243041 | 5/12/2022 |
Order Terminating Certification Order No: 22-0511-1d 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
242871 | 4/28/2022 |
Request to Terminate Licence License Termination Staff Recommendation -Solar Energy Generating Systems VIII - Harper Lake Compliance 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
242682 | 4/15/2022 |
Letter from Terra Gen SEGS VIII D-BIO-2 Desert Tortoise Fencing Maintenance Biological Resources, Compliance 1 page(s)
| | CEC/John Heiser | California Energy Commission |
242234 | 3/9/2022 |
SEGS VIII Request to Terminate License Luz Solar Partners, ltd., VIII (Project Owner), an indirect wholly owned subsidiary of Terra-Gen, LLC, herby submits this request to terminate the California Energy Commission (CEC) license for the Solar Energy Generating System (SEGS) VIII (88-AFC-0lC). 1 page(s)
| | CEC/John Heiser | LSA |
241984 | 2/28/2022 |
PWS 2 - SEGS VIII & IX 2021 CEC Annual Report
Compliance 77 page(s)
| | CEC/John Heiser | Terra-Gen Operating Compnay |
236836 | 2/18/2021 |
88-AFC-1 PWS 2 & 89-AFC-1 PWS 2 - SEGS VIII & IX 2020 CEC Annual Report
Compliance 74 page(s)
| | CEC/Dockets | Terra-Gen Operating Compnay |
234397 | 8/20/2020 |
Notice of Decision for the SEGS VIII Decommissioning Plan *** THIS DOCUMENT SUPERSEDES TN 234383 *** 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
234383 | 8/20/2020 |
Notice of Decision for the SEGS VIII Decommissioning Plan *** THIS DOCUMENT IS REPLACED BY TN 234397 *** 2 page(s)
| | CEC/Docket Unit | California Energy Commission |
234364 | 8/19/2020 |
ORDER APPROVING DECOMMISSIONING PLAN AND COUNTY OVERSIGHT OF DECOMMISSIONING ACTIVITIES
4 page(s)
| | CEC/Dockets | California Energy Commission |
234250 | 8/6/2020 |
CEC STAFF RESPONSE TO LUZ SOLAR PARTNERS VIII, LTD, COMMENTS ON THE STAFF ANALYSIS AND RECOMMENDATIONS FOR THE SEGS VIII FDP Memo - SOLAR ENERGY GENERATING SYSTEMS UNIT VIII (88-AFC-01C)
Final Decommissioning Plan - Staff Analysis
Revised Noise, Transportation, and Waste Management Sections 19 page(s)
| | Interested Persons | California Energy Commission |
234219 | 8/3/2020 |
Luz Solar Partners, VIII, Ltd. Comments - Comments on Staff Analysis for SEGS VIII Final Decommissioning Plan
Compliance, Noise and Vibration, Traffic and Transportation, Waste Management 2 page(s)
| | CEC/John Heiser | Luz Solar Partners, VIII, Ltd. |
234065 | 7/30/2020 |
County Oversight of Solar Energy Generating Systems (SEGS) VIII Decommissioning Memo 1 page(s)
| | Interested Parties | California Energy Commission |
234002 | 7/23/2020 |
Staff Analysis of the Solar Electric Generating System (SEGS) VIII - Decommissioning Plan
116 page(s)
| | CEC/Docket Unit | California Energy Commission |
233901 | 7/16/2020 |
Order Approving Petition for Modification Order No 20-0708-4 3 page(s)
| | CEC/Dockets | California Energy Commission |
233868 | 7/14/2020 |
Notice Of Decision VIII & IX Post Certification Petition to Add Battery Energy Storage System
Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
233842 | 7/13/2020 |
Notice Of Decision VIII & IX Post Certification Petition to Add Battery Energy Storage System
Compliance 3 page(s)
| | CEC/Docket Unit | California Energy Commission |
233637 | 6/24/2020 |
Memo - (SEGS) VIII and IX Petition to Amend
1 page(s)
| | Interested Parties | California Energy Commission |
233096 | 5/22/2020 |
SEGS VIII and IX BESS Staff Analysis Staff Analysis-Battery Energy Storage System Amendment Compliance 56 page(s)
| | CEC/Docket Unit | California Energy Commission |
232903 | 5/4/2020 |
SEGS VIII (88-AFC-01C) Final Decommissioning Plan SEGS VIII (88-AFC-01C) Final Decommissioning Plan, Dated May 1, 2020 Compliance 276 page(s)
| | John Heiser, CEC CPM | LSA |
232902 | 5/1/2020 |
SEGS VIII (88-AFC-01C) Final Decommissioning Plan Transmittal Letter SEGS VIII (88-AFC-01C) Final Decommissioning Plan Transmittal Letter, Dated May 1, 2020 Compliance 1 page(s)
| | CEC/John Heiser | LSA |
232831 | 4/24/2020 |
88-AFC-1 PWS 2 & 89-AFC-1 PWS 2 - SEGS VIII & IX 2019 CEC Annual Report
Compliance 119 page(s)
| | | Terra-Gen Operating Compnay |
231371 | 1/3/2020 |
SEGS VIII Decommissioning Workshop Notice Notice of Staff Workshop; January 14, 2020 at 9:30 a.m. Compliance 6 page(s)
| | CEC/Docket Unit | California Energy Commission |
231368 | 1/3/2020 |
SEGS VIII draft Decommissioning Plan Draft Decommissioning Plan Compliance 182 page(s)
| | CEC/Dockets | California Energy Commission |
231314 | 12/24/2019 |
Data Request Responses Set 2 for SEGS VIII and IX (88-AFC-01C AND 89-AFC-01C) PTM to add BESS Data Request Responses Set 2 for SEGS VIII and IX (88-AFC-01C and 89-AFC-01C) PTM to add BESS Compliance, Public Health, Transmission Line Safety and Nuisance, Transmission System Engineering, Worker Safety and Fire Protection 19 page(s)
| | John Heiser, CEC CPM | LSA |
231201 | 12/13/2019 |
88-AFC-1 PWS 2 & 89-AFC-1 PWS 2 - SEGS VIII & IX 2018 CEC Annual Report
Compliance 78 page(s)
| | CEC/Dockets | Terra-Gen Operating Compnay |
230873 | 11/27/2019 |
SEGS 8 and - BESS DR Set 2 final
4 page(s)
| | Dan Thompson/Terra-Gen | California Energy Commission |
229725 | 9/12/2019 |
Data Request Responses, Set 1, for Petition for Modification SEGS VIII and IX Responses to the data requests, Set 1, received from the CEC dated August 26, 2019 for the Solar Energy Generating Systems (SEGS) VIII and IX Petition for Post Certification Change to add Battery Energy Storage System (BESS). - Data Request Responses, Set 1, for Petition for Modification SEGS VIII and IX, 88-AFC-01C AND 89-AFC-01C BESS. Compliance 12 page(s)
| | John Heiser, CEC CPM | LSA |
229535 | 8/26/2019 |
Letter to Dan Thompson VP Origination Development TerraGen Solar Energy Generating Systems VII & IX Petition for Post Certification Change to Add a Battery Energy Storage System Data Request Set 1 (88-AFC-01C & 89-AFC-01C) Compliance 3 page(s)
| | CEC/Dockets | Energy Commission |
229201 | 8/2/2019 |
Notice of Receipt Petition for Post Certification Change Solar Energy Generating Systems VIII and IX Notice of Receipt Petition for Post Certification Change Solar Energy Generating Systems VIII and IX for Battery Storage System Install Compliance 2 page(s)
| | CEC/Dockets | Energy Commission |
229090 | 7/26/2019 |
Petition for Modification SEGS VIII and IX 88AFC01C AND 89AFC01C BESS Petition for Modification of SEGS VIII and IX (88-AFC-01C AND 89-AFC-01C) to add a Battery Energy Storage System (BESS) to the project. Project Description 24 page(s)
| | John Heiser, CEC CPM | LSA |
225660 | 10/31/2018 |
Compliance Docketing Policy
3 page(s)
| | CEC/Dockets | California Energy Commission |
224787 | 9/24/2018 |
Order Approving Transfer of Ownership from Luz Partners LTD., VIII to Terra-Gen, LLC
2 page(s)
| | CEC/Dockets | California Energy Commission |
223298 | 4/30/2018 |
Petition to Transfer Operational Control of SEGS VIII Project
5 page(s)
| | CEC/Docket Unit | Winston & Strawn LLP |
201203 | 11/14/2013 |
Notice of Determination Employee Break Room and Training Facility Compliance 4 page(s)
| | | California Energy Commission |
71497 | 6/28/2013 |
Notice of Receipt - Petition to Amend the CEC Decision
3 page(s)
| | CEC/Docket Unit | CEC/D.Rundquist |
71433 | 6/27/2013 |
Nextera Energy Resources' Training-Break Building SHL Addendum
1 page(s)
| | CEC/D.Rundquist | Nextera Energy Resources/R.Fimbres |
71288 | 6/17/2013 |
Petition to Amend - Training-Break Building SHL
35 page(s)
| | CEC/D.Rundquist | NEXTera Energy Resources/R.Fimbres |
67686 | 10/10/2012 |
Approval of Requested Modification to Construct New Foundation and Structure for Spare Transformer
1 page(s)
| | CEC/Docket Unit | CEC/D. Rundquist |
67281 | 9/24/2012 |
Notice of Determination -Petition to Add New Foundation and Containment Structure for Spare Transformer
2 page(s)
| | CEC/Docket Unit | CEC/D.Rundquist |
66611 | 8/10/2012 |
Amendment Addendum to the Conditions of Certification
1 page(s)
| | CEC/ D. Rundquist | NextEra Energy/ R. Fimbres |
65901 | 6/22/2012 |
Petition to Amend
6 page(s)
| | CEC / D. Rundquist | NER / R. Fimbres |
61454 | 7/20/2011 |
Approval of Requested Modification to add Additional Loops within the Plant Boundary
1 page(s)
| | NextEra Energy Operating Services | CEC/ Dale Rundquist |
61241 | 6/29/2011 |
Notice of Determination
2 page(s)
| | CEC/Dockets Unit | CEC/C.Marxen |
60280 | 4/18/2011 |
Memo of Understanding Between CEC and Bureau Veritas North America INC.
6 page(s)
| | CEC/Dockets Unit | CEC/T.O'Brien |
59677 | 2/14/2011 |
Proposal to Add Additional Loops within Plant Boundaries
4 page(s)
| | CEC/ C. Dvis | Next Era Energy |
58165 | 8/24/2010 |
Delegate CBO Authority Letter
2 page(s)
| | CEC/ Docket Unit | CEC/ C. Davis |
51423 | 5/4/2009 |
Operating Company Name Change
1 page(s)
| | CEC/ S. Munro | NextEra Energy/ G. Sellers |
51321 | 4/28/2009 |
Petition to Construct A New Building Within the Plant Boundary
2 page(s)
| | CEC/ S. Munro | FPL Energy/ R. Fimbres |
42194 | 9/6/2007 |
Request for consent of CEC to the Transfer of Ownership Interests in Luz Solar Partners LTD. VIII
2 page(s)
| | CEC / J. Pfannenstiel | Caithness Energy, LLC / J. Greco |
23047 | 11/13/2001 |
Elimination of 16 Hour-Per-Day Limit on Fossil Fuel Electrical Generation
4 page(s)
| | Segs Viii & Ix Projects/Hensen/dockets | CEC/Therkelsen |
21008 | 6/19/2001 |
Adoption Order
19 page(s)
| | Dockets | CEC/Keese/pernell/laurie/rosenfeld |
15449 | 8/1/2000 |
NOTICE of Public Review Period for Draft Staff Analysis
10 page(s)
| | CEC/Docket | CEC/Therkelsen |
15046 | 7/12/2000 |
Notice of Receipt - Request for Amendment
2 page(s)
| | CEC/Docekts | CEC/Therkelsen |
14654 | 5/16/2000 |
Order Approving a Petition to Amend Biological Resources Conditions of Certification
3 page(s)
| | CEC/Docket | CEC/Keese |
14598 | 5/24/2000 |
Notice of Exemption
1 page(s)
| | Office Of Planning & Research | CEC/Munro |
13870 | 3/9/2000 |
Notice of Receipt SEGS VIII and SEGS IX Projects - Request for Amendment.
2 page(s)
| | CEC/Docket | CEC/Therkelsen |
13782 | 3/2/2000 |
SEGS VIII and IX, Petition for Change in Conditions of Certification Marsh Restoration Conditions BIO-5 (SEGS VIII) and BIO-11.k (SEGS IX)
39 page(s)
| | CEC/Munro | Fpl Energy |
11185 | 5/14/1999 |
Notification of Approval to Build Water Treatment Building at SEGS VIII and SEGS IX Facilities - 88-AFC-1C and 89-AFC-1C
1 page(s)
| | Harper Lake Company/Patch | CEC/Munro |
10958 | 4/30/1999 |
Notification of Approval to Build Water Treatment Building at SEGS VIII and SEGS IX Facilities
1 page(s)
| | Hartper Lake Co. Viii & Hlc Ix/Patch | CEC/Muno |
9408 | 9/14/1998 |
Notice of Post-Certification Change to Harper Lake Company VIII and HLC IX Company's SEGS VIII and SEGS IX Projects Hinckley, California 88-AFC-1C and 89-AFC-1C
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
8899 | 5/24/1995 |
Letter to provide California Energy Commission Staff with an Analysis & Statement of position regarding the current decommissioning conditions of certification for SEGS IX.
10 page(s)
| | CEC/Therkelsen | Ggkm |
8375 | 3/24/1998 |
Order APproving CHange of Operator of the SEGS VIII and SEGS IX Projects.
1 page(s)
| | CEC/Docket File | CEC/Keese |
8187 | 2/24/1998 |
NOTICE OF RECEIPT: Request for Commission Approval of Change of Project Operator for the SEGS VIII and SEGS IX Projects. Attached is an Information Request Form.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
6185 | 8/13/1997 |
The July 23, 1997 letter regarding Harper Lake Company's Commitment to Supply Water to Harper Lake Marsh.
2 page(s)
| | Mr. James Carter | CEC/Therkelsen |
6184 | 8/13/1997 |
The July 23, 1997 Spirit of the Sage Council letter regarding Water Supply to Harper Lake Marsh and Desert Tortoise Habitat Compensation.
2 page(s)
| | Spirit Of The Sage Council/Patterson | CEC/Therkelsen |
6062 | 8/12/1997 |
Letter to Deputy Director of the Siting and Environmental Division re Harper Lake Corporation exemptions from wetlands protection.
1 page(s)
| | CEC/Docket File | The Desert Protective Council, Inc./Anderson |
5510 | 7/29/1997 |
Letter re Spirit of the Sage Council Opposes Any Dismissal of Environmental Requirements at Harper Lake.
1 page(s)
| | CEC/Docket File | Spirit Of The Sage Council/Patterson |
5508 | 7/29/1997 |
Letter to Robert Therkelsen re Harper Lake Company's Commitment to Supply Water to Harper Lake Marsh.
2 page(s)
| | CEC/Docket File | James Carter |
3166 | 8/23/1996 |
Memo re brief summary of meeting on 8/7/96 regarding provision on well water to Harper Lake marsh
2 page(s)
| | CEC/Docket File | CEC/Munro |
3144 | 8/29/1996 |
Request from Steve Munro to acknowledge responsibility for the maintenance of Hoffman Road by the SEGS Project Owners, LSP VIII & LSP IX
4 page(s)
| | CEC/Docket File | Luz Solar Partners/Kenneth Hoffman |
3051 | 8/1/1996 |
Letter in response to (7/23/96) memo regarding the 7/23/96 conference call
2 page(s)
| | Grattan, Gersick, Karp & Miller | CEC/Munro |
3049 | 7/24/1996 |
Memo re summary of 5/2/96 staff workshop on the Harper Lake marshes and important new information
5 page(s)
| | CEC/Docket File | CEC/Munro |
3047 | 7/25/1996 |
Letter in response to (7/8/96) concerns about marsh water liability.
3 page(s)
| | Grattan, Gersick, Karp & Miller | CEC/Munro |
2792 | 5/30/1996 |
Submittal of text of proposed Biological Resources Condition 5, and proposed Biological Resources Condition 11k
6 page(s)
| | CEC/Munro | Grattan, Gersick, Karp & Miller/Gersick |
2665 | 5/2/1996 |
Submittal of letter from county regarding county maintenance of Hoffman Road
4 page(s)
| | Grattan, Gersick, Karp, Miller/Gersick | CEC/Munro |
2642 | 4/22/1996 |
Notice of Staff Workshop - Request for Amendment by the Harper Lake Companies to be held 5/2/96
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
2075 | 12/15/1995 |
SUBMITTAL OF HARPER LAKE CO. REQUEST TO AMEND SPECIFIED SEGS VIII and SEGS IX AIR QUALITY CONDITIONS OF CERTIFICATION
31 page(s)
| | CEC/Docket File | Grattan,gersick,karp,miller |
2053 | 11/28/1995 |
SUBMITTAL OF SUPPLEMENT TO PETITION OF INTERVENOR JAMES LaMONT TO REVOKE CERTIFICATION OF SEGS VIII and IX OR IN THE ALTERNATIVE, TO AMEND CONDITIONS OF SEGS VIII and IX.
10 page(s)
| | CEC/Docket File | Attys For Interv, J. Lamont/Becker |
1903 | 8/29/1995 |
SUBMITTAL OF HARPER LAKE ROAD TOTOISE MONITORING AND FENCE AGREEMENT
11 page(s)
| | CEC/Docket File | CEC Cec |
822 | 9/9/1992 |
Memo re amendment request - Biological Resources Condition 5
19 page(s)
| | CEC/Docket File | CEC/Scott |
821 | 4/24/1993 |
ORDER APPROVING AMENDMENT FOR INCREASED MEGAWATT OUTPUT ORDER #93-0414.12(a)
2 page(s)
| | CEC/Docket File | CEC/Imbrecht |
820 | 4/13/1995 |
SUBMITTAL OF COPY OF NOTICE OF POST-CERTIFICATION CHANGE APPROVING HEATER FAN MODIFICATIONS, SEGS VIII
1 page(s)
| | Us Operating Services, Harper Lake | CEC/Munro |
819 | 3/30/1995 |
LETTER RE CALENDARING THE PENDING MATTERS
2 page(s)
| | CEC/Shean | Harland Law Firm |
818 | 3/21/1995 |
NOTICE OF POST-CERTIFICATION CHANGE TO THE PROJECT DESIGN
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
817 | 3/14/1995 |
LETTER RE REVIEWING THE STATUR OF THE OTHER MATTERS IN VARIOUS PETITIONS AND REQUEST RE LUZ SEGS VII AND OR IX
1 page(s)
| | Harland Law Firm | CEC Cec |
816 | 3/14/1995 |
LETTER RE STATUS OF STAFF RECOMMENDATION ON DECOMMISSIONING WAS SUPPOSED ISSUE
1 page(s)
| | CEC/Edwards | Harland Law Firm |
815 | 12/14/1994 |
COMMISSION ORDER RE SEGS VIII BIOLOGY CONDITION 4F
2 page(s)
| | CEC/Docket File | CEC Cec |
814 | 12/14/1994 |
LETTER RE DRAFT AGREEMENT FOR MITIGATION OF IMPACTS ON DESERT TORTOISES ALONG HARPER LAKE ROAD BY LUZ
1 page(s)
| | CEC/Rakow | Henri R. Bisson |
813 | 12/13/1994 |
LETTER OF INTENT RE THE AGREEMENT MITIGATION OF IMPACTS ON DESERT TORTOISES ALONG HARPER LAKE ROAD
21 page(s)
| | CEC/Docket File | Ggkm/Trowbridge |
812 | 12/6/1994 |
AGREEMENT FOR MITIGATION OF IMPACTS ON DESERT TORTOISES ALONG HARPER LAKE ROAD
26 page(s)
| | CEC/Docket File | Ggkm |
811 | 11/22/1994 |
NOTICE OF CONTINUED FULL COMMISSION HEARING TO BE HELD 11-30-94
1 page(s)
| | CEC/Docket File | CEC/Rakow |
810 | 11/22/1994 |
TRANSCRIPT FILE IN TRANSCRIPT FILE DATED 11-14-94
81 page(s)
| | CEC/Docket File | CEC Cec |
809 | 11/21/1994 |
(REVISED) DRAFT COMMISSION ORDER AMENDING SEGS VIII - BIOLOGY CONDITION 4(f)
66 page(s)
| | CEC/Docket File | CEC Cec |
808 | 11/17/1994 |
SUBMITTAL OF COMMENTS ON THE DRAFT COMMISSION ORDER AMENDING SEGS VIII BIOLOGY CONDITION 4(f) AND ADDITIONAL DRAFT FINDINGS AND CONCLUSION
6 page(s)
| | CEC/Rakow | Fish & Game/ Baughman |
807 | 11/17/1994 |
SUBMITTAL OF COMMENTS FOR DESERT TORTOISE PRESERVE COMMITTEE ON DRAFT COMMISSION ORDER AMENDING SEGS VIII, BIOLOGY CONDITION 4(f)
3 page(s)
| | CEC/Docket File | Dtpc/Dale |
806 | 11/14/1994 |
SUBMITTAL OF COMMENTS RE DRAFT COMMISSION ORDER AMENDING SEGS VIII, BIOLOGY CONDITION 4(f)
4 page(s)
| | CEC/Edwards | Us Fish & Wildlife |
805 | 11/14/1994 |
MEMO RE DRAFT COMMISSION ORDER AMENDING SEGS VIII BIOLOGY CONDITION 4(f) AND ADDITIONAL DRAFT FINDINGS AND CONCLUSION NOVEMBER 1994
3 page(s)
| | CEC/Rakow | Fish & Game |
804 | 11/10/1994 |
STAFF'S COMMENTS RE: DRAFT COMMISSION ORDER ON BIOLOGY CONDITION 4(f)
11 page(s)
| | CEC/Docket File | CEC Cec |
803 | 11/10/1994 |
SUBMITTAL OF COMMENTS ON CEC DRAFT COMMISSION ORDER AMENDING SEGS VIII BIOLOGY CONDITION 4 (f)
9 page(s)
| | CEC/Docket File | Ggkm/Trowbridge |
802 | 11/4/1994 |
ADDITIONAL DRAFT FINDINGS AND CONCLUSION
6 page(s)
| | CEC/Docket File | CEC/Rakow |
801 | 11/1/1994 |
DRAFT COMMISSION ORDER AMENDING SEGS VIII - BIOLOGY CONDITION 4(f)
55 page(s)
| | CEC/Docket File | CEC Cec |
800 | 11/1/1994 |
NOTICE OF AVAILABILITY OF DRAFT COMMISSION ORDER AMENDING - BIOLOGY CONDITION 4(f); NOTICE OF COMMITTEE HEARING TO BE HELD 11-14-94 AND NOTICE OF FULL COMMISSION HEARING TO BE HELD 11-16-94
6 page(s)
| | CEC/Docket File | CEC/Rakow |
799 | 10/20/1994 |
LETTER RE DESERT TORTOISE MITIGATION AGREEMENT
8 page(s)
| | CEC/Rakow | Ggk |
798 | 10/18/1994 |
LETTER RE MARCH ENHANCEMENT AMENDMENT
2 page(s)
| | CEC/Edwards | Ggk |
797 | 10/11/1994 |
STAFF COMMENTS RE: DESERT TORTOISE AMENDMENT PROCEEDINGS
5 page(s)
| | CEC/Docket File | CEC/Ogata |
796 | 10/7/1994 |
SUBMITTAL OF DESERT TORTOISE MITIGATION AGREEMENT, DEPT. OF INTERIOR POLICY: "NO SURPRISES - ASSURING CERTAINTY FOR PRIVATE LAND OWNERS IN ENDANGERED SPECIES ACT HABITAT CONSERVATION PLANNING, U.S. FISH AND W
15 page(s)
| | CEC/Rakow | Ggkm |
795 | 9/30/1994 |
TRANSCRIPT FILED IN TRANSCRIPT DATED 9-20-94
75 page(s)
| | Interest Parties | CEC Cec |
794 | 9/29/1994 |
MEMO RE INFORMATION REQUESTED BY THE COMMITTEE AT THE 9-20-94 HEARING ON HARPER LAKE ROAD MITIGATION AGREEMENTS
6 page(s)
| | CEC/Rakow, Noteware | CEC/Edwards |
793 | 9/2/1994 |
NOTICE OF COMMITTEE HEARING TO BE HELD 9-20-94
5 page(s)
| | CEC/Docket File | CEC/Rakow |
792 | 8/22/1994 |
LETTER RE PROPOSED AMENDMENTS TO MARSH ENHANCEMENT AGREEMENT
2 page(s)
| | CEC/Edwards | Aegis Companies |
791 | 8/22/1994 |
LETTER SUMMARIZING COMMENTS RE THE 8-8-94 CONFERENCE CALL BETWEEN PARTIES INVOLVED IN THE HARPER LAKE ROAD FENCE ISSUE
2 page(s)
| | CEC/Edwards | Usblm/Swanson |
790 | 8/5/1994 |
MEMO RE STAFF REPORT ON PROGRESS TOWARD RESOLUTION OF TORTOISE FENCE REQUIREMENT
2 page(s)
| | CEC/Rakow | CEC/Edwards |
789 | 7/22/1994 |
MEMO RE SUMMARY OF 7-14-94 MARSH ENHANCEMENT WORKSHOP
9 page(s)
| | CEC/Sazaki, Ogata | Edwards |
788 | 7/22/1994 |
MEMO RE SUMMARY OF 7-14-94 TORTOISE FENCE AGREEMENT WORKSHOP
7 page(s)
| | CEC/Sazaki, Ogata | CEC/Edwards |
787 | 7/11/1994 |
MEMO RE STAFF REPORT ON PROGRESS TOWARD RESOLUTION OF TORTOISE FENCE REQUIREMENT AND REQUEST FOR TIME EXTENSION
3 page(s)
| | CEC/Kevorkian | CEC/Edwards |
786 | 7/1/1994 |
LETTER SUBMITTING AGENCY RESPONSE TO YOUR PROPOSED AGREEMENT FOR MITIGATION OF IMPACTS ON DESERT TORTOISES ALONG HARPER LAKE ROAD
5 page(s)
| | Ggk&m/Gersick | CEC/Edwards |
785 | 7/1/1994 |
CHANGE OF TOPICS TO BE DISCUSSED NOTICE OF WORKSHOP TO DISCUSS MARSH ENHANCEMENT TO BE HELD 7-14-94
3 page(s)
| | CEC/Docket File | CEC/Therkelsen |
784 | 6/30/1994 |
ORDER GRANTING EXTENSION
4 page(s)
| | CEC/Docket File | CEC/Kevorkian |
783 | 6/21/1994 |
LETTER RE COMPLIANCE WITH WATER RESOURCES CONDITIONS RE: WATER USAGE MONITORING
1 page(s)
| | Harper Lake Co./ Divirgilio | CEC/Edwards |
782 | 6/15/1994 |
NOTICE OF WORKSHOP TO DISCUSS MARSH ENHANCEMENT TO BE HELD 7-14-94
3 page(s)
| | CEC/Docket File | CEC/Therkelsen |
781 | 6/9/1994 |
SUBMITTAL OF AGREEMENT FOR MITIGATION OF IMPACTS ON DESERT TORTOISES ALONG HARPER LAKE ROAD
12 page(s)
| | CEC/Edwards | Ggkm/Gersick |
780 | 5/26/1994 |
LETTER TERMS AND CONDITION OF THE AMENDED INTERIM DESERT TORTOISE HANDLING
3 page(s)
| | Luz/Divivgilio | Usblm/Swanson |
779 | 5/25/1994 |
LETTER REQUESTING ADDITIONAL TIME TO RESPOND TO BIOLOGY CONDITION OF CERTIFICATION #4 (F)
1 page(s)
| | CEC/Edwards | Ggkm/Gersick |
778 | 5/23/1994 |
LETTER FROM THEODORE GOLONDZINIER OF SAN BERNARDINO COUNTY TRANSPORTATION/FLOOD CONTROL RE: TELEPHONE CONVERSATION OF MAY 18, 1994 CONCERNING THE DRAFT AGREEMENT FOR MITIGATION OF IMPACTS ON DESERT TORTOISES
1 page(s)
| | CEC/Edwards | San Bernardino County |
777 | 5/11/1994 |
WITHDRAWAL OF SCHOOL PAYMENTS AMENDMENT REQUEST
4 page(s)
| | CEC/Edwards | Ggkm/Gersick |
776 | 5/10/1994 |
ORDER GRANTING EXTENSION
4 page(s)
| | CEC/Docket File | CEC/Kevorkian |
775 | 5/10/1994 |
MEMO SUMMARIZING MARCH 9, 1994 TORTOISE FENCE ALTERNATIVES WORKSHOP
9 page(s)
| | Interested Parties | CEC/Edwards |
774 | 5/3/1994 |
JOINT REQUEST FOR TIME EXTENSION FOR AGREEMENT NEGOTIATIONS
4 page(s)
| | CEC/Docket File | CEC/Therkelsen |
773 | 4/27/1994 |
LETTER (ON BEHALF OF THE LSP PARTNERSHIPS) TO INFORM OF SETTLEMENT OF DISTRICTS REIMBURSEMENT OF COSTS
3 page(s)
| | CEC/Edwards | Ggkm/Gersick |
772 | 4/25/1994 |
NOTICE OF A WORKSHOP TO DISCUSS ALTERNATIVE TO TORTOISE FENCING ALONG HARPER LAKE ROAD TO BE HELD 5-6-94
5 page(s)
| | CEC/Docket File | CEC/Therkelsen |
771 | 4/8/1994 |
NOTICE OF A WORKSHOP TO DISCUSS ALTERNATIVES TO TOROISE FENCING ALONG HARPER LAKE ROAD, TO BE HELD 4-20-94
5 page(s)
| | CEC/Docket File | CEC/Therkelsen |
770 | 3/23/1994 |
LETTER REQUESTING CURRENT STATUS OF THE BLM DEMAND LETTER OF AUG.20, 1993
2 page(s)
| | Blm/Swanson | Harland Lwa Firm |
769 | 3/16/1994 |
SUBMITTAL OF RESPONSES TO CEC STAFF DATA REQUESTS RE HLC'S PROPOSED MARSH ENHANSEMENT AMENDMENT
14 page(s)
| | CEC/Docket File | Ggkm/Gersick |
768 | 3/1/1994 |
MEMO RE STAFF REPORT ON ISSUES BEFORE THE COMMITTEE RESULTING FROM JAMES LaMONT's 9/28/93 PETITION OF COMPLAINT
0 page(s)
| | CEC/Kevorkian | CEC/Edwards |
767 | 2/25/1994 |
NOTICE OF A WORKSHOP TO DISCUSS ALTERNATIVES TO TORTOISE FENCING ALONG HARPER LAKE ROAD TO BE HELD 3/9/94
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
766 | 2/24/1994 |
LETTER RE REVISED INTERIM TORTOISE MONITORING PROTOCOL
2 page(s)
| | CEC/Edwards | Gratten,gersick,karp,miller |
765 | 2/24/1994 |
LETTER SUBMITTING PUBLISHED REPORTS RELATIVE TO WORK ZONE TRAFFIC CONTROL SIGNING AND STANDARDS PER CONVERSATION
5 page(s)
| | CEC/Edwards | Sbct/Fcd/ Gonzalez |
764 | 2/15/1994 |
TRANSCRIPT FILED INTO THE TRANSCRIPT FILE DATED 2-2-94
196 page(s)
| | Interested Parties | CEC Cec |
763 | 2/15/1994 |
INTERVENOR JAMES LA MONT'S OBJECTIONS TO DATA RESPONSES OF HARPER LAKE COMPANIES DATED 1-11-94, & 1-18-94
8 page(s)
| | CEC/Docket File | Attys For Interv/T.j. Becker |
762 | 2/15/1994 |
INTERVENOR JAMES LA MONTS' AT-ISSUE MEMORANDUM CONCERNING: H. DIKE REPAIR AND F. HOFFMAN ROAD REALIGNMENT
4 page(s)
| | CEC/Docket File | Attys For Interv/T.j. Becker |
761 | 2/14/1994 |
STAFF MOTION TO COMPEL ANSWERS TO DATA REQUESTS RE: MARSH ENHANCEMENT AMENDMENT
11 page(s)
| | CEC/Docket File | CEC Cec |
760 | 2/11/1994 |
LETTER RE HARPER LAKE COMPANIES' REQUEST TO AMEND SEGS VIII DECISION BIOLOGY CONDITION 4F
2 page(s)
| | Dfg/Sullivan | CEC/Kevorkian |
759 | 2/11/1994 |
LETTER RE HARPER LAKE COMPANIES REQUEST TO AMEND SEGS VIII DECISION BIOLOGY CONDITION 4F
5 page(s)
| | Blm/Bisso | CEC/Kevorkian |
758 | 2/10/1994 |
TRANSCRIPT FILED INTO THE TRANSCRIPT FILE DATED 2-3-94
235 page(s)
| | Interested Paries | CEC Cec |
757 | 2/10/1994 |
LETTER RE THE PROPOSED PROJECT
1 page(s)
| | CEC/Edwards | San Bernardino Co. |
756 | 2/10/1994 |
LETTER RE CONCERNED ABOUT RIGHT OF WAY COMPLIANCE ISSUES
2 page(s)
| | CEC/Edwards | Blm/Swanson |
755 | 2/10/1994 |
SUBMITTAL OF TWO RECENT LETTERS AND DECISION RE THE PROPOSED PROJECT
7 page(s)
| | CEC/Edwards | Blm/Swanson |
754 | 2/10/1994 |
LETTER SUBMITTING PUBLIC COMMENTS AND OPPOSE TO THE PROPOSED PROJECT
4 page(s)
| | CEC/Public Advisor | Desert Tortoise Preserve Committee |
753 | 2/8/1994 |
SUBMITTAL OF REQUESTED CORRESPONDENCE REGARDING AUTHORITY TO HANDLE THE DESERT TORTOISE
13 page(s)
| | CEC/Shean | Ggkm/Gersick |
752 | 2/8/1994 |
TRANSCRIPT FILED INTO THE TRANSCRIPT FILE DATED 2-1-94
46 page(s)
| | CEC/Docket File | CEC Cec |
751 | 2/7/1994 |
TRANSCRIPT FILED INTO THE TRANSCRIPT FILE DATED 2-4-94
48 page(s)
| | Interest Parties | CEC Cec |
750 | 2/3/1994 |
LETTER SUBMITTING PUBLIC COMMENT AND OPPOSAL OF THE PROPOSED AMENDMENT
4 page(s)
| | CEC/Public Advisor | Desert Tortoise Preserve Committee |
749 | 2/1/1994 |
SUBMITTAL OF ERRATA PAGE 3, REVISES OF APPLICANT'S MEMORANDUM OF POINTS AND AUTHORITIES
7 page(s)
| | CEC/Docket File | Ggkm/Gersick |
748 | 1/28/1994 |
SUBMITTAL OF COMMENTS ON THE REQUEST FOR AMENDMENT
5 page(s)
| | CEC/Public Advisor | Desert Tortoise Preserve Committee |
747 | 1/27/1994 |
SUBMITTAL OF MEMORANDUM OF POINTS AND AUTHORITIES IN RESPONSE TO THE DEC. 12, 1993 ORDER OF THE ASSIGNED COMMITTEE
11 page(s)
| | CEC/Docket File | CEC Cec |
746 | 1/27/1994 |
STAFF REPLY TO HARPER LAKE COMPANY'S OBJECTION TO STAFF TESTIMONY AND DEMONSTRATION
3 page(s)
| | CEC/Docket File | CEC/Ogata |
745 | 1/27/1994 |
SUBMITTAL OF TESTIMONY OF HLC'S WITNESSES, WITNESS DECLARATIONS AND EXHIBIT LIST
41 page(s)
| | CEC/Shean | Ggkm/Gersick |
744 | 1/27/1994 |
SUBMITTAL OF STAFF TESTIMONY OF DALE B. EDWARDS, MARC SAZAKI, AND KRISTIN H. BERRY RE DESERT TORTOISE MITIGATION
103 page(s)
| | CEC/Docket File | CEC/Edwards |
743 | 1/27/1994 |
LETTER FROM TRANSPORTATION/FLOOD CONTROL DEPT. RE UPCOMING TORTOISE FENCE HEARING
1 page(s)
| | CEC/Edwards | Sbcpw |
742 | 1/27/1994 |
MEMO RE REQUESTED RE-OPENING OF CONSULTATION WITH (DEPARTMENT), UNDER CA ENDANGER SPECIES ACT.
7 page(s)
| | CEC/Kevorkian | Fish & Game/Sullivan |
741 | 1/26/1994 |
SUBMITTAL OF ERRATA PAGE 6, WHICH REVISES APPLICANTS RESPONSE TO STAFF WITNESS LIST, MAP OF ARE AND OTHER INFORMATION RE: DESERT TORTOISE MITIGATION
7 page(s)
| | CEC/Docket File | Atty For Appl/Gersick |
740 | 1/24/1994 |
STAFF POINTS AND AUTHORITIES RE: SCHOOL PAYMENTS
7 page(s)
| | CEC/Docket File | CEC/Ogata |
739 | 1/24/1994 |
APPLICANT'S RESPONSE TO STAFF WITNESS LIST, DOCUMENTATION LIST, MAP OF AREA AND OTHER INFORMATION RE: DESERT TORTOISE MITIGATION
15 page(s)
| | CEC/Docket File | Atty For Appl/Gersick |
738 | 1/18/1994 |
MEMO RE: STAFF REPORT ON ISSUES BEFORE THE COMMITTEE RESULTING FROM JAMES LaMONT'S 9-28-93 PETITION OF COMPLAINT
2 page(s)
| | CEC/Kevorkian & Rakow | CEC/Edwards |
737 | 1/18/1994 |
SUBMITTAL OF WRITTEN TESTIMONY FOR BIOLOGICAL MITIGATION HARPER LAKE
4 page(s)
| | CEC/Edwards | Nonprofit Counsel/Lee |
736 | 1/14/1994 |
LETTER RE: INFORMATION REQUEST: OWNERSHIP OF PROPERTY ALONG HARPER LAKE ROAD
7 page(s)
| | County Of San Bernardino T/Fc/gray | Ggkm/Gersick |
735 | 1/13/1994 |
SUBMITTAL OF RESPONSE TO CEC & INTERVENOR LA MONT WATER USE DATA REQUEST
9 page(s)
| | CEC/Docket File | Ggkm/Gersick |
734 | 1/11/1994 |
SUBMITTAL OF WITNESS LIST, TESTIMONY SUBJECT AREA, DOCUMENTARY EVIDENCE LIST, WITNESS QUALIFICATIONS AND HARPER LAKE ROAD MAP
24 page(s)
| | CEC/Docket File | Ggkm/Gersick |
733 | 1/11/1994 |
SUBMITTAL OF STAFF WITNESS LIST, DOCUMENTATION LIST, MAP OF AREA AND OTHER INFORMATION RE: DESERT TORTOISE MITIGATION
33 page(s)
| | CEC/Docket File | CEC Cec |
732 | 1/11/1994 |
SUBMITTAL OF RESPONSES TO INTERVENOR JAMES LAMONT'S DATA REQUEST
14 page(s)
| | CEC/Docket File | Ggkm/Gersick |
731 | 1/10/1994 |
SUBMITTAL OF MEMORANDUM OF POINTS AND AUTHORITIES IN SUPPORT OF APPLICANTS PROPOSED AMENDMENT
43 page(s)
| | CEC/Docket File | Ggkm/Gersick |
730 | 1/7/1994 |
NOTICE OF EVIDENTIARY HEARING LOCATIONS TO BE HELD 2-1-94 IN HELENDALE AND 2-2, 2-3, 2-4-94 IN SAN BERNARDINO
7 page(s)
| | CEC/Docket File | CEC Cec |
729 | 1/7/1994 |
REVISION TO AMENDED HEARING ORDER
4 page(s)
| | CEC/Docket File | CEC/Kevorkian |
728 | 1/7/1994 |
AMENDED HEARING ORDER
7 page(s)
| | CEC/Docket File | CEC/Kevorkian |
727 | 1/5/1994 |
LETTER REQUESTING TO BE PLACED ON THE PROOF OF SERVICE FOR THE DESERT TORTOISE MITIGATION HEARING
4 page(s)
| | CEC/Shean | Doj/Levin |
726 | 1/4/1994 |
LETTER CONCERNING THE SEGS VIII DESERT TORTOISE MITIGATION MATTER
2 page(s)
| | Blm/Swanson | CEC/Kevorkian |
725 | 12/31/1993 |
SUBMITTAL OF TWO RECENT LETTERS AND DECISION ISSUED BY US DEPT. OF INTERIOR FOR LUZ SEGS VIII AND IX PROJECT
7 page(s)
| | CEC/Docket File | Usdofi/Swanson |
724 | 12/23/1993 |
AMENDED HEARING ORDER(DESERT TORTOISE MITIGATION)
15 page(s)
| | CEC/Docket File | CEC Cec |
723 | 12/21/1993 |
STAFF RESPONSE TO APPLICANT'S MOTION TO AMEND HEARING ORDER
2 page(s)
| | CEC/Docket File | CEC/Ogata |
722 | 12/17/1993 |
APPLICANTS MOTION TO AMEND HEARING ORDER
12 page(s)
| | CEC/Shean | Ggkm/Gersick |
721 | 12/17/1993 |
STAFF REQUEST FOR HEARING ORDER AMENDMENT
6 page(s)
| | CEC/Docket File | CEC Cec |
720 | 12/15/1993 |
LETTER RE UNABLE TO COMPLY WITH THE DEC. 15, 1993, DEADLINE
6 page(s)
| | CEC/Kevorkian | Ggkm/Gersick |
719 | 12/6/1993 |
SUBMITTAL OF ADDRESS CHANGE
1 page(s)
| | CEC/Shean | Lawrence F. Lapre |
718 | 11/22/1993 |
LETTER IN RESPONSE TO REQUEST THAT THE MOU "BE CLARIFIED TO REFLECT THE CONTINUATION OF HANDING ACTIVITIES ALONG HARPER LAKE ROAD WHEN NECESSARY
2 page(s)
| | Ensr/Sanz | Df&g/Hoover |
717 | 11/22/1993 |
INTERVENOR JAMES LA MONT'S DATA REQUESTS TO HARPER LAKE COMPANIES
7 page(s)
| | CEC/Docket File | Harland Law Firm/Becker |
716 | 11/18/1993 |
HEARING ORDER (OTHER MATTERS)
9 page(s)
| | CEC/Docket File | CEC/Kevorkian |
715 | 11/9/1993 |
SUBMITTAL OF HEARING ORDER
10 page(s)
| | CEC/Docket File | CEC/Kevorkian |
714 | 11/8/1993 |
LETTER RE CONCERNS OF THE REQUEST FOR A HEARING ON THE ISSUE OF DECOMMISSIONING ON 11-23-93
1 page(s)
| | CEC/Shean | Harland Law Firm |
713 | 11/5/1993 |
MEMO RE PROPOSED MODIFICATION OF TWO TERMS AND CONDITIONS IN BIOLOGICAL OPINION #1-6-89-F-61 INVOLVING HARPER LAKE ROAD
2 page(s)
| | Usf&w | Blm |
712 | 11/4/1993 |
LETTER SUBMITTING ADDRESS CHANGE
1 page(s)
| | CEC/Docket File | Lawrence La Pre |
711 | 10/25/1993 |
TRANSCRIPT FILED INTO THE TRANSCRIPT FILE DATED 10-13-93
121 page(s)
| | Interested Parties | CEC Cec |
710 | 10/18/1993 |
LETTER URGING ENFORCEMENT OF THE MITIGATION CONDITIONS WHICH HLC HAS REPORTEDLY NOT FULFILLED
1 page(s)
| | CEC/Docket File | June Ringer |
709 | 10/15/1993 |
LETTER RE HLC REQUEST TO AMEND THE CEC DECISION FOR THE SEGS VIII & IX
1 page(s)
| | CEC/Therkelsen | Usdi/Faanes |
708 | 10/15/1993 |
LETTER REQUESTING THE CEC REJECT HLC AMENDMENT AND DIRECT THE TO IMMEDIATELY INSTALL THE TORTOISE FENCE
1 page(s)
| | CEC.Cec.therkelsen | Dtc |
707 | 10/15/1993 |
LETTER IN RESPONSE TO THE NOTICE OF PETITION TO REVOKE CERTIFICATION, OR ALTERNATIVELY TO AMEND CONDITIONS
3 page(s)
| | CEC/Kevorkian | Sbcdtfc/Gray |
706 | 10/15/1993 |
LETTER IN RESPONSE TO REQUEST FOR THE POSSIBILITY OF CHANGE TO THE PLACEMENT OF TORTOISE PROOF FENCES LOCATIONS
1 page(s)
| | CEC/Edwards | Sbcdtfc/Gonzalez |
705 | 10/14/1993 |
STAFF PREHEARING CONFERENCE STATEMENT
12 page(s)
| | CEC/Docket File | CEC/Ogata |
704 | 10/12/1993 |
SUBMITTAL OF APPLICANTS PREHEARING CONFERENCE STATEMENTS
20 page(s)
| | CEC/Docket File | Gratten, Gersick, Karp & Miller |
703 | 10/12/1993 |
QUALIFICATION OF FRANKLIN G. HOOVER
1 page(s)
| | CEC/Docket File | CEC Cec |
702 | 10/8/1993 |
MEMO RE STATEMENT REGARDING HARPER LIKES CO. TWO REQUESTS TO AMEND CONDITIONS
12 page(s)
| | CEC/Docket File | Fish & Game |
701 | 10/8/1993 |
LETTER RE PETITION OF INTERVENOR JAMES LAMONT TO REVOKE OR ALTERNATIVELY TO AMEND CERTIFICATION OF SEGS VIII AND IX
1 page(s)
| | CEC/Shean | Harland Law Firm/Becker |
700 | 10/6/1993 |
LETTER RE SEGS VIII BIOLOGY CONDITION 5, AND SEGS IX BIOLOGY CONDITION 11K
22 page(s)
| | CEC/Edwards | Hlc |
699 | 10/6/1993 |
SUBMITTAL OF A LETTER OPPOSED TO THE AMENDMENT OF CONDITION
3 page(s)
| | CEC/Therkelsen | Desert Tortoise Council |
698 | 10/6/1993 |
LETTER RE RESPONSE TO AMENDMENT REQUEST CONCERNING PAYMENTS TO SCHOOLS
2 page(s)
| | Hlc/Divirgilio | CEC/Edwards |
697 | 10/6/1993 |
SUBMITTAL OF DATA REQUESTS FOR REQUEST TO AMEND - BIOLOGY CONDITION 5, SEGS VIII AND BIOLOGY CONDITION 11K, SEGS IX
2 page(s)
| | Hlc/Divirilio | CEC/Edwards |
696 | 10/6/1993 |
MEMO RE: COMMITTEE HEARING ON SEGS VIII TORTOISE FENCE AMENDMENT REQUEST
2 page(s)
| | CEC/Kevorkian, Rakow | CEC/Therkelsen |
695 | 10/6/1993 |
MEMO RE: SEGS VIII REQUEST TO AMEND THE REQUIREMENT FOR TORTOISE FENCING
1 page(s)
| | Dfg/Gibbons | CEC/Blevins |
694 | 10/6/1993 |
LETTER RE LETTERS TO HARPER LAKE ROAD LANDOWNERS
9 page(s)
| | CEC/Edwards | Gratten,gersick,karp&miller |
693 | 10/6/1993 |
LETTER RE: STATUS OF RESPONSES TO LETTERS TO HARPER LAKE ROAD LANDOWNERS REGARDING TORTOISE FENCING SEGS VIII
1 page(s)
| | Grattan, Gersick, Karp&miller/Gersick | CEC/Edwards |
692 | 10/6/1993 |
LETTER RE: TORTOISE FENCING ALONG HARPER LAKE ROAD SEGS VIII
1 page(s)
| | Dept. Transportation And Flood Control | CEC/Edwards |
691 | 10/6/1993 |
LETTER RE: SUBMITTAL OF AN AMENDMENT TO BIOLOGY CONDITION 4F, UNABLE TO COMPLETE AND SUBMIT AMENDMENT BY REQUESTED DATE
1 page(s)
| | CEC/Edwards | Grattan, Gersick, Karp & Miller |
690 | 10/6/1993 |
NOTICE OF RECEIPT
3 page(s)
| | CEC/Docket File | CEC Cec |
689 | 10/1/1993 |
NOTICE OF PETITION TO REVOKE CERTIFICATION, OR ALTERNATIVELY TO AMEND CONDITIONS OF CERTIFICATION TO BE HELD 10-13-93
7 page(s)
| | CEC/Docket File | CEC/Kevorkian |
688 | 9/30/1993 |
REQUEST TO SET HEARING RE MOTION TO REVOKE CERTIFICATION; OR IN THE ALTERNATIVE, TO AMEND CONDITIONS
5 page(s)
| | Interested Parties | Harland Law Firm/Becker |
687 | 9/30/1993 |
PETITION TO REVOKE CERTIFICATION OF SEGS VIII & IX OR IN THE ALTERNATIVE, TO AMEND CONDITIONS OF SEGS VIII & IX
20 page(s)
| | CEC Cec | Harland Law Firm/Becker |
686 | 9/30/1993 |
NOTICE OF HEARING TO BE HELD 10-13-93 ON THE REQUESTED AMENDMENTS AND RETURN RECOMMENDATIONS FOR THEIR DISPOSITION
8 page(s)
| | CEC/Docket File | CEC Cec |
685 | 9/30/1993 |
LETTER URGING TO REJECT AMENDMENTS TO THE DECISION
1 page(s)
| | CEC/Public Advisors | Gerry Scherba |
684 | 9/29/1993 |
ORDER OF REFERRAL
1 page(s)
| | CEC/Docket File | CEC/Imbrecht |
683 | 9/29/1993 |
LETTER RE COMPEL HARPER LAKE CO. TO BUILD TORTOISE FENCE AND ENHANCE HARPER LAKE MARSH
1 page(s)
| | CEC/Public Advisor | Paul Emery |
682 | 9/28/1993 |
LETTER RE: COMMENTS ON THE PROPOSED AMENDMENTS
1 page(s)
| | CEC/Edwards | Transportation Flood Control/Golondziner |
681 | 9/27/1993 |
LETTER OPPOSED TO THE PROPOSED AMENDMENTS
1 page(s)
| | CEC/Public Advisors Office | Lee Hayes |
680 | 9/23/1993 |
MEMO RE: REQUEST TO AMEND THE REQUIREMENT FOR TORTOISE FENCING - SOLAR ELECTRIC GENERATING STATION
4 page(s)
| | CEC/Blevins | Dept. Fish & Game |
679 | 9/22/1993 |
LETTER TO CONFIRM INTENTION TO COMMENT ON ALL PROPOSED AMENDMENTS
1 page(s)
| | CEC/Edwards | Harland Law Firm/Becker |
678 | 9/16/1993 |
LETTER RE: REQUESTS TO AMEND SEGS VIII, SOCIOECONOMIC CONDITIONS 2, BIOLOGY CONDITIONS 4F AND 5, "SEGS IX DECOMMISSIONING CONDITION OF CERTIFICATION 1, BIOLOGY CONDITION 11K, SOCIOECONOMIC CONDITION 4
1 page(s)
| | CEC/Edwards | Hlc |
677 | 9/15/1993 |
LETTER RE: HLC VIII HAS BEEN ELECTED AS GENERAL PARTNER
1 page(s)
| | CEC/Edwards | Harper Lake Co./Gelber |
676 | 9/14/1993 |
NOTICE OF STAFF PROPOSED CHANGE
2 page(s)
| | CEC/Docket File | CEC Cec |
675 | 9/14/1993 |
MEMO RE: STAFF PROPOSED AMENDMENT TO TRAFFIC AND TRANSPORTATION CONDITION 12 SEGS VIII
2 page(s)
| | Technical Unit Seniors | CEC/Edwards |
674 | 8/23/1993 |
LETTER RE: BUREAU OF LAND MANAGEMENT IS CONTEMPLATING TERMINATION OF RIGHT-OF-WAY GRANT CACA 21591 FOR FAILURE TO COMPLY WITH THE GRANT TERMS AND CONDITIONS
8 page(s)
| | Liz Development & Finance Corp. | Bureau Of Land Management |
673 | 7/21/1993 |
NOTICE OF RECEIPT FOR HARPER LAKE COMPANY'S REQUEST TO AMEND THE CEC DECISIONS FOR SEGS UNIT VIII & IX PROJECTS
2 page(s)
| | CEC/Docket File | CEC Cec |
672 | 7/9/1993 |
PETITIONS TO AMEND CONDITIONS OF CERTIFICATION THE SEGS VIII AND SEGS IX PROJECTS
25 page(s)
| | CEC/Edwards | Gratten,gersick,karp, Miller |
671 | 4/26/1993 |
NOTICE OF WORKSHOP TO DISCUSS ALTERNATIVES TO THE REQUIREMENT FOR TORTOISE FENCING TO BE HELD 5-12-93
3 page(s)
| | CEC/Docket File | CEC/Therkelsen |
670 | 4/22/1993 |
LETTER RE: COPIES TO BE MADE OF SOME CEC FILE INFORMATION
1 page(s)
| | CEC/D. Edwards | Atty: Harland & Gromala |
669 | 4/5/1993 |
NOTICE OF POST - CERTIFICATION PROJECT CHANGE
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
668 | 6/10/1993 |
LETTER REQUESTING MODIFICATION TO CEC DECISION FOR CERTIFICATION FOR NOx EMISSIONS FOR SEGS VIII AND SEGS IX
6 page(s)
| | CEC/Edwards | Wzi,inc./Wilson |
667 | 6/17/1993 |
NOTICE OF RECEIPT - REQUEST TO AMEND; AIR QUALITY CONDITIONS 23, 24, 38, AND 40
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
666 | 2/5/1993 |
Letter to amplify certain aspects of a matter which concerns the Department of Fish & Game and the owner's of the SEGS VIII-IX facility
3 page(s)
| | Fish & Game/ Sullivan | Gratten, Gersick Karp & Miller |
665 | 9/15/1992 |
Notice of receipt - request to amend decision - cooling tower blowdown water for dust control
6 page(s)
| | CEC/Docket File | CEC/Therkelsen |