257809 | 6/21/2024 |
CONFIDENTIALITY Unit 18_GPC Q2 2024 Fire Protection Compliance Submission
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
257796 | 7/18/2024 |
CEC response letter to Geysers Power Company, LLC re confidentiality applications, dated June 21, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
257429 | 6/26/2024 |
2023 Annual Compliance Report - Socrates (U18)
58 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
257345 | 6/21/2024 |
GPC Unit 18_Q2 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential Designation
3 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris & Donlan LLP |
255982 | 3/29/2024 |
CONFIDENTIAL Unit 18 Annual Fire Alarm Inspection Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255981 | 3/29/2024 |
CONFIDENTIAL Unit 18 Semi-Annual Fire Alarm Inspection Report
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255980 | 3/29/2024 |
CONFIDENTIAL Unit 18 Annual Fire Pump Report
18 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255979 | 3/29/2024 |
CONFIDENTIAL Unit 18 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Fourth Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255978 | 3/29/2024 |
CONFIDENTIAL Unit 18 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Fourth Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255977 | 3/29/2024 |
CONFIDENTIAL Unit 18 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Third Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255976 | 3/29/2024 |
CONFIDENTIAL Unit 18 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Third Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255975 | 3/29/2024 |
CONFIDENTIAL Unit 18 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_Second Quarter
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255974 | 3/29/2024 |
CONFIDENTIAL Unit 18 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_Second Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255973 | 3/29/2024 |
CONFIDENTIAL Unit 18 Wet Pipe Fire Sprinkler System Quarterly and Annual Report_First Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255972 | 3/29/2024 |
CONFIDENTIAL Unit 18 Standpipe and Hose System Quarterly and Annual Report_First Quarter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255971 | 3/29/2024 |
CONFIDENTIAL Unit 18 Deluge Sprinkler Systems Water Spray Quarterly and Annual Report_First Quarter
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255898 | 4/24/2024 |
CEC's Response Letter to Geysers Power Company re Application for Confidential Designation, dated 3-29-2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
255368 | 3/29/2024 |
GPC Unit 18_2023 ITM Reports_Repeated Application for Confidential Designation
19 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
255358 | 3/29/2024 |
GPC Unit 18_Letter to Keith Winstead Regarding Fire Protection-3 Submission
1 page(s)
| | CEC/Keith Winstead | Ellison Schneider Harris & Donlan LLP |
255211 | 3/7/2024 |
CONFIDENTIAL_U18_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
12 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255206 | 2/16/2024 |
CONFIDENTIAL Unit 18 GPC Q1 2024 FIRE PROTECTION Compliance Submission
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
255190 | 3/20/2024 |
CEC Response Letter to Applications for Confidential Designation dated Feb 16, 2024 and March 7, 2024
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
254913 | 3/7/2024 |
Repeated Application for Confidentiality_U18_GPC 2023 FIRE PROTECTION 4 and 5 Compliance Submission
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
254541 | 2/16/2024 |
GPC Unit 18_Q1 2024 ITM Corrective Action Compliance Submission_Repeated Application for Confidential
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
250878 | 6/30/2023 |
2022 Annual Compliance Report - Socrates (U18)
54 page(s)
| | CEC/John Heiser | Geysers Power Company, LLC |
249811 | 4/19/2023 |
CEC Response Letter re Application for Confidential Designation dated March 30, 2023
Compliance 2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
249782 | 3/30/2023 |
Geysers Power Company, Unit 18, 4Q22 ITM Report Wet Sprinkler Inspection
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249781 | 3/30/2023 |
Geysers Power Company, Unit 18, 4Q22 ITM Report Deluge Inspection
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
249780 | 3/30/2023 |
Geysers Power Company, Unit 18, ITM Report Cover Letter
4 page(s)
| | CEC/Keith Winstead | Ellison Schneider Harris & Donlan LLP |
249514 | 3/30/2023 |
Geysers Power Company, Unit 18, Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
248046 | 12/13/2022 |
November 2022 Monthly Recommissioning Report for Geysers Power Company, LLC Socrates Unit 18 Facility
6 page(s)
| | CEC/John Heiser and Keith Winstead | Ellison Schneider Harris & Donlan LLP |
247598 | 11/21/2022 |
CEC Response for Confidential Designation Geysers Unit 18, Socrates
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247579 | 11/4/2022 |
GPC Unit 18_Q3 2022 Wet Pipe Inspection Report
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247578 | 11/4/2022 |
GPC Unit 18_Q3 2022 Deluge Inspection Report
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247577 | 11/4/2022 |
GPC Unit 18_Q3 2022 Second Semiannual FireScan Report
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247576 | 11/4/2022 |
GPC Unit 18_Q3 2022 ITM Report Cover Letter
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247302 | 11/4/2022 |
GPC Unit 18_Q3 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247274 | 11/3/2022 |
CEC Response to Geysers Unit 18 Repeated Application for Confidentiality
2 page(s)
| | Ellison Schneider Harris & Donlan LLP/Chase Maxwell | California Energy Commission |
247209 | 10/19/2022 |
GPC Unit 18_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247196 | 10/20/2022 |
GPC Unit 18_Wet Pipe Q2 2022 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247195 | 10/20/2022 |
GPC Unit 18_Deluge Q2 2022 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
247194 | 10/20/2022 |
GPC Unit 18_Q2 2022 ITM Report Cover Letter_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246702 | 10/20/2022 |
GPC Unit 18_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
246649 | 10/19/2022 |
GPC Unit 18_Q2 2022 ITM Reports and Compliance Documents_Repeated Application for Confidential Designation
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243910 | 6/1/2022 |
Unit 18_Wet Pipe Fire Sprinkler System Quarterly and Annual Report
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243909 | 6/1/2022 |
Unit 18_Fire Alarm and Life Safety System Inspection Certificate
10 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243908 | 6/1/2022 |
Unit 18_Electric Fire Pump Annual Report # 3
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243907 | 6/1/2022 |
Unit 18_Electric Fire Pump Annual Report # 2
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243906 | 6/1/2022 |
Unit 18_Electric Fire Pump Annual Report # 1
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243905 | 6/1/2022 |
Unit 18_Electric Fire Pump Annual Report - Fire Pump Performance Test Graph
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243904 | 6/1/2022 |
Unit 18_GPC Q1 2022 ITM Report Cover Letter_CONFIDENTIAL
6 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
243859 | 7/6/2022 |
CEC Response Geyser Unit 18 Confidential Application June 1, 2022
2 page(s)
| | C. Maxwell Ellison Schneider Harris & Donlan LLP | California Energy Commission |
243807 | 6/30/2022 |
2021 Annual Compliance Report - Socrates
Compliance 53 page(s)
| | CEC/Docket Unit | Geysers Power Company, LLC |
243382 | 6/1/2022 |
Unit 18_GPC Q1 2022 ITM Reports and Compliance Documents Repeated Application for Confidential Designation
12 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
242575 | 4/5/2022 |
2020 Revised Annual Compliance Report - Socrates
Compliance 70 page(s)
| | CEC/Eric Veerkamp, CPM | Geysers Power Company, LLC |
242165 | 11/22/2021 |
Confidential GPD October 2021 Monthly Recommissioning Report
7 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
242164 | 11/22/2021 |
Confidential Fire Scan 2021 Report
10 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
242163 | 11/22/2021 |
Confidential Deluge 2021 Report
5 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
242162 | 11/22/2021 |
Confidential Wet-Pipe 2021 Report
3 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
242161 | 11/22/2021 |
Confidential Cover Letter for Geysers Power Company ITM Report Q 3 2021
4 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
242155 | 12/3/2021 |
Geysers Update 2-8-2019-presentation design plan
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242151 | 12/3/2021 |
U16_U18_U20_Wetting_pump_piping_CEC
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242133 | 12/3/2021 |
U18 4-22-19-4_ReCx ITM Fire Inspection Report (00484041xBA8E1)
1 page(s)
| | CEC/Docket Unit | Ellison Schneider Harris Donlan |
242132 | 12/3/2021 |
20190402 Geysers Unit #18 BOD ReCx Privileged and Confidential
27 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242131 | 12/3/2021 |
U18 4-22-19-3_ReCx ITM Fire Inspection Report (00484040xBA8E1)
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242130 | 12/3/2021 |
U18 4-22-19_ReCx ITM Fire Inspection Report (00484037xBA8E1)
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242129 | 12/3/2021 |
U18 4-22-19-2_ReCx ITM Fire Inspection Report (00484038xBA8E1)
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242128 | 12/3/2021 |
20190402 Geysers Unit_CEC Comments
27 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242127 | 12/3/2021 |
20190402 Geysers Unit #18 BOD ReCx Privileged and Confidential - 1
27 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242103 | 12/3/2021 |
Geysers Socrates (Unit 18) Review of BOD and Recom Plan_200117
2 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242102 | 12/3/2021 |
20210929 Geysers Unit 18 FP BOD_Rev0_Privileged and Confidential
15 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242101 | 12/3/2021 |
20210807 Geysers Unit #18 BOD ReCx Privileged and Confidential_Rev2
130 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242100 | 12/3/2021 |
20210524 Geysers Unit #18 Socrates BOD ReCx Privileged and Confidential_Rev1
124 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242099 | 12/3/2021 |
2019 Summary of ReCx CAR Unit 18 Socrates
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242098 | 12/3/2021 |
2019 ReCx CAR-18-009 FP Systems Hydraulic Nameplates
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242097 | 12/3/2021 |
2019 ReCx CAR-18-008 Wet Sprinkler Piping System
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242096 | 12/3/2021 |
2019 ReCx CAR-18-007 Sequence of Operation
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242095 | 12/3/2021 |
2019 ReCx CAR-18-006 Removal of NonOperational Systems
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242094 | 12/3/2021 |
2019 ReCx CAR-18-005 Fire Alarm System Notification
| | CEC/Docket Unit | Ellison Schneider Harris Donlan |
242093 | 12/3/2021 |
2019 ReCx CAR-18-004 Fire Alarm System Monitoring
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242092 | 12/3/2021 |
2019 ReCx CAR-18-003 Fire Alarm System
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242091 | 12/3/2021 |
2019 ReCx CAR-18-002 Fire Pump operation
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242090 | 12/3/2021 |
2019 ReCx CAR-18-001 Fire Pump Pressure Switches Setting
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242065 | 12/3/2021 |
Socrates-ITM-2016 RK0861 QSP
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242064 | 12/3/2021 |
Socrates-ITM-2016 RK0861 QFA
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242063 | 12/3/2021 |
Socrates-ITM-2016 RK0633 QSP
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242062 | 12/3/2021 |
Socrates-ITM-2016 QSP
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242061 | 12/3/2021 |
Socrates-ITM-2016 QFA
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242060 | 12/3/2021 |
Socrates ITM-2016 fire sprinkler report
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242059 | 12/3/2021 |
Socrates ITM 2016 fire alarm report
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242058 | 12/3/2021 |
ompliance_Socrates_5_23_16_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242057 | 12/3/2021 |
Compliance_Sorates_2_29_16_ITM_Fire-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242056 | 12/3/2021 |
Compliancer_Socrates_2_3_15_ITM_Fire-Sprinkler-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242055 | 12/3/2021 |
Compliance_Socrates_11_2_15_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242054 | 12/3/2021 |
Compliance_Socrates_11_28_16_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242053 | 12/3/2021 |
Compliance_Socrates_11_21_13_ITM_Fire-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242052 | 12/3/2021 |
Compliance_Socrates_11-21-2013_ITM_Fire-Sprinkler_A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242051 | 12/3/2021 |
Compliance_Socrates_8_3_15_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242050 | 12/3/2021 |
Compliance_Socrates_8_29_16_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242049 | 12/3/2021 |
Compliance_Socrates_8_28_14_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242048 | 12/3/2021 |
Compliance_Socrates_10_28_14_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242047 | 12/3/2021 |
Compliance_Socrates_6_10_13_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242046 | 12/3/2021 |
Compliance_Socrates_2_3_15_ITM_Fire-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242045 | 12/3/2021 |
Compliance_Socrates_2_29_16_ITM_Sprinkler-A
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242044 | 12/3/2021 |
Compliance_Scorates__10_28_14_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242043 | 12/3/2021 |
Compliance_Scorates__8_28_14_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
242042 | 12/3/2021 |
Compliance_Scorates__6_7_13_ITM_Fire-Q
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
241684 | 1/27/2022 |
U19-Calistoga Dry Pipe 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241683 | 1/27/2022 |
U19-Calistoga Diesel Fire Pump 2021 Q4 Report_CONFIDENTIAL
7 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241682 | 1/27/2022 |
U19-Calistoga Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241681 | 1/27/2022 |
U20-Grant Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241680 | 1/27/2022 |
U20-Grant Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241679 | 1/27/2022 |
U19-Calistoga Pre-action 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241678 | 1/27/2022 |
U19-Calistoga Electric Fire Pump 2021 Q4 Report_CONFIDENTIAL
5 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241677 | 1/27/2022 |
U16-Quicksilver Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241676 | 1/27/2022 |
U16-Quicksilver Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241675 | 1/27/2022 |
U18-Socrates Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241674 | 1/27/2022 |
U18-Socrates Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241673 | 1/27/2022 |
U17-Lakeview Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241672 | 1/27/2022 |
U17-Lakeview Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241671 | 1/27/2022 |
U03-Sonoma Deluge 2021 Q4 Report_CONFIDENTIAL
4 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241670 | 1/27/2022 |
U03-Sonoma Wet Sprinkler 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
241669 | 1/27/2022 |
U03-Sonoma Pre-action 2021 Q4 Report_CONFIDENTIAL
3 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
241668 | 1/27/2022 |
Geysers Power Company ITM Report Cover Letter_CONFIDENTIAL
5 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
241563 | 2/16/2022 |
GPC Response to Executive Director's Confidentiality Determination
2 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
241375 | 2/2/2022 |
CEC Response Letter Geysers #3 Confidential Application May 25, 2018, Nov 19 and Dec 10, 2021, and Jan 10 and 27, 2022
Compliance 11 page(s)
| | J Harris of Ellison Schneider Harris & Donlan LLP | California Energy Commission |
241303 | 1/27/2022 |
Application for Confidential Designation
8 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris & Donlan LLP |
240998 | 12/20/2021 |
Annual Compliance Report - Socrates
Compliance 84 page(s)
| | CEC/Mr. Eric W. Veerkamp, Compliance Project Manager | Geysers Power Company, LLC |
240810 | 12/3/2021 |
Unit 18 Socrates Application for Confidential Designation - applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240808 | 12/3/2021 |
Unit 18 Socrates Application for Confidential Designation - applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240807 | 12/3/2021 |
Unit 18 - Socrates Application for Confidential Designation
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240804 | 12/3/2021 |
Unit 18 Socrates Application for Confidential Designation - applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240800 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240797 | 12/3/2021 |
applications-fire suppression docs-2018
33 page(s)
| | CEC/Drew Bohan | Ellison Schneider Harris Donlan |
240678 | 11/22/2021 |
Application for Confidential Designation
9 page(s)
| | | Ellison Schneider Harris & Donlan LLP |
240660 | 11/22/2021 |
GPC October 2021 Monthly Recommissioning Report
3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris & Donlan LLP |
240559 | 11/10/2021 |
June 2021 Monthly Recommissioning Report
Compliance 3 page(s)
| | CEC/Eric Veerkamp | Ellison Schneider Harris Donlan |
240553 | 11/10/2021 |
Monthly Recommissioning Report_August 2020_PUBLIC
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
240531 | 11/9/2021 |
December 2020 Geysers Monthly Recommissioning Report
4 page(s)
| | CEC/docket unit | California Energy Commission |
240525 | 11/9/2021 |
November 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240519 | 11/9/2021 |
October 2020 Geysers Monthly Recommissioning Report
3 page(s)
| | CEC/docket unit | California Energy Commission |
240513 | 11/9/2021 |
September 2020 Geysers Monthly Recommissioning Report
5 page(s)
| | CEC/docket unit | California Energy Commission |
240507 | 11/9/2021 |
Monthly Recommissioning Report_July 2020
3 page(s)
| | CEC/docket unit | California Energy Commission |
240501 | 11/9/2021 |
Monthly Recommissioning Report (June 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240495 | 11/9/2021 |
Monthly Recommissioning Report (May 2020)
3 page(s)
| | CEC/docket unit | California Energy Commission |
240485 | 11/9/2021 |
GPC Monthly Recommissioning Report - April 2020
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
240476 | 11/9/2021 |
August 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240475 | 11/9/2021 |
July 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240474 | 11/9/2021 |
September 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240472 | 11/9/2021 |
May 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240471 | 11/9/2021 |
February 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240470 | 11/9/2021 |
April 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240469 | 11/9/2021 |
March 2021 Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 3 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
240468 | 11/9/2021 |
January 2021 Monthly Recommissioning Report Fire System Recommissioning Report for Geysers Compliance 4 page(s)
| | CEC/Eric Veerkamp | California Energy Commission |
235700 | 11/19/2020 |
ORDER APPROVING SETTLEMENT
3 page(s)
| | CEC/Dockets | California Energy Commission |
232694 | 4/8/2020 |
Geysers Power Company, LLC Comments - 2019 Annual Compliance Report
Compliance 18 page(s)
| | CEC/Dockets | Geysers Power Company, LLC |
231323 | 12/26/2019 |
2018 Annual Compliance Report for the Socrates Power Plant (Unit 18) 2018 Annual Compliance Report for the Socrates Power Plant (Unit 18) at the Geysers Compliance 16 page(s)
| | Mr Eric W Veerkamp | Geysers Power Company, LLC |
230279 | 10/18/2019 |
RESOLUTION - RE GEYSERS FACILITIES FIRE SYSTEM RECOMMISSIONING Resolution No: 19-1014-4 1 page(s)
| | CEC/Docket Unit | California Energy Commission |
226128 | 12/17/2018 |
Commission Order for Socrates 20181210 wet down system engine i Final Commission Order for Geysers Socrates Unit 18, PTA for wet down system permanent diesel engine installation Compliance 2 page(s)
| | CEC/Dockets | California Energy Commission |
225930 | 11/20/2018 |
Revised Air Quality and Worker Safety Conditions of Certification
Air Quality 8 page(s)
| | CEC/Docket Unit | California Energy Commission |
225738 | 11/1/2018 |
Memo - Staff Response to Petitioner’s Comments on Staff’s Revised Air District Permit Conditions
6 page(s)
| | CEC/Docket Unit | California Energy Commission |
225662 | 10/31/2018 |
Compliance Docketing Policy
3 page(s)
| | CEC/Dockets | California Energy Commission |
225093 | 10/25/2018 |
Notice of Staff Workshop November 8, 2018 at 2:00 p.m. 4 page(s)
| | CEC/Docket Unit | California Energy Commission |
225034 | 10/18/2018 |
Applicant's Comments on Staff's Revisions to Worker Safety-1 Condition of Certification
14 page(s)
| | CEC/Eric Veerkamp and Keith Winstead | Ellison Schneider Harris & Donlan LLP |
224986 | 10/15/2018 |
Revised Worker Safety-1 Condition of Certification
2 page(s)
| | CEC/Docket Unit | California Energy Commission |
224740 | 9/17/2018 |
Geysers Power Company LLC Comments on the Staff Analysis of the Petition to Amend
9 page(s)
| | CEC/Keith Winstead | Ellison Schneider Harris & Donlan LLP |
224577 | 8/23/2018 |
Staff Analysis – Permanent Diesel Pump for Cooling Tower Wetting System The Geysers Power Company, LLC requests the Energy Commission to approve this petition to make identical modifications at each of the facilities to replace temporary portable emergency diesel engines with stationary permanent emergency diesel engines for the cooling tower wet down systems to aid in fire prevention at the Quicksilver, Socrates, and Grant geothermal power plants. 220 page(s)
| | California Energy Commission 1516 9th Street. Sacramento, CA 95814 | California Energy Commission |
222537 | 2/13/2018 |
Air Quality Emissions & Impact Anaylsis
3 page(s)
| | CEC/Ketih Winstead | Calpine |
222334 | 1/23/2018 |
Geysers Power Company, LLC - Consolidated Petition for a Staff Approved Modifications FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C),
and UNIT 20 (82-AFC-1C)
16 page(s)
| | CEC/Docket Unit | Geysers Power Plant |
222285 | 1/19/2018 |
Notice of Receipt - Petition to Amend the Energy Commission Decisions for Geysers Unit 16, Unit 18 and Unit 20 PETITION TO AMEND THE ENERGY COMMISSION DECISIONS
FOR GEYSERS UNIT 16 (79-AFC-5C), UNIT 18 (79-AFC-3C), and UNIT 20 (82-AFC-1C) TO ALLOW MINOR IMPROVEMENTS FOR FIRE PREVENTION COOLING TOWER WET-DOWN
3 page(s)
| | CEC/Docket Unit | California Energy Commission |
222037 | 12/21/2017 |
PTA Geysers-16, Quicksilver, Diesel Generator for Cooling Tower Wetting System Petition to Amend (PTA) to install a permanent diesel generator for the cooling tower wetting system 56 page(s)
| | CEC/Eric Veerkamp | Geysers Power Company, LLC |
207191 | 1/5/2016 |
Expedited Processing Pursuant to Ex Order B-36-15 Approval of Emergency Reconstruction Activities Air Quality 7 page(s)
| | Geysers Power Company, LLC/James Kluesener | California Energy Commission |
206756 | 11/24/2015 |
Socrates (Unit 18) 1980 Final Decision
48 page(s)
| | | California Energy Commission |
206755 | 11/24/2015 |
Socrates (Unit 18) Compliance Plan
56 page(s)
| | | California Energy Commission |
206740 | 11/23/2015 |
Socrates (Unit 18) Executive Director's Approval of Expedited Processing for Cooling Tower Replacement
2 page(s)
| | | California Energy Commission |
206732 | 11/23/2015 |
Geysers Power Socrates (Unit 18) - Cooling Tower Replacement Project Description and Request for Expedited Processing
19 page(s)
| | | California Energy Commission |
206700 | 11/19/2015 |
Permission to Obtain and Implement County-Issued Demolition Permits to Abate Fire Damage to Structures at Geysers 16, 18, and 20 *** SEE PREVIOUSLY FILED LETTER. TN 206306 *** 2 page(s)
| | | California Energy Commission |
206306 | 10/8/2015 |
Executive Director's Permission Letter for Cooling Tower Demolition after the 2015 Valley Fire
2 page(s)
| | Calpine Corporation/Bruce Carlsen | California Energy Commission |
31951 | 7/23/2004 |
REVIEW OF RECLAIMED WATER USES AT THE GEYSERS FACILITIES - - GEYSERS POWER COMPANY, LLC
4 page(s)
| | CEC/Dockets | Rtp Environmental Assoc. |
31943 | 7/23/2004 |
Comments to "Engineering Report for the Use of Recycled Water at The Geysers" Power Plant Units.
42 page(s)
| | CEC/K. Defolo/dockets | Ca Rwqcb |
31109 | 3/12/2004 |
Approval of Petition to Use Reclaimed Wastewater and Approval of Verification Changes
3 page(s)
| | Calpine/Carslen/dockets | CEC/Tronaas |
31098 | 3/12/2004 |
Notice of Exemption - Petition to Allow the Use of Reclaimed Wastewater
1 page(s)
| | Office Of Planning And Research/Dockets | CEC/Tronaas |
30960 | 2/20/2004 |
Notice of Insignificant Project Change for Geysers Units to Allow for Use of Reclaimed Wastewater Unit 3 (80-AFC-1C), Unit 16 (79-AFC-5C), Unit 17 (79-AFC-1C), Unit 18 (79-AFC-3C), Unit 19 (81-AFC-1C), and Unit 20 (82-AFC-1C) 2 page(s)
| | CEC/Docket Unit | CEC/O'brien |
29689 | 8/15/2003 |
Comments on the petition to the California Energy Commission to amend the Energy Commission Decisions for Geysers Unit 3, 16, 17, 18, 19 and 20 to allow selected uses of reclaimed wastewater
3 page(s)
| | O'brien/Cec | California Regional Water Quality Control Board/Ma |
29157 | 7/10/2003 |
Notice of Receipt, Petition to Amend the Energy Commission Decisions (79-AFC-3C)
3 page(s)
| | Dockets | CEC/O'brien |
29133 | 6/25/2003 |
License Amendments
43 page(s)
| | CEC/Tronaas/dockets | Ch2mhill/Salamy |
11773 | 4/22/1999 |
Commission Order Approving Ownership Transfers
1 page(s)
| | CEC/Docket File | CEC/Keese |
10731 | 3/30/1999 |
Notice of Receipt - The CEC has received a petition requesting an ownership change for the Geysers Power Plant Units 16, 17, 18 and 20.
2 page(s)
| | CEC/Docket File | CEC/Therkelsen |
5577 | 9/22/1994 |
PG&E GEYSERS POWER PLANT - MODIFICATION REQUESTS TO COMPLIANCE MONITORING PLANS FOR UNITS 16-20
1 page(s)
| | CEC/Brand | Pg&e/Speer |
652 | 3/14/1995 |
LETTER REQUESTING THAT MODIFICATIONS BE GRANTED BY CEC STAFF AFTER REVIEW OF REQUEST DATED 9-14-95
3 page(s)
| | CEC/Brand | Pg&e |
651 | 10/19/1994 |
NOTICE OF RECEIPT - REQUEST TO AMEND CHANGES - IN DECISION - ASSESS IMPACTS ON ENVIRENMENTAL QUALTIY, PUBLIC HEALTH & SAFETY, AND CONSISTENCY OF PROPOSED CHANGES
1 page(s)
| | CEC/Docket File | CEC/Therkelsen |