Docket Log

Docket: 82-AFC-01C
Project Title: Compliance - PG&E Geysers Unit 20, 82-AFC-01C
Generated On: 4/20/2024 1:19:34 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2553703/29/2024 GPC Unit 20_2023 ITM Reports_Repeated Application for Confidential Designation

19 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2553593/29/2024 GPC Unit 20_Letter to Keith Winstead Regarding Fire Protection-3 Submission

1 page(s)
 CEC/Keith WinsteadEllison Schneider Harris & Donlan LLP
2552133/7/2024 CONFIDENTIAL_U20_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2552072/16/2024 CONFIDENTIAL Unit 20 GPC Q1 2024 FIRE PROTECTION Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2551923/20/2024 CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2549153/7/2024 Repeated Application for Confidential Designation_U20_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2545422/16/2024 GPC Unit 20_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2508756/30/2023 2022 Annual Compliance Report - Unit 20 (Grant)

75 page(s)
 CEC/Keith WinsteadGeysers Power Company, LLC
2498134/19/2023 CEC Response Letter re Application for Confidential Designation dated March 30, 2023

Compliance
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2497754/3/2023 Geysers Power Company Wet Sprinkler Inspection Report 4Q2022 CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497744/3/2023 Geysers Power Company Deluge Inspection Report 4Q2022 CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497734/3/2023 Geysers Power Company ITM Report Cover Letter CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2495294/3/2023 Geysers Power Company ITM Reports Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24804812/13/2022 November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Grant Unit 20 Facility

6 page(s)
 CEC/John Heiser and Keith WinsteadEllison Schneider Harris & Donlan LLP
24760011/21/2022 CEC Response for Confidential Designation Geysers Unit 20, Grant

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase Maxwell California Energy Commission
24758811/4/2022 GPC Unit 20_Q3 2022 Wet Pipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24758711/4/2022 GPC Unit 20_Q3 2022 Deluge Inspection Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24758611/4/2022 GPC Unit 20_Q3 2022 Second Semiannual FireScan Report

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24758511/4/2022 GPC Unit 20_Q3 2022 ITM Report Cover Letter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24730611/4/2022 GPC Unit 20_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24727611/3/2022 CEC Response to Geysers Unit 20 Repeated Application for Confidentiality

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24720710/19/2022 GPC Unit 20_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24718910/20/2022 GPC Unit 20_Wet Pipe Q2 2022 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24718810/20/2022 GPC Unit 20_Deluge Q2 2022 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24718710/20/2022 GPC Unit 20_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24670410/20/2022 GPC Unit 20_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24665110/19/2022 GPC Unit 20_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2439036/1/2022 Unit 20_Fire Alarm and Life Safety System Inspection Certificate

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2439026/1/2022 Unit 20_Electric Fire Pump Annual Report # 3

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2439016/1/2022 Unit 20_Electric Fire Pump Annual Report # 2

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2439006/1/2022 Unit 20_Electric Fire Pump Annual Report # 1

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438996/1/2022 Unit 20_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438986/1/2022 Unit 20_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438976/1/2022 Unit 20_Standpipe and Hose System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438966/1/2022 Unit 20_Wet Pipe Fire Sprinkler System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438956/1/2022 Unit 20_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438617/6/2022 CEC Response Geyser Unit 20 Confidential Application June 1, 2022

2 page(s)
 C. Maxwell Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2438096/30/2022 2021 Annual Compliance Report - Grant

Compliance
85 page(s)
 CEC/Docket UnitGeysers Power Company, LLC
2433906/1/2022 Unit 20_GPC Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2425784/5/2022 2020 Revised Annual Compliance Report - Grant
N/A
196 page(s)
 Eric Veerkamp, CPMGeysers Power Company, LLC
24217611/22/2021 Confidential GPD October 2021 Monthly Recommissioning Report

7 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24217511/22/2021 Confidential Basis of Design Narrative

2 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24217411/22/2021 Confidential Fire Scan Report

10 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24217311/22/2021 Confidential Deluge 2021 Report

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24217211/22/2021 Confidential Wet-Pipe 2021 Report

3 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24217111/22/2021 Confidential Cover Letter for Geysers Power Company ITM Report Q 3 2021

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24215312/3/2021 Geysers Update 2-8-2019-presentation design plan

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24215012/3/2021 U16_U18_U20_Wetting_pump_piping_CEC

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24199812/3/2021 20210524 Grant BOD ReCx Privileged and Confidential_Rev1

129 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186712/3/2021 ITM_Standpipe Inspection Report_April 2019
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186612/3/2021 Hydraulic Calc Plate image
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186512/3/2021 Grant 2020 Jensen engineering Review of BOD and Recom Plan
 CEC/Docket UnitEllison Schneider Harris & Donlan
24186412/3/2021 20190410_Geysers Unit #20 Grant BOD_ReCx_Privileged and Confidential_BOD w Appendices (00479865xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186312/3/2021 20190410 Geysers Unit #20 Grant BOD ReCx Privileged and Confidential
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186212/3/2021 ITM-Grant_Q1 Wet Pipe 2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186112/3/2021 ITM-Grant_Q1 Fire Pump_3_2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24186012/3/2021 ITM-Grant_Q1 Fire Pump_2_2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24185912/3/2021 ITM-Grant_Q1 Fire Pump_1_2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24185812/3/2021 ITM-Grant Q1 2021_fire alarm system inspection_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24185712/3/2021 ITM Grant Q1_Standpipe 2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24185612/3/2021 ITM Grant Q1 Deluge 2021_CALPINE-10350_CONFIDENTIAL
 CEC/Drew BohanEllison Schneider Harris & Donlan
24185512/3/2021 20210929 Geysers Unit 20 FP BOD_Rev0_Privileged and Confidential
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184912/3/2021 2019 ReCx CAR-20-011 FP Systems Hydraulic Nameplates (00484380xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184812/3/2021 2019 ReCx CAR-20-010 Wet Sprinkler Piping System (00484379xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184712/3/2021 2019 ReCx CAR-20-009 Yard Hose Stations (00484378xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184612/3/2021 2019 ReCx CAR-20-008 Sequence of Operation (00484392xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184512/3/2021 2019 ReCx CAR-20-007 Removal of NonOperational Systems (00484391xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184412/3/2021 2019 ReCx CAR-20-006 Fire Alarm System Notification (00484389xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184312/3/2021 2019 ReCx CAR-20-005 Fire Alarm System Monitoring (00484388xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184212/3/2021 2019 ReCx CAR-20-004 Fire Alarm System (00484387xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184112/3/2021 2019 ReCx CAR-20-003 Spray Nozzles @ Transformer Yard (00484386xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24184012/3/2021 2019 ReCx CAR-20-002 Underground Pipe @ Transformer Yard (00484383xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183812/3/2021 2019 ReCx CAR-20-001 Fire Pump Pressure Switches Setting (00484382xBA8E1)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183612/3/2021 TM-Grant_6-7-13_Fire_Alarm_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183512/3/2021 ITM-Grant-2016-fire alarm inspection
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183412/3/2021 ITM-Grant-2016 annual fire sprinkler
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183312/3/2021 TM-Grant-2016 annual fire alarm
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183212/3/2021 ITM-GRANT 2016 fire alarm inspection
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183112/3/2021 ITM-2016 RK0861 QSP GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24183012/3/2021 ITM-2016 RK0861 QFA GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182912/3/2021 TM-2016 RK0633 QSP GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182812/3/2021 ITM-2016 RK0633 QFA GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182712/3/2021 ITM_Grant_8-3-15_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182612/3/2021 ITM_Grant_8-29-16_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182512/3/2021 ITM_Grant_8-29-16_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182412/3/2021 ITM_Grant_8-25-14_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182312/3/2021 ITM_Grant_12-2-15_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182212/3/2021 ITM_Grant_11-28-16_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182112/3/2021 ITM_Grant_11-2-15_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24182012/3/2021 ITM_Grant_10-30-14_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181912/3/2021 ITM_Grant_8-3-15_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181812/3/2021 ITM_Grant_6-10-13_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181712/3/2021 ITM_Grant_5-5-15_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181612/3/2021 TM_Grant_5-25-16_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181512/3/2021 ITM_Grant_5-23-16_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181412/3/2021 ITM_Grant_4-21-13_Fire_Sprinkler_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181312/3/2021 ITM_Grant_2-3-15_Fire_Sprinkler_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181212/3/2021 ITM_Grant_2-29-16_Fire_Sprinkler_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181112/3/2021 TM_Grant_1-28-16_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24181012/3/2021 ITM Grant_2-3-15_Fire_Alarm_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180912/3/2021 ITM Grant_2-29-16_Fire_Alarm_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180812/3/2021 ITM Grant_11-21-13_Fire_Alarm_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180612/3/2021 ITM_Grant_9-25-17_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180512/3/2021 ITM_Grant_9-25-17_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180412/3/2021 ITM_Grant_6-26-17_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180312/3/2021 ITM_Grant_6-25-17_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180212/3/2021 ITM_Grant_3-26-18_Fire_Sprinkler_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180112/3/2021 ITM_Grant_3-20-17_Fire_Sprinkler_Insp_A
 CEC/Drew BohanEllison Schneider Harris & Donlan
24180012/3/2021 ITM_Grant_12-13-17_Fire_Sprinkler_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179912/3/2021 ITM_Grant_12-13-17_Fire_Alarm_Insp_Q
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179812/3/2021 ITM-2018 RK3694 Grant ASP
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179712/3/2021 ITM-2017 RK3695 Grant AFA
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179612/3/2021 ITM-2017 RK1150 AFA GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179512/3/2021 ITM-2017 RK1149 ASA GRANT
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179412/3/2021 ITM-121918-wet pipe sprinker report RK5094 QSP
 CEC/Drew BohanEllison Schneider Harris & Donlan
24179312/3/2021 TM-121918-fire alarm inspection RK5095 QFA
 CEC/Drew BohanEllison Schneider Harris & Donlan
2416501/27/2022 U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416491/27/2022 U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416481/27/2022 U19-Calistoga Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416471/27/2022 U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416461/27/2022 U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416451/27/2022 U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416441/27/2022 U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416431/27/2022 U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416421/27/2022 U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Docket UnitEllison Schneider Harris & Donlan LLP
2416411/27/2022 U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416401/27/2022 U18-Socrates Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416391/27/2022 U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416381/27/2022 U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416371/27/2022 U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416361/27/2022 U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416351/27/2022 U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2416341/27/2022 Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL

5 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
2415682/16/2022 GPC Response to Executive Director's Confidentiality Determination

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2413772/2/2022 CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022

Compliance
11 page(s)
 J Harris of Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2413041/27/2022 Application for Confidential Designation

8 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24099512/20/2021 2020 Annual Compliance Report - Grant

Compliance
319 page(s)
 CEC/Mr. Eric W. Veerkamp, Compliance Project ManagerGeysers Power Company, LLC
24082612/3/2021 Unit 20 Grant applications-fire suppression docs-2018
2017-2018
 CEC/Drew BohanEllison Schneider Harris & Donlan
24082512/3/2021 Unit 20 Grant applications-fire suppression docs-2018
Historic 2013-2016
 CEC/Drew BohanEllison Schneider Harris & Donlan
24082412/3/2021 Unit 20 Grant applications-fire suppression docs-2018
 CEC/Drew BohanEllison Schneider Harris & Donlan
24082312/3/2021 Unit 20 Grant applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24081912/3/2021 Unit 20 Grant - applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan
24081712/3/2021 Unit 20 Grant applications-fire suppression docs-2018
 CEC/Drew BohanEllison Schneider Harris & Donlan
24080212/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24079912/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24068211/22/2021 Application for Confidential Designation

9 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24066211/22/2021 GPC October 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24055511/10/2021 June 2021 Monthly Recommissioning Report
June 2021 Fire System Recommissioning
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24055011/10/2021 Monthly Recommissioning Report_August 2020_PUBLIC

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24052811/9/2021 December 2020 Geysers Monthly Recommissioning Report

4 page(s)
 CEC/docket unitCalifornia Energy Commission
24052211/9/2021 November 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051611/9/2021 October 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051011/9/2021 September 2020 Geysers Monthly Recommissioning Report

5 page(s)
 CEC/docket unitCalifornia Energy Commission
24050411/9/2021 Monthly Recommissioning Report_July 2020

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049811/9/2021 Monthly Recommissioning Report (June 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049211/9/2021 Monthly Recommissioning Report (May 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24047811/9/2021 GPC Monthly Recommissioning Report - April 2020

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24045111/9/2021 September 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24045011/9/2021 August 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044911/9/2021 July 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044811/9/2021 April 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044711/9/2021 March 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044611/9/2021 May 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044511/9/2021 January 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24044411/9/2021 February 2021 Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
23569811/19/2020 ORDER APPROVING SETTLEMENT

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2326934/8/2020 Geysers Power Company, LLC Comments - 2019 Annual Compliance Report

Compliance
21 page(s)
 CEC/DocketsGeysers Power Company, LLC
23132212/26/2019 2018 Annual Compliance Report for the Grant Power Plant (Unit 20)
2018 Annual Compliance Report for the Grant Power Plant (Unit 20) at the Geysers
Compliance
33 page(s)
 Mr Eric VeerkampGeysers Power Company, LLC
23028110/18/2019 RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING
Resolution No: 19-1014-4
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22612912/17/2018 Commission Order 20181210 Grant wet down system engine installa
Final Commission Order for Geysers Grant Unit 20, PTA for wet down system permanent diesel engine installation
Compliance
2 page(s)
 CEC/DocketsCalifornia Energy Commission
22593111/20/2018 Revised Air Quality and Worker Safety Conditions of Certification

Air Quality
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22573911/1/2018 Memo - Staff Response to Petitioner’s Comments on Staff’s Revised Air District Permit Conditions

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22558210/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
22509110/25/2018 Notice of Staff Workshop
November 8, 2018 at 2:00 p.m.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22503610/18/2018 Applicant's Comments on Staff's Revisions to Worker Safety-1 Condition of Certification

14 page(s)
 CEC/Eric Veerkamp and Keith WinsteadEllison Schneider Harris & Donlan LLP
22498710/15/2018 Revised Worker Safety-1 Condition of Certification

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2247419/17/2018 Geysers Power Company LLC Comments on the Staff Analysis of the Petition to Amend

9 page(s)
 CEC/Keith WinsteadEllison Schneider Harris & Donlan LLP
2245788/23/2018 Staff Analysis – Permanent Diesel Pump for Cooling Tower Wetting System
On December 21, 2017, the California Energy Commission received a petition from the Geysers Power Company, LLC, to amend the Energy Commission licenses for the Quicksilver (formerly PG&E Geysers Unit 16), Socrates (formerly PG&E Geysers Unit 18), and Grant (formerly PG&E Geysers Unit 20) geothermal power plants. These power plants are located in Lake and Sonoma counties, approximately 25 miles north of the City of Santa Rosa.
220 page(s)
 1516 9th Street, Sacramento CA 95814California Energy Commission
2225392/13/2018 Air Quality Emissions & Impact Anaylsis

Air Quality
3 page(s)
 CEC/Keith WinsteadCalpine
2223351/23/2018 Geysers Power Company, LLC - Consolidated Petition for a Staff Approved Modifications
FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C), and UNIT 20 (82-AFC-1C)
16 page(s)
 CEC/Docket UnitGeysers Power Plant
2222831/19/2018 Notice of Receipt - Petition to Amend the Energy Commission Decisions for Geysers Unit 16, Unit 18 and Unit 20
PETITION TO AMEND THE ENERGY COMMISSION DECISIONS FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C), and UNIT 20 (82-AFC-1C)TO ALLOW MINOR IMPROVEMENTS FOR FIRE PREVENTION COOLING TOWER WET-DOWN
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22203512/21/2017 PTA Geysers-16, Quicksilver, Diesel Generator for Cooling Tower Wetting System
Petition to Amend (PTA) to install a permanent diesel generator for the cooling tower wetting system
56 page(s)
 CEC/Eric VeerkampGeysers Power Company, LLC
2102332/8/2016 Final Permission for Exec. Order B-36-16 Expedited Processing & N. Sonoma Air Pollution Control Dist Authority to Construct(ATC)

8 page(s)
 Geysers Power Company, LLC/James KluesenerCalifornia Energy Commission
2071921/5/2016 Expedited Processing Pursuant to Executive Order B-36-15
Approval of Emergency Reconstruction Activities
Air Quality
2 page(s)
 Geysers Power Company, LLC/James KluesenerCalifornia Energy Commission
20710212/22/2015 Geysers Power – Grant (Unit 20) Cooling Tower Replacement Project Description and Request for Expedited Processing

20 page(s)
 CEC/Robert OglesbyGeysers Power Company, LLC
20676611/24/2015 Grant (Unit 20) 1983 Final Decision

274 page(s)
  California Energy Commission
20675811/24/2015 Grant (Unit 20) Compliance Plan

106 page(s)
  California Energy Commission
20670111/19/2015 Permission to Obtain and Implement County-Issued Demolition Permits to Abate Fire Damage to Structures at Geysers 16, 18, and 20
*** SEE PREVIOUSLY FILED LETTER. TN 206307 ***
2 page(s)
  California Energy Commission
20630710/8/2015 Executive Director's Permission Letter for Cooling Tower Demolition after the 2015 Valley Fire

2 page(s)
 Calpine Corporation/Bruce CarlsenCalifornia Energy Commission
319547/23/2004 REVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES- - GEYSERS POWER COMPANY, LLC

4 page(s)
 CEC/DocketsRtp Environmental Assoc
319417/23/2004 Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.

42 page(s)
 CEC/K. Defolo/docketsCa Rwqcb
311043/12/2004 Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes

5 page(s)
 Calpine/Carlsen/docketsCEC/Tronaas
311013/12/2004 Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater

1 page(s)
 Office Of Planning And Research/DocketsCEC/Tronaas
309612/20/2004 Notice of Insignificant Project Change for Geysers Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C) to Allow for Use of Reclaimed Wastwater.

2 page(s)
 CEC/DocketsCEC/O'brien
304808/15/2003 Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'brien/CecCalifornia Regional Water Quality Control Board/Ma
296858/15/2003 Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'brien/CecCalifornia Regional Water Quality Control Board/Ma
291596/27/2003 Notice of Receipt, Petition to Amend the Energy Commission Decisions (82-AFC-1C)

3 page(s)
 DocketsCEC/O'brien
291366/25/2003 License Amendments

40 page(s)
 CEC/Tronaas/docketsCh2mhill/Salamy
117694/22/1999 Commission Order Approving Ownership Transfers

1 page(s)
 CEC/Docket FileCEC/Keese
107303/30/1999 Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18, and 20.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
88825/25/1995 Order Approving Modifications to Biology Condition 5-5, Waste Management Condition 11-7, and Deletion of Power Plant Efficiency and Reliability Condition 17-9.

3 page(s)
 CEC/Docket FileCEC Cec
26474/12/1996 Notice of Post-Certification Change for the PG&E's Geysers Unit 20 Project

1 page(s)
 CEC/Docket FileCEC/Therkelsen
6593/14/1995 LETTER REQUESTING THAT MODIFICATIONS BE GRANTED BY CEC STAFF AFTER REVIEW OF THE REQUEST 9/14/95

3 page(s)
 CEC/BrandPg&e
6583/13/1995 LETTER RE COMMENTS ON THE CEC STAFF DRAFT RECOMMENTDATIONS REGARDING (3) PG&E REQUESTS FOR CONDITIONS OF CERTIFICATION AMENDMENTS

1 page(s)
 CEC/Docket FileFriends Of Cobb Mountain
65710/19/1994 NOTICE OF RECEIPT - REQUEST TO AMEND DECISION - ASSESS IMPACTS ON ENVIRONMENTAL QUALITY, PUBLIC HEALTH & SAFETY AND CONSIS TENCY OF PROPOSED CHANGES

1 page(s)
 CEC/Docket FileCEC/Therkelsen
6569/22/1994 PG&E GEYSERS POWER PLANT - MODIFICATION REQUESTS TO COMPLIANCE MONITORING PLANS FOR UNIT 16-20

1 page(s)
 CEC/BrandPg&e
   CONFIDENTIAL Unit 20 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Standpipe and Hose System Quarterly and Annual Report_First Quarter

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter

3 page(s)
 CEC/Drerw BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Annual Fire Pump Report

18 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Semi-Annual Fire Alarm Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
   CONFIDENTIAL Unit 20 Annual Fire Alarm Report

9 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP