76442 | 12/14/2015 |
Final Response to Comments Part 6
166 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76431 | 12/4/2015 |
Declaration of Closure of the Rulemaking File Regarding the 2016 Title 24 Building Energy Efficiency Standards Rulemaking Proceeding
1 page(s)
| | CEC/Docket Unit | CEC/P. Fredieu |
76430 | 12/4/2015 |
Certificate of Compliance Regarding the 2016 Title 24 Building Energy Efficiency Standards Rulemaking Proceeding
1 page(s)
| | CEC/Docket Unit | CEC/P. Fredieu |
76429 | 12/4/2015 |
Statement of Mailing of the 2016 Title 24 Building Energy Efficiency Standards Rulemaking Proceeding
2 page(s)
| | CEC/Docket Unit | CEC/F. Fredieu |
76428 | 12/4/2015 |
Updated Revised Nine Point Criteria BEES Parts 1 and 6 v6
10 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
76427 | 12/4/2015 |
Revised Updated Informative Digest (Part 2 and 6) (v2)
3 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
76426 | 12/3/2015 |
Nine Point Criteria BEES Parts 1 and 6 v5
10 page(s)
| | CEC/Docket Unit | CEC |
76425 | 12/3/2015 |
Final Response to Comments Part 6
57 page(s)
| | CEC/Docket Unit | CEC |
76424 | 12/3/2015 |
Updated Informative Digest Part 1 and 6
3 page(s)
| | CEC/Docket Unit | CEC |
76422 | 12/3/2015 |
Final Statement of Reasons Part 1 and 6
58 page(s)
| | CEC/Docket Unit | CEC |
76416 | 12/2/2015 |
Transcript of Business Meeting Referencing Item #5 concerning the Building Energy Efficiency Standards
15 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
76414 | 12/2/2015 |
2016 Alternative Calculation Method Approval Manual for the 2016 Building Energy Efficiency Standards (Marked Version)
56 page(s)
| | CEC/Docket Unit | CEC/A. Smith |
76413 | 12/2/2015 |
2016 Reference Appendices for the 2016 Building Energy Efficiency Standards (Marked Version)
507 page(s)
| | CEC/Docket Unit | CEC/A. Smith |
76412 | 12/2/2015 |
2016 Building Energy Efficiency Standards for Residential and Nonresidential Buildings (Marked Version)
300 page(s)
| | CEC/Docket Unit | CEC/A. Smith |
76411 | 11/30/2015 |
Transcript of Business Meeting Referencing Hearing and Possible Adoption of Regulations
66 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
76408 | 11/30/2015 |
Comments re 2017-2020 Title 24 Will Probably Be Obsolete
2 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76407 | 11/30/2015 |
Comments re 15-day Language is Not Enough
3 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76406 | 11/30/2015 |
Comments re CEC is Hastening Illumigeddon and Hurting California Businesses
2 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76405 | 11/30/2015 |
Comments re Advanced Controls Are Not Ready Yet
2 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76404 | 11/25/2015 |
Comments on Title 24 Updates re Human Centric Lighting Will Increase Lighting Retrofits
2 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76392 | 11/19/2015 |
Resolution No. 15-1112-4 - Resolution Adopting Negative Declaration and Proposed Regulations
13 page(s)
| | CEC/Dockets Unit | CEC/T. Winter |
76384 | 11/18/2015 |
Notice of Determination and CEQA Filing Fee No Effect Determination
2 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
76344 | 11/12/2015 |
Comments on Support of Proposed 2016 Title 24 15-Day Language on Lighting Alterations
1 page(s)
| | CEC/Docket Unit | US Energy Solutions/K. Hall |
76343 | 11/12/2015 |
Comments on Title 24 2016 Proposed 15-Day Language on Lightintg Alterations Language
9 page(s)
| | CEC/Docket Unit | Rural Hard to Reach Local Government Partnerships’ Working Group/C. Kalashian |
76342 | 11/10/2015 |
Comments on Ecology Action on Lighting Alterations Language
1 page(s)
| | CEC/Docket Unit | Alameda Municipal Power/G. Steiger |
76341 | 11/10/2015 |
Comments on Adoption of the 2016 15-Day Language
1 page(s)
| | CEC/Docket Unit | SF Environment/D. Raphael |
76340 | 11/10/2015 |
Comments on Title 24 2016 15-Day Language for Lighting Alterations
2 page(s)
| | CEC/A. McAllister | Lutron Electronics Co., Inc./M. Jouaneh |
76339 | 11/10/2015 |
Comments on Adoption of Title 24 2016 15-Day Language
1 page(s)
| | CEC/Docket Unit | Advanced Energy Services/N. Schetselaar |
76338 | 11/10/2015 |
Comment on Support of Lighting Control Issue Improvements
1 page(s)
| | CEC/Docket Unit | California Business Properties Assocation & Various |
76337 | 11/10/2015 |
Comment on Support of Proposed 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Regency Lighting/K. Lane |
76336 | 11/10/2015 |
Comments on Adoption of 15-Day Language for the Title 24 2016 Lighting Alterations
1 page(s)
| | CEC/Docket Unit | Association of Monterey Bay Area Government (AMBAG)/J. Button |
76335 | 11/10/2015 |
Question on California Energy Commission's Rationale that Changes to 15-Day Language is Better
1 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76334 | 11/10/2015 |
Question on California Energy Commission Employees Keeping Their Jobs After Killing so Many Retrofit Jobs
1 page(s)
| | CEC/Docket Unit | S. Walerczyk |
76333 | 11/9/2015 |
Comments in Support of Proposed 2016 Title 24 15-Day Language on Lighting Alterations
1 page(s)
| | CEC/Docket Unit | Lumenature/M. Pursell |
76332 | 11/9/2015 |
Comments on Revised 15-Day Language on Lighting Alterations
3 page(s)
| | CEC/Docket Unit | California Investor Owned Utilities (IOUs) |
76330 | 11/9/2015 |
Comments on Support of Proposed 15-Day Language on Lighting Alterations
2 page(s)
| | CEC/Docket Unit | Northern California Comercial Association of Realtors (NCCAR)/D. Byron |
76329 | 11/9/2015 |
Support of Adoption of 15-Day Language on Lighting Alterations
1 page(s)
| | CEC/Docket Unit | Regency Lighting/N. Willhite |
76327 | 11/9/2015 |
Regency Lighting Email
1 page(s)
| | CEC/ Docket Unit | Regency Lighting |
76326 | 11/9/2015 |
Ecology Action Comments
10 page(s)
| | CEC/Docket Unit | Ecology Action |
76325 | 11/9/2015 |
Comments on Support of the Proposed 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Regency Lighting/D. McClosky |
76324 | 11/9/2015 |
Comments on Support of the Proposed 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Regency Lighting/M. Wells |
76323 | 11/9/2015 |
Comments on Support of the Proposed 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Regency Lighting/S. Clark |
76322 | 11/9/2015 |
Comments on Support of the Proposed 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Regency Lighting/J. Spedding |
76321 | 11/9/2015 |
Comments on Proposed Revisions to the 15-day Language - Revised 2016 Lighting Alterations Provisions
2 page(s)
| | CEC/A. McAllister | PHILIPS/D. Woodward, M.D. |
76320 | 11/9/2015 |
Comments on Title 24 2016 Proposed 15-Day Language
3 page(s)
| | CEC/Docket Unit | EcoCosm/J. Tiedemann |
76319 | 11/9/2015 |
Comments on Support for 2016 Title 24 15-Day Language
1 page(s)
| | CEC/Dockets Unit | All Industrial Electric Supply/R. Nicholson |
76315 | 11/6/2015 |
Staff Analysis of M. Niels Engineering Report Submitted with IBEW Lighting Alteration Comments
13 page(s)
| | CEC/Docket Unit | CEC/M. Shirakh |
76314 | 11/5/2015 |
Comments on Title 24
1 page(s)
| | CEC/Docket Unit | California Retrofit, Inc./R. Mitten |
76313 | 11/4/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | S. Vargas |
76312 | 11/4/2015 |
Comments Regarding Appendix 1-A, Referenced Standards
1 page(s)
| | CEC/Docket Unit | APP-TECH Inc./P. Splitt |
76311 | 11/3/2015 |
Comments on Adoption of 15-Day Language
5 page(s)
| | CEC/Dockets Unit | Controlled Energy/D. Link |
76310 | 11/4/2015 |
Comments On Title 24 Debate
13 page(s)
| | CEC/Dockets Unit | S. Walerczyk |
76307 | 11/2/2015 |
Comments on Title 24 Stakeholder Update - Action Requested
1 page(s)
| | M. Guzman-Aceves | Vista Universal, Inc./A. Swart |
76306 | 11/2/2015 |
Comments on Title 24 2016 - CEC Lighting Retrofit Code Revisions
1 page(s)
| | M. Guzman-Aceves, CEC/C. Cross and D. Parrow | Lighting Systems/L. Cooper |
76305 | 11/2/2015 |
Comments on Unintended Consequences of Current Energy Code
1 page(s)
| | CEC/C. Cross, O. Awolowo, K. McDonnell, D. Parrow, A. Brousseau, T. Chandler | California Comfort Systems USA/J. Pink |
76304 | 11/2/2015 |
Comments on Proposed 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | Lighting Systems/S. Gray |
76303 | 11/2/2015 |
Comments on Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | California Comfort Systems USA/J. Pink |
76302 | 11/2/2015 |
Comments on 2016 Title 24 and Urgent Call to Action
1 page(s)
| | M. Guzman-Aceves, CEC/C. Cross, O. Awolowo, K. McDonnell, D. Parrow, A. Brousseau and T. | S. Pelston |
76293 | 10/29/2015 |
Comments on Title 24 Lighting Requirements
2 page(s)
| | CEC/Dockets Unit | Financial Energy Management, Inc./J. Crossman |
76291 | 10/27/2015 |
Proposed 15-Day Language for Section 141.0(b)2, Nonresidential Lighting Alteration Provisions
8 page(s)
| | CEC/Dockets Unit | CEC/A. Ownby |
76289 | 10/27/2015 |
Notice of Hearing for Possible Adoption of 2016 Proposed Building Energy Efficiency Standards in Title 24, Part 6, Sections 141.0(b)2I, J, K, and L
4 page(s)
| | CEC/Dockets Unit | CEC/A. Ownby |
76285 | 10/26/2015 |
Second Comment on Support of Adopting the Proposed 2016 15-Day Language
2 page(s)
| | CEC/O. Awolowo, K. Douglas | Stan Walercyzk |
76283 | 10/23/2015 |
Comments on Support of Improvements Proposed to Title 24
3 page(s)
| | M. Guzman-Aceves, C. Cross, O. Awolowo, K. McDonnell, D. Parrow, A. Brousseau, etc. | Lime Energy/A. Procell |
76282 | 10/23/2015 |
Comments with LightPro Software, LLC on Title 24 Section 6 Adjustments
4 page(s)
| | M. Guzman-Aceves | PowerDown Lighting Systems, Inc./C. Bornheim |
76281 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | S. Lewis |
76280 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | S. Kleiman |
76279 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | M. Crockett |
76278 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | M. Kidder |
76277 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | I. Kleiman |
76276 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | A, Kleiman |
76275 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
3 page(s)
| | CEC/Docket Unit | Fluoresco Services/K. Christensen |
76274 | 10/23/2015 |
Comments on Support of Improvement of Title 24
3 page(s)
| | Governor Brown/CEC Commissioners | AVP, Engineering/Energy Solutions/J. Baty |
76273 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | ABM Electrical & Lighting Solutions, Inc./J. Zentgraf |
76272 | 10/23/2015 |
Comments on nconsistency of Proposed Lighting Alteration Language
2 page(s)
| | CEC/Docket Unit | Stoel Rives LLP/ J. Wellinghoff |
76271 | 10/23/2015 |
Comments on 2016 Title 24 lighting Modifications and Alterations Language
1 page(s)
| | Governor Brown, CEC/A. McAllister, R. Weisenmiller | Lighting Systems/T. Vaughn |
76270 | 10/23/2015 |
Comments on Support on Modifications of 2013 Title 24 Regulations
4 page(s)
| | CEC/A. McAllister | Controlled Energy/D. Link |
76269 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | Staples Energy Inc./S. Landrum |
76268 | 10/23/2015 |
Comments on Lost Jobs in Lighting Retrofit Industry
1 page(s)
| | CEC/A. McAllister | Stanford University/G. Hamilton |
76267 | 10/23/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | CEC/Docket Unit | Quest/T. Bankroff |
76266 | 10/23/2015 |
Comments on Support on Adopting the 2016 15-Day Language
3 page(s)
| | CEC/O. Awolowo, Governor Brown, M. Guzman-Aceves | EcologyAction |
76265 | 10/23/2015 |
Comments on Energy Reduction Goal Achievement
1 page(s)
| | CEC/C. Cross, O. Awolowo, K. McDonnell, D. Parrow, A. Brousseau, T. Chandler | Lighting Right, LLC/M. Williams |
76264 | 10/23/2015 |
Comments on Support of Adopting Changes to 2016 Title 24 Lighting Modifications
1 page(s)
| | CEC/K. Douglas | Illuminer/C. Dempsey |
76263 | 10/23/2015 |
Comments on Adoption of 15-Day Language for the 2016 Building Energy Efficiency Standards
1 page(s)
| | CEC/Dockets Unit | City/County Association of Governments of San Mateo County |
76259 | 10/23/2015 |
Comments on Support of Adopting the Proposed 2016 15-Day Language
2 page(s)
| | CEC/C. Cross, R. Weisenmiller | S. Walerczyk |
76258 | 10/22/2015 |
Comments on Support of Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | H & S Electric, Inc./D. Glasshoff |
76257 | 10/22/2015 |
Comments on Support of Adopting Proposed 2016 15-Day Language
3 page(s)
| | CEC/C. Cross, O. Awolowo, K. Mconnell, D. Parrow, A. Brousseau, T. Chandler/Governor Brown | Lighting Efficiency & Design/C. Fall |
76256 | 10/22/2015 |
Comments on Changes to the Title 24 Regulations
1 page(s)
| | CEC/C. Cross | R. Bofinger |
76255 | 10/22/2015 |
Comments on Support of Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | LiteArc Lighting/R. Villegas |
76254 | 10/22/2015 |
Comments on Support of Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | GFI Electrical and General Contractors/F. Gonzales |
76253 | 10/22/2015 |
Support on Changes to 2016 Title 24 Lighting Modifications
1 page(s)
| | CEC/D. Parrow | EcoCosm, Inc./J. Arens |
76251 | 10/22/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | T. Marshall Electrical |
76250 | 10/22/2015 |
Comments on Support for Lighting Retrofit Exemptions
1 page(s)
| | CEC/R. Weisenmiller | Silicon Valley Leadership Group/T. McRae |
76249 | 10/22/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | EcoCosm, Inc./J. Tiedemann, LEED AP |
76248 | 10/22/2015 |
Comments on Support of Changes to 2016 Title 24
1 page(s)
| | CEC/O. Awolowo | EcoCosm, Inc./J. Arens |
76247 | 10/22/2015 |
Comments on Support on Adopting Proposed 2016 15-Day Language
2 page(s)
| | Governor Brown, M. Guzman-Aceves | East Bay Energy Watch/B. Havenar-Daughton |
76246 | 10/22/2015 |
Comments on Hundreds of Jobs In The Lighting Retrofit Industry Are Being Lost, and Urge Adoption of Proposed 2016 15-Day Language
2 page(s)
| | CEC/D. Parrow | Frontier Illumination LLC/J. Mack |
76245 | 10/22/2015 |
letter regarding importance of 2016 Title 24 alterations vote proposal
2 page(s)
| | CEC/Docket Unit | Revolution Lighting Technologies, Inc. |
76244 | 10/22/2015 |
Comments on Concerns Big Labor is Strengthening Their Market Share and Needing Title 24 Code Changed for 2016
3 page(s)
| | CEC/D. Parrow | Enlgiht/M. Tracy |
76243 | 10/22/2015 |
Comments on Hundreds of Jobs In The Lighting Retrofit Industry Are Being Lost, and Urge Adoption of Proposed 2016 15-Day Language
4 page(s)
| | CEC/D. Parrow | Association of Monterey Bay Area Governments/E. Russell |
76242 | 10/22/2015 |
Comments Letter RE Permitfor Lighting Retrofit Title 24
2 page(s)
| | CEC/Docket Unit | EnLight |
76241 | 10/22/2015 |
Email to Commissoner Douglas re Lighting Retrofit Industry
1 page(s)
| | CEC/ Executive Office | John Mack |
76240 | 10/22/2015 |
Comments on California Energy Commission Acting on Changes to 2016 Title 24 Lighting Modifications
2 page(s)
| | CEC/M. Guzman-Aceves, CEC/C. Cross, O. Awolowo, K. McDonnell, D. Parrow, A. Brousseau, T. Chandler | ABI Services, Inc,/M. Spahn |
76239 | 10/22/2015 |
Letter in support of exemptions for lighting retrofits
1 page(s)
| | CEC/Docket Unit | Silicon Valley Leadership Group |
76237 | 10/22/2015 |
Comments On Hundreds of Skilled Jobs In The Lighting Retrofit Industry Are Being Lost
2 page(s)
| | Governor Brown/Office of the Governor/M. Guzman-Aceves | Revolution Lighting Technologies, Inc./T. Peterson |
76232 | 10/21/2015 |
Comments on Inconsistency of Proposed Lighting Alteration Language
2 page(s)
| | CEC/Dockets Unit | Stoel Rives LLP/J. Wellinghoff |
76216 | 10/16/2015 |
Comments on Adoption of 15 Day Language for 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/Dockets Unit | BeyondFire, LLC/K. Johnson |
76157 | 9/9/2015 |
Comments on Lighting Alterations Language
2 page(s)
| | CEC/ Docket Unit | Ecology Action |
76150 | 8/31/2015 |
Comments on Automatic Demand Response and Future
2 page(s)
| | CEC/Docket Unit | Stan Walercyzk |
76149 | 8/31/2015 |
Comments on Can The CEC Do Anything Right
3 page(s)
| | CEC/Docket Unit | Stan Walercyzk |
76132 | 8/19/2015 |
Comments on 2016 Residential Appendices to Part 6
2 page(s)
| | CEC/Docket Unit | Knauf Insulation/D. Ware |
76123 | 8/12/2015 |
My Strictest vs. Best Letter for 2016 Title 24 CEC Title 24
2 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
76122 | 8/10/2015 |
Comments on 15-Day Language to the 2016 Title 24 2016 Building Efficiency Standards
1 page(s)
| | CEC/Docket Unit | Dana Electric/T. McPeek |
76121 | 8/10/2015 |
Comments on Adoption of 15-Day Language
3 page(s)
| | CEC/A. McAllister | Eaton Lighting Solution |
76120 | 8/10/2015 |
IBEW, NECA & LMCC Comments on 15 Day Language - Lighting Control Exemption Proposals with Neils Exhibits E, F & G (Exhibits are Excel Spreadsheets)
72 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/T. Enslow |
76119 | 8/10/2015 |
Comments on T24 2016 15-Day Language for Lighting Alterations
4 page(s)
| | CEC/A. McAllister | Lutron Electronics Co., Inc./P. Hakkarainen, Ph.D. |
76117 | 8/10/2015 |
Comments on Proposed Lighting Retrofit Requirements
3 page(s)
| | CEC/Docket Unit | Los Angeles Department of Water & Power/D. Jacot |
76115 | 8/10/2015 |
RHA Reponse to Adoption of 15 Day Language
1 page(s)
| | CEC/Docket Unit | RHA |
76113 | 8/10/2015 |
San Francisco Department of the Environment Comments on Adoption of 15 Day Language
1 page(s)
| | CEC/Docket Unit | San Francisco Department of the Environment |
76112 | 8/10/2015 |
Comments Diminishing Returns
2 page(s)
| | CEC/Docket unit | Stan Walerczyk |
76111 | 8/10/2015 |
Comments Credibility and Venues
2 page(s)
| | CEC/ Docket Unit | Stan Walerczyk |
76110 | 8/10/2015 |
Comments Nonvisual Part of Lighting
2 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
76108 | 8/7/2015 |
Comments Supporting Adoption of Title 24 2016 15-Day Language
2 page(s)
| | CEC/Docket Unit | Stanford Unifersity Facilities Energy Management/L. Kramer |
76107 | 8/7/2015 |
Comments on Building Energy Efficiency Standard Rulemaking
2 page(s)
| | CEC/Docket Unit | Mammoth Sierra Electric/M. Kleinbard |
76103 | 8/6/2015 |
Comments on Adoption of 15-Day Language for 2016 Energy Efficiency Building Standards
6 page(s)
| | CEC/A. McAllister | Acuity Brands/C. English and T. Hernandez |
76102 | 8/6/2015 |
Comments on Adoption of 15-Day Language for 2016 Energy Efficiency Building Standards
2 page(s)
| | CEC/Docket Unit | Ecology Action/G. Thomas |
76101 | 8/4/2015 |
Comments on Adoption of 15-Day Language for 2016 Energy Efficiency Building Standards
2 page(s)
| | CEC/Docket Unit | Controlled Energy/D. Link |
76100 | 8/5/2015 |
Comments on Cost Analysis to Perform Acceptance Test on Occupancy Sensor
1 page(s)
| | CEC/Docket Unit | Zeller Electric Corp./L. Green |
76099 | 8/5/2015 |
Comments on Time Average for CA Acceptance Testing
1 page(s)
| | CEC/Docket Unit | ALBD Electric & Cable/J. Black |
76096 | 8/5/2015 |
Building Standards Listserv re 15-Day Notice for Additional Documents Relied Upon
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
76095 | 8/4/2015 |
Transcript of 06-10-15 Business Meeting, Highlighted Version
292 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
76091 | 8/4/2015 |
Comments on Adoption of 15-Day Language for 2016 BEES
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
76090 | 8/4/2015 |
Comments on Declared Cost of Acceptance Testing for Lighting Alterations
3 page(s)
| | CEC/Docket Unit | National Lighting Contractors Association of America/M. Scalzo |
76086 | 8/4/2015 |
Comments on Adoption of 15-Day Language for 2016
3 page(s)
| | CEC/Docket Unit | National Lighting Contractors Association of America (NLCAA)/J. Yapp |
76085 | 8/4/2015 |
Comments on Adoption of 15-Day Language for 2016
1 page(s)
| | CEC/Docket Unit | ABI Services, Inc.M. Spahn |
76084 | 8/4/2015 |
Comments on Adoption of 15-Day Language for 2016
1 page(s)
| | CEC/Docket Unit | Serrano Electric/D. Serrano |
76083 | 8/3/2015 |
Comments on Cost Analysis on Acceptance Test on an Occupancy Sensor
1 page(s)
| | CEC/Docket Unit | William's Electric, Inc./B. Bloomberg |
76074 | 7/28/2015 |
15 Day Notice for Additional Document Relied Upon
4 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76068 | 7/22/2015 |
Nonresidential Energy Impacts-Overall - Excel Spreadsheet
4 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
76047 | 7/15/2015 |
Transcript of 06-10-15 Business Meeting
292 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
76041 | 7/14/2015 |
Amended Electronic Notice of Initial Study
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
76040 | 7/13/2015 |
CEQA Filing Fee No Effect Determination
1 page(s)
| | CEC/Docket Unit | Department of Fish and Wildlife |
76035 | 7/13/2015 |
County Clerk Cover Letter
1 page(s)
| | CEC/Dockt Unit | CEC/ Peter Strait |
76034 | 7/13/2015 |
Electronic Notice of Initial Study
2 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76033 | 7/13/2015 |
Notice of Intent to Adopt a Negative Declaration
2 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76032 | 7/13/2015 |
Initial Study and Proposed Negative Declaration
1 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76031 | 7/13/2015 |
AT Commissioning Costs
1 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76030 | 7/13/2015 |
Vintage Lighting Savings
2 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76029 | 7/13/2015 |
Lighting Alteration Savings Analysis
5 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76028 | 7/13/2015 |
Electronic Notice of 15-Day Language
2 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76027 | 7/13/2015 |
Notice of Availability of 15 Day Language
5 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76026 | 7/13/2015 |
Revised Express Terms
8 page(s)
| | CEC/Docket Unit | CEC/ Peter Strait |
76024 | 7/9/2015 |
Comments on 2016 Standards Section 141.0(b)2.1.ii (Nonres Lighting Alterations)
1 page(s)
| | CEC/E. Geiszler and M. Shirakh | Gabel Associates, LLC/M. Gabel |
76023 | 7/8/2015 |
Comments on Existing Luminaries
1 page(s)
| | Mike Stone and Bob Raymer | Greg Mahoney |
76010 | 7/1/2015 |
Comparison of 2013 and Proposed 2016 Lighting System Alteration Requirements: Proposed Section 141.0, subdivision (b)2.I
14 page(s)
| | CEC/Docket Unit | CEC |
76001 | 6/25/2015 |
Buildings Standard List - Adoption Hearing Presentation for the 15-Day Language
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75980 | 6/15/2015 |
Resolution Adopting 2016 Standards Track Changes
22 page(s)
| | CEC/Docket Unit | CEC/S. Pittard |
75971 | 6/15/2015 |
Notice of Determination
1 page(s)
| | CEC/Docket Unit | CEC/D. Burgess |
75970 | 6/12/2015 |
Building Standards Listserve re Press Release on Approval of Building Energy Efficiency Standards
4 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75969 | 6/12/2015 |
Building Standards Listserv re Notification re Comments Available
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75963 | 6/12/2015 |
Listserv Notice re Resolution Adopting Negative Declaration & Proposed Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75962 | 6/12/2015 |
Revised Express Terms 15-Day Language Website Page
1 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75961 | 6/12/2015 |
Comments on 15-Day Language
5 page(s)
| | CEC/L. Simon | Behzad Eghtesady |
75959 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 150 0
6 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75957 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 141 0
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75956 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 100 1
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75955 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 10-103
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75952 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 130 0
4 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75951 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 130 1
7 page(s)
| | CEC/Docket unit | RNM Engineering, Inc. |
75950 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 130 2
3 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75949 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 130 4
2 page(s)
| | CEC/Docket unit | RNM Engineering, Inc. |
75948 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 130 5
6 page(s)
| | CEC/ Docket Unit | RNM Engineering, Inc. |
75947 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 140 6
11 page(s)
| | CEC/ Docket Unit | RNM Engineering, Inc.'s |
75946 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Section 140 7
3 page(s)
| | CEC/ Docket Unit | RNM Engineering, Inc. |
75945 | 6/9/2015 |
RNM Engineering, Inc.'s Comments to Sec 140 1
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75942 | 6/11/2015 |
Adoption Hearing Presentation
34 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75941 | 6/11/2015 |
Resolution Adopting Negative Declaration and Proposed Regulations - Order No. 15-0610-5
22 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75938 | 6/10/2015 |
Comments on Title 24 Adoption Hearing Testimony
1 page(s)
| | CEC/Docket Unit | Lutron Electronics Co., Inc./M. Jouaneh |
75937 | 6/10/2015 |
Comments on Lighting Division on Title 24 2016 Building Standards
3 page(s)
| | CEC/A. McAllister | NEMA/K. Pitsor |
75936 | 6/10/2015 |
Comments on Thermostats Section on Title 24 2016 Building Standards
4 page(s)
| | CEC/A. McAllister | NEMA |
75935 | 6/10/2015 |
Comments on Prohibiting Adhesive Tape
1 page(s)
| | CEC/Docket Unit | Dr. K. Nourmohammadi, PE, Ph.D. |
75934 | 6/10/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | City/County Association of Governments of San Mateo County/S. Wong |
75933 | 6/10/2015 |
Vintage Lighting Savings V3 - Chart
1 page(s)
| | CEC/Docket Unit | Vintage Lighting Savings |
75932 | 6/9/2015 |
Dustin Hamel of Advanced Energy Services, Inc. Comments on 15 Day Language
1 page(s)
| | CEC/Docket Unit | Dustin Hamel |
75931 | 6/9/2015 |
Comments on 15 Day Lanuguage
1 page(s)
| | CEC/Docket Unit | Pacific Northwest National Laboratory |
75930 | 6/9/2015 |
Comments on 15 Day Language
1 page(s)
| | CEC/Docket Unit | Troy Stokes |
75929 | 6/9/2015 |
Eaton Cooper Lighting Business Comments on 15 Day Language
5 page(s)
| | CEC/Docket Unit | Eaton Powering Business Worldwide |
75928 | 6/9/2015 |
Comments Regarding the Title 24 2016 Proposed Standard
3 page(s)
| | CEC/Docket Unit | Acuity Brands |
75927 | 6/9/2015 |
Comments Supporting Adoption of Title 24
1 page(s)
| | CEC/Docket Unit | Association of Monterey Bay Area Governments/E. Russell |
75926 | 6/9/2015 |
Comments on Proposed Lighting Retrofit Requirements
3 page(s)
| | CEC/Docket Unit | Los Angeles Department of Water & Power/D. Jacot |
75925 | 6/9/2015 |
Comments on Request for Another Edit Before Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Jay Martin |
75924 | 6/9/2015 |
Comments on Proposed Changes to Part 6 of Title 24
1 page(s)
| | CEC/Docket Unit | Advanced Energy Services, Inc./N. chetselaar |
75923 | 6/9/2015 |
Comments re References to NFRC 203-2014 Measurement and Ratings
3 page(s)
| | CEC/Docket Unit | Solatube International/N. Digert, Ph.D. |
75922 | 6/9/2015 |
Comments on Supporting Adoption of Title 24 15-Day Language
1 page(s)
| | CEC/Docket Unit | Lumenature/M. Pursell |
75921 | 6/9/2015 |
Comments on Title 24 15-Day Language
3 page(s)
| | CEC/Docket Unit | American Lighting Association/E. Jacobson |
75919 | 6/9/2015 |
Comments on 15-Day Language on CALGreen
2 page(s)
| | CEC/Docket Unit | Department of Housing and Communty Development/E. Withers |
75918 | 6/9/2015 |
Comments on Proposed Revisions to the California Building Energy Efficiency Standards
4 page(s)
| | CEC/Docket Unit | Taylor Engineering |
75917 | 6/9/2015 |
Comments on Title 24 15 Day Language
3 page(s)
| | CEC/Docket Unit | MaxLite |
75916 | 6/9/2015 |
Comments to the 15-Day Language for the 2016 Energy Efficiency Standards
4 page(s)
| | CEC/Docket Unit | LUTRON Electronics Co., Inc. |
75914 | 6/9/2015 |
Vintage Lighting Retrofit Savings
1 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75913 | 6/9/2015 |
Comments regarding Proposed Codes and Standards Enhancement Initiative
50 page(s)
| | CEC/Docket Unit | ONCE |
75911 | 6/8/2015 |
Listserv email Notice
1 page(s)
| | Listserv | CEC |
75910 | 6/9/2015 |
Comments on Adoption of 15 Day Language
2 page(s)
| | CEC/Docket Unit | Hinkley Lighting |
75907 | 6/9/2015 |
Comments on 2016 15-Day Draft Building Energy Efficiency Standards
3 page(s)
| | CEC/M. Shirakh | Sierra Club California/E. Moreno |
75906 | 6/9/2015 |
Comments on Request to Adopt 15-Day Language as Published
2 page(s)
| | CEC/Docket Unit | Controlled Energy/D. Link |
75904 | 6/9/2015 |
Comments on Adoption of 15-Day Language for 2016 Title 24
3 page(s)
| | CEC/M. Shirakh | Metal Building Manufacturers Association/W. Shoemaker, Ph.D. |
75903 | 6/9/2015 |
Comments on Proposed Revisions to Title 24 15-Day Language
9 page(s)
| | CEC/A. McAllister | Philips/K. Cook |
75902 | 6/9/2015 |
Recommended Changes to Proposed 2016 2016 California Building Energy Efficiency Code
2 page(s)
| | CEC/Docket Unit | Airex Manufacturing Inc./ Howard Ahern |
75901 | 6/9/2015 |
Report Impact and Advantages of Removable Insulation Protective Covers
9 page(s)
| | CEC/Docket Unit | Dr. Saum K. Nourmohammadi |
75899 | 6/8/2015 |
NECA IBEW Comment on 15 Day Language - Lighting Control Exemption Proposals
19 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo |
75897 | 6/8/2015 |
Comments on Request Board Reconsider Changes to Title 24
4 page(s)
| | CEC/Docket Unit | Progress Lighting/D. Peek |
75896 | 6/8/2015 |
Comments on Adoption of 15-Day Language
2 page(s)
| | CEC/Docket Unit | Gary & Carolyn Fox |
75895 | 6/8/2015 |
Comments on 15-Day Language
1 page(s)
| | CEC/A. McAllister | Cree, Inc./G. Merritt |
75894 | 6/8/2015 |
Comments on 2016 15-Day Draft Building Energy Efficiency Standards
2 page(s)
| | CEC/M. Shirakh | Town of Atherton/r. DeGolia |
75892 | 6/8/2015 |
Building Standards-List: Comments - 15-Day Language - 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75889 | 6/5/2015 |
Comments on New Compliance Path for Lighting Alterations and Modifications
1 page(s)
| | CEC/Docket Unit | Mike Stone |
75888 | 6/8/2015 |
Comments on Proposed Codes and Standards Enhancement Initiative
6 page(s)
| | CEC/Docket Unit | Once Innovations/J. Hoffmann |
75887 | 6/8/2015 |
Comments on Support of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Stanford University/L. Kramer |
75886 | 6/8/2015 |
Comments on Opposition to New Compliance Path for Lighting Alterations and Modications
2 page(s)
| | CEC/Docket Unit | Michael Doherty |
75885 | 6/8/2015 |
Comments on Support of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Friel Energy Solutions Inc./C. Friel |
75884 | 6/8/2015 |
Comments in Favor of Retrofit
2 page(s)
| | CEC/Docket Unit | NLCAA/J. Yapp |
75883 | 6/5/2015 |
Comments on Adoption of 15-Day Language for the 2016 Energy Efficiency Building Standards
2 page(s)
| | CEC/Docket Unit | Community Energy Services/M. Bond |
75882 | 6/5/2015 |
Comments on 2016 Title 24 15-Day Language
2 page(s)
| | CEC/A. McAllister | Schneider Electric U.S.A./W. Stoppelmoor, Jr. |
75878 | 6/5/2015 |
Comments on Building Standards 15 Day Language
1 page(s)
| | CEC/Docket Unit | NAIMA |
75875 | 6/4/2015 |
Comments on 15-Day Language and ASHRAE 62.2 for All Dwelling Unit
3 page(s)
| | CEC/Docket Unit | Newport Ventures/M. Moore |
75872 | 6/4/2015 |
Comments regarding Adoption of 15 Day Language
1 page(s)
| | CEC/Docket Unit | Steel Framing Alliance |
75870 | 6/3/2015 |
Comments on Photovoltaic Compliance Credit Tradeoff
2 page(s)
| | CEC/R. Weisenmiller, K. Douglas, D. Hochschild, A. McAllister and J. Scott | Extruded Polystyrene Foam Association/J. Ferraro |
75869 | 6/3/2015 |
Support of Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Enlight/M. Tracy |
75868 | 6/3/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Building Valley Energy Solutions/B. Walburg |
75867 | 6/3/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | American Lighting/N. Miller |
75866 | 6/3/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | ABI Services, Inc./M. Spahn |
75835 | 6/2/2015 |
Robert Shearer Comments on an Incorrect Change to Building Energy Efficiency Standards Section 130.1 (d) 2. D. iv
3 page(s)
| | CEC/Docket Unit | Robert A. Shearer, BSEE |
75828 | 6/1/2015 |
Comments on Proposed Residential Appendices
3 page(s)
| | CEC/Docket Unit | Navien, Inc. |
75826 | 6/1/2015 |
Comments on CBECC - Title 24
2 page(s)
| | CEC/Docket Unit | Greg Davis |
75825 | 6/1/2015 |
Comments on Adoption of 15-Day Language
1 page(s)
| | CEC/Docket Unit | Eaton Corporation |
75824 | 6/1/2015 |
Comments on PV Compliance Tradeoff
3 page(s)
| | CEC/Docket Unit | American Chemistry Council |
75815 | 5/29/2015 |
Comments on 15 Day Language
4 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75814 | 5/29/2015 |
Comments on the PV Compliance Credit
1 page(s)
| | CEC/A. McAllister | PIMA |
75813 | 5/29/2015 |
Comments on Daylit Zone Area Controls
1 page(s)
| | CEC/Docket Unit | Robert Shearer BSEE |
75810 | 5/28/2015 |
BuildingStandards-List: Revised Notice of Availability and Opportunity for Comment on the 15-Day Language and Additional Documents Relied Upon
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75804 | 5/28/2015 |
Notice of Availability of 15 Day Language
6 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75801 | 5/26/2015 |
Comments on 2016 and 2013 Title 24
7 page(s)
| | CEC/Docket Unit | Ecology Action/G. Thomas |
75800 | 5/26/2015 |
Comments on Support of Removal of Section 130.1(a)2.C.
1 page(s)
| | CEC/Docket Unit | Robert A. Shearer, BSEE |
75799 | 5/26/2015 |
Comments on Possible Equipment Damage and Liability Created By Code Language in Sections 130.4(1) and 140.6(a) and in the Nonresidential Appendices to Part 6, Section NA7.7.6
9 page(s)
| | CEC/Docket Unit | Robert A. Shearer, BSEE |
75798 | 5/26/2015 |
Staff Supplement for Water heaters Proposals
4 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75797 | 5/26/2015 |
Staff Supplement for Residential Walls Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75796 | 5/26/2015 |
Staff Supplement for Residential Lighting Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75795 | 5/26/2015 |
Staff Supplement for Residential Fault Indicator Display Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75794 | 5/26/2015 |
Staff Supplement for Residential Attics and Ducts Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75793 | 5/26/2015 |
Staff Supplement for Nonresidential Skylight Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75792 | 5/26/2015 |
Staff Supplement for Nonresidential Partial On Sensors Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75791 | 5/26/2015 |
Staff Supplement for Nonresidential Outdoor Lighting Power
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75790 | 5/26/2015 |
Staff Supplement for Nonresidential Outdoor Lighting Controls
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75789 | 5/26/2015 |
Staff Supplement for Nonresidential HVAC Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75788 | 5/26/2015 |
Staff Supplement for Nonresidential HVAC Efficiency Proposals
1 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75787 | 5/26/2015 |
Staff Supplement for Misc ASHRAE Alignment Proposals
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75786 | 5/26/2015 |
Staff Supplement for Nonresidential Lighting Power Proposals
1 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75784 | 5/26/2015 |
BUILDINGSTANDARDS-LIST: Notice of Hearing for Possible Adoption of 2016 Proposed Building Energy Efficiency Standards and Negative Declaration Based on the Initial Study; Availability and Opportunity for Comment on the 15-Day Language
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75783 | 5/22/2015 |
Lighting Retrofit ROI Data - Gene Thomas - Ecology Action (Excel Spreadsheet)
1 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75782 | 5/22/2015 |
PG&E Territory - Next Generation Construction: Advanced Residential Water Heating Webinar
35 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75781 | 5/22/2015 |
U.S. Department of Energy - Building Technologies Program - Assessing the Energy Savings of Tankless Water Heater Retrofits in Public Housing
92 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75780 | 5/22/2015 |
ENERGY STAR Program Requirements Product Specification for Residential Refrigerators and Freezers, Eligibility Criteria, Version 5.0
10 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75779 | 5/22/2015 |
ENERGY STAR Program Requirements Product Specification for Residential Dishwashers, Eligibility Criteria, Version 6.0
11 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75774 | 5/22/2015 |
Yanda Zhang - 2016 Lighting Retrofit Analysis
1 page(s)
| | CEC/Docket Unit | CEC/ A. Ownsby |
75773 | 5/26/2015 |
Yanda Zhang - 2016 Nonresidentail Lighting Retrofit Impact Analysis Methodology
2 page(s)
| | CEC/Docket Unit | CEC/ A. Ownsby |
75771 | 5/19/2015 |
Comments on Consideration of a Photovoltaic Compliance Credit
3 page(s)
| | CEC/A. McAllister | NAIMA/C. Rich |
75769 | 5/15/2015 |
Comments on Appendix JA8-2
1 page(s)
| | CEC/J. Walter | Aaron Brusatori |
75768 | 5/15/2015 |
BUILDINGSTANDARDS-LIST: Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75767 | 5/15/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
1 page(s)
| | CEC/Docket Unit | NLCAA/J. Yapp |
75762 | 5/14/2015 |
Comments on Proposed Amendments
2 page(s)
| | CEC/Docket Unit | Guillen Electric Company/J. Guillen |
75761 | 5/14/2015 |
National Electrical Contractors Association (“NECA”) and the California International Brotherhood of Electrical Workers ("IBEW") Comments on Revised Proposed Lighting Control Exemptions
5 page(s)
| | CEC/Docket Unit and M. Shirakh | Adams Broadwell Joseph & Cardozo |
75753 | 5/12/2015 |
BUILDINGSTANDARDS-LIST: Additional Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75726 | 5/8/2015 |
Comment on Quick Favor - Help Strengthen NECA's Lighting Control Market Share
3 page(s)
| | CEC/Docket Unit | Taft Electric Company/B. Jeppesen |
75725 | 5/8/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
1 page(s)
| | CEC/R. Weisenmiller | National Electrical Contractors Association/P. Brown |
75724 | 5/8/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | The Joint Electrical Industry Fund/N. Struthers |
75723 | 5/8/2015 |
NECA Comment Letter RE Proposed Amendments
3 page(s)
| | CEC/Docket Unit | NECA |
75715 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | San Francisco Electrical Construction Industry/J. Koppel |
75714 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
3 page(s)
| | CEC/Docket Unit | International Brotherhood of Electrical Workers Local No. 441/R. Samaniego |
75713 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
3 page(s)
| | CEC/Docket Unit | California State Association of Electrical Workers/r. Samaniego |
75712 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | Mann Electric/D. Mann |
75711 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit, A. McAllister, M. Shirakh | JO Electric/J. Ortega |
75710 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | Albright Electric, Inc./S. Shuck |
75709 | 5/7/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | HMT Electric - Brian Hudak |
75703 | 5/6/2015 |
Stakeholder Impacts and Comments Regarding Title 24 2013 (Excel Spreadsheet)
1 page(s)
| | CEC/Docket Unit | Gene Thomas |
75701 | 5/5/2015 |
Buildingstandards Listserv - Additional Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75700 | 5/5/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
2 page(s)
| | CEC/Docket Unit | Morrow-Meadows Corporation/C. Earley |
75699 | 5/4/2015 |
Comment on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
3 page(s)
| | CEC/Docket Unit | National Electrical Contractors Association (NECA)/F. McDermott |
75682 | 5/4/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
2 page(s)
| | CEC/Docket Unit | Contra Costa Electric, Inc./R. Robertson |
75681 | 5/1/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
2 page(s)
| | CEC/Docket Unit | Morrow-Meadows Corporation/R. Meadows |
75680 | 5/1/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
2 page(s)
| | CEC/Docket Unit | Morrow-Meadows Corporation/R. Jarvis |
75679 | 5/1/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.O-E
2 page(s)
| | CEC/Docket Unit | Morrow-Meadows Corporation/J. Goetz |
75677 | 5/1/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
1 page(s)
| | CEC/Docket Unit | Weber Electric Company, Inc./. Vogl |
75674 | 5/1/2015 |
Comments on Proposed Amendments of Section 141.0b-2 and Table 141.0-E
2 page(s)
| | CEC/Docket UNit | InterMountain Electric Company |
75672 | 4/30/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
3 page(s)
| | CEC/Docket Unit | Pacific Ridge Electric/C. Doyle |
75671 | 4/30/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | Stockman's Water & Energy/K. Story |
75670 | 4/30/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | Christopher Smith |
75666 | 4/29/2015 |
Comments on Proposed Amendments of Section 141.0(b)(2) and Table 141.0-E
2 page(s)
| | CEC/Docket Unit | Walton Electric Corporation/T. Gray |
75655 | 4/27/2015 |
Comments on Proposed Revisions to the California Building Energy Efficiency Standards, Title 24, Part 6 and Appendices; 45-Day Language
2 page(s)
| | CEC/Andrew McAllister | ProAutomated/J. Webb |
75654 | 4/24/2015 |
PG&E Comments on 15 Day Proposed Changes to Nonresidential Lighting Retrofit Requirements in 2016 Title 24 Standards
19 page(s)
| | CEC/Docket Unit | Pacific Gas & Electric |
75653 | 4/23/2015 |
Regulation Approval Request Response Regarding 2015 Triennial Rulemaking Cycle Modifications to CCR, Title 24, Part 1 and Part 6 by the California Energy Commission
1 page(s)
| | CEC/P. Bozorgchami | Cal Fire/A. Henning |
75650 | 4/23/2015 |
Web Ex Recording for March 3, 2015 Hearing
1 page(s)
| | CEC/Docket Unit | CEC/C. Hong |
75649 | 4/23/2015 |
Web Ex Recording for March 2, 2015 Hearing
1 page(s)
| | CEC/Docket Unit | CEC/C. Hong |
75647 | 4/23/2015 |
National Electrical Contractors Association & International Brotherhood of Electrical Workers Comment on Lighting Control Exemption Proposals and Exhibit A - Energy Impact of Proposed Lighting Control Exceptions (Excel Spreadsheet)
7 page(s)
| | CEC/Docket Unit and Mazi Shirakh | Adams Broadwell Joseph & Cardozo/T. Enslow |
75637 | 4/20/2015 |
Comments on Suggestion to Allow Timed Shutoff of Parking Garage Lighting
2 page(s)
| | CEC/Docket Unit | Willdan Energy Solutions/J. Martin |
75632 | 4/16/2015 |
S. Walerczyk's Tenth Comments regarding 2016 and Existing Title 24
3 page(s)
| | CEC/ Docket Unit | S. Walerczyk |
75631 | 4/16/2015 |
Email from NSF J. Evans RE NSF P374 vs. ASTM C-518
1 page(s)
| | CEC/ P. Bozorgchami | NSF International/ J. Evans |
75630 | 4/16/2015 |
Email to J. Peters
2 page(s)
| | J. Peters | CEC/ P. Strait |
75629 | 4/15/2015 |
Comments on Draft 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/Docket Unit | City of Arcata/M. Winkler |
75625 | 4/14/2015 |
Building Standards Listserv - Transcripts for the March 2 and 3, 2015 Lead Commissioner Hearing for 45-Day Language 2016 Building Energy Efficiency Standards Revisions
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75622 | 4/14/2015 |
2016 Standards Workshop Transcript, March 3, 2015. Edited and Highlited.
232 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75621 | 4/13/2015 |
9th Comments Regarding 2016 and Existing Title 24
3 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75615 | 4/10/2015 |
2016 Standards Workshop Transcript, March 2, 2015. Highlited.
255 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75606 | 4/10/2015 |
2016 Standards Workshop Transcript - Lead Commissioner Hearing, March 2, 2015. OFFICIAL VERSION
255 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75603 | 4/9/2015 |
2016 Standards Workshop Transcript - Lead Commissioner Hearing, March 3, 2015. OFFICIAL VERSION.
232 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75602 | 4/9/2015 |
8th Comments for Title 24 Lighting Retrofits
2 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75600 | 3/30/2015 |
MaxLite Comments on Title 24
3 page(s)
| | CEC/Docket Unit | MaxLite |
75599 | 4/9/2015 |
Martin Energetics Comments on Title 24 2016 Proposed Regulations
11 page(s)
| | CEC/ Docket Unit | Martin Energetics/ Bill Martin |
75598 | 4/9/2015 |
NEMA Lightig Industry Letter of Concern to CEC Commissioner McAllister
4 page(s)
| | CEC/ A. McAllister | NEMA |
75597 | 3/30/2015 |
APSP Comments on Title 24
2 page(s)
| | CEC/Docket Unit | APSP |
75596 | 4/8/2015 |
7th Comments re Cost Effective Idea for Existing and 2016 Title 24
1 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75595 | 4/8/2015 |
6th Comments re Proposed 2016 Code, Version 16.x and 6.x
6 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75594 | 4/7/2015 |
Codes and Standards White Paper - Report - New Home Cost v. Price Study - April 2015
38 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75593 | 4/7/2015 |
Comments on T-24 Extends Life for Gas by the Death of Geothermal Heat Pumps
13 page(s)
| | CEC/Docket Unit | Bill Martin |
75591 | 4/7/2015 |
Listserv Notice
2 page(s)
| | CEC/Docket Unit | CEC/ T. Winter |
75582 | 4/6/2015 |
Comments re: 2013 Energy Standards
1 page(s)
| | CEC/Docket Unit | Athans Enterprises, Inc./G. Athens |
75580 | 4/6/2015 |
Standards Workshop Transcript. Morning of March 2, 2015, afternoon of March 3, 2015
219 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75578 | 4/6/2015 |
BUILDINGSTANDARDS-LIST: Additional Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75574 | 4/3/2015 |
Corrected Comments on Version 9 for Title 24
1 page(s)
| | CEC/Docket Unit | Alamo Lighting/R. Olsevit |
75568 | 4/1/2015 |
Request to Clarify Wording from Title 24 2013-Part 6-Sect 110.9bD
1 page(s)
| | CEC/Docket Unit | Lighting & Watercon Supply/G. Smith |
75567 | 4/1/2015 |
Additional Comments on Title 24 2016 45-Day Proposed Standard
4 page(s)
| | CEC/A. McAllister | Acuity Brands/C. English and T. Hernandez |
75566 | 3/30/2015 |
Comments on 2016 Building Standards Update
1 page(s)
| | CEC/Docket Unit | San Francisco Department of the Environment/D. Raphael |
75562 | 4/1/2015 |
International Brotherhood of Electrical Workers and National Electrical Contractors Assoc. Comments on 45 day Title 24 Part 1 Admin Regulations
16 page(s)
| | CEC/Docket Unit | Adams Broadwell Joseph & Cardozo/T. Enslow |
75561 | 4/1/2015 |
Response to NEMA - Excel Spreadsheet
1 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75560 | 4/1/2015 |
Comments Regarding Title 24 Revisions
8 page(s)
| | CEC/Docket Unit | The Local Government Sustainable Energy Coalition/J. London |
75559 | 3/30/2015 |
Comments to Title 24, Part 6 and Appendices, 45-Day Language
2 page(s)
| | CEC/A. McAllister | Juno Lighting Group/L. Carmody |
75558 | 3/30/2015 |
Ecology Action Comments on 45-Day Language
5 page(s)
| | CEC/Docket Unit | Ecology Action |
75557 | 3/30/2015 |
NRDC Comments on the February 2015 45-Day Language
33 page(s)
| | CEC/Docket Unit | NRDC |
75556 | 3/30/2015 |
SCE Comments on Nonresidential Lighting Retrofit Requirements
11 page(s)
| | CEC/Docket Unit | Southern California Edison |
75554 | 3/30/2015 |
Comments on 2016 Building Standards Update
3 page(s)
| | CEC/Docket Unit | Goodman/N. Walker |
75552 | 3/30/2015 |
The Engineering Enterprise's Comments on the 2016 Title 24 Proposed Code
3 page(s)
| | CEC/Docket Unit | The Engineering Enterprise |
75547 | 3/30/2015 |
Proposed Revisions to 2016 NA7.6.1 Automatic Daylighting Controls Acceptance Testing
3 page(s)
| | CE/Docket Unit | RNM Engineering |
75546 | 3/30/2015 |
Comments on 45 Day Language - Electrical
1 page(s)
| | CEC/Docket Unit | Taylor Engineering/J. Stein |
75545 | 3/30/2015 |
Comments on 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/A. McAllister | Silver Creek/R. McIntosh |
75544 | 3/30/2015 |
Comments on Proposed Building Standard Changes.
3 page(s)
| | CEC/Docket Unit | Bradford White Water Heaters/E. Truskoski |
75543 | 3/30/2015 |
Proposed Revision to NA7.6.3 - Area Weighted Calculation for Demand Response Testing.
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75542 | 3/30/2015 |
Comments on Area Weighted Calculations for DR Testing
3 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75541 | 3/30/2015 |
Comments on Resolution of Conflict in Lighting Power Density for Egress Lighting as Used in Sec 130.1
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75540 | 3/30/2015 |
Request Definition of Lighting Power As Used in Sec 130.1
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75539 | 3/30/2015 |
Comments on 45-Day Language
5 page(s)
| | CEC/Docket Unit | Taylor Engineering/J. Stein |
75538 | 3/27/2015 |
Comments on Recommended Additions to Reference Appendices Section JA4
1 page(s)
| | CEC/Docket Unit | Gabel Associates, Inc./r. Howley |
75537 | 3/26/2015 |
Comments on Section 150.2(b)1 45-Day Language 2016 Analysis V11 Roof - Excel Spreadsheet
1 page(s)
| | CEC/Docket Unit | Lowe Southwest Distribution/C. Snowder |
75536 | 3/26/2015 |
Comments on Section 150.2(b)1Hlg Roof Deck Insulation 45-Day Language
1 page(s)
| | CEC/M. Shirakh | Lowe Southwest Distribution/C. Snowder |
75535 | 2/27/2015 |
Multiple Comments Regarding 45-Day Response
7 page(s)
| | CEC/M. Shirakh | Lowe Southwest Distribution/C. Snowder |
75532 | 3/27/2015 |
Comments on the CEC's Proposed Regulations to Tile 24, Part 1, Chapter 10 and Part 6
6 page(s)
| | CEC/Docket Unit | Building Standards Commission |
75531 | 3/27/2015 |
Comments on Proposed Amendments to Part 1, Chapter 10 and Part 11
1 page(s)
| | CEC/Docket Unit | Building Standards Commission |
75530 | 3/27/2015 |
Proposed Revisions to 2016 Joint Appendices Color Temperature for Residential LEDs
1 page(s)
| | CEC/Docket Unit | Auerbach-Glasow-French/P. Glasow |
75529 | 3/27/2015 |
Comments on 45-Day Language Version of Section 150.1(c)8
3 page(s)
| | CEC/Docket Unit | Air-Conditioning, Heating & Refrigeration Institute/F. Stanonik |
75522 | 3/27/2015 |
Listserv Notice
2 page(s)
| | CEC/Docket Unit | CEC |
75521 | 3/27/2015 |
Statewide Utility CASE Team Responses to Additional Stakeholder Comment Letters on the Proposed Title 24 Standards for Residential Lighting
13 page(s)
| | CEC/Docket Unit | CEC/M. McGaraghan |
75519 | 3/26/2015 |
Notice of Postponement of Hearing for Consideration and Possible Adoption - Revisions to the California Building Energy Efficiency Standards California Code of Regulations, Title 24, Part 1, Chapter 10, and Part 6 (California Energy Code)
1 page(s)
| | CEC/Dockdt Unit | CEC/A. Ownby |
75518 | 3/26/2015 |
Additional Commnts in Support of Version 9
1 page(s)
| | CEC/Docket Unit | Building Value Energy Solutions/B. Walburg |
75517 | 3/26/2015 |
Comments on Submetering and Thermostats Sections on Title 24 2016 Building Standards
4 page(s)
| | CEC/A. McAllister | National Electrical Manufacturers Association/K. Pitsor |
75516 | 3/26/2015 |
Clarification Questions for Proposed Revisions to California Title 24, Part 6, Subchapter 3
3 page(s)
| | CEC/M. Shirakh | GE Appliances & Lighting/Y. Williams |
75515 | 3/26/2015 |
Codes and Standards Enhancement Initiative (CASE) Residential Instantaneous Water Heaters
101 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75514 | 3/26/2015 |
NRDC's Comments on the Nonresidential Lighting Alterations Revisions Proposed in the February 2015 45-Day Language for the 2016
3 page(s)
| | CEC/Docket Unit | NRDC |
75512 | 3/25/2015 |
Comments on Area Controls for Daylit Zones
15 page(s)
| | CEC/Docket Unit | Robert A. Shearer, BSEE |
75511 | 3/25/2015 |
Comments on Possible Unsafe Conditions Per 130.1(c)6 and 130.1(c)7
4 page(s)
| | CEC/Docket Unit | Robert A. Shearer, BSEE |
75510 | 3/25/2015 |
Comments on 2016 Update Title 24, Parts 1 and 6
5 page(s)
| | CEC/Docket Unit | California Building Industry Association/R. Raymer |
75509 | 3/25/2015 |
Comments on 45-Day Language of Title 24, Part 6
3 page(s)
| | CEC/A. Ownby | Emerging Technologies Associates, Inc./D. DeJean |
75508 | 3/24/2015 |
Comments on Proposed Revisions to Title 24
1 page(s)
| | CEC/Docket Unit | Jade Sky Technologies/R. Liao |
75504 | 3/23/2015 |
NLCAA Jack Yapp Comments RE Proposed Clarification and Additions to Section 130.1a
2 page(s)
| | CEC/ Docket Unit | NLCAA/ j. yAPP |
75503 | 3/20/2015 |
Comments on Title 24
3 page(s)
| | CEC/Docket Unit | KW Engineering |
75501 | 3/20/2015 |
CPBA's Comments on Nonresidential Building Energy Efficiency Standards California Code of Regulations Title 24, Part 6
26 page(s)
| | CEC/Docket Unit | Consol/I. Robles |
75498 | 3/20/2015 |
Comments on Lighting Alterations
14 page(s)
| | CEC/Docket uNIT | PG&E |
75497 | 3/20/2015 |
Comments on Residential LED Color Temperature
1 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75496 | 3/20/2015 |
Comments on NA7 6 3 Demand Response Testing
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75495 | 3/20/2015 |
Comments on Section 130.1e Demand Responsive Controls
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc. |
75493 | 3/19/2015 |
Comments in Response to the Proposed Changes to Nonresidential Lighting Alteration Requirements in Section 141.0
14 page(s)
| | CEC/Docket Unit | PG&E |
75491 | 3/19/2015 |
Comments on 2016 Building Energy Efficiency Standards
3 page(s)
| | CEC/Docket Unit | American Institute of Architects/L. Derivi |
75490 | 3/19/2015 |
GANA AEC Comment on Title 24 Spandrel Insulation
3 page(s)
| | CEC/Docket Unit | Birch Point Consulting/T. Culp, Ph.D. |
75489 | 3/19/2015 |
Building Standards Listserv - Additional Comments Part 1 and 6
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75488 | 3/19/2015 |
Serious Concerns Related to IES Position
7 page(s)
| | CEC/A. McAllister | University of California, Davis, Department of Design |
75487 | 3/19/2015 |
Comments on Harmonization of Commissioning and Acceptance Testing
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75486 | 3/19/2015 |
Comments on Proposed Revisions to 2016 Title 24, Part 6 Suggestion to Modify NA7.6
3 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R. Miller |
75485 | 3/19/2015 |
Comments on 2016 Title 24, Part 6, Section 130.4
2 page(s)
| | CEC/Docket Unit | RNM Engineering, Inc./R, Nukker |
75484 | 3/19/2015 |
Comments on IBEW-NECA Labor Management Cooperation Committee.
4 page(s)
| | CEC/Docket Unit | National Lighting Contractors Association of America/J. Yapp |
75483 | 3/19/2015 |
Comments re Draft 2016 Building Energy Efficiency Standards - Flex Duct Restrictions
2 page(s)
| | CEC/A. McAllister | North American Insulation Manufacturers Association (NAIMA)/C. Cottrell |
75482 | 3/19/2015 |
Comments Regarding the Proposed Voluntary California Quality LED Lamp Specification
7 page(s)
| | CEC/Docket Unit | AccurIC Ltd./D. Bannister |
75481 | 3/19/2015 |
Comment re 2016 Building Standards Update
2 page(s)
| | CEC/Docket Unit | university of Essex/A. Wilkins |
75480 | 3/19/2015 |
Comment re Draft 2016 Building Energy Efficiency Standards
1 page(s)
| | CEC/A. McAllister | California Building Industry Association/R. Raymer |
75479 | 3/19/2015 |
Comments re Draft 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/A. McAllister | Thermaflex/M. Harris |
75478 | 3/19/2015 |
Comments re Draft 2016 Building Energy Efficiency Standards
1 page(s)
| | CEC/A. McAllister | Pac West Properties, LLC/D. Lloyd |
75477 | 3/19/2015 |
Comments re Draft 2016 Building Energy Efficiency Standard
1 page(s)
| | CEC/A. McAllister | Atco Rubber Products, Inc./C. Kirkland |
75476 | 3/19/2015 |
Comments re Draft Residential Building Energy Efficiency Standards - Title 24
2 page(s)
| | CEC/A. McAllister | American Lighting Association/E. Jacobson |
75475 | 3/13/2015 |
Revised Attachment to Fully Executed Economic Impact Statement
5 page(s)
| | CEC/Dockets Unit | CEC/A. Ownby |
75474 | 3/19/2015 |
Comments regarding 2016 Update
3 page(s)
| | CEC/Docket Unit | Solar Rating & Certification Corporation |
75473 | 3/19/2015 |
Email RE HPA and WHFan Issue
1 page(s)
| | CEC/Docket Unit | QC Manufacturing, Inc/ Andy Lora |
75472 | 3/19/2015 |
Comments regarding 2016 Building Standards
1 page(s)
| | CEC/Docket Unit | Opterra Energy Services |
75470 | 3/18/2015 |
Building Standards List - Notice of Proposed Action
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75469 | 3/18/2015 |
Building Standards List - Notice of Intent to Adopt Negative Declaration
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75468 | 3/18/2015 |
Building Standards List - Public Comment Period Open
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75467 | 3/18/2015 |
Building Standards List - Presentations for March 2-3 Hearing
1 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75466 | 3/18/2015 |
Building Standards List - Notice re Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
1 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75465 | 3/18/2015 |
Building Standards List - Lead Commissioner Hearing to Discuss 45 Day Language
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75464 | 3/18/2015 |
Building Standards List - Express Terms of 2016 Standards Revision Now Available
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75463 | 3/18/2015 |
Building Standards List - Staff Intended Changes to Address Concerns with 45 Day Language
1 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75462 | 3/18/2015 |
Efficiency List - Experss Terms of 2016 Standards Revision Now Available
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75461 | 3/18/2015 |
Efficiency List - Notices of Proposed Action - Rulemaking on 2016 Building energy Efficiency Standards
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75447 | 3/18/2015 |
Building Standards Listserve Comments on Proposed Title 24, Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75446 | 3/18/2015 |
Building Standards Listserve Additional Comments on Proposed Title 24 Part 1 (Standards) and 6 (California Energy Code) Regulations
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
75445 | 3/13/2015 |
Fully Executed Economic and Fiscal Impact Statement Form 399 - 2016 Standards
5 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
75443 | 3/18/2015 |
Comments on Proposed Revisions to 2016 Joint Appendices Colro Temperature for Residential LEDs
2 page(s)
| | CEC/Docket Unit | Randall Whitehead Lighting Solutions/R. Whitehead |
75442 | 3/18/2015 |
Comments on Support of Version 0
1 page(s)
| | CEC/Docket Unit | Controlled Energy/D. Link |
75441 | 3/17/2015 |
Comments on 2016 Building Standards Update
2 page(s)
| | CEC/Docket Unit | Richard Heath & Associates, Inc./Dr. J. O'Bannon |
75439 | 3/17/2015 |
Comments on title 24 Lighting
1 page(s)
| | CEC/Docket Unit | Stanford University/G. Hamilton |
75438 | 3/17/2015 |
Support for Proposted Title 24 Changes
1 page(s)
| | CEC/Docket Unit | Sierra Business Council/J. osser |
75434 | 3/17/2015 |
Comments on NOPA, Proposed Revisions to the California Building Energy Efficiency Standards
2 page(s)
| | CEC/Docket Unit | California Municipal Utilities Association/T. Andreoni |
75433 | 3/17/2015 |
Comment on 2016 Building Energy Efficiency Standards
10 page(s)
| | CEC/Docket Unit | The Lighting Quotient/D. Pfund |
75432 | 3/17/2015 |
Notice of Proposed Action on Proposed Revisions to Title 24, Part 1, Chapter 10, Part 6
1 page(s)
| | CEC/Docket Unit | Southern California Public Power Authority (SCPPA)/T. DeRivi |
75431 | 3/17/2015 |
Comments on 2016 Title 24 45-Day Language
3 page(s)
| | CEC/Docket Unit | North American Insulation Manufacturers Association (NAIMA)/C. Cottrell |
75430 | 3/17/2015 |
Comment on Stairwell Lighting Control Requirements
4 page(s)
| | CEC/Docket Unit | National Lighting Contractors Association of America/J. Yapp |
75429 | 3/17/2015 |
Comments on Title 24, 2016 Building Standards Update
15 page(s)
| | CEC/A. McAllister | National Electrical Manufacturers Association (NEMA)/K. Pitsor |
75428 | 3/17/2015 |
Comments on Title 24, 2016 45-Day Proposed Revisions
14 page(s)
| | CEC/A. McAllister | Acuirty Brands/C. English and T. Hernandez |
75427 | 3/17/2015 |
Comment on Small Duct High Velocity Product Class in Title 24
15 page(s)
| | CEC/Docket Unit | Unico Inc./S. Intagliata and C. Messmer |
75426 | 3/17/2015 |
Comment on the 45-Day Language of Title 24, Part 6
4 page(s)
| | CEC/A. Ownby | Kingport Corp./L. Stevens |
75425 | 3/17/2015 |
Comments to 2016 Building Energy Efficiency Standards, Section 141.0
3 page(s)
| | CEC/Docket Unit | Los Angeles Department of Water & Power/D. Jacot |
75424 | 3/17/2015 |
Comments on Title 24, 2016 45-Day Language
7 page(s)
| | CEC/A. McAllister | Lutron Electronics Co., Inc./M. Jouaneh |
75419 | 3/17/2015 |
Comments re Support of Version 9 of the Proposed Language for Indoor Lighting Alterations
2 page(s)
| | CEC/Docket Unit | Ameresco/K. Marks |
75418 | 3/17/2015 |
Comments on Title 24 45-Day Language
9 page(s)
| | CEC/A. McAllister | Philips/K. Cook |
75417 | 3/17/2015 |
Comments Regarding Support of Version 9 of the Proposed Language for Indoor Lighting Alterations
2 page(s)
| | CEC/Docket Unit | Damion Remsberg |
75416 | 3/17/2015 |
Fifth Comments Regarding Support of Version 9 of the Proposed Language for Indoor Lighting Alterations
7 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
75415 | 3/17/2015 |
Comments Regarding Support of Version 9 of the Proposed Language for Indoor Lighting Alterations
2 page(s)
| | CEC/Docket Unit | Ameresco, Inc./J. Kozelka |
75414 | 3/16/2015 |
Comments on 45 Day Language of California's 2016 Building Energy Efficiency Standards
2 page(s)
| | CEC/Docket Unit | ABM Electrical & Lighting Solutions, Inc./J. Murnin |
75413 | 3/16/2015 |
Declaration Statement
2 page(s)
| | CEC/Docket Unit | Gary R. Flamm Consulting |
75412 | 3/16/2015 |
Support of Version 9
1 page(s)
| | CEC/Docket Unit | Quick Light Recycling/P. Woodard |
75411 | 3/16/2015 |
Further Comments Regarding Updated Proposed Changes to Title 24
2 page(s)
| | CEC/Docket Unit | Alamo Lighting/R. Ofsevit |
75410 | 3/13/2015 |
CEQA Filing Fee No Effect Determination
1 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75409 | 3/13/2015 |
California Department of Fish and Wildlife No Effect Determination for the 2016 Building Energy Efficiency Standards Update E-Mail
2 page(s)
| | CEC/Docket Unit/P. Brehler and T. Winter | CEC/P. Strait |
75408 | 3/13/2015 |
Comments on 2013 Title 24, Part 6
1 page(s)
| | CEC/Docket Unit | EnerPath Services, Inc./J. Baty |
75407 | 3/13/2015 |
Comments on Version 9, Title 24, 2016 45 Day Language
2 page(s)
| | CEC/Docket Unit | Ecology Action/G. Thomas |
75406 | 3/13/2015 |
Comments on Proposed Changes to Part 6, Section 1410
1 page(s)
| | CEC/Docket Unit | AERC Recycling Solutions/F. Alioto |
75405 | 3/13/2015 |
Comments in Support of Changes to Title 24
1 page(s)
| | CEC/Docket Unit | EnLight/M. Tracy |
75400 | 3/13/2015 |
Support of Possible Changes to Tiel 24 Energy Efficiency Code and Standards
2 page(s)
| | CEC/A. Ownby | American Lighting/D. Cohen |
75399 | 3/13/2015 |
Comments on Proposed Updates to Title 24
2 page(s)
| | CEC/Docket Unit | American Lighting/N. Miller |
75398 | 3/13/2015 |
Comments and Support on Changes to Version 9 Regarding Additions and Alterations of Interior and Exterior Lighting Fixtures
2 page(s)
| | CEC/Docket Unit | ABI Services, Inc./M. Spahn |
75397 | 3/12/2015 |
Comments on Sampling of Nonresidential Outdoor Lighting Controls
1 page(s)
| | CEC/Docket Unit | California Electrical Training, Inc./J. Yapp |
75396 | 3/12/2015 |
2016 Building Standards 45-Day Express Language Comments
3 page(s)
| | CEC/Docket Unit | Steel Framing Alliance/M. Nowak |
75395 | 3/11/2015 |
Comments on 2013 Title 24 ection 6 130.5
1 page(s)
| | CEC/Docket Unit | D. Felker |
75392 | 1/30/2015 |
Comments Regarding 2016 California Title 24 Building Energy Efficiency Standards, Draft
2 page(s)
| | CEC/Docket Unit | Kichler/J. Dross |
75381 | 3/4/2015 |
Comments on Proposed Changes to Title 24
1 page(s)
| | CEC/Docket Unit | Oracle/G. Denise |
75380 | 3/6/2015 |
CA State Labor Management Cooperation Committee - Thomas Enslow's proposed amendments to Title 24, Part 1, Section 10-103-A
20 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75379 | 3/6/2015 |
Joint Committee on Energy and Environmental Policy (JCEEP) Supplemental Comments on 2016 ATTCP Admin Regulations
11 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75378 | 3/6/2015 |
Joint Committee on Energy and Environmental Policy (JCEEP) Comments on the Proposed 2016 Title24, Part 1 ATTCP Regulations
6 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75377 | 3/6/2015 |
Joint Committee on Energy and Environmental Policy (JCEEP) Comments on 2016 Building Energy Efficiency Standards Pre-Rulemaking Proposals for HVAC Efficiency Requirements
5 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75376 | 3/9/2015 |
Comments on the Proposed 45-Day Language Express Terms
1 page(s)
| | CEC/A. Ownby | A. O. Smith Corporation/D. Bixby |
75325 | 3/6/2015 |
Leukos - The Journal of the Illuminating Engineering Society of North America - High Color Rendering Can Enable Better Vision without Requiring More Power article
13 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75324 | 3/6/2015 |
Comments on 45 Day Language
3 page(s)
| | CEC/Docket Unit | International Association of Plumbing and Mechanical Officials (IAPMO)/L. Nelson |
75323 | 3/5/2015 |
Email from Thomas Enslow re ATTCP Regulations
5 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
75281 | 3/4/2015 |
Comments Regarding Title 24 Proposed Changes
1 page(s)
| | CEC/Docket Unit | ABM Electrical Solutions/J. Zentgraf |
75280 | 3/4/2015 |
Comments Regarding 2016 Building Energy Efficiency Standards
4 page(s)
| | CEC/Docket Unit | California Department of General Services/J. Morgan |
75279 | 3/2/2015 |
Opening Comments on the Proposed 2016 Title 24, Part 6 45-Day Language
3 page(s)
| | CEC/Docket Unit | Ecology Action/G. Thomas |
75270 | 3/5/2015 |
Public Comment - McHugh Energy
7 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75269 | 3/5/2015 |
Public Comment - Benningfield Group
12 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75268 | 3/5/2015 |
D2-10 CEQA Compliance
1 page(s)
| | CEC/Docket Unit | CEC/P.Strait |
75267 | 3/5/2015 |
D2-9 Part 11 - CALGreen
14 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75266 | 3/5/2015 |
D2-8 Nonresidential Appendices
7 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75265 | 3/5/2015 |
D2-7 Part 6 Subchapter 6 - Lighting Language Preview
5 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75264 | 3/5/2015 |
D2-7 Part 6 Subchapter 6 - Lighting
5 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75263 | 3/5/2015 |
D2-6 Part 6 Subchapter 5 - Lighting
7 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75262 | 3/5/2015 |
D2-5 Part 6 Subchapter 5 - Envelope and Mechanical
6 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75261 | 3/5/2015 |
D2-4 Part 6 Subchapter 4
12 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75260 | 3/5/2015 |
D2-3 Part 6 Subchapter 3
11 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75259 | 3/5/2015 |
D2-2 Part 1 Section 10-103 ATTCP
6 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75258 | 3/5/2015 |
D2-1 Introduction
21 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75257 | 3/5/2015 |
D1-10 Residential Appendices
6 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75255 | 3/5/2015 |
D1-9 Joint Appendices 4, 5, 10
10 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75254 | 3/5/2015 |
D1-8 PV Compliance Credit
2 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75253 | 3/5/2015 |
D1-7 ACM Approval Manual
12 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75252 | 3/5/2015 |
D1-6 Part 6 Subchapter 7, 8, 9, JA8 - Lighting 2
5 page(s)
| | CEC/ Docket Unit | CEC/ P. Strait |
75251 | 3/5/2015 |
D1-6 Part 6 Subchapter 7, 8, 9, JA8 - Lighting 1
9 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75250 | 3/5/2015 |
D1-6 Part 6 Subchapter 7, 8, 9 - HVAC and Water Heating
9 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75248 | 3/5/2015 |
D1-5 Part 6 Subchapter 7, 8, 9 - Attics and Walls
28 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75247 | 3/5/2015 |
D1-4 Part 6 Subchapter 2
7 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75246 | 3/5/2015 |
D1-3 Part 6 Subchapter 1
1 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75245 | 3/5/2015 |
D1-2 Part 1 Section 10
4 page(s)
| | CEC/Docket Unit | CEC/ P. Strait |
75244 | 3/5/2015 |
D1-1 Introduction
21 page(s)
| | CEC/Docket Unit | CEC/ P/. Strait |
75243 | 3/4/2015 |
Comments on Title 24
1 page(s)
| | CEC/Docket Unit | American Lighting/E. Inderwick |
75242 | 3/3/2015 |
Concerns Regarding New 2013 Title 24 Standards
2 page(s)
| | CEC/A. Ownby | American Lighting/P. Roberts |
75241 | 3/3/2015 |
Support on Changes to Part 6, Section 141.0
1 page(s)
| | CEC/Docket Unit | Dana Electric/T. McPeek |
75240 | 3/3/2015 |
Codes and Standards Enhancement Initiative (CASE) - Statewide Utility CASE Team Responses to Stakeholder Comment Letters on the Proposed Title 24 Standards for Residential Lighting
31 page(s)
| | CEC/Docket Unit | Energy Solutions/M. McGaraghan and McHugh Energy/J. McHugh |
75239 | 3/2/2015 |
Support on Revision of Title 24, Part 6
2 page(s)
| | CEC/Docket Unit and A. Ownby | New Light Energy Design/B. Walburg |
75238 | 3/3/2015 |
Comments on 2016 Building Energy Efficiency Standards
4 page(s)
| | CEC/Docket Unit | California Department of General Services/D. Elliott |
75237 | 3/2/2015 |
Comment on Title 24 45-Day Language
5 page(s)
| | CEC/Docket Unit | California Business Properties Association/M. Hargrove |
75236 | 3/2/2015 |
Comment Regarding title 24 Building Energy Efficiency Standards
5 page(s)
| | CEC/Docket Unit | Gary R. Flamm Consulting |
75234 | 3/2/2015 |
Support for the Proposed Changes to Part 6, Section 141.0
1 page(s)
| | CEC/Docket Unit | Quick Light Recycling/P. Woodard |
75233 | 2/27/2015 |
CPI-SFC Comments on California Energy Code 45-Day Language
2 page(s)
| | CEC/A. McAllister | American Chemistry Council Center for the Polyurethanes Industry/J. Koscher |
75231 | 3/2/2015 |
Letter in Support of Part 6, Section 141.0
2 page(s)
| | CEC/Docket Unit | Controlled Energy/D. Link |
75230 | 2/27/2015 |
Building Standards List - Notice of Intent to Adopt a Negative Declaration; Availability of the Initial Study and Start of the Public Comment Period - E-mail List
2 page(s)
| | BuildingStandards@ListServer.Energy.ca.gov | Energy Commission |
75229 | 2/27/2015 |
Efficiency List - Notice of Intent to Adopt a Negative Declaration; Availability of the Initial Study and Start of the Public Comment Period - E-mail List
2 page(s)
| | Efficiency@ListServer.Energy.ca.gov | Energy Commission |
75228 | 2/27/2015 |
County Clerk Cover Letter to Request to Post Notice of Intent to Adopt a Negative Declaration
1 page(s)
| | County Clerk | CEC/P. Strait |
75227 | 2/27/2015 |
Notice of Intent to Adopt a Negative Declaration, Availability of the Initial Study and Start of the Public Comment Period - Proposed 2016 Revisions to the California Building Energy Efficiency Standards - California Code of Regulations Title 24, Parts 1, and 6
2 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
75226 | 2/27/2015 |
California Energy Commission Staff Report - Initial Study and Proposed Negative Declaration for the 2016 Building Energy Efficiency Standards for Residential and Nonresidential Buildings - February 2015
58 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74854 | 2/27/2015 |
Email to Docket 02-26-14 Letter From University of California, Davis, Department of Design re Serious Concerns Related to IES Position
8 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74850 | 2/27/2015 |
Comment on Title 24
1 page(s)
| | CEC/Docket Unit | Steve Robinson |
74849 | 2/27/2015 |
Comment on Title 24
1 page(s)
| | CEC/Docket Unit | Alamo Lighting/R. Ofsevit |
74848 | 2/26/2015 |
Comment on Title 24
1 page(s)
| | CEC/A. Ownby | Susan Vargas |
74847 | 2/26/2015 |
Comment on Title 24
1 page(s)
| | CEC/Docket Unit | Regency Lighting/J. Spedding |
74831 | 2/26/2015 |
Title 24 Impact
2 page(s)
| | CEC/Docket Unit | American Lighting/J. Yochum |
74830 | 2/26/2015 |
Jack Morehouse Comments on 2016 Energy Standards 45 Day Language
2 page(s)
| | CEC/Docket Unit | CEC/D. Wong |
74829 | 2/25/2015 |
Impact of the New Title 24 Standards
1 page(s)
| | CEC/Docket Unit | American Lighting/B. Wollrab |
74828 | 2/25/2015 |
National Lighting ContractorAssociation of America/Jack Yapp Regarding Registration of Certificates of Acceptance
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
74827 | 2/24/2015 |
Enlight/Matt Tracy Support of Title 24 Modifications for Lighting Retrofits
2 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
74690 | 2/25/2015 |
Cree Worldwide Letter of support for the new T24 language
1 page(s)
| | CEC/Docket Unit | Cree Worldwide |
74686 | 2/25/2015 |
Impact to Company Regarding Title 24
2 page(s)
| | CEC/Docket Unit | American Lighting/N. Miller |
74685 | 2/24/2015 |
Support of Proposed Changes in 45-Day Language for 2016 Title 24, Part 6
1 page(s)
| | CEC/Docket Unit | Royal Wholesale Electric/R. Viviano |
74684 | 2/24/2015 |
Support of Proposed Changes to Title 24
1 page(s)
| | CEC/Docket Unit | ABI Services, Inc./M. Spahn |
74683 | 2/24/2015 |
Support of Proposed Changes to 45-Day Language to 2016 Title 24, Part 6
1 page(s)
| | CEC/Docket Unit | Lumenature/M. Pursell |
74678 | 2/24/2015 |
Comments of the Ambag Energy Watch Program
1 page(s)
| | CEC/Docket Unit | Association of Monterey Bay Area Governments |
74675 | 2/24/2015 |
Staff Intended Changes to Address Concerns with 45 Day Language
6 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74660 | 2/23/2015 |
4th Comments Regarding 2013 Title 24
2 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
74627 | 2/20/2015 |
Codes and Standards Enhancement Initiative (CASE) Residential Instantaneous Water Heaters (updated version)
101 page(s)
| | CEC/Docket Unit | CEC/A. Ownby |
74626 | 2/20/2015 |
Third Comments on Title 24
2 page(s)
| | CEC/Docket Unit | Stan Walerczyk |
74625 | 2/20/2015 |
Recommended Improvements for 2016 California Title 24 Building Codes
4 page(s)
| | CEC/S. Lee | Lawrence Berkeley National Laboratory/E. Sung, R. Ghatikar, M. Piette & N. Bourassa |
74564 | 2/19/2015 |
Second Comment on 2016 Title 24
2 page(s)
| | CECDocket Unit | Principal of Lighting Wizards/S. Walerczyk |
74563 | 2/19/2015 |
Comment on 2016 Title 24
2 page(s)
| | CEC/Docket Unit | Principal of Lighting Wizards/S. Walercyzk |
74503 | 2/10/2015 |
2016 T24 CASE Report - HPA - DCS
146 page(s)
| | CEC/ Docket Unit | CEC/ Adrian Ownsby |
74502 | 2/10/2015 |
2016 T24 CASE Report - High Perfornace Walls
70 page(s)
| | CEC/Docket Unit | CEC/ Adrian Ownsby |
74487 | 2/10/2015 |
Signed Economic and Fiscal Impact Statement Form 399 - 2016 Standards
5 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74474 | 2/5/2015 |
Alternate Calculation Method Approval Manual Appendix to Part 6 - 45 Day Language
66 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74473 | 2/5/2015 |
2016 Nonresidential Appendices to Part 6 - 45 Day Language
89 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74472 | 2/5/2015 |
2016 Residential Appendices to Part 6 - 45 Day Language
136 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74470 | 2/5/2015 |
2016 Joint Appendices to Part 6 - 45 Day Language
276 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74469 | 2/5/2015 |
2016 Standards Parts 1 and 6 - 45 Day Language
287 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74442 | 2/2/2015 |
Face Sheet 2016 Standards Parts 1 and 6 - Stamped by Building Standars Commission
1 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74433 | 1/30/2015 |
TDV Final Report - 2016 Standards
73 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74432 | 1/30/2015 |
Economic and Fiscal Impact Statement Form 399 - Spreadsheet Calculations - 2016 Standards
1 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74431 | 1/30/2015 |
Economic and Fiscal Impact Statement Form 399 - Attachment - 2016 Standards
5 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74430 | 1/30/2015 |
Economic and Fiscal Impact Statement Form 399- 2016 Standards
5 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74429 | 1/30/2015 |
ISOR 2016 Standards
83 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74428 | 1/30/2015 |
NOPA 2016 Standards
18 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74427 | 1/30/2015 |
Face Sheet OAL Form 400 2016 Standards Part 1 and 6
2 page(s)
| | CEC/Dockets Unit | CEC/P. Strait |
74426 | 1/30/2015 |
Face Sheet BSC 2016 Standards Part 1 and 6
2 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74391 | 1/27/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential Instantaneous Water Heaters, Addendum to CASE Report submitted on September 19, 2014 (January 2015)
26 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74382 | 1/26/2015 |
Standard Form 399 For Building Energy Efficiency Standards Rulemaking Proceeding for Title 24, Parts 1 and 6
11 page(s)
| | California Natural Resources Agency | CEC/R. Oglesby |
74381 | 1/26/2015 |
Notice Publication/Regulations Submission - 2016 Building Energy Efficiency Standards, Title 24, Part 1, Chapter 10, Part 6
2 page(s)
| | CEC/Docket Unit | CEC/T. Winter |
74369 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Lighting Controls: Clarification and Control Credits, October 2014
66 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74368 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Final Report - Minimum Skylight Area, December 2014
85 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74367 | 1/22/2015 |
Residential IWH-LCC Spreadsheet - Appendix E of CASE Report
30 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74366 | 1/22/2015 |
U.S. Department of Energy, Impacts of Water Quality on Residential Water Heating Equipment, November 2013
46 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74365 | 1/22/2015 |
Memorandum Regarding Multifamily Analysis for Residential Envelope CASE Proposals
12 page(s)
| | CEC/Adrian Ownby | TRC |
74364 | 1/22/2015 |
FYI: Voice of SD Title 24 Lighting Story
4 page(s)
| | CEC/Christine Collopy, Dave Ashuckian, Eurlyne Geiszler, Maziar Shirakh, Peter Strait and Simon Lee | CEC/A. Beck |
74363 | 1/22/2015 |
Battelle The Business of Innovations' Final Report Study on Benefits of Removal of Water Hardness (Calcium and Magnesium IONS) From a Water Supply
251 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74362 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Thermally Driven Cooling, October 2014
70 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74361 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential Lighting, October 2014
100 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74360 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential Instantaneous Water Heaters, September 2014
92 page(s)
| | CECDocket Unit | CEC/P. Strait |
74359 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential HVAC Verification and Diagnostics, August 2014
51 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74358 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Proposals Based on ASHRAE 90.1-2013, September 2014
94 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74357 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Lighting Controls: Partial-ON Occupancy Sensors, September 2014
49 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74356 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Outdoor Lighting Power Allowance, December 2014
163 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74355 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Outdoor Lighting Controls, September 2014
54 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74354 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Opaque Envelope, December 2014
79 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74353 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Lighting: Indoor LPDs, October 2014
87 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74352 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Nonresidential Economizer Modifications, August 2014
56 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74351 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential Ducts in Conditioned Space / High Performance Attics, October 3, 2014
146 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74350 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - Residential High Performance Walls and QII, September 2014
82 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74349 | 1/22/2015 |
Codes and Standards Enhancement Initiative (CASE) - HVAC Equipment Efficiency Based on ASHRAE 90.1-2013 - September 2014
61 page(s)
| | CEC/Docket Unit | CEC/P. Strait |
74345 | 1/21/2015 |
Water Heater Manufacturer Websites
1 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74344 | 1/21/2015 |
US Craftmaster Gas Water Heater With the Flame Guard Safety System Installation Instructions and Use & Care Guide Natural Gas Models Only - 12/05
29 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74343 | 1/21/2015 |
State Water Heaters Installation Instructions and Use & Care Guide Residential Gas Water Heaters
36 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74342 | 1/21/2015 |
Rheem - Use & Care Manual With Installation Instructions for the Installer - Residential Gas - Low NOx Emissions Water Heaters - 03/07
24 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74341 | 1/21/2015 |
Lochinvar - Installation Instructions and Use & Care Guide Residential Gas Water Heaters
40 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74340 | 1/21/2015 |
GSW - Installation and Operating Instructions - Atmospheric Vented Water Heater - 12-06
32 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74339 | 1/21/2015 |
Bradford White - Damper Equipped Gas Water Heater Installation & Operation Instruction Manual for Flammable Vapor Ignition Resistant System Equipped Water Heater - June 2012
36 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74338 | 1/21/2015 |
AO Smith - Ultra Low Nox Gas Water Heater with the FVIR Safety System Installation Instructions and Use & Care Guide - June 2012
36 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74337 | 1/21/2015 |
American - Installation, Operation, and Service Manual Residential Storage Type Gas Water Heater - March 2000
33 page(s)
| | CEC Docket Unit | CEC/P. Strait |
74270 | 1/9/2015 |
Memo to Open Docket
1 page(s)
| | CEC/Docket Unit | CEC/ I. Neumann |