TN #Docketed DateDocument TitleExhibit #ToFrom
552422/5/2010 Comment from Berman Economics Regarding IEPR Update Workshop on Incremental Impacts of Energy Policy Initiatives

1 page(s)
 CEC/Docket UnitThe Berman Group/R. Berman
5395511/3/2009 Competitive Power Ventures Comments on the Emission Reduction Credits in the SCAQMD

4 page(s)
 CEC/ Docket UnitCompetitive Power Ventures Inc/ W. Mitchell
5367010/15/2009 EmeraChem Power Comment on September 24th Workshop

4 page(s)
 CEC/ J. Byron & J. BoydEmeraChem Power/ J. Valmus
5357410/7/2009 Competitive Power Ventures Comments on Emission Reduction Credits

4 page(s)
 CECCompetitive Power Ventures
5357310/7/2009 AES Southland Comments regarding Workshop Emission Reduction Cedits

8 page(s)
 CEC/ Docket UnitAES Southland/ E. Pendergraft
5357210/7/2009 Southern Califronia Edison Companies Commetns on Workshop Need for Emission Reduction Credits

10 page(s)
 CEC/ Docket UnitSCE
5357110/7/2009 GE Energy Committee Workshop Comments on the Potential need for Emission Reduction Credits in South Coast Air Quality District

1 page(s)
 CECGE Energy/ D. Alexander
5356010/1/2009 Comments H. Fraval of Combined Heat & Power Technical Guideline

2 page(s)
 CEC/ Docket UnitFBE California Inc/ H. Fraval
534259/25/2009 Powerpoint Presentation on Defining the Need for LA Basin & Dispatchable Resources

10 page(s)
 CEC/ Docket UnitSouthern California Edison/ M. Minick
534249/25/2009 Powerpoint Presentation on Potential Electricity Sector Needs for PM-10 ERCs in SCAQMD

20 page(s)
 CEC/ Docket UnitCEC/ D. Vidaver
534239/25/2009 Powerpoint Presentation on CEC ERC Workshop

10 page(s)
 CEC/ Docket UnitAnaheim Public Utilities/ S. Sciortino
534229/25/2009 Powerpoint Presentation on the Case for New Gas-Fired Plants in SCAQMD: Environmental Protection & Economic Stability

31 page(s)
 CEC/ Docket UnitLatham & Watkins LLP/ M. Carroll
534219/25/2009 ERC- Kostrzewa Power Point Presentation

7 page(s)
 CEC/ Docket UnitERC
534209/25/2009 Powerpoint Presentation on PM-10 Market Conditions & Offset Availability in SCAQMD

10 page(s)
 CEC/ Docket UnitSouth Coast Aor Quality Management District/ M. Nazemi
534199/25/2009 Powerpoint Presentation on SCAQMD Air Credits for Power Plants Assessing Los Angeles Basin Reliability given Environmental Constraints

33 page(s)
 CEC/ Docket UnitAspen Enviornmental Group/ R. McCann
534189/25/2009 Powerpoint Presentation on Power System Reliability Overview

26 page(s)
 CEC/ Docket UnitDepartment of Water and Power
534179/25/2009 Powerpoint Presentation on Dispatchable Capacity Needs in Southern California & the Los Angeles Basin

18 page(s)
 CEC/ Docket UnitCalifornia ISO/ C/ Micsa
534159/25/2009 Agenda for the Potential need for the Emission Reduction Credits in the South Coast Air Quality Management District

3 page(s)
 CEC/ Docket UnitCEC/ D. Parrow
531979/10/2009 Notice of Committee Workshop on the Potential Need for Emission Reduction Credits in the South Coast Air Quality Managment District

6 page(s)
 CEC/Docket UnitCEC/J. Byron/J. Boyd
529128/19/2009 NRG Comments RE Committee Workshop

9 page(s)
 CEC/ J. ByronNRG/ S. Hoffman
528588/13/2009 RRI Energy comments on July 28, 2009 Workshop on Once-Through Cooling (2009 IEPR - OTC)

11 page(s)
 CEC/ J. ByronRRI/ E. Leuze
528408/12/2009 Dynegy Comments on CEC Workshop RE Implication on Electric Reliability of Proposal for Mitigation of Once-Through Cooling of Existing Electric Generating Facilities

5 page(s)
 CEC/ Docket UnitDynegy/ R. Hickock
528398/11/2009 City & County of San Francisco Comment on Inter-Agency Analysis of Options for Eliminating Reliance on Once-Through Cooling Power Plants

3 page(s)
 CEC/ Docket UnitOffice of the City Attorney/ D. Herrera
528358/11/2009 BAMx Comments on the Inter-Agency Analysis of Generation & Transmission Options for Eliminating Reliance upon Once-Through Cooling Power Plants

3 page(s)
 CEC/ Docket UnitBAMx/ E. Chang
528348/11/2009 SCE Comments on July 28th Workshop RE The Inter-Agency Analysis of Generation & Transmission options for Eliminating Reliance upon Once-Through Cooling Power Plants

5 page(s)
 CEC/ Docket UnitSouthern California Edison/ M. Alvarez
528338/11/2009 SDGE Comments on the Draft Joint Agency Staff Paper

2 page(s)
 CEC/ Docket UnitSDGE/ Tamara Raskerry
528328/11/2009 PG&E's Comments on July 28th Workshop

5 page(s)
 CEC/ Docket UnitPG&E/ M. Krausse
528318/11/2009 Calpine Corporation Comments on the July 29th IEPR Workshop on the Replacement of OTC Units

4 page(s)
 CEC/ Docket UnitCalpine Corporation/ M. Barmack
528308/11/2009 Division of Ratepayer Advocates Comments on the Joint Energy Agency Proposal on Options for Eliminating Reliance Upon Once-Through Cooling Power Plants

7 page(s)
 CEC/ Docket UnitDivision of Ratepayer Advocates/ M. Tisadale
528298/11/2009 Comments of the NRDC on the Committee Workshop on Inter-Agency Analysis of Generation & Transmission Options for Eliminating Reliance Upon Once-Through Cooling Power Plants

3 page(s)
 CEC/ Docket UnitNatural Resources Defense Council/ N. Long
528268/11/2009 MIRANT's Comments following July 28, 2009 IEPR Workshop Addressing Inter-Agency Analysis of the Elimination of Once-Through Cooling

2 page(s)
 CEC/ Docket UnitMirant California/ S. Beaty
527228/5/2009 Power Engineering Comments on Photovoltaic Alternatives to Peaking Natural-Gas Fired Coastal Units

7 page(s)
 CEC/ Docket UnitPower Engineering/ B. Powers
526828/3/2009 Public Comments from Doris Morrissey RE Plan to Prohibit Using Ocean Water to Cool Coastal Power Generating Plants

1 page(s)
 CEC/ Docket UnitPublic/ D. Morrissey
526667/31/2009 Public Comment Letter Regarding Power Plant Cooling Systems

1 page(s)
 CEC/ Docket UnitMediaOffice
526658/3/2009 CPUC General Procurement Rules Presentation

11 page(s)
 CEC/ Docket UnitCPUC/ S. Baker
526648/3/2009 Agenda for Inter-Agency Analysis of Generation & Transmission Options

4 page(s)
 CEC/ Docket UnitCEC/ D. Parrow
526628/3/2009 Inter-Agency Analysis of Generation & Transmission Options for OTC Mitigation Presentation

24 page(s)
 CEC/ Docket UnitCEC/ M. Jaske
526187/30/2009 Public Comments from Eric Leuze

6 page(s)
 CEC/ J. ByronPublic/ E. Leuze
525777/27/2009 Draft Joint Agency Staff Paper on Implmentation of Once-Through Cooling Mitigation through Energy Infrastructure Planning & Procurement

28 page(s)
 CEC/ Docket UnitCalifornia ISO
524217/14/2009 Notice of Committee Workshop on Inter-Agency Analysis of Generation and Transmission Options for Eliminating Reliance upon Once-Through Cooling Power Plants

5 page(s)
 CEC/ Docket UnitCEC/ J. Byron & J. Boyd
517675/26/2009 PG&E Comments on IEPR Workshop Regarding 2009 IEPR - OTC & Appendices

375 page(s)
 CEC/ Docket UnitPG&E/ J. Denzler
517455/29/2009 AES Southland's Comments Submitted for the Workshop on Options for Maintaining Electric System Reliability

6 page(s)
 CEC/ Docket UnitAES Southland/ J. Gill
517185/27/2009 Written Workshop Comments of SCE on Electric System Reliability when Eliminating Once-Through Cooling Power Plants

8 page(s)
 CEC/ Docket UnitSouthern California Edison/ M. Alvarez
516945/27/2009 Comments from the Natural Resources Defense Council on the Options for Maintaining Electric System Reliability

4 page(s)
 CEC/ Docket UnitNRDC/ Noah Long
516905/26/2009 Mirant Comments on Once-Through Cooling Issues

5 page(s)
 CEC/ Docket UnitMirant California, LLC/ S. Beatty
516895/26/2009 Comments of the City & County of San Francisco on Maintaing Electric System Reliablity Power Plant Use of Once-Through Cooling

4 page(s)
 CEC/ Docket UnitOffice of City Attorney/ T. Muller
516865/26/2009 The Environmental Law and Justice Clinic at Golden Gate University School of Law submits Comments

4 page(s)
 CEC/ Docket UnitGolden Gate University/ L. Williams
516815/26/2009 Comments on CEC Workshop RE Implications on Electric Reliablity of Propsal for Mitigation of Once-Through Cooling of Existing Electric Generating Facilites

8 page(s)
 CEC/ Docket UnitDynegy/ R. Hickok
515325/12/2009 Powerpoint Presentation on Policy on the Use of Coastal & Estuarine Waters for Power Plant Cooling

12 page(s)
 CEC/ Docket UnitCalifornia Enviornmental Protection Agency/ J. Bishop
515215/18/2009 Resubmittal of Public Comments

2 page(s)
 CEC/ Docket UnitPublic/ F. Brandt
515065/11/2009 Power Point Presentation on OTC Workshop

9 page(s)
 CEC/ Docket UnitSCQAMD
515055/11/2009 Power Point Prsentation regarding IEPR OTC Workshop

7 page(s)
 CEC/ Docket UNitCalifornia ISO
515045/11/2009 California Public Utilities Commissions Power Point Presentation regarding Procurement Policies and OTC

13 page(s)
 CEC/ Docket UnitCalifornia Public Utilities Commission
514815/7/2009 Role and Performance of OTC Plants Presentation

33 page(s)
 CEC/ Docket UnitCEC/ L. Esternon-Green
514805/7/2009 Powerpoint Presentation on Assuring Reliability and OTC Mitigation

10 page(s)
 CEC/ Docket UnitCEC/ M. Jaske
514795/7/2009 Implications of Proposals for Mitigation of Once-through Cooling of Existing Electric Generating Facilities on Electric Reliability

5 page(s)
 CEC/ Docket UnitCEC/ L. Esternon-Green
514165/4/2009 Riverkeeper, Inc. Comments on the U.S. Nuclear Regulatory Commission's Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38, RE Indian Point Nuclear Generating Unit Nos. 2 and 3, Draft Report for Comment

48 page(s)
 Chief, Rulemaking, Directives and Editing BranchRiverkeeper/ V. M. Tafur
514155/4/2009 Comments on Once-Through Cooling Air Emision Credits & Electrical Generation

3 page(s)
 Assemblyman/ F. Fuentes & Assemblywoman/ N. SkinnerAlliance for Nuclear Responsiblity/ R. Becker
514135/4/2009 Maintaing Electric System Reliablility when Eliminating Once-Through Cooling Power Plants

1 page(s)
 CEC/ J. Byron & J. BoydAlliance for Nuclear Resposiblity/ R. Becker
513124/28/2009 Comments from Private Citizen F. Brandt

1 page(s)
 CEC/ Docket UnitPrivate Citizen F. Brandt
513004/27/2009 Notice of Committee Workshop on Options for Maintaining Electric System Reliability When Eliminating Once-Through Colling Power Plants

4 page(s)
 CEC/Docket UnitCEC/J. Byron/J. Boyd
506573/25/2009 Request for new Sub Docket

1 page(s)
 CEC/Docket UnitCEC/ Lynette Esternon Green
2493-010/14/2009 CommitteeWorkshop on the Potential need for Emission Reduction Credits in t

272 page(s)
   
2470-08/11/2009 July 28th Transcript on Committee Workshop on Inter-Agency Analysis of Gene

264 page(s)
   
2432-05/29/2009 Transcript of May 11th IEPR Workshop on Options for Maintaing Electric Syst

234 page(s)