| 268181 | 1/7/2026 |
Appendix E Application for Confidential Request Application for Confidential Request for Appendix E (Interconnection Agreement and QC14 Phase 2 Study) 2 page(s)
| | CEC/Drew Bohen | Rincon Consultants, Inc. |
| 268177 | 1/6/2026 |
Appendix A Application for Confidential Request_Prop Owner Info Application of Confidentiality for Appendix A Property Owner Information (Confidential Appendix)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268176 | 1/6/2026 |
Appendix Q Application for Confidential Request_Socio Application for Confidentiality for Appendix Q Socioeconomics Technical Report.
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268175 | 1/6/2026 |
Appendix YL Application for Confidential Request_Bio Application of Confidentiality for Appendix Y.L California Natural Diversity Database (CNDDB) Figure
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268173-1 | 1/6/2026 |
Appendix Z Facility Definitions_VDPC In accordance with California Code of Regulations Title 20 § 1877 (b), Appendix Z provides an explanation of how the Project facilities meet one or more of the definitions of “facility” in California Public Resources Code § 25545(b).
3 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268173-2 | 1/6/2026 |
Appendix AA Public Resources Code Section 21183 and 211836_VDPC Provides a crosswalk and attachment which demonstrate the ways in which the Project meets the requirements of California Public Resources Code (PCR) Sections 21183 and 21183.6.
9 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268173-3 | 1/6/2026 |
Appendix T Vaca Dixon BESS Hazard Mitigation Analysis_VDPC The Hazard Mitigation Analysis evaluates fire and safety risks for the Project, detailing compliance with fire codes, results of UL 9540A testing, and mitigation measures such as fire detection, thermal runaway protection, and explosion control to ensure safe operation of the lithium-ion ESS installation.
Appendix T.A UL9540 Certificate;
Appendix T.B 9540A Test Reports;
Appendix T.C SYL User Manual;
Appendix T.D Safety Data Sheets;
Appendix T.E NFPA 69 Test Report
303 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268172-1 | 1/6/2026 |
Appendix Y Biological Resources Technical Study_VDPC_Part 1 of 3 Includes a Biological Resources Technical Study which analyzes the potential impacts of the Project and evaluates short and long term impacts of the Project to biological resources.
Y.A Regulatory Framework;
Y.B Species Compendia;
Y.C Representative Site Photographs;
Y.D Burrowing Owl Survey Report;
Y.E Dry Season Large Branchiopod Protocol Sampling Results (2024);
Y.F Wet Season Large Branchiopod Protocol Sampling Results;
Y.G Large Branchiopod Habitat Assessment Report;
Y.H Dry Season Large Branchiopod Protocol Sampling Results (2025);
Y.I Crotch’s Bumble Bee Survey Report;
Y.J Aquatic Resources Delineation Report;
Y.K Special-Status Species Evaluation Table;
Y.L California Natural Diversity Database (CNDDB) Figure (scale1:6,000) (Confidential - submitted separately);
Y.M United States Fish and Wildlife Service Meeting Minutes
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268172-2 | 1/6/2026 |
Appendix Y Biological Resources Technical Study_VDPC_Part 2 of 3 Includes a Biological Resources Technical Study which analyzes the potential impacts of the Project and evaluates short and long term impacts of the Project to biological resources.
Y.A Regulatory Framework;
Y.B Species Compendia;
Y.C Representative Site Photographs;
Y.D Burrowing Owl Survey Report;
Y.E Dry Season Large Branchiopod Protocol Sampling Results (2024);
Y.F Wet Season Large Branchiopod Protocol Sampling Results;
Y.G Large Branchiopod Habitat Assessment Report;
Y.H Dry Season Large Branchiopod Protocol Sampling Results (2025);
Y.I Crotch’s Bumble Bee Survey Report;
Y.J Aquatic Resources Delineation Report;
Y.K Special-Status Species Evaluation Table;
Y.L California Natural Diversity Database (CNDDB) Figure (scale1:6,000) (Confidential - submitted separately);
Y.M United States Fish and Wildlife Service Meeting Minutes
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268172-3 | 1/6/2026 |
Appendix Y Biological Resources Technical Study_VDPC_Part 3 of 3 Includes a Biological Resources Technical Study which analyzes the potential impacts of the Project and evaluates short and long term impacts of the Project to biological resources.
Y.A Regulatory Framework;
Y.B Species Compendia;
Y.C Representative Site Photographs;
Y.D Burrowing Owl Survey Report;
Y.E Dry Season Large Branchiopod Protocol Sampling Results (2024);
Y.F Wet Season Large Branchiopod Protocol Sampling Results;
Y.G Large Branchiopod Habitat Assessment Report;
Y.H Dry Season Large Branchiopod Protocol Sampling Results (2025);
Y.I Crotch’s Bumble Bee Survey Report;
Y.J Aquatic Resources Delineation Report;
Y.K Special-Status Species Evaluation Table;
Y.L California Natural Diversity Database (CNDDB) Figure (scale1:6,000) (Confidential - submitted separately);
Y.M United States Fish and Wildlife Service Meeting Minutes
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268171-1 | 1/6/2026 |
Appendix U Arges BESS Hazard Mitigation Analysis_VDPC The Hazard Mitigation Analysis evaluates fire and safety risks for the Project, detailing compliance with fire codes, results of UL 9540A testing, and mitigation measures such as fire detection, thermal runaway protection, and explosion control to ensure safe operation of the lithium-ion ESS installation.
Appendix U.A UL9540 Certificate;
Appendix U.B 9540A Test Reports;
Appendix U.C SYL User Manual;
Appendix U.D Safety Data Sheets;
Appendix U.E NFPA 69 Test Report
352 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268171-2 | 1/6/2026 |
Appendix V Vaca Dixon BESS Hazard Consequence Analysis_VDPC The Hazard Consequence Analysis evaluates potential fire and safety risks for the Project, detailing mitigation measures, distances to sensitive receptors, and modeling of hazardous gas releases during thermal runaway events using UL 9540A test data and PHAST software to ensure compliance with fire codes and protect life safety.
V.A SYL SU3794U3794KC UL 9540A Cell Level Test Result
87 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268171-3 | 1/6/2026 |
Appendix W Arges BESS Hazard Consequence Analysis_VDPC The Hazard Consequence Analysis evaluates potential fire and safety risks for the Project, detailing mitigation measures, distances to sensitive receptors, and modeling of hazardous gas releases during thermal runaway events using UL 9540A test data and PHAST software to ensure compliance with fire codes and protect life safety.
W.A SYL SU3794U3794KC UL 9540A Cell Level Test Result
72 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268171-4 | 1/6/2026 |
Appendix X January 2025 Phase I ESA_VDPC The Phase I Environmental Site Assessment (January 2025) includes a discussion of potential environmental concerns based on site reconnaissance, historical land use review, regulatory database searches, and interviews. This report covers portions of the PG&E parcel where the gen-tie line would be located. The assessment follows ASTM standards and supports compliance with federal requirements for property due diligence.
X.A Database Radius Report;
X.B Historical Research Documentation;
X.C Photograph Log;
X.D TRC Staff and Environmental Professional Qualifications/Resumes;
X.E Environmental Professional Statement
445 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268170-1 | 1/6/2026 |
Appendix R Air Quality and Greenhouse Gas Emissions Study_VDPC_Part 1 of 2 Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the Project and evaluates short and long term impacts of the Project to sensitive receptors.
R.A Assumptions and Calculations;
R.B CalEEMod Output Files;
R.C Ambient Air Quality Analysis;
R.D Health Risk Assessment
160 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268170-2 | 1/6/2026 |
Appendix R Air Quality and Greenhouse Gas Emissions Study_VDPC_Part 2 of 2 Includes an Air Quality and Greenhouse Gas Emissions Study which analyzes the potential impacts of the Project and evaluates short and long term impacts of the Project to sensitive receptors.
R.A Assumptions and Calculations;
R.B CalEEMod Output Files;
R.C Ambient Air Quality Analysis;
R.D Health Risk Assessment
200 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268170-3 | 1/6/2026 |
Appendix S Emergency Response Plan_VDPC The Emergency Response Plan outlines procedures for fire service personnel to ensure safe and effective responses to emergencies at the Project Site, with remote monitoring by the operator and provisions for both operational and construction phases.
S.A Map of Site;
S.B Emergency Response Map;
S.C Incident Report Form;
S.D Bomb Threat Report;
S.E Bomb Threat Checklist;
S.F Chemical/Biological Agent Threat Report;
S.G Chemical/Biological Agent Threat Checklist;
S.H Safety Data Sheets;
S.I Considerations During Construction
100 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268169-1 | 1/6/2026 |
Appendix N Lighting Plan _VDPC Includes proposed lighting plan with elevations, site plan and lighting fixture schedule.
4 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268169-2 | 1/6/2026 |
Appendix O Public Resources Code Section and Required Certifications_VDPC Compliance letter for prevailing wage and workforce requirements set forth in Assembly Bill 205 (“AB 205”), and Public Resources Code Section 25545.3.3 and 25545.3.5.
3 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268169-3 | 1/6/2026 |
Appendix P Simulated Views_VDPC Appendix P provides pre- and post-Project condition photos and visual simulations. Appendix P.A provides Federal Highway Administration (FHWA) Visual Impact Assessment Worksheets. Appendix P.B. includes correspondence with CEC to confirm key observation point (KOP) selections.
P.A FHWA Rating Forms;
P.B KOP Correspondence with CEC
28 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268168-1 | 1/6/2026 |
Appendix J Community Benefits Plan_VDPC Provides the Applicant’s plan and timeline to obtain agreements with Solano County community-based organizations to make significant investments over the next ten years with community-based initiatives and programs in the County, prior to Project certification, consistent with Public Resources Code section 25545.10. 4 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268168-2 | 1/6/2026 |
Appendix K DOD Informal Review Request_VDPC Department of Defense Military Aviation and Installation Assurance Siting Clearinghouse Informal Review Request Form. The form includes Project details and a map of the Project location.
8 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268168-3 | 1/6/2026 |
Appendix L Transportation Impact Study_VPC Analyzes traffic conditions related to the Project and surrounding transportation facilities.
29 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268168-4 | 1/6/2026 |
Appendix M FAA Notice Acknowledgement_VDPC Provides record of Federal Aviation Administration screening tool to confirm FAA notice requirements.
5 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268167-1 | 1/6/2026 |
Appendix G August 2025 Phase I ESA_VDPC Phase I Environmental Site Assessment (August 2025) including a discussion of potential environmental concerns based on site reconnaissance, historical land use review, regulatory database searches, and interviews. The assessment follows ASTM standards and supports compliance with federal requirements for property due diligence.
G.A Database Radius Report;
G.B Historical Research Documentation;
G.C Photograph Log;
G.D TRC Staff and Environmental Professional Qualifications/Resumes;
G.E Environmental Professional Statement
247 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268167-2 | 1/6/2026 |
Appendix I Noise Study_VDPC Includes a Noise Study which analyzes the potential noise impacts of the Project and evaluates the short and long term impacts of the Project to noise-sensitive receptors.
I.A Assumptions and Calculations;
I.B Ambient Noise Data;
I.C Construction Noise Modeling Data;
I.D Operational Noise Modeling Data;
I.E Manufacturer’s specifications
58 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268167-3 | 1/6/2026 |
Appendix H Geotechnical Report_VDPC The Geotechnical Report provides site-specific geotechnical data and recommendations for earthwork, foundation design, and pavement construction for the proposed Project.
H.A Guide Specifications For Earthwork;
H.B Field Investigation;
H.C Soils Test Data;
H.D Seismic Design Data 95 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268166-1 | 1/6/2026 |
Appendix B List of Preparers_VDPC Provides the names and titles of all application preparers for the Project organized by subject area.
5 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268166-2 | 1/6/2026 |
Appendix C Project Plan Set_VDPC Includes Project design, layout, site plans, elevations, component details and notes. 15 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268166-3 | 1/6/2026 |
Appendix D Hydrology and Stormwater Management Report_VDPC Hydrology and Stormwater Management Report addressing stormwater management design compliance with state and local water quality and discharge requirements and prevention of downstream flooding or erosion.
Appendix D.A Project Drawings;
Appendix D.B Stormwater Plans;
Appendix D.C Soil Data
132 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268164 | 1/6/2026 |
Chapter 5_Environmental Analysis_VDPC This section provides an introduction to the seventeen (17) individual environmental impact assessments required for the certification of the Project as well as Cumulative Project details. Introduction 6 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268163 | 1/16/2026 |
Section 5-17_Wildfire_VDPC This section discusses issues related to wildfire associated with the construction and operation of the Project. 26 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268162 | 1/16/2026 |
Section 5-16_Geological Hazards and Resources_VDPC This section describes the geological hazards and resources present in the vicinity of the Project Site, as well as the potential impacts that may result from construction and operation of the Project related to geological hazards and geological resources of commercial, recreational, or scientific value.
26 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268161 | 1/16/2026 |
Section 5-15_Paleontological Resources_VDPC This section describes the paleontological resources and geologic units present in the vicinity of the Project Site, as well as the potential impacts that may result from construction and operation of the Project related to the destruction of a unique paleontological resource or Site, or unique geologic feature. 10 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268160 | 1/16/2026 |
Section 5-14_Soils_VDPC This section describes the soil resources present in the vicinity of the Project Site, as well as the potential impacts that may result from construction and operation of the Project related to soils. 18 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268159 | 1/16/2026 |
Section 5-13_Water Resources_VDPC This section discusses the existing water resources near the Project, and potential impacts that the Project may have on these resources. 54 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268158 | 1/16/2026 |
Section 5-12_Biological Resources_VDPC This section describes biological resources in and near the Project, and the potential impacts that the Project may have on these resources. This section includes information from the Biological Resources Technical Study (BRTS) prepared for the Project by Rincon Consultants, Inc (Appendix Y). 58 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268157 | 1/16/2026 |
Section 5-11_Waste Management_VDPC This section discusses the potential effect on human health and the environment from existing site conditions as well as nonhazardous and hazardous waste generated during construction and operation at the Project. 18 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268156-1 | 1/16/2026 |
Section 5-10_Worker Safety_VDPC This section summarizes the worker health and safety issues that may be encountered during construction and operation of the Project. 24 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268156-2 | 1/16/2026 |
Section 5-9_Hazardous Materials_VDPC This section discusses the use and storage of hazardous materials associated with the construction and operation of the Project and the potential effects on human health and the environment. 28 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268155 | 1/16/2026 |
Section 5-8_Public Health_VDPC This section discusses activities that could potentially affect public health as they relate to the construction and operation of the Project. This section relies on information from the Air Quality and Greenhouse Gas Emissions Study prepared for the Project (Appendix R). The Air Quality and Greenhouse Gas Emissions Study includes a Health Risk Assessment (HRA), which assesses potential effects and public exposure associated with airborne emissions from the Project. The HRA was conducted following the guidelines established by the California Office of Environmental Health Hazard Assessment (OEHHA) and the California Air Resources Board (CARB). 14 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268154 | 1/16/2026 |
Section 5-7_Air Quality_VDPC The section presents the air quality impact assessment related to the Project. This section relies on information from the Air Quality and Greenhouse Gas Emissions Study prepared for the Project (Appendix R). 26 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268153 | 1/16/2026 |
Section 5-6_Socioeconomics_VDPC This section describes the effects of the Project on socioeconomic resources and is based on and directly incorporates information from the Socioeconomics Report prepared by ECONorthwest and available in Appendix Q. 38 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268152 | 1/16/2026 |
Section 5-5_Visual Resources_VDPC This section describes the visual resources present in the vicinity of the Project as well as the potential impacts to visual resources that may result from construction and operation of the Project. 30 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268151 | 1/16/2026 |
Section 5-4_Traffic and Transportation_VDPC This section discusses the potential effect on traffic and transportation from the Project. This section relies on information from the Transportation Impact Study prepared for the Project (Appendix L). 32 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268150 | 1/16/2026 |
Section 5-3_Noise_VDPC This section presents the noise impact assessment related to the Project. This section relies on information from the Noise Study prepared for the Project (Appendix I). 32 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268149-1 | 1/16/2026 |
Section 5-2_Land Use_VDPC This section describes the land uses present in the vicinity of the Project Site, as well as the potential impacts that may result from construction and operation of the Project related to land use. 32 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268149-2 | 1/16/2026 |
Section 5-1_Cultural Resources and Tribal Cultural Resources_VDPC This section describes cultural resources, inclusive of archaeological, built environment, and tribal cultural resources, in and near the Project, and the potential effects the Project may have on these resources. The details provided are based on the Project's Cultural Resources Technical Report prepared by Rincon Consultants, Inc. The Cultural Resources Technical Report is included as Confidential Appendix F. 40 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268148 | 1/16/2026 |
Chapter 6_Alternatives_VDPC This section discusses alternatives to the Project. These include the “no project” alternative, a technology alternative, as well as a discussion of the site selection criteria employed. This discussion focuses on alternatives that could feasibly accomplish the basic objectives of the Project and could avoid or substantially lessen one or more of the potential impacts. 20 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268147 | 1/16/2026 |
Chapter 4_Engineering_VDPC In accordance with CEC requirements, this chapter presents information related to the design, engineering, reliability and efficiency of the Project. 4 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268146 | 1/16/2026 |
Chapter 3_Facility Closure_VDPC This chapter discusses facility closure. Section 3.1 discusses temporary facility closure, and Section 3.2 discusses permanent facility closure. Section 3.2, Permanent Closure, describes the framework for decommissioning and reclamation for the Project. 2 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268145 | 1/6/2026 |
Chapter 2_Project Description_VDPC This chapter provides a project description and details of the Project. Project Description 32 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268144 | 1/6/2026 |
Chapter 1_Executive Summary_VDPC This chapter provides an executive summary of the Project and presents Project objectives, location, components, schedule, and ownership details as well as a list of Application preparers.
Executive Summary 6 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268143 | 1/6/2026 |
Cover, Title Pages and TOC_VDPC Title pages and Table of Contents for CEC Opt-In Application Introduction 14 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268142 | 1/6/2026 |
Cover Letter and CEC Opt-In Application Matrix_VDPC Cover letter to the CEC regarding the Opt-In Application for the Certification of the Project and matrix identifying location of CEC Appendix B requirements within the Opt-In Application (Chapters 1 through 6). Compliance, Introduction 28 page(s)
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| 268140 | 1/5/2026 |
Deanna Cole Comments - OPPOSED
Air Quality, Hazardous Materials, Noise and Vibration, Public Health, Traffic and Transportation, Soil and Water 1 page(s)
| | CEC Docket Unit | Deanna Cole |
| 268108 | 1/2/2026 |
Memo to open new docket
1 page(s)
| | CEC/Docket Unit | California Energy Commission |
| | |
Appendix A Property Owner Information (Confidential Appendix)_VDPC Contains property owner names and mailing addresses for all assessor parcel numbers (APNs) within 1,000 feet of the Project facilities and 500 feet of the Project’s generation intertie line.
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| | |
Appendix L of Appendix Y Biological Resources Technical Study_VDPC A map at a scale of 1:6,000 (under confidential cover) containing sensitive biological resource data from the California Natural Diversity Database (CNDDB).
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| | |
Appendix Q Socioeconomics Study_VDPC The study describes the Project and regional socioeconomic conditions, and analyzes potential direct, indirect, and cumulative socioeconomic impacts using qualitative and, where possible, quantitative methods.
Q.A List of Preparers;
Q.B References
| | CEC/Docket Unit | Rincon Consultants, Inc. |
| | |
Appendix E Interconnection Agreement and QC14 Phase 2 Study (Confidential Appendix)_VDPC Confidential Interconnection Agreement for the Project detailing the terms for interconnecting to PG&E’s transmission system. Outlines technical requirements, construction milestones, cost responsibilities, and operational protocols to ensure compliance with reliability standards and safe grid integration. 175 page(s)
| | CEC/Drew Bohen | Rincon Consultants, Inc. |