Docket Log

Docket: 87-AFC-01C
Project Title: COMPLIANCE-Luz Solar Electric Generating System Cogeneration AFC (150 MW) Units III-VII.
Generated On: 4/19/2024 4:08:28 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2489742/27/2023 CEC 2022 Report
LUZ Annual 2022 Report
Compliance
27 page(s)
 CEC/Docket UnitNextEra Energy
2484331/18/2023 2022 S2 Groundwater Quality Monitoring Report
2022 S2 Groundwater Quality Monitoring Report
Compliance
144 page(s)
 CEC/Docket UnitNextEra Energy
2484321/18/2023 2022 S2 Groundwater Detection Monitoring Report
2022 S2 Groundwater Detection Monitoring Report
Compliance
204 page(s)
 CEC/Docket UnitNextEra Energy
2462929/30/2022 SEGS October 12 Business Meeting
Item d-Oct 12 BM Backup for SEGS Proposed Order for License Termination
Compliance
4 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2442798/1/2022 SEGS III-VII Request For License Termination

2 page(s)
 CEC/John HeiserDayZenLLC
2440877/14/2022 SEGS Kramer Junction 2022 1st Semiannual Bioremediation Report

Compliance
8 page(s)
 CEC/Docket UnitNextEra Energy
2440867/14/2022 SEGS Kramer junction 2022 1st Semiannual Detection Monitoring Report

80 page(s)
 CEC/Docket UnitNextEra Energy
2432685/24/2022 Order Amending the Site Boundary and Terminating Jurisdiction
Order No: 22-0524-1
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2430495/13/2022 Staff Analysis-Boundary Modification
Staff Analysis of Petition to Amend the Final Commission Decision
Compliance
20 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2426364/12/2022 SEGS Petition To Amend Boundary - Unit VII

Compliance
395 page(s)
 CEC/Docket UnitDayZenLLC
2415872/18/2022 Order Modifying Site Boundary
Order No: 22-0216-2
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2415042/10/2022 SEGS III-VII Annual Report 2021

19 page(s)
 CEC/John HeiserNextEra Energy
2414102/4/2022 SEGS III-VII PTA Boundary Adjustment Staff Assessment
STAFF ANALYSIS OF PETITION TO AMEND THE FINAL COMMISSION DECISION
Compliance
20 page(s)
 Interested PartiesCalifornia Energy Commission
2411991/18/2022 SEGS Kramer Junction 2021 2nd Semiannual Detection Monitoring Report

Compliance
131 page(s)
 CEC/Docket UnitNextEra Energy
2411981/18/2022 SEGS Kramer Junction 2021 2nd Semiannual Bioremediation Report

Compliance
133 page(s)
 CEC/Docket UnitNextEra Energy
2411381/11/2022 Petition to Amend Boundary Change Appendix B Part I - SEGS III-VII

342 page(s)
 CEC/John HeiserDayZenLLC
241137-11/11/2022 Petition to Amend Boundary Change - SEGS III-VII

10 page(s)
 CEC/Docket UnitDayZenLLC
241137-21/11/2022 Petition to Amend Boundary Change Appendix A - SEGS III-VII

12 page(s)
 CEC/Docket UnitDayZenLLC
241137-31/11/2022 Petition to Amend Boundary Change Appendix B Part II - SEGS III-VII

223 page(s)
 CEC/John HeiserDayZenLLC
241137-41/11/2022 Petition to Amend Boundary Change Appendix B Part III - SEGS III-VII

302 page(s)
 CEC/John HeiserDayZenLLC
241137-51/11/2022 Petition to Amend Boundary Change Appendix B Part IV - SEGS III-VII

170 page(s)
 CEC/John HeiserDayZenLLC
2389377/19/2021 Kramer Junction 2021 1st Semiannual Detection Monitoring Report

80 page(s)
 CEC/Docket UnitNextEra Energy
2389367/19/2021 Kramer Junction 2021 1st Semiannual Bioremediation Report

49 page(s)
 CEC/Docket UnitNextEra Energy
2388907/15/2021 SEGS III-VII Emissions Report Q2 2021

21 page(s)
 CEC/Docket UnitNextEra Energy
2382046/15/2021 Order Approving Facility Decommissioning Plan

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2381786/11/2021 NOTICE OF DECISION by the CALIFORNIA ENERGY COMMISSION
Filing of Notice of Decision in compliance with Public Resources Code section 21080.5 Solar Energy Generating System Units III-VII Facility Decommissioning Plan
Compliance
2 page(s)
 CEC/Docket UnitEnergy Commission
2380636/1/2021 SEGS III-VII Facility Decommissioning Plan Staff Assessment

148 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2379445/24/2021 Report of Conversation - SEGS III-VII Kramer Junction Project
Conversation between Ann Crisp of the CEC and Jennifer Merrick, Tetra Tech
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2376575/4/2021 Report of Conversation - SEGS III-VII Evaporation Pond Decommissioning
Conversation between Mike Conway, Abdel-Karim Abulaban, and Geoff Lesh of the CEC and John Steude of the Lahontan Regional Water Quality Control Board.
2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2375014/20/2021 SEGS III-VII Wildlife Fencing Memorandum

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
13 page(s)
 CEC/Ann Crisp and Eric KnightTetra Tech
2375004/20/2021 SEGS III-VII_Final Decommissioning Plan
Solar Energy Generating System (SEGS III-VII)-Final Decommissioning Plan
Compliance
487 page(s)
 CEC/Docket OfficeCalifornia Energy Commission
2373674/2/2021 SEGS III - VII 2021 First Quarter Emissions Report

21 page(s)
 Mojave Desert Air Quality Management District/Alan DeSalvioNextEra Energy
2372073/18/2021 Fire Protection at SEGS III - VIII
Email from Glen King- removing combustible materials
Compliance
3 page(s)
 Ryan CasebeerCalifornia Energy Commission
2371713/15/2021 Notice of Receipt and Notice of Workshop for Draft Decommissioning Plan for Solar Energy Generating System (SEGS) III-VII

6 page(s)
 CEC/DocketsCalifornia Energy Commission
237137-13/11/2021 Email from Joe Zuccaro to Next Era Energy
Fire Systems at SEGS III-VIII
2 page(s)
 Next Era Energy/Glen KingCalifornia Energy Commission
237137-23/11/2021 Letter from Next Era to Joe Zuccaaro
RE: Fir Systems at the SEGS III-VIII Facility
1 page(s)
 Next Era Energy/Joe ZuccaroCalifornia Energy Commission
2368072/16/2021 SEGS III - VII 2020 Annual Compliance Report

15 page(s)
 CEC/DocketsNextEra Energy
2367522/12/2021 SEGS III-VII Decommissioning Plan

Air Quality, Alternatives, Biological Resources, Cultural Resources, Efficiency, Executive Summary, Facility Design, Compliance, Geology/Paleontology, Hazardous Materials, Introduction, Land Use, Noise and Vibration, Project Description, Public Health, Reliability, Socioeconomics, Traffic and Transportation, Transmission Line Safety and Nuisance, Transmission System Engineering, Visual Resources, Worker Safety and Fire Protection, Waste Management, Soil and Water, Greenhouse Gases
434 page(s)
 CEC/DocketsTetra Tech
2365342/1/2021 SEGS III - VII Second Semi-annual Bioremediation Monitoring Report

50 page(s)
 CEC/Docket OfficeNextEra Energy
2365332/1/2021 SEGS III - VII Fourth Quarter Emissions Report

22 page(s)
 CEC/Docket OfficeNextEra Energy
2365322/1/2021 SEGS III - VII Second Semi-annual Evaporation Pond Monitoring Report

134 page(s)
 CEC/Docket OfficeNextEra Energy
2338087/8/2020 SEGS Kramer Junction 2020 1st Semiannual Detection Monitoring Report

80 page(s)
 California Water Quality Control Board/John Steude, PGNextEra Energy
2338077/8/2020 SEGS Kramer Junction Q2 2020 Emissions Report

21 page(s)
 Mojave Desert Air Quality Management District/Alan DeSalvioNextEra Energy
2338067/8/2020 SEGS Kramer Junction 2020 1st Semiannual Bioremediation Report

15 page(s)
 California Water Quality Control Board/John Steude, PGNextEra Energy
2326284/2/2020 SEGS III-VII First Quarter 2020 Emissions Report

17 page(s)
 CEC/DocketsNextEra Energy
2322252/25/2020 SEGS III - VII 2019 Annual Compliance Report

43 page(s)
 CEC/John HeiserNextEra Energy
231623-11/22/2020 SEGS III - VII 2019 2nd Semiannual Bioremediation Report

13 page(s)
 Calif. Water Quality Control Board/John Steude, PGNextEra Energy
231623-21/22/2020 SEGS III - VII 2019 2nd Semiannual Pond Monitoring Report

143 page(s)
 Calif. Water Quality Control Board/John Steude, PGNextEra Energy
2313951/7/2020 SEGS III VII Fourth Quarter Emissions Reeport
Quarterly Emissions Report
20 page(s)
 CEC/DocketsNextEra Energy
23106312/10/2019 SEGS III - VII 2018 Annual Compliance Report

88 page(s)
 CEC Compliance Project ManagerNextEra Energy
2294938/20/2019 Cold Layup Plan Addendum - SEGS VI-VII Kramer Junction
March 2019
29 page(s)
 CEC/Docket UnitNextera Energy Resources
22571310/31/2018 Cold Layup Plan - SEGS VI-VII Kramer Junction
September 2018
25 page(s)
 CEC/Docket UnitNextera Energy Resources
22565910/31/2018 Compliance Docketing Policy

3 page(s)
 CEC/DocketsCalifornia Energy Commission
672809/24/2012 Notice of Determination -Petition to Add New Foundation and Containment Structure for Spare Transformer

2 page(s)
 CEC/Docket UnitCEC/D.Rundquist
666028/10/2012 Amendment Addendum to the Conditions of Certification

1 page(s)
 CEC/ D. RundquistNextEra Energy/ R. Fimbres
658956/22/2012 Petition to Amend

6 page(s)
 CEC / D. RundquistNER / R. Fimbres
514225/4/2009 Operating Company Name Change

1 page(s)
 CEC/ S. MunroNextEra Energy/ G. Sellers
335172/23/2005 Order Approving Transfer of operational control to FPL Energy Operating Services, Inc. (Order No. 05-0216-01(d).

1 page(s)
 CEC/Docket UnitCEC/Commissioner Rosenfeld
332131/28/2005 Notice of Receipt - Petition for Change of Operation

2 page(s)
 CEC/DocketsCEC/Johnson
332061/27/2005 Change of Operator of Luz Solar Partners III - VII.

1 page(s)
 Steve Munro/Docket UnitJ. Keener, Fpl Energy
330761/6/2005 Petition for Change of Operator of SEGS III- VII (Kramer Junction).

2 page(s)
 C. Najarian/Docket UnitFpl Energy, D. Fellman
222319/5/2001 Notice of Exemption - Approval of Elimination of the 16 Hours-Per-Day Limit on Fossil Fuel Electrical Gen at the SEGS III-VII Facility

3 page(s)
 Office Of Planning And Research/DocketsCEC/Munro
88904/7/1994 Notice of Receipt Request to Amend.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
88893/29/1994 Submittal of Amendment request to address the one site Bioremediation Treatment of Contaminated Soils within decision.

15 page(s)
 CEC/EdwardsKjc/Rib
888812/13/1993 Order Approving Amendment for Air Quality Condition 22, 24 and 29.

6 page(s)
 CEC/Docket FileCEC/Crowley
88877/21/1993 KJC operating Company's request to amend the CEC Decision for SEGS III - VII Projects.

2 page(s)
 CEC/Docket FileCEC Cec
88861/13/1993 Notice of Receipt - Request to amend decision, proposed changes are to remove language in Air Quality Conditions of Certification #24 and #29.

3 page(s)
 CEC/Docket FileCEC/Therkelsen
88851/7/1993 Submittal of requests for amendments of the permit documents.

15 page(s)
 CEC/EdwardsKjc/Rib
741611/5/1997 Notice of Post-Certification Change for the Kramer Junction Company's SEGS III-VII Projects. The oil/water separator is molded plastic measuring about 2 ft wide by 3.5 ft long by 2 ft high, and will be installed on top of the center, and shortest, of five tanks comprising KJC's Water and Oil Processing Equipment (WOPE).

1 page(s)
 CEC/Docket FileCEC/Therkelsen
48717/8/1997 Notice of Post-Certification Change for the Kramer Juntion Company's SEGS III-VII Projects.

1 page(s)
 CEC/Docket FileCEC/Therkelsen
48705/16/1995 Notice of Availability of Staff Analysis of Bioremediation Process and Facility at Solar Electric Generating Stations SEGS III & VII.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
48695/16/1995 Submittal of Staff Analysis On Soil and Water Resources.

6 page(s)
 CEC/Docket FileCEC/O'hagan
48685/16/1995 Letter requesting for reclassification of Therminol Contaminated Soil as Nonhazardous pursuant to Section 66260.200 (f) - Waste Evaluation Unit File #F143.

13 page(s)
 Kjc Operating/RibDept. Tsc/Carlisle
48675/16/1995 Staff Analysis - Waste Management.

22 page(s)
 CEC/Docket FileCEC/Ringer
48667/12/1994 Notice of Data Response Workshop to be held 7-28-94.

2 page(s)
 CEC/Docket FileCEC/Therkelsen