257807 | 6/21/2024 |
CONFIDENTIAL Unit 16_GPC Q2 2024 Fire Protection Compliance Submission
3 page(s)
| | Keith Winstead | Ellison Schneider Harris & Donlan LLP |
257794 | 7/18/2024 |
CEC response letter to Geysers Power Company, LLC re confidentiality applications, dated June 21, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
257430 | 6/26/2024 |
2023 Annual Compliance Report - Quicksilver (U16)
97 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
257314 | 6/21/2024 |
GPC Unit 16_Q2 2024 ITM Corrective Action Compliance Submission_Repeated Applicaiton for Confidential Designation
3 page(s)
| | Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255957 | 3/29/2024 |
CONFIDENTIAL Unit 16 Annual Fire Alarm Inspection Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255956 | 3/29/2024 |
CONFIDENTIAL Unit 16 Semi-Annual Fire Alarm Inspection Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255955 | 3/29/2024 |
CONFIDENTIAL Unit 16 Annual Fire Pump Report
18 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255954 | 3/29/2024 |
CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255953 | 3/29/2024 |
CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255952 | 3/29/2024 |
CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255951 | 3/29/2024 |
CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255950 | 3/29/2024 |
CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255949 | 3/29/2024 |
CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255948 | 3/29/2024 |
CONFIDENTIAL Unit 16 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255947 | 3/29/2024 |
CONFIDENTIAL Unit 16 Standpipe and Hose System Quarterly and Annual Report_First Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255945 | 3/29/2024 |
CONFIDENTIAL Unit 16 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255896 | 4/24/2024 |
CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/ Chase Maxwell | California Energy Commission |
255366 | 3/29/2024 |
GPC Unit 16_2023 ITM Reports_Repeated Application for Confidential Designation
19 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
255357 | 3/29/2024 |
GPC Unit 16_Letter to Keith Winstead Regarding Fire Protection-3 Submission
1 page(s)
| | CEC/Keith Winstead | Ellison Schneider Harris & Donlan LLP |
255209 | 3/7/2024 |
CONFIDENTIAL_U16_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
12 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255205 | 2/16/2024 |
CONFIDENTIAL Unit 16 GPC Q1 2024 FIRE PROTECTION Compliance Submission
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255188 | 3/20/2024 |
CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
254911 | 3/7/2024 |
Repeated Application for Confidentiality_U16_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
254540 | 2/16/2024 |
GPC Unit 16_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
250877 | 6/30/2023 |
2022 Annual Compliance Report - Quicksilver (U16)
105 page(s)
| | CEC/John Heiser | Geysers Power Company, LLC |
249809 | 4/19/2023 |
CEC Response Letter re Application for Confidential Designation dated March 30, 2023
Compliance 2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
249785 | 3/30/2023 |
Geysers Power Company, Unit 16, 4Q22 ITM Report Deluge Inspection
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249784 | 3/30/2023 |
Geysers Power Company, Unit 16, 4Q22 ITM Report Wet Sprinkler Inspection
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249783 | 3/30/2023 |
Geysers Power Company, Unit 16, ITM Report Cover Letter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249513 | 3/30/2023 |
Geysers Power Company, Unit 16, Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248044 | 12/13/2022 |
November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Quicksilver Unit 16 Facility
6 page(s)
| | CEC/John Heiser and Keith Winstead | Ellison Schneider Harris & Donlan LLP |
247596 | 11/21/2022 |
CEC Response for Confidential Designation Geysers Unit 16, Quicksilver
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247571 | 11/4/2022 |
GPC Unit 16_Q3 2022 Wet Pipe Inspection Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247570 | 11/4/2022 |
GPC Unit 16_Q3 2022 Deluge Inspection Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247569 | 11/4/2022 |
GPC Unit 16_Q3 2022 Second Semiannual FireScan Report
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247568 | 11/4/2022 |
GPC Unit 16_Q3 2022 ITM Report Cover Letter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247299 | 11/4/2022 |
GPC Unit 16_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247272 | 11/3/2022 |
CEC Response to Geysers Unit 16 Repeated Application for Confidentiality
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247211 | 10/19/2022 |
GPC Unit 16_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247202 | 10/20/2022 |
GPC Unit 16_Wet Pipe Q2 2022 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247201 | 10/20/2022 |
GPC Unit 16_Deluge Q2 2022 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247200 | 10/20/2022 |
GPC Unit 16_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246700 | 10/20/2022 |
GPC Unit 16_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246647 | 10/19/2022 |
GPC Unit 16_Q2 2022 ITM Reports and Compliance Documents_Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243885 | 6/1/2022 |
Unit 16_Fire Alarm and Life Safety System Inspection Certificate
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243884 | 6/1/2022 |
Unit 16_Wet Pipe Fire Sprinkler System Quarterly and Annual Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243883 | 6/1/2022 |
Unit 16_Standpipe and House System Quarterly and Annual Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243882 | 6/1/2022 |
Unit 16_Deluge Sprinkler Systems Water Spray Quarterly and Annual Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243881 | 6/1/2022 |
Unit 16_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243880 | 6/1/2022 |
Unit 16_Electric Fire Pump Annual Report # 3
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243879 | 6/1/2022 |
Unit 16_Electric Fire Pump Annual Report # 2
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243878 | 6/1/2022 |
Unit 16_Electric Fire Pump Annual Report # 1
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243877 | 6/1/2022 |
Unit 16_Electric Fire Pump Annual Report
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243876 | 6/1/2022 |
Unit 16_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243857 | 7/6/2022 |
CEC Response Geyser Unit 16 Confidential Application June 1, 2022
2 page(s)
| | C. Maxwell Ellison Schneider Harris & Donlan LLP | California Energy Commission |
243805 | 6/30/2022 |
2021 Annual Compliance Report - Quicksilver
Compliance 96 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
243378 | 6/1/2022 |
Unit 16_GPC Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation
12 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242580 | 4/5/2022 |
2020 Revised Annual Compliance Report - Quicksilver N/A Compliance 120 page(s)
| | CEC/Eric Veerkamp, CPM | Geysers Power Company, LLC |
242178 | 12/3/2021 |
Unit 16 Quicksilver - Geysers Update 2-8-2019-presentation design plan
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242152 | 12/3/2021 |
U16_U18_U20_Wetting_pump_piping_CEC
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242149 | 12/3/2021 |
Quicksliver-ITM-2019-fire pump inspection
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242148 | 12/3/2021 |
Quicksliver-ITM-2019-electric fire pump inspection
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242147 | 12/3/2021 |
Quicksliver-ITM_2019-Standpipe Inspection Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242146 | 12/3/2021 |
Quicksilver ITM-2019-wet pipe inspection
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242145 | 12/3/2021 |
Quicksliver ITM-2019-fire alarm inspection report-certificate
9 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242144 | 12/3/2021 |
Quicksilver ITM-2019-pump test performance graph-3
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242143 | 12/3/2021 |
Quicksilver ITM-2019-pump test performance graph-2
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242142 | 12/3/2021 |
Quicksilver ITM-2019-pump test performance graph-1
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242141 | 12/3/2021 |
20190301_Geysers Unit 16 BOD_ReCx Privileged and Confidential_FINAL
113 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242140 | 12/3/2021 |
20190204 Geysers Unit #16 BOD_BF_TS
24 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242139 | 12/3/2021 |
20190204 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT_TS
23 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242138 | 12/3/2021 |
20181024 Geysers Unit _16 BOD ReCx Privileged and Confidential DRAFT_CE
23 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242137 | 12/3/2021 |
20181024 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT_BF_TS
23 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242136 | 12/3/2021 |
20181024 Geysers Unit #16 BOD ReCx Privileged and Confidential DRAFT
59 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242135 | 12/3/2021 |
20180926 Geysers Unit Basis of Design Re-Commissioning Plan DRAFT TS_BF
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242134 | 12/3/2021 |
20180912 Geysers Unit Basis of Design Re-Commissioning Plan DRAFT TS
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242126 | 12/3/2021 |
Quicksilver-ITM-Q1 2021 Wet-Pipe CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242125 | 12/3/2021 |
Quicksilver-ITM-Q1 2021 Standpipe CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242124 | 12/3/2021 |
Quicksilver-ITM-Q1 2021 Deluge CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242123 | 12/3/2021 |
Quicksilver-ITM- Q1 2021_Fire alarm_CONFIDENTIAL
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242122 | 12/3/2021 |
Quicksilver-ITM Q1 2021 Fire Pump_3 CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242121 | 12/3/2021 |
Quicksilver-ITM Q1 2021 Fire Pump_2 CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242120 | 12/3/2021 |
Quicksilver-ITM Q1 2021 Fire Pump_1 CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242119 | 12/3/2021 |
20210823 Geysers Unit 16 FP BOD_Rev1
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242118 | 12/3/2021 |
20210807 Geysers Unit 16 FP BOD_Rev0 CEC Review TS
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242117 | 12/3/2021 |
20210807 Geysers Unit 16 FP BOD_Rev0 CEC Review CEC
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242116 | 12/3/2021 |
October 2020 Geysers Monthly Recommissioning Report CONFIDENTIAL (00530834xBA8E1)
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242115 | 12/3/2021 |
January 2021 Monthly Recommissioning Report CONFIDENTIAL (00538487xBA8E1)
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242114 | 12/3/2021 |
GPC_March 2021 Monthly Recommissioning Report_CONFIDENTIAL
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242113 | 12/3/2021 |
February 2021 Monthly Recommissioning Report CONFIDENTIAL
11 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242112 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-009 Yard Hose Stations
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242111 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-008 Sequence of Operation
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242110 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-007 Removal of NonOperational Systems
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242109 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-006 Fire Alarm System Notification
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242108 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-005 Fire Alarm System Monitoring
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242107 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-004 Fire Alarm System
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242106 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-003 Spray Nozzles @ Transformer Yard
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242105 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-002 Underground Pipe @ Transformer Yard
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242104 | 12/3/2021 |
2019 ReCx Corrective Action Report_CAR-16-001 Fire Pump Pressure Switches Setting
1 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242089 | 12/3/2021 |
ITM_Quivksilver_8-03-15_Fire Sprinkler Insp_Q
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242088 | 12/3/2021 |
ITM_Quicksilver_8-4-15_Fire Alarm Insp_Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242087 | 12/3/2021 |
ITM_Quicksilver_8-30-16_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242086 | 12/3/2021 |
ITM_Quicksilver_8-30-16_Fire Alarm Insp_ Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242085 | 12/3/2021 |
ITM_Quicksilver_8-28-14_Fire Sprinkler Insp_Q
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242084 | 12/3/2021 |
ITM_Quicksilver_8-28-14_Fire Alarm Insp_Q
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242083 | 12/3/2021 |
ITM_Quicksilver_6-10-13_Fire Sprinkler Insp_Q
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242082 | 12/3/2021 |
ITM_Quicksilver_6-07-13_Fire Alarm Insp_A
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242081 | 12/3/2021 |
ITM_Quicksilver_5-24-16_Fire Sprinkler Insp_Q
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242080 | 12/3/2021 |
ITM_Quicksilver_5-24-16_Fire Alarm Insp_Q
14 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242079 | 12/3/2021 |
ITM_Quicksilver_5-05-15_Fire Sprinkler Insp_Q
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242078 | 12/3/2021 |
ITM_Quicksilver_5-05-15_Fire Alarm Insp_Q
14 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242077 | 12/3/2021 |
ITM_Quicksilver_3-1-16_Fire Alarm Insp_A
14 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242076 | 12/3/2021 |
ITM_Quicksilver_3-01-16_Fire Sprinkler Insp_A
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242075 | 12/3/2021 |
ITM_Quicksilver_2-2-15_Fire Alarm Insp_A
14 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242074 | 12/3/2021 |
ITM_Quicksilver_2-02-15_Fire Sprinkler Insp_A
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242073 | 12/3/2021 |
ITM_Quicksilver_11-29-16_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242072 | 12/3/2021 |
ITM_Quicksilver_11-29-16_Fire Alarm Insp_Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242071 | 12/3/2021 |
ITM_Quicksilver_11-20-13_Fire Alarm Insp_A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242070 | 12/3/2021 |
ITM_Quicksilver_11-19-13_Fire Sprinkler Insp_A
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242069 | 12/3/2021 |
ITM_Quicksilver_10-30-14_Fire Sprinkler Insp_Q
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242068 | 12/3/2021 |
ITM_Quicksilver_10-28-14_Fire Alarm Insp_Q
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242067 | 12/3/2021 |
Fire sprinkler-ITM-3-1-2016
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242066 | 12/3/2021 |
fire alarm ITM annual 3116
14 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241991 | 11/22/2021 |
Confidential GPD October 2021 Monthly Recommissioning Report
7 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241990 | 11/22/2021 |
Confidential Fire Scan 2021 Report
10 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241989 | 11/22/2021 |
Confidential Deluge 2021 Report
4 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241988 | 11/22/2021 |
Confidential Wet-Pipe 2021 Report
3 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241987 | 11/22/2021 |
Confidential Cover Letter for Geysers Power Company ITM Report Q 3 2021
4 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
241934 | 12/3/2021 |
ITM_Quicksilver_9-26-17_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241933 | 12/3/2021 |
ITM_Quicksilver_9-26-17_Fire Alarm Insp_Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241932 | 12/3/2021 |
ITM_Quicksilver_8-15-17_Fire Pump Test_A
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241931 | 12/3/2021 |
ITM_Quicksilver_6-27-17_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241930 | 12/3/2021 |
ITM_Quicksilver_6-27-17_Fire Alarm Insp_Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241929 | 12/3/2021 |
ITM_Quicksilver_3-27-18_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241928 | 12/3/2021 |
ITM_Quicksilver_3-27-18_Fire Alarm Insp_A
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241927 | 12/3/2021 |
ITM_Quicksilver_3-21-17_Fire Sprinkler Insp_A
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241926 | 12/3/2021 |
ITM_Quicksilver_3-21-17_Fire Alarm Insp_A
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241925 | 12/3/2021 |
ITM_Quicksilver_12-14-17_Fire Sprinkler Insp_Q
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241924 | 12/3/2021 |
ITM_Quicksilver_12-14-17_Fire Alarm Insp_Q
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241923 | 12/3/2021 |
Fire-sprinkler-ITM-12-17-18 RK5097
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241922 | 12/3/2021 |
Fire System-wet down-Hydraulic Calculation Letter-2017
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241921 | 12/3/2021 |
fire sprinkler-ITM-2018
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241920 | 12/3/2021 |
Fire pump-ITM-2017-3
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241919 | 12/3/2021 |
Fire pump-ITM-2017-2
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241918 | 12/3/2021 |
Fire pump-ITM-2017-1
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241917 | 12/3/2021 |
Fire alarm-ITM-quarterly-2017
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241916 | 12/3/2021 |
Fire alarm-ITM-2018
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241915 | 12/3/2021 |
Fire alarm-ITM-12-17-18 RK5096
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241914 | 12/3/2021 |
20180504 Geysers CT Wetting System Water Supply 11153809_Report
13 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241718 | 1/27/2022 |
U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241717 | 1/27/2022 |
U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241716 | 1/27/2022 |
U19-Calistoga Deluge 2021 Q4 Report_CONIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241715 | 1/27/2022 |
U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241714 | 1/27/2022 |
U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241713 | 1/27/2022 |
U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241712 | 1/27/2022 |
U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241711 | 1/27/2022 |
U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241710 | 1/27/2022 |
U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241709 | 1/27/2022 |
U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241708 | 1/27/2022 |
U18-Socrates Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241707 | 1/27/2022 |
U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241706 | 1/27/2022 |
U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241705 | 1/27/2022 |
U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241704 | 1/27/2022 |
U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241703 | 1/27/2022 |
U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL
| | | Ellison Schneider Harris & Donlan LLP |
241702 | 1/27/2022 |
Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL
| | | Ellison Schneider Harris & Donlan LLP |
241564 | 2/16/2022 |
GPC Response to Executive Director's Confidentiality Determination
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241373 | 2/2/2022 |
CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022
Compliance 11 page(s)
| | J Harris of Ellison Schneider Harris & Donlan LLP | California Energy Commission |
241302 | 1/27/2022 |
Application for Confidential Designation
7 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
240997 | 12/20/2021 |
2020 Annual Compliance Report - Quicksilver
Compliance 136 page(s)
| | CEC/Mr. Eric W. Veerkamp, Compliance Project Manager | Geysers Power Company, LLC |
240811 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240809 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240806 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240805 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240803 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240801 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240793 | 12/3/2021 |
Unit 16 Quicksilver applications for confidential designation - fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240666 | 11/22/2021 |
Application for Confidential Designation
9 page(s)
| | CEC/docket unit | Ellison Schneider Harris & Donlan LLP |
240658 | 11/22/2021 |
GPC October 2021 Monthly Recommissioning Report
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
240560 | 11/10/2021 |
June 2021 Monthly Recommissioning Report
Compliance 3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris Donlan |
240552 | 11/10/2021 |
Monthly Recommissioning Report_August 2020_PUBLIC
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
240530 | 11/9/2021 |
December 2020 Geysers Monthly Recommissioning Report
4 page(s)
| | CEC/docket unit | California Energy Commission |
240524 | 11/9/2021 |
November 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240518 | 11/9/2021 |
October 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240512 | 11/9/2021 |
September 2020 Geysers Monthly Recommissioning Report
5 page(s)
| | CEC/docket unit | California Energy Commission |
240506 | 11/9/2021 |
Monthly Recommissioning Report_July 2020
3 page(s)
| | CEC/docket unit | California Energy Commission |
240500 | 11/9/2021 |
Monthly Recommissioning Report (June 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240494 | 11/9/2021 |
Monthly Recommissioning Report (May 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240480 | 11/9/2021 |
GPC Monthly Recommissioning Report - April 2020
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
240467 | 11/9/2021 |
August 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240466 | 11/9/2021 |
July 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240465 | 11/9/2021 |
September 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240464 | 11/9/2021 |
May 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240463 | 11/9/2021 |
January 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240462 | 11/9/2021 |
February 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240461 | 11/9/2021 |
April 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240460 | 11/9/2021 |
March 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
235706 | 11/19/2020 |
ORDER APPROVING SETTLEMENT
3 page(s)
| | CEC/Dockets | California Energy Commission |
232691 | 4/8/2020 |
2019 Annual Compliance Report for the Quicksilver Power Plant (Unit 16)
Compliance 17 page(s)
| | CEC/Dockets | Geysers Power Company, LLC |
231319 | 12/26/2019 |
2018 Annual Compliance Report for the Quicksilver Power Plant (Unit 16) 2018 Annual Compliance Report for the Quicksilver (Unit 16) Power Plant at the Geysers Compliance 16 page(s)
| | Eric W Veerkamp | Geysers Power Company, LLC |
230277 | 10/18/2019 |
RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING Resolution No: 19-1014-4 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
226127 | 12/17/2018 |
Commission Order 20181210 Quicksilver wet down system engine in Final Commission Order for Geysers Quicksilver Unit 16, PTA for wet down system permanent diesel engine installation Compliance 2 page(s)
| | CEC/Dockets | California Energy Commission |
225929 | 11/20/2018 |
Revised Air Quality and Worker Safety Conditions of Certification
Air Quality 8 page(s)
| | CEC/Docket Unit | California Energy Commission |
225737 | 11/1/2018 |
Memo - Staff Response to Petitioner’s Comments on Staff’s Revised Air District Permit Conditions
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
225633 | 10/30/2018 |
Compliance Docketing Policy
3 page(s)
| | Plant Manager | California Energy Commission |
225092 | 10/25/2018 |
Notice of Staff Workshop November 8, 2018 at 2:00 p.m. 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
225035 | 10/18/2018 |
Applicant's Comments on Staff's Revisions to Worker Safety-1 Condition of Certification
14 page(s)
| | CEC/Eric Veerkamp and Keith Winstead | Ellison Schneider Harris & Donlan LLP |
224985 | 10/15/2018 |
Revised Worker Safety-1 Condition of Certification
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
224739 | 9/17/2018 |
Geysers Power Company LLC Comments on the Staff Analysis of the Petition to Amend
9 page(s)
| | CEC/Keith Winstead | Ellison Schneider Harris & Donlan LLP |
224576 | 8/23/2018 |
Staff Analysis – Permanent Diesel Pump for Cooling Tower Wetting System The Geysers Power Company, LLC requests the Energy Commission to approve this petition to make identical modifications at each of the facilities to replace temporary portable emergency diesel engines with stationary permanent emergency diesel engines for the cooling tower wet down systems to aid in fire prevention at the Quicksilver, Socrates, and Grant geothermal power plants. 220 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
222538 | 2/13/2018 |
Air Quality Emissions & Impact Anaylsis
Air Quality 3 page(s)
| | CEC/Keith Winstead | Calpine |
222333 | 1/23/2018 |
Geysers Power Company, LLC - Consolidated Petition for a Staff Approved Modifications For: GPC Quicksilver Power Plant
GPC Socrates Power Plant
GPC Grant Power Plant
Geysers Unit 16 Docket: 79-AFC-OSC
Geysers Unit 18 Docket: 79-AFC-OJC
Geysers Unit 20 Docket: 82-AFC-01C
16 page(s)
| | CEC/Docket Unit | Geysers Power Plant |
222284 | 1/19/2018 |
Notice of Receipt - Petition to Amend the Energy Commission Decisions for Geysers Unit 16, Unit 18 and Unit 20 PETITION TO AMEND THE ENERGY COMMISSION DECISIONS FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C), and UNIT 20 (82-AFC-1C) TO ALLOW MINOR IMPROVEMENTS FOR FIRE PREVENTION COOLING TOWER WET-DOWN
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
222036 | 12/21/2017 |
PTA Geysers-16, Quicksilver, Diesel Generator for Cooling Tower Wetting System Petition to Amend (PTA) to install a permanent diesel generator for the cooling tower wetting system 56 page(s)
| | CEC/Eric Veerkamp | Geysers Power Company, LLC |
210230 | 2/8/2016 |
Final Permission for Exec. Order B-36-16 Expedited Processing & Lake Co Air Quality Mgmt Dist Authority to Construct (ATC)
8 page(s)
| | Geysers Power Company, LLC/James Kluesener | California Energy Commission |
206749 | 11/24/2015 |
Quicksilver (Unit 16) 1981 Final Decision and Compliance Plan
318 page(s)
| | | California Energy Commission |
206736 | 11/23/2015 |
Quicksilver (Unit 16) Executive Director's Approval of Expedited Processing for Cooling Tower Replacement
2 page(s)
| | | California Energy Commission |
206731 | 11/23/2015 |
Geysers Power Quicksilver (Unit 16) - Cooling Tower Replacement Project Description and Request for Expedited Processing
16 page(s)
| | | California Energy Commission |
206699 | 11/19/2015 |
Permission to Obtain and Implement County-Issued Demolition Permits to Abate Fire Damage to Structures at Geysers 16, 18, and 20 *** SEE PREVIOUSLY FILED LETTER. TN 206305 *** 2 page(s)
| | Calpine Corporation | California Energy Commission |
206305 | 10/8/2015 |
Executive Director's Permission Letter for Cooling Tower Demolition after the 2015 Valley Fire
2 page(s)
| | Calpine Corporation/Bruce Carlsen | California Energy Commission |
31952 | 7/23/2004 |
AREVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES- - GEYSERS POWER COMPANY, LLC
4 page(s)
| | CEC/Dockets | Rtp Environmental Assoc |
31945 | 7/23/2004 |
Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.
42 page(s)
| | CEC/K. Defolo/dockets | Ca Rwqcb |
31107 | 3/12/2004 |
Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes
3 page(s)
| | Calpine/Carlsen/dockets | CEC/Tronaas |
31096 | 3/12/2004 |
Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Tronaas |
30962 | 2/20/2004 |
Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C) 2 page(s)
| | CEC/Dockets | CEC/O'brien |
29684 | 8/15/2003 |
Comments on the petition to the CEC to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 amd 20 to allow selected uses of reclaimed wastewater
3 page(s)
| | O'bien/Cec | California Regional Water Quality Control Board/Ma |
29153 | 7/10/2003 |
Notice of Receipt, Petition to Amend the Energy Commiission Decisions (79-AFC-5C
1 page(s)
| | Dockets | CEC/O'brien |
29134 | 6/25/2003 |
License Amendments
43 page(s)
| | CEC/Tronaas/dockets | Ch2mhill/Salamy |
11770 | 4/22/1999 |
Commission Order Approving Ownership Transfers
1 page(s)
| | CEC/Docket File | CEC/Keese |
10732 | 3/30/1999 |
Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18 and 20.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
10125 | 2/2/1999 |
Unit 16 Transfer of CEC Certificate, Decision Number P800-81-007 to Geysers Power Company, LLC
2 page(s)
| | CEC Cec Brand | PG&E/Speer, Jr. |
655 | 3/14/1995 |
LETTER REQUESTING THAT MODIFICATIONS BE GRANTED BY CEC STAFF AFTER REVIEW OF THE REQUEST DATED 9-14-94
3 page(s)
| | CEC/Brand | Pg&e |
654 | 10/19/1994 |
NOTICE OF RECEIPT - REQUEST TO AMEND DECISION - ASSESS IM PACTS ON ENVIRONMENTAL QUALTIY, PUBLIC HEALTH & SAFETY AND CONSISTENCY OF PROPOSED CHANGES
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |
653 | 9/22/1994 |
PG&E GEYSERS POWER PLANT - MODIFICANTION REQUEST TO COMPLIANCE MONITORING PLANS FOR UNITS 16-20
1 page(s)
| | CEC/Brand | Pg&e/Speer |