Docket Log

Docket: 79-AFC-05C
Project Title: Compliance - Application for Certification for PG&E Geysers Unit 16 (78-NOI-6)
Generated On: 12/26/2024 11:00:22 AM

Include:     
TN #Docketed DateDocument TitleExhibit #ToFrom
2578076/21/2024 CONFIDENTIAL Unit 16_GPC Q2 2024 Fire Protection Compliance Submission

3 page(s)
 Keith WinsteadEllison Schneider Harris & Donlan LLP
2577947/18/2024 CEC response letter to Geysers Power Company, LLC re confidentiality applications, dated June 21, 2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2574306/26/2024 2023 Annual Compliance Report - Quicksilver (U16)

97 page(s)
 CEC/Docket UnitGeysers Power Company, LLC
2573146/21/2024 GPC Unit 16_Q2 2024 ITM Corrective Action Compliance Submission_Repeated Applicaiton for Confidential Designation

3 page(s)
 Drew BohanEllison Schneider Harris & Donlan LLP
2559573/29/2024 CONFIDENTIAL Unit 16 Annual Fire Alarm Inspection Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559563/29/2024 CONFIDENTIAL Unit 16 Semi-Annual Fire Alarm Inspection Report

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559553/29/2024 CONFIDENTIAL Unit 16 Annual Fire Pump Report

18 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559543/29/2024 CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559533/29/2024 CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559523/29/2024 CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559513/29/2024 CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559503/29/2024 CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559493/29/2024 CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559483/29/2024 CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559473/29/2024 CONFIDENTIAL Unit 16 Standpipe and Hose System Quarterly and Annual Report_First Quarter

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2559453/29/2024 CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2558964/24/2024 CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/ Chase MaxwellCalifornia Energy Commission
2553663/29/2024 GPC Unit 16_2023 ITM Reports_Repeated Application for Confidential Designation

19 page(s)
  Ellison Schneider Harris & Donlan LLP
2553573/29/2024 GPC Unit 16_Letter to Keith Winstead Regarding Fire Protection-3 Submission

1 page(s)
 CEC/Keith WinsteadEllison Schneider Harris & Donlan LLP
2552093/7/2024 CONFIDENTIAL_U16_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2552052/16/2024 CONFIDENTIAL Unit 16 GPC Q1 2024 FIRE PROTECTION Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2551883/20/2024 CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2549113/7/2024 Repeated Application for Confidentiality_U16_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2545402/16/2024 GPC Unit 16_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2508776/30/2023 2022 Annual Compliance Report - Quicksilver (U16)

105 page(s)
 CEC/John HeiserGeysers Power Company, LLC
2498094/19/2023 CEC Response Letter re Application for Confidential Designation dated March 30, 2023

Compliance
2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
2497853/30/2023 Geysers Power Company, Unit 16, 4Q22 ITM Report Deluge Inspection

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497843/30/2023 Geysers Power Company, Unit 16, 4Q22 ITM Report Wet Sprinkler Inspection

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2497833/30/2023 Geysers Power Company, Unit 16, ITM Report Cover Letter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2495133/30/2023 Geysers Power Company, Unit 16, Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24804412/13/2022 November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Quicksilver Unit 16 Facility

6 page(s)
 CEC/John Heiser and Keith WinsteadEllison Schneider Harris & Donlan LLP
24759611/21/2022 CEC Response for Confidential Designation Geysers Unit 16, Quicksilver

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24757111/4/2022 GPC Unit 16_Q3 2022 Wet Pipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24757011/4/2022 GPC Unit 16_Q3 2022 Deluge Inspection Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24756911/4/2022 GPC Unit 16_Q3 2022 Second Semiannual FireScan Report

10 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24756811/4/2022 GPC Unit 16_Q3 2022 ITM Report Cover Letter

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24729911/4/2022 GPC Unit 16_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24727211/3/2022 CEC Response to Geysers Unit 16 Repeated Application for Confidentiality

2 page(s)
 Ellison Schneider Harris & Donlan LLP/Chase MaxwellCalifornia Energy Commission
24721110/19/2022 GPC Unit 16_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720210/20/2022 GPC Unit 16_Wet Pipe Q2 2022 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720110/20/2022 GPC Unit 16_Deluge Q2 2022 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24720010/20/2022 GPC Unit 16_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24670010/20/2022 GPC Unit 16_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
24664710/19/2022 GPC Unit 16_Q2 2022 ITM Reports and Compliance Documents_Application for Confidential Designation

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438856/1/2022 Unit 16_Fire Alarm and Life Safety System Inspection Certificate

11 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438846/1/2022 Unit 16_Wet Pipe Fire Sprinkler System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438836/1/2022 Unit 16_Standpipe and House System Quarterly and Annual Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438826/1/2022 Unit 16_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438816/1/2022 Unit 16_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438806/1/2022 Unit 16_Electric Fire Pump Annual Report # 3

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438796/1/2022 Unit 16_Electric Fire Pump Annual Report # 2

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438786/1/2022 Unit 16_Electric Fire Pump Annual Report # 1

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438776/1/2022 Unit 16_Electric Fire Pump Annual Report

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438766/1/2022 Unit 16_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL

6 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2438577/6/2022 CEC Response Geyser Unit 16 Confidential Application June 1, 2022

2 page(s)
 C. Maxwell Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2438056/30/2022 2021 Annual Compliance Report - Quicksilver

Compliance
96 page(s)
 CEC/Docket UnitGeysers Power Company, LLC
2433786/1/2022 Unit 16_GPC Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation

12 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2425804/5/2022 2020 Revised Annual Compliance Report - Quicksilver
N/A
Compliance
120 page(s)
 CEC/Eric Veerkamp, CPMGeysers Power Company, LLC
24217812/3/2021 Unit 16 Quicksilver - Geysers Update 2-8-2019-presentation design plan

8 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24215212/3/2021 U16_U18_U20_Wetting_pump_piping_CEC

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214912/3/2021 Quicksliver-ITM-2019-fire pump inspection

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214812/3/2021 Quicksliver-ITM-2019-electric fire pump inspection

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214712/3/2021 Quicksliver-ITM_2019-Standpipe Inspection Report

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214612/3/2021 Quicksilver ITM-2019-wet pipe inspection

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214512/3/2021 Quicksliver ITM-2019-fire alarm inspection report-certificate

9 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214412/3/2021 Quicksilver ITM-2019-pump test performance graph-3

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214312/3/2021 Quicksilver ITM-2019-pump test performance graph-2

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214212/3/2021 Quicksilver ITM-2019-pump test performance graph-1

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214112/3/2021 20190301_Geysers Unit 16 BOD_ReCx Privileged and Confidential_FINAL

113 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24214012/3/2021 20190204 Geysers Unit #16 BOD_BF_TS

24 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213912/3/2021 20190204 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT_TS

23 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213812/3/2021 20181024 Geysers Unit _16 BOD ReCx Privileged and Confidential DRAFT_CE

23 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213712/3/2021 20181024 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT_BF_TS

23 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213612/3/2021 20181024 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT

59 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213512/3/2021 20180926 Geysers Unit Basis of Design Re-Commissioning Plan DRAFT TS_BF

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24213412/3/2021 20180912 Geysers Unit Basis of Design Re-Commissioning Plan DRAFT TS

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212612/3/2021 Quicksilver-ITM-Q1 2021 Wet-Pipe CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212512/3/2021 Quicksilver-ITM-Q1 2021 Standpipe CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212412/3/2021 Quicksilver-ITM-Q1 2021 Deluge CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212312/3/2021 Quicksilver-ITM- Q1 2021_Fire alarm_CONFIDENTIAL

10 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212212/3/2021 Quicksilver-ITM Q1 2021 Fire Pump_3 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212112/3/2021 Quicksilver-ITM Q1 2021 Fire Pump_2 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24212012/3/2021 Quicksilver-ITM Q1 2021 Fire Pump_1 CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211912/3/2021 20210823 Geysers Unit 16 FP BOD_Rev1

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211812/3/2021 20210807 Geysers Unit 16 FP BOD_Rev0 CEC Review TS

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211712/3/2021 20210807 Geysers Unit 16 FP BOD_Rev0 CEC Review CEC

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211612/3/2021 October 2020 Geysers Monthly Recommissioning Report CONFIDENTIAL (00530834xBA8E1)

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211512/3/2021 January 2021 Monthly Recommissioning Report CONFIDENTIAL (00538487xBA8E1)

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211412/3/2021 GPC_March 2021 Monthly Recommissioning Report_CONFIDENTIAL

10 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211312/3/2021 February 2021 Monthly Recommissioning Report CONFIDENTIAL

11 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211212/3/2021 2019 ReCx Corrective Action Report_CAR-16-009 Yard Hose Stations

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211112/3/2021 2019 ReCx Corrective Action Report_CAR-16-008 Sequence of Operation

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24211012/3/2021 2019 ReCx Corrective Action Report_CAR-16-007 Removal of NonOperational Systems

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210912/3/2021 2019 ReCx Corrective Action Report_CAR-16-006 Fire Alarm System Notification

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210812/3/2021 2019 ReCx Corrective Action Report_CAR-16-005 Fire Alarm System Monitoring

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210712/3/2021 2019 ReCx Corrective Action Report_CAR-16-004 Fire Alarm System

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210612/3/2021 2019 ReCx Corrective Action Report_CAR-16-003 Spray Nozzles @ Transformer Yard

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210512/3/2021 2019 ReCx Corrective Action Report_CAR-16-002 Underground Pipe @ Transformer Yard

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24210412/3/2021 2019 ReCx Corrective Action Report_CAR-16-001 Fire Pump Pressure Switches Setting

1 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208912/3/2021 ITM_Quivksilver_8-03-15_Fire Sprinkler Insp_Q

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208812/3/2021 ITM_Quicksilver_8-4-15_Fire Alarm Insp_Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208712/3/2021 ITM_Quicksilver_8-30-16_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208612/3/2021 ITM_Quicksilver_8-30-16_Fire Alarm Insp_ Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208512/3/2021 ITM_Quicksilver_8-28-14_Fire Sprinkler Insp_Q

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208412/3/2021 ITM_Quicksilver_8-28-14_Fire Alarm Insp_Q

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208312/3/2021 ITM_Quicksilver_6-10-13_Fire Sprinkler Insp_Q

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208212/3/2021 ITM_Quicksilver_6-07-13_Fire Alarm Insp_A

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208112/3/2021 ITM_Quicksilver_5-24-16_Fire Sprinkler Insp_Q

5 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24208012/3/2021 ITM_Quicksilver_5-24-16_Fire Alarm Insp_Q

14 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207912/3/2021 ITM_Quicksilver_5-05-15_Fire Sprinkler Insp_Q

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207812/3/2021 ITM_Quicksilver_5-05-15_Fire Alarm Insp_Q

14 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207712/3/2021 ITM_Quicksilver_3-1-16_Fire Alarm Insp_A

14 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207612/3/2021 ITM_Quicksilver_3-01-16_Fire Sprinkler Insp_A

5 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207512/3/2021 ITM_Quicksilver_2-2-15_Fire Alarm Insp_A

14 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207412/3/2021 ITM_Quicksilver_2-02-15_Fire Sprinkler Insp_A

5 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207312/3/2021 ITM_Quicksilver_11-29-16_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207212/3/2021 ITM_Quicksilver_11-29-16_Fire Alarm Insp_Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24207112/3/2021 ITM_Quicksilver_11-20-13_Fire Alarm Insp_A
 CEC/Drew BohanEllison Schneider Harris Donlan
24207012/3/2021 ITM_Quicksilver_11-19-13_Fire Sprinkler Insp_A

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24206912/3/2021 ITM_Quicksilver_10-30-14_Fire Sprinkler Insp_Q

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24206812/3/2021 ITM_Quicksilver_10-28-14_Fire Alarm Insp_Q

15 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24206712/3/2021 Fire sprinkler-ITM-3-1-2016

5 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24206612/3/2021 fire alarm ITM annual 3116

14 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24199111/22/2021 Confidential GPD October 2021 Monthly Recommissioning Report

7 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24199011/22/2021 Confidential Fire Scan 2021 Report

10 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24198911/22/2021 Confidential Deluge 2021 Report

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24198811/22/2021 Confidential Wet-Pipe 2021 Report

3 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24198711/22/2021 Confidential Cover Letter for Geysers Power Company ITM Report Q 3 2021

4 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24193412/3/2021 ITM_Quicksilver_9-26-17_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24193312/3/2021 ITM_Quicksilver_9-26-17_Fire Alarm Insp_Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24193212/3/2021 ITM_Quicksilver_8-15-17_Fire Pump Test_A

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24193112/3/2021 ITM_Quicksilver_6-27-17_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24193012/3/2021 ITM_Quicksilver_6-27-17_Fire Alarm Insp_Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192912/3/2021 ITM_Quicksilver_3-27-18_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192812/3/2021 ITM_Quicksilver_3-27-18_Fire Alarm Insp_A

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192712/3/2021 ITM_Quicksilver_3-21-17_Fire Sprinkler Insp_A

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192612/3/2021 ITM_Quicksilver_3-21-17_Fire Alarm Insp_A

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192512/3/2021 ITM_Quicksilver_12-14-17_Fire Sprinkler Insp_Q

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192412/3/2021 ITM_Quicksilver_12-14-17_Fire Alarm Insp_Q

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192312/3/2021 Fire-sprinkler-ITM-12-17-18 RK5097

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192212/3/2021 Fire System-wet down-Hydraulic Calculation Letter-2017

3 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192112/3/2021 fire sprinkler-ITM-2018

4 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24192012/3/2021 Fire pump-ITM-2017-3

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191912/3/2021 Fire pump-ITM-2017-2

7 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191812/3/2021 Fire pump-ITM-2017-1

6 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191712/3/2021 Fire alarm-ITM-quarterly-2017

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191612/3/2021 Fire alarm-ITM-2018

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191512/3/2021 Fire alarm-ITM-12-17-18 RK5096

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24191412/3/2021 20180504 Geysers CT Wetting System Water Supply 11153809_Report

13 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
2417181/27/2022 U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417171/27/2022 U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL

7 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417161/27/2022 U19-Calistoga Deluge 2021 Q4 Report_CONIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417151/27/2022 U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417141/27/2022 U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417131/27/2022 U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417121/27/2022 U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL

5 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417111/27/2022 U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417101/27/2022 U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417091/27/2022 U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417081/27/2022 U18-Socrates Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417071/27/2022 U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417061/27/2022 U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417051/27/2022 U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL

4 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417041/27/2022 U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL

3 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2417031/27/2022 U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL
  Ellison Schneider Harris & Donlan LLP
2417021/27/2022 Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL
  Ellison Schneider Harris & Donlan LLP
2415642/16/2022 GPC Response to Executive Director's Confidentiality Determination

2 page(s)
 CEC/Drew BohanEllison Schneider Harris & Donlan LLP
2413732/2/2022 CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022

Compliance
11 page(s)
 J Harris of Ellison Schneider Harris & Donlan LLPCalifornia Energy Commission
2413021/27/2022 Application for Confidential Designation

7 page(s)
  Ellison Schneider Harris & Donlan LLP
24099712/20/2021 2020 Annual Compliance Report - Quicksilver

Compliance
136 page(s)
 CEC/Mr. Eric W. Veerkamp, Compliance Project ManagerGeysers Power Company, LLC
24081112/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24080912/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24080612/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24080512/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24080312/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24080112/3/2021 applications-fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24079312/3/2021 Unit 16 Quicksilver applications for confidential designation - fire suppression docs-2018

33 page(s)
 CEC/Drew BohanEllison Schneider Harris Donlan
24066611/22/2021 Application for Confidential Designation

9 page(s)
 CEC/docket unitEllison Schneider Harris & Donlan LLP
24065811/22/2021 GPC October 2021 Monthly Recommissioning Report

3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris & Donlan LLP
24056011/10/2021 June 2021 Monthly Recommissioning Report

Compliance
3 page(s)
 CEC/Eric VeerkampEllison Schneider Harris Donlan
24055211/10/2021 Monthly Recommissioning Report_August 2020_PUBLIC

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24053011/9/2021 December 2020 Geysers Monthly Recommissioning Report

4 page(s)
 CEC/docket unitCalifornia Energy Commission
24052411/9/2021 November 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051811/9/2021 October 2020 Geysers Monthly Recommissioning Report

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24051211/9/2021 September 2020 Geysers Monthly Recommissioning Report

5 page(s)
 CEC/docket unitCalifornia Energy Commission
24050611/9/2021 Monthly Recommissioning Report_July 2020

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24050011/9/2021 Monthly Recommissioning Report (June 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24049411/9/2021 Monthly Recommissioning Report (May 2020)

3 page(s)
 CEC/docket unitCalifornia Energy Commission
24048011/9/2021 GPC Monthly Recommissioning Report - April 2020

3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
24046711/9/2021 August 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046611/9/2021 July 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046511/9/2021 September 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046411/9/2021 May 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046311/9/2021 January 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046211/9/2021 February 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
4 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046111/9/2021 April 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
24046011/9/2021 March 2021 Monthly Recommissioning Report
Fire System Recommissioning Report for Geysers
Compliance
3 page(s)
 CEC/Eric VeerkampCalifornia Energy Commission
23570611/19/2020 ORDER APPROVING SETTLEMENT

3 page(s)
 CEC/DocketsCalifornia Energy Commission
2326914/8/2020 2019 Annual Compliance Report for the Quicksilver Power Plant (Unit 16)

Compliance
17 page(s)
 CEC/DocketsGeysers Power Company, LLC
23131912/26/2019 2018 Annual Compliance Report for the Quicksilver Power Plant (Unit 16)
2018 Annual Compliance Report for the Quicksilver (Unit 16) Power Plant at the Geysers
Compliance
16 page(s)
 Eric W VeerkampGeysers Power Company, LLC
23027710/18/2019 RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING
Resolution No: 19-1014-4
1 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22612712/17/2018 Commission Order 20181210 Quicksilver wet down system engine in
Final Commission Order for Geysers Quicksilver Unit 16, PTA for wet down system permanent diesel engine installation
Compliance
2 page(s)
 CEC/DocketsCalifornia Energy Commission
22592911/20/2018 Revised Air Quality and Worker Safety Conditions of Certification

Air Quality
8 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22573711/1/2018 Memo - Staff Response to Petitioner’s Comments on Staff’s Revised Air District Permit Conditions

6 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22563310/30/2018 Compliance Docketing Policy

3 page(s)
 Plant ManagerCalifornia Energy Commission
22509210/25/2018 Notice of Staff Workshop
November 8, 2018 at 2:00 p.m.
4 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22503510/18/2018 Applicant's Comments on Staff's Revisions to Worker Safety-1 Condition of Certification

14 page(s)
 CEC/Eric Veerkamp and Keith WinsteadEllison Schneider Harris & Donlan LLP
22498510/15/2018 Revised Worker Safety-1 Condition of Certification

2 page(s)
 CEC/Docket UnitCalifornia Energy Commission
2247399/17/2018 Geysers Power Company LLC Comments on the Staff Analysis of the Petition to Amend

9 page(s)
 CEC/Keith WinsteadEllison Schneider Harris & Donlan LLP
2245768/23/2018 Staff Analysis – Permanent Diesel Pump for Cooling Tower Wetting System
The Geysers Power Company, LLC requests the Energy Commission to approve this petition to make identical modifications at each of the facilities to replace temporary portable emergency diesel engines with stationary permanent emergency diesel engines for the cooling tower wet down systems to aid in fire prevention at the Quicksilver, Socrates, and Grant geothermal power plants.
220 page(s)
 California Energy Commission 1516 9th Street. Sacramento, CA 95814California Energy Commission
2225382/13/2018 Air Quality Emissions & Impact Anaylsis

Air Quality
3 page(s)
 CEC/Keith WinsteadCalpine
2223331/23/2018 Geysers Power Company, LLC - Consolidated Petition for a Staff Approved Modifications
For: GPC Quicksilver Power Plant GPC Socrates Power Plant GPC Grant Power Plant Geysers Unit 16 Docket: 79-AFC-OSC Geysers Unit 18 Docket: 79-AFC-OJC Geysers Unit 20 Docket: 82-AFC-01C
16 page(s)
 CEC/Docket UnitGeysers Power Plant
2222841/19/2018 Notice of Receipt - Petition to Amend the Energy Commission Decisions for Geysers Unit 16, Unit 18 and Unit 20
PETITION TO AMEND THE ENERGY COMMISSION DECISIONS FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C), and UNIT 20 (82-AFC-1C) TO ALLOW MINOR IMPROVEMENTS FOR FIRE PREVENTION COOLING TOWER WET-DOWN
3 page(s)
 CEC/Docket UnitCalifornia Energy Commission
22203612/21/2017 PTA Geysers-16, Quicksilver, Diesel Generator for Cooling Tower Wetting System
Petition to Amend (PTA) to install a permanent diesel generator for the cooling tower wetting system
56 page(s)
 CEC/Eric VeerkampGeysers Power Company, LLC
2102302/8/2016 Final Permission for Exec. Order B-36-16 Expedited Processing & Lake Co Air Quality Mgmt Dist Authority to Construct (ATC)

8 page(s)
 Geysers Power Company, LLC/James KluesenerCalifornia Energy Commission
20674911/24/2015 Quicksilver (Unit 16) 1981 Final Decision and Compliance Plan

318 page(s)
  California Energy Commission
20673611/23/2015 Quicksilver (Unit 16) Executive Director's Approval of Expedited Processing for Cooling Tower Replacement

2 page(s)
  California Energy Commission
20673111/23/2015 Geysers Power Quicksilver (Unit 16) - Cooling Tower Replacement Project Description and Request for Expedited Processing

16 page(s)
  California Energy Commission
20669911/19/2015 Permission to Obtain and Implement County-Issued Demolition Permits to Abate Fire Damage to Structures at Geysers 16, 18, and 20
*** SEE PREVIOUSLY FILED LETTER. TN 206305 ***
2 page(s)
 Calpine CorporationCalifornia Energy Commission
20630510/8/2015 Executive Director's Permission Letter for Cooling Tower Demolition after the 2015 Valley Fire

2 page(s)
 Calpine Corporation/Bruce CarlsenCalifornia Energy Commission
319527/23/2004 AREVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES- - GEYSERS POWER COMPANY, LLC

4 page(s)
 CEC/DocketsRtp Environmental Assoc
319457/23/2004 Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.

42 page(s)
 CEC/K. Defolo/docketsCa Rwqcb
311073/12/2004 Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes

3 page(s)
 Calpine/Carlsen/docketsCEC/Tronaas
310963/12/2004 Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater

1 page(s)
 Office Of Planning And Research/DocketsCEC/Tronaas
309622/20/2004 Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater
Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C)
2 page(s)
 CEC/DocketsCEC/O'brien
296848/15/2003 Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 amd 20 to allow selected uses of reclaimed wastewater

3 page(s)
 O'bien/CecCalifornia Regional Water Quality Control Board/Ma
291537/10/2003 Notice of Receipt, Petition to Amend the Energy Commiission Decisions (79-AFC-5C

1 page(s)
 DocketsCEC/O'brien
291346/25/2003 License Amendments

43 page(s)
 CEC/Tronaas/docketsCh2mhill/Salamy
117704/22/1999 Commission Order Approving Ownership Transfers

1 page(s)
 CEC/Docket FileCEC/Keese
107323/30/1999 Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18 and 20.

2 page(s)
 CEC/Docket FileCEC/Therkelsen
101252/2/1999 Unit 16 Transfer of CEC Certificate, Decision Number P800-81-007 to Geysers Power Company, LLC

2 page(s)
 CEC Cec BrandPG&E/Speer, Jr.
6553/14/1995 LETTER REQUESTING THAT MODIFICATIONS BE GRANTED BY CEC STAFF AFTER REVIEW OF THE REQUEST DATED 9-14-94

3 page(s)
 CEC/BrandPg&e
65410/19/1994 NOTICE OF RECEIPT - REQUEST TO AMEND DECISION - ASSESS IM PACTS ON ENVIRONMENTAL QUALTIY, PUBLIC HEALTH & SAFETY AND CONSISTENCY OF PROPOSED CHANGES

1 page(s)
 CEC/Docket FileCEC/Therkelsen
6539/22/1994 PG&E GEYSERS POWER PLANT - MODIFICANTION REQUEST TO COMPLIANCE MONITORING PLANS FOR UNITS 16-20

1 page(s)
 CEC/BrandPg&e/Speer