
Errata to February 10, 2000 Testimony - Proof of Service
4 page(s)
| | CEC/Laurie | CEC/Buell |
13614 | 2/14/2000 |
Applicant Motion to Exclude Proffered Testimony - Proof of Service
5 page(s)
| | CEC/Docket | Thompson |
13605 | 2/10/2000 |
Staff Testimony for 2/18/00 Hearings - Attachments Staff's Testimony to the High Desert Committee's 2/1/00 Order - Proof of Service
33 page(s)
| | CEC/Laurie | CEC/Buell |
13570 | 2/10/2000 |
Witnesses and Exhibit List Prepared Testimony for High Desert for Reopened Evidentiary Hearings - Proof of Service
63 page(s)
| | CEC/Docket | Gary Ledford |
13562 | 2/10/2000 |
PMPD - High Desert Power Project and City of Barstow Comments - January 14, 2000
2 page(s)
| | CEC/Laurie | The City Of Barstow/Warner |
13561 | 2/10/2000 |
Additional Prepared Testimony for Andy Welch (Attachment: Cover Letter; Proof of Service)
4 page(s)
| | CEC/Docket | Hdpp/Thompson |
13560 | 2/10/2000 |
Victor Valley Water District's Aquifer Storage and Recovery Agreement for the High Desert Power Project
27 page(s)
| | CEC/Docket | Hdpp/Thompson |
13538 | 2/7/2000 |
Presiding Member Proposed Decision - Proof of Service
50 page(s)
| | CEC/Laurie | Barstow Crossroads Of Opportunity/Warner |
13498 | 1/26/2000 |
E-mail regarding: Extension of Option - Proof of Service
3 page(s)
| | Crown Cork & Seal Co./Vatistas | Hdpp/Barnett |
13484 | 1/10/2000 |
Letter of Opposition
1 page(s)
| | CEC/Docket | Robert Osmond |
13479 | 1/4/2000 |
Letter of Opposition
1 page(s)
| | CEC/Docket | Curtis Harmon |
13478 | 1/4/2000 |
Letter of Opposition.
1 page(s)
| | CEC/Docket | Ernestine Farris |
13455 | 2/1/2000 |
Opposition to Motion of Applicant and Motion to Reopen Evidentiary Record and Hold Additional Evidentiary Hearing for Limited Purpose - Proof of Service
11 page(s)
| | CEC/Docket | Gary A. Ledford |
13453 | 1/28/2000 |
Sixteen letters received from members of the public, commenting on the PMPD - Proof of Service
25 page(s)
| | High Desert Pos List | CEC/Buell |
13441 | 2/1/2000 |
Order Reopening Evidentiary Record and Notice of Evidentiary Hearing - Proof of Service
6 page(s)
| | CEC/Docket | CEC/Laurie |
13360 | 1/4/2000 |
Letter of Opposition to Proposed Project.
1 page(s)
| | CEC/Docket | Mary Burden |
13359 | 1/4/2000 |
Letter of Opposition to Proposed Project
1 page(s)
| | CEC/Docket | Boyd Walker |
13340 | 1/10/2000 |
Letter of opposition to proposed project.
1 page(s)
| | CEC/Docket | Name Illegible |
13339 | 1/10/2000 |
Letter of Opposition to proposed project.
1 page(s)
| | CEC/Docket | Lynn Jaroszwski |
13330 | 1/18/2000 |
Letter with enclosure titled: Resolution No. 00-4
4 page(s)
| | CEC/Docket | City Of Victorville/Carolee Stotko |
13329 | 1/18/2000 |
Letter opposing power plant
1 page(s)
| | Docket Unit | Reginald Adams |
13317 | 1/10/2000 |
Letter of Opposition to proposed power plant.
1 page(s)
| | CEC/Docket | Lisa K. Lamere |
13316 | 1/20/2000 |
Letter of Opposition to proposed power plant
1 page(s)
| | CEC/Docket | Ann Leatz |
13315 | 1/20/2000 |
Letter of Opposition to proposed power plant.
1 page(s)
| | CEC/Docket | Ronald R. Leatz |
13314 | 1/13/2000 |
Letter of objection to power plant proposal
1 page(s)
| | CEC/Docket | Roann R. Leatz |
13302 | 1/18/2000 |
Presiding Member's Proposed Decision
3 page(s)
| | CEC/Laurie | City Of Barstow/Paul Warner |
13292 | 1/19/2000 |
Applicant Comments to the Presiding Members' Proposed Decision (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | Hdpp/Thompson |
13291 | 1/19/2000 |
Comments of the Department of Fish and Game on the Presiding Member's Proposed Decision For the High Desert Power Project (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket | Dept. Of Fish And Game/Adams |
13283 | 1/18/2000 |
Comments of the Department of Fish and Game of the Presiding Member's Proposed Decision - Proof of Service
5 page(s)
| | CEC/Docket | Department Of Fish And Game/Stephen E. Adams |
13279 | 1/18/2000 |
Betty Williams concerns regarding High Desert
1 page(s)
| | CEC/Docket | CEC/Ross |
13267 | 1/5/2000 |
Staff Review of the Proposed Language for Conditions of Certification Soil & Water 17 and 18. (Attachment: Proof of Service)
3 page(s)
| | Victor Valley Water Dist/Hill/hdpp/welch | CEC/Buell |
13263 | 1/4/2000 |
Letter of concern regarding building the proposed power plant.
1 page(s)
| | CEC/Docket | Patricia A. Harmon |
13253 | 1/14/2000 |
Applicant's Motion to Reopen Proceedings for Limited Purpose - Proof of Service
123 page(s)
| | CEC/Docket | Thompson |
13250 | 1/13/2000 |
Comments of Commission Staff on the Presiding Member's Proposed Decision for the High Desert Power Project (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket | CEC/Holmes |
13248 | 1/14/2000 |
Comments of Gary A. Ledford on Presiding Member's Proposed Decision - Exhibit "A":Victor Valley Wastewater Reclamaion Authority's Petition for Change of Point of Discharge, Place of Use and Purpose of Use - Proof of Service
30 page(s)
| | CEC/Docket | Gary A. Ledford |
13246 | 1/14/2000 |
Letter stating that the Power Project should be located where water is readily available
1 page(s)
| | CEC/Docket | Willim C. Mcloed Ii |
13222 | 1/5/2000 |
Comments against power plant proposal.
1 page(s)
| | CEC/Docket | Christopher Nagle |
13221 | 1/4/2000 |
Comments against the power plant proposal.
1 page(s)
| | CEC/Docket | Barbara Walker |
13146 | 1/6/2000 |
Letter RE: PMPD - Failure to Provide Evidence of an Aquifer Storage and Recovery Agreement that is Consistent with Staff's Proposed Conditions of Certification. (Attachment: Proof of Service)
3 page(s)
| | Victor Valley Water Dist/Hill/hdpp/welch | CEC/Buell |
13096 | 1/4/2000 |
Draft Environmental Impact Statement (U.S. Fish and Wildlife Service) (Attachments: Appendices -- Draft EIS; Draft Implementing Agreement; Habitat Conservation Plan Federal Endangered Species Act Section 10(a)(1)(B) for the HDPP)
856 page(s)
| | CEC/Buell | Navigant Consulting Inc./Cuellar |
13083 | 12/29/1999 |
CEC Condition Allowing District Use of Wells/Aquifer Storage and Recovery Agreement Approved by the Victor Valley Water District Board of Directors on December 7, 1999 (Attachment: Proof of Service)
30 page(s)
| | CEC/Buell | Victor Valley Water District/Hill |
13060 | 12/28/1999 |
Initiation of Endangered Species Act Section 7 Consultation on Southwest Gas Corporation's Proposed Natural Gas Pipeline
6 page(s)
| | Fws Ventura Field Office | Blm |
13052 | 12/27/1999 |
Offset Requirements.
1 page(s)
| | CEC/Buell | Mojave Desert Aqmd/Fryxell |
12991 | 12/20/1999 |
Letter Recommending a Mandate that the Plant Use Natural Gas-Fired Fuel Cells.
1 page(s)
| | CEC/Commissioners | Robet W. Russell |
12968 | 12/15/1999 |
MWA Board Changes to Ordinance No. 9 - Proof of Service
3 page(s)
| | CEC/Buell | Mojave Water Agency |
12919 | 12/15/1999 |
Presiding Member's Proposed Decision (Attachment: Proof of Service)
352 page(s)
| | CEC/Docket | CEC/Laurie/rohy |
12773 | 11/19/1999 |
Post-Hearing Reply Brief of Commission Staff on the High Desert Power Project Application for Certification (Attachment: Proof of Service)
4 page(s)
| | CEC/Docket | CEC/Holmes |
12700 | 11/17/1999 |
Reply Brief of Gary A. Ledford - Public Intervenor on Water and Related Matters and Alternatives - -Proof of Service
11 page(s)
| | CEC/Docket | Gary A. Ledford |
12631 | 11/5/1999 |
Post-Hearing Brief of Commission Staff on the High Desert Power Project AFC
8 page(s)
| | CEC/Docket | CEC/Holmes |
12615 | 11/8/1999 |
Opening Brief for HDPP - Proof of Service
10 page(s)
| | CEC/Docket | Thompson |
12591 | 11/4/1999 |
Opening Brief on Water and Related Matters and Alternatives
101 page(s)
| | CEC/Docket | Gary L Ledford |
12590 | 11/5/1999 |
Opening Brief - Proof of Service
11 page(s)
| | CEC/Docket | Adams Broadwell Joseph &cardozo/Reynolds |
12367 | 10/12/1999 |
Aquifer Storage and Recovery Agreement Between the HDPP and the VVWD
23 page(s)
| | CEC/Buell | Vvwd/Hill |
12365 | 10/12/1999 |
Concerns RE: Mojave Water Agency Considering Changing its in Policy (Attachment: Proof of Service)
14 page(s)
| | Mojave Water Agency/Norman | Hdpp/Barnett |
12364 | 10/12/1999 |
Conditions of Certification Water Supply & Rules Diagram
2 page(s)
| | CEC/Docket | CEC Cec |
12363 | 10/12/1999 |
Comments RE: Letter from Best, Best & Krieger Who Represents High Desert Power Project RE: Mojave Water Agency Sale of Water to High Desert Power Project AND Memorandum to HDPP from Best, Best & Krieger LLP (Attachments: Letter dated Oct. 5, 1999 and Memorandum; October 4, 1999)
17 page(s)
| | Mojave Water Agency/Caoutte | Brunick, Alvarez & Battersby/Brunick |
12318 | 10/15/1999 |
Response to the Inquiry from the Administrative Law Judge. (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket | Southwest Gas Corp/Jacobson |
12297 | 10/19/1999 |
MWA Board Directed Changes to Ordinance No. 9 (Attachment: Proof of Service)
1 page(s)
| | CEC/Buell | Mojave Water Agency/Caouete |
12267 | 10/5/1999 |
Declaration Signed by Mr. Thomas W. Bilhorn on October 1, 1999. (Attachment: Service List)
2 page(s)
| | CEC/Laurie | Dept. Fo Fish And Game/Adams |
12230 | 10/5/1999 |
Notice of Proposed Issuance of Emission Reduction Credit
1 page(s)
| | CEC/Docket | Mdaqmd/Michele Baird |
12221 | 10/5/1999 |
EXHIBIT - Environmental Impact Statement - Disposal and Reuse of George Air Force Base, California
1000 page(s)
| | CEC/Docket | Gary A. Ledford |
12209 | 10/4/1999 |
Commission Hearings on High Desert power Project: Declaration Signed by Mr. Thomas W. Bilhorn on 10/1/99 - (Attachment: Proof of Service)
5 page(s)
| | CEC/Laurie | Dept. Of Fish & Game/Adams |
12199 | 10/4/1999 |
Memo regarding water issues affecting High Desert and comments in regards thereto.
1 page(s)
| | CEC/Rohy/valkosky | CEC Cec |
12196 | 10/1/1999 |
FT-20/High Desert Power Project, Southern California Logistics Airport (formerly George AFB) Proof of Service
6 page(s)
| | Afbca/Jackson | Us Environmental Protection Agency/Barbara Smith |
12184 | 9/21/1999 |
WEDA Base Reuse EIR
1 page(s)
| | Gary A. Ledford | CEC/Buell |
12183 | 10/1/1999 |
Sign-in Sheet - Sept. 30, 1999 Committee Hearing
4 page(s)
| | CEC/Docket | CEC Cec |
12182 | 10/1/1999 |
Newspaper Article: Power-Plant Plan Assailed Over Water Use (Sept. 29, 1999)
2 page(s)
| | CEC/Docket | The Wall Street Journal |
12157 | 9/30/1999 |
Prepared Rebuttal Testimony of Bob Beeby (Attachment: Proof of Service)
6 page(s)
| | CEC/Docket | Hdpp/Thompson |
12156 | 10/1/1999 |
Aquifer Storage and Recovery Agreement between and High Desert and Victor Valley Water District - Proof of Service
30 page(s)
| | CEC/Buell | Victor Valley Water District |
12155 | 9/30/1999 |
Origination of Rebuttal Questions Asked of Bob Beeby
7 page(s)
| | CEC/Docket | Hdpp/Thompson |
12154 | 9/30/1999 |
Motion to Exclude Testimony
8 page(s)
| | CEC/Docket | Hdpp/Thomspon |
12152 | 9/21/1999 |
VVEDA Base Reuse EIR
1 page(s)
| | Gary A. Ledford | CEC/Buell |
12147 | 9/30/1999 |
Notice of Time Change for Evidentiary Hearings - October 7-8, 1999 - City of Victorville
Proof of Service
3 page(s)
| | CEC/Docket | CEC/Laurie/rohy |
12146 | 9/30/1999 |
Staff Water Resources Rebuttal Testimony and Errata for Soil and Water Resources and Air Quality Testimony.
60 page(s)
| | CEC/Laurie/rohy | CEC/Buell |
12141 | 9/21/1999 |
Exhibit - Water Quality Control Policy
15 page(s)
| | CEC/Docket | Gary A. Ledford |
12120 | 9/29/1999 |
Notice of Unavailability of Witness and Intent to Request Entry of Testimony Into Evidence by Declaration (Attachment: Proof of Service)
1 page(s)
| | CEC/Laurie | Dept. Of Fish & Game/Adams |
12111 | 9/28/1999 |
Notice of Unavailability of Witness and Intent to Request Entry of Testimony into Evidence by Declaration
4 page(s)
| | CEC/Laurie | Dept. Of Fish & Game/Adams |
12106 | 9/13/1999 |
Notice of Witnesses and Exhibit List of Gary A. Ledford - Proof of Service
15 page(s)
| | CEC/Docket | Gary A. Ledford |
12103 | 9/21/1999 |
Exhibit - Cauoette E-Mail "Our ordinance Requires CEQA" Proof of Service
13 page(s)
| | CEC/Docket | Gary A. Ledford |
12102 | 9/15/1999 |
Exhibit 126 Intervenor Ledford
67 page(s)
| | CEC/Docket | Gary A. Ledford |
12099 | 9/21/1999 |
Exhibit 120 - Memo of September 14, 1999 MWA & minutes August 16, 1999 MWA
12 page(s)
| | CEC/Docket | Gary A. Ledford |
12092 | 9/15/1999 |
Request for Subpoena - October 7th and 8th, 1999 - City of Victorville Council Chambers Proof of Service
6 page(s)
| | CEC/Docket | Gary A. Ledford |
12085 | 9/20/1999 |
Notice of Evidentiary Hearing and Hearing Order - CEC - Mailing List
3 page(s)
| | CEC/Docket | CEC Cec |
12074 | 9/15/1999 |
Request for Subpoena - 10/7-8/99 - Proof of Service
6 page(s)
| | CEC/Docket | Gary A. Ledford |
12073 | 9/15/1999 |
Time Estimated for direct and cross-examination. Proof of Service
5 page(s)
| | CEC/Docket | Gary A. Ledford |
12072 | 9/15/1999 |
Direct Testimony of Gary A. Ledford on Water and Related Matters - Proof of Service
27 page(s)
| | CEC/Docket | Gary A. Ledford |
12071 | 9/15/1999 |
Intervenor Ledford Exhibit 136 - Declaration of Norman T. Caoutte Document actual date is 10/24/94
22 page(s)
| | CEC/Docket | Gary A. Ledford |
12068 | 9/21/1999 |
Exhibit - Delcaration of Larry Rowe in Support of Judgment
31 page(s)
| | CEC/Docket | Gary A. Ledford |
12063 | 9/21/1999 |
Exhibit - Certificates of Participation $26,290,000 Berrenda Mesa 25,000 AFY - SWP Water
24 page(s)
| | CEC/Docket | Gary A. Ledford |
12062 | 9/21/1999 |
EXhibit 111 Regional Water Management Plan - Bookman Edmonston - Beebe
67 page(s)
| | CEC/Docket | Gary A. Ledford |
12061 | 9/21/1999 |
Exhibit 112 - Master Plan for the Delivery of Water Malcolm Pirnie - 1990 - Proof of Service
24 page(s)
| | CEC/Docket | Gary A. Ledford |
12060 | 9/22/1999 |
Exhibit 115 - USGS Report 95-4189 - Ground - Water and Surface - Water Relations along the Mojave River, Southern California - Proof of Service
47 page(s)
| | CEC/Docket | Gary A. Ledford |
12056 | 9/17/1999 |
Supplemental Testimony for the Department of Fish and Game
5 page(s)
| | CEC/Laurie | Department Of Fish And Game/Stephen Adams |
12051 | 9/15/1999 |
Letter to Gary A. Ledford dated 9/13/99 Regarding Cross Examination of Dr. Fox - Proof of Service
5 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cordozo/Elena Bebonville |
12034 | 9/21/1999 |
Direct Testimony of Ledford on Wet/Dry Cooling or In the Alternative Use of Supplemental Water of Free Production Allowance
76 page(s)
| | CEC/Docket | Gary A. Ledford |
12033 | 9/21/1999 |
Exhibit - Settlement Agreement with VVEDA Requiring and EIR
19 page(s)
| | CEC/Docket | Gary A. Ledford |
12032 | 9/21/1999 |
Exhibit - SWRCB - Beneficial Uses
11 page(s)
| | CEC/Docket | Gary A. Ledford |
12031 | 9/21/1999 |
Amended Witnesses and Exhibit List of Gary A. Ledford
16 page(s)
| | CEC/Docket | Gary A. Ledford |
12030 | 9/20/1999 |
Direct Testimony Wet/Dry, Exhibits
1 page(s)
| | CEC/Docket | G. Ledford |
11994 | 9/14/1999 |
Intervenor Ledford Exhibit 130 - Proof of Service
6 page(s)
| | CEC/Docket File | Gary A. Ledford |
11993 | 9/14/1999 |
Intervenor Ledford Exhibit 129 - Computed Groundwater Mounding in HDPP Well Field Under Base Case - Proof of Service
6 page(s)
| | CEC/Docket File | Gary A. Ledford |
11991 | 9/14/1999 |
Intervenor Ledford Exhibit 128 - Court of Appeal Case Nos. EO17881/EO18923/EO18023 and EO18681 - Proof of Service
27 page(s)
| | CEC/Docket File | Gary A. Ledford |
11990 | 9/14/1999 |
Intervenor Ledford Exhibit 127 - Proof of Service
6 page(s)
| | CEC/Docket File | Gary A. Ledford |
11989 | 9/14/1999 |
Intervenor Ledford Exhibit 125 - Fifth Annual Report of the Mojave Basin Area Watermaster - Water Year 1997-98 - Proof of Service
42 page(s)
| | CEC/Docket File | Gary A. Ledford |
11974 | 9/8/1999 |
Staff Declarations for Demand Conformance and Facility Design - Proof of Service
8 page(s)
| | CEC/Docket | CEC/Buell |
11972 | 9/10/1999 |
Letter to Laurie From Reynolds (9/9/99) RE: Hearing Matters; Testimony of J. Phyllis Fox RE: Hazardous Materials Management of Behalf of CURE; CURE's Notice of Intent to Cross-Examine Witnesses and Proof of Service.
23 page(s)
| | CEC/Docket | Adams Broadwell Joseph & Cardozo/Heeley |
11971 | 9/14/1999 |
Direct Testimony of Gary A. Ledford on Water and Related Matters for the High Desert Power Project. (Attachment: Proof of Service)
27 page(s)
| | CEC/Docket | Gary A. Ledford |
11946 | 9/3/1999 |
Errata to Staff's Soils and Water Resources, Biological Resources and Air Quality Testimony - Proof of Service
18 page(s)
| | CEC/Laurie/rohy | CEC/Buell |
11945 | 9/7/1999 |
Errata Sheets for the prefiled direct testimony of Southwest's witness, Joseph P. Provenza, Jr.
24 page(s)
| | CEC/Docket | Southwest Gas Corp./Jacobson |
11943 | 7/30/1999 |
Letter regarding Southern California International Airport, Victorville
6 page(s)
| | Ca Regional Water Quality/Plaziak | High Desert Power/Welch |
11937 | 9/7/1999 |
1. Areas Ready for Declarations and 2. Areas That Can be Submitted by Declaration if Supplemented by Staff. Proof of Service
16 page(s)
| | CEC/Docket | Thompson |
11932 | 9/9/1999 |
Supplemental testimony from the California Department of Fish and Game regarding the High Desert Power Project.
5 page(s)
| | CEC/Laurie | Department Of Fish & Game |
11925 | 9/7/1999 |
Staff Declarations and Errata to Demand Conformance, Facility Design, Hazardous Materials Management and Visual Resources - Proof of Service
32 page(s)
| | CEC/Laurie/rohy | CEC/Buell |
11924 | 9/7/1999 |
HDPP Rebuttal and Clarification
8 page(s)
| | CEC/Docket | Thompson |
11902 | 8/31/1999 |
Project Mailing List
2 page(s)
| | CEC/Docket | CEC Cec |
11890 | 9/2/1999 |
REVISED - Notice of Evidentiary Hearings and Hearing Order
6 page(s)
| | CEC/Docket File | CEC/Laurie/rohy |
11885 | 8/31/1999 |
Requested Changes in Conditions of Certification
4 page(s)
| | CEC/Buell | Department Of Fish & Game/Stephene E. Adams |
11880 | 8/29/1999 |
Rebuttal Testimony of Gary A. Ledford to the Testimony of Mathew S. Layton on Cooling Towers - Wet, Dry and Wet/Dry Hybrid - Proof of Service
12 page(s)
| | CEC/Docket | Gary A. Ledford |
11879 | 8/29/1999 |
Rebuttal Testimony of Gary A. Ledford to the Testimony of Linda Bond and Joseph O'Hagen on Soil and Water - Proof of Service
72 page(s)
| | CEC/Docket | Gary A. Ledford |
11878 | 8/29/1999 |
Rebuttal Testimony of Gary A. Ledford to the Testimony of Jon Hughes on Behalf of CURE on Socioeconomic Effects - Proof of Service
8 page(s)
| | CEC/Docket | Gary A. Ledford |
11854 | 8/27/1999 |
Rebuttal Testimony RE: HDPP
4 page(s)
| | CEC/Laurie | Ca Dept. Of Fish And Game/Adams |
11830 | 8/27/1999 |
Project Mailing List - Mojave Water Agency, Apple Valley
5 page(s)
| | CEC/Docket File | CEC Cec |
11826 | 8/27/1999 |
Proposed Condition
137 page(s)
| | CEC/Buell | G. Ledford |
11816 | 8/20/1999 |
Petition for Review, Brad Foster v. Energy Resources Conservation Development Commission
23 page(s)
| | Ca Supreme Court/Honorable R. M. George | Gary A. Ledford |
11815 | 8/20/1999 |
Correspondence to Commissioners Laurie and Rohy, dated August 19, 1999
4 page(s)
| | CEC/Docket File | Thompson |
11803 | 8/24/1999 |
Letter regarding Hearing Schedule
2 page(s)
| | CEC/Laurie/rohy | High Desert Power Project/Barnett |
11792 | 8/23/1999 |
CURE's August 19, 1999 Letter RE: Hearing Procedure (Proof of Service)
2 page(s)
| | CEC/Laurie/rohy | Adams Broadwell Joseph & Cardozo/Heeley |
11756 | 8/19/1999 |
Order Granting Extension of Time (Attached: Proof of Service)
1 page(s)
| | CEC/Docket File | CEC/Moore/rohy |
11755 | 8/16/1999 |
1. Revised Exhibit and Witness List; 2. Witness/Exhibit List by Subject; and 3. Individual Testimonies (Attachment: Proof of Service)
71 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
11750 | 8/16/1999 |
Testimony of J. Phyllis Fox on Behalf of CURE; Testimony of John Hughes on Behalf of CURE on Socioeconomic Effects of the HDPP
28 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/Heeley |
11748 | 8/16/1999 |
Prepared Direct Testimony of Joseph P. Provenza, Jr.
70 page(s)
| | CEC/Docket Office | Southwest Gas Corp/Jacobson |
11747 | 8/17/1999 |
South Coast AQMD District Resolution 99-16 Approving the Inter-district Transfer of VOC ERCs; and Mojave Desert AQMD Resolution 99-09 Approving the Inter-district and Interbasin Tramper of VOC ERCs (Attachment: Service List)
6 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
11737 | 8/16/1999 |
Letter regarding the Desert Power Project Committee's July 16, 1999 order. Staff filing its final socioeconomic, biological resources and water and soil resources testimony.
126 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
11735 | 8/17/1999 |
California Fish and Game testimony.
17 page(s)
| | CEC/Laurie | Department Of Fish & Game/Adams |
11732 | 8/16/1999 |
Applicant's Analysis of Impacts to Riparian and Aquatic Species in the Mojave River Riparian Area
17 page(s)
| | CEC/Docket File | Thompson |
11731 | 8/16/1999 |
Applicant's Amendments to Conditions of Stream Encroachment Permit Compliance Operations and Monitoring Plan
8 page(s)
| | CEC/Docket File | Thompson |
11724 | 8/16/1999 |
California Department of Fish and Game testimony regarding the High Desert Power
Project application.
17 page(s)
| | CEC/Laurie | Dept. Of Fish & Game/Adams |
11723 | 8/16/1999 |
High Desert Power Project (Attachment: Proof of Service.)
2 page(s)
| | Ccec/Buell | Victor Valley Water District |
11718 | 8/10/1999 |
Response to California Energy Commission Staff Status Report, July 6, 1999 (Attachment: Proof of Service)
1 page(s)
| | CEC/Laurie/rohy | Dept. Of Fish & Game/Legal Office/s. Adams |
11717 | 8/9/1999 |
Petition by Gary A. Ledford for an Order Lengthening Time to File Direct Testimony & For Addition and Modified Witness and Exhibit List (Attachment: Proof of Service)
19 page(s)
| | CEC/Docket File | G.ledford |
11698 | 8/13/1999 |
Notice of a Staff Workshop - August 26, 1999 (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket File | CEC/Laurie |
11590 | 7/16/1999 |
Hazardous Material Management and Air Quality Testimony
43 page(s)
| | Hdpp/Welch | CEC/Buell |
11588 | 7/16/1999 |
Order Denying Petition to Intervene - (Brad Foster) (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket File | CEC/Laurie/rohy |
11587 | 7/16/1999 |
Motion for Order Directing the Preparation of an Environmental Impact Report (EIR) as Required Under CEQA (Attachment: Proof of Service)
19 page(s)
| | CEC/Docket File | G. Ledford |
11586 | 7/16/1999 |
Support for the Petition of Brad Foster to Intervene (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket File | G. Ledford |
11585 | 7/13/1999 |
Replacement Pages for Draft PSD Permit for HDPP (Attachment: proof of Service)
5 page(s)
| | CEC/Buell | Us Epa |
11584 | 7/12/1999 |
Proposed PSD Permit for HDPP (Attachment: Proof of Service)
11 page(s)
| | Hdpp/Barnett | Us Epa/Haber |
11583 | 7/12/1999 |
Lead Agency Request for Endangered Species Act Section 7 Consultation (Attachment; Proof of Service)
2 page(s)
| | Us Fish & Wildlife/Noda | Us Epa/Haber |
11582 | 7/12/1999 |
Applicant's Response to Staff Report #12
5 page(s)
| | CEC/Docket | Hdpp/Thompson |
11581 | 7/20/1999 |
Revised Draft Erosion Control and Renegotiation Plan and Revised Draft Biological Resources Mitigation Implementation Plan for the HDPP
31 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
11579 | 7/16/1999 |
Reply to HDPP Response to Staff Status Report Number 12 (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket File | G. Ledford |
11578 | 8/3/1999 |
CURE's Addition to Witness and Exhibit Lists - SUPPLEMENT
6 page(s)
| | CEC/Docket Unit | Adams Broadweel Joseph And Cardozo/Heeley |
11571 | 8/2/1999 |
Staff Witness and Exhibit List (Attachment: Proof of Service List)
4 page(s)
| | CEC/Laurie/rohy | CEC/Buell |
11568 | 8/2/1999 |
Exhibit and Witness Schedule (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
11564 | 8/2/1999 |
CURE's Additions to Witness and Exhibit Lists (Attachment: proof of Service)
4 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph And Cardozo/Heeley |
11563 | 8/2/1999 |
Identification of the exhibits it intends to sponsor for admission into the evidentiary record (Attachment: Proof of Service)
1 page(s)
| | CEC/Docket Office | Southwest Gas Corp/Bettwy |
11554 | 8/3/1999 |
Response to Socioeconomic Resources Questions
2 page(s)
| | CEC/Buell | Hdpp/Welch |
11518 | 7/9/1999 |
Staff Status Report #12
6 page(s)
| | CEC/Docket | Thompson |
11509 | 7/22/1999 |
Historic Properties Treatment Plan for the Southwest Gas Corporation Pipeline.
37 page(s)
| | CEC/Docket File | Rmi/Amy L. Cuellar |
11503 | 7/21/1999 |
Response of HDPP to Various Gary A. Ledford Filings, dated July 20, 1999 (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
11501 | 7/20/1999 |
Supplemental Reply to HDPP Response to Staff Status Report Numbers 12 (Attachment: Proof of Service)
3 page(s)
| | CEC/Docket | Gary Ledford |
11493 | 7/8/1999 |
Final Determination of Compliance
72 page(s)
| | CEC/Docket | Mojave Desert Air Quality Management District/Fryx |
11488 | 7/16/1999 |
Notice of Evidentiary Hearings and Hearing Order
9 page(s)
| | CEC/Docket File | CEC/Laurie/rohy |
11487 | 7/15/1999 |
Concerns regarding siting of the proposed HDPP, Southern California Logistics Airport, Victorville, San Transfer County.
6 page(s)
| | CEC/Buell | California Regional Water Quality Control Board |
11482 | 7/20/1999 |
Order Denying Motion for Preparation of Environmental Impact Report
5 page(s)
| | CEC/Docket | CEC.Rohy |
11476 | 7/16/1999 |
Final Hazardous Material Management and Air Quality Testimony.
65 page(s)
| | Hdpp/Welch | CEC/Buell |
11455 | 7/6/1999 |
Confidential Application RE: The Historic Properties Treatment Plan for the 32-Mile Gas Pipeline Proposed for the High Desert Power Project.
1 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
11425 | 7/6/1999 |
Status Report Number 12
7 page(s)
| | CEC/Comm. Laurie/rohy | CEC/Richard Buell |
11385 | 6/28/1999 |
Applicant Response to Petition to Intervene By Brad Foster
5 page(s)
| | CEC/Docket File | Thompson |
11376 | 6/29/1999 |
Comments on the TANC Memo
4 page(s)
| | MDAQMD/Robert Zeller | Ensr/Sara J. Head |
11371 | 6/22/1999 |
Applicants' Model Results for Post-Closure Injection (Attachment: Proof of Service)
13 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
11370 | 6/22/1999 |
Petition to Intervene (Attachment: Proof of Service)
2 page(s)
| | CEC/Docket File | Brad Foster |
11359 | 6/16/1999 |
Staff Workshop - Mojave Water Agency - Apple Valley, CA
4 page(s)
| | CEC/Docket File | CEC/Staff Workshop |
11328 | 6/15/1999 |
Summary of Modeling Analysis of HDPP Impacts to Local Water Conditions of Supplemental Injection
9 page(s)
| | CEC/O'hagen | L. D. Bond & Associates |
11327 | 6/9/1999 |
Comments from the Firm Representing the Baldy Mesa Water District, A County Water District, Which is Situated in the Alta Mesa Sub-Area of the Mojave Basin Area.
14 page(s)
| | CEC/Buell | Gresham, Savage, Nolan & Tilden Llp/M. Davis |
11326 | 6/9/1999 |
Comments from Firm Representing Silver Lakes Association, a County Water District, which is Situated in the Alto Sub-Area of the Mojave Basin Area.
12 page(s)
| | CEC/Buell | Gresham, Savage, Nolan & Tilden Llp/M. Davis |
11320 | 6/7/1999 |
Status Report #1
9 page(s)
| | CEC/Docket File | Thompson |
11319 | 6/7/1999 |
Outline of Modeling Analysis of HDPP Project Impacts to Local Water Conditions
9 page(s)
| | CEC/Joe O'hagan | Ldbond & Associates/Linda D. Bond |
11310 | 6/4/1999 |
Notice of Staff Workshop June 15, 1999 Mojave Water Agency, Apple Valley
6 page(s)
| | CEC/Docket File | CEC/Laurie |
11309 | 6/4/1999 |
Status Report Number 11
7 page(s)
| | CEC/Laurie | CEC/Richard Buell |
11299 | 6/4/1999 |
First Status Report (Attachment: Proof of Service)
4 page(s)
| | CEC/Sharpless | Dept. Of Fish & Game/N. Murray |
11294 | 6/4/1999 |
Status Report #1
5 page(s)
| | CEC/Docket File | High Desert Power Project, Llc/A. Thompson |
11289 | 6/4/1999 |
Status Report of the California Unions For Reliable Energy (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket Unit | Adams, Broadwell, Joseph & Cardozo/Heeley |
11281 | 6/10/1999 |
Correspondence to Mr. Michael Duane Davis
10 page(s)
| | CEC/Docket File | Thompson |
11258 | 5/28/1999 |
Letter regarding the water supply
13 page(s)
| | CEC/Buell | High Desert Power Project Llc/Andrew C. Welch |
11256 | 5/28/1999 |
Correspondence to USEPA Region IX dated May 24, 1999 regarding water supply
26 page(s)
| | CEC/Docket File | Thompson |
11255 | 5/28/1999 |
Correspondence to R. Buell dated May 26, 1999 regarding water supply.
14 page(s)
| | CEC/Docket File | Thompson |
11164 | 5/19/1999 |
Cultural Resources Assessment Report
151 page(s)
| | CEC/Docket File | Rmi/Cuellar |
11132 | 5/21/1999 |
Notice of Preliminary Determination of Compliance
37 page(s)
| | CEC/Docket File | Mojave Desert Aqmd/Baird |
11110 | 5/18/1999 |
Letter regarding Linda Bond's proposed modeling analysis for estimating the HDPP impacts to local ground water conditions.
10 page(s)
| | High Desert Power Project/A. Welch | CEC/Buell |
11052 | 5/12/1999 |
Resolution No. 99-09: A Resolution of the Governing Board of the Mojave Desert Air Quality Management District Approving Intedistrict and Interbasin Transfer of Offsets (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket File | Mojave Desert Air Quality Management District |
11050 | 5/12/1999 |
Air Quality Workshop Mailing List - San Francisco, CA
2 page(s)
| | CEC/Docket Unit | CEC Cec |
11046 | 5/11/1999 |
Notice of Change in Workshop Location and Time - May 13, 1999 - CEC
5 page(s)
| | CEC/Docket File | CEC/Laurie |
11017 | 5/6/1999 |
Revised Emissions Data
9 page(s)
| | Mojave Desert Aqmd/Salv | High Desert Power Project/Welch |
11016 | 5/6/1999 |
Supplement Evidentiary Position Paper Failure of Project to Comply the California State Constitution "Reasonableness of Use" Sutter Licensing Mitigation package related to water.
18 page(s)
| | CEC/Buell | Gary Ledford |
11014 | 5/10/1999 |
Joint Environmental Impact Mitigation Proposal of the Applicant and CURE
35 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo |
10979 | 4/28/1999 |
5 Reports of Conversations regarding Water Supply Modeling by Linda D. Bond of LD Bond & Associates
7 page(s)
| | CEC/Docket File | CEC/Morthole |
10938 | 4/30/1999 |
NOTICE of Staff Workshops for the High Desert Power Project AFC: Air Quality (May 11, 1999) San Francisco, CA; Water and Biological Resources (May 13, 1999) Victorville, CA (Attachment: Proof of Service)
7 page(s)
| | CEC/Docket File | CEC/Laurie |
10903 | 4/15/1999 |
Update of EPA's Issues with the High Desert Power Project: Summary and Status of the Major Issues that have surfaced in EPA's Review.
3 page(s)
| | CEC/Buell | Us Epa/M. Haber |
10888 | 4/20/1999 |
Committee Order re: Parties' Scheduling Proposal
4 page(s)
| | CEC/Docket File | CEC/Laurie |
10883 | 4/19/1999 |
Transmission System Reliability Testimony (Attachment: Proof of Service)
23 page(s)
| | CEC/Docket File | Cal Iso/R. Sparks |
10880 | 4/19/1999 |
Biological Assessment for the Southwest Gas Corporation Proposed Natural Gas Pipeline for Service to the High Desert Power Project
165 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
10855 | 4/13/1999 |
Correspondence to Matt Haber (U.S. EPA, Region IX) dated April 9, 1999
8 page(s)
| | CEC/Docket File | Thompson/Us Environmental Protection/balentine/hea |
10830 | 4/15/1999 |
Update Of EPA's Issues
7 page(s)
| | CEC/Buell | Us Environmental Protection Agency/Haber |
10813 | 4/12/1999 |
Addendum Number 2 to the "Evaluation of Alternative Water Supplies for the High Desert Power Project." (Attachment: Proof of Service)
130 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
10811 | 4/9/1999 |
Staff's Revisions/Supplemental Analysis Concerning: Cooling Technologies; Biological Resources; Cultural Resources; and Proposed Water Resources
103 page(s)
| | Hdpp/Welch | CEC/Buell |
10810 | 4/9/1999 |
Prehearing Conference Statement (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | Southwest Gas Corp/Jacobson |
10809 | 4/9/1999 |
Prehearing Conference Statement of Gary Ledford Objection to Proposed Conditions Relating to Relating to Water Service
2 page(s)
| | CEC/Docket File | Gary A. Ledford |
10792 | 4/9/1999 |
Notice of Second Prehearing Conference and Scheduling Order
5 page(s)
| | CEC/Docket File | Southwest Gas Corp |
10791 | 4/9/1999 |
Applicant's Second Prehearing Conference Statement
8 page(s)
| | CEC/Docket File | Hdpp/A. Thompson |
10782 | 4/9/1999 |
CURE's Second Prehearing Conference Statement
6 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo |
10780 | 4/9/1999 |
Second Prehearing Conference Statement of Commission Staff
7 page(s)
| | CEC/Docket File | CEC/Hough |
10777 | 4/9/1999 |
Prehearing Conference Statement of Gary Ledford Objecting to Proposed Conditions Relating to Water Service (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | CEC/Ledford |
10763 | 2/24/1999 |
Applicant Response to Data Requests Filed by Gary Ledford
6 page(s)
| | CEC/Docket File | Thompson |
10746 | 4/5/1999 |
Letter in Response to CURE's Preliminary Dry Cooling Analysis. (Attachment: Proof of Service)
11 page(s)
| | Ccec/Buell | G. Ledford |
10739 | 4/7/1999 |
Second Petition to Intervene
6 page(s)
| | CEC/Sharpless | Department Of Fish And Game/Huges/murray |
10710 | 4/2/1999 |
Order RE: Responses to Intervenor's Data Requests
3 page(s)
| | CEC/Docket | CEC/Sharpless |
10673 | 3/31/1999 |
Letter to Buell from Reynolds (3/30/99) CURE's Preliminary Dry Cooling Analysis
60 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cardozo |
10660 | 3/31/1999 |
HDPP Response to Ledford Motion for Order Directing Response (Attachment: Proof of Service)
64 page(s)
| | CEC/Docket Unit | Councel For High Desert Power Project/A. Thompson |
10618 | 3/29/1999 |
Notice of Cancellation of a Staff Workshop for High Desert - April 1, 1999
4 page(s)
| | CEC/Docket File | CEC Cec |
10604 | 3/25/1999 |
Sign-in Sheet RE: Staff Workshop - March 12, 1999
5 page(s)
| | CEC/Docket File | CEC/Buell |
10600 | 3/25/1999 |
Letter with Staff's Supplemental Testimony
11 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
10586 | 3/26/1999 |
Coincedence of 90F and F Stability
1 page(s)
| | CEC/Dokcet File | Howard Balentine |
10558 | 3/23/1999 |
Staff Interpollutant Offset Principles/Comments on the Applicant's Interpollutant Trading Study.
21 page(s)
| | Hdpp, Llc/Welch | CEC/Buell |
10556 | 3/18/1999 |
CURE's Comments on Interpollutant Offset Issues
7 page(s)
| | CEC/Buell | Lizanne Reynolds |
10555 | 3/17/1999 |
Files for HDPP Conference Call Workshop
1 page(s)
| | CEC/Buell | Gary Ledford |
10547 | 3/22/1999 |
Motion for Order Directing Response
15 page(s)
| | CEC/Docket File | Gary A. Ledford |
10537 | 3/22/1999 |
CURE's Comments on The Air Quality and a Public Health Sections of the CEC Staff Assessment
2 page(s)
| | CEC/Odoemelam | Ensr/Balentine |
10536 | 3/19/1999 |
Errata to the Staff Assessment and Additional Staff Witness Qualifications
23 page(s)
| | CEC/Docket File | CEC/Hough |
10525 | 3/19/1999 |
Comments responding to the analyses prepared by ENSR
10 page(s)
| | Air Pollution Control Office/Fryxell | Air Division/Haber |
10524 | 3/19/1999 |
Notice of a Staff Workshop - April 1, 1999 - San Francisco
5 page(s)
| | CEC/Docket File | CEC/Sharpless |
10518 | 3/19/1999 |
Letter to Buell From Reynolds (3/18/99) CURE's Comments on Interpollutant Offset
10 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Heeley |
10497 | 3/16/1999 |
Modeling Issues for 3/16/99 Workshop
2 page(s)
| | CEC/O'hagan | L Bond & Associates/Bond |
10496 | 3/16/1999 |
Model Features, Numerical Values, and Scope of Sensitivity Analysis
1 page(s)
| | CEC/Docket File | CEC Cec |
10470 | 3/15/1999 |
Aquifer Testing Program Summary
1 page(s)
| | CEC/Docket File | CEC |
10469 | 3/15/1999 |
Assessment of Groundwater Impacts
7 page(s)
| | CEC/Docket File | CEC |
10452 | 3/11/1999 |
CEC's Request for Agency Comments
2 page(s)
| | CEC/Buell | Department Of Transportation/Hesnard |
10445 | 3/10/1999 |
Suggestions for the Evaluation of Groundwater Use
6 page(s)
| | CEC/O'hagan | L. D. Bond & Associates/L. Bond |
10444 | 3/10/1999 |
Interpollutant Tradeoff Analysis
8 page(s)
| | Us Epa/Haber | Ensr/Balentine/head |
10434 | 3/10/1999 |
Notice of Second Prehearing Conference and Scheduling Order - April 16, 1999
4 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
10415 | 3/10/1999 |
Notice of Second Prehearing Conference and Scheduling Order
7 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
10400 | 3/5/1999 |
ROC Jess Lefkoff - March 1, 1999
7 page(s)
| | CEC/O'hagan | Ld Bond & Associates/Bond |
10376 | 3/4/1999 |
Letter to Buell from Reynolds (3/3/99) HDPP Ozone Study by Blanchard ET AL.
17 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Renolds |
10361 | 2/26/1999 |
Proposed Exhibit List and Preliminary Witness List (Attachment: Proof of Service)
9 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
10353 | 3/3/1999 |
Sign-in Sheet: Staff Workshop 3/2/99
4 page(s)
| | CEC/Docket File | CEC/Buell |
10337 | 3/1/1999 |
Letter of Thanks for providing comments on HDPP
4 page(s)
| | CEC/Docket File | Department Of Water & Power/Holloway |
10330 | 2/26/1999 |
Notice of a Staff Workshop - March 12, 1999 (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | CEC/Sharpless |
10326 | 2/26/1999 |
1. Letter to Poole from Hastely dated 2/17/99
2. Memo from Fox to Kelly dated 2/22/99
3. Proof of Service
27 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Heeley |
10323 | 2/26/1999 |
Letter Submitting the names and qualifications of representatives
11 page(s)
| | CEC/Docket File | Southwest Gas Corporation |
10309 | 2/24/1999 |
Correspondence to Matt Haber (EPA) from ENSR, dated February 16, 1999. (Attachment: Proof of Service)
48 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
10304 | 2/25/1999 |
Applicant Response to Data Requests Filed by Gary Ledford
9 page(s)
| | CEC/Docket File | Thompson |
10294 | 2/24/1999 |
Order Granting Petitions to Intervene
4 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
10276 | 2/19/1999 |
Correspondence to Department of Environmental Protection Regarding American Natural Power/SCONOx
23 page(s)
| | CEC/Docket | High Desert Power Project/Thompson |
10275 | 2/19/1999 |
Applicant Comments to Staff Assessment
9 page(s)
| | CEC/Docket | High Desert Power Project/Thompson |
10274 | 2/22/1999 |
Report of Conversations - Gas Pipeline Routing
5 page(s)
| | CEC/Buell | CEC/S. Baker |
10273 | 2/19/1999 |
Comments RE: Petition to Intervene.
3 page(s)
| | CEC/Mendonca | Los Angeles Dept. Of Water And Power/Holloway |
10242 | 2/18/1999 |
Staff Assessment, Southern California International Airport
6 page(s)
| | CEC/Buell | Ca. Regional Water Quality Control Board/Baqai |
10241 | 2/18/1999 |
Notice of Continuation - Of February 16, Staff Workshop for the High Desert Power Project
1 page(s)
| | CEC/Docket File | CEC Cec |
10239 | 2/18/1999 |
Business Meeting Mailing List
4 page(s)
| | CEC/Docket File | CEC Cec Public Meeting |
10230 | 2/17/1999 |
Notice of a Staff Workshop - Tuesday, 3/2/99 - U.S. Environmental Protection Agency - San Francisco
6 page(s)
| | CEC/Docket File | CEC Cec Sharpless |
10226 | 2/18/1999 |
1. Letter to Buell (2/17/99) Regarding Comments of Staff Assessment
2. 7/25/98 Geomatrix Report and Review of Power Plant Proposed Groundwater Use
86 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Heely |
10225 | 2/18/1999 |
Petition to Intervene
5 page(s)
| | CEC/Docket File | Energy Resources Conservation & Dev. Comm./Bettwy |
10224 | 2/17/1999 |
Petition to Intervene of the California Department of Fish and Game
6 page(s)
| | CEC/Sharpless | Department Of Fish & Game/Hughes |
10220 | 2/17/1999 |
CURE Date Requests Numbers 252 Through 266
17 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Heely |
10216 | 2/11/1999 |
Pre-Hearing Conference Statement
2 page(s)
| | CEC/Sharpless/laurie | California Iso/Perez |
10209 | 2/11/1999 |
Order Denying Intervenor's Motion (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
10206 | 2/9/1999 |
CURE'S Preliminary Conference Statement
71 page(s)
| | CEC/Docket File | Adams, Broadwell & Joseph/Heeley |
10202 | 2/10/1999 |
Applicant's Prehearing Conference Statement
10 page(s)
| | CEC/Docket File | Thompson |
10201 | 2/10/1999 |
Motion by Gary A. Ledford to Continue the Prehearing Conference and Change the Location of the Hearing
4 page(s)
| | CEC/Docket File | Intervention Party/Ledford |
10200 | 2/10/1999 |
Data Request - Letter to Buck Johns, Manager, High Desert
5 page(s)
| | CEC/Docket File | Interventing Party/Ledford |
10199 | 2/10/1999 |
Prehearing Conference Statement
6 page(s)
| | CEC/Docket File | Thompson |
10198 | 2/10/1999 |
Prehearing Conference Statement of Gary Ledford Objecting to Proposed Conditions Relating to Water Service.
29 page(s)
| | CEC/Docket File | Interventing Party/Ledford |
10197 | 2/10/1999 |
Data Request of Mojave Water Agency and the Board of Directors of the Agency Acting as the Watermaster Set Number One
5 page(s)
| | CEC/Docket File | Party In Intervention/Ledford |
10196 | 2/10/1999 |
Data Request Victor Valley Water District
5 page(s)
| | CEC/Docket File | Party In Intervention/Ledford |
10190 | 2/9/1999 |
Prehearing Conference Statement of the California Department of Fish and Game
6 page(s)
| | CEC/Sharpless | Fish And Game/Hughes |
10189 | 2/9/1999 |
Prehearing Conference Statement of Gary Ledford Objecting to Proposed Conditions Relating to Water Service
25 page(s)
| | CEC/Docket File | Party In Intervention/Ledford |
10187 | 2/9/1999 |
Prehearing Conference Statement of Commission Staff
12 page(s)
| | CEC/Docket File | CEC/Hough |
10178 | 2/9/1999 |
Applicant High Desert Power Project Prehearing Conference Statement
7 page(s)
| | CEC/Docket Unit | Thompson |
10165 | 2/8/1999 |
Notice of a Staff Workshop for High Desert AFC. 2/16/99 Mojave Water Agency, Apple Valley.
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
10164 | 2/5/1999 |
United Association Welder Certification Program
40 page(s)
| | United Assoc./Macdonald | Department Of Industrial Relations/Lemire |
10162 | 2/8/1999 |
Notice of a Staff Workshop for High Desert AFC. 2/16/99 Mojave Water Agency, Apple Valley.
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
10155 | 2/5/1999 |
Staff Assessment Workshop
3 page(s)
| | CEC/Docket File | Mojave Desert Aqmd |
10154 | 2/5/1999 |
Staff Assessment Workshop
1 page(s)
| | CEC/Docket File | Mojave Desert Aqmd |
10153 | 2/5/1999 |
Air Quality Issues - CEC Workshop
21 page(s)
| | CEC/Docket File | Ensr |
10152 | 2/5/1999 |
Proposed HDPP Groundwater Banking Operation
6 page(s)
| | CEC/Docket File | High Desert Power Project, Llc |
10151 | 2/5/1999 |
Opposition to Condition
21 page(s)
| | CEC/Docket File | Ledford/Taxpayer |
10150 | 2/5/1999 |
Results of Revised Health Risk Assessment for the High Desert Power Project after Lowering the Stack Height to 130 Feet
3 page(s)
| | Mojave Desert Air Quality/Desalvio | Ensr/Balentine |
10138 | 12/18/1998 |
Applicant's Objection to Commission Staff Data Requests 147-157
5 page(s)
| | CEC/Docket | High Desert Power Project/Thompson |
10135 | 2/3/1999 |
Order Granting Petition to Intervene
4 page(s)
| | CEC/Docket | CEC/Laurie/sharpless |
10127 | 2/1/1999 |
Receptor Locations and Terrain Heights for CEC Modeling
1 page(s)
| | A. Welsh | CEC/T. Ngo |
10119 | 1/28/1999 |
Notice of Availability of the Staff Assessment
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
10118 | 1/29/1999 |
Petition for Intervention
3 page(s)
| | CEC/Docket | Ledford |
10117 | 1/29/1999 |
Response to Air Resources Board Letter of 12/8/98 Concerning Ozone Modeling for the Interpollant Tradeoff Analysis for the High Desert Power Project
9 page(s)
| | Desalvio | Ensr/Balentine |
10107 | 1/27/1999 |
Letter of Issue of Concerns -
10 page(s)
| | Air Pollution Control Office/Fryx | Air Resource Board/Menebroker |
10096 | 1/26/1999 |
Letter to Noda From Reynolds Dated 1/25/99 - Comments on Notice of Intent for High Desert
22 page(s)
| | CEC/Docket | Adams Broadwell & Joseph |
10095 | 1/26/1999 |
Request for Agency Comments on the High Desert Power Project Staff Assessment.
1 page(s)
| | High Desert Agency Distribution | CEC/Therkelsen |
10094 | 1/26/1999 |
Document Handling - Public Participation in Review of the High Desert Power Project.
2 page(s)
| | Librarian/Public Members | CEC/Therkelsen |
10089 | 1/26/1999 |
Letter against the building of and of operate a 680 to 830 MW natural gas fueled electricity generation power plant at High Desert.
2 page(s)
| | CEC/Docket | Ying |
10077 | 1/26/1999 |
High Desert Power Project, Revised Preliminary Determination of Compliance.
67 page(s)
| | Mojave Desert Aqmd/Fryxell | Us Environmental Protection Agency |
10075 | 1/26/1999 |
Revised Preliminary Determination of Compliance High Desert Power Project.
196 page(s)
| | CEC/Fryxell | Community Enbironmental Services/Bedwell |
10062 | 1/22/1999 |
Letter to Singer from Reynolds Dated 1/20/99 Regarding: Proposed Nonregulation of Discharge by High Desert
11 page(s)
| | CEC/Docket | Adams Broadwell & Joseph |
10060 | 1/21/1999 |
Additional Information on the Operation and Maintenance of the Gas Pipeline for the HDPP. (Attachment: Proof of Service)
11 page(s)
| | CEC/Sazaki | A. Cuellar |
10059 | 1/20/1999 |
STAFF ASSESSMENT - High Desert Power Project (Application for Certification)
(Attachment: Proof of Service)
633 page(s)
| | CEC/Docket | CEC/Buell/haussler/therkelsen |
10041 | 1/20/1999 |
Letter Regarding Official Request for Removal of Charlene L. Wardlow's Name From the Service Lists
1 page(s)
| | CEC/Docket | Calpine/Wardlow |
10037 | 1/19/1999 |
Letter to Charles L. Fryxell From Lizanne Reynolds Dated 1/14/99, Regarding Comments on Revised PDOC for High Desert Power Plant
215 page(s)
| | CEC/Docket | Adams Broadwell And Joseph/Heeley |
10033 | 1/19/1999 |
Notice of Staff Assessment Workshops 2/3/99 - 2/4/99- at the Mojave Desert AQMD, Victorville and 2/5/99 at CEC, Sacramento
7 page(s)
| | CEC/Docket | CEC/Sharpless |
10025 | 1/15/1999 |
Preliminary Determination of Compliance
12 page(s)
| | Mojave Desert Air Quaility Mtg. Dist/Fryxell | CEC/Therkelsen |
10007 | 1/13/1999 |
Notice of Intention Exemption 97-SIT-1 and Application for Certification 97-AFC-1
2 page(s)
| | CEC/Buell | Deaprtment Of Transporation/Grimes |
10006 | 1/13/1999 |
Public Notice - Notice of Availability of the Notice of Intent for the HDPP
1 page(s)
| | CEC/Docket | High Desert Power Project |
10005 | 1/14/1999 |
Applicant's Responses to Staff Data Requests 147-157
70 page(s)
| | CEC/Docket | Thompson |
10002 | 1/13/1999 |
Correspondence to R. Buell Regarding Hazardous Materials
6 page(s)
| | CEC/Docket | Thompson/Welch |
9993 | 1/6/1999 |
October 6, 1998 Proposed Issuance of ERCs for Shutdown of GAFB
(Attachment: Proof of Service)
11 page(s)
| | Southern California Intl. Airport Authority/J. Rob | Mojave Desert Aqmd/Fryxell |
9964 | 1/6/1999 |
Report of Waste Discharge General Information Form For Waste Discharge Requirements.
8 page(s)
| | CEC/Docket | Rmi/Cuellar |
9933 | 1/4/1999 |
Applicant's Preliminary Application for an Incidental Take Permit
270 page(s)
| | CEC/Docket | Rmi/Cuellar |
9926 | 12/30/1998 |
E-Mail to Mark Sazaki from EPA - RE: Preparation of an Environmental Impact Statement for Federal Permits Associated with Construction and Operation of the High Desert Power Plant Project. (Attachment: Proof of Service)
7 page(s)
| | CEC/Sazaki | Epa |
9907 | 12/28/1998 |
Revised Proposed Issuance ERCs for Newberry Springs Engine Retrofits
5 page(s)
| | Air Pollution Control Officer/Fryxell | Us Environmental Protection Agency/Haber |
9899 | 12/22/1998 |
Applicant's Responses to CURE Data Requests 229-251.
88 page(s)
| | CEC/Docket | Thompson/Gilcrest |
9885 | 12/21/1998 |
Applicant's Responses to CEC Data Requests 145 and 146 and Applicant's Objections to CEC Data Requests 147-157.
8 page(s)
| | CEC/Docket | Thompson |
9879 | 12/17/1998 |
Sixty-Day Notice of Intent to Sue for Violation of Section 7 of the Endangered Species Act; Right-of-Way Application for the High Desert Power Plant
21 page(s)
| | Unit | Adams, Broadwell & Joseph/Heeley |
9878 | 12/18/1998 |
Revised Preliminary Determination of Compliance - Dec. 16, 1998
32 page(s)
| | CEC/Docket File | Mojave Desert Aqmd/Baird/fryxell |
9871 | 12/17/1998 |
Estimating Interpollutant Trade-off Ratio for the High Desert Power Project
16 page(s)
| | Mojave Desert Aqmd/Salvio | Ensr/Head |
9868 | 12/17/1998 |
Proposed Interpollutant Offset Ratio for High Desert Power Project.
10 page(s)
| | CEC/Docket | Adams Broadwell & Joseph/Heeley |
9864 | 12/15/1998 |
California Endangered Species Act Consultation
6 page(s)
| | Fish & Game/Taucher | High Desert Power Project Llc/Welch |
9863 | 12/15/1998 |
Letter of response to the review of the ENSR ozone modeling results.
6 page(s)
| | Mojave Desert Air Quality/Salvio | Air Resources Board/Menebroker |
9853 | 12/16/1998 |
Notice of Prehearing Conference and Scheduling Order
(Attachment: Proof of Service)
7 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
9828 | 12/11/1998 |
Applicant's Objections to CURE Data Request 229 Through 251.
7 page(s)
| | CEC Cec Docket File | Thompson |
9790 | 12/8/1998 |
High Desert Power Project Data Requests Nos. 147 through 157
8 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
9788 | 12/8/1998 |
Letter to Charles L. Fryxell from Lizanne Reynolds (12/3/98) - Proposed issuance of ERC's For Southern California Gas-Newberry Springs Engine Retrofits - Comments on Second Notice
43 page(s)
| | Air Pollution Control Office/Fryx | Adams Broadwell & Joseph/Reynolds |
9747 | 12/1/1998 |
Letter regarding process of the High Desert Power Project and Filing of a Revised Offset Plan
6 page(s)
| | Air And Toxics Div./Haber | CEC/Therkelsen |
9744 | 12/2/1998 |
Conversation Regarding: The Runway 21 Designation.
5 page(s)
| | CEC/Golden | City Of Victorville/Haynes |
9736 | 12/1/1998 |
Correspondence to R. Zeller (MDAQMD) dated 11/24/98.
7 page(s)
| | CEC/Docket File | Thompson/Gilcrest/welch/kreminski/broemmeisiek |
9725 | 11/24/1998 |
CURE Data Requests to Applicant Numbers 229 through 251
14 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Heeley |
9721 | 11/24/1998 |
High Desert Power Project Status Report Number 10. Committee's 10/6/98 Fourth Revised Scheduling Order directed staff and other parties to file a status report on 11/24.
9 page(s)
| | CEC/Sharpless/laurie | CEC Cec Buell |
9716 | 11/24/1998 |
Applicant's Status Report Number 10
8 page(s)
| | CEC/Docket File | High Desert Power Project/Thompson |
9713 | 11/24/1998 |
Revised Short Term Air Quality Impact Assessment.
17 page(s)
| | CEC/Docket File | Energy Resources/Thompson/gilcrest/head |
9709 | 11/24/1998 |
Application for Certification for High Desert Power Project - Status Report of the California Unions for Reliable Energy.
6 page(s)
| | CEC/Docket File | Energy Resources Conservation/Joseph |
9699 | 11/23/1998 |
Acceptance for processing by Mojave Water Agency for Water Services to the High Desert Project.
24 page(s)
| | CEC/Buell | Mojave Water Agency |
9688 | 11/19/1998 |
September 10, 1998 Proposed ERC Issuance for ERC's from Hinkley Engine Retrofits
6 page(s)
| | CEC/Therkelsen | Mojave Desert Aqmd/Zeller |
9678 | 11/18/1998 |
Objections of the California Unions for Reliable Energy to Applicant's Data Request # 3 Through 6.
28 page(s)
| | CEC/Docket File | Adams Broadwell & Josehp/Heely |
9677 | 11/18/1998 |
CURE'S Comments on Proposed Issuance of ERCs for Shutdown of George Air Force Base (11/13/98).
28 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Heeley |
9676 | 11/18/1998 |
Request the High Desert Power Project, Limited Liability Company, supply the request information #145 through 146.
6 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
9674 | 11/17/1998 |
Environmental Permitting Submittals for the 32-Mile Gas Pipeline associated with the HDPP.
2 page(s)
| | Southern California Gas Company/Marel | Resource Management Internationl/ Cuellar |
9667 | 11/17/1998 |
List of HDPP Documents (Non-Confidential)
2 page(s)
| | CEC/Buell | Southern California Gas Company/Marelli |
9666 | 11/17/1998 |
Environmental Permitting Documents
1 page(s)
| | CEC/Buell | Southern California Gas Co./Marelli |
9665 | 11/17/1998 |
Request to Receive all the Documents to Date that High Desert has Submitted to the CEC Regarding Environmental Permitting of the Second Proposed Natural Gas Pipeline
1 page(s)
| | CEC/Buell | Southern California Gas Company/Marelli |
9647 | 11/13/1998 |
Applicant's Responses to CURE data requests 206-228.
21 page(s)
| | CEC/Docket File | Resource Management International/Cuellar |
9636 | 11/12/1998 |
Hearing Order on Potential Amendments to the Integrated Assessment of Need and the "Need CAP"
8 page(s)
| | CEC/Docket File | CEC/Rohy/sharpless |
9633 | 11/12/1998 |
Applicant's Responses to Data Requests 143-144
6 page(s)
| | CEC/Docket File | Thompson |
9629 | 11/10/1998 |
Applicant's Revised Offset Plan
28 page(s)
| | CEC/Docket File | Thompson-law Office |
9626 | 11/12/1998 |
Applicant's Responses to Data Requests 143-144.
6 page(s)
| | CEC/Docket File | Thompson |
9621 | 11/9/1998 |
Revised Proposed Issuance of ERCs for Newberry Springs Engine Retrofits
11 page(s)
| | Southern California Gas Co./Muyco | Air Pollution Control Oficer/Fryxell |
9616 | 11/9/1998 |
Addendum 1 to the "Evaluation of Alternative Water Supplies for High Desert Power Project" and the draft condition of Fish and Game
43 page(s)
| | CEC/Docket File | Resource Management International, Inc./Cuellar |
9603 | 11/4/1998 |
Emissions and BACT Addendum and attachments
72 page(s)
| | CEC Cec Docket Files | Law Office Thompson /Hilcrest |
9597 | 11/2/1998 |
Applicant Data Requests to CURE Numbers 3 through 6; Applicant Objection to CURE Data Requests 206 through 228
12 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9578 | 11/3/1998 |
Status Report of the California Unions for Reliable Energy.
6 page(s)
| | CEC/Dockets | Adams Broadwell & Joseph/Heeley |
9577 | 10/30/1998 |
Applicant's Responses to CEC Data Requests 140-142 and Applicant's Status Report Number 9
11 page(s)
| | CEC/Docket File | Thompson/High Desert Power Project |
9572 | 10/26/1998 |
Re-Proposed Issuance of Emission Reduction Credits for PG&E Hinkley Engine Retrofits (Attachment: Proof of Service)
10 page(s)
| | Mojave Desert Aqmd/Fryxell | U.s. Epa/M. Haber |
9569 | 10/30/1998 |
Status Report Number 9
(Attached: Proof of Service)
7 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
9568 | 10/29/1998 |
HDPP Water Site Application - Joint Meeting with VVWD
29 page(s)
| | Planning And Resource Center | Mojave Water Agency/Caouette |
9567 | 10/28/1998 |
Enclosed Copy of the November Issue of the Bradco High Desert Report
1 page(s)
| | CEC/Laurie | Hdpp/B. John |
9566 | 10/28/1998 |
Enclosed copy of the November Issue of The Bradco High Desert Report
1 page(s)
| | CEC/Rohy | Hdpp/B. Johns |
9565 | 10/28/1998 |
Enclosed copy of the November Issue of The Bradco High Desert Report
1 page(s)
| | CEC/Sharpless | Hdpp/B. Johns |
9564 | 10/28/1998 |
Sign in Sheet - Draft PSA and Project Issues Resolution Workshop (October 27, 1998)
3 page(s)
| | CEC/Docket File | CEC/Buell |
9563 | 10/26/1998 |
Emission Reduction Credits for two Hinkley Internal Combustion Engines
9 page(s)
| | Mojave Desert Aqmd/Fryxell | CEC/Therkelsen |
9553 | 10/23/1998 |
The Bradco High Desert Report
17 page(s)
| | CEC/Valkovsky | Hdpp/Johns |
9538 | 10/21/1998 |
Final Interconnection Study, dated September 14, 1998.
13 page(s)
| | Southern California Edison/Velarde | California Iso/Perez |
9529 | 10/16/1998 |
10/16/98 Letter and CURE Data Requests Numbers 206 through 228 addressed to Thompson.
31 page(s)
| | CEC/Dockets | Cure/Reynolds |
9523 | 10/16/1998 |
10/16/98 Letter to Buell enclosing "Well Interfernce Effects of High Desert Power Projects Proposed Wellfiled in the Victor Valley Water District" by Dr. J. Phyllis Fox.
125 page(s)
| | CEC/Dockets File | Adams Broadwell & Joseph/Lizanne Reynolds |
9522 | 10/16/1998 |
CURE Comments on Proposed Ammonia Mitigation
39 page(s)
| | CEC/Buell | Cure/Reynolds |
9508 | 10/15/1998 |
September 25, 1998 Lahontan Regional Water Quality Control Board Meeting Summary
5 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9489 | 10/13/1998 |
Comments of HDPP Regarding Project Water Supply and Schedule
8 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9480 | 10/9/1998 |
Notice of Proposed Issuance of Emission Reduction Credits
1 page(s)
| | CEC/Docket File | Mojave Desert Air Quality Management Dist/Baird |
9479 | 10/9/1998 |
Notice of Draft PSA and Project Issues Resolution Workshop for the High Desert Power Project Application for Certification
4 page(s)
| | CEC/Docket File | CEC/Sharpless |
9468 | 10/7/1998 |
Information on the Crockett Cogeneration Startup and Shutdown Emission Compliance Tests.
144 page(s)
| | Hdpp/Welch | CEC/Buell |
9467 | 10/7/1998 |
High Desert Power Project Data Requests No.2 143 through 144
(Attachment: Proof of Service)
5 page(s)
| | Hdpp/Welch | CEC/Buell |
9466 | 10/6/1998 |
Fourth Revised Scheduling Order
8 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
9465 | 10/6/1998 |
Article in Victorville Daily Press
5 page(s)
| | CEC/Docket Unit | CEC/Buell |
9445 | 10/2/1998 |
Letter from the US Army Corps of Engineers Verifying the Jurisdictional Determination for the High Desert Power Project's 32-mile gas pipeline. (Attachment: Proof of Service List)
5 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9442 | 10/1/1998 |
Emission Reduction Credits Request for Southern California Gas Company at Newberry Springs Compressor Station (Attachment: Proof of Service)
7 page(s)
| | Mojave Desert Aqmd/Fryxell | U.s.epa/Haber |
9438 | 9/28/1998 |
Letter to Charles L. Fryxell Dated September 25, 1998 Regarding Proposal Issuance of ERCs For Southern California Gas-Newberry Springs Engine Retrofits from Lizanne Reynolds
37 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Debonville |
9437 | 9/4/1998 |
Request for a copy of the High Desert AFC
2 page(s)
| | Blm/Cannon | CEC/Buell |
9424 | 9/28/1998 |
Notice of Proposed Issuance of Emmission Reduction Credits
(Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | Mojave Desert Aqmd/Baird |
9423 | 9/28/1998 |
Emission Reduction Credits for Newberry Springs Engine Retrofit (Attachment: Proof of Service)
7 page(s)
| | Mojave Desert Aqmd/Fryxell | CEC/Therkelsen |
9422 | 9/28/1998 |
Revised Proposed Issuance of ERCs for Hinkley Engine Retrofits (Attachment: Proof of Service)
9 page(s)
| | Pg&e Co./Burke | Mojave Desert Aqmd/Fryxell |
9421 | 9/28/1998 |
ERC Application for PG&E Hinkley Gas Compressor System/Response to Comments in California Energy Commission July 16, 1998 Letter
(Attachment: Proof of Service)
20 page(s)
| | Mojave Desert Air Quality Mgmt. Dist./Fryxell | Sierra Research/Rubenstein |
9374 | 9/25/1998 |
Applicant's Response to CEC Staff Workshop Summary and Status Report Number 8
8 page(s)
| | CEC/Docket File | Hddp/Thompson |
9364 | 9/24/1998 |
High Desert Power Project Workshop Summary and Status Report Number 8
9 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
9363 | 9/23/1998 |
Applicant's Comments Regarding Proposed Schedule and Applicant's Objections to Staff Data Requests 140 through 142.
9 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9362 | 9/23/1998 |
Comments of CURE on Staff's Proposed Schedule and Proof of Service
12 page(s)
| | CEC/Heeley | Adams, Broadwell & Joseph/Heeley |
9361 | 9/23/1998 |
Comments of CURE On Staff's Proposed Schedule
11 page(s)
| | CEC/Docket File | Adams, Broadwell & Joseph/Josph/reynolds |
9360 | 9/17/1998 |
High Desert Power Project Interconnection Study - Final Report
147 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9352 | 9/15/1998 |
Applicant's Response to Air Force Base Conversion Agency Dated August 28, 1998
(Attachment: Proof of Service)
6 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9351 | 9/17/1998 |
Draft Streambed Alteration Agreement for the High Desert Power Project (Attachment: Service List)
8 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9350 | 9/16/1998 |
High Desert Power Project Interconnection Study - Final Report (Attachment: Service List)
155 page(s)
| | CEC/Docket File | Rmi/Cuellar |
9349 | 9/16/1998 |
Analysis and Mitigation of Air Quality Impacts
38 page(s)
| | CEC/Buell | Adams, Broadwell & Joseph/Reynolds |
9348 | 9/16/1998 |
Sign-in Sheet: Issues Resolutions and Project Status Workshop
3 page(s)
| | CEC/Docket File | CEC/Buell |
9347 | 9/15/1998 |
Letter Dated 9/15/98 to Richard K. Buell from Lizanne Reynolds RE: High Desert Power Plant: Analysis and Mitigation of Air Quality Impacts
(Attachment: Proof of Service)
42 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Heeley |
9346 | 9/14/1998 |
Applicant's Response to CURE Data Request No. 200 (Attachment: Proof of Service)
5 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9344 | 9/10/1998 |
Letter Dated 9/8/98 to Rebecca Jones from Lizanne Reynolds RE: Proposed Section 1603 Streambed Alteration Agreement for High Desert Power Project
(Attachment: Proof of Service)
27 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Heeley |
9343 | 9/14/1998 |
High Desert Power Project
(Attachment: Proof of Service)
7 page(s)
| | CEC/Docket Unit | Department Of Toxic Substances Control/Riley |
9331 | 8/25/1998 |
Status of High Desert Interconnection Study
1 page(s)
| | Ca Iso/Sparks | CEC/Mccuen |
9330 | 9/8/1998 |
Applicant's Status Report Number 7
(Attachment: Service List)
5 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9329 | 9/8/1998 |
Geology and Hydrogeology of the George Air Force Base Vicinity.
1 page(s)
| | CEC/O'hagan | Adams, Broadwell & Joseph/Reynolds |
9328 | 9/10/1998 |
Applicability of the California Health and Safety Code Provisions to the High Desert Power Project.
(Attachments: Various Letters Regarding the Subject)
15 page(s)
| | CEC/Sharpless | Dept. Of Toxic Substances Control/Huff |
9327 | 9/8/1998 |
Applicant's Seventh Status Report
4 page(s)
| | CEC/Docket Unit | High Desert Power Porject/Thompson |
9311 | 9/10/1998 |
Wastewater Recycling System Proposed for the HDPP
4 page(s)
| | CEC/Buell | Dept. Of Toxic Substances Control/Rauh |
9308 | 9/9/1998 |
Completion Date of the High Desert Power Project Interconnection Study.
5 page(s)
| | CEC/Buell | Ca Iso/Perez |
9285 | 8/26/1998 |
Applicant's Responses to CURE Data Requests 172-199 and Letter from the Calif. Department of Fish and Game Regarding the Applicant's Streambed Alteration Notification.
(Attachment: Proof of Service)
38 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9284 | 8/25/1998 |
Army Corps of Engineers Delineation of Potential Waters of the United States for the 32-mile gas pipeline. (Attachment: Proof of Service)
43 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9283 | 8/25/1998 |
Discussion with Charles Lieber of the FAA Los Angeles of the Stack Height Issue.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Buell | CEC/Golden |
9282 | 8/25/1998 |
List of Conditions and Mitigations Re: High Desert Power Project
(Attachment: Proof of Service)
7 page(s)
| | CEC/Buell | Victor Valley Water Dist./Vega |
9281 | 8/24/1998 |
Notice of Proposed Issuance of Emmission of Reduction Credits - Notice is Hereby Given that the Mojave Desert AQMD is Proposing to Grant the United States Marine Corps Logistics Base (Barstow, CA) Emmission Reduction Credits for the Conversion of Vehicles to be Natural Gas at the Nebo and Yermo Annexes.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | Mojave Desert Aqmd/Baird |
9280 | 8/24/1998 |
Notice of Proposed Issuance of Emmission Reduction Credits - Notice is Hereby Given that the Mojave Desert AQMD is Proposing to Grant the Biogen Power Inc. Emission Reduction Credits for the Shutdown of Biogen Power I.
(Attached: Proof of Service)
5 page(s)
| | CEC/Docket File | Mojave Desert Aqmd/Baird |
9279 | 8/24/1998 |
Notice of Proposed Issuance of Emmission Reduction Credits - Mojave AQMD is Proposing to Grant the Southern California Gas Co. Emission Credits for the modifications of six engine.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | Mojave Desert Air Quality Management Dist./Baird |
9278 | 8/24/1998 |
RE: Delays in Completing the Interconnection Study for the High Desert Power Project and the Cal-ISO's Review of that Study.
(Attachment: Proof of Service)5
5 page(s)
| | Cal Iso/Perez | CEC/Therkelsen |
9277 | 8/21/1998 |
Correspondence to the Dept. of Toxic Substances Control and EPA Guidance on the exemption for recycling.
26 page(s)
| | CEC/Doket Unit | Councel For Hdpp/Thmpson |
9276 | 8/21/1998 |
CURE Presentation at 8/18/98 Victor Valley Water District Board Meeting.
(Attachment: Proof of Service)
11 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Heeley |
9275 | 8/24/1998 |
December 20, 1996 Application for ERC's from Biogen Shutdown.
(Attachment: Proof of Service)
7 page(s)
| | Biogen Power, Inc./Coco | Mojave Desert Aqmd/Coco |
9274 | 8/24/1998 |
January 14, 1997 Application for ERCs from Newberry Springs Engine Retrofits
10 page(s)
| | Southern California Gas Co./Muyco | Mojave Desert Aqmd/Fryxell |
9255 | 8/20/1998 |
Correspondence to R. Buell dated August 19, 1998 from R.A.Cook of Wilbanks Corp. Proof of service is attached.
5 page(s)
| | CEC/Docket Unit | Law Office Of Allan J. Thompson/Thompson |
9254 | 8/20/1998 |
CURE's Objections to Applicant's Data Request Number 1(j).
5 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph |
9246 | 8/19/1998 |
Letter with a brief discussion of the appropriate sequencing of the Energy Commission's decision on the High Desert Power Project. Proof of service is attached.
5 page(s)
| | Victor Valley Water District/Vega | CEC/Hough |
9245 | 8/19/1998 |
Committee Ruling Regarding Scheduling and Air Quality Matters. Proof of service is attached.
8 page(s)
| | CEC/Docket File | CECSCecsharpless & Laurie |
9244 | 8/20/1998 |
Sign-in sheet of the August 19, 1998 Prehearing Conference held in Yuba City.
4 page(s)
| | CEC/Docket File | CEC Cec |
9243 | 8/18/1998 |
HDPP 2nd Natural Gas Pipeline Biological Resources Supplemental Filing. Proof of service is attached.
5 page(s)
| | CEC/Buell | Mojave Water Agency/Caouette |
9222 | 8/17/1998 |
ROC with Bob Zeller of Mojave Desert Dist.
5 page(s)
| | CEC/Buell | CEC/Golden |
9221 | 8/14/1998 |
Applicant's Response to CEC Data Requests 123 to 139 and Letter from the US Army Corps of Engineers confirming the jurisdictional determination for the HDPP.
155 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9220 | 8/14/1998 |
CURE Data Requests to Application Nos. 200 - 205.
(Attachment: Proof of Service)
9 page(s)
| | CEC/Docket Unit | Adams, Broadwell & Joseph/Heeley |
9213 | 8/13/1998 |
Sign-in List - Conference Call Workshop (August 12, 1998)
3 page(s)
| | CEC/Docket File | CEC/Buell |
9212 | 8/12/1998 |
Applicant's Objections to CURE Data Request Nos. 172 through 199
(Attachment: Proof of Service)
6 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
9211 | 8/13/1998 |
Request for Siting Committee Action
2 page(s)
| | Hdpp/Thompson | CEC/Laurie |
9205 | 8/12/1998 |
VOC Offsets.
7 page(s)
| | CEC/Matthews | Dept. Of The Air Force/Collins |
9202 | 8/11/1998 |
High Desert Interconnection Study Rev1, ISO Comments.
3 page(s)
| | Sce | Cal-iso/Sparks |
9201 | 8/11/1998 |
High Desert Comments/Questions - High Desert Interconnection Study.
1 page(s)
| | Cal-iso/Sparks | CEC/Mccuen |
9200 | 8/11/1998 |
Request for Guidance
1 page(s)
| | CEC/Efs Committee/laurie/rohy | CEC/Therkelsen |
9181 | 8/6/1998 |
Applicant's Letters pertaining to ERC's for the High Desert Power Project. Proof of service is attached.
28 page(s)
| | CEC/Docket Unit | Rmi, Inc./Cuellar |
9169 | 8/5/1998 |
Applicant's Responses to CURE Data Requests 168-171 and Applicant's Streambed Alteration Agreement for the 32-mile gas pipeline.
274 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9167 | 8/5/1998 |
Regarding Order Directing Clarification. Letter providing Calpine Corporation's response to the Committee's questions as they relate to the Sutter Power Plant. Proof of service is attached.
6 page(s)
| | CEC/Siting Committee/sharpless, Laurie | Ellison & Schneider/Ellison |
9164 | 8/4/1998 |
Response of CURE to Order Directing Clarification of Air Quality Issues and August 4, 1998 Letter from Marc D. Joseph to Richard K. Buell.
20 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Debonville |
9162 | 8/5/1998 |
ERC Applications for PG&E Hinkley Compressor Station.
4 page(s)
| | CEC/Therkelsen/ngo | Sierra Research/G. Rubenstien |
9161 | 8/4/1998 |
High Desert Power Project - Staff's Response to the HDPP Committee's July 20, 1998 Order Directing Clarification. Proof of service is attached.
8 page(s)
| | CEC/Sharpless & Laurie | CEC/Buell |
9140 | 7/31/1998 |
Notice of Conference Call Workshop for the High Desert Power Project AFC. (Attachment: Map; Proof of Service)
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
9134 | 7/31/1998 |
Applicant's Letter to Mr. Antal Szijj of the US Army Corps of Engineers. Proof of service is attached.
8 page(s)
| | CEC/Docket File | Rmi, Inc./Cuellar |
9132 | 7/31/1998 |
Energy Commission Staff Reports of Conversation Docketed in July 1998. Proof of service is attached.
10 page(s)
| | High Desert Power Project Proof Of Service | CEC/Morthole |
9123 | 7/27/1998 |
CURE Data Requests Numbers 172 through 199
13 page(s)
| | Allan J. Thompson | Adams, Broadwell & Joseph/Joseph |
9118 | 7/28/1998 |
Applicant's Response to Third Revised Scheduling Order, Applicant's Objections to Staff Data Requests 123-129, Bureau of Land Management Meeting Letter, Applicant's Letter to Alan DeSalvio, Applicant's Steampipe Alteration Agreement for the High Desert Power Project.
142 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
9109 | 7/27/1998 |
Applicant's Cooling Tower Plume Analysis and Applicant's Responses to CURE Data Requests 152 - 167, Dated June 26, 1998.
12 page(s)
| | CEC/Docket Unit | Hdpp/Rmi/cuellar |
9108 | 7/27/1998 |
Analysis of the plume of a cooling tower located in a desert environment.
12 page(s)
| | CEC/Buell | Hdpp/Wolfinger |
9092 | 7/23/1998 |
Document Handling for the High Desert Power Project.
1 page(s)
| | Librarian | CEC/Therkelsen |
9091 | 7/23/1998 |
Request for Agency Comments on the High Desert Power Project Second Natural Gas Pipeline Amendment, Biological Resources Supplemental filing. Proof of service is attached.
2 page(s)
| | High Desert Power Project Agency Distribution | CEC/Therkelsen |
9081 | 7/20/1998 |
Applicant's Interconnection Study--Revision I, prepared by Southern California Edison Company. Proof of service is attached.
135 page(s)
| | CEC/Docket Unit | Law Office Of Allan Thompson/Thompson |
9079 | 7/21/1998 |
U.S. EPA Participation Regarding Current Licensing Process for the High Desert Power Project. (Enclosure: Order Directing Clarification)
(Attachment: Proof of Service)
6 page(s)
| | U.s. Epa/Marcus | CEC/Sharpless |
9078 | 7/21/1998 |
Staff letter of July 8, 1998 Concerning the Status of The Dept. of Toxic Substances Control's Review of the Proposed Wastewater Recycling System for the High Desert Power Project. (Enclosure: Third Revised Scheduling Order)
4 page(s)
| | Dept. Of Toxic Substances Control/Huff | CEC/Sharpless |
9073 | 7/21/1998 |
Applicant's Objections to CURE Data Requests 168 through 171.
6 page(s)
| | CEC/Docket File | Hdpp/Thompson |
9072 | 7/21/1998 |
Letter regarding Emission Reduction Credits Request for PG&E Internal Combustion Engines. Proof of service is attached.
4 page(s)
| | Mojave Desert Aqmd/Fryxell | United States Environmental Protection Agency/Habe |
9071 | 7/21/1998 |
Letter regarding a proposal to issue an emission reduction credit (ERC). Proof of service is attached.
3 page(s)
| | Mojave Desert Air Quality Management District/Fryx | Air Resources Board/Menebroker |
9070 | 7/21/1998 |
Comments on the Draft Preliminary Staff Assessment for the High Desert Power Project. Proof of service is attached.
4 page(s)
| | CEC/Buell | Dept. Of Water And Power The City Of Los Angeles/H |
9063 | 7/20/1998 |
Third Revised Scheduling Order. Proof of service is attached.
5 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
9062 | 7/20/1998 |
Order Directing Clarification. Proof of service is attached.
3 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
9058 | 7/20/1998 |
Review of High Desert Power Plant Proposed Groundwater Use.
28 page(s)
| | Victor Valley Water Dist./Kraus | Geomatrix/N. Johnson/lacombe |
9050 | 7/17/1998 |
Letter regarding the letter dated July 10, 1998 in response to the project's letter of July 6. Proof of service is attached.
2 page(s)
| | Goal Line Environmental Tech/Danziger | High Desert Power Project/Wolfinger |
9038 | 7/16/1998 |
Emission Reduction Credits for Two Hinkley Internal Combustion Engines. (Proof of Service Attached)
7 page(s)
| | Mojave Desert Aqmd/Fryxell | CEC/Therkelsen |
9035 | 7/13/1998 |
Copy of the Applicant's Objections to CURE's Data Requests 152 through 167. Proof of service is attached.
7 page(s)
| | CEC/Docket Unit | Law Office Of Allan Thompson/Thompson |
9034 | 7/13/1998 |
Copy of the presentation given by CURE's consultant, Dr. Phyllis Fox, to the Victor Valley Water District Board at their July 7, 1998 Hearing. Proof of service is attached.
8 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Reynolds |
9032 | 7/16/1998 |
Letter to Rick Buell from Ted Rauh regarding the June 4, 1998 letter requesting comments on the applicability of sections 66261.4(a)(5) of Title 22 of Division 4.5 of the California Code of Regulations and 25143.2(c)(2) of Chapter 6.5 of Division 20 of the California Health and Safety Code to the operation of a wastewater recycling system.
8 page(s)
| | CEC/Buell | Dept. Of Toxic Substances Control/Rauh |
9025 | 7/15/1998 |
High Desert Power Project Data Requests No.s 123 through 139. Proof of service is attached.
7 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
9010 | 7/14/1998 |
Letter to CEC/Rick Buell RE: Request for comments (in June 4, 1998 letter).
(Attachment: Proof of Service)
8 page(s)
| | CEC/Buell | Dept. Of Toxic Substances Control/Rauh |
9009 | 7/14/1998 |
Additions to the High Desert Proof of Service List under "Interested Agencies". Attached is the Current Revised (7/10/98) Proof of Service List.
4 page(s)
| | All Parties | CEC/Valkosky |
9002 | 7/13/1998 |
Cultural, Archaeological, Historical, and Paleontological Resources Site Locations, Application for Confidentiality, HDPP.
(Attachment: Proof of Service)
4 page(s)
| | Hdpp/Welch | CEC/Rhoads |
9001 | 7/10/1998 |
Submittal of Miscellaneous Correspondence Regarding High Desert Power Project.
(Attachments: Ltr. from HDPP/Wolfinger to CEC/Buell RE: VVWB Board Meeting; Ltr. from HDPP/Wolfinger to CEC/Buell RE: Removing Simple Cycle Peaking Plant Configuration from consideration by CEC; HDPP/Wolfinger for Mojave Desert AQMD/Fryxell 7/8/98; other Misc Document
9 page(s)
| | CEC/Docket Unit | Hdpp/A. Thompson |
8990 | 7/10/1998 |
Letter to Mickeal Agaibi from Rick Buell. Proof of service is attached.
7 page(s)
| | Federal Aviation Administration/Agaibi | CEC/Buell |
8989 | 7/10/1998 |
Letter to Andrew Welch from Rick Buell and a copy of the Final Report 1997 Emission Compliance Tests at the Crockett Cogeneration Facility. Proof of service is attached.
15 page(s)
| | High Desert Power Project,llc/Welch | CEC/Buell |
8988 | 7/10/1998 |
Comments regarding review of referenced documents.
(Attachment: Letter dated 07/01/98 to L. Grimes from City of Victorville/J. Hnatek)
3 page(s)
| | City Of Victorville/Planning Dept. | Ca Dept. Of Transportation/Grimes |
8986 | 7/10/1998 |
Letter RE: VVWB Board Meeting - July 7, 1998.
1 page(s)
| | CEC/Buell | Hdpp/Wolfinger |
8982 | 7/8/1998 |
Submittal of: Applicant's Draft Habitat Conservation Plan and Implementing Agreement; Draft Biological Assessment; Draft Environmental Report; Draft Biological Resources Mitigation Implementation Plan and Draft Erosion Control and Revegetation Plan; Revised Section 2.3 Biological Resources.
(Enclosure: Cover letter; Proof of Service)
12 page(s)
| | CEC/Docket File | Rmi/Cuellar |
8979 | 7/8/1998 |
Comments of CURE on the Schedule For A Revised Preliminary Staff Assessment. Proof of service is attached.
8 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Debonville |
8978 | 7/9/1998 |
Notification Letter that the High Desert Power Project is officially removing the simple cycle peaking plant configuration from consideration by the CEC.
1 page(s)
| | CEC/Buell | High Desert Power Project/Wolfinger |
8977 | 7/9/1998 |
Copy of the correspondence between Goal Line Environmental Technologies and High Desert Power Project. Proof of service is attached.
6 page(s)
| | CEC/Buell | Community Environmental Services/Abramowitz |
8976 | 7/9/1998 |
Comments of Dept. of Fish and Game regarding Draft Preliminary Staff Assessment San Bernardino County. Proof of service is attached.
3 page(s)
| | CEC/Buell | Dept. Of Justice/Levin |
8970 | 7/8/1998 |
High Desert Power Project Status Report Number 6. Proof of service is attached.
11 page(s)
| | CEC/Sharpless & Laurie | CEC/Buell |
8966 | 7/8/1998 |
Project Status and Update Report.
(Enclosures: Cover letter; Proof of Service)
8 page(s)
| | CEC/Docket File | Hdpp/Thompson |
8965 | 7/8/1998 |
Request for Committee Staff Guidance.
5 page(s)
| | CEC/Efs Siting Committee/laurie/rohy | Hdpp/Thompson |
8964 | 7/6/1998 |
CURE Data Requests to Applicant Numbers 168 through 171. Proof of service is attached.
7 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Heeley |
8955 | 7/6/1998 |
Correspondence dated July 2, 1998 from Andrew C.Welch to Richard Buell concerning Visual issues raised in the PSA. Proof of service is attached.
20 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8954 | 7/6/1998 |
High Potential for Excavation to Impact Significant Paleontological Non-renewable Resources.
5 page(s)
| | CEC/Therkelsen | Dept.community And Cultural Resources/Reynolds |
8953 | 7/6/1998 |
Committee Conference Sign-in List for July 1, 1998.
2 page(s)
| | CEC/Docket File | CEC/Buell |
8952 | 7/6/1998 |
Air Quality Workshop Sign-in Sheet for June 30, 1998
2 page(s)
| | CEC/Docket File | CEC/Buell |
8951 | 7/6/1998 |
Biological Opinion, Mojave River Pipeline in San Bernardino County, California.
(Filed under date received 7/6/98)
(Enclosure: Map/Mojave River Pipeline)
90 page(s)
| | Farmers Home Administration/J. Hays | U.s. Dept. Of The Interior/Fish & Wildlife/j. Hohm |
8949 | 7/1/1998 |
Letter from Marc D. Joseph/Lizanne Reynolds to Board of Directors, Victor Valley Water District, dated 6/30/98, Regarding High Desert Power Project: Well Interference Analysis (w/enclosure) and Proof of Service.
201 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Heeley |
8948 | 7/2/1998 |
Report of Telephone Conversation between Denise Washick of U.S. Fish and Wildlife Service and Marc Sazaki of CEC regarding Endangered Species Consultation with HDPP and BLM. Proof of service is attached.
2 page(s)
| | CEC/Docket File | CEC/Sazaki |
8924 | 6/29/1998 |
Enclosed: Letter to Richard K. Buell from Marc D. Joseph and Lizanne Reynolds dated June 29, 1998 Re: HDPP: Comments on Draft PSA; and
Letter to Sue Tracy from Peter M. Krasnoff dated June 24, 1998 Subject: Supplemental information, Wastewater Treatment, HDPP.
101 page(s)
| | CEC/Docket | Adams, Broadwell & Joseph/Heeley |
8923 | 6/29/1998 |
Letter and Exhibits to Mr. Charles L. Fryxell dated June 18, 1998 re: PDOC Comments in the above-referenced matter.
91 page(s)
| | CEC/Docket | Adams, Broadwell & Joseph/Debonville |
8920 | 6/26/1998 |
CURE Data Requests to Applicant Numbers 152 through 167. Proof of service is attached.
18 page(s)
| | CEC/Docket Unit | Adams Broadwell & Joseph/Heeley |
8915 | 6/29/1998 |
Reply to Letter of June 8, 1998 and subsequent telephone conversations regarding preparation of an Environmental Assessment for the "Northern Pipeline" component of the proposed High Desert Power Project.
(Enclosure: Proof of Service)
5 page(s)
| | CEC/Haussler | U.s. Dept. Of The Interior/Read |
8912 | 6/26/1998 |
Copy of Correspondence to Rick Buell dated June 18, 1998 pertaining to the CEC permitting of the High Desert Power Project. Proof of service is attached.
16 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8911 | 6/29/1998 |
Applicant's Comments to Preliminary Staff Assessment. Proof of service is attached.
26 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8898 | 6/24/1998 |
Applicant's Comments on the Preliminary Determination of Compliance (PDOC) and Additional Gas Turbine Vendor Data. Proof of service is attached.
35 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8876 | 6/15/1998 |
Notice of Proposed Issuance of Emission Reduction Credits.
1 page(s)
| | CEC/Buell | Mojave Desert Aqmd |
8874 | 6/24/1998 |
Letter regarding the preliminary determination of compliance for the High Desert Power Plant.
4 page(s)
| | Mojave Desert Air Quality Management District/Fryx | Air Resources Board/Kenny |
8863 | 6/24/1998 |
Stack Height.
3 page(s)
| | U.s. Dept. Of Transportation/Agaibi | Hdpp, Llc/Wolfinger |
8840 | 6/23/1998 |
Summary of the April 30, 1998, High Desert Power Project Issues Workshop. Proof of service is attached.
7 page(s)
| | CEC/Docket File | CEC/Buell |
8838 | 6/22/1998 |
High Desert Power Project's Returned Notices.
1 page(s)
| | CEC/Esternon | CEC/Harris |
8837 | 6/22/1998 |
E-mail letter regarding the July 1st Hearing in Victorville.
2 page(s)
| | CEC/Buell | Richard Elersich |
8836 | 6/22/1998 |
Letter regarding Preliminary Determination of Compliance. Proof of service is attached.
14 page(s)
| | Mojave Desert Aqmd/Fryxell | United States Environmental Protection Agency/Habe |
8835 | 6/22/1998 |
Comments on the Preliminary Staff Assessment for High Desert Power Project. Proof of services is attached.
6 page(s)
| | CEC/Buell | Community Environmental Services/Abramowitz |
8834 | 6/22/1998 |
Cover letter of their request to receive a High Desert's Application for Certification.
1 page(s)
| | Wilbanks Corporation/Cook | CEC/Johnson |
8833 | 6/18/1998 |
Preliminary Determination of Compliance for the High Desert Project. Proof of service is attached.
10 page(s)
| | Mojave Desert Air Quality Management District/Fryx | CEC/Rhoads |
8832 | 6/18/1998 |
Notice of Receipt of Supplemental Information for a Second Natural Gas Pipeline for the High Desert Power Project. Proof of service is attached.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
8826 | 6/22/1998 |
Enclosed copies of the High Desert Power Project AFC.
1 page(s)
| | Southwest Gas Corp./Meyer | CEC/R.e. Johnson |
8825 | 6/19/1998 |
Preliminary Determination of Compliance for the High Desert Power Project.
102 page(s)
| | Mojave Desert Air Quality Mgmt. Dist./Fryxell | Adams, Broadwell & Joseph/Joseph |
8824 | 6/18/1998 |
Notice of PSA Workshop for the High Desert Power Project Application for Certification.
(Attachment: Map; Proof of Service/List)
5 page(s)
| | CEC/Docket File | CEC/Sharpless |
8823 | 6/16/1998 |
Document Handling for the High Desert Power Project
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
8822 | 6/18/1998 |
Notice of Air Quality Workshop for the High Desert Power Project Application for Certification.
(Attachment: Proof of Service/List)
5 page(s)
| | CEC/Docket Unit | CEC/Sharpless |
8821 | 6/16/1998 |
Request for Agency Comments on the High Desert Power Project Second Natural Gas Pipeline Amendment.
(Attachments: Proof of Service/List; Internal Distribution List)
6 page(s)
| | High Desert Power Project Agency Distribution | CEC/Therkelsen |
8820 | 6/15/1998 |
Applicant's Analysis of the Proposed Natural Gas Pipeline.
240 page(s)
| | CEC/Docket Unit | Hdpp,llc/Cuellar |
8819 | 6/15/1998 |
LOI's for ERCs as well as information concerning PM10 Emission Reduction Credit Calculations.
64 page(s)
| | CEC/Docket Unit | Hdpp, Llc/Thompson |
8792 | 6/9/1998 |
E-mail letter to Tony and Phil regarding High Desert Interconnection Study: ISO Request for more information. Letter was cc to Rick Buell.
2 page(s)
| | Tony And Phil | Cal-iso/Sparks |
8788 | 6/4/1998 |
Energy Commission Staff Reports of Conversation Docketed in April and May 1998.
1 page(s)
| | High Desert Power Project Proof Of Service | CEC/Morthole |
8787 | 6/4/1998 |
Letter to Mr. Ted N. Rauh of the Hazardous Waste Management Program requesting to obtain their Department's comments on the applicant's assertion that California Health and Safety Code section apply to this project.
7 page(s)
| | Dept. Of Toxic Substances Control/Rauh | CEC/Buell |
8786 | 6/4/1998 |
Notice of Informational Hearing and Committee Conference to be held on July 1, 1998 at Victorville City Hall in Victorville, CA.
Notice to Landowners of Informational Hearing and Committee Conference to be held on July 1, 1998 in Victorville, CA.
5 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
8785 | 6/2/1998 |
Letter from CURE to California Environmental Protection Agency regarding Review of Wastewater Characteristics and letter from Lizanne Reynolds to Michael Agaibi regarding FAA Airspace Determination.
40 page(s)
| | CEC/Docket Unit | Law Office Of Adams Broadwell & Joseph/Heeley |
8784 | 6/4/1998 |
Letter regarding FAA Airspace Determination.
5 page(s)
| | Us Dept. Of Transportation/Agaibi | Law Office Of Adams, Broadwell & Joseph/Reynolds |
8783 | 6/4/1998 |
Letter to the Director of Building and Safety regarding facility design portion of the PSA.
1 page(s)
| | City Of Victorville/Worley | CEC/Kisabuli |
8766 | 6/8/1998 |
Applicant's Responses to CURE's Data Requests 139-151. Discs that are referenced in the responses are provided (one copy only).
46 page(s)
| | CEC/Docket | Law Office Of Allan Thompson/Thompson |
8765 | 6/8/1998 |
Letter to Mr. Roger Cannon on the possibility of preparing a joint environmental document for the High Desert Power Project.
10 page(s)
| | Bureau Of Land Management, Barstow Field Office/Ca | CEC/Haussler |
8764 | 6/8/1998 |
Clarifications to the paleontological resources section of the Draft PSA for the High Desert Power Project.
2 page(s)
| | CEC/Buell | Dept. Of Community And Cultural Resources/Reynolds |
8763 | 6/8/1998 |
Comments on On-Site Generator Recycling of Wastewater in a Closed Loop System.
6 page(s)
| | CEC/Buell | Law Office Of Latham & Watkins/Carroll |
8753 | 6/3/1998 |
Staff's Proposed Conditions of Certification for Facility Design.
(Attachments: Proof of Service/List; Internal Distribution List)
22 page(s)
| | Hdpp/Welch | CEC/Buell |
8744 | 6/2/1998 |
Table describing staff's criteria for evaluating Hazardous Material exposures. Attached is the proof of service.
4 page(s)
| | High Desert Proof Of Service | CEC/Buell |
8743 | 6/2/1998 |
Letter regarding the location of the High Desert Power Project's Power Plant. Attached is the proof of service.
3 page(s)
| | CEC/Buell | Calepa/Cass |
8735 | 6/2/1998 |
Second Revised Scheduling Order. Attached is the proof of service.
7 page(s)
| | CEC/Docket Unit | CEC/Sharpless & Laurie |
8732 | 6/2/1998 |
Sign-in sheet of the PSA Workshop held in Victorville, California. (Day 2)
1 page(s)
| | CEC/Docket Unit | CEC Cec |
8731 | 6/2/1998 |
Sign-in sheet of the PSA Workshop held in Victorville, California. (Day 1)
1 page(s)
| | CEC/Docket Unit | CEC Cec |
8730 | 6/2/1998 |
Explanations to Mr. Buell's March 30, 1998 letter.
2 page(s)
| | CEC/Buell | U.s. Dept. Of Transportation/Agaibi |
8686 | 5/21/1998 |
Request for Agency Comments on the High Desert Power Project Draft Preliminary Staff Assessment.
1 page(s)
| | Agency Distribution List | CEC/Therkelsen |
8685 | 5/21/1998 |
Document Handling for the High Desert Power Project - RE: Draft Preliminary Staff Assessment.
1 page(s)
| | Librarian | CEC/Therkelsen |
8684 | 5/21/1998 |
Notice of Availability - Draft Preliminary Staff Assessment for the High Desert Power Project AFC.
(Enclosures: Order Form; Proof of Service; Internal Distribution List)
5 page(s)
| | CEC/Docket File | CEC/Therkelsen |
8683 | 5/21/1998 |
Sign-in Sheet for Committee Conference on May 20, 1998.
3 page(s)
| | CEC/Docket File | CEC/Buell |
8676 | 5/20/1998 |
Notice of Continuation.
1 page(s)
| | CEC/Docket File | CEC/Sharpless |
8675 | 5/18/1998 |
Revised Submittal of "Hazardous Waste Treatment Permit Requirements for Crystallizer."
(Enclosure: Proof of Service)
6 page(s)
| | CEC/Docket Unit | Hdpp/Thompson |
8674 | 5/19/1998 |
Preliminary Determination of Compliance for the High Desert Power Project.
(Attachments: Proof of Service; Internal Distribution List)
36 page(s)
| | Hdpp/Wolfinger | Mohave Desert Aqmd/Collins |
8673 | 5/19/1998 |
Response to May 1, 1998 letter describing the Southwest Gas Corp. proposal for a pipeline from near the Highway 58/Helendale Road Intersection and the proposed "High Desert Power Plant" at the Southern California Intl. Airport.
(Attachments: Proof of Service; Internal Distribution List)
6 page(s)
| | Greystone Epse/Forsythe | U.s. Dept. Of The Interior/Blm/read |
8658 | 5/15/1998 |
Status Report Number Five
(Attachment: Proof of Service; Internal Distribution)
9 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
8657 | 5/14/1998 |
RE: Committee Conference and Order Applicants Response to Request for Submittal of information to be submitted to the CEC by May 15, 1998. (Attachment: Proof of Service)
9 page(s)
| | CEC/Sharpless | Hdpp Llc/Welch |
8656 | 5/14/1998 |
Status Report by the California Unions for Reliable Energy (CURE).
(Attachment: Proof of Service)
10 page(s)
| | CEC/Docket File | Adams. Broadwell & Joseph/Joseph |
8655 | 5/15/1998 |
DRAFT - Preliminary Staff Assessment.
462 page(s)
| | CEC/Docket File | CEC/Buell |
8654 | 5/15/1998 |
Response to letter of March 30, 1998.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Buell | Mickeal R. Agaibi |
8650 | 5/13/1998 |
Notice of PSA Workshops for the High Desert Power Project Application for Certification.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Docket File | CEC/Sharpless |
8649 | 5/8/1998 |
CURE Data Requests to Applicant Numbers 139 through 151.
15 page(s)
| | CEC/Docket File | Cure/Joseph |
8648 | 5/11/1998 |
Ammonia Release Modeling.
8 page(s)
| | CEC/Buell | Ensr/Mullen |
8647 | 5/11/1998 |
Report of Conversation with Denise Washick (USFWS).
(Attachment: Proof of Service; Internal Distribution List)
5 page(s)
| | CEC/Buell | CEC/Sazaki |
8646 | 5/11/1998 |
Report of Conversation with RMI Consulting - Amy Cuellor and others - re: Proposed 26 Mile Southwest Gas Corporation Pipeline and Biological Resource Surveys
4 page(s)
| | CEC/Buell | CEC/York |
8645 | 5/11/1998 |
HDPP April 30, 1998 Workshop Summary.
(Attachments: Proof of Service; Distribution List; Internal Distribution List)
6 page(s)
| | CEC/Buell | CEC/Sazaki |
8639 | 5/12/1998 |
Additional Information on the Gas Turbines.
(Enclosures: 2 Disks - Appendix A)
57 page(s)
| | CEC/Sharpless | Hdpp Llc/Welch |
8635 | 5/8/1998 |
Applicant's responses to CURE's Data Requests 127-131.
69 page(s)
| | CEC/Docket Unit | Hdpp Llc/Thompson |
8634 | 5/8/1998 |
Status Report Number Four.
(Attachment: Proof of Service, Proof of Service List; Internal Distribution List)
11 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
8628 | 5/7/1998 |
Letters of Intent for the NOx and VOC ERCs and Road Segments identified in the project area for PM10 offsets for submittal to CEC.
2 page(s)
| | CEC/Valkovsky | Hdpp Llc/Wolfinger |
8627 | 5/6/1998 |
Emissions Calculations for the High Desert power Project. (Attachment: Proof of Service)
4 page(s)
| | Hdpp Llc/Wolfinger | Mojave Desert Aqmd/Collins |
8615 | 5/5/1998 |
High Desert Power Project Construction information.
(Attachment: Proof of Service)
5 page(s)
| | CEC/Greystone | CEC/Buell |
8614 | 5/4/1998 |
Notice of Committee Conference and Order.
(Attachment: Proof of Service)
8 page(s)
| | CEC/Docket File | CEC/Sharpless |
8613 | 5/4/1998 |
Revised jurisdictional Acreages for the High Desert Power Project, City of Victorville, San Bernardino County, California.
12 page(s)
| | U.s. Army Corps Of Engineers/Szijj | Resource Mgmt. International/Cuellar |
8602 | 5/1/1998 |
Proposed High Desert Pipeline Project - Potential for Threatened, Endangered or Sensitive Species within Project Area.
9 page(s)
| | Dept. Of Fish And Game/Jones | Greystone/Hoffmeister |
8600 | 5/1/1998 |
Project Mailing List - Data Response and Issue Workshop (4/30/98).
3 page(s)
| | CEC/Docket File | CEC/Buell |
8593 | 4/30/1998 |
Letter of Request for public meetings.
1 page(s)
| | CEC/Valkovsky | Hdpp/Wolfinger |
8592 | 4/30/1998 |
Recommendations on the expected contents of a Letter of Intent to obtain emission reduction credits (ERCs).
(Attachment Proof of Service)
5 page(s)
| | Hdpp/Welch | CEC/Buell |
8591 | 4/30/1998 |
REPORT OF CONVERSATION - RE: DTSC's Preliminary Responses to the HDPP Waste Permit Requirements.
1 page(s)
| | CEC/Buell | CEC/Townsend-smith |
8590 | 4/30/1998 |
Report of Conversation - RE: CURE April 21, 1998 Letter Concerning HDPP Permit Requirement for Hazardous Waste Treatment Facility.
2 page(s)
| | CEC/Buell | CEC/Townsend-smith |
8588 | 4/29/1998 |
Project Mailing List - Second Committee Status Conference
1 page(s)
| | CEC/Docket File | CEC/Buell |
8586 | 4/29/1998 |
Second revision to the HRA for the High Desert Power Project.
(Attached: Proof of Service)
7 page(s)
| | CEC/Odoemelam | Ensr/Balentine |
8571 | 4/24/1998 |
High Desert Power Project Status Report Number Three. Proof of service is attached.
23 page(s)
| | CEC/Sharpless & Laurie | CEC/Buell |
8569 | 4/24/1998 |
Status Report by the California Unions for Reliable Energy. Proof of service is attached.
10 page(s)
| | CEC/Docket Unit | Attorneys For The California Unions For Reliable E |
8566 | 4/23/1998 |
Applicant's Objections to CURE Data Requests 127-138, Applicant's Status Report Number 3 and Errata to CEC Data Request 45.
36 page(s)
| | CEC/Docket Unit | Resource Management International, Inc./Cuellar |
8565 | 4/23/1998 |
Letter to Rick Buell regarding High Desert Power Project's mitigation program.
2 page(s)
| | CEC/Buell | Department Of Community And Cultural Resources/Rey |
8559 | 4/21/1998 |
HDPP: Permit Requirement for Hazardous Waste Treatment.
(Enclosure: Cover letter; Proof of Service)
17 page(s)
| | CEC/Sharpless | Adams, Broadwell & Joseph/Joseph |
8557 | 4/22/1998 |
Informational letter regarding the process and review High Desert Power Project AFC.
4 page(s)
| | Southern California Gas Company/Marelli | CEC/Buell |
8556 | 4/22/1998 |
Letters to Various Individuals RE: Public Workshop to discuss water resource issues and issues on other environmental issues - April 30, 1998 in Victorville.
13 page(s)
| | Gallagher/Kraus/jones/caouette/washick/hnatek/saka | CEC/Buell |
8555 | 4/22/1998 |
Summary of the February 25, 1998, High Desert Power Project Data Response and Issues Resolution Workshop.
(Attachment: Proof of Service; Internal Distribution List)
12 page(s)
| | Workshop Participants | CEC/Buell |
8547 | 4/22/1998 |
Permit Requirement for Hazardous Waste Treatment.
15 page(s)
| | CEC/Sharpless/laurie | Adams, Broadwell & Joseph/Joseph |
8539 | 4/20/1998 |
Evaluation of Alternative Water Supplies.
(Enclosure: Map; Proof of Service)
41 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
8531 | 4/20/1998 |
Memo from the ARB regarding their review of the CIWMB report on tire burning. Proof of service is attached.
5 page(s)
| | CEC/Buell | Ensr Consulting And Engineering/Head |
8530 | 4/20/1998 |
A copy of Calpine's response to staff data request numbers 1 through 8. It contains Calpine's complete response to staff's data request regarding emission rates, and turbine manufacturers data provided at the April 14, 1998 Workshop in Victorville, CA. Proof of service is attached.
55 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
8521 | 4/17/1998 |
Applicant's Responses to CEC Data Request 45.
(Attachment: Proof of Service)
35 page(s)
| | CEC/Docket Unit | Rmi/Cuellar |
8520 | 4/17/1998 |
Information Requirements for Additional NG Pipeline.
(Attachment: Proof of Service; Internal Dist. List)
5 page(s)
| | A. Welch/A. Thompson | CEC/Buell |
8519 | 4/17/1998 |
Data Response and Issue Workshop Sign-In sheet.
3 page(s)
| | CEC/Docket File | CEC/Buell |
8518 | 4/17/1998 |
2.5 ppm NOx Emissions for Gas Turbines.
1 page(s)
| | South Coast Aqmd/Ganguli | Engelhard Corp./Burns |
8517 | 4/17/1998 |
AQMD BACT Guidelines Update document/LAER Analysis.
2 page(s)
| | South Coast Air Quality Mgmt. Dist./Wallerstein | U.s. Epa/Howekamp |
8516 | 4/17/1998 |
NOx Emission from Gas Turbine.
1 page(s)
| | South Coast Air Quality Mgmt. Dist./Ganguli | Mitsubishi Heavy Industries America, Inc./Nakatani |
8515 | 4/17/1998 |
SCAQMD Update of BACT Natural Gas Fired Turbines.
1 page(s)
| | South Coast Air Quality Mgmt. Dist./Ganguli | Cormetech/Stephenson |
8512 | 4/15/1998 |
Notice of Data Response and Issue Workshop for the High Desert Power Project Application for Certification.
(Attachment: Proof of Service; Internal Distribution List)
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
8498 | 4/9/1998 |
CURE Data Requests to Applicant Numbers 136 through 138. Proof of service is attached.
5 page(s)
| | CEC/Docket File | Attorneys For California Unions For Reliable Energ |
8494 | 4/9/1998 |
Applicant's Responses to CURE Data Request 52. Proof of service is attached.
13 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8492 | 4/8/1998 |
CURE Data Requests to Applicant Numbers 127 through 135.
(Attachment: Proof of Service)
8 page(s)
| | CEC/Docket Unit | Adams, Bradwell & Joseph/Debonville |
8490 | 4/9/1998 |
High Desert Power Project Status Report Number Two--Addendum. Proof of service is attached.
3 page(s)
| | CEC/Sharpless & Laurie | CEC/Buell |
8489 | 4/9/1998 |
Notice of Second Committee Status Conference to be held on April 28, 1998 at the Energy Commission. Proof of service is attached.
3 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
8482 | 4/9/1998 |
Letter to Rick Buell regarding gas pipeline transportation services to the High Desert Power Project.
3 page(s)
| | CEC/Buell | Constellation Power Development/Wolfinger |
8477 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | Air Force Base Conversion Agency/Collins | CEC/Buell |
8476 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | Victor Valley Wastewater Reclamation Authority/Gal | CEC/Buell |
8475 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | City Of Adelanto/Sakamato | CEC/Buell |
8474 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | City Of Adelanto/Self | CEC/Buell |
8473 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | City Of Victorville/Roberts | CEC/Buell |
8472 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | Victor Valley Water District/Kraus | CEC/Buell |
8471 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | Dept. Of Fish & Game/Jones | CEC/Buell |
8470 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | Mojave Water Agency/Caouette | CEC/Buell |
8469 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | U.s.fish & Wildlife Service/Washick | CEC/Buell |
8468 | 4/7/1998 |
Cover letter to applicant's documentation of the changed water demand for their review of the project.
1 page(s)
| | City Of Victorville/Hnatek | CEC/Buell |
8461 | 4/7/1998 |
Supplemental - Notice of Data Response and Issue Workshop for the High Desert Power Project Application for Certification.
(Attachment: Proof of Service)
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
8449 | 4/3/1998 |
Aqueous Ammonia Release Mitigation Measures. Proof of service is attached.
18 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8439 | 4/2/1998 |
Notice for Data Response and Issue Workshop for the High Desert Power Project Application for Certification.
(Attachments: Proof of Service; Internal Distribution List)
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
8437 | 4/1/1998 |
Energy Commission Staff Reports of Conversation docketed in March 1998. Proof of service is attached.
6 page(s)
| | High Desert Power Project Proof Of Service List | CEC/Buell |
8436 | 4/1/1998 |
Report of Telephone Conversation with Mr. Andrew Welch of High Desert Power Project, LLC regarding Mojave Desert AQMD permit for the High Desert Power Project. Proof of service is attached.
5 page(s)
| | CEC/Docket File | CEC/Buell |
8434 | 4/1/1998 |
Report of Telephone Conversation with Mr. Andrew Welch of High Desert Power Project, LLC regarding High Desert Power Project Water Plan. Proof of service is attached.
5 page(s)
| | CEC/Docket File | CEC/Buell |
8433 | 4/1/1998 |
Report of Telephone Conversation with Mr. Robert Zeller of Mojave Desert AQMD regarding Workshop on April 14, DOC for one project configuration, and application of Mojave Desert AQMD rules. Proof of service is attached.
5 page(s)
| | CEC/Docket File | CEC/Golden |
8431 | 4/1/1998 |
Request for a copy of the March 20, 1998 letter from Andrew C. Welch to the Scientific Review Committee, South Coast Air Quality Management Dist.
1 page(s)
| | Adams, Broadwell & Joseph/Joseph | CEC/Buell |
8430 | 3/31/1998 |
Applicant Responses to CEC Data Requests 111-119 in the above-captioned project.
23 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8429 | 3/31/1998 |
RMI's letter dated March 12, 1998 to Mr. Antal Szijj of the US Army Corps of Engineers with supporting documentation. The subject of the letter is "Request for a jurisdictional Determination for the Proposed High Desert Power Project (HDPP), City of Victorville, San Bernardino County, CA."
20 page(s)
| | High Desert Power Project, Llc/Welch | Flour Daniel/Rausavljevich |
8424 | 3/30/1998 |
Applicant's Revisions to the AFC; Section 3.0, Tables 3.4-4, 5, and 6; Appendix A, Tables A-4, 5, 6, 7, 8, and 9; and Appendix B, Figures B-4 and 6, and Tables B-12, 13, 14, 17, 18, and 19) prepared by Flour Daniel.
(Attachment: Service List)
23 page(s)
| | High Desert Power Project, Llc./Welch | Flour Daniel/Rausavljevich |
8419 | 3/30/1998 |
Report of Conversation (Meeting): Subject - BACT meeting at the Air Resources Board Headquarter Sacramento, 10 - 12 Wednesday 25, March 1998.
3 page(s)
| | CEC/Docket File | CEC/Layton |
8418 | 3/30/1998 |
Comments regarding South Coast LAER meeting, March 20, 1998.
1 page(s)
| | CEC/Buell | CEC/Golden |
8416 | 3/30/1998 |
Regarding: Federal Aviation Administration's February 4, 1998 evaluation of the HDPP and potential hazards to the airspace at SCIA. CEC requests that the Federal Aviation Administration re-evaluate the stack height issue and present a written evaluation.
5 page(s)
| | Federal Aviation Admin./Agaibi | CEC/Buell |
8408 | 3/27/1998 |
BACT/LAER Information -
Attachments: Letter from M. Haber (U.S. EPA) to R. Danziger (Goal Line Environmental Technologies; Letter from A. Welch, (High Desert Power Project) to the Scientific Review Committee, South Coast Air Quality Mgmt. Dist.; Proof of Service (G. Morthole, 3/27/98)
42 page(s)
| | Proof Of Service, 97-afc-1 | CEC/Buell |
8396 | 3/26/1998 |
High Desert Power Project Status Report Number Two ERRATA. Proof of Service is attached.
5 page(s)
| | CEC/Sharpless & Laurie | CEC/Buell |
8386 | 3/25/1998 |
Applicant's Status Report. Proof of service is attached.
5 page(s)
| | CEC/Sharpless & Laurie | Counsel For High Desert Power Project/Thompson |
8384 | 3/25/1998 |
High Desert Power Project Status Report Number Two.
(Attachment: Proof of Service (G. Morthole, 3/25/98))
22 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
8360 | 3/20/1998 |
High Desert Power Project Offset Plan submitted to the Mojave Desert AQMD on March 18, 1998. Proof of Service is attached.
18 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8339 | 3/18/1998 |
Committee Order re: Specific Responses
(Attachment: Proof of Service (S. Harris, 3/18/98))
6 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
8333 | 3/17/1998 |
Applicant's Response to CEC Staff Data Requests 117-119. Proof of service is attached.
7 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8328 | 3/12/1998 |
Request for a Jurisdictional Determination for the Proposed High Desert Power Project, City of Victorville, San Bernardino County, California.
42 page(s)
| | U.s.army Corps Of Engineers/Szijj | Rmi/Steck |
8325 | 3/16/1998 |
Applicant's Responses to CEC Data Requests 27, 28, 29, 43, 44, 45, 49, 68, 89, 90, 91, 92, 93, 94, 108, 109, 110.
(Attachment: Service List, (D. Gilcrest, 3/16/98))
91 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8317 | 3/16/1998 |
Response to the Prevention of Significant Deterioration application for an Environmental Protection Agency Approval to Construct, dated January 30, 1998.
(Attachments: Instructions for Claiming Confidentiality; Fax transmittal sheet)
6 page(s)
| | High Desert Power Project/Wolfinger | U.s. E.p.a./Haber |
8315 | 3/12/1998 |
FAA Airspace Determination: High Desert Power Plant
(Attachments: Southern California International Airport Comprehensive Airport Land Use Plan; Proof of Service (Heeley, 3/12/98))
9 page(s)
| | U.s. Dept. Of Transportation/Agaibi | Adams, Broadwell & Joseph/Reynolds |
8312 | 3/16/1998 |
Report of Conversation with Steve Mavis of California ISO regarding High Desert Interconnection Study Plan, Congestion Management, Thermal Overloads, Voltage Problems, Stability. Attached is a proof of service.
5 page(s)
| | CEC/Docket | CEC/Mccuen |
8292 | 3/11/1998 |
Applicant's Responses to CEC Data Requests 95-107.
24 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8291 | 3/11/1998 |
High Desert Interconnection Study Scope to be done by Southern California Edison.
5 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
8290 | 3/11/1998 |
Report of Conversation with Tony Velarde of Southern California Edison regarding Methodologies for assessing variable configurations for High Desert, High Desert Interconnection Study Plan, Net Buss Bar Power. Attached is a proof of service.
5 page(s)
| | CEC/Docket File | CEC/Mccuen |
8289 | 3/11/1998 |
Applicant's Responses to CURE Data Requests 1 - 126.
Attachments: WQ-58d, TS-111, TS-114, TS-117, Data Requests #50 and 55 (documents are on diskette also); Proof of Service (Gilcrest, 3/11/98)
1148 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8288 | 3/11/1998 |
Report of Conversation with Robert Sparks of California ISO regarding Interconnection Study Plan, Congestion Management. Attached is a proof of service.
5 page(s)
| | CEC/Docket File | CEC/Mccuen |
8287 | 3/11/1998 |
Report of Conversation with Andrew Welch of High Desert Power Project regarding Number of gas turbines to be analyzed for the project and need for emission data to support this analysis. Attached is a proof of service.
5 page(s)
| | CEC/Docket File | CEC/Buell |
8286 | 3/11/1998 |
Phone call with Zeller at Mojave District. Attached is a proof of service.
5 page(s)
| | CEC/Buell, Hough | CEC/Golden |
8268 | 3/9/1998 |
Energy Commission Staff Reports of Conversation Docketed in February 1998. Attached is a proof of service.
2 page(s)
| | High Desert Power Project Proof Of Service | CEC/Buell |
8261 | 3/6/1998 |
Order Granting Petition to Intervene.
(Attachment: Proof of Service (Harris, 3/5/98))
4 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
8259 | 3/6/1998 |
Order Granting Petition to Intervene.
(Attachment: Proof of Service (Harris, 3/5/98))
1 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
8258 | 3/6/1998 |
Revised Scheduling Order
(Attachment: Proof of Service - (Harris, 3/5/98))
2 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
8255 | 3/6/1998 |
E-mail re: SCONOx inquiry.
1 page(s)
| | Machaver | CEC/Layton |
8254 | 3/6/1998 |
E-mail to Mr. Kemption re: High Desert Power Plant on air quality issues.
1 page(s)
| | Kempton | CEC/Golden |
8252 | 3/6/1998 |
E-mail re : High Desert Interconnection Study
1 page(s)
| | CEC/Buell | CEC/Mccuen |
8251 | 3/6/1998 |
High Desert Power Project alternatives--Summary of 2/11/98 phone conversation with John Hnatek, City of Victorville Planning Director.
2 page(s)
| | CEC/Buell | CEC/Allen |
8240 | 3/4/1998 |
Sign-in sheets from the March 3, 1998 High Desert Power Project Committee Conference.
2 page(s)
| | CEC/Docket File | CEC Cec |
8238 | 3/4/1998 |
Overhead slides used in the March 3, 1998 High Desert Power Project Status Meeting with California Energy Commission.
8 page(s)
| | CEC/Docket File | CEC Cec |
8232 | 3/3/1998 |
Request to receive copies of the High Desert Power Project's (applicant) filing to the Letter to Abramowitz regarding request to receive copies of the High Desert Power Project's (applicant) filings to the Energy Commission, Mojave Desert Air Quality Management District, and U.S. Environmental Protection Agencies regarding information on BACT.
4 page(s)
| | Community Environmental Services/Abramowitz | CEC/Buell |
8231 | 3/2/1998 |
High Desert Power Project Data Request Nos. 111 Through 118.
(Attachment: Proof of Service (3/2/98))
7 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
8223 | 2/27/1998 |
Applicant's Response to Specific Committee Questions of January 29, 1998.
(Attachment: Proof of Service (Gilcrest, 2/27/98))
15 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8222 | 3/3/1998 |
Response to the transmission questions posed in Part II.B of the January 29.1998 scheduling Order issued by the California Energy Commission in the proceedings for the proposed High Desert Power Project.
Attachment: Letter from Calif. ISO/Perez (dated 1/29/98) to ISO Grid Planning Work Group Re: Final Version of procedures for planning the ISO Grid
17 page(s)
| | CEC/Valkosky | California Independent System Operator (iso)/Perez |
8219 | 3/2/1998 |
Petition to Intervene by Calpine Corporation. (Attachment: Proof of Service, (O'Connor, 3/2/98))
5 page(s)
| | CEC/Docket File | Ellison & Schneider/Ellison |
8214 | 2/27/1998 |
Response of Commission Staff to Committee Scheduling Order.
Attachment: Proof of Service (Tien-Tran, 2/27/98)
24 page(s)
| | CEC/Docket File | CEC/Hough |
8213 | 2/27/1998 |
Memo Regarding High Desert Power Project Status Report; Attachment A - Schedule for High Desert Power Project; Attachment B - Status Report on California Energy Commission Staff's Data Requests.
Attachment: Proof of Service (Tien-Tran, 2/27/98)
8 page(s)
| | CEC/Sharpless/laurie | CEC/Buell |
8211 | 2/27/1998 |
Status Report and Responses to Specific Matters by the California Unions for Reliable Energy.
30 page(s)
| | CEC/Docket Unit | Attorneys For California Unions For Reliable Energ |
8205 | 2/26/1998 |
Meeting - February 25, 1998 (Victorville, CA): Data Response & Issue Workshop Voluntary Sign-In List.
7 page(s)
| | CEC/Docket File | CEC/ Buell |
8193 | 2/24/1998 |
Applicant's Response to CURE Data Requests of February 6, 1998 and Applicant's Response to CEC Staff Data Requests 95 - 110.
Attachment: Proof of Service, (Gilcrest, 2/24/98)
12 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8192 | 2/24/1998 |
Correspondence to Mr. Robert Zeller (Mojave Desert Air Quality Management District) and Supplemental Air Quality Impact Analysis for NO2.
Attachment: Proof of Service (Gilcrest, 2/23/98)
18 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
8185 | 2/24/1998 |
Independent System Operator (ISO) Additions/Revisions to the Summary of the January 8, 1998, High Desert Power Project Transmission Issues Workshop.
(Enclosure: Proof of Service; Internal Distribution List)
15 page(s)
| | Workshop Participants | CEC/Buell |
8172 | 2/19/1998 |
Correspondence from the U.S. Department of Transportation, Federal Aviation Administration Regarding: Southern California International Airport, Victorville, CA Airspace Case No. 97-AWP-0193-NRA Proposed Construction of Electrical Power Generation Station. (Attachment: Proof of Service, D. Gilcrest, 2/19/98)
7 page(s)
| | Atty. For High Desert Project/Thompson | CEC/Docket Unit |
8060 | 2/19/1998 |
Process of the Committee Regarding proceedings for the proposed High Desert Power Project.
Enclosures: 1/29/98 Scheduling Order; 2/9/98 Notice of Committee Conference
7 page(s)
| | California Independent System Operator/Mavis | CEC/Valkosky |
8053 | 2/19/1998 |
Letter regarding licensing proceedings for the proposed High Desert Power Project.
6 page(s)
| | California Independent System Operator/Perez | CEC/Valkosky |
8038 | 2/4/1998 |
Draft Report discussing Feasibility of Providing Water Supply for the High Desert Power Project.
Attachment: Proof of Service (G. Morthole, 2/18/98)
23 page(s)
| | High Desert Power Project/Welch | Victor Valley Water District/Kraus |
8024 | 2/13/1998 |
Responses to Data Requests 52-56
Attachments: Attachment VR-52 (Map - which shows the Southern International Airport)
Proof of Service (Gilcrest, 2/13/98)
9 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
7986 | 2/6/1998 |
CURE Data Requests Numbers 1 through 126.
Attachment: Proof of Service (B. Heeley)
36 page(s)
| | CEC/Docket File | Adams, Broadwell & Joseph/Heeley |
7984 | 2/10/1998 |
Notice of Committee Conference to be held on March 3, 1998 at the Energy Commission, Hearing Room A. Proof of service is attached.
2 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
7983 | 2/10/1998 |
Summary of the January 8, 1998 High Desert Power Project Transmission Issues Workshop. Proof of service is attached.
11 page(s)
| | Workshop Participants | CEC/Buell |
7982 | 2/10/1998 |
Report of Conversation with Alan Thompson.
1 page(s)
| | CEC/Buell | CEC/Hough |
7971 | 2/9/1998 |
Letter to Andrew Welch of HDPP regarding Uniform Building Code (UBC). Proof of service is attached.
6 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
7970 | 2/9/1998 |
Letter to Jessica Martini of RMI regarding typical biological resources mitigation implementation plans. Proof of service is attached.
4 page(s)
| | Resource Management International, Inc./Martini | CEC/Buell |
7969 | 2/6/1998 |
Prevention of Significant Deterioration Permit Application and Response to Data Request 32
Attachment: Proof of Service List (D. Gilcrest, 2/5/98)
219 page(s)
| | CEC/Docket Unit | High Desert Power Project/Thompson |
7966 | 2/6/1998 |
Addition (Steve Mavis, California Independent System Operator) to the Proof of Service List.
Attachment: Current revised Proof of Service List for the above-referenced proceeding (S. Harris, Rev. 2/6/98)
3 page(s)
| | All Parties | CEC/S. Valkosky |
7961 | 2/6/1998 |
Email letter regarding High Desert Telecon.
1 page(s)
| | CEC/Buell | CEC/Mccuen |
7960 | 2/6/1998 |
Email letter regarding High Desert Interconnection Study.
1 page(s)
| | CEC/Buell | CEC/Mccuen |
7959 | 2/5/1998 |
Notice of Data Response & Issue Workshop for the High Desert Power Project Application for Certification to be held on Feb. 25, 1998 in Victorville, CA. Proof of service is attached.
5 page(s)
| | CEC/Docket File | CEC/Sharpless |
7956 | 2/5/1998 |
Clarification of Data Response - High Desert Power Project.
1 page(s)
| | CEC/Buell | CEC/Ngo |
7929 | 1/27/1998 |
Proof of Publication.
1 page(s)
| | CEC/Nicholson | Daily Press Victor Valley |
7916 | 2/2/1998 |
Summary of January 21, 1998 Meeting with EPA, ARB and Mojave Desert AQMD staff. Proof of service is attached.
8 page(s)
| | CEC/Dockets | CEC/Buell |
7913 | 2/2/1998 |
High Desert Power Project Response to Data Requests 69 through 75. Proof of service is attached.
42 page(s)
| | CEC/Docket Unit | Counsel For High Desert Power Project/Thompson |
7906 | 1/30/1998 |
Energy Commission Staff Reports of Conversation docketed in January 1998. Attached is the proof of service.
2 page(s)
| | High Desert Power Project Proof Of Service | CEC/Buell |
7905 | 1/30/1998 |
Letter from CALPINE regarding review of the SCONOx Technology for the Sutter project. Attached is the proof of service.
10 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
7902 | 1/30/1998 |
Report of telephone conversation with Jim Chen of Englehardt regarding high temp catalyst NOx control systems.
1 page(s)
| | CEC/Docket File | CEC/Layton |
7901 | 1/30/1998 |
Report of telephone conversation with Ted Guth of SunLaw regarding SCONOx NOx control system.
1 page(s)
| | CEC/Docket File | CEC/Layton |
7900 | 1/30/1998 |
E-mail letter regarding SCE preliminary comments on RMI interconnection study & SCE study.
1 page(s)
| | CEC/Buell | CEC/Mccuen |
7899 | 1/30/1998 |
E-mail letter requesting to forward the materials for High Desert Power Project to Mr. Crichton of LADWP.
1 page(s)
| | CEC/Mccuen | Tim Wu |
7898 | 1/30/1998 |
E-mail letter regarding SCE participation at Jan. 8 High Desert Transmission Line Workshop.
1 page(s)
| | CEC/Buell, Rejohnson, Hough, Therkelsen | CEC/Mccuen |
7897 | 1/30/1998 |
Report of telephone conversation with Steve Mavis of Calif ISO regarding the Attendance at the Jan. 8, 1998 Transmission Workshop, ISO participation, must run generation, interconnection studies, Mira Loma Xfmrs, ISO control agreement--interconnection study.
2 page(s)
| | CEC/Docket File | CEC/Mccuen |
7895 | 1/29/1998 |
Scheduling Order and a Letter to All Parties regarding the Current Proof of Service List (Revised 1/26/98).
8 page(s)
| | CEC/Docket File | CEC/Sharpless & Laurie |
7894 | 1/29/1998 |
Transmission System Engineering Discussion Topic 2.
2 page(s)
| | CEC/Buell | Resource Management International, Inc./Steck |
7892 | 1/29/1998 |
Report of telephone conversation with Andrew Welch of High Desert Power Project regarding Transmission System Engineering and Facility Design data responses.
1 page(s)
| | CEC/Docket File | CEC/Buell |
7891 | 1/29/1998 |
Report of telephone conversation with Andrew Welch of High Desert Power Project regarding Responses to Hazardous Materials Handling Data Requests dated Jan. 22 & 28, 1998.
1 page(s)
| | CEC/Docket File | CEC/Buell |
7890 | 1/29/1998 |
Report of telephone conversation with Ted Guth of SunLaw regarding SCONOx NOx control system. Attached is a proof of service.
4 page(s)
| | CEC/Docket File | CEC/Layton |
7889 | 1/29/1998 |
Report of telephone conversation with Jim Chen of Englehardt regarding high temp catalyst NOx control systems. Attached is a proof of service.
4 page(s)
| | CEC/Docket File | CEC/Layton |
7888 | 1/28/1998 |
High Desert Power Project Response to Data Requests 89 through 94 and Revised Date for Response to Data Requests 43 and 44. Attached is a proof of service.
5 page(s)
| | California Energy Commission | Law Office Of Allan Thompson |
7882 | 1/28/1998 |
Information clarifying issues relative to water supply for the High Desert Power Project. Attached is the proof of service.
5 page(s)
| | CEC/Buell | Mojave Water Agency/Caouette |
7876 | 1/27/1998 |
Report of Conversation with Amy Steck, RMI; Amy Welch, HDPP; Rick Buell, CEC Project Manager RE: Post-Workshop Discussion/Clarification of Data Requests for Cultural and Paleo Resources.
2 page(s)
| | CEC/Docket File | CEC/K. Matthews |
7875 | 1/27/1998 |
Letter responding to the questions raised at the Workshop regarding guarantees and scalability of the SCONOx system.
2 page(s)
| | Mojave Desert Air Quality Management District/Zell | Goalline Environmental Technologies/Danziger |
7867 | 1/26/1998 |
Transcript of the January 15, 1998 Informational Hearing held at Victorville, CA filed in Transcript file.
136 page(s)
| | CEC/Docket File | CEC Cec |
7863 | 1/26/1998 |
Order No. 97-1203-7: Commission Determination that AFC is Complete.
3 page(s)
| | CEC/Docket File | CEC/Keese, Sharpless, Laurie & Moore |
7860 | 1/23/1998 |
Interconnection Study for the High Desert Power Project. Attached is the service list.
11 page(s)
| | High Desert Power Project/Welch | Adams Broadwell & Joseph/Joseph |
7859 | 1/23/1998 |
Energy Commission staff's comments on the scope and design of the transmission system interconnection study to be conducted for the High Desert Power Project. Attached is the proof of service.
3 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
7857 | 1/23/1998 |
Supplementary Analyses: BACT Evaluation, Health Risk Assessment, Air Quality Impact Assessment, Visibility Analysis (Document Number 8700-835-400-BACT) Attachments: Proof of Service (D. Gilcrest) Copies of Letters- from ENSR/S. Head- Dated 1/15/98 and 1/20/98
153 page(s)
| | CEC/Docket Unit | High Desert Power Project Llc/Gilcrest |
7850 | 1/22/1998 |
Summary of the December 30, 1997 High Desert Power Project Data Request Workshop.
Attached is the Proof of Service List.
11 page(s)
| | Workshop Participants | CEC/Buell |
7821 | 1/20/1998 |
Letter regarding emission offset requirements for the proposed High Desert Power Plant in the Mojave Desert Air Quality Management District.
3 page(s)
| | High Desert Power Project Llc/Johns | Cal/Epa/dunlap |
7813 | 1/20/1998 |
Presentation for the Informational Hearing at the Energy Commission on January 15, 1998.
19 page(s)
| | CEC/Docket File | High Desert Power Project, Llc/Welch & Wolfinger |
7812 | 1/20/1998 |
Energy Commission Staff's Presentation on the Siting Process for the Information Hearing held on January 15, 1998.
6 page(s)
| | CEC/Docket File | CEC/Buell |
7807 | 1/16/1998 |
Application for Interconnection.
3 page(s)
| | Southern California Edison Company/Williams | Andrew Welch |
7806 | 1/16/1998 |
Data request responses for most of the 77 data requests and 11 discussion topics filed by the Commission staff on Dec. 15, 1997. Proof of Service is attached.
Attachments AQ-23, PH-46 and TSE-76 are submitted electronically.
359 page(s)
| | CEC/Docket Office | Law Office Of Allan Thompson/Counsel For High Dese |
7805 | 1/16/1998 |
Sign-in sheet from the Informational Hearing & Site Visit in Victorville, CA.
4 page(s)
| | CEC/Docket File | CEC Cec |
7796 | 1/14/1998 |
Procedural Ruling and Proof of Service
6 page(s)
| | CEC/Docket File | CEC/Sharpless/laurie |
7794 | 1/6/1998 |
Response of the California Unions for Reliable Energy to the High Desert Power Project Request for Procedural Ruling.
8 page(s)
| | CEC/Docket File | Attorneys For California Unions For Reliable Energ |
7792 | 1/14/1998 |
Letter regarding Data Requests and questions raised by Dept. of Fish & Game which should be addressed and numbered Data Requests 89 through 94.
Attached is the proof of service list.
6 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
7791 | 1/14/1998 |
Report of telephone conversation with Marc Joseph & Lizanne Reynolds regarding topics for discussion at the January 15, 1998 Informational Hearing.
1 page(s)
| | CEC/Docket File | CEC/Buell |
7790 | 1/14/1998 |
Preliminary draft of items yet to be submitted/actions yet to be taken in advance of Staff's release of its PSA.
3 page(s)
| | CEC/Thompson, Hough & Joseph | Hearing Office/Valkosky |
7789 | 1/14/1998 |
Letter regarding the Applicant requesting any parties that know of an issue that would not otherwise be included in the Southern California Edison study to submit any issues in writing.
1 page(s)
| | All Interested Parties | High Desert Power Project/Welch |
7788 | 1/13/1998 |
Recommended list for notification and review of the High Desert Power Project interconnection study.
22 page(s)
| | High Desert Power Project/Welch | California Iso/Sparks |
7776 | 1/12/1998 |
Letter regarding High Desert Power Project's high potential to contain significant non-renewable paleontological resources.
1 page(s)
| | California Energy Commission | Dept. Of Community And Cultural Resources/Reynolds |
7770 | 1/9/1998 |
Report of Telephone Conversation with Andrew Welch and Allan Thompson regarding Visual Resource Data requests numbers 58, 63 and 64.
1 page(s)
| | CEC/Docket File | CEC/Buell |
7765 | 1/8/1998 |
Concerns and questions posed after reviewing the proposed well placements.
2 page(s)
| | CEC/Buell | Department Of Fish And Game/Jones |
7763 | 1/8/1998 |
Sign-in sheet of the January 8, 1998 Transmission System Engineering Workshop.
3 page(s)
| | CEC/Docket File | CEC Cec |
7759 | 1/8/1998 |
Response of Commission Staff to Applicant's Request for Procedural Ruling.
6 page(s)
| | CEC/Docket File | CEC/Hough |
7752 | 1/6/1998 |
Missing page from Redding Peaking Plant - Small Power Plant Exemption Application. This should have been contained in Attachment A of the Energy Commission staff's December 17, 1997 Data Requests.
2 page(s)
| | High Desert Power Project Llc/Wolfinger | CEC/Buell |
7750 | 1/6/1998 |
Proof of Service
2 page(s)
| | CEC/Docket Unit | High Desert Project/Gilcrest |
7740 | 12/31/1997 |
High Desert Power Project's Request for Procedural Ruling and Applicant's Response to Staff Data Requests of December 17, 1997. Attached is the Proof of Service List.
13 page(s)
| | CEC/Docket Office | Counsel For High Desert Power Project/Thompson |
7736 | 12/31/1997 |
High Desert Power Project Staff Issue Identification Report. Attached is the Proof of Service List.
19 page(s)
| | CEC/Docket File | CEC/Buell |
7731 | 12/30/1997 |
Letter regarding position paper on interbasin transfers
5 page(s)
| | Arb/Dunlap | High Desert Power Project/Johns |
7730 | 12/30/1997 |
Data Request Workshop - Project Mailing List
4 page(s)
| | CEC/Docket File | CEC/Buell |
7719 | 12/24/1997 |
Proof of Service - regarding the Application for Certification for the High Desert Power Project (HDPP)
4 page(s)
| | CEC/Docket File | CEC/Gina Morthole |
7710 | 12/24/1997 |
Notice of Transmission System Engineering Workshop for the High Desert Power Project Application for Certification to be held on January 8, 1998 at the Energy Commission.
2 page(s)
| | CEC/Docket File | CEC/Sharpless |
7689 | 12/24/1997 |
Order Granting Petition to Intervene.
7 page(s)
| | CEC/Docket File | CEC/Sharpless |
7688 | 12/23/1997 |
Information regarding High Desert Power Project.
9 page(s)
| | Los Angeles Dept. Of Water & Power/Wu | CEC/Therkelsen |
7687 | 12/17/1997 |
Reply of California Unions for Reliable Energy to Response of High Desert Power Project to Petition to Intervene.
8 page(s)
| | CEC/Docket File | Attorney For California Unions For Reliable Energy |
7675 | 12/17/1997 |
Data Requests Numbers 1 through 77, and Transmission System Engineering Discussion Topics 1 through 11. Attached is the Proof of Service List.
50 page(s)
| | High Desert Power Project/Welch | CEC/Buell |
7672 | 12/16/1997 |
Notice of Data Request Workshop for the High Desert Power Project Application for Certification to be held on December 30, 1997 in Hearing Rm. B.
6 page(s)
| | CEC/Docket File | CEC/Sharpless |
7664 | 12/16/1997 |
Letter re the Informational Hearing Notice.
5 page(s)
| | State Senate/Knight | CEC/Sharpless |
7663 | 12/16/1997 |
Letter re the Informational Hearing Notice.
5 page(s)
| | Victorville City Council | CEC/Sharpless |
7662 | 12/16/1997 |
Letter re Informational Hearing Notice.
5 page(s)
| | State Assembly/Olberg | CEC/Sharpless |
7628 | 12/12/1997 |
Response of High Desert Power Project to Petition to Intervene by California Unions for Reliable Energy.
7 page(s)
| | CEC/Docket Office | Attorney For High Desert Power Project/Thompson |
7626 | 12/15/1997 |
Notice of Informational Hearing and Site Visit
7 page(s)
| | CEC/Docket File | CEC/Sharpless |
7625 | 12/15/1997 |
Notice to Landowners Regarding Informational Hearing and Site Visit
7 page(s)
| | CEC/Docket File | CEC/Sharpless |
7603 | 12/10/1997 |
Letter regarding High Desert Power Project.
2 page(s)
| | Senator Knight | CEC/Keese |
7602 | 12/10/1997 |
Letter regarding High Desert Power Project.
2 page(s)
| | Assemblyman Keith Olberg | CEC/Keese |
7562 | 12/3/1997 |
Petition to Intervene by California Unions for Reliable Energy.
8 page(s)
| | CEC/Docket File | Adams Broadwell & Joseph/Joseph |
7534 | 12/2/1997 |
Letter re routing of correspondence.
1 page(s)
| | CEC/Therkelsen | Dept. Of The Air Force/Collins |
7533 | 12/2/1997 |
The Daily Press/Victorville, California newspaper article entitled "Power plant could generate 375 jobs."
2 page(s)
| | CEC/Docket File | CEC Cec |
7528 | 12/1/1997 |
Letter regarding requirements for an air permit for this project since 1994.
1 page(s)
| | CEC/Sharpless | High Desert Power Project/Wolfinger |
7521 | 11/26/1997 |
Notes on the High Desert Power Project.
1 page(s)
| | CEC/Buell | State Water Resources Control Board/Jehiel Cass |
7509 | 11/25/1997 |
High Desert Data Adequacy. Proof of Service list is included.
8 page(s)
| | CEC/Chairman & Commissioners | CEC/Rhoads |
7489 | 11/20/1997 |
Fax transmittal letter re the Application for New Source Review submitted by High Desert Power Project for the proposed plant in Victorville.
2 page(s)
| | High Desert Power Proj/Wolfinger | Mojave Desert Air Quality Mgmt. District/Fryxell |
7483 | 11/17/1997 |
Application for Certification seeking authority to construct and operate a natural gas-fired, nominal 700 megawatt power project to be located in the City of Victorville, CA.
960 page(s)
| | CEC/Rhoads | High Desert Power Project/Wolfinger |
7477 | 11/17/1997 |
Letter re transmittal of High Desert Power Project Application for Certification.
1 page(s)
| | Air Force Base Conversion Agency/Collins | CEC/Buell |
7476 | 11/17/1997 |
Document handling for the High Desert Power Project Application for Certification.
1 page(s)
| | Librarian | CEC/Therkelsen |
7475 | 11/17/1997 |
Request for Agency Participation in the Review of Supplementary Information for the High Desert Power Project Application for Certification.
2 page(s)
| | High Desert Power Project Agency Distribution | CEC/Therkelsen |
7462 | 11/12/1997 |
Agenda Item for the December 3, 1997, Business Meeting - Commission Consideration of Data Adequacy of the High Desert Power Project Application for Certification.
2 page(s)
| | CEC/Rhoads | CEC/Therkelsen |
7407 | 11/3/1997 |
Letter re High Desert Power Project Data Adequacy.
2 page(s)
| | CEC/Buell | Adams Broadwell & Joseph/Joseph |
7390 | 10/30/1997 |
Final three resource areas (water resources, waste management & biological resources) that were open in the Application for Certification. Included is a table summarizing the project's adequacy level.
64 page(s)
| | CEC/Buell | High Desert Power Project/Wolfinger |
7330 | 10/23/1997 |
Letter of apology for not sending a copy of the Application for Certification.
Attached is the Proof of Service.
2 page(s)
| | Air Force Base Conversion Agency/Sommer | CEC/Therkelsen |
7299 | 10/21/1997 |
Memo to Rick Buell from Amy Steck re Air Quality. Attached is the Application to Construct (ATC) which is part of the Application for Certification for High Desert Power Project.
27 page(s)
| | CEC/Buell | Rmi/Steck |
7260 | 10/10/1997 |
Letter to Marc D. Joseph providing the CEC's rationale for not including some comments in the September 18, 1997 letter to the applicant.
10 page(s)
| | Adams Broadwell & Joseph/Joseph | CEC/Buell |
6997 | 9/24/1997 |
Additional information for the Traffic and Transportation Section 5.4. Also attached are the copies of the Memorandum of Discussion which is not part of the Traffic and Transportation Section but a reference document to the section.
12 page(s)
| | CEC/Buell & Allen | Resource Management International, Inc/Steck |
6985 | 9/19/1997 |
Letter re AFC still inadequate for air quality, water resources and biology resources, waste management, and traffic and transportation.
31 page(s)
| | High Desert Power Project/Wolfinger | CEC/Buell |
6940 | 9/18/1997 |
Letter regarding loaning a copy of the High Desert Power Project Application for Certification.
1 page(s)
| | Aes/Rugley | CEC/Buell |
6814 | 9/11/1997 |
Letter responding to the August 29, 1997 submission by High Desert Power Project.
14 page(s)
| | CEC/Buell | Adams Broadwell & Joseph/Joseph |
6813 | 9/10/1997 |
Pages 5.5-14 through 5.5-16 which were inadvertently omitted from the Land Use Information submitted to the CEC on August 29, 1997.
4 page(s)
| | CEC/Buell | Rmi/Steck |
6780 | 9/8/1997 |
Documents for the High Desert Power Project: Appendix A - Heat and Material Balance Tables A-1 thru A-9, Applicable Figures from Section 3 - Project Description, Revisions to Appendix B - Water Balance and Diagrams and Analysis.
37 page(s)
| | CEC/Buell | Rmi/Steck |
6779 | 9/5/1997 |
Figure B-2 Overall Water Balance Diagram, Table B-3 Water Balance Stream Summary and Table B-4 Estimated Waste Water Analysis. Phase I and Phase II reference materials for George Air Force Base.
1693 page(s)
| | CEC/Buell | Rmi/Steck |
6672 | 8/29/1997 |
Attachments for CEC Staff's review: Attachment 1 - Responses to the CEC's Comments, Attachment 2 - Crystallizer Description, Attachment 3 - Additional Text Changes.
339 page(s)
| | CEC/Buell | Rmi/Richardson |
6537 | 8/27/1997 |
Summary of the July 22, 1997 High Desert Power Project Data Adequacy Workshop, Victorville, California. Attached is the July 22, 1997 Sign-In Sheets.
9 page(s)
| | Workshop Participants | CEC/Buell |
6467 | 8/25/1997 |
Summary of the March 12, 1997 High Desert Power Project Prefiling Meeting.
Attached is the Sign-In sheet from the March 12, 1997 Meeting.
15 page(s)
| | Rmi/Richardson | CEC/Johnson |
6466 | 8/25/1997 |
Comments on the High Desert Power Project Draft Application for Certification Project Description.
6 page(s)
| | Rmi/Richardson | CEC/Johnson |
6465 | 8/25/1997 |
Notice of a Second Prefiling Meeting to Discuss the Preparation of an Application for Certification for the High Desert Power Project to be held on March 24, 1997 at the Energy Commission.
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
6464 | 8/25/1997 |
Environmental Impact Analysis for High Desert Power Project under the "Envelope" Concept.
4 page(s)
| | CEC/Allen & Johnson | Resource Management International/Richardson |
6463 | 8/25/1997 |
Notice of a Prefiling Meeting to Discuss the Preparation of an Application for Certification for the High Desert Power Project to be held on March 12, 1997 at the Energy Commission.
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
6462 | 8/25/1997 |
Sign-In sheets from the February 19, 1997 Prefiling Meeting.
7 page(s)
| | CEC/Docket File | CEC Cec |
6461 | 8/22/1997 |
Notice of Ex Parte & Report of Conversation with Janie Kelly of EnviroSense, Rick Wolfinger of High Desert Power Project and Allan Thompson, Attorney at Law on August 21, 1997.
1 page(s)
| | CEC/Docket Office | CEC/Sharpless & Shapiro |
6460 | 8/22/1997 |
Notice of Ex Parte and Report of Conversation with Janie Kelly of EnviroSense, Rick Wolfinger of High Desert Power Project and Allan Thompson, Attorney at Law.
1 page(s)
| | CEC/Docket Office | CEC/Laurie & Stone |
6459 | 8/22/1997 |
Letter re Overview of Meeting with High Desert Power Plant held on August 5, 1997 with the City of Victorville, Mojave Water Agency, Victor Valley Wastewater Reclamation Authority and the Department to discuss water issues related to the project.
1 page(s)
| | CEC/Sazaki | Dept. Of Fish And Game/Jones |
6458 | 8/22/1997 |
Letter stating that the High Desert Power Project AFC is located on sediments known to contain significant non-renewable paleontological resources.
1 page(s)
| | CEC Cec | Dept. Of Community And Cultural Resources/Reynolds |
6433 | 8/21/1997 |
Letter re Cultural and Paleontological Resources Confidentiality Application, Final Resource Maps and AFC Appendices.
Attached is the Proof of Service.
11 page(s)
| | High Desert Power Project Director/Welch | CEC/Rhoads |
6313 | 8/19/1997 |
Letter re Cultural Resources Confidentiality Application, High Desert Power Project (Pre-Filing).
2 page(s)
| | High Desert Power Project Director/Welch | CEC/Rhoads |
6312 | 8/19/1997 |
Letter re Summary of the June 3, 1997 High Desert Power Project Prefiling Meeting on Data Adequacy and Project Schedule.
4 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6311 | 8/19/1997 |
Letter re Proposed response of RMI to CEC staff's comments on draft AFC sections to be acceptable with some clarifications.
4 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6310 | 8/19/1997 |
Letter re Comments on the draft AFC section "5.12 Air Quality" submitted last June 6, 1997.
2 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6309 | 8/19/1997 |
Letter responding to the June 6, 1997 letter granting the request for a waiver, provided the applicant files 10 hard copies and 2 electronic copies of the appendix containing air quality dispersion modeling inputs and outputs with the AFC.
1 page(s)
| | Resource Management International/Richardson | CEC/Rhoads |
6308 | 8/19/1997 |
Application for Confidential Designation.
3 page(s)
| | CEC/Docket File | Resource Management International/Hibbeler |
6307 | 8/19/1997 |
Letter re Request for Waiver of Number of Copies to be Submitted for the High Desert Power Project's Application for Certification.
2 page(s)
| | CEC/Rhoads | Resource Management International/Hibbeler |
6306 | 8/19/1997 |
Letter re Comments on the draft AFC sections "3.0 Project Description", "4.0 Facility Design", "5.8 Public Health, Worker Safety and Hazardous Materials Handling", "5.9 Visual Resources", "5.10 Cultural Resources" and "5.11 Water Resources" submitted last May 23, 1997.
12 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6305 | 8/19/1997 |
Memo re Review of RMI "Revised Comment Table".
11 page(s)
| | CEC/Baker,brand,evans,matthews,stennick,o'hagan,sa | CEC/Buell |
6304 | 8/19/1997 |
Letter re Comments on the draft AFC sections "3.5 Transmission Line", "6.5 Transmission Alternatives", "Appendix I-1 Estimated Capital Costs", "Appendix I-2 Preliminary Power Flow Studies" and "Appendix X BACT Analysis" submitted last May 15, 1997.
2 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6303 | 8/19/1997 |
Letter re Comments on the draft AFC sections "3.6 Reliability" and "5.7 Paleontologic Resources" submitted last May 9, 1997.
4 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6302 | 8/19/1997 |
Letter re RMI's request to Rick Buell to review the previously filed AFC to find a "good example" of a table that summarizes the laws, ordinances and standards applicable to a siting project.
2 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6301 | 8/19/1997 |
Letter re Comments and suggestions on the draft AFC sections "5.3 Biology", "5.4 Traffic", "5.5 Land Use" and "5.6 Socioeconomics" submitted last May 7, 1997.
4 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6300 | 8/19/1997 |
Letter re Comments and suggestions on the draft AFC sections "5.1 Noise" and "5.2 Geology and Soils" submitted last April 30, 1997.
4 page(s)
| | Resource Management International/Richardson | CEC/Buell |
6299 | 8/19/1997 |
Letter re Lisa Richardson of RMI's clarification of CEC staff's summary.
2 page(s)
| | Foster Wheeler Environmental Corp./Salamy | CEC/Buell |
6298 | 8/19/1997 |
Letter to Lisa Richardson re Revision of the Visual Resources KOP from Oro Grande.
3 page(s)
| | Resource Management International/Richardson | CEC/Johnson |
6297 | 8/19/1997 |
Letter to Roger E. Johnson re confirmation of conversation to add Marc Joseph's name to the mailing list.
1 page(s)
| | CEC/Johnson | Adams & Broadwell/Strickland |
6296 | 8/19/1997 |
Letter to Lisa Richardson re Summary of the March 24, 1997 High Desert Power Project Prefiling Meeting on Air Quality.
3 page(s)
| | Resource Management International/Richardson | CEC/Johnson |
6295 | 8/19/1997 |
Attendance sheet from the March 24, 1997 High Desert Power Project Prefiling Meeting held at the California Energy Commission.
2 page(s)
| | CEC/Docket File | CEC Cec |
6294 | 8/19/1997 |
Attendance sheet from the March 12, 1997 High Desert Power Project Prefiling Meeting held at the California Energy Commission.
5 page(s)
| | CEC/Docket File | CEC Cec |
6216 | 8/15/1997 |
Notice of Data Adequacy Workshop for the High Desert Power Project on August 21, 1997 is being CANCELLED. Attached is the Proof of Service List.
5 page(s)
| | CEC/Docket File | CEC/Therkelsen |
6065 | 8/12/1997 |
Letter re the Commission adopting the List of Data Inadequacy. Attached is the Annotated Attachment B: Energy Commission Staff's Findings Regarding Whether the August 7, 1997 Submittal Eliminates any Inadequacies in the List of Data Inadequacies.
27 page(s)
| | High Desert Power Project Llc/Wolfinger | CEC/Rhoads |
6064 | 8/12/1997 |
Memo re High Desert Power Project Data Adequacy Recommendation.
1 page(s)
| | CEC/Commissioners | CEC/Rhoads |
5985 | 8/11/1997 |
Submittal of letter on behalf of the CA Unions for Reliable Energy re: High Desert Power Project Data Adequacy
13 page(s)
| | CEC/Buell | Adams Broadwell & Joseph/Joseph |
5984 | 8/11/1997 |
LADWP comments on the proposed High Desert Power Project (HDPP)
2 page(s)
| | CEC/Therkelsen | Ladwp/Holloway |
5940 | 8/11/1997 |
Email summaries of recent communications between Al McCuen, of the CEC staff, and the California Unions for Reliable Energy (CURE), regarding the data adequacy of the transmission line analysis contain in the High Desert Power Project Application for Certification.
4 page(s)
| | CEC/Docket Unit | CEC/Buell |
5855 | 8/7/1997 |
Project Overview. Attached are maps based on USGS 1:24,000 Adelanto, Helendale, Victorville and Victorville NW maps.
1 page(s)
| | CEC/Buell | Resource Management International |
5854 | 8/7/1997 |
A Report on Socioeconomics.
6 page(s)
| | CEC/Buell | Resource Management International |
5852 | 8/7/1997 |
High Desert Power Project's response to the CEC's comments on the AFC. The following Items are also attached: Phase I Installation Restoration Program Records Search, Phase II Installation Restoration Phase II Confirmation/Quantification, City of Victorville Ordinances 1301 and 1451, 10-Mile Radius Air Quality Quad Maps, Project Overview Map.
1788 page(s)
| | CEC/Buell | Resource Management International/Richardson |
5823 | 8/8/1997 |
Notice of Data Adequacy Workshop for the High Desert Power Project Application for Certification to be held on August 21, 1997 at the California Energy Commission, Third Floor Conference Room. Attached is a map and the proof of service list.
7 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5822 | 8/7/1997 |
Comments on the documentation Bob Therkelsen had submitted in support of the cited High Desert Power Project.
1 page(s)
| | CEC/Therkelsen | Office Of Historic Preservation/Widell |
5815 | 8/6/1997 |
Letter to accompany a copy of the AFC for review and comment
2 page(s)
| | Ca Public Utilities Commission/Morse | CEC/Therkelsen |
5814 | 8/6/1997 |
Letter to accompany a copy of the AFC for review and comment
2 page(s)
| | Ca Public Utilities Commission/Zeiring | CEC/Therkelsen |
5789 | 8/5/1997 |
Letter re their comments on data adequacy for the High Desert Power Project.
7 page(s)
| | Adams & Broadwell/Joseph | CEC/Therkelsen |
5788 | 8/4/1997 |
Letter re AFC High Desert Power Project, Southern California International Airport, San Bernardino County.
2 page(s)
| | CEC/Therkelsen | Cal/Epa /carter |
5773 | 8/1/1997 |
Copy of e-mail re ROC with Lisa Richardson August 1, 1997.
1 page(s)
| | CEC/Baker,townsend,stennick | CEC/Buell |
5648 | 7/31/1997 |
Copy of email re ROC with Lisa Richardson of RMI and Bob Mantey regarding Noise.
1 page(s)
| | CEC/Baker,najarian | CEC/Buell |
5647 | 7/31/1997 |
Copy of Rick Buell's email to Townsend, Pittard and Maul re ROC with Lisa Richardson on Worker Safety.
1 page(s)
| | CEC/Townsend,pittard,maul | CEC/Buell |
5646 | 7/31/1997 |
Letter re High Desert Power Project's Application For Certification.
2 page(s)
| | Southern California Edison/Nguyen | CEC/Therkelsen |
5633 | 7/31/1997 |
July 25, 1997 Draft Data Adequacy Worksheets.
88 page(s)
| | CEC/Docket Unit | CEC/Buell |
5539 | 7/30/1997 |
Report of Telephone conversation between Phyllis Fox of Adams & Broadwell for CURE and CEC re Water Resource Data Adequacy Concerns.
1 page(s)
| | CEC/Docket File | CEC Cec |
5538 | 7/30/1997 |
Report of Telephone conversation between RMI and CEC re Water Data Adequacy Deficiencies.
2 page(s)
| | CEC/Docket File | CEC Cec |
5515 | 7/29/1997 |
Letter re the completion of data adequacy review.
31 page(s)
| | High Desert Power Project Llc/Wolfinger | CEC/Rhoads |
5458 | 7/24/1997 |
Letter re loaning a copy of the High Desert Power Project AFC.
1 page(s)
| | Pacific Gas Transmission Company/Eisenman | CEC/Buell |
5457 | 7/24/1997 |
Letter re loaning a copy of the High Desert Power Project AFC.
1 page(s)
| | Pelco Consulting Group/Mariano | CEC/Buell |
5456 | 7/24/1997 |
Rough memo from David Marcus on the adequacy of the transmission section of the HDPP.
3 page(s)
| | CEC/Mccuen | Adams & Broadwell/Joseph |
5455 | 7/24/1997 |
Report of Conversation with Marc Joseph (CURE).
1 page(s)
| | CEC/Project File,high Desert Afc | CEC/Hough |
5454 | 7/24/1997 |
Letter to Resource Management International, Inc. re Staff's Preliminary data adequacy worksheets for the technical disciplines of Efficiency, Facility Design, Hazardous Material Handling, and Noise. Also included are Reliability, Waste Management, and Worker Safety.
26 page(s)
| | Rmi Inc./Richardson | CEC/Therkelsen |
5453 | 7/25/1997 |
Sign-In sheet from the Data Adequacy Workshop held at Victorville City Hall in Victorville, CA.
5 page(s)
| | CEC/Docket File | CEC Cec |
5452 | 7/24/1997 |
Request for Agency Participation in the High Desert Power Project Application for Certification.
1 page(s)
| | CEC/Therkelsen | County Fire Department/Brierty |
5332 | 7/23/1997 |
Letter requesting a copy of the AFC and wishes to be placed on the mailing list for notices of future meetings, workshops, hearings, etc.
1 page(s)
| | CEC/Buell | Electricity Oversight Brd/Heath |
5330 | 7/21/1997 |
Letter re Agenda Item for the August 13, 1997, Business Meeting - Committee Consideration of the Executive Director's Data Adequacy Recommendation for the High Desert Power Project Application for Certification.
3 page(s)
| | CEC/Rhoads | CEC/Therkelsen |
5329 | 7/21/1997 |
Letter re High Desert Power Project's AFC.
2 page(s)
| | Mojave Desert Air Quality Mgmt.district/Fryxell | CEC/Therkelsen |
5277 | 7/21/1997 |
Letter re High Desert Power Project's filing of an AFC.
1 page(s)
| | Lahontan Water Board/Evans | CEC/Therkelsen |
5276 | 7/21/1997 |
Letter to Rick Buell re High Desert Power Project Application for Certification Data Adequacy Review.
4 page(s)
| | CEC/Buell | Mojave Water Agency/Caouette |
5258 | 7/21/1997 |
Draft Summary of the Portions of the High Desert AFC that are not data adequate.
14 page(s)
| | CEC/Buell | Adams & Broadwell/Joseph |
5257 | 7/21/1997 |
Letter Resource Management International, Inc. re: the preliminary data adequacy review of the High Desert Power Project Application for Certification for some technical disciplines.
60 page(s)
| | Rmi Inc./Richardson | CEC/Therkelsen |
5195 | 7/18/1997 |
E-mail copy of the letter re High Desert Power Plant Project Fact Sheet and Location Maps.
1 page(s)
| | Pelco Consulting Group/Mariano | CEC/Buell |
5194 | 7/18/1997 |
Letter to Resource Management International, Inc. re the staff's completion of its preliminary data adequacy review of the High Desert Power Project Application for Certification.
59 page(s)
| | Rmi Inc./Richardson | CEC/Therkelsen |
5186 | 7/3/1997 |
Letter to 31 people re Request for Agency Participation in the High Desert Power Project Application for Certification.
62 page(s)
| | CEC/Docket File | CEC/Therkelsen |
4915 | 7/14/1997 |
Summary of the MWA Comments on the Draft Water Resources Section for the High Desert Power Project.
3 page(s)
| | Rmi Inc./Richardson | Mojave Water Agency/Caouette |
4879 | 7/10/1997 |
Hearing Officer Assignment for Application For Certification proceedings for High Desert Power Project.
1 page(s)
| | CEC/All Commissioners | CEC/Keese |
4872 | 7/10/1997 |
Letter regarding High Desert Power Project's location on mid-Pleistocene sediments that are known to contain significant non-renewable paleontological resources.
1 page(s)
| | CEC/Therkelsen | Dept. Of Community & Cultural Resources/Reynolds |
4865 | 7/9/1997 |
Letter to Resource Management International, Inc. regarding their request of the agency list and the mailing list for the High Desert Power Project.
14 page(s)
| | Rmi Inc./Richardson | CEC/Buell |
4864 | 7/9/1997 |
Letter regarding request for Dept. of Toxic Substances Control participation in the High Desert Power Project Application for Certification.
2 page(s)
| | Dept. Of Toxic Substances Control/Scandura | CEC/Therkelsen |
4861 | 7/9/1997 |
Notice of a Data Adequacy Workshop for the High Desert Power Project Application for Certification to be held on July 22, 1997 from 9:30am to 4:00pm at Victorville City Hall in Victorville, CA. Attached is a facility map.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
4840 | 7/3/1997 |
Notice of Receipt of the Application for Certification for the High Desert Power Project. Attached is a facility map
5 page(s)
| | CEC/Docket File | CEC/Therkelsen |
4825 | 6/30/1997 |
Submittal of (5) copies of reference material cited in the High Desert Power Project Application for Certification(AFC) which are not likely to be found at public libraries or other government agencies in the City or County of Sacramento
168 page(s)
| | CEC/Rick Buell | Rmi/Lisa Richardson |
4824 | 6/30/1997 |
Submittal of (12) copies of Appendix Z, Air Quality Modeling Data, High Desert Power Project
250 page(s)
| | CEC/Buell | Applicant/Resource Management International |
4823 | 6/30/1997 |
Submittal of 125 copies of the Application for Certification of the High Desert Power Project, a natural gas-fired, 700 megawatt project to be located in the City of Victorville, at the Southern California International Airport
1 page(s)
| | CEC/Rhoads | High Desert Power Project, Llc |
1346-0 | 4/26/2000 |
Committee Conference before the CEC and Development Commission
53 page(s)
| | | CEC |
1330-0 | 2/28/2000 |
Hearing
346 page(s)
| | | CEC |
1327-0 | 2/10/2000 |
Committee Conference on PMPD
69 page(s)
| | | CEC |
1287-0 | 10/19/1999 |
Hearing Before the CA Energy Resources Conservation and Development
352 page(s)
| | | CEC |
1255-0 | 5/13/1999 |
Informational Hearing
60 page(s)
| | | CEC |
1230-0 | 2/25/1999 |
Committee Status Conference
103 page(s)
| | | CEC |
1215-0 | 12/8/1998 |
Informational Hearing 11/19/98 3:05 pm
69 page(s)
| | | CEC |
1184-0 | 7/23/1998 |
Verbatim Transcript of the Proceedings
176 page(s)
| | | CEC |
1172-0 | 6/2/1998 |
Committee Conference
118 page(s)
| | | CEC |
1170-0 | 5/14/1998 |
Second Committee Status Conference
234 page(s)
| | | CEC |
1161-0 | 3/17/1998 |
Committee Conference
179 page(s)
| | | CEC |
1151-0 | 1/26/1998 |
Informational Hearing
136 page(s)
| | | CEC |
2 | 2/9/1999 |
Pre-Hearing Conference Statement
1 page(s)
| | CEC/Sharpless/laurie | California Iso/Perez |