201894 | 3/20/2014 |
Summary of Proposed AQ Administrative Changes 03-20-2014 Summary of Additional Proposed Administrative AQ Changes pertaining to DLN1+ AQ Amendment Air Quality 19 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201867 | 3/12/2014 |
01-13-2014 Midway Sunset - AQ Staff Questions with Owner Responses AQ Staff Questions (Pertaining to DLN1+TE Amendment) with Owner Responses Air Quality 2 page(s)
| | CEC/Dockets Unit | California Energy Commission |
201277 | 11/21/2013 |
Post Certification Amendment to Replace the Unit A and Unit B Combustion Systems with DLN1+ Petition to Amend to Replace the Unit A and Unit B Combustion Systems with DLN1+ Turndown Enhance (DLN1+TE) Combustion Systems Compliance 103 page(s)
| | CEC/Mary Dyas | Midway Sunset Cogeneration Company |
37643 | 8/9/2006 |
Notice of Receipt - Petition to Amend The Energy Commission Decision for the Midway Sunset Cogeneration Project. 85-AFC-3C
3 page(s)
| | Docket Unit | CEC / R. E. Johnson |
11083 | 5/10/1999 |
Public Records Act Request
3 page(s)
| | CEC/Docket File | Adams Broadwell Joseph & Cordozo/Texier |
5582 | 11/3/1986 |
Notice of a Preliminary Staff Assessment Workshop to be held on November 12, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5389 | 11/15/1985 |
Notice of Staff Data Adequacy Workshop on the SANDER AFC.
0 page(s)
| | CEC/Docket File | CEC Cec |
5346 | 7/22/1987 |
Notice of Availability of the FSA.
0 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5345 | 7/20/1987 |
Final Staff Assessment.
0 page(s)
| | CEC/Docket File | CEC Cec |
5344 | 7/17/1987 |
Letter transmitting a copy of the final decision to the Resources Agency.
0 page(s)
| | CEC/Docket File | CEC/Rhoads |
5343 | 7/17/1987 |
Letter transmitting a copy of the final decision to the U.S. Environmental Protection Agency.
0 page(s)
| | CEC/Docket File | CEC/Rhoads |
5342 | 6/8/1987 |
Letter re change in Applicant's name.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Strokes |
5341 | 5/21/1987 |
Letter transmitting a copy of the Cultural Resources portion of the CEC staff's Final Staff Assessment for the Midway-Sunset Cogeneration Project.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5340 | 5/19/1987 |
Notice of availability of the Final Commission Decision.
0 page(s)
| | CEC/Docket File | CEC Cec |
5339 | 5/18/1987 |
Memo re change in Applicant's Name.
0 page(s)
| | CEC/Docket File | CEC/Fay |
5338 | 5/19/1987 |
Commission Decision Too large to docket 0 page(s)
| | CEC/Docket File | CEC/Full Commission |
5337 | 5/18/1987 |
Commission Decision Order.
0 page(s)
| | CEC/Docket File | CEC/Full Commission |
5325 | 5/18/1987 |
Transcript from the 5/12/87 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5324 | 5/14/1987 |
Memo re Midway-Sunset's Proposed Decision.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5323 | 5/14/1987 |
Committee Amendments and Corrections.
0 page(s)
| | CEC/Docket File | CEC Cec |
5322 | 5/13/1987 |
Attendance sheet from the Committee Conference held on 5/12/87.
0 page(s)
| | CEC/Docket File | CEC Cec |
5321 | 5/12/1987 |
Errata Sheet to Staff's Comments on the Proposed Decision.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5320 | 5/7/1987 |
Back up material from the 5/13/87 Business Meeting, Item #1.
0 page(s)
| | CEC/Docket File | CEC Cec |
5319 | 5/8/1987 |
Staff Comments on the Proposed Decision.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5318 | 5/8/1987 |
Air Resources Board Comments re Proposed Commission Decision.
0 page(s)
| | CEC/Docket File | Arb |
5317 | 5/4/1987 |
Letter re name change of applicant to Midway Sunset Cogeneration Project.
0 page(s)
| | CEC/Docket File | Varanini |
5316 | 4/29/1987 |
Letter transmitting a copy of the most recent schedule for the Midway Sunset Cogeneration Company.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5315 | 4/28/1987 |
Notice of Availability of the Proposed Decision, Committee Conference, and Full Commission Hearing.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5314 | 4/28/1987 |
Letter re the Biological Conditions for Certification Report for the Midway-Sunset Cogeneration Project.
0 page(s)
| | CEC/Docket File | Fish & Wildlife Service/Kobetich |
5313 | 4/27/1987 |
Proposed Commission Decision.
0 page(s)
| | CEC/Docket File | CEC Cec |
5312 | 4/23/1987 |
Letter re the suggested modifications set forth in the "Air Resources Board Comments re Presiding Member's Report', docketed March 30, 1987.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5311 | 4/21/1987 |
Letter commenting on the PMR Biological Conditions of Certification.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5310 | 4/20/1987 |
Letter re Air Resources Board Staff's suggestion for modification of the verification for condition 16.
0 page(s)
| | CEC/Docket File | Arb/Menebroket |
5309 | 4/14/1987 |
Memo re transmission systems and engineering -- common collector system.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5308 | 4/10/1987 |
Letter re the Midway-Sunset's Biological Monitoring Program.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5307 | 4/10/1987 |
Letter summarizing the agreement reached at the 4/6/87 workshop re the biological monitoring plan.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5306 | 4/6/1987 |
Transcript from the 4/2/87 Hearing filed in the Transcript file.
0 page(s)
| | CEC/Docket File | CEC Cec |
5305 | 4/2/1987 |
Copy of page 71, condition 2a from the Midway PMR.
0 page(s)
| | CEC/Docket File | CEC Cec |
5304 | 4/2/1987 |
Memo re Corrections to Staff's Comments on the PMR.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5303 | 3/30/1987 |
Staff's Comments on the Presiding Member's Report.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5302 | 3/30/1987 |
Air Resources Board Comments re Presiding Member's Report.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5301 | 3/30/1987 |
Letter formally notifying California Energy Commission that the Applicant's choice for supplying annual report information is to provide only items E - H as defined and requested in the verification of "Power Plant Efficiency", Condition 1.
0 page(s)
| | CEC/Docket File | Midway-sunset Project/Western |
5300 | 3/27/1987 |
Applicant's Comments on the Presiding Member's Report.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5299 | 3/23/1987 |
Notice of a Biology Workshop to be held on 4/6/87.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5298 | 3/18/1987 |
Notice Rescheduling Committee Conference to April 2, 1987 (Revised March 18, 1987).
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5297 | 3/17/1987 |
Notice Rescheduling Committee Conference to April 2, 1987.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5296 | 3/11/1987 |
Letter re the proposed interconnection of the Midway-Sunset Project to Pacific Gas & Electric Company's Midway Substation.
0 page(s)
| | CEC/Docket File | Pacific Gas & Electric Company/Haywood |
5295 | 3/9/1987 |
Presiding Member's Report.
0 page(s)
| | CEC/Docket File | CEC Cec |
5294 | 3/3/1987 |
Letter transmitting a copy of the power purchase contract between the Sun Exploration and Production Company and Southern California Edison with the confidential portions deleted.
0 page(s)
| | CEC/Docket File | CEC/Mundstock |
5293 | 2/27/1987 |
Letter re reviewing Midway-Sunset's PSD Application.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5292 | 2/25/1987 |
Submittal of page 3 of Midway-Sunset Reply Brief that was inadvertently left out.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Geibel |
5291 | 2/25/1987 |
Memo containing Corrections to Staff's Opening and Reply Briefs Filed on February 2nd and 23rd, 1987.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5289 | 2/20/1987 |
Submittal of Biological Monitoring program for staff's review and approval.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5288 | 2/18/1987 |
Applicant's Brief on Air Quality.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5281 | 2/23/1987 |
Staff's Reply Brief on Power Plant Efficiency Structural Engineering Power Plant Reliability Transmission Line Systems & Evaluation Electrical Engineering and Demand Conformance.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5280 | 2/23/1987 |
Applicant's Reply Brief.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5279 | 2/20/1987 |
Submittal of Biological Monitoring Program for staff's Review and approval.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5278 | 2/18/1987 |
Applicant's Brief on Air Quality.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5275 | 2/18/1987 |
Attendance sheet from the Evidentiary Hearing held on 2/10/87.
0 page(s)
| | CEC/Docket File | CEC Cec |
5274 | 2/17/1987 |
Transcript from the 2/10/87 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5273 | 2/4/1987 |
Applicant's Testimony on Air Quality.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5272 | 2/4/1987 |
Testimony of Air Resources Board re Compliance with Air Quality Laws and Regulations.
0 page(s)
| | CEC/Docket File | Arb/Shiroma |
5271 | 2/4/1987 |
Applicant's Opening Brief.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5270 | 2/3/1987 |
Attendance sheet from the Air Quality workshop held on 2/3/87.
0 page(s)
| | CEC/Docket File | CEC Cec |
5269 | 2/3/1987 |
Staff Brief on Power Plant Efficiency Structural Engineering and Power Plant Reliability.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5268 | 1/30/1987 |
Final Staff Assessment.
0 page(s)
| | CEC/Docket File | CEC Cec |
5267 | 1/30/1987 |
Report of telephone conversation with Bob Levine re setting up a meeting between staff and Applicant to discuss conditions of Certification.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5266 | 1/30/1987 |
Memo re Midway-Sunset Cogeneration Project-State Biological Opinion.
0 page(s)
| | CEC/Docket File | Dept. Of Fish & Game/Parnell |
5265 | 1/23/1987 |
Attendance sheet from the 12/3/86 Midway-Sunset Biology Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5264 | 1/22/1987 |
Notice of an Air Quality and Public Health Workshop to be held on Feb. 3, 1987.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5263 | 1/22/1987 |
Exhibit List and Exhibits 1 - 3.
0 page(s)
| | CEC/Docket File | CEC/Fay |
5262 | 1/20/1987 |
Sun Cogeneration and Southern Sierra Energy Companies' Comments on ER 6 "Committee Proposed Order" dated January 6, 1987.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5261 | 1/20/1987 |
Letter re CEC's investigation of substation facilities and services provided to qualifying Facilities by utilities.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5260 | 1/20/1987 |
Memo re Transmission Issues.
0 page(s)
| | CEC/Docket File | CEC/Maul |
5259 | 1/16/1987 |
Notice of Hearing and Briefing Order to be held on Feb. 10, 1987.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5256 | 1/16/1987 |
Transcript from the 1/12/87 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5255 | 1/15/1987 |
Final Determination of Compliance.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogeneration Project/Western |
5254 | 1/13/1987 |
Attendance sheet from the 1/12/87 Prehearing Conference.
0 page(s)
| | CEC/Docket File | CEC Cec |
5253 | 1/13/1987 |
Attendance sheet from the 1/12/87 Prehearing Conference.
0 page(s)
| | CEC/Docket File | CEC Cec |
5252 | 1/13/1987 |
Letter responding to the District's November 17, 1986 request for comments on the proposed DOC for Midway-Sunset.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogeneration Project/Western |
5251 | 1/12/1987 |
CEC Staff's, Sun Cogen. Company So. Sierra Energy Company's Agreement on Conditions for Mitigation of Biological Impacts of the Midway-Sunset Project.
0 page(s)
| | CEC/Docket File | Varanini & Radillo |
5250 | 1/12/1987 |
Letter re Midway-Sunset Project Determination of Compliance Application Nos. 4014800-807.
0 page(s)
| | CEC/Docket File | Sun Cogeneration Co./Stokes |
5249 | 1/9/1987 |
Copy of KCAPCD's Determination of Compliance for the Midway-Sunset 225 MW Cogeneration Facility.
0 page(s)
| | CEC/Docket File | Kcapcd/Paxson |
5248 | 1/7/1987 |
Letter serving as a follow-up to the December 16, 1986 discussion re the transmission line system.
0 page(s)
| | CEC/Docket File | Zitlau Consulting/Zitlau |
5247 | 1/6/1987 |
Letter containing comments on the reviewed preliminary DOC.
0 page(s)
| | CEC/Docket File | Arb/Menebroker |
5230 | 12/31/1986 |
Notice Rescheduling Committee Hearing from 1/6/87 to 1/12/87.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5229 | 12/31/1986 |
Letter transmitting a copy of the draft DOC and draft supporting analysis as requested by staff.
0 page(s)
| | CEC/Docket File | Kcapcd/Paxson |
5228 | 12/29/1986 |
Transcript from the 12/16/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5227 | 12/24/1986 |
Notice of Air Quality Prehearing Conference.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5226 | 12/24/1986 |
Memo re the Midway-Sunset Air Quality Determination of Compliance and Air Quality FSA Schedule.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5225 | 12/22/1986 |
Letter re the Preliminary Determination of Compliance.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5224 | 12/22/1986 |
Notice of an Air Quality Workshop to be held on 12/30/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5223 | 12/16/1986 |
Transcript from the 12/12/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5222 | 12/16/1986 |
List of persons who received a copy of the Briefing Report on the Western Kern County Collector System.
0 page(s)
| | CEC/Docket File | CEC Cec |
5221 | 12/15/1986 |
Transcript from the 12/11/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5220 | 12/12/1986 |
Transcript from the 12/8/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5219 | 12/9/1986 |
Transcript from the 12/5/86 hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5218 | 12/18/1986 |
Letter re New Source Review Stationary Source Determination for Proposed Midway-Sunset Cogeneration Project.
0 page(s)
| | CEC/Docket File | Kcapcd/Paxson |
5217 | 12/17/1986 |
Attendance sheet from the Midway-Sunset & Mobil Belridge joint T-Line Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5216 | 12/16/1986 |
Letter containing answers to three questions put forth to PG&E in Ms. Crowley's letter of October 15, 1986.
0 page(s)
| | CEC/Docket File | Pacific Gas & Electric Co./Willoughby |
5215 | 12/12/1986 |
Attendance sheet from the 12/12/86 Evidentiary Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
5214 | 12/12/1986 |
Attendance sheet from the 12/11/86 Evidentiary Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
5213 | 12/12/1986 |
Memo re the Western Kern County Joint Transmission Line Workshop Scheduled for December 16, 1986.
0 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5212 | 12/12/1986 |
Notice of Relocation of an Air Quality Workshop from Sacramento to Bakersfield, California.
0 page(s)
| | CEC/Docket File | CEC/Heard |
5211 | 12/10/1986 |
Applicant's Testimony on Transmission Line Engineering.
0 page(s)
| | CEC/Docket File | Atty. For Applicant/Varanini |
5210 | 12/10/1986 |
Notice of an Air Quality Workshop to be held on December 19, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5209 | 12/10/1986 |
Notice of an Air Quality Workshop to be held on December 19, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5208 | 12/9/1986 |
Review of Applicant's AFC Amendments dated October 6, 1986.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5207 | 12/9/1986 |
Air Resources Board Issue Identification and Witness List with Qualifications.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5206 | 12/9/1986 |
Attendance sheet from the 12/5/86 Evidentiary Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
5205 | 12/5/1986 |
Transcript from the 12/1/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5204 | 12/5/1986 |
Testimony of R. Don Vardeman on Transmission System Evaluation and Transmission System Engineering.
0 page(s)
| | CEC/Docket File | Marron, Reid & Sheehy/Varanini |
5203 | 12/4/1986 |
Final Staff Assessment - Staff Testimony in Uncontested Areas (Transmission System Engineering, Transmission System Evaluation).
0 page(s)
| | CEC/Docket File | CEC Cec |
5202 | 12/5/1986 |
Letter transmitting copies of the Power Sales Agreements and Amendments between Anaheim and Riverside and Desert G & T as discussed at the 11/5/86 Demand Conformance Workshop.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5201 | 12/4/1986 |
Receipt of the Confidential portion of Applicant's Testimony on Demand Conformance.
0 page(s)
| | CEC/Docket File | Atty. For The Applicant/Varanini |
5200 | 12/3/1986 |
Current Proof of Service List.
0 page(s)
| | CEC/Docket File | CEC/Fay |
5199 | 12/2/1986 |
Applicant's Testimony on the following: Structural Engineering; Civil Engineering, Visual Resources; Alternatives, Cultural Resources; Public Health; Safety; Mechanical Engineering; Transmission Line Safety and Nuisance; Power Plant Reliability; Electrical Engineering, Biological Resources and Soil Conservation.
0 page(s)
| | CEC/Docket File | Atty. For The Applicant/Varanini |
5198 | 12/1/1986 |
Memorandum of Points and Authorities of Sun Cogeneration Company re the Staff's Recommendation that the Commission Regulate the Biological Effects of Oil Field Activities Not Part of or Caused by the Proposed Cogeneration.
0 page(s)
| | CEC/Docket File | Pillsbury, Madison & Sutro/Roethe |
5197 | 12/1/1986 |
Final Staff Assessment (Staff Testimony In Contested and Uncontested Areas.)
0 page(s)
| | CEC/Docket File | CEC Cec |
5196 | 12/1/1986 |
Prepared Testimony of John T. Gray re Biological Resources in the Steam Service Area.
0 page(s)
| | CEC/Docket File | Pillsbury, Madison & Sutro/Roethe |
5185 | 12/1/1986 |
Prepared Testimony of Fred Armijo on Biological Resources.
0 page(s)
| | CEC/Docket File | Pillsbury, Madison & Sutro/Roethe & Flores |
5184 | 12/1/1986 |
Attendance sheet from the 12/1/86 Evidentiary Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
5183 | 12/1/1986 |
Staff Brief on Indirect Impacts of the Midway-Sunset Project on Biological Resources.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5182 | 12/1/1986 |
Transcript from the 11/25/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5181 | 11/26/1986 |
Staff Testimony in Uncontested Areas.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5180 | 11/26/1986 |
Attendance sheet from the November 25, 1986 Evidentiary Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
5179 | 11/26/1986 |
Applicant's Prepared Testimony on Demand Conformance.
0 page(s)
| | CEC/Docket File | Atty. For The Applicant/Varanini |
5178 | 11/24/1986 |
Submittal of the resumes of the remaining witnesses: Fred R. Klumb, Jeffrey R. Leboff, Dennis Ostrom, Jean J. Ospital, Daniel C. Pearson and Crispin H. Pierce.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5177 | 11/21/1986 |
Notice of a Biological Workshop to be held on Dec. 3, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5176 | 11/21/1986 |
Supplemental to Archaelogical Survey Report Fuel Unloading Facility - Kern County, CA.
0 page(s)
| | CEC/Docket File | Applicant |
5175 | 11/20/1986 |
Applican'ts Testimony on the following: Waste Management Land Use, Water Resources, Water Quality, Decommissioning, Socioeconomics, Noise, Traffic and Transportation, Engineering Geology and Power Plant Efficiency.
0 page(s)
| | CEC/Docket File | Atty. For The Applicant/Varanini |
5174 | 11/20/1986 |
Final Staff Assessment.
0 page(s)
| | CEC/Docket File | CEC Cec |
5173 | 11/20/1986 |
Memo re Preliminary Staff Assessment for Midway-Sunset Cogeneration Project, Kern County.
0 page(s)
| | CEC/Docket File | Dept. Of Fish & Game/Parnell |
5172 | 11/14/1986 |
Letter re the mailing of the Midway-Sunset master log.
0 page(s)
| | CEC/Docket File | CEC/Wilson |
5170 | 11/14/1986 |
Attendance sheet from the 11/12/86 California Energy Commission Staff Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5169 | 11/14/1986 |
Letter requesting a copy of the ELFIN Financial Input Data File for the Southern California Edison Company.
0 page(s)
| | CEC/Docket File | Independent Power Corp./El-gasseir |
5168 | 11/12/1986 |
Submittal of the following information: Transmission line Safety and Nuisance Responses to the PSA; Structural Engineering Responses to the PSA; Resumes of Witnesses; Air Quality Response to cumulative impacts discussion as requested at the Prehearing Conference; Civil Engineering response to the PSA.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5167 | 11/10/1986 |
Attendance sheet from the Demand Conformance Workshop held on 11/5/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5166 | 11/6/1986 |
Notice of a Workshop Cancellation and Rescheduling.
0 page(s)
| | CEC/Docket File | CEC Cec |
5165 | 11/5/1986 |
Notice of Evidentiary Hearings and Hearing Order.
0 page(s)
| | CEC/Docket File | CEC Cec |
5164 | 11/4/1986 |
Letter to Kekerix of CEC transmitting the proposed witness list for the Evidentiary Hearings.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5163 | 11/4/1986 |
Revised Errata Edition - Preliminary Staff Assessment: Demand Conformance.
0 page(s)
| | CEC/Docket File | CEC/Mcgowan |
5153 | 10/31/1986 |
Transcript from the 10/27/86 hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5152 | 11/3/1986 |
Preliminary Staff Assessment: Demand Conformance.
0 page(s)
| | CEC/Docket File | CEC/Mcgowan |
5151 | 10/31/1986 |
Notice of a workshop to consider shared transmission facilities for cogeneration projects in Southwestern Kern Counties to be held on Nov. 13, 1986
0 page(s)
| | CEC/Docket File | CEC Cec |
5150 | 10/31/1986 |
Memo re PSA filing on Demand Conformance.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5149 | 10/31/1986 |
Staff's corrected Prehearing Conference Statement and Witness Qualifications list.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5148 | 10/30/1986 |
Submittal of corrected pages (VR-5, VR-8, VR-11) to Data Response dated October 3, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5147 | 10/28/1986 |
Notice of a demand conformance prehearing workshop to be held on 11/5/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5146 | 10/27/1986 |
Engineering responses to the workshop of 10/16/86 and Southern California Edison Company's response to transmission system evaluation Data Request dated 9/5/86.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5145 | 10/27/1986 |
Letter acknowleding and accepting invitation to participate in proposed workshop on transmission facilities in Kern County.
0 page(s)
| | CEC/Docket File | Cpuc/Vial |
5144 | 10/24/1986 |
Staff's Prehearing Conference Statement.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5143 | 10/24/1986 |
Preliminary Prehearing Conference Statement.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5142 | 10/23/1986 |
Prehearing Conference Statement.
0 page(s)
| | CEC/Docket File | Emilio Varanini |
5141 | 10/23/1986 |
Attendance sheet from the Oct. 21, 1986 Transmission Line Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5140 | 10/23/1986 |
Attendance sheet from the Oct. 20, 1986 Biology Prehearing Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5139 | 10/23/1986 |
Attendance sheet from the Oct. 17, 1986 Prehearing Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5138 | 10/23/1986 |
Attendance sheet from the Oct. 8, 1986 Biology Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5137 | 10/17/1986 |
Data Response Submittal: Biology - Oct. 8, 1986 Workshop; Transmission Line Engineering - Sept. 5, 1986; Transmission System Evaluation Data Requests - Sept. 5, 1986 and Public Health - June 12, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5136 | 10/17/1986 |
Attendance sheet from the prehearing and demand conformance workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5135 | 10/16/1986 |
Committee Order Workshop to Consider Shared Transmission Line.
0 page(s)
| | CEC/Docket File | CEC/Crowley & Mussetter |
5134 | 10/16/1986 |
Letter to the President of CPUC re workshop to discuss and examine the sharing of new transmission facilities for proposed power plants in Kern County.
0 page(s)
| | CEC/Docket File | CEC/Crowley & Mussetter |
5133 | 10/16/1986 |
Letter to Southern California Edison Company requesting that a workshop be held to discuss the sharing of new transmission facilities for proposed facilities for proposed power plants in the Kern County.
0 page(s)
| | CEC/Docket File | CEC/Crowley & Mussetter |
5132 | 10/16/1986 |
Letter to Pacific Gas & Electric Company re the sharing of new transmission facilities on the Western side of Kern County.
0 page(s)
| | CEC/Docket File | CEC/Crowley & Mussetter |
5131 | 10/15/1986 |
Letter commenting on the status of the DOC at this time.
0 page(s)
| | CEC/Docket File | Kcapcd/Hebertson |
5129 | 10/9/1986 |
Preliminary Staff Assessment.
0 page(s)
| | CEC/Docket File | CEC Cec |
5128 | 10/8/1986 |
Change of prehearing conference location.
0 page(s)
| | CEC/Docket File | CEC/Public Adviser Office |
5127 | 10/7/1986 |
Notice of a prehearing workshop and demand conformance workshop to be held 10/16/86 and 10/17/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5126 | 10/7/1986 |
Submittal of a revision to air quality data response no. 38 previously submitted August 4, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5125 | 10/6/1986 |
Data response submittal: July 7, 1986 Structural engineering; August 27, 1986 Air quality and Sept. 5, 1986 Land Use, visual resources, transmission line engineering and transmission system evaluation.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5124 | 10/6/1986 |
Fourteenth Set of Staff Data Requests Nos. 370 - 373.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5123 | 10/3/1986 |
Letter transmitting the July 25, 1986 Supplement to agencies for review and comment.
0 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5122 | 10/1/1986 |
Motion to compel answers from applicant--air quality data requests.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5121 | 9/26/1986 |
Notice of Biology Workshop to be held on October 8, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5120 | 9/26/1986 |
Response to Applicant's Objection to California Energy Commission Staff Data Requests (Committee Order dated September 17, 1986).
0 page(s)
| | CEC/Docket File | Arb/Walsh |
5119 | 9/23/1986 |
Notice of Prehearing Conference to be held on October 27, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5118 | 9/19/1986 |
Attendance sheet from the scheduling conference held on 9/10/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5117 | 9/18/1986 |
Committee Order re Applicant's Objection to Staff Data Requests.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5116 | 9/17/1986 |
California Energy Commission Staff's Draft Assessments of each generator proposed as an air emission offset.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5115 | 9/16/1986 |
Submittal of Envirosphere contact report with Gus Pivetti; Ruben Nunez; Bob Shepard; Barry Hazeun and Ted Whitney.
0 page(s)
| | CEC/Docket File | Envirosphere/Allen |
5114 | 9/15/1986 |
Transcript from the 9/10/86 Hearing filed in the Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
5113 | 9/12/1986 |
Applicant hereby submits its objections pursuant to staff data requests.
0 page(s)
| | CEC/Docket File | Atty. For Applicant/Varanini |
5112 | 9/11/1986 |
Committee Scheduling Order.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5111 | 9/9/1986 |
Response to Data Requests in the areas of Biological and Cultural Resources; Noise Clarification dated June 27, August 7 and August 14, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5110 | 9/5/1986 |
Staff data requests in the areas of land use; visual resources; transmission line engineering and transmission system evaluation.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5109 | 9/4/1986 |
Attendance sheet from the 9/3/86 air quality workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5108 | 9/4/1986 |
List of Kern County cogeneration/resource recovery projects that were omitted from the air quality data requests.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5107 | 9/4/1986 |
Responding to Mr. Western's letter of July 14, 1986 to Mr. Rueger/PG&E requesting information re the 230 kV connection of project to Midway Substation.
0 page(s)
| | CEC/Docket File | Pacific Gas & Electric Company/Metague |
5106 | 9/2/1986 |
Submittal of the following items: Air Quality responses to the 4/10/86 data request; Structural Engineering responses to the 4/28 and 7/7/86 requests and clarification to the 8/7/86 Workshop; 6/12/86 Public Health; 7/16/86 Transmission line safety & nuisance; 7/2/86 Power plant reliability clarification & modification to AFC Figure 4.2-5.
0 page(s)
| | CEC/Docket File | CEC Cec |
5105 | 9/2/1986 |
Attendance sheet from the Air Quality Workshop held 8/27/86.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5104 | 9/2/1986 |
Letter requesting copies of detailed maps and any other information that would be of interest to property owners.
0 page(s)
| | CEC/Docket File | Lars Martensson |
5103 | 8/27/1986 |
Data Request Nos. 339 - 348.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5102 | 8/27/1986 |
Letter re project schedule and demand conformance.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5101 | 8/26/1986 |
Committee Scheduling Order -- and Notice of Conferece.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5100 | 8/25/1986 |
Notice of an Air Quality Data Response Workshop on September 3, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5099 | 8/21/1986 |
Motion to reconsider Tentative Schedule.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5098 | 8/15/1986 |
Notice of an air quality data response workshop to be held 8/27/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5097 | 8/15/1986 |
Notice of staff workshop on staff draft final report; "Assessment of the cumulative socioeconomic impancts."
0 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5096 | 8/15/1986 |
Data requests (#336-338) and a letter re 7/25/86 cut-off date.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5095 | 8/14/1986 |
Committee order re: Scheduling.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5094 | 8/14/1986 |
Letter informing that the California Energy Commission staff has established a 7/25/86 information cut-off date for the preliminary staff assessment.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5093 | 8/12/1986 |
Attendance sheet from the data response workshop held 8/8/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5092 | 8/11/1986 |
Letter containing corrections to minor errors in the August 4, 1986 data response to questions raised by the KCAPCD.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5091 | 8/11/1986 |
Submittal of corrections to fuel use data contained in appendix AQ-3 of the August 4, 1986 data response.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5090 | 8/12/1986 |
Attendance sheet from the data response workshop held Aug. 7, 1986.
0 page(s)
| | CEC/Docket File | CEC Cec |
5089 | 8/6/1986 |
Attendance sheet from the August 4, 1986 Pacific Gas & Electric Company Transmission Outlet Study.
0 page(s)
| | CEC/Docket File | CEC Cec |
5088 | 8/4/1986 |
Data response to KCAPCD request to September 20, 1985.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5087 | 8/4/1986 |
Data responses for the following requests: Air quality April 10th & June 12th; June 12 transmission engineering; July 7th structural engineering; July 16th Civil engineering and biological resources clarifications and the July 25th water quality and waste management request.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5086 | 8/4/1986 |
Letter re review of final reports addressing wildlife and Botanical surveys for the Midway-Sunset AFC.
0 page(s)
| | CEC/Docket File | Fish & Wildlife Service/Kobetich |
5085 | 8/4/1986 |
Data response submittal containing changes which have taken place since the AFC was accepted.
0 page(s)
| | CEC/Docket File | Midway-sunet Cogen Project/Levine |
5084 | 7/31/1986 |
Memo re applicant's interpretation of the stipulation it entered into on Feb. 19, 1986.
0 page(s)
| | CEC/Docket File | CEC/Redillo |
5082 | 8/1/1986 |
Letter asking for a response to data request #311.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5081 | 7/30/1986 |
Notice of data responses and biology workshops to be held Aug. 7 and 8, 1986.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5080 | 7/28/1986 |
Memo re the transmission line engineering and transmission line evaluation responses and Pacific Gas & Electric Company's study.
0 page(s)
| | CEC/Docket File | CEC/Radillo |
5079 | 7/28/1986 |
Data response for the following biological resources: air quality (eng.); air quality (modeling); structural engineering; noise; public health; transmission line engineering; cultural resources; water quality; visual resources; waste management; electrical eng.; mechanical eng.; also second revision to the AFC.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5078 | 7/28/1986 |
Staff data requests.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5077 | 7/28/1986 |
Notice of a public workshop concerning the Pacific Gas & Electric Company's transmission outlet study.
0 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5076 | 7/24/1986 |
Letter re California Energy Commission staff request of a 91 day extension in the project schedule.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5075 | 7/21/1986 |
Report of telephone conversation with Gary Fay re the docketing of the biology data responses and also the interconnect study.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5074 | 7/18/1986 |
Attendance sheet from the data response workshop and continuation of Seismic Design Criteria & Structural Engineering Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5073 | 7/18/1986 |
Letter re California Energy Commission's requests for additional data in the subject area of transmission line engineering.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5072 | 7/16/1986 |
Data response to requests 296-306 dated June 27, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset/Western |
5071 | 7/16/1986 |
Data response to request made by the staff in the area of transmission line engineering and transmission system evaluation.
0 page(s)
| | CEC/Docket File | Midway-sunset/Western |
5070 | 7/16/1986 |
Attendance sheet from the structural engineering and seismic design criteria workshop held 7/11/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5069 | 7/14/1986 |
Letter re application for confidentiality.
0 page(s)
| | CEC/Docket File | CEC/Rhoads |
5068 | 7/10/1986 |
Attendance sheet from Biology Workshop held 6/3/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5067 | 7/9/1986 |
Clarification and correction Botanical Field Survey Results.
0 page(s)
| | CEC/Docket File | Dames & Moore/Gray |
5066 | 7/8/1986 |
Response to data requests dated 4/10/86.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5065 | 7/8/1986 |
Data request necessary for a complete staff analysis in structural engineering.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5064 | 7/7/1986 |
Data request workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5063 | 7/3/1986 |
Notice of a data response workshop on 7/16/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5062 | 7/3/1986 |
Notice of a data request and Seismic design criteria workshop on 7/11/86.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5061 | 7/1/1986 |
Additional responses to data request of 4/10/86.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5060 | 7/1/1986 |
Report of Conversation with Ed Chalouplca of Pacific Gas & Electric Company on June 27, 1986.
0 page(s)
| | CEC/Docket File | CEC/Woo |
5059 | 6/30/1986 |
Transcript from the 6/24/86 Hearing filed in the Transcript file.
0 page(s)
| | CEC/Docket File | CEC Cec |
5058 | 6/30/1986 |
Letter to Valerie Hall re Mr. Douglas McCormick's review of the current status of this project.
0 page(s)
| | CEC/Docket File | Kcapcd/Paxson |
5057 | 7/1/1986 |
Letter to Midway-Sunset transmitting three references that will provide the background information and calculation routines needed to respond to data request 280 and requests to public exposure/health risks.
0 page(s)
| | CEC/Docket File | Envirosphere/Russ |
5056 | 6/26/1986 |
Notice to provide a response to additional data request in the subject area of transmission line engineering.
0 page(s)
| | CEC/Docket File | Midway Sunset Cogen Project/Western |
5055 | 6/30/1986 |
Attached responses to May 13 request asking for changes since AFC was first submitted.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen/Western |
5054 | 6/30/1986 |
Staff requests specified information necessary for a complete staff analysis in Biological & Cultural Resources from Sun Cogen Co.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5053 | 6/25/1986 |
Attendance sheet of the issue assessment conference held June 24, 1986.
0 page(s)
| | CEC/Docket File | CEC Cec |
5052 | 6/20/1986 |
Notice of a data request workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5051 | 6/20/1986 |
Review of Biological Studies.
0 page(s)
| | CEC/Docket File | Sacramento Endangered Species Office/Harlow |
5050 | 6/19/1986 |
Attendance sheet from data request workshop held on 6/17/86.
0 page(s)
| | CEC/Docket File | CEC Cec |
5049 | 6/19/1986 |
Letter providing further clarification of the ex-parte communication with Don Vardeman of Sun Oil Co. on 5/21/86.
0 page(s)
| | CEC/Docket File | Envirosphere/Cronk |
5048 | 6/12/1986 |
Staff Data Request Nos. 250 - 295.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5047 | 6/10/1986 |
Memo re the Midway-Sunset Schedule.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5046 | 6/9/1986 |
Attendance sheet from the June 6, 1986 Data Response Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5045 | 6/6/1986 |
Summary from the May 7, 1986 Data Request Workshop on Structural Engineering and Transmission System Evaluation.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5044 | 6/5/1986 |
Southern California Edison Company's Application for Confidential Designation, dated June 3, 1986.
0 page(s)
| | CEC/Docket File | Southern California Edison/Dozier |
5043 | 6/3/1986 |
Notice of a Data Request Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5042 | 6/2/1986 |
Additional responses to data request of April 10, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5041 | 6/2/1986 |
Biological Workplan submittal, entitled "Results of Botanical Field Survey #2."
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5040 | 6/2/1986 |
Biological Workplan submittal, entitled "Results of Wildlife Field Survey."
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen. Project/Western |
5039 | 6/2/1986 |
Staff data request Nos. 246 - 248 and on Public Health.
0 page(s)
| | CEC/Docket File | CEC/Kekerix |
5038 | 6/2/1986 |
Data Response No. 212.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5037 | 6/2/1986 |
Data Response No. 209C.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5036 | 6/2/1986 |
Data Response No. 230I.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5035 | 6/2/1986 |
Data Response No. 215.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5034 | 5/30/1986 |
Letter re Midway-Sunset's Cultural Resources Application for Confidentiality.
0 page(s)
| | CEC/Docket File | CEC/Rhoads |
5033 | 5/29/1986 |
Notice of Hearing (Issue Assessment Conference).
0 page(s)
| | CEC/Docket File | CEC Cec |
5032 | 5/27/1986 |
Additional Response to Data Request of April 10, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Western |
5031 | 5/23/1986 |
Letter re PG&E's Preliminary Interconnection Study.
0 page(s)
| | CEC/Docket File | Pacific Gas & Electric Company |
5030 | 5/22/1986 |
Notice of a Second Data Response Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5029 | 5/22/1986 |
Notice of Public Workshop and Site Visit.
0 page(s)
| | CEC/Docket File | CEC Cec |
5028 | 5/16/1986 |
Attendance sheet from the 4/3/86 Biology Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5027 | 5/14/1986 |
Letter to Sun Cogen. Company re the two acceptable formats for relating the proposed site changes.
0 page(s)
| | CEC/Docket File | CEC Cec |
5026 | 5/14/1986 |
Attendance sheet from 5/12/86 data response workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5025 | 5/12/1986 |
Letter re: application for confidential designation regarding the power purchase contract between sun exploration and product company and Southern California Edison Company.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Proj./Levine & Western |
5024 | 5/9/1986 |
Letter to Pacific Gas & Electric Company re California Energy Commission's staff data request of April 10, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Project/Levine |
5023 | 5/6/1986 |
Staff Data Request.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5022 | 5/5/1986 |
Response to April 10, 1986 data request.
0 page(s)
| | CEC/Docket File | Levine/Project Manager |
5021 | 5/5/1986 |
Letter and application for confidential designation.
0 page(s)
| | CEC/Docket File | Western/Project Manager |
5020 | 5/5/1986 |
Notice of a Data Response Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5019 | 5/5/1986 |
Letter requesting that the power purchase contract be maintained confidential and proposing that a response as to why it should be submitted by May 9, 1986.
0 page(s)
| | CEC/Docket File | Levine/Project Manager |
5018 | 5/5/1986 |
Commission Escrow Determination.
0 page(s)
| | CEC/Docket File | CEC Cec |
5017 | 5/2/1986 |
Data request of April 10, 1986.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen. Project/Western |
5016 | 5/1/1986 |
Report of Conversation re: responses to various data requests.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5015 | 4/30/1986 |
Data requests No. 194 thru No. 207.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5014 | 4/30/1986 |
Confirmation of changes to or clarification of data requests made since 4/17/86 workshop.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5013 | 4/29/1986 |
Statement of the Commission staff on which electricity report to apply.
0 page(s)
| | CEC/Docket File | CEC Cec |
5012 | 4/29/1986 |
Letter re Biological surveys; Discovery data response biological work plan.
0 page(s)
| | CEC/Docket File | Western/Project Manager |
5011 | 4/25/1986 |
Backup material from the 4/30/86 Business Meeting.
0 page(s)
| | CEC/Docket File | CEC Cec |
5010 | 4/25/1986 |
Notice of a Data Request Workshop.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5009 | 4/25/1986 |
Letter requesting that the applicant include the project's steam service area in the areas surveyed for biological.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5008 | 4/25/1986 |
Revised stipulation between staff and applicant re need test.
0 page(s)
| | CEC/Docket File | Western |
5007 | 4/24/1986 |
Current (revised April 24, 1986) Proof of Service List.
0 page(s)
| | CEC/Docket File | CEC/Fay |
5006 | 4/24/1986 |
Report of telephone conversation with Ted Rado and Mike Mulligan of U.S.Fish and Wildlife Services re biological resource information.
0 page(s)
| | CEC/Docket File | CEC/Sazaki |
5005 | 4/22/1986 |
Notification of New Library being added to the Proof of Service List.
0 page(s)
| | CEC/Docket File | CEC/Valkosky |
5004 | 4/21/1986 |
Staff's data requests nos. 170-193.
0 page(s)
| | CEC/Docket File | CEC/Mason |
5003 | 4/21/1986 |
Attendance sheet from the 4/17/86 Workshop.
0 page(s)
| | CEC/Docket File | CEC Cec |
5002 | 4/18/1986 |
Memo containing response to Committee discussion of Escrow Determination at Informational Hearing, April 11, 1986.
0 page(s)
| | CEC/Docket File | Joyce Mason |
5001 | 4/18/1986 |
Committee Escrow Recommendation.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
5000 | 4/18/1986 |
Notice of Commission Hearing re: Escrow Determination.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4999 | 4/14/1986 |
Transcript from the 4/11/86 Hearing filed in Transcript File.
0 page(s)
| | CEC/Docket File | CEC Cec |
4998 | 4/16/1986 |
Letter containing requested data regarding the gross and net electrical generation that would be available from subject project.
0 page(s)
| | CEC/Docket File | Western |
4997 | 4/16/1986 |
Report of telephone conversation with John Gray/Dames & Moore regarding biological field sampling techniques for scent stations.
0 page(s)
| | CEC/Docket File | CEC/Sazaki |
4996 | 4/14/1986 |
Attendance sheet from the April 11, 1985 Site Visit and Informational Hearing.
0 page(s)
| | CEC/Docket File | CEC Cec |
4991 | 4/14/1986 |
Comments on the reviewed proposed biology work plan re the timing and scope of biological studies for the Midway-Sunset Project.
0 page(s)
| | CEC/Docket File | Dept. Of Fish & Game/Parnell |
4990 | 4/11/1986 |
Staff Data Requests.
0 page(s)
| | CEC/Docket File | CEC/Mason |
4989 | 4/8/1986 |
Notice of a Data Request Workshop.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4988 | 4/7/1986 |
Curren Proof of Service List.
0 page(s)
| | CEC/Docket File | CEC/Valkosky |
4987 | 4/7/1986 |
Order Granting Petition to Intervene.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4986 | 3/18/1986 |
ARB's Data Requests.
0 page(s)
| | CEC/Docket File | Arb/Menebroker |
4985 | 3/26/1986 |
Letter re Midway-Sunset Cogen Project, Application for Confidentiality.
0 page(s)
| | CEC/Docket File | CEC/Ward |
4984 | 3/25/1986 |
Notice of Public Workshop and Site Visit.
0 page(s)
| | CEC/Docket File | CEC Cec |
4983 | 3/26/1986 |
Discovery Data Response Biological Work Plan.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen Proj./Western |
4982 | 3/26/1986 |
Commenting on our public agency information request notice dated March 4, 1986.
0 page(s)
| | CEC/Docket File | Dept. Of Transportation/Smith |
4981 | 3/21/1986 |
Petition to Intervene from California Air Resources Board.
0 page(s)
| | CEC/Docket File | Arb/Walsh |
4980 | 3/20/1986 |
Letter advising property owners/residents that they can be kept abreast of all developments & activities associated with the Midway-Sunset Proceedings.
0 page(s)
| | CEC/Docket File | CEC Cec |
4979 | 3/17/1986 |
Committee Order: Formulating Escrow Recommendation.
0 page(s)
| | CEC/Docket File | CEC Cec |
4978 | 2/18/1986 |
Agenda Back-up material from 2/19/86 Business Meeting -- Items 3 & 4.
0 page(s)
| | CEC/Docket File | CEC Cec |
4977 | 3/14/1986 |
Submittal of requested information to be used on a socioeconomic cumulative impact study.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen.proj./Levine |
4976 | 3/13/1986 |
Response to Commissioner Crowley's letter of March 5, 1986 re property owners adjacent to the plant site and along the primary transmission line right-of-way.
0 page(s)
| | CEC/Docket File | Midway-sunset Cogen./Levine |
4975 | 3/12/1986 |
Report of conversation with Ed Western and Bob Levine/Sun Cogen. re a biology workshop at the proposed plant site.
0 page(s)
| | CEC/Docket File | CEC/Mason |
4974 | 3/7/1986 |
Current Proof of Service List.
0 page(s)
| | CEC/Docket File | CEC Cec |
4973 | 3/6/1986 |
Notice of Informational Presentation and Site visit.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4967 | 3/6/1986 |
Notice to Public Agencies and Request for Information.
0 page(s)
| | CEC/Docket File | CEC Cec |
4964 | 3/5/1986 |
Letter to So. Sierra Energy Co. requesting a listing of all property owners adjacent to the plant site; and all owners of parcels within the alternate transmission line rights-of-way.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4963 | 3/5/1986 |
Letter to Sun Cogen. Co. requesting a listing of all property owners adjacent to the plant site; and all owners of parcels within the alternate transmission line rights-of-way.
0 page(s)
| | CEC/Docket File | CEC/Crowley |
4962 | 3/3/1986 |
Comments re: Adequacy Determination.
0 page(s)
| | CEC Cec | Kern County Air Pollution Control District |
4961 | 2/27/1986 |
Power Purchase Contract between So. California Edison and Sun Exploration and Production Company and Application for Confidential Designation.
0 page(s)
| | CEC Cec | Midway-sunset Cogen.project/E.r.western & R.n.levi |
4960 | 2/26/1986 |
Copy of Final Supplement to the AFC.
0 page(s)
| | Interested Parties | CEC/Bob Therkelsen |
4959 | 2/26/1986 |
Review of Proposed Biological Studies Work Plan for the Midway-Sunset Cogen. Project.
0 page(s)
| | CEC Cec | Usdi/Gail C. Kobetich |
4958 | 2/26/1986 |
Order accepting the AFC as complete.
0 page(s)
| | Interested Parties | CEC/Charles Imbrecht |
4957 | 2/14/1986 |
Additional information on Air Quality Transmission System Evaluation.
0 page(s)
| | CEC Cec | Midway-sunset Cogen.proj./E.r.western & R.n.levine |
4956 | 2/7/1986 |
Report of telephone conversation with Ed Western, Don Vardeman, & B.J. Atkins of Sun Cogen. Co. re which generators are being used as a part of the offset package.
0 page(s)
| | Interested Parties | CEC/Valerie Hall |
4955 | 2/6/1986 |
Report of conversation with Mike Gardner (So. Sierra Energy Co.) re data deficiencies.
0 page(s)
| | Interested Parties | CEC/Valerie Hall |
4954 | 2/6/1986 |
Report of telephone conversation with Don Vardeman of Sun Cogen. Company re the current data adequacy status.
0 page(s)
| | Interested Parties | CEC/Valerie Hall |
4953 | 1/27/1986 |
Submitted for review & comments -- Supplements dated Sept. 30, 1985, Jan. 6, 1986 & Jan. 24, 1986.
0 page(s)
| | Agency Distribution List | CEC/Bob Therkelsen |
4952 | 1/24/1986 |
Data response to CEC letter of Dec. 31, 1985, CEC Hearing of Jan. 8, 1986 & the Jan. 21, 1986 Workshop re Air Quality & Transmission System Evaluation.
0 page(s)
| | CEC/R.n.ward & V.t.hall | R.n.levine & E.r.western/Project Managers |
4951 | 1/7/1986 |
Data response to CEC's letter of Dec. 31, 1985 re Air Quality & Transmission System.
0 page(s)
| | CEC/R.n.ward & V.t.hall | E.r.western & R.n.levine/Project Managers |
4950 | 10/2/1985 |
Data Response to comments submitted by the KCAPCD on Sept. 20, 1985.
0 page(s)
| | CEC/R.n.ward & V.t.hall | R.n.levine & E.r.western/Project Managers |
4949 | 1/23/1986 |
Notice of Availability of Supplements dated Sept. 30, 1985 & Jan. 6, 1986.
0 page(s)
| | Interested Parties | CEC Cec |
4940 | 1/13/1986 |
Notice of Public Workshop.
0 page(s)
| | Interested Parties | CEC/Bob Therkelsen |
4939 | 1/7/1986 |
Memo re Midway-Sunset Cogen. Project AFC Acceptance recommendation.
0 page(s)
| | Commissioners | Randall Ward |
4938 | 1/2/1986 |
Letter commenting on the remaining deficiencies in the AFC.
0 page(s)
| | Sun Cogen.co./Edmond Western | CEC/Randall Ward |
4937 | 1/2/1986 |
Letter commenting on the Midway-Sunset Supplements.
0 page(s)
| | CEC Cec | Kern County Dept. Of Planning/Peter E. Whitehead |
4936 | 12/31/1985 |
Letter re the submittal of the eight supplement dated Dec. 6, 1985 for public comment.
0 page(s)
| | Agency Distribution List | CEC/Bob Therkelsen |
4935 | 12/6/1985 |
Data response to the November 13, 1985 hearing also additional information in the areas of transmission engineering, cultural resources and transmission system evaluation.
0 page(s)
| | Randy Ward & Valerie Hall | Sun Cogen.co./So. Sierra Co. E.r.western & R.n.lev |
4934 | 12/5/1985 |
Report of a telephone conversation with B.J. Atkins/Midway, Joe Kubler and Doug Brewer/Dames & Moore re air quality.
0 page(s)
| | Interested Parties | CEC/Valerie Hall |
4933 | 12/10/1985 |
Review of supplements to the Midway-Sunset Cogen. AFC.
0 page(s)
| | CEC/E. Ross Deter | Sacto. Endangered Species Office/Gail C. Kobetich |
4932 | 12/6/1985 |
Response to Nov. 13, 1985 Hearing additional information re areas of transmission eng., cultural resources and transmission system evaluation.
0 page(s)
| | CEC Cec | Midway-sunset/Western & Levine |
4931 | 12/6/1985 |
Seventh Supplement to AFC Agency Distribution Letter.
0 page(s)
| | Interested Parties | CEC/Bob Therkelsen |
4929 | 11/27/1985 |
Data Adequacy Worksheet response to Data Adequacy assessment dated November 1, 1985; Workshop held on November 8, 1985 and the CEC Hearing of November 13, 1985.
0 page(s)
| | CEC Cec | Midway-sunset Cogen./Western & Levine |
4928 | 11/12/1985 |
Data response to November 1, 1985 data adequacy assessment of the AFC and the workshop held on November 8, 1985.
0 page(s)
| | CEC/Ward & Hall | Sun Cogen. Co./E.r. Western |
4927 | 12/3/1985 |
Information that was inadvertently omitted from the response submitted on Nov. 27, 1985.
0 page(s)
| | CEC Cec | E.r. Western & R.n. Levine Applicants |
4926 | 12/2/1985 |
Report of telephone conversation with Ed Western and Don Vardeman of Sun Cogen. Co. re the remaining issues for data adequacy.
0 page(s)
| | Interested Parties | CEC/Valerie Hall |
4925 | 11/20/1985 |
Data Deficiencies.
0 page(s)
| | Interested Parties | CEC/Charles Imbrecht |
4924 | 11/20/1985 |
Notice of Availability of Supplement to the AFC for the Midway-Sunset Cogen. Project.
0 page(s)
| | Interested Parties | CEC/Bob Therkelsen |
4923 | 11/20/1985 |
Letter requesting a copy of the archeological survey to be conducted on the transmission line.
0 page(s)
| | CEC/Valerie Hall | Native American Heritage/Annette Ospital |
4922 | 11/14/1985 |
Fourth, Fifth & Sixth Supplements (dated Oct. 24, Nov. 6 and Nov. 12, 1985) to the Midway-Sunset Cogen Project.
0 page(s)
| | Agency Distribution List | CEC/Bob Therkelsen |
4921 | 11/13/1985 |
Agenda Back Up material for Item #6 (Midway-Sunset AFC) of Nov. 13, 1985 Business Meeting.
0 page(s)
| | Commissioners | Randall Ward |
4914 | 11/12/1985 |
Data Adequacy Workshop Response.
0 page(s)
| | CEC/Randall Ward & Valerie Hall | E.r. Western |
4913 | 11/8/1985 |
Notice of Availability.
0 page(s)
| | Interested Parties | CEC Cec |
4912 | 11/7/1985 |
Response to Data Adequacy Worksheet.
0 page(s)
| | CEC Cec | Midway-sunset Cogen. Project/E. Western & R. Levin |
4911 | 11/4/1985 |
Letter re: Data Deficiencies in Midway-Sunset AFC.
0 page(s)
| | Sun Cogen. Co./Edmond R. Western | CEC/Randall M. Ward |
4910 | 10/29/1985 |
Notice of a Data Adequacy Workshop.
0 page(s)
| | Interested Parties | CEC/E. Ross Deter |
4909 | 10/29/1985 |
Letter commenting on Midway-Sunset's Sept. 30th response to KCAPCD Sept. 20th, 85 deficiency list.
0 page(s)
| | CEC/Rick Buell | Kcapcd/Thomas Paxson |
4908 | 10/25/1985 |
Supplement to the AFC dated Oct. 15, 1985.
0 page(s)
| | Agency Distribution List | CEC/E. Ross Deter |
4907 | 10/25/1985 |
Data responses to the following request: CEC Staff data adequacy assessment of the AFC; Oct. 17, 1985 workshop; Oct. 18th telephone conversation discussing structural engineering and Oct. 23rd, telephone conversation re air quality.
0 page(s)
| | CEC/Valerie Hall | Southern Sierra Energy Co./Robert Levine |
4906 | 10/25/1985 |
Notice of Availability - Supplement to the AFC for the Midway-Sunset Cogen Project.
0 page(s)
| | Interested Parties | CEC Cec |
4905 | 10/25/1985 |
Telephone conversation with Engineer Bob Levine of So. Sierra Energy Co. re: items identified by the executive director's letter as being inadequate for structural engineering.
0 page(s)
| | Interested Parties | CEC/Gary Fay |
4904 | 10/24/1985 |
Response to CEC Staff Data Adequacy Assessment.
0 page(s)
| | CEC Cec | So.sierra Energy Co./Robert N. Levine |
4903 | 10/16/1985 |
Data Adequacy Worksheet Response.
0 page(s)
| | CEC/Randall Ward & Valerie Hall | Southern Sierra Energy Co./Robert N. Levine |
4902 | 10/18/1985 |
Letter re: Flood hazard review & groundwater comments for Midway-Sunset Cogeneration project, Crocker Canyon, Southwest of Derby Acres.
0 page(s)
| | CEC/Randall M. Ward | Kern County Water Agency/Stuart T. Pyle |
4901 | 10/9/1985 |
Cultural Resource Impact.
0 page(s)
| | Native American Heritage/Annette Ospital | So.sierra Energy Co./R.n. Levine |
4900 | 10/2/1985 |
Data Adequacy comments re: the AFC.
0 page(s)
| | CEC Cec | Arb/Raymond E. Menebroker |
4899 | 10/8/1985 |
Notice of a Data Adequacy Workshop.
0 page(s)
| | Interested Parties | CEC Cec |
4897 | 10/8/1985 |
Responds to agency requests for comments.
0 page(s)
| | Interested Parties | CEC Cec |
4896 | 10/7/1985 |
Supplements dated September 20 and 24, 1985.
0 page(s)
| | Agency Distribution List | CEC/E. Ross Deter |
4895 | 10/2/1985 |
Adequacy Determination.
0 page(s)
| | CEC/Valerie Hall | Kcapcd/Thomas Paxson |
4894 | 10/1/1985 |
Letter commenting on a recent development in energy conservation for cogeneration systems.
0 page(s)
| | CEC/Ernesto Perez | Energy Labs/Michael Dubey |
4893 | 9/27/1985 |
Letter commenting on the need for more detailed project information to determine whether or not a conditional use permit is required.
0 page(s)
| | CEC/Randall M. Ward | Kern Country Planning Dept./Peter F. Whitehead |
4892 | 9/12/1985 |
Memorandum re: Confidential material.
0 page(s)
| | CEC/Docket File | Valerie Hall |
4891 | 9/25/1985 |
Letter requesting a copy of the project site location map.
0 page(s)
| | CEC Cec | San Bernardino County Museum/Robert Reynolds |
4890 | 9/24/1985 |
Data Adequacy Worksheet Response.
0 page(s)
| | CEC Cec | E. Western & R.n. Levine |
4889 | 9/23/1985 |
Supplemental Data Submittal.
0 page(s)
| | CEC Cec | Sun.cogen.co. & So.sierra Energy Co./Western & Lev |
4888 | 9/23/1985 |
Response to request for public agency participation.
0 page(s)
| | CEC Cec | Dept. Of Fish & Game/George Nokes |
4887 | 9/23/1985 |
Document Handling.
0 page(s)
| | Staff Of Libraries | CEC Cec |
4886 | 9/23/1985 |
Use of the Application for Certification.
0 page(s)
| | Member Of The Public | CEC Cec |
4885 | 9/17/1985 |
Notice of Receipt.
0 page(s)
| | Interested Parties | CEC/E. Ross Deter |
4884 | 9/12/1985 |
Letter commenting on Division of Oil & Gas' review of Midway-Sunset AFC.
0 page(s)
| | CEC Cec | Division Of Oil & Gas/Hal Bopp |
4883 | 9/11/1985 |
Notice of a Data Adequacy workshop.
0 page(s)
| | Interested Parties | CEC Cec |
4882 | 9/5/1985 |
Request for Public Agency participation.
0 page(s)
| | Agency Distribution List | CEC/E. Ross Deter |
4881 | 8/28/1985 |
One hundred & fifty copies of AFC for the proposed Midway-Sunset Cogen. Project.
0 page(s)
| | CEC/Docket File | Sun Cogen. Co. & So. Sierra Energy Co./R. Levine & |